HomeMy WebLinkAbout#09 - 15th St. N. Improvements State Aid STAFF REPORT
DATE: May 21, 2024
CONSENT
AGENDA ITEM: Approve Resolution Requesting a Variance from Standard for State Aid Operations
for the 15th Street North Improvements
SUBMITTED BY: Jack Griffin, City Engineer
REVIEWED BY: Clark Schroeder, Interim City Administrator Clarissa Hadler, Finance Director Marty Powers, Public Works Director
Chad Isakson, Assistant City Engineer
ISSUE BEFORE COUNCIL: Should the City Council approve a resolution, requesting a variance from
Minnesota Rules for State Aid Operation 8820.2800 subpart 2A for the 15th Street North Improvements?
BACKGROUND: On May 7, 2024 the City Council accepted contractor bids and awarded a contract for
the street improvements along 15th Street North, from Inwood Avenue to the Lake Elmo-Oakdale City
limits. 15th Street North is a designated municipal state aid route and the project is proposed to be funded,
in part, using $330,000 from the City’s municipal state aid construction funds.
PROPOSAL DETAILS/ANALYSIS: Minnesota Rules for State Aid Operation 8820.2800 subpart 2A,
Eligibility for Funding, requires all plans to be approved by the state-aid engineer before opening contractor
bids to be eligible for state-aid construction funding. Although the City’s construction plans used for
obtaining contractor bids did include all state aid review comments through Addendum #1, formal approval
of the plans by the State Aid Engineer had not yet been received prior to the April 18, 2024 bid opening.
Therefore, the City must apply for and receive a Variance to the State Aid Operations in order to maintain
funding eligibility. The application packet for the Variance Committee must be submitted by June 3, 2024.
FISCAL IMPACT: The post-bid total estimated project cost is $532,000. The improvements will be
funded through a combination of Municipal State Aid Funds, in the amount of $330,000; Special
Assessments, in the amount of $89,000, and General Tax levy funds in the amount of $113,000. Without
an approved variance from the State Aid office, the Project will not be eligible to receive state aid funds.
RECOMMENDATION: Staff is recommending that the City Council approve a Resolution, as part of the
consent agenda, Requesting a Variance from Standard for State Aid Operation for the 15th Street North
Improvements. If removed from the consent agenda, the recommended motion for this action is as follows:
“Move to approve Resolution No. 2024-069, Requesting a Variance from Standard for State Aid
Operation for the 15th Street North Improvements.”
ATTACHMENTS:
1. Resolution Requesting a Variance from Standard for State Aid Operation for the 15th Street North
Improvements.
2. Variance Application Packet.
CITY OF LAKE ELMO
WASHINGTON COUNTY
STATE OF MINNESOTA
RESOLUTION NO. 2024-069
A RESOLUTION REQUESTING A VARIANCE FROM STANDARD FOR STATE AID
OPERATIONS FOR THE 15TH STREET NORTH IMPROVEMENTS
(PROJECT No. S.A.P. 206-110-002)
WHEREAS, the City of Lake Elmo intends to improve the pavement surfaces in fiscal
year 2024 along 15th Street North, from Inwood Avenue (CSAH 13) to the Lake Elmo/Oakdale
City limits, and
WHEREAS, the City of Lake Elmo prepared plans and specifications consisting of a full
depth reclamation of the pavement surfaces along 15th Street North, Project S.A.P. 206-110-002,
submitted the plans and specifications for State Aid review, incorporated State Aid review
comments, received contractor bids for the improvements, and
WHEREAS, Minnesota Rules for State Aid Operation 8820.2800 subpart 2A, Eligibility
for Funding, requires final plans to be approved by the State Aid engineer before opening bids for
the project; and
WHEREAS, the reason for this variance requests is to comply with State Aid Rules
regarding the sequence of approvals within MSA Rules. The project was let on April 18, 2024
prior to State Aid Approval on May 8, 2024, and
WHEREAS, all plan changes requested by the State Aid engineer were incorporated into
the plan set through addendum #1, and were therefore fully included in the plans used by
contractors when submitting their bids, and
NOW, THEREFORE BE IT RESOLVED, that the City of Lake Elmo City Council does hereby
request a variance from the Minnesota Department of Transportation State Aid Operations Rules
Chapter 8820.2800 subpart 2A (Eligibility of Funding) to allow plan approval after letting of the
project in lieu of plan approval prior to letting the project; and
BE IT FURTHER RESOLVED, that the City of Lake Elmo City Council hereby indemnifies,
saves and hold harmless the State of Minnesota and its agents and employees of and from claims,
demands, actions, or causes of action arising out of or by reason of Project No. S.A.P. 206-110-
002 in accordance with Minnesota Rules 8820.2800 and further agrees to defend at their sole cost
and expense any action or proceeding commenced for the purpose of asserting any claim arising
as a result of the granting this variance.
ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE SEVENTH DAY OF MAY,
2024.
CITY OF LAKE ELMO
By: __________________________
Charles Cadenhead
(Seal) Mayor
ATTEST:
________________________________
Julie Johnson
City Clerk
June 29th, 2024
Kristine Elwood
State Aid Engineer
Minnesota Department of Transportation
395 John Ireland Blvd. MS 500
St. Paul, MN 55155
RE: LAKE ELMO PROJECT No. 2023-121
15TH Street North Improvements
SAP 206-110-002
Approval – Variance Request from State Aid Operations Chapter 8820.2800 subpart
2A.
Dear Ms. Elwood,
Please accept this State Aid Variance request packet for consideration by the Variance Committee at the
June 27, 2024 Variance Advisory Committee meeting.. The packet contains the necessary documentation
to appropriately support the request for the variance noted above. The bid opening variance is sought for
15th Street North Improvements in Lake Elmo, which includes a full depth reclamation to improve
pavement conditions.
If you have any questions or require additional information, please contact me at (651) 726-5040 or
mark.rohweder@kljeng.com
Sincerely,
Mark Rohweder, P.E.
Project Manager
Enclosures
Cc: Jack Griffin, PE, Lake Elmo City Engineer
For more information visit: www.dot.state.mn.us/stateaid/variance.html
Or contact: Mao Yang, MnDOT, 651‐366‐3840
Mao.Yang@state.mn.us 1
State Aid for Local Transportation
395 John Ireland Blvd. MS 500
St. Paul, MN 55155
Revision Date: 1/30/2020
Design Element Variance Justification Checklist
This checklist should be completed and submitted with all required attachments to the State Aid for Local
Transportation Division when a local agency has determined that a variance from Minnesota Rules 8820 for
State Aid Operations Rules is justified.
The following documents and information is needed when one or more variance requests is identified on a
project. Note additional information may be requested by the Variance Advisory Committee after submittal of
the checklist and attachments for their investigation.
Ensure to check the box for items attached to this checklist and to respond to all questions. Where the question
does not apply to the variance request or no impacts, note it in the field provided and give a brief explanation on
how that was determined.
1. A variance request cover letter addressed to the State Aid Division Director
2. A formal written request in the form of a certified resolution from the responsible city council or
county board that includes the following items. MN Rules, part 8820.3300, subpart 1, item A
a. Identification of the project by location and termini. MN Rules, part 8820.3300, subpart 1,
item B
SAP/SP: 206‐110‐002
b. Cite the specific part or standard for which the variance is requested and describe the
modification proposed. MN Rules, part 8820.3300, subpart 1, item C
Rule Design Element Request
Select One Rule 8820.2800
Subp. 2.A.
Bid opening prior to State Aid Appoval
Select One
Select One
A typical resolution format is available on the State Aid Variance website.
3. Define the critical design element involved (i.e. not “Design Speed”): horizontal alignment (radius or
degree of curvature), vertical alignment, grades, lane width, shoulder width, bridge width, structural
capacity, stopping sight distance (horizontal and vertical), cross slope, super‐elevation, clearance
(horizontal and vertical).
NA
For more information visit: www.dot.state.mn.us/stateaid/variance.html
Or contact: Mao Yang, MnDOT, 651‐366‐3840
Mao.Yang@state.mn.us 2
4. For Complete Street consideration, are design elements from A Policy on Geometric Design of Highway
Streets from the American Association of State Highway and Transportation Officials being proposed for
this variance request? MN Statutes, section 174.75, subdivision 5, MN Statues, section 162.02,
subdivision 3a, MN Statutes, section 162.09, subdivision 3a
No Yes Reference Page(s)/Table(s):
5. For Complete Street consideration, are design elements from Context Sensitive Solutions in Designing
Major Urban Thoroughfares for Walkable Communities from the Institute of Transportation Engineers
being proposed for this variance request? MN Statutes, section 174.75, subdivision 5 MN Statues,
section 162.02, subdivision 3a, MN Statutes, section 162.09, subdivision 3a
No Yes Reference Page(s)/Table(s):
6. Attach an index map of the project. MN Rules, part 8820.3300, subpart 1a, item A
7. Attach typical sections for the in‐place section(s) and proposed section(s). MN Rules, part
8820.3300, subpart 1a, item B
8. Provide the reasons for the request. MN Rules, part 8820.3300, subpart 1a, item C
The plan approval process and bid opening were not properly coordinated. Bid opening was completed
prior to plan approval by MSA.
9. Include existing and projected traffic counts.
Existing ADT: 4,003 Projected ADT: 5,070
10. Include legal and posted speeds of abutting roadway sections.
40 MPH
11. Provide information on the economic impacts which may result from the requested variance. For
example compare the difference in cost to construct to standard versus the preferred alternative. MN
Rules, part 8820.3300, subpart 1a, item D, MN Rules, part 8820.3400, subpart 3, item A
The City of Lake Elmo budget for this project included the MSA funds which are available in their
construction acount. The City will experience financial short fall in their street maintenance and
reconstuction budget without the use of the MSA funds.
12. Provide information on the social impacts which may result from the requested variance. MN Rules,
part 8820.3300, subpart 1a, item D, MN Rules, part 8820.3400, subpart 3, item A
NA
13. Provide information on the safety impacts which may result from the requested variance. For example
provide the summary data on the number of crashes, type of crashes, severity of crashes, and
For more information visit: www.dot.state.mn.us/stateaid/variance.html
Or contact: Mao Yang, MnDOT, 651‐366‐3840
Mao.Yang@state.mn.us 3
contributing factors and crash modification factors with or without meeting the design element in the
variance request. MN Rules, part 8820.3300, subpart 1a, item D, MN Rules, part 8820.3400, subpart 3,
item A
NA
14. Provide information on the environmental impacts which may result from the requested variance. MN
Rules, part 8820.3300, subpart 1a, item D, MN Rules, part 8820.3400, subpart 3, item A
NA
15. Provide information on the effectiveness of the project in eliminating an existing and projected
deficiency in the transportation system. MN Rules, part 8820.3300, subpart 1a, item E, MN Rules, part
8820.3400, subpart 3, item B
The project will complete a full depth reclamtion of the existing street that has multiple pavement
failures requiring extensive maintaince.
16. Provide information on the effects on adjacent lands. MN Rules, part 8820.3300, subpart 1a, item F,
MN Rules, part 8820.3400, subpart 3, item C
NA
17. Provide information on the number of persons affected. MN Rules, part 8820.3300, subpart 1a, item G,
MN Rules, part 8820.3400, subpart 3, item D
City of Lake Elmo (approximately 13,500 residents)
18. Provide information on the safety considerations and mitigations as they apply to pedestrians. MN
Rules, part 8820.3300, subpart 1a, item H (1), MN Rules, part 8820.3400, subpart 3, item F
NA
19. Provide information on the safety considerations and mitigations as they apply to bicyclists. MN Rules,
part 8820.3300, subpart 1a, item H (2), MN Rules, part 8820.3400, subpart 3, item F
NA
20. Provide information on the safety considerations and mitigations as they apply to the motoring public.
MN Rules, part 8820.3300, subpart 1a, item H (3), MN Rules, part 8820.3400, subpart 3, item F
NA
21. Provide information on the safety considerations and mitigations as they apply to fire, police, and
emergency units. MN Rules, part 8820.3300, subpart 1a, item H (4), MN Rules, part 8820.3400, subpart
3, item F
NA
For more information visit: www.dot.state.mn.us/stateaid/variance.html
Or contact: Mao Yang, MnDOT, 651‐366‐3840
Mao.Yang@state.mn.us 4
22. Include available accident data in detail that indicates the resulting damage (property
damage/injury/death), contributing causes, and location.
The Minnesota Crash Mapping Analysis Tool (MnCMAT) is available thru the SALT Traffic Safety website
at http://www.dot.state.mn.us/stateaid/crashmapping.html. Note that access to the MnCMAT
application requires approval of the city or county engineer. Questions on gaining access or use of the
application can be directed to mcmat.dot@state.mn.us.
23. Provide information on the effect on future maintenance. MN Rules, part 8820.3400, subpart 3, item E
The project will eliminate the annual surface patching that was being completed on the existing
pavement due to pavement failure from increasing traffic volumes.
24. Provide information on the effect that the rule and standards may have in imposing an undue burden
on a city or county. MN Rules, part 8820.3400, subpart 3, item G
The rule was inadvertently missed and missunderstood during conversations with State Aid staff,
applying the rule will place an undue burden on the City of Lake Elmo's budget.
25. Any other pertinent factors.
The constuction plan set was initialy submitted to MSA for review in March 21, 2024. Review comments
were received on April 4, 2024. MSA comments were addressed and the plans were resubmitted along
with the title sheet for signature on April 5, 2024. Changes requested by MSA were included in
Addendum 1 for bidders. The plan set bidders based their bid matches the plan set MSA signed.
Variance Submittal
When you are ready to submit this variance request, save the checklist on your local workstation with
the project number and Variance Request in the name of the document; e.g. 088‐888‐
008_Variance_Request.doc.
This completed checklist and required attachments should be submitted electronically to your District
State Aid Engineer and Mao Yang at mao.yang@state.mn.us by the variance submittal date.