HomeMy WebLinkAbout#05 - 30th St. N. Gap Segment Pay Request 2 STAFF REPORT DATE: August 20, 2024 CONSENT AGENDA ITEM: Approve Pay Request No. 2 for the 30th Street North Gap Segment Improvements SUBMITTED BY: Chad Isakson, Project Engineer REVIEWED BY: Nicole Miller, City Administrator Marty Powers, Public Works Director Clarissa Hadler, Finance Director Jack Griffin, City Engineer ISSUE BEFORE COUNCIL: Should the City Council approve Pay Request No. 2 for the 30th Street North Gap Segment Improvements? BACKGROUND: Bituminous Roadways, Inc. was awarded a construction contract on May 7, 2024 to complete the 30th Street North Gap Segment Improvements. Work remains in progress to address remaining punch list items, with a substantial completion date of August 30, 2024 and final completion date of September 27, 2024. PROPOSAL DETAILS/ANALYSIS: Bituminous Roadways, Inc. has submitted Partial Pay Request No. 2 in the amount of $205,802.01. The request has been reviewed and payment is recommended in the amount requested. In accordance with the contract documents, the City has retained 5% of the total work completed. The amount retained is $17,746.51. FISCAL IMPACT: None. Partial payment is proposed in accordance with the Contract for the project. Payment remains within the authorized scope and budget. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Pay Request No. 2 for the 30th Street North Gap Segment Improvements. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Pay Request No. 2 to Bituminous Roadways, Inc. in the amount of $205,802.01 for the 30th Street North Gap Segment Improvements”. ATTACHMENTS: 1. Partial Pay Estimate No. 2. PROJECT PAY FORM PARTIAL PAY ESTIMATE NO. PERIOD OF ESTIMATE TO PROJECT OWNER: CONTRACTOR: 1. Original Contract Amount 2. Net Change Order Sum 3. Revised Contract (1+2) 4. *Work Completed 5. *Stored Materials 6. Subtotal (4+5) 7. Retainage* 8. Previous Payments 9. Amount Due (6-7-8) *Detailed Breakdown Attached START DATE:ON SCHEDULE SUBSTANTIAL COMPLETION:X FINAL COMPLETION: ENGINEER'S CERTIFICATION: KLJ Engineering, inc. DATE CONTRACTOR'S CERTIFICATION: CONTRACTOR DATE APPROVED BY OWNER:CITY OF LAKE ELMO, MINNESOTA DATE DATE No.Approval Date Amount $353,078.85 Additions Deductions $10,245.00 $354,930.15 1 6/20/2024 $10,245.00 $363,323.85 $354,930.15 $0.00 $131,381.63 $17,746.515.0% CONTRACT TIME TOTALS $10,245.00 $0.00 $205,802.01 NET CHANGE $10,245.00 CONTRACT CHANGE ORDER SUMMARY PAY ESTIMATE SUMMARY 2 7/31/20247/1/2024FROM 30TH ST N GAP SEGMENT IMPROVEMENTS PROJECT NO. 2023.122 CITY OF LAKE ELMO 3880 LAVERNE AVENUE NORTH LAKE ELMO, MN 55042 ATTN: CHAD ISAKSON, P.E., PROJECT ENGINEER BITUMINOUS ROADWAYS, INC. 3080 LEXINGTON AVE SO EAGAN, MN 55121 ATTN: PAUL HILDESTAD, PROJECT MANAGER 6/1/2024 9/27/2024 REVISED DAYS REMAINING 118 0 58 8/30/2024 ORIGINAL DAYS BY BY YES NO The undersigned Contractor certifies that to the best of their knowledge, information and belief the work covered by this payment estimate has been completed in accordance with the contract documents, that all amounts have been paid by the contractor for work for which previous payment estimates was issued and payments received from the owner, and that current payment shown herein is now due. The undersigned certifies that the work has been reviewed and to the best of their knowledge and belief, the quantities shown in this estimate are correct and the work has been performed in accordance with the contract documents. ENGINEER BY FOCUS Engineering inc PROJECT PAYMENT FORM 8-8-24 8/7/2024 Mark Rohweder Digitally signed by Mark Rohweder DN: C=US, E=mark.rohweder@kljeng.com, CN=Mark RohwederDate: 2024.08.07 16:09:48-06'00' PAUL HILDESTAD Digitally signed by PAUL HILDESTADDN: C=US, E=PAUL.HILDESTAD@BITROADS.COM, CN=PAUL HILDESTADDate: 2024.08.08 08:23:17-05'00' Estimated Total Qty. Description Quantity Price This Period MOBILIZATION 1.00 $45,000.00 1.00 0.50 $22,500.00 CLEARING 2.00 $620.00 2.00 0.00 $0.00 GRUBBING 2.00 $104.00 2.00 0.00 $0.00 REMOVE CASTING 2.00 $360.00 0.00 0.00 $0.00 SALVAGE DELINEATOR 1.00 $26.00 0.00 0.00 $0.00 SALVAGE SIGN 9.00 $378.00 2.00 2.00 $84.00 SAWING BIT 1,038.00 $2,854.50 1,038.00 0.00 $0.00 REMOVE CURB AND GUTTER 2,254.00 $15,778.00 2,254.00 0.00 $0.00 REMOVE CONCRETE PAVEMENT 2.00 $54.00 97.00 0.00 $0.00 REMOVE BIT PAVEMENT 1,012.00 $5,363.60 1,012.00 0.00 $0.00 SALVAGE SIGN SPECIAL 1.00 $64.00 0.00 0.00 $0.00 SALVAGE SIGN PANEL SPECIAL 1.00 $26.00 0.00 0.00 $0.00 EXCAVATION- COMMON 245.00 $8,575.00 245.00 0.00 $0.00 SELECT GRANULAR 245.00 $6,125.00 245.00 0.00 $0.00 COMMON EMBANKMENT***IF NEEDED- USE RECLAIM FROM ROAD AND ADD TO TRAIL 23.00 $1,012.00 65.25 65.25 $2,871.00 SUBGRADE CORRECTION 510.00 $3,825.00 0.00 0.00 $0.00 SUBGRADE PREP 2,827.00 $5,654.00 2,827.00 2,827.00 $5,654.00 STREET SWEEPER 20.00 $2,000.00 9.00 9.00 $900.00 WATER 33.00 $1,650.00 10.00 10.00 $500.00 AGG BASE CL VI 186.00 $7,068.00 186.00 0.00 $0.00 FULL DEPTH RECLIMATION 2,549.00 $7,647.00 2,638.00 0.00 $0.00 HAUL FULL DEPTH RECLIMATION 142.00 $4,544.00 142.00 142.00 $4,544.00 MILL BIT PAVEMENT 2" 3,986.00 $11,958.00 3,897.00 3,897.00 $11,691.00 FOG SEAL 12.00 $204.00 0.00 0.00 $0.00 TACK 477.00 $477.00 450.00 450.00 $450.00 SPWEA240B 140.00 $13,300.00 169.69 169.69 $16,120.55 PAY APP #2 AMOUNT DUE PAY APP 2 26 TON $95.00 0 25 GAL $1.00 0 24 GAL $17.00 0 23 SY $3.00 0 22 CY $32.00 0 21 SY $3.00 2638 20 CY $38.00 186 19 MGAL $50.00 0 18 HR $100.00 0 17 SY $2.00 0 16 SY $7.50 0 15 CY $44.00 0 14 CY $25.00 245 13 CY $35.00 245 12 EACH $26.00 0 11 EACH $64.00 0 10 SY $5.30 1012 9 SY $27.00 97 8 LF $7.00 2254 7 LF $2.75 1038 6 EACH $42.00 0 5 EACH $26.00 0 4 EACH $180.00 0 3 EACH $52.00 2 2 EACH $310.00 2 1 LS $45,000.00 0.5 Item ID UM Price PAID TO DATE Unit Estimate Items Jo LAKE ELMO 30TH STREET IMPS Project Manager: PAUL HILDESTAD PAY APP #2 (JULY) Jo 2412019 Project Name: LAKE ELMO 30TH STREET IMPS 7/1/2024 8:28 AM Produced by B2W Software, Inc. Page 1 of 1 PAY APP #2 (JULY) SPWEA240C 834.00 $75,060.00 826.14 826.14 $74,352.60 SPNWB230C 352.00 $31,680.00 361.09 361.09 $32,498.10 ADJUST VALVE BOX 1.00 $280.00 1.00 1.00 $280.00 CASTING ASSEMBLY 2.00 $3,200.00 0.00 0.00 $0.00 ADJUST FRAME AND RING 3.00 $2,175.00 0.00 0.00 $0.00 B618 2,514.00 $47,766.00 2,514.00 0.00 $0.00 TRAFFIC CONTROL 1.00 $7,500.00 1.00 0.50 $3,750.00 INSTALL SIGN 9.00 $4,140.00 2.00 2.00 $920.00 INSTALL SIGN SPECIAL 1.00 $310.00 0.00 0.00 $0.00 INSTALL SIGN PANEL SPECIAL 1.00 $25.20 0.00 0.00 $0.00 INSTALL DELINEATOR 1.00 $25.20 0.00 0.00 $0.00 DELINEATOR 1.00 $78.00 0.00 0.00 $0.00 SIGN 17.00 $1,071.00 18.00 18.00 $1,134.00 INLET PROTECTION 11.00 $1,100.00 11.00 0.00 $0.00 STRAW LOG 48.00 $240.00 0.00 0.00 $0.00 COMPOST LOG 1,605.00 $3,771.75 2,621.00 0.00 $0.00 TOPSOIL 90.00 $4,770.00 102.00 102.00 $5,406.00 FERTILIZER 42.00 $96.60 200.00 200.00 $460.00 21-111 21.00 $84.00 85.00 85.00 $340.00 RAPID STABALIZATION 2.00 $1,280.00 5.00 5.00 $3,200.00 4" SOLID GR IN 2,948.00 $6,633.00 2,986.00 2,986.00 $6,718.50 6" SOLID GR IN 495.00 $1,658.25 500.00 500.00 $1,675.00 10" SOLID GR IN 251.00 $1,782.10 247.00 247.00 $1,753.70 12" SOLID GR IN 174.00 $1,583.40 215.00 215.00 $1,956.50 4" DBLE GR IN 1,605.00 $7,142.25 175.00 175.00 $778.75 PAVT MSSG GR IN 62.00 $4,960.00 62.00 62.00 $4,960.00 CONCRETE CURB RAMP WALK 372.00 $0.00 405.00 405.00 $8,100.00 TRUNCATED DOMES 46.00 $0.00 50.00 50.00 $2,750.00 DRILL AND GROUT REINF BAR 25.00 $0.00 26.00 26.00 $286.00 $353,078.85 $216,633.70 120 EACH $11.00 0 110 SF $55.00 0 100 SF $20.00 0 52 SF $80.00 0 51 LF $4.45 0 50 LF $9.10 0 49 LF $7.10 0 48 LF $3.35 0 47 LF $2.25 0 46 MGAL $640.00 0 45 LB $4.00 0 44 LB $2.30 0 43 CY $53.00 0 42 LF $2.35 2621 41 LF $5.00 0 40 EACH $100.00 11 39 SF $63.00 0 38 EACH $78.00 0 37 EACH $25.20 0 36 EACH $25.20 0 35 EACH $310.00 0 34 EACH $460.00 0 33 LS $7,500.00 0.5 32 LF $19.00 2514 31 EACH $725.00 0 30 EACH $1,600.00 0 29 EACH $280.00 0 28 TON $90.00 0 27 TON $90.00 0 7/1/2024 8:28 AM Produced by B2W Software, Inc. Page 1 of 1