HomeMy WebLinkAbout#10 - Washington County CIP Comments STAFF REPORT DATE: October 15, 2024 CONSENT AGENDA ITEM: Approve City Comments on the Washington County DRAFT 2025-2029 Capital Improvement Plan (CIP) SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Nicole Miller, City Administrator Jason Stopa, Community Development Director Marty Powers, Public Works Director Chad Isakson, Assistant City Engineer ISSUE BEFORE COUNCIL: Should the City Council approve City comments on the Washington County DRAFT 2025-2029 Capital Improvement Plan? BACKGROUND: On October 1, 2024, staff received notice from Washington County that the Draft 2025- 2029 Capital Improvement Plan (CIP) was available for review and comment. Comments must be received by November 1, 2024 for consideration when adopting the final CIP. As part of the annual budget process, Washington County prepares a five-year Capital Improvement Plan (CIP), which includes the county's tentative plans for roads, bridges, parks, land, trails, transit, and public facilities. The first year of this plan is included in the county's proposed 2025 budget. The “out-years” of 2026-2029 reflect projected needs and estimated costs, which may change based on future priorities and funding opportunities. Projects that were budgeted in prior years, and are not yet complete, are not reflected in the draft 2025-2029 CIP. Funding for the completion of those projects has been set aside, and therefore aren’t reflected in future years’ CIP documents. A full copy of the draft CIP document is available online at the County website. The attached packet highlights the substantial transportation roadway related projects included within the City of Lake Elmo over the next five years. Parks and Public Facility projects are generally not included in this review, with the exception of comments regarding the Central Greenway Regional Trail. It should also be noted that the County completes intersection control projects and pavement preservation projects each year but the work related to these improvements are not specifically identified within the CIP document. The County is budgeting and average of $620,000 per year for intersection control project(s), and has budgeted $35M over 5 years for various pavement maintenance and preservation projects. PROPOSAL DETAILS/ANALYSIS: Staff has reviewed the County’s Draft 2025-2029 CIP and has prepared comments as outlined on the attached letter for consideration. FISCAL IMPACT: No Fiscal Impacts at this time. However, County improvement projects completed within the City of Lake Elmo often contain a cost participation by the City. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the consent agenda, the City comments to be submitted to Washington County regarding the County’s 2025-2029 Capital Improvement Plan. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve City comments to be submitted to Washington County regarding the County’s 2025- 2029 Capital Improvement Plan with comments to be submitted on or before November 1, 2024.” ATTACHMENTS: 1. Draft City Comment Letter. 2. Summary packet of the Washington County Draft 2025-2029 Capital Improvement Plan. 3. County CIP Location Map. CIP 2025-2029 PROJECTS BY CATEGORY Project Category Proposal 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total Road & Bridge $60,063,800 $90,888,700 $91,420,000 $42,761,100 $34,045,000 $319,178,600 RB-2201 $620,000 $620,000 $770,000 $620,000 $920,000 $3,550,000 RB-2203 $250,000 $250,000 $200,000 $200,000 $200,000 $1,100,000 RB-2204 $6,650,000 $7,200,000 $5,600,000 $7,150,000 $8,450,000 $35,050,000 RB-2216 $500,000 $350,000 $500,000 $500,000 $350,000 $2,200,000 RB-2580 $200,000 $350,000 $0 $0 $0 $550,000 RB-2582 $800,000 $2,689,000 $0 $0 $0 $3,489,000 RB-2609 $1,100,000 $0 $14,400,000 $0 $0 $15,500,000 RB-2629 $0 $0 $1,100,000 $0 $5,500,000 $6,600,000 RB-2639 $9,100,000 $0 $0 $0 $0 $9,100,000 RB-2641 $0 $0 $0 $0 $250,000 $250,000 RB-2645 $600,000 $0 $1,000,000 $0 $7,800,000 $9,400,000 RB-2650 $0 $0 $0 $550,000 $1,150,000 $1,700,000 RB-2651 $1,425,000 $1,900,000 $2,500,000 $2,300,000 $2,625,000 $10,750,000 RB-2652 $9,400,000 $0 $0 $0 $0 $9,400,000 RB-2658 $0 $0 $0 $450,000 $0 $450,000 RB-2667 $200,000 $4,000,000 $0 $0 $0 $4,200,000 RB-2668 $1,450,000 $0 $12,500,000 $0 $0 $13,950,000 RB-2672 $1,100,000 $0 $15,300,000 $0 $0 $16,400,000 RB-2674 $1,500,000 $40,000,000 $0 $0 $0 $41,500,000 RB-2675 $400,000 $3,000,000 $0 $0 $0 $3,400,000 RB-2682 $0 $400,000 $0 $0 $0 $400,000 RB-2683 $0 $450,000 $0 $2,150,000 $0 $2,600,000 RB-2684 $4,250,000 $0 $0 $0 $0 $4,250,000 RB-2685 $3,000,000 $6,000,000 $29,500,000 $0 $0 $38,500,000 RB-2687 $120,000 $0 $0 $0 $0 $120,000 RB-2688 $0 $130,000 $0 $0 $0 $130,000 RB-2690 $700,000 $400,000 $0 $7,100,000 $0 $8,200,000 RB-2691 $350,000 $850,000 $0 $5,500,000 $0 $6,700,000 RB-2692 $0 $0 $450,000 $0 $1,000,000 $1,450,000 RB-2693 $0 $1,000,000 $0 $5,300,000 $0 $6,300,000 RB-2694 $200,000 $4,500,000 $0 $0 $0 $4,700,000 RB-2695 $400,000 $1,450,000 $0 $0 $0 $1,850,000 RB-2696 $0 $100,000 $0 $0 $0 $100,000 RB-2697 $0 $200,000 $0 $0 $0 $200,000 RB-2701 $0 $0 $700,000 $350,000 $4,200,000 $5,250,000 RB-2702 $0 $0 $350,000 $0 $0 $350,000 RB-2703 $0 $0 $1,250,000 $0 $0 $1,250,000 RB-2801 $0 $0 $0 $400,000 $800,000 $1,200,000 RB-2803 $150,000 $400,000 $0 $0 $0 $550,000 RB-2804 $0 $900,000 $0 $0 $0 $900,000 RB-2805 $1,300,000 $0 $0 $0 $0 $1,300,000 RB-2806 $255,000 $0 $0 $0 $0 $255,000 RB-2807 $500,000 $750,000 $4,500,000 $0 $0 $5,750,000 RB-2808 $400,000 $550,000 $0 $3,100,000 $0 $4,050,000 RB-2809 $400,000 $550,000 $0 $2,674,900 $0 $3,624,900 RB-2810 $200,000 $0 $0 $0 $0 $200,000 RB-2811 $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000 RB-2812 $0 $700,000 $0 $2,984,200 $0 $3,684,200 RB-2813 $0 $100,000 $0 $0 $0 $100,000 RB-2814 $0 $1,563,200 $0 $0 $0 $1,563,200 RB-2815 $0 $400,000 $0 $0 $0 $400,000 RB-2816 $0 $850,000 $0 $0 $0 $850,000 RB-2817 $0 $0 $300,000 $0 $0 $300,000 RB-2818 $0 $0 $300,000 $0 $0 $300,000 RB-2819 $0 $0 $0 $500,000 $0 $500,000 RB-2820 $0 $0 $0 $732,000 $0 $732,000 RB-2821 $0 $0 $0 $0 $400,000 $400,000 ϮϬ CIP 2025-2029 Project Category Proposal 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total RB-2822 $0 $0 $0 $0 $200,000 $200,000 RRA-2297-11 $12,343,800 $8,086,500 $0 $0 $0 $20,430,300 Parks & Land $1,965,400 $4,875,000 $3,725,000 $3,225,000 $2,775,000 $16,565,400 HC-1048-027 $145,000 $25,000 $25,000 $25,000 $25,000 $245,000 PARK-1001 $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 PARK-1003 $350,000 $350,000 $350,000 $350,000 $350,000 $1,750,000 PARK-1005 $250,000 $550,000 $300,000 $250,000 $250,000 $1,600,000 PARK-1006 $0 $0 $0 $0 $250,000 $250,000 PARK-2016 $0 $0 $250,000 $1,850,000 $0 $2,100,000 PARK-3017 $0 $0 $0 $400,000 $0 $400,000 PARK-3018 $0 $0 $0 $250,000 $1,800,000 $2,050,000 PARK-4006 $0 $150,000 $2,000,000 $0 $0 $2,150,000 PARK-6006 $1,020,400 $0 $0 $0 $0 $1,020,400 PARK-8017 $0 $0 $600,000 $0 $0 $600,000 PARK-9002 $0 $800,000 $0 $0 $0 $800,000 PARK-9003 $0 $2,900,000 $0 $0 $0 $2,900,000 PARK-9004 $100,000 $0 $0 $0 $0 $100,000 PARK-9005 $0 $0 $100,000 $0 $0 $100,000 Public Facilities $10,814,700 $7,700,000 $33,275,000 $8,050,000 $1,550,000 $61,389,700 BOND-2027 $0 $0 $0 $0 $0 $0 BSD-CH-2501 $100,000 $1,300,000 $0 $0 $0 $1,400,000 BSD-CW-2002 $50,000 $500,000 $50,000 $50,000 $50,000 $700,000 BSD-CW-2101 $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 BSD-CW-2401 $80,100 $0 $0 $0 $0 $80,100 BSD-CW-2501 $200,000 $0 $0 $0 $0 $200,000 BSD-FL-2701 $0 $0 $300,000 $0 $0 $300,000 BSD-GC-2501 $0 $0 $1,225,000 $0 $0 $1,225,000 BSD-GC-2801 $0 $0 $0 $1,500,000 $0 $1,500,000 BSD-GC-2901 $0 $0 $0 $0 $1,400,000 $1,400,000 BSD-LEC-2501 $1,100,000 $0 $0 $0 $0 $1,100,000 BSD-MSS-2001 $1,500,000 $5,800,000 $5,600,000 $6,400,000 $0 $19,300,000 BSD-ODL-2501 $200,000 $0 $0 $0 $0 $200,000 BSD-PGL-2001 $0 $0 $12,000,000 $0 $0 $12,000,000 BSD-SWCH-2502 $1,500,000 $0 $0 $0 $0 $1,500,000 BSD-SWEHSB-001 $3,884,600 $0 $0 $0 $0 $3,884,600 BSD-SWNS-001 $100,000 $0 $0 $0 $0 $100,000 BSD-WBSL-001 $2,000,000 $0 $14,000,000 $0 $0 $16,000,000 $72,843,900 $103,463,700 $128,420,000 $54,036,100 $38,370,000 $397,133,700 Ϯϭ CIP 2025-2029 Description The project scope includes an annual program for intersection control upgrades. Projects under this program may be individually identified and programmed through the County's Intersection Control Ranking System (ICRS). Future projects may include improvements to County State Aid Highway (CSAH) 14 (34th Street North) at High Point Drive, CSAH 15 (Manning Avenue) at County Road (CR) 64 (McKusick Road), and CSAH 2 (Broadway Avenue) Signal Timing Updates. Justification High-level intersection controls (roundabouts and traffic signals) may be constructed at county highway intersections meeting criteria set forth in the ICRS. The county proactively plans for the installation of intersection controls to improve the safety and efficiency of traffic flow on the County Highway System. The annual ICRS determines the priority of these installations. The number of projects programmed varies depending on actual budget funding, the availability of matching funds, unforeseen development, or intersection safety problems. RB-2201 Expenditures Account Name 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total Planning/Design $20,000 $20,000 $20,000 $20,000 $20,000 $100,000 Construction $600,000 $600,000 $750,000 $600,000 $900,000 $3,450,000 $620,000 $620,000 $770,000 $620,000 $920,000 $3,550,000 RB-2201 Funding Sources Account Name 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total Local Contributions $210,000 $210,000 $210,000 $210,000 $210,000 $1,050,000 State Aid $410,000 $410,000 $560,000 $410,000 $710,000 $2,500,000 $620,000 $620,000 $770,000 $620,000 $920,000 $3,550,000 Budget Impact/Other The typical traffic signal costs $1,500 per year to operate and maintain. This cost to the public is off-set by the increased traffic flow efficiency and enhanced safety. Capital Project Category: Road & Bridge Location: Various/Other District: Multiple Total Estimated Project Cost: $3,550,000 Prior Year(s) Total Cost: Project #: RB-2201 Project Name: Intersection Control Projects ϲϴ CIP 2025-2029 Description The project scope includes an annual program comprised of pavement preservation projects including: 1) seal coating 2) crack filling 3) pavement milling 4) overlays 5) hot and cold-in-place recycling 6) pavement reclamation 7) full-depth reclamation 8) minor subgrade corrections 9) right-of-way 2025 may include: 1) CSAH 13 (Inwood Avenue North) - CSAH 10 to CSAH 6 2) CSAH 15 (Manning Avenue North) - TH 36 to 80th Street 3) CSAH 25 (Century Avenue South) - South Century Avenue to Brookview Drive East Justification These projects are scheduled to interrupt the normal deterioration of highways to extend the pavement life. Pavement condition is measured/calculated annually and reported as the system-wide Pavement Condition Index (PCI) that assigns a value to each roadway segment on a scale of 1-100, with higher numbers equating to better pavement condition. Public Works Performance Measures set two goals: 1) system-wide average PCI = 72 or greater, and 2) no roadway PCI should be lower than 40. RB-2204 Expenditures Account Name 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total Planning/Design $300,000 $300,000 $300,000 $300,000 $300,000 $1,500,000 Construction $6,350,000 $6,900,000 $5,300,000 $6,850,000 $8,150,000 $33,550,000 $6,650,000 $7,200,000 $5,600,000 $7,150,000 $8,450,000 $35,050,000 RB-2204 Funding Sources Account Name 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total State Aid $150,000 $2,050,000 $150,000 $1,800,000 $2,750,000 $6,900,000 Wheelage Tax $2,950,000 $2,950,000 $2,950,000 $2,850,000 $3,000,000 $14,700,000 County Transportation Sales Tax (Road & Bridge)$0 $0 $0 $0 $100,000 $100,000 TAA - Preservation $3,050,000 $2,200,000 $2,500,000 $2,500,000 $2,600,000 $12,850,000 TAA - Other $500,000 $0 $0 $0 $0 $500,000 $6,650,000 $7,200,000 $5,600,000 $7,150,000 $8,450,000 $35,050,000 Budget Impact/Other Projects completed under the Pavement Preservation Program reduce operation and maintenance costs. Capital Project Category: Road & Bridge Location: Various/Other District: Multiple Total Estimated Project Cost: $35,050,000 Prior Year(s) Total Cost: Project #: RB-2204 Project Name: Pavement Preservation & Rehab ϳϬ CIP 2025-2029 Description The project scope includes the following improvements to County State Aid Highway (CSAH) 13 (Ideal Avenue) in Oakdale and Lake Elmo: 1) safety improvements including widening for shoulders 2) pavement improvement 3) turn lane and intersection improvements 4) pedestrian and non-motorized upgrades 5) drainage improvements Justification Increased traffic and development drive the need for roadway upgrades, including widening of the road and the railroad crossing. This area is also a nexus for regional surface water drainage, hence the design needs to work toward accommodating and improving regional surface water management in this area. RB-2645 Expenditures Account Name 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total Planning/Design $600,000 $0 $500,000 $0 $0 $1,100,000 Construction $0 $0 $0 $0 $7,800,000 $7,800,000 Right-of-Way $0 $0 $500,000 $0 $0 $500,000 $600,000 $0 $1,000,000 $0 $7,800,000 $9,400,000 RB-2645 Funding Sources Account Name 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total TAA - Other $0 $0 $0 $0 $300,000 $300,000 Local Contributions $100,000 $0 $300,000 $0 $500,000 $900,000 State Aid $500,000 $0 $0 $0 $0 $500,000 County Transportation Sales Tax (Road & Bridge)$0 $0 $700,000 $0 $5,500,000 $6,200,000 TAA - Safety & Trails $0 $0 $0 $0 $1,500,000 $1,500,000 $600,000 $0 $1,000,000 $0 $7,800,000 $9,400,000 Budget Impact/Other The project will increase operation and maintenance costs associated with additional pavement, drainage, and sidewalk infrastructure. Capital Project Category: Road & Bridge Location: Various/Other District: Multiple Total Estimated Project Cost: $9,400,000 Prior Year(s) Total Cost: Project #: RB-2645 Project Name: CSAH 13 - CSAH 6 to CSAH 14 ϳϴ CIP 2025-2029 Description The project scope includes the following improvements to County State Aid Highway (CSAH) 15: 1) new CSAH 15 highway segment south of Trunk Highway (TH) 36 which ties into the proposed interchange at Manning and TH 36 2) all necessary drainage and surface water management improvements 3) new regional trail and pedestrian ramp facilities 4) new access locations for proposed developments This project addresses many regional traffic and safety goals. From a county standpoint, this proposed south segment of CSAH 15 connects Manning Avenue to Stillwater Boulevard, which currently requires access to TH 36. From a Minnesota Department of Transportation's (MnDOT) standpoint, this project reduces local trips on TH 36, where traffic volumes have increased due to the St. Croix River Crossing project. This project also aids in development potential south of TH 36. Justification Coordination with MnDOT, local partners, and developers strengthened the county's goal to complete this gap on the CSAH 15 corridor. RB-2652 Expenditures Account Name 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total Construction $9,400,000 $0 $0 $0 $0 $9,400,000 $9,400,000 $0 $0 $0 $0 $9,400,000 RB-2652 Funding Sources Account Name 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total Local Contributions $500,000 $0 $0 $0 $0 $500,000 County Transportation Sales Tax (Road & Bridge) $8,500,000 $0 $0 $0 $0 $8,500,000 TAA - Safety & Trails $400,000 $0 $0 $0 $0 $400,000 $9,400,000 $0 $0 $0 $0 $9,400,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Various/Other District: District 3 Total Estimated Project Cost: $12,820,300 Prior Year(s) Total Cost: $3,420,300 Project #: RB-2652 Project Name: 58th Street Extension/County Highway 15 South Segment ϴϭ CIP 2025-2029 Description The project scope includes improvements to County State Aid Highway (CSAH) 17 at the intersection with Trunk Highway (TH) 36 in the cities of Lake Elmo and Grant. The work is expected to include: 1) a grade separated crossing of TH 36 2) ramps to provide access between CSAH 17 and TH 36 3) retaining walls 4) storm water treatment facilities 5) pedestrian facilities 6) intersection controls for frontage roads 7) frontage road extension on south side Justification TH 36 users currently experience congestion (capacity constraints) during both A.M. and P.M. peak hours resulting from the existing signal at CSAH 17 (Lake Elmo Avenue). This congestion results in an unacceptable level-of-service during peak hours which is expected to worsen as traffic volumes are forecasted to increase. Due to the extended cycle lengths, CSAH 17 has long wait times before being served by the signal. The existing, closely-spaced frontage road intersection on the north of TH 36 consistently queues traffic through the intersection. This CSAH 17 intersection has a crash and severity rate that is significantly higher than the Minnesota Department of Transportation (MnDOT) statewide system average for similar signalized intersections. To date, $10 million in federal grants, and $26 million in state bonds/grants have been secured for the construction of this project. RB-2674 Expenditures Account Name 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total Construction $0 $40,000,000 $0 $0 $0 $40,000,000 Right-of-Way $1,500,000 $0 $0 $0 $0 $1,500,000 $1,500,000 $40,000,000 $0 $0 $0 $41,500,000 RB-2674 Funding Sources Account Name 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total Federal Grants $0 $10,000,000 $0 $0 $0 $10,000,000 Local Contributions $0 $3,000,000 $0 $0 $0 $3,000,000 State Aid $1,500,000 $1,000,000 $0 $0 $0 $2,500,000 State Grants $0 $6,000,000 $0 $0 $0 $6,000,000 State Bonds $0 $20,000,000 $0 $0 $0 $20,000,000 $1,500,000 $40,000,000 $0 $0 $0 $41,500,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Various/Other District: Multiple Total Estimated Project Cost: $46,534,300 Prior Year(s) Total Cost: $5,034,300 Project #: RB-2674 Project Name: CSAH 17 at TH 36 Intersection ϴϲ CIP 2025-2029 Description The project scope includes the following improvements on County State Aid Highway (CSAH) 15 (Manning Avenue) between CSAH 10 (10th Street North) and 30th Street. 1) addition of center left turn lanes at key locations 2) pavement rehabilitation 3) storm water treatment improvements Justification CSAH 15 is the backbone of the county's transportation system, thus, is an important north-south route connecting Interstate 94 to Lake Elmo, Stillwater, and beyond. These highway improvements are necessary to ensure the ongoing safe and efficient operation of this highway segment. RB-2684 Expenditures Account Name 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total Construction $4,250,000 $0 $0 $0 $0 $4,250,000 $4,250,000 $0 $0 $0 $0 $4,250,000 RB-2684 Funding Sources Account Name 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total Local Contributions $250,000 $0 $0 $0 $0 $250,000 State Aid $4,000,000 $0 $0 $0 $0 $4,000,000 $4,250,000 $0 $0 $0 $0 $4,250,000 Budget Impact/Other The project will increase operation and maintenance costs because of the added pavement widths and storm water infrastructure. Capital Project Category: Road & Bridge Location: Various/Other District: District 3 Total Estimated Project Cost: $4,600,000 Prior Year(s) Total Cost: $350,000 Project #: RB-2684 Project Name: CSAH 15 - CSAH 10 to 30th Street ϵϬ CIP 2025-2029 Description The project scope includes the following improvements at the intersection of County State Aid Highway (CSAH) 19 (Keats Avenue) and CSAH 10 (10th Street North): 1) evaluation for roundabout construction 2) park entrance improvements 3) roadway drainage and surface water management 4) pedestrian and bicycle facility improvements Preliminary design along with public engagement will determine the final project scope, right-of-way acquisition required, and cost estimates which will be included in a future capital improvement plan. Justification Traffic growth and ongoing development in the region has increased volumes around this intersection.The current all-way stop control can be confusing during peak traffic times and does not adequately service the demand. Delays are common and backups more than 1,000 feet occur frequently. This intersection is ranked near the top of the County's Intersection Control Ranking System. It is well suited for a roundabout, but will need significant reconstruction to address other needs. RB-2701 Expenditures Account Name 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total Planning/Design $0 $0 $700,000 $0 $0 $700,000 Construction $0 $0 $0 $0 $4,200,000 $4,200,000 Right-of-Way $0 $0 $0 $350,000 $0 $350,000 $0 $0 $700,000 $350,000 $4,200,000 $5,250,000 RB-2701 Funding Sources Account Name 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total Local Contributions $0 $0 $200,000 $50,000 $200,000 $450,000 County Transportation Sales Tax (Road & Bridge) $0 $0 $500,000 $300,000 $4,000,000 $4,800,000 $0 $0 $700,000 $350,000 $4,200,000 $5,250,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Lake Elmo District: District 3 Total Estimated Project Cost: $5,250,000 Prior Year(s) Total Cost: Project #: RB-2701 Project Name: CSAH 19 @ CSAH 10 Intersection ϭϬϮ CIP 2025-2029 Description The project scope will include an analysis of the County State Aid Highway (CSAH) 14 corridor between Klondike Avenue and 39th Street. The analysis will be looking at current and future needs to provide a vision that helps guide improvement opportunities in this growing residential and business corridor. This study will look at future needs regarding highway capacity, intersections, access, right-of-way, drainage, pedestrian/bicycle facilities, utilities, etc. Justification This section of highway suffers from a deteriorating pavement section, lack of pedestrian facilities, lack of shoulders, and poor vehicular operations. RB-2702 Expenditures Account Name 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total Planning/Design $0 $0 $350,000 $0 $0 $350,000 $0 $0 $350,000 $0 $0 $350,000 RB-2702 Funding Sources Account Name 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total Local Contributions $0 $0 $50,000 $0 $0 $50,000 State Aid $0 $0 $300,000 $0 $0 $300,000 $0 $0 $350,000 $0 $0 $350,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Lake Elmo District: District 3 Total Estimated Project Cost: $350,000 Prior Year(s) Total Cost: Project #: RB-2702 Project Name: CSAH 14 - Klondike Avenue to 39th Street ϭϬϯ CIP 2025-2029 Description The project scope includes the following improvements to County State Aid Highway (CSAH) 15 (Manning Avenue) from 30th Street to CSAH 14 (Stillwater Boulevard/40th Street South): 1) highway expansion from two-lane undivided to four-lane divided highway 2) construction of trails on both east and west side of highway 3) drainage improvements, including storm water treatment facilities 4) railroad crossing review Preliminary design, along with public engagement, will determine the final project scope, right-of-way acquisition required, and cost estimates. The estimated cost is based on past per mile costs of similar improvements. Justification CSAH 15 is the backbone of the county's transportation system, thus, is an important north-south route connecting Interstate 94 to Lake Elmo, Stillwater, and beyond. These highway improvements are necessary to ensure the ongoing safe and efficient operation of this highway segment. RB-2801 Expenditures Account Name 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total Planning/Design $0 $0 $0 $400,000 $400,000 $800,000 Right-of-Way $0 $0 $0 $0 $400,000 $400,000 $0 $0 $0 $400,000 $800,000 $1,200,000 RB-2801 Funding Sources Account Name 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total Local Contributions $0 $0 $0 $100,000 $200,000 $300,000 State Aid $0 $0 $0 $300,000 $600,000 $900,000 $0 $0 $0 $400,000 $800,000 $1,200,000 Budget Impact/Other The project will increase operation and maintenance costs because of the added pavement widths and storm water infrastructure. Capital Project Category: Road & Bridge Location: Various/Other District: District 3 Total Estimated Project Cost: $1,200,000 Prior Year(s) Total Cost: Project #: RB-2801 Project Name: CSAH 15 - 30th Street to CSAH 14 ϭϬϱ CIP 2025-2029 Description The project scope includes the following improvements at the intersection of County State Aid Highway (CSAH) 10 (10th Street) and CSAH 17 (Lake Elmo Avenue). 1) improved intersection control- likely with a roundabout or signal 2) highway drainage and surface water management 3) pedestrian and bicycle facility improvements Preliminary design along with public engagement will determine the final project scope, right-of-way acquisition required, and cost estimates, which will be included in a future capital improvement plan. Justification Stillwater Public School District is planning to construct a new elementary school in the northwest corner of CSAH 10 and CSAH 17. This new school will increase traffic volumes at this intersection, which is currently controlled with all-way stop signs. RB-2808 Expenditures Account Name 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total Planning/Design $400,000 $250,000 $0 $0 $0 $650,000 Construction $0 $0 $0 $3,100,000 $0 $3,100,000 Right-of-Way $0 $300,000 $0 $0 $0 $300,000 $400,000 $550,000 $0 $3,100,000 $0 $4,050,000 RB-2808 Funding Sources Account Name 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total Local Contributions $0 $100,000 $0 $500,000 $0 $600,000 State Aid $0 $450,000 $0 $2,400,000 $0 $2,850,000 Planned Use of Fund Balance-R&B $400,000 $0 $0 $0 $0 $400,000 TAA - Other $0 $0 $0 $200,000 $0 $200,000 $400,000 $550,000 $0 $3,100,000 $0 $4,050,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Lake Elmo District: District 3 Total Estimated Project Cost: $4,050,000 Prior Year(s) Total Cost: Project #: RB-2808 Project Name: CSAH 10 and CSAH 17 Intersection ϭϭϭ CIP 2025-2029 Description The project scope includes a feasibility study to determine best design for crossing the railroad north of Lake Elmo Park Reserve. Justification As areas of central Washington County continue to develop, demand for trail facilities increase. This project will build off of the 13 miles of trail south of Lake Elmo Park Reserve. The proposed segment within Lake Elmo is the next segment needed to continue the implementation of the full vision of this regional trail. A feasibility study will determine best methods for connecting to a future trail along County Road 14. PARK-9005 Expenditures Account Name 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total Planning/Design $0 $0 $100,000 $0 $0 $100,000 $0 $0 $100,000 $0 $0 $100,000 PARK-9005 Funding Sources Account Name 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total State Sales Tax $0 $0 $100,000 $0 $0 $100,000 $0 $0 $100,000 $0 $0 $100,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Cost estimate details will be a product of the 2027 design process. Additional funding is expected to be needed for construction. Capital Project Category: Parks & Land Location: Lake Elmo District: District 3 Total Estimated Project Cost: $100,000 Prior Year(s) Total Cost: Project #: PARK-9005 Project Name: Central Greenway Regional Trail Feasibility Study ϲϲ 36 10th 60th 5th Hudson Ke a t s La k e E l m o 50th 15th In w o o d 34th 20th 27th 53rd 55th Jane Lake Jane Ja m a c a 57th 59th Hi l l 47th 7th 31st 51st 43rd 39th De m o n t r e v i l l e 45th 38th Ma n n i n g Stillwater 24th 26th 42nd Islan d 58t h 9th 30th 32nd Ki m b r o 21st Ja d e 6t h Iv o r y H i l l t o p Is l e O l s o n L a k e 8th Julep 12th Jewel 44th 56th Ir i s 22nd 37th 36th 35th La v e r n e Jun i p e r Ann i k a Jasmine Ja m l e y Le g i o n L i l y Kl o n d i k e 16th Upper 33Rd Imp e r i a l Lin d e n 3rd Ki r k w o o d 33rd Deer Pond Hy t r a i l Irving Hid d e n B a y 4th Jerom e 14th Ju n e 28th Vi l l a g e Tapestry Ja s p e r Eagle Poi n t Jonquil Wildflower La y t o n Pr i v a t e Ke l v i n I r o n w o o d Highla n d s Ja n e r o L e e w a r d Ci m a r r o n 10 t h S t r e e t Kind r e d Ja m e s Ir i s h Prairiev i e w Ja c k P i n e 49th Ja y Lower 31st Marquess Ir v i n Li l a c Mo n a r c h Lower 8th L i s b o n Birc h B a r k 40thLav e n d e r Kr a f t La m p e r t Bl a z i n g s t a r Whistling Valley J u n c o Li t t l e B l u e s t e m 11th La d y S l i p p e r 5 t h S t r e e t Windbreak Su n f i s h L a k e P a r k I n b o u n d Iv y w o o d In n s d a l e 3rd Street Ma r q u e s s T r a i l L a n g l y Ju n o La n s i n g Ju l i a n n e Upper 30th 6t h S t r e e t Lisbon Avenue Ir w i n Sunflower 41st WB I 9 4 T o I n w o o d A v e N Upper 7 t h Queen Upper 9th 57 t h S t r e e t Upper 42Nd 2 7 t h S t r e e t 15th Str e e t Cherrywoo d WB I94 To Ke a t s A v e N 44th Street 41st Street Ja s m i n e A v e n u e 59th Street Hu m m i n g b i r d Jer o m e A v e n u e Keats Ave N T o W B I 9 4 Manning Ave N T o W B I 9 4 Hill Trail 3 0 t h S t r e e t 33 r d S t r e e t 24t h S t r e e t 20 t h S t r e e t 58t h S t r e e t Legion Lane Lar k s p u r Demontreville Tra i l Hu m m i n g b o r d Ac c e s s 21st La v e r n e 57 t h S t r e e t 32nd Ma n n i n g Ir i s h 35th 34th Li l y Lilac 55th Jamaca 35th La v e r n e 56th Sti l l w a t e r 36 La k e E l m o La n g l y La y t o n Li l a c 33rd Li l y 10 t h S t r e e t M a n n i n g 6th Street Is l e 21st 9th 57th 36th Kirkwood 53rd Lind e n Whistli n g V a l l e y Ma n n i n g 50th 5th 33rd Highlands 59th 6th Street I n n s d a l e I r o n w o o d Linden Legion Lane LindenPr i v a t e Julep 28th Vi l l a g e Lilac Iv y Inn s d a l e Lower 8th 31st 57th Lisbon 9th 39th Ke a t s 55th 56 t h 36 Isle Jule p Ir v i n 55th Man n i n g 32nd La v e r n e 37th K e l v i n Ma n n i n g Le g i o n 9th Ivy 34th La y t o n Li n d e n Ja d e 5th Hudson 36th 39t h DOWNSLAKE LAKE ELMOREGIONALPARK RESERVE LAKE ELMO LAKE JANE SUNFISH LAKE OLSONLAKE LAKE DEMONTREVILLE CLEARLAKE HORSESHOELAKE ROSELAKE REIDPARK VFWPARK LIONS PARK TANA RIDGEPARK City of Woodbury STONEGATEPARK KRAMERLAKE GOOSELAKEARMSTRONGLAKE RIDGEPARK KE A T S A V E N EAGLE POINTLAKE TABLYNPARK HEIGHTSPARK LAKE JANEHILLS PARK PEBBLEPARK City of Oakdale West LakelandTownship Baytown Township City ofOak ParkHeights City of GrantCity ofPine Springs DEMONTREVILLEWILDLIFE PARK DEMONTREVILLEPARK KLEISPARK CARRIAGESTATIONPARK SUNFISH LAKEPARK City ofOak ParkHeights StillwaterTownship HOMESTEDPARK 7 HERITAGEPARK VERONICAPOND GOETSCHEL'SPOND City ofAfton TablynPark Eagle PointCreek Estates Lake ElmoHeights Torre Pines Farms ofLake Elmo Parkview Estates WildflowersShores HuppertAdd BeautCrest Estates FriedrichHghts Kenridge Add Prairie RidgeOffice Park Eagle PointBusiness Park Stonegate Hammes CountryVista Whistling Valley MidlandMeadows DavidNelson Est TheHomestead TartanMeadows The Forest Schwartz-Martinco Add PackardPark EdenPark HeritageFarm LonesomePine Add DownsLake Est MyronEllman Elmo View Cty AudPlat No. 8 Lake Elmo Park Brookman Add Sunfish Ponds Hamlet OnSunfish Lake ParkMeadows Tapestry AtCharlottes' Grove Berschen's Shores DawcinAcres LakeJaneHighlands TealPass Est Fox FireEstates Meyer'sPineridge KrausesAdd Springborn'sGreen Acres Arabian Hills JudithMaryManor Lake Elmo Vista Rolling Hills Est Prairie Hamlet HiddenMeadowsOf Lake Elmo Jesse'sHideaway DiscoverCrossing Arvold'sAcres St. Croix'sSanctuary TamarackFarm Est CarriageStation TanaRidgeJohn M DayFarm Add The Fields ofSt. Croix2nd Add The Fieldsof St. Croix BluestemAt The Fieldsof St. Croix BurrwoodEstBergmannAdd DemontrevilleHighlands Add Lane's DemontrevilleCountry ClubDemontrevilleHighlands Add Olson Lake Add Oace AcresAdd LakeJaneHills Lake JaneManor No. 1 ThreeLakesFarm Add Bordners Garner Farmettes Royal Golf Club Southwind Hunters Crossing HammesEstates Savona Boulder Ponds Inwood Lakewood Crossing2nd Addition Easton Village Wildflower Cimarron Legacy At Northstar Village Preserve ST. CROIX SANCTUARY PARK EDENPARK PILOTPARK HAMMESPARK GOOSE LAKEPARK F Map Date: November 2020010.5 Miles Created By: Planning Department