My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-052
LakeElmo
>
City Council
>
Resolutions (1970's to 2020)
>
2020's
>
2024
>
2024-052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2025 2:33:24 PM
Creation date
8/23/2024 10:36:25 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF LAKE ELMO <br />WASHINGTON COUNTY <br />STATE OF MINNESOTA <br />RESOLUTION NO. 2024-052 <br />FAVAMA %N 13 19[ff_A'V1J91 V M-4144 0 0111 M I <br />WHEREAS, pursuant to a resolution passed by the City Council on the 15th day of August <br />2023, a feasibility report has been prepared by FOCUS Engineering, Inc. for the 15th Street North <br />Improvements; and <br />WHEREAS, ten days mailed notice and two weeks published notice of the hearing was <br />given, and the hearing was held thereon on the 7th day of May 2024, at which all persons desiring <br />to be heard were given the opportunity to be heard thereon; and <br />WHEREAS, the feasibility report prepared by FOCUS Engineering, Inc., and dated March <br />2024 states that the project is necessary, cost-effective, and feasible; and <br />WHEREAS, pursuant to an advertisement for bids for the 15th Street North <br />Improvements, bids were received, opened, and tabulated according to law, and bids were received <br />complying with the advertisement; and <br />WHEREAS, bids were tabulated, checked and summarized to verify that all requirements <br />of the submittal were met; and <br />WHEREAS, the project engineer reviewed the bids and has provided a letter <br />recommending the award of the contract to the lowest responsible bidder, Bituminous Roadways, <br />Inc., for the bid amount of $381,004.40. <br />01.111411 E 11 <br />1. Such improvement is deemed necessary, cost-effective, and feasible as detailed in the <br />Feasibility Report dated March 2024. <br />2. Such improvement is hereby ordered as proposed in the council resolution adopted this 7th <br />day of May, 2024. <br />3. The city council declares its official intent to reimburse itself for the costs of the <br />improvement from the proceeds of tax-exempt bonds. <br />4. That the Mayor and City Clerk are hereby authorized and directed to enter into a Contract <br />in the accordance with the above ordered Project, in the amount of the Contractor's lowest <br />responsible bid, and according to the plans and specifications thereof approved by the City <br />Council. <br />
The URL can be used to link to this page
Your browser does not support the video tag.