HomeMy WebLinkAbout4-21-08 Minutes2
Lake Elmo Park Commission
Minutes of the Regular Meeting
April 21, 2008
Secretary Blackford called the meeting to order at 7:00 p.m. COMMISSIONERS
PRESENT: Ames, Blackford, Booher, Dunn, Larson, Wagner and Zeno.
STAFF PRESENT: Project Assistant Kriegler
Agenda
Agenda was approved, (M/S Ames / Booher) with 2 additional agenda items:
7c. Information item: May 7 Highway 5 planting project
8. Park Reservation Policy
Minutes
March 17 Minutes: M/S/ P, Blackford/Ames, move to approve as corrected Vote: 6:0
Commissioner Ames was not in attendance. Commissioner Blackford clarified that
mountain biking is currently a prohibited activity at Sunfish Lake as stipulated in the city
code (#8065- Chapter 1015)
Follow-up to Washington County request to conduct deer harvest in Sunfish Lake
Park in November of 2008
Carol Kriegler reported that Peter Mott of Washington County Parks had submitted a
revised agreement for the Sunfish Lake Park / Lake Elmo Park Reserve deer harvest. The
revised agreement includes the cap of 100 deer to be harvested between the two parks, as
requested by the Park Commission.
Peter also reported that he had reviewed the 2008 deer hunting zones and regulations and
found no changes that could potentially impact the planned harvest.
Follow-up to a Development of a Comprehensive Signage System – presentation of 3
conceptual designs.
Linda Wagner reported on a proposed plan to place banners on light posts located on
Lake Elmo Avenue and Highway 5 near the Village. The banners would serve to
welcome people to Lake Elmo and promote local businesses. Each banner would include
the name of a business sponsor. The cost of the banners would be covered through
contributions of participating businesses and possibly donations from local service
organizations. Several banner concepts were presented with various city graphic
concepts. Carol Kriegler had created several of the graphics, with the possibility of the
graphic also being incorporated into comprehensive park system signage. Rolf Larson
also presented a potential graphic with a nesting eagle. The Commission was asked to
provide comments relative to the concepts. Thos comments were as follows:
Middle logo difficult to read
Like use of the eagle
Would like to see use of a barn / farm to better reflect character of Lake Elmo
Barns are a common landmark
Any city graphic used within the park sign systems should be consistent with what the
city uses elsewhere.
Linda and Carol reported that the banner concept and city graphic concepts would be
presented at the May 13 council workshop. The commission expressed support of the
banner concept moving forward.
Lowes Partnership Program
Project Assistant Kriegler reported that a marketing representative from Lowes has
verbally expressed that the city will be awarded $7,000.00-10,000 in materials and in-
kind services for a park project and that a written agreement is forthcoming.
Heights Park Neighborhood Meeting
Carol Kriegler reminded commissioners of the neighborhood meeting scheduled for
Wednesday evening, May 7. Kriegler provided an overview of the layout of the park.
The lot is considered a “flag lot” with minimal road frontage and is surrounded by homes.
This layout creates a particular challenge in balancing neighborhood / public access
verses adjacent home owner’s privacy and protection. Commissioners were encouraged
to familiarize themselves with the park and the past survey results in preparation for the
meeting.
John Ames commented that one of the surveys included the claim that the city had
promised neighbors that the park would always remain a place of passive use. Ames
requested that this claim be researched. He also expressed that the CIP is a planning
document and does not necessarily ensure a project’s implementation, and that the
Commission should be careful about accepting a similarly challenging lot as park
dedication in the future.. Lastly, he expressed concern about the future of park
improvement funding availability. He commented that money is “drying up”.
Information Items
7a. Trail Improvement Update
Carol Kriegler reported that inclement weather had prevented staff and city
engineers from doing two scheduled field visits of Stonegate Trail. A trail visit is
scheduled in the next week for the purpose of conducting a preliminary assessment of the
trail from an engineering perspective.
The Commission expressed the desire to continue to pursue the steps necessary to see
other 3 identified trail segments (in 2008 work plan) completed. Kriegler reported that
she would consult with Administrator Hoyt regarding the need and process for land
acquisitions and conveying.
Park Partners Reports
7b. Information item: Horses in Sunfish Lake Park
The need was expressed for signage at Sunfish Lake Park that reflects “No
mountain biking” and information relative to use for horseback riding.
7c. Information item: Planting Project
Park Reservation Policy
John Ames reported that a resident had expressed frustration to him regarding his/her
lack of success in being able to reserve a field. It was reported that all fields were already
reserved. The Commission requested that the reservation policy be brought forward for
review at the next meeting.
Meeting was adjourned (M/S, Dunn / Blackford) at 8:50 p.m.
Respectfully submitted,
Carol Kriegler
Project Assistant