HomeMy WebLinkAbout#19 - 15th St. N. Improvements STAFF REPORT
DATE: May 7, 2024
PUBLIC HEARING
AGENDA ITEM: Public Improvement Hearing; Approve Resolution Ordering the Improvement,
Accept Bids and Award a Contract for the 15th Street North Improvements
SUBMITTED BY: Jack Griffin, City Engineer
REVIEWED BY: Clark Schroeder, Interim City Administrator Clarissa Hadler, Finance Director Marty Powers, Public Works Director
Chad Isakson, Assistant City Engineer
ISSUE BEFORE COUNCIL: The City Council is respectfully requested to conduct a Public Improvement
Hearing for the 15th Street North Improvements. Following the hearing, should the City Council Order the
Improvements, Accept Bids and Award a Construction Contract for the project?
BACKGROUND: Pursuant to Minnesota Statutes, Section 429.011 to 429.111, a Public Improvement
Hearing was noticed for May 7, 2024, to consider making the improvements along 15th Street North, from
Inwood Avenue to the Lake Elmo-Oakdale City limits. The attached notice was published in the official
newspaper and individual notifications were sent to each address that will be wholly or partially assessed
for the improvements. A feasibility report was adopted by the City Council on March 19, 2024 in order to
ready these improvements for 2024 construction. The report identifies the necessary improvements, the
estimated project costs, the assessment methodology and preliminary assessment amounts to be levied
against benefitting properties.
The City Council also approved the Project plans and specifications on March 19, 2024 and authorized staff
to advertise the Project for bids. The Project was advertised on QuestCDN.com and in the Stillwater Gazette
in accordance with the Minnesota Competitive Bidding requirements.
PROPOSAL DETAILS/ANALYSIS: The improvements include pavement rehabilitation of
approximatley 2,594 feet (0.49 miles) of collector roadway, consisting of a Full Depth Reclamation (FDR).
The project area includes the segment of 15th Street North that connects Inwood Avenue (CSAH 13) to the
Lake Elmo-Oakdale City limits. The roadway segment is designated as a Municipal State Aid Street
(MSAS) which is eligible to receive MSA funds to pay for all or a portion of the improvements that are
state aid eligible. The FDR will include an 8‐inch recycled aggregate base with a new 4-inch bituminous
surface, and will provide a 10-ton roadway pavement section. The pavement surface width will be reduced
from 40 feet down to 36 feet, leaving a single 12-foot eastbound thru lane, a single 12-foot westbound thru
lane, and 6-foot paved shoulders. Existing connecting driveways will be resurfaced up to the public right-
of-way. Upon completion of the FDR improvements, the roadway will be striped consistent will existing
conditions, including a double yellow centerline stipe to prohibit passing along the length of the street
segment. Based on MSA design standards, no on-street parking will be permitted. There are no storm sewer
improvements needed for the project and there are no stormwater management requirements. Impervious
surfaces along the street corridor will be reduced as the paved shoulder widths are decreased from 8-feet to
6-feet.
The total estimated project cost is $532,000. A portion of the project is proposed to be assessed to the
benefitting properties. The proposed street assessment is $39,800 for the commercial property located at
8281 15th Street North (Pine Crest Storage Inc.), and $8,200 for each of the 6 residential properties with
direct access to the improved street. The City Planning Department has reviewed the benefitting properties
and none of the properties are able to be subdivided under the current land use and zoning designations.
Several properties have been placed, either wholly or partially, into Met Council Ag Preserve designations.
As an Ag Preserve property, the City cannot assess the properties. Therefore, at the time of the final
assessment hearing, any properties that remain Ag Preserve will be removed from the final assessment roll.
Current Ag Preserve properties include 8280 15th Street North, 8281 15th Street North, 8290 15th Street
North, and PID 28.029.21.22.0001.
The unit residential street assessment is based on assessing 30% of the street costs on a per unit basis, after
deducting the MSA fund contribution to the project costs to address the use of the roadway as a collector
street. The commercial street assessment is based on assessing 100% of the adjusted street costs (reduced
by MSA funds) on a lineal foot basis. Assessments for street improvements will be levied over a 15-year
period and charged an interest rate of 1% over the bond rate for the project.
On April 18, 2024, contractor bids were received, publicly opened, and read aloud. The City received 3
bids for this project, with Bituminous Roadways, Inc. providing the lowest bid in the amount of
$381,004.40. Following review and verification of the bid tabulations, the City Engineer and the
engineering design consultant are recommending that the Council award the contract to the lowest
responsible bidder, Bituminous Roadways, Inc., as outlined in the attached letter.
As a part of this award staff is requesting Council to provide the City Administrator authorization to enter
into a material testing contract with Braun Intertec in the not-to-exceed amount of $5,906.
FISCAL IMPACT: The post-bid total estimated project cost remains within the Feasibility Report
estimated of costs at $532,000. The improvements will be funded through a combination of Municipal State
Aid Funds, in the amount of $330,000; Special Assessments, in the amount of $89,000, and General Tax
levy funds in the amount of $113,000.
RECOMMENDATION: Staff is recommending that the City Council approve a Resolution, Ordering the
Improvement, Accepting Bids and Awarding a Contract to Bituminous Roadways, Inc., for the bid amount
of $381,004.40 for the 15th Street North Improvements. The recommended motion for this action is as
follows:
“Move to approve Resolution No. 2024-052, Ordering the Improvement, Accepting Bids and
Awarding a Contract to Bituminous Roadways, Inc. for the bid amount of $381,004.40 for the
15th Street North Improvements.”
Staff is also recommending that the City Council authorize the City Administrator to enter into a material
testing contract with Braun Intertec in the not-to-exceed amount of $5,906. The recommended motion for
this action is as follows:
“Move to authorize the City Administrator to enter into a material testing contract with Braun Intertec
in the not-to-exceed amount of $5,906 for the 15th Street North Improvements.
ATTACHMENTS:
1. Resolution Ordering the Improvements, Accepting Bids and Awarding a Contract for the 15th
Street North Improvements.
2. Notice of Hearing on Improvement.
3. Preliminary Assessment Roll.
4. Engineer’s Letter of Award Recommendation and Tabulation of Bids.
5. Location Map.
6. Project Schedule.
CITY OF LAKE ELMO
WASHINGTON COUNTY
STATE OF MINNESOTA
RESOLUTION NO. 2024-052
A RESOLUTION ORDERING THE IMPROVEMENT, ACCEPTING BIDS AND
AWARDING A CONTRACT FOR THE 15TH STREET NORTH IMPROVEMENTS
WHEREAS, pursuant to a resolution passed by the City Council on the 15th day of August
2023, a feasibility report has been prepared by FOCUS Engineering, Inc. for the 15th Street North
Improvements; and
WHEREAS, ten days mailed notice and two weeks published notice of the hearing was
given, and the hearing was held thereon on the 7th day of May 2024, at which all persons desiring
to be heard were given the opportunity to be heard thereon; and
WHEREAS, the feasibility report prepared by FOCUS Engineering, Inc., and dated March
2024 states that the project is necessary, cost-effective, and feasible; and
WHEREAS, pursuant to an advertisement for bids for the 15th Street North
Improvements, bids were received, opened, and tabulated according to law, and bids were received
complying with the advertisement; and
WHEREAS, bids were tabulated, checked and summarized to verify that all requirements
of the submittal were met; and
WHEREAS, the project engineer reviewed the bids and has provided a letter
recommending the award of the contract to the lowest responsible bidder, Bituminous Roadways,
Inc., for the bid amount of $381,004.40.
NOW, THEREFORE, BE IT RESOLVED,
1. Such improvement is deemed necessary, cost-effective, and feasible as detailed in the
Feasibility Report dated March 2024.
2. Such improvement is hereby ordered as proposed in the council resolution adopted this 7th
day of May, 2024.
3. The city council declares its official intent to reimburse itself for the costs of the
improvement from the proceeds of tax-exempt bonds.
4. That the Mayor and City Clerk are hereby authorized and directed to enter into a Contract
in the accordance with the above ordered Project, in the amount of the Contractor’s lowest
responsible bid, and according to the plans and specifications thereof approved by the City
Council.
5. The City Clerk is hereby authorized and directed to return forthwith to all bidders the
deposits made with their bids, except that the deposits of the successful bidder and the next
two lowest bidders shall be retained until a contract has been signed.
ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE SEVENTH DAY OF MAY, 2024.
CITY OF LAKE ELMO
By: __________________________
Charles Cadenhead
(Seal) Mayor
ATTEST:
________________________________
Julie Johnson
City Clerk
CITY OF LAKE ELMO
NOTICE OF HEARING ON IMPROVEMENT
15TH STREET NORTH IMPROVEMENTS
Notice is hereby given that the City Council of Lake Elmo will conduct a public hearing
on Tuesday, May 7, 2024, at or approximately after 7:00 PM to consider the making of
the following improvements, pursuant to Minnesota Statutes, Sections 429.011 to
429.111:
The project includes pavement rehabilitation of 15th Street North, from Inwood Avenue
(CSAH 13) to the westerly City limits, including approximately 2,594 feet (0.49 miles) of
collector roadway, and consisting of a Full Depth Reclamation (FDR).
The area proposed to be assessed for the street improvements include each of the 7
properties abutting 15th Street North, between Inwood Avenue (CSAH 13) and the
westerly City limits connecting to the City of Oakdale. The estimated total cost for the
project is $532,000. A reasonable estimate of the impact of the assessment will be
available at the hearing. Such persons as desiring to be heard with reference to the
proposed improvements will be heard at this meeting.
DATED: March 19, 2024
BY ORDER OF THE LAKE ELMO CITY COUNCIL
Charles Cadenhead, Mayor
(Published in the Stillwater Gazette on March 22, 2024 and March 29, 2024)
FIGURE NO. 1
ASSESSABLE PROPERTIES
LEGEND
15TH STREET NORTH
15TH STREET NORTH IMPROVEMENTS
PROJECT NO. 2023.121
MARCH, 2024
Feet
0 1000 2000ASSESSABLE PROPERTY
8280
8281
2802921220001
81
5
5
81
3
5
81
6
7
8291
15TH ST N
IN
W
O
O
D
A
V
E
(
C
S
A
H
1
3
)
15TH ST N
10TH ST N (CSAH 10)
ASSESSABLE PROPERTY - COMMERCIAL
CITY OF LAKE ELMO, MN.
MARCH, 2024
15TH STREET IMPROVEMENTS
PRELIMINARY ASSESSMENT ROLL
PAGE 1 of 1
NO. NAME PID
STREET
ASSESSMENT
AMOUNT
STREET FRONT
FOOTAGE
STREET
IMPROVEMENT
UNITS
1 ARMSTRONG THOMAS G 7801 20TH ST N OAKDALE MN 55128 2802921220001 $8,200 1
2 ARMSTRONG THOMAS P & JODI M 8280 15TH ST N 8280 15TH ST N LAKE ELMO MN 55042 2802921240003 $8,200 1
3 ARMSTRONG ROSEMARY E 8291 15TH ST N 8291 15TH ST N LAKE ELMO MN 55042 2802921310003 $8,200 1
4 ARMSTRONG THOMAS G 8281 15TH ST N 7801 20TH ST N OAKDALE MN 55128 2802921340002 $39,800 1020
5 PREVAILING PROPERTIES LLC 8167 15TH ST N 2400 HENSLOW CT N OAKDALE MN 55128 2802921320003 $8,200 1
6 TRIVISKI JOHN P & MARY J 8155 15TH ST N 8155 15TH ST N LAKE ELMO MN 55042 2802921320001 $8,200 1
7 OLSON WAYNE C & LORRAINE P 8135 15TH ST N 8135 15TH ST N LAKE ELMO MN 55042 2802921320002 $8,200 1
TOTAL $89,000
*Properties in RED represent commercial lots
**Properties in BLACK represent residential lots
ADDRESS MAILING ADDRESS
2750 Blue Water Rd, Suite 100
Eagan, MN 55121-1661
651-222-2176
KLJENG.COM
April 22, 2024
Jack Griffin
Engineer
Cit of Lake Elmo
3880 Laverne Aveunue North
Lake Elmo, MN 55042
Re: 15th St N Improvement Project Award Recommendation
Dear Mr. Griffin:
Bids for the 15th St N Improvement Project were received on April 16, 2024 at 10:00 am. Three bids
were received and read aloud. Below is a summary of the bids:
Contractor Base Bid
Bituminous Roadways Inc. $381,004.40
Asphalt Surface Technologies Corp. $386,900.13
OMG Midwest Inc. dba Minnesota Paving & Materials $390,900.80
The bids were checked for mathematical accuracy and no discrepancies were found. The low bidder is
Bituminous Roadways Inc. by $5,895.73. The Engineer’s estimate of construction costs was
$418,870.00. Bituminous Roadways Inc. submitted the require documentation with their bid. Based on
the results of the bid, it is our opinion that the bid was fair and competitive. Therefore, we recommend
that the contract be awarded to the apparent low bidder, Bituminous Roadways Inc. The City of Lake
Elmo has the option to award the contract to the lowest qualified bidder based on the base bid.
Bituminous Roadways Inc. is the lowest bidder for the base bid.
Please contact me with any questions at 651.726.5040.
Sincerely,
KLJ
Mark Rohweder
Project Manager
15TH STREET NORTH IMPROVEMENTS
CITY OF LAKE ELMO
04/18/2024 10:00 AM CDT
Line Item Item Description UofM Quantity Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension
1 MOBILIZATION LUMP SUM 1 $50,000.00 $50,000.00 $22,000.00 $22,000.00 $35,000.00 $35,000.00 $18,000.00 $18,000.00
2 REMOVE SIGN EACH 1 $80.00 $80.00 $42.00 $42.00 $44.00 $44.00 $41.00 $41.00
3 SALVAGE DELINEATOR/ MARKER PANEL EACH 1 $40.00 $40.00 $26.00 $26.00 $27.50 $27.50 $26.00 $26.00
4 SALVAGE SIGN EACH 5 $120.00 $600.00 $42.00 $210.00 $44.00 $220.00 $41.00 $205.00
5 SAWING BIT PAVEMENT (FULL DEPTH)LIN FT 172 $3.00 $516.00 $2.75 $473.00 $3.00 $516.00 $6.00 $1,032.00
6 REMOVE BITUMINOUS PAVEMENT SQ YD 18 $7.00 $126.00 $22.00 $396.00 $22.00 $396.00 $18.00 $324.00
7 SUBGRADE CORRECTION SQ YD 2,140 $3.00 $6,420.00 $6.25 $13,375.00 $15.40 $32,956.00 $12.00 $25,680.00
8 SUBGRADE PREPARATION SQ YD 10,701 $3.00 $32,103.00 $2.00 $21,402.00 $0.94 $10,058.94 $1.50 $16,051.50
9 AGGREGATE SURFACING (CV) FROM STOCKPILE CU YD 146 $40.00 $5,840.00 $43.00 $6,278.00 $33.00 $4,818.00 $50.00 $7,300.00
10 STREET SWEEPER (WITH PICKUP BROOM)HOUR 20 $200.00 $4,000.00 $100.00 $2,000.00 $198.00 $3,960.00 $80.00 $1,600.00
11 WATER M GALLON 59 $75.00 $4,425.00 $55.00 $3,245.00 $45.00 $2,655.00 $50.00 $2,950.00
12 FULL DEPTH RECLAMATION SQ YD 11,658 $3.00 $34,974.00 $3.00 $34,974.00 $1.02 $11,891.16 $1.50 $17,487.00
13 HAUL FULL DEPTH RECLAMATION (LV)CU YD 1,295 $10.00 $12,950.00 $17.00 $22,015.00 $18.37 $23,789.15 $32.00 $41,440.00
14 MILL BITUMINOUS SURFACE (2.0'')SQ YD 29 $2.00 $58.00 $7.00 $203.00 $10.00 $290.00 $20.00 $580.00
15 BITUMINOUS MATERIAL FOR TACK COAT GALLON 749 $3.00 $2,247.00 $1.00 $749.00 $3.00 $2,247.00 $2.00 $1,498.00
16 TYPE SP 9.5 WEARING COURSE MIX (2,C)TON 1,294 $85.00 $109,990.00 $85.00 $109,990.00 $89.98 $116,434.12 $90.00 $116,460.00
17 TYPE SP 12.5 NON WEAR COURSE MIX (2,C)TON 1,294 $85.00 $109,990.00 $85.00 $109,990.00 $85.69 $110,882.86 $86.00 $111,284.00
18 TRAFFIC CONTROL LUMP SUM 1 $20,000.00 $20,000.00 $8,500.00 $8,500.00 $2,420.00 $2,420.00 $2,300.00 $2,300.00
19 INSTALL SIGN EACH 5 $400.00 $2,000.00 $700.00 $3,500.00 $742.50 $3,712.50 $685.00 $3,425.00
20 INSTALL DELINEATOR / MARKER PANEL EACH 1 $50.00 $50.00 $26.00 $26.00 $27.50 $27.50 $26.00 $26.00
21 SIGN SQ FT 15 $65.00 $975.00 $65.00 $975.00 $68.20 $1,023.00 $65.00 $975.00
22 STORM DRAIN INLET PROTECTION EACH 2 $200.00 $400.00 $100.00 $200.00 $180.00 $360.00 $512.00 $1,024.00
23 CULVERT END CONTROLS EACH 8 $200.00 $1,600.00 $155.00 $1,240.00 $220.00 $1,760.00 $155.00 $1,240.00
24 SEDIMENT CONTROL LOG TYPE COMPOST LIN FT 728 $3.00 $2,184.00 $2.75 $2,002.00 $3.85 $2,802.80 $3.75 $2,730.00
25 FERTILIZER TYPE 1 POUND 73 $1.00 $73.00 $5.60 $408.80 $5.00 $365.00 $5.50 $401.50
26 SEED MIXTURE 21‐111 POUND 37 $5.00 $185.00 $31.00 $1,147.00 $8.00 $296.00 $31.00 $1,147.00
27 RAPID STABILIZATION METHOD 3 M GALLON 4 $700.00 $2,800.00 $1,000.00 $4,000.00 $1,375.00 $5,500.00 $1,005.00 $4,020.00
28 6'' SOLID LINE MULTI COMP GR IN (WR)LIN FT 5,136 $2.00 $10,272.00 $1.45 $7,447.20 $1.54 $7,909.44 $1.45 $7,447.20
29 24'' SOLID LINE MULTI COMP GR IN (WR)LIN FT 12 $10.00 $120.00 $65.65 $787.80 $72.16 $865.92 $67.00 $804.00
30 4'' DBLE SOLID LINE MULTI COMP GR IN (WR)LIN FT 1,284 $3.00 $3,852.00 $2.65 $3,402.60 $2.86 $3,672.24 $2.65 $3,402.60
Base Bid Total:$418,870.00 $381,004.40 $386,900.13 $390,900.80
Bituminous Roadways Inc.Asphalt Surface Technologies
Corp.
OMG Midwest Inc. dba Minnesota
Paving & MaterialsEngineer Estimate
LOCATION MAP
FIGURE NO. 1
15TH STREET N IMPROVEMENTS
CITY OF
LAKE ELMO
15TH STREET N
LEGEND
PROJECT NO. 2023.121
MARCH 2024
15TH STREET N
PROJECT LOCATION
PROJECT SCHEDULE
CITY OF LAKE ELMO
15TH STREET NORTH IMPROVEMENTS
PROJECT NO. 2023.121
AUGUST 15, 2023 Council authorizes preparation of Preliminary Design.
DECEMBER 5, 2023 Presentation of Preliminary Design Findings and Recommendations. Authorize
preparation of Feasibility Report and Plans and Specifications.
MARCH 19, 2024 Council accepts the Feasibility Report and Calls for Public Hearing. Council approves
Plans and Specifications and orders Advertisement for Bids.
APRIL 18, 2024 Project Bid Date: Receive contractor bids.
APRIL 25, 2024 Neighborhood informational meeting.
MAY 7, 2024 Public Improvement Hearing. Council Orders the Improvement. Council accepts
Bids and awards Contract.
MAY 27, 2024 Conduct Pre‐Construction Meeting and issue Notice to Proceed.
SEPTEMBER 23, 2024 Substantial Completion.
OCTOBER 25, 2024 Final Completion.
*Final Assessment Hearing Schedule TDB (if applicable)