Loading...
HomeMy WebLinkAbout#16 - 2025 Street and Utility Improvements STAFF REPORT DATE: September 17, 2024 REGULAR AGENDA ITEM: Authorize Preliminary Design, Geotechnical Services and Feasibility Report for the 2025 Street and Utility Improvements SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Nicole Miller, City Administrator Clarissa Handler, Finance Director Marty Powers, Public Works Director Chad Isakson, Assistant City Engineer ISSUE BEFORE COUNCIL: Should the City Council authorize preliminary design, geotechnical services and the preparation of a feasibility report for the 2025 Street and Utility Improvements? BACKGROUND: The City maintains a 10-year revolving Street Capital Improvement Program (Street CIP) to promote the strategic use of limited financial resources while maintaining, developing or replacing the City’s local street network to an acceptable level of service. The Street CIP consists of a 10-year overview of scheduled capital street projects to address pavements that have or are projected to exceed their useful pavement service life and can no longer be effectively maintained, and to address transportation capacity limitations. The 10-year horizon of the CIP provides the city with an opportunity to evaluate project priorities annually and to adjust the timing, scope, and cost of projects as new information becomes available. PROPOSAL DETAILS/ANALYSIS: The following public streets have been identified for improvement in 2025: • 59th Street Circle North, from Keats Avenue to the west loop (Prairie Hamlet); • 55th Street North, from 57th Street to the north cul-de-sac (Judith Mary Manor); • 57th Street North, from 55th Street to Julep Way (Rolling Hills Estates); • Julep Way North, from 57th Street to the south cul-de-sac and 55th Street North, from Keats Avenue to the west cul-de-sac (Lake Elmo Vista); • Jasper Avenue North, from Jane Road to the north cul-de-sac, 49th Street North, from Jasper Avenue to Jerome Avenue, and Jerome Avenue North, from 49th Street to the east cul-de-sac (Teal Pass Estates); and • Irish Court North, from Lake Jane Trail to south end cul-de-sac, have been identified for improvement in the year 2025. The project will include street and drainage improvements along and within the public right-of-way, with the type and extent of the street improvement to be based upon a geotechnical services investigation of the existing pavement sections and conditions. Existing storm sewer inspections will be conducted to identify storm sewer repairs or corrections deemed necessary to restore or improve the existing roadway drainage. There is no existing sanitary sewer or public watermain along any of the existing streets, and all areas reside outside of the City’s planned MUSA boundaries. Therefore, no sanitary sewer extensions are planned with this Project. In addition, no public watermain extensions have been planned or programmed by the City along these identified streets. However, staff is proposing that the Project investigate the feasibility and cost to potentially extend City water to the Prairie Hamlet properties, along 55th Street (Lake Elmo Vista) and along Irish Court as these neighborhoods are currently adjacent to existing public watermains. The feasibility and costs can then be presented to the Council and the impacted property owners to decide whether to proceed with the installation of public watermain as part of the Project. In order to initiate the improvement, the council must authorize the preparation of a feasibility report as required by the statutory process for public improvements that are specially assessed. The feasibility report will advise on the scope of recommended improvements; provide estimated project costs; identify easement and right-of-way, permits and other requirements of other local agencies needed to implement the improvements; recommend whether the improvements should be best made as proposed or in connection with some other improvement; and advise if the improvements are necessary, cost effective, and feasible. The report will also provide a proposed preliminary assessment roll for each of the benefitting properties based upon the City’s Special Assessment Policy for Local Improvements. FOCUS Engineering has prepared the project work plan and engineering services task order to initiate detailed topographic survey and preliminary design for this Project. These preliminary design efforts are recommended for this Project to better identify the specific infrastructure improvements that will be needed, before reliable costs and proposed assessments can be determined and brought forward in the feasibility report. The City Engineer worked with SEH, Inc. and Bolton and Menk, Inc. to prepare a preliminary design scope of work and fee estimate. Each proposal has been reviewed to verify that the full scope of services being requested have been provided. Staff is recommending that the City authorize the City Administrator to sign a Task Order for Preliminary Design Services with Bolton and Menk in the amount of $55,570 (SEH proposal was in the amount of $74,450). FOCUS Engineering also obtained proposals from AET, Inc. and Braun Intertec for Geotechnical Investigations. The Geotechnical Services will review the in-place roadway structure and soil conditions and provide recommendations on proposed roadway improvements. Staff is recommending that the City authorize the City Administrator to retain AET, Inc. in the amount of $16,294.50 (Braun Intertec proposal was in the amount of $19,520). A project schedule is attached and outlines the implementation timeframe necessary to address public involvement, acquire field survey, identify and obtain project related easements, complete the detailed design, and to receive contractor bids to ready the improvements for construction in 2025. FISCAL IMPACT: $91,900. If authorized, Bolton and Menk will complete topographic survey and preliminary design services in a not to exceed amount of $55,570; FOCUS Engineering will be the engineering lead for all services and prepare the feasibility report in a not to exceed amount of $20,000; and AET Inc. will complete Geotechnical Services in a not to exceed amount of $16,294.50. If the improvements are ordered, the preliminary design costs will be charged against the project fund and become assessable to the benefitting properties. Should the project not be constructed, these costs cannot be assessed. RECOMMENDATION: Staff is recommending that the City Council approve a Resolution Ordering Preparation of Preliminary Design, Geotechnical Services and Feasibility Report for the 2025 Street and Utility Improvements. The recommended motion for this action is as follows: “Move to approve Resolution No. 2024-101, ordering preparation of Preliminary Design, Geotechnical Services and Feasibility Report for the 2025 Street and Utility Improvements”. ATTACHMENTS: 1. Resolution Ordering Preparation of Preliminary Design, Geotechnical Services and Feasibility Report for the 2025 Street and Utility Improvements. 2. Project Location Map. 3. Project Schedule. 4. Bolton and Menk Task Order for Preliminary Design Engineering Support Services. CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2024-101 A RESOLUTION ORDERING THE PREPARATION OF PRELIMINARY DESIGN, GEOTECHNICAL SERVICES AND FEASIBILITY REPORT FOR THE 2025 STREET & UTILITY IMPROVEMENTS WHEREAS, the City maintains a 10-year revolving Street Capital Improvement Program (Street CIP) to promote the strategic use of limited financial resources while maintaining, developing or replacing the City’s local street network; and WHEREAS, the Street CIP represents the City’s long-range street improvement program that identifies the present and future needs and priorities, and develops a schedule of public improvements to address the most essential improvements first; and WHEREAS, the public streets located along 59th Street Circle North, from Keats Avenue to the west loop (Prairie Hamlet); 55th Street North, from 57th Street to the north cul-de-sac (Judith Mary Manor); 57th Street North, from 55th Street to Julep Way (Rolling Hills Estates); Julep Way North, from 57th Street to the south cul-de-sac and 55th Street North, from Keats Avenue to the west cul-de-sac (Lake Elmo Vista); Jasper Avenue North, from Jane Road to the north cul-de-sac, 49th Street North, from Jasper Avenue to Jerome Avenue, and Jerome Avenue North, from 49th Street to the east cul-de-sac (Teal Pass Estates); and Irish Court North, from Lake Jane Trail to south end cul-de-sac, have been identified for improvement in the year 2025; and WHEREAS, the 2025 Street and Utility Improvement project also proposes to investigate the feasibility and cost to potentially extend City water to the Prairie Hamlet properties, along 55th Street (Lake Elmo Vista) and along Irish Court as these neighborhoods are currently adjacent to existing public watermains; and WHEREAS, it is proposed to assess the benefiting properties for all or a portion of the cost of the improvement, pursuant to the City’s Special Assessment Policy and Minnesota Statues Chapter 429. NOW, THEREFORE, BE IT RESOLVED, That the proposed improvement, called 2025 Street and Utility Improvements, be referred to the City Engineer, and his consultants to complete the preliminary design engineering, geotechnical investigations, and prepare a feasibility report in accordance with Minnesota Statues Chapter 429 for the proposed improvements, and to report to the council with all convenient speed advising the council in a preliminary way as to whether the proposed improvement is necessary, cost-effective, and feasible; whether it should be best made as proposed or in connection with some other improvement; the estimated cost of the improvement as recommended; and a description of the methodology used to calculate individual assessments for affected parcels. ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE SEVENTEENTH DAY OF SEPTEMBER, 2024. CITY OF LAKE ELMO (Seal) By: __________________________ ATTEST: Charles Cadenhead, Mayor ________________________________ Julie Johnson, City Clerk LOCATION MAP FIGURE NO. 1 CITY OF LAKE ELMO PROJECT NEIGHBORHOOD LEGEND IMPROVEMENTS PROJECT NO. 2024.114 PROJECT STREETS IRISH COURT N PRAIRIE HAMLET LAKE ELMO VISTAROLLING HILLS ESTATES JUDITH MARY MANOR TEAL PASS ESTATES 2025 STREET & UTILITY          PROJECT SCHEDULE  CITY OF LAKE ELMO  2025 STREET AND UTILITY IMPROVEMENTS  PROJECT NO. 2024.114        SEPTEMBER 17, 2024  Council authorizes preparation of Preliminary Design, Geotechnical Services and  Feasibility Report.    DECEMBER 3, 2024  Presentation  of Preliminary  Design  Findings  and  Recommendations.  Authorize  preparation of Plans and Specifications.    JANUARY 16, 2025  Neighborhood informational meeting(s) on scope of improvements.    FEBRAURY 18, 2025  Council accepts the Feasibility Report and Calls for Public Hearing. Council approves  Plans and Specifications and orders Advertisement for Bids.    MARCH 20, 2025  Project Bid Date: Receive contractor bids.    MARCH 27, 2025  Neighborhood informational meeting(s) on Preliminary Assessments.    APRIL 1, 2025  Public  Improvement  Hearing.  Council  Orders  the  Improvement  (4/5th  Vote).  Council accepts Bids and awards Contract.     MAY, 2025    Conduct Pre‐Construction Meeting and issue Notice to Proceed.   SEPTEMBER 12, 2025    Substantial Completion.   OCTOBER 31, 2025    Final Completion.    *Final Assessment Hearing Schedule TDB       TASK ORDER NO. 25 – 2025 STREET AND UTILITY IMPROVEMENTS                   Page 1 of 4                                             TASK ORDER               No. 25  CITY OF LAKE ELMO, MINNESOTA – BOLTON AND MENK, INC.  PROFESSIONAL CONSULTING SERVICES AGREEMENT    In accordance with ARTICLE 1 of the Master AGREEMENT between the City of Lake Elmo (“CITY”) and  Bolton and Menk, Inc. (“ENGINEER”), dated MARCH 20, 2013 (“AGREEMENT”), the ENGINEER agrees  to provide Professional Consulting Support Services as follows:      2025 STREET AND UTILITY IMPROVEMENTS    PROJECT OVERVIEW: This Project includes Professional Engineering Services for the 2025 Street and  Utility  Improvements,  to  be  authorized  in  phases  and  beginning with  preliminary  design  and  feasibility report support services. Upon completion of the preliminary design and feasibility report  support services, this Task Order may be later amended to authorize the preparation of plans and  specifications and/or construction phase support services as may be applicable.     The improvements include the rehabilitation of the public streets, consisting of approximately 8,000  feet (1.5 miles) of local streets located in 6 neighborhoods as follows:     Prairie Hamlet:  59th Street Circle North, from Keats Avenue to the west loop.   Judith Mary Manor: 55th Street North, from 57th Street to the north cul‐de‐sac.   Rolling Hills Estates: 57th Street North, from 55th Street to Julep Way.   Lake Elmo Vista: Julep Way North, from 57th Street to the south cul‐de‐sac; and 55th Street  North, from Keats Avenue to the west cul‐de‐sac.   Teal Pass Estates: Jasper Avenue North, from Jane Road to the north cul‐de‐sac; 49th Street  North, from Jasper Avenue to Jerome Avenue; and Jerome Avenue North, from 49th Street to  the east cul‐de‐sac.   Irish Court North, from Lake Jane Trail to south end cul‐de‐sac.    The  improvements  will  consist  of  either  a  full  street  reconstruction  or  full‐depth  pavement  reclamation, to be determined through a detailed geotechnical investigation. New concrete curb and  gutter  will  be  installed  to  replace  the  existing  bituminous  curb.  In  addition  to  the  street  improvements, the storm sewer or drainage along each street will be reviewed and upgraded as  necessary to prevent water from standing on or along the street, and to repair or replace existing  storm sewer infrastructure as recommended through the preliminary design site investigations.    Due to the proximity to existing public watermains, the preliminary  design  will  also  include  a  recommended layout and cost estimate to extend City water to serve each property along 59th Street  Circle (Prairie Hamlet); 55 Street (Lake Elmo Vista), and Irish Court. The preliminary cost estimates will  be presented to the property owners and City Council as part of  the  feasibility  report  for  consideration to incorporate watermain extensions in one or more area of the project.             TASK ORDER NO. 25 – 2025 STREET AND UTILITY IMPROVEMENTS                   Page 2 of 4                                             SERVICES TO BE PROVIDED BY ENGINEER: Bolton and Menk, Inc., Inc. shall provide the following  Professional Engineering Services:     1. Project management throughout the course of work for preparation of preliminary design  documents including a monthly PMT meeting, and submittal of a weekly progress memo and  job to date budget form.  2. Work with city staff to develop success criteria for the project, obtain project information and  formalize the budget and schedule.   3. Review of existing as‐built plans as made available by the CITY.  4. Site visit to review existing pavement conditions, drainage patterns and to define project  limits based on existing pavements.   5. Survey: Coordinate Gopher State One Call utility locates and perform topographic survey of  existing conditions within project limits for the purposes of preparing design documents.   6. Perform condition review of existing drainage and storm sewer systems, perform unconfined  visual observations, and make recommendations regarding additional storm sewer televising,  if needed.  7. Make recommendations of storm sewer repairs and new storm sewer improvements to be  completed as part of the project.   8. Review Geotechnical Report findings and recommendations obtained by the CITY.  9. Prepare  preliminary  design  including  street  rehabilitation  recommendations,  watermain  layout, where applicable, and stormwater management.  10. Review County GIS maps and half section maps to review existing right‐of‐way and easements  within the project area. Identify right of way and easement needs to construct the proposed  infrastructure.  11. Identify any major utility conflicts related to the proposed preliminary design.  12. Identify permits required to complete the proposed work.  13. Prepare Preliminary Design Memorandum outlining the proposed scope of improvements and  a summary of the stormwater management plan for meeting watershed permit requirements.  14. Prepare opinion of probable cost based on the preliminary design layout. Project Costs shall  be categorized as directed by the CITY for the purpose of preparing preliminary assessment  calculations and for use in the feasibility report. Assessment calculations to be performed by  the CITY.  15. Prepare Exhibit(s) showing the proposed improvements for use in the Feasibility Report.    DELIVERABLES:   Preliminary Plans in electronic format (PDF).   Preliminary Opinion of Total Probable Project Costs.    Preliminary Design Memorandum summarizing preliminary final design assumptions,  proposed  scope  of  improvements, watershed  management  requirements  and  mitigation measures, and other performance criteria incorporated into the project.   Identification of easements needed for the construction of the Project. Preliminary  easement needs Exhibit(s), if needed.   Feasibility Report Exhibit(s).            TASK ORDER NO. 25 – 2025 STREET AND UTILITY IMPROVEMENTS                   Page 3 of 4                                             CITY RESPONSIBILITES:  The CITY (or its consultants) will provide the following:    1. Retain geotechnical investigation and provide copy of geotechnical report.  2. Coordination with the public and conduct public meetings.  3. Presentation(s) to the City Council.  4. Easement negotiations and acquisition.  5. Review of preliminary plans.  6. Preparation of the Feasibility Report, including assessment calculations, assessment Role and  Conduct Public Improvement Hearing.    TIMES FOR RENDERING SERVICES:  ENGINEER shall perform its services and provide deliverables in  accordance with the following schedule, contingent upon receipt of the Geotechnical Services Report.  1. September 17, 2024. Preliminary Design Services authorized.  2. December  3,  2024.  Presentation  of  Preliminary  Design  Findings  and  Recommendations  to  Council.  CITY’S REPRESENTATIVE AND CONTRACT ADMINISTRATION:  The CITY’s representative with respect  to  services  rendered  by  ENGINEER  under  this  TASK  ORDER  shall  be the City Engineer.  Project  correspondence must be addressed to:  Jack Griffin, P.E., City Engineer   City of Lake Elmo   3800 Laverne Avenue North  Lake Elmo, MN 55042  651.300.4264     Email: Jack.griffin@focusengineeringinc.com    COMPENSATION:  Compensation to ENGINEER shall be based on the hourly billing rates for each staff  as assigned and provided in the ENGINEER’S Proposal and Fee Estimate for the work. Invoices shall be  submitted once each month and should be sent to the attention of the City Engineer. Payment for  Services shall be in accordance with ARTICLE 3.2 of the Master AGREEMENT.  Compensation to ENGINEER for Project Management, Topographic Survey,  and  the  Preliminary  Design Services shall be on an hourly rate basis in a not to exceed amount of $55,570.    ADDITIONAL SERVICES:  If authorized by the CITY, ENGINEER shall furnish or obtain from others  Additional  Services  which  are  not  considered  under  this  Task  Order.  Such  services  shall  be  compensated for on an Hourly Rate basis in an amount approved by the City prior to any services  being started or as otherwise mutually agreed. The CITY is not obligated to compensate ENGINEER for  services completed outside the approved scope of work which are completed prior to ENGINEER  submitting a written request to the CITY, and receiving written approval of the CITY.    ATTACHMENTS:  ENGINEER’s Proposal and Fee Estimate dated September 9, 2024.        TASK ORDER NO. 25 – 2025 STREET AND UTILITY IMPROVEMENTS                   Page 4 of 4                                             APPROVAL  AND  ACCEPTANCE:  Approval  and  Acceptance  of  this  Task  Order,  including  the  attachment(s) listed above, shall incorporate this document as part of the AGREEMENT. ENGINEER is  authorized to begin performance of services upon receipt of a copy of this Task Order signed by CITY.    The Effective Date of this Task Order is September 17, 2024.    BOLTON AND MENK, INC.    CITY OF LAKE ELMO, MINNESOTA      By _________________________________   By ______________________________________  (Authorized Principal of the Firm)  City Administrator      Client:City of Lake Elmo Project:2025 Street and Utility Improvements TASK NO.WORK TASK DESCRIPTION Project ManagerMike WarnerProject EngineerColeton NelsonEngineering TechnicianStormwater ManagerBrent JohnsonStormwater EngineerBrian RuckerSurvey ManagerRon AlwinGraduate SurveyorJeff CornellSurvey Field TechnicianSurvey Crew(2-person)ClericalCourtney MaulTotals 1.0 Preliminary Design 1.1 Project Management 10 2 12 1.2 Develop Critical Success Criteria 1 1 2 1.3 Review Existing As-Built Plans 1 4 5 1.4 Site Visit to Review Existing Conditions 4 4 8 1.5 Topographic Survey of Existing Conditions 1 4 10 10 70 16 4 115 1.6 Review Condition of Existing Storm Sewer System 1 12 10 23 1.7 Recommendation of Storm Sewer Repairs and Modifications 1 4 4 16 25 1.8 Review Geotechnical Report 2 4 6 1.9 Preliminary Design and Stormwater Management Plan 8 24 2 4 38 1.10 Review Existing R/W and Easements and Identify Needs 1 4 2 7 1.11 Identify Major Private Utility Conflicts 1 2 3 1.12 Identify Applicable Permits 1 2 1 2 6 1.13 Prepare Preliminary Design Memo 4 20 4 28 1.14 Prepare Preliminary Opinion of Probable Costs 2 12 14 1.15 Prepare Feasibility Report Exhibit(s)2 16 18 TOTAL HOURS - TASK 1 40 115 10 7 26 12 10 70 16 4 310 BOLTON & MENK, INC. 2025 Street and Utility Improvements City of Lake Elmo, Minnesota Client: City of Lake Elmo Project: 2025 Street and Utility Improvements TASK NO.WORK TASK DESCRIPTION Project ManagerMike WarnerProject EngineerColeton NelsonEngineering TechnicianStormwater ManagerBrent JohnsonStormwater EngineerBrian RuckerSurvey ManagerRon AlwinGraduate SurveyorJeff CornellSurvey Field TechnicianSurvey Crew(2-person)ClericalCourtney MaulTotal Hours Total Cost 1.0 Preliminary Design 40 115 10 7 26 12 10 70 16 4 310 $55,570 TOTAL HOURS 40 115 10 7 26 12 10 70 16 4 310 AVERAGE HOURLY RATE $196.00 $156.00 $147.00 $200.00 $166.00 $200.00 $129.00 $189.00 $325.00 $121.00 SUBTOTAL $7,840 $17,940 $1,470 $1,400 $4,316 $2,400 $1,290 $13,230 $5,200 $484 $55,570TOTAL FEE BOLTON & MENK, INC. 2025 Street and Utility Improvements City of Lake Elmo, Minnesota