HomeMy WebLinkAbout00 - 06-17-24 Full PCMP
NOTICE OF MEETING
City of Lake Elmo Parks Commission
3880 Laverne Avenue North
June 17, 2024
6:30 p.m.
AGENDA
1. Call to Order
2. Pledge of Allegiance
3. Approve Agenda
4. Approve Minutes
a) May 20th, 2024
5. Public Comment
6. Sand Volleyball Courts
7. Lions Multi-use Court
8. Communications
9. Adjourn
***Note: Every effort will be made to accommodate person or persons that need special considerations to attend this meeting
due to a health condition or disability. Please contact the Lake Elmo City Clerk if you are in need of special accommodations.
Our Mission is to Provide Quality Public Services in a Fiscally
Responsible Manner in Partnership with our Community.
City of Lake Elmo Parks Commission Minutes
May 20, 2024 Members Present: Commissioners Kastler, Elam, Hoelscher, Esch, Bloyer, Barrett, and Sturtz Absent: none Staff Present: Assistant Public Works Director Swanepoel The meeting was called to order by Kastler at 6:30 PM. Approval of Agenda Barrett motioned to approve the agenda, Hoelscher provided a second; no discussion. Motion approved 7-0. Approval of Minutes Elam motioned to approve the April 15, 2024 Parks Commission Minutes, Hoelscher provided a second; no discussion. Motion passed 6-0-1, Kastler abstained. Public Comments Diane Polasik at 14400 N 94th Street in Stillwater and Mark Wetzel at 4880 39th Ave. S. in Minneapolis,
provided comments regarding the benefits of community centers and proposing the potential development of one in the area. They also promoted the benefits of the Cimarron Community Garden for interested residents. Parks Master Plan Anna, Boulton and Menk representative, provided background information and presented the Master
Plan. The Commission had questions, provided comments and proposed edits. Barrett moved to recommend the Parks Master Plan draft to the City Council for approval, Hoelscher provided a second; discussion. Motion passed unanimously 7-0. Lions Park Ice Rink
Assistant Public Works Director Swanepoel presented the current conditions of the court and options for repair. Commission questioned rink materials and possible use in other park locations. Hoelscher motioned to table the ice rink for two meetings and directed staff to bring back other options, in addition to the two listed, including the use of maintaining the multipurpose with the liner and with the possibility of including the pleasure rink or putting these in other locations, Bloyer provided a second; discussion. Motion passed unanimously 7-0. Capital Improvement Plan (CIP) Assistant Public Works Director Swanepoel presented. The Commission had questions, provided comments and suggested edits.
Hoelscher motioned to approve the 2025-2034 Capital Improvement Plan with the addition of the multiuse park for $100,000 in 2026, the baseball muti-sport facility in 2029, and new pavilions to be named later in 2026, 2027, 2028, 2029, and 2030; Barrett proved a second. Discussion. Esch friendly amended the motion to add a line item for Invasive Species Management for $25,000 in 2026, Hoelscher provided a second; amendment passed 6-0-1, Bloyer abstain. Discussion. Motion passed 6-0-1, Bloyer abstained. Communications
a) Pickleball court update.
b) Dog park grand opening invite.
c) Tablyn Park parking lot update.
d) Barrett inquired about lighting, the fence gap, nets, and parking at Pebble Park.
e) Bloyer resignation in August.
Kastler adjourned the meeting at 9:06 PM Respectfully Submitted Rebecca McGuire, Deputy Clerk
STAFF REPORT
DATE: 06/17/2024
Motion
TO: Parks Commission
AGENDA ITEM: Sand Volleyball Courts
FROM: Adam Swanepoel, Assistant Public Works Director
REVIEWED BY: Marty Powers, Public Works Director
BACKGROUND:
As part of a solution to the lack of sand volleyball courts in 2021, the parks commission added additional
sand courts to the 2024 CIP. With Lions Park being the only park in the system with sand courts, the
courts are used often and reserved throughout the summer months.
ISSUE BEFORE THE COMMISSION:
Would the parks commission like to recommend to council new sand volleyball courts be added to the park
system?
PROPOSAL DETAILS/ANALYSIS:
Staff has reviewed the areas available in city parks which would be suitable of having sand volleyball
courts. Some of the site conditions considered were open space up to 80 feet x 80 feet, flat area, minimal
leafed trees, and parking. These conditions were considered in order to provide options for two courts,
reduce vegetation growth within the courts and having parking access for its users.
Construction of the courts would be completed by public works staff. Current soil from the potential area
would be removed up to 20” deep. That material depending on location would remain on site or be moved
offsite. Staff would install drain tile to eliminate water from sitting inside the play area. Staff would then
backfill the area with course mason sand which would be purchased from a local vendor. Nets and poles
would be purchased and installed by staff for the completion of the project. Any fencing would be
contracted out and installed by a vendor.
Available sites for sand volleyball include:
Option 1: Pilot Park – capable of 1 or 2 courts on the North – East corner of the park. Staff would suggest
to include a fence on two sides of the court to prevent the game ball from leaving the park and onto the
street.
Option 2: Ivywood Park – capable of 1-2 courts which would sit east of current pavilion. With this location
staff would suggest a fence on the south side of the courts to prevent the game ball from entering the street.
Option 3: Carriage Station – capable of 1 court in-between the current basketball court and pavilion.
Court size is correlated with the type of park. Pilot and Carriage Station are determined neighborhood parks
while Ivywood is being considered as a community park. Staff would suggest 1 court at a neighborhood
park and consider two courts at a community park
Cost analysis of the project would consists of:
Nets /Poles - $2000 per court
Sand – 200 cu. yd. per court - $12,000 per court
Fencing - $40 per foot - $3,200 per side/court
FISCAL IMPACT:
The addition of sand volleyball courts has been outlined in the 2024 CIP. As part of the CIP $30,000 was
budgeted for the courts which would come directly from the Parks Dedication Funds.
RECCOMMENDATION:
Staff recommends the following motion:
Move to recommend to City Council the addition of 1 sand volleyball courts at Pilot Park and 1 sand
volleyball court at Carriage Station.
STAFF REPORT
DATE: 06/17/2024
MOTION
AGENDA ITEM: Lions Park – Multiuse Courts
TO: Parks Commission
SUBMITTED BY: Adam Swanepoel, Assistant Public Works Director
REVIEWED BY: Marty Powers, Public Works Director
BACKGROUND:
At the May 2024 Parks Commission meeting, the discussion of the Lion’s Park multi-use courts
was tabled to provide additional location options for an ice rink or pleasure rink. Additional ice
rinks in the city are not being considered at this time by staff. Current staffing conditions would
not support the labor needed to maintain an additional rink within the city. The city is being
directed to reduce water usage throughout the year and adding an additional rinks would not
show our efforts in water conservation. If the Parks Commission chooses to remove the hockey
rink from this location they could still consider a pleasure rink in Lions Park
As part of the March 19, 2018 Parks Commission Meeting a proposal was brought forward and
discussed with the recommendation of the Parks Commission to transform the existing tennis
court area into a multi-use Pickle Ball and Hockey Rink with boards which encompassed the
area. This proposal was approved by City Council and construction was completed in 2019.
In the past two years staff have had an increase in the number of complaints regarding the
conditions of the pickle ball courts at Lions Park which included cracking of the surface and
pealing of the color coating. In April, 2024 staff removed one of the playing nets from the area
due to the surface causing a tripping hazard. Staff noticed under the surface layer of paint was
also a deteriorating layer of asphalt. C&H Sport Surfacing provided the city with a review of the
courts. It was noted, deterioration of the asphalt will likely continue and resurfacing the courts
with paint would not hold up.
Using the area as an ice rink in the winter and pickle ball courts in the summer has created issues
with the pickle ball surface and underlying asphalt. The freeze and thawing action of the ice
during our winter months causes the current cracks to become larger and more define in a short
period of time. In order to hold water in the rink, the center drain is plugged in the winter
months. This causes the water to sit on the surface longer and go through the freeze/thaw cycle
for an extended period of time. Staff suggests using the area for only one sport to minimize court
damage.
ISSUE BEFORE THE COMMISION:
What would the parks commission recommend to do with the multi-use area?
PROPOSAL DETAILS/ANALYSIS:
Page 2
The pickle ball courts at Lions Park were heavily used since their install in 2019 and the sport
has seen a large increase in the amount of players. The city currently has one pair of pickle ball
courts in Ivywood Park and 10 additional courts in Pebble and Tablyn Park for the public use at
no cost. A private indoor court is currently also available for the public near the intersection of
Lake Elmo Ave and Hudson Blvd. Benefits of keeping pickle ball in Lions Park is the ability to
have lighting in early summer and fall and its proximity to the downtown area. Pickle ball courts
have minimal maintenance for staff. Set up and removal of the nets in the spring and fall along
with weekly garbage pickup. Courts should be resurfaced every 5-7 years, cost to resurface the
area could cost $10,000-$14,000 .
Currently Lions Park is the only city owed ice rink within our parks system. In the past staff has
flooded an additional areas near the hockey rink to make for an additional pleasure rink. Benefits
of keeping the Lion’s Park rink is the lighted area and Dasher Boards for the use of hockey.
Keeping the area as an ice rink has more associated maintenance cost. Flooding of the rink takes
up to several days of staff time in the early mornings to establish good ice and then routine
flooding a few times a week to maintain a smooth top layer of ice for skating. Each year staff can
use 10,000 gal of water to fill the rink for its first use. Snow removal from the rink is normally
completed 1-2 days after a snowfall and depends on staff availability, weekends/ holidays, the
season temperatures and snow fall totals. Public Works currently does not have an overtime
budget for park related tasks.
In the past a pleasure rink has been created in addition to the hockey rink at the Lion’s Park
location. Staff has not seen a demand for the pleasure rink and with unexpected winter conditions
elected not to continue flooding the area. Staff could consider bringing back the pleasure rink in
at Lions Park location if the demand for additional rink was warranted.
FISCAL IMPACT:
Costs of utilizing the court for one sport may vary over time. Commissioners should consider
future funding to resurface the area as soon as 2025 if the intent is to keep it for pickle ball use. If
the intention is to keep the area hockey, Public Works would being making changes in 2025,
which would include PW labor and equipment, disposal of the existing asphalt, eliminating the
center drain, the use of our existing millings stock pile and some additional class 5 lime rock on
the surface to lessen the dark color that the sun would use to melt ice. Estimated cost for this
would not exceed $5000 and would be funded from Public Works Operating Expenses
Keeping the area for pickle ball only or for both pickle ball and hockey, could cost up to $75,000
the first year and an additional $10,000 - $14,000 every 7 years. Due to the challenges the center
drain creates with warmer air rising (melting the ice) staff recommends removing the drain and
re-grading the court so it sheds off the court to the outer perimeter.
OPTIONS:
Option 1: Utilizing the area as an Ice Rink Only.
Making use of the area as an ice rink only will eliminate the cost of repaving the area and
then resurfacing the area every 5-7 years. Staff would cap the center drain, remove the asphalt
and fill the area flat with aggregate material. This will provide a flat area to make ice and
eliminate the soft spot which is created by the drain.
Page 3
Option 2: Resurface for Pickle ball only
Utilizing the area for pickle ball only will reduce staff ice making and snow removal time
along with reducing water use. Staff would eliminate the drain, raise the center with millings and
contract a frim to, repave the courts followed by resurfacing and painting the area for pickle ball.
Option 3: Reconstruct the surface for both Hockey and Pickle ball
PW staff would eliminate the drain, raise the center with millings and contract a firm to
repave the area followed by resurfacing and painting the courts for pickle ball. PW would also
purchase a liner to minimize any future water and ice from penetrating into the asphalt due to
flooding for ice, which causes the premature cracking and surface failure.
RECOMMENDATION:
“Recommend to City Council Option “____” for the multiuse area at Lions Park.