HomeMy WebLinkAbout#18 - ISD 834 Utility Petition STAFF REPORT
DATE: May 21, 2024
REGULAR
AGENDA ITEM: Accept Petition from the Stillwater Area Public School District (District)
for Connection to Public Water and Sanitary Sewer and Authorize the
Preparation of a Feasibility Report
SUBMITTED BY: Jack Griffin, City Engineer
REVIEWED BY: Clark Schroeder, Interim City Administrator
Sarah Sonsalla, City Attorney
Clarissa Hadler, Finance Director
Marty Powers, Public Works Director
Chad Isakson, Assistant City Engineer
ISSUE BEFORE COUNCIL: Should the City Council accept the petition from the Stillwater Area Public
School District (District) for connection to public water and sanitary sewer and authorize the preparation
of a Feasibility Report?
BACKGROUND: A petition requesting the connection to City water and sanitary sewer was received
from the District on May 8, 2024, most likely consisting of 100% of the properties that would benefit from
the proposed improvements. See attached petition.
Leading up to the formal petition request, City and District staff held several meetings related to the
District’s expansion plans for the Oak-Land Middle School. Included in the expansion plan discussions was
the inquiry from the District to connect to pubic water and sanitary sewer. In response to these inquiries,
the City Engineer prepared 3 high level concepts for connecting the Oak‐Land Middle School to public
sewer, including information for connecting to public water (see attached Engineering Memorandum dated
April 8, 2024). Two of the sewer options also contemplated/included the new Lake Elmo Elementary
School to be located at 10th Street (CSAH 10) and Lake Elmo Avenue (CSAH 17). These options were
developed together with connection fees and high level (order of magnitude) cost estimates. The options
were prepared for the purpose of discussions between the City and District to then determine if the District
remained interested in the utility connections based on the costs presented.
PROPOSAL DETAILS/ANALYSIS: A detailed Feasibility Report is required as the next step in the
process to better define the scope of desired/required improvements and to produce more accurate cost
estimates needed to make an informed decision. A Feasibility Report is also required as part of the statutory
process for public improvements that are specially assessed. The feasibility report will advise on the scope
of recommended improvements; provide estimated project costs; identify easement and right-of-way,
permits and other requirements of other local agencies needed to implement the improvements; recommend
whether the improvements should be best made as proposed or in connection with some other improvement;
and advise if the improvements are necessary, cost effective, and feasible. The report will also provide a
proposed preliminary assessment roll for each of the benefitting properties based upon the City’s Special
Assessment Policy for Local Improvements.
Because the District is likely the only benefitting property, staff is suggesting the following steps to process
this request.
1. District submits formal letter petitioning the City for connection to City sewer (and/or City water
as may be applicable) for Oak-Middle School. Letter indicates that the District agrees to pay all
costs for the feasibility report, currently estimated to be $21,000. This letter has been received.
2. District submits signed "City of Lake Elmo Petition for Local Improvement' form as provided by
the City and as reviewed by the City Attorney. Petition is attached.
3. City staff presents petition to the City Council for consideration and if accepted, recommends
Council authorize the preparation of a Feasibility Report.
4. Upon City Council approved resolution authorizing the Feasibility Report, the District submits an
escrow check in the amount of $21,000 to cover the costs of the study.
5. Upon receipt of escrow payment, City staff will proceed with the report. The first step for the study
will include a kick-off meeting with the City, City’s engineering consultants, and District staff to
review/verify scope.
If the proposed project moves forward to design/construction, the District would be asked to sign a Waiver
of Assessment in the City’s standard form, agreeing to the proposed special assessment amounts.
FISCAL IMPACT: None. The District will be asked to pay all costs for the Feasibility Report, in the
estimated amount of $21,000.
RECOMMENDATION: Staff is recommending that the City Council approve a Resolution Declaring
Adequacy of Petition, and Ordering Preparation of a Feasibility Report for connection to Pubic Water and
Sanitary Sewer for the Oak-Land Middle School. The recommended motion for this action is as follows:
“Move to approve Resolution No. 2024-065, Declaring Adequacy of Petition, and Ordering
Preparation of a Feasibility Report for connection to Public Water and Sanitary Sewer for the Oak-
Land Middle School, to be completed jointly by FOCUS Engineering, Inc. and Bolton and Menk, Inc.
in the not to exceed amount of $21,000.”
ATTACHMENTS:
1. Resolution Declaring Adequacy of Petition, and Authorizing Preparation of a Feasibility Report.
2. District Petition for connection to City Water and Sanitary Sewer, dated May 8, 2024.
3. Preliminary Engineering Memorandum dated April 8, 2024.
CITY OF LAKE ELMO
WASHINGTON COUNTY
STATE OF MINNESOTA
RESOLUTION NO. 2024-065
A RESOLUTION DECLARING ADEQUACY OF PETITION AND ORDERING THE
PREPARATION OF A FEASIBILITY REPORT FOR CONENCTION TO MUNICIPAL
WATER AND SANITARY SEWER FOR THE OAK-LAND MIDDLE SCHOOL
WHEREAS, a petition was received on May 8, 2024 from the Stillwater Area Public School
District, formally requesting connection to municipal water and sanitary sewer for the Oak-Land Middle
School; and
WHEREAS, it is proposed to assess the benefiting properties for all or a portion of the cost of
the improvements, pursuant to the City’s Special Assessment Policy and Minnesota Statues, Chapter 429.
NOW, THEREFORE, IT IS HEREBY RESOLVED,
1. The Petition requesting the improvements is hereby declared to be signed by the required
percentage of owners of property affected thereby. This declaration is made in conformity to
Minnesota Statutes 429.035.
2. The Petition for the proposed improvements are hereby referred to the City Engineer and his
consultants, to complete a feasibility report in accordance with Minnesota Statues, Chapter 429
for the proposed improvements, and to report to the council in a preliminary way as to whether
the proposed improvement is necessary, cost-effective, and feasible; whether it should best be
made as proposed or in connection with some other improvement; the estimated cost of the
improvement as recommended; and a description of the methodology used to calculate individual
assessments for affected parcels.
ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE TWENTY-FIRST DAY OF MAY,
2024.
CITY OF LAKE ELMO
By: __________________________
Charles Cadenhead
(Seal) Mayor
ATTEST:
________________________________
Julie Johnson, City Clerk
PAGE 1 of 2
MEMORANDUM
Date: April 8, 2024
To: Nathan Fuerst, Planning Consultant Re: ISD 834 Oak‐Land and new Elementary Schools
Cc: Clark Schroeder, Interim City Administrator Watermain/Sanitary Sewer Petition Process
Jason Stopa, Community Development Director
Marty Powers, Public Works Director
Chad Isakson, PE, Assistant City Engineer
From: Jack Griffin, PE, City Engineer
Engineering has prepared 3 high level concepts for connecting the Oak‐Land Middle School to public sewer and
information for connecting to public water, with 2 of the sewer options that also contemplate/include the new
Lake Elmo Elementary School to be located at 10th Street (CSAH 10) and Lake Elmo Avenue (CSAH 17). These
options were developed together with connection fees and high level (order of magnitude) cost estimates. The
options were prepared for the purpose of discussions between the City and School District to then determine the
best path moving forward. A detailed Feasibility Report is required as the next step in the process to better define
the scope of desired/required improvements and to produce more accurate cost estimates needed to make an
informed decision.
UTILITY CONNECTION PROCESS
1. School District submits signed petition to the City (using City form of petition) formally requesting the City
to prepare a feasibility report for the School District to connect to the public water and or sanitary sewer
system.
2. As part of the Petition submittal, the following information should be provided:
a. Timing/schedule for water/sanitary sewer to be available and online.
b. Statement of understanding of the City’s current connection costs and 2024 City Fee Schedule.
c. Indication of the sewer connection Option(s) to be investigated.
3. Understanding/agreement that the School District will provide all funding for the Feasibility Study (a fee
estimate will be provided prior to initiating the study).
4. Upon completion of Feasibility Report and identification of Project related costs, the City will require a
Waiver of Assessment Agreement prior to proceeding to design phase engineering.
SANITARY SEWER CONNECTION POLICIES/FEES
1. City Water and City Sanitary Sewer costs are 100% assessed to the benefitting properties in accordance
with the City Special Assessment Policy.
a. Note: It appears that School District will be only benefitting property. Efforts to create joint sewer
connection project with Cimarron would likely result in project delays and uncertainties.
2. Connection Fees include the following from the current 2024 City Fee Schedule.
SEWER
a. Sewer Availability Charge (SAC) = $3,000 per SAC unit (based on Met Council SAC Determination).
b. Sewer Connection Charge = $1,000 per SAC unit.
c. Met Council SAC Fee (pass through fee to Met Council) = $2,485 per SAC unit.
FOCUS ENGINEERING, inc.
Cara Geheren, P.E. 651.300.4261
Jack Griffin, P.E. 651.300.4264
Chad Isakson, P.E. 651.300.4285
PAGE 2 of 2
d. Example. Oak‐Land School Building SAC determination by Met Council = 140 SAC units (est.)
i. Connection Fees = ($3,000 + $1,000 + $2,485) x 140 SAC units. $907,900.
e. Example. Lake Elmo Elementary School @ 148,000 SF is 129 SAC units (est.)
i. Connection Fees = $836,565.
WATER
1. Water Availability Charge (WAC) = $3,000 per WAC unit (based on Met Council SAC
Determination: 1 SAC = 1 WAC).
2. Water Connection Charge = $1,000 per WAC unit.
3. Example. Oak‐Land School Building WAC determination by Met Council = 140 WAC units (est.)
a. Connection Fees = ($3,000 + $1,000) x 140 SAC units. $560,000 + Meter Fee (based on
size).
4. Example. Lake Elmo Elementary School @ 148,000 SF is 129 SAC units (est.)
a. Connection Fees = $516,000 + Meter Fee.
3. Infrastructure ownership and maintenance responsibilities.
a. City owns and maintains public infrastructure (infrastructure used by more than one property
owner).
b. City owns/maintains all fire hydrants and watermain lines feeding each fire hydrant.
c. Infrastructure constructed for sole use of property owner remains privately owned and
maintained. This includes lift stations and forcemains.
SANITARY SEWER CONNECTION INFRASTRUCTURE IMPROVEMENTS
1. Option 1. Combined sewer project with new Lake Elmo Elementary School Build.
a. Privately owned LS/FM to Elementary School Site (5,700 LF).
b. LS = $450K. FM = $70/LF. $1.1M with 30% soft costs and contingency.
c. Elementary School (LS + 3,300 LF FM). $900K with 30% soft costs and contingency.
d. Add Connection Fees at time of each building permit.
2. Option 2. Privately owned LS/FM to east manhole on 5th Street (6,000 LF).
a. LS = $450K. FM = $70/LF. $1.1m with 30% soft costs and contingency.
b. Add Connection Fees at time of building permit.
3. Option 3. Private Gravity Sewer to Ex. RGC LS + Public system LS/FM upgrades.
a. Privately owned Gravity sewer (1,400 LF) to Ex. RCG LS. $250K.
b. Upgrade RCG LS and replace ex. Forcemain (7,400 LF). $900k.
c. Future Elementary School (LS + 200 LF FM). $600K with 30% soft costs and contingency.
d. Add Connection Fees at time of each building permit.
CITY WATER CONNECTION INFRASTRUCTURE IMPROVEMENTS
1. Public owned maintained watermain from 10th Street (CSAH 19) and Palmer Drive intersection.
a. Watermain with Hydrants (3600 LF) = $520K.
b. Add Connection Fees at time of connection/building permit.
7+,6 0$3 ,
:$55$17<
9%:' PDN
QHLWKHUDOHJD
IURP YDULRXV
UHIHUHQFHRQO\
RPLVVLRQVRUL
XVHRIWKHPD
H[WHQWWKH\DU
'DWD6RXUFH
%DVHPDS
7+,6 0$3 ,
:$55$17<
9%:' PDN
QHLWKHUDOHJD
IURP YDULRXV
UHIHUHQFHRQO\
RPLVVLRQVRUL
XVHRIWKHPD
H[WHQWWKH\DU
'DWD6RXUFH
%DVHPDS
7+,6 0$3 ,
:$55$17<
9%:' PDN
QHLWKHUDOHJD
IURP YDULRXV
UHIHUHQFHRQO\
RPLVVLRQVRUL
XVHRIWKHPD
H[WHQWWKH\DU
'DWD6RXUFH
%DVHPDS
7+,6 0$3 ,
:$55$17<
9%:' PDN
QHLWKHUDOHJD
IURP YDULRXV
UHIHUHQFHRQO\
RPLVVLRQVRUL
XVHRIWKHPD
H[WHQWWKH\DU
'DWD6RXUFH
%DVHPDS