My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6-Right-of-way Permit Authorization Form
LakeElmo
>
Public Works
>
Right-of Way (ROW) Permits (permanent)
>
Right-of-Way Permit Procedure and Applications
>
6-Right-of-way Permit Authorization Form
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2026 1:53:29 PM
Creation date
8/26/2024 3:23:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Authorization of Permit Page 1 of 2 April 2024 <br />PERMIT NO. <br />CITY OF LAKE ELMO <br />3880 Laverne Avenue North <br />Lake Elmo, Minnesota 55042 <br />Phone: 651.747.3900 <br />AUTHORIZATION OF PERMIT (Office Use Only) <br />Upon payment of permit fee in the amount of $ and in consideration of the agreement to comply in all <br />respects with the applicable ordinances and regulations covering such operations, permission is hereby granted for <br />the work to be completed as described in the attached application. Said work shall be completed in accordance <br />with requirements listed on the back of this form and special precautions required, as hereby stated: <br />Field Staking: Work under this permit must be field staked and approved by the City prior to <br />commencing construction. <br />Joint trenching is required for this installation. <br />No paved surfaces are to be disturbed by this work. Installation under paved surfaces shall be done by <br />boring or jacking. <br />Underground construction must be installed so it will not harm or unnecessarily destroy the root growth <br />of trees. <br />Draintile shall be installed in accordance with City Details. Connection to catch basin/manhole shall be <br />core drilled. Please call Public Works at 651.747.3941, a minimum of 24 hours in advance to schedule an <br />inspection of connection to catch basin/manhole. <br />Additional Provisions: <br />Approved By: Date: <br />Fee Received: Date: <br />Inspected By: Date Approved: <br />Record Drawing Received: Date: <br />NOTE: General Requirements of the Permit are listed on page 2 of this Form.
The URL can be used to link to this page
Your browser does not support the video tag.