HomeMy WebLinkAbout3b. Presentation - About ULI TAPs - Megan Flanagan Presentation 2.4.252
ULI’S MISSION
Shape the future of the built environment for
transformative impact in communities worldwide.
3
A multi-disciplinary membership organization with more than
48,000 members in private enterprise and public service
What the Urban Land Institute does:
Conducts research
Provides a forum for sharing of best practices
Writes, edits, and publishes books and magazines
Organizes and conducts meetings
Directs outreach programs
Conducts Technical Assistance Panels (TAPs) and Advisory Service Panels (ASPs)
Urban Land Institute
What is a Technical Assistance Panel?
ULI MN conducts Technical Assistance Panels (TAPs) at the request of
a community or public agency to provide an unbiased, interdisciplinary
panel of volunteer real estate professionals who address a specific
project, development or policy issue.
The design of the Advisory Services program is highly immersive and experiential so that
panelists can truly understand a community before making recommendations to advance its
needs. By bringing together national and local experts, Technical Assistance Panels (TAPs)
bring the benefits of lessons from other communities facing similar challenges around the
country while still maintaining a grounding in the local context. TAPs include emphasis on three
important areas: engagement with the sponsor, engagement with the community, and an expert
deliberative process.
4
ULI Minnesota Relevant Experience
ULI Minnesota has conducted more than 20 TAPs over the past 15 years, with over 120 real estate
leaders bringing their time and talent to address pressing challenges facing communities.
These TAPs are supported by our robust network of Advisory Services work, including Navigating
Your Competitive Future Panels, Urban Plan for Public Officials, workshops, and training sessions for
municipal officials and staff, and senior leadership councils on a range of topics.
With the assistance of the ULI Minnesota TAP, the City has been able to move forward on a key redevelopment
project that expands rental housing options for residents. The TAP provided immeasurable assistance and was
vital in guiding the strategic directions for the property. – Mayor Sandra Martin, City of Shoreview
Thank you all for being there, it exceeded our expectations exponentially!! Such a great group of amazing
experts who really dug into our questions! – Corrin Wendell, City of Little Canada
5
Pre-Panel Process
1.The Sponsor engages ULI Minnesota to provide insight on
a land use or policy challenge.
2.ULI Staff recruits Chair(s) from membership.
3.A Steering Committee of Sponsor Staff, ULI Staff, Chair(s),
and potential other key stakeholders begins planning the
panel, including finalizing 3-4 key questions for the
panelists to consider.
6
Sponsor Responsibilities
•Working as part of Steering Committee to define the scope of work and questions for the panel to address
•Providing meeting facilities for the panel
•Preparing study area maps and briefing materials in advance of the TAP
•Preparing list of local stakeholders to be interviewed by the TAP panel
•Leading a tour of the study area
•Hosting a reception on the first day and providing breakfast and lunch for the panel during work days
•Conducting a briefing at the beginning of the panel
•Being available for panel questions, if necessary, during the closed-session discussions
•Attending presentation to review preliminary recommendations
•Reviewing and commenting on draft panel report
7
Steering Committee Responsibilities
•Defining the scope of work and questions for the panel to address
•Identifying, vetting, and recruiting potential panelists, ensuring a diverse range of
perspectives and expertise
•Providing recommendations on materials to include in the briefing book
•Providing recommendations for stakeholders to include in the interviews; assisting with
outreach to the identified stakeholders
•Assisting with planning and logistics
•Attending presentation to review preliminary recommendations
8
Chair Responsibilities
•Reviewing and providing input on TAP agenda and work plan prepared by ULI MN staff
•Leading the discussion at pre-TAP conference calls and/or meetings with the Sponsor
•Reviewing briefing book materials before they are distributed to the panel
•At receptions or dinners, speaking on behalf of ULI MN, introducing panelists and describing the TAP assignment.
•During the TAP:
o Convening the TAP and describing its objectives
o Guiding the work and discussions of work teams
o Emphasizing the need for the panel to focus on the questions posed by the sponsor
o Leading the discussion regarding the preparation of materials for the post-TAP presentation
•Reviewing the first draft TAP report and providing edits and recommendations; further reviewing the second draft and signing off on the final report
•Leading the formal presentation of the panel’s final report and recommendations to the TAP sponsor
9
Panelist Responsibilities
•Fully committing time and attention to the panel, attending all sessions and actively participating
•Reviewing background materials in advance of the panel and asking clarifying question if needed
•Conducting interviews with stakeholders, recording insights, and maintaining confidentiality
•Participating in deliberations, formulating recommendations, and preparing the materials for the
presentation to the sponsor. This can include providing drawings, sourcing images, illustrative
examples, and data, and compiling the slide deck.
•Reviewing the second draft TAP report and providing recommendations
•Participating in presentations of the recommendations as the chair requests
10
ULI Staff Responsibilities
•Scheduling and participating in preparatory meetings, including steering committee, meetings with Sponsor, and advance panelist meetings
•Working with the panel chair(s) to plan the agenda for the TAP
•Working with the Sponsor to ensure that adequate space is reserved and communicating the required technology needs
•Compiling the briefing book materials into a user-friendly format for the panelists
•Assigning staff roles and engaging contractors as needed (project management, technical writing, etc)
•Securing permissions for illustrative images
•Inviting stakeholders to participate in interviews and scheduling them
•Securing reimbursement for panelist expenses
•Handling contracts and invoices
•Publishing the finalized report to ULI Knowledge Finder and arranging for distribution
•Scheduling a follow-up interview one year after the TAP’s completion
11
Process
Panel reviews briefing materials in advance
Tour of study site
Conversations at reception
Sponsor presentation to panel
Stakeholder interviews
Panel recommendations
Presentation & written report
Example Slides from Recent Report
13
TAP Overall Guiding Principles
Use City-owned sites as catalysts for surrounding properties.
Prioritize improved pedestrian connectivity from each site to nearby
amenities and residences for a safe and walkable environment.
Establish an identity or long-term vision that is emblematic of the
character of the community including branding, tagline, and visual
cues.
Capture activity on each site that supports the local economy,
including but not limited to, tax base, diverse commercial
services,and increased households.
14
Housing Rent Viability
15
Townhomes and Income Restricted Units Funded by Bonds are Most Viable
Multifamily Cost Analysis Apartment Income Analysis
Land Price per Unit 20,000 Expected Return on Cost 7%
Cost of Construction 250,000 Required Rent per Unit 22,680
Total Cost Basis 270,000 Per month 1,890
Expected Profit Margin 20% 54,000 Average Rent PSF Required 2.91
Total Basis 324,000
Sample Townhome Sales Current Market Rents
304 Manitoba 355,000 Ansel Rents 2.73
2786 Quebec 403,000 McMillan Rents 2.28
Bujold Projected New Rents 2.00
0 First Bank Drive - Site Activation Pilot Examples
16
Pop ups at Central Station, St. Paul
Winter Market at Lyndale Gardens, Richfield
Both activations took place on formerly vacant sites
Activation Example:Texa -Tonka (St. Louis Park)
17
18
2828 Rice Street:Key Takeaways
3-5 years
Hold on to site until Rice is reconstructed
Get into use agreement with next door building to use the site, may lead to sale
5-10 years
Try to sell after Rice gets reconstructed
Negotiate with new developer for higher and better use of liquor store site
Future development is likely focused on commercial
19
Prioritize Placemaking and Walkability
Create design workbook with standards for the public realm to guide new private
development along Rice Street and Little Canada Road
o Streetlights
o Sidewalks and landscape buffer (all new projects should be required to put in sidewalks
and landscape buffer) along right of way and to any buildings that are set back from the
street
o Street furniture
o Trash facilities
o Building façades
20
Next Steps
Create Station Area/Small-Area Plan for the Town Center
Focus on public realm and programming improvements and relationship to development potential
Design BRT station-area
Develop public-private partnership framework – i.e. what the City is able to offer to a private developer to achieve the development it wants to see
Develop design standards for Rice Street and Little Canada Road
Develop Small-Area Plan for 2828 Condit Site
Reconsider traffic engineering
Create framework for public realm improvements
Develop public-private partnership framework
21
Investment
Starts at $17,500, depending on project scope
Factors include length of panel, number of panelists, local versus out of market panelists
Panels are usually 1.5 – 3 days, though can be up to 5 days
22
Q&A
23