HomeMy WebLinkAbout#08 - Tapestry Sanitary Sewer Pay Request STAFF REPORT DATE: December 17, 2024 CONSENT AGENDA ITEM: Accept Improvements and Approve Pay Request No. 9 (Final) for the Tapestry Sanitary Sewer Extension SUBMITTED BY: Chad Isakson, Project Engineer REVIEWED BY: Nicole Miller, City Administrator Clarissa Hadler, Finance Director Marty Powers, Public Works Director Jack Griffin, City Engineer ISSUE BEFORE COUNCIL: Should the City Council accept the improvements and approve Pay Request No. 9 (Final) for the Tapestry Sanitary Sewer Extension? BACKGROUND: A-1 Excavating was awarded a construction contract on May 17, 2022 to complete the Tapestry Sanitary Sewer Extension. The contractor has now completed the work in accordance with the contract, plans, and specifications, including all punch list items. PROPOSAL DETAILS/ANALYSIS: A-1 Excavating has submitted Partial Pay Request No. 9 (Final) in the amount of $40,415.44. The Project Engineer has prepared a Certificate of Completion indicating that all work is completed, including all punch list items, and is recommending the acceptance of the improvements and release of final retainage. Project acceptance will initiate the one-year warranty period for the improvements. The one-year warranty will begin on December 17, 2024 and will extend through December 17, 2025. FISCAL IMPACT: None. Final payment is being recommended within the authorized scope and budget for the project. The final total project cost came in at $1,478,800 versus the post-bid approved project cost of $1,547,000 (which includes project costs, city sanitary sewer connection fees, and oversized sewer recovery costs). The final construction cost component of the project paid to the contractor is $808,308.70 versus the contract award amount of $795,795.00. The total final project cost includes contingency funds for professional services required to be performed throughout the warranty period. The project was financed by special benefit assessments previously levied. RECOMMENDATION: Staff is recommending that the City Council, as part of the Consent Agenda, accept the improvements and approve Pay Request No. 9 (Final) for the Tapestry Sanitary Sewer Extension. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to accept the improvements for the Tapestry Sanitary Sewer Extension and approve Pay Request No. 9 (Final) to A-1 Excavating in the amount of $40,415.44”. ATTACHMENTS: 1. Partial Pay Estimate No. 9 (Final). 2. Certificate of Completion. 12-02-2024 PARTIAL PAY ESTIMATE NO.9(Final) TAPESTRY SANITARY SEWER EXTENSION 9-Final CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2020.120 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 LS 1 $70,450.00 $70,450.00 0.00 $0.00 1.00 $70,450.00 2 LS 1 $5,000.00 $5,000.00 0.00 $0.00 1.00 $5,000.00 3 EA 3 $140.00 $420.00 0.00 $0.00 3.00 $420.00 4 LF 735 $2.00 $1,470.00 0.00 $0.00 503.00 $1,006.00 5 LF 70 $8.00 $560.00 0.00 $0.00 43.00 $344.00 6 EA 13 $400.00 $5,200.00 0.00 $0.00 13.00 $5,200.00 7 EA 4 $400.00 $1,600.00 0.00 $0.00 5.00 $2,000.00 8 SY 20 $30.00 $600.00 0.00 $0.00 0.00 $0.00 9 LF 105 $12.00 $1,260.00 0.00 $0.00 105.00 $1,260.00 10 EA 1 $3,200.00 $3,200.00 0.00 $0.00 1.00 $3,200.00 11 LS 1 $5,000.00 $5,000.00 0.00 $0.00 1.00 $5,000.00 12 EA 1 $8,100.00 $8,100.00 0.00 $0.00 1.00 $8,100.00 13 EA 1 $100.00 $100.00 0.00 $0.00 1.00 $100.00 14 EA 1 $6,100.00 $6,100.00 0.00 $0.00 1.00 $6,100.00 15 LBS 270 $18.00 $4,860.00 0.00 $0.00 192.00 $3,456.00 16 EA 1 $7,388.00 $7,388.00 0.00 $0.00 1.00 $7,388.00 17 EA 2 $1,950.00 $3,900.00 0.00 $0.00 2.00 $3,900.00 18 LF 2,390 $44.00 $105,160.00 0.00 $0.00 2,390.00 $105,160.00 19 LF 172 $112.00 $19,264.00 0.00 $0.00 171.00 $19,152.00 20 EA 1 $17,850.00 $17,850.00 0.00 $0.00 1.00 $17,850.00 21 EA 1 $12,500.00 $12,500.00 0.00 $0.00 1.00 $12,500.00 22 LS 1 $10,000.00 $10,000.00 0.00 $0.00 1.00 $10,000.00 23 EA 1 $5,800.00 $5,800.00 0.00 $0.00 1.00 $5,800.00 24 EA 14 $200.00 $2,800.00 0.00 $0.00 14.00 $2,800.00 25 LF 172 $8.00 $1,376.00 0.00 $0.00 171.00 $1,368.00 26 LS 1 $414,866.00 $414,866.00 0.00 $0.00 1.00 $414,866.00 27 EA 4 $180.00 $720.00 0.00 $0.00 5.00 $900.00 28 LF 60 $61.00 $3,660.00 0.00 $0.00 26.00 $1,586.00 29 EA 1 $400.00 $400.00 0.00 $0.00 0.00 $0.00 30 LF 50 $5.00 $250.00 0.00 $0.00 50.00 $250.00 31 LF 15 $10.00 $150.00 0.00 $0.00 10.00 $100.00 32 SY 275 $9.00 $2,475.00 0.00 $0.00 275.00 $2,475.00 33 SF 200 $3.00 $600.00 0.00 $0.00 130.00 $390.00 34 LF 200 $6.00 $1,200.00 0.00 $0.00 200.00 $1,200.00 35 CY 440 $18.00 $7,920.00 0.00 $0.00 440.00 $7,920.00 36 TN 325 $22.00 $7,150.00 0.00 $0.00 362.85 $7,982.70 37 TN 440 $17.00 $7,480.00 0.00 $0.00 366.20 $6,225.40 38 TN 140 $140.00 $19,600.00 0.00 $0.00 165.25 $23,135.00 39 GAL 50 $7.00 $350.00 0.00 $0.00 0.00 $0.00 40 SF 200 $12.00 $2,400.00 0.00 $0.00 130.00 $1,560.00 41 SY 72 $108.00 $7,776.00 0.00 $0.00 66.70 $7,203.60 42 CY 300 $1.00 $300.00 0.00 $0.00 8.00 $8.00 43 SY 300 $6.00 $1,800.00 0.00 $0.00 0.00 $0.00 44 SY 2,540 $6.00 $15,240.00 0.00 $0.00 4,534.00 $27,204.00 45 HR 10 $150.00 $1,500.00 0.00 $0.00 0.00 $0.00 $795,795.00 $0.00 $800,559.70 CO1-1 LS 1 $1,705.00 $1,705.00 0.00 $0.00 1.00 $1,705.00 CO1-2 LS 1 $1,149.00 $1,149.00 0.00 $0.00 1.00 $1,149.00 CO1-3 LS 1 $4,895.00 $4,895.00 0.00 $0.00 1.00 $4,895.00 $7,749.00 $0.00 $7,749.00 CO 2-1 LS 1 $15,239.40 $15,239.40 0.00 $0.00 0.00 $0.00 $15,239.40 $0.00 $0.00 CO 3-1 LS 1 -$10,474.70 -$10,474.70 0.00 $0.00 0.00 $0.00 -$10,474.70 $0.00 $0.00 TOTALS - CONTRACT $808,308.70 $0.00 $808,308.70 UPSIZED VFDs CHANGE ORDER 2 TEMPORARY ELECTRICAL SERVICE TOTAL CHANGE ORDER 2 CHANGE ORDER 3 COMPENSATING CHANGE ORDER TOTAL CHANGE ORDER 3 CHANGE ORDER 1 TEMPORARY MULCHING PUMPING OF EXISTING LIFT STATION TOTAL BASE BID COAT MANHOLE CONSTRUCT INVERT BYPASS PUMPING CORE DRILL CONNECTION TO EXISTING STRUCTURE TRAFFIC CONTROL INLET PROTECTION SILT FENCE, MACHINE SLICED SEDIMENT CONTROL LOG, TYPE WOOD FIBER CLEARING GRUBBING CLEAR BRUSH REMOVE SANITARY SEWER PIPE BASE BID MOBILIZATION CONNECT TO EXISTING 8" SANITARY SEWER CONNECT TO EXISTING 10" SANITARY SEWER DUCTILE IRON FITTINGS ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE OFF ROAD STRUCTURE MARKER TOTAL CHANGE ORDER 1 TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,B) REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT REMOVE AND DISPOSE OF EXISTING CONCRETE WALK REMOVE FENCE EXCAVATION - COMMON (EV) (P) AGGREGATE BASE, CLASS 6 SELECT GRANULAR BORROW 6" CONCRETE LIFT STATION PAD TOPSOIL BORROW (LV) SEED MIXTURE 25-151 & HYDRAULIC MULCH SEED MIXTURE 35-241 & EROSION CONTROL BLANKET STREET SWEEPER WITH PICK UP BROOM SALVAGE AND REINSTALL 18" CPP STORM SEWER PIPE SEAL MANHOLE JOINT 6" HDPE SANITARY FORCEMAIN, DIRECTIONAL DRILL 8" PVC SANITARY SEWER PIPE, SDR 26 4' DIAMETER SANITARY AIR RELEASE MANHOLE, INCL CASTING AND RINGS 4' DIAMETER SANITARY MANHOLE, INCL CASTING AND RINGS REMOVE EXISTING LIFT STATION COMPONENTS REPLACE EXISTING LIFT STATION TOP SECTION, FURNISH & INSTALL CASTING FURNISH AND INSTALL STEPS IN EXISTING LIFT STATION TELEVISING LIFT STATION SALVAGE AND REINSTALL STORM SEWER STRUCTURE SAWCUT BITUMINOUS PAVEMENT SAWCUT CONCRETE PAVEMENT 4" CONCRETE WALK BITUMINOUS MATERIAL FOR TACK COAT CITY OF LAKE ELMO, MN TAPESTRY SANITARY SEWER EXTENSION PROJECT NO. 2020.119 CERTIFICATE OF COMPLETION DATE OF ISSUANCE: December 17, 2024 OWNER: CITY OF LAKE ELMO, MN CONTRACTOR: A-1 EXCAVATING, LLC PROJECT NAME: TAPESTRY SANITARY SEWER EXTENSION PROJECT NO.: 2020.119 This Certification of Completion applies to all work under the Contract Documents This Certification of Completion applies to the following specified parts of the Contract Documents I do hereby certify that the work to which this Certificate applies has been constructed in accordance with the Contract dated June 7, 2022. The above-mentioned improvement is hereby declared to be complete and acceptance of this work is recommended. DATE OF COMPLETION: December 17, 2024 Chad Isakson Reg. No. 49028 FOCUS Engineering, inc. THE WARRANTY PERIOD BEGINS December 17, 2024 AND ENDS December 17, 2025