HomeMy WebLinkAbout#05 - Right of Way Management9/9/2024
Provided by Councilmember Dragisich
I wanted to provide some information on the City's ROW management. Our City Code section
9.20 Right-Of-Way Management Permits provides for right-of-way management. Section
9.20.020 Election to Manage the Public Rights-Of-Way states:
9.20.020 Election To Manage The Public Rights-Of-Way
Pursuant to the authority granted to the city under state and federal statutory,
administrative, and common law, the city hereby elects, pursuant to M.S.A. § 237.163,
subd. 2b, to manage rights-of-way within its jurisdiction.
Some definitions in 9.20 Right of Way Management Permits applicable to our workshop
discussion include:
Degradation means the accelerated depreciation of the right-of-way caused by
excavation in or disturbance of the right-of-way, resulting in the need to reconstruct the
right-of-way earlier than would be required if the excavation did not occur.
Degradation cost means money paid to the city to cover the cost associated with a
decrease in the useful life of a public right-of-way caused by excavation; the cost to
achieve a level of restoration, subject to Minn. R. part 7819.1100, as determined by the
city at the time the permit is issued, not to exceed the maximum restoration shown in
plates one to 13, set forth in Minn. R. parts 7819.9900 to 7819.9950.
Degradation fee means the estimated fee established at the time of permitting by the city
to recover costs associated with the decrease in the useful life of the right-of-way
caused by the excavation, and which equals the degradation cost.
Management cost means the actual cost incurred by the city for public rights-of-way
management, including, but not limited to, costs associated with registering applicants;
issuing, processing, and verifying right-of-way or small wireless facility permit
applications; inspecting job sites and restoration projects; maintaining, supporting,
protecting, or moving user equipment during public right-of-way work; determining the
adequacy of right-of-way restoration; restoring work inadequately performed after
providing notice and the opportunity to correct the work; and revoking right-of-way or
small wireless facility permits and performing all other tasks required by this chapter,
including other costs the city may incur in managing the provisions of this chapter. The
term "management cost" does not include payment by a telecommunications right-of-
way user for the use of the right-of-way, unreasonable fees of a third-party contractor
used by the city including fees tied to or based on customer counts, access lines, or
revenues generated by the right-of-way or for the city, the fees and costs of litigation
relating to the interpretation of M.S.A. § 237.162 or 237.163, as they may be amended
from time to time, or any ordinance enacted under those sections, or the city's fees and
costs related to appeals taken pursuant to LEC 9.20.340.
Right of Way Management
September 10, 2024
Page 2
Restoration cost means an amount of money paid to the city by a permittee to achieve
the level of restoration according to plates 1 to 13 of the state public utilities
commission rules.
Restore or restoration means the process by which an excavated right-of-way and
surrounding area, including pavement and foundation, is returned to the same condition
and life expectancy that existed before excavation.
Section 9.20.160 Right-Of-Way Patching And Restoration
(c) Standards. The permittee shall perform excavation, backfilling, patching, and restoration
according to the standards and with the materials specified by the city and shall comply
with Minn. R. part 7819.1100. The city shall have the authority to prescribe the manner and
extent of the restoration, and may do so in written procedures of general application or on a
case-by-case basis. The city, in exercising this authority, shall be guided by the following
standards and considerations:
(1) The number, size, depth, and duration of the excavations, disruptions, or
damage to the right-of-way;
(2) The traffic volume carried by the right-of-way;
(3) The character of the neighborhood surrounding the right-of-way;
(4) The pre-excavation condition of the right-of-way;
(5) The remaining life-expectancy of the right-of-way affected by the
excavation;
(6) Whether the relative cost of the method of restoration to the permittee is in
reasonable balance with the prevention of an accelerated depreciation of
the right-of-way that would otherwise result from the excavation,
disturbance, or damage to the right-of-way; and
(7) The likelihood that the particular method or restoration would be effective in
slowing the depreciation of the right-of-way that would otherwise take
place.
MN Rules Part 7819.1100
Subpart 1. Restoration standards. Restoration must return the right-of-way to the same
condition that existed before excavation. Subject to this standard, plates 1 to 13, shown
in parts 7819.9900 to 7819.9950, indicate maximum limits of restoration methods and
area requirements the local government unit can impose when a right-of-way user
excavates in the public right-of-way. The local government unit and right-of-way user
may agree to a lesser requirement.
The right-of-way user is responsible for all of its work done in the public right-of-way,
whether by employees, agents, or independent contractors.
Subp. 2. Levels of restoration. All levels of restoration include compaction of the
materials placed in the excavation of the subgrade and aggregate base, plus pavement
Right of Way Management
September 10, 2024
Page 3
replacement, in kind. If required by the local government unit, all work must be
performed according to the local government unit's specifications and drawings.
Subp. 3. Degradation fee. A right-of-way user may elect to pay a degradation fee in lieu
of restoration. However, the right-of-way user shall remain responsible for replacing and
compacting the subgrade and aggregate base material in the excavation and the
degradation fee must not include the cost to accomplish these responsibilities.
Standard Plates 1 to 13, shown in parts 7819.9900 to 7819.9950 are shown in the attached
Minnesota Rules 7819.
Right-of-Way management includes determining the cost associated with utilities located within
the City’s Rights-Of-Way. To fulfills the City’s fiduciary and stewardship responsibility to the
public, it must develop policies to effectively manage their right-of-way in addition to creating
methods for identifying and recovering public costs involved with this process. This need is
driven, in part, by the significant investment the City has made in its rights-of-way. It is important
to understand that the costs incurred by the City in managing its rights-of-way are not one-time
costs, but rather are annual costs that increase each year as a result of inflation.
Right-Of-Way Management Plan
A public right-of-way management plan should reflect the City’s actual costs associated with the
management of its rights-of-way on an annual basis. The process to develop such a plan needs
to include a review of all the City’s activities related either directly or indirectly to managing its
rights-of-way and the costs it incurs as a result of utilities located within the rights-of-way.
These costs include:
Overhead Costs
The obvious components of any service cost are the direct and indirect costs (i.e. labor,
supplies, vehicles, space utilization, management information services, etc.) committed
to an activity. Not as obvious are the costs incurred by support activities that must be
undertaken in order for the direct labor personnel to successfully complete their
mission. When determining the total cost for management of the public rights-of-way,
these administrative overhead costs must be included.
Degradation Costs
Degradation is defined as depreciation to the roadway, alleys, sidewalks,
boulevard/landscaped areas, other infrastructure, and amenities that result from
intrusion into the public right-of-way. Numerous public right-of-way cost recovery studies
have concluded that when projects intrude into the surface of a street there is a
definable reduction in the remaining life of the street.
Construction Costs
The presence of utilities within the right-of way increases the cost of construction and
reconstruction for City. Costs affected by the presence of utilities include construction
Right of Way Management
September 10, 2024
Page 4
planning, design, project inspection and management, and actual construction. The
increased costs of engineering and construction resulting from utilities within the right-
of-way increases the amount the City must borrow and the corresponding interest costs
on that debt
Operating Costs
The City incurs operating costs in managing and maintaining the right-of-way. These
costs can be identified within a number of the City’s operating funds including the
General Fund, Internal Service Funds, Special Revenue Funds, Enterprise Funds, Risk
Management Fund, Equipment Maintenance Fund, and other funds depending on the
City’s fund structure. These costs should be adjusted to include the overhead costs
incurred by the City.
Disruption Costs
Disruption costs are those costs that result in the interruption of the normal use of the
public right-of-way. The most common disruptions relate to lane closures and detours.
The disruption costs identified should be based on an estimate of the additional
distance traveled by the vehicles owned by the City resulting from the closure of streets
due to intrusions. An overhead amount is added to arrive at the total annual cost related
to disruption
Return on Investment
The City has made a significant investment in the assets located within the right-of-way.
These generally include street pavements, sidewalks, lighting, traffic controls, right-of-
way purchased (not dedicated without cost to the local government) and other assets.
All of these assets benefit the utility located in the right-of-way. To determine the annual
return on investment, the local government needs to determine the net value of these
assets (cost of acquisition less depreciation) and then establish an appropriate rate of
return on this investment
Depreciation
Costs incurred in the operation of the right-of-way are either recorded as operating
expenses or capitalized as assets. Whether the cost is expensed immediately or
capitalized, the City actually pays for the asset at the time it is acquired. Generally,
anything that is used up in the period in which the cost of acquiring it is incurred is
treated as an operating expense. Personnel, supplies, and repairs and maintenance are
typical examples of costs that are treated as operating expenses. These costs are
shown in the financial statements each year in the total amount of the expenditure for
each category. The cost incurred in the acquisition or construction of assets such as
pavement, lighting, traffic controls, etc. are recorded as capital expenditures. That means
these costs do not show up as an operating expense in the year in which the expenditure
occurs, rather the cost of these assets is depreciated. Depreciation is the process of
allocating the cost of an asset over its useful life in a systematic and rational manner. A
proportion of the annual depreciation expense can be allocated to the utilities within the
right-of-way.
Right of Way Management
September 10, 2024
Page 5
CHAPTER 7819
PUBLIC UTILITIES COMMISSION
PUBLIC RIGHTS-OF-WAY STANDARDS
APPLICABILITY.7819.0050
DEFINITIONS.7819.0100
HIGH-DENSITY CORRIDOR.7819.0200
FEES AND PENALTIES.7819.1000
RESTORATION OF RIGHT-OF-WAY.7819.1100
NOTICE.7819.1200
INDEMNIFICATION.7819.1250
COMPLETION CERTIFICATE.7819.1300
CONSTRUCTION PERFORMANCE BOND.7819.3000
RELOCATION OF EXISTING FACILITIES.7819.3100
RIGHT-OF-WAY VACATION.7819.3200
ABANDONED FACILITIES.7819.3300
MAPPING SYSTEMS
AUTHORITY; PURPOSE.7819.4000
REQUIRED MAPPING INFORMATION.7819.4100
FACILITY INSTALLATION, CONSTRUCTION, LOCATION
INSTALLATION OF TELECOMMUNICATIONS FACILITY.7819.5000
CONSTRUCTION AND LOCATION REQUIREMENTS.7819.5100
UTILITY TRENCH RESTORATION; PLATES 1 AND 2.7819.9900
UTILITY TRENCH RESTORATION; PLATES 3 AND 4.7819.9905
UTILITY TRENCH RESTORATION; PLATE 5.7819.9910
UTILITY TRENCH RESTORATION; PLATE 6.7819.9915
UTILITY HOLE RESTORATION; PLATE 7.7819.9920
UTILITY HOLE RESTORATION; PLATE 8.7819.9925
UTILITY HOLE RESTORATION; PLATE 9.7819.9930
UTILITY HOLE RESTORATION; PLATE 10.7819.9935
TYPICAL ROAD PLAN; PLATE 11.7819.9940
TYPICAL ROAD RESTORATION; PLATE 12.7819.9945
TYPICAL ROAD SHOULDER RESTORATION; PLATE 13.7819.9950
7819.0050 APPLICABILITY.
With the exception of part 7819.1100, subparts 1 and 2, and the associated plates at parts
7819.9900 to 7819.9950, part 7819.1200, part 7819.5000, and part 7819.5100, this chapter applies
Official Publication of the State of Minnesota
Revisor of Statutes
7819.0050MINNESOTA RULES1
to all local government units that have elected, pursuant to Minnesota Statutes, section 237.163,
subdivision 2, to exercise the authority to manage their public rights-of-way under Minnesota
Statutes, sections 237.162 and 237.163. Part 7819.1100, subparts 1 and 2 and the associated plates
at parts 7819.9900 to 7819.9950, part 7819.1200, part 7819.5000, and part 7819.5100 apply whether
or not the local government unit has elected to manage its public right-of-way under Minnesota
Statutes, sections 237.162 and 237.163. Part 7819.1200 is not applicable to a local government unit
that has adopted an ordinance requiring a right-of-way user to obtain a permit or to provide a notice
for certain types of work in lieu of a permit.
This chapter applies to all right-of-way users as defined in part 7819.0100, subpart 21.
For right-of-way users subject to the franchising authority of a local government unit, to the
extent that rights, duties, and obligations regarding the use of the public right-of-way are addressed
in the terms of any applicable franchise agreement, the terms of the franchise prevail over any
conflicting provisions in this chapter.
Statutory Authority: MS s 237.163
History: 23 SR 2004
Published Electronically:November 14, 2003
7819.0100 DEFINITIONS.
Subpart 1.Scope.The terms used in this chapter have the meanings given in this part.
Subp. 2.Abandoned facility."Abandoned facility" means a facility no longer in service or
physically disconnected from a portion of the operating facility, or from any other facility, that is
in use or still carries service. A facility is not abandoned unless declared so by the right-of-way
user.
The definition of abandoned facility in this chapter is not meant to affect the treatment of the
term abandoned facility under any other rules.
Subp. 3.City."City" means a statutory or home rule charter city.
Subp. 4.Commission."Commission" means the state Public Utilities Commission.
Subp. 5.Congested right-of-way."Congested right-of-way" means a crowded condition in
the subsurface of the public right-of-way that occurs when the maximum lateral spacing between
existing underground facilities does not allow for construction of new underground facilities without
using hand digging to expose the existing lateral facilities in conformance with Minnesota Statutes,
section 216D.04, subdivision 3, over a continuous length in excess of 500 feet.
Subp. 6.Construction performance bond."Construction performance bond," as referenced
in Minnesota Statutes, section 237.162, subdivision 8, clause (2), means any of the following forms
of security provided at the permittee's option:
A.individual project bond;
B.cash deposit;
Official Publication of the State of Minnesota
Revisor of Statutes
2MINNESOTA RULES7819.0050
C.security of a form listed or approved under Minnesota Statutes, section 15.73, subdivision
3;
D.letter of credit, in a form acceptable to the local government unit;
E.self-insurance, in a form acceptable to the local government unit; and
F.a blanket bond for projects within the local government unit, or other form of construction
bond, for a time specified and in a form acceptable to the local government unit.
Subp. 7.Degradation cost."Degradation cost" means the cost to achieve a level of restoration
as determined by the local government unit at the time the permit is issued, not to exceed the
maximum restoration shown in plates 1 to 13, which are set forth in parts 7819.9900 to 7819.9950.
Subp. 8.Degradation fee."Degradation fee" means the estimated fee established at the time
of permitting by the local government unit to recover costs associated with the decrease in the
useful life of the right-of-way caused by the excavation, and which equals the degradation cost.
Subp. 9.Facility."Facility" means any tangible asset in the public right-of-way required to
provide utility service.
Subp. 10.Five-year project plan."Five-year project plan" shows projects adopted by the
local government unit for construction within the next five years.
Subp. 11.High-density corridor."High-density corridor" means a designated portion of the
public right-of-way within which telecommunications right-of-way users having multiple and
competing facilities may be required to build and install facilities in a common conduit system or
other common structure.
Subp. 12.Hole."Hole" means an excavation in the pavement, with the excavation having a
length less than the width of the pavement.
Subp. 13.Local government unit."Local government unit" has the meaning given it in
Minnesota Statutes, section 237.162.
Subp. 14.Patch."Patch" means a method of pavement replacement that is temporary in nature.
A patch consists of: (1) the compaction of the subbase and aggregate base, and (2) the replacement,
in kind, of the existing pavement for a minimum of two feet beyond the edges of the excavation in
all directions. A patch is considered full restoration only when the pavement is included in the local
government unit's five-year project plan.
Subp. 15.Pavement."Pavement" means any type of improved surface that is within the public
right-of-way and that is paved or otherwise constructed with bituminous, concrete, aggregate, or
gravel.
Subp. 16.Permit."Permit" has the meaning given "right-of-way permit" in Minnesota Statutes,
section 237.162.
Subp. 17.Permittee."Permittee" means a person to whom a permit to excavate or obstruct a
right-of-way has been granted by a local government unit under this chapter.
Official Publication of the State of Minnesota
Revisor of Statutes
7819.0100MINNESOTA RULES3
Subp. 18.Person."Person" means an individual or entity subject to the laws and rules of this
state, however organized, whether public or private, whether domestic or foreign, whether for profit
or nonprofit, and whether natural, corporate, or political. Examples include:
A.a business or commercial enterprise organized as any type or combination of corporation,
limited liability company, partnership, limited liability partnership, proprietorship, association,
cooperative, joint venture, carrier or utility, and any successor or assignee of any of them;
B.a social or charitable organization; and
C.any type or combination of political subdivision, which includes the executive, judicial,
or legislative branch of the state, a local government unit, or a combination of any of them.
Subp. 19.Public right-of-way."Public right-of-way" has the meaning given it in Minnesota
Statutes, section 237.162.
Subp. 20.Restoration."Restoration" means the process by which an excavated public
right-of-way and surrounding area, including pavement and foundation, is returned to the same
condition that existed before excavation.
Subp. 21.Right-of-way user."Right-of-way user" means: (1) a telecommunications
right-of-way user as defined by Minnesota Statutes, section 237.162, subdivision 4; or (2) a person
owning or controlling a facility in the public right-of-way that is used or is intended to be used for
providing utility service, and who has a right under law, franchise, or ordinance to use the public
right-of-way.
Subp. 22.Temporary surface."Temporary surface" means the compaction of subbase and
aggregate base and replacement, in kind, of the existing pavement only to the edges of the excavation.
It is temporary in nature except when the replacement is of pavement included in the local
government unit's two-year project plan, in which case it is considered full restoration.
Subp. 23.Trench."Trench" means an excavation in the pavement, with the excavation having
a length equal to or greater than the width of the pavement.
Subp. 24.Two-year project plan."Two-year project plan" shows projects adopted by the
local government unit for construction within the next two years.
Subp. 25.Utility service."Utility service" includes: (1) services provided by a public utility
as defined in Minnesota Statutes, section 216B.02, subdivisions 4 and 6; (2) services of a
telecommunications right-of-way user, including the transporting of voice or data information; (3)
services provided by a cable communications system as defined in Minnesota Statutes, chapter
238; (4) natural gas or electric energy or telecommunications services provided by a local government
unit; (5) services provided by a cooperative electric association organized under Minnesota Statutes,
chapter 308A; and (6) water, sewer, steam, cooling, or heating services.
Statutory Authority: MS s 237.163
History: 23 SR 2004
Published Electronically:November 14, 2003
Official Publication of the State of Minnesota
Revisor of Statutes
4MINNESOTA RULES7819.0100
7819.0200 HIGH-DENSITY CORRIDOR.
An ordinance establishing the procedure for installing a high-density corridor must conform to
the following standards:
A.The ordinance must provide for competitive neutrality among telecommunications
right-of-way users.
B.The local government unit's procedure to establish the high-density corridor must include
the following elements:
(1)a need and opportunity analysis by the local government unit;
(2)a finding by the local government unit that the designated portion of the public
right-of-way is, or will imminently be, congested right-of-way;
(3)a determination by the local government unit governing council that a high-density
corridor should be established;
(4)notice and opportunity for interested parties to be heard on the proposed high-density
corridor;
(5)the development by the local government unit of a cost study that includes the
allocation of the cost of building and maintaining the high-density corridor, principles of cost
recovery, and the allocation of capacity within it, which must be submitted to public hearing and
review by the governing body of the local government unit; and
(6)the opportunity for any party providing utility service in the applicable right-of-way
to appeal the governing body's adoption of the cost study to the commission.
C.Existing telecommunications facilities shall not be relocated to the high-density corridor,
unless required pursuant to part 7819.3100.
Statutory Authority: MS s 237.163
History: 23 SR 2004
Published Electronically:November 14, 2003
7819.1000 FEES AND PENALTIES.
Subpart 1.Permit fee.A local government unit that requires a permit for excavation in or
obstruction of the public right-of-way shall make its permit fee schedule available to the public.
The permit fee schedule must be established in advance and designed to recover the local government
unit's actual costs incurred in managing the public right-of-way.
Subp. 2.Allocation of permit fees.Permit fees must be based on an allocation among all
users of the public right-of-way, which shall include the local government unit itself, so as to reflect
the proportionate costs imposed on the local government unit by each of the various types of users
of the public rights-of-way. Although the local government unit must be allocated its proportionate
share of permit fees, the local government unit need not transfer funds to pay permit fees.
Official Publication of the State of Minnesota
Revisor of Statutes
7819.1000MINNESOTA RULES5
Permit fees must be allocated in a competitively neutral manner and must be imposed in a
manner so that aboveground uses of public rights-of-way do not bear costs incurred by the local
government unit to regulate underground uses of public rights-of-way.
Subp. 3.Delay penalty.A local government unit may establish and impose a reasonable
penalty for unreasonable delays in right-of-way excavation, obstruction, patching, or restoration.
The delay penalty must be established from time to time by resolution of the local government
unit's governing body. A delay penalty must not be imposed if the delay in project completion is
due to circumstances beyond the control of the applicant, including without limitation inclement
weather, acts of God, or civil strife.
Statutory Authority: MS s 237.163
History: 23 SR 2004
Published Electronically:November 14, 2003
7819.1100 RESTORATION OF RIGHT-OF-WAY.
Subpart 1.Restoration standards.Restoration must return the right-of-way to the same
condition that existed before excavation. Subject to this standard, plates 1 to 13, shown in parts
7819.9900 to 7819.9950, indicate maximum limits of restoration methods and area requirements
the local government unit can impose when a right-of-way user excavates in the public right-of-way.
The local government unit and right-of-way user may agree to a lesser requirement.
The right-of-way user is responsible for all of its work done in the public right-of-way, whether
by employees, agents, or independent contractors.
Subp. 2.Levels of restoration.All levels of restoration include compaction of the materials
placed in the excavation of the subgrade and aggregate base, plus pavement replacement, in kind.
If required by the local government unit, all work must be performed according to the local
government unit's specifications and drawings.
Subp. 3.Degradation fee.A right-of-way user may elect to pay a degradation fee in lieu of
restoration. However, the right-of-way user shall remain responsible for replacing and compacting
the subgrade and aggregate base material in the excavation and the degradation fee must not include
the cost to accomplish these responsibilities.
Statutory Authority: MS s 237.163
History: 23 SR 2004
Published Electronically:November 14, 2003
7819.1200 NOTICE.
Subpart 1.Requirement.Except in the case of an emergency, before initiating excavation in
a public right-of-way, obstruction of a public right-of-way for more than two hours, or obstruction
of more than one lane of traffic, the right-of-way user shall notify the local government unit in
writing. The information in the notice must include the name, address, and telephone number of
Official Publication of the State of Minnesota
Revisor of Statutes
6MINNESOTA RULES7819.1000
the right-of-way user and any contractors involved in the excavation; the anticipated start and
completion dates; the typical depth of the lines; and the general location of the work.
Subp. 2.Waiver.The local government unit may waive all or any portion of the requirements
of subpart 1. A waiver of the notice requirement must be renewed on an annual basis, unless a
different waiver period is agreed to by the local government unit.
Subp. 3.Applicability.This part is not applicable to a local government unit that has adopted
an ordinance requiring a right-of-way user to obtain a permit or to provide a notice for certain types
of work in lieu of a permit.
Statutory Authority: MS s 237.163
History: 23 SR 2004
Published Electronically:November 14, 2003
7819.1250 INDEMNIFICATION.
Subpart 1.Authority, generally.As a condition for issuing a permit for work on a public
right-of-way, a local government unit may require the permittee to indemnify the local government
unit against liability claims. The local government unit may require indemnification when a permit
authorizes a permittee to obstruct or excavate on or within a public right-of-way to install, maintain,
or repair the permittee's facilities.
Subp. 2.Claims indemnified.The local government unit may require the permittee to defend,
indemnify, and hold harmless the local government unit from all liability or claims of liability for
bodily injury or death to persons, or for property damage, in which the claim:
A.alleges a negligent or otherwise wrongful act or omission of the permittee or its employee,
agent, or independent contractor in installing, maintaining, or repairing the permittee's facilities;
and alleges that the local government unit is liable, without alleging any independent negligent, or
otherwise wrongful, act or omission on the part of the local government unit; or
B.is based on the local government unit's negligent or otherwise wrongful act or omission
in issuing the permit or in failing to properly or adequately inspect or enforce compliance with a
term, condition, or purpose of the permit granted to the permittee.
Subp. 3.Claims not indemnified.A permittee is not required to indemnify a local government
unit for losses or claims occasioned by the negligent or otherwise wrongful act or omission of the
local government unit, except:
A.to the extent authorized in subpart 2 regarding the issuance of a permit or the inspection
or enforcement of compliance with the permit; or
B.when otherwise provided in an applicable franchise agreement.
Subp. 4.Remedy is additional; subrogation.A defense or indemnification of a local
government unit by a permittee is deemed not to be a waiver of any defense or immunity otherwise
available to the local government unit.
Official Publication of the State of Minnesota
Revisor of Statutes
7819.1250MINNESOTA RULES7
A permittee, in defending any action on behalf of the local government unit, is entitled to assert
every defense or immunity that the local government unit could assert in its own behalf.
Subp. 5.Local government unit's authorization to proceed.A local government unit's
authorization to proceed with excavation or obstruction in the right-of-way pursuant to notice under
part 7819.1200 is deemed a permit for the purpose of this part.
Statutory Authority: MS s 237.163
History: 23 SR 2004
Published Electronically:November 14, 2003
7819.1300 COMPLETION CERTIFICATE.
Subpart 1.Requirement.If required by the local government unit as part of its permit process,
a person designated by the right-of-way user as a responsible employee shall sign a completion
certificate showing the completion date for the work performed, identifying the installer and designer
of record, and certifying that work was completed according to the requirements of the local
government unit.
Subp. 2."As built" drawings.If required by the local government unit as part of its permit
process and if necessary due to changes from the work as projected when the permit was applied
for, the permittee shall submit "as built" drawings or maps within six months of completing the
work, showing any deviations from the plan that are greater than plus or minus two feet.
Subp. 3.Response.The local government unit shall respond within 30 days of receipt of the
completion certificate. Failure to approve or disapprove the permittee's performance within 30 days
is deemed to be approval by the local government unit.
Subp. 4.Obligation.Construction triggers an obligation of the right-of-way user that the
right-of-way restoration be completed according to the conditions in part 7819.1100. The
right-of-way user also assumes responsibility for "as built" drawings and for repairing facilities or
structures, including right-of-way that was damaged during facility installation. The obligation is
limited to one year for plantings and turf establishment.
Statutory Authority: MS s 237.163
History: 23 SR 2004
Published Electronically:November 14, 2003
7819.3000 CONSTRUCTION PERFORMANCE BOND.
Subpart 1.Authority to require performance bond.At the time of application for an
excavation permit, the local government unit may require a right-of-way user who elects to restore
the right-of-way to post a construction performance bond, as defined in part 7819.0100, subpart 6.
A local government unit does not need to provide a construction performance bond to ensure
the restoration of streets following its own excavation.
Official Publication of the State of Minnesota
Revisor of Statutes
8MINNESOTA RULES7819.1250
Subp. 2.Amount.The security provided by a construction performance bond must cover an
amount reasonably estimated to restore the right-of-way to the condition that existed before the
excavation, and may also include reasonable, directly related costs that the local government unit
estimates will be incurred if the right-of-way user fails to perform under the bond. Litigation costs
and attorney fees are not direct costs to be included in calculating the amount of the bond.
Subp. 3.Term.If, 24 months after completion of the restoration of the right-of-way, the
representative of the local government unit determines that the right-of-way has been properly
restored, the surety on the construction performance bond must be released.
Statutory Authority: MS s 237.163
History: 23 SR 2004
Published Electronically:November 14, 2003
7819.3100 RELOCATION OF EXISTING FACILITIES.
Subpart 1.Requirement.A right-of-way user shall promptly and at its own expense, with due
regard for seasonal working conditions, permanently remove and relocate its facilities in the
right-of-way when it is necessary to prevent interference, and not merely for convenience of the
local government unit, in connection with: (1) a present or future local government use of the
right-of-way for a public project; (2) the public health or safety; or (3) the safety and convenience
of travel over the right-of-way.
Subp. 2.Exception.Notwithstanding subpart 1, a right-of-way user is not required to remove
or relocate its facilities from a right-of-way that has been vacated in favor of a nongovernmental
entity unless and until the reasonable costs to do so are first paid to the right-of-way user.
Statutory Authority: MS s 237.163
History: 23 SR 2004
Published Electronically:November 14, 2003
7819.3200 RIGHT-OF-WAY VACATION.
Subpart 1.Reservation of right.If the local government unit vacates a right-of-way that
contains the facilities of a right-of-way user and the right-of-way vacation does not require the
relocation of the right-of-way user's facilities, the local government unit shall, except when it would
not be in the public interest, reserve to and for itself and all right-of-way users having facilities in
the vacated right-of-way, the right to install, maintain, and operate facilities in the vacated
right-of-way and to enter upon the right-of-way at any time to reconstruct, inspect, maintain, or
repair the facilities.
Subp. 2.Relocation of facilities.If the local government unit vacates a right-of-way that
contains the facilities of a right-of-way user and the right-of-way vacation requires the relocation
of the right-of-way user's facilities, payment of the relocation costs must be determined as follows:
(1) if the vacation proceedings are initiated by the right-of-way user, the right-of-way user must
pay the relocation costs; (2) if the vacation proceedings are initiated by the local government unit
Official Publication of the State of Minnesota
Revisor of Statutes
7819.3200MINNESOTA RULES9
for a public project, the right-of-way user must pay the relocation costs unless otherwise agreed to
by the local government unit and the right-of-way user; or (3) if the vacation proceedings are
initiated for the purpose of benefiting a person other than the right-of-way user, the benefited person
must pay the relocation costs.
Statutory Authority: MS s 237.163
History: 23 SR 2004
Published Electronically:November 14, 2003
7819.3300 ABANDONED FACILITIES.
A right-of-way user shall notify the local government unit when facilities are to be abandoned.
A right-of-way user that has abandoned facilities in a right-of-way shall remove them from that
right-of-way if required in conjunction with other right-of-way repair, excavation, or construction,
unless this requirement is waived by the local government unit.
Statutory Authority: MS s 237.163
History: 23 SR 2004
Published Electronically:November 14, 2003
MAPPING SYSTEMS
7819.4000 AUTHORITY; PURPOSE.
In managing the use of its public rights-of-way, a local government unit may establish, develop,
and implement a right-of-way mapping system according to this part and part 7819.4100. The
purpose of a mapping system is to:
A.allow flexibility in its use by the local government unit as an effective management tool;
B.enhance public safety and user facility safety;
C.provide for long-term cost savings;
D.improve public right-of-way design quality; and
E.allow for better information collection and cooperative usage among local government
units, telecommunications companies, and other users of the public right-of-way.
Statutory Authority: MS s 237.163
History: 23 SR 2004
Published Electronically:November 14, 2003
7819.4100 REQUIRED MAPPING INFORMATION.
Subpart 1.Application required.When a local government unit requires a permit for
excavation in or obstruction of its public right-of-way, a person wishing to undertake a project
Official Publication of the State of Minnesota
Revisor of Statutes
10MINNESOTA RULES7819.3200
within the public right-of-way shall submit a right-of-way permit application, which may require
the filing of mapping information pursuant to subpart 2.
Subp. 2.Information.The local government unit may require as part of its permit application
the filing of all the following information:
A.location and approximate depth of applicant's mains, cables, conduits, switches, and
related equipment and facilities, with the location based on:
(1)offsets from property lines, distances from the centerline of the public right-of-way,
and curb lines as determined by the local government unit;
(2)coordinates derived from the coordinate system being used by the local government
unit; or
(3)any other system agreed upon by the right-of-way user and local government unit;
B.the type and size of the utility facility;
C.a description showing aboveground appurtenances;
D.a legend explaining symbols, characters, abbreviations, scale, and other data shown on
the map; and
E.any facilities to be abandoned, if applicable, in conformance with Minnesota Statutes,
section 216D.04, subdivision 3.
Subp. 3.Changes and corrections.The application must provide that the applicant agrees to
submit "as built" drawings, reflecting any changes and variations from the information provided
under subpart 2, items A to E.
Subp. 4.Additional construction information.In addition, the right-of-way user shall submit
to the local government unit at the time the project is completed a completion certificate according
to part 7819.1300.
Subp. 5.Manner of conveying permit data.A right-of-way user is not required to provide
or convey mapping information or data in a format or manner that is different from what is currently
utilized and maintained by that user. A permit application fee may include the cost to convert the
data furnished by the right-of-way user to a format currently in use by the local unit of government.
These data conversion costs, unlike other costs that make up permit fees, may be included in the
permit fee after the permit application process.
Subp. 6.Data on existing facilities.At the request of a local government unit, a right-of-way
user shall provide existing data on its existing facilities within the public right-of-way in the form
maintained by the user at the time the request was made, if available.
Statutory Authority: MS s 237.163
History: 23 SR 2004
Published Electronically:November 14, 2003
Official Publication of the State of Minnesota
Revisor of Statutes
7819.4100MINNESOTA RULES11
FACILITY INSTALLATION, CONSTRUCTION, LOCATION
7819.5000 INSTALLATION OF TELECOMMUNICATIONS FACILITY.
Subpart 1.Requirements.The following requirements pertain to telecommunications facility
installation in a public right-of-way.
A.During plowing or trenching of a facility, a warning tape must be placed at a depth of
12 to 18 inches above copper cables with over 200 pairs and above each fiber facility.
B.A directional bore facility within the limits of a city must be placed in conduit below a
concrete- or bituminous-paved road surface or in conduit or armored cable in other locations. The
conduit or armored cable must be of a type determined by the telecommunications right-of-way
user. The city may waive this provision if the right-of-way user agrees to additional marking of the
facility. This provision does not apply to residential connections.
C.A buried telecommunications facility must have a locating wire or conductive shield,
except for dielectric cables.
D.Unless the local government unit directs that no location markers be placed, a location
marker must be placed at least every 1,300 feet, as well as at road crossings and at culverts. For
areas outside of cities, unless the local government unit directs that no location markers be placed,
the markers must be placed at least every 1,300 feet or within line of sight whichever is less, as
well as at road crossings and at culverts.
E.A buried fiber facility installed within the limits of a city must be placed in conduit of
a type determined by the telecommunications right-of-way user, unless this requirement is specifically
waived by the city. A buried fiber facility beyond city limits must be placed by the
telecommunications right-of-way user, in its discretion, using industry-acceptable standards.
F.A buried fiber facility, conditions permitting, must be placed at a minimum depth of 36
inches below the surface and at a maximum depth of 48 inches, unless otherwise altered by the
local government unit on a case-by-case basis.
G.In a city, urban town, urban county, or urban service area, conditions permitting, a copper
facility buried below a concrete- or bituminous-paved road surface must be placed at a minimum
depth of 36 inches below the road surface and a maximum of 48 inches, unless otherwise altered
by the local government unit on a case-by-case basis. Any other copper facility in a city, urban
town, urban county, or urban service area must be placed at a minimum depth of 30 inches below
the surface and at a maximum depth of 48 inches, unless otherwise altered by the local government
unit on a case-by-case basis.
H.A copper facility in a public right-of-way not covered in item G, conditions permitting,
must be placed at a minimum depth of 30 inches below the surface and at a maximum depth of 48
inches, unless otherwise altered by the local government unit on a case-by-case basis.
I.The placing of any telecommunications facility must comply with the National Electric
Safety Code, as incorporated by reference in Minnesota Statutes, section 326B.35.
Official Publication of the State of Minnesota
Revisor of Statutes
12MINNESOTA RULES7819.5000
J.For purposes of this part:
(1)an "urban town" is a town described in Minnesota Statutes, section 368.01,
subdivision 1 or 1a;
(2)an "urban county" is Anoka, Carver, Dakota, Hennepin, Ramsey, St. Louis, Scott,
or Washington county; and
(3)an "urban service area" is an unincorporated area within two miles of the corporate
limits of a city, over which a joint planning board is authorized to exercise planning and land use
control under Minnesota Statutes, section 462.3585.
Subp. 2.Locating, marking, or exposing facility.If a telecommunications facility owner is
unable to locate its underground facility as required under Minnesota Statutes, section 216D.04, it
must expose the facility so that it can be located.
Statutory Authority: MS s 237.163
History: 23 SR 2004; L 2007 c 140 art 5 s 32; art 13 s 4
Published Electronically:November 14, 2003
7819.5100 CONSTRUCTION AND LOCATION REQUIREMENTS.
Subpart 1.Installation requirements for telecommunications facility.The installation of a
telecommunications facility in the right-of-way must be done in conformance with part 7819.5000.
Subp. 2.Installation requirements for gas or electric facility.The installation requirements
for an electric facility must comply with the construction standards established by the National
Electrical Safety Code as directed by the Minnesota Electrical Act, Minnesota Statutes, sections
326.241 to 326.448, or any superseding authority. The installation requirements for a gas facility
must comply with the construction standards established by Code of Federal Regulations, title 47,
parts 191, 192, 193, and 199, as directed by Minnesota Statutes, section 299F.57, or any superseding
legal authority.
Subp. 3.Location of facility.Placement of a facility in a particular location within the
right-of-way must take into account the current and anticipated uses of the right-of-way and the
distinct engineering, construction, operation, and maintenance characteristics of each type of use.
Subp. 4.Access to nontraveled portion of right-of-way.A local government unit shall not
unreasonably prohibit the placement of a facility in the nontraveled portion of the right-of-way.
The traveled portion of the right-of-way includes the shoulder of the road or highway.
Statutory Authority: MS s 237.163
History: 23 SR 2004
Published Electronically:November 14, 2003
Official Publication of the State of Minnesota
Revisor of Statutes
7819.5100MINNESOTA RULES13
7819.9900 UTILITY TRENCH RESTORATION; PLATES 1 AND 2.
Subpart 1.Plate 1.
Official Publication of the State of Minnesota
Revisor of Statutes
14MINNESOTA RULES7819.9900
Subp. 2.Plate 2.
Statutory Authority: MS s 237.163
History: 23 SR 2004
Published Electronically:April 24, 2023
Official Publication of the State of Minnesota
Revisor of Statutes
7819.9900MINNESOTA RULES15
7819.9905 UTILITY TRENCH RESTORATION; PLATES 3 AND 4.
Subpart 1.Plate 3.
Official Publication of the State of Minnesota
Revisor of Statutes
16MINNESOTA RULES7819.9905
Subp. 2.Plate 4.
Statutory Authority: MS s 237.163
History: 23 SR 2004
Published Electronically:April 24, 2023
Official Publication of the State of Minnesota
Revisor of Statutes
7819.9905MINNESOTA RULES17
7819.9910 UTILITY TRENCH RESTORATION; PLATE 5.
Statutory Authority: MS s 237.163
History: 23 SR 2004
Published Electronically:November 14, 2003
Official Publication of the State of Minnesota
Revisor of Statutes
18MINNESOTA RULES7819.9910
7819.9915 UTILITY TRENCH RESTORATION; PLATE 6.
Statutory Authority: MS s 237.163
History: 23 SR 2004
Published Electronically:November 14, 2003
Official Publication of the State of Minnesota
Revisor of Statutes
7819.9915MINNESOTA RULES19
7819.9920 UTILITY HOLE RESTORATION; PLATE 7.
Statutory Authority: MS s 237.163
History: 23 SR 2004
Published Electronically:November 14, 2003
Official Publication of the State of Minnesota
Revisor of Statutes
20MINNESOTA RULES7819.9920
7819.9925 UTILITY HOLE RESTORATION; PLATE 8.
Statutory Authority: MS s 237.163
History: 23 SR 2004
Published Electronically:November 14, 2003
Official Publication of the State of Minnesota
Revisor of Statutes
7819.9925MINNESOTA RULES21
7819.9930 UTILITY HOLE RESTORATION; PLATE 9.
Statutory Authority: MS s 237.163
History: 23 SR 2004
Published Electronically:November 14, 2003
Official Publication of the State of Minnesota
Revisor of Statutes
22MINNESOTA RULES7819.9930
7819.9935 UTILITY HOLE RESTORATION; PLATE 10.
Statutory Authority: MS s 237.163
History: 23 SR 2004
Published Electronically:November 14, 2003
Official Publication of the State of Minnesota
Revisor of Statutes
7819.9935MINNESOTA RULES23
7819.9940 TYPICAL ROAD PLAN; PLATE 11.
Statutory Authority: MS s 237.163
History: 23 SR 2004
Published Electronically:November 14, 2003
Official Publication of the State of Minnesota
Revisor of Statutes
24MINNESOTA RULES7819.9940
7819.9945 TYPICAL ROAD RESTORATION; PLATE 12.
Statutory Authority: MS s 237.163
History: 23 SR 2004
Published Electronically:November 14, 2003
Official Publication of the State of Minnesota
Revisor of Statutes
7819.9945MINNESOTA RULES25
7819.9950 TYPICAL ROAD SHOULDER RESTORATION; PLATE 13.
Statutory Authority: MS s 237.163
History: 23 SR 2004
Published Electronically:November 14, 2003
Official Publication of the State of Minnesota
Revisor of Statutes
26MINNESOTA RULES7819.9950