HomeMy WebLinkAbout#20- Lake Elmo Elementary1 STAFF REPORT DATE: 11/6/2024 ITEM #: Regular TO: Lake Elmo City Council FROM: Nathan Fuerst, AICP, Consulting Planner AGENDA ITEM: Lake Elmo Elementary - Conditional Use Permit, Variance, and Preliminary Plat REVIEWED BY: Jason Stopa, Community Development Director Sophia Jensen, City Planner BACKGROUND: As a result of an assessment of school facility needs, Stillwater Area Public Schools (ISD 834, hereafter referred to as the “School District”) has identified the need for a new elementary school facility in Lake Elmo’s South Planning Area. The School District has identified the subject property as a preferred location for a new elementary school to replace the aging Lake Elmo Elementary located Northeast of the intersection of Lake Elmo Blvd N. and Stillwater Blvd. N. On March 6, 2024, the City Council approved an amendment to the City’s Comprehensive Plan and Zoning Map to allow for the establishment of the public-school use on the subject property. Since that time, the School district’s team has been compiling detailed development plans for the site. The following applications represent entitlements required for this project: 1. Conditional Use Permit (CUP) – The Public Facilities zoning district requires a CUP for this use, a public school. The CUP will cover use of the entire site. 2. Subdivision – The School District’s is proposing to develop an unplatted property. Consistent with other development, the School District is required to plat the property through the major subdivision process, this is due to the previously unknown need for public right of way dedication and improvements. 3. Variance – Variances to the maximum lot area in the PF District and location of a drive in a buffer area are required. ISSUE BEFORE THE CITY COUNCIL: Should the City Council approve the CUP, Subdivision, and Variance requests to allow the Lake Elmo Elementary School to move forward? REQUEST DETAILS: Applicant/Owner: Stillwater Public Schools (ISD 834) Location: PID 26.029.21.44.0001 Zoning District: Public Facilities Future Land Use: Institutional 2 Deadline for Action: Application Complete: 8/23/2024 120 Day Deadline: 12/21/2024 PROPOSAL DETAILS/ANALYSIS: Site Data. Total Site Area 47.59 acres Wetlands None Environmental Review. This project does not trigger a mandatory Environmental Assessment Worksheet under Minnesota Rules 4410.4300. No further environmental review is required. Bulk Standards. Standards 105.12.970(f)(1) Requirement (with structure): As Proposed Maximum Lot Area 20 acres 47.59 acres Minimum Lot Width 100’ ~1253’ Minimum Lot Depth 150 ~1485’ Max Impervious Cover 32% 18.01% Minimum Setback - Front 50 feet ~170’, 380’ Minimum Setback - Side 50 feet 140 feet Minimum Setback - Corner 50 feet N/A Minimum Setback - Rear 50 feet ~775’ feet Maximum Height 50 feet 34’ Driveway Setback from intersection 50 feet from r-o-w ~1/4 mile Driveway setback from side lot line 5 feet 38’ & 326’ Driveway Width 20 – 34’ feet 34’ Land Use Conformance. The subject property received a comprehensive plan amendment and rezoning approval through Resolution 2024-029 and Ordinance 2024-07, respectively, on March 6, 2024. The proposed land use, a public school, is consistent with the future land use, Institutional, and zoning district, Public Facilities, where it is a conditional use. Minimum Lot Area. The Lake Elmo Elementary School site is comprised of one parcel 47.59 acres in area. This is above the City’s maximum lot area of 20 acres. Because the school is seeking to subdivide this property as required by the City, the City has also required a variance be approved to the 20 acre maximum. Staff support a variance to the City’s maximum lot size due to the fact that a great majority of this property is encumbered by the buffer for the Oakdale Gun Club. Additionally, as this property is located at the intersection of two county roads, there are significant distances required for the two entrances from that intersection, reducing the ability to subdivide this property in a manner more conforming with the City’s ordinance. MN Shooting Range Protection Act: In May 2005, Minnesota Governor Tim Pawlenty signed into law the Shooting Range Protection Act. It became effective on May 28, 2005, becoming Minnesota Statutes, 3 Chapter 87A. This Statute protects existing shooting ranges from becoming noncompliant as a result of adjacent development. State law establishes a 750 foot buffer from the shooting range property boundary. In that area, the law prevents the establishment of any land use which would cause the shooting range to become nonconforming with the performance standards for shooting ranges which were adopted by reference in state statute. The elementary school is proposed on a parcel abutting a portion of the Oakdale Gun Club. When the application was initially discussed, City staff explored this issue and reviewed the performance standards for shooting ranges in person at the MN DNR’s Central Office. Staff’s initial finding was that the only performance standard requiring further review was statutory noise limits created by State Statute 87A.05 Noise Standards. The Stillwater Area School District was required to submit a noise study which tested the noise levels generated by the Oakdale Gun Club to determine whether the establishment of any new uses on site would be over the allowable levels in statute. The noise study, completed by Veneklasen Associates, measured noise levels at four different locations in the 750’ buffer area. Measurements were taken during the week after the 4th of July, when the Oakdale Gun Club is open to the general public and therefore it’s busiest time of year. The Study concludes that the noise generated at all four testing locations is below the maximum levels in state statue for a Public School, which has the most sensitive Noise Area Classification (NAC) in statue. Staff required the noise study be revised to include an assessment of sound levels at the testing locations during the fall period with leaf-off conditions when higher caliber rifles are typically used more frequently at the Oakdale Gun Club. The acoustic consultant has provided an updated memo containing methodology and updated findings based on modeling and past attendance records shared by Oakland Gun Club. The findings show that even with fall conditions, all testing points remain under the state statutory noise threshold. Tree Preservation. The subject property is heavily wooded with many densely planted qualifying significant trees requiring protection under the City’s ordinance. A significant amount of the trees on this parcel will need to be removed for the School District’s proposed improvements, with removals mostly concentrated on the east half of the site. Tree removals are proposed in part due to a need for mass grading to allow improvements such as stormwater management, drives, parking areas, ball and recreational fields, and the school building. The School District has proposed an exception to the City’s Tree Mitigation Standards under LEC 105.12.460 (f). The rationale is that the former property owner, who had owned the property for over three decades, planted the majority of trees on site between 1990 and 2003. In the areas on site where the previous owner planted trees, they were planted in a grid-like pattern similar to tree farms in terms of species composition and planting proximity. The City’s ordinance allows for exceptions to tree mitigation requirements if all the following conditions exist: A. It is not feasible to combine the subject parcel with adjacent parcels that could use the parcel as required green space; 4 B. Strict adherence to the City's tree preservation and replacement standards would prevent reasonable development that is consistent with the Comprehensive Plan and desirable to the City on the parcel; and C. The exception requested is the minimum needed to accomplish the desired development or redevelopment. The City Council may provide partial or full relief to tree mitigation requirements under LEC 105.12.460. The City may consider multiple forms of relief, depending on which form of relief best balances the objectives of the City and tree preservation. The City may also require payment of a fee-in- lieu of tree replacement. Summary of Tree Mitigation Data: • Total Significant Tree Caliper inches on site (existing) = 29,296 • Total Significant Tree Caliper inches to be removed = 23,411 • Total Significant Tree Caliper inches planted by Previous Owner = 27,327 • Total ‘Previous Owner Planted’ Significant Inches Removed = 20,653 Mitigation Required Without Exception: A. Total Significant Tree Caliper inches on site (existing) = 29,296 inches B. Total Significant Tree Caliper inches to be removed = 23,411 inches C. (A x .3) Allowable Removal (caliper inches) = 8,788 inches D. (B - C) Mitigation Inches = 14,623 inches E. (D x .5) Evergreen Replacement Inches = 7,312 inches F. Evergreen Replacement Trees (1 standard tree = 3”) = 2,437 trees G. Cash in Lieu Fee ($325/caliper inch) = $2,376,400 Mitigation Required With Exception for Owner Planted Trees: A. Total Significant Tree Caliper inches on site (not planted by previous owner) = 1969 B. Total Significant Tree Caliper inches to be removed (not planted by previous owner) = 1314 C. (A x .3) Allowable Removal (caliper inches) = 591 inches D. (B - C) Mitigation Inches = 723 inches E. (D x .5) Evergreen Replacement Inches = 362 inches F. Evergreen Replacement Trees (1 standard tree = 3”) = 121 trees G. Cash in Lieu Fee ($325/caliper inch) = $117,650 The City’s Landscape Architect’s 9/12/2024 review memo requires further clarification of tree removal data to understand the requirements for replacement. Staff recommend consideration of a fee of $325 per unmitigated caliper inch, but not to exceed $50,000, in exchange for flexibility provided through the exception requested for this project. Landscaping. The City’s Landscape Architect has reviewed the planting plan for conformance with the City’s ordinance and commented on necessary plan revisions in their 9/12/2024 review memo. The Applicant will need to recalculate the total number of trees that are required for tree mitigation. Additional information such as provisions for irrigation, species diversity requirements, and other details will be required in a future resubmittal. A condition of approval is added requiring conformance to the City Landscape Architect’s Memo. 5 Buffering and Screening. City Code Section 105.12.970 (f)(2) requires a 150-foot buffer from abutting residential properties. While the school building and nearly all site improvements meet the building setback requirement, a driveway access for the busses will be located within 38’ of the northern property line. The parcel immediately to the north is undeveloped but is zoned Rural Single Family. This necessitates a variance to the buffering standard. Key rationale include mandatory access spacing requirements for safety along Lake Elmo Avenue, and that the nearest home to the north of the proposed drive is over four hundred feet away. Trees are proposed in the landscaping plan to line the school’s northern driveway access and would help to recreate the vegetative buffer along with existing vegetated areas that will be preserved. Building Design. Elevations submitted with the site plans indicate a new school building which is designed with primary materials including brick, glass, and architecturally treated metal. In its design, the building has facades which vary in design with contrasting building materials and colors and creates visual interest. The building materials and façade elevations proposed are consistent with the City code and design standards manual for such structures and are therefore found acceptable. Parking. City code requires three spaces per classroom. There are 53 rooms that are classrooms or an equivalent learning space. Therefore, a minimum of 159 parking spaces are required. There are a total of 211 parking spaces supplied in in the southern parking area, and a total of 13 adjacent to the bus parking to create a total on site of 224 spaces. This site meets the parking minimum established by code. Winter performance of the parking lot is an important consideration for safety and the reduction of chloride use. The following suggestions are made to improve performance: • Snow storage areas should be identified on grading plans. • Grading of snow storage areas should be considered in order to reduce meltwater sprawl onto surfaces treated with chlorides. • Tree plantings and other landscaping should be carefully located such that plantings are not destroyed by winter maintenance activities or salt from snow piles. Traffic and Access. This project is served by two county roads, Lake Elmo Avenue North and 10th Street North. A traffic study was required and supplied by the Applicant. Both the study and site plans have been reviewed by the City Engineer and Washington County for issues related to traffic and access. Washington County will ultimately require an access permit for the use and is the responsible jurisdiction for county roads. Washington County has provided the following requirements in its letter which are paraphrased here for brevity: 1. Turn Lanes are required for both access points. 2. Queuing on to county roads will not be permitted. Washington County is now planning to improve the intersection of CSAH 10 and 17 in 2028. 3. A traffic light or roundabout is required at the entrance to the School (10th ST. N. entrance) this will be expected at the School District’s cost. 4. The bus entrance on Lake Elmo Avenue may be restricted to a ¾ access intersection with northern ‘left-outs’ prohibited. 5. Queuing on county roads will be prohibited. 6 6. It is suggested that the School District provide options for safe walking routes to school for students who wish to do so. The City Engineer provided a review memo dated 9/23/24 with the following comments related to Transportation Improvements and Access: 1. Access Management. The Proposed access locations along both Lake Elmo Avenue (CSAH 17) and 10th Street (CSAH 10) must be approved by Washington County. 2. Turn Lane Improvements. As part of the site improvements, dedicated right and left turn lanes must be constructed along Lake Elmo Avenue (CSAH 17) and 10th Street (CSAH 10) at both access locations. Turn lanes must be constructed meeting Washington County standards. 3. Intersection Control Improvements. Traffic Control Improvements must be included as part of the site improvements for the opening of the school as recommended by Washington County. A traffic signal is required at the new access location along 10th Street North (CSAH 10), complete with crosswalks. A temporary wood pole traffic signal, or alternate traffic control improvement approved by Washington County, is required at the intersection of Lake Elmo Avenue (CSAH 17) and 10th Street (CSAH 10), compete with crosswalks. 4. Emergency Service Access. Emergency vehicle access to and throughout the site must be reviewed and approved by the Lake Elmo Fire Department. 5. Bituminous Trails. The site improvements include the construction of a bituminous trail along the east and south sides of the site along Lake Elmo Avenue and 10th Street. The grading plans should be revised to eliminate the drainage swale obstruction that will impede any future extension of the trail to the west along 10th Street. Consideration should also be given to the provision of pedestrian connectivity internal to the school property and connection to the County Park Preserve. Due to the fact that Washington County is planning improvements at the intersection of Lake Elmo Avenue and 10th Street North, City staff anticipates that there will be additional future costs to the City that must be accounted for. With the County’s cost share policy, the primary costs to the City would be the right of way acquisition and stormwater management. Due to the new Lake Elmo Elementary at this location, the County has accelerated plans for infrastructure improvements to improve service after determining improvements necessary due to the traffic study. The City’s staff suggest the following requirements to address cost impacts to the City: 1. The Plat shall dedicate right of way as needed for future county intersection improvements. 2. The School District shall design the stormwater ponds to accommodate the needs for stormwater management at the new intersection of CSAH 10 & 17. 3. The City will require a cost participation from the Applicant at no more than 50% of the City's cost or $250,000, whichever is less, to account for the costs of the future intersection improvements at County Roads 10 & 17. CONDITIONAL USE PERMIT FINDINGS: City Code Section 105.12.290(a) provides findings required for Conditional Use Permit approval. Staff recommends the following findings: 1. The proposed use will not be detrimental to or endanger the public health, safety, comfort, convenience or general welfare of the neighborhood or the city. Approval of a conditional use permit should not be detrimental to or endanger the public health, safety, comfort, convenience or general welfare of the neighborhood or City. The City has required that the Applicant submit evidence to determine impacts on woodlands, traffic, and noise. 7 2. The use or development conforms to the City of Lake Elmo Comprehensive Plan. This use is consistent with the Comprehensive Plan as amended by Resolution 2024-029. 3. The use or development is compatible with the existing neighborhood. The proposed land use, an elementary school, is permitted as a conditional use and is compatible with surrounding residential development. 4. The proposed use meets all specific development standards for such use listed in Article 15 of this Chapter. The conditional use permit amendment meets all specific development standards of Article 15. Variances to the lot area maximum and buffer distances are proposed. 5. If the proposed use is in a flood plain management or shoreland area, the proposed use meets all the specific standards for such use listed in Chapter 105.12.1260 (Shoreland Regulations) and Title 100 (Flood Plain Management). The proposed uses will not be within the floodplain, and the property does not fall within the City’s shoreland overlay district. 6. The proposed use will be designed, constructed, operated and maintained so as to be compatible in appearance with the existing or intended character of the general vicinity and will not change the essential character of that area. The proposed new building is designed to be compatible with the City’s design standards. 7. The proposed use will not be hazardous or create a nuisance as defined under this Chapter to existing or future neighboring structures. It is not anticipated for the use to become a nuisance as the site will meet applicable performance standards. 8. The proposed use will be served adequately by essential public facilities and services. The Applicant has requested a utility feasibility study and intends to connect the parcel to the public sewer system as required under the City’s ordinance. Washington County and City engineering staff have suggested conditions of approval that would mitigate impacts expected to county roadways. 9. The proposed use will not create excessive additional requirements at public cost for public facilities and services and will not be detrimental to the economic welfare of the community. The use will provide an expanded capacity to serve area residents with educational services. Intersection improvements, or cost participation in future improvements required due to this use, are required by the City to mitigate City costs on public infrastructure improvements. 10. The proposed use will not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons, property or the general welfare because of excessive production of traffic, noise, smoke, fumes, glare or odors. The use will not produce excessive noise, smoke, fumes, glare or odors. Washington County and City engineering staff have suggested conditions of approval that would mitigate impacts expected to county roadways. 11. Vehicular approaches to the property, where present, will not create traffic congestion or interfere with traffic on surrounding public thoroughfares. Washington County and City engineering staff have suggested conditions of approval that would mitigate impacts expected to county roadways. 12. The proposed use will not result in the destruction, loss or damage of a natural or scenic feature of major importance. The proposed expansion will meet applicable performance standards. Environmental features on site will be preserved where possible, with most tree occurring on the east side of the property. 8 SUBDIVISION FINDINGS. The process for review of subdivisions is established in Title 103 of City Code. To approve a Preliminary Plat, the City shall make the determination that the project does not meet the findings for denial established in code section 103.00.090(d)(2) as follows: a. That the proposed subdivision is in conflict with the city's comprehensive plan, development code, capital improvements program, or other policy or regulation. b. That the physical characteristics of the site, including, but not limited to, topography, vegetation, susceptibility to erosion and siltation, susceptibility to flooding, water storage, and retention, are such that the site is not suitable for the type or intensity of development or use contemplated. c. That the design of the subdivision or the proposed improvements are likely to cause substantial and irreversible environmental damage. d. That the design of the subdivision or the type of improvements will be detrimental to the health, safety, or general welfare of the public. e. That the design of the subdivision or the type of improvement will conflict with easements on record or with easements established by judgment of a court. f. That the subdivision is premature as determined by the standards of this title. VARIANCE FINDINGS. An applicant must establish and demonstrate compliance with the variance criteria set forth in Lake Elmo City Code Section 105.12.320 before the City may grant an exception or modification to city code requirements. These criteria are listed below, along with comments from Staff about the applicability of these criteria to the applicant’s request. Staff recommends the following findings: 1) Practical Difficulties. A variance to the provision of this chapter may be granted by the Board of Adjustment upon the application by the owner of the affected property where the strict enforcement of this chapter would cause practical difficulties because of circumstances unique to the individual property under consideration and then only when it is demonstrated that such actions will be in keeping with the spirit and intent of this chapter. Definition of practical difficulties - “Practical difficulties” as used in connection with the granting of a variance, means that the property owner proposes to use the property in a reasonable manner not permitted by an official control. Parcel Size: The use proposed by the Applicant will be on a property of 47.59 acres less required right of way dedication. The lot area variance is needed due to the desire to locate uses on site outside of the buffer established around the Oakdale Gun Club property, and the need to locate accesses at acceptable distances from the intersection of CSAHs 10 & 17. Buffer: The northern driveway access to Lake Elmo Avenue is proposed with a distance of approximately 38 feet from the northern lot line. Due to the requirement to meet access spacing requirements intended to protect public safety, the access should not be moved any further south. In the proposed location of the drive is approximately 400 feet away from the residence to the north. 2) Unique Circumstances. The plight of the landowner is due to circumstances unique to the property not created by the landowner. Parcel Size: The Applicant is not proposing to expand the area of the property. The existing conditions on site were not created by the Applicant. 9 Buffer: The Applicant is proposing accesses that are responsive to Washington County engineering requirements and cannot move the northern drive out of the buffer area. 3) Character of Locality. The proposed variance will not alter the essential character of the locality in which the property in question is located. Parcel Size/Buffer: The variances will not impact the essential character of the area. The request meets the City’s design standards. 4) Adjacent Properties and Traffic. The proposed variance will not impair an adequate supply of light and air to properties adjacent to the property in question or substantially increase the congestion of the public streets or substantially diminish or impair property values within the neighborhood. Parcel Size/Buffer: The variance should not impair adjacent properties. Washington County and City engineering staff have suggested conditions of approval that would mitigate impacts expected to county roadways. AGENCY REVIEW: This request was distributed to several departments and agencies for review on Wednesday, August 7th, 2024. The following review comments are noted: • Fire Department Memo (9/18/2024) Provided comments regarding drive lanes, fire detection and suppression, building addressing, and gates/locks/access. • City Engineer Memo (9/23/2024) Provided comments regarding impervious surface, water connection, grading, transportation and stormwater. Engineering requested more detailed plans. • City Landscape Architect Memo (9/12/2024) Provided comments on revisions need to the tree mitigation and landscaping plans. • Washington County DOT Memo (9/18/2024) Provided comments regarding development plan and required intersection improvements. • Valley Branch Watershed District – Email received 9/18/2024 indicated that the school district is working with VBWD on permitting and review requirements. Conditions of approval have been included to address agency review comments where applicable. RECOMMENDED CONDITIONS OF APPROVAL: 1. The Applicant must enter into a Development Agreement, in the City’s standard form, prior to issuance of a notice to proceed or any building permit for work on site. 2. Prior to the City signing or approving recording of the Final Plat or Development Agreement, the Applicant shall fully address all comments in the following review memos, or any subsequently revised memo, to the satisfaction of the City: a. City Engineer’s memo dated September 23, 2024, b. City Landscape Architect’s memo dated September 12, 2024, c. City Fire Chief’s memo dated September 18, 2024. d. City Attorney’s Plat Opinion. e. Washington County Engineering memo dated September 18, 2024. 3. The Applicant may not allow any queuing of traffic accessing this site from occurring on the abutting Lake Elmo Avenue (CSAH 17) and 10th Street (CSAH 10). 10 4. The applicant must provide, at applicant’s sole cost, dedicated right and left turn lanes along Lake Elmo Avenue (CSAH 17) and 10th Street (CSAH 10), at both new access locations. Turn lanes must be constructed meeting Washington County standards. 5. The Applicant must provide a separate trail connection along the Lake Elmo Avenue North Corridor. 6. The Applicant must provide at applicant’s sole cost, Traffic Control Improvements to be operational with the opening of the school, including a permanent traffic control signal at the new access location along 10th Street North (CSAH 10), complete with crosswalks, and including a temporary wood‐pole traffic signal at the intersection of Lake Elmo Avenue (CSAH 17) and 10th Street (CSAH 10), complete with crosswalks. The applicant must enter into a cost reimbursement agreement to reimburse the County for design and construction related engineering services for these improvements. 7. The Plat must dedicate right-of-way along Lake Elmo Avenue (CSAH 17) and 10th Street (CSAH 10) as required by Washington County and the City. 8. All easements as required by the City Engineer and Public Works Director shall be documented on the Final Plat prior to the release of the Final Plat for recording. 9. The Final Plat shall not be recorded until the City approves the Final Construction Plans. 10. The City will require a cost participation from the Applicant at no more than 50% of the City's cost or $250,000, whichever is less, for the applicant’s cost-share of the future intersection improvements at Lake Elmo Avenue (CSAH 17) and 10th Street (CSAH 10). 11. The Applicant shall provide stormwater management mitigation for all required site improvements, including the County roadway and intersection improvements, County roadway turn lanes, all bituminous trails, and including additional future impervious surfaces, as estimated by Washington County, for the future County roadway improvements along CSAH 17 and CSAH 10 to be constructed by the County at a future date. 12. The storm water management facilities and BMPs will remain privately owned and maintained. A Storm Water Maintenance and Easement Agreement in the City’s standard form of agreement must be executed and recorded with the Final Plat for all privately owned stormwater facilities. 13. The Applicant shall pay an in-lieu fee of $325 per caliper inch for unmitigated tree removal on site, up to a total of $50,000. 14. Any intensification of the use or expansion of the use within the buffer area of the Oakdale Gun Club shall comply with Minnesota State Statutes Chapter 87A, as may be amended. 15. After establishment of the use on site, any grading or removal of healthy specimen trees in required buffer areas, including the buffer of the Oakdale Gun Club, shall be reviewed by the City against applicable design standards. 16. Upon substantial completion of the project, as defined in the required development agreement, the school building must be connected to City water and sewer. 17. The Applicant must provide plans for the water and sewer connection to the satisfaction of the City Engineer, Public Works Director, and Fire Chief prior to the release of the building permit with connections made at the Applicant’s sole cost. 11 18. Water and Sewer Availability Charges, and other fees as applicable, must be paid prior to issuance of a building permit. 19. The Applicant will be required to sign a Waiver of Assessment Agreement with the City of Lake Elmo, in the City’s standard form of agreement, to reimburse the City for public sanitary sewer improvements to be constructed by the City to facilitate the connection to City sewer. 20. All city, state, or other necessary permits must be obtained prior to the release of the building permit. 21. Substantial construction must take place within 12 months of the date on which the conditional use permit was granted or the conditional use permit is void. The Applicant must also comply with provisions of City Code Section 105.12.290 Conditional Use Permits. 22. The Applicant shall enter into a separate grading agreement with the City before starting any grading activity in advance of final plat approval. The City Engineer shall review any grading plan that is submitted in advance of a final plat, and said plan shall document the extent of any proposed grading on the site. PUBLIC COMMENT: Notice of a public hearing was sent to surrounding property owners and published in the Stillwater Gazette. The Planning Commission held a public hearing on October 16, 2024. One written comment concerning the amount of tree removals with opposition to the requested exception to tree mitigation was filed with the City before the meeting. Three residents provided public comment on the proposal and focused comments on the following topics as summarized by staff: • Concern about the amount of tree removal • Opposition for exception requested to tree mitigation standards • Opposition to variance requests • Concerns for traffic speeds and safety along the corridor • Concerns and questions about roadway improvements or possible widening • Noise impacts from Oakdale Gun Club on elementary school OPTIONS: The City May: • Approve the request; • Approve the request with conditions (staff recommendation); • Deny the request citing findings of fact for denial. PLANNING COMMISSION ACTION: After holding the public hearing for the School District’s requests, the Planning Commission discussed the proposal at its October 16, 2024 meeting. In its discussion, the Planning Commission considered the tree removals, required access points, infrastructure improvements, noise study, and trail connectivity. The Planning Commission ultimately voted 3-2 to recommend the item for City Council approval with Staff’s recommended findings and conditions. Dissenting planning commissioners noted a desire for reduced tree removal or additional tree replacement. 12 RECOMMENDATION: The City Council is asked to make a determination on the requests. Staff recommend that the Applicant’s requests be approved by the City based on compliance with relevant criteria established in the City’s Plans and Ordinance. Below are recommended motions: “Move to adopt Resolution 2024-114 approving the Variances requested for Lake Elmo Elementary as proposed by Stillwater Area Public Schools, ISD 834, with the conditions and findings listed in the staff report.” “Move to adopt Resolution 2024-115 approving the Preliminary Plat requested for Lake Elmo Elementary as proposed by Stillwater Area Public Schools, ISD 834, with the conditions and findings listed in the staff report.” “Move to adopt Resolution 2024-116 approving the Conditional Use Permit requested for Lake Elmo Elementary as proposed by Stillwater Area Public Schools, ISD 834, with the conditions and findings listed in the staff report.” ATTACHMENTS: 1. Draft Resolutions approving Variances, CUP, and Preliminary Plat 2. Submittal Package 3. City Engineer Memo (9/23/2024) 4. City Fire Dept Memo (9/18/2024) 5. City Landscape Architect Memo (9/12/2024) 6. Washington County DOT Comments (9/18/2024) 1 CITY OF LAKE ELMO COUNTY OF WASHINGTON STATE OF MINNESOTA RESOLUTION NO. 2024-114 A RESOLUTION APPROVING THE REQUEST WITH CONDITIONS FOR VARIANCES AT 10928 10th STREET NORTH WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing under the laws of the State of Minnesota; and WHEREAS, Stillwater Area Schools, ISD 834, (the “Applicant”), owner of the property located at 10928 10th Street North, PID# 26.029.21.44.0001, Lake Elmo, MN 55042 (the “Property”) has submitted an application to the City of Lake Elmo (the “City”) for variances to maximum lot area and buffer areas in order to permit the establishment of a new Lake Elmo Elementary School; and WHEREAS, notice has been published, mailed, and posted pursuant to the Lake Elmo Zoning Code, Section 105.12.250; and WHEREAS, the Lake Elmo Planning Commission held a public hearing on October 16th, 2024 to review and consider the Variances; and WHEREAS, the Lake Elmo Planning Commission has submitted its report and recommendation of approval to the City Council as part of a Staff Memorandum dated November 6th 2024; and WHEREAS, the proposed Lake Elmo Elementary includes one parcel along with dedication of public right of way northwest of 10th Street N and Lake Elmo Avenue N; and WHEREAS, the City Council considered said matter at its November 6th 2024 meeting and voted to approve the Variances with findings and conditions for approval; and NOW, THEREFORE, based on the testimony elicited and information received, the City Council makes the following: FINDINGS 1) Practical Difficulties as used in connection with the granting of a variance, means that the property owner proposes to use the property in a reasonable manner not permitted by an official control: Parcel Size: The use proposed by the Applicant will be on a property of 47.59 acres less required right of way dedication. The lot area variance is needed due to the desire to locate uses on site outside of the buffer established around the Oakdale Gun Club property, and 2 the need to locate accesses at acceptable distances from the intersection of CSAHs 10 & 17. Buffer: The northern driveway access to Lake Elmo Avenue is proposed with a distance of approximately 38 feet from the northern lot line. Due to the requirement to meet access spacing requirements intended to protect public safety, the access should not be moved any further south. In the proposed location of the drive is approximately 400 feet away from the residence to the north. 2) Unique Circumstances the plight of the landowner is due to circumstances not created by the landowner: Parcel Size: The Applicant is not proposing to expand the area of the property. The existing conditions on site were not created by the Applicant. Buffer: The Applicant is proposing accesses that are responsive to Washington County engineering requirements and cannot move the northern drive out of the buffer area. 3) Character of Locality the proposed variance will not alter the essential character of the locality in which the property in question is located: Parcel Size/Buffer: The variances will not impact the essential character of the area. The request meets the City’s design standards. 4) Adjacent Properties and Traffic the proposed variance will not impair an adequate supply of light and air to properties adjacent to the property in question or substantially increase the congestion of the public streets or substantially diminish or impair property values within the neighborhood: Parcel Size/Buffer: The variance should not impair adjacent properties. Washington County and City engineering staff have suggested conditions of approval that would mitigate impacts expected to county roadways. DECISION NOW, THEREFORE, BE IT FURTHER RESOLVED, and based upon the information received and the above Findings, that the City Council of the City of Lake Elmo hereby approves the request with conditions for a variance request to allow a parcel maximum of 47.6 acres, and a drive up to 38’ from the northern property boundary for the Lake Elmo Elementary School project at 10928 10th Street North. The conditions for approval are outlined below: 1. The Applicant must enter into a Development Agreement, in the City’s standard form, prior to issuance of a notice to proceed or any building permit for work on site. 2. Prior to the City signing or approving recording of the Final Plat or Development Agreement, the Applicant shall fully address all comments in the following review memos, or any subsequently revised memo, to the satisfaction of the City: 3 a. City Engineer’s memo dated September 23, 2024, b. City Landscape Architect’s memo dated September 12, 2024, c. City Fire Chief’s memo dated September 18, 2024. d. City Attorney’s Plat Opinion. e. Washington County Engineering memo dated September 18, 2024. 3. The Applicant may not allow any queuing of traffic accessing this site from occurring on the abutting Lake Elmo Avenue (CSAH 17) and 10th Street (CSAH 10). 4. The applicant must provide, at applicant’s sole cost, dedicated right and left turn lanes along Lake Elmo Avenue (CSAH 17) and 10th Street (CSAH 10), at both new access locations. Turn lanes must be constructed meeting Washington County standards. 5. The Applicant must provide a separate trail connection along the Lake Elmo Avenue North Corridor. 6. The Applicant must provide at applicant’s sole cost, Traffic Control Improvements to be operational with the opening of the school, including a permanent traffic control signal at the new access location along 10th Street North (CSAH 10), complete with crosswalks, and including a temporary wood‐pole traffic signal at the intersection of Lake Elmo Avenue (CSAH 17) and 10th Street (CSAH 10), complete with crosswalks. The applicant must enter into a cost reimbursement agreement to reimburse the County for design and construction related engineering services for these improvements. 7. The Plat must dedicate right-of-way along Lake Elmo Avenue (CSAH 17) and 10th Street (CSAH 10) as required by Washington County and the City. 8. All easements as required by the City Engineer and Public Works Director shall be documented on the Final Plat prior to the release of the Final Plat for recording. 9. The Final Plat shall not be recorded until the City approves the Final Construction Plans. 10. The City will require a cost participation from the Applicant at no more than 50% of the City's cost or $250,000, whichever is less, for the applicant’s cost-share of the future intersection improvements at Lake Elmo Avenue (CSAH 17) and 10th Street (CSAH 10). 11. The Applicant shall provide stormwater management mitigation for all required site improvements, including the County roadway and intersection improvements, County roadway turn lanes, all bituminous trails, and including additional future impervious surfaces, as estimated by Washington County, for the future County roadway improvements along CSAH 17 and CSAH 10 to be constructed by the County at a future date. 12. The storm water management facilities and BMPs will remain privately owned and maintained. A Storm Water Maintenance and Easement Agreement in the City’s standard form of agreement must be executed and recorded with the Final Plat for all privately owned stormwater facilities. 13. The Applicant shall pay an in-lieu fee of $325 per caliper inch for unmitigated tree removal on site, up to a total of $50,000. 4 14. Any intensification of the use or expansion of the use within the buffer area of the Oakdale Gun Club shall comply with Minnesota State Statutes Chapter 87A, as may be amended. 15. After establishment of the use on site, any grading or removal of healthy specimen trees in required buffer areas, including the buffer of the Oakdale Gun Club, shall be reviewed by the City against applicable design standards. 16. Upon substantial completion of the project, as defined in the required development agreement, the school building must be connected to City water and sewer. 17. The Applicant must provide plans for the water and sewer connection to the satisfaction of the City Engineer, Public Works Director, and Fire Chief prior to the release of the building permit with connections made at the Applicant’s sole cost. 18. Water and Sewer Availability Charges, and other fees as applicable, must be paid prior to issuance of a building permit. 19. The Applicant will be required to sign a Waiver of Assessment Agreement with the City of Lake Elmo, in the City’s standard form of agreement, to reimburse the City for public sanitary sewer improvements to be constructed by the City to facilitate the connection to City sewer. 20. All city, state, or other necessary permits must be obtained prior to the release of the building permit. 21. Substantial construction must take place within 12 months of the date on which the conditional use permit was granted or the conditional use permit is void. The Applicant must also comply with provisions of City Code Section 105.12.290 Conditional Use Permits. 22. The Applicant shall enter into a separate grading agreement with the City before starting any grading activity in advance of final plat approval. The City Engineer shall review any grading plan that is submitted in advance of a final plat, and said plan shall document the extent of any proposed grading on the site. Passed and duly adopted this 6th day of November, 2024 by the City Council of the City of Lake Elmo, Minnesota. ____________________________________ Mayor Charles Cadenhead ATTEST: _______________________________ Julie Johnson, City Clerk 1 LA515-137-923112.v2 CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2024-115 RESOLUTION APPROVING THE 10TH AND LAKE ELMO SCHOOL ADDITION PRELIMINARY PLAT WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing under the laws of the State of Minnesota; and WHEREAS, Stillwater Area Public Schools, ISD 834, (the “Applicant”) submitted an application to the City of Lake Elmo for a preliminary plat called 10th and Lake Elmo School Addition, for the property legally described on the attached Exhibit A (the “Property”), a copy of the preliminary plat is on file in the City of Lake Elmo Community Development Department; and WHEREAS, the Lake Elmo Planning Commission held a public hearing on October 16, 2024 to review and consider the preliminary plat application; and WHEREAS, the Lake Elmo Planning Commission has submitted its report and 3-2 recommendation of approval of the preliminary plat to the City Council as part of a staff report dated November 6, 2024; and WHEREAS, the City Council considered the preliminary plat at its November 6, 2024, meeting and hereby makes the following findings of fact: 1. That the preliminary plat is consistent with the intent of the 2040 Lake Elmo Comprehensive Plan and the 2040 Land Use Map for this area. 2. That the preliminary plat complies with the general intent of the Village Medium Density Residential and Commercial zoning districts. 3. That the preliminary plat generally complies with the City’s subdivision regulations and does not meet the findings for denial established in LEC 103.00.090(d)(2). 4. That the preliminary plat generally complies with the Lake Elmo Design Guidelines and Standards Manual. 5. That the preliminary plat generally complies with the City’s Zoning Code. NOW, THEREFORE, BE IT RESOLVED THAT the City Council does hereby approve the 10th and Lake Elmo School Addition preliminary plat subject to the following conditions: 1. The Applicant must enter into a Development Agreement, in the City’s standard form, prior to issuance of a notice to proceed or any building permit for work on site. 2 LA515-137-923112.v2 2. Prior to the City signing or approving recording of the Final Plat or Development Agreement, the Applicant shall fully address all comments in the following review memos, or any subsequently revised memo, to the satisfaction of the City: a. City Engineer’s memo dated September 23, 2024, b. City Landscape Architect’s memo dated September 12, 2024, c. City Fire Chief’s memo dated September 18, 2024. d. City Attorney’s Plat Opinion. e. Washington County Engineering memo dated September 18, 2024. 3. The Applicant may not allow any queuing of traffic accessing this site from occurring on the abutting Lake Elmo Avenue (CSAH 17) and 10th Street (CSAH 10). 4. The applicant must provide, at applicant’s sole cost, dedicated right and left turn lanes along Lake Elmo Avenue (CSAH 17) and 10th Street (CSAH 10), at both new access locations. Turn lanes must be constructed meeting Washington County standards. 5. The Applicant must provide a separate trail connection along the Lake Elmo Avenue North Corridor. 6. The Applicant must provide at applicant’s sole cost, Traffic Control Improvements to be operational with the opening of the school, including a permanent traffic control signal at the new access location along 10th Street North (CSAH 10), complete with crosswalks, and including a temporary wood‐pole traffic signal at the intersection of Lake Elmo Avenue (CSAH 17) and 10th Street (CSAH 10), complete with crosswalks. The applicant must enter into a cost reimbursement agreement to reimburse the County for design and construction related engineering services for these improvements. 7. The Plat must dedicate right-of-way along Lake Elmo Avenue (CSAH 17) and 10th Street (CSAH 10) as required by Washington County and the City. 8. All easements as required by the City Engineer and Public Works Director shall be documented on the Final Plat prior to the release of the Final Plat for recording. 9. The Final Plat shall not be recorded until the City approves the Final Construction Plans. 10. The City will require a cost participation from the Applicant at no more than 50% of the City's cost or $250,000, whichever is less, for the applicant’s cost-share of the future intersection improvements at Lake Elmo Avenue (CSAH 17) and 10th Street (CSAH 10). 11. The Applicant shall provide stormwater management mitigation for all required site improvements, including the County roadway and intersection improvements, County roadway turn lanes, all bituminous trails, and including additional future impervious surfaces, as estimated by Washington County, for the future County roadway improvements along CSAH 17 and CSAH 10 to be constructed by the County at a future date. 12. The storm water management facilities and BMPs will remain privately owned and maintained. A Storm Water Maintenance and Easement Agreement in the City’s standard form of agreement must be executed and recorded with the Final Plat for all privately owned stormwater facilities. 3 LA515-137-923112.v2 13. The Applicant shall pay an in-lieu fee of $325 per caliper inch for unmitigated tree removal on site, up to a total of $50,000. 14. Any intensification of the use or expansion of the use within the buffer area of the Oakdale Gun Club shall comply with Minnesota State Statutes Chapter 87A, as may be amended. 15. After establishment of the use on site, any grading or removal of healthy specimen trees in required buffer areas, including the buffer of the Oakdale Gun Club, shall be reviewed by the City against applicable design standards. 16. Upon substantial completion of the project, as defined in the required development agreement, the school building must be connected to City water and sewer. 17. The Applicant must provide plans for the water and sewer connection to the satisfaction of the City Engineer, Public Works Director, and Fire Chief prior to the release of the building permit with connections made at the Applicant’s sole cost. 18. Water and Sewer Availability Charges, and other fees as applicable, must be paid prior to issuance of a building permit. 19. The Applicant will be required to sign a Waiver of Assessment Agreement with the City of Lake Elmo, in the City’s standard form of agreement, to reimburse the City for public sanitary sewer improvements to be constructed by the City to facilitate the connection to City sewer. 20. All city, state, or other necessary permits must be obtained prior to the release of the building permit. 21. Substantial construction must take place within 12 months of the date on which the conditional use permit was granted or the conditional use permit is void. The Applicant must also comply with provisions of City Code Section 105.12.290 Conditional Use Permits. 22. The Applicant shall enter into a separate grading agreement with the City before starting any grading activity in advance of final plat approval. The City Engineer shall review any grading plan that is submitted in advance of a final plat, and said plan shall document the extent of any proposed grading on the site. Passed and duly adopted this 6th day of November, 2024, by the City Council of the City of Lake Elmo, Minnesota. ___________________________________ Mayor Charles Cadenhead ATTEST: ____________________________________ Julie Johnson, City Clerk 4 LA515-137-923112.v2 Resolution 2024-115 Exhibit A Legal Description of Subject Property Old Legal Description: The Southeast 1/4 of the Southeast 1/4 of Section 26, Township 29, Range 21, Washington County, Minnesota, and all that part of the Southwest 1/4 of the Southeast 1/4, lying Easterly of the West 435.6 feet of the East 2006 feet of the South 1/2 of the Southeast 1/4 of said Section, Washington County, Minnesota. Abstract Property New Legal Description: Lot 1, Block 1, 10TH AND LAKE ELMO SCHOOL ADDITION CITY OF LAKE ELMO WASHINGTON COUNTY, MINNESOTA RESOLUTION NO. 2024-116 A RESOLUTION APPROVING A CONDITIONAL USE PERMIT TO ALLOW ESTABLISMENT OF A PUBLIC SCHOOL IN THE PUBLIC FACILITIES DISTRICT WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing under the laws of the State of Minnesota; and WHEREAS, Stillwater Area Schools, ISD 834, (the “Applicant”), owner of the property located at 10928 10th Street North, PID# 26.029.21.44.0001, Lake Elmo, MN 55042 (the “Property”) has submitted an application to the City of Lake Elmo (the “City”) for a Conditional Use Permit to allow the establishment of a new Lake Elmo Elementary School; and WHEREAS, notice has been published, mailed, and posted pursuant to the Lake Elmo Zoning Code, Section 105.12.250; and WHEREAS, the Lake Elmo Planning Commission held a public hearing on said matter on October 16, 2024; and WHEREAS, the Lake Elmo Planning Commission submitted its report and recommendation concerning the Conditional Use Permit request to the City Council as part of a Staff Memorandum dated November 6, 2024; and WHEREAS, the City Council considered said matter at its November 6, 2024 meeting. NOW, THEREFORE, based on the testimony elicited and information received, the City Council makes the following: FINDINGS 1) That the procedures for obtaining said Conditional Use Permit (CUP) are found in the Lake Elmo Zoning Ordinance, Section 105.12.290. 2) That all the submission requirements of said Section 105.12.290 have been met by the Applicant. 3) That the proposed Conditional Use Permit is to allow the expansion of Oak Land Middle School as more fully described in application materials submitted to the City. 4) That the proposed Conditional Use Permit will be located on property to be legally described as found in Exhibit A to this Resolution. 5) That a public school is designated as a Conditional Use within the PF – Public Facilities Zoning District in Section 105.12.970 of the Zoning Ordinance; and 6) That the proposed use will not be detrimental to or endanger the public health, safety, comfort, convenience or general welfare of the neighborhood or the city. 7) That the proposed use conforms to the City of Lake Elmo Comprehensive Plan. 8) That the proposed use is compatible with the existing neighborhood. 9) That the proposed use meets all specific development standards for such use listed in Article 7 of the Zoning Ordinance. 10) That the proposed use will be designed, constructed, operated and maintained so as to be compatible in appearance with the existing or intended character of the general vicinity and will not change the essential character of that area. 11) That the proposed use will not be hazardous or create a nuisance as defined under this Chapter to existing or future neighboring uses. 12) That the proposed use will be served adequately by essential public facilities and services, including streets, police and fire protection, drainage structures, refuse disposal, water and sewer systems and schools or will be served adequately by such facilities and services provided by the persons or agencies responsible for the establishment of the proposed use. 13) That the proposed use will not create excessive additional requirements at public cost for public facilities and services and will not be detrimental to the economic welfare of the community. 14) That the proposed use will not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons, property or the general welfare because of excessive production of traffic, noise, smoke, fumes, glare or odors. 15) That vehicular approaches to the property, where present, will not create traffic congestion or interfere with traffic on surrounding public thoroughfares. 16) That the proposed use will not result in the destruction, loss or damage of a natural or scenic feature of major importance. CONCLUSIONS AND DECISION Based on the foregoing, the Applicants’ application for a Conditional Use Permit is granted subject to the following conditions: 1. The Applicant must enter into a Development Agreement, in the City’s standard form, prior to issuance of a notice to proceed or any building permit for work on site. 2. Prior to the City signing or approving recording of the Final Plat or Development Agreement, the Applicant shall fully address all comments in the following review memos, or any subsequently revised memo, to the satisfaction of the City: a. City Engineer’s memo dated September 23, 2024, b. City Landscape Architect’s memo dated September 12, 2024, c. City Fire Chief’s memo dated September 18, 2024. d. City Attorney’s Plat Opinion. e. Washington County Engineering memo dated September 18, 2024. 3. The Applicant may not allow any queuing of traffic accessing this site from occurring on the abutting Lake Elmo Avenue (CSAH 17) and 10th Street (CSAH 10). 4. The applicant must provide, at applicant’s sole cost, dedicated right and left turn lanes along Lake Elmo Avenue (CSAH 17) and 10th Street (CSAH 10), at both new access locations. Turn lanes must be constructed meeting Washington County standards. 5. The Applicant must provide a separate trail connection along the Lake Elmo Avenue North Corridor. 6. The Applicant must provide at applicant’s sole cost, Traffic Control Improvements to be operational with the opening of the school, including a permanent traffic control signal at the new access location along 10th Street North (CSAH 10), complete with crosswalks, and including a temporary wood‐pole traffic signal at the intersection of Lake Elmo Avenue (CSAH 17) and 10th Street (CSAH 10), complete with crosswalks. The applicant must enter into a cost reimbursement agreement to reimburse the County for design and construction related engineering services for these improvements. 7. The Plat must dedicate right-of-way along Lake Elmo Avenue (CSAH 17) and 10th Street (CSAH 10) as required by Washington County and the City. 8. All easements as required by the City Engineer and Public Works Director shall be documented on the Final Plat prior to the release of the Final Plat for recording. 9. The Final Plat shall not be recorded until the City approves the Final Construction Plans. 10. The City will require a cost participation from the Applicant at no more than 50% of the City's cost or $250,000, whichever is less, for the applicant’s cost-share of the future intersection improvements at Lake Elmo Avenue (CSAH 17) and 10th Street (CSAH 10). 11. The Applicant shall provide stormwater management mitigation for all required site improvements, including the County roadway and intersection improvements, County roadway turn lanes, all bituminous trails, and including additional future impervious surfaces, as estimated by Washington County, for the future County roadway improvements along CSAH 17 and CSAH 10 to be constructed by the County at a future date. 12. The storm water management facilities and BMPs will remain privately owned and maintained. A Storm Water Maintenance and Easement Agreement in the City’s standard form of agreement must be executed and recorded with the Final Plat for all privately owned stormwater facilities. 13. The Applicant shall pay an in-lieu fee of $325 per caliper inch for unmitigated tree removal on site, up to a total of $50,000. 14. Any intensification of the use or expansion of the use within the buffer area of the Oakdale Gun Club shall comply with Minnesota State Statutes Chapter 87A, as may be amended. 15. After establishment of the use on site, any grading or removal of healthy specimen trees in required buffer areas, including the buffer of the Oakdale Gun Club, shall be reviewed by the City against applicable design standards. 16. Upon substantial completion of the project, as defined in the required development agreement, the school building must be connected to City water and sewer. 17. The Applicant must provide plans for the water and sewer connection to the satisfaction of the City Engineer, Public Works Director, and Fire Chief prior to the release of the building permit with connections made at the Applicant’s sole cost. 18. Water and Sewer Availability Charges, and other fees as applicable, must be paid prior to issuance of a building permit. 19. The Applicant will be required to sign a Waiver of Assessment Agreement with the City of Lake Elmo, in the City’s standard form of agreement, to reimburse the City for public sanitary sewer improvements to be constructed by the City to facilitate the connection to City sewer. 20. All city, state, or other necessary permits must be obtained prior to the release of the building permit. 21. Substantial construction must take place within 12 months of the date on which the conditional use permit was granted or the conditional use permit is void. The Applicant must also comply with provisions of City Code Section 105.12.290 Conditional Use Permits. 22. The Applicant shall enter into a separate grading agreement with the City before starting any grading activity in advance of final plat approval. The City Engineer shall review any grading plan that is submitted in advance of a final plat, and said plan shall document the extent of any proposed grading on the site. Passed and duly adopted this 6th day of November, 2024 by the City Council of the City of Lake Elmo, Minnesota. ____________________________________ Mayor Charles Cadenhead ATTEST: _______________________________ Julie Johnson, City Clerk RESOLUTION 2024-116 Exhibit A Legal Description of Subject Property Old Legal Description: The Southeast 1/4 of the Southeast 1/4 of Section 26, Township 29, Range 21, Washington County, Minnesota, and all that part of the Southwest 1/4 of the Southeast 1/4, lying Easterly of the West 435.6 feet of the East 2006 feet of the South 1/2 of the Southeast 1/4 of said Section, Washington County, Minnesota. Abstract Property New Legal Description: Lot 1, Block 1, 10TH AND LAKE ELMO SCHOOL ADDITION MEMORANDUM To: Nicole Miller, City Administrator, Lake Elmo From: Paul Aplikowski | PA Date: August 23, 2024 Comm. No: 232224 Subject: Independent School District #834 Submittal to City of Lake Elmo on behalf of Stillwater Area Public Schools, for the proposed New Lake Elmo Elementary School project, located at the intersection of Lake Elmo Avenue North and 10th Street North, Lake Elmo, Minnesota (Property ID #2602921440001) Conditional Use Permit, Preliminary Plat, and Variance Submittal Narrative: On behalf of Stillwater Area Public Schools, we are submitting for City staff review a Conditional Use Permit, Preliminary Plat, and Variance application for the proposed new Lake Elmo Elementary School. Stillwater Area Public Schools is excited to continue to serve elementary-aged students at a larger school within the city of Lake Elmo. The proposed 1,100-student elementary school building would replace the current Lake Elmo Elementary School located at 11030 Stillwater Boulevard, Lake Elmo, Minnesota. The new building is proposed to be a total of 148,700 square feet and will be predominately a two-story structure. The building will staff about 130 employees. The anticipated school day schedule is currently planned to be from 7:45 a.m. – 2:15 p.m. Projected mobilization, ground-breaking, and building construction is planned to commence in Spring of 2025. Construction is expected to be completed by August 2026. Since the initial sketch plat application, the zoning of the parcel has been revised from Agricultural (A) to Public Facilities (PF) and the comprehensive plan has been updated to amend future land use from Rural Area Development (RAD) to Institutional (INST) as well as adjusting the MUSA boundary to include this site. As the subject site to be developed is over the maximum size of 20 acres, we are now requesting a variance to develop the entire 47.6-acre parcel. In reaction to the city and county comments that were received on the initial sketch plat application, the proposed site plan has gone through several iterations. Included in these changes are the addition of trails on the south and east sides of the parcel and moving the bus parking entry further north to comply with the required quarter-mile separation from an intersection. Also, based on the submitted traffic study, the internal vehicle stacking has been increased to keep car queuing off the adjacent roads. As requested, a sound study of the site has been conducted and the site has been found to be in compliance with sound codes. Given the receptor type, the modified MPCA code criterion is that the sound level at the property line (or anywhere on the project) cannot exceed a sound level of 63 dBA when measured over a period of one hour. The loudest hourly sound level that was measured was 55 dBA attributable to gun club activities at the closest measurement location at the property line. As sound decays with distance, the decibel level continues to drop the further the observer gets from the source. Additionally, all locations of all sound sensors were reviewed and approved by city staff prior to the start of sound data collection. Also included in this submittal is the completed traffic study which was previously submitted to the City along with the Oak-Land Middle School submittal currently under review. MEMORANDUM Page 2 of 3 Item A. A listing of contact information including name(s), address(es), and phone number(s) of the: owner of record, authorized agents or representatives, engineer, surveyor, and any other relevant associates. Response: Independent School District #834 Staff: Maria Schrul, Executive Director of Finance 1875 South Greeley Street, Stillwater, MN 55082 (651) 351-8321 Mark Drommerhausen, Executive Director of Operations 1875 South Greeley Street, Stillwater, MN 55082 (651) 351-8379 Anthony Willger, Manager of Facilities and Site Operations 1875 South Greeley Street, Stillwater, MN 55082 (651) 351-8374 Design and Construction: Paul Aplikowski, Wold Architects & Engineers 332 Minnesota Street, Saint Paul, MN 55101 (651) 227-7773 Valerie Peterson, Wold Architects & Engineers 332 Minnesota Street, Saint Paul, MN 55101 (651) 227-7773 Greg Buchal, Larson Engineering (Civil Engineer) 3524 Labore Road, White Bear Lake, MN 55110 (651) 481-9120 Gary Zifko, Kraus-Anderson 501 South Eighth Street, Minneapolis, MN 55404 (612) 332-8940 Cornerstone Land Surveying 1970 Northwestern Avenue, Suite 200, Stillwater, MN 55082 (651) 275-8969 Item B. A listing of the following site data: address, current zoning, parcel size in acres and square feet, property identification number(s), and current legal description(s). Response: Address: Northwest corner of Tenth Avenue North and Lake Elmo Avenue North, Lake Elmo, Minnesota 55042 Zoning: PF – Public Facilities Property Identification Numbers: #2602921440001 Parcel size: 2,072,859 square feet 47.6acres Current Legal Description: Section 26 Township 029 Range 021 PT OF S1/2 OF SE1/4 BEING E 1570.4 FT MEMORANDUM Page 3 of 3 Item C. A narrative regarding the history of the property (current and past used) and any pre- application discussions with staff. Response: Please refer to the above narrative. Item D. A specific written description of the proposed use(s). i. Incorporate information describing how the use will work on the proposed site including proposed site changes, existing open spaces, landscaping, traffic circulation, transition areas to adjacent properties, individual uses for existing and proposed structures, and effects on natural areas (wetlands, forests, etc.) both on-site and in the general vicinity of the project. ii. Provide specific details about the use including the number of employees, hours of operation, maximum number of animals (if applicable), proposed development schedule, etc. Response: Please refer to the above narrative. Item E. Provide justification that the proposed use meets the following findings: i. The proposed use will not be detrimental to or endanger the public health, safety, comfort, convenience or general welfare of the neighborhood or City. ii. The use or development conforms to the City of Lake Elmo Comprehensive Plan. iii. The use or development is compatible with the existing neighborhood. Response: Please refer to the above narrative. Feel free to contact Wold Architects and Engineers or the District with any questions or concerns you may have. AM/MN-EDU-ISD834/ES_New Lake Elmo/232224/_Admin/2024.08.23 Memo to Nicole Miller Larson Engineering, Inc. 3524 Labore Road White Bear Lake, MN 55110-5126 651.481.9120 Fax: 651.481.9201 www.larsonengr.com MEMORANDUM To: City of Lake Elmo Date: August 20, 2024 From: Larson Engineering Project No: 12236128.000 Project: New Lake Elmo Elementary School Thank you in advance for reviewing our request for an exception to the City of Lake Elmo’s Tree Preservation and Replacement Ordinances. Stillwater Area Public Schools is planning to construct a new elementary school within the City of Lake Elmo. This school will be designed to accommodate 1,100 students and will benefit the local community and meet the requirements set forth by the City of Lake Elmo. This Memo provides specific design aspects from an engineer’s perspective of the site and outlines design decisions and explains why the New Lake Elmo Elementary is impacting such a large number of trees and why the school is looking to receive an exception for tree preservation. When designing a new school, one of the first considerations is the proposed layout of the site. There are quite a few elements that go into the initial consideration of a site layout such as potential access points to the site, adjacent parcel uses & zoning designations, drainage patterns, existing wetlands/landlocked basins, and grading. Listed below are major design factors that were identified when designing the site layout the proposed elementary school. ➢ Access Points & County Road: Since the first concept design of the site, the layout intended to have two entry points to access the site. The reason for two access points was to separate student drop-off/teacher parking from the entry that services the school busses and trucks for deliveries. This practice promotes far greater safety throughout the site as the school district can better regulate the flow of traffic through their site. These entry points need to be roughly a quarter mile from intersection of Lake Elmo Ave North and 10 Street North which is a standard county requirement to promote safety at intersections and allow traffic queuing at the intersection without inhibiting the access points. In addition, trails are required along both County Roads to service the local community. ➢ Adjacent Parcels: Parcels directly abutting the proposed new school site consist of either residential homes, public park, or a gun club. The gun club was the primary concern after reviewing the adject parcels. ➢ Drainage Patterns, Wetlands, and Landlocked basin: The existing site is broken down into two major drainage areas that split the site from roughly its northwest corner to its southeast corner. These drainage areas flow to landlocked basin located on the site. A landlocked basin is low area where water flows to and has no way of escaping even is major rainfall events, these lowland areas would have to fill up with stormwater around 15-20 feet over a vast area to have any chance of leaving the site. There were no wetlands identified on the parcel. City of Lake Elmo August 20, 2024 2 of 4 12236128.000 ➢ Grading: The existing site has a vast variation in grades as the high point of the site is over 46 feet of vertical difference from the low point of the site and there are relatively no flat areas other than the northwest corner of the site. The design factors above all have significant impact on design of the site and overall impact on the trees. The next section will directly outline how each of these design criteria impacted the tree preservation of the site. ➢ Access Points & County Road: These entry points to the site provide roughly a quarter mile separation from intersection of Lake Elmo Ave North and 10 Street North as this is a standard with Washington County. Both of proposed locations enter the site in highly wooded areas. The entry on the northeast side of the site off of Lake Elmo Ave North has no flexibility in its location as it cannot be pushed further North as it’s already near the edge of the property and it also can’t push further south at its already just under the Washington County’s desired quarter mile spacing from the intersection and the County will prohibit moving the entry any further south. The entry on the south side of the site off of 10th Street North has the flexibility to move further West but would impact an existing right turn lane but not further east due to Washington County’s desired quarter mile spacing from the intersection. The proposed design kept the south entry as east as possibly as this design option would have the east impact on trees. In Addition to the access points a trail was required on the south and east side of the property adjacent to the county roads this requirement was from both the County and the City of Lake Elmo. Due to the existing topography adjacent to the county road the proposed trail required the design had to make significant modifications to the topography alongside the county road. The topography was revised to provide both a trial consistent with City and County standards and also to create a new drainage way for the runoff from the county road that would not inhibit the trail, this had significant impacts on the existing trees due to the revised topography. Image #1 and Image #2 below depict the access points and trail that service Lake Elmo Ave North and 10TH Street North Image #1 Image #2 City of Lake Elmo August 20, 2024 3 of 4 12236128.000 ➢ Adjacent Parcels: The gun club being an adjacent parcel had a significant impact on the layout of the site. A 750 foot buffer was used from the edge of the gun club’s property when determining the layout of the site. This buffer is shown in Image #3 below. Pushing out proposed site layout to the East side of the site had a significant impact on trees as this side of the parcel which was farmed less and had a greater number of trees and vegetation. Image #3 ➢ Drainage Patterns, Wetlands, and Landlocked basin: The overall site was designed to maintain existing drainage patterns and preserve the existing landlocked basin to meet the Valley Branch Watershed Districts requirements. The southern landlocked basin was significantly impacted by the access point entering the site due to vast grade change between the landlocked basin and the entry drive. This caused a large number of trees to be impacted, in addition the volume taken away from the land locked basin due entry drive had to be made up in that landlocked basin, this meant further grading was required in the basin to restore the volume back to what it was, this in turn impacted additional trees. The landlocked basin on the North side of the site was expanded due to request from Washington County as they plan on improving Lake Elmo Ave North and 10TH Street North in the future, on going coordination is still being done to finalize coordinating the stormwater need of the County, but this expansion of the landlocked basin also impacted additional trees. The expanded landlocked basin can be seen on the North side of the site in Image #1 which was referenced above, in addition Image #4 depicted below shows the flood elevations of the existing landlocked basin. City of Lake Elmo August 20, 2024 4 of 4 12236128.000 Image #4 ➢ Grading: The existing topography of the site has large variations in grades and lack any large flat areas to propose improvements such a school, parking lots, ball fields, soccer fields, and any other amenities typically found at an elementary school. The vast variation of grades can be seen below in Image #5. To design a site that would provide all these amenities, the site needed to be mass graded to provide flatter areas. The mass grading of the site was done in a way to maintain as many trees a feasibly possible while still proving amenities that will service the school district and the public. Image #5 The design choices listed above outline why trees throughout the site were impacted. These choices, along with the other site factors and the fact that the site is heavily wooded, seem to be reasonable justifications for providing an exception to the tree preservation requirements. KNOW ALL PERSONS BY THESE PRESENTS: That independent School District No. 834, a Minnesota body corporate and politic, fee owner of the following described property situated in the County of Washington, State of Minnesota, to wit: The Southeast 1/4 of the Southeast 1/4 of Section 26, Township 29, Range 21, Washington County, Minnesota, and all that part of the Southwest 1/4 of the Southeast 1/4, lying Easterly of the West 435.6 feet of the East 2006 feet of the South 1/2 of the Southeast 1/4 of said Section, Washington County, Minnesota. Abstract Property Has caused the same to be surveyed and platted as 10TH AND LAKE ELMO SCHOOL ADDITION and does hereby dedicate to the public for public use the public way and the drainage and utility easements as created by this plat. In witness whereof said Independent School District No. 834, a Minnesota body corporate and politic, has caused these presents to be signed by its proper officer this ________ day of _____________________, 20___. SIGNED: Independent School District No. 834 By __________________________________ , Its Chief Financial Officer Marie Schrul STATE OF MINNESOTA COUNTY OF WASHINGTON This instrument was acknowledged before me this _________ day of___________________________ , 20______, by Marie Schrul, the Chief Financial Officer of Independent School District No. 834, a Minnesota body corporate and politic. __________________________________ (SIGNATURE) __________________________________ (PRINTED) Notary Public, Minnesota My Commission Expires _______________________ I, Daniel L. Thurmes, do hereby certify that this plat was prepared by me or under my direct supervision; that I am a duly Licensed Land Surveyor in the State of Minnesota; that this plat is a correct representation of the boundary survey; that all mathematical data and labels are correctly designated on this plat; that all monuments depicted on the plat have been, or will be correctly set within one year; that all water boundaries and wet lands, as defined in Minnesota Statutes Section 505.01, Subd. 3, as of the date of this certificate are shown and labeled; and all public ways are shown and labeled on this plat. Dated this _________ day of ___________________, 2024. __________________________________________ Daniel L. Thurmes, Licensed Land Surveyor, Minnesota License No. 25718 STATE OF MINNESOTA COUNTY OF WASHINGTON This instrument was acknowledged before me on this _________ day of ___________________, 2023, by Daniel L. Thurmes, Licensed Land Surveyor, Minnesota License No. 25718 ___________________________________________ (signature) ___________________________________________ (print) Notary Public, Dakota County, Minnesota My Commission Expires January 31, 2030 AKE ELMO PLANNING COMMISSION Approved by the Planning Commission of the City of Lake Elmo, Minnesota, this _________day of__________________, 2024. By _______________________________________ , Chairperson By________________________________________ , Secretary CITY COUNCIL OF THE CITY OF LAKE ELMO This plat was approved by the City Council of the City of Lake Elmo, Minnesota, this _________day of__________________, 2024 and hereby certifies compliance with all requirements as set forth in Minnesota Statutes, Section 505.03, Subd. 2. By ___________________________________________, Mayor By____________________________________________, Clerk LAND SURVEYING, INC. CORNERSTONE 10TH AND LAKE ELMO SCHOOL ADDITION LAKE ELMO PLANNING COMMISSION Approved by the Planning Commission of the City of Lake Elmo, Minnesota, this _________day of__________________, 2024. By _______________________________________ , Chairperson By________________________________________ , Secretary CITY COUNCIL OF THE CITY OF LAKE ELMO This plat was approved by the City Council of the City of Lake Elmo, Minnesota, this _________day of__________________, 2024 and hereby certifies compliance with all requirements as set forth in Minnesota Statutes, Section 505.03, Subd. 2. By ___________________________________________, Mayor By____________________________________________, Clerk WASHINGTON COUNTY SURVEYOR Pursuant to Chapter 820, Laws of Minnesota, 1971, and in accordance with Minnesota Statutes, Section 505.021, Subd. 11, this plat has been reviewed and approved this _______ day of ______________, 2024. By _______________________________________ Washington County Surveyor By________________________________________ WASHINGTON COUNTY AUDITOR/TREASURER Pursuant to Minnesota Statutes, Section 505.021, Subd. 9 and Section 272.12, taxes payable in the year 202___, on real estate hereinbefore described, have been paid; and there are no delinquent taxes, and transfer has been entered, on this _________ day of ________________ 2024. By ________________________________Washington County Auditor/Treasurer By ________________________________________ Deputy WASHINGTON COUNTY RECORDER Document Number ___________________ I hereby certify that this instrument was recorded in the Office of the County Recorder for record on this _______ day of __________________, 2024, at __________________ o'clock ____. M., and was duly recorded in Washington County Records. By________________________________________________ Washington County Recorder By ____________________________________________ Deputy VICINITY MAP SEC. 26, TWP. 29, RNG. 21, WASHINGTON COUNTY, MN (NOT TO SCALE) SHEET 1 OF 2 SHEETSSE1/4SW1/4NE1/4NW1/4SITE 10TH STREET NORTH (C.S.A.H. 10)LAKE ELMO AVENUE NORTH (C.S.A.H. 17)SCALE IN FEET NORTH SCALE: 1 INCH = 80 FEET 0 80 160 DENOTES SET 1/2 INCH X 18 INCH IRON PIPE MARKED R.L.S. 25718 UNLESS OTHERWISE INDICATED. DENOTES FOUND 1/2 INCH IRON PIPE MARKED AS SHOWN. LAND SURVEYING, INC. CORNERSTONE 10TH AND LAKE ELMO SCHOOL ADDITION DENOTES FOUND WASHINGTON COUNTY MONUMENTAS NOTED 1010 ARE SHOWN AS THUS: DRAINAGE AND UTILITY EASEMENTS (NOT TO SCALE) BEING 10 FEET IN WIDTH AND ADJOINING LOT LINES UNLESS OTHERWISE SHOWN ON THE PLAT. THE ORIENTATION OF THIS BEARING SYSTEM IS BASED UPON NORTH LINE OF THE NW1/4 OF SECTION 13. TWP. 29, RNG. 21 WHICH IS ASSUMED TO HAVE THE BEARING OF N89°21'23"E. 10 10 SHEET 2 OF 2 SHEETS WETLAND AS DELINEATED BY BOPRAY ENVIRONMENTALON AUGUST 9, 2024 LOT 1 BLOCK 1 NEW ELEMENTARY SOFT SURFACE PLAY AREA HARD SURFACE PLAY AREA 13 9 10 13 10 1010 10 10 10 10 10 10 10 10 10 3 5 42 5 4 LAKE ELMO AVENUE NORTH (C.S.A.H. 17)10TH STREET NORTH (C.S.A.H. 10) CONTACT: TONY WILLGER Manager of Facility and Site Operations Stillwater Area Public Schools 1875 South Greely Street Stillwater, MN 55082 651-351-8374 COUNTY/CITY: REVISIONS: PROJECT LOCATION: DATE REVISION CITY OF LAKE ELMO WASHINGTON COUNTY 08-22-24 INITIAL ISSUE CERTIFICATION: I hereby certify that this plan was prepared by me, or under my direct supervision, and that I am a duly Licensed Land Surveyor under the laws of the state of Minnesota. Daniel L. Thurmes Registration Number: 25718 Date:__________________ 10TH AND LAKE ELMO SCHOOL PRELIMINARY PLAT LAND SURVEYING, INC. CORNERSTONE Suite #200 1970 Northwestern Ave Stillwater, MN 55082 Phone 651.275.8969 Fax 651.275.8976 dan@ cssurvey .net PROJECT NO. FILE NAME 08-22-2024 VICINITY MAP LEGAL DESCRIPTION: (THE FOLLOWING LEGAL DESCRIPTION IS PER THE LAND TITLE, INC. AS AGENT FOR FIRST AMERICAN TITLE INSURANCE COMPANY TITLE COMMITMENT NO. 683144 DATED AUG. 9, 2023.) The Southeast 1/4 of the Southeast 1/4 of Section 26, Township 29, Range 21, Washington County, Minnesota, and all that part of the Southwest 1/4 of the Southeast 1/4, lying Easterly of the West 435.6 feet of the East 2006 feet of the South 1/2 of the Southeast 1/4 of said Section, Washington County, Minnesota. Abstract Property AREA: EXISTING AREAS: GROSS PARCEL AREA = 2,072,858 SQ. FT. / 47.59 ACRES 10TH STREET ESMT.= 78,522 SQ. FT. / 1.80 ACRES LAKE ELMO AVE ESMT.= 63,513 SQ. FT. / 1.46 ACRES NET PARCEL AREA = 1,930,823 SQ. FT. / 44.33 ACRES PROPOSED AREAS: TOTAL PARCEL AREA: = 2,072,858 SQ. FT. / 47.59 ACRES LOT 1, BLOCK 1:= 1,861681 SQ. FT. / 42.74 ACRES ROW DEDICATION:= 211,177 SQ. FT. / 4.85 ACRES ADDITION SEC. 26, TWP. 29, RNG. 21, WASHINGTON COUNTY, MN (NOT TO SCALE)SE1/4SW1/4NE1/4NW1/4SITE 0 NORTH 100 200 WETLAND NOTE: NO WETLANDS PRESENT BASED ON AN SEPTEMBER 2023 EXAMINATION BY BOPRAY ENVIRONMENTAL AND A PREVIOUS 'NO WETLANDS PRESENT' DETERMINATION PER 'NOTICE OF DECISION' BY THE VALLEY BRANCH WATERSHED DISTRICT DATED 12/31/2020 UNDERGROUND UTILITIES NOTES: THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE SURVEYOR MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM THE INFORMATION AVAILABLE. THIS SURVEY HAS NOT PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. GOPHER STATE ONE CALL LOCATE TICKET NUMBER(S) 232783758. SOME MAPS WERE RECEIVED, WHILE OTHER UTILITIES DID NOT RESPOND TO THE LOCATE REQUEST. ADDITIONAL UTILITIES OF WHICH WE ARE UNAWARE MAY EXIST. CALL BEFORE YOU DIG! TWIN CITY AREA:TOLL FREE:1-800-252-1166651-454-0002 Gopher State One Call 1. BEARINGS ARE BASED ON COORDINATES SUPPLIED BY THE WASHINGTON COUNTY SURVEYORS OFFICE. 2. UNDERGROUND UTILITIES SHOWN PER GOPHER ONE LOCATES AND AS-BUILTS PLANS PROVIDED BY THE CITY OF LAKE ELMO. 3. THERE MAY SOME UNDERGROUND UTILITIES, GAS, ELECTRIC, ETC. NOT SHOWN OR LOCATED. 4. LIDAR ELEVATION DATA RELIED UPON FOR INTERIOR TOPOGRAPHIC INFORMATION. CHECK SHOTS TO VERIFY LIDAR ACCURACY WERE TAKEN AS INDICATED BY THE SPOT ELEVATIONS NOTED IN THE GRAPHICS. SOME VARIATION FROM THE ACTUAL GROUND ELEVATIONS MAY OCCUR DUE TO OUR INABILITY TO VERIFY AREAS IN HEAVY TREE COVER. TOPOGRAPHY ON ALL ROAD SURFACES AND ROAD DITCHES WERE DEVELOPED BASED ON FIELD SURVEY SHOTS TAKEN IN OCTOBER 2023. SURVEY NOTES: LEGEND: UNDERGROUND ELECTRIC UNDERGROUND CABLE TV UNDERGROUND FIBER OPTIC UNDERGROUND TELEPHONE OVERHEAD UTILITY UNDERGROUND GAS SANITARY SEWER STORM SEWER WATERMAIN FENCE CURB [TYPICAL] CONTOURS TREELINE FOUND MONUMENT SET 1/2" IRON PIPE MARKED RLS NO. 25718 CABLE TV PEDESTAL AIR CONDITIONER ELECTRIC MANHOLE ELECTRIC METER ELECTRIC PEDESTAL ELECTRIC TRANSFORMER LIGHT POLE GUY WIRE POWER POLE GAS MANHOLE GAS METER TELEPHONE MANHOLE TELEPHONE PEDESTAL SANITARY CLEANOUT SANITARY MANHOLE CATCH BASIN STORM DRAIN FLARED END SECTION STORM MANHOLE FIRE DEPT. CONNECTION HYDRANT CURB STOP WATER WELL WATER MANHOLE WATER METER POST INDICATOR VALVE WATER VALVE BOLLARD FLAG POLE MAIL BOX TRAFFIC SIGN UNKNOWN MANHOLE SOIL BORING SPOT ELEVATION TRAFFIC SIGNAL CONIFEROUS TREE DECIDUOUS TREE (THE FOLLOWING EXCEPTIONS APPEAR ON THE LAND TITLE, INC. AS AGENT FOR FIRST AMERICAN TITLE INSURANCE COMPANY TITLE COMMITMENT NO. 683144 DATED AUG. 9, 2023.) 13. Easement for utility purposes per Book 118 of Deeds, page 551, as Document Number 101676, Book 135 of Deeds, pages 373-374 as Document Number 118648. Assignment per Document Number 471911. Quit Claim Deed conveyance to Northwestern Bell Telephone Company d/b/a US West Communications per Document Number 611259. Definition of Easement per Document Number 639079. Corrective Definition of Easements per Document Number 797893. (SHOWN GRAPHICALLY). 14. Highway Easement per Book 245 of Deeds, page 271, as Document Number 219558. (SHOWN GRAPHICALLY). 15. Slope Easement per Book 245 of Deeds, page 272. (SHOWN GRAPHICALLY). 16. Highway and Slope Easement per Book 256 of Deeds, page 159-160, as Document Number 228200. (SHOWN GRAPHICALLY). TITLE NOTES: BENCHMARKS ELEVATIONS BASED ON INFORMATION AS SHOWN ON THE TKDA WATERMAIN PLANS - SHEET C502 DATED 4/15/2014. TOP NUT HYDRANT 400 ' N. OF 10TH STREET. ELEVATION = 939.37 PID#2602921440001 XXXX LAKE ELMO AVE. N. LE23147 SURVLE147 VICINITY MAP SEC. 26, TWP. 29, RNG. 21, WASHINGTON COUNTY, MN (NOT TO SCALE)SE1/4SW1/4NE1/4NW1/4SITE SITE PLAN AND ENGINEERING INFORMATION PER PLANS PROVIDED BY LARSON ENGINEERING 8/21/2024. SITEPLAN NOTES: RELOCATE EXISTING POWER POLECOORD. W/ UTILITY PROVIDER.MAINTAIN 4' CLEAR ZONE FROM TRAIL(TYPICAL.)RELOCATE EXISTING POWER POLECOORD. W/ UTILITY PROVIDER.MAINTAIN 4' CLEAR ZONE FROM TRAIL(TYPICAL.)RELOCATE EXISTING POWER POLECOORD. W/ UTILITY PROVIDER.MAINTAIN 4' CLEAR ZONE FROM TRAIL(TYPICAL.)RELOCATE EXISTING POWER POLECOORD. W/ UTILITY PROVIDER.MAINTAIN 4' CLEAR ZONE FROM TRAIL(TYPICAL.)C.S.A.H. NO. 17 (LAKE ELMO AVE. N.)C.S.A.H. NO. 10 (10TH STREET NORTH)10TH STREET NORTH COURT 12THSTREETNORTH11THSTREETNORTHADDRESS: 10684 10THSTREET CT NOWNER: BENCKHANNAH & ANDREWLOT AREA: 1.5 ACREZONING: RSADDRESS: 10674 10THSTREET CT NOWNER: LUDWIGMICHEAL & PATRICIALOT AREA: 1.5 ACREZONING: RSADDRESS: 10664 10THSTREET CT NOWNER: WEMEIERBARBARA & GARYLOT AREA: 2.0 ACREZONING: RSADDRESS: 10654 10THSTREET CT NOWNER: KIMBERELYDALE JR & LORI A.LOT AREA: 1.8 ACREZONING: RSADDRESS: 10644 10THSTREET CT NOWNER: JOHNSONISAIAH & ROBYNLOT AREA: 1.6 ACREZONING: RSADDRESS: 10386 10THSTREET NOWNER: OAKDALEGUN CLUBLOT AREA: 22.5 ACREZONING: RRADDRESS: 1515 KEATSAVE NOWNER: WASHINGTONCOUNTYLOT AREA: 239.5 ACREZONING: PFADDRESS: 1515 KEATSAVE NOWNER: WASHINGTONCOUNTYLOT AREA: 12.4 ACREZONING: PFADDRESS: 1326 LAKEELMO AVE NOWNER: FRANCESANNE PETERSON TRSLOT AREA: 6.9 ACREZONING: RSADDRESS: 1515 KEATSAVE NOWNER: WASHINGTONCOUNTYLOT AREA: 12.4 ACREZONING: PFADDRESS: -OWNER: HOMESTEADHOMEOWNERSLOT AREA: 8.5 ACREZONING: PFADDRESS: 11066 12THSTREET NOWNER: DUFAULTCHASE & JANETLOT AREA: 1.5 ACREZONING: RSADDRESS: 11040 12THSTREET NOWNER: DREYER PHILIP& MARY SUE SCHRANTZLOT AREA: 1.7 ACREZONING: RSADDRESS: 11047 12THSTREET NOWNER: HENDRICKSSTEPHEN & SUSANLOT AREA: 1.6 ACREZONING: RSADDRESS: 11075 12THSTREET NOWNER: VALLOTLAWRENCE & JUDITHLOT AREA: 1.6 ACREZONING: RSADDRESS: 11066 11THSTREET NOWNER: GUTIERREZSTEVEN & EMILYLOT AREA: 1.5 ACREZONING: RSADDRESS: 11048 11THSTREET NOWNER: HILLS JEFEREY& KATHRYNLOT AREA: 2.1 ACREZONING: RSADDRESS: 11063 11THSTREET NOWNER: BERKOWITZROBERT & SARAHLOT AREA: 1.6 ACREZONING: RSADDRESS: 11025 10THSTREET NOWNER: LUJAIN WADICO LLCLOT AREA: 0.8 ACREZONING: CADDRESS: 978 LAKEELMO AVE NOWNER: HOLMGRENTERI & STEVENLOT AREA: 2.5 ACREZONING: RSADDRESS: 10895 10THSTREET NOWNER: STEINMANTHOMAS & DEBRALOT AREA: 1.6 ACREZONING: RSADDRESS: 10841 10THSTREET NOWNER: JOHNSONBENJAMINLOT AREA: 4.1 ACREZONING: RSADDRESS: 10759 10THSTREET NOWNER: LUKINMICHAEL & ANNLOT AREA: 12.0 ACREZONING: RRADDRESS: 10699 10THSTREET NOWNER: MAMMENGAROBERT & CARRIELOT AREA: 12.0 ACREZONING: RRADDRESS: 10639 10THSTREET NOWNER: LOCKETTKENNETH III & JILLLOT AREA: 12.0 ACREZONING: RRADDRESS: -OWNER: MHC CIMARRON LLCLOT AREA: 104.1 ACREZONING: MDRNEW ELEMENTARYFFE: 931.00 (ARCH: 100'-0")SOFT SURFACEPLAY AREAHARD SURFACEPLAY AREA13910131010101010101010101010103542540NORTH50100200SYMBOL LEGENDPARCEL INFOPID: 26.029.21.44.0001LOT SIZE: 47.59 ACRESZONING: AGRICULTURAL (A)PROPOSED ZONING: PUBLIC FACILITIES (PF)LEGAL DESCRIPTION: PT OF S1/2 OF SE1/4 BEING E 1570.4FT SECTION 26 TOWNSHIP 029 RANGE 021P:\Projects\Projects - 2023\12236128 - New Stillwater Elementary School - Wold\C. Design\Drawing Files\12236128 - C000 Zoning & Property Info Plan.dwg 08-23-2024 PRELIMINARYPLAT SUBMITTALRevisionsDescriptionDateNumNorthCheck:Drawn:Date:Comm:MTH08-23-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Greg A. Buchal, P.E.Date: Lic. No.:08.23.202423793I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Professional Engineerunder the laws of the state of Minnesota.INDEPENDENT SCHOOLDISTRICT #834New Lake ElmoElementary School1875 Greeley St S, Stillwater, MN55082Corner of 10th Streen North andLake Elmo Avenue NorthLake Elmo MN 55042AFEDCBA12345678MNZONING ANDPROPERTYINFO PLANEASEMENT LINERIGHT-OF-WAY LINEPROPERTY LINEC000RR - Rural ResidentialA - AgriculturalPF - Public FacilitiesZONING LEGENDMDR - Medium Density ResidentialRS - Rural Single FamilyC - CommercialPROPOSED ROADWAY/TRAILSBITUMINOUS PAVEMENTPROPOSED HEAVY-DUTYBITUMINOUS PAVEMENTPROPOSED COUNTY ROADWAYPAVEMENT SECTIONPROPOSED BITUMINOUS TRAILPROPOSED CONCRETE PAVEMENT P:\Projects\Projects - 2023\12236128 - New Stillwater Elementary School - Wold\C. Design\Drawing Files\12236128 - C001 SWPPP.dwg 08-23-2024 PRELIMINARYPLAT SUBMITTALRevisionsDescriptionDateNumNorthCheck:Drawn:Date:Comm:MTH08-23-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Greg A. Buchal, P.E.Date: Lic. No.:08.23.202423793I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Professional Engineerunder the laws of the state of Minnesota.INDEPENDENT SCHOOLDISTRICT #834New Lake ElmoElementary School1875 Greeley St S, Stillwater, MN55082Corner of 10th Streen North andLake Elmo Avenue NorthLake Elmo MN 55042AFEDCBA12345678MNPROJECT SPECIFIC SWPPP INFORMATION:I.GENERAL CONSTRUCTION ACTIVITY INFORMATIONPROJECT NAME:NEW LAKE ELMO ELEMENTARY SCHOOLPROJECT LOCATION:NORTH EAST CORNER OF THE INTERSECTIONOF LAKE ELMO AVE N. AND 10TH STREET N.LAKE ELMO, MN 55042PROJECT CONTACTSOWNER:INDEPENDENT SCHOOL DISTRICT #8341875 GREELEY STREET SOUTHSTILLWATER, MN 5508CONTACT:ENGINEER:LARSON ENGINEERING, INC.3524 LABORE ROADWHITE BEAR LAKE, MN 55110CONTACT: MITCH HONSA, P.E., 651-481-92120, MHONSA@LARSONENGR.COMCONTRACTOR:COMPANY (TBD)ADDRESSCITY, STATE, ZIPCONTACT: NAME, PHONE, EMAILCITY WHERE WORK WILL TAKE PLACE:LAKE ELMO, MNCOUNTY WHERE WORK WILL TAKE PLACE:WASHINGTONLATITUDE/LONGITUDE OF APPROXIMATE CENTROID OF PROJECT:45° 57' 53" N, 92° 53' 06" WPROJECT TYPE (CIRCLE ONE):RESIDENTIALCOMMERCIAL/INDUSTRIALROAD CONSTRUCTIONRESIDENTIAL & ROAD CONSTRUCTIONOTHER (DESCRIBE): SCHOOLDATES OF CONSTRUCTION (ESTIMATED):Construction start date:10/2024Construction completion date:10/2026PROJECT DESCRIPTION:The project will consist of the construction of a new school building, parking lots, drives, sidewalks,athletic fields, stormwater basins, and related utilities. There are no wetland impacts associated withthe project.PROJECT LIMITS:See the project plans, in particular the grading & erosion control plans, for site disturbance limits.SITE DISTURBANCE SUMMARY (to nearest tenth acre):Total number of acres to be disturbed:34.9Pre-Construction acres of impervious:0.0Post-Construction acres of impervious:8.6Total new impervious acres:8.6II.RECEIVING WATERSRECEIVING WATERS (WITHIN ONE MILE OF PROJECT PROPERTY EDGE):NAME OF WATER BODYTYPESPECIAL WATER?IMPAIRED WATER?Goose Lake (South)LakeNoYesLake ElmoLakeNoYes (Mercury)Horse Shoe LakeLakeNoNoRoseLakeNoNoKramerLakeNoNoH.J. Brown PondPondNoYes (PFOS)MargaretLakeNoNoTOTAL MAXIMUM DAILY LOAD (TMDL) WATERSN/AIDENTIFY WETLAND IMPACTS:1.Will construction result in any potential adverse impacts to wetlands, including excavation,degradation of water quality, draining, filling, permanent inundation or flooding, conversion to astormwater pond?No.If yes, describe impacts and mitigation measures that were taken to address the impacts and includecopies of permits or approvals from an official state wide wetland program issued specifically for thisproject or site:N/AENVIRONMENTALLY SENSITIVE AREAS:1.Identify adjacent public waters where the MN DNR has declared "work in water restrictions" duringfish spawning timeframes:None identified.2.Describe any stormwater mitigation measures that will be implemented, as a result of anenvironmental review, endangered or threatened species review or archeological site review:N/AIII.PROJECT PLANS AND SPECIFICATIONSRefer to the project plans, specifications, geotechnical report, and stormwater calculations which depict variousfeatures that are relevant to this project. Such features may include, but are not limited to, the following:·Project location and construction limits.·Existing and final grades, including dividing lines and direction of flow for all pre and post-constructionstormwater runoff drainage areas located within the project limits.·Soil types at the site.·Locations of impervious surfaces.·Locations of areas not to be disturbed (e.g., buffer zones, wetlands, etc.)·Steep slope locations.·Locations of areas where construction will be phased to minimize duration of exposed soils.·Locations of all temporary and permanent erosion control and sediment control best management practices(BMP's).·Buffer zones as required in item 9.17 and 23.11 of the permit.·Locations of potential pollution-generating activities identified in Section 12 of the permit.·Standard details for erosion and sediment control BMP's to be installed at the site.The anticipated erosion prevention and sediment control BMP quantities needed for the life of this projectinclude the following. These quantities are estimated only and shall be verified by the Contractor.BMPEstimated QuantityFinal QuantityRock Construction EntranceSilt FenceInlet ProtectionConcrete WashoutFES Outlet Rip-RapTurf SeedingErosion BlanketSOIL INFORMATIONRefer to geotechnical report for site specific soil information.TEMPORARY SEDIMENT CONTROL (SITE SPECIFIC ITEMS)1.Is the project required to install a temporary sediment basin due to 10 or more acres draining to acommon location, or 5 acres or more if the site is located within 1 mile of a special or impaired water?No.If yes, describe (or attach plans) showing how the basin will be designed and constructed in accordancewith Section 14.N/A2.Will the project include dewatering, basin draining?No.If yes, describe measures to be used to treat/dispose of turbid or sediment-laden water and method toprevent erosion or scour of discharge points (see Section 10 of the permit):N/A. Based on soil boring results, dewatering is not anticipated.3.Will the project include use of filters for backwash water?No.If yes, describe how filter backwash water will be managed on the site or properly disposed of:N/APERMANENT STORMWATER MANAGEMENT (SITE SPECIFIC ITEMS)1.Will the project result in one acre or more of new impervious surface or result in one acre or more of newimpervious in total if the project is part of a larger plan of development?Yes.If yes, a water quality volume of one inch of runoff from the cumulative new impervious surfaces must beretained on site (Section 15) through infiltration unless prohibited due to one of the reasons in item 16.14through 16.21. If infiltration is prohibited, identify other methods of stormwater treatment used (e.g. filtration,wet sedimentation basin, regional ponding, or equivalent method):Three new infiltration basins are being proposed as part of the project to provide the required waterquality volume from the total new and fully reconstructed impervious areas.2.Attach design parameters for the planned permanent stormwater management system, including volumecalculations, discharge rate calculations, construction details including basin depth, outlet configurations,location, design of pre-treatment devices, and timing for installation.See the project plans and stormwater calculations.3.For infiltration systems, provide at least one soil boring, test pit, or infiltrometer test in the location of theinfiltration practice for determining infiltration rates.See the geotechnical evaluation reports contained within the stormwater calculations. Additionalin-field testing and geotechnical observations are planned during construction to verify soilcharacteristics at the proposed basin location.4.For projects that discharge to trout streams, including tributaries to trout streams, identify method ofincorporating temperature controls into the permanent stormwater management system.N/ASEQUENCE OF CONSTRUCTION ACTIVITIES1.Install stabilized rock construction entrances.2.Install perimeter erosion control BMP's (silt fence, bio-logs, etc).3.Install temporary construction fencing at infiltration areas and other areas not be disturbed.4.Install inlet protection throughout project area and downstream inlets.5.Construct temporary sediment basins/traps as necessary.6.Strip and stockpile topsoil.7.Complete rough grading of site.8.Stabilize denuded areas and stockpiles.9.Install site utilities.10.Install temporary inlet protection at newly installed catch basins/inlets.11.Install curb and gutter and pavement sections.12.Place topsoil and final grading of areas to be vegetated.13.Remove accumulated sediment from basins / ponds.14.Final grade pond and infiltration areas, including soil de-compaction as specified.15.Complete stormwater basin as-built surveys (as required by project specifications and/or localjurisdictional authorities).16.Complete permanent stabilization including plantings, seeding, and mulch.17.Upon completion of construction activity and satisfactory vegetation establishment, remove remainingtemporary erosion and sediment control BMPs.18.Reseed / restore any areas disturbed during BMP removal.SEEDING NOTES AND REQUIREMENTS:1.The Contractor is responsible to salvage and preserve existing topsoil as necessary for final stabilization.All topsoil to be salvaged and re-used shall be processed as necessary to meet project specifications.2.Prior to final seeding, all areas to be vegetated shall be scarified/decompacted and amended as specifiedin the plans and specifications.3.Unless otherwise noted, all seed mixes and applications shall be in accordance with MNDOT SeedingManual, latest edition.4.See the project plans and specifications for seed mixtures, mulch, slope stabilization, and all otherlandscaping requirements.FINAL STABILIZATION:Ensure Final Stabilization of the site. Final Stabilization is not complete until all of the following requirements arecomplete:1.All soil disturbing activities at the site have been completed and soils are stabilized by a uniform perennialvegetative cover with a density of 70 percent of its expected final growth over the entire pervious surfacearea, or other equivalent means necessary to prevent soil erosion under erosive conditions.2.The permanent stormwater management system is constructed and operating as designed. Temporary orpermanent sedimentation basins that are to be used as permanent water quality management basinshave been cleaned of any accumulated sediment. All sediment has been removed from conveyancesystems and ditches are stabilized with permanent cover.3.All temporary synthetic and structural erosion prevention and sediment control BMPs (such as silt fence,bio-logs, etc.) have been removed from the site. BMPs designed to decompose on site may be left inplace.4.Upon correction of all erosion and sediment items and achieving vegetative cover, temporary erosionprevention and sediment control BMPs will be removed and properly disposed/recycled.5.Within 30 days of final stabilization, a notice of termination shall be submitted to the MPCA (see PermitTermination Req's) .GENERAL SWPPP NOTES:1.The Contractor and all Subcontractors involved with construction activity that disturbs soil, or implementsa pollution control measure as part of the Storm Water Pollution Prevention Plan (SWPPP) for this project,must comply with the requirements of the National Pollution Discharge Elimination System (NPDES) /State Disposal System (SDS) Program, General Permit MNR10001, Dated August 1, 2023.2.The Contractor and all Subcontractors shall be responsible for reviewing the NPDES Permit in its entirety,to ensure that all SWPPP measures are in place and permit requirements fulfilled throughout the durationof the project.SWPPP TRAINING (SECTION 21):SWPPP PREPARER:COMPANY: LARSON ENGINEERING, INC.CONTACT: GREG BUCHAL, 651-481-9120, GBUCHAL@LARSONENGR.COMCOURSE, INSTRUCTOR: DESIGN OF SWPPP, ONLINE COURSETRAINING ENTITY: UNIVERSITY OF MINNESOTAEXPIRATION: MAY 31, 2025SWPPP CONTACT:CONTRACTOR: (TBD)CONTACT: NAME, PHONE, EMAILCOURSE, INSTRUCTOR: TRAINING ENTITY:EXPIRATION:This SWPPP was prepared by personnel certified in design of construction SWPPP's as listed above. Copies ofrespective certifications are available upon request. In accordance with Section 21 of the permit, the followingindividuals must receive training, and the content and extent of the training is commensurate with the individual'sjob duties and responsibilities with regard to activities covered under the permit:a.Individuals preparing the SWPPP for the project.b.Individuals overseeing implementation of, revising and/or amending the SWPPP, and individualsperforming inspections for the project.c.Individuals performing or supervising the installation, maintenance and repair of BMP's.Individuals must receive training from local, state, federal agencies, professional organizations, or other entitieswith expertise in erosion prevention, sediment control, permanent stormwater treatment and the MNNPDES/SDS Construction Stormwater permit. Individuals shall attend a refresher-training course every three (3)years.SWPPP IMPLEMENTATION RESPONSIBILITIES:1.The Owner and Contractor are Permittee(s) as identified by the NPDES permit.2.The Contractor shall be responsible for all on-site implementation of the SWPPP, including allSubcontractor activities.3.The Contractor shall provide knowledgeable and experienced person(s) in the application, installation,and maintenance of Erosion and Sediment Control BMP's throughout the project.4.The Contractor shall provide person(s) meeting the training requirements of the NPDES permit to conductinspection and maintenance of all erosion prevention and sediment control BMP's in accordance withpermit requirements. One of these individuals must be available for an on-site inspection within 72 hoursupon request by the MPCA.5.The Contractor shall provide training documentation for all individual(s) required by the permit. Thistraining documentation shall be recorded in the SWPPP prior to construction, or as soon as personnel forthe project have been determined. Documentation shall include:a. Names of personnel associated with the project required to be trained (as listed above andunder Section 21 of the permit).b. Dates of training, name of instructor, and entity providing training.c. Content of training course or workshop including number of hours of training.INSPECTIONS AND MAINTENANCE:1.The Contractor shall provide person(s) meeting the training requirements to conduct inspection andmaintenance of all erosion prevention and sediment control BMP's under this project in accordance withpermit requirements.2.An example MPCA construction stormwater checklist can be found at the link below. Note: This templateinspection report does not address all aspects of the NPDES Permit. The completion of this checklistdoes not guarantee that all permit requirements are in compliance; it is the responsibility of thePermittee(s) to read and understand the full permit requirements.https://www.pca.state.mn.us/sites/default/files/wq-strm2-36.docxRECORDS RETENTION:The SWPPP, including all changes/amendments, and inspections and maintenance records shall be kept onsite during normal working hours by individuals who have operational control of that portion of the site.All Owner(s) shall keep the SWPPP, along with the following additional records, on file for three (3) years aftersubmittal of the NOT as outlined in Section 4:a.The Final SWPPP;b.Any other stormwater related permits required for the project;c.Records of all inspection and maintenance conducted during construction;d.All permanent operation and maintenance agreements that have been implemented, including allRight-Of-Way, Contracts, Covenants, and other binding requirements regarding perpetual maintenance;ande.All required calculations for design of the temporary and permanent stormwater management systems.PROJECT LOCATION AND RECEIVING WATERS MAP:SWPPPC001 P:\Projects\Projects - 2023\12236128 - New Stillwater Elementary School - Wold\C. Design\Drawing Files\12236128 - C001 SWPPP.dwg 08-23-2024 PRELIMINARYPLAT SUBMITTALRevisionsDescriptionDateNumNorthCheck:Drawn:Date:Comm:MTH08-23-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Greg A. Buchal, P.E.Date: Lic. No.:08.23.202423793I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Professional Engineerunder the laws of the state of Minnesota.INDEPENDENT SCHOOLDISTRICT #834New Lake ElmoElementary School1875 Greeley St S, Stillwater, MN55082Corner of 10th Streen North andLake Elmo Avenue NorthLake Elmo MN 55042AFEDCBA12345678MNGENERAL SWPPP REQUIREMENTS AND NOTES:TEMPORARY EROSION PREVENTION PRACTICES (SECTION 8)1.Prior to beginning any construction work at the site, locations of areas not to be disturbed must bedelineated (e.g., with flags, stakes, signs, silt fence, snow fence, etc.) throughout the project site.2.Minimize the need for disturbance of portions of the project with steep slopes. For those slopedareas which must be disturbed, use techniques such as phasing and stabilization practicesdesigned for steep slopes (e.g., slope draining and terracing).3.Stabilize all exposed soil areas (including stockpiles). Stabilization must be initiated immediately tolimit soil erosion whenever any construction activity has permanently or temporarily ceased on anyportion of the site and will not resume for a period exceeding 14 calendar days (or 7 days if withinone mile of an identified impaired water). Stabilization must be completed no later than 14calendar days (or 7 days if within one mile of an identified impaired water) after the constructionactivity has ceased.4.Stabilization is not required on constructed base components of roads, parking lots, and similarsurfaces. Stabilization is not required on temporary stockpiles without significant silt, clay ororganic components (e.g., clean aggregate stockpiles, demolition concrete stockpiles, sandstockpiles) but sediment controls must be placed at the base of the stockpile.5.For Public Waters that the Minnesota Department of Natural Resources has promulgated “work inwater restrictions” during specified fish spawning time frames, all exposed soil areas that are within200 feet of the water's edge, and drain to these waters must complete the stabilization activitieswithin 24 hours during the restriction period.6.Stabilize the normal wetted perimeter of the last 200 linear feet of temporary or permanentdrainage ditches or swales that drain water from the site within 24 hours after connecting to asurface water or property edge. Stabilize remaining portions of temporary or permanent ditches orswales within 14 calendar days (or 7 days if within one mile of an identified impaired water) afterconnecting to a surface water or property edge and construction in that portion of the ditchtemporarily or permanently ceases.7.Temporary or permanent ditches or swales being used as sediment containment systems duringconstruction (with properly designed rock-ditch checks, bio rolls, silt dikes, etc.) do not need to bestabilized during the temporary period of use as a sediment containment system. These areasmust be stabilized within 24 hours after no longer being used for as a sediment containmentsystem.8.Applying mulch, hydromulch, tackifier, polyacrylamide or similar erosion prevention practices is notacceptable within any portion of the normal wetted perimeter of a temporary or permanentdrainage ditch or swale section with a continuous slope of greater than 2 percent.9.Pipe outlets must be provided with temporary or permanent energy dissipation within 24 hoursafter connection to a surface water or permanent stormwater treatment system.10.Route water around unstabilized areas on the site and to reduce erosion, unless infeasible. Useerosion controls and velocity dissipation devices such as check dams, sediment traps, riprap, orgrouted riprap at outlets within and along the length of any constructed stormwater conveyancechannel, and at any outlet, to provide a non‐erosive flow velocity, to minimize erosion of channelsand their embankments, outlets, adjacent stream banks, slopes, and downstream waters duringdischarge conditions.11.Unless infeasible due to lack of pervious or vegetated areas, direct discharges from BMPs tovegetated areas of the site (including any natural buffers) in order to increase sediment removaland maximize stormwater infiltration. Use velocity dissipation devices if necessary to preventerosion when directing stormwater to vegetated areas.12.Infiltration areas shall not be excavated until all upstream areas have been stabilized and/orupstream BMPs are in place to properly prevent sediment deposition. Only low impact equipmentshall be allowed in infiltration areas which shall be clearly identified, staked, and marked/fencedoff.13.Project phasing shall be implemented to ensure land disturbance and temporary erosion controlmeasures can be effectively inspected and maintained throughout the duration of the project inaccordance with the Inspection and Maintenance requirements of Section 11.TEMPORARY SEDIMENT CONTROL PRACTICES (SECTION 9)1.Sediment control practices must be established on all down gradient perimeters and be locatedupgradient of any buffer zones. The perimeter sediment control practices must be in place beforeany upgradient land‐disturbing activities begin. These practices shall remain in place until FinalStabilization has been established.2.If downgradient sediment controls become overloaded, based on frequent failure or excessivemaintenance requirements, additional upgradient sediment control practices or redundant BMPsshall be installed to eliminate the overloading concerns. All changes shall be recorded in theSWPPP.3.Temporary or permanent drainage ditches and sediment basins designed as part of a sedimentcontainment system (e.g., ditches with rock-check dams) require sediment control practices onlyas appropriate for site conditions.4.A floating silt curtain placed in the water is not an acceptable sediment control BMP except whenworking on a shoreline or below the waterline. Immediately after construction activity (e.g.,installation of rip rap along the shoreline) in that area is complete, upland perimeter controlpractices shall be installed if exposed soils still drain to a surface water.5.Re‐install all sediment control practices that have been adjusted or removed to accommodateshort‐term activities such as clearing or grubbing, or passage of vehicles, immediately after theshort‐term activity has been completed. Complete any short‐term activity that requires removal ofsediment control practices as quickly as possible and re‐install sediment control practices beforethe next precipitation event even if the short‐term activity is not complete.6.All storm drain inlets must be protected by appropriate BMPs during construction until all sourceswith potential for discharging to the inlet have been stabilized. Inlet protection may be removed fora particular inlet if a specific safety concern (street flooding/freezing) has been identified by thePermittee(s) or the jurisdictional authority (e.g., city/county/township/MnDOT engineer).ThePermittee(s) must document the need for removal in the SWPPP.7.Temporary soil stockpiles must have silt fence or other effective sediment controls, and cannot beplaced in any natural buffers or surface waters, including stormwater conveyances such as curband gutter systems, or conduits and ditches unless there is a bypass in place for the stormwater.8.Where vehicle traffic leaves any part of the site (or onto paved roads within the site) install avehicle tracking BMP to minimize the track out of sediment from the construction site. Examples ofvehicle tracking BMPs include (but are not limited to) rock pads, mud mats, slash mulch, concreteor steel wash racks, or equivalent systems. Use street sweeping if such vehicle tracking BMPs arenot adequate to prevent sediment from being tracked onto the street.9.The Permittee(s) must install temporary sedimentation basins as required in accordance withpermit requirements.10.Minimize soil compaction by restricting vehicle access in areas where final vegetative stabilizationwill occur, unless otherwise infeasible.11.Discharges from BMPs shall be directed to vegetated areas unless infeasible.12.Preserve a 50 foot natural buffer or (if a buffer is infeasible on the site) provide redundant (double)perimeter sediment controls when a surface water is located within 50 feet of the project's earthdisturbances and stormwater flows to the surface water.13.Perimeter sediment controls shall be installed at least 5 feet apart unless limited by lack ofavailable space. Natural buffers are not required adjacent to road ditches, judicial ditches, countyditches, stormwater conveyance channels, storm drain inlets, and sediment basins. If preservingthe buffer is infeasible, the reasons for which shall be recorded in the SWPPP.14.The use of polymers, flocculants, or other sedimentation treatment chemicals, if used on theproject, shall be used in accordance with accepted engineering practices, dosing specifications,and sediment removal design specifications provided by the product manufacturer or supplier. Useconventional erosion and sediment controls prior to the chemical addition to ensure effectivetreatment. Chemicals may only be applied where treated stormwater is directed to a sedimentcontrol system which allows or filtration of settlement of the floc prior to discharge.15.If the proposed project as shown on the plans has 10 or more acres draining to a common locationor 5 acres or more if the site is within one mile of a special or impaired water (as identified inSection II - Receiving Waters and Environmentally Sensitive Areas), then a temporary sedimentbasin must be constructed as shown on the plans. Temporary sediment basins will have aminimum of 3,600 cubic feet of storage per acre draining to the basin. The basin outlet shallprovide for discharging water from the surface to minimize discharging of pollutants. A stabilizedemergency overflow shall be constructed.DEWATERING AND BASIN DRAINING (SECTION 10)1.Discharge turbid or sediment‐laden waters related to dewatering or basin draining (e.g., pumpeddischarges, trench/ditch cuts for drainage) to a temporary or permanent sediment basin on theproject site unless infeasible. Discharge from the temporary or permanent sedimentation basins tosurface waters if the basin water has been visually checked to ensure adequate treatment hasbeen obtained in the basin and that nuisance conditions will not result from the discharge. If thewater cannot be discharged to a sedimentation basin prior to entering the surface water, it must betreated with the appropriate BMPs, such that the discharge does not adversely affect the receivingwater or downstream properties.2.Discharge water that contains oil or grease, must use an oil‐water separator or suitable filtrationdevice (e.g. cartridge filters, absorbents pads) prior to discharging the water.3.All water from dewatering or basin‐draining activities must be discharged in a manner that doesnot cause nuisance conditions, erosion in receiving channels or downslope properties, erosion orscour in the immediate vicinity of discharge points, or inundation in wetlands causing significantadverse impact to the wetland.4.The use of filters with backwash water, haul the backwash water away for disposal, return thebackwash water to the beginning of the treatment process, or incorporate the backwash water intothe site in a manner that does not cause erosion. Discharge backwash water to the sanitary sewerif permission is granted by the sanitary sewer authority. Replace and clean the filter media used indewatering devices when required to retain adequate function.INSPECTIONS AND MAINTENANCE (SECTION 11)1.Owner and Contractor shall ensure that a trained person (as identified in item 21.2.b) of the permit willinspect the entire construction site at a minimum:- Once every seven (7) days during active construction, and- Within 24 hours after a rainfall event greater than 1/2 inch in 24 hours2.Inspect all erosion prevention and sediment control BMPs and Pollution Prevention ManagementMeasures to ensure integrity and effectiveness during all routine and post‐rainfall event inspections. Allnonfunctional BMPs must be repaired, replaced, or supplemented with functional BMPs by the end of thenext business day after discovery, or as soon as field conditions allow access unless another time frameis specified below. Investigate and comply with the following Inspection and Maintenance requirements:a.All perimeter control devices must be repaired, replaced, or supplemented when they becomenonfunctional or the sediment reaches one‐half (1/2) of the height of the device. These repairs mustbe made by the end of the next business day after discovery, or thereafter as soon as field conditionsallow access.b.Temporary and permanent sedimentation basins must be drained and the sediment removed whenthe depth of sediment collected in the basin reaches one‐half (1/2) the storage volume. Drainage andremoval must be completed within 72 hours of discovery, or as soon as field conditions allow access.c.Inspect and photograph dewatering discharges at the beginning and at least once every 24 hoursduring operation.d.Surface waters, including drainage ditches and conveyance systems, must be inspected for evidenceof erosion and sediment deposition during each inspection. Remove all deltas and sedimentdeposited in surface waters, including drainage ways, catch basins, and other drainage systems, andrestabilize the areas where sediment removal results in exposed soil. The removal and stabilizationmust take place within seven (7) days of discovery unless precluded by legal, regulatory, or physicalaccess constraints. Use all reasonable efforts to obtain access. If precluded, removal and stabilizationmust take place within seven (7) calendar days of obtaining access. Contact all local, regional, stateand federal authorities and receiving any applicable permits, prior to conducting any work in surfacewaters.e.Construction site vehicle exit locations must be inspected for evidence of off‐site sediment trackingonto paved surfaces. Tracked sediment must be removed from all paved surfaces both on and off sitewithin 24 hours of discovery, or if applicable, within a shorter time.f.Streets and other areas adjacent to the project must be inspected for evidence of off‐siteaccumulations of sediment. If sediment is present, it must be removed in a manner and at a frequencysufficient to minimize off‐site impacts (e.g., fugitive sediment in streets could be washed into stormsewers by the next rain and/or pose a safety hazard to users of public streets).5.Inspection frequency adjustment:a.Inspections of areas with permanent cover can be reduced to once per month, even if constructionactivity continues on other portions of the site; orb.where sites have permanent cover on all exposed soil and no construction activity is occurringanywhere on the site, inspections can be reduced to once per month and, after 12 months, may besuspended completely until construction activity resumes. The MPCA may require inspections toresume if conditions warrant; orc.where construction activity has been suspended due to frozen ground conditions, inspections may besuspended. Inspections must resume within 24 hours of runoff occurring, or upon resumingconstruction, whichever comes first.3.All inspections and maintenance activities within 24 hours of being conducted must be recorded andretained in the SWPPP. These records must include:a.Date and time of inspectionsb.Name of person(s) conducting inspectionsc.Findings of inspections, including the specific location where corrective actions are neededd.Corrective actions taken (including dates, times, and party completing maintenance activities)e.Date and amount of all rainfall events greater than 1/2 inch (0.5 inches) in 24 hours. Rainfall amountsmust be obtained by a properly maintained rain gauge installed onsite, a weather station that is within1 mile of your location or a weather reporting system that provides site specific rainfall data from radarsummaries.f.If any discharge is observed to be occurring during the inspection, a record of all points of the propertyfrom which there is a discharge must be made, and the discharge should be described (i.e., color,odor, floating, settled, or suspended solids, foam, oil sheen, and other obvious indicators of pollutants)and photographed.g.Any amendments to the SWPPP proposed as a result of the inspection must be documented withinseven (7) calendar days.4.All infiltration areas must be inspected to ensure that no sediment from ongoing construction activity isreaching the infiltration area. All infiltration areas must be inspected to ensure that equipment is not beingdriven across the infiltration area.POLLUTION PREVENTION MANAGEMENT MEASURES (SECTION 12)Implement the following pollution prevention management measures on the site:1.Storage, Handling, and Disposal of Construction Products, Materials, and Wastes shall comply with thefollowing to minimize the exposure to stormwater of any of the products, materials, or wastes. Productsor wastes which are either not a source of contamination to stormwater or are designed to be exposed tostormwater are not held to this requirement:a.Building products that have the potential to leach pollutants must be under cover (e.g., plasticsheeting or temporary roofs) to prevent the discharge of pollutants or protected by a similarly effectivemeans designed to minimize contact with stormwater.b.Pesticides, herbicides, insecticides, fertilizers, treatment chemicals, and landscape materials must beunder cover (e.g., plastic sheeting or temporary roofs) to prevent the discharge of pollutants orprotected by similarly effective means designed to minimize contact with stormwater.c.Hazardous materials, toxic waste, (including oil, diesel fuel, gasoline, hydraulic fluids, paint solvents,petroleum‐based products, wood preservatives, additives, curing compounds, and acids) must beproperly stored in sealed containers to prevent spills, leaks or other discharge. Restricted accessstorage areas must be provided to prevent vandalism. Storage and disposal of hazardous waste orhazardous materials must be in compliance with Minn. R. ch. 7045 including secondary containmentas applicable.d.Solid waste must be stored, collected and disposed of properly in compliance with Minn. R. ch. 7035.e.Portable toilets must be positioned so that they are secure and will not be tipped or knocked over.Sanitary waste must be disposed of properly in accordance with Minn. R. ch. 7041.2.Fueling and Maintenance of Equipment or Vehicles; Spill Prevention and Response: Take reasonablesteps to prevent the discharge of spilled or leaked chemicals, including fuel, from any area wherechemicals or fuel will be loaded or unloaded including the use of drip pans or absorbents unlessinfeasible. Conduct fueling in a contained area unless infeasible. Ensure adequate supplies are availableat all times to clean up discharged materials and that an appropriate disposal method is available forrecovered spilled materials. Report and clean up spills immediately as required by Minn. Stat. § 115.061,using dry clean up measures where possible.3.Vehicle and equipment washing: Wash the exterior of vehicles or equipment on the project site, washingmust be limited to a defined area of the site. Runoff from the washing area must be contained in asediment basin or other similarly effective controls and waste from the washing activity must be properlydisposed of. Properly use and store soaps, detergents, or solvents. No engine degreasing is allowed onsite.4.Concrete and other washouts waste: Provide effective containment for all liquid and solid wastesgenerated by washout operations (concrete, stucco, paint, form release oils, curing compounds and otherconstruction materials) related to the construction activity. The liquid and solid washout wastes must notcontact the ground, and the containment must be designed so that it does not result in runoff from thewashout operations or areas. Liquid and solid wastes must be disposed of properly and in compliancewith MPCA rules. A sign must be installed adjacent to each washout facility that requires site personnelto utilize the proper facilities for disposal of concrete and other washout wastes.SWPPP AMENDMENTS (SECTION 6):1.One of the individuals described in item 21.2.a or 21.2.b of the permit or another qualifiedindividual must complete all SWPPP changes. Changes involving the use of less stringent BMPsmust include a justification describing how the replacement BMP is effective for the sitecharacteristics.2.The SWPPP shall be amended to include additional or modified BMPs as necessary to correctproblems identified or address situations whenever there is a change in design, construction,operation, maintenance, weather or seasonal conditions having a significant effect on thedischarge of pollutants to surface waters or groundwater.3.The SWPPP shall be amended to include additional or modified BMPs as necessary to correctproblems identified or address situations whenever inspections or investigations by the site owneror operator, USEPA or MPCA officials indicate the SWPPP is not effective in eliminating orsignificnatly minimizing the ischarge of pollutants to surface waters or groundwater or thedischarges are cuasing water quality standard exceedances (e.g., nuisance conditions as definedin Minn. R. 7050.0210, subp. 2 or the SWPPP is not consistend with the ofjectives of the USEPAapproved TMDL.BMP SELECTION AND INSTALLATION (SECTION 7):1.All BMPs identified in the SWPPP document and construction plans shall be selected, installed,and maintained in an appropriate and functional manner in accordance with relevant manufacturerspecifications and accepted engineering practices.2.Do not disturb more land (i.e., phasing) than can be effectively inspected and maintained inaccordance with Section 11.PERMIT TERMINATION (SECTIONS 4 AND 13)1.Permittees must submit a NOT within 30 days after all termination conditions listed in Section 13are complete.2.Permittees must submit a NOT within 30 days after selling or otherwise legally transferring theentire site, including permit responsibility for roads (e.g., street sweeping) and stormwaterinfrastructure final clean out, or transferring portions of a site to another party. The permittees'coverage under the permit terminates at midnight on the submission date of the NOT.3.Permittees may terminate permit coverage prior to completion of all construction activity if theymeet all of the following conditions:a.Construction activity has ceased for at least 90 days; andb.at least 90 percent (by area) of all originally proposed construction activity has been completedand permanent cover has been established on those areas; andc.on areas where construction activity is not complete, permanent cover has been established;andd.the site complies with items 13.3 through 13.7 of the permit.After permit coverage is terminated under this item, any subsequent development on the remainingportions of the site will require permit coverage if the subsequent development itself or as part ofthe remaining common plan of development or sale will result in land disturbing activity of one (1)or more acres in size.4.Permittees may terminate coverage upon MPCA approval after submitting informationdocumenting the owner canceled the project.5.Permittees must complete all construction activity and must install permanent cover over all areasprior to submitting the NOT. Vegetative cover must consist of a uniform perennial vegetation with adensity of 70 percent of its expected final growth. Vegetation is not required where the function of aspecific area dictates no vegetation, such as impervious surfaces or the base of a sand filter.6.Permittees must clean the permanent stormwater system of any accumulated sediment and mustensure the system meets all applicable requirements in Section 15 through 19 of the permit and isoperating as designed.7.Permittees must remove all sediment from conveyance systems prior to submitting the NOT.8.Permittees must remove all temporary synthetic erosion prevention and sediment control BMPsprior to submitting the NOT. BMPs designed to decompose on-site may be left in place.9.For residential construction only, permit coverage terminates on individual lots if the structures arefinished and temporary erosion prevention and downgradient perimeter control is complete, theresidence sells to the homeowner, and the permittee distributes the MPCA's "Homeowner FactSheet" to the homeowner.10.For construction projects on agricultural land (e.g., pipelines across cropland), disturbed land mustbe returned to its preconstruction agricultural condition prior to submitting the NOT.11.When submitting the NOT, permittees must include either ground or aerial photographs showingvegetative cover requirements have been met as listed above. All submitted photographs shallinclude the date and specific site location.LONG TERM OPERATION AND MAINTENANCE:1.Upon the completion of construction activity and NPDES permit termination, in accordance withSections 4 and 13, the Property Owner shall become the responsible party for long term operationand maintenance (O&M) of all permanent stormwater management features under this project.2.All associated operations, inspections, maintenance, and record keeping shall be performed bytrained individual(s) familiar with the site stormwater management system.3.Record keeping of inspections and maintenance items shall be maintained by the Owner inaccordance with applicable Maintenance Agreements/Declarations as required by localjurisdictional authorities.SWPPPC002 C.S.A.H. NO. 17 (LAKE ELMO AVE. N.)C.S.A.H. NO. 10 (10TH STREET NORTH)930932934936938938936934932 910914916920934936942944944942940938936934932930918916914912938930928926920918916914912910908906904904 906908918 920 922906 908 910912914916918920922924926928930932934932930928926924922920916918914912910908906910910912914916908906904902900910910914920922924922914912910916918920922928928926924922922926922920912914916920920922924916918920922920930918910898902904898900910900910930920910920930924922924 918932922924926928920918918920922920922924 924926928930932934936942940936934934936938934936938930932934928922924926920922924918924926926922900898916918924926932934936930928926924932930898908906904 C.S.A.H. NO. 17 (LAKE ELMO AVE. N.)C.S.A.H. NO. 10 (10TH STREET NORTH)93 0932 93 4 93 6 93 8 938936934932 9109 1 4916 92093493 6 942944944942940938936934932930918 916 914 912 9 3 8 93 0 9 2 8 92 6 92 0 91 8 91 6 91 4 91 2 91 0908 9 0 6 9 0 4 904906908918 920 922906 908 910 912 914 916 918 920 922 924 926 928 930 932934932 930 928 926 924 922920 916 918 914912 910908906910 910 91 2 914 916 908906 904902900 9109109149209229249229149129109169189209229289 2 8 9 2 6924922 922926922920 91291491692092092292491691892092292093091891089 8 90290489890091090091093092091092093092492 2 92 4 918932922924926928920918918920922 920922924924926 928930932934936 942 940 936 934 934 936 938 934 936 938 930 932 934928922924926920922924918924926926922 9008989169189249269 3 2 9349369309289269249329308 9 8 908 906 9 0 4 NEW ELEMENTARYFFE: 931.00 (ARCH: 100'-0")SOFT SURFACEPLAY AREAHARD SURFACEPLAY AREA1391013101010101010101010101010354254C.S.A.H. NO. 17 (LAKE ELMO AVE. N.)C.S.A.H. NO. 10 (10TH STREET NORTH)93 0932 93 4 93 6 93 8 938936934932 9109 1 4916 92093493 6 942944944942940938936934932930918 916 914 912 9 3 8 93 0 9 2 8 92 6 92 0 91 8 91 6 91 4 91 2 91 0 9 0 8 90 6 9 0 4 904906908918 92 0 922906 908 910 912 914 916 918 920 922 924 926 928 930 932934932 930 928 926 924 922 920 916 918 914912 910908906910 910 91 2 914 916 908906 9049029 0 0 9109109149209229249229149129109169189209229289 2 892 6924922 922926922920 91291491692092092292491691892092292093091891089 8 90290489890091090091093092091092093092492 2 92 4 918932922924926928920918918920922 920922924924926 928930932934936 942 940 936 934 934 936 938 934 936 938 930 932 934928922924926920922924918924926926922 9008989169189249269 3 2 9349369309289269249329308 9 8 908 9 0 6 9 0 4 C.S.A.H. NO. 17 (LAKE ELMO AVE. N.)C.S.A.H. NO. 10 (10TH STREET NORTH)930932934936938938936934932 910914916920934936942944944942940938936934932930918916914912938930928926920918916914912910908906904904 906908918 920 922906 908 910912914916918920922924926928930932934932930928926924922920916918914912910908906910910912914916908906904902900910910914920922924922914912910916918920922928928926924922922926922920912914916920920922924916918920922920930918910898902904898900910900910930920910920930924922924 918932922924926928920918918920922920922924 924926928930932934936942940936934934936938934936938930932934928922924926920922924918924926926922900898916918924926932934936930928926924932930898908906904NEW ELEMENTARYFFE: 931.00 (ARCH: 100'-0")SOFT SURFACEPLAY AREAHARD SURFACEPLAY AREA1391013101010101010101010101010354254930930 930930930925920910930930930 925925925930 925920920925920915915920925930915920915905900930930935940930935935940930930925920910900915905920915910905900920915915920925920925925925930925925 RIP-RAP @ OUTLETSILT FENCEAROUND INLETRIP-RAP @ OUTLETRIP-RAP @ OUTLETRIP-RAP @ OUTLETSILT FENCEAROUND INLETRIP-RAP @ OUTLETRIP-RAP @OVERFLOWRIP-RAP @ OUTLET930 925930INLET PROTECTION (TYP.)INLET PROTECTION (TYP.)INLET PROTECTION (TYP.)INLET PROTECTION (TYP.)INLET PROTECTION (TYP.)INLET PROTECTION (TYP.)RIP-RAP @ OUTLETSEDIMENT LOG (TYP.)SEDIMENT LOG (TYP.)SEDIMENT LOG (TYP.)SILT FENCE (TYP.)SILT FENCE (TYP.)SILT FENCE (TYP.)SILT FENCE (TYP.)SILT FENCE (TYP.)920915910920920925920SILT FENCEAROUND INLET935 930940930930ROCK CONSTRUCTIONENTRANCEROCK CONSTRUCTIONENTRANCESILT FENCEAROUND INLET928929928928927926924926929929928927927 926 924 923922 921928928927926926927928929928927926929923922921 921922923924925926927928929928 927 926924923922921919918917916914916917918919921921922923924919918917916914913912911909908907906904903902901899898926927928929931929932933934936937938939941942929931932933934932933934936937938939941942928929931929928927926926924923922921919918918919918916914912908906904902898917913911909907903901899928927926922921919918917916914913912911909908907906904903902901899898919918917916916917918919921922927926924923922921924924926926926927928929929928928927926927926924923922 929928927926924923922921929928927926916917918919921922914913912911909908921919919921924923919921938936937934933932931937938939941942936936937938929929931931 C.S.A.H. NO. 17 (LAKE ELMO AVE. N.)C.S.A.H. NO. 10 (10TH STREET NORTH)93 0932 93 4 93 6 93 8 938936934932 9109 1 4916 92093493 6 942944944942940938936934932930918 916 914 912 9 3 8 93 0 9 2 8 92 6 92 0 91 8 91 6 91 4 91 2 91 0908 9 0 6 9 0 4 904906908918 920 922906 908 910 912 914 916 918 920 922 924 926 928 930 932934932 930 928 926 924 922920 916 918 914912 910908906910 910 91 2 914 916 908906 904902900 9109109149209229249229149129109169189209229289 2 8 9 2 6924922 922926922920 91291491692092092292491691892092292093091891089 8 90290489890091090091093092091092093092492 2 92 4 918932922924926928920918918920922 920922924924926 928930932934936 942 940 936 934 934 936 938 934 936 938 930 932 934928922924926920922924918924926926922 9008989169189249269 3 2 9349369309289269249329308 9 8 908 906 9 0 4 P:\Projects\Projects - 2023\12236128 - New Stillwater Elementary School - Wold\C. Design\Drawing Files\12236128 - C050 Site Constraints.dwg 08-23-2024 PRELIMINARYPLAT SUBMITTALRevisionsDescriptionDateNumNorthCheck:Drawn:Date:Comm:MTH08-23-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Greg A. Buchal, P.E.Date: Lic. No.:08.23.202423793I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Professional Engineerunder the laws of the state of Minnesota.INDEPENDENT SCHOOLDISTRICT #834New Lake ElmoElementary School1875 Greeley St S, Stillwater, MN55082Corner of 10th Streen North andLake Elmo Avenue NorthLake Elmo MN 55042AFEDCBA12345678MNSITECONSTRAINTSC050FLOOD ELEVATION OFLANDLOCKED BASINFLOOD ELEVATION OFLANDLOCKED BASINEXISTING TREE LINEEXISTING TREE LINE750 FOOT SOUND BUFFEREXISTING TREE LINEGRADING FOR COUNTY DITCH & TRAILGRADING FOR COUNTY DITCH & TRAILENTRY GRADING INTOLANDLOCKED BASINENTRY GRADING1:200 SCALELANDLOCKED BASINS0NORTH1002004001:200 SCALE750 FOOT SOUND BUFFER0NORTH1002004001:200 SCALETRAIL & DITCH GRADINGCOUNTY ROAD 0NORTH1002004001:200 SCALEENTRY GRADING0NORTH1002004001:200 SCALETHROUGHOUT SITEEXISTING SLOPES 0NORTH100200400 SB7 DSB4 DSB3 DSB2 DSB5 ASB6 ASB1 CSB8 DSB9 BC.S.A.H. NO. 17 (LAKE ELMO AVE. N.)C.S.A.H. NO. 10 (10TH STREET NORTH)SHEET: C102SHEET: C101SHEET: C104SHEET: C10310TH STREET ACCESS SHEET: C105LAKE ELMO AVENUE ACCESS SHEET: C105 DEMOLITION NOTES1.Verify all existing utility locations.2.It is the responsibility of the Contractor to perform or coordinate all necessaryutility demolitions and relocations from existing utility locations to all onsiteamenities and buildings. These connections include, but are not limited to, water,sanitary sewer, cable tv, telephone, gas, electric, site lighting, etc.3.Prior to beginning work, contact Gopher State Onecall (651-454-0002) to locateutilities throughout the area under construction. The Contractor shall retain theservices of a private utility locator to locate the private utilities.4.Sawcut along edges of pavements, sidewalks, and curbs to remain.5.All construction shall be performed in accordance with state and local standardspecifications for construction.P:\Projects\Projects - 2023\12236128 - New Stillwater Elementary School - Wold\C. Design\Drawing Files\12236128 - C100 Existing Coniditions & Demolition Plan.dwg 08-23-2024 PRELIMINARYPLAT SUBMITTALRevisionsDescriptionDateNumNorthCheck:Drawn:Date:Comm:MTH08-23-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Greg A. Buchal, P.E.Date: Lic. No.:08.23.202423793I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Professional Engineerunder the laws of the state of Minnesota.INDEPENDENT SCHOOLDISTRICT #834New Lake ElmoElementary School1875 Greeley St S, Stillwater, MN55082Corner of 10th Streen North andLake Elmo Avenue NorthLake Elmo MN 55042AFEDCBA12345678MNOVERALL:EXISTINGCONDITIONS ANDDEMOLITIONPLANC1000NORTH4080160SYMBOL LEGENDREMOVE AND DISPOSE OF EXISTINGBITUMINOUS PAVEMENT SECTIONREMOVE AND DISPOSE OF EXISTINGGRAVEL SECTIONREMOVE AND DISPOSE OF EXISTING TREES,STUMPS, AND UNDERBRUSH. SEE LANDSCAPE PLANFOR EXACT REMOVALSSOIL BORING LOCATIONEASEMENT LINEPROPERTY LINERIGHT OF WAY LINESANITARY SEWER PIPESTORM SEWER PIPEWATERMAIN PIPECOMMUNICATIONS UNDERGROUND LINEELECTRIC OVERHEAD LINEELECTRIC UNDERGROUND LINEFIBER OPTIC UNDERGROUND LINEGAS UNDERGROUND LINEFENCESB1 C SB4 DSB3 DSB2 DMATCH LINE - SEE SHEET C101MATCH LINE - SEE SHEET C103MATCH LINE - SEE SHEET C101 MATCH LINE - SEE SHEET C102 DEMOLITION NOTES1.Verify all existing utility locations.2.It is the responsibility of the Contractor to perform or coordinate all necessaryutility demolitions and relocations from existing utility locations to all onsiteamenities and buildings. These connections include, but are not limited to, water,sanitary sewer, cable tv, telephone, gas, electric, site lighting, etc.3.Prior to beginning work, contact Gopher State Onecall (651-454-0002) to locateutilities throughout the area under construction. The Contractor shall retain theservices of a private utility locator to locate the private utilities.4.Sawcut along edges of pavements, sidewalks, and curbs to remain.5.All construction shall be performed in accordance with state and local standardspecifications for construction.REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT.REMOVE AND DISPOSE OF EXISTING GRAVEL SECTION.REMOVE AND SALVAGE EXISTING STREET SIGN, REMOVE ANDDISPOSE OF EXISTING POST AND ANY RELATED FOOTING.REMOVE AND RELOCATE POWER POLE AND OVERHEAD UTILITYLINES. COORDINATE WITH UTILITY COMPANY. SEE SHEET C400-C404FOR POSSIBLE POLE LOCATIONS.REMOVE AND DISPOSE OF EXISTING STORM SEWER UTILITY.REMOVE AND DISPOSE OF EXISTING HYDRANT.PROTECT EXISTING GAS MAIN. COORDINATE WITH UTILITY PROVIDERIF ANY RELOCATION OF THE MAIN LINE IS REQUIRED FORCONSTRUCTION.REMOVE AND DISPOSE OF EXISTING RIP-RAP.KEY NOTES12375648P:\Projects\Projects - 2023\12236128 - New Stillwater Elementary School - Wold\C. Design\Drawing Files\12236128 - C100 Existing Coniditions & Demolition Plan.dwg 08-23-2024 PRELIMINARYPLAT SUBMITTALRevisionsDescriptionDateNumNorthCheck:Drawn:Date:Comm:MTH08-23-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Greg A. Buchal, P.E.Date: Lic. No.:08.23.202423793I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Professional Engineerunder the laws of the state of Minnesota.0NORTH204080INDEPENDENT SCHOOLDISTRICT #834New Lake ElmoElementary School1875 Greeley St S, Stillwater, MN55082Corner of 10th Streen North andLake Elmo Avenue NorthLake Elmo MN 55042AFEDCBA12345678MNNORTHWEST:EXISTINGCONDITIONS ANDDEMOLITIONPLANC101SYMBOL LEGENDREMOVE AND DISPOSE OF EXISTINGBITUMINOUS PAVEMENT SECTIONREMOVE AND DISPOSE OF EXISTINGGRAVEL SECTIONREMOVE AND DISPOSE OF EXISTING TREES,STUMPS, AND UNDERBRUSH. SEE LANDSCAPE PLANFOR EXACT REMOVALSSOIL BORING LOCATIONEASEMENT LINEPROPERTY LINERIGHT OF WAY LINESANITARY SEWER PIPESTORM SEWER PIPEWATERMAIN PIPECOMMUNICATIONS UNDERGROUND LINEELECTRIC OVERHEAD LINEELECTRIC UNDERGROUND LINEFIBER OPTIC UNDERGROUND LINEGAS UNDERGROUND LINEFENCESB1 C SB7 DSB2 DSB5 ASB6 AMATCH LINE - SEE SHEET C102MATCH LINE - SEE SHEET C104MATCH LINE - SEE SHEET C101MATCH LINE - SEE SHEET C102 113368544477DEMOLITION NOTES1.Verify all existing utility locations.2.It is the responsibility of the Contractor to perform or coordinate all necessaryutility demolitions and relocations from existing utility locations to all onsiteamenities and buildings. These connections include, but are not limited to, water,sanitary sewer, cable tv, telephone, gas, electric, site lighting, etc.3.Prior to beginning work, contact Gopher State Onecall (651-454-0002) to locateutilities throughout the area under construction. The Contractor shall retain theservices of a private utility locator to locate the private utilities.4.Sawcut along edges of pavements, sidewalks, and curbs to remain.5.All construction shall be performed in accordance with state and local standardspecifications for construction.REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT.REMOVE AND DISPOSE OF EXISTING GRAVEL SECTION.REMOVE AND SALVAGE EXISTING STREET SIGN, REMOVE ANDDISPOSE OF EXISTING POST AND ANY RELATED FOOTING.REMOVE AND RELOCATE POWER POLE AND OVERHEAD UTILITYLINES. COORDINATE WITH UTILITY COMPANY. SEE SHEET C400-C404FOR POSSIBLE POLE LOCATIONS.REMOVE AND DISPOSE OF EXISTING STORM SEWER UTILITY.REMOVE AND DISPOSE OF EXISTING HYDRANT.PROTECT EXISTING GAS MAIN. COORDINATE WITH UTILITY PROVIDERIF ANY RELOCATION OF THE MAIN LINE IS REQUIRED FORCONSTRUCTION.REMOVE AND DISPOSE OF EXISTING RIP-RAP.KEY NOTES12375648P:\Projects\Projects - 2023\12236128 - New Stillwater Elementary School - Wold\C. Design\Drawing Files\12236128 - C100 Existing Coniditions & Demolition Plan.dwg 08-23-2024 PRELIMINARYPLAT SUBMITTALRevisionsDescriptionDateNumNorthCheck:Drawn:Date:Comm:MTH08-23-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Greg A. Buchal, P.E.Date: Lic. No.:08.23.202423793I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Professional Engineerunder the laws of the state of Minnesota.0NORTH204080INDEPENDENT SCHOOLDISTRICT #834New Lake ElmoElementary School1875 Greeley St S, Stillwater, MN55082Corner of 10th Streen North andLake Elmo Avenue NorthLake Elmo MN 55042AFEDCBA12345678MNNORTHEAST:EXISTINGCONDITIONS ANDDEMOLITIONPLANC102SYMBOL LEGENDREMOVE AND DISPOSE OF EXISTINGBITUMINOUS PAVEMENT SECTIONREMOVE AND DISPOSE OF EXISTINGGRAVEL SECTIONREMOVE AND DISPOSE OF EXISTING TREES,STUMPS, AND UNDERBRUSH. SEE LANDSCAPE PLANFOR EXACT REMOVALSSOIL BORING LOCATIONEASEMENT LINEPROPERTY LINERIGHT OF WAY LINESANITARY SEWER PIPESTORM SEWER PIPEWATERMAIN PIPECOMMUNICATIONS UNDERGROUND LINEELECTRIC OVERHEAD LINEELECTRIC UNDERGROUND LINEFIBER OPTIC UNDERGROUND LINEGAS UNDERGROUND LINEFENCESB1 C SB2 DSB8 DSB9 BC.S.A.H. NO. 10 (10TH STREET NORTH)MATCH LINE - SEE SHEET C101MATCH LINE - SEE SHEET C103MATCH LINE - SEE SHEET C103 MATCH LINE - SEE SHEET C1041144443 DEMOLITION NOTES1.Verify all existing utility locations.2.It is the responsibility of the Contractor to perform or coordinate all necessaryutility demolitions and relocations from existing utility locations to all onsiteamenities and buildings. These connections include, but are not limited to, water,sanitary sewer, cable tv, telephone, gas, electric, site lighting, etc.3.Prior to beginning work, contact Gopher State Onecall (651-454-0002) to locateutilities throughout the area under construction. The Contractor shall retain theservices of a private utility locator to locate the private utilities.4.Sawcut along edges of pavements, sidewalks, and curbs to remain.5.All construction shall be performed in accordance with state and local standardspecifications for construction.REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT.REMOVE AND DISPOSE OF EXISTING GRAVEL SECTION.REMOVE AND SALVAGE EXISTING STREET SIGN, REMOVE ANDDISPOSE OF EXISTING POST AND ANY RELATED FOOTING.REMOVE AND RELOCATE POWER POLE AND OVERHEAD UTILITYLINES. COORDINATE WITH UTILITY COMPANY. SEE SHEET C400-C404FOR POSSIBLE POLE LOCATIONS.REMOVE AND DISPOSE OF EXISTING STORM SEWER UTILITY.REMOVE AND DISPOSE OF EXISTING HYDRANT.PROTECT EXISTING GAS MAIN. COORDINATE WITH UTILITY PROVIDERIF ANY RELOCATION OF THE MAIN LINE IS REQUIRED FORCONSTRUCTION.REMOVE AND DISPOSE OF EXISTING RIP-RAP.KEY NOTES12375648P:\Projects\Projects - 2023\12236128 - New Stillwater Elementary School - Wold\C. Design\Drawing Files\12236128 - C100 Existing Coniditions & Demolition Plan.dwg 08-23-2024 PRELIMINARYPLAT SUBMITTALRevisionsDescriptionDateNumNorthCheck:Drawn:Date:Comm:MTH08-23-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Greg A. Buchal, P.E.Date: Lic. No.:08.23.202423793I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Professional Engineerunder the laws of the state of Minnesota.0NORTH204080INDEPENDENT SCHOOLDISTRICT #834New Lake ElmoElementary School1875 Greeley St S, Stillwater, MN55082Corner of 10th Streen North andLake Elmo Avenue NorthLake Elmo MN 55042AFEDCBA12345678MNSOUTHWEST:EXISTINGCONDITIONS ANDDEMOLITIONPLANC103SYMBOL LEGENDREMOVE AND DISPOSE OF EXISTINGBITUMINOUS PAVEMENT SECTIONREMOVE AND DISPOSE OF EXISTINGGRAVEL SECTIONREMOVE AND DISPOSE OF EXISTING TREES,STUMPS, AND UNDERBRUSH. SEE LANDSCAPE PLANFOR EXACT REMOVALSSOIL BORING LOCATIONEASEMENT LINEPROPERTY LINERIGHT OF WAY LINESANITARY SEWER PIPESTORM SEWER PIPEWATERMAIN PIPECOMMUNICATIONS UNDERGROUND LINEELECTRIC OVERHEAD LINEELECTRIC UNDERGROUND LINEFIBER OPTIC UNDERGROUND LINEGAS UNDERGROUND LINEFENCESB1 C SB2 DSB1 CSB8 DC.S.A.H. NO. 17 (LAKE ELMO AVE. N.)C.S.A.H. NO. 10 (10TH STREET NORTH)MATCH LINE - SEE SHEET C102MATCH LINE - SEE SHEET C104MATCH LINE - SEE SHEET C103MATCH LINE - SEE SHEET C104 1123(TYP. OF 2)3335444457DEMOLITION NOTES1.Verify all existing utility locations.2.It is the responsibility of the Contractor to perform or coordinate all necessaryutility demolitions and relocations from existing utility locations to all onsiteamenities and buildings. These connections include, but are not limited to, water,sanitary sewer, cable tv, telephone, gas, electric, site lighting, etc.3.Prior to beginning work, contact Gopher State Onecall (651-454-0002) to locateutilities throughout the area under construction. The Contractor shall retain theservices of a private utility locator to locate the private utilities.4.Sawcut along edges of pavements, sidewalks, and curbs to remain.5.All construction shall be performed in accordance with state and local standardspecifications for construction.REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT.REMOVE AND DISPOSE OF EXISTING GRAVEL SECTION.REMOVE AND SALVAGE EXISTING STREET SIGN, REMOVE ANDDISPOSE OF EXISTING POST AND ANY RELATED FOOTING.REMOVE AND RELOCATE POWER POLE AND OVERHEAD UTILITYLINES. COORDINATE WITH UTILITY COMPANY. SEE SHEET C400-C404FOR POSSIBLE POLE LOCATIONS.REMOVE AND DISPOSE OF EXISTING STORM SEWER UTILITY.REMOVE AND DISPOSE OF EXISTING HYDRANT.PROTECT EXISTING GAS MAIN. COORDINATE WITH UTILITY PROVIDERIF ANY RELOCATION OF THE MAIN LINE IS REQUIRED FORCONSTRUCTION.REMOVE AND DISPOSE OF EXISTING RIP-RAP.KEY NOTES12375648P:\Projects\Projects - 2023\12236128 - New Stillwater Elementary School - Wold\C. Design\Drawing Files\12236128 - C100 Existing Coniditions & Demolition Plan.dwg 08-23-2024 PRELIMINARYPLAT SUBMITTALRevisionsDescriptionDateNumNorthCheck:Drawn:Date:Comm:MTH08-23-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Greg A. Buchal, P.E.Date: Lic. No.:08.23.202423793I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Professional Engineerunder the laws of the state of Minnesota.0NORTH204080INDEPENDENT SCHOOLDISTRICT #834New Lake ElmoElementary School1875 Greeley St S, Stillwater, MN55082Corner of 10th Streen North andLake Elmo Avenue NorthLake Elmo MN 55042AFEDCBA12345678MNSOUTHEAST:EXISTINGCONDITIONS ANDDEMOLITIONPLANC104SYMBOL LEGENDREMOVE AND DISPOSE OF EXISTINGBITUMINOUS PAVEMENT SECTIONREMOVE AND DISPOSE OF EXISTINGGRAVEL SECTIONREMOVE AND DISPOSE OF EXISTING TREES,STUMPS, AND UNDERBRUSH. SEE LANDSCAPE PLANFOR EXACT REMOVALSSOIL BORING LOCATIONEASEMENT LINEPROPERTY LINERIGHT OF WAY LINESANITARY SEWER PIPESTORM SEWER PIPEWATERMAIN PIPECOMMUNICATIONS UNDERGROUND LINEELECTRIC OVERHEAD LINEELECTRIC UNDERGROUND LINEFIBER OPTIC UNDERGROUND LINEGAS UNDERGROUND LINEFENCESB1 C REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT.REMOVE AND DISPOSE OF EXISTING GRAVEL SECTION.REMOVE AND SALVAGE EXISTING STREET SIGN, REMOVE ANDDISPOSE OF EXISTING POST AND ANY RELATED FOOTING.REMOVE AND RELOCATE POWER POLE AND OVERHEAD UTILITYLINES. COORDINATE WITH UTILITY COMPANY. SEE SHEET C400-C404FOR POSSIBLE POLE LOCATIONS.REMOVE AND DISPOSE OF EXISTING STORM SEWER UTILITY.REMOVE AND DISPOSE OF EXISTING HYDRANT.PROTECT EXISTING GAS MAIN. COORDINATE WITH UTILITY PROVIDERIF ANY RELOCATION OF THE MAIN LINE IS REQUIRED FORCONSTRUCTION.REMOVE AND DISPOSE OF EXISTING RIP-RAP.KEY NOTES12375648SB8 DC.S.A.H. NO. 10 (10TH STREET NORTH)11114444435C.S.A.H. NO. 17 (LAKE ELMO AVE. N.)11113333685444477DEMOLITION NOTES1.Verify all existing utility locations.2.It is the responsibility of the Contractor to perform or coordinate all necessaryutility demolitions and relocations from existing utility locations to all onsiteamenities and buildings. These connections include, but are not limited to, water,sanitary sewer, cable tv, telephone, gas, electric, site lighting, etc.3.Prior to beginning work, contact Gopher State Onecall (651-454-0002) to locateutilities throughout the area under construction. The Contractor shall retain theservices of a private utility locator to locate the private utilities.4.Sawcut along edges of pavements, sidewalks, and curbs to remain.5.All construction shall be performed in accordance with state and local standardspecifications for construction.P:\Projects\Projects - 2023\12236128 - New Stillwater Elementary School - Wold\C. Design\Drawing Files\12236128 - C100 Existing Coniditions & Demolition Plan.dwg 08-23-2024 PRELIMINARYPLAT SUBMITTALRevisionsDescriptionDateNumNorthCheck:Drawn:Date:Comm:MTH08-23-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Greg A. Buchal, P.E.Date: Lic. No.:08.23.202423793I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Professional Engineerunder the laws of the state of Minnesota.0NORTH204080INDEPENDENT SCHOOLDISTRICT #834New Lake ElmoElementary School1875 Greeley St S, Stillwater, MN55082Corner of 10th Streen North andLake Elmo Avenue NorthLake Elmo MN 55042AFEDCBA12345678MNSITE ACCESSREMOVALS PLANC105SYMBOL LEGENDREMOVE AND DISPOSE OF EXISTINGBITUMINOUS PAVEMENT SECTIONREMOVE AND DISPOSE OF EXISTINGGRAVEL SECTIONREMOVE AND DISPOSE OF EXISTING TREES,STUMPS, AND UNDERBRUSH. SEE LANDSCAPE PLANFOR EXACT REMOVALSSOIL BORING LOCATIONEASEMENT LINEPROPERTY LINERIGHT OF WAY LINESANITARY SEWER PIPESTORM SEWER PIPEWATERMAIN PIPECOMMUNICATIONS UNDERGROUND LINEELECTRIC OVERHEAD LINEELECTRIC UNDERGROUND LINEFIBER OPTIC UNDERGROUND LINEGAS UNDERGROUND LINEFENCESB1 CC.S.A.H. NO.10 (10TH STREET NORTH)SITE ACCESS REMOVALS0NORTH3060120C.S.A.H. NO.17 (LAKE ELMO AVENUE)SITE ACCESS REMOVALS0NORTH306012011113333857744 SB7 DSB4 DSB3 DSB2 DSB5 ASB6 ASB1 CSB8 DSB9 BC.S.A.H. NO. 17 (LAKE ELMO AVE. N.)C.S.A.H. NO. 10 (10TH STREET NORTH)NEW ELEMENTARYFFE: 931.00 (ARCH: 100'-0")SOFT SURFACEPLAY AREAHARD SURFACEPLAY AREA1391013101010101010101010101010354254SHEET: C202SHEET: C201SHEET: C204SHEET: C20310TH STREET ACCESS SHEET: C205LAKE ELMO AVENUE ACCESS SHEET: C205211 PARKING STALLS,STALLS SHOWN ARE A TYPICALOF 18' LONG X 9' WIDEDRIVE LANES SHOWN ARE ATYPICAL OF 24' WIDEONE-WAY STUDENTDROP OFF LANESMAIN ENTRANCEBUSES AND TRUCKSENTRANCE ONLYSTUDENT DROP-OFFAND TEACHER PARKINGENTRANCELOADING/UNLOADINGZONEBUS AND TEACHERPARKING STALLSADDITIONAL R.O.W.DEDICATIONONE-WAY STUDENTDROP OFF LANESADDITIONAL R.O.W.DEDICATIONOUTDOOR LEARNINGFIRE TRUCK SERVICEDRIVE / WALKING TRAIL2 KICK BALL FIELDSFIRE TRUCK SERVICEDRIVE / WALKING TRAIL750' FROM GUN CLUBPROPERTY750' FROM GUN CLUBPROPERTYSYMBOL LEGENDPROPOSED ROADWAY/TRAILSBITUMINOUS PAVEMENTPROPOSED HEAVY-DUTYBITUMINOUS PAVEMENTPROPOSED COUNTY ROADWAYPAVEMENT SECTIONPROPOSED BITUMINOUS TRAILPROPOSED CONCRETE PAVEMENTSOIL BORING MARKERPROJECT AREA CALCULATIONSTOTAL SITE AREA:2,072,858 SF(47.59 AC)100%IMPERVIOUS AREAS:NEW SCHOOL 97,789 SF(2.24 AC)4.72%SIDEWALK/BIT. TRAILS63,176 SF(1.45 AC)3.05%PARKING/ROADWAYS181,902 SF (4.18 AC)8.77%SPORTFIELDS/AG-LIME 29,169 SF(0.67 AC)0.01% PAVERS 1,257 SF(0.03 AC)0.01%TOTAL NEW IMPERVIOUS373,293 SF(8.57 AC)18.01%RIGHT OF WAY:EXISTING R.O.W.142,035 SF(3.26 AC)6.85%PROPOSED R.O.W.211,177 SF (4.85 AC)10.19%ADDITIONAL R.O.W DEDICATION 69,142 SF (1.59 AC)3.33%OPEN SPACE:REMAINING OPEN SPACE1,699,565 SF (39.02 AC)81.99%EASEMENT LINERIGHT-OF-WAY LINEPROPERTY LINEP:\Projects\Projects - 2023\12236128 - New Stillwater Elementary School - Wold\C. Design\Drawing Files\12236128 - C200 Site Plan.dwg 08-23-2024 PRELIMINARYPLAT SUBMITTALRevisionsDescriptionDateNumNorthCheck:Drawn:Date:Comm:MTH08-23-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Greg A. Buchal, P.E.Date: Lic. No.:08.23.202423793I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Professional Engineerunder the laws of the state of Minnesota.INDEPENDENT SCHOOLDISTRICT #834New Lake ElmoElementary School1875 Greeley St S, Stillwater, MN55082Corner of 10th Streen North andLake Elmo Avenue NorthLake Elmo MN 55042AFEDCBA12345678MNSB1OVERALL:SITE PLANC2000NORTH4080160 SB4 DSB3 DSB2 DMATCH LINE - SEE SHEET C201MATCH LINE - SEE SHEET C203MATCH LINE - SEE SHEET C201 MATCH LINE - SEE SHEET C20271512'151515155'88888750' FROM GUNCLUB PROPERTYKEY NOTESB612 CONCRETE CURB AND GUTTER, SEE DETAILVALLEY GUTTER, SEE DETAILSURMOUNTABLE CONCRETE CURB AND GUTTER,SEE DETAILACCESSIBLE CURB RAMP, SEE DETAIL_A: TYPE 1_B: TYPE 2PARKING SIGN AND POST, SEE DETAIL_A: ADA PARKING_B: ADA ACCESS AISLE_C: ADA LOADING_D: STOP_E: DO NOT ENTER_F: BUSES & TRUCKS ONLY_G: LANE USE SIGN_H: PED CROSSING_I: DROP OFF/PICKUP KEEP RIGHT_J: BEGIN ONEWAYPARKING SIGN, POST, AND BOLLARD, SEE DETAIL_A: ADA PARKING_B: ADA ACCESS AISLE4' TALL CHAIN LINK FENCING, SEE DETAILBACKSTOP FENCING, SEE DETAILFLAGPOLE, SEE DETAILBOLLARD, SEE DETAILINSTALL SALVAGED STREET SIGN ON NEW POST,SEE DETAIL X/C000_A: STOP_B: COUNTY ROAD 10 MARKER_C: RIGHT LANE MUST TURN_D: WARNING STOP AHEAD_E: COUNTY PARK SIGN_F: COUNTY HIGHWAY SIGN_G: SPEED LIMITMONUMENT SIGN, SEE ARCH.BASKETBALL HOOP, SEE DETAILLANDSCAPE WALL, SEE ARCH.AG-LIME, SEE DETAILSOFT SURFACE PLAY AREA (BY OTHERS)OUTDOOR LEARNING AREA, LANDSCAPE PLANLOADING DOCK, SEE ARCH.CURB TRANSITION12765489111012313141516171819SYMBOL LEGENDP:\Projects\Projects - 2023\12236128 - New Stillwater Elementary School - Wold\C. Design\Drawing Files\12236128 - C200 Site Plan.dwg 08-23-2024 PRELIMINARYPLAT SUBMITTALRevisionsDescriptionDateNumNorthCheck:Drawn:Date:Comm:MTH08-23-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Greg A. Buchal, P.E.Date: Lic. No.:08.23.202423793I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Professional Engineerunder the laws of the state of Minnesota.0NORTH204080INDEPENDENT SCHOOLDISTRICT #834New Lake ElmoElementary School1875 Greeley St S, Stillwater, MN55082Corner of 10th Streen North andLake Elmo Avenue NorthLake Elmo MN 55042AFEDCBA12345678MNNORTHWEST:SITE PLANC201PROPOSED ROADWAY/TRAILSBITUMINOUS PAVEMENT, SEE DETAILPROPOSED HEAVY-DUTYBITUMINOUS PAVEMENT, SEE DETAILPROPOSED COUNTY ROADWAYPAVEMENT SECTION, SEE DETAILPROPOSED BITUMINOUS TRAIL,SEE DETAILPROPOSED CONCRETE PAVEMENT,SEE DETAILPROPOSED AG-LIME,SEE DETAILSOIL BORING MARKEREASEMENT LINERIGHT-OF-WAY LINEPROPERTY LINESB1 SB7 DSB2 DSB5 ASB6 ANEW ELEMENTARYFFE: 931.00 (ARCH: 100'-0")SOFT SURFACEPLAY AREAHARD SURFACEPLAY AREA13MATCH LINE - SEE SHEET C202MATCH LINE - SEE SHEET C204MATCH LINE - SEE SHEET C201MATCH LINE - SEE SHEET C202 19191919194A3333111171313141712'12'12'12'12'12'12'12'12'11'11'11'24'5 ' 3 5 . 3 6 ' 2 8 '9'9'1 8 '9'TYP10'TYP3'TYP12'5'10'10'5'20'8'10'10'161811133311731225'115A5B5D5F5D11E11F300'180' 600' 300'KEY NOTESB612 CONCRETE CURB AND GUTTER, SEE DETAILVALLEY GUTTER, SEE DETAILSURMOUNTABLE CONCRETE CURB AND GUTTER,SEE DETAILACCESSIBLE CURB RAMP, SEE DETAIL_A: TYPE 1_B: TYPE 2PARKING SIGN AND POST, SEE DETAIL_A: ADA PARKING_B: ADA ACCESS AISLE_C: ADA LOADING_D: STOP_E: DO NOT ENTER_F: BUSES & TRUCKS ONLY_G: LANE USE SIGN_H: PED CROSSING_I: DROP OFF/PICKUP KEEP RIGHT_J: BEGIN ONEWAYPARKING SIGN, POST, AND BOLLARD, SEE DETAIL_A: ADA PARKING_B: ADA ACCESS AISLE4' TALL CHAIN LINK FENCING, SEE DETAILBACKSTOP FENCING, SEE DETAILFLAGPOLE, SEE DETAILBOLLARD, SEE DETAILINSTALL SALVAGED STREET SIGN ON NEW POST,SEE DETAIL X/C000_A: STOP_B: COUNTY ROAD 10 MARKER_C: RIGHT LANE MUST TURN_D: WARNING STOP AHEAD_E: COUNTY PARK SIGN_F: COUNTY HIGHWAY SIGN_G: SPEED LIMITMONUMENT SIGN, SEE ARCH.BASKETBALL HOOP, SEE DETAILLANDSCAPE WALL, SEE ARCH.AG-LIME, SEE DETAILSOFT SURFACE PLAY AREA (BY OTHERS)OUTDOOR LEARNING AREA, LANDSCAPE PLANLOADING DOCK, SEE ARCH.CURB TRANSITION12765489111012313141516171819P:\Projects\Projects - 2023\12236128 - New Stillwater Elementary School - Wold\C. Design\Drawing Files\12236128 - C200 Site Plan.dwg 08-23-2024 PRELIMINARYPLAT SUBMITTALRevisionsDescriptionDateNumNorthCheck:Drawn:Date:Comm:MTH08-23-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Greg A. Buchal, P.E.Date: Lic. No.:08.23.202423793I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Professional Engineerunder the laws of the state of Minnesota.0NORTH204080INDEPENDENT SCHOOLDISTRICT #834New Lake ElmoElementary School1875 Greeley St S, Stillwater, MN55082Corner of 10th Streen North andLake Elmo Avenue NorthLake Elmo MN 55042AFEDCBA12345678MNNORTHEAST:SITE PLANC202SYMBOL LEGENDPROPOSED ROADWAY/TRAILSBITUMINOUS PAVEMENT, SEE DETAILPROPOSED HEAVY-DUTYBITUMINOUS PAVEMENT, SEE DETAILPROPOSED COUNTY ROADWAYPAVEMENT SECTION, SEE DETAILPROPOSED BITUMINOUS TRAIL,SEE DETAILPROPOSED CONCRETE PAVEMENT,SEE DETAILPROPOSED AG-LIME,SEE DETAILSOIL BORING MARKEREASEMENT LINERIGHT-OF-WAY LINEPROPERTY LINESB1 SB2 DSB8 DSB9 BC.S.A.H. NO. 10 (10TH STREET NORTH)MATCH LINE - SEE SHEET C201MATCH LINE - SEE SHEET C203MATCH LINE - SEE SHEET C203 MATCH LINE - SEE SHEET C2041119191931212'12' 11'11'11'11'11'11'12'12' 12' 12'12' 12'12'12'12'33111115D5G750' FROM GUNCLUB PROPERTY300'180'300'180'11G300'180'600'KEY NOTESB612 CONCRETE CURB AND GUTTER, SEE DETAILVALLEY GUTTER, SEE DETAILSURMOUNTABLE CONCRETE CURB AND GUTTER,SEE DETAILACCESSIBLE CURB RAMP, SEE DETAIL_A: TYPE 1_B: TYPE 2PARKING SIGN AND POST, SEE DETAIL_A: ADA PARKING_B: ADA ACCESS AISLE_C: ADA LOADING_D: STOP_E: DO NOT ENTER_F: BUSES & TRUCKS ONLY_G: LANE USE SIGN_H: PED CROSSING_I: DROP OFF/PICKUP KEEP RIGHT_J: BEGIN ONEWAYPARKING SIGN, POST, AND BOLLARD, SEE DETAIL_A: ADA PARKING_B: ADA ACCESS AISLE4' TALL CHAIN LINK FENCING, SEE DETAILBACKSTOP FENCING, SEE DETAILFLAGPOLE, SEE DETAILBOLLARD, SEE DETAILINSTALL SALVAGED STREET SIGN ON NEW POST,SEE DETAIL X/C000_A: STOP_B: COUNTY ROAD 10 MARKER_C: RIGHT LANE MUST TURN_D: WARNING STOP AHEAD_E: COUNTY PARK SIGN_F: COUNTY HIGHWAY SIGN_G: SPEED LIMITMONUMENT SIGN, SEE ARCH.BASKETBALL HOOP, SEE DETAILLANDSCAPE WALL, SEE ARCH.AG-LIME, SEE DETAILSOFT SURFACE PLAY AREA (BY OTHERS)OUTDOOR LEARNING AREA, LANDSCAPE PLANLOADING DOCK, SEE ARCH.CURB TRANSITION12765489111012313141516171819P:\Projects\Projects - 2023\12236128 - New Stillwater Elementary School - Wold\C. Design\Drawing Files\12236128 - C200 Site Plan.dwg 08-23-2024 PRELIMINARYPLAT SUBMITTALRevisionsDescriptionDateNumNorthCheck:Drawn:Date:Comm:MTH08-23-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Greg A. Buchal, P.E.Date: Lic. No.:08.23.202423793I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Professional Engineerunder the laws of the state of Minnesota.0NORTH204080INDEPENDENT SCHOOLDISTRICT #834New Lake ElmoElementary School1875 Greeley St S, Stillwater, MN55082Corner of 10th Streen North andLake Elmo Avenue NorthLake Elmo MN 55042AFEDCBA12345678MNSOUTHWEST:SITE PLANC203SYMBOL LEGENDPROPOSED ROADWAY/TRAILSBITUMINOUS PAVEMENT, SEE DETAILPROPOSED HEAVY-DUTYBITUMINOUS PAVEMENT, SEE DETAILPROPOSED COUNTY ROADWAYPAVEMENT SECTION, SEE DETAILPROPOSED BITUMINOUS TRAIL,SEE DETAILPROPOSED CONCRETE PAVEMENT,SEE DETAILPROPOSED AG-LIME,SEE DETAILSOIL BORING MARKEREASEMENT LINERIGHT-OF-WAY LINEPROPERTY LINESB1 SB2 DSB1 CSB8 DC.S.A.H. NO. 17 (LAKE ELMO AVE. N.)C.S.A.H. NO. 10 (10TH STREET NORTH)NEW ELEMENTARYFFE: 931.00 (ARCH: 100'-0")91013101010101010101010101010354254MATCH LINE - SEE SHEET C202MATCH LINE - SEE SHEET C204MATCH LINE - SEE SHEET C203MATCH LINE - SEE SHEET C204 5'11119119119119114B1919191919191919191911111919133331334A6A6B(3 TYP)9'TYP9'TYP9'TYP9'TYP9'TYP9'TYP(6 TYP)91418'24'18'18'24'18'24'18'18'12'12'12'12'12'24.29'10'5'8'8'10'10'10'5'8'8'8'8'7.67' 8'181333314B334B4B111115C5C335I5I5H5H5E5E5J5J11A11B11C11D11E31600'KEY NOTESB612 CONCRETE CURB AND GUTTER, SEE DETAILVALLEY GUTTER, SEE DETAILSURMOUNTABLE CONCRETE CURB AND GUTTER,SEE DETAILACCESSIBLE CURB RAMP, SEE DETAIL_A: TYPE 1_B: TYPE 2PARKING SIGN AND POST, SEE DETAIL_A: ADA PARKING_B: ADA ACCESS AISLE_C: ADA LOADING_D: STOP_E: DO NOT ENTER_F: BUSES & TRUCKS ONLY_G: LANE USE SIGN_H: PED CROSSING_I: DROP OFF/PICKUP KEEP RIGHT_J: BEGIN ONEWAYPARKING SIGN, POST, AND BOLLARD, SEE DETAIL_A: ADA PARKING_B: ADA ACCESS AISLE4' TALL CHAIN LINK FENCING, SEE DETAILBACKSTOP FENCING, SEE DETAILFLAGPOLE, SEE DETAILBOLLARD, SEE DETAILINSTALL SALVAGED STREET SIGN ON NEW POST,SEE DETAIL X/C000_A: STOP_B: COUNTY ROAD 10 MARKER_C: RIGHT LANE MUST TURN_D: WARNING STOP AHEAD_E: COUNTY PARK SIGN_F: COUNTY HIGHWAY SIGN_G: SPEED LIMITMONUMENT SIGN, SEE ARCH.BASKETBALL HOOP, SEE DETAILLANDSCAPE WALL, SEE ARCH.AG-LIME, SEE DETAILSOFT SURFACE PLAY AREA (BY OTHERS)OUTDOOR LEARNING AREA, LANDSCAPE PLANLOADING DOCK, SEE ARCH.CURB TRANSITION12765489111012313141516171819P:\Projects\Projects - 2023\12236128 - New Stillwater Elementary School - Wold\C. Design\Drawing Files\12236128 - C200 Site Plan.dwg 08-23-2024 PRELIMINARYPLAT SUBMITTALRevisionsDescriptionDateNumNorthCheck:Drawn:Date:Comm:MTH08-23-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Greg A. Buchal, P.E.Date: Lic. No.:08.23.202423793I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Professional Engineerunder the laws of the state of Minnesota.0NORTH204080INDEPENDENT SCHOOLDISTRICT #834New Lake ElmoElementary School1875 Greeley St S, Stillwater, MN55082Corner of 10th Streen North andLake Elmo Avenue NorthLake Elmo MN 55042AFEDCBA12345678MNSOUTHEAST:SITE PLANC204SYMBOL LEGENDPROPOSED ROADWAY/TRAILSBITUMINOUS PAVEMENT, SEE DETAILPROPOSED HEAVY-DUTYBITUMINOUS PAVEMENT, SEE DETAILPROPOSED COUNTY ROADWAYPAVEMENT SECTION, SEE DETAILPROPOSED BITUMINOUS TRAIL,SEE DETAILPROPOSED CONCRETE PAVEMENT,SEE DETAILPROPOSED AG-LIME,SEE DETAILSOIL BORING MARKEREASEMENT LINERIGHT-OF-WAY LINEPROPERTY LINESB1 SB8 D12' 11'11'11'11'12'12' 12' 12'12' 12'12'12' 12' 12'300'180'600'300'180'300'180'600'24.29'12'12'12'12'12'12'12'12'12'12'11'11'11'300'180'600'600'300'180'KEY NOTESB612 CONCRETE CURB AND GUTTER, SEE DETAILVALLEY GUTTER, SEE DETAILSURMOUNTABLE CONCRETE CURB AND GUTTER,SEE DETAILACCESSIBLE CURB RAMP, SEE DETAIL_A: TYPE 1_B: TYPE 2PARKING SIGN AND POST, SEE DETAIL_A: ADA PARKING_B: ADA ACCESS AISLE_C: ADA LOADING_D: STOP_E: DO NOT ENTER_F: BUSES & TRUCKS ONLY_G: LANE USE SIGN_H: PED CROSSING_I: DROP OFF/PICKUP KEEP RIGHT_J: BEGIN ONEWAYPARKING SIGN, POST, AND BOLLARD, SEE DETAIL_A: ADA PARKING_B: ADA ACCESS AISLE4' TALL CHAIN LINK FENCING, SEE DETAILBACKSTOP FENCING, SEE DETAIL12765483FLAGPOLE, SEE DETAILBOLLARD, SEE DETAILINSTALL SALVAGED STREET SIGN ON NEW POST,SEE DETAIL X/C000_A: STOP_B: COUNTY ROAD 10 MARKER_C: RIGHT LANE MUST TURN_D: WARNING STOP AHEAD_E: COUNTY PARK SIGN_F: COUNTY HIGHWAY SIGN_G: SPEED LIMITMONUMENT SIGN, SEE ARCH.BASKETBALL HOOP, SEE DETAILLANDSCAPE WALL, SEE ARCH.AG-LIME, SEE DETAILSOFT SURFACE PLAY AREA (BY OTHERS)OUTDOOR LEARNING AREA, LANDSCAPE PLANLOADING DOCK, SEE ARCH.CURB TRANSITION911101213141516171819P:\Projects\Projects - 2023\12236128 - New Stillwater Elementary School - Wold\C. Design\Drawing Files\12236128 - C200 Site Plan.dwg 08-23-2024 PRELIMINARYPLAT SUBMITTALRevisionsDescriptionDateNumNorthCheck:Drawn:Date:Comm:MTH08-23-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Greg A. Buchal, P.E.Date: Lic. No.:08.23.202423793I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Professional Engineerunder the laws of the state of Minnesota.INDEPENDENT SCHOOLDISTRICT #834New Lake ElmoElementary School1875 Greeley St S, Stillwater, MN55082Corner of 10th Streen North andLake Elmo Avenue NorthLake Elmo MN 55042AFEDCBA12345678MNSITE ACCESSPLANC205C.S.A.H. NO.10 (10TH STREET NORTH)SITE ACCESS0NORTH3060120C.S.A.H. NO.17 (LAKE ELMO AVENUE)SITE ACCESS0NORTH3060120SYMBOL LEGENDPROPOSED ROADWAY/TRAILSBITUMINOUS PAVEMENT, SEE DETAILPROPOSED HEAVY-DUTYBITUMINOUS PAVEMENT, SEE DETAILPROPOSED COUNTY ROADWAYPAVEMENT SECTION, SEE DETAILPROPOSED BITUMINOUS TRAIL,SEE DETAILPROPOSED CONCRETE PAVEMENT,SEE DETAILPROPOSED AG-LIME,SEE DETAILSOIL BORING MARKEREASEMENT LINERIGHT-OF-WAY LINEPROPERTY LINESB1 93 0 93 2 93 4 9 3 6 93 8 938936934932 9329349369389409 3 8 93 6 9109 1 4916 9209 3 4 9 3 6 942944944942940938936934932930918 916 914 912 9 3 8 9 3 0 9 2 8 92 6 9 2 0 9 1 8 9 1 6 91 4 9 1 2 9 1 0908 9 0 6 9 0 4 904906908918 92 0 922906 908 910 912 914916918920922924926928930932934932930928926924922920916918914912910908906 910 910 91 2 914 916 908906 9049029009109109149209229249229149129109169189209229289289 2 8 9 26924922 922926922920914912914916916918912920920922924916918920 922920930918910898 900 90290489890091090091093092091092093092492 2 92 4 9189 3 2 922924926928920918918920922 920922924924926 928 930932934936 942 940 936 934 934 936 938 934 936 938 930 932 934928922924926922924926920922924918924926926922 9008989169189249269 3 2 934936930928926924932930898 908 906 904 NEW ELEMENTARYFFE: 931.00 (ARCH: 100'-0")SOFT SURFACEPLAY AREAHARD SURFACEPLAY AREA1391013101010101010101010101010354254930 9 3 0 930930930925920910930930 930925925925 9309259209209259209159159209259309159209159059009 3 09309359409309359359409309309259209109009159059209159109059009209159159209259209259259259309259 2 5 930 925930920915910 9209209259209 3 5 93 0 940 930 930928929928928927926924926929929928927927926924923 922921928928927926926927928929928927926929923922921921922923924925926927928929928 9279269249239229219199189179169149169179189199219219229239249199189179169149139129119099089079069049039029018998989 2 69279 2 8 9 2 9 9 3 19299329339349369379389399419429299319329339349329339349369379389399419429289299319299289279269 2 6924923922921919918918919918916914912908906904902898917913911909907903901899 9289279269229219199189179169149139129119099089079069049039029018998989199189179169169179189199219229279269249239229219 2 4 92492692692692792892 9 9299289289279269279269 2 4923922 929928927926924923922921929928927926916917918919921 92291491391291190990892191991992192492391992193 8 9 3 6 9 3 7 93 4 9 3 3 9 3 2 9 3 1 937 938 939 941942 936 936 937 938 929 929 931 931SHEET: C302SHEET: C301SHEET: C304SHEET: C30310TH STREET ACCESS SHEET: C305LAKE ELMO AVENUE ACCESS SHEET: C305 1.Tree protection consisting of snow fence or safety fence installed at the drip line shall be in place prior to beginningany grading or demolition work at the site.2.All elevations with an asterisk (*) shall be field verified. If elevations vary significantly, notify the Engineer forfurther instructions.3.Grades shown in paved areas represent finish elevation.4.All construction shall be performed in accordance with state and local standard specifications for construction.5.Permittees must not excavate infiltration systems to final grade, or within three (3) feet of final grade, until thecontributing drainage area has been constructed and fully stabilized unless they provide rigorous erosionprevention and sediment controls (e.g., diversion berms) to keep sediment and runoff completely away from theinfiltration area.GRADING NOTES1.THE CONTRACTOR SHALL CONDUCT OPERATIONS AND IMPLEMENT MINNESOTA POLLUTION CONTROL AGENCY (MPCA)BEST MANAGEMENT PRACTICES (BMP) TO CONTROL SITE SILTATION AND EROSION INTO DRAINAGE WAYS. THECONTRACTOR SHALL COMPLY WITH ALL CONDITIONS AND COMPLETION DATES RELATIVE TO ALL PERMITS ISSUED FORTHE WORK TO BE COMPLETED. THE ENGINEER MAY ISSUE A STOP WORK ORDER FOR ALL DEVELOPMENT WORK ANDBUILDING CONSTRUCTION FOR NONCOMPLIANCE WITH THESE MEASURES.2.SEQUENCING. ALL SILT FENCE AND OTHER EROSION CONTROL MEASURES SHALL BE IN PLACE AND APPROVED BYENGINEER PRIOR TO ANY REMOVALS, EXCAVATION OR CONSTRUCTION AND SHALL BE MAINTAINED UNTIL VIABLE TURFOR GROUND COVER HAS BEEN ESTABLISHED AND APPROVED BY THE ENGINEER.3.SILT FENCE. THE CONTRACTOR SHALL INSTALL SILT FENCE AT THE LOCATIONS SHOWN ON THE PLANS AND INACCORDANCE WITH THE CITY STANDARD DETAILS. SILT FENCE DAMS AND INTERIM SUMPS SHALL BE PLACED TOINTERCEPT SILT FROM CONCENTRATED RUNOFF FROM OPEN GRADED AREAS. ADDITIONAL SILT FENCE SHALL BEREQUIRED AS DIRECTED BY THE ENGINEER.4.STOCKPILES. ALL STOCKPILE AREAS SHALL HAVE SILT FENCE OR SEDIMENT TRAPPING SYSTEMS PLACED AROUND THEENTIRE PERIMETER.5.INLET PROTECTION. THE CONTRACTOR SHALL INSTALL INLET PROTECTION ON ALL EXISTING STORM SEWER INLETS INACCORDANCE WITH THE CITY STANDARD DETAILS. INLET PROTECTION SHALL ALSO BE PROVIDED ON ALL PROPOSEDSTORM SEWER INLETS IMMEDIATELY FOLLOWING CONSTRUCTION OF THE INLET. INLET PROTECTION MUST BEINSTALLED IN A MANNER THAT WILL NOT IMPOUND WATER FOR EXTENDED PERIODS OF TIME OR IN A MANNER THATPRESENTS A HAZARD TO VEHICULAR OR PEDESTRIAN TRAFFIC.6.TEMPORARY SEDIMENT BASINS. THE CONTRACTOR SHALL INCORPORATE TEMPORARY SEDIMENT BASINS THROUGHOUTTHE CONSTRUCTION SITE TO CAPTURE RUNOFF AND SLOW THE FLOW OF WATER AND ALLOW SEDIMENT TO SETTLEOUT. TEMPORARY SEDIMENT BASINS SHALL BE INSTALLED AS DIRECTED BY THE CITY ENGINEER.7.ROCK CONSTRUCTION ENTRANCE. A ROCK ENTRANCE SHALL BE CONSTRUCTED AND MAINTAINED AS SHOWN ON THEPLAN TO REDUCE TRACKING OF SILT AND DIRT ONTO THE PUBLIC STREETS. A GEOTEXTILE FABRIC SHALL BE PLACEDUNDERNEATH THE ROCK. THE ROCK SHALL BE PERIODICALLY REPLENISHED TO MAINTAIN THE INTENDEDPERFORMANCE. MUD AND DEBRIS SHALL BE REMOVED OR SCRAPED FROM TIRES AND VEHICLE UNDERCARRIAGE PRIORTO LEAVING THE SITE.8.STREET SWEEPING. ALL STREETS USED FOR ACCESS TO THE SITE AND HAUL ROUTES USED FOR CONSTRUCTIONEQUIPMENT AND MATERIAL SUPPLIES SHALL BE CLEANED AT THE END OF EACH WORKING DAY. THE CITY OR ENGINEERMAY ORDER ADDITIONAL SWEEPING OF THE STREETS AS DEEMED REQUIRED AT DEVELOPER/CONTRACTOR EXPENSE.9.DEWATERING. EACH EXCAVATION SHALL BE KEPT DRY DURING THE COURSE OF ALL WORK HEREIN, INCLUDINGSUBGRADE CORRECTION, PIPE INSTALLATION, STRUCTURE CONSTRUCTION AND BACKFILLING, TO THE EXTENT THAT NODAMAGE FROM HYDROSTATIC PRESSURE, FLOATATION OR OTHER DAMAGE RESULTS. ALL EXCAVATIONS SHALL BEDEWATERED TO A DEPTH OF AT LEAST 3 INCHES BELOW THE BOTTOM OF THE CONCRETE SLAB OR PIPE TO BEINSTALLED THEREIN. THE CONTRACTOR MAY USE ANY METHOD OR COMBINATION OF METHODS FOR DEWATERING HECHOOSES; HOWEVER, ALL DEWATERING METHODS AND EQUIPMENT WHICH IN THE OPINION OF THE ENGINEER, AREINEFFECTIVE SHALL BE ABANDONED, IMPROVED, REPLACED OR THERWISE ALTERED TO OBTAIN EFFECTIVEDEWATERING. THE CONTRACTOR SHALL PROVIDE ALL POWER, PUMPS, MATERIALS AND APPARATUS NECESSARY, ANDSHALL BE RESPONSIBLE FOR DISPOSING OF THE WATER PUMPED FROM THE EXCAVATION IN A MANNER WHICH WILL NOTINTERFERE WITH OTHER WORK WITHIN THE AREA AND NOT TO DAMAGE PUBLIC OR PRIVATE PROPERTY. THECONTRACTOR WILL BE HELD RESPONSIBLE FOR THE CONDITION OF ANY PIPE, CONDUIT, DITCH, CHANNEL OR NATURALWATERCOURSE UTILIZED FOR DRAINAGE PURPOSES, AND ALL EROSION, SEDIMENT OR OTHER ADVERSE RESULTS OFTHEIR USE SHALL BE REPAIRED.10.POSITIVE DRAINAGE AND PROTECTION. THE CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE THROUGHOUT THESITE AT ALL TIMES. LOW POINTS WITHIN AND ALONG ROADWAYS ARE EXPRESSLY PROHIBITED. THE CONTRACTORSHALL BE RESPONSIBLE FOR TEMPORARY DITCHES, PIPING OR OTHER MEANS TO FACILITATE PROPER DRAINAGEDURING CONSTRUCTION. TO PROTECT PREVIOUSLY GRADED AREAS FROM EROSION, WOOD FIBER BLANKET SHALL BEPLACED IMMEDIATELY ON STEEP SLOPES (1:3 OR GREATER) AND EMBANKMENTS, PERMANENT AND TEMPORARY PONDS,AND OUTLETS AND OVERFLOWS TO PROTECT THE COMPLETED GRADE AND MINIMIZE SILT IN THE RUNOFF.11.DRAINAGE DITCHES. THE NORMAL WETTED PERIMETER OF ANY TEMPORARY OR PERMANENT DRAINAGE DITCH ORSWALE THAT DRAINS WATER FROM ANY PORTION OF THE CONSTRUCTION SITE, OR DIVERTS WATER AROUND THE SITE,MUST BE STABILIZED WITHIN 200 LINEAL FEET FROM THE PROPERTY EDGE, OR FROM THE POINT OF DISCHARGE INTOANY SURFACE WATER. STABILIZATION OF THE LAST 200 LINEAL FEET MUST BE COMPLETED WITHIN 24 HOURS AFTERCONNECTING TO A SURFACE WATER. STABILIZATION OF THE REMAINING PORTIONS OF ANY TEMPORARY ORPERMANENT DITCHES OR SWALES MUST BE COMPLETE WITHIN 14 DAYS AFTER CONNECTING TO A SURFACE WATER ANDCONSTRUCTION IN THAT PORTION OF THE DITCH HAS TEMPORARILY OR PERMANENTLY CEASED. TEMPORARY ORPERMANENT DITCHES OR SWALES THAT ARE BEING USED AS A SEDIMENT CONTAINMENT SYSTEM (WITH PROPERLYDESIGNED ROCK DITCH CHECKS, BIO ROLLS, SILT DIKES, ETC.) DO NOT NEED TO BE STABILIZED. THESE AREAS MUST BESTABILIZED WITHIN 24 HOURS AFTER NO LONGER BEING USED AS A SEDIMENT CONTAINMENT SYSTEM.12.TURF ESTABLISHMENT. ALL EXPOSED SOIL AREAS MUST BE STABILIZED AS SOON AS POSSIBLE TO LIMIT SOIL EROSIONBUT IN NO CASE LATER THAN 14 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HASTEMPORARILY OR PERMANENTLY CEASED.13.MAINTENANCE AND INSPECTION. EROSION CONTROL MEASURES SHALL BE MAINTAINED THROUGHOUT THECONSTRUCTION AND UNTIL SATISFACTORY ESTABLISHMENT OF PERMANENT GROUND COVER IS OBTAINED. ALLEROSION AND SEDIMENTATION CONTROL MEASURES, AND STORMWATER OUTFALLS MUST BE INSPECTED WEEKLY, ANDWITHIN 24 HOURS OF THE SITE RECEIVING 0.5 INCHES OF RAIN. REPAIRS MUST BE MADE ON THE SAME DAY ORFOLLOWING DAY OF THE INSPECTION. UNSATISFACTORY CONDITIONS NOT REPAIRED OR CLEANED UP WITHIN48-HOURS OF NOTIFICATION SHALL RESULT IN A STOP WORK ORDER, AND/OR SAID WORK SHALL BE COMPLETED ATCONTRACTOR'S EXPENSE.14.REMOVAL. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL TEMPORARY EROSION CONTROL MEASURES,STRUCTURES AND DEVICES ONLY AFTER RECEIVING ENGINEER APPROVAL. ALL DEBRIS, STAKES, AND SILTS ALONG SILTFENCES SHALL BE REMOVED AND DISPOSED OFF SITE. THE CONTRACTOR SHALL HAND RAKE SILTED AREAS ALONG THEFENCE LOCATIONS TO PROVIDE A SMOOTH FINAL GRADE AND SHALL RESTORE THE GROUND SURFACE WITH SEED ORSOD, AS REQUIRED, TO MATCH THE FINISHED GRADE TO THE ADJACENT AREA.15.FINAL STORM SEWER SYSTEM. AT THE COMPLETION OF THE WORK AND BEFORE THE FINAL WALK THROUGH, THECONTRACTOR SHALL REMOVE STORM SEWER INLET PROTECTION MEASURES AND THOROUGHLY FLUSH THE STORMSEWER SYSTEM. SEDIMENT AND DEBRIS SHALL BE COMPLETELY REMOVED AND CLEANED AT THE INLETS, OUTLETS, ANDDOWNSTREAM OF EACH OUTLET. RIPRAP AND GEOTEXTILE FABRIC MAY REQUIRE REPLACEMENT AS DIRECTED BY THEENGINEER TO OBTAIN A LIKE NEW INSTALLATION ACCEPTABLE TO THE CITY16.DITCH CHECK (BIOROLL BLANKET SYSTEM). BIOROLL AND BLANKET SYSTEMS SHALL BE INSTALLED AS DITCH CHECKSONLY IN SPECIFIED LOCATIONS AS APPROVED BY THE CITY ENGINEER. BIOROLLS ARE NOT TO BE UTILIZED IN AREASWHERE VEHICLE AND CONSTRUCTION TRAFFIC OCCUR.17.FLOTATION SILT CURTAIN. FLOTATION SILT CURTAIN SHALL BE UTILIZED WHEN CONSTRUCTION ACTIVITIES OCCURDIRECTLY ADJACENT TO LAKES, STREAMS OR WETLANDS IN ORDER TO CONTAIN SEDIMENTS NEAR THE BANKS OFWORKING AREAS. THE INSTALLATION OF FLOTATION SILT CURTAINS WILL BE REQUIRED AS DIRECTED BY THE CITYENGINEER.18.CONCRETE WASHOUT ONSITE. ALL LIQUID AND SOLID WASTES GENERATED BY CONCRETE WASHOUT OPERATIONS MUSTBE CONTAINED IN A LEAK-PROOF CONTAINMENT FACILITY OR IMPERMEABLE LINER. A COMPACTED CLAY LINER THATDOES NOT ALLOW WASHOUT LIQUIDS TO ENTER GROUND WATER IS CONSIDERED AN IMPERMEABLE LINER. THE LIQUIDAND SOLID WASTES MUST NOT CONTACT THE GROUND, AND THERE MUST NOT BE RUNOFF FROM THE CONCRETEWASHOUT OPERATIONS OR AREAS. LIQUID AND SOLID WASTES MUST BE DISPOSED OF PROPERLY AND IN COMPLIANCEWITH MPCA REGULATIONS. A SIGN MUST BE INSTALLED ADJACENT TO EACH WASHOUT FACILITY TO INFORM CONCRETEEQUIPMENT OPERATORS TO UTILIZE THE PROPER FACILITIES.CITY OF LAKE ELMO GRADING ANDEROSION STANDARD PLAN NOTESP:\Projects\Projects - 2023\12236128 - New Stillwater Elementary School - Wold\C. Design\Drawing Files\12236128 - C300 Grading & Erosion Control Plan.dwg 08-23-2024 PRELIMINARYPLAT SUBMITTALRevisionsDescriptionDateNumNorthCheck:Drawn:Date:Comm:MTH08-23-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Greg A. Buchal, P.E.Date: Lic. No.:08.23.202423793I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Professional Engineerunder the laws of the state of Minnesota.INDEPENDENT SCHOOLDISTRICT #834New Lake ElmoElementary School1875 Greeley St S, Stillwater, MN55082Corner of 10th Streen North andLake Elmo Avenue NorthLake Elmo MN 55042AFEDCBA12345678MNOVERALL:GRADING ANDEROSIONCONTROLPLANC3000NORTH4080160SYMBOL LEGENDSYMBOL LEGENDPROPOSED CONTOURS - MAJOR INTERVALGRADE BREAK LINEPROPOSED CONTOURS - MINOR INTERVAL949950950EXISTING CONTOURS2.0%950.00 TC949.50 GLGRADE SLOPESPOT ABBREVIATIONS:TC - TOP OF CURBGL - GUTTER LINEB - BITUMUNOUSC - CONCRETEG - GRADEEOF - EMERGENCY OVERFLOWOF - OVERFLOWTW - TOP OF WALLBW - BOTTOM OF WALL (F/G)AG - AGLIME(*) - EXISTING TO BE VERIFIEDEASEMENT LINEPROPERTY LINERIGHT OF WAY LINEBENCHMARKELEVATIONS BASED ON INFORMATION ASSHOWN ON THE TKDA WATERMAIN PLANS -SHEET C502 DATED 4/15/2014. TOP NUTHYDRANT 400 ' N. OF 10TH STREET.ELEVATION = 939.37 914 9 1 2 9 1 0908910 912 914 916 918 920 922 9249269249229209 2 4 9 2 6 9 2 8 930932934936938940938914912910908906904920930940940938918920 904906908906 908 910 912 914 916 918 920 922 924 926 928 930 932934932930928926924922920916918914912910908906930918910898900902904 920930924900940 906925925930 925 930 SILT FENCE (TYP.)SILT FENCE (TYP.)927926924923922921928928927926926.57 G930.19 B925.31 AG925.19 AG927.03 B929.50 B929.32 B/AG929.42 B929.24 B/AG928.49 AG928.37 AG928.47 AG927.96 AG927.90 AG926.40 AG925.55 AG925.10 AG924.25 AG927.33 AG926.95 AG925.89 AG926.31 AG926.56 AG925.44 AG925.86 AG926.11 AG926.04 AG925.66 AG925.04 AG924.53 AG923.96 AG926.20 G926.85 B929 928 927 926 924 923 922 921 929 928 927 926MATCH LINE - SEE SHEET C301MATCH LINE - SEE SHEET C303MATCH LINE - SEE SHEET C301 MATCH LINE - SEE SHEET C302 P:\Projects\Projects - 2023\12236128 - New Stillwater Elementary School - Wold\C. Design\Drawing Files\12236128 - C300 Grading & Erosion Control Plan.dwg 08-23-2024 PRELIMINARYPLAT SUBMITTALRevisionsDescriptionDateNumNorthCheck:Drawn:Date:Comm:MTH08-23-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Greg A. Buchal, P.E.Date: Lic. No.:08.23.202423793I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Professional Engineerunder the laws of the state of Minnesota.0NORTH204080INDEPENDENT SCHOOLDISTRICT #834New Lake ElmoElementary School1875 Greeley St S, Stillwater, MN55082Corner of 10th Streen North andLake Elmo Avenue NorthLake Elmo MN 55042AFEDCBA12345678MNNORTHWEST:GRADING ANDEROSIONCONTROLPLANC3011.Tree protection consisting of snow fence or safety fence installed at thedrip line shall be in place prior to beginning any grading or demolition workat the site.2.All elevations with an asterisk (*) shall be field verified. If elevations varysignificantly, notify the Engineer for further instructions.3.Grades shown in paved areas represent finish elevation.4.All construction shall be performed in accordance with state and localstandard specifications for construction.5.Permittees must not excavate infiltration systems to final grade, or withinthree (3) feet of final grade, until the contributing drainage area has beenconstructed and fully stabilized unless they provide rigorous erosionprevention and sediment controls (e.g., diversion berms) to keep sedimentand runoff completely away from the infiltration area.GRADING NOTESSYMBOL LEGENDSYMBOL LEGENDPROPOSED CONTOURS - MAJOR INTERVALGRADE BREAK LINEPROPOSED CONTOURS - MINOR INTERVAL949950950EXISTING CONTOURS2.0%950.00 TC949.50 GLGRADE SLOPESPOT ABBREVIATIONS:TC - TOP OF CURBGL - GUTTER LINEB - BITUMUNOUSC - CONCRETEG - GRADEEOF - EMERGENCY OVERFLOWOF - OVERFLOWTW - TOP OF WALLBW - BOTTOM OF WALL (F/G)AG - AGLIME(*) - EXISTING TO BE VERIFIEDEASEMENT LINEPROPERTY LINERIGHT OF WAY LINERIP-RAP / ROCK CONST. ENTRANCESEE DETAIL X/CX00 OR X/CX00 OR X/CX00INLET PROTECTION, SEE DETAIL X/CX00SEDIMENT LOG, SEE DETAIL X/CX00SEDIMENT LOG, SEE DETAIL X/CX001.See sheet C300 for City of Lake Elmo Grading and Erosion StandardPlan notes.CITY NOTESBENCHMARKELEVATIONS BASED ON INFORMATION ASSHOWN ON THE TKDA WATERMAIN PLANS -SHEET C502 DATED 4/15/2014. TOP NUTHYDRANT 400 ' N. OF 10TH STREET.ELEVATION = 939.37 93 0 93 2 9 3 4 9 3 6 93 8 9409409 3 8 93 6 93 4 932 93092 6 924 922 9 1 8 920 9 1 6 91 4 912 910 910 912914916918920922922920918916914912 9109 1 4916 9209 3 4 9 3 6 9429449 3 8 9 3 0 928 926 920 918 916914912910908906 904 904906918 920 922920930922924 9189 3 2 922924926928924926 928 930932934936930928926924NEW ELEMENTARYFFE: 931.00 (ARCH: 100'-0")SOFT SURFACEPLAY AREAHARD SURFACEPLAY AREA13930930930925920910930930 930925925920920925920915915920925930915920915905900930930935940930935 RIP-RAP @ OUTLETSILT FENCEAROUND INLETRIP-RAP @OVERFLOWRIP-RAP @ OUTLETINLET PROTECTION (TYP.)INLET PROTECTION (TYP.)RIP-RAP @ OUTLETSEDIMENT LOG (TYP.)SEDIMENT LOG (TYP.)SILT FENCE (TYP.)9 3 5 9 3 0 930 930 ROCK CONSTRUCTIONENTRANCESILT FENCEAROUND INLET928929928928927926924926929929928927928927926929923922921921922923924925926927928929931.00 FFE931.00 FFE931.00 FFE931.00 FFE931.00 FFE931.00 FFE931.00 FFE931.00 FFE931.00 FFE931.00 FFE930.66 C928.77 C928.47 C928.57 TC928.07 GL928.27 TC927.77 GL925.17 TC924.87 RIM925.32 C928.12 TC927.62 GL928.27 C926.89 B/C927.01 B926.86 B923.90 TC923.60 GL928.72 TC928.22 GL928.87 C930.85 TW927.35 BW930.85 C930.63 C930.85 C930.78 C930.64 C930.59 C930.54 C930.92 C930.85 C930.49 C930.44 C930.39 C926.46 TC925.96 GL930.83 C930.74 C930.79 C930.64 C/B930.52 B/C929.94 B930.12 B927.20 RIM930.85 TS927.30 BS930.92 C929.50 C929.32 C927.79 B/C927.91 B926.88 C926.59 C930.00 G930.00 G929.55 TC929.05 GL929.62 C929.64 C930.41 C930.53 C930.80 G930.92 C930.37 B930.19 B927.21 C927.44 C930.88 C930.68 C929.84 C930.58 C929.74 C927.74 C927.64 C927.52 C927.62 C919.78 TC(EOF)919.48 GL919.62 TC919.12 RIM928.58 TC928.38 GL929.93 TC929.43 GL929.28 GL/TC928.60 GL/TC921.59 TC921.29 GL921.43 TC920.93 GL925.80 TC925.30 GL926.29 TC925.79 GL928.68 TC928.18 RIM929.58 TC928.88 RIM929.48 GL/TC928.80 GL/TC930.79 C930.79 C930.15 C930.14 C929.64 C930.51 C929.84 C930.61 C930.82 C930.73 C930.09 C929.89 C929.56 C929.81 C930.08 C930.24 C930.00 C930.19 C930.07 C930.61 C927.97 GL/TC927.88 GL/TC928.47 C928.38 C928.88 TC928.38 GL927.65 TC927.35 GL924.34 TC923.84 RIM926.58 TC926.08 GL926.31 TC925.81 GL926.73 TC926.23 GL926.88 C926.71 C926.46 C925.53 TC925.03 GL926.68 C925.63 TC925.33 GL927.85 TC927.55 GL925.99 TC925.66 GL927.64 TC927.34 GL925.75 TC925.45 GL927.85 TC927.55 GL923.71 TC923.21 GL926.74 B/C925.66 B927.80 C928.37 TC931.41 TC931.41 TC930.98 GL927.10 C927.22 C927.87 B/C927.71 TC927.21 GL930.03 TC929.53 GL929.15 TC928.85 GL930.54 TC930.04 GL930.92 TC930.42 GL930.58 TC930.08 GL929.75 TC929.25 GL928.52 TC928.22 GL929.55 TC929.05 GL929.03 C930.10 G926.95 C927.17 C927.24 C927.99 B931.00 C930.93 C930.93 C930.64 B930.01 C930.52 B930.41 B930.15 B929.98 B930.00 B930.18 B929.55 C929.37 C929.70 C929.52 C930.00 G929.50 B929.32 B/AG929.42 B928.41 B928.21 B930.47 C930.49 C931.00 CADA ZONE - MAX SLOPE2% (ANY DIRECTION)9289279269249239229219199189179169149169179189199219219229239249199189179169149139129119099089079069049039029018998989269279 28929931929932933934936937938939941942929931932933934 915.00 (OF)10' WIDEMAINTAIN EXISTINGCROSS SLOPE (≈ 2.00%)MAINTAIN EXISTINGCROSS SLOPE (≈ 2.00%)MAINTAIN EXISTINGCROSS SLOPE (≈ 2.00%)93 8 9 3 6 9 3 7 93 4 9 3 3 9 3 2 9 3 1 929 929 931 931 INFILTRATION BASIN #1 (7P)100-YEAR HWL: 917.10OUTLET: 916.50BTM: 915.00INFILTRATION BASIN #2 (8P)100-YEAR HWL: 915.19OUTLET: 915.00BTM: 914.00MATCH LINE - SEE SHEET C302MATCH LINE - SEE SHEET C304MATCH LINE - SEE SHEET C301MATCH LINE - SEE SHEET C302P:\Projects\Projects - 2023\12236128 - New Stillwater Elementary School - Wold\C. Design\Drawing Files\12236128 - C300 Grading & Erosion Control Plan.dwg 08-23-2024 PRELIMINARYPLAT SUBMITTALRevisionsDescriptionDateNumNorthCheck:Drawn:Date:Comm:MTH08-23-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Greg A. Buchal, P.E.Date: Lic. No.:08.23.202423793I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Professional Engineerunder the laws of the state of Minnesota.0NORTH204080INDEPENDENT SCHOOLDISTRICT #834New Lake ElmoElementary School1875 Greeley St S, Stillwater, MN55082Corner of 10th Streen North andLake Elmo Avenue NorthLake Elmo MN 55042AFEDCBA12345678MNNORTHEAST:GRADING ANDEROSIONCONTROLPLANC3021.Tree protection consisting of snow fence or safety fence installed at thedrip line shall be in place prior to beginning any grading or demolition workat the site.2.All elevations with an asterisk (*) shall be field verified. If elevations varysignificantly, notify the Engineer for further instructions.3.Grades shown in paved areas represent finish elevation.4.All construction shall be performed in accordance with state and localstandard specifications for construction.5.Permittees must not excavate infiltration systems to final grade, or withinthree (3) feet of final grade, until the contributing drainage area has beenconstructed and fully stabilized unless they provide rigorous erosionprevention and sediment controls (e.g., diversion berms) to keep sedimentand runoff completely away from the infiltration area.GRADING NOTESSYMBOL LEGENDSYMBOL LEGENDPROPOSED CONTOURS - MAJOR INTERVALGRADE BREAK LINEPROPOSED CONTOURS - MINOR INTERVAL949950950EXISTING CONTOURS2.0%950.00 TC949.50 GLGRADE SLOPESPOT ABBREVIATIONS:TC - TOP OF CURBGL - GUTTER LINEB - BITUMUNOUSC - CONCRETEG - GRADEEOF - EMERGENCY OVERFLOWOF - OVERFLOWTW - TOP OF WALLBW - BOTTOM OF WALL (F/G)AG - AGLIME(*) - EXISTING TO BE VERIFIEDEASEMENT LINEPROPERTY LINERIGHT OF WAY LINERIP-RAP / ROCK CONST. ENTRANCESEE DETAIL X/CX00 OR X/CX00 OR X/CX00INLET PROTECTION, SEE DETAIL X/CX00SEDIMENT LOG, SEE DETAIL X/CX00SEDIMENT LOG, SEE DETAIL X/CX001.See sheet C300 for City of Lake Elmo Grading and Erosion StandardPlan notes.CITY NOTESBENCHMARKELEVATIONS BASED ON INFORMATION ASSHOWN ON THE TKDA WATERMAIN PLANS -SHEET C502 DATED 4/15/2014. TOP NUTHYDRANT 400 ' N. OF 10TH STREET.ELEVATION = 939.37 914918920924922920906904902900910910914920922924922914912910916918920922928922922920 918918918926922920916914912914916914912912912914912914916914916 918 920 922912924926 9 2 6 92 8 9 3 0 920920922924916918920918910898 900898900910 9009109309209109129008989169189249268 9 8 908 9069 0 4 925920910900915905920915910905900920915915920RIP-RAP @ OUTLETSILT FENCEAROUND INLETRIP-RAP @ OUTLETINLET PROTECTION (TYP.)SILT FENCE (TYP.)SILT FENCE (TYP.)SILT FENCE (TYP.)915920915910910920920ROCK CONSTRUCTIONENTRANCE927926926927926.57 G927.03 B925.75 B925.57 B927.18 B927.00 B919.35 TC918.85 GL919.03 TC918.53 RIM925.06 TC924.56 GL925.42 TC924.92 GL917.50 TC917.00 RIM918.00 TC917.50 GL919.08 TC918.58 GL918.88 TC918.58 GL929.42 B919.49 TC918.78 GL920.39 TC919.89 GL919.05 GL/TC919.25 GL/TC918.73 GL/TC918.93 GL/TC917.65 TC917.15 GL917.95 TC (EOF)917.65 GL920.37 TC919.87 GL920.73 TC920.23 GL926.85 B924923922921919918918919 918916914912908906904902898917913911909907903901899922921919918917916914913912911909908907906904903902901899898919918917916916917918919921922MAINTAIN EXISTINGCROSS SLOPE (≈ 2.00%)MAINTAIN EXISTINGCROSS SLOPE (≈ 2.00%)MAINTAIN EXISTINGCROSS SLOPE (≈ 2.00%)916917918919921922914913912911909908914913912911909921919919921INFILTRATION BASIN #3 (10P)OVER EXCAVATE BASIN BOTTOMTO 907.00 AND REMOVE ANY POORSOILS BACKFILL WITH CLEAN SAND100-YEAR HWL: 917.85OUTLET: 916.50BTM: 915.00MATCH LINE - SEE SHEET C301MATCH LINE - SEE SHEET C303MATCH LINE - SEE SHEET C303 MATCH LINE - SEE SHEET C304 P:\Projects\Projects - 2023\12236128 - New Stillwater Elementary School - Wold\C. Design\Drawing Files\12236128 - C300 Grading & Erosion Control Plan.dwg 08-23-2024 PRELIMINARYPLAT SUBMITTALRevisionsDescriptionDateNumNorthCheck:Drawn:Date:Comm:MTH08-23-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Greg A. Buchal, P.E.Date: Lic. No.:08.23.202423793I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Professional Engineerunder the laws of the state of Minnesota.0NORTH204080INDEPENDENT SCHOOLDISTRICT #834New Lake ElmoElementary School1875 Greeley St S, Stillwater, MN55082Corner of 10th Streen North andLake Elmo Avenue NorthLake Elmo MN 55042AFEDCBA12345678MNSOUTHWEST:GRADING ANDEROSIONCONTROLPLANC3031.Tree protection consisting of snow fence or safety fence installed at thedrip line shall be in place prior to beginning any grading or demolition workat the site.2.All elevations with an asterisk (*) shall be field verified. If elevations varysignificantly, notify the Engineer for further instructions.3.Grades shown in paved areas represent finish elevation.4.All construction shall be performed in accordance with state and localstandard specifications for construction.5.Permittees must not excavate infiltration systems to final grade, or withinthree (3) feet of final grade, until the contributing drainage area has beenconstructed and fully stabilized unless they provide rigorous erosionprevention and sediment controls (e.g., diversion berms) to keep sedimentand runoff completely away from the infiltration area.GRADING NOTESSYMBOL LEGENDSYMBOL LEGENDPROPOSED CONTOURS - MAJOR INTERVALGRADE BREAK LINEPROPOSED CONTOURS - MINOR INTERVAL949950950EXISTING CONTOURS2.0%950.00 TC949.50 GLGRADE SLOPESPOT ABBREVIATIONS:TC - TOP OF CURBGL - GUTTER LINEB - BITUMUNOUSC - CONCRETEG - GRADEEOF - EMERGENCY OVERFLOWOF - OVERFLOWTW - TOP OF WALLBW - BOTTOM OF WALL (F/G)AG - AGLIME(*) - EXISTING TO BE VERIFIEDEASEMENT LINEPROPERTY LINERIGHT OF WAY LINERIP-RAP / ROCK CONST. ENTRANCESEE DETAIL X/CX00 OR X/CX00 OR X/CX00INLET PROTECTION, SEE DETAIL X/CX00SEDIMENT LOG, SEE DETAIL X/CX00SEDIMENT LOG, SEE DETAIL X/CX001.See sheet C300 for City of Lake Elmo Grading and Erosion StandardPlan notes.CITY NOTESBENCHMARKELEVATIONS BASED ON INFORMATION ASSHOWN ON THE TKDA WATERMAIN PLANS -SHEET C502 DATED 4/15/2014. TOP NUTHYDRANT 400 ' N. OF 10TH STREET.ELEVATION = 939.37 93 8 938936934932 93293493693893 8 942944944942940938936934932930918916914 912 928930 910910912914916 908906 926928928926924932930928926924922920920918918920922 920922924936 942 940 936 934 934 936 938 934 936 938 930 932 934928922924926922920918918922924926920 926920922924918924926926922932 934936930928926924932930908 NEW ELEMENTARYFFE: 931.00 (ARCH: 100'-0")91013101010101010101010101010354254930 9 3 0 930930930930935940935940930930925 9259209259259259309259 2 5RIP-RAP @ OUTLETRIP-RAP @ OUTLETSILT FENCEAROUND INLETINLET PROTECTION (TYP.)INLET PROTECTION (TYP.)INLET PROTECTION (TYP.)INLET PROTECTION (TYP.)SEDIMENT LOG (TYP.)925920SILT FENCEAROUND INLET940 928926927928929929.35 GL/TC930.58 TC930.08 GL929.27 GL/TC928.99 GL/TC928.91 GL/TC931.00 FFE931.00 FFE931.00 FFE931.00 FFE931.00 FFE931.00 FFE931.00 FFE931.00 FFE931.00 FFE931.00 FFE931.00 FFE931.00 FFE930.01 C930.93 C930.59 TC930.09 GL929.34 TC928.84 RIM930.22 TC929.72 GL930.85 TW927.35 BW930.85 C930.63 C930.85 C930.78 C930.64 C930.59 C930.54 C930.92 C930.85 C930.49 C930.44 C930.39 C930.79 C930.64 C/B927.20 RIM930.85 TS927.30 BS930.92 C929.15 C929.10 RIM931.00 C930.92 C928.04 TC927.54 GL928.28 B/C927.18 B927.00 B924.20 TC923.70 GL925.06 TC924.56 GL925.11 TC924.61 GL925.36 TC924.86 GL925.42 TC924.92 GL923.96 TC (EOF)923.46 GL924.82 TC924.32 GL930.79 C930.79 C930.15 C930.78 C930.90 TW/BW930.76 TW/C930.29 BW930.56 C927.80 C928.37 TC927.87 GL931.41 TC930.91 GL931.41 TC930.98 GL927.71 TC927.21 GL930.54 TC930.04 GL930.92 TC930.42 GL930.58 TC930.08 GL929.55 TC929.05 GL930.70 PAD930.10 G931.00 C930.93 C930.93 C930.64 B930.52 B930.41 B929.42 B930.19 C930.38 C930.54 C930.83 C930.49 C930.13 C930.47 C930.49 C930.25 C931.00 C929.85 C929.77 C930.13 C929.91 C930.35 C930.12 C930.67 C930.86 C930.73 C930.68 C930.86 C930.93 C930.85 C930.75 C931.05 TC930.55 GL929.70 TC929.20 GL929.85 C929.91 C930.45 GL/TC930.81 TC930.31 GL930.60 C930.96 C929.97 C929.58 TC929.08 GL929.44 GL/TC929.59 C930.03 C929.88 TC929.38 GL930.90 G929.07 C928.09 C929.12 TC928.62 GL929.24 C928.95 C926.22 TC925.92 GL928.91 TC928.41 GLADA ZONE - MAX SLOPE2% (ANY DIRECTION)929.03 C928.53 GL/TC928.65 C927.90 GL/TC928.33 TC927.83 GL928.02 C928.45 C928.06 TC927.56 GL928.22 TC927.92 GL928.37 C928.69 TC928.19 GL929.05 TC928.55 GL929.20 C929.82 C929.67 TC929.17 GL928.53 GL/TC928.61 GL/TC929.39 TC928.89 GL929.51 C929.18 TC928.68 GL928.43 TC927.93 GL928.01 TC927.51 GL927.53 TC927.03 GL927.11 TC926.61 GL928.09 GL/TC928.17 GL/TC926.49 TC926.19 GL925.05 TC924.75 RIM928.49 TC927.99 GL928.61 C929.61 TC929.11 GL929.50 TC929.00 GL929.08 TC928.58 GL929.36 TC928.86 GL928.47 TC928.17 GL928.32 TC928.02 GL928.16 TC927.66 GL925.59 TC925.29 GL926.85 TC926.55 GL928.02 TC927.72 GL924.15 TC923.85 RIM924.15 TC925.02 RIM927.45 GL/TC927.53 GL/TC927.19 GL/TC927.27 GL/TC926.65 GL/TC926.73 GL/TC928.70 TC928.20 GL928.28 TC927.78 GL927.80 TC927.30 GL927.38 TC926.88 GL927.62 GL/TC927.54 GL/TC927.80 TC927.30 GL927.38 TC926.88 GL926.91 TC926.41 GL926.48 TC925.98 GL927.26 GL/TC927.18 GL/TC926.72 GL/TC926.64 GL/TC926.36 GL/TC926.28 GL/TC925.82 GL/TC925.74 GL/TC927.53 TC927.03 GL927.11 TC926.61 GL926.63 TC926.13 GL926.21 TC925.71 GL928.28 TC927.78 GL928.01 TC927.51 GL926.63 TC926.13 GL926.54 TC926.04 GL926.12 TC925.62 GL925.64 TC925.14 GL925.22 TC924.72 GL926.21 TC925.71 GL925.73 TC925.23 GL925.31 TC924.81 GL924.56 TC924.06 GL924.50 TC924.00 GL926.44 TC926.14 GL925.89 TC925.39 RIM925.39 TC924.89 GL926.70 TC926.40 GL926.02 TC925.72 GL924.86 TC924.36 GL925.19 TC924.69 GL925.60 TC925.10 GL928.14 C926.97 C928.24 C928.32 C928.44 C928.36 C925.52 TC925.02 GL927.25 TC926.75 GL927.41 TC927.11 GL927.53 C924.81 TC924.31 GL925.96 TC925.46 GL926.65 TC926.15 RIM928.29 TC927.99 GL928.45 TC928.15 GL928.00 TC927.70 GL928.12 C929.50 C925.17 TC924.67 GL925.29 C (EOF)925.49 TC924.99 GL926.37 TC925.87 GL925.65 TC925.35 GL925.77 C924.54 TC924.04 GL927.26 TC926.76 GL927.26 TC926.76 GL926.29 TC926.17 GL926.41 B/C926.29 B/C924.30 TC923.80 GL927.44 TC926.94 GL927.53 TC927.03 GL927.11 TC926.61 GL926.63 TC926.13 GL926.21 TC925.71 GL927.02 TC926.52 GL926.54 TC926.04 GL926.12 TC925.62 GL927.22 TC926.72 GL926.79 TC926.29 RIM926.29 TC925.79 GL925.34 TC925.04 GL925.62 TC925.32 GL926.29 TC925.99 GL927.12 TC926.62 GL927.66 TC927.16 GL926.48 TC925.98 RIM925.69 TC925.19 GL926.43 TC925.93 GL926.07 TC925.57 GL926.64 TC926.34 GL927.95 TC927.65 GL928.10 B/C926.79 C926.05 TC925.55 GL926.20 C924.60 TC924.10 GL925.57 C924.82 B924.65 B924.85 B924.70 B929932933934936937938939941942932933934936937938939941942928929931929.70 C929928927926926924 928927926927926924923922921924924926 9269269279289 2 9 921.50 RIM921.00 RIM9299289289279269279269 2 4923922 MAINTAIN EXISTINGCROSS SLOPE (≈ 2.00%)MAINTAIN EXISTINGCROSS SLOPE (≈ 2.00%)92492391992193 8 937 938 939 941942 936 936 937 938 MATCH LINE - SEE SHEET C302MATCH LINE - SEE SHEET C304MATCH LINE - SEE SHEET C303MATCH LINE - SEE SHEET C304P:\Projects\Projects - 2023\12236128 - New Stillwater Elementary School - Wold\C. Design\Drawing Files\12236128 - C300 Grading & Erosion Control Plan.dwg 08-23-2024 PRELIMINARYPLAT SUBMITTALRevisionsDescriptionDateNumNorthCheck:Drawn:Date:Comm:MTH08-23-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Greg A. Buchal, P.E.Date: Lic. No.:08.23.202423793I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Professional Engineerunder the laws of the state of Minnesota.0NORTH204080INDEPENDENT SCHOOLDISTRICT #834New Lake ElmoElementary School1875 Greeley St S, Stillwater, MN55082Corner of 10th Streen North andLake Elmo Avenue NorthLake Elmo MN 55042AFEDCBA12345678MNSOUTHEAST:GRADING ANDEROSIONCONTROLPLANC3041.Tree protection consisting of snow fence or safety fence installed at thedrip line shall be in place prior to beginning any grading or demolition workat the site.2.All elevations with an asterisk (*) shall be field verified. If elevations varysignificantly, notify the Engineer for further instructions.3.Grades shown in paved areas represent finish elevation.4.All construction shall be performed in accordance with state and localstandard specifications for construction.5.Permittees must not excavate infiltration systems to final grade, or withinthree (3) feet of final grade, until the contributing drainage area has beenconstructed and fully stabilized unless they provide rigorous erosionprevention and sediment controls (e.g., diversion berms) to keep sedimentand runoff completely away from the infiltration area.GRADING NOTESSYMBOL LEGENDSYMBOL LEGENDPROPOSED CONTOURS - MAJOR INTERVALGRADE BREAK LINEPROPOSED CONTOURS - MINOR INTERVAL949950950EXISTING CONTOURS2.0%950.00 TC949.50 GLGRADE SLOPESPOT ABBREVIATIONS:TC - TOP OF CURBGL - GUTTER LINEB - BITUMUNOUSC - CONCRETEG - GRADEEOF - EMERGENCY OVERFLOWOF - OVERFLOWTW - TOP OF WALLBW - BOTTOM OF WALL (F/G)AG - AGLIME(*) - EXISTING TO BE VERIFIEDEASEMENT LINEPROPERTY LINERIGHT OF WAY LINERIP-RAP / ROCK CONST. ENTRANCESEE DETAIL X/CX00 OR X/CX00 OR X/CX00INLET PROTECTION, SEE DETAIL X/CX00SEDIMENT LOG, SEE DETAIL X/CX00SEDIMENT LOG, SEE DETAIL X/CX001.See sheet C300 for City of Lake Elmo Grading and Erosion StandardPlan notes.CITY NOTESBENCHMARKELEVATIONS BASED ON INFORMATION ASSHOWN ON THE TKDA WATERMAIN PLANS -SHEET C502 DATED 4/15/2014. TOP NUTHYDRANT 400 ' N. OF 10TH STREET.ELEVATION = 939.37 C.S.A.H. NO. 10 (10TH STREET NORTH)918 916 914 912 910 910 91 2 914 91 6 910910914920922924922914912910916918920922928922922916914912914910 9 1 4 912914916912920920922924916918920922920910918918920922912914 922916918924926908 9069 0 4 920915915920925RIP-RAP @ OUTLETRIP-RAP @ OUTLETSILT FENCEAROUND INLETINLET PROTECTION (TYP.)SEDIMENT LOG (TYP.)SILT FENCE (TYP.)915920915910910920920ROCK CONSTRUCTIONENTRANCE918919 919918917916916917918919921922916917918919921922914913912911909908914913912911909921919919921C.S.A.H. NO. 17 (LAKE ELMO AVE. N.)930932934936938938936938940938936934932930926926926924922918920916914912920934936942944942940938938922924926928924926928930932934936942940936934934936938934936938915920925930930935940930935935940930INLET PROTECTION (TYP.)935930940930930ROCK CONSTRUCTIONENTRANCESILT FENCEAROUND INLET925926927928929928926927928929931932933934936937938939941942929931932933934932933934936937938939941942928929931938936937934933932931937938939941942936936937938929929931931P:\Projects\Projects - 2023\12236128 - New Stillwater Elementary School - Wold\C. Design\Drawing Files\12236128 - C300 Grading & Erosion Control Plan.dwg 08-23-2024 PRELIMINARYPLAT SUBMITTALRevisionsDescriptionDateNumNorthCheck:Drawn:Date:Comm:MTH08-23-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Greg A. Buchal, P.E.Date: Lic. No.:08.23.202423793I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Professional Engineerunder the laws of the state of Minnesota.0NORTH204080INDEPENDENT SCHOOLDISTRICT #834New Lake ElmoElementary School1875 Greeley St S, Stillwater, MN55082Corner of 10th Streen North andLake Elmo Avenue NorthLake Elmo MN 55042AFEDCBA12345678MNC3051.Tree protection consisting of snow fence or safety fence installed at thedrip line shall be in place prior to beginning any grading or demolition workat the site.2.All elevations with an asterisk (*) shall be field verified. If elevations varysignificantly, notify the Engineer for further instructions.3.Grades shown in paved areas represent finish elevation.4.All construction shall be performed in accordance with state and localstandard specifications for construction.5.Permittees must not excavate infiltration systems to final grade, or withinthree (3) feet of final grade, until the contributing drainage area has beenconstructed and fully stabilized unless they provide rigorous erosionprevention and sediment controls (e.g., diversion berms) to keep sedimentand runoff completely away from the infiltration area.GRADING NOTESSYMBOL LEGENDSYMBOL LEGENDPROPOSED CONTOURS - MAJOR INTERVALGRADE BREAK LINEPROPOSED CONTOURS - MINOR INTERVAL949950950EXISTING CONTOURS2.0%950.00 TC949.50 GLGRADE SLOPESPOT ABBREVIATIONS:TC - TOP OF CURBGL - GUTTER LINEB - BITUMUNOUSC - CONCRETEG - GRADEEOF - EMERGENCY OVERFLOWOF - OVERFLOWTW - TOP OF WALLBW - BOTTOM OF WALL (F/G)AG - AGLIME(*) - EXISTING TO BE VERIFIEDEASEMENT LINEPROPERTY LINERIGHT OF WAY LINERIP-RAP / ROCK CONST. ENTRANCESEE DETAIL X/CX00 OR X/CX00 OR X/CX00INLET PROTECTION, SEE DETAIL X/CX00SEDIMENT LOG, SEE DETAIL X/CX00SEDIMENT LOG, SEE DETAIL X/CX00SITE ACCESSGRADING PLANC.S.A.H. NO.10 (10TH STREET NORTH)SITE ACCESS0NORTH3060120C.S.A.H. NO.17 (LAKE ELMO AVENUE)SITE ACCESS0NORTH30601201.See sheet C300 for City of Lake ElmoGrading and Erosion Standard Plan notes.CITY NOTESBENCHMARKELEVATIONS BASED ON INFORMATION ASSHOWN ON THE TKDA WATERMAIN PLANS -SHEET C502 DATED 4/15/2014. TOP NUTHYDRANT 400 ' N. OF 10TH STREET.ELEVATION = 939.37 NEW ELEMENTARYFFE: 931.00 (ARCH: 100'-0")SOFT SURFACEPLAY AREAHARD SURFACEPLAY AREA1391013101010101010101010101010354254MATCH LINE - SEE SHEET C402MATCH LINE - SEE SHEET C404MATCH LINE - SEE SHEET C401MATCH LINE - SEE SHEET C403MATCH LINE - SEE SHEET C403 MATCH LINE - SEE SHEET C404 MATCH LINE - SEE SHEET C401 MATCH LINE - SEE SHEET C402 EXISTING 24"CMP CULVERTSHEET: C402SHEET: C401SHEET: C404SHEET: C40310TH STREET ACCESS SHEET: C405LAKE ELMO AVENUE ACCESS SHEET: C405 CABLE UNDERGROUND LINEFIBER OPTIC UNDERGROUND LINEELECTRIC UNDERGROUND LINEELECTRIC OVERHEAD LINETELEPHONE UNDERGROUND LINESTORM SEWER PIPESANITARY SEWER PIPENATURAL GAS UNDERGROUND LINEWATERMAIN PIPEDRAINTILE PIPECITY OF LAKE ELMO'S STANDARD PLANNOTES FOR SANITARY SEWER PLANSSYMBOL LEGEND1.ALL SANITARY SEWER AND ACCESORIES MUST BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF LAKEELMO STANDARD SPECIFICATIONS AND DETAILS.2.ALL SANITARY SEWER PVC PIPE SHALL BE INSTALLED IN ACCORDING TO CITY OF STANDARD DRAWING 103"GRANULAR MATERIAL BEDDING METHOD" (FOR PVC SANITARY SEWER PIPE).3.UNLESS NOTED OTHERWISE, ALL SMOOTH WALLED SANITARY SEWER PVC PIPE AND FITTINGS SHALL BE SDR35 WITH ELASTOMETRIC GASKETED JOINTS.4.ALL SANITARY SEWER SERVICES SHALL BE 4-INCH PVC, SCH. 40.5.SMOOTH WALLED PVC PIPE AND FITTINGS SHALL CONFORM WITH THE REQUIREMENTS OF ASTM D-3034 FORTHE SIZE, STANDARD DIMENSION RATION (SDR), AND STRENGTH REQUIREMENTS INDICATED ON THE PLANS,SPECIFICATIONS, AND SPECIAL PROVISIONS.6.REINFORCED CONCRETE PIPE AND FITTINGS SHALL CONFORM WITH THE REQUIREMENTS OF MnDOT SPEC3236 (REINFORCED CONCRETE PIPE) FOR THE TYPE, SIZE, AND STRENGTH CLASS SPECIFIED HEREIN.7.JOINTS OF MANHOLE RISER SECTIONS SHALL BE TONGUE AND GROOVE WITH RUBBER "O" RING JOINTSPROVIDED ON ALL SANITARY SEWER MANHOLES.8.SANITARY SEWER INLET AND OUTLET PIPES SHALL BE JOINED TO THE MANHOLE WITH A GASKETED,FLEXIBLE, WATERTIGHT CONNECTION TO ALL DIFFERENTIAL SETTLEMENT OF THE PIPE AND MANHOLE.9.A 1'-0" TO 1'-4" MANHOLE SECTION SHALL BE INSTALLED UNDER THE CONE SECTION TO ALLOW FOR HEIGHTADJUSTMENT WHENEVER POSSIBLE.10.ALL SERVICE LINE STUBS MUST HAVE 2" x 2" HARDWOOD MARKER WITH METAL SPIKE RUNNING FROM THEEND OF PIPE TO FINISHED GRADE ELEVATION.11.UPON MARKING A CONNECTION TO AN EXISTING SANITARY SEWER STUB OR MANHOLE, DIRT AND DEBRISSHALL BE PREVENTED FROM ENTERING THE EXISTING SEWER BY IMMEDIATELY INSTALLING WATERTIGHTPLUGS AS NEEDED IN THE EXISTING MANHOLE.12.ALL MAINLINE SANITARY SEWER AND SERVICES SHALL HAVE TRACER WIRE PER CITY SPECIFICATIONS ANDDETAILS.EASEMENT LINESETBACK LINERIGHT-OF-WAY LINEPROPERTY LINECITY OF LAKE ELMO'S STANDARD PLANNOTES FOR WATERMAIN PLANS1.ALL WATERMAIN AND ACCESSORIES MUST BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF LAKEELMO STANDARD SPECIFICATIONS AND DETAILS.2.MANIPULATION OF EXISTING VALVES SHALL BE PERFORMED ONLY BY CITY PERSONNEL.3.WATERMAIN SHALL BE DUCTILE IRON PIPE, ENCASED IN POLYETHYLENE, CLASS--52.4.ALL FITTINGS SHALL COMPLY WITH CEAM SPEC. 2611.2.A1. ALL FITTINGS SHALL BE DUCTILE IRON PIPE WITHPOLYETHYLENE ENCASEMENT. ALL CONNECTIONS SHALL BE INSTALLED UTILIZING COR -- BLUE NUTS &BOLTS.5.USE GATE VALVES FOR ALL APPLICATIONS UP THROUGH 12 INCHES.6.GATE VALVES SHALL BE RESILIENT WEDGE AMERICAN FLOW CONTROL SERIES 2500 OR APPROVED EQUAL.GATE VALVES MUST COMPLY WITH CEAM SPEC 2611.2.C.2.7.USE BUTTERFLY VALVES FOR ALL APPLICATIONS GREATER THAN 12 INCHES.8.BUTTERFLY VALVES SHALL BE MUELLER LINESEAL III, OR APPROVED EQUAL. BUTTERFLY VALVES SHALLCOMPLY WITH CEAM SPEC. 26 11.2.CA.9.BOLTS AND NUTS ON ALL VALVES AND HYDRANTS SHALL BE STAIN LESS STEEL.10.ALL HYDRANTS SHALL BE INSTALLED 5.0 FEET BACK OF CURB.11.HYDRANTS SHALL BE WATEROUS "PACER," MODEL WB-67 OR APPROVED EQUAL, FITTED WITH FH 800 SERIES FLEX STAKE AND PAINTED RED.12.HYDRANTS SHALL HAVE TWO OUTLET NOZZLES FOR 2- 12 (1. D.) HOSE CONNECTIONS ANDONE 4" STORZ NOZZLE (MODEL WB--67) AND PENTAGON NUT END CAP.13.THE CURB STOP SERVICE ASSEMBLY SHALL HAVE A MINIMUM 1 -- FT ADJUSTMENT RANGE AND SHALLEXTEND 6 INCHES ABOVE FINISHED GRADE FULLY EXTENDED.14.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING WATER TO HOMES AND BUSINESSESWHOSE WATER SUPPLY IS DISRUPTED DURING THE COURSE OF THE PROJECT.LIGHT POLESTORM MANHOLEFLARED ENDCURB INLETCATCH BASINWATER SHUTOFFGATE VALVE & BOXHYDRANTSANITARY MANHOLEP:\Projects\Projects - 2023\12236128 - New Stillwater Elementary School - Wold\C. Design\Drawing Files\12236128 - C400 Utility Plan.dwg 08-23-2024 PRELIMINARYPLAT SUBMITTALRevisionsDescriptionDateNumNorthCheck:Drawn:Date:Comm:MTH08-23-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Greg A. Buchal, P.E.Date: Lic. No.:08.23.202423793I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Professional Engineerunder the laws of the state of Minnesota.INDEPENDENT SCHOOLDISTRICT #834New Lake ElmoElementary School1875 Greeley St S, Stillwater, MN55082Corner of 10th Streen North andLake Elmo Avenue NorthLake Elmo MN 55042AFEDCBA12345678MNOVERALL:UTILITY PLANC4000NORTH4080160CITY OF LAKE ELMO'S STANDARD PLANNOTES FOR STORM SEWER PLANS1.ALL STORM SEWER AND ACCESSORIES MUST BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF LAKEELMO STANDARD SPECIFICATIONS AND DETAILS.2.REINFORCED CONCRETE PIPE AND FITTINGS SHALL CONFORM WITH THE REQUIREMENTS OF M n DOTSPEC 3236 (REINFORCED CONCRETE PIPE) FOR THE TYPE, SIZE, AND STRENGTH CLASS SPECIFIED HEREIN.3.PRECAST CONCRETE MANHOLE AND CATCH BASIN SECTIONS SHALL CONFORM TO THEREQUIREMENTS OF ASTM C--477.4.A 1'-0" TO 1'-4" MANHOLE SECTION SHALL BE INSTALLED UNDER THE CONE SECTION TO ALLOW FORHEIGHT ADJUSTMENT WHENEVER POSSIBLE.5.JOINTS OF MANHOLE RISER SECTIONS SHALL BE TONGUE AND GROOVE WITH RUBBER "O" RING JOINTSPROVIDED ON ALL STORM SEWER MANHOLES.6.RIP-- RAP SHALL BE HAND -- PLACED OVER GEOTEXTILE FABRIC AND CONFORM TO MnDOT SPEC. 3601,CLASS III, OR AS SPECIFIED HEREIN.7.THE GEOTEXTILE FABRIC USED UNDER RIP --RAP SHALL EXTEND 3-FT UNDER THE APRON.8.FURNISH & INSTALL TRASH GUARDS ON ALL FLARED END SECTIONS.9.ALL SILT SHALL BE CLEANED OUT FROM THE RIP - RAP AT THE END OF THE PROJECT.10.STORM SEWER STRUCTURES WITHIN 1 0 FT OF WATERMAIN ARE TO HAVE WATER TIGHT CONNECTIONS PERMDH REQUIREMENTS.11.ALL NEW STORM SEWER PIPE SHALL BE FLUSHED AND TELEVISED PRIOR TO SUBSTANTIAL COMPLETION- SEE SPECIFICATION SECTION 700 - CLOSEOUT REQUIREMENTSBENCHMARKELEVATIONS BASED ON INFORMATION ASSHOWN ON THE TKDA WATERMAIN PLANS -SHEET C502 DATED 4/15/2014. TOP NUTHYDRANT 400 ' N. OF 10TH STREET.ELEVATION = 939.37 MATCH LINE - SEE SHEET C401MATCH LINE - SEE SHEET C403MATCH LINE - SEE SHEET C401 MATCH LINE - SEE SHEET C402 8" DIP WM 150' SERVICE RADIUSP:\Projects\Projects - 2023\12236128 - New Stillwater Elementary School - Wold\C. Design\Drawing Files\12236128 - C400 Utility Plan.dwg 08-23-2024 PRELIMINARYPLAT SUBMITTALRevisionsDescriptionDateNumNorthCheck:Drawn:Date:Comm:MTH08-23-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Greg A. Buchal, P.E.Date: Lic. No.:08.23.202423793I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Professional Engineerunder the laws of the state of Minnesota.0NORTH204080INDEPENDENT SCHOOLDISTRICT #834New Lake ElmoElementary School1875 Greeley St S, Stillwater, MN55082Corner of 10th Streen North andLake Elmo Avenue NorthLake Elmo MN 55042AFEDCBA12345678MNC401NORTHWEST:UTILITY PLANCABLE UNDERGROUND LINEFIBER OPTIC UNDERGROUND LINEELECTRIC UNDERGROUND LINEELECTRIC OVERHEAD LINETELEPHONE UNDERGROUND LINESTORM SEWER PIPESANITARY SEWER PIPENATURAL GAS UNDERGROUND LINEWATERMAIN PIPEDRAINTILE PIPESYMBOL LEGENDEASEMENT LINERIGHT-OF-WAY LINEPROPERTY LINEPOWER POLESTORM MANHOLEFLARED ENDCURB INLETCATCH BASINWATER SHUTOFFGATE VALVE & BOXHYDRANTSANITARY MANHOLELIGHT POLEKEY NOTESCATCH BASIN MANHOLE, SEE DETAIL 1/C503_A: CASTING & FRAME: NEENAH R-3067-C, TYLE L GRATE_B: CASTING & FRAME: NEENAH R-3501-TB, TYLE L GRATECATCH BASIN , SEE DETAIL X/CX00_A: CASTING & FRAME: NEENAH R-3067-C, TYLE L GRATE_B: CASTING & FRAME: NEENAH R-3501-TB, TYLE L GRATESTORM MANHOLE, CASTING & FRAME: NEENAH R-1642, TYLE BLID, SEE DETAIL X/CX00SANITARY MANHOLE, SEE DETAIL X/CX00HYDRANT WITH GATE VALVE, SEE DETAIL X/CX00GATE VALVE AND BOX, SEE DETAIL X/CX004" PERFORATED PE PLAYGROUND DRAIN TILE WITH SOILSEPARATION FABRIC, SEE DETAIL X/CX00LIFT STATION, SEE DETAIL X/CX00CLEANOUT, SEE DETAIL X/CX00FLARED END SECTION, SEE DETAIL X/CX00TRENCH DRAIN, SEE DETAIL X/CX0012345678910CITY OF LAKE ELMO NOTES1.See sheet C400 for City of Lake Elmo Standard Plan Notes for SanitarySewer Plans, Storm Sewer Plans, and Watermain Plans.BENCHMARKELEVATIONS BASED ON INFORMATION ASSHOWN ON THE TKDA WATERMAIN PLANS -SHEET C502 DATED 4/15/2014. TOP NUTHYDRANT 400 ' N. OF 10TH STREET.ELEVATION = 939.3711 NEW ELEMENTARYFFE: 931.00 (ARCH: 100'-0")SOFT SURFACEPLAY AREAHARD SURFACEPLAY AREA13MATCH LINE - SEE SHEET C402MATCH LINE - SEE SHEET C404MATCH LINE - SEE SHEET C401MATCH LINE - SEE SHEET C4026" HYDRANTWITH GV8" WATER SERVICECORD. W/ MECH.6" SAN. CORD. W/MECHINV: 923.00SAN MH-2RIM: 929.38INV: 921.9055 LF 6" PVC@ 2.00%6" SAN. CORD. W/MECHINV: 923.0010" RD, CORD. W/MECHSTMH-28RIM: 925.98INV: 921.2012" RD, CORD. W/MECHINV: 923.50106 LF 12" PVC(SCH.40) @ 2.17%CBMH-29RIM: 925.31INV: 920.81CBMH-30RIM: 923.84INV: 918.87SUMP: 914.87CBMH-32RIM: 927.35INV: 922.85137 LF 12" HDPE@ 1.50%138 LF 24" HDPE@ 3.70%99 LF 18" RCP@ 1.51%TRENCH DRAININV (N): 926.95INV (S): 926.70INV (OUT): 925.00RAIN GUARDIANRIM: 919.12INV: 918.12FES-10INV: 916.50FES-10INV: 915.00FES-10INV: 916.50CBMH-30RIM: 924.87INV: 920.37FES-10INV: 916.50141 LF 18" RCP@ 3.61%CBMH-30RIM: 926.10INV: 921.60SUMP: 917.60CBMH-30RIM: 928.18INV: 923.4556 LF 18" RCP@ 3.30%STMH-30RIM: 928.70INV: 923.87CONNECT ON EXISTING18" CMP PIPEINV: 924.10EXTEND 23' TO NEW MH28 LF 18" RCP@ 1.51%23 LF 18" CMP@ 1.00%97 LF 15" HDPE@ 2.00%68 LF 15" HDPE@ 2.20%83 LF 15" HDPE@ 1.00%INSTALL NEWHYDRANTEXTEND 6" DIP WM6" HYDRANTWITH GV6" HYDRANTWITH GV6" HYDRANTWITH GV8" GATEVALVE8" GATEVALVE(TYP. OF 3)WET-TAP INTO 16" HDPEWM, COORDINATECONNECTION WITH THECITY OF LAKE ELMO8" DIP WM8" DIP WMRELOCATE EXISTING POWER POLECOORD. W/ UTILITY PROVIDER.MAINTAIN 4' CLEAR ZONE FROM TRAIL(TYPICAL.)PLAYGROUND DT150' SERVICE RADIUS150' SERVICE RADIUSP:\Projects\Projects - 2023\12236128 - New Stillwater Elementary School - Wold\C. Design\Drawing Files\12236128 - C400 Utility Plan.dwg 08-23-2024 PRELIMINARYPLAT SUBMITTALRevisionsDescriptionDateNumNorthCheck:Drawn:Date:Comm:MTH08-23-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Greg A. Buchal, P.E.Date: Lic. No.:08.23.202423793I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Professional Engineerunder the laws of the state of Minnesota.0NORTH204080INDEPENDENT SCHOOLDISTRICT #834New Lake ElmoElementary School1875 Greeley St S, Stillwater, MN55082Corner of 10th Streen North andLake Elmo Avenue NorthLake Elmo MN 55042AFEDCBA12345678MNC402NORTHEAST:UTILITY PLANCABLE UNDERGROUND LINEFIBER OPTIC UNDERGROUND LINEELECTRIC UNDERGROUND LINEELECTRIC OVERHEAD LINETELEPHONE UNDERGROUND LINESTORM SEWER PIPESANITARY SEWER PIPENATURAL GAS UNDERGROUND LINEWATERMAIN PIPEDRAINTILE PIPESYMBOL LEGENDEASEMENT LINERIGHT-OF-WAY LINEPROPERTY LINEPOWER POLESTORM MANHOLEFLARED ENDCURB INLETCATCH BASINWATER SHUTOFFGATE VALVE & BOXHYDRANTSANITARY MANHOLELIGHT POLEKEY NOTESCATCH BASIN MANHOLE, SEE DETAIL 1/C503_A: CASTING & FRAME: NEENAH R-3067-C, TYLE L GRATE_B: CASTING & FRAME: NEENAH R-3501-TB, TYLE L GRATECATCH BASIN , SEE DETAIL X/CX00_A: CASTING & FRAME: NEENAH R-3067-C, TYLE L GRATE_B: CASTING & FRAME: NEENAH R-3501-TB, TYLE L GRATESTORM MANHOLE, CASTING & FRAME: NEENAH R-1642, TYLE BLID, SEE DETAIL X/CX00SANITARY MANHOLE, SEE DETAIL X/CX00HYDRANT WITH GATE VALVE, SEE DETAIL X/CX00GATE VALVE AND BOX, SEE DETAIL X/CX004" PERFORATED PE PLAYGROUND DRAIN TILE WITH SOILSEPARATION FABRIC, SEE DETAIL X/CX00LIFT STATION, SEE DETAIL X/CX00CLEANOUT, SEE DETAIL X/CX00FLARED END SECTION, SEE DETAIL X/CX00TRENCH DRAIN, SEE DETAIL X/CX0012345678910CITY OF LAKE ELMO NOTES1.See sheet C400 for City of Lake Elmo Standard Plan Notes for SanitarySewer Plans, Storm Sewer Plans, and Watermain Plans.BENCHMARKELEVATIONS BASED ON INFORMATION ASSHOWN ON THE TKDA WATERMAIN PLANS -SHEET C502 DATED 4/15/2014. TOP NUTHYDRANT 400 ' N. OF 10TH STREET.ELEVATION = 939.3711 C.S.A.H. NO. 10 (10TH STREET NORTH)MATCH LINE - SEE SHEET C401MATCH LINE - SEE SHEET C403MATCH LINE - SEE SHEET C403 MATCH LINE - SEE SHEET C404FES-6INV: 898.00117 LF 24" RCP@ 8.55%RAIN GUARDIANRIM: 917.00INV: 916.00OUTLET FESINV: 916.50119 LF 24" RCP@ 1.50%STMH-28RIM: 918.30INV: 908.06FES-1INV: 906.00124 LF 24" RCP @ 1.50%RAIN GUARDIANRIM: 918.53INV: 917.53CBMH-4RIM: 917.11INV: 909.85CBMH-4RIM: 916.20INV: 911.20640 LF 24" RCP @ 0.70%22 LF 24" RCP @ 6.13%6" HYDRANTWITH GV8" DIP WMRELOCATE EXISTING POWER POLECOORD. W/ UTILITY PROVIDER.MAINTAIN 4' CLEAR ZONE FROM TRAIL(TYPICAL.)P:\Projects\Projects - 2023\12236128 - New Stillwater Elementary School - Wold\C. Design\Drawing Files\12236128 - C400 Utility Plan.dwg 08-23-2024 PRELIMINARYPLAT SUBMITTALRevisionsDescriptionDateNumNorthCheck:Drawn:Date:Comm:MTH08-23-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Greg A. Buchal, P.E.Date: Lic. No.:08.23.202423793I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Professional Engineerunder the laws of the state of Minnesota.0NORTH204080INDEPENDENT SCHOOLDISTRICT #834New Lake ElmoElementary School1875 Greeley St S, Stillwater, MN55082Corner of 10th Streen North andLake Elmo Avenue NorthLake Elmo MN 55042AFEDCBA12345678MNC403SOUTHWEST:UTILITY PLANCABLE UNDERGROUND LINEFIBER OPTIC UNDERGROUND LINEELECTRIC UNDERGROUND LINEELECTRIC OVERHEAD LINETELEPHONE UNDERGROUND LINESTORM SEWER PIPESANITARY SEWER PIPENATURAL GAS UNDERGROUND LINEWATERMAIN PIPEDRAINTILE PIPESYMBOL LEGENDEASEMENT LINERIGHT-OF-WAY LINEPROPERTY LINEPOWER POLESTORM MANHOLEFLARED ENDCURB INLETCATCH BASINWATER SHUTOFFGATE VALVE & BOXHYDRANTSANITARY MANHOLELIGHT POLEKEY NOTESCATCH BASIN MANHOLE, SEE DETAIL 1/C503_A: CASTING & FRAME: NEENAH R-3067-C, TYLE L GRATE_B: CASTING & FRAME: NEENAH R-3501-TB, TYLE L GRATECATCH BASIN , SEE DETAIL X/CX00_A: CASTING & FRAME: NEENAH R-3067-C, TYLE L GRATE_B: CASTING & FRAME: NEENAH R-3501-TB, TYLE L GRATESTORM MANHOLE, CASTING & FRAME: NEENAH R-1642, TYLE BLID, SEE DETAIL X/CX00SANITARY MANHOLE, SEE DETAIL X/CX00HYDRANT WITH GATE VALVE, SEE DETAIL X/CX00GATE VALVE AND BOX, SEE DETAIL X/CX004" PERFORATED PE PLAYGROUND DRAIN TILE WITH SOILSEPARATION FABRIC, SEE DETAIL X/CX00LIFT STATION, SEE DETAIL X/CX00CLEANOUT, SEE DETAIL X/CX00FLARED END SECTION, SEE DETAIL X/CX00TRENCH DRAIN, SEE DETAIL X/CX0012345678910CITY OF LAKE ELMO NOTES1.See sheet C400 for City of Lake Elmo Standard Plan Notes for SanitarySewer Plans, Storm Sewer Plans, and Watermain Plans.BENCHMARKELEVATIONS BASED ON INFORMATION ASSHOWN ON THE TKDA WATERMAIN PLANS -SHEET C502 DATED 4/15/2014. TOP NUTHYDRANT 400 ' N. OF 10TH STREET.ELEVATION = 939.3711 C.S.A.H. NO. 17 (LAKE ELMO AVE. N.)C.S.A.H. NO. 10 (10TH STREET NORTH)NEW ELEMENTARYFFE: 931.00 (ARCH: 100'-0")91013101010101010101010101010354254MATCH LINE - SEE SHEET C402MATCH LINE - SEE SHEET C404MATCH LINE - SEE SHEET C403MATCH LINE - SEE SHEET C404EXISTING 24"CMP CULVERT6" HYDRANTWITH GV4" WATER SERVICECORD. W/ MECH.8" WATER SERVICECORD. W/ MECH.CONNECT TO EXISTING SANITARY FORCE MAIN(ONGOING COORDINATION WITH THE CITY OF LAKEELMO FOR HOW THIS CONNECTION SHALL BE MADE)6" SAN. CORD. W/MECHINV: 923.00130 LF 6" PVC@ 2.00%287 LF 6" PVC@ 2.00%SAN MH-1RIM: 930.65INV (NW): 920.50INV (E): 920.40SAN MH-2RIM: 929.38INV: 921.90SAN MH-3RIM: 929.20INV (W/N): 914.28INV (S): 914.18158 LF 6" PVC@ 4.80%55 LF 6" PVC@ 2.00%6" SAN. CORD. W/MECHINV: 923.00213 LF 8" PVC@ 2.00%SAN MH-4RIM: 926.30INV (N): 909.92INV (S): 909.82LIFT STATIONRIM: 929.20INV (N): 906.40170 LF 8" PVC@ 2.00%CBMH-1RIM: 929.10INV: 924.1610" RD, CORD. W/MECHINV: 925.0012" RD, CORD. W/MECHINV: 925.0012" RD, CORD. W/MECHINV: 925.0042 LF 10" PVC(SCH.40) @ 2.00%114 LF 12" HDPE@ 1.50%68 LF 12" HDPE@ 1.50%88 LF 18" PVC(SCH.40) @ 1.50%STMH-2RIM: 928.47INV: 922.4549 LF 12" PVC(SCH.40) @ 2.00%STMH-6RIM: 927.79INV (N): 924.02INV (S/E): 921.43CBMH-4RIM: 926.29INV: 920.1125 LF 12" HDPE@ 6.96%16 LF 12" HDPE@ 1.50%35 LF 24" HDPE@ 1.50%78 LF 24" HDPE@ 3.06%CB-7RIM: 924.75INV: 920.25CB-9RIM: 925.98INV: 921.48111 LF 18" HDPE@ 1.50%39 LF 12" HDPE@ 3.51%CBMH-10RIM: 924.66INV: 920.18CB-11RIM: 924.92INV: 920.42FES-1INV: 916.50OUTLET FESINV: 916.50FES-9INV: 921.00FES-10INV: 921.50CBMH-20RIM: 925.02INV: 917.89SUMP: 913.89CBMH-21RIM: 924.31INV: 919.81CBMH-23RIM: 923.85INV: 918.47CB-25RIM: 928.84INV: 924.34CBMH-26RIM: 929.40INV: 924.32CBMH-27RIM: 927.90INV: 923.4315 LF 12" HDPE@ 8.93%107 LF 18" HDPE@ 3.01%81 LF 15" HDPE@ 1.00%93 LF 18" PVC(SCH. 40) @ 1.00%34 LF 12" PVC(SCH. 40) @ 2.00%50 LF 15" HDPE@ 1.78%72 LF 6" NON-PERF.DT @ 2.33%TRENCH DRAININV (N): 926.95INV (S): 926.70INV (OUT): 925.00FES-9INV: 917.0052 LF 18" HDPE@ 0.96%115 LF 18" HDPE@ 0.50%STMH-30RIM: 924.90INV: 918.44SUMP: 914.4440 LF 12" HDPE@ 4.52%CBMH-30RIM: 923.46INV: 917.91SUMP: 913.91CBMH-4RIM: 919.83INV (S): 915.60INV (W): 914.3356 LF 12" PVC(SCH. 40) @ 1.50%CB-27RIM: 927.99INV: 923.49CBMH-24RIM: 926.15INV: 922.15CBMH-24RIM: 925.39INV: 921.69CBMH-24RIM: 927.65INV: 922.6261 LF 12" HDPE@ 2.82%CBMH-27RIM: 927.52INV: 922.9325 LF 15" HDPE@ 1.24%35 LF 12" HDPE@ 1.31%178 LF 24" HDPE@ 0.50%6" HYDRANT6" HYDRANTWITH GV6" HYDRANTWITH GV6" HYDRANTWITH GV8" GATEVALVE(TYP. OF 3)8" GATEVALVEWET-TAP INTO 16" HDPEWM, COORDINATECONNECTION WITH THECITY OF LAKE ELMO8" DIP WM8" DIP WMRELOCATE EXISTING POWER POLECOORD. W/ UTILITY PROVIDER.MAINTAIN 4' CLEAR ZONE FROM TRAIL(TYPICAL.)RELOCATE EXISTING POWER POLECOORD. W/ UTILITY PROVIDER.MAINTAIN 4' CLEAR ZONE FROM TRAIL(TYPICAL.)150' SERVICE RADIUSP:\Projects\Projects - 2023\12236128 - New Stillwater Elementary School - Wold\C. Design\Drawing Files\12236128 - C400 Utility Plan.dwg 08-23-2024 PRELIMINARYPLAT SUBMITTALRevisionsDescriptionDateNumNorthCheck:Drawn:Date:Comm:MTH08-23-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Greg A. Buchal, P.E.Date: Lic. No.:08.23.202423793I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Professional Engineerunder the laws of the state of Minnesota.0NORTH204080INDEPENDENT SCHOOLDISTRICT #834New Lake ElmoElementary School1875 Greeley St S, Stillwater, MN55082Corner of 10th Streen North andLake Elmo Avenue NorthLake Elmo MN 55042AFEDCBA12345678MNC404SOUTHEAST:UTILITY PLANCABLE UNDERGROUND LINEFIBER OPTIC UNDERGROUND LINEELECTRIC UNDERGROUND LINEELECTRIC OVERHEAD LINETELEPHONE UNDERGROUND LINESTORM SEWER PIPESANITARY SEWER PIPENATURAL GAS UNDERGROUND LINEWATERMAIN PIPEDRAINTILE PIPESYMBOL LEGENDEASEMENT LINERIGHT-OF-WAY LINEPROPERTY LINEPOWER POLESTORM MANHOLEFLARED ENDCURB INLETCATCH BASINWATER SHUTOFFGATE VALVE & BOXHYDRANTSANITARY MANHOLEKEY NOTESCATCH BASIN MANHOLE, SEE DETAIL 1/C503_A: CASTING & FRAME: NEENAH R-3067-C, TYLE L GRATE_B: CASTING & FRAME: NEENAH R-3501-TB, TYLE L GRATECATCH BASIN , SEE DETAIL X/CX00_A: CASTING & FRAME: NEENAH R-3067-C, TYLE L GRATE_B: CASTING & FRAME: NEENAH R-3501-TB, TYLE L GRATESTORM MANHOLE, CASTING & FRAME: NEENAH R-1642, TYLE BLID, SEE DETAIL X/CX00SANITARY MANHOLE, SEE DETAIL X/CX00HYDRANT WITH GATE VALVE, SEE DETAIL X/CX00GATE VALVE AND BOX, SEE DETAIL X/CX004" PERFORATED PE PLAYGROUND DRAIN TILE WITH SOILSEPARATION FABRIC, SEE DETAIL X/CX00LIFT STATION, SEE DETAIL X/CX00CLEANOUT, SEE DETAIL X/CX00FLARED END SECTION, SEE DETAIL X/CX00TRENCH DRAIN, SEE DETAIL X/CX00123456789LIGHT POLE10CITY OF LAKE ELMO NOTES1.See sheet C400 for City of Lake Elmo Standard Plan Notes for SanitarySewer Plans, Storm Sewer Plans, and Watermain Plans.BENCHMARKELEVATIONS BASED ON INFORMATION ASSHOWN ON THE TKDA WATERMAIN PLANS -SHEET C502 DATED 4/15/2014. TOP NUTHYDRANT 400 ' N. OF 10TH STREET.ELEVATION = 939.3711 C.S.A.H. NO. 10 (10TH STREET NORTH)C.S.A.H. NO. 17 (LAKE ELMO AVE. N.)P:\Projects\Projects - 2023\12236128 - New Stillwater Elementary School - Wold\C. Design\Drawing Files\12236128 - C400 Utility Plan.dwg 08-23-2024 PRELIMINARYPLAT SUBMITTALRevisionsDescriptionDateNumNorthCheck:Drawn:Date:Comm:MTH08-23-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Greg A. Buchal, P.E.Date: Lic. No.:08.23.202423793I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Professional Engineerunder the laws of the state of Minnesota.0NORTH204080INDEPENDENT SCHOOLDISTRICT #834New Lake ElmoElementary School1875 Greeley St S, Stillwater, MN55082Corner of 10th Streen North andLake Elmo Avenue NorthLake Elmo MN 55042AFEDCBA12345678MNC405SITE ACCESSUTILITY PLANC.S.A.H. NO.10 (10TH STREET NORTH)SITE ACCESS UTILITY PLAN0NORTH3060120C.S.A.H. NO.17 (LAKE ELMO AVENUE)SITE ACCESS UTILITY PLAN0NORTH3060120CABLE UNDERGROUND LINEFIBER OPTIC UNDERGROUND LINEELECTRIC UNDERGROUND LINEELECTRIC OVERHEAD LINETELEPHONE UNDERGROUND LINESTORM SEWER PIPESANITARY SEWER PIPENATURAL GAS UNDERGROUND LINEWATERMAIN PIPEDRAINTILE PIPESYMBOL LEGENDEASEMENT LINERIGHT-OF-WAY LINEPROPERTY LINEPOWER POLESTORM MANHOLEFLARED ENDCURB INLETCATCH BASINWATER SHUTOFFGATE VALVE & BOXHYDRANTSANITARY MANHOLELIGHT POLECITY OF LAKE ELMO NOTES1.See sheet C400 for City of Lake Elmo Standard Plan Notes for SanitarySewer Plans, Storm Sewer Plans, and Watermain Plans.BENCHMARKELEVATIONS BASED ON INFORMATION ASSHOWN ON THE TKDA WATERMAIN PLANS -SHEET C502 DATED 4/15/2014. TOP NUTHYDRANT 400 ' N. OF 10TH STREET.ELEVATION = 939.37KEY NOTESCATCH BASIN MANHOLE, SEE DETAIL 1/C503_A: CASTING & FRAME: NEENAH R-3067-C, TYLE L GRATE_B: CASTING & FRAME: NEENAH R-3501-TB, TYLE L GRATECATCH BASIN , SEE DETAIL X/CX00_A: CASTING & FRAME: NEENAH R-3067-C, TYLE L GRATE_B: CASTING & FRAME: NEENAH R-3501-TB, TYLE L GRATESTORM MANHOLE, CASTING & FRAME: NEENAH R-1642, TYLE BLID, SEE DETAIL X/CX00SANITARY MANHOLE, SEE DETAIL X/CX00HYDRANT WITH GATE VALVE, SEE DETAIL X/CX00GATE VALVE AND BOX, SEE DETAIL X/CX004" PERFORATED PE PLAYGROUND DRAIN TILE WITH SOILSEPARATION FABRIC, SEE DETAIL X/CX00LIFT STATION, SEE DETAIL X/CX00CLEANOUT, SEE DETAIL X/CX00FLARED END SECTION, SEE DETAIL X/CX00TRENCH DRAIN, SEE DETAIL X/CX001234567891011 DESIGN GROUP | Landscape Architecture www.calyxdesigngroup.com RE: Lake Elmo Elementary School Tree Mitigation Exception Request The new Lake Elmo Elementary School project is requesting an exception to the City’s tree preservation and replacement standards. Standards for tree preservation exceptions by City Council are dictated by Lake Elmo City Code Section 105.12.470.f.1 The proposed project site for the new Lake Elmo Elementary School is an existing agricultural field with a significant amount of coniferous tree rows planted by the previous landowner. These trees are primarily 8”- 12” caliper red pines, scotch pines, blue spruce, and norway spruce. Per the historic aerial imagery below, these gridded tree rows were planted between 1991 and 2003. 1991 Aerial Image 2003 Aerial Image 2014 Aerial Image 2024 Aerial Image To develop this site for the new elementary school, a significant amount of the previous landowner planted trees will need to be removed for the elementary building, parking, driveways, utilities, and stormwater management. Diligent efforts were made by the Architect and Civil Engineer to limit site disturbance to the East side of the property while maintaining the necessary functions and features of the elementary school. Because a significant portion of the tree removals would be previous landowner planted trees, the project is requesting that these landowner planted trees be exempt from a tree mitigation penalty. DESIGN GROUP | Landscape Architecture www.calyxdesigngroup.com The following sections of Lake Elmo City Code pertain to this request. Beneath each section of city code is a description about how this section applies to the Lake Elmo Elementary School site. 105.12.470 Tree Preservation Section c.1.b.5 A Tree Preservation Plan is not required for the following activities: Tree removal related to public improvement projects and maintenance or repairs to existing streets, roadways, sewers, parks, storm water facilities and utility infrastructure. The proposed Elementary School is a public improvement project . The ballfields and playground will be open to the public. 105.12.470 Tree Preservation Section c.3.c Trees that were planted as part of a commercial business such as a tree farm or nursery do not need to be inventoried on an individual basis. A general description of the trees and an outer boundary of the planted area must be provided. The burden of proof shall be on the applicant to provide evidence to support the finding that the trees were planted as part of a commercial business. Per the attached aerial imagery from 1991-2024, a significant portion of the coniferous trees on this agricultural site were planted by the previous landowner between 1991 and 2003. The gridded layout mimics a standard tree farm planting plan. The attached tree inventory chart documents these landowner planted trees as primarily 8”-12” caliper coniferous trees including red pine, scotch pine, blue spruce, and norway spruce. 105.12.470 Tree Preservation Section c.5.c-d The following types of trees do not need to be included as part of the tally of tree removals: c. Trees that were planted as part of a commercial business, such as a tree farm or nursery (subject to verification by the City); or d. Trees that were planted by the current property owner. In making such a determination, the City shall consider consistency of the age of the trees, any patterns in the location of trees, historical aerial photography and evidence of intentional planting such as invoices, formal planting plans or cost sharing agreements. Per the attached aerial imagery from 1991-2024, a significant portion of the coniferous trees on this agricultural site were planted by the previous landowner between 1991 and 2003. The gridded layout mimics a standard tree farm planting plan. The attached tree inventory chart documents these landowner planted trees as primarily 8”-12” caliper coniferous trees including red pine, scotch pine, blue spruce, and norway spruce. DESIGN GROUP | Landscape Architecture www.calyxdesigngroup.com 105.12.470 Tree Preservation Section f.1: Exception Standards Not withstanding the City’s desire to accomplish tree preservation and protection goals, there may be instances where these goals are in conflict with other City objectives. These conflicts will most likely occur on small, heavily-wooded parcels. The City recognizes there may be instances where it is not practical or reasonable to have an applicant plant the total required replacement trees on site. Applicants may ask the City to approve exceptions to the City’s tree preservation and replacement standards. The City Council may grant exceptions if all of the following conditions exist: a. It is not feasible to combine the subject parcel with adjacent parcels that could use the parcel as required green space; b. Strict adherence to the City’s tree preservation and replacement standards would prevent reasonable development that is consistent with the Comprehensive Plan and desirable to the City on the parcel; and c. The exception requested is the minimum needed to accomplish the desired development or redevelopment. a. Within the site’s limits, the project will support and maintain new trees around the development area to meet the Lake Elmo landscape and screening requirements. However, it is not feasible for the Elementary School to plant and continue to maintain additional mitigation trees on property or an adjacent parcel. Rather than funding on-site amenities for elementary students, taxpayer dollars would be going towards a substantial tree mitigation penalty due to the loss of the previous landowner’s planted tree rows. b. This project is a reasonable development that is consistent with the goals of the Comprehensive Plan. A new Elementary School is an essential public service for the City of Lake Elmo, especially in a geographically ideal location near the Middle School. c. The Architect and Civil Engineer have worked diligently to minimize site disturbance while maintaining all of the necessary functions and features for the Elementary School including parking, driveways, utilities, and stormwater management. 105.12.470 Tree Preservation Section f.2: Reduced Mitigation for Exceptions If the City Council approves an exception to the tree preservation standards, relief from the requirements of the standards may take the form of reduced mitigation requirements, greater allowable tree removal, higher thresholds for determining significant trees, or any combination of the above. The City Council will determine which form of relief best balances the objectives of the City and tree preservation. The proposed Lake Elmo Elementary School project requests that the City Council exempt the landowner planted trees from a mitigation penalty. The project intends to meet the Lake Elmo standard landscape requirements and mitigation penalty for the removal of naturally occurring site trees. The proposed Elementary School is an essential public service and provides public improvements including ballfields and a playground that will be open to the community. With this tree mitigation exemption, the school will be able use more of the budget for the elementary students’ building , site amenities, and education. 930 9 3 0 930930930925920910930930 930925925925 930925928929928928927926924926929929928927927 926 924 923 922 921928928927926 9269279289299289279269299239229219209209219229239249259269279289299 2 8 9279269259249239229219209199189179169159159209259309149159169179189199209219219229239249199189179169159149139129119099089079069059049039029019008998989 2 6 9 2 7 9 2 8 9 2 9 9 3 0 9 3 19299309329339349359369379389399409419429299309319329339349359329339349359369379389399409419429289299309319309299289279269 2 6925924923922921920919918918919918916914912910908906904902900898917915913911909907905903901899 92892792692292192091991891791691591491391291191090990890790690590490390290190089989892091991891791691591591691791891992092192292792692592492392292192092 4 92492592692692592592692792892 9 9299289309 2 8 9 2 7 9 2 6 9 2 7 9 2 6 9 2 5 9 2 5 9 2 4923922 930 929928927926925924923922921930929928927926916917918919920921922915914913912911910909908921920919919920921 92592492391992092193 8 93 6 93 7 9 3 5 934 93 3 93 2 93 1 93 0 937 938 939940941942 936 936 937938 930 929 929930931 9311391013101010101010101010101010354254 93 0 932 93 4 93 6 938 938936934932 920 910 914916918920922922920918916914 9 1 2 9 1 0908910912914916918920922924 926924922920924926928930932934936938940 9109149169209349 3 6 942944944942940938936934932930918 916 914 912 9 3 8 93 0 9 2 8 92 6 92 0 91 8 91 6 91 4 91 2 91 0908 9 0 6 9 0 4 904906908918 92 0 922906 908 910912914916918920922924926928930932934932930928926924922920916918914912910908906 910 910 91 2 914 916 908906 904902900910910914920922924922914912910916918920922928 9289 2 8 9 2 6924922 922926922920912912914912914916914916918920922924926926928 93 0 932924920920922924916918920922920930918910898 90290489890091090091093092091092093092492 2 92 4 918932922924926928920918918920922 920922924924926 928930932934936 942 940 936 934 934 936 934 930 932 934928922924926918922924926920920922924918924926926922 9008989169189249269 3 2 934936930928926924932930898 908 906 904 TREE PROTECTIONFENCE, TYP.PROPOSEDBUILDINGTREE REMOVALSAREA, TYP.TREE REMOVALSAREA, TYP.TREE REMOVALSAREA, TYP.TREE REMOVALSAREA, TYP.TREE REMOVALSAREA, TYP.TREE REMOVALSAREA, TYP.TREE PROTECTIONFENCE PER DETAILTREE PROTECTIONFENCE PER DETAILTREE PROTECTIONFENCE PER DETAILTREE PROTECTIONFENCE PER DETAILEXISTING TREESTO REMAINEXISTING TREESTO REMAINEXISTING TREESTO REMAINEXISTING TREES TO REMAINEXISTING TREES TO REMAIN TREE PROTECTIONFENCE PER DETAILXXXXXXXXTREE REMOVALSAREA, TYP.TREE REMOVALSAREA, TYP.PROPOSED BUILDINGEXISTING TREES TO REMAIN EXISTING TREESTO REMAINTREE PROTECTIONFENCE PER DETAILXXXXXXXXXXXXXXXXXXXXXXXXXXXXEXISTING TREESTO REMAIN750' SOUND BUFFER LINE 750' SOUND BUFFER LINE 750' SOUND BUFFER LINEX:\Projects\2024 Projects\24-127 Lake Elmo Elementary School, Lake Elmo, MN\24127_LANDSCAPE_24x36 City Submittal_08-23-2024.dwg RevisionsDescriptionDateNumFEDCBA12345678MNNorthCheck:Drawn:Date:Comm:BHHL08-23-202412236128Stillwater Area PublicSchools ISD #834FFE Blinds Title -NEW LAKE ELMOELEMENTARYSCHOOL1875 Greeley Street SouthStillwater, MN 550823524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Benjamin D. Hartberg, PLADate: Lic. No.:xx.xx.xxxx48084I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Landscape Architectunder the laws of the state of Minnesota.DESIGN GROUPLandscape ArchitecturePlanning475 Cleveland Avenue N. | Suite 101ASaint Paul, MN 55104651.788.9018 | calyxdesigngroup.com C 2024 CALYX Design Group, LLC. All rights reserved.L1.000TREEPRESERVATION& MITIGATIONPLANTREE REMOVAL AREASymbols Legend:TREE PROTECTION FENCEA SUBSTANTIAL AMOUNT OF EXISTING TREES ONTHIS PROPERTY WERE PLANTED BY THE PREVIOUSLANDOWNER BETWEEN 1992 & 2003.REFER TO THE L3.000 SHEET SERIES FORTREE INVENTORY CHARTLANDOWNER PLANTED TREENATURALLY OCCURRING TREE1L1.000TYPICAL TREE PROTECTION DETAILNOT TO SCALEDRIP LINENOTE: TREE PROTECTION SHALL BE PROVIDED BY CONTRACTOR AS REQUIRED TO AIDE IN SURVIVABILITY OFEXISTING TREES TO REMAIN. DO NOT STORE MATERIALS OR DRIVE EQUIPMENT WITHIN THE TREE DRIP LINE ASDESIGNATED ABOVE. MAINTAIN THE FENCE INTEGRITY AT ALL TIMES THROUGHOUT CONSTRUCTION.TREE PROTECTION FENCE SHALL BE IN PLACE PRIOR TO THE START OF DEMOLITION.PLANELEVATION4' SNOW FENCE WITH POSTS @8' O.C. (MAX.) AT EDGE OFCRITICAL ROOT ZONE (A RADIUSOF 1-1/2 FEET FOR EVERY 1INCH OF DBH FOR THE TREETRUNK OF THE TREE BEINGPRESERVED. REFER TO PLANFOR LOCATION.TREE NOTED TO REMAINCONTRACTOR(S) ARE RESPONSIBLEFOR OBTAINING UTILITY LOCATES,INCLUDE PRIVATE UTILITIES SUCH ASPHONE AND CABLE. CALL NO LESSTHAN 48 HOURS IN ADVANCE.Total Significant Tree Inches On-Site: 29,296Total Significant Inches Removed: 21,392Municipal Tree Mitigation Site Data:Total Significant Inches on Site Planted by Previous Owner:27,327Total 'Previous Owner Planted' Significant Inches Removed:20,653Total 'Previous Owner Planted' Significant Inches to Remain as Credit:6,67430% Allowed Removal: 590[ (Total Significant Inches On-Site) - (Total Significant Inches on Site Planted by Previous Owner) ] x 0.30Municipal Tree Mitigation Calculation:29,296 - 27,327 = 1,969 x 0.30 = 590Inches Requiring Mitigation: 149[ (Total Significant Inches Removed) - (Total 'Previous Owner Planted' Significant Inches Removed) ] - 30% Allowed Removal21,392 - 20,653 = 739 - 590 = 149Remaining Inches Requiring Mitigation after Credit is Applied: 0Replacement Inches Requiring Mitigation - Previous Owner Planted Significant Inches to Remain as Credit149 - 6,674 = 0Tree Mitigation: 930 930930930930925920910930930 9309259 2 5925 9309259209209259209159159209259309159209159059009 3 09309359409309359359409309309 2 5920910900915905920915910 9059009209159159209259209259259259309 2 5 9 2 5 930 925930915920915 9209209259209 3 5 93 0 940 930 9309289299289289279269249269299299289279 2 7 9 2 6 924 923 922 921 9 2 8928927926 9269279289299289279269299239229219219229239249259269279289299 2 8 92 7 9269249239229219199189179169149169179189199219219229239249199189179169149139129119099089079069049039029018998989 2 6 9 2 7 9 2 8 9 2 9 9 3 19299329339349369379389399419429299319329339349329339349369379389399419429289299319299289279269 2 6924923922921919918918919918916914912908906904902898917913911909907903901899 92892792692292191991891791691491391291190990890790690490390290189989891991891791691691791891992192292792692492392292192 4 92492692692692792892 9 9299289 2 8 9 2 7 9 2 6 9 2 7 9 2 6 9 2 4923922 929928927926924923922921929928927926916917918919921 92291491391291491391292191991992192492391992193 8 9 3 693 7 93 4 93 3 93 2 93 1 937 938 939 941 942 936 936 937938 929 929 931 931 897894896897895893 896895894893892891897896895894893139101310101010101010101010101035425493 0932 93 4 93 6 938 938936934932 926 926 924 922 91 8 920 91 6 914 912 910 908910 912 914916918920922922920918916914 9 1 2 9 1 0908910 912914916918920922 924926924922920924926928930932934936938940938 936 9109 1 4916 9209 3 4 9 3 6 942944944942940938936934932930918 916 914 912 9 3 8914912 910908906904 920 930 940940 938918920916922924924922920 93 0 9 2 8 92 6 92 0 91 8 91 6 91 4 91 2 91 0908 9 0 6 9 0 4 904906908918 920 922906 908 910 912 914 916 918 920 922 924926928930 932934932930928926924922920916918914912910908906 910 910 91 2 914 916 908906 904902900910910914920922924922914912910916918920922928 9269289 2 8 9 2 6924922 922920 918918918926922920916914912914916914912910912912914912914916914916918920922912924926 9 2 6 92 8 93 0 932930934928926924920920922924916918920922920930918910898 900 90290489890091090091093092091092093092492 2 92 4 9189 3 2 922924926928920918918920922 920922924924926 928930932934936 942 940 936 934 934 936 938 934 936 938 930912 932 934928922924926922920918918922924926920920922924918924926926922 9008989169189249269 3 2 934936930928926924932930898 908 9 0 6 904 940 906PROPOSED BUILDINGX:\Projects\2024 Projects\24-127 Lake Elmo Elementary School, Lake Elmo, MN\24127_LANDSCAPE_24x36 _CD BID SET.dwg RevisionsDescriptionDateNumFEDCBA12345678MNNorthCheck:Drawn:Date:Comm:BHHL10-09-202412236128Stillwater Area PublicSchools ISD #834FFE Blinds Title -NEW LAKE ELMOELEMENTARYSCHOOL1875 Greeley Street SouthStillwater, MN 550823524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Benjamin D. Hartberg, PLADate: Lic. No.:xx.xx.xxxx48084I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Landscape Architectunder the laws of the state of Minnesota.DESIGN GROUPLandscape ArchitecturePlanning475 Cleveland Avenue N. | Suite 101ASaint Paul, MN 55104651.788.9018 | calyxdesigngroup.com C 2024 CALYX Design Group, LLC. All rights reserved.10928 10th Street NorthLake Elmo, MN 55042OVERVIEWLANDSCAPEEXHIBITPROPOSED BUILDINGLAKE ELMO AVENUE NORTH10TH STREET NORTH 930 930930930930925920910930930 9309259 2 5925 9309259289299289289279269249269299299289279 2 7 9 2 6 924 923 922 921 9 2 8928927926 9269279289299289279269299239229219209209219229239249259269279289299 2 8 92 7 9269259249239229219209199189179169159159209259309149159169179189199209219219229239249199189179169159149139129119099089079069059049039029019008998989 2 6 9 2 7 9 2 8 9 2 9 9 3 0 9 3 19299309329339349359369379389399409419429299309319329339349359329339349359369379389399409419429289299309319309299289279269 2 6 9 2 5924923922921920919918918919918916914912910908906904902900898917915913911909907905903901899 92892792692292192091991891791691591491391291191090990890790690590490390290190089989892091991891791691591591691791891992092192292792692592492392292192092 4 92492592692692592592692792892 9 9299289309 2 8 9 2 7 9 2 6 9 2 7 9 2 6 9 2 5 9 2 5 9 2 4923922 930 929928927926925924923922921930929928927926915916917918919920921 92291591491391291191090990891491391291191090992192091991992092192592492391992092193 8 9 3 693 7 9 3 5 93 4 93 3 93 2 93 1 93 0 937 938 939940941942 936 936 937938 930 929 929930931 9311391013101010101010101010101010354254 93 0932 93 4 93 6 938 938936934932 926 926 924 922 91 8 920 91 6 914 912 910 908910 912 914916918920922922920918916914 9 1 2 9 1 0908910 912914916918920922 924926924922920924926928930932934936938940938 936 9109 1 4916 9209 3 4 9 3 6 942944944942940938936934932930918 916 914 912 9 3 8914912 910908906904 920 930 940940 938918920916922924924922920 93 0 9 2 8 92 6 92 0 91 8 91 6 91 4 91 2 91 0908 9 0 6 9 0 4 904906908918 920 922906 908 910 912 914 916 918 920 922 924926928930 932934932930928926924922920916918914912910908906 910 910 91 2 914 916 908906 904902900910910914920922924922914912910916918920922928 9269289 2 8 9 2 6924922 922920 918918918926922920916914912914916914912910912912914912914916914916918920922912924926 9 2 6 92 8 93 0 932930934928926924920920922924916918920922920930918910898 900 90290489890091090091093092091092093092492 2 92 4 9189 3 2 922924926928920918918920922 920922924924926 928930932934936 942 940 936 934 934 936 938 934 936 938 930912 932 934928922924926922920918918922924926920920922924918924926926922 9008989169189249269 3 2 934936930928926924932930898 908 9 0 6 904 940 906PROPOSED BUILDINGGeneral Notes:X:\Projects\2024 Projects\24-127 Lake Elmo Elementary School, Lake Elmo, MN\24127_LANDSCAPE_24x36 City Submittal_08-23-2024.dwg RevisionsDescriptionDateNumFEDCBA12345678MNNorthCheck:Drawn:Date:Comm:BHHL08-23-202412236128Stillwater Area PublicSchools ISD #834FFE Blinds Title -NEW LAKE ELMOELEMENTARYSCHOOL1875 Greeley Street SouthStillwater, MN 550823524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Benjamin D. Hartberg, PLADate: Lic. No.:xx.xx.xxxx48084I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Landscape Architectunder the laws of the state of Minnesota.DESIGN GROUPLandscape ArchitecturePlanning475 Cleveland Avenue N. | Suite 101ASaint Paul, MN 55104651.788.9018 | calyxdesigngroup.com C 2024 CALYX Design Group, LLC. All rights reserved.1. See Civil Engineer's plans for site plan layout and dimensions.2. Contractor to coordinate all work in the city right-of-way with City of Lake Elmo Public Works Department.3. See Architect's plans for additional requirements regarding the site plan layout.4. Place a minimum of 6" topsoil or slope dressing on all areas disturbed by construction, including right-of-way boulevards, unless specified otherwise.5. See Civil Engineer's Plans for proposed utilities.General Notes:LANDSCAPE AREA 'A'SHEET L1.002L1.001OVERVIEWLANDSCAPEPLANCONTRACTOR(S) ARE RESPONSIBLEFOR OBTAINING UTILITY LOCATES,INCLUDE PRIVATE UTILITIES SUCH ASPHONE AND CABLE. CALL NO LESSTHAN 48 HOURS IN ADVANCE.LANDSCAPE AREA 'C'SHEET L1.004LANDSCAPE AREA 'E'SHEET L1.006LANDSCAPE AREA 'F'SHEET L1.007LANDSCAPE AREA 'D'SHEET L1.005LANDSCAPE AREA 'B'SHEET L1.003Landscape Requirements:Site DataStreet Frontage: approx. 2,790 lineal feetAcres of Disturbance: approx. 34 acresParking Stalls: 224Existing Significant Trees to Remain On Site as Credit: 719Required Trees1 Tree per 50' of street frontage2,790 / 50 = 55 Trees(+)5 Trees per acre of disturbance5 x 34 = 170 Trees(=)225 Total Required Trees(-)719 Existing Significant Trees to Remain On Site(=)0 Remaining Trees Owed253 Trees Proposed per PlanNotes25% minimum of required landscape trees shall be coniferous25% minimum of required landscape trees shall be deciduous15% maximum of required landscape trees may be ornamental1 shade tree per 15 parking lot stalls minimum224 stalls / 15 = 15 Shade TreesLAKE ELMO AVENUE NORTH10TH STREET NORTH 9 2 5 9 2 6 9 2 4 9 2 3 9 2 2 9 2 1 930 929 928 927 926 925 924 923 922 921 908906 908 910 912 914 916 918 920 922 924 926 928 930 932934932 930928926924922920916918914912910908 924940 MNDOT SEEDTURF SEEDAG LIMEBACKSTOP PERCIVIL PLANSEXISTING WOODSTO REMAINEXISTING LANDSCAPETO REMAINEXISTING LANDSCAPETO REMAINTURF SOD SEED / SEED LINEFENCE PERCIVIL PLANSTEAM BENCHESTEAM BENCHESTEAM BENCHESKICKBALL FIELDEXISTING WOODSTO REMAIN750' SOUND BUFFER LINETYPE 'A'MNDOT SEEDTYPE 'A'MNDOT SEEDTYPE 'B'MNDOT SEEDTYPE 'A'MATCH LINEMATCH LINEMATCH LINEMATCH LINEMATCH LINE MATCH LINE X:\Projects\2024 Projects\24-127 Lake Elmo Elementary School, Lake Elmo, MN\24127_LANDSCAPE_24x36 City Submittal_08-23-2024.dwg RevisionsDescriptionDateNumFEDCBA12345678MNNorthCheck:Drawn:Date:Comm:BHHL08-23-202412236128Stillwater Area PublicSchools ISD #834FFE Blinds Title -NEW LAKE ELMOELEMENTARYSCHOOL1875 Greeley Street SouthStillwater, MN 550823524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Benjamin D. Hartberg, PLADate: Lic. No.:xx.xx.xxxx48084I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Landscape Architectunder the laws of the state of Minnesota.DESIGN GROUPLandscape ArchitecturePlanning475 Cleveland Avenue N. | Suite 101ASaint Paul, MN 55104651.788.9018 | calyxdesigngroup.com C 2024 CALYX Design Group, LLC. All rights reserved.L1.002LANDSCAPELAYOUT PLANAREA 'A'CONTRACTOR(S) ARE RESPONSIBLEFOR OBTAINING UTILITY LOCATES,INCLUDE PRIVATE UTILITIES SUCH ASPHONE AND CABLE. CALL NO LESSTHAN 48 HOURS IN ADVANCE.General Notes:1. See Civil Engineer's plans for site plan layout and dimensions.2. Contractor to coordinate all work in the city right-of-way with City of Lake Elmo Public Works Department.3. See Architect's plans for additional requirements regarding the site plan layout.4. Place a minimum of 6" topsoil or slope dressing on all areas disturbed by construction, including right-of-way boulevards, unless specified otherwise.5. See Civil Engineer's Plans for proposed utilities.General Notes:MNDOT Seed Type 'A' per ScheduleMNDOT Seed Type 'B' per ScheduleMNDOT Seed Type 'C' per ScheduleLive Plugs per ScheduleTurf Sod per SpecificationsTurf Seed per SpecificationsLandscape Legend: 9259209109259259269249269279289279269239229219209209219229239249259269279289299 2 7 9269259249239229219209199189179169159159209259309149159169179189199209219219229239249199189179169159149139129119099089079069059049039029019008998989 2 6 9 2 7 9 2 8 9 2 9 9 3 0 9 3 1 93 4 93 3 93 2 93 1 93 0 930 929 929930931 93113 93 0 932 93 4 9109 1 4916 9209 3 4 9 3 0 9 2 8 92 6 9 2 0 91 8 9 1 6 914912910908 906 904 904906908918 92 0 922906 908 910920930 92 2 92 4 9189 3 2 922924926928924926 928930SOFT SURFACE PLAY AREABY OTHERSGAGA PITS PER SPECIFICATIONSBASKETBALL STANDARDSPER SPECIFICATIONSSTRIPING PER CIVILTURF SODMNDOT SEEDMNDOT SEEDMNDOT SEEDMNDOT SEEDMNDOT SEEDTURF SOD PAVING PERCIVIL PLANSPAVING PER CIVIL PLANSEXISTING WOODSTO REMAINSEED / SOD LINE6' TURF SOD MOW STRIP6' TURF SOD MOW STRIPFENCING PER CIVILLIVE PLUGSLIVE PLUGSMNDOT SEEDTURF SODTURF SODSEED / SOD LINE6' TURF SOD MOW STRIPPAVING PERCIVIL PLANSPAVING PER CIVIL PLANSSNOWSTORAGEAREA750' SOUND BUFFER LINE MNDOT SEEDTYPE 'A'TYPE 'A'TYPE 'A'TYPE 'A'TYPE 'A'TYPE 'B'MNDOT SEEDTYPE 'C'MNDOT SEEDTYPE 'C'6' TURF SOD MOW STRIPFENCING PER CIVILEXISTING WOODSTO REMAINMATCH LINEMATCH LINEMATCH LINEMATCH LINEMATCH LINEMATCH LINEX:\Projects\2024 Projects\24-127 Lake Elmo Elementary School, Lake Elmo, MN\24127_LANDSCAPE_24x36 City Submittal_08-23-2024.dwg RevisionsDescriptionDateNumFEDCBA12345678MNNorthCheck:Drawn:Date:Comm:BHHL08-23-202412236128Stillwater Area PublicSchools ISD #834FFE Blinds Title -NEW LAKE ELMOELEMENTARYSCHOOL1875 Greeley Street SouthStillwater, MN 550823524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Benjamin D. Hartberg, PLADate: Lic. No.:xx.xx.xxxx48084I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Landscape Architectunder the laws of the state of Minnesota.DESIGN GROUPLandscape ArchitecturePlanning475 Cleveland Avenue N. | Suite 101ASaint Paul, MN 55104651.788.9018 | calyxdesigngroup.com C 2024 CALYX Design Group, LLC. All rights reserved.L1.003LANDSCAPELAYOUT PLANAREA 'B'CONTRACTOR(S) ARE RESPONSIBLEFOR OBTAINING UTILITY LOCATES,INCLUDE PRIVATE UTILITIES SUCH ASPHONE AND CABLE. CALL NO LESSTHAN 48 HOURS IN ADVANCE.General Notes:1. See Civil Engineer's plans for site plan layout and dimensions.2. Contractor to coordinate all work in the city right-of-way with City of Lake Elmo Public Works Department.3. See Architect's plans for additional requirements regarding the site plan layout.4. Place a minimum of 6" topsoil or slope dressing on all areas disturbed by construction, including right-of-way boulevards, unless specified otherwise.5. See Civil Engineer's Plans for proposed utilities.General Notes:MNDOT Seed Type 'A' per ScheduleMNDOT Seed Type 'B' per ScheduleMNDOT Seed Type 'C' per ScheduleLive Plugs per ScheduleTurf Sod per SpecificationsTurf Seed per SpecificationsLandscape Legend: 9259 2 7 9 2 6 9 2 8928927926930 929 928 927 926 904922 910908906930918910898 900 902904898900910930920900MNDOT SEEDTURF SEEDAG LIMEBACKSTOP PERCIVIL PLANSEXISTING LANDSCAPETO REMAINTURF SOD TURF SOD TURF SOD PAVING PER CIVIL PLANSSEED / SOD LINESEED / SEED LINE6' TURF SOD MOW STRIP6' TURF SOD MOW STRIPTEAM BENCHESTEAM BENCHESKICKBALL FIELDEXISTING WOODSTO REMAINEXISTING WOODSTO REMAIN75 0 ' S O U N D B U F F E R L I N E TYPE 'A'MNDOT SEEDTYPE 'A'MATCH LINEMATCH LINEMATCH LINEMATCH LINEMATCH LINEMATCH LINEMATCH LINEMATCH LINEMATCH LINE MATCH LINE MATCH LINE MATCH LINE X:\Projects\2024 Projects\24-127 Lake Elmo Elementary School, Lake Elmo, MN\24127_LANDSCAPE_24x36 City Submittal_08-23-2024.dwg RevisionsDescriptionDateNumFEDCBA12345678MNNorthCheck:Drawn:Date:Comm:BHHL08-23-202412236128Stillwater Area PublicSchools ISD #834FFE Blinds Title -NEW LAKE ELMOELEMENTARYSCHOOL1875 Greeley Street SouthStillwater, MN 550823524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Benjamin D. Hartberg, PLADate: Lic. No.:xx.xx.xxxx48084I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Landscape Architectunder the laws of the state of Minnesota.DESIGN GROUPLandscape ArchitecturePlanning475 Cleveland Avenue N. | Suite 101ASaint Paul, MN 55104651.788.9018 | calyxdesigngroup.com C 2024 CALYX Design Group, LLC. All rights reserved.L1.004LANDSCAPELAYOUT PLANAREA 'C'CONTRACTOR(S) ARE RESPONSIBLEFOR OBTAINING UTILITY LOCATES,INCLUDE PRIVATE UTILITIES SUCH ASPHONE AND CABLE. CALL NO LESSTHAN 48 HOURS IN ADVANCE.General Notes:1. See Civil Engineer's plans for site plan layout and dimensions.2. Contractor to coordinate all work in the city right-of-way with City of Lake Elmo Public Works Department.3. See Architect's plans for additional requirements regarding the site plan layout.4. Place a minimum of 6" topsoil or slope dressing on all areas disturbed by construction, including right-of-way boulevards, unless specified otherwise.5. See Civil Engineer's Plans for proposed utilities.General Notes:MNDOT Seed Type 'A' per ScheduleMNDOT Seed Type 'B' per ScheduleMNDOT Seed Type 'C' per ScheduleLive Plugs per ScheduleTurf Sod per SpecificationsTurf Seed per SpecificationsLandscape Legend: 930 9 3 0 930930930930930 9309309289299289289279299299289269279289299289299 2 8 9 2 7929 93093293393493593693793893994094194292993093193293393493593092992892892 9 92992893093 8 9 3 6 93 7 9 3 5 93 4 937 938 939940941942 936 936 937938 93 4 9 3 6 93 8 9 3 4 9 3 6 9429449449 3 8 9 3 0930920930 932934936 942 940 932 930928926924PROPOSED BUILDINGOUTDOOR CLASSROOMENLARGEMENT SHEET L1.008TURF SODTURF SODTURF SODTURF SODTURF SODTURF SODTURF SODTURF SODTURF SODTURF SODTURF SODTURF SOD PAVING PER CIVIL PLANS PAVING PERCIVIL PLANSPAVING PERCIVIL PLANSMNDOT SEEDEXISTING WOODSTO REMAINSEED / SOD LINE6' TURF SOD MOW STRIP6' TURF SOD MOW STRIP6' TURF SOD MOW STRIPFLAGPOLE PER ARCHITECTURALCAFE SEATINGWASTE RECEPTACLESPRAIRIE THEMEDPERENNIAL BEDWASTE RECEPTACLESPERENNIAL BED TRASH ENCLOSUREBY OTHERSBIKE BOLLARDSBACKED BENCHPRAIRIE THEMEDEXISTING WOODSTO REMAINTURF SODTURF SODTURF SODSNOWSTORAGE AREASNOWSTORAGEAREAMNDOT SEEDTYPE 'A'MNDOT SEEDTYPE 'C'MNDOT SEEDTYPE 'C'MNDOT SEEDTYPE 'A'ENTRYTYPE 'A'MATCH LINEMATCH LINEMATCH LINEMATCH LINEMATCH LINEMATCH LINE MATCH LINEMATCH LINEMATCH LINEMATCH LINE 6' TURF SOD MOW STRIPX:\Projects\2024 Projects\24-127 Lake Elmo Elementary School, Lake Elmo, MN\24127_LANDSCAPE_24x36 City Submittal_08-23-2024.dwg RevisionsDescriptionDateNumFEDCBA12345678MNNorthCheck:Drawn:Date:Comm:BHHL08-23-202412236128Stillwater Area PublicSchools ISD #834FFE Blinds Title -NEW LAKE ELMOELEMENTARYSCHOOL1875 Greeley Street SouthStillwater, MN 550823524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Benjamin D. Hartberg, PLADate: Lic. No.:xx.xx.xxxx48084I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Landscape Architectunder the laws of the state of Minnesota.DESIGN GROUPLandscape ArchitecturePlanning475 Cleveland Avenue N. | Suite 101ASaint Paul, MN 55104651.788.9018 | calyxdesigngroup.com C 2024 CALYX Design Group, LLC. All rights reserved.L1.005LANDSCAPELAYOUT PLANAREA 'D'CONTRACTOR(S) ARE RESPONSIBLEFOR OBTAINING UTILITY LOCATES,INCLUDE PRIVATE UTILITIES SUCH ASPHONE AND CABLE. CALL NO LESSTHAN 48 HOURS IN ADVANCE.General Notes:1. See Civil Engineer's plans for site plan layout and dimensions.2. Contractor to coordinate all work in the city right-of-way with City of Lake Elmo Public Works Department.3. See Architect's plans for additional requirements regarding the site plan layout.4. Place a minimum of 6" topsoil or slope dressing on all areas disturbed by construction, including right-of-way boulevards, unless specified otherwise.5. See Civil Engineer's Plans for proposed utilities.General Notes:MNDOT Seed Type 'A' per ScheduleMNDOT Seed Type 'B' per ScheduleMNDOT Seed Type 'C' per ScheduleLive Plugs per ScheduleTurf Sod per SpecificationsTurf Seed per SpecificationsLandscape Legend: 923922921920919918918 9 1 9 9 1 8 9 1 6 9 1 4 9 1 2 9 1 0 9 0 8 9 0 6 9 0 4 9 0 2 9 0 0 8 9 8 9179159139119099079059039018999229219209199189179169159149139129119109099089079069059049039029019008998989209199189179169159159169179189199209219229159169179189199209219229159149139129119109099089149139129119109099219209199199209219229209049029 0 0 910910914920922924922914912910918920928918918918926922920916914912912 9109009109209108989169189249268 9 8 9 0 6 9 0 4 MNDOT SEEDMNDOT SEEDMNDOT SEEDSEED / SOD LINE6' TURF SOD MOW STRIPPAVING PER CIVIL PLANS6' TURF SOD MOW STRIPMNDOT SEEDEXISTING WOODSTO REMAINEXISTING WOODSTO REMAINPAVING PER CIVIL PLANSMNDOT SEEDLIVE PLUGSMONUMENT SIGNBY OTHERS6' TURF SOD MOW STRIPSNOW STORAGEAREA750' SOUND BUFFER LINE 7 5 0 ' SOUND BU F F ER L IN EMULCH & EDGERPER NOTESTYPE 'A'TYPE 'A'TYPE 'A'TYPE 'A'MNDOT SEEDTYPE 'C'MNDOT SEEDTYPE 'C'MNDOT SEEDTYPE 'C'MNDOT SEEDTYPE 'A'LIVE PLUGSLIVE PLUGSTURF SODTURF SODTURF SODMATCH LINEMATCH LINEMATCH LINEMATCH LINEMATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE X:\Projects\2024 Projects\24-127 Lake Elmo Elementary School, Lake Elmo, MN\24127_LANDSCAPE_24x36 City Submittal_08-23-2024.dwg RevisionsDescriptionDateNumFEDCBA12345678MNNorthCheck:Drawn:Date:Comm:BHHL08-23-202412236128Stillwater Area PublicSchools ISD #834FFE Blinds Title -NEW LAKE ELMOELEMENTARYSCHOOL1875 Greeley Street SouthStillwater, MN 550823524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Benjamin D. Hartberg, PLADate: Lic. No.:xx.xx.xxxx48084I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Landscape Architectunder the laws of the state of Minnesota.DESIGN GROUPLandscape ArchitecturePlanning475 Cleveland Avenue N. | Suite 101ASaint Paul, MN 55104651.788.9018 | calyxdesigngroup.com C 2024 CALYX Design Group, LLC. All rights reserved.L1.006LANDSCAPELAYOUT PLANAREA 'E'CONTRACTOR(S) ARE RESPONSIBLEFOR OBTAINING UTILITY LOCATES,INCLUDE PRIVATE UTILITIES SUCH ASPHONE AND CABLE. CALL NO LESSTHAN 48 HOURS IN ADVANCE.General Notes:1. See Civil Engineer's plans for site plan layout and dimensions.2. Contractor to coordinate all work in the city right-of-way with City of Lake Elmo Public Works Department.3. See Architect's plans for additional requirements regarding the site plan layout.4. Place a minimum of 6" topsoil or slope dressing on all areas disturbed by construction, including right-of-way boulevards, unless specified otherwise.5. See Civil Engineer's Plans for proposed utilities.General Notes:MNDOT Seed Type 'A' per ScheduleMNDOT Seed Type 'B' per ScheduleMNDOT Seed Type 'C' per ScheduleLive Plugs per ScheduleTurf Sod per SpecificationsTurf Seed per SpecificationsLandscape Legend: 9 3 0 932933934935936937938939940941942928929930931930929928927926926925924923922 928927926922921920919918917916915914913912911910909908907906905904903902901900899898919917915916918920922927926925924923922921920924924 92592692692592592692792892 9 9 2 8 9 2 7 9 2 6 9 2 7 9 2 6 9 2 5 9 2 5 9 2 4923922922921920919919920921 92592492391992092191013101010101010101010101010354254938936934932 944942940938936934932930918 916 914 912 910910912914916 908906 9049 2 8 9 2 6924 922920910920918918920922 920922924940 936 934928922924926924926 934936932930908 PAVING PER CIVIL PLANSTURF SODTURF SODTURF SODTURF SODMNDOT SEEDPAVING PER CIVIL PLANSPAVING PER CIVIL PLANSMNDOT SEEDMNDOT SEEDMNDOT SEEDMNDOT SEEDEXISTING WOODS TO REMAINSEED / SOD LINESEED / SOD LINE6' TURF SOD MOW STRIP6' TURF SOD MOW STRIP6' TURF SOD MOW STRIPLIVE PLUGSLIVE PLUGSMNDOT SEED6' TURF SOD MOW STRIPSEED / SOD LINE6' TURF SOD MOW STRIPSNOWSTORAGE AREASNOWSTORAGE AREABIKE BOLLARDSSNOWSTORAGE AREATURF SODPAVING PER CIVIL PLANSPAVING PER CIVIL PLANSLIFT STATION BY OTHERSSNOWSTORAGE AREASNOWSTORAGE AREATYPE 'A'TYPE 'A'TYPE 'A'TYPE 'A'TYPE 'A'TYPE 'C'MNDOT SEEDTYPE 'C'MNDOT SEEDTYPE 'C'MNDOT SEEDTYPE 'A'LIVE PLUGSLIVE PLUGSMATCH LINEMATCH LINEMATCH LINEMATCH LINEMATCH LINEMATCH LINE 6' TURF SOD MOW STRIP6' TURF SOD MOW STRIPX:\Projects\2024 Projects\24-127 Lake Elmo Elementary School, Lake Elmo, MN\24127_LANDSCAPE_24x36 City Submittal_08-23-2024.dwg RevisionsDescriptionDateNumFEDCBA12345678MNNorthCheck:Drawn:Date:Comm:BHHL08-23-202412236128Stillwater Area PublicSchools ISD #834FFE Blinds Title -NEW LAKE ELMOELEMENTARYSCHOOL1875 Greeley Street SouthStillwater, MN 550823524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Benjamin D. Hartberg, PLADate: Lic. No.:xx.xx.xxxx48084I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Landscape Architectunder the laws of the state of Minnesota.DESIGN GROUPLandscape ArchitecturePlanning475 Cleveland Avenue N. | Suite 101ASaint Paul, MN 55104651.788.9018 | calyxdesigngroup.com C 2024 CALYX Design Group, LLC. All rights reserved.L1.007LANDSCAPELAYOUT PLANAREA 'F'CONTRACTOR(S) ARE RESPONSIBLEFOR OBTAINING UTILITY LOCATES,INCLUDE PRIVATE UTILITIES SUCH ASPHONE AND CABLE. CALL NO LESSTHAN 48 HOURS IN ADVANCE.General Notes:1. See Civil Engineer's plans for site plan layout and dimensions.2. Contractor to coordinate all work in the city right-of-way with City of Lake Elmo Public Works Department.3. See Architect's plans for additional requirements regarding the site plan layout.4. Place a minimum of 6" topsoil or slope dressing on all areas disturbed by construction, including right-of-way boulevards, unless specified otherwise.5. See Civil Engineer's Plans for proposed utilities.General Notes:MNDOT Seed Type 'A' per ScheduleMNDOT Seed Type 'B' per ScheduleMNDOT Seed Type 'C' per ScheduleLive Plugs per ScheduleTurf Sod per SpecificationsTurf Seed per SpecificationsLandscape Legend: 6" HYDRANTWITH GVWASTE RECEPTACLESPAVING PERCIVIL PLANSTURF SODTURF SODTURF SODENTRYPRAIRIE THEMEDPERENNIAL BEDSTAMPED INTEGRALCOLOR CONCRETELEARNING BOARDCABINET PERARCHITECTURALBENCHES PER SPECX:\Projects\2024 Projects\24-127 Lake Elmo Elementary School, Lake Elmo, MN\24127_LANDSCAPE_24x36 City Submittal_08-23-2024.dwg RevisionsDescriptionDateNumFEDCBA12345678MNNorthCheck:Drawn:Date:Comm:BHHL08-23-202412236128Stillwater Area PublicSchools ISD #834FFE Blinds Title -NEW LAKE ELMOELEMENTARYSCHOOL1875 Greeley Street SouthStillwater, MN 550823524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Benjamin D. Hartberg, PLADate: Lic. No.:xx.xx.xxxx48084I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Landscape Architectunder the laws of the state of Minnesota.DESIGN GROUPLandscape ArchitecturePlanning475 Cleveland Avenue N. | Suite 101ASaint Paul, MN 55104651.788.9018 | calyxdesigngroup.com C 2024 CALYX Design Group, LLC. All rights reserved.OUTDOOR CLASSROOM ENLARGEMENT1L1.008LANDSCAPEENLARGEMENTSCONTRACTOR(S) ARE RESPONSIBLEFOR OBTAINING UTILITY LOCATES,INCLUDE PRIVATE UTILITIES SUCH ASPHONE AND CABLE. CALL NO LESSTHAN 48 HOURS IN ADVANCE.SYMBOLCODEBOTANICAL NAMECOMMON NAMESIZECONTAINERQTYREMARKSEVERGREEN TREESPdPicea glauca `Densata`Black Hills Spruce6` Hgt.B&B13Pn3Pinus nigraAustrian Pine6` Hgt.B&B10ORNAMENTAL TREESMSMalus x `Spring Snow`Spring Snow Crab Apple2" Cal.B&B23SISyringa reticulata `Ivory Silk`Ivory Silk Japanese Tree Lilac2" Cal.B&B21OVERSTORY TREEAsAcer x freemanii `Sienna`Sienna Glen Maple2.5" Cal.B&B37BrBetula nigraRiver Birch6` Hgt.B&B11Clump FormCoCeltis occidentalisCommon Hackberry2.5" Cal.B&B24GiGleditsia triacanthos inermis `Skycole` TMSkyline Thornless Honey Locust2.5" Cal.B&B22GDGleditsia triacanthos inermis 'Draves' TMStreet Keeper Honey Locust2.5" Cal.B&B8Ov2Ostrya virginianaIronwood2.5" Cal.B&B41PtPopulus tremuloidesQuaking Aspen2.5" Cal.B&B10QBQuercus bicolorSwamp White Oak2.5" Cal.B&B6QrQuercus rubraNorthern Red Oak2.5" Cal.B&B27Spring DugANNUALS/PERENNIALSHa2Hemerocallis x `Happy Returns`Happy Returns Daylily1 gal.Pot10GRASSESCkCalamagrostis x acutiflora `Karl Foerster`Feather Reed Grass1 gal.Pot6PLANT SCHEDULE X:\Projects\2024 Projects\24-127 Lake Elmo Elementary School, Lake Elmo, MN\24127_LANDSCAPE_24x36 City Submittal_08-23-2024.dwg RevisionsDescriptionDateNumFEDCBA12345678MNNorthCheck:Drawn:Date:Comm:BHHL08-23-202412236128Stillwater Area PublicSchools ISD #834FFE Blinds Title -NEW LAKE ELMOELEMENTARYSCHOOL1875 Greeley Street SouthStillwater, MN 550823524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Benjamin D. Hartberg, PLADate: Lic. No.:xx.xx.xxxx48084I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Landscape Architectunder the laws of the state of Minnesota.DESIGN GROUPLandscape ArchitecturePlanning475 Cleveland Avenue N. | Suite 101ASaint Paul, MN 55104651.788.9018 | calyxdesigngroup.com C 2024 CALYX Design Group, LLC. All rights reserved.NOT TO SCALEDECIDUOUS TREE PLANTING DETAILNOT TO SCALETYP. SHRUB PLANTING DETAILNOT TO SCALETYP. PERENNIAL PLANTING DETAILNOT TO SCALETYPICAL MULCH & EDGER DETAILPERENNIAL / PLUG PLANTEDGE CONDITION VARIES - SEE PLAN.MULCH PER NOTES.PLANTING SOIL PER NOTES.CONTRACTOR PREPARED SUBGRADENOTE:HAND-LOOSEN ROOTS OF CONTAINERIZEDPLANT MATERIALS.............................................................ON CENTER SPACING AS STATED ON PLANWIDTH OF HOLE EXCAVATION SHALL EXTEND A MINIMUM OF 6INCHES BEYOND THE PLANTS ROOT SYSTEM.3'' DEPTH WATERING BASINPLANTING SOIL PER NOTES.MULCH PER NOTESFINISHED GRADEPLANT ACCORDING TO PLANTING DETAILS FOR ISOLATEDPLANTING LOCATIONS WITH THE EXCEPTION OF REDUCEDHOLE WIDTH.DO NOT HEAVILY PRUNE THE TREE AT PLANTING.PRUNE ONLY CROSSOVER LIMBS, CO-DOMINANTLEADERS, AND BROKEN OR DEAD BRANCHES. SOMEINTERIOR TWIGS AND LATERAL BRANCHES MAY BEPRUNED; HOWEVER, DO NOT REMOVE THE TERMINALBUDS OF BRANCHES THAT EXTEND TO THE EDGE OFTHE CROWN.LANDSCAPE CONTRACTOR RESPONSIBLE TOKEEP TREE STRAIGHT AND PLUM.LANDSCAPE CONTRACTOR TO INSTALL 6" WHITEPVC TRUNK GUARD AT TIME OF PLANTING.MARK THE NORTH SIDE OF THE TREE IN THENURSERY, AND ROTATE TREE TO FACENORTH AT THE SITE WHEN EVER POSSIBLE.SET TOP OF ROOT BALL FLUSH TOGRADE OR 1-2 IN. HIGHER IN SLOWLYDRAINING SOILS.EACH TREE MUST BE PLANTED SUCH THAT THETRUNK FLARE IS VISIBLE AT THE TOP OF THE ROOTBALL. TREES WHERE THE TRUNK FLARE IS NOTVISIBLE SHALL BE REJECTED. DO NOT COVER THETOP OF THE ROOT BALL WITH SOIL.4 IN. HIGH EARTH SAUCER BEYOND EDGE OFROOT BALL (FOR ISOLATED TREES ONLY).REMOVE ALL TWINE, ROPE AND WIRE, AND BURLAPFROM TOP HALF OF ROOT BALLIF PLANT IS SHIPPED WITH A WIRE BASKET AROUND THE ROOT BALL,CUT THE WIRE BASKET OFF AND REMOVE. DISPOSE OFF OFF-SITE.PLACE ROOT BALL ON UNEXCAVATED OR TAMPED SOIL. ENSURENOTE: FOR DIMENSIONS OF PLANTING AREAS SEEPLAN, SOIL BACKFILL SHALL BE GARDEN BLENDSOIL ( EQUAL MIX OF COMPOST, SAND & SOIL ) PERNOTES.TAMP SOIL AROUND ROOT BALL BASE FIRMLY WITH FOOTPRESSURE SO THAT ROOT BALL DOES NOT SHIFT.WOOD MULCH. DO NO PLACE MULCH INCONTACT WITH TREE TRUNK. MAINTAINTHE MULCH WEED-FREE FOR AFTERPLANTING.MULCH RING 4 FT. DIA. MINIMUM6 FT. DIA. PREFERREDNOTES:TREE PLANTING REQUIREMENTS:-REMOVE ALL TWINE, ROPE, WIRE, AND BURLAP FROM THETOP-HALF OF THE ROOT BALL AND DISPOSE OF OFF-SITE.-REMOVE THE WIRE BASKET DOWN TO THE SECONDHORIZONTAL WIRE FROM THE BOTTOM AND DISPOSE OFOFF-SITE.-EXPOSE ROOT FLARE AND SET AT GRADENEW PLANT HOLES PASS THE REQUIRED INFILTRATION TEST.1'-6" (MIN.)4"FACE OF WALL OR BACK OF CURB.MULCH PER LANDSCAPE NOTESEDGER PER LANDSCAPE NOTES3 OZ. NEEDLE-PUNCH FILTER FABRIC, TURN-UPFINISHED GRADEPITCH SUB-GRADE TO DRAIN AWAYFROM BUILDING WALLS & CURBS.NOTES: SEE PLAN FOR CROSS SLOPE DIRECTION.PLANT BED WIDTH VARIES, SEE PLAN.AT EDGES, OVERLAP SEAMS 4".SEE PLANSWIDTHS MAY VARYSUBMIT MULCH, EDGER, AND FABRIC SAMPLES FOR APPROVAL.DOUBLE STAKE WITH WIRE: #12 GALVANIZED WIRETHROUGH THE EYE OF THE CINCH-TIE RUBBERSUPPORT. AVOID DAMAGE TO THE ROOT BALL WITHSUPPORT STAKES.NURSERY GRADE FIBERGLASS TREE STAKES, 1116" X 6'-0"3421L2.001LANDSCAPEDETAILSCONTRACTOR(S) ARE RESPONSIBLEFOR OBTAINING UTILITY LOCATES,INCLUDE PRIVATE UTILITIES SUCH ASPHONE AND CABLE. CALL NO LESSTHAN 48 HOURS IN ADVANCE.Existing boundary, location, topographic, and utility information shown on this plan is from a field survey from James R. Hill, Inc.·Do not begin tree clearing work until tree protection measures are in place and to the permit approval of the City Forester hasbeen granted.·Critical Root Zone:Install high density polyethylene safety fence, 4 ft. high, international orange, at the Drip Line or at the Critical Root Zone whichever is greater, of trees to be preserved per detail, prior to commencement of earthwork activity. Field-staking of the fence location(s) subject to City approval.·Where silt fence and proposed tree protection fence overlap, place the tree protection fence on the outside of the silt fence,double-staked at the break-point.·Refer to Tree Protection Detail·The contractor shall prune the canopy of existing trees to remain where the canopy is in jeopardy of damage due to the newimprovements shown. It is recommended that the contractor hire a certified arborist to perform the pruning. Any branches brokenduring construction shall be immediately trimmed and wounds painted to prevent further damage.·Perform work in accordance with the laws, ordinances, rules, regulations, and orders of public authority having jurisdiction.Secure and pay for permits, governmental fees and licenses necessary for the proper execution of the demolition work.·Provide protective coverings and enclosures as necessary to prevent damage to existing work that is to remain. Existing work toremain may include items such as trees, shrubs, lawns, sidewalks, drives, curbs, utilities, buildings and/or other structures on oradjacent to the demolition site. Provide temporary fences and barricades as required for the safe and proper execution of thework and the protection of persons and property.·Remove debris, waste, and rubbish promptly from the site. On-site burial of debris is not permitted. Burn no debris on the site.Salvage material not otherwise indicated to be reused shall become the Contractor's property and is to be removed promptlyfrom the site and disposed of in strict accordance with all applicable laws, regulations, and/or statutes.·Buildings, features, surfaces, and other descriptive references shown on this drawing are for informational purposes only. Fieldverify all information relevant to the project prior to proceeding with the work. Visit the site and determine all site conditions andhazards.·This plan is a guide as to the anticipated amount of disturbance expected due to proposed improvements. The contractor isexpected to take all necessary precautions to ensure trees noted to remain are not damaged during construction. Do not storematerial or drive within the drip line of existing trees to remain. Be aware of overhead branches for clearance of material andequipment.·This plan is not a guarantee that existing trees will survive during/post construction, but rather a guide to help assure theirprotection and greatest chances of survival at the surface level. Further protection measures outside this scope could involveecologists, foresters and arborists.·Notify the Owner's Representative when tree protection fencing is taken down to perform work in conjunction with the newimprovements noted in this plan set. The contractor is responsible for re-erecting the tree protection fence immediately after thework is complete, when ever possible·Trees shown as existing to remain (be preserved) that are damaged / killed as a result of construction activities are subject toreplacement per the City Tree Replacement penalty. Replacement trees are to be paid for at no additional expense to the Owner.Tree Preservation & Protection Notes:TOMAHAWK TREE STABILIZER STAKES.MINIMUM (2) PER TREE.SODROOT BALL TO SIT ON MOUNDEDMULCH - 4" DEEP - SEE SPECPLANTING SOIL - SEE SPEC.TOPSOILSUBGRADEOTHERWISE. NO MULCH TO BE IN CONIFER TO HAVE SHREDDEDHARDWOOD MULCH UNLESS NOTED PLACE ROOT BALL SO THAT BASALFLARE IS 1" ABOVE SURROUNDINGCONTACT WITH TRUNK.NOTE: SUBGRADE, REMOVE BURLAPDRAIN SYSTEM IS NECESSARY4" DIAMETER AUGERED HOLE, 42" MIN. DEPTH. FILLED W/ 3/4" DIAMETER DRAIN ROCK. COVER W/ 6" FILTER FABRIC.FOR HEAVY CLAY SOILS.FROM TOP 1/3 OF ROOT BALLGRADE.THE CONTRACTOR IS RESPONSIBLE FORENSURING THE TREES ARE IN A PLUMBPOSITION THROUGHOUT THE WARRANTY PERIOD.TREE HEIGHT MEASURED FROM TOP OF ROOT BALL TO BASE OF CENTRAL LEADER.NOT TO SCALECONIFEROUS TREE PLANTING DETAIL5 X:\Projects\2024 Projects\24-127 Lake Elmo Elementary School, Lake Elmo, MN\24127_LANDSCAPE_24x36 City Submittal_08-23-2024.dwg RevisionsDescriptionDateNumFEDCBA12345678MNNorthCheck:Drawn:Date:Comm:BHHL08-23-202412236128Stillwater Area PublicSchools ISD #834FFE Blinds Title -NEW LAKE ELMOELEMENTARYSCHOOL1875 Greeley Street SouthStillwater, MN 550823524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Benjamin D. Hartberg, PLADate: Lic. No.:xx.xx.xxxx48084I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Landscape Architectunder the laws of the state of Minnesota.DESIGN GROUPLandscape ArchitecturePlanning475 Cleveland Avenue N. | Suite 101ASaint Paul, MN 55104651.788.9018 | calyxdesigngroup.com C 2024 CALYX Design Group, LLC. All rights reserved.L2.002LANDSCAPEDETAILSCONTRACTOR(S) ARE RESPONSIBLEFOR OBTAINING UTILITY LOCATES,INCLUDE PRIVATE UTILITIES SUCH ASPHONE AND CABLE. CALL NO LESSTHAN 48 HOURS IN ADVANCE.PLUGFLATRiver BullrushBolboschoenus fluviatiusRootSizeCommon NameScientific Name(Provide a randomand equal mixtureof the plants listed)PLUGFLATTussock SedgeCarex strictaPLUGFLATWooley SedgeCarex pellitaPLUGFLATBebb's SedgeCarex bebbiPLUGFLATBlue Joint GrassCalamagrostis canadensisPLUGFLATBottle Brush SedgeCarex comosaPLUGFLATLake SedgeCarex lacustrisPLUGFLATFox SedgeCarex vulpinoideaPLUGFLATCommon RushJuncus effususPLUGFLATGreen BulrushScirpus atrovirensPLUGFLATCord GrassSpartina pectinataPLUGFLATWoolgrassScirpus cyperinus24" On-CenterPlug Spacing:*Contractor is to evenly distribute the allocated amount of prairie plugs throughout the basinbottom areas located within the site accordingly.BASIN BOTTOM: LIVE PLUG SCHEDULE:MNDOT Seed Type 'A' areas noted per plan: (unless otherwise noted on civil plans), shall be:MnDOT Southern Shortgrass Roadside seed mixture, drilled into the topsoil layer at 26.0 lbs per acre.Submit seed mix for approval. Grading and Erosion Control per Civil Plans and Specifications.Add 20lbs per acre of MnDOT 21-111 Oats Cover Crop.MNDOT SEED MIXES:NATIVE SEEDING INSTALLATION METHOD:Drop Seeding Onto Tilled SitesThis is the "standard" method for seeding on prepared sites such as those on construction projects.a)Site Preparation: The site should be prepared by loosening topsoil to a minimum depth of 3inches.b)Fertilizer: Use a fertilizer analysis based on a soil test or a general recommendation is a10-10-10 (NPK) commercial grade analysis at 200 lbs/acre.c)Seed Installation: Seed should be installed with a drop seeder that will accurately meter thetypes of seed to be planted, keep all seeds uniformly mixed during the seeding and containdrop seed tubes for seed placement (Brillion-type). The drop seeder should be equipped with acultipacker assembly to ensure seed-to-soil contact.d)Seeding Rates: Rates are specified in the mixture tabulation for the specified mix.e)Packing: If the drop seeder is not equipped with a cultipacker, the site should be cultipackedfollowing the seeding to ensure seed-to-soil contact.f)Mulch: Cover soil with a hydromulch consisting of natural wood fiber or paper fiber, water, andM-Binder at 100 lbs per acre.Note: Heavy equipment is not allowed in the infiltration basins to keep soils from getting compacted.If any compaction occurs due to seeding operations, the soils must be uncompacted.NATIVE SEED REQUIRED MAINTENANCE - 3 YRS:Native Grass and Forb Mixtures (mixtures beginning with the number 3)Year 1Establishment (spring seeding):1)Prepare site - Late April - May2)Seed - May 1 - June 1Maintenance:1)Mow (6-8 inches) - every 30 days after planting until September 30.2)Weed Control - mowing should help control annual weeds. Spot spray thistles, etc.Establishment (fall seeding):1)Prepare site - Late August - early September2)Seed - late September to freeze-upMaintenance (following season):1)Mow (6-8 inches) - once in May, June, and July2)Weed Control - mowing should keep annual weeds down. Spot spray thistles, etc.Evaluation:1)Cover crop growing within 2 weeks of planting (except dormant plantings).2)Seedlings spaced 1-6 inches apart in drill rows.3)Native grass seedlings may only be 4-6 inches tall.4)If there is a flush of growth from foxtail etc., mow as necessary.Year 2Maintenance:1)Mow (6-8 inches) one time between June 1 - August 15 before weeds set seed.2)Weed Control - mowing should keep annual weeds down. Spot spray thistles, etc.3)Some sites may not require much maintenance the second year.Evaluation:1)Cover crop will be gone unless winter wheat was used in a fall planting.2)Grasses forming clumps 1-6 inches apart in drill rows, but still short.3)Some flowers should be blooming (black-eyed Susans, bergamot, etc.).4)If there is a flush of growth from foxtail etc., mow site.Year 3Maintenance:1)Mow only if necessary.2)Weed Control - Spot spray thistles, etc.3)Sites usually do not require much maintenance the third year.Evaluation:1)Planting should begin looking like a prairie - tall grasses, flowers, etc.Long-termMaintenance:1)Weed Control - Spot spray thistles, etc.2)Burning (3-5 year rotation) alternate spring and fall if possible.3)Haying (3-5 year rotation) late summer or early fall. Alternate with burning (may substitute for burning).4)Burning two years in a row will really "clean up" rough-looking sites.MNDOT Seed Type 'B' areas noted per plan: (unless otherwise noted on civil plans), shall be:MnDOT Wet Ditch seed mixture, drilled into the topsoil layer at 20.0 lbs per acre. Submit seed mix forapproval. Grading and Erosion Control per Civil Plans and Specifications.Add 20lbs per acre of MnDOT 21-111 Oats Cover Crop.MNDOT Seed Type 'C' areas noted per plan: (unless otherwise noted on civil plans), shall be:MnDOT Southern Tallgrass Roadside seed mixture, drilled into the topsoil layer at 26.0 lbs per acre.Submit seed mix for approval. Grading and Erosion Control per Civil Plans and Specifications.Add 20lbs per acre of MnDOT 21-111 Oats Cover Crop. X:\Projects\2024 Projects\24-127 Lake Elmo Elementary School, Lake Elmo, MN\24127_LANDSCAPE_24x36 City Submittal_08-23-2024.dwg RevisionsDescriptionDateNumFEDCBA12345678MNNorthCheck:Drawn:Date:Comm:BHHL08-23-202412236128Stillwater Area PublicSchools ISD #834FFE Blinds Title -NEW LAKE ELMOELEMENTARYSCHOOL1875 Greeley Street SouthStillwater, MN 550823524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Benjamin D. Hartberg, PLADate: Lic. No.:xx.xx.xxxx48084I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Landscape Architectunder the laws of the state of Minnesota.DESIGN GROUPLandscape ArchitecturePlanning475 Cleveland Avenue N. | Suite 101ASaint Paul, MN 55104651.788.9018 | calyxdesigngroup.com C 2024 CALYX Design Group, LLC. All rights reserved.1. Tree saucer for individual trees outside of a plant bed to be four inches (4") depth Western Red Cedar wood mulch. Install per tree planting detail. Do not place mulch against tree trunk. Remove wire and burlap from top third of root ball before final soilback-fill and mulch. Dyed or Colorized mulch is strictly prohibited.2. Refer to civil plan sheets for grading, drainage, site dimensions, survey, tree removal, proposed utilities & erosion control.3. All plant material shall comply with the latest edition of the American Standard for Nursery Stock, American Association of Nurserymen. Unless noted otherwise, deciduous shrubs shall have at least 5 canes at the specified shrub height. Plant materialshall be delivered as specified.4. Plan takes precedence over plant schedule if discrepancies in quantities exist.5. All proposed plants shall be located and staked as shown. Install 6" diameter perforated white PVC trunk guards on all new deciduous trees by November 1st.6. Adjustment in location of proposed plant material may be needed in field. Should an adjustment be required, the client will provide field approval. Significant changes may require city review and approval.7. The project landscape contractor shall be held responsible for watering and properly handling all plant materials brought on the site both before and after installation. Schedule plant deliveries to coincide with expected installation time within 36 hours.8. All plant materials shall be fertilized upon installation as specified.9. The landscape contractor shall provide the owner with a watering schedule appropriate to the project site conditions and to plant material growth requirements.10. If the landscape contractor is concerned or perceives any deficiencies in the plant selections, soil conditions, drainage or any other site condition that might negatively affect plant establishment, survival or guarantee, they must bring these deficiencies tothe attention of the landscape architect & client prior to bid submission. Plant bed drainage concerns during plant installation shall be brought to the attention of the Owner and General Contractor immediately.11. Contractor shall establish to his/ her satisfaction that soil and compaction conditions are adequate to allow for proper drainage at and around the building site.12. Contractor is responsible for ongoing maintenance of all newly installed material, per specifications. Any acts of vandalism or damage which may occur prior to owner acceptance shall be the responsibility of the contractor. Contractor shall provide theowner with a maintenance program including, but not limited to, pruning, fertilization and disease/pest control.13. Warranty: The contractor shall guarantee newly planted material through ONE calendar year from the date of written owner acceptance. Plants that exhibit more than 50% die-back damage shall be replaced at no additional cost to the owner. Thecontractor shall also provide PVC trunk guards on deciduous trees. Prune dead wood at 11 month warranty review period - use wound paint on trees.14. This layout plan constitutes our understanding of the landscape requirements listed in the ordinance. Changes and modifications may be requested by the city based on applicant information, public input, council decisions, etc.15. The landscape contractor shall be responsible for obtaining any permits and coordinating inspections as required throughout the work process.16. Plant size & species substitutions must be approved in writing prior to acceptance in the field.17. Irrigation: Refer to irrigation performance plan and specifications18. Edger to be 16 GA Plated Finish Perforated Edger, Coyote or approved Equal. Stake every 18" minimum. Submit sample for approval.19. Landscape Contractor is responsible for coordination with the General Contractor, to protect the new improvements on and off-site during landscape work activities. Report any damage to the General Contractor immediately.20. Unless otherwise noted/indicated, all landscape beds to be 4" depth of Western Red Cedar wood mulch over weed mat. Submit mulch sample for approval.21. All planting, seeding, and sodded areas shall be prepared prior to installation activities with a harley power box rake or equal to provide a firm planting bed free of stones, sticks, construction debris, etc.22. Turf Sodding and Seeding activity shall conform to all rules and regulations as established in the MnDOT Seeding Manual, 2014 edition, for turf bed preparation, installation, maintenance, acceptability, and warranty. An acceptable stand of seeded turf islush, full, and weed-free. See specifications for maintenance requirements.23. The Landscape Contractor shall furnish samples of all landscape materials for approval prior to installation.24. The Landscape Contractor shall clear and grub the underbrush from within the work limits to remove dead branches, leaves, trash, weeds and foreign materials.25. The landscape contractor shall contact Gopher State One Call no less than 48 hours before digging for field utility locations.26. The landscape contractor shall be responsible for the removal of erosion control measures once vegetation has been established to the satisfaction of the municipal staff. This includes silt curtain fencing and sediment logs placed in the landscape.27. The landscape contractor shall be responsible for visiting the site to become familiar with the conditions prior to bidding and installation. Coordinate with the general contractors on matters such as fine grading, landscaped area conditions, staging areas,irrigation connection to building, etc.28. See Site and Civil plans for additional information regarding the project, including infiltration area soils and sub-surface drainage requirements and performance.29. Topsoil Requirements: See Specifications30. Landscape contractor must prove the open sub-grade of all planting areas after their excavation is capable of infiltrating a minimum requirement of 1/4-inch of water per hour prior to installation of plant materials, topsoil, irrigation, weed mat, and mulch.Planting areas not capable of meeting this requirement shall have 4" diameter X 48" depth holes augured every 36" on-center and filled with MnDOT Free-Draining Coarse Filter Aggregate. Re-test sub-grade percolation for compliance to infiltration minimumrequirement.31. Landscape contractor to provide nursery pull list (bill of lading) including plant species and sizes shipped to the site. Additionally, the landscape contractor shall provide nursery stock traceability, proving none of the materials provided contain or aregenetic strains of the neonicotinoid family including acetamiprid, clothianidin, imidacloprid, nitenpyram, nithiazine, thiacloprid and thiamethoxam.Landscape Notes and Requirements:L2.003LANDSCAPEDETAILSCONTRACTOR(S) ARE RESPONSIBLEFOR OBTAINING UTILITY LOCATES,INCLUDE PRIVATE UTILITIES SUCH ASPHONE AND CABLE. CALL NO LESSTHAN 48 HOURS IN ADVANCE. X:\Projects\2024 Projects\24-127 Lake Elmo Elementary School, Lake Elmo, MN\24127_LANDSCAPE_24x36 City Submittal_08-23-2024.dwg RevisionsDescriptionDateNumFEDCBA12345678MNNorthCheck:Drawn:Date:Comm:BHHL08-23-202412236128Stillwater Area PublicSchools ISD #834FFE Blinds Title -NEW LAKE ELMOELEMENTARYSCHOOL1875 Greeley Street SouthStillwater, MN 550823524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Benjamin D. Hartberg, PLADate: Lic. No.:xx.xx.xxxx48084I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Landscape Architectunder the laws of the state of Minnesota.DESIGN GROUPLandscape ArchitecturePlanning475 Cleveland Avenue N. | Suite 101ASaint Paul, MN 55104651.788.9018 | calyxdesigngroup.com C 2024 CALYX Design Group, LLC. All rights reserved.LANDOWNER PLANTED TREENATURALLY OCCURRING TREEL3.001TREEPRESERVATION& MITIGATIONSCHEDULES X:\Projects\2024 Projects\24-127 Lake Elmo Elementary School, Lake Elmo, MN\24127_LANDSCAPE_24x36 City Submittal_08-23-2024.dwg RevisionsDescriptionDateNumFEDCBA12345678MNNorthCheck:Drawn:Date:Comm:BHHL08-23-202412236128Stillwater Area PublicSchools ISD #834FFE Blinds Title -NEW LAKE ELMOELEMENTARYSCHOOL1875 Greeley Street SouthStillwater, MN 550823524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Benjamin D. Hartberg, PLADate: Lic. No.:xx.xx.xxxx48084I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Landscape Architectunder the laws of the state of Minnesota.DESIGN GROUPLandscape ArchitecturePlanning475 Cleveland Avenue N. | Suite 101ASaint Paul, MN 55104651.788.9018 | calyxdesigngroup.com C 2024 CALYX Design Group, LLC. All rights reserved.LANDOWNER PLANTED TREENATURALLY OCCURRING TREEL3.002TREEPRESERVATION& MITIGATIONSCHEDULES X:\Projects\2024 Projects\24-127 Lake Elmo Elementary School, Lake Elmo, MN\24127_LANDSCAPE_24x36 City Submittal_08-23-2024.dwg RevisionsDescriptionDateNumFEDCBA12345678MNNorthCheck:Drawn:Date:Comm:BHHL08-23-202412236128Stillwater Area PublicSchools ISD #834FFE Blinds Title -NEW LAKE ELMOELEMENTARYSCHOOL1875 Greeley Street SouthStillwater, MN 550823524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Benjamin D. Hartberg, PLADate: Lic. No.:xx.xx.xxxx48084I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Landscape Architectunder the laws of the state of Minnesota.DESIGN GROUPLandscape ArchitecturePlanning475 Cleveland Avenue N. | Suite 101ASaint Paul, MN 55104651.788.9018 | calyxdesigngroup.com C 2024 CALYX Design Group, LLC. All rights reserved.LANDOWNER PLANTED TREENATURALLY OCCURRING TREEL3.003TREEPRESERVATION& MITIGATIONSCHEDULES X:\Projects\2024 Projects\24-127 Lake Elmo Elementary School, Lake Elmo, MN\24127_LANDSCAPE_24x36 City Submittal_08-23-2024.dwg RevisionsDescriptionDateNumFEDCBA12345678MNNorthCheck:Drawn:Date:Comm:BHHL08-23-202412236128Stillwater Area PublicSchools ISD #834FFE Blinds Title -NEW LAKE ELMOELEMENTARYSCHOOL1875 Greeley Street SouthStillwater, MN 550823524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Benjamin D. Hartberg, PLADate: Lic. No.:xx.xx.xxxx48084I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Landscape Architectunder the laws of the state of Minnesota.DESIGN GROUPLandscape ArchitecturePlanning475 Cleveland Avenue N. | Suite 101ASaint Paul, MN 55104651.788.9018 | calyxdesigngroup.com C 2024 CALYX Design Group, LLC. All rights reserved.LANDOWNER PLANTED TREENATURALLY OCCURRING TREEL3.004TREEPRESERVATION& MITIGATIONSCHEDULES X:\Projects\2024 Projects\24-127 Lake Elmo Elementary School, Lake Elmo, MN\24127_LANDSCAPE_24x36 City Submittal_08-23-2024.dwg RevisionsDescriptionDateNumFEDCBA12345678MNNorthCheck:Drawn:Date:Comm:BHHL08-23-202412236128Stillwater Area PublicSchools ISD #834FFE Blinds Title -NEW LAKE ELMOELEMENTARYSCHOOL1875 Greeley Street SouthStillwater, MN 550823524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Benjamin D. Hartberg, PLADate: Lic. No.:xx.xx.xxxx48084I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Landscape Architectunder the laws of the state of Minnesota.DESIGN GROUPLandscape ArchitecturePlanning475 Cleveland Avenue N. | Suite 101ASaint Paul, MN 55104651.788.9018 | calyxdesigngroup.com C 2024 CALYX Design Group, LLC. All rights reserved.LANDOWNER PLANTED TREENATURALLY OCCURRING TREEL3.005TREEPRESERVATION& MITIGATIONSCHEDULES X:\Projects\2024 Projects\24-127 Lake Elmo Elementary School, Lake Elmo, MN\24127_LANDSCAPE_24x36 City Submittal_08-23-2024.dwg RevisionsDescriptionDateNumFEDCBA12345678MNNorthCheck:Drawn:Date:Comm:BHHL08-23-202412236128Stillwater Area PublicSchools ISD #834FFE Blinds Title -NEW LAKE ELMOELEMENTARYSCHOOL1875 Greeley Street SouthStillwater, MN 550823524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Benjamin D. Hartberg, PLADate: Lic. No.:xx.xx.xxxx48084I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Landscape Architectunder the laws of the state of Minnesota.DESIGN GROUPLandscape ArchitecturePlanning475 Cleveland Avenue N. | Suite 101ASaint Paul, MN 55104651.788.9018 | calyxdesigngroup.com C 2024 CALYX Design Group, LLC. All rights reserved.LANDOWNER PLANTED TREENATURALLY OCCURRING TREEL3.006TREEPRESERVATION& MITIGATIONSCHEDULES X:\Projects\2024 Projects\24-127 Lake Elmo Elementary School, Lake Elmo, MN\24127_LANDSCAPE_24x36 City Submittal_08-23-2024.dwg RevisionsDescriptionDateNumFEDCBA12345678MNNorthCheck:Drawn:Date:Comm:BHHL08-23-202412236128Stillwater Area PublicSchools ISD #834FFE Blinds Title -NEW LAKE ELMOELEMENTARYSCHOOL1875 Greeley Street SouthStillwater, MN 550823524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Benjamin D. Hartberg, PLADate: Lic. No.:xx.xx.xxxx48084I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Landscape Architectunder the laws of the state of Minnesota.DESIGN GROUPLandscape ArchitecturePlanning475 Cleveland Avenue N. | Suite 101ASaint Paul, MN 55104651.788.9018 | calyxdesigngroup.com C 2024 CALYX Design Group, LLC. All rights reserved.LANDOWNER PLANTED TREENATURALLY OCCURRING TREEL3.007TREEPRESERVATION& MITIGATIONSCHEDULES X:\Projects\2024 Projects\24-127 Lake Elmo Elementary School, Lake Elmo, MN\24127_LANDSCAPE_24x36 City Submittal_08-23-2024.dwg RevisionsDescriptionDateNumFEDCBA12345678MNNorthCheck:Drawn:Date:Comm:BHHL08-23-202412236128Stillwater Area PublicSchools ISD #834FFE Blinds Title -NEW LAKE ELMOELEMENTARYSCHOOL1875 Greeley Street SouthStillwater, MN 550823524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Benjamin D. Hartberg, PLADate: Lic. No.:xx.xx.xxxx48084I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Landscape Architectunder the laws of the state of Minnesota.DESIGN GROUPLandscape ArchitecturePlanning475 Cleveland Avenue N. | Suite 101ASaint Paul, MN 55104651.788.9018 | calyxdesigngroup.com C 2024 CALYX Design Group, LLC. All rights reserved.LANDOWNER PLANTED TREENATURALLY OCCURRING TREEL3.008TREEPRESERVATION& MITIGATIONSCHEDULES X:\Projects\2024 Projects\24-127 Lake Elmo Elementary School, Lake Elmo, MN\24127_LANDSCAPE_24x36 City Submittal_08-23-2024.dwg RevisionsDescriptionDateNumFEDCBA12345678MNNorthCheck:Drawn:Date:Comm:BHHL08-23-202412236128Stillwater Area PublicSchools ISD #834FFE Blinds Title -NEW LAKE ELMOELEMENTARYSCHOOL1875 Greeley Street SouthStillwater, MN 550823524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Benjamin D. Hartberg, PLADate: Lic. No.:xx.xx.xxxx48084I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Landscape Architectunder the laws of the state of Minnesota.DESIGN GROUPLandscape ArchitecturePlanning475 Cleveland Avenue N. | Suite 101ASaint Paul, MN 55104651.788.9018 | calyxdesigngroup.com C 2024 CALYX Design Group, LLC. All rights reserved.LANDOWNER PLANTED TREENATURALLY OCCURRING TREEL3.009TREEPRESERVATION& MITIGATIONSCHEDULES X:\Projects\2024 Projects\24-127 Lake Elmo Elementary School, Lake Elmo, MN\24127_LANDSCAPE_24x36 City Submittal_08-23-2024.dwg RevisionsDescriptionDateNumFEDCBA12345678MNNorthCheck:Drawn:Date:Comm:BHHL08-23-202412236128Stillwater Area PublicSchools ISD #834FFE Blinds Title -NEW LAKE ELMOELEMENTARYSCHOOL1875 Greeley Street SouthStillwater, MN 550823524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Benjamin D. Hartberg, PLADate: Lic. No.:xx.xx.xxxx48084I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Landscape Architectunder the laws of the state of Minnesota.DESIGN GROUPLandscape ArchitecturePlanning475 Cleveland Avenue N. | Suite 101ASaint Paul, MN 55104651.788.9018 | calyxdesigngroup.com C 2024 CALYX Design Group, LLC. All rights reserved.LANDOWNER PLANTED TREENATURALLY OCCURRING TREEL3.010TREEPRESERVATION& MITIGATIONSCHEDULES X:\Projects\2024 Projects\24-127 Lake Elmo Elementary School, Lake Elmo, MN\24127_LANDSCAPE_24x36 City Submittal_08-23-2024.dwg RevisionsDescriptionDateNumFEDCBA12345678MNNorthCheck:Drawn:Date:Comm:BHHL08-23-202412236128Stillwater Area PublicSchools ISD #834FFE Blinds Title -NEW LAKE ELMOELEMENTARYSCHOOL1875 Greeley Street SouthStillwater, MN 550823524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Benjamin D. Hartberg, PLADate: Lic. No.:xx.xx.xxxx48084I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Landscape Architectunder the laws of the state of Minnesota.DESIGN GROUPLandscape ArchitecturePlanning475 Cleveland Avenue N. | Suite 101ASaint Paul, MN 55104651.788.9018 | calyxdesigngroup.com C 2024 CALYX Design Group, LLC. All rights reserved.LANDOWNER PLANTED TREENATURALLY OCCURRING TREEL3.011TREEPRESERVATION& MITIGATIONSCHEDULESCONTRACTOR(S) ARE RESPONSIBLEFOR OBTAINING UTILITY LOCATES,INCLUDE PRIVATE UTILITIES SUCH ASPHONE AND CABLE. CALL NO LESSTHAN 48 HOURS IN ADVANCE. 930 9 3 0 930930930925920910930930 930925925925 930925928929928928927926924926929929928927927 926 924 923 922 921928928927926 9269279289299289279269299239229219209209219229239249259269279289299 2 8 9 2 7 9269259249239229219209199189179169159159209259309149159169179189199209219219229239249199189179169159149139129119099089079069059049039029019008998989 2 6 9 2 7 9 2 8 9 2 9 9 3 0 9 3 19299309329339349359369379389399409419429299309319329339349359329339349359369379389399409419429289299309319309299289279269 2 6925924923922921920919918918919918916914912910908906904902900898917915913911909907905903901899 92892792692292192091991891791691591491391291191090990890790690590490390290190089989892091991891791691591591691791891992092192292792692592492392292192092 4 92492592692692592592692792892 9 9299289309 2 8 9 2 7 9 2 6 9 2 7 9 2 6 9 2 5 9 2 5 9 2 4923922 930 929928927926925924923922921930929928927926916917918919920921922915914913912911910909908921920919919920921 92592492391992092193 8 9 3 6 93 7 9 3 5 93 4 93 3 93 2 93 1 93 0 937 938 939940941942 936 936 937938 930 929 929930931 9311391013101010101010101010101010354254 93 0 932 93 4 93 6 93 8 938936934932 924 922 9 1 8 920 91 6 914 912 910 910 912 914916918920922922920918916914 9 1 2 91 0908910912914916918920922924 926924922920924926928930932934936938940 9109149169209349 3 6 942944944942940938936934932930918 916 914 912 9 3 8 93 0 9 2 8 92 6 92 0 91 8 91 6 91 4 91 2 9 1 0908 9 0 6 9 0 4 904906908918 92 0 922906 908 910912914916918920922924926928930932934932930928926924922920916918914912910908906 910 910 91 2 914 916 908906 904902900910910914920922924922914912910916918920922928 9289 2 8 9 2 6924922 922926922920914912914916914916918924920920922924916918920 922920930918910898 90290489890091090091093092091092093092492 2 92 4 9189 3 2 922924926928920918918920922 920922924924926 928930932934936 942 940 936 934 934 936 934 930 932 934928922924926922924926920920922924918924926926922 9008989169189249269 3 2 934936930928926924932930898 908 906 904 906PROPOSED BUILDINGX:\Projects\2024 Projects\24-127 Lake Elmo Elementary School, Lake Elmo, MN\24127_LANDSCAPE_24x36 City Submittal_08-23-2024.dwg RevisionsDescriptionDateNumFEDCBA12345678MNNorthCheck:Drawn:Date:Comm:BHHL08-23-202412236128Stillwater Area PublicSchools ISD #834FFE Blinds Title -NEW LAKE ELMOELEMENTARYSCHOOL1875 Greeley Street SouthStillwater, MN 550823524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Benjamin D. Hartberg, PLADate: Lic. No.:xx.xx.xxxx48084I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Landscape Architectunder the laws of the state of Minnesota.DESIGN GROUPLandscape ArchitecturePlanning475 Cleveland Avenue N. | Suite 101ASaint Paul, MN 55104651.788.9018 | calyxdesigngroup.com C 2024 CALYX Design Group, LLC. All rights reserved.L4.000IRRIGATIONPERFORMANCEPLANAll turf seeded, turf sodded, and perennial planting areas to receiveirrigation from a high-efficiency permanent irrigation system. Finalsystem layout to be provided in the Permit Set.Irrigation Note:PROPOSED BUILDING1. IRRIGATION SYSTEM SHOULD AVERAGE 40(+/-) PSI AT THE BASE OF ALL SPRINKLER HEADS. NOTIFY LANDSCAPEARCHITECT IF EXISTING PRESSURE DIFFERS. BUILDING PRESSURE IS NOT KNOWN.2. THE CONTRACTOR MAY MAKE MINOR ADJUSTMENTS TO THE LOCATION AND SPACING AS NECESSARY TOACCOMMODATE ACTUAL FIELD CONDITIONS. HEAD LOCATIONS SHALL BE FLAGGED AND REVIEWED BY THELANDSCAPE ARCHITECT PRIOR TO INSTALLATION.3. COORDINATE SLEEVING AND IRRIGATION PIPE / HEAD / INTERNAL PLUMBING INSTALLATION WITH THE WORK OFOTHERS.4. ALL MATERIALS SHALL BE INSTALLED AS DETAILED ON DRAWINGS. (HOWEVER, IF THE CONTRACT DRAWINGSAND/OR SPECIFICATIONS DO NOT THOROUGHLY DESCRIBE THE METHOD OR TECHNIQUES TO BE USED, THECONTRACTOR SHALL FOLLOW THE INSTALLATION METHODS ISSUED BY THE MANUFACTURE. ALL SUCHLITERATURE MUST BE SUBMITTED 48 HOURS PRIOR TO INSTALLATION FOR REVIEW AND APPROVAL BY THELANDSCAPE ARCHITECT.)5. CHECK AND VERIFY ALL EXISTING AND PROPOSED SITE CONDITIONS, UTILITIES, AND SERVICES PRIOR TOTRENCHING.6. LATERAL PIPING TO BE A MINIMUM OF 12 INCHES DEEP AND MAINLINES A MINIMUM OF 18 INCHES DEEP.7. ALL MAIN LINE PIPING AND LATERAL PIPE OF 1-1/2" AND LARGER SHALL BE PVC (SDR 26 / CLASS 160), HOWEVERTHE IRRIGATION FEED FROM THE BUILDING INTO THE LANDSCAPE SHALL BE COPPER. ALL OTHER LATERAL PIPEOF 1-1/4" AND SMALLER MAY BE POLYETHYLENE.8. ALL TEES AND ELBOWS SHALL BE PVC (160 PSI). INCLUDE THRUST BLOCKING AT TEE AND ELBOW POINTS.9. ALL SPRINKLERS SHALL BE AS NOTED ON DETAIL & SPECIFICATION.10. ADJUST HEADS FOR GRADE, AS NECESSARY, AFTER TURF GRASS HAS BEEN ESTABLISHED AND ALL SETTLEMENTAT HEADS HAS OCCURRED.11. ALL AUTOMATIC CONTROLLERS, RISERS, BACKFLOW PREVENTERS AND HOSE BIBS SHALL BE SET PLUM.SPRINKLER HEAD RISERS, QUICK COUPLER VALVES AND ALL VALVES WITH STEMS SHALL BE SET PERPENDICULARTO FINISHED GRADE.12. CONTROL VALVE WIRES, INCLUDING THE GROUND WIRE, SHALL BE #12 GAUGE U.F.U.L. APPROVED DIRECT BURIAL.UNDERGROUND CONNECTIONS SHALL BE MADE WITH 3-M WIRE CONNECTORS (DBY) OR APPROVED EQUAL.13. TRACER-WIRE IS TO BE PLACED OVER ALL MAIN AND LATERAL LINES.14. PLACE ALL VALVES IN APPROVED VALVE BOXES.15. USE TEFLON TAPE ON ALL THREADED JOINTS.16. BRAND EACH VALVE BOX WITH 2" HIGH LETTERING SHOWING ZONE NUMBER AND CONTROLLER LETTER (EXAMPLE'A3'). THIS STAMP IS TO MATCH THE ZONE SHOWN ON THE PLAN UNLESS OTHERWISE DIRECTED BY LANDSCAPEARCHITECT.17. CONDUCT PERFORMANCE TEST IN THE PRESENCE OF OWNER AND LANDSCAPE ARCHITECT FOLLOWINGCOMPLETION OF SYSTEM INSTALLATION.18. CONDUCT AND DEMONSTRATE WINTERIZATION AND SPRING START-UP PROCESS TO OWNER IN THE FALL OFCOMPLETION.19. LANDSCAPE ARCHITECT SHALL BE NOTIFIED TO VERIFY TRENCH DEPTHS BEFORE BACKFILLING.20. IRRIGATION CONTRACTOR TO COORDINATE MECHANICAL ROOM WATER CONNECTION POINT WITH MECHANICALENGINEER AND PLUMBING CONTRACTOR.21.AFTER INSTALLATION OF DRIP IRRIGATION PIPE IS COMPLETE AND PRIOR TO SODDING OR MULCH INSTALLATION,THE CONTRACTOR SHALL CONTACT THE LANDSCAPE ARCHITECT TO REVIEW THE INSTALLATION OF THE DRIPIRRIGATION SYSTEM.22. LANDSCAPE CONTRACTOR TO ADJUST HEADS IN THE FIELD TO ENSURE WATER DOES NOT SPRAY THE BUILDINGFACE OR PAVED AREAS.23.COORDINATE LOCATION OF ROOFTOP-MOUNTED ATMOSPHERIC MOISTURE (RAIN) SENSOR WITH OWNER ANDARCHITECT.24.COORDINATE LOCATION OF SLEEVING UNDER PAVED AREAS WITH GENERAL CONTRACTOR, EARTHWORK, ANDPAVING SUB-CONTRACTORS.25.SUBMIT LAYOUT PLAN AND PRODUCT DATA TO THE LANDSCAPE ARCHITECT FOR REVIEW AND APPROVAL PRIORTO INSTALLATION.26.IRRIGATION BID SHALL INCLUDE (1) FALL SHUT-DOWN AND (1) SPRING START-UP (SPRING OF THE YEAR FOLLOWINGINSTALLATION).27.THIS PROJECT WILL USE HUNTER COMMERCIAL IRRIGATION PRODUCTS.28.PROVIDE THE OWNER WITH MANUFACTURER'S INSTRUCTION MANUAL FOR CONTROLLER. POST IRRIGATION ZONELAYOUT MAP AT 8"x10" NEXT TO THE CONTROLLER FOR REFERENCE.29.PROVIDE THE OWNER WITH AN AS-BUILT PLAN (PAPER AND CAD .DWG) UPON COMPLETION OF INSTALLATION.Irrigation Performance Notes:IRRIGATEDTURF AREAIRRIGATED MOW STRIPIRRIGATED MOW STRIPIRRIGATION LIMIT LINEIRRIGATEDTURF AREAIRRIGATEDTURF AREAIRRIGATEDTURF AREAIRRIGATEDTURF AREAIRRIGATEDTURF AREAIRRIGATEDTURF AREAIRRIGATEDTURF AREAIRRIGATED MOW STRIPIRRIGATED ISLANDSIRRIGATED PLANTERSIRRIGATEDPLANTERSIRRIGATEDTURF AREAIRRIGATEDTURF AREAIRRIGATEDTURF AREAIRRIGATION LIMIT LINEIRRIGATION LIMIT LINEIRRIGATION LIMIT LINEIRRIGATIONLIMIT LINECONTRACTOR(S) ARE RESPONSIBLEFOR OBTAINING UTILITY LOCATES,INCLUDE PRIVATE UTILITIES SUCH ASPHONE AND CABLE. CALL NO LESSTHAN 48 HOURS IN ADVANCE. Memorandum www.srfconsulting.com 3701 Wayzata Boulevard, Suite 100 | Minneapolis, MN 55416-3791 | 763.475.0010 Fax: 1.866.440.6364 An Equal Opportunity Employer SRF No. 17789 To: Stillwater Area Public Schools From: Brent Clark, PE, Project Manager Eric Wurst, EIT, Traffic Engineer I Date: August 1, 2024 Subject: New Lake Elmo Elementary School & Oak-Land Middle School Transportation Study Introduction SRF has completed a transportation study for the new proposed Lake Elmo Elementary School and additions to the existing Oak-Land Middle School (see Figure 1: Project Location). The proposed Elementary School, which is expected to replace the existing Lake Elmo Elementary School, is located in the northwest quadrant of the Lake Elmo Avenue North (CSAH 17) and 10th Street North (CSAH 10) intersection in the City of Lake Elmo, MN. The new elementary school, which is expected to open in Fall of 2026, is anticipated to have approximately 1,100 students and 130 staff members. The existing Oak-Land Middle School is located in the southwest quadrant of the Manning Avenue North (CSAH 15) and 10th Street North (CSAH 10) intersection. Planned renovations include a proposed 16,000 square foot gymnasium and a 29,500 square foot classroom addition. The capacity of the school is expected to increase from 950 to 1,250 students with 125 total staff. Therefore, the main objectives of the transportation study are to review existing operations within the study area, evaluate transportation impacts to the adjacent roadway network based on the new elementary school and additions to the middle school, and recommend any necessary improvements to provide safe and efficient operations for all modes of transportation. The following information provides the assumptions, analysis, and recommendations offered for consideration. Existing Conditions Existing conditions were reviewed to identify any existing operational and/or safety issues within the study area. The evaluation of existing conditions included various data collection efforts, including traffic data, roadway characteristics, pedestrian/bicycle facilities, crash history, school observations, and an intersection capacity analysis, which are summarized in the following sections. NORTHNorth02417789 July 2024 Project Location Figure 1New Lake Elmo Elementary & Oak-Land Middle School Transportation Study City of Lake Elmo 10th Street N Proposed New Lake Elmo Elementary School Oak-Land Middle School Manning Avenue NLake Elmo Avenue NKeats Avenue NHudson Boulevard 94 - Lake Elmo Elementary School Study Intersection - Oak-Land Middle School Study Intersection LEGEND 10 WASHINGTON COUNTY 15 WASHINGTON COUNTY 17 WASHINGTON COUNTY 19 WASHINGTON COUNTY New Lake Elmo Elementary School & Oak-Land Middle School August 1, 2024 Transportation Study Page 3 Study Intersections The following study intersections represent the primary focus of the transportation study. These intersections, categorized for each respective school, were identified through discussions with the project team as they relate to potential school impacts, as well as future area infrastructure needs. Lake Elmo Elementary School:  10th Street North (CSAH 10)/Keats Avenue North (CSAH 19)  10th Street North (CSAH 10)/Lake Elmo Avenue North (CSAH 17)  Lake Elmo Avenue North (CSAH 17)/Hudson Boulevard Oak-Land Middle School:  Manning Avenue North (CSAH 15)/10th Street North (CSAH 10)  Manning Avenue North (CSAH 15)/Oak-Land Middle School North Access  Manning Avenue North (CSAH 15)/Oak-Land Middle School South Access Traffic Data SRF collected 24-hour vehicular and pedestrian/bicyclist turning movement counts at the study intersections on Thursday, May 23, 2024, while area schools were in session. The existing Oak-Land Middle School hours are currently between 7:50 a.m. and 2:20 p.m., and the peak hours of the study area are summarized below. Note that the school arrival peak hour coincides with the a.m. peak hour of the adjacent roadway, which is 7:00 a.m. to 8:00 a.m.  AM Peak Hour: 7:00 a.m. to 8:00 a.m.  School Departure Peak Hour: 2:00 p.m. to 3:00 p.m.  PM Peak Hour: 4:00 p.m. to 5:00 p.m. It should be noted that crack sealing construction was occurring along Manning Avenue during data collection efforts. While the construction resulted in sporadic lane/shoulder closures throughout the day, Manning Avenue remained open, and travel patterns were not expected to be impacted as a result of the construction. In addition, on-going construction along I-94 may be causing various regional traffic impacts between Oakdale and the St. Croix River, however, based on discussions with the county staff, the traffic volumes collected were considered representative of the study area. Roadway Characteristics A field assessment was completed to identify various roadway characteristics within the transportation system study area, such as functional classification, general configuration, and posted speed limit. A summary of these roadway characteristics is shown in Table 1. Note that these are general characteristics and that there are some deviations within the area or segments of the roadways. For example, Keats Avenue transitions from a 4-lane divided A-Minor Expander to a 2-lane divided local street north of 10th Avenue. New Lake Elmo Elementary School & Oak-Land Middle School August 1, 2024 Transportation Study Page 4 Table 1. Existing Roadway Characteristics (1) Functional Classification based on the City of Lake Elmo’s 2040 Comprehensive Plan. (2) Functional classification transitions from an A-Minor Reliever to a Minor Collector east of Manning Avenue. (3) Functional classification transitions from a Major Collector to an ‘Other Arterial’ north of 10th Street. (4) Keats Avenue transitions from 4-lane divided A Minor Expander with a speed limit of 55-mph to a 2-lane divided local street with a speed limit of 35-mph north of 10th Street. (5) Speed limit change occurs north of Hudson Boulevard, with a posted speed limit of 55-mph to the north, and 50-mph to the south. From a traffic control perspective, the Manning Avenue/10th Street and Manning Avenue/Oak-Land Middle School south access intersections are signalized, and the 10th Street/Keats Avenue and 10th Street/Lake Elmo Avenue intersections are unsignalized with all-way stop control. All other study intersections are unsignalized with side-street stop control. Existing geometrics, traffic controls, and traffic volumes in the study area are shown in Figure 2. Pedestrian and Bicycle Facilities A field assessment was completed to identify the current local and regional pedestrian/bicycle facilities within the study area and is illustrated in Figure 3. While Keats Avenue (CSAH 19) has an off-street trail that provides connectivity from Woodbury to the Lake Elmo Park Reserve, the rest of the study roadways generally lack off-street pedestrian/bicycle facilities. It should be noted that the high speeds (i.e. 55-mph) along these roadways likely deter most pedestrians and bicyclists from using the shoulder. In general, the nearby local neighborhood developments include internal pedestrian/bicycle facility networks. Given the close proximity of these residential neighborhoods to the two school sites, it is important to consider pedestrian/bicycle connectivity within the project area. Further discussion regarding pedestrian/bicycle considerations is provided later in this document. Safety Analysis A safety analysis was completed to understand any crash trends or geometric issues at the study intersections. The safety analysis was based on reported crashes using MnDOT’s Crash Mapping Analysis Tool (MnCMAT2) from April 1, 2019, to March 31, 2024, which represents the most recent five-year period available. Results of the safety analysis are summarized below and shown in Figure 4, while detailed crash type/rate information is included in the Appendix. Roadway Functional Classification (1) General Configuration Posted Speed Limit (mph) 10th Street (CSAH 10) A Minor Reliever (2) 2-lane undivided 55 Manning Avenue (CSAH 15) A Minor Expander 4-lane divided 55 Lake Elmo Avenue (CSAH 17) Major Collector (3) 2-lane undivided 50/55 (5) Keats Avenue (CSAH 19) A Minor Expander (4) 4-lane divided (4) 55 (4) Hudson Boulevard Major Collector 2-lane undivided 50 NORTHNorth02417789 July 2024 Existing Conditions Figure 2New Lake Elmo Elementary & Oak-Land Middle School Transportation Study City of Lake Elmo 10th Street N Manning Avenue NLake Elmo Avenue NKeats Avenue NHudson Boulevard 94Keats Avenue 10th Street Lake Elmo Avenue 10th Street Manning Avenue 10th Street Oak-Land Middle School Manning Avenue Oak-Land North Access Manning Avenue Oak-Land South Access Lake Elmo Avenue Hudson Boulevard XX [XX] (XX) - A.M. Peak Hour Volume - School Departure Peak Hour Volume - P.M. Peak Hour Volume - Side-Street Stop Control - Signalized Control - All Way Stop Control LEGEND (293) [169] 180(19) [16] 3(200) [142] 1093 [16] (17)4 [12] (23)1 [14] (13) (14) [13] 7 (392) [320] 156 (315) [199] 143 1 [11] (9) 310 [225] (270) 134 [119] (135) (72) [57] 75(163) [92] 106(100) [66] 10698 [87] (110)78 [128] (148)12 [25] (41) (125) [113] 60 (344) [283] 164 (104) [64] 38 25 [20] (30) 272 [211] (237) 38 [58] (57) (47) [59] 63(770) [467] 509(272) [159] 152122 [154] (133)468 [427] (504)17 [46] (86) (215) [165] 170 (209) [126] 64 (60) [83] 101 59 [36] (50) 139 [86] (126) 199 [74] (134) (13) [8] 13(1090) [697] 74021 [24] (21)742 [564] (682) (62) [42] 26 (23) [34] 114(1035) [613] 631(1) [1] 0189 [65] (20)565 [519] (689)0 [0] (0)11 [27] (41) (24) [63] 123 (25) [69] 137 0 [1] (1) 0 [0] (0) 0 [1] (1) (41) [28] 60(288) [175] 235(17) [3] 922 [17] (27)160 [224] (245)8 [5] (25) (66) [26] 11 (63) [30] 22 (46) [25] 17 14 [19] (36) 30 [28] (48) 29 [10] (22) Proposed New Lake Elmo Elementary School10 WASHINGTON COUNTY 15 WASHINGTON COUNTY 17 WASHINGTON COUNTY 19 WASHINGTON COUNTY NORTHNorth02417789 July 2024 Existing Pedestrian and Bicycle Facilities Figure 3New Lake Elmo Elementary & Oak-Land Middle School Transportation Study City of Lake Elmo 10th Street NKeats Avenue NHudson Boulevard 94 Proposed New Lake Elmo Elementary School Oak-Land Middle School LEGEND - Trail - Sidewalk - On-Road Network (Shoulder) - All-Way Stop Control - Traffic Signal Lake Elmo Avenue NManning Avenue NSTOP STOPSTOP10 WASHINGTON COUNTY 15 WASHINGTON COUNTY 17 WASHINGTON COUNTY 19 WASHINGTON COUNTY NORTHNorth02417789 July 2024 Safety Analysis Summary (2019-2024)Figure 4New Lake Elmo Elementary & Oak-Land Middle School Transportation Study City of Lake Elmo 10th Street N Manning Avenue NLake Elmo Avenue NKeats Avenue NHudson Boulevard 94 Marshall Rd - Crash Rate Below Average - Crash Rate Above Average - Crash Rate Above Critical - Serious (Black)/Fatal (Red) Vehicle Crash - Serious (Black)/Fatal (Red) Pedestrian Crash LEGEND 2020, 2024 Proposed New Lake Elmo Elementary School Oak-Land Middle School 2019, 20222019 10 WASHINGTON COUNTY 15 WASHINGTON COUNTY 17 WASHINGTON COUNTY 19 WASHINGTON COUNTY New Lake Elmo Elementary School & Oak-Land Middle School August 1, 2024 Transportation Study Page 8 o There was a total of 24 crashes reported within the study area during the analysis period. The number of crashes ranged from a high of nine (9) crashes at the 10th Street/Lake Elmo Avenue intersection to a low of one (1) crash at the 10th Street/Keats Avenue and Manning Avenue/Oak-Land Middle School South Access intersections. o In order to determine the significance of the crashes, crash rates were calculated for each intersection and compared to average crash rates published by MnDOT for intersections with similar characteristics (i.e., traffic control, traffic volumes, lighting, environment, etc.) A higher than average rate does not necessarily indicate a significant crash problem. Therefore, critical rates were calculated to determine the statistical significance. If the actual rates are below the critical rates, crashes that occurred may be due to the random nature of crashes and not necessarily a geometric design or traffic control issue. Based on the results of analysis, which is illustrated in Figure 4, no study intersections are above the critical crash rate, indicating that no study intersections have a statistically significant crash problem. o It should be noted that one (1) fatal and four (4) serious injury crashes have occurred within the study area during the analysis period. Descriptions of the fatal/serious injury crashes, which are based on the police reports, are summarized below: o 10th Street/Lake Elmo Avenue – Fatal single vehicle run-off-road crash. Driver ran a stop sign at high speed, before exiting the roadway and hitting a tree. Based on the police report, the driver was intoxicated at the time of the crash. o Lake Elmo Avenue/Hudson Boulevard – Serious injury head-on crash. Driver crossed the centerline, colliding with oncoming traffic. Based on the police reports, drugs/alcohol may have played a role in the crash. o Lake Elmo Avenue/Hudson Boulevard – Serious injury angle crash. Side-street vehicle failed to observe right-of-way and pulled out into oncoming traffic. o 10th Street/Manning Avenue – Serious injury left-turn crash. Westbound left turning vehicle failed to yield to oncoming vehicle with green light. o 10th Street/Manning Avenue – Serious injury left-turn crash. Eastbound left turning vehicle failed to yield to oncoming vehicle with green light. o All eight (8) of the multi-vehicle crashes that occurred at the 10th Street/Lake Elmo Avenue were the result of vehicles running the stop signs or failing to yield right-of-way. o Six (6) of the seven (7) crashes at the Lake Elmo Avenue/Hudson Boulevard intersection were either minor injury or serious injury crashes, a majority of which were angle crashes. New Lake Elmo Elementary School & Oak-Land Middle School August 1, 2024 Transportation Study Page 9 Lake Elmo Elementary School Observations SRF conducted observations of the parent pick-up/drop-off operations at the existing Lake Elmo Elementary School during the week of May 20th, 2024, to gather general trip rate information and assess potential storage needs for the new site. This data, along with queuing data from other schools and ITE trip generation standards, was important for estimating the operations expected at the relocated elementary school. Oak-Land Middle School Observations As mentioned previously, the Oak-Land Middle School hours of operations are currently between 7:50 a.m. and 2:20 p.m. The middle school, which serves grades 7-9, currently has an enrollment of approximately 950 students. In order to identify current travel patterns and any access, circulation, pick-up/drop-off, and/or pedestrian crossing issues, field observations were performed at the school. A summary of the middle school operations during the a.m. and school departure peak periods are shown in Figure 5 and 6, respectively. The trip generation for the school during the peak hours is summarized in Table 2. Table 2. Oak-Land Middle School – Trip Generation (actual counts) School Students School Arrival Peak Hour School Departure Peak Hour P.M. Peak Hour Daily Trips In Out In Out In Out Oak-Land MS 950 337 286 131 174 77 111 2,172 The middle school has two separate parking lot/vehicular access locations, each serving a different purpose for the school.  The North Access is a three-quarter access designated for buses only from 7:00 a.m. to 3:00 p.m. The lot operates as a counterclockwise loop with buses entering from the access along Manning Avenue and looping around the lot to reach the bus pick-up/drop-off area, located on the north side of the school. Given the access restriction, approximately five (5) to 16 buses were observed to make U-turn movements at the Manning Avenue/South Access intersection during school peak hours.  The South Access is the primary access for staff/visitor parking and parent pick-up/drop-off operations. Parents will queue in a counterclockwise one-way loop and pick-up/drop-off students in a designated area, immediately adjacent to the main building access. In addition to staff members, a school resource officer is positioned in the area during school dismissal to help facilitate the process and direct students from the building access. 02417789 July 2024 Oak-Land Middle School - AM Drop-Off Operations New Lake Elmo Elementary School and Oak-Land Middle School Transportation Study City of Lake Elmo Figure 5Parent Drop-OffBus Drop-Off Bus Only Entrance/Exit Main Access Bus AccessNORTHNorth Parent Entrance/Exit Oak-Land Middle School - Primary Parent Drop-Off Path - Primary Parent Drop-Off Queue - Bus Drop-Off Path - Bus Drop-Off Queue - Building Access LEGEND Manning Avenue N**School Times: 7:50 a.m. to 2:20 p.m. North Lot (No Parking During School Hours) Staff and Visitor Parking Three Quarter Access (Right Turn Out Only) 15 WASHINGTON COUNTY 02417789 July 2024 Oak-Land Middle School - PM Pick-Up Operations New Lake Elmo Elementary School and Oak-Land Middle School Transportation Study City of Lake Elmo Figure 6Parent Pick-UpBus Pick-Up Special Education Buses (Before School Dismissal) Bus Only Entrance/Exit Main Access Bus AccessNORTHNorth Parent Entrance/Exit Oak-Land Middle School Manning Avenue N**School Times: 7:50 a.m. to 2:20 p.m. North Lot Staff and Visitor Parking Three Quarter Access (Right Turn Out Only) - Primary Parent Pick-Up Path - Primary Parent Pick-Up Queue - Bus Pick-Up Path - Bus Pick-Up Queue - Staff/Police Officer Location - Building Access LEGEND Northbound Buses Make U-Turn 15 WASHINGTON COUNTY New Lake Elmo Elementary School & Oak-Land Middle School August 1, 2024 Transportation Study Page 12 During school arrivals, parents start arriving at the school around 7:05 a.m. and buses begin to arrive around 7:25 a.m., with the school starting at 7:50 a.m. Internal queueing was observed to extend onto Manning Avenue for approximately ten (10) minutes, however, the queues were maintained with the turn lane storage, and were not observed to affect mainline traffic. The school area was generally clear by 7:50 a.m. During afternoon pick-ups, travel patterns were generally the same as the morning drop-off. Students were released at 2:20 p.m., and most students were picked up and the school area was cleared within 15 minutes. Parents were observed to arrive at the school early, with some parents arriving as early as 1:45 p.m. Internal queueing was observed to extend onto Manning Avenue starting at 2:10 p.m., and queues nearly maxed out the turn lane storage at the intersection. Despite guidance from staff, some students were observed to cut across the parking lot to get picked up from their parents. In general, the overall operations during the school arrival and departure periods were observed to be safe and efficient. The only safety issues observed were when students would walk across the pick-up queue and parking lot to get to their parents’ vehicle. Despite signage, parents often would not pull up past the main school entrance, leaving potential on-site queueing storage underutilized. While internal queues that extended onto Manning Avenue were observed to be maintained within the turn lane storage, there may be occurrences throughout the year where these queues extend beyond the turn lanes, causing friction and additional conflict points along Manning Avenue. Intersection Capacity Analysis An existing intersection capacity analysis was completed using Synchro/SimTraffic software to establish a baseline condition to which future traffic operations can be compared. The capacity analysis was completed for the weekday a.m., school departure, and p.m. peak hour of the adjacent roadway network. Capacity analysis results identify a Level of Service (LOS) which indicates how well an intersection is operating. Intersections are graded from LOS A through LOS F. The LOS results are based on average delay per vehicle results from SimTraffic, which correspond to the delay threshold values shown in Table 3. LOS A indicates the best traffic operation and LOS F indicates an intersection where demand exceeds capacity. Overall intersection LOS A through D is generally considered acceptable by drivers in the Twin Cities Metropolitan Area. Table 3. Level of Service Criteria for Signalized and Unsignalized Intersections LOS Designation Signalized Intersection Average Delay/Vehicle (seconds) Unsignalized Intersection Average Delay/Vehicle (seconds) A ≤ 10 ≤ 10 B > 10 - 20 > 10 - 15 C > 20 - 35 > 15 - 25 D > 35 - 55 > 25 - 35 E > 55 - 80 > 35 - 50 F > 80 > 50 New Lake Elmo Elementary School & Oak-Land Middle School August 1, 2024 Transportation Study Page 13 For side-street stop-controlled intersections, special emphasis is given to providing an estimate for the level of service of the side-street approach. Traffic operations at an unsignalized intersection with side-street stop control can be described in two ways. First, consideration is given to the overall intersection level of service. This takes into account the total number of vehicles entering the intersection and the capability of the intersection to support these volumes. Second, it is important to consider the delay on the minor approach. Since the mainline does not have to stop, the majority of delay is attributed to the side-street approaches. It is typical of intersections with higher mainline traffic volumes to experience high-levels of delay (i.e., poor levels of service) on the side-street approaches, but an acceptable overall intersection level of service during peak hour conditions. Schools generally have higher peaking characteristics as compared to the typical roadway network during the a.m. and p.m. peak hours (i.e., traffic on/near school grounds tend to be busy for a short period of time close to school start and end times). The study focused on analyzing and publishing findings for the 60-minute interval, which is the traffic industry standard. Additionally, peak 15-minute intervals were reviewed to provide context on any operational issues occurring immediately before or after school start and end times. Results of the existing intersection capacity analysis, shown in Table 4, indicate that all study intersections, other than the 10th Street/Keats Avenue intersection, currently operate at an acceptable overall LOS D or better during the a.m., school departure, and p.m. peak hours. Table 4. Existing Intersection Capacity Analysis Intersection A.M. Peak Hour (3) School Departure Peak Hour (3) P.M. Peak Hour LOS Delay LOS Delay LOS Delay 10th Street/Keats Avenue (1) B 14 sec. C 17 sec. F 63 sec. 10th Street/Lake Elmo Avenue (1) B 14 sec. C 16 sec. D 27 sec. Lake Elmo Avenue/Hudson Boulevard (2) A/A 7 sec. A/A 7 sec. A/A 10 sec. 10th Street/Manning Avenue C 26 sec. C 23 sec. D 38 sec Manning Avenue/Oak-Land MS North Access (2) A/A 6 sec. A/A 5 sec. A/A 6 sec. Manning Avenue/Oak-Land MS South Access B 11 sec. A 6 sec. A 7 sec. (1) Indicates an all-way stop control, where the overall LOS and delay are shown. (2) Indicates an unsignalized intersection with side-street stop control, where the overall LOS is shown followed by the worst side-street approach LOS. The delay shown represents the worst side-street approach delay. (3) The school a.m. and p.m. peak hours are defined as 7:00 – 8:00 a.m. and 2:00 – 3:00 p.m. respectively. The school a.m. peak hour generally coincides with the a.m. peak hour of the adjacent roadway network. New Lake Elmo Elementary School & Oak-Land Middle School August 1, 2024 Transportation Study Page 14 The following information summarizes the operational and/or queuing issues identified as part of the existing conditions analysis: 10th Street/Keats Avenue: o The overall intersection operates at a LOS F (63 seconds) during the p.m. peak hour, and the eastbound and westbound approaches (i.e., 10th Street) both have delays of 70 seconds or greater and 95th percentile queues of 600 feet or greater. o The intersection is atypical for an all-way stop control, with multiple turn lanes and a wide center median along Keats Avenue. Drivers were observed to be confused on who had the right-of-way, and several turning movements occurred simultaneously mid-intersection. o Note the intersection is ranked as the number 3 priority intersection within the Washington County 2023 Intersection Control Ranking System (ICR S) Report and is programmed within the Washington County 2024-2028 Capital Improvement Plan for roundabout evaluation/preliminary design in 2027. 10th Street/Lake Elmo Avenue: o While the overall intersection operates at an acceptable LOS D (27 seconds), the eastbound approach operates at a LOS E (43 seconds) with 95th percentile queues of approximately 375 feet during the p.m. peak hour. o While the intersection is below the average crash rate, there have been eight (8) crashes in the last five (5) years that involved vehicles running the stop sign or failing to yield right-of-way. Manning Avenue/Oak-Land Middle School South Access: o As mentioned previously, parent pick-up/drop-off queues were observed to extend onto Manning Avenue for short durations (i.e., 10-minutes) during both the school arrival and departure peak hours. During site observations these queues were observed to be maintained within turn lane storage, however, there may be occurrences throughout the year where these queues extend beyond the turn lanes, which may cause friction and additional conflict points along Manning Avenue. New Lake Elmo Elementary School & Oak-Land Middle School August 1, 2024 Transportation Study Page 15 Proposed School Projects As mentioned previously, both the new Lake Elmo Elementary School and Oak-Land Middle School additions are expected to be completed and open in Fall of 2026. Oak-Land Middle School The existing Oak-Land Middle School is located in the southwest quadrant of the Manning Avenue (CSAH 15) and 10th Street (CSAH 10) intersection. Planned renovations, which are illustrated in Figure 7, include a proposed 16,000 square foot gymnasium and a 29,500 square foot classroom addition. The capacity of the school is expected to increase from 950 to 1,250 students with 125 total staff. No parking lot or vehicular access changes are planned as part of the renovation project. Note classes are scheduled to take place for approximately 172 days of the year. Lake Elmo Elementary School The new proposed Lake Elmo Elementary School, shown in Figure 8, is located in the northwest quadrant of the Lake Elmo Avenue (CSAH 17) and 10th Street (CSAH 10) intersection in the City of Lake Elmo. The new elementary school is expected to replace the existing Lake Elmo Elementary School, which is located in the northeast quadrant of the Lake Elmo Avenue/Stillwater Boulevard intersection. The new elementary school is anticipated to have a maximum enrollment of 1,100 students and 130 staff members. Note the current enrollment of Lake Elmo Elementary is approximately 650 students, however, for the purpose of this study the year of opening (2026) with the maximum enrollment was analyzed to provide a conservative estimate. Classes are scheduled to take place approximately 168 days of the year. Access to the elementary school is proposed at the following two (2) locations: • Main School Access: Located along 10th Street, approximately 1,225 feet west of 10th Street/Lake Elmo Avenue intersection; this access would be the primary access for staff/visitor parking and will also serve parent pick-up/drop-off operations. • Bus Access: Located along Lake Elmo Avenue, approximately 1,250 feet north of the 10th Street/Lake Elmo Avenue intersection; this access is intended for buses/utility vehicles only for the school. Further discussion regarding the site plan is documented later in this study. NORTHNorth02417789 July 2024 Preliminary Site Plan - Oak-Land Middle School Figure 7New Lake Elmo Elementary & Oak-Land Middle School Transportation Study City of Lake Elmo 02417789 July 2024 Preliminary Site Plan - Lake Elmo Elementary School Figure 8New Lake Elmo Elementary & Oak-Land Middle School Transportation Study City of Lake ElmoNORTHNorthMain School Access Bus Access New Lake Elmo Elementary School & Oak-Land Middle School August 1, 2024 Transportation Study Page 18 Traffic Forecasts To evaluate traffic impacts associated with the two school projects, traffic forecasts were developed for the year 2026 build conditions. The following information summarizes the year 2026 traffic forecast development process. School Time Changes Based on discussions with the school district, school times are expected to change prior to Year 2026 conditions and are summarized in Table 5. To account for the shift in travel patterns to/from Oak-Land Middle School, site trips were estimated throughout the network and modified to align with the new hours of operations. Given the staggered start/end times, four (4) separate peak hours were analyzed as part of this study to align with the new school times. It should be noted that these peak hours, which are also summarized in Table 5, slightly overlap with each other, however, in general the two (2) schools are staggered enough to minimize compounding impacts. Note the p.m. peak hour is based on the adjacent roadway network and is expected to remain from 4:00 to 5:00 p.m. Table 5. School Time Changes School School Times School Peak Hours Analyzed Current Future (2026) Oak-Land Middle School 7:50 – 2:20 pm 8:35 – 3:05 pm 7:45 -8:45 am 2:30-3:30 pm Lake Elmo Elementary 8:45 – 3:15 pm 7:45 – 2:15 pm 7:00 -8:00 am 1:45-2:45 pm Background Traffic Growth To account for general background growth in the area, a growth rate of one and three quarters (1.75) percent was applied to the existing peak hour traffic volumes to develop year 2026 background traffic forecasts. This growth rate was developed using a combination of historical average daily traffic (ADT) volumes from surrounding roadways publish by MnDOT, traffic forecasts from both the City of Lake Elmo and Washington County Comprehensive Plans, and engineering judgment. It should be noted that there are several development opportunities and potential roadway connections south of the school sites, however, based on discussions with the project team the general background growth rate is expected to account for this development potential from a traffic perspective. Trip Generation – Oak-Land Middle School To account for the traffic operations associated with the enrollment changes expected at Oak-Land Middle School, trip generation estimates were developed. The trip generation estimates, shown in Table 6, were developed using the existing trip rates based on the data collected at the site access locations (highlighted in gray). New Lake Elmo Elementary School & Oak-Land Middle School August 1, 2024 Transportation Study Page 19 Table 6. Oak-Land Middle School – Trip Generation School Students School Arrival Peak Hour School Departure Peak Hour P.M. Peak Hour Daily Trips In Out In Out In Out Current Site Trips 950 337 286 131 174 77 111 2,172 Enrollment Increase 300 +106 +90 +41 +54 +24 +35 +685 Total Site Trips 1,250 443 376 172 228 101 146 2,857 Results of the trip generation estimate indicate that Oak-Land Middle School is expected to generate an additional 196 school arrival peak hour, 95 school departure peak hour, 59 p.m. peak hour, and 685 daily trips with the new enrollment. Therefore, the school site trips were proportionally increased to account for the change in trips associated with the proposed enrollment increases. Trip Generation – Lake Elmo Elementary School To identify the traffic operations with the proposed elementary school, trip generation estimates for the school arrival (7:00 to 8:00 a.m.), school departure (1:45 to 2:45 p.m.), and p.m. peak hours (4:00 to 5:00 p.m.), as well as a daily basis were developed. The trip generation estimates, shown in Table 7, were developed using the ITE Trip Generation Manual, 11th Edition. Note that the trip generation was developed for the maximum enrollment of the school to provide a conservative estimate. Table 7. Trip Generation Estimate Land Use Type (ITE Code) Students School Arrival Peak Hour School Departure Peak Hour P.M. Peak Hour Daily Trips In Out In Out In Out Elementary School (520) 1,100 446 379 228 267 81 95 2,497 Results of the trip generation estimate indicate that the proposed new Lake Elmo Elementary School is expected to generate approximately 825 school arrival peak hour, 495 school departure peak hour, 176 p.m. peak hour, and 2,497 daily trips. Trips were distributed throughout the study area based on the directional distribution shown in Figure 9, which was developed based on enrollment information provided by the school district, existing travel patterns, and engineering judgement. Traffic Forecast Summary Based on the traffic forecast approach described within this study, peak hour traffic forecasts were developed for year 2026 build conditions, which is illustrated in Figures 10. The year 2026 build conditions incorporate adjustments for school hours at Oak-Land Middle School, general background growth, and additional trips generated by the new elementary school and middle school expansion. Figure 10 illustrates the peak volumes during the busiest periods, showing the peak hour volumes for each respective school at their primary study intersections. The year 2026 build traffic forecasts for all four (4) school peak periods are shown in the Appendix. NORTHNorth02417789 July 2024 Directional Distribution - Lake Elmo Elementary School Figure 9New Lake Elmo Elementary & Oak-Land Middle School Transportation Study City of Lake Elmo Manning Avenue NKeats Avenue NHudson Boulevard 94 5%7.5%2.5%5%25%25%10%Oak-Land Middle School Proposed New Lake Elmo Elementary School - Neighborhood Destination (Multiple Access Points) LEGEND 10th Street N Lake Elmo Avenue N20% 10 WASHINGTON COUNTY 15 WASHINGTON COUNTY 17 WASHINGTON COUNTY 19 WASHINGTON COUNTY NORTHNorth02417789 July 2024 Year 2026 Build Conditions Figure 10New Lake Elmo Elementary & Oak-Land Middle School Transportation Study City of Lake Elmo 10th Street N Oak-Land Middle School Manning Avenue NLake Elmo Avenue NKeats Avenue NHudson Boulevard 94 Proposed New Lake Elmo Elementary School XX [XX] (XX) - A.M. Peak Hour Volume - School Departure Peak Hour Volume - P.M. Peak Hour Volume - Side-Street Stop Control - Signalized Control - All Way Stop Control LEGENDLake Elmo Main Access 10th Street Lake Elmo Avenue 10th Street Lake Elmo Avenue Hudson Boulevard110 [75] (30)250 [175] (70) (25) [65] 130 (595) [450] 260 300 [145] (60) 460 [345] (435) (90) [90] 145(170) [90] 115(105) [75] 100215 [160] (135)85 [125] (155)20 [35] (45) (155) [190] 160 (385) [335] 260 (125) [100] 95 35 [25] (35) 400 [250] (270) 40 [50] (60) (55) [60] 105(300) [175] 235(20) [10] 1025 [20] (30)165 [195] (255)10 [10] (30) (70) [35] 15 (65) [25] 25 (50) [25] 20 15 [25] (40) 30 [25] (50) 30 [10] (25)Lake Elmo Avenue Lake Elmo Bus Access (0) [20] 20(355) [280] 29010 [10] (0)300 [295] (330) (0) [10] 10 (0) [20] 20 Keats Avenue 10th Street (305) [170] 190(20) [20] 5(230) [195] 2155 [20] (20)5 [15] (25)5 [10] (15) (15) [10] 10 (410) [320] 175 (330) [195] 150 5 [15] (10) 335 [230] (285) 235 [175] (165)Manning Avenue 10th Street Manning Avenue Oak-Land North Access Manning Avenue Oak-Land South Access (55) [80] 65(800) [570] 455(285) [175] 180130 [160] (150)495 [490] (525)35 [50] (90) (235) [195] 130 (225) [150] 80 (65) [85] 90 45 [50] (55) 140 [115] (140) 195 [95] (140) (15) [15] 20(1130) [825] 70030 [40] (25)750 [630] (710) (65) [50] 35 (25) [45] 155(1075) [740] 545(5) [0] 0255 [90] (25)525 [575] (715)0 [0] (0)15 [25] (45) (25) [70] 165 (30) [75] 185 0 [0] (5) 0 [0] (0) 0 [0] (5) 10 WASHINGTON COUNTY 15 WASHINGTON COUNTY 17 WASHINGTON COUNTY 19 WASHINGTON COUNTY New Lake Elmo Elementary School & Oak-Land Middle School August 1, 2024 Transportation Study Page 22 Year 2026 Build Conditions To understand how the study intersections will accommodate the year 2026 build traffic forecasts, an intersection capacity analysis was completed using Synchro/SimTraffic software. The following information summarizes the year 2026 build conditions. Assumptions The following assumptions were included as part of the intersection capacity analysis: • While operational issues were identified at the 10th Street/Keats Avenue intersection under existing conditions, the intersection was assumed to remain all-way stop control under the build conditions analysis. It should be noted that roundabout evaluation and preliminary design is programmed for 2027 based on the Washington County 2024-2028 Capital Improvement Plan. • It should be noted that the analysis assumes there is adequate parent pick-up/drop-off storage provided on-site. The required storage for parent pick-up/drop-offs and potential impacts of inadequate storage are discussed within the site plan review section. • While not shown in the preliminary site plan, an eastbound left-turn lane was assumed at the 10th Street/Main School Access for the new Lake Elmo Elementary School. • The operations analysis represents the busiest hour for each respective school at their primary study intersections. Operations for all four (4) school peak periods are shown in the Appendix. Year 2026 Build Conditions Results of the year 2026 build conditions intersection capacity analysis are shown in Table 8. Table 8. Year 2026 Build Intersection Capacity Analysis Intersection A.M. Peak Hour (3) School Departure Peak Hour (3) P.M. Peak Hour LOS Delay LOS Delay LOS Delay Lake Elmo Elementary School 10th Street/Keats Avenue (1) C 19 sec. D 26 sec. F > 3 min. 10th Street/Lake Elmo Avenue (1) F 98 sec. E 37 sec. F 54 sec. Lake Elmo Avenue/Hudson Boulevard (2) A/A 8 sec. A/A 6 sec. A/B 11 sec. Lake Elmo Avenue/Bus Access (2) A/A 5 sec. A/A 5 sec. A/A 4 sec. 10th Street/Main School Access (2) F/F > 2 min. C/F 58 sec. A/B 14 sec. Oak-Land Middle School 10th Street/Manning Avenue C 26 sec. C 26 sec. D 38 sec. Manning Avenue/Oak-Land MS North Access (2) A/A 10 sec. A/A 5 sec. A/A 6 sec. Manning Avenue/Oak-Land MS South Access B 14 sec. A 7 sec. A 6 sec. (1) Indicates an all-way stop control, where the overall LOS and delay are shown. (2) Indicates an unsignalized intersection with side-street stop control, where the overall LOS is shown followed by the worst side-street approach LOS. The delay shown represents the worst side-street approach delay. (3) The a.m. and school departure peak hour operations are summarized under each respective school peak period. Note the p.m. peak hour is based on the adjacent roadway network. New Lake Elmo Elementary School & Oak-Land Middle School August 1, 2024 Transportation Study Page 23 The following information summarizes the operational and/or queuing issues identified as part of the year of opening (i.e. 2026 build) intersection capacity analysis. Note the following section summarizes the percentage of trips contributed to the roadway network by the school developments. 10th Street/Keats Avenue: o The intersection is expected to be overcapacity during the p.m. peak hour, with overall average delays of over three (3) minutes and maximum eastbound queues of 1/2-mile. o As mentioned previously, this intersection is programmed within the Washington County 2024-2028 Capital Improvement Plan for roundabout evaluation/preliminary design in 2027. o Recommendation: The County should execute their CIP and construct a roundabout at the intersection to improve operations and safety. 10th Street/Lake Elmo Avenue: o The intersection is expected to operate at an unacceptable LOS E/F during the a.m., school departure, and p.m. peak hours. Eastbound queues are expected to be over 600 feet during all three peak hours, and westbound queues are expected to be over 1,500 feet during the a.m. peak hour. o As mentioned previously, while the intersection is below the average crash rate, there have been eight (8) crashes in the last five (5) years that involved vehicles running the stop sign or failing to yield right-of-way. o Recommendation: The County should consider constructing a traffic signal or roundabout at the intersection to improve operations and better delineate right-of-way. 10th Street/Lake Elmo Elementary Main School Access: o The southbound approach (i.e. elementary school exit) operates at LOS F and is expected to have queues of 500 to 1,200 feet (25 to 60 vehicles) during the peak 30-minute windows before and after school start and end times. o Approximately 250 vehicles are expected to make a southbound left-turn movement during the a.m. peak hour, which presents a safety concern given the peak characteristics associated with the school, and the high-speeds (i.e. 55-mph) of the adjacent roadway network. In addition, gaps along 10th Street are expected to be limited, and drivers may accept smaller gaps and make more aggressive movements, which could increase the risk of a potential crash. o Recommendation: Construct a traffic signal or roundabout at the intersection to improve operations and safety.  Other options were considered, such as employing traffic control officers, restricting left-turns, or implementing staggered pick-up/drop-off schedules. However, high speeds on the roadway pose a safety concern for traffic control officers. Implementing access restrictions would force vehicles to travel three quarters of a mile to the 10th New Lake Elmo Elementary School & Oak-Land Middle School August 1, 2024 Transportation Study Page 24 Street/Keats Avenue intersection to reroute their travel patterns. Additionally, while staggered pick-up/drop-off schedules could help alleviate some operational challenges, they may inconvenience parents with multiple students and are unlikely to fully resolve the safety and operational concerns. 10th Street/Lake Elmo Elementary Bus Access: o During school arrival and departure peak hours, an estimated 16 to 18 buses are anticipated to access the site from the south, likely within a similar time window. o Recommendation: While not needed from an operations perspective, given the high speeds (i.e. 55-mph) of the roadway, a northbound left-turn lane is recommended at the school’s bus access from a safety perspective. New Lake Elmo Elementary School & Oak-Land Middle School August 1, 2024 Transportation Study Page 25 Trip Proportional Share Based on the year 2026 build conditions analysis, intersection improvements were identified at the 10th Street/Lake Elmo Avenue intersection. The improvements are triggered based on a combination of background traffic and the maximum enrollment of the elementary school. It should be noted that operational issues were identified at the intersection during the p.m. peak hour under existing conditions. Therefore, to identify the number of trips the proposed elementary school contributes to the intersection, a trip proportional share analysis was conducted. The intersection is currently an all-way stop control, therefore, all movements conflict with each other and contribute to the overall operations of the intersection. The trip proportional share, which is shown in Table 9, was developed by taking the expected elementary site trips entering the intersection and dividing them by the total number of entering vehicles under the year 2026 build conditions. The review included daily trips as well as each of the three peak hours analyzed (i.e. a.m., school departure, and p.m. peak hour) given issues were identified under all peak hour scenarios. Note that the proportional share was primarily focused on the Lake Elmo Elementary School trips, as the school times are largely staggered from each other and the increase in trips from Oak-Land Middle School during the p.m. peak hour is expected to be minimal. The resultant proportional share of trips that the proposed elementary school contributes to the intersection ranges from seven (7) to 35 percent. Table 9. 10th Street/Lake Elmo Avenue - Trip Proportional Share (2026 Build) Entering Volumes A.M. Peak Hour School Departure Peak Hour P.M. Peak Hour Daily Lake Elmo Elementary Site Trips 580 350 125 1,750 Year 2026 Build Total Volumes 1,645 1,490 1,710 18,120 Proportional Share 35% 23% 7% 10% In addition to assessing the 10th Street/Lake Elmo Avenue intersection, daily volumes were also reviewed along the study roadways. A summary of the current background traffic and the traffic volume changes associated with the school developments is shown in Figure 11. Note the background traffic volumes are based on the 24-hour volumes collected as part of the study and adjusted using the general background growth rate. The ADT comparison indicates that most study roadways are only anticipated to increase by approximately one (1) to 10 percent as a result of the school developments. NORTHNorth02417789 June 2024 Daily Volume Comparison Figure 11New Lake Elmo Elementary & Oak-Land Middle School Transportation Study City of Lake Elmo 10th Street N Manning Avenue NLake Elmo Avenue NKeats Avenue NHudson Boulevard 94 XX (XX) [XX] {XX} /+- - 2024 ADT - Estimated 2026 ADT - New Daily School Trips - 2026 ADT with New School Trips - % Change in Daily Traffic Volume (2026) - Study Intersections LEGEND 9,890 (10,250) [650] {10,900} +6% 6,185 (6,400) [650] {7,050} +10% 8,400 (8,700) [525] {9,225} +6% 17,850 (18,475) [350] {18,825} +2% 6,660 (6,900) [125] {7,025} +2% Proposed New Lake Elmo Elementary School Oak-Land Middle School 13,150 (13,600) [150] {13,750} +1% 8,000 (8,300) [350] {8,650} +4% 18,000 (18,625) [400] {19,025} +2% 10 WASHINGTON COUNTY 15 WASHINGTON COUNTY 17 WASHINGTON COUNTY 19 WASHINGTON COUNTY New Lake Elmo Elementary School & Oak-Land Middle School August 1, 2024 Transportation Study Page 27 Parent Pick-up/Drop-off Storage A review of the existing and proposed parent pick-up/drop-off storage was completed to identify any issues and recommend potential improvements to limit any impacts to the adjacent roadway network. Oak-Land Middle School As mentioned previously, field observations were performed at the Oak-Land Middle School to identify any access, circulation, and/or parent pick-up/drop-off issues. Observations indicated that internal queueing extended onto Manning Avenue but generally remained within the turn lane storage at the Manning Avenue/Oak-Land Middle School south access intersection. From the main building access, there is approximately 750 feet of single-lane internal queueing storage provided on-site, and approximately 1,200 feet of queues were observed. Projecting forward with the anticipated enrollment increases, approximately 375 feet of additional storage may be required in the future to accommodate increased demand. With the future enrollment, parent pick-up/drop-off queues are expected to extend beyond turn lanes, which may cause friction and additional conflict points along Manning Avenue. Therefore, the following considerations are provided to help increase vehicular storage on-site, which are summarized below and illustrated in Figure 12. It should be noted that there is limited flexibility to improve on-site storage for the site given the existing building footprint/access and the Manning Avenue intersection location. 1. Consider implementing a dual-lane entry within the parking lot to provide an additional 500 feet of on-site storage. This configuration allows vehicles to queue in two lanes before merging into a single lane prior to the parent pick-up/drop-off area. The strategy could be accomplished through the use of daily cones, signage, pavement markings, and/or direct communication with parents. It is important to note that this strategy will utilize the full width of the drive isle, which may limit parking and/or maneuvering the parking lot for staff and other users. Additionally, the merge point may present a learning curve for some parents, and initial implementation may require support from the school resource officer. Note this strategy will not alleviate queueing onto Manning Avenue but is expected to maintain queueing within the turn lane storage, similar to what was observed under existing conditions. 2. If feasible, consider providing an additional building access for students on the south side of the building. During observations, it was noted that despite signage, parents did not pull up past the main school entrance, resulting in 170 feet of on-site queuing storage being underutilized. Introducing a south-side access point would encourage parents to utilize this additional storage effectively. 3. Other strategies, such as implementing staggered pick-up/drop-off times for different grades or classes could be considered if issues arise. NORTHNorth1,200 ft 1 (170 ft) 2 New Lake Elmo Elementary School & Oak-Land Middle School August 1, 2024 Transportation Study Page 29 Lake Elmo Elementary School The proposed elementary school layout includes a one-way parent pick-up/drop-off, with two lanes of queueing storage provided near the school’s main entrance. Based on the preliminary site plan, there is expected to be approximately 2,100 feet of internal queueing storage provided within the parent pick-up/drop-off lane. Based on recent (i.e. 2022 to 2024) queueing studies completed by SRF at multiple elementary schools in/around the metro (including the existing Lake Elmo Elementary School), the expected storage needed for an enrollment of 1,100 students is approximately 2,400 feet. Note this storage represents the school pick-up timeframe, which is often longer than the morning drop-off, as several parents often arrive early and wait for the school release. Comparing the expected storage needed at the proposed elementary school under the max enrollment with the preliminary site plan indicates that there is a potential deficit of approximately 300 feet of storage. This deficit may result in queues along 10th Street to block through traffic, which could cause safety and operational issues. Therefore, the following site plan considerations are provided to help increase vehicular storage on-site and improve internal operations/site circulation, which are summarized below and illustrated in Figure 13. 1. Consider extending the dual-lane storage to just east of the internal intersection to provide an additional 300 feet of on-site vehicular storage. While a dual-lane pick-up/drop-off operation could be considered, it requires significant staffing for successful implementation. The purpose of the dual-lanes in this configuration is to increase the capacity for stacking vehicles on-site before merging them into a standard single-lane pick-up/drop-off area. a. Provide adequate signage and striping to inform parents to form two lanes during school pick-up/drop-offs and merge to one lane near the designated parent pick-up/drop-off area. Note that based on other school observations, this may only be needed during school pick-ups when parents arrive early and wait for the school release. As mentioned previously, the merge point may present a learning curve for some parents, and initial implementation may require support from school staff. 2. Consider reconfiguring or redesigning the parking lot to minimize access points near the parent pick-up/drop-off outlet. This adjustment aims to decrease conflict points, designate right-of-way to reduce driver confusion, and improve circulation. NORTHNorth02417789 July 2024 Site Plan Considerations - Lake Elmo Elementary School Figure 13New Lake Elmo Elementary & Oak-Land Middle School Transportation Study City of Lake Elmo 2,400 ft 1 2 New Lake Elmo Elementary School & Oak-Land Middle School August 1, 2024 Transportation Study Page 31 Pedestrian/Bicycle Considerations Note the existing pedestrian/bicycle facility network is discussed in the existing conditions section and previously shown in Figure 3. While nearby local neighborhood developments incorporate internal pedestrian/bicycle facilities, the adjacent highways generally lack off-street facilities and pedestrian crossings. The proximity of the two (2) schools to these high-speed county highways presents a challenge in balancing pedestrian connectivity with safety concerns. Enhancing pedestrian access is important for ensuring school accessibility, yet the high-speed nature of the adjacent roadways raises safety considerations. Therefore, the following pedestrian/bicycle considerations are offered, which are also illustrated in Figure 14. It should be noted that there may be several feasibility challenges with the provided considerations, therefore, further discussion should occur with area stakeholders to determine what pedestrian/bicycle facilities options could/should be implemented. 1. Extend the existing trail along 10th Street (trail starts at Palmer Drive but terminates approximately 150 feet to the east) to connect to the Manning Avenue/10th Street intersection. This connection provides Oak-Land Middle School users the ability to walk to/from the neighborhood development along Palmer Drive. 2. Guide future development to include a trail connection from Oak-Land Middle School to the neighborhood to the west. The neighborhood comprises of approximately five (5) percent of the middle school’s current enrollment and is within a short walking distance, averaging less than 3/4 mile. a. As mentioned previously, there are upcoming plans to extend 5th Street to Manning Avenue, with off-street trails along the roadway and anticipated residential developments nearby. Therefore, this trail connection could potentially facilitate a future trail connection to the extended 5th Street if/when it gets extended. 3. Similar to consideration #2, there are residential neighborhoods nearby where students could potentially walk or bike if safe facilities were provided. This consideration involves establishing a pedestrian/bicycle connection to/from the neighborhoods to the southeast, east, and northeast of the proposed elementary school. The proposed facilities would cross the adjacent highways at the current all-way stop controlled intersection of Lake Elmo Avenue/10th Street, with potential improvements to a traffic signal or roundabout. Given the roadway speeds, additional support from parents or staff may be desired at the crossing. Nevertheless, this offers another accessibility option that could help alleviate vehicular traffic. 4. The Washington County Bicycle and Pedestrian Plan (2021) identifies future off-road pedestrian/bicycle facilities along 10th Street (CSAH 10) and Manning Avenue (CSAH 15). Note both corridors are designated as “high priority” within the plan and would connect the proposed facilities outlined above. While not identified in the plan, an off-street facility could be considered along Lake Elmo Avenue could provide access to the residential development along 5th Street. a. Note Washington County is planning to reconstruct Manning Avenue from 10th Street to 30th Street to provide center left-turn lanes at key locations. As part of the project, off-street pedestrian/bicycle facilities could be considered. NORTHNorth02417789 July 2024 Pedestrian and Bicycle Considerations Figure 14New Lake Elmo Elementary & Oak-Land Middle School Transportation Study City of Lake Elmo 10th Street NKeats Avenue NHudson Boulevard 94 Proposed New Lake Elmo Elementary School Oak-Land Middle School Lake Elmo Avenue NManning Avenue N2 STOP 2A STOP 3 154 4 LEGEND - Recommended Trail/Sidewalk - Trail - Sidewalk - All-Way Stop Control - Traffic Signal - Future Roadway Extension - Future Washington County Reconstruction Project STOP 4A New Lake Elmo Elementary School & Oak-Land Middle School August 1, 2024 Transportation Study Page 33 Summary and Conclusions SRF has completed a transportation study for the new Lake Elmo Elementary School and the additions to Oak-Land Middle School in the City of Lake Elmo, MN. The main objectives of the transportation study were to review existing operations within the study area, evaluate transportation impacts to the adjacent roadway network based on the new elementary school and additions to the middle school, and recommend any necessary improvements to provide safe and efficient operations for all modes of transportation. Key findings of the transportation study are summarized below: 1) Existing Conditions: a. Pedestrian/Bicycle Facilities: Existing pedestrian/bicycle facilities were assessed, revealing gaps and safety challenges, particularly due to the high-speed roadways surrounding the schools. b. Safety Analysis: A review of crash data identified patterns and highlighted intersections with higher crash rates, however, none of the study intersections have a crash rate over the critical rate, indicating that no study intersections have a statistically significant crash problem. c. School Observations: Field observations were conducted at both the Oak-Land Middle School and former Lake Elmo Elementary School to identify travel patterns, pick-up/drop-off queues, and other site-specific issues. i. Parent pick-up/drop-off queues were observed at Oak-Land Middle School to extend onto Manning Avenue for short durations (i.e. 10-minutes) during the school arrival and departure peak hours. d. Traffic Operations: Existing operational issues were identified at the following study intersections. All other study intersections are expected to operate at an acceptable LOS D or better during peak periods. i. 10th Street/Keats Avenue: Overall intersection operates at LOS F during the p.m. peak hour. ii. 10th Street/Lake Elmo Avenue: Eastbound approach operates at LOS E during p.m. peak hour. 2) Traffic Forecasts: a. Background Growth: A 1.75 percent annual growth rate was applied to existing peak hour traffic volumes to forecast 2026 background traffic. b. Lake Elmo Elementary Trip Generation: The new Lake Elmo Elementary School is expected to generate approximately 825 a.m. peak hour, 495 school departure peak hour, 176 p.m. peak hour, and 2,497 daily trips. New Lake Elmo Elementary School & Oak-Land Middle School August 1, 2024 Transportation Study Page 34 c. Oak-Land Middle School Trip Generation: The expected enrollment changes at the Oak-Land Middle School are expected to generate an additional 196 a.m. peak hour, 95 school departure peak hour, 59 p.m. peak hour, and 685 daily trips. 3) Future Operations: a. Year 2026 Build Conditions: The following study intersections were projected to experience unacceptable levels of service during peak hours: i. 10th Street/Keats Avenue ii. 10th Street/Lake Elmo Avenue iii. 10th Street/Lake Elmo Elementary School Main Access b. Trip Proportional Share: Existing issues were identified at the 10th Street/Lake Elmo Avenue intersection. Therefore, a trip generation analysis was conducted to determine the proportion of trips attributable to the proposed elementary school. It is anticipated that the elementary school will contribute seven (7) to 35 percent of the total traffic volume at this intersection. c. Parent Pick-up/Drop-off Storage: Both schools are expected to have a deficit in on-site vehicular storage for parent pick-up/drop-off operations, which may cause impacts to the adjacent roadway network. 4) Recommendations: a. Intersection Improvements: Traffic control improvements (i.e. traffic signal or roundabout) were recommended at the following study intersections to improve operations and safety. In addition, a northbound left-turn lane was recommended at the Lake Elmo Avenue/Lake Elmo Elementary School Bus Access intersection for safety purposes. i. 10th Street/Keats Avenue ii. 10th Street/Lake Elmo Avenue iii. 10th Street/Lake Elmo Elementary School Main Access b. Site Plan Recommendations: Recommendations were provided for both schools to improve internal circulation and expand on-site queuing storage to accommodate the increased vehicular demand expected during peak periods. c. Pedestrian/Bicycle Connectivity: Enhancements were proposed to create safer connections for pedestrians and bicyclists, including trail extensions and new crossings, to promote active transportation. Veneklasen Associates Consultants in Acoustics | Noise | Vibration | AV | IT 1711 Sixteenth Street • Santa Monica California 90404 • tel: 310.450.1733 • fax: 310.396.3424 • www.veneklasen.com October 28, 2024 Wold Architects & Engineers 332 Minnesota St., Suite W2000 Saint Paul, MN 55101 Attention: Matthew M. Mohr, AIA | Associate Subject: New Lake Elmo Elementary School Noise Study Lake Elmo, Minnesota Property Noise Measurement Summary Veneklasen Project No. 8512-002 Dear Matthew: Veneklasen Associates, Inc. (Veneklasen) provides the following property acoustical measurement summary and analysis as compared to the applicable State of Minnesota noise codes for the subject project. The proposed project is planned due east of the existing Oakdale Gun Club in Lake Elmo, Minnesota. Given that measurements were not completed during the peak operational time of year for the club, additional acoustical analyses were conducted to estimate potential increases in measured noise levels for increases in club activities. This report documents our findings. Executive Summary The subject project is proposed to be constructed on a corner lot directly due east, and to share a property line with, the existing Oakdale Gun Club, both located in Lake Elmo, Minnesota. The intention of this study was to determine whether existing activities from the gun club as measured at the proposed project property, as well as other planned outdoor activity areas for the school and at the westernmost portion of the school building, would comply with the applicable State noise codes. An acoustical measurement survey was conducted to collect data from gun club activities at various areas of acoustic sensitivity, as defined by the appropriate codes. This data was analyzed and compared against allowable property noise level limits and determined to be compliant without additional mitigation. Further analysis was conducted to evaluate the anticipated noise level increases resulting from increased activity as well as the effects that higher-caliber firearms have on measured noise levels. These results were also compared to applicable code requirements and found to be compliant without additional mitigation. In summary, existing noise levels from the gun club as well as anticipated noise from increased use at busiest time meet the Code requirements and do not require the Lake Elmo Elementary School to implement any noise mitigation measures to be compliant with the state noise code requirements. Noise Criteria The City of Lake Elmo has no specific criteria for property noise relating to firearms, shooting ranges, or gun clubs. Nor does it include any explicit prohibition of noise beyond subjective language. In instances such as this, it is appropriate to defer to the county or state codes. Typically, this would solely be the Minnesota Pollution Control Agency (MPCA) Chapter 7030 “Noise Pollution Control”. However, the Minnesota Statutes 2023 Chapter 87A “Shooting Ranges” document has specific criteria that apply to shooting ranges and the like that explicitly modify the MPCA noise criteria. Both of these criteria are explained further below. Veneklasen Associates New Lake Elmo Elementary School Noise Study; Lake Elmo, Minnesota Property Noise Measurement Summary; Veneklasen Project No. 8512-002 October 28, 2024; Page 2 of 9 Month Day, Year; Page 2 of 9 www.veneklasen.com Section 87A.05 “Noise Standards” of the Minnesota Statutes document states the following: Allowable noise levels for the operation of a shooting range are the levels determined by replacing the steady state noise L10 and L50 state standards for each period of time within each noise area’s classification with a single Leq(h) standard for impulsive noise that is two dBA lower than that of the L10 level for steady state noise. The noise level shall be measured outside of the range property at the location of the receiver’s activity according to the Minnesota Rules, parts 7030.0010 to 7030.0080, as in effect on May 28, 2005. For purposes of this section, “Leq(h)” means the energy level that is equivalent to a steady state level that contains the same amount of energy as the time varying sound level for a 60 -minute time period. Per the MPCA chapter on noise control, an elementary school would be classified as a Noise Area Classification 1 , which has the strictest noise limits in this document and also classifies property types such as residences, places of worship, etc. Section 7030.0040 “Noise Standards” provides a table of allowable noise levels per noise metric (L10 or L50), time of day, and Noise Area Classification. Table is summarized below. Table 1. MPCA Property Noise Standards Noise Area Classification Daytime Nighttime L50 L10 L50 L10 1 60 65 50 55 2 65 70 65 70 3 75 80 75 80 Per discussions with the gun club management, the club closes for members at sundown. Daytime hours, per the MPCA, are defined as the hours between 7AM and 10PM. Based on the Noise Classification Area and the daytime operation, the standard MPCA criteria would be: 1. L50 limit of 60 dBA and 2. L10 limit of 65 dBA. 3. However, per Section 87A.05, which specifically addresses a shooting range, these criteria are substituted for a single hourly equivalent (average) sound pressure level of 63 dBA. Section 87A.04(a) “Mitigation Area” of the Minnesota Statutes document states the following: Except for those uses, developments, and structures in existence or for which approval has been granted by October 1, 2005, or as provided in paragraph (b), no change in use, new development, or construction of a structure shall be approved for any portion of property within 750 feet of the perimeter property line of an outdoor shooting range if the change in use, development, or construction would cause an outdoor shooting range in compliance with this chapter to become out of compliance. This states that, given the school property has portions within 750 feet of the existing gun club property line, if gun club activities would exceed the 63 dBA limit discussed above, it is the responsibility of the Client to provide acoustic mitigation to comply. Per Section 87A.05, areas that must comply with this noise limit include areas of outdoor activity and the school building itself. Acoustical Measurement Summary An acoustic measurement survey was conducted to evaluate the existing impacts of gun club activities on the property line, as well as other proposed areas of outdoor activity per the applicable State code. These results were then compared to the allowable noise limit to determine whether additional steps towards acoustic mitigation were necessary. Beginning on the 4th of July and going until the fall, the Oakdale Gun Club opens their club to the public on weekends. It is limited to membership only on weekdays in this period of time. It is understood that, during this period of time, occupancy increases on weekends because the club hosts both the public as well as its members. Therefore, it was Veneklasen Associates New Lake Elmo Elementary School Noise Study; Lake Elmo, Minnesota Property Noise Measurement Summary; Veneklasen Project No. 8512-002 October 28, 2024; Page 3 of 9 Month Day, Year; Page 3 of 9 www.veneklasen.com Veneklasen’s goal to conduct acoustic measurements over some of these July weekends to capture both “membership only” days as well as weekends, which may have higher occupancy. Veneklasen visited the site on Monday July 8, 2024 and set up four (4) noise monitors on the proposed project site to capture gun club activity noise. Acoustic data was captured over two (2) separate weekends and several weekdays. Per the code criteria, noise levels were evaluated by hour-long segments. Sounds not attributable to gun club activities (e.g., documented weather events using the Weather Underground website) were omitted from the analysis. Table 2 and Figure 1 below show a summary of the collected noise data attributable to gun club activities as well as an aerial satellite image of the measurement locations. L1 was taken at the property line, L2 was taken at the nearest location of proposed outdoor school activities, L3 is the approximate edge of the 750-foot mitigation area discussed in the previous section, and L4 is the northwesternmost corner of the proposed school building. Figure 1. Aerial Image of Project Site Showing Measurement Locations Table 2. Measurement Results Summary Measurement Location Weekday Results Weekend Results Average, LAeq(h) Maximum, LAeq(h) Average, LAeq(h) Maximum, LAeq(h) L1 46 49 47 55 L2 45 49 46 50 L3 47 49 50 53 L4 48 51 48 52 Note that often levels from L3 and L4 are louder than L1 and L2 despite being further away from the gun club. Our analysis of gun club activity noise has determined that often gun fire noise levels are equal to, or sometimes below, the existing ambient noise levels, which are dictated by nearby traffic noise. Measurement positions L3 and L4 are Veneklasen Associates New Lake Elmo Elementary School Noise Study; Lake Elmo, Minnesota Property Noise Measurement Summary; Veneklasen Project No. 8512-002 October 28, 2024; Page 4 of 9 Month Day, Year; Page 4 of 9 www.veneklasen.com closer to the nearby roadways and the average hourly levels are therefore generally louder unless influenced by higher amounts of gunfire activity. Note that the maximum hourly level at L1 is louder at L1 than all other positions due to gun fire activity. Acoustic Modelling To verify the accuracy of acoustic measurements at the positions noted above, Veneklasen created an acoustic model of the gun club and proposed school property. The 2023 version of the SoftNoise Predictor acoustic modelling software was used to build the noise propagation model, specifically using the ISO 9613 noise calculation method. This software allows the incorporation of geographical conditions across both sites, atmospheric affects, effects of existing structures, and other attributes that affect how sound levels change as they propagate from the gun club to the proposed school properties. Once all four noise monitors, as discussed above, were running, Veneklasen had club members conduct several test shots at each of the five shooting bays and conducted short-duration calibration measurements within 15-feet of each of these shooting locations. These measurements were used to show the accuracy of the acoustic model discussed above to verify that the terrain, foliage, atmospheric conditions, etc. were all modeled appropriately such that the model represented real-world measurement conditions. The maximum deviation between modelled analysis results versus measured results was 0.9 decibels at the L4 position, which is the furthest position away from the sound source and well within the acceptable margin of error for an acoustic model. As noted above, acoustical measurements took place in July of 2024 when the gun club is only open to the public on weekends. However, during the months of October and November, the club is open to the public seven days a week. Per conversations with gun club ownership, these months are the most populus and generally when they have the highest patronage. Once a suitable acoustic model was constructed, it was pertinent to evaluate anticipated noise level changes based on increased occupancy from summer to fall. This includes both the effects of increased number of people as well as higher caliber firearms. Acoustic models were created for each condition. Increased Occupancy The gun club does not track number of rounds fired per day. They do, however, track the number of patrons who attend per day and were able to provide Veneklasen with occupancy data for July of 2023, October through November of 2023, and July of 2024. Veneklasen utilized a formula to calculate the anticipated change in measured sound level based on changes in occupancy from summer to fall. This formula format is a logarithmic change formula used often in acoustics for other applications (e.g., changes in traffic noise): 𝛥[𝑐𝐵] =10 log10 𝑜𝑐𝑐𝑒𝑎𝑙𝑙 𝑜𝑐𝑐𝑟𝑢𝑙𝑙𝑒𝑟 To model the increases in measured noise level, Veneklasen input the occupancy data collected from July of 2024 and the fall of 2023 into the formula above. Figure 2 shows predicted noise with increased occupancy in the fall at the same measurement locations shown in Figure 1. Numeric results below are shown in one hour dBA values with a maximum value of 60dBA, which is below the allowable 63dBA criterion. Veneklasen Associates New Lake Elmo Elementary School Noise Study; Lake Elmo, Minnesota Property Noise Measurement Summary; Veneklasen Project No. 8512-002 October 28, 2024; Page 5 of 9 Month Day, Year; Page 5 of 9 www.veneklasen.com Figure 2. Increased Fall-Time Occupancy Noise Model Given that this method is primarily used for constant sound sources (e.g., free flowing traffic or mechanical equipment), using it for an intermittent sound source like gunfire will likely result in an overestimation of increased noise. When summing constant and equal sound sources, the two will always overlap because they are consistently running and therefore double; when summing intermittent sound sources, whether or not the overall acoustic pressure doubles or is less than double depends on whether the intermittent events line up in time or not. Additionally, occupancy data provided to Veneklasen is highly variable when comparing July of 2023 to July of 2024. On average, weekends in July of 2023 were ten persons lower than weekends in July of 2024. Given that the highest occupancy weekend day in either year during this month was 38 people, this is a statistically significant swing. Therefore, Veneklasen has used the 90th percentile of occupancy data for July of 2024 and for fall of 2023 to evaluate a case where a large number of patrons happen to v isit the club on a particular day. All occupancy data provided to Veneklasen by gun club ownership can be found in the appendix. High-Caliber Firearms In careful analysis of the measurement data, it was observed that there were instances where the hourly noise level on a particular day would be substantially higher than the other measured hourly levels on that same day. It was found that these were due to louder individual gunshot events occurring within said hour (or hours) as compared to other hours. These were uncommon in the measured data. As mentioned previously, gun club management provided a demonstration for Veneklasen at each of the firing bays so that short-duration acoustic measurements could be conducted and compared to the noise monitoring positions in order to calibrate an acoustical model. One of these was a 45-caliber firearm. L1: 59dBA L2: 57dBA L3: 57dBA L4: 60dBA Veneklasen Associates New Lake Elmo Elementary School Noise Study; Lake Elmo, Minnesota Property Noise Measurement Summary; Veneklasen Project No. 8512-002 October 28, 2024; Page 6 of 9 Month Day, Year; Page 6 of 9 www.veneklasen.com To model the case where patrons of all shooting bays are using a high caliber rifle, Veneklasen modelled noise to the proposed school property in the instance where a 45-caliber firearm is being used at each of the five shooting bays simultaneously. This is representative of a shooting competition event being held at the club. Numeric results below are shown in one hour dBA values with a maximum value of 62 dBA, which is below the allowable 63 dBA criterion. Note, this model is conservative for a similar reason the above model is because shooters in all five bays will not be firing simultaneously and will not all fire the same number of rounds so what is presented is the most conservative representation of use. It is also worth noting that the gun club has a 50 -caliber firearm limit. Figure 3. Five Simultaneous High-Caliber Firearm Modelled Noise Levels Summary Veneklasen conducted acoustic measurements of firearm noise from the Oakdale Gun Club as measured on the proposed project school site to determine whether noise levels exceeded allowable MPCA criteria and would trigger the proposed project to implement noise control measures. The allowable noise threshold was 63dBA as measured within one (1) hour at any location on the school property where activity would take place. Acoustic measurements at four (4) key locations were taken in July of 2023. The results of these measurements showed that existing noise levels are compliant with MPCA criteria. However, it was communicated to Veneklasen that occupancy, and likely noise, was greater during the months of October and November. Therefore, Veneklasen completed additional calculations to model different higher-noise operating conditions of the gun club and verify these would also be code compliant. L1: 59dBA L2: 59dBA L3: 58dBA L4: 62dBA Veneklasen Associates New Lake Elmo Elementary School Noise Study; Lake Elmo, Minnesota Property Noise Measurement Summary; Veneklasen Project No. 8512-002 October 28, 2024; Page 7 of 9 Month Day, Year; Page 7 of 9 www.veneklasen.com Veneklasen modelled both an increase in gun club occupancy as well as increased usage of high -caliber firearms. Both of these acoustic models also showed noise levels in compliance with MCPA criteria. It should be noted that, for reasons discussed above, these calculated models are conservative and likely overestimated noise levels. Therefore, no acoustic mitigation measures are required to comply with state noise codes. If you have any questions, please do not hesitate to call. Sincerely, Veneklasen Associates, Inc. Kevin Patterson Arjun Shankar Senior Associate Associate Veneklasen Associates New Lake Elmo Elementary School Noise Study; Lake Elmo, Minnesota Property Noise Measurement Summary; Veneklasen Project No. 8512-002 October 28, 2024; Page 8 of 9 Month Day, Year; Page 8 of 9 www.veneklasen.com APPENDIX I – Oakdale Gun Club Occupancy Logs Table 3. Gun Club Occupancy Data Date Day Occupancy July, 2023 8 Sat 20 9 Sun 30 15 Sat 38 16 Sun 17 22 Sat 30 23 Sun 27 29 Sat 26 30 Sun 34 Aug., 2023 5 Sat 19 6 Sun 15 12 Sat 24 13 Sun 24 19 Sat 44 20 Sun 32 26 Sat 44 27 Sun 44 Sept., 2023 2 Sat 33 3 Sun 27 9 Sat 29 10 Sun 24 15 Fri. 19 16 Sat. 41 17 Sun. 29 22 Fri. 18 23 Sat. 25 24 Sun. 24 29 Fri. 17 30 Sat. 41 Oct., 2023 1 Sun. 49 5 Fri. 39 6 Sat. 67 7 Sun. 66 13 Fri. 15 14 Sat. 41 15 Sun. 93 19 Thurs. 31 20 Fri. 55 21 Sat 94 22 Sun 89 23 Mon 42 24 Tue 17 25 Wed 37 26 Thu 31 27 Fri 44 28 Sat 116 29 Sun 111 30 Mon 73 31 Tue 47 Nov., 2023 1 Wed 75 2 Thu 98 3 Fri 90 4 Sat 50 5 Sun 58 6 Mon 35 7 Tue 32 8 Wed 36 9 Thu 41 10 Fri 45 11 Sat 63 12 Sun 81 18 Sat 24 19 Sun 40 July, 2024 6 Sat 29 7 Sun 16 13 Sat 18 14 Sun 29 20 Sat 16 21 Sun 14 27 Sat 24 28 Sun 14 Veneklasen Associates New Lake Elmo Elementary School Noise Study; Lake Elmo, Minnesota Property Noise Measurement Summary; Veneklasen Project No. 8512-002 October 28, 2024; Page 9 of 9 Month Day, Year; Page 9 of 9 www.veneklasen.com Table 4. Gun Club Occupancy Statistics Time Period Occupancy Avg Max 90th Percentile Standard Deviation July 2023 28 38 35 7 Aug. 2023 31 44 44 6 Sept. 2023 27 41 40 7 Oct. 2023 58 116 96 7 Nov. 2023 55 98 87 6 July 2024. 20 29 29 6 Summer Comb. 28 44 42 9 Autumn Comb. 57 116 94 26     PAGE 1 of 4  MEMORANDUM         Date:  September 23, 2024        To:  Sophia Jensen, City Planner  Re:  ISD 834 Lake Elmo Elementary School   Cc:  Nathan Fuerst, Planning Consultant    PID 26‐029‐21‐44‐0001    Marty Powers, Public Works Director    Minor Subdivision and CUP    Chad Isakson, PE, Assistant City Engineer      From:  Jack Griffin, PE, City Engineer          Engineering has reviewed the ISD 834 Lake Elmo Elementary School Site Plans received August 26, 2024 as part of  their Minor Subdivision and CUP applications. The new school is proposed to be located at the corner of Lake  Elmo Avenue (CSAH 17) and 10 Street (CSAH 10). The review consisted of the following documentation:   Plat: 10th and Lake Elmo School Addition.   Preliminary Plat and Plans dated August 23, 2024: C000, C001, C002, C050, C100‐C105; C200‐C205; C300‐ C305; C400‐C405; C500‐505.   Stormwater Management Report dated August 23, 2024.   Draft Geotechnical Report dated June 26, 2024.   Traffic Study dated August 1, 2024.      FINAL PLAT: 10TH AND LAKE ELMO SCHOOL ADDITION  1. The Final Plat shall not be recorded until the City Engineer approves the Final Construction Plans.  2. County Roadway Right‐of‐way Dedication. Right‐of‐way dedication has been shown on the Plat along both  Lake Elmo Avenue (CSAH 17) and 10th Street North (CSAH 10) to provide a total of 75‐feet from  referenced section line. The right‐of‐way dedication must be reviewed and verified by Washington County  prior to recording a Final Plat to ensure the right‐of‐way dedication is sufficient for future County roadway  improvements, including potentially a future roundabout complete with pedestrian facilities.    Additional  right‐of‐way  dedication  appears  to  be  needed  at  the northwest  corner  of  Lake  Elmo  Avenue (CSAH 17) and 10th Street North (CSAH 10) to accommodate a site‐triangle similar to the  northeast and southeast corners.   3. All easements as required by the City Engineer and Public Works Director shall be documented on the  Final Plat prior to the release of the Final Plat for recording. Easement revisions may be necessary to the  Final Plat as the Construction Plans are reviewed and finalized. All easement areas must be free from all  encroachments other than those approved by the City Engineer and upon execution of an easement  encroachment agreement. Prohibited encroachments include, but are not limited to trees, structures,  landscaping, fences, retaining walls, storm sewer running parallel with the easement, stormwater basins  and BMPs, and grading that exceeds 4:1.  4. Dedicated drainage and utility easements, minimum 10‐feet wide, are required along all public roadway  frontage. Easements along public roadways, including Lake Elmo Avenue (CSAH 17) and 10th Street (CSAH  10), have been shown on the Final Plat as required.    Site  and  grading  plan  revisions  will  be  necessary  to  remove  grading  and  BMP  encroachments  to  preserve the use of these easements for small/dry utility installation. Grading within the easement  areas must be revised and the plans clearly labeled to be a 4:1 maximum slope.   FOCUS ENGINEERING, inc.  Cara Geheren, P.E.   651.300.4261  Jack Griffin, P.E.                651.300.4264  Chad Isakson, P.E.  651.300.4285      PAGE 2 of 4  5. Dedicated utility easements are required over all public watermain as determined by the City Engineer  and Public Works Director. Easements must be a minimum width of 30‐feet centered over all public  watermain and each hydrant. Dedicated utility easements have been shown on the Final Plat. Revisions  may be necessary as the Construction Plans are reviewed and finalized.  6. Drainage and utility easements are required over all stormwater BMPs, including the 100‐year high water  level areas, maintenance access roadways to a public right‐of‐way, maintenance benches, and over all  emergency overflow locations and pathways. Stormwater management easements are shown on the Final  Plat, but must be revised to incorporate all required elements as listed above. Easement revisions are  necessary such that the Final Plat easements are consistent with the easements shown on the site and  grading plans. Additional revisions may be necessary as the Construction Plans are reviewed and finalized.  7. The storm water management facilities will remain privately owned and  maintained. A  Storm Water  Maintenance and Easement Agreement in the City’s standard form of agreement must be executed and  recorded with the Final Plat for all privately owned stormwater facilities.  8. All  off‐site  permanent  and  temporary  easements,  if  necessary  to construct the proposed site  improvements, must be acquired and provided to the City prior to the approval of the Final Construction  Plans. Each easement, if needed, must be provided in the City’s standard form of easement agreement.    TRANSPORTATION IMPROVMENTS, ACCESS AND COLLECTOR STREETS    1. Access Management. The proposed access locations along both Lake Elmo Avenue (CSAH 17) and 10th  Street (CSAH 10) must be approved by Washington County.   2. Turn Lane Improvements. As part of the site improvements, dedicated right and left turn lanes must be  constructed along Lake Elmo Avenue (CSAH 17) and 10th Street (CSAH 10) at both access locations. Turn  lanes must be constructed meeting Washington County standards  3. Intersection Control Improvements. Traffic Control Improvements must be included as part of the site  improvements for the opening of the school as recommended by Washington County. A traffic signal is  required at the new access location along 10th Street North (CSAH 10), complete with crosswalks. A  temporary wood‐pole traffic signal, or alternate traffic control improvement approved by Washington  County,  is  required  at  the  intersection  of  Lake  Elmo  Avenue  (CSAH  17)  and  10th  Street  (CSAH  10),  complete with crosswalks.   4. Emergency Service Access. Emergency vehicle access to and throughout the site must be reviewed and  approved by the Lake Elmo Fire Department.  5. Bituminous Trails. The site improvements include the construction of a bituminous trail along the east and  south sides of the site long Lake Elmo Avenue (CSAH 17) and 10th Street (CSAH 10). The grading plans  should be revised to eliminate the drainage swale obstruction that will impede any future extension of  the trail to the west along 10th Street (CSAH 10). Consideration should also be given to the provision of  pedestrian connectivity internal to the school property and connection to the County Park Preserve.    STORMWATER MANAGEMENT  1. The site plan is subject to a storm water management plan (SWMP)  meeting  State,  Valley  Branch  Watershed District (VBWD) and City rules. Storm water facilities proposed as part of the site plan to meet  State and VBWD permitting requirements must be constructed in accordance to City Engineering Design  Standards dated January 2022, even though the facilities will remain privately owned.  2. The stormwater management mitigation must be provided for all required site improvements, including  the County roadway and intersection improvements, County roadway turn lanes, and all bituminous trails.  3. In addition, it should be condition of the minor subdivision approval that the stormwater management  BMPs be oversized to accommodate the future County roadway improvements to be constructed by the  County  at  a  future  date.  The  stormwater  BMP  oversizing  must  address  the  additional  proposed  impervious surface areas as provided by Washington County.  4. All stormwater facilities and BMPs will be privately owned and maintained by the school district. The  school  district  will  be  required  to  provide  a  Stormwater  Maintenance  and  Easement  Agreement  in  accordance with the City’s standard form of agreement.      PAGE 3 of 4  5. All storm water basins must be placed in easements in accordance with the Stormwater Maintenance and  Easement Agreement. The easements must fully incorporate the 100‐year high water level areas, 10‐foot  maintenance  bench,  maintenance  access  roadways  to  a  public  right‐of‐way,  and  over  all  emergency  overflow locations and pathways.  6. The SWMP will be required to verify that rate control and volume control requirements are met for all  points of discharge from the site. The existing and proposed drainage exhibits must clearly show and label  all points of discharge from the site, including any required public improvements and turn lanes. The  SWMP rate control tables must reference each discharge location independently and combined.  7. Overland emergency overflows or outlets will be required as part of the site and grading plans.  8. All infiltration basins shall be sized using design infiltration rates based on actual soil borings obtained  from within the basin footprint at the proposed basin bottom elevation. Soil borings must be taken for  each infiltration basin in the number and to the depths required by the VBWD and City design standards.  Soil boring information submitted to date remains insufficient.  9. All wetlands and wetland buffers must be delineated and protected by easement.  10. Minimum floor elevations must be at least 2 feet higher than the adjacent 100‐year HWL elevation. Also,  all low opening elevations for all buildings must be at least 1‐ft higher than any adjacent emergency  overflow elevation (EOF). All building low floor and low opening elevations must be clearly labeled on the  grading plans.  11. All localized low points (catch basins) and low areas (land locked basins) must be protected within a  drainage easement up to the 100‐year high‐water level. The grading plans must be revised to label and  clarify the purpose of all low areas.   12. The grading plans must label all steep slope areas with notations indicating  the maximum allowable  grading slopes.  13. The grading plans must label all basin maintenance access roadways, label the maximum slope as 10%,  and label the maintenance roadway width as 20‐feet.    MUNICIPAL WATER SUPPLY  1. Connection to the municipal water system is available to the existing trunk watermain running along Lake  Elmo Avenue (CSAH 17). The applicant will be responsible for connecting to the existing 16‐inch trunk  watermain along Lake Elmo Avenue (CSAH 17) in two locations to create a looped watermain network  around the new school. A minimum 8‐inch ductile iron watermain shall be extended internal to the site  and throughout the property as necessary to provide connection to all proposed uses.  2. The project will require the placement of fire hydrants and water system valves internal to the site as  determined  by  the  Lake  Elmo  Public  Works  Director  and  Fire  Department.  The  site  plans  show  the  watermain extension, hydrant locations and system valves generally consistent with City requirements.  Revisions may be necessary as the Construction Plans are finalized.  3. Minimum 30‐foot easements centered over the pipe/hydrant have been shown on the plans as required.   4. No watermain oversizing is anticipated as part of this Project.    SANITARY SEWER SYSTEM  1. A Comprehensive Plan Amendment has been approved to expand the Municipal Urban Service Area  (MUSA) for the property. Therefore, the extension of public sanitary sewer service will be required to  serve the new elementary school.  2. The applicant will be required to construct a privately owned and maintained sanitary lift station on the  district property and extend a private forcemain to a designated connection point to be located on the  northeast corner of Lake Elmo Avenue (CSAH 17) and 10th Street (CSAH 10). The private forcemain will be  combined with a new public forcemain to be installed by the City and extended south along Lake Elmo  Avenue (CSAH 17) to an existing trunk sanitary sewer at 5th Street.  3. The new school sewer service would discharge by gravity to the new lift station.  4. Plan revisions are required for the private lift station facility to ensure that the facility is fully located on  district property and that the maintenance access is internal to the school property, fully outside all  required right‐of‐way dedication.      PAGE 4 of 4  5. It  is  anticipated  that  the  sanitary  sewer  improvements  will  be partially  constructed  though  a  public  improvement project with both the private and public improvements to be paid by the District.    FINAL CONSTRUCTION PLANS & SPECIFICATIONS  1. Final Construction Plans and Specifications must be prepared and submitted for City review and approval.  The plans and specifications must be in accordance with the City Engineering Design Standards Manual  dated  January  2022,  using  City  standard  details,  plan  notes  and  specifications  and  meeting  City  Engineering Design Guidelines, unless approved otherwise by the City Engineer.  2. No construction on the Project may begin until the applicant has received City Engineer approval for the  Final Construction Plans; the applicant has obtained and submitted to the City all applicable permits,  easements and permissions needed for the project; and a preconstruction meeting has been held by the  City’s engineering department.  3. Existing Conditions Plans C100‐C105. Revise plans to include all required information and labeling to fully  depict the existing site conditions. In particular, the existing condition information is insufficient along the  existing roadway corridors.  4. Site Plans C200‐C205. Revise the site plans to include all required transportation improvements including  safe pedestrian crossing and intersection controls as required by Washington County.  5. Grading Plans C300‐C305. Revise the grading plans to eliminate all easement encroachments along Lake  Elmo Avenue (CSAH 17) and 10th Street (CSAH 10). Revise the grading plans to provide all required  stormwater BMP design information and labels.  6. Utility Plans C400‐C405. Relocate the proposed sanitary lift station to be outside the right‐of‐way sight  triangle and revise the lift station maintenance access to be internal to the site. Label all utilities as public  or private owned and maintained. Provide more design details for all work within the public right‐of‐way.                                   LAKE ELMO FIRE DEPARTMENT – OFFICE OF THE FIRE MARSHAL Fire Prevention, Code Enforcement, and Public Education “Proudly Serving Neighbors and Friends” September 18, 2024 Sophia Jensen, Planner City of Lake Elmo Re: Conditional Use Permit Review of Lake Elmo Elementary (10928 10TH Street North) Prepared by: Anthony Svoboda, Fire Marshal Approved by: Dustin Kalis, Fire Chief Applicable Codes: • 2020 Minnesota State Fire Code • 2020 Minnesota State Building Code • Lake Elmo Fire Department Fire Code Policies • NFPA 13, 2016 edition • NFPA 13D, 2016 edition Fire Department Comments: 1) All roads and drive lanes shall meet the Lake Elmo Fire Department requirements for widths and turning radiuses. 2) Approved fire apparatus roads shall be provided and maintained in coordination with engineering, public works, planning, and fire departments. In accordance with MSFC D104.2, two fire apparatus access roads shall be required and maintained at all times. 3) Project construction phasing shall accommodate emergency access to the entire construction zone at all times, generally meaning two separate means of entrance/exit as defined in the code. Phasing plan to be approved by the fire department prior to construction. 4) An approved signage and marking plan shall be determined for all No Parking and Fire Lane access roads. On- street parking shall be provided in approved locations following review by Engineering and Public Works. Parking shall be prohibited on both sides of private drive lanes. 5) Street names and addressing shall be consistent with the Washington County Uniform Street Naming and Property Numbering System. 6) Fire hydrants and watermains shall be provided in approved locations following review by Engineering and Public Works. LAKE ELMO FIRE DEPARTMENT – OFFICE OF THE FIRE MARSHAL Fire Prevention, Code Enforcement, and Public Education “Proudly Serving Neighbors and Friends” 7) Building address numbers shall be plainly visible from the street fronting the property and shall be contrasting color from the background. Size and placement of address numbers shall be approved by the fire and planning departments. a. Buildings address of 10928 10TH Street North, Lake Elmo, MN 55042 has been approved. 8) A fire sprinkler system shall be installed in commercial buildings in accordance with the Minnesota State Fire Code and Chapter 1306 of the Minnesota State Building Code. A permit is required prior to work. a. Fire Department sprinkler connection locations shall be approved prior to installation. 9) A fire alarm system shall be installed in commercial buildings in accordance with the Minnesota State Fire Code (907.2.3) and Lake Elmo Ordinances. A permit is required prior to work. 10) An emergency responder radio coverage amplifier shall be installed throughout the building if the fire department determines that signal strength is not reliable. 11) An exterior door numbering system shall be utilized to determine exterior doors on all sides of the building. Door numbering convention shall be approved by the fire department prior to installation. 12) A KNOX rapid access lockbox shall be installed in an approved location, on all commercial buildings. a. Multiple KNOX rapid access lockboxes may be required as determined by the fire department. 13) KNOX locking Fire Department Connection Caps shall be installed on all fire department connections. 14) All gates, whether manual or electric, shall be accompanied by either a KNOX lock or KNOX gate control switch for rapid access. 15) All parking areas shall be capable of supporting the imposed load of fire apparatus weighing up to 75,000 pounds. Questions, clarifications, or the request to provide code documents can be made using the contact information listed below. Respectfully, Memorandum 800 Washington Avenue North, Suite 103 Minneapolis, MN 55401 September 12, 2024 TO : SOPHIA JENSEN FROM: SARAH EVENSON, PLA RE: STILLWATER ELEMENTARY LANDSCAPE AND TREE PRESERVATION PLAN REVIEW SUBMITTALS 1. CUP and Preliminary Plat Submittal, dated 8/19/24 received 8/26/24 REVIEW HISTORY 1. 09/12/24 – CUP and Preliminary Plat Landscape Plan Review LOCATION: Northwest corner of the intersection of 10th Street North and Lake Elmo Avenue North CURRENT LAND USE CATEGORY: Public Facilities (PF) ADJACENT AND SURROUNDING LAND USE: PF and Rural Single Family to the north, Rural Single Family to the east, and Rural Single Family and Rural Residential to the south and west (including the gun club) SPECIAL LANDSCAPE PROVISIONS: 750’ sound buffer from adjacent gun club. Exemption request for mitigation of owner-planted trees. TREE PRESERVATION PLAN: 105. 12. 470 • A tree preservation plan will need to be submitted that meets code, including, but not limited to: o The applicant has submitted supplementary information that supports the granting of a variance that would allow them not to mitigate trees planned to be removed that were planted by the previous landowner. As such; these trees will not be considered in the tree preservation and mitigation calculations. However, the removal of more than 30% of the naturally occurring significant tree inches onsite still requires mitigation. o 1,969 qualifying (naturally occurring) significant inches exist. 590 are allowed to be removed without mitigation. The plan proposes removing 739 significant inches of qualifying trees, which leaves 149” that must be mitigated. No credit is to be given for preserving “previous owner planted” significant inches. o In order to determine the number and type of mitigation trees required, the applicant must create a table that breaks out the significant common, coniferous/evergreen, and hardwood deciduous trees planned to be removed, per 105.12.470 (c) (8). Any inches removed over the allowed 30% will need to be replaced at the following percentages: common tree species will need to be replaced at 25% of the inches removed and evergreen/hardwood trees need to be replaced at 50% of the inches removed. September 12, 2024 Stillwater Elementary Memorandum 2 o Revise the last row of the table on sheet L1.000 to remove reference to a credit and instead include the breakdown of common, evergreen, and deciduous inches to be mitigated and the corresponding number of required mitigation trees. o Replace the tree protection detail on sheet L1.000 with the city standard tree protection detail. LANDSCAPE PLAN: 105.12.480 • A landscape plan as submitted does not currently meet code, and needs to be revised as follows and resubmitted prior to approval: o The landscape plan must be revised to include the addition of the appropriate number of mitigation trees required to meet tree preservation code. o Additional trees should include enough evergreens to put the proposed trees into compliance with the code’s tree composition requirements. More than 25% of proposed trees need to be evergreen and fewer than 15% can be ornamental. o Provisions for irrigation are required, whether through an irrigation plan, or a commitment to hire out watering for the duration of the 2-year warranty period. o Show the location of a topsoil stockpile and provide notes indicating that the quantity of soil shall be sufficient to cover all landscaped areas at least 4” deep. o Ensure that per 105.12.480 (b) (7) trees shall be planted ten feet away from utilities including water and sewer stubs. o Screening- Requirements of 105.12.480 (f) Screening is required between more intensive and less intensive land uses- add or adjust spacing of screening trees along northern drive and play area so that spacing does not exceed 40’. *Per 105.12.480 (c)(2) development or disturbed area trees can be utilized as screening trees. TREE PLANTING REQUIREMENTS SITE MEASUREMENT CODE REQUIRED PROPOSED Required street frontage trees (1 per 50 lf or 1 tree/lot minimum) 2790 lf 55 55 Required lake or stream trees (1 per 50 lf along shoreline, except where natural vegetation exists) 0 0 0 Required development trees (5 per acre disturbed)* 34 acres 170 170 Required Mitigation Trees TBD Required perimeter screening trees (1 per 40 lf)* Required parking lot trees 224 stalls 15 15 Total Required Trees 253 September 12, 2024 Stillwater Elementary Memorandum 3 RECOMMENDATION: The landscape and tree preservation plans must be revised and resubmitted to address the items in this memo. Sarah Evenson, PLA (MN) City of Lake Elmo Municipal Landscape Architect P: (262) 391-7653 E: sarah@hkgi.com TREE COMPOSITION REQUIREMENTS QUANTITY % COMPOSITION REQUIREMENT Deciduous Shade Trees 186 74% >25% Required Coniferous Trees 23 9% >25% Required Ornamental Trees 44 17% <15% Required Tree Count 253 PUBLIC WORKS Wayne Sandberg, P.E., Director, County Engineer Frank D. Ticknor, P.E., Deputy Director September 18, 2024 Sophia Jensen City Planner City of Lake Elmo 3880 Laverne Avenue Lake Elmo, MN 55042 Lake Elmo Elementary School Dear Sophia, Thank you for the opportunity to review and comment on the proposed Lake Elmo Elementary School application at the intersection of County State Aid Highway 17 (Lake Elmo Avenue) & CSAH 10 (10th Street). The county thanks the City of Lake Elmo and the Stillwater School District for meeting with the county to discuss the proposed new school location that meets the community’s needs while also providing for safe transportation connections. The county will continue coordinating with the district and city on this proposed school; below are some comments that the County has for the proposal. As we have shared, the proposed rural location adjacent to two high-speed county highways presents several significant challenges related to nonmotorized access and traffic safety and operations; these concerns are identified in the traffic study. By their nature, County Highways manage regional traffic (vehicular, freight, transit, bicycle, pedestrian, etc.) at higher average speeds. With Washington County currently the fifth fastest-growing county in the state, containing two of the top ten fastest-growing cities in the state (Woodbury and Lake Elmo), we would be irresponsible in not planning for the future of this area. We offer the following comments regarding the new design of the school site and the traffic study. 1. The site plan indicates right turn lanes at both proposed access points; the county would also require dedicated left turn lanes as a condition of access permit approval. 2. The traffic study indicates a significant delay for motorists at the intersection of CSAH 10 and CSAH 17 (overall Level of Service F), with queues extending well beyond the available storage. Washington County expects that the development team will mitigate these operational and safety issues prior to school opening. The intersection of CSAH 10 & CSAH 17 is tentatively scheduled in the County’s draft Capital Improvement Plan for construction of improvements in 2028, with $4M total planned investment. This is a significant investment, largely driven by the placement of the school at its proposed location. Washington County appreciates the City’s support in planning for this improvement during the design of the Lake Elmo Elementary School. 3. The traffic study recommends a traffic signal or roundabout at the County Highway 10/Lake Elmo Elementary School main access. Washington County expects that this will be installed by the development team without city or county cost contribution as a condition of access approval, and operational prior to opening of the school. A great place to live, work and play…today and tomorrow Government Center | 14949 62nd Street North | P. O. Box 6 | Stillwater, MN 55082-0006 P: 651-430-6001 | F: 651-430-6017 | TTY: 651-430-6246 www.co.washington.mn.us Washington County is an equal opportunity organization and employer 4. The traffic study recommends a northbound left turn lane at the County Highway 17 (listed as 10th Street in the traffic study)/Lake Elmo Elementary Bus Access due to high speeds; Washington County concurs with this recommendation if left-in access is to be provided at this location. Washington County continues to view this access as unnecessary, as inbound and outbound buses could be provided safe and efficient access to the county highway system via the controlled intersection at the proposed 10th Street access. If the developer feels that an access to Lake Elmo Avenue must be installed, Washington County expects that this intersection will be designed and constructed as a ¾ access preventing eastbound ‘left-outs’ from the School site and directing all traffic to turn south. The Oak-Land Middle School has this configuration at its bus-only access to County Highway 15 as well. Restricting exiting traffic to right turns only helps prevent the excessive delays that may be experienced by left turns which would in turn generate demands for an additional traffic signal or roundabout to provide safe left-out access. 5. The traffic study states that “the expected storage needed for an enrollment of 1100 students is approximately 2400 feet long” but only 2100 feet of storage is provided. Washington County cannot allow queuing to extend onto County rights-of-way and infrastructure, and will not permit an access that does not provide for adequate on-site storage at day of opening and under a future ‘full-build’ condition. 6. The intersection of CSAH 10 & CSAH 19 is in the draft CIP for construction 2029, with $5.25M total planned investment. 7. Minimizing unnecessary access to county highways allows for turning movements to be consolidated to locations where improvements such as turn lanes, traffic signals, and roundabouts can mitigate traffic conflicts. As a condition of access permit approval, the county may require the removal of other pre-existing access points and may also require the applicant to mitigate the traffic safety and operational impacts of the proposed new access through the installation of various highway improvements including turn lanes, traffic signals, or roundabouts Still haven't heard a compelling reason for this access. 8. School District staff have communicated that busing will be provided for students in neighborhoods surrounding the new Lake Elmo Elementary, but this appears to conflict with information provided on the district’s website stating, “Routes are currently being redrawn to give priority to all students living 2 miles or further from school and others required by law to receive busing. The 2 mile no busing zone means families living within 2 miles of school who do not have a bus available will have to find alternative transportation.” (https://www.stillwaterschools.org/our-district/news/district-news-detail/~board/district- news/post/bus-routes-and-school-start-times-will-be- changing#:~:text=Routes%20are%20currently%20being%20redrawn%20to%20give%20priority,bu s%20available%20will%20have%20to%20find%20alternative%20transportation). Even when bus transportation is provided, it is imperative to provide safe walking routes for students who wish A great place to live, work and play…today and tomorrow Government Center | 14949 62nd Street North | P. O. Box 6 | Stillwater, MN 55082-0006 P: 651-430-6001 | F: 651-430-6017 | TTY: 651-430-6246 www.co.washington.mn.us Washington County is an equal opportunity organization and employer to walk, and encouraging walking promotes health and reduces vehicular traffic demands. Washington County expects that non-motorized access to the school will be prioritized by the development team and available to students at the day of opening. This will reinforce the public nature of the amenities proposed for this site. Given the continued and rapid progress on the project plans we felt it was important to reiterate the following comments: While the placement of schools along highways enables convenient vehicle access, these locations also present safety issues for vehicles and pedestrians that defy easy or effective solutions. Given the ongoing prevalence of student drop-offs, school sites often generate significant inbound queues that sometimes extend onto highway shoulders, into turn lanes, and sometimes even obstructing highway through lanes, with safety repercussions. Providing adequate internal stacking can consume significant amounts of space but is necessary to prevent congestion from extending onto highways. Experience with school speed limits and/or flashing lights suggests that they have very limited effectiveness in slowing traffic down and can cause a large variability of speed, which is itself a safety concern. Even costly solutions such as traffic signals are often seen as a barrier for pedestrians due to the high vehicle volumes and less-than-perfect behavior by drivers. Safe access to the site for students and others who wish to arrive by walking or biking from existing nearby neighborhoods, both to provide safe walking routes and safe crossing points of the county highways remains a priority for Washington County Public Works. The school district must consider and plan for pedestrian infrastructure within walking distance of the school, notwithstanding any current policies related to bus transportation. The pedestrian routes should connect with nearby neighborhoods, both existing and planned, and should provide reasonably direct access into the school site itself. A preliminary assessment suggests that upwards of four miles of new trail would be needed to connect existing neighborhoods to the school site. Washington County does not have any available funding for these necessary trail linkages in our 5-year Capital Improvement Plan. The Washington County 2040 Comprehensive Plan contains access criteria for county roads related to spacing, sight lines, and availability of local road connections. School sites typically generate significant traffic volume and queuing; therefore, the County appreciates the School District’s work to complete a traffic study to better understand the anticipated traffic operations at the proposed access locations and affected nearby intersections. Washington County access spacing guidelines for minor arterial roads (both County Highway 17 and County Highway 10) is ¼ of a mile (1,320 feet). Partial reductions in this spacing may sometimes be considered in favor of other safety aspects, such as optimizing sight distance or maximizing spacing from other existing intersections. A great place to live, work and play…today and tomorrow Government Center | 14949 62nd Street North | P. O. Box 6 | Stillwater, MN 55082-0006 P: 651-430-6001 | F: 651-430-6017 | TTY: 651-430-6246 www.co.washington.mn.us Washington County is an equal opportunity organization and employer Access permits will be needed for the construction of new driveway connections within the county right- of-way, and will require the construction of turn lanes into the site and the provision of adequate internal stacking space to prevent congestion from extending onto the county highway. The Washington County Comprehensive Plan indicates that 75 feet of right-of-way from the centerline should be secured at the time of development along both CSAH 10 and CSAH 17. The city will be responsible for the costs of future right-of-way acquisition if not secured at the time of development, in accordance with Washington County Cost Participation Policy #8001 as previously referenced. A Right-of-Way Permit will be required for any work within the County highway right-of-way as it relates to the development. As the development progresses, a plan set will be required with the application and include any grading, culvert installation, water and sewer services, parallel trail development, signage, and any landscaping and other improvements within the County right of way. All utility connections to County highway right of way for the development will also require their own Washington County Right of Way permits. Typically, these utility connection permits are the responsibility of the utility companies. The desire for regional stormwater remains. With review of the stormwater management report, it appears that the planned infiltration basins have additional capacity to manage the county ROW runoff in the future. The landlocked basins on site create some challenges but from our review it appears feasible. The County requests continued coordination to provide stormwater management. The County has a future project planned with the onset of the new school site, partnering on stormwater management will help the County and City reduce the number of challenges the future project will pose. This may require re-working of the proposed infiltration basins to allow the county road to drain to the new ponds, either via ditches or storm sewer. County Road 10 and County Road 17 are both listed as priorities for future paved trail development in Washington County’s Bike and Pedestrian Plan as high and medium priorities, respectively. This underlines the importance of planning for these future trails as part of the overall site design, including right-of-way dedication (listed above), grading, and landscaping. Pedestrians from nearby neighborhoods, especially Cimmaron residents, will want to cross the County Road 10 and County Road 17 intersection to access the future school and Lake Elmo Park Reserve. The proposed design and layout should thoughtfully and safely accommodate these users with connections that are direct and don’t require crossing parking lots and vehicle access roads. Lake Elmo Park Reserve is owned and operated by Washington County Parks. This land is protected in perpetuity as part of the Metropolitan Regional Parks system and will not be available for any future expansion of the proposed school or any other school district use. A great place to live, work and play…today and tomorrow Government Center | 14949 62nd Street North | P. O. Box 6 | Stillwater, MN 55082-0006 P: 651-430-6001 | F: 651-430-6017 | TTY: 651-430-6246 www.co.washington.mn.us Washington County is an equal opportunity organization and employer Washington County Parks would support a safe and accessible trail connection from the school directly to the existing trail network within Lake Elmo Park Reserve. Note that the existing trails closest to the school are ski trails in the winter. Thus, a gate would be needed so the park could seasonally close the trail to prevent impacts from walkers on groomed ski trails. Additionally, fencing and/or native vegetative screening at the property border with park will be needed. Please contact County Parks staff for additional guidance on this or the trail connection route. Thank you again for the opportunity to provide comments on the traffic study for Lake Elmo Elementary. We look forward to continuing to work with the City of Lake Elmo to ensure that development in this area is successful and well-served by the transportation network. Sincerely, Daniel Elder Planner II Cc (email only): Kevin Corbid, Washington County Administrator Jennifer Wagenius, Washington County Deputy Administrator Jan Lucke, Washington County Deputy Administrator Wayne Sandberg, Public Works Director/County Engineer Frank Ticknor, Deputy Director Public Works Lyssa Leitner, Public Works Planning Director Joe Gustafson, Traffic Engineer Kevin Peterson, Design Engineer Alex McKinney, Parks Director Mark Drommerhausen, Director of Operations Stillwater Area Public Schools Dr. Michael Funk, Superintendent Stillwater Area Public Schools