HomeMy WebLinkAbout#14 - 2025-2034 Capital Improvement PlanSTAFF REPORT DATE: December 17, 2024 AGENDA ITEM: 2025-2034 Capital Improvement Program TO: City Council SUBMITTED BY: Clarissa Hadler, Finance Director BACKGROUND: Beginning this spring staff started developing recommendations for updates to the 2025-2034 Capital Improvement Program (CIP) working in consultation with the Parks Commission. Council reviewed it briefly at their August budget work session. The Planning Commission held a public hearing on the 2025-2034 CIP at their November 13, 2024 meeting. There were no public comments at the meeting or written comments received prior. The Planning Commission voted 4-0 to find the CIP consistent with the 2040 Comprehensive Plan. ISSUE BEFORE COMMISSION: Should Council approve the 2024-2033 Capital Improvement Program? PROPOSAL DETAILS/ANALYSIS: A copy of the 2025-2034 CIP is included in your packet. It includes projects that cost at least $25,000 and have a useful life span of five years or longer. Projects are prioritized and funding sources are identified. The 2025-2034 CIP includes 149 projects with a total estimated cost of $162,622,00. These projects include street work, vehicles and equipment (fire, public works, parks and utilities), park and trail improvements, and utility infrastructure. FISCAL IMPACT: The total estimated costs of all the projects is $162,622,000. Funding sources are identified for each project with a summary included on page ____. OPTIONS: 1) Approve the 2025-2034 CIP 2) Amend and then Approve the 2025-2034 CIP RECOMMENDATION: “Motion to approve the 2025-2034 Capital Improvement Program” ATTACHMENT: • Draft 2025-2034 Capital Improvement Program 1 City of Lake Elmo Capital Improvement Program 2025 – 2034 November 13, 2024 Planning Commission Public Hearing December 17, 2024 City Council Final Adoption TABLE OF CONTENTS Introduction What is a CIP? .................................................................................................................1 Scope of the Draft CIP .....................................................................................................1 Funding Sources...............................................................................................................2 Project Priorities ...............................................................................................................2 2025-2034 CIP CIP Overview ...................................................................................................................3 Street Projects ..................................................................................................................3 Vehicle Replacement Fund…………………………………………………………….. 3 CIP Report Descriptions .................................................................................................4 CIP Reports (Appendix) Projects Listings ………………………………………………………………….... A-1 Projects by Year & Department ...………………………………………..……..… A-5 Projects by Year & Priority ...……………………………………………………… A-17 Funding Source Summary …………………………………………………………. A-23 Projects by Funding Source 2025-2034 …………………………………………… A-24 Projects & Funding Sources by Department …………………………..………….. A-30 Project Detail ……………………………….……………………………....……… A-36 Street CIP Map & Schedule ………………………………………………………… A-147 1 INTRODUCTION What is a CIP? A Capital Improvement Program, or CIP, is a multi-year (5 – 10 years) capital expenditure plan for a city’s infrastructure (such as streets, parks and utility systems), vehicles, equipment, and public buildings. It identifies the major projects needed and desired by the community, their potential costs and how they would be financed. Including a project in a CIP does not commit the city to that project. The City Council must specifically authorize each one, and the associated funding, before any project may proceed. When the CIP is reviewed (ideally annually, in conjunction with the budgeting process), projects may go forward as planned, advance ahead of schedule, be removed entirely, or new projects may be added, depending upon changes in circumstances and priorities. The Minnesota Land Planning Act requires that the implementation plan portion of the Comprehensive Plan include a CIP for major infrastructure needs (transportation, wastewater, water supply, parks and open space) for a five-year time period. Cities often expand the scope of their CIPs to include other capital needs (major equipment replacements, for example) and sometimes look beyond the five-year time period, up to 20 years in the future for some projects. Such projects represent more of a “wish-list” that can be evaluated each time the plan is updated. As a part of the Comprehensive Plan, the CIP has some legal standing. Minnesota Statutes Chapter 473.865 provides that “a local governmental unit shall not adopt any official control or fiscal device which is in conflict with its comprehensive plan.” A fiscal device includes a budget or bond issue; so it is important that the plan and CIP be kept-up-to date and in sync with city budgets. The primary benefit of a CIP is as a financial planning tool to help the city plan for the impact of capital needs on future budgets and property taxes, and to help forecast the need for borrowing to undertake major projects. The information developed as part of the capital planning process can help document the need for various projects and assist the City Council to sort out competing priorities. Scope of the CIP Lake Elmo’s CIP includes all capital projects that cost at least $25,000 and have a useful life span of five years or longer. Projects include all capital needs including major repairs to buildings and equipment purchases and replacements. Any projects not meeting these parameters would be reviewed as part of the annual operating budget but would not be included in the CIP. 2 Methodology The City of Lake Elmo moved from a 5-year to a 10-year CIP for the first time in 2024. The process of moving to a 10-year CIP has meant a substantial increase in the number of projects expected. Types of projects listed in the CIP include things like vehicles, equipment, street projects, utility projects, and so on. Some projects, like street reconstructions, will have both a street and a sewer or water component, which are listed separately. This year, staff started an effort to reorganize the project numbering and naming conventions. Part of that process was to assign project numbers of related items the same numerical value. So, you will find that the 2025 Street & Utility Improvements has a project PW-100 for the street portion and a project W-100 for the water portion. Project numbers are also grouped by category; trucks are the lowest numbers, then equipment, annual street improvements are 100+, etc. All cost estimates are preliminary and based on current dollars. No assumptions have been made about inflation. It will be important to refine and update costs each year when the plan is reviewed, especially for projects in the first year or two of the plan. Some purchases that are not likely to occur until slightly beyond the ten-year planning period may also be included in the CIP, such as the Ladder Truck, in order to see their impact on fund balances. Most of these projects are replacements for equipment and vehicles (such as fire trucks) which may have a life span of 10, 15 or 20 years and more. The plan may also include “pending” projects for which timelines (and in most cases, cost estimates) have not yet been identified; such as the previously MPCA grant projects that have currently lost funding. As more information is developed about the need for, cost, and possible funding sources for these projects, they will be included in future CIP updates. Funding Sources The CIP identifies a possible funding source(s) for each project listed. The main funding sources are as follows: Bond Proceeds Projects financed by borrowing, later to be repaid with property taxes or utility funds, and potentially special assessments depending upon the characteristics of the project. General Fund Annual operating budget which occasionally funds CIP projects, primarily funded by property tax revenues. Park Dedication Fund Existing City fund, receipts from cash-in-lieu of land park dedication fees paid by developers and others who subdivide their land. Stormwater Fund Funds come from fees paid by users of the Stormwater system. 3 Wastewater (Sewer) Fund Funds come from fees paid by users of the Wastewater (Sewer) System. Vehicle Fund Fund used to segregate funds set aside for planned vehicle replacements and new acquisitions. Funds are transferred from the operating budget (primarily property taxes) and the sale of equipment. Water Fund Funds come from fees paid by users of the Water System. Municipal State Aid (MSA) State aid funds allocated to the City each year; annual allocation grows as the City grows. Grants/Donations Funds obtained via contributions by outside parties. One of our major funding sources for Water projects has been MPCA dollars from the 3M settlement funds. There are multiple well and treatment projects currently expected to receive funding from that source. In addition to these sources, it is possible that future projects could be funded from user fees, vehicle trade-ins or other sources not listed. Many projects will be funded from a mix of funding sources, such as part cash and part bonding, or part water fund and part sewer fund. City contributions to capital-type funds have varied over the years. Starting in 2025, staff has proposed levies that will contribute directly to capital reserve funds to more transparently show how much we are saving for future capital investments. We have also added more set-aside funds, such as the Infrastructure Reserve, Park Reserve, and City Hall Reserve to plan for increased use of cash in order to reduce future bonding. Project Priorities Capital improvement projects should be prioritized in some way so that limited funding can be allocated to those which are most important. This is difficult because the varying nature of the projects and their benefits and objectives are so disparate as to be essentially not comparable. Some public agencies have developed elaborate rating and ranking systems to try to set priorities. Complicated scoring systems may have some disadvantages because they may give a false sense of objectivity or precision to the priority setting process. Others use simpler systems, or simply do not try to compare projects that are like “apples and oranges.” There is no accepted system or “industry standard” for prioritizing projects. The following system has been utilized by staff: 1. Critical or urgent, high-priority projects that should be done if at all possible; a special effort should be made to find sufficient funding for all of the projects in this group. 2. Very important, high-priority projects that should be done as funding becomes available. 3. Important and worthwhile projects to be considered if funding is available; may be deferred to a subsequent year. 4. Less important, low-priority projects; desirable but not essential. 5. Future Consideration 4 2025 – 2034 CAPITAL IMPROVEMENT PLAN City-Wide Summary For 2025 through 2034, the draft CIP includes 149 projects (active and new recommendations) with a total estimated cost of $162,622,000. The paragraphs below and charts on the following pages provide both a summary and details of projects, timing, funding sources. Projects are a mix of replacements, improvements, and additions. Attached Reports – • Project Totals by Department • Project Totals by Funding Source Department # Projects Admin & Finance Depts 2 Building Dept 4 Fire Dept 10 Parks and Recreation 35 Public Works Dept 54 Sewer Dept 6 Storm Water Dept 7 Water Dept 31 Total 149 Administration & Finance Departments Admin and Finance generally do not have many projects in the CIP. The two budgeted for 2025 include financial software and a prospective land purchase. The land purchase is for future ballfield land, but due to the fact this possible purchase was not included in the CIP for review by the Park Commission last spring and it is largely a City Council led project, it was determined to leave it under Administration for now. Attached Reports – • Admin/Finance – Summary • Admin/Finance – Detail • Ballfield Fund – Funding Sources & Uses Building Department The Building Department has four vehicles for travel to building site for inspections. These vehicles are currently planned for a seven-year rotation with an estimated 15% funded by the trade-in or sale or existing vehicles. Attached Reports – • Building Dept – Summary • Building Dept – Detail Fire Department The Fire Department has 10 items in the 2025-2024 CIP, with a mix of vehicles and equipment. These purchases are almost exclusively funded by the Vehicle Replacement Fund and Trade- 5 ins/Sale of Equipment. Due to the nature of these vehicles the expected life span and the trade-in percentage vary greatly. Attached Reports – • Fire Dept – Summary • Fire Dept – Detail Public Works Departments The “Public Works Departments” encompasses the following; • General Public Works (Streets and General Maintenance) • Parks • Water • Sewer • Stormwater Public Works projects are divided out into these “sub-departments” due largely to the way that we account for government spending and the types of revenues that fund these projects. Parks CIP projects are funded largely by Park Dedication funds that come from developers. Street projects are funded largely by either by the property tax levy or bond proceeds (debt) repaid by the property tax levy. Water, sewer and stormwater projects are paid from those Enterprise Funds or bond proceeds (which are then repaid from those Enterprise Funds). Because many projects have cross-over between the Public Works departments, it seemed most straightforward to review PW CIP items via the following categories; including Vehicles & Equipment, PW Building, Parks, and Infrastructure. Vehicle & Equipment Purchases There are currently 21 items planned for replacement or purchase in the next 10 years, including 12 trucks and 9 small and large pieces of equipment. Attached Reports – • PW Vehicles & Equipment – Summary • PW Vehicles & Equipment – Detail Public Works Building There are currently only four items on the Public Works Building (3445 Ideal Ave N) planned for repair/addition/replacement in the next 10 years. This particular subset of projects will be a focus of future development of this Capital Improvement Plan, so that we can properly plan for repairs as the building ages. Attached Reports – • PW Building – Summary • PW Building – Detail 6 Parks Projects There are currently 35 items on the Parks CIP, most of which is replacement of existing park equipment and facilities. These items were reviewed by the Parks Commission in June and recommended for approval. All projects are currently funded by the Park Dedication Fund, which we expect to be fully-funded for the next 10 years. However, those projections are based on existing development trends and can change significantly depending on what occurs in the housing market.. Some of the projects are labeled simply “New Park Pavillion” without a location. This denotes a plan to replace one pavilion per year, with the actual location being determined by condition and need. Attached Reports – • Parks – Summary • Parks – Detail • Park Dedication Fund (404) – Funding Sources & Uses Infrastructure Projects This subset of projects includes Street, Water, Sewer & Stormwater Projects. At the July 11, 2024 City Council Workshop, City Engineer Jack Griffin presented an updated Pavement Management Plan that outlined the planned Street Reconstructions. This plan has since been updated internally as new information is received and assumptions changed. Street reconstruction projects are planned tentatively for the next 10 years. The final timing of projects is dependent on street condition, project costs, available funding, and other factors. “Street Improvement Projects” are typically done by neighborhood and a portion of the project is assessed to homeowners for a 15-year period. It is these projects that will sometimes have a segment in both Street and Water, as discussed earlier. Other street projects include collector streets that serve more of the city as a whole and may not have as many assessments, or County-led projects with a required City contribution. The list of Utility (Water, Sewer, and Stormwater) projects includes a mix of repairs or replacements of existing facilities, expansion or new facilities to address growth and/or PFAS pollution, and contributions to developments to ensure proper sizing of new infrastructure. Of note in Water projects is the cost of new Treatment Plants. It is currently expected that these facilities will be fully-funded by the MPCA with the 3M Settlement Funds. So, of the approximately $74 million in water projects, over $50 million will come from Grants/Donations. Also of note, and related to those settlement funds, are projects that had been adopted in past years, but are now marked as “Future” because MPCA funding for those projects is no longer expected. These projects may not occur, or if they do, they may be largely funded by Special Assessments. We have left them in the plan as we await additional information. Attached Reports – 7 • Infrastructure – Summaries for Streets, Water, Sewer & Stormwater • Infrastructure – Details for Streets, Water, Sewer & Stormwater Vehicle Replacement Fund The Vehicle Fund is the only capital fund whose purchases are split across departments, and as such it seemed appropriate to bring some attention to it separately. The city has been contributing to the fund regularly since 2019. As we’ve built out the CIP to a 10-year plan, it is clear that those funding levels need to increase. The projected Tax Levy is shown with a starting amount of $400K in 2025 and increasing $50K per year until 2031 and then holding steady. An interfund loan is planned for 2027 to be repaid over a 5-year period to address a shortage in the fund that year. These projected revenues allow for this portion of the CIP to be fully funded for the next 10 years. Attached Reports – • Vehicle Fund (410) – Funding Sources & Uses FUTURE CHANGES This CIP is reviewed annually and adjusted as necessary. As mentioned, the City just moved from a simplistic 5-year CIP to a more comprehensive 10-year CIP in 2024. The software we utilize for maintaining the CIP has provided new budgeting tools. And staff is working to more thoroughly inventory and plan for maintenance of our existing assets as well as plan for new investments to enhance the quality of life of the community. As such, this CIP will continue to grow and each year we will have a better understanding of the long-term capital needs of the City of Lake Elmo. Alongside planning for expenditures, of course, is the need to plan for the revenue to fund these projects. As mentioned earlier, the city will be implementing a separate capital levy in 2025 to more transparently illustrate how taxes are levied for these capital projects, and to grow available cash with the goal of decreasing debt load over time. Utility Rates are reviewed each year with the utility projects herein having a significant effect on the rates needed to maintain revenue sufficiency in those funds. And, finally, the City is in the process of implementing Utility Franchise Fees on local utility companies to allocate toward capital needs. Department 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Admin/Finance Department 2,875,000 100,000 - - - - - - - - 2,975,000 Building Department - 35,000 - - 35,000 70,000 - - 35,000 - 175,000 Fire Department 145,000 622,673 613,774 - 77,453 - 76,744 192,500 - 2,575,000 4,303,144 Parks and Recreation 382,000 898,000 480,000 945,000 1,835,000 460,000 - 150,000 125,000 - 5,275,000 Public Works Department 3,865,200 8,415,000 11,240,000 2,450,000 3,475,000 8,990,000 8,130,000 4,393,500 3,800,000 15,110,000 69,868,700 Sewer Department 925,920 40,000 250,000 - 1,685,000 - - 1,000,000 - 380,000 4,280,920 Storm Water Department 685,405 80,000 781,000 50,000 50,000 50,000 50,000 50,000 50,000 - 1,846,405 Water Department 28,683,275 25,937,000 2,890,000 1,650,000 1,500,000 1,850,000 1,854,537 210,000 1,350,000 8,050,799 73,975,611 Grand Total 37,561,800 36,127,673 16,254,774 5,095,000 8,657,453 11,420,000 10,111,281 5,996,000 5,360,000 26,115,799 162,699,780 2025 through 2034 Capital Improvement Plan Lake Elmo, MN Totals by Department Admin/Finance Department Building Department Fire Department Parks and Recreation Public Works Department Sewer Department Storm Water Department Water Department % 2% 0% 3% 3% 43% 3% 1% 45% 100% Source 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total % Ballfield Fund 2,775,000 - - - - - - - - - 2,775,000 1.7% Bond Proceeds - Assessment Funded 1,106,000 1,137,000 826,500 735,000 652,500 660,000 600,000 1,174,500 900,000 2,340,000 10,131,500 6.2% Bond Proceeds - Stormwater Fund - - 575,000 - - - - - - - 575,000 0.4% Bond Proceeds - Tax Levy 1,834,000 6,478,000 9,028,500 1,715,000 2,522,500 6,640,000 7,160,000 2,740,500 2,600,000 5,790,000 46,508,500 28.6% Bond Proceeds - Water Fund - 750,000 2,600,000 1,500,000 1,500,000 1,700,000 1,500,000 - 550,000 - 10,100,000 6.2% Fire Equipment & Projects Fund 115,000 - 25,000 - - - - 192,500 - 375,000 707,500 0.4% General Fund 75,000 75,000 160,000 - - - - - - 108,500 418,500 0.3% Grants/Donation 27,000,000 24,750,000 - - - 1,000,000 - - - 14,885,000 67,635,000 41.6% Infrastructure Reserve Fund (409)1,065,200 50,000 - - - 500,000 - - - - 1,615,200 1.0% Municipal Sate Aid (MSA)- 500,000 500,000 - - - - - - - 1,000,000 0.6% Park Dedication Fund (404)292,000 828,000 480,000 850,000 1,790,000 460,000 - 125,000 125,000 - 4,950,000 3.0% Sewer Fund 935,920 40,000 250,000 - 1,685,000 - - 1,000,000 - 48,500 3,959,420 2.4% Storm Water Fund 690,405 80,000 206,000 50,000 50,000 50,000 50,000 50,000 50,000 39,500 1,315,905 0.8% Vehicle/Equip Trade-In 45,000 11,000 222,000 20,000 90,000 28,000 120,000 103,000 45,000 280,000 964,000 0.6% Vehicle Replacement Fund 220,000 641,673 1,171,774 75,000 367,453 227,000 361,744 400,500 290,000 2,125,000 5,880,144 3.6% Water Fund 1,408,275 712,000 285,000 150,000 - 150,000 319,537 210,000 800,000 124,299 4,159,111 2.6% Total - Non-MPCA 37,561,800 36,052,673 16,329,774 5,095,000 8,657,453 11,415,000 10,111,281 5,996,000 5,360,000 26,115,799 162,694,780 100% 2025 through 2034 Funding Source Summary - All Projects Lake Elmo, MN Funding Sources Ballfield Fund Bond Proceeds - Assessment Funded Bond Proceeds - Stormwater Fund Bond Proceeds - Tax Levy Bond Proceeds - Water Fund Fire Equipment & Projects Fund General Fund Grants/Donation Infrastructure Reserve Fund (409) Municipal Sate Aid (MSA) Park Dedication Fund (404) Sewer Fund Storm Water Fund Non MPCA-Funded Projects Source 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total % Bond Proceeds - Assessment Fu 320,000 - - - - - - - - 380,000 700,000 3% Bond Proceeds - Stormwater Fu - - 575,000 - - - - - - - 575,000 3% Bond Proceeds - Water Fund 750,000 2,600,000 1,500,000 1,500,000 1,700,000 1,500,000 - 550,000 - 10,100,000 50% Sewer Fund 925,920 40,000 250,000 - 1,685,000 - - 1,000,000 - - 3,900,920 19% Storm Water Fund 685,405 80,000 206,000 50,000 50,000 50,000 50,000 50,000 50,000 - 1,271,405 6% Water Fund 1,363,275 687,000 190,000 150,000 - 150,000 180,000 210,000 800,000 - 3,730,275 18% Total - Non-MPCA 3,294,600 1,557,000 3,821,000 1,700,000 3,235,000 1,900,000 1,730,000 1,260,000 1,400,000 380,000 20,277,600 100% MPCA-Funded Projects Source 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total % Grants/Donation 27,000,000 24,500,000 - - - - - - - 7,985,000 59,485,000 100% Total - MPCA 27,000,000 24,500,000 - - - - - - - 7,985,000 59,485,000 100% 2025 through 2034 Funding Source Summary - Utility Projects Lake Elmo, MN Funding Sources (non-MPCA only) Bond Proceeds - Assessment Funded Bond Proceeds - Stormwater Fund Bond Proceeds - Water Fund Sewer Fund Storm Water Fund Water Fund Dept Status Project #Project Cost Project Admin/Finance Department New Recomm AF - 001 200,000 Financial Software Suite New Recomm AF - 002 2,775,000 Ballfield Property Purchase 2,975,000$ Total 297,500$ 10-Year Average Building Department Active B-001 35,000 Building Inspection Vehicle 1 Active B-002 35,000 Building Inspection Vehicle 2 Active B-003 35,000 Building Inspection Vehicle 3 Active B-004 70,000 Building Inspection Vehicle 4 175,000$ Total 17,500$ 10-Year Average Fire Department Active F-004 30,000 Rescue 1 Hose Storage and Equipment Refurbish Active F-009 1,176,447 Tender 2 Active F-011 60,000 UTV 1 Active F-012 2,200,000 Ladder 1 Active F-014 77,453 Command Vehicle 1 Active F-015 76,744 Command Vehicle 2 Active F-017 375,000 SCBA Replacement Active F-018 192,500 Turnout Gear Replacement Active F-021 40,000 Equipment Decon Cleaning System New Recomm F-031 75,000 Station Alerting System 4,303,144$ Total 430,314$ 10-Year Average Parks and Recreation Active PR-001 45,000 Chevy 2500 Active PR-002 35,000 Kubota SUV Active PR-003 90,000 Bobcat ToolCat Active PR-004 60,000 John Deere Gator Active PR-005 25,000 Air Compressor Active PR-006 70,000 Skid Loader Active PR-027 65,000 Kleis Park Playground - Replacement Active PR-028 125,000 Tana Ridge Park Play Equipment - Replacement Active PR-029 210,000 Tablyn Park Play Equipment - Replacement Lake Elmo, MN Capital Improvement Plan - Project Listing & Status 2025 through 2034 Active PR-030 125,000 Stonegate Park Play Equipment - Replacement Active PR-031 125,000 Reid Park Play Equipment - Replacement Active PR-032 125,000 Ridge Park Play Equipment - Replacement Active PR-034 125,000 Hidden Knoll Park Play Equipment - Replacement Active PR-036 250,000 Carriage Station Park Play Equipment - Replacement Active PR-038 78,000 Trail Additions Active PR-039 250,000 Lions Park Playground Equipment Replacement Active PR-040 30,000 Court Resurfacing Active PR-043 275,000 Lions Park Concession Building Updates Active PR-044 150,000 Skate Park Active PR-045 30,000 Outdoor Fitness Equipment Active PR-046 30,000 Outdoor Fitness Park Active PR-047 30,000 Disk Golf Active PR-048 300,000 Central Play Complex New Recomm PR-049 227,000 Reid Park Parking Lot New Recomm PR-050 30,000 Court Resurfacing New Recomm PR-051 200,000 Trail Connection New Recomm PR-052 225,000 Park Sign Replacement New Recomm PR-053 1,000,000 Multisport Complex Amenities New Recomm PR-054 25,000 Invasive Species Management New Recomm PR-055 80,000 New Park Pavilion New Recomm PR-056 80,000 New Park Pavilion New Recomm PR-057 80,000 New Park Pavilion New Recomm PR-058 80,000 New Park Pavilion New Recomm PR-059 80,000 New Park Pavilion Active PR-069 520,000 Central Greenway Regional Trail 5,275,000$ Total 527,500$ 10-Year Average Public Works Department Active PW-002 300,000 D2 - Dump Truck 2 - 15 Mack Single Active PW-003 300,000 D3 - Dump Truck 3 - 17 Mack Active PW-004 70,000 D4 - Dump Truck 4 - 19 F-450 Active PW-005 300,000 D5 - Dump Truck 5 - 19 Mack Active PW-006 330,000 D6 - Dump Truck 6 - 20 Mack Tandem Active PW-007 300,000 D7 - Dump Truck 7 - 21 Mack Active PW-008 70,000 D8 - Dump Truck 8 - 22 F-550 Active PW-011 75,000 P1 - Pickup 1 - F-250 Active PW-012 75,000 P2 - Pickup 2 - F-250 Active PW-013 45,000 P3 - Pickup 3 - F-150 Active PW-014 31,000 P4 - Pickup 4 - Ranger Active PW-015 55,000 P5 - Pickup 5 - 3500 Active PW-021 230,000 E1 - Equip 1 - Case Loader Active PW-023 145,000 E3 - Equip 3 - Backhoe Active PW-025 70,000 E5 - Equip 5 -Bobcat Skid Active PW-026 40,000 E6 - Equip 6 - Service Lift Active PW-027 160,000 E7 - Equip 7 - Radios Active PW-028 125,000 E8 - Equip 8 - Asphalt Roller Active PW-029 47,500 E9 - Equip 9 - Asphalt Trailer Active PW-030 60,000 E10 - Equip 10 - Chipper Active PW-031 25,000 E11 - Equip 11 - Forklift New Recomm PW-051 35,000 PWB1 - Refinish Public Works Shop Floor Active PW-052 55,000 PWB2 - Public Works Building Generator New Recomm PW-053 30,000 PWB3 - Public Works Building Roof New Recomm PW-054 110,000 PWB4 - Public Works Building Additional Shop Space New Recomm PW-055 80,000 PWB5 - Public Works Building Overhead Garage Doors Active PW-090 1,315,000 Reevaluate- Homestead St & Utility Improvements Active PW-091 4,550,000 Future - PP/EP/20th Street & Utility Improvements Active PW-092 3,500,000 Future - Tartan Street & Utility Improvements Active PW-093 3,400,000 Future - DL/SP/For Street & Utility Improvements Active PW-100 2,620,000 2025 Street Improvements Active PW-101 2,740,000 2026 Street Improvements Active PW-102 2,755,000 2027 Street Improvements Active PW-103 2,450,000 2028 Street Improvements Active PW-104 2,175,000 2029 Street Improvements Active PW-105 2,200,000 2030 Street Improvements Active PW-106 2,000,000 2031 Street Improvements Active PW-107 3,915,000 2032 Street Improvements Active PW-108 3,000,000 2033 Street Improvements New Recomm PW-109 3,200,000 2034 Street Improvements Active PW-120 960,200 UP RR Crossing - Village Parkway Active PW-120-2 105,000 UP RR Crossing - Private Drive Closure Active PW-121 560,000 Hudson Blvd Improvements - Vahli-Hi to Bus Fac. Active PW-122 2,100,000 Hudson Blvd Improvements - Keats to Kramer Lake Ov Active PW-123 5,760,000 South Frontage Rd (Demontreville Tr to Keats Ave) New Recomm PW-124 4,600,000 5th St N - Keats to Lake Elmo Ave Active PW-125 5,000,000 TH36-Lake Elmo Ave (CSAH 17) Imp Active PW-126 3,000,000 South Frontage Road (Keats to Lake Elmo Ave) Active PW-127 300,000 Manning/Hudson Stoplight Active PW-128 1,000,000 Ideal Ave (CSAH 13)-Phase 3- CSAH 14 to CSAH 6 New Recomm PW-129 1,000,000 CSAH 14 - Klondike to 39th New Recomm PW-130 1,000,000 CSAH 17 Imp - CSAH 14 - 43rd Active PW-131 500,000 Lake Elmo Ave (CSAH 17) & 39th St N Traffic Signal Active PW-132 500,000 CSAH 6/Inwood Signal New Recomm PW-133 500,000 CSAH 10 / CSAH 17 Roundabout 69,868,700$ Total 6,986,870$ 10-Year Average Sewer Department Active S-093 380,000 Future - DL/SP/For Street & Util Imp - Sewer Active S-104 1,685,000 2029 Street Improvements Active S-107 1,000,000 Tapestry Sanitary Sewer Collection System Upgrades Active S-108 900,000 I-94 Lift Station and Forcemain Upgrade Active S-120 115,920 Sewer Oversizing Active S-121 200,000 Sewer Oversizing for Sect 16 Extension 4,280,920$ Total 428,092$ 10-Year Average Storm Water Department Active SW-001 285,405 Phase 2 Regional Drainage Impr. - Northstar Pond Active SW-002 575,000 Phase 3 Regional Drainage Impr - Lions Park Pond Active SW-003 80,000 Stormwater Reuse - Development Irrigation Systems Active SW-004 76,000 Stormwater Reuse - Lions & VFW Park Irrigation Active SW-005 80,000 Stormwater Reuse - Irrigation Systems Active SW-006 400,000 Hudson Boulevard Culvert Repair Active SW-TBD 350,000 Future Unidentified Stormwater Projects 1,846,405$ Total 184,641$ 10-Year Average Water Department Active W-001 100,000 W1 - Water 1 - Portable Generator Active W-002 130,000 W2 - Water 2 - F-550 Service Truck Active W-003 44,537 W3 - Water 3 - RAM 3500 Van Active W-004 65,799 W4 - Water 4 - F-250 Service Truck Active W-011 50,000 T1 - Tower 1 - Langly Ct Active W-012 800,000 T2 - Tower 2 - Ideal Ave Active W-014 800,000 T4 - Tower 4 - Inwood Ave Active W-017 60,000 WL2 - Well 2 - 55th St Active W-019 50,000 WL4 - Well 4 - 50th St Active W-020 50,000 WL5 - Well 5 - Lily Ave Active W-021 750,000 WL6 - Well 6 - Future Well & Site Acquisition Active W-022 750,000 WL7 - Well 7 (or 3) - Test Well & Site Acquisition Active W-041 49,000,000 TP1 - Treatment Plant 1 Active W-042 2,500,000 TP2 - Treatment 2 - Well 2 - GAC Filter System Active W-090 935,000 Future - Homestead Street & Utility Impr - Water Active W-091 2,500,000 Future - PP/EP/20th Street & Utility Impr - Water Active W-092 1,900,000 Future - Tartan Street & Utility Impr - Water Active W-093 2,200,000 Future - DL/SP/For Street & Utility Impr - Water Active W-094 450,000 Future - 45th Street Watermain Extension Active W-100 320,000 2025 Street & Utility Improvements - Water portion Active W-101 327,000 2026 Street & Utility Improvements - Water portion Active W-103 150,000 2028 Street & Utility Improvements - Water portion Active W-105 100,000 2030 Street & Utility Improvements - Water portion Active W-106 130,000 2031 Street & Utility Improvements - Water portion Active W-107 210,000 2032 Street & Utility Improvements - Water portion Active W-108 550,000 2033 Street & Utility Improvements - Water portion Active W-120 582,800 Village East Trunk Watermain & PRV Active W-122 1,800,000 Hudson Blvd - Trunk Watermain Extension New Recomm W-124 1,700,000 5th St N - Keats to Lake Elmo Ave - Water Portion Active W-130 4,500,000 Trunk Watermain Extensions Active W-160 470,475 Watermain Oversizing 73,975,611$ Total 7,397,561$ 10-Year Average Produced Using Plan-It CIP Software 2025 through 2034 Admin-Finance Summary Lake Elmo, MN Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Admin/Finance Department Financial Software Suite AF - 001 100,000 100,000 200,000 Ballfield Property Purchase AF - 002 2,775,000 2,775,000 Ballfield Fund 2,775,000 2,775,000 General Fund 75,000 75,000 150,000 Water Fund 25,000 25,000 50,000 Source Grand Total 2,875,000 100,000 0 0 0 0 0 0 0 0 2,975,000 GRAND TOTAL 2,875,000 100,000 0 0 0 0 0 0 0 0 2,975,000 Financial Software Suite 2025 thru 2034 Admin/Finance - Detail Lake Elmo, MN Project #AF - 001 Project Name Financial Software Suite Contact Finance Director Department Admin/Finance Department Category Unassigned Priority 3 Important Status New Recommendation Useful Life 10 years Description The current set-up utilizing different software for financial accounting and utility billing, as well as manual and spreadsheet processes for Special Assessments, Fixed Assets, Escrows and more, creates significant inefficiencies in the Finance Department. New software can incorporate automated Accounts Payable processes, adding efficiencies across the entire organization. Significant savings in staff time will make the department more resilient in the face of employee turnover and community growth. Very preliminary estimates of total costs are estimated at $200,000, which would include a conversion to the new software, as well as new workflows to automate tasks. Costs will be spread across at least two calendar years. The time-value of the increased efficiencies are expected to exceed the annualized costs of the software. In addition, these gained efficiencies will make the department more resilient to employee turnover. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Other 100,000 100,000 0 0 0 0 0 0 0 0 200,000 Total 100,000 100,000 0 0 0 0 0 0 0 0 200,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total General Fund 75,000 75,000 0 0 0 0 0 0 0 0 150,000 Water Fund 25,000 25,000 0 0 0 0 0 0 0 0 50,000 Total 100,000 100,000 0 0 0 0 0 0 0 0 200,000 Produced Using Plan-It CIP Software Ballfield Property Purchase 2025 thru 2034 Admin/Finance - Detail Lake Elmo, MN Project #AF - 002 Project Name Ballfield Property Purchase Contact City Administrator Department Admin/Finance Department Category Land Priority 3 Important Status New Recommendation Useful Life 99 years Description Purchase of two properties for future development of parks and ballfields. Per city council meeting on 8/27/24. Tentative closing in early 2025. Interfund Loan -- repayment over 10 years w/ dedicated levy. $2,700,000 for land + $75,000 for closing costs/incidentals $1,058,280 to be transferred from Park Ded -- Royal Golf ballfield contribution. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Land Acquisition 2,700,000 0 0 0 0 0 0 0 0 0 2,700,000 Other 75,000 0 0 0 0 0 0 0 0 0 75,000 Total 2,775,000 0 0 0 0 0 0 0 0 0 2,775,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Ballfield Fund 2,775,000 0 0 0 0 0 0 0 0 0 2,775,000 Total 2,775,000 0 0 0 0 0 0 0 0 0 2,775,000 Produced Using Plan-It CIP Software 2025 through 2034 Ballfield Fund - Funding Sources & Uses Lake Elmo, MN Source Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Ballfield Fund Beginning Balance 0 0 0 0 0 0 0 0 0 0 Revenues and Other Fund Sources Revenue Ballfield Levy 257,508 248,924 240,341 231,757 223,174 214,590 206,006 197,423 188,839 180,256 Park Dedication 1,058,280 0 0 0 0 0 0 0 0 0 Interfund Loan 1,716,720 0 0 0 0 0 0 0 0 0 Total 3,032,508 248,924 240,341 231,757 223,174 214,590 206,006 197,423 188,839 180,256 Other Fund Sources Total Revenues and Other Fund Sources 3,032,508 248,924 240,341 231,757 223,174 214,590 206,006 197,423 188,839 180,256 Total Funds available 3,032,508 248,924 240,341 231,757 223,174 214,590 206,006 197,423 188,839 180,256 Expenditures and Uses Capital Projects & Equipment Admin/Finance Department Ballfield Property Purchase AF - 002 2,775,000 0 0 0 0 0 0 0 0 0 Total 2,775,000 0 0 0 0 0 0 0 0 0 Other Uses Interfund Loan Payment 257,508 248,924 240,341 231,757 223,174 214,590 206,006 197,423 188,839 180,256 Total 257,508 248,924 240,341 231,757 223,174 214,590 206,006 197,423 188,839 180,256 Total Expenditures and Uses 3,032,508 248,924 240,341 231,757 223,174 214,590 206,006 197,423 188,839 180,256 Change in Fund Balance 0 0 0 0 0 0 0 0 0 0 Ending Balance 0 0 0 0 0 0 0 0 0 0 Produced Using Plan-It CIP Software Produced Using Plan-It CIP Software 2025 through 2034 Building Dept - Summary Lake Elmo, MN Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Building Department Building Inspection Vehicle 1 B-001 35,000 35,000 Building Inspection Vehicle 2 B-002 35,000 35,000 Building Inspection Vehicle 3 B-003 35,000 35,000 Building Inspection Vehicle 4 B-004 35,000 35,000 70,000 Vehicle/Equip Trade-In 5,000 5,000 5,000 5,000 20,000 Vehicle Replacement Fund 30,000 30,000 60,000 30,000 150,000 Source Grand Total 0 35,000 0 0 35,000 65,000 0 0 35,000 0 170,000 GRAND TOTAL 0 35,000 0 0 35,000 70,000 0 0 35,000 0 175,000 Building Inspection Vehicle 1 2025 thru 2034 Building Dept - Detail Lake Elmo, MN Project #B-001 Project Name Building Inspection Vehicle 1 Contact Building Official Department Building Department Category Vehicles Priority 2 Very Important Status Active Useful Life 7 years Dept. Unit Number/Name BLDG-1 Make Chevrolet Model Equinox VIN / SN 3GNAXSEVXNS165061 Year 2022 Color Black License Plate 977305 Location/Address City Hall Description Building Inspection Vehicle 1 Current - 2022 Equinox - purchased 2022 Prior - 2004 S10 Colorado, 20YY S10 Colorado 7 year purchasing cycle. Justification 7 year replacement cycle on 4 Building Inspection vehicles. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 35,000 0 0 0 0 0 35,000 Total 0 0 0 0 35,000 0 0 0 0 0 35,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 30,000 0 0 0 0 0 30,000 Vehicle/Equip Trade-In 0 0 0 0 5,000 0 0 0 0 0 5,000 Total 0 0 0 0 35,000 0 0 0 0 0 35,000 Produced Using Plan-It CIP Software Building Inspection Vehicle 2 2025 thru 2034 Building Dept - Detail Lake Elmo, MN Project #B-002 Project Name Building Inspection Vehicle 2 Contact Building Official Department Building Department Category Vehicles Priority 2 Very Important Status Active Useful Life 7 years Dept. Unit Number/Name BLDG-2 Make Mitsubishi Model Outlander VIN / SN JA4ARUAU8NU024737 Year 2022 Color White License Plate 968478 Location/Address City Hall Description Building Inspection Vehicle 2 Current - 2022 Mitsubishi Outlander (VIN 4737) Prior - 2015 Jeep (sold 12/22/22) 7 year purchasing cycle. Justification 7 year replacment cycle on 4 Building Inspection vehicles. Produced Using Plan-It CIP Software Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 35,000 0 0 0 0 35,000 Total 0 0 0 0 0 35,000 0 0 0 0 35,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 30,000 0 0 0 0 30,000 Total 0 0 0 0 0 30,000 0 0 0 0 30,000 Produced Using Plan-It CIP Software Building Inspection Vehicle 3 2025 thru 2034 Building Dept - Detail Lake Elmo, MN Project #B-003 Project Name Building Inspection Vehicle 3 Contact Building Official Department Building Department Category Vehicles Priority 2 Very Important Status Active Useful Life 7 years Dept. Unit Number/Name BLDG-3 Make Mitsubishi Model Outlander VIN / SN JA4ARUAU7NU024731 Year 2022 Color Black License Plate 977306 Description Building Inspection Vehicle 3 Current - 2022 Mitsubishi Outlander (VIN 4731) Prior - 2017 Equinox (sold 4/18/23) 7 year purchasing cycle. Justification 7 year replacment cycle on 4 Building Inspection vehicles. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 35,000 0 0 0 0 35,000 Total 0 0 0 0 0 35,000 0 0 0 0 35,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 30,000 0 0 0 0 30,000 Vehicle/Equip Trade-In 0 0 0 0 0 5,000 0 0 0 0 5,000 Total 0 0 0 0 0 35,000 0 0 0 0 35,000 Produced Using Plan-It CIP Software Building Inspection Vehicle 4 2025 thru 2034 Building Dept - Detail Lake Elmo, MN Project #B-004 Project Name Building Inspection Vehicle 4 Contact Building Official Department Building Department Category Vehicles Priority 3 Important Status Active Useful Life 7 years Dept. Unit Number/Name BLDG-4 Make Chevrolet Model Equinox VIN / SN 3GNAXUEVOLS538391 Year 2019 Color White Description Building Inspection Vehicle 4 Current - 2019 Chevrolet Equinox 7 year purchasing cycle. Justification 7 year replacement cycle on 4 Building Inspection vehicles. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 35,000 0 0 0 0 0 0 35,000 0 70,000 Total 0 35,000 0 0 0 0 0 0 35,000 0 70,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 30,000 0 0 0 0 0 0 30,000 0 60,000 Vehicle/Equip Trade-In 0 5,000 0 0 0 0 0 0 5,000 0 10,000 Total 0 35,000 0 0 0 0 0 0 35,000 0 70,000 Produced Using Plan-It CIP Software Produced Using Plan-It CIP Software Produced Using Plan-It CIP Software 2025 through 2034 Fire Dept - Summary Lake Elmo, MN Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Fire Department Rescue 1 Hose Storage and Equipment Refurbish F-004 30,000 30,000 Tender 2 F-009 487,673 688,774 1,176,447 UTV 1 F-011 60,000 60,000 Ladder 1 F-012 2,200,000 2,200,000 Command Vehicle 1 F-014 77,453 77,453 Command Vehicle 2 F-015 76,744 76,744 SCBA Replacement F-017 375,000 375,000 Turnout Gear Replacement F-018 192,500 192,500 Equipment Decon Cleaning System F-021 40,000 40,000 Station Alerting System F-031 75,000 75,000 Fire Equipment & Projects Fund 115,000 25,000 192,500 375,000 707,500 Vehicle/Equip Trade-In 6,000 100,000 30,000 25,000 200,000 361,000 Vehicle Replacement Fund 30,000 541,673 563,774 47,453 51,744 2,000,000 3,234,644 Source Grand Total 145,000 547,673 688,774 0 77,453 0 76,744 192,500 0 2,575,000 4,303,144 GRAND TOTAL 145,000 547,673 688,774 0 77,453 0 76,744 192,500 0 2,575,000 4,303,144 Rescue 1 Hose Storage and Equipment Refurbish 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-004 Project Name Rescue 1 Hose Storage and Equipment Refurbish Contact Fire Chief Department Fire Department Category Vehicles Priority 2 Very Important Status Active Useful Life 15 years Make Rosenbauer Description Refurbish existing hose storage area to include preconnected hose capabilities and refurbish tool and equipment areas to better utilize available equipment storage space. Justification The fire department replaces or refurbishes vehicles on a rotating basis based on each individual vehicles need. As department operations are being reevaluated with the new single station operating model, all department apparatus will be used more frequently for its intended use. This project will allow for better apparatus utilization and response capability. The Rescue 1 refurbishment will provide a refurbish of existing hose storage area to include preconnected hose capabilities and refurbish tool and equipment areas to better utilize available storage space. Rescue 1 is utilized by all Fire Department staff to respond to emergency incidents 24 hours a day 365 days per year to provide crew response, firefighter safety, support on emergency incidents, and prevention efforts. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 30,000 0 0 0 0 0 0 0 0 0 30,000 Total 30,000 0 0 0 0 0 0 0 0 0 30,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 30,000 0 0 0 0 0 0 0 0 0 30,000 Total 30,000 0 0 0 0 0 0 0 0 0 30,000 Produced Using Plan-It CIP Software Tender 2 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-009 Project Name Tender 2 Contact Fire Chief Department Fire Department Category Vehicles Priority 1 Critical Status Active Useful Life 20 years Dept. Unit Number/Name Tender 2 Make Spartan Model Gladiator VIN / SN 4S7AX2F996C055229 Year 2007 Color Red Description Replacement of Tender 2 (2007 Rosenbauer/Spartan Tender/Engine) including all necessary response equipment, lighting and graphics. Justification The fire department replaces vehicles on a rotating basis based on each individual vehicles need. The Tender 2 replacement will be utilized by all Fire Department staff to respond to emergency incidents 24 hours a day 365 days per year to provide crew response, firefighter safety, support on emergency incidents, and prevention efforts. This was originally budgeted as a 2027 CIP purchase but due to rapidly increasing costs and the significant length of replacement build time, this request to purchase is being presented now. Current build time is currently estimated at 26 – 30 months from time of order. The vehicle being replaced will be sold upon the arrival of the new engine. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 487,673 688,774 0 0 0 0 0 0 0 1,176,447 Total 0 487,673 688,774 0 0 0 0 0 0 0 1,176,447 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 487,673 563,774 0 0 0 0 0 0 0 1,051,447 Vehicle/Equip Trade-In 0 0 100,000 0 0 0 0 0 0 0 100,000 Fire Equipment & Projects Fund 0 0 25,000 0 0 0 0 0 0 0 25,000 Total 0 487,673 688,774 0 0 0 0 0 0 0 1,176,447 Produced Using Plan-It CIP Software UTV 1 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-011 Project Name UTV 1 Contact Fire Chief Department Fire Department Category Vehicles Priority 2 Very Important Status Active Useful Life 15 years Make Polaris Model Ranger VIN / SN 4XARF68A794733391 Year 2009 Color Red Description Replacement of UTV 1 (2008 Polaris Ranger 6x6) including all necessary response equipment, lighting and graphics. Justification The fire department replaces vehicles on a rotating basis based on each individual vehicles need. The UTV 1 replacement will be utilized by all Fire Department staff to respond to emergency incidents 24 hours a day 365 days per year to provide crew response, firefighter safety, support on emergency incidents, and prevention efforts. This equipment is especially critical for utilization within our parks and trail systems. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 60,000 0 0 0 0 0 0 0 0 60,000 Total 0 60,000 0 0 0 0 0 0 0 0 60,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 54,000 0 0 0 0 0 0 0 0 54,000 Vehicle/Equip Trade-In 0 6,000 0 0 0 0 0 0 0 0 6,000 Total 0 60,000 0 0 0 0 0 0 0 0 60,000 Produced Using Plan-It CIP Software Ladder 1 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-012 Project Name Ladder 1 Contact Fire Chief Department Fire Department Category Vehicles Priority 1 Critical Status Active Useful Life 20 years Dept. Unit Number/Name Ladder 1 Make Rosenbauer Model Commander 78' Aerial VIN / SN 54F2CC702FWM10914 Year 2015 Color Red Description Replacement of Ladder 1 (2015 Rosenbauer 78' Aerial) including all necessary response equipment, lighting and graphics. Justification The fire department replaces vehicles on a rotating basis based on each individual vehicles need. The Ladder 1 replacement will be utilized by all Fire Department staff to respond to emergency incidents 24 hours a day 365 days per year to provide crew response, firefighter safety, support on emergency incidents, and prevention efforts. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 0 0 2,200,000 2,200,000 Total 0 0 0 0 0 0 0 0 0 2,200,000 2,200,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 0 0 0 2,000,000 2,000,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 0 0 200,000 200,000 Total 0 0 0 0 0 0 0 0 0 2,200,000 2,200,000 Produced Using Plan-It CIP Software Command Vehicle 1 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-014 Project Name Command Vehicle 1 Contact Fire Chief Department Fire Department Category Vehicles Priority 1 Critical Status Active Useful Life 8 years Dept. Unit Number/Name C1 Make Chevrolet Model Tahoe VIN / SN 1GNSKLED2MR463377 Year 2021 Color Red License Plate C1 Description Replacement of CV1 (2021 Chevrolet Tahoe) including all necessary response equipment, lighting and graphics. Justification The fire department replaces vehicles on a rotating basis based on each individual vehicles need. The Command Vehicle will be utilized by Fire Department Fire Inspector and officer staff to respond to emergency incidents 24 hours a day 365 days per year to provide critical incident command, firefighter safety, support on emergency incidents, fire inspections and prevention efforts. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 77,453 0 0 0 0 0 77,453 Total 0 0 0 0 77,453 0 0 0 0 0 77,453 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 47,453 0 0 0 0 0 47,453 Vehicle/Equip Trade-In 0 0 0 0 30,000 0 0 0 0 0 30,000 Total 0 0 0 0 77,453 0 0 0 0 0 77,453 Budget Impact Less maintenance/repairs required to upkeep new vehicle Produced Using Plan-It CIP Software Command Vehicle 2 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-015 Project Name Command Vehicle 2 Contact Fire Chief Department Fire Department Category Vehicles Priority 1 Critical Status Active Useful Life 8 years Dept. Unit Number/Name C2 Make Dodge Model Durango VIN / SN 1C4SDJFT3PC676827 Year 2023 Color Black License Plate C2 Description Replacement of Command Vehicle 2 including all necessary response equipment, lighting and graphics. Justification The fire department replaces vehicles on a rotating basis based on each individual vehicles need. The Command Vehicle will be utilized by the Assistant Fire Chief to respond to emergency incidents 24 hours a day 365 days per year to provide critical incident command, firefighter safety, support on emergency incidents, fire inspections and prevention efforts. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 76,744 0 0 0 76,744 Total 0 0 0 0 0 0 76,744 0 0 0 76,744 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 51,744 0 0 0 51,744 Vehicle/Equip Trade-In 0 0 0 0 0 0 25,000 0 0 0 25,000 Total 0 0 0 0 0 0 76,744 0 0 0 76,744 Produced Using Plan-It CIP Software Budget Impact Less maintenance/repairs required to upkeep new vehicle Produced Using Plan-It CIP Software SCBA Replacement 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-017 Project Name SCBA Replacement Contact Fire Chief Department Fire Department Category Equipment: Fire Equip Priority 1 Critical Status Active Useful Life 15 years Make Drager Year 2019 Description Replacement of Self Contained Breathing Apparatus (SCBA) equipment. Justification Replacement of SCBA equipment that have become non-compliant with NFPA and OSHA standards. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 0 0 375,000 375,000 Total 0 0 0 0 0 0 0 0 0 375,000 375,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Fire Equipment & Projects Fund 0 0 0 0 0 0 0 0 0 375,000 375,000 Total 0 0 0 0 0 0 0 0 0 375,000 375,000 Produced Using Plan-It CIP Software Turnout Gear Replacement 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-018 Project Name Turnout Gear Replacement Contact Fire Chief Department Fire Department Category Equipment: Fire Equip Priority 1 Critical Status Active Useful Life 10 years Make GLOBE Year 2019 Description Replacement of 35 sets of turnout gear (Jacket, Pants, Particulate Hood and Boots). Justification Per NFPA 1971, turnout gear is required to be retired and taken out of service after 10 years. The requested sets of turnout gear, additional hoods and boots include the enhanced safety features available through the 2018 NFPA 1971 standard. New safety features include, less water absorption by the turnout gear outer shell, a particle protection barrier on hoods, and better ergonomic design of turnout gear to minimize gaps in protection. The benefit of acquiring this funding will greatly increase the safety of our firefighters during all types of incidents and drills requiring structural firefighting turnout gear. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 192,500 0 0 192,500 Total 0 0 0 0 0 0 0 192,500 0 0 192,500 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Fire Equipment & Projects Fund 0 0 0 0 0 0 0 192,500 0 0 192,500 Total 0 0 0 0 0 0 0 192,500 0 0 192,500 Produced Using Plan-It CIP Software Equipment Decon Cleaning System 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-021 Project Name Equipment Decon Cleaning System Contact Fire Chief Department Fire Department Category Equipment: Fire Equip Priority 1 Critical Status Active Useful Life 20 years Description Equipment decon cleaning system cleans all protective gear and steel, composite, rubber, fabric, plastic equipment in a mechanical, self-contained process. This equipment is permanently installed in the decon room of the fire station. This system offers a quick, easy and safe method of cleaning protective gear in a sealed compartment. This ergonomic process minimizes manual contact with contaminated materials. Justification Exposure to hazardous chemicals and carcinogens is a well known health risk for firefighters. Studies have shown that they run a significantly higher risk of being diagnosed with various forms of cancer than the general population. To reduce this dangerous exposure it is essential to thoroughly, safely and efficiently clean and decontaminate all protective equipment after every use. Cleaning gear with and equipment decon cleaning system, significantly reduces the exposure to cancer causing PAH particles and supports a safer work environment for staff. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 40,000 0 0 0 0 0 0 0 0 0 40,000 Total 40,000 0 0 0 0 0 0 0 0 0 40,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Fire Equipment & Projects Fund 40,000 0 0 0 0 0 0 0 0 0 40,000 Total 40,000 0 0 0 0 0 0 0 0 0 40,000 Produced Using Plan-It CIP Software Station Alerting System 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-031 Project Name Station Alerting System Contact Fire Chief Department Fire Department Category Equipment: Fire Equip Priority 2 Very Important Status New Recommendation Useful Life 25 years Description Purchase of a station alerting system (Phoenix G-2 Alerting System) and associated instillation costs for the system in the fire station. This system was proposed in the planning of the new fire station and was eliminated due to the project budget. Justification The Pheonix G2 Alerting System is a station alerting system used by many fire departments throughout the US including all departments in Ramsey, Anoka and Hennepin Counties. This system alerts station crews of an incoming incident through, lighting, message boards and A/V notifications. Currently, the Washington County Emergency Communications Response Center will be ready with the capabilities to support the Phoenix G2 Alerting System in early 2025. When an incident occurs, the G2 Communications Gateway receives alert data from a dispatcher using CAD and the USDD interactive web-based interface we use today. Dispatch processing time is reduced when said alert data is sent over a high-speed network which can notify fire stations with alerts and information in less than a second. At the fire station, the Phoenix G2 system integrates crystal clear text to speech technology and high- contrast message signs and LED lighting. This helps emergency responders react promptly and efficiently to every call. This systems benefits the on-shift staff by increasing situational awareness and mental preparedness by using clear, consistent station alerting vocals. This helps crews respond more quickly and efficiently. The systems and alerting devices are designed to reduce cardiac stress, anxiety, optical shock, and sleep deprivation through ramped toning and lighting levels. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 75,000 0 0 0 0 0 0 0 0 0 75,000 Total 75,000 0 0 0 0 0 0 0 0 0 75,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Fire Equipment & Projects Fund 75,000 0 0 0 0 0 0 0 0 0 75,000 Total 75,000 0 0 0 0 0 0 0 0 0 75,000 Produced Using Plan-It CIP Software Produced Using Plan-It CIP Software 2025 through 2034 Public Works - Vehicles & Equipment - Summary Lake Elmo, MN Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Parks and Recreation Chevy 2500 PR-001 45,000 45,000 Kubota SUV PR-002 35,000 35,000 Bobcat ToolCat PR-003 90,000 90,000 John Deere Gator PR-004 60,000 60,000 Air Compressor PR-005 25,000 25,000 Skid Loader PR-006 70,000 70,000 Vehicle/Equip Trade-In 20,000 20,000 15,000 55,000 Vehicle Replacement Fund 70,000 70,000 75,000 30,000 25,000 270,000 Source Grand Total 90,000 70,000 0 95,000 45,000 0 0 25,000 0 0 325,000 Public Works Department D2 - Dump Truck 2 - 15 Mack Single PW-002 300,000 300,000 D3 - Dump Truck 3 - 17 Mack PW-003 300,000 300,000 D4 - Dump Truck 4 - 19 F-450 PW-004 70,000 70,000 D5 - Dump Truck 5 - 19 Mack PW-005 300,000 300,000 D6 - Dump Truck 6 - 20 Mack Tandem PW-006 330,000 330,000 D7 - Dump Truck 7 - 21 Mack PW-007 300,000 300,000 D8 - Dump Truck 8 - 22 F-550 PW-008 70,000 70,000 P1 - Pickup 1 - F-250 PW-011 75,000 75,000 P2 - Pickup 2 - F-250 PW-012 75,000 75,000 Produced Using Plan-It CIP Software Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total P3 - Pickup 3 - F-150 PW-013 45,000 45,000 P4 - Pickup 4 - Ranger PW-014 31,000 31,000 P5 - Pickup 5 - 3500 PW-015 55,000 55,000 E1 - Equip 1 - Case Loader PW-021 230,000 230,000 E3 - Equip 3 - Backhoe PW-023 145,000 145,000 E5 - Equip 5 -Bobcat Skid PW-025 70,000 70,000 E6 - Equip 6 - Service Lift PW-026 40,000 40,000 E7 - Equip 7 - Radios PW-027 160,000 160,000 E8 - Equip 8 - Asphalt Roller PW-028 125,000 125,000 E9 - Equip 9 - Asphalt Trailer PW-029 47,500 47,500 E10 - Equip 10 - Chipper PW-030 60,000 60,000 E11 - Equip 11 - Forklift PW-031 25,000 25,000 General Fund 160,000 160,000 Vehicle/Equip Trade-In 25,000 117,000 40,000 23,000 60,000 103,000 40,000 60,000 468,000 Vehicle Replacement Fund 120,000 608,000 260,000 167,000 310,000 375,500 260,000 125,000 2,225,500 Source Grand Total 145,000 0 885,000 0 300,000 190,000 370,000 478,500 300,000 185,000 2,853,500 Water Department W1 - Water 1 - Portable Generator W-001 100,000 100,000 W2 - Water 2 - F-550 Service Truck W-002 130,000 130,000 W3 - Water 3 - RAM 3500 Van W-003 44,537 44,537 W4 - Water 4 - F-250 Service Truck W-004 65,799 65,799 Vehicle/Equip Trade-In 5,000 35,000 20,000 60,000 Water Fund 95,000 139,537 45,799 280,336 Source Grand Total 0 0 100,000 0 0 0 174,537 0 0 65,799 340,336 Produced Using Plan-It CIP Software Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total GRAND TOTAL 235,000 70,000 985,000 95,000 345,000 190,000 544,537 503,500 300,000 250,799 3,518,836 Chevy 2500 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PR-001 Project Name Chevy 2500 Contact Public Works Director Department Parks and Recreation Category Vehicles Priority 3 Important Status Active Useful Life 10 years Make Chevrolet Model Silverado 2500 VIN / SN 2GC2KREGGK1138193 Year 2019 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 45,000 0 0 0 0 0 45,000 Total 0 0 0 0 45,000 0 0 0 0 0 45,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 30,000 0 0 0 0 0 30,000 Vehicle/Equip Trade-In 0 0 0 0 15,000 0 0 0 0 0 15,000 Total 0 0 0 0 45,000 0 0 0 0 0 45,000 Produced Using Plan-It CIP Software Kubota SUV 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PR-002 Project Name Kubota SUV Contact Public Works Director Department Parks and Recreation Category Vehicles Priority 3 Important Status Active Useful Life 12 years Make Kubota Model RTV X1100C VIN / SN A5KC2GDBTEG014726 Year 2014 Old Project Number PR-020 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 35,000 0 0 0 0 0 0 35,000 Total 0 0 0 35,000 0 0 0 0 0 0 35,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 25,000 0 0 0 0 0 0 25,000 Vehicle/Equip Trade-In 0 0 0 10,000 0 0 0 0 0 0 10,000 Total 0 0 0 35,000 0 0 0 0 0 0 35,000 Produced Using Plan-It CIP Software Bobcat ToolCat 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PR-003 Project Name Bobcat ToolCat Contact Public Works Director Department Parks and Recreation Category Vehicles Priority 3 Important Status Active Useful Life 10 years Make Bobcat Model Toolcat VIN / SN AHG812638 Year 2015 Color Black and White Old Project Number PR- 5555555 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 90,000 0 0 0 0 0 0 0 0 0 90,000 Total 90,000 0 0 0 0 0 0 0 0 0 90,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 70,000 0 0 0 0 0 0 0 0 0 70,000 Vehicle/Equip Trade-In 20,000 0 0 0 0 0 0 0 0 0 20,000 Total 90,000 0 0 0 0 0 0 0 0 0 90,000 Produced Using Plan-It CIP Software John Deere Gator 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PR-004 Project Name John Deere Gator Contact Public Works Director Department Parks and Recreation Category Vehicles Priority 2 Very Important Status Active Useful Life 10 years Make John Deere Model Pro-Gator 2020A VIN / SN 1TC202ATPJT100S47 Year 2018 Color Green Old Project Number PR-016 Description 2018 John Deere pro-gator 2020A model to be replaced in 2028. Justification Doesn’t fit our needs anymore/limited uses Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 60,000 0 0 0 0 0 0 60,000 Total 0 0 0 60,000 0 0 0 0 0 0 60,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 50,000 0 0 0 0 0 0 50,000 Vehicle/Equip Trade-In 0 0 0 10,000 0 0 0 0 0 0 10,000 Total 0 0 0 60,000 0 0 0 0 0 0 60,000 Produced Using Plan-It CIP Software Air Compressor 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PR-005 Project Name Air Compressor Contact Public Works Director Department Parks and Recreation Category Equipment: Miscellaneous Priority 3 Important Status Active Useful Life 15 years VIN / SN 270781URH282 Year 1996 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 25,000 0 0 25,000 Total 0 0 0 0 0 0 0 25,000 0 0 25,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 0 25,000 0 0 25,000 Total 0 0 0 0 0 0 0 25,000 0 0 25,000 Produced Using Plan-It CIP Software Skid Loader 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PR-006 Project Name Skid Loader Contact Public Works Director Department Parks and Recreation Category Vehicles Priority 3 Important Status Active Useful Life 10 years Old Project Number PW-054 Description Additional skid loader to be used to mow park trails and asphalt in the summer. During the winter it can be used to aid in snow removal at city parking lots and possibly on park trails and sidewalks (w/blower) 2 speed high flow. - Compact tractor with loader, box blade, disc, slit seeder, aerator, ball field drag, trail mower, etc. Justification Additional skid loader needed due to growth in streets and parks Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 70,000 0 0 0 0 0 0 0 0 70,000 Total 0 70,000 0 0 0 0 0 0 0 0 70,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 70,000 0 0 0 0 0 0 0 0 70,000 Total 0 70,000 0 0 0 0 0 0 0 0 70,000 Produced Using Plan-It CIP Software D2 - Dump Truck 2 - 15 Mack Single 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-002 Project Name D2 - Dump Truck 2 - 15 Mack Single Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 12 years Make Mack Model Single VIN / SN 1M2AX11C1FM001539 Year 2015 Color Green License Plate 943972 Old Project Number PW-062 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 300,000 0 0 0 0 0 0 0 300,000 Total 0 0 300,000 0 0 0 0 0 0 0 300,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 260,000 0 0 0 0 0 0 0 260,000 Vehicle/Equip Trade-In 0 0 40,000 0 0 0 0 0 0 0 40,000 Total 0 0 300,000 0 0 0 0 0 0 0 300,000 Produced Using Plan-It CIP Software D3 - Dump Truck 3 - 17 Mack 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-003 Project Name D3 - Dump Truck 3 - 17 Mack Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 12 years Make Mack VIN / SN 1M2AY11CXJM001919 Year 2017 Color Green License Plate 954700 Old Project Number PW-062 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 300,000 0 0 0 0 0 300,000 Total 0 0 0 0 300,000 0 0 0 0 0 300,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 260,000 0 0 0 0 0 260,000 Vehicle/Equip Trade-In 0 0 0 0 40,000 0 0 0 0 0 40,000 Total 0 0 0 0 300,000 0 0 0 0 0 300,000 Produced Using Plan-It CIP Software D4 - Dump Truck 4 - 19 F- 450 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-004 Project Name D4 - Dump Truck 4 - 19 F-450 Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 12 years Make Ford Model F-450 VIN / SN 1FDUF4HY3KDA07601 Year 2019 Color White License Plate 963707 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 70,000 0 0 0 70,000 Total 0 0 0 0 0 0 70,000 0 0 0 70,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 50,000 0 0 0 50,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 20,000 0 0 0 20,000 Total 0 0 0 0 0 0 70,000 0 0 0 70,000 Produced Using Plan-It CIP Software D5 - Dump Truck 5 - 19 Mack 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-005 Project Name D5 - Dump Truck 5 - 19 Mack Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 12 years Make Mack Model Single Axle VIN / SN 1M2GR2AC2KM001117 Year 2019 Color Green License Plate 960836 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 300,000 0 0 0 300,000 Total 0 0 0 0 0 0 300,000 0 0 0 300,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 260,000 0 0 0 260,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 40,000 0 0 0 40,000 Total 0 0 0 0 0 0 300,000 0 0 0 300,000 Produced Using Plan-It CIP Software D6 - Dump Truck 6 - 20 Mack Tandem 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-006 Project Name D6 - Dump Truck 6 - 20 Mack Tandem Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 12 years Make Mack Model Tandem Axle VIN / SN 1M2GR4GC1LM018434 Year 2020 Color Green License Plate 963050 Old Project Number PW-045 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 330,000 0 0 330,000 Total 0 0 0 0 0 0 0 330,000 0 0 330,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 0 270,000 0 0 270,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 60,000 0 0 60,000 Total 0 0 0 0 0 0 0 330,000 0 0 330,000 Produced Using Plan-It CIP Software D7 - Dump Truck 7 - 21 Mack 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-007 Project Name D7 - Dump Truck 7 - 21 Mack Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 12 years Dept. Unit Number/Name PW- 21-1 Make Mack Model Single Axle VIN / SN 1M2GR2AC2MM001511 Year 2021 Color Green License Plate 963045 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 0 300,000 0 300,000 Total 0 0 0 0 0 0 0 0 300,000 0 300,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 0 0 260,000 0 260,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 0 40,000 0 40,000 Total 0 0 0 0 0 0 0 0 300,000 0 300,000 Produced Using Plan-It CIP Software D8 - Dump Truck 8 - 22 F- 550 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-008 Project Name D8 - Dump Truck 8 - 22 F-550 Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 12 years Make Ford Model F-550 VIN / SN 1FDUF5HNXNEE97688 Year 2022 Color White License Plate 968480 Old Project Number PR-015 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 0 0 70,000 70,000 Total 0 0 0 0 0 0 0 0 0 70,000 70,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 0 0 0 45,000 45,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 0 0 25,000 25,000 Total 0 0 0 0 0 0 0 0 0 70,000 70,000 Produced Using Plan-It CIP Software P1 - Pickup 1 - F- 250 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-011 Project Name P1 - Pickup 1 - F-250 Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 10 years Dept. Unit Number/Name 17-2 Make Ford Model F-250 VIN / SN 1FTBF2B69HEE05924 Year 2017 Color White License Plate 954651 Old Project Number PW-063 Description Lift gate and boss snow v plow Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 75,000 0 0 0 0 0 0 0 75,000 Total 0 0 75,000 0 0 0 0 0 0 0 75,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 60,000 0 0 0 0 0 0 0 60,000 Vehicle/Equip Trade-In 0 0 15,000 0 0 0 0 0 0 0 15,000 Total 0 0 75,000 0 0 0 0 0 0 0 75,000 Produced Using Plan-It CIP Software P2 - Pickup 2 - F- 250 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-012 Project Name P2 - Pickup 2 - F-250 Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 10 years Dept. Unit Number/Name 17-3 Make Ford Model F-250 VIN / SN 1FTBF2B67HEE05923 Year 2017 Color White License Plate 954049 Old Project Number PW-064 Description Lift gate and boss snow v plow Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 75,000 0 0 0 0 0 0 0 75,000 Total 0 0 75,000 0 0 0 0 0 0 0 75,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 60,000 0 0 0 0 0 0 0 60,000 Vehicle/Equip Trade-In 0 0 15,000 0 0 0 0 0 0 0 15,000 Total 0 0 75,000 0 0 0 0 0 0 0 75,000 Produced Using Plan-It CIP Software P3 - Pickup 3 - F- 150 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-013 Project Name P3 - Pickup 3 - F-150 Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 10 years Make Ford Model F-150 VIN / SN 1FTEW1EP6GFB12308 Year 2017 Color White License Plate 950247 Old Project Number PW-061 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 45,000 0 0 0 0 0 0 0 45,000 Total 0 0 45,000 0 0 0 0 0 0 0 45,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 28,000 0 0 0 0 0 0 0 28,000 Vehicle/Equip Trade-In 0 0 17,000 0 0 0 0 0 0 0 17,000 Total 0 0 45,000 0 0 0 0 0 0 0 45,000 Produced Using Plan-It CIP Software P4 - Pickup 4 - Ranger 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-014 Project Name P4 - Pickup 4 - Ranger Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 10 years Make Ford Model Ranger VIN / SN 1FTER1FH2NLD54171 Year 2022 Color White License Plate 976820 Old Project Number PW-019 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 31,000 0 0 31,000 Total 0 0 0 0 0 0 0 31,000 0 0 31,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 0 18,000 0 0 18,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 13,000 0 0 13,000 Total 0 0 0 0 0 0 0 31,000 0 0 31,000 Produced Using Plan-It CIP Software P5 - Pickup 5 - 3500 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-015 Project Name P5 - Pickup 5 - 3500 Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 10 years Make GMC Model Sierra 3500 VIN / SN 1GT39SE72RF373748 Year 2024 Color White License Plate 801178 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 0 0 55,000 55,000 Total 0 0 0 0 0 0 0 0 0 55,000 55,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 0 0 0 32,000 32,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 0 0 23,000 23,000 Total 0 0 0 0 0 0 0 0 0 55,000 55,000 Produced Using Plan-It CIP Software E1 - Equip 1 - Case Loader 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-021 Project Name E1 - Equip 1 - Case Loader Contact Public Works Director Department Public Works Department Category Equipment: PW Equip Priority 3 Important Status Active Useful Life 15 years Make Case Model 721 VIN / SN JFF0122871 Year 1999 Color Yellow Old Project Number PW-004 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 230,000 0 0 0 0 0 0 0 230,000 Total 0 0 230,000 0 0 0 0 0 0 0 230,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 200,000 0 0 0 0 0 0 0 200,000 Vehicle/Equip Trade-In 0 0 30,000 0 0 0 0 0 0 0 30,000 Total 0 0 230,000 0 0 0 0 0 0 0 230,000 Produced Using Plan-It CIP Software E3 - Equip 3 - Backhoe 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-023 Project Name E3 - Equip 3 - Backhoe Contact Public Works Director Department Public Works Department Category Equipment: PW Equip Priority 3 Important Status Active Useful Life 15 years Make Case Model M580 VIN / SN N6C410161 Year 2005 Color Yellow Old Project Number PW-044 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 145,000 0 0 0 0 0 0 0 0 0 145,000 Total 145,000 0 0 0 0 0 0 0 0 0 145,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 120,000 0 0 0 0 0 0 0 0 0 120,000 Vehicle/Equip Trade-In 25,000 0 0 0 0 0 0 0 0 0 25,000 Total 145,000 0 0 0 0 0 0 0 0 0 145,000 Produced Using Plan-It CIP Software E5 - Equip 5 - Bobcat Skid 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-025 Project Name E5 - Equip 5 -Bobcat Skid Contact Public Works Director Department Public Works Department Category Equipment: PW Equip Priority 3 Important Status Active Useful Life 10 years Make Bobcat Model T66 Skid Steer VIN / SN B4SB26144 Year 2022 Color White Old Project Number PW-071 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 70,000 0 0 70,000 Total 0 0 0 0 0 0 0 70,000 0 0 70,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 0 45,000 0 0 45,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 25,000 0 0 25,000 Total 0 0 0 0 0 0 0 70,000 0 0 70,000 Produced Using Plan-It CIP Software E6 - Equip 6 - Service Lift 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-026 Project Name E6 - Equip 6 - Service Lift Contact Public Works Director Department Public Works Department Category Equipment: PW Equip Priority 3 Important Status Active Useful Life 20 years Make Stertil Koni Model 18000 LBS Year 2006 Color White Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 40,000 0 0 0 0 40,000 Total 0 0 0 0 0 40,000 0 0 0 0 40,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 35,000 0 0 0 0 35,000 Vehicle/Equip Trade-In 0 0 0 0 0 5,000 0 0 0 0 5,000 Total 0 0 0 0 0 40,000 0 0 0 0 40,000 Produced Using Plan-It CIP Software E7 - Equip 7 - Radios 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-027 Project Name E7 - Equip 7 - Radios Contact Public Works Director Department Public Works Department Category Equipment: PW Equip Priority 3 Important Status Active Useful Life 10 years Make Motorola Model APX 4000 VIN / SN See picture attachments Year 2007 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 160,000 0 0 0 0 0 0 0 160,000 Total 0 0 160,000 0 0 0 0 0 0 0 160,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total General Fund 0 0 160,000 0 0 0 0 0 0 0 160,000 Total 0 0 160,000 0 0 0 0 0 0 0 160,000 Produced Using Plan-It CIP Software E8 - Equip 8 - Asphalt Roller 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-028 Project Name E8 - Equip 8 - Asphalt Roller Contact Public Works Director Department Public Works Department Category Equipment: PW Equip Priority 3 Important Status Active Useful Life 12 years Make Case Model 721 VIN / SN DDD0DV23NHNTT0402 Year 2018 Color Orange Old Project Number PW-046 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 125,000 0 0 0 0 125,000 Total 0 0 0 0 0 125,000 0 0 0 0 125,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 110,000 0 0 0 0 110,000 Vehicle/Equip Trade-In 0 0 0 0 0 15,000 0 0 0 0 15,000 Total 0 0 0 0 0 125,000 0 0 0 0 125,000 Produced Using Plan-It CIP Software E9 - Equip 9 - Asphalt Trailer 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-029 Project Name E9 - Equip 9 - Asphalt Trailer Contact Public Works Director Department Public Works Department Category Equipment: PW Equip Priority 3 Important Status Active Useful Life 10 years Make STEPP Model Sphd 3.0 VIN / SN 4S9PHD3Y5NS127688 Year 2022 Color Orange Old Project Number PW-049 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 47,500 0 0 47,500 Total 0 0 0 0 0 0 0 47,500 0 0 47,500 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 0 42,500 0 0 42,500 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 5,000 0 0 5,000 Total 0 0 0 0 0 0 0 47,500 0 0 47,500 Produced Using Plan-It CIP Software E10 - Equip 10 - Chipper 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-030 Project Name E10 - Equip 10 - Chipper Contact Public Works Director Department Public Works Department Category Equipment: PW Equip Priority 3 Important Status Active Useful Life 10 years Make Bandit Model 12XP Intimidator VIN / SN 4FMUS1615PR529085 Year 2024 Color Yellow Old Project Number PW-078 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 0 0 60,000 60,000 Total 0 0 0 0 0 0 0 0 0 60,000 60,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 0 0 0 48,000 48,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 0 0 12,000 12,000 Total 0 0 0 0 0 0 0 0 0 60,000 60,000 Produced Using Plan-It CIP Software E11 - Equip 11 - Forklift 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-031 Project Name E11 - Equip 11 - Forklift Contact Public Works Director Department Public Works Department Category Equipment: PW Equip Priority 3 Important Status Active Useful Life 12 years Make Yale Model 50VX VIN / SN B875V12731L Year 2018 Color Yellow Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 25,000 0 0 0 0 25,000 Total 0 0 0 0 0 25,000 0 0 0 0 25,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 22,000 0 0 0 0 22,000 Vehicle/Equip Trade-In 0 0 0 0 0 3,000 0 0 0 0 3,000 Total 0 0 0 0 0 25,000 0 0 0 0 25,000 Produced Using Plan-It CIP Software W1 - Water 1 - Portable Generator 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #W-001 Project Name W1 - Water 1 - Portable Generator Contact Public Works Director Department Water Department Category Vehicles Priority 3 Important Status Active Useful Life 20 years Make Generac Model 4001E Portable Generator Year 2002 Color Yellow Old Project Number PW-085 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 100,000 0 0 0 0 0 0 0 100,000 Total 0 0 100,000 0 0 0 0 0 0 0 100,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 95,000 0 0 0 0 0 0 0 95,000 Vehicle/Equip Trade-In 0 0 5,000 0 0 0 0 0 0 0 5,000 Total 0 0 100,000 0 0 0 0 0 0 0 100,000 Produced Using Plan-It CIP Software W2 - Water 2 - F- 550 Service Truck 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #W-002 Project Name W2 - Water 2 - F-550 Service Truck Contact Public Works Director Department Water Department Category Vehicles Priority 3 Important Status Active Useful Life 12 years Make Ford Model F-550 VIN / SN 1FDUF5HT9KDA26132 Year 2019 Color White License Plate 963714 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 130,000 0 0 0 130,000 Total 0 0 0 0 0 0 130,000 0 0 0 130,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 0 0 0 105,000 0 0 0 105,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 25,000 0 0 0 25,000 Total 0 0 0 0 0 0 130,000 0 0 0 130,000 Produced Using Plan-It CIP Software W3 - Water 3 - RAM 3500 Van 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #W-003 Project Name W3 - Water 3 - RAM 3500 Van Contact Public Works Director Department Water Department Category Vehicles Priority 3 Important Status Active Useful Life 10 years Make Dodge Model RAM Promaster 3500 VIN / SN 3C6FRVHG6ME504541 Year 2021 Color White Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 44,537 0 0 0 44,537 Total 0 0 0 0 0 0 44,537 0 0 0 44,537 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 0 0 0 34,537 0 0 0 34,537 Vehicle/Equip Trade-In 0 0 0 0 0 0 10,000 0 0 0 10,000 Total 0 0 0 0 0 0 44,537 0 0 0 44,537 Produced Using Plan-It CIP Software W4 - Water 4 - F- 250 Service Truck 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #W-004 Project Name W4 - Water 4 - F-250 Service Truck Contact Public Works Director Department Water Department Category Vehicles Priority 3 Important Status Active Useful Life 10 years Make Ford Model F-250 VIN / SN 1FTBF2BA2RED51100 Year 2024 Color White License Plate 801621 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 0 0 65,799 65,799 Total 0 0 0 0 0 0 0 0 0 65,799 65,799 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 0 0 0 0 0 0 45,799 45,799 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 0 0 20,000 20,000 Total 0 0 0 0 0 0 0 0 0 65,799 65,799 Produced Using Plan-It CIP Software Produced Using Plan-It CIP Software 2025 through 2034 Public Works Building - Summary Lake Elmo, MN Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Public Works Department PWB1 - Refinish Public Works Shop Floor PW-051 35,000 35,000 PWB2 - Public Works Building Generator PW-052 55,000 55,000 PWB3 - Public Works Building Roof PW-053 30,000 30,000 PWB4 - Public Works Building Additional Shop Space PW-054 110,000 110,000 PWB5 - Public Works Building Overhead Garage Doors PW-055 80,000 80,000 General Fund 108,500 108,500 Sewer Fund 10,000 48,500 58,500 Storm Water Fund 5,000 39,500 44,500 Water Fund 20,000 78,500 98,500 Source Grand Total 35,000 0 0 0 0 0 0 0 0 275,000 310,000 GRAND TOTAL 35,000 0 0 0 0 0 0 0 0 275,000 310,000 PWB1 - Refinish Public Works Shop Floor 2025 thru 2034 Public Works Building - Detail Lake Elmo, MN Project #PW-051 Project Name PWB1 - Refinish Public Works Shop Floor Contact Public Works Director Department Public Works Department Category Buildings Priority 3 Important Status New Recommendation Useful Life 10 years Description Produced Using Plan-It CIP Software PWB2 - Public Works Building Generator 2025 thru 2034 Public Works Building - Detail Lake Elmo, MN Project #PW-052 Project Name PWB2 - Public Works Building Generator Contact Public Works Director Department Public Works Department Category Buildings Priority 3 Important Status Active Useful Life 10 years Make Cummins Model 100kw VIN / SN E240344533 Year 2024 Old Project Number PW-085 Description Produced Using Plan-It CIP Software PWB3 - Public Works Building Roof 2025 thru 2034 Public Works Building - Detail Lake Elmo, MN Project #PW-053 Project Name PWB3 - Public Works Building Roof Contact Public Works Director Department Public Works Department Category Buildings Priority 3 Important Status New Recommendation Useful Life 10 years Description Produced Using Plan-It CIP Software PWB4 - Public Works Building Additional Shop Space 2025 thru 2034 Public Works Building - Detail Lake Elmo, MN Project #PW-054 Project Name PWB4 - Public Works Building Additional Shop Space Contact Public Works Director Department Public Works Department Category Buildings Priority 3 Important Status New Recommendation Useful Life 10 years Description Per Marty, Adding additional shop space in 10 yearsNext Project Produced Using Plan-It CIP Software PWB5 - Public Works Building Overhead Garage Doors 2025 thru 2034 Public Works Building - Detail Lake Elmo, MN Project #PW-055 Project Name PWB5 - Public Works Building Overhead Garage Doors Contact Public Works Director Department Public Works Department Category Buildings Priority 3 Important Status New Recommendation Useful Life 10 years Description Per Marty, We have a ton of issues with our overhead doors- so we will likely need to find a solution to that- changing to lighter doors and different openers Produced Using Plan-It CIP Software Produced Using Plan-It CIP Software 2025 through 2034 Parks - Summary Lake Elmo, MN Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Parks and Recreation Kleis Park Playground - Replacement PR-027 65,000 65,000 Tana Ridge Park Play Equipment - Replacement PR-028 125,000 125,000 Tablyn Park Play Equipment - Replacement PR-029 210,000 210,000 Stonegate Park Play Equipment - Replacement PR-030 125,000 125,000 Reid Park Play Equipment - Replacement PR-031 125,000 125,000 Ridge Park Play Equipment - Replacement PR-032 125,000 125,000 Hidden Knoll Park Play Equipment - Replacement PR-034 125,000 125,000 Carriage Station Park Play Equipment - Replacement PR-036 250,000 250,000 Trail Additions PR-038 78,000 78,000 Lions Park Playground Equipment Replacement PR-039 250,000 250,000 Court Resurfacing PR-040 30,000 30,000 Lions Park Concession Building Updates PR-043 275,000 275,000 Skate Park PR-044 150,000 150,000 Outdoor Fitness Equipment PR-045 30,000 30,000 Outdoor Fitness Park PR-046 30,000 30,000 Disk Golf PR-047 30,000 30,000 Central Play Complex PR-048 300,000 300,000 Reid Park Parking Lot PR-049 227,000 227,000 Court Resurfacing PR-050 30,000 30,000 Produced Using Plan-It CIP Software Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Trail Connection PR-051 200,000 200,000 Park Sign Replacement PR-052 225,000 225,000 Multisport Complex Amenities PR-053 1,000,000 1,000,000 Invasive Species Management PR-054 25,000 25,000 New Park Pavilion PR-055 80,000 80,000 New Park Pavilion PR-056 80,000 80,000 New Park Pavilion PR-057 80,000 80,000 New Park Pavilion PR-058 80,000 80,000 New Park Pavilion PR-059 80,000 80,000 Central Greenway Regional Trail PR-069 520,000 520,000 Park Dedication Fund (404)417,000 625,000 480,000 850,000 1,790,000 460,000 125,000 125,000 4,872,000 Source Grand Total 417,000 625,000 480,000 850,000 1,790,000 460,000 0 125,000 125,000 0 4,872,000 GRAND TOTAL 417,000 703,000 480,000 850,000 1,790,000 460,000 0 125,000 125,000 0 4,950,000 Kleis Park Playground - Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-027 Project Name Kleis Park Playground - Replacement Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status Active Useful Life 25 years Description Replacement of playground equipment Justification Playset installed in 1993 has exceeded the expected life Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 65,000 0 0 0 0 0 0 0 0 0 65,000 Total 65,000 0 0 0 0 0 0 0 0 0 65,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)65,000 0 0 0 0 0 0 0 0 0 65,000 Total 65,000 0 0 0 0 0 0 0 0 0 65,000 Produced Using Plan-It CIP Software Tana Ridge Park Play Equipment - Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-028 Project Name Tana Ridge Park Play Equipment - Replacement Department Parks and Recreation Category Park Improvements Priority 5 Future Consideration Status Active Useful Life 25 years Description Replace the 2005 play equipment Justification End of its useful life Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 125,000 0 0 0 0 125,000 Total 0 0 0 0 0 125,000 0 0 0 0 125,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 0 125,000 0 0 0 0 125,000 Total 0 0 0 0 0 125,000 0 0 0 0 125,000 Produced Using Plan-It CIP Software Tablyn Park Play Equipment - Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-029 Project Name Tablyn Park Play Equipment - Replacement Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status Active Useful Life 25 years Description Replace the 1997 play equipment Justification End of its useful life Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 210,000 0 0 0 0 0 0 0 0 210,000 Total 0 210,000 0 0 0 0 0 0 0 0 210,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 210,000 0 0 0 0 0 0 0 0 210,000 Total 0 210,000 0 0 0 0 0 0 0 0 210,000 Produced Using Plan-It CIP Software Stonegate Park Play Equipment - Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-030 Project Name Stonegate Park Play Equipment - Replacement Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status Active Useful Life 25 years Description Replace the 1998 play equipment Justification End of its useful life Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 125,000 0 0 0 0 0 0 0 125,000 Total 0 0 125,000 0 0 0 0 0 0 0 125,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 125,000 0 0 0 0 0 0 0 125,000 Total 0 0 125,000 0 0 0 0 0 0 0 125,000 Produced Using Plan-It CIP Software Reid Park Play Equipment - Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-031 Project Name Reid Park Play Equipment - Replacement Department Parks and Recreation Category Park Improvements Priority 5 Future Consideration Status Active Useful Life 25 years Description Replace the 2008 play equipment Justification End of its useful life Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 0 125,000 0 125,000 Total 0 0 0 0 0 0 0 0 125,000 0 125,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 0 0 0 0 125,000 0 125,000 Total 0 0 0 0 0 0 0 0 125,000 0 125,000 Produced Using Plan-It CIP Software Ridge Park Play Equipment - Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-032 Project Name Ridge Park Play Equipment - Replacement Department Parks and Recreation Category Park Improvements Priority 3 Important Status Active Useful Life 25 years Description Replace the 2003 play equipment Justification End of its useful life Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 125,000 0 0 0 0 0 0 0 0 0 125,000 Total 125,000 0 0 0 0 0 0 0 0 0 125,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)125,000 0 0 0 0 0 0 0 0 0 125,000 Total 125,000 0 0 0 0 0 0 0 0 0 125,000 Produced Using Plan-It CIP Software Hidden Knoll Park Play Equipment - Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-034 Project Name Hidden Knoll Park Play Equipment - Replacement Department Parks and Recreation Category Park Improvements Priority 5 Future Consideration Status Active Useful Life 25 years Description Replace the 2007 play equipment Justification Exceeded its useful life Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 125,000 0 0 125,000 Total 0 0 0 0 0 0 0 125,000 0 0 125,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 0 0 0 125,000 0 0 125,000 Total 0 0 0 0 0 0 0 125,000 0 0 125,000 Produced Using Plan-It CIP Software Carriage Station Park Play Equipment - Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-036 Project Name Carriage Station Park Play Equipment - Replacement Department Parks and Recreation Category Park Improvements Priority 5 Future Consideration Status Active Useful Life 25 years Description Replace the 2000 playset Justification End of useful life Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 250,000 0 0 0 0 0 0 250,000 Total 0 0 0 250,000 0 0 0 0 0 0 250,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 250,000 0 0 0 0 0 0 250,000 Total 0 0 0 250,000 0 0 0 0 0 0 250,000 Produced Using Plan-It CIP Software Trail Additions 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-038 Project Name Trail Additions Department Parks and Recreation Category Park Improvements Priority 3 Important Status Active Useful Life 25 years Description Potential Trails connections between developments along Hudson Blvd and the trail connection along Manning Ave from cty 14 south to the Rail Road track Justification Trail would address the following community needs-Deliver students safely to school, bring people to our parks, provide safe recreation, trail diversity-provide feel of Lake Elmo and bring people to the downtown Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 78,000 0 0 0 0 0 0 0 0 78,000 Total 0 78,000 0 0 0 0 0 0 0 0 78,000 Produced Using Plan-It CIP Software Lions Park Playground Equipment Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-039 Project Name Lions Park Playground Equipment Replacement Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status Active Useful Life 25 years Description Replacement of playground equipment Justification Playset installed in 2000 has exceeded the expected life Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 250,000 0 0 0 0 0 0 0 0 250,000 Total 0 250,000 0 0 0 0 0 0 0 0 250,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 250,000 0 0 0 0 0 0 0 0 250,000 Total 0 250,000 0 0 0 0 0 0 0 0 250,000 Produced Using Plan-It CIP Software Court Resurfacing 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-040 Project Name Court Resurfacing Department Parks and Recreation Category Park Improvements Priority 2 Very Important Status Active Useful Life 10 years Description Resurface the playing surfaces at Demontreville, Carriage Station and Lions Justification Seal existing courts playing surface and lining Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 30,000 0 0 0 0 0 0 0 0 30,000 Total 0 30,000 0 0 0 0 0 0 0 0 30,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 30,000 0 0 0 0 0 0 0 0 30,000 Total 0 30,000 0 0 0 0 0 0 0 0 30,000 Produced Using Plan-It CIP Software Lions Park Concession Building Updates 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-043 Project Name Lions Park Concession Building Updates Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status Active Useful Life 20 years Description Building updates to concession stand including update bathrooms and kitchen area Justification Extend life of building and updating 20+ year old interior. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 275,000 0 0 0 0 0 0 0 275,000 Total 0 0 275,000 0 0 0 0 0 0 0 275,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 275,000 0 0 0 0 0 0 0 275,000 Total 0 0 275,000 0 0 0 0 0 0 0 275,000 Produced Using Plan-It CIP Software Skate Park 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-044 Project Name Skate Park Department Parks and Recreation Category Park Improvements Priority 5 Future Consideration Status Active Useful Life 25 years Description Create Skate Park within Park System to include oportunies for BMX Justification New oportunity for teenagers within city Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 150,000 0 0 0 0 0 150,000 Total 0 0 0 0 150,000 0 0 0 0 0 150,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 150,000 0 0 0 0 0 150,000 Total 0 0 0 0 150,000 0 0 0 0 0 150,000 Produced Using Plan-It CIP Software Outdoor Fitness Equipment 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-045 Project Name Outdoor Fitness Equipment Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status Active Useful Life 25 years Description Add fitness equipment to amenaties within park system Justification Additional fitness equipment to be added to park system or along trail based off interest in fitness park. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 30,000 0 0 0 0 0 30,000 Total 0 0 0 0 30,000 0 0 0 0 0 30,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 30,000 0 0 0 0 0 30,000 Total 0 0 0 0 30,000 0 0 0 0 0 30,000 Produced Using Plan-It CIP Software Outdoor Fitness Park 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-046 Project Name Outdoor Fitness Park Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status Active Useful Life 25 years Description Create an outdoor fitness park as an addition to or replacement of a parks playset. Justification Diversity in the city park play equipment, intended use for kids and adults Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 30,000 0 0 0 0 0 0 0 0 30,000 Total 0 30,000 0 0 0 0 0 0 0 0 30,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 30,000 0 0 0 0 0 0 0 0 30,000 Total 0 30,000 0 0 0 0 0 0 0 0 30,000 Produced Using Plan-It CIP Software Disk Golf 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-047 Project Name Disk Golf Department Parks and Recreation Category Park Improvements Priority 5 Future Consideration Status Active Useful Life 25 years Description Create an outdoor disk golf course within the park system. Justification Continue to search for possible location of disk golf within the park system Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 30,000 0 0 0 0 0 30,000 Total 0 0 0 0 30,000 0 0 0 0 0 30,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 30,000 0 0 0 0 0 30,000 Total 0 0 0 0 30,000 0 0 0 0 0 30,000 Produced Using Plan-It CIP Software Central Play Complex 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-048 Project Name Central Play Complex Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status Active Useful Life 25 years Description Identify area to create a central play complex to include a large play structure Justification Create a central park to include play structure and shelter for multi family gatherings Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 300,000 0 0 0 0 0 300,000 Total 0 0 0 0 300,000 0 0 0 0 0 300,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 300,000 0 0 0 0 0 300,000 Total 0 0 0 0 300,000 0 0 0 0 0 300,000 Produced Using Plan-It CIP Software Reid Park Parking Lot 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-049 Project Name Reid Park Parking Lot Department Parks and Recreation Category Park Improvements Priority 3 Important Status New Recommendation Description Remove and replace existing asphalt and curb. Replace curb with concreate to extend to 30th st. Extend parking lot to the East for additional parking. Reconstruct walking trail from ballfield to 30th st. include ramp and crosswalk to existing sidewalk. Justification deteriorating asphalt parking lot and trail. Extend parking to add additional parking space Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 227,000 0 0 0 0 0 0 0 0 0 227,000 Total 227,000 0 0 0 0 0 0 0 0 0 227,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)227,000 0 0 0 0 0 0 0 0 0 227,000 Total 227,000 0 0 0 0 0 0 0 0 0 227,000 Produced Using Plan-It CIP Software Court Resurfacing 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-050 Project Name Court Resurfacing Department Parks and Recreation Category Park Improvements Priority 3 Important Status New Recommendation Description Resurface playing Courts (Tablyn, Pebble) Justification Resurfacing courts every 7 years to increase lifespan, improve safety and aesthetic appeal Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 30,000 0 0 0 0 30,000 Total 0 0 0 0 0 30,000 0 0 0 0 30,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 0 30,000 0 0 0 0 30,000 Total 0 0 0 0 0 30,000 0 0 0 0 30,000 Produced Using Plan-It CIP Software Trail Connection 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-051 Project Name Trail Connection Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status New Recommendation Description Acquire easement or land to construct a trail connection from Wildflower to Tanna Ridge Justification Trail connectivity Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 200,000 0 0 0 0 0 200,000 Total 0 0 0 0 200,000 0 0 0 0 0 200,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 200,000 0 0 0 0 0 200,000 Total 0 0 0 0 200,000 0 0 0 0 0 200,000 Produced Using Plan-It CIP Software Park Sign Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-052 Project Name Park Sign Replacement Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status New Recommendation Description Redesign park enterence signs for all city parks Justification Replace 20 year old signs. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 225,000 0 0 0 0 225,000 Total 0 0 0 0 0 225,000 0 0 0 0 225,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 0 225,000 0 0 0 0 225,000 Total 0 0 0 0 0 225,000 0 0 0 0 225,000 Produced Using Plan-It CIP Software Multisport Complex Amenities 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-053 Project Name Multisport Complex Amenities Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status New Recommendation Description Build baseball and/or multisport fields at sports facility Justification Adding additional amenities to sports complex Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 1,000,000 0 0 0 0 0 1,000,000 Total 0 0 0 0 1,000,000 0 0 0 0 0 1,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 1,000,000 0 0 0 0 0 1,000,000 Total 0 0 0 0 1,000,000 0 0 0 0 0 1,000,000 Produced Using Plan-It CIP Software Invasive Species Management 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-054 Project Name Invasive Species Management Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status New Recommendation Description Conduct assessment or management of Invasive Species within sunfish lake park or park system Justification Match funding Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 25,000 0 0 0 0 0 0 0 0 25,000 Total 0 25,000 0 0 0 0 0 0 0 0 25,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 25,000 0 0 0 0 0 0 0 0 25,000 Total 0 25,000 0 0 0 0 0 0 0 0 25,000 Produced Using Plan-It CIP Software New Park Pavilion 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-055 Project Name New Park Pavilion Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status New Recommendation Description Construct new park pavilion (location to be determined) Justification Provide means of shade and an area to congregate Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 80,000 0 0 0 0 0 0 0 0 80,000 Total 0 80,000 0 0 0 0 0 0 0 0 80,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 80,000 0 0 0 0 0 0 0 0 80,000 Total 0 80,000 0 0 0 0 0 0 0 0 80,000 Produced Using Plan-It CIP Software New Park Pavilion 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-056 Project Name New Park Pavilion Contact Public Works Director Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status New Recommendation Description New Park Pavilion in a park (location to be determined) Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 80,000 0 0 0 0 0 0 0 80,000 Total 0 0 80,000 0 0 0 0 0 0 0 80,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 80,000 0 0 0 0 0 0 0 80,000 Total 0 0 80,000 0 0 0 0 0 0 0 80,000 Produced Using Plan-It CIP Software New Park Pavilion 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-057 Project Name New Park Pavilion Contact Public Works Director Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status New Recommendation Description New Park Pavilion in park (location to be determined) Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 80,000 0 0 0 0 0 0 80,000 Total 0 0 0 80,000 0 0 0 0 0 0 80,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 80,000 0 0 0 0 0 0 80,000 Total 0 0 0 80,000 0 0 0 0 0 0 80,000 Produced Using Plan-It CIP Software New Park Pavilion 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-058 Project Name New Park Pavilion Contact Public Works Director Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status New Recommendation Description New Park Pavilion in Park (location to be determined) Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 80,000 0 0 0 0 0 80,000 Total 0 0 0 0 80,000 0 0 0 0 0 80,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 80,000 0 0 0 0 0 80,000 Total 0 0 0 0 80,000 0 0 0 0 0 80,000 Produced Using Plan-It CIP Software New Park Pavilion 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-059 Project Name New Park Pavilion Contact Public Works Director Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status New Recommendation Description New Park Pavilion on park (location to be determined) Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 80,000 0 0 0 0 80,000 Total 0 0 0 0 0 80,000 0 0 0 0 80,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 0 80,000 0 0 0 0 80,000 Total 0 0 0 0 0 80,000 0 0 0 0 80,000 Produced Using Plan-It CIP Software Central Greenway Regional Trail 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-069 Project Name Central Greenway Regional Trail Contact Engineer Department Parks and Recreation Category Park Improvements Priority 3 Important Status Active Useful Life 25 years Old Project Number PR-009 Description County Project Central Greenway Regional Trail beginning at CSAH 19 and I-94, traveling through Lake Elmo Park Reserve, east along Stillwater Bvld to Manning Ave and then north to TH36. 2023 potential segments include in front of Hagbergs and near Keats/CSAH 10 (if a road project is funded). Justification Trail would address the following community needs: -Deliver students safely to school -Bring people to our downtown -Bring people to our parks -Provide safe recreation -Trail Diversity-Provide feel of Lake Elmo -Omit need to bike down Hwy 5/CSAH 14 -Compatibility with public grant opportunities -Compatibility with private funding opportunities Feasibility of land acquisition will be a consideration Trail likely to be built in segments in conjuction with county road projects and as funding allows through Met Council or other state grants Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 520,000 0 0 0 0 0 0 520,000 Total 0 0 0 520,000 0 0 0 0 0 0 520,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 520,000 0 0 0 0 0 0 520,000 Total 0 0 0 520,000 0 0 0 0 0 0 520,000 Budget Impact Additional trails to maintain-labor and materials for snow removal if desired by city Trail construction cost may be as high as $12 million. City would expect cost share with county as well as grants to offset costs. 2023 costs are for trail through new roundabout at CSAH 19 and CSAH 10 and trail extension abutting Hagebergs Future costs will be added as they are known Produced Using Plan-It CIP Software 2025 through 2034 Park Dedication Fund (404) - Funding Sources & Uses Lake Elmo, MN Source Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Park Dedication Fund (404) Beginning Balance 3,000,000 3,048,522 2,423,522 2,344,472 1,571,483 236,967 981,167 981,167 856,167 1,611,848 Revenues and Other Fund Sources Revenue Park Dedication 1,523,802 0 400,950 77,011 455,484 1,204,200 0 0 880,681 372,684 Total 1,523,802 0 400,950 77,011 455,484 1,204,200 0 0 880,681 372,684 Other Fund Sources Total Revenues and Other Fund Sources 1,523,802 0 400,950 77,011 455,484 1,204,200 0 0 880,681 372,684 Total Funds available 4,523,802 3,048,522 2,824,472 2,421,483 2,026,967 1,441,167 981,167 981,167 1,736,848 1,984,532 Expenditures and Uses Capital Projects & Equipment Parks and Recreation Central Greenway Regional Trail PR-069 0 0 0 520,000 0 0 0 0 0 0 Reid Park Parking Lot PR-049 227,000 0 0 0 0 0 0 0 0 0 Lions Park Playground Equipment Replacement PR-039 0 250,000 0 0 0 0 0 0 0 0 Court Resurfacing PR-040 0 30,000 0 0 0 0 0 0 0 0 Skate Park PR-044 0 0 0 0 150,000 0 0 0 0 0 Court Resurfacing PR-050 0 0 0 0 0 30,000 0 0 0 0 Trail Connection PR-051 0 0 0 0 200,000 0 0 0 0 0 New Park Pavilion PR-056 0 0 80,000 0 0 0 0 0 0 0 New Park Pavilion PR-057 0 0 0 80,000 0 0 0 0 0 0 New Park Pavilion PR-058 0 0 0 0 80,000 0 0 0 0 0 New Park Pavilion PR-059 0 0 0 0 0 80,000 0 0 0 0 Park Sign Replacement PR-052 0 0 0 0 0 225,000 0 0 0 0 Produced Using Plan-It CIP Software Multisport Complex Amenities PR-053 0 0 0 0 1,000,000 0 0 0 0 0 Invasive Species Management PR-054 0 25,000 0 0 0 0 0 0 0 0 New Park Pavilion PR-055 0 80,000 0 0 0 0 0 0 0 0 Tana Ridge Park Play Equipment - Replacement PR-028 0 0 0 0 0 125,000 0 0 0 0 Tablyn Park Play Equipment - Replacement PR-029 0 210,000 0 0 0 0 0 0 0 0 Stonegate Park Play Equipment - Replacement PR-030 0 0 125,000 0 0 0 0 0 0 0 Reid Park Play Equipment - Replacement PR-031 0 0 0 0 0 0 0 0 125,000 0 Ridge Park Play Equipment - Replacement PR-032 125,000 0 0 0 0 0 0 0 0 0 Hidden Knoll Park Play Equipment - Replacement PR-034 0 0 0 0 0 0 0 125,000 0 0 Carriage Station Park Play Equipment - Replacement PR-036 0 0 0 250,000 0 0 0 0 0 0 Outdoor Fitness Equipment PR-045 0 0 0 0 30,000 0 0 0 0 0 Outdoor Fitness Park PR-046 0 30,000 0 0 0 0 0 0 0 0 Kleis Park Playground - Replacement PR-027 65,000 0 0 0 0 0 0 0 0 0 Disk Golf PR-047 0 0 0 0 30,000 0 0 0 0 0 Central Play Complex PR-048 0 0 0 0 300,000 0 0 0 0 0 Lions Park Concession Building Updates PR-043 0 0 275,000 0 0 0 0 0 0 0 Total 417,000 625,000 480,000 850,000 1,790,000 460,000 0 125,000 125,000 0 Other Uses Transfer to Ballfield Fund 1,058,280 0 0 0 0 0 0 0 0 0 Total 1,058,280 0 0 0 0 0 0 0 0 0 Total Expenditures and Uses 1,475,280 625,000 480,000 850,000 1,790,000 460,000 0 125,000 125,000 0 Change in Fund Balance 48,522 -625,000 -79,050 -772,989 -1,334,516 744,200 0 -125,000 755,681 372,684 Ending Balance 3,048,522 2,423,522 2,344,472 1,571,483 236,967 981,167 981,167 856,167 1,611,848 1,984,532 Source Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Produced Using Plan-It CIP Software 2025 through 2034 Infrastructure - Streets - Summary Lake Elmo, MN Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Public Works Department Reevaluate- Homestead St & Utility Improvements PW-090 1,315,000 1,315,000 Future - PP/EP/20th Street & Utility Improvements PW-091 4,550,000 4,550,000 Future - Tartan Street & Utility Improvements PW-092 3,500,000 3,500,000 Future - DL/SP/For Street & Utility Improvements PW-093 3,400,000 3,400,000 2025 Street Improvements PW-100 2,620,000 2,620,000 2026 Street Improvements PW-101 2,740,000 2,740,000 2027 Street Improvements PW-102 2,755,000 2,755,000 2028 Street Improvements PW-103 2,450,000 2,450,000 2029 Street Improvements PW-104 2,175,000 2,175,000 2030 Street Improvements PW-105 2,200,000 2,200,000 2031 Street Improvements PW-106 2,000,000 2,000,000 2032 Street Improvements PW-107 3,915,000 3,915,000 2033 Street Improvements PW-108 3,000,000 3,000,000 2034 Street Improvements PW-109 3,200,000 3,200,000 UP RR Crossing - Village Parkway PW-120 960,200 960,200 UP RR Crossing - Private Drive Closure PW-120-2 105,000 105,000 Hudson Blvd Improvements - Vahli-Hi to Bus Fac.PW-121 560,000 560,000 Hudson Blvd Improvements - Keats to Kramer Lake Ov PW-122 2,100,000 2,100,000 South Frontage Rd (Demontreville Tr to Keats Ave)PW-123 5,760,000 5,760,000 5th St N - Keats to Lake Elmo Ave PW-124 4,600,000 4,600,000 TH36-Lake Elmo Ave (CSAH 17) Imp PW-125 2,500,000 2,500,000 5,000,000 South Frontage Road (Keats to Lake Elmo Ave)PW-126 1,000,000 2,000,000 3,000,000 Manning/Hudson Stoplight PW-127 300,000 300,000 Ideal Ave (CSAH 13)-Phase 3- CSAH 14 to CSAH 6 PW-128 1,000,000 1,000,000 Produced Using Plan-It CIP Software CSAH 14 - Klondike to 39th PW-129 1,000,000 1,000,000 CSAH 17 Imp - CSAH 14 - 43rd PW-130 1,000,000 1,000,000 Lake Elmo Ave (CSAH 17) & 39th St N Traffic Signal PW-131 500,000 500,000 CSAH 6/Inwood Signal PW-132 500,000 500,000 CSAH 10 / CSAH 17 Roundabout PW-133 500,000 500,000 Bond Proceeds - Assessment Funded 786,000 1,137,000 826,500 735,000 652,500 660,000 600,000 1,174,500 900,000 1,960,000 9,431,500 Bond Proceeds - Tax Levy 1,834,000 6,478,000 9,028,500 1,715,000 2,522,500 6,640,000 7,160,000 2,740,500 2,600,000 5,790,000 46,508,500 Grants/Donation 250,000 1,000,000 6,900,000 8,150,000 Infrastructure Reserve Fund (409)1,065,200 50,000 500,000 1,615,200 Municipal Sate Aid (MSA)500,000 500,000 1,000,000 Source Grand Total 3,685,200 8,415,000 10,355,000 2,450,000 3,175,000 8,800,000 7,760,000 3,915,000 3,500,000 14,650,000 66,705,200 GRAND TOTAL 3,685,200 8,415,000 10,355,000 2,450,000 3,175,000 8,800,000 7,760,000 3,915,000 3,500,000 14,650,000 66,705,200 Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Produced Using Plan-It CIP Software 2025 through 2034 Infrastructure - Water - Summary Lake Elmo, MN Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Department T1 - Tower 1 - Langly Ct W-011 50,000 50,000 T2 - Tower 2 - Ideal Ave W-012 800,000 800,000 T4 - Tower 4 - Inwood Ave W-014 800,000 800,000 WL2 - Well 2 - 55th St W-017 60,000 60,000 WL4 - Well 4 - 50th St W-019 50,000 50,000 WL5 - Well 5 - Lily Ave W-020 50,000 50,000 WL6 - Well 6 - Future Well & Site Acquisition W-021 750,000 750,000 WL7 - Well 7 (or 3) - Test Well & Site Acquisition W-022 750,000 750,000 TP1 - Treatment Plant 1 W-041 24,500,000 24,500,000 49,000,000 TP2 - Treatment 2 - Well 2 - GAC Filter System W-042 2,500,000 2,500,000 Future - Homestead Street & Utility Impr - Water W-090 935,000 935,000 Future - PP/EP/20th Street & Utility Impr - Water W-091 2,500,000 2,500,000 Future - Tartan Street & Utility Impr - Water W-092 1,900,000 1,900,000 Future - DL/SP/For Street & Utility Impr - Water W-093 2,200,000 2,200,000 Future - 45th Street Watermain Extension W-094 450,000 450,000 2025 Street & Utility Improvements - Water portion W-100 320,000 320,000 2026 Street & Utility Improvements - Water portion W-101 327,000 327,000 2028 Street & Utility Improvements - Water portion W-103 150,000 150,000 2030 Street & Utility Improvements - Water portion W-105 100,000 100,000 2031 Street & Utility Improvements - Water portion W-106 130,000 130,000 Produced Using Plan-It CIP Software 2032 Street & Utility Improvements - Water portion W-107 210,000 210,000 2033 Street & Utility Improvements - Water portion W-108 550,000 550,000 Village East Trunk Watermain & PRV W-120 352,800 230,000 582,800 Hudson Blvd - Trunk Watermain Extension W-122 1,800,000 1,800,000 5th St N - Keats to Lake Elmo Ave - Water Portion W-124 1,700,000 1,700,000 Trunk Watermain Extensions W-130 1,500,000 1,500,000 1,500,000 4,500,000 Watermain Oversizing W-160 150,475 130,000 190,000 470,475 Bond Proceeds - Assessment Funded 320,000 320,000 Bond Proceeds - Water Fund 750,000 2,600,000 1,500,000 1,500,000 1,700,000 1,500,000 550,000 10,100,000 Grants/Donation 27,000,000 24,500,000 7,985,000 59,485,000 Water Fund 1,363,275 687,000 190,000 150,000 150,000 180,000 210,000 800,000 3,730,275 Source Grand Total 28,683,275 25,937,000 2,790,000 1,650,000 1,500,000 1,850,000 1,680,000 210,000 1,350,000 7,985,000 73,635,275 GRAND TOTAL 28,683,275 25,937,000 2,790,000 1,650,000 1,500,000 1,850,000 1,680,000 210,000 1,350,000 7,985,000 73,635,275 Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Produced Using Plan-It CIP Software 2025 through 2034 Infrastructure - Sewer - Summary Lake Elmo, MN Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Sewer Department Future - DL/SP/For Street & Util Imp - Sewer S-093 380,000 380,000 2029 Street Improvements S-104 1,685,000 1,685,000 Tapestry Sanitary Sewer Collection System Upgrades S-107 1,000,000 1,000,000 I-94 Lift Station and Forcemain Upgrade S-108 900,000 900,000 Sewer Oversizing S-120 25,920 40,000 50,000 115,920 Sewer Oversizing for Sect 16 Extension S-121 200,000 200,000 Bond Proceeds - Assessment Funded 380,000 380,000 Sewer Fund 925,920 40,000 250,000 1,685,000 1,000,000 3,900,920 Source Grand Total 925,920 40,000 250,000 0 1,685,000 0 0 1,000,000 0 380,000 4,280,920 GRAND TOTAL 925,920 40,000 250,000 0 1,685,000 0 0 1,000,000 0 380,000 4,280,920 Produced Using Plan-It CIP Software Produced Using Plan-It CIP Software 2025 through 2034 Infrastructure - Stormwater - Summary Lake Elmo, MN Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Storm Water Department Phase 2 Regional Drainage Impr. - Northstar Pond SW-001 285,405 285,405 Phase 3 Regional Drainage Impr - Lions Park Pond SW-002 575,000 575,000 Stormwater Reuse - Development Irrigation Systems SW-003 40,000 40,000 80,000 Stormwater Reuse - Lions & VFW Park Irrigation SW-004 76,000 76,000 Stormwater Reuse - Irrigation Systems SW-005 40,000 40,000 80,000 Hudson Boulevard Culvert Repair SW-006 400,000 400,000 Future Unidentified Stormwater Projects SW-TBD 50,000 50,000 50,000 50,000 50,000 50,000 50,000 350,000 Bond Proceeds - Stormwater Fund 575,000 575,000 Storm Water Fund 685,405 80,000 206,000 50,000 50,000 50,000 50,000 50,000 50,000 1,271,405 Source Grand Total 685,405 80,000 781,000 50,000 50,000 50,000 50,000 50,000 50,000 0 1,846,405 GRAND TOTAL 685,405 80,000 781,000 50,000 50,000 50,000 50,000 50,000 50,000 0 1,846,405 Reevaluate- Homestead St & Utility Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-090 Project Name Reevaluate- Homestead St & Utility Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-040 Description Due to MPCA Grant Policy changes, no longer grant-eligible. Project needs to be reevaluated since grant approval now unlikely - may simply become a street-only project with assessments. Street work is needed. Annual street improvements per recommendation by City Engineer Street improvements. (formerly 3M grant project) Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 1,315,000 0 0 0 0 0 0 0 0 1,315,000 Total 0 1,315,000 0 0 0 0 0 0 0 0 1,315,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 1,000,000 0 0 0 0 0 0 0 0 1,000,000 Bond Proceeds - Assessment Funded 0 315,000 0 0 0 0 0 0 0 0 315,000 Total 0 1,315,000 0 0 0 0 0 0 0 0 1,315,000 Produced Using Plan-It CIP Software Future - PP/EP/20th Street & Utility Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-091 Project Name Future - PP/EP/20th Street & Utility Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 5 Future Consideration Status Active Useful Life 25 years Old Project Number PW-041 Description Due to a change in MPCA grant policy, all 3M Grant Street & Utility projects are now unlikely. Moved all back to 2034 and changed to Future Consideration. Extension of watermain for Packard Park, Eden Park and 20th Street Circle to address PFAS; including budgeted amount for reconstruction of public streets. Requires 3M Grant Fund application. 3M-Grant (CDWSP Approved Neighborhood). Justification Packard Park, Eden Park and 20th Street Circle street improvements to be completed in conjunction with 3M watermain extension to serve neighborhood. In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 4,550,000 4,550,000 Total 0 0 0 0 0 0 0 0 0 4,550,000 4,550,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 0 0 0 0 3,550,000 3,550,000 Bond Proceeds - Assessment Funded 0 0 0 0 0 0 0 0 0 1,000,000 1,000,000 Total 0 0 0 0 0 0 0 0 0 4,550,000 4,550,000 Produced Using Plan-It CIP Software Future - Tartan Street & Utility Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-092 Project Name Future - Tartan Street & Utility Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 5 Future Consideration Status Active Useful Life 25 years Old Project Number PW-042 Description Due to a change in MPCA grant policy, all 3M Grant Street & Utility projects are now unlikely. Moved all back to 2034 and changed to Future Consideration. Extension of watermain for Tartan Park subdivision and Klondike Avenue to address PFAS; including budgeted amount for reconstruction of public streets. Requires 3M Grant Fund application. 3M-Grant application required (Neighborhood not included in CDWSP). Justification Tartan Park subdivision and Klondike Avenue street improvements to be completed in conjunction with 3M watermain extension to serve neighborhood. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 3,500,000 3,500,000 Total 0 0 0 0 0 0 0 0 0 3,500,000 3,500,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 0 0 0 0 0 0 0 0 0 3,500,000 3,500,000 Total 0 0 0 0 0 0 0 0 0 3,500,000 3,500,000 Produced Using Plan-It CIP Software Future - DL/SP/For Street & Utility Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-093 Project Name Future - DL/SP/For Street & Utility Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 5 Future Consideration Status Active Useful Life 25 years Old Project Number PW-055 Description Due to a change in MPCA grant policy, all 3M Grant Street & Utility projects are now unlikely. Moved all back to 2034 and changed to Future Consideration. Extension of watermain for Downs Lake Estates, Sunfish Ponds, and Forest subdivision to address PFAS; including budgeted amount for reconstruction of public streets. Requires 3M Grant Fund application. 3M-Grant applicaiton required (Neighborhood not included in CDWSP). Justification Downs Lake Estates, Sunfish Ponds, and Forest subdivision street improvements to be completed in conjunction with 3M watermain extension to serve neighborhood. In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 3,400,000 3,400,000 Total 0 0 0 0 0 0 0 0 0 3,400,000 3,400,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 0 0 0 0 0 0 0 0 0 3,400,000 3,400,000 Total 0 0 0 0 0 0 0 0 0 3,400,000 3,400,000 Produced Using Plan-It CIP Software 2025 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-100 Project Name 2025 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-041 Description Annual street program for Street Improvements for 59th St Ct/ 55th St/ Julep Way & 57th St/ Jasper/ Jerome/ Irish Ct (30% assessed) Justification In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 2,620,000 0 0 0 0 0 0 0 0 0 2,620,000 Total 2,620,000 0 0 0 0 0 0 0 0 0 2,620,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 1,834,000 0 0 0 0 0 0 0 0 0 1,834,000 Bond Proceeds - Assessment Funded 786,000 0 0 0 0 0 0 0 0 0 786,000 Total 2,620,000 0 0 0 0 0 0 0 0 0 2,620,000 Produced Using Plan-It CIP Software 2026 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-101 Project Name 2026 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-042 Description Annual street program: Street Improvements for the Lake Elmo Heights subdivision, Innsdale Ct, and Inwood Ct (30% assessed). Justification In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 2,740,000 0 0 0 0 0 0 0 0 2,740,000 Total 0 2,740,000 0 0 0 0 0 0 0 0 2,740,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 1,918,000 0 0 0 0 0 0 0 0 1,918,000 Bond Proceeds - Assessment Funded 0 822,000 0 0 0 0 0 0 0 0 822,000 Total 0 2,740,000 0 0 0 0 0 0 0 0 2,740,000 Produced Using Plan-It CIP Software 2027 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-102 Project Name 2027 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-055 Description Annual street program: for Street Improvements for Hidden Bay Tr/ Birchwood/ Cherrywood/ Windbreak/ Jack Pine/ Deer Pond (30% assessed). Justification In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 2,755,000 0 0 0 0 0 0 0 2,755,000 Total 0 0 2,755,000 0 0 0 0 0 0 0 2,755,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 1,928,500 0 0 0 0 0 0 0 1,928,500 Bond Proceeds - Assessment Funded 0 0 826,500 0 0 0 0 0 0 0 826,500 Total 0 0 2,755,000 0 0 0 0 0 0 0 2,755,000 Produced Using Plan-It CIP Software 2028 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-103 Project Name 2028 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-056 Description Annual street program: for Street Improvements for the St. Croix's Sanctuary subdivision (30% assessed). Justification In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 2,450,000 0 0 0 0 0 0 2,450,000 Total 0 0 0 2,450,000 0 0 0 0 0 0 2,450,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 1,715,000 0 0 0 0 0 0 1,715,000 Bond Proceeds - Assessment Funded 0 0 0 735,000 0 0 0 0 0 0 735,000 Total 0 0 0 2,450,000 0 0 0 0 0 0 2,450,000 Produced Using Plan-It CIP Software 2029 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-104 Project Name 2029 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-068 Description 50th Street + Hill Trail (combine with Low Pressure sewer ext. to Oakdale) Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 2,175,000 0 0 0 0 0 2,175,000 Total 0 0 0 0 2,175,000 0 0 0 0 0 2,175,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 1,522,500 0 0 0 0 0 1,522,500 Bond Proceeds - Assessment Funded 0 0 0 0 652,500 0 0 0 0 0 652,500 Total 0 0 0 0 2,175,000 0 0 0 0 0 2,175,000 Produced Using Plan-It CIP Software 2030 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-105 Project Name 2030 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-070 Description Annual street program: for Street Improvements for Discover Crossing subdivision and Hilltop Avenue (30% assessed). Justification In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 2,200,000 0 0 0 0 2,200,000 Total 0 0 0 0 0 2,200,000 0 0 0 0 2,200,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 1,540,000 0 0 0 0 1,540,000 Bond Proceeds - Assessment Funded 0 0 0 0 0 660,000 0 0 0 0 660,000 Total 0 0 0 0 0 2,200,000 0 0 0 0 2,200,000 Produced Using Plan-It CIP Software 2031 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-106 Project Name 2031 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-075 Description Annual street program: for Street Improvements for Tablyn Park subdivision (30% assessed). Justification In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 2,000,000 0 0 0 2,000,000 Total 0 0 0 0 0 0 2,000,000 0 0 0 2,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 0 1,400,000 0 0 0 1,400,000 Bond Proceeds - Assessment Funded 0 0 0 0 0 0 600,000 0 0 0 600,000 Total 0 0 0 0 0 0 2,000,000 0 0 0 2,000,000 Produced Using Plan-It CIP Software 2032 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-107 Project Name 2032 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-080 Description Annual street program: for Street Improvements for Tapestry at Charlotte's Grove subdivision (30% assessed). Justification In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 3,915,000 0 0 3,915,000 Total 0 0 0 0 0 0 0 3,915,000 0 0 3,915,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 0 0 2,740,500 0 0 2,740,500 Bond Proceeds - Assessment Funded 0 0 0 0 0 0 0 1,174,500 0 0 1,174,500 Total 0 0 0 0 0 0 0 3,915,000 0 0 3,915,000 Produced Using Plan-It CIP Software 2033 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-108 Project Name 2033 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 4 Less Important Status Active Useful Life 40 years Old Project Number PW-084 Description Annual street program: for Street Improvements for 36th Street, 37th Street and Irwin Avenue and 47th/50th/Kimbro (Keats to Lake Elmo). (30% assessed). Justification In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 3,000,000 0 3,000,000 Total 0 0 0 0 0 0 0 0 3,000,000 0 3,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 0 0 0 2,100,000 0 2,100,000 Bond Proceeds - Assessment Funded 0 0 0 0 0 0 0 0 900,000 0 900,000 Total 0 0 0 0 0 0 0 0 3,000,000 0 3,000,000 Produced Using Plan-It CIP Software 2034 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-109 Project Name 2034 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status New Recommendation Useful Life 25 years Description DeMontreville-Highlands Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 3,200,000 3,200,000 Total 0 0 0 0 0 0 0 0 0 3,200,000 3,200,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 0 0 0 0 2,240,000 2,240,000 Bond Proceeds - Assessment Funded 0 0 0 0 0 0 0 0 0 960,000 960,000 Total 0 0 0 0 0 0 0 0 0 3,200,000 3,200,000 Produced Using Plan-It CIP Software UP RR Crossing - Village Parkway 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-120 Project Name UP RR Crossing - Village Parkway Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 40 years Old Project Number PW-035 Description Construction of the street, trail and sidewalk segment of Village Parkway that crosses the Union Pacific Railroad (UPRR) and railroad right-of-way, including trunk watermain extension across the railroad right-of-way with pressure reduction valve (to be installed with development), and closure of the adjacent private railroad crossing (separate project PW-120-2). To obtain permitting and approvals, the project includes potential upgrades to the UPRR crossing at Klondike Avenue. Justification Village Parkway crossing is needed to connect the developing Village neighborhoods north and south of the tracks, including pedestrian connectivity for a walkable downtown area. The Private closure (DOT 183913SD) and potential improvements to Klondike Avenue (DOT 183811D) are requirements of the Railroad for obtaining the new improved crossing location. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 960,200 0 0 0 0 0 0 0 0 0 960,200 Total 960,200 0 0 0 0 0 0 0 0 0 960,200 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Infrastructure Reserve Fund (409)960,200 0 0 0 0 0 0 0 0 0 960,200 Total 960,200 0 0 0 0 0 0 0 0 0 960,200 Produced Using Plan-It CIP Software UP RR Crossing - Private Drive Closure 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-120-2 Project Name UP RR Crossing - Private Drive Closure Contact Engineer Department Public Works Department Category Street Construction Priority 2 Very Important Status Active Useful Life 40 years Old Project Number PW-036 Description UP RR Crossing - Private driveway closure required for Village Parkway Crossing Justification Railroad requirement in order to get new crossing at Village Parkway Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 105,000 0 0 0 0 0 0 0 0 0 105,000 Total 105,000 0 0 0 0 0 0 0 0 0 105,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Infrastructure Reserve Fund (409)105,000 0 0 0 0 0 0 0 0 0 105,000 Total 105,000 0 0 0 0 0 0 0 0 0 105,000 Produced Using Plan-It CIP Software Hudson Blvd Improvements - Vahli- Hi to Bus Fac. 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-121 Project Name Hudson Blvd Improvements - Vahli-Hi to Bus Fac. Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-079 Description MSA Route Reconstruction of gap segments along Hudson Boulevard to improve the roadway to the adopted Hudson Boulevard design standards with pedestrian trail. Gap segments are portions of the roadway not being improved as part of ongoing or upcoming development projects. 2025 Segment (Vahli-Hi to Bus Facility). Trail Connection Justification Pavement section nearing or beyond useful life. Improvements have been deferred to extent possible to allow for development paid upgrades along some segments. Gap segments to be addressed to create completed project and complete trail connections. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 560,000 0 0 0 0 0 0 0 0 560,000 Total 0 560,000 0 0 0 0 0 0 0 0 560,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 560,000 0 0 0 0 0 0 0 0 560,000 Total 0 560,000 0 0 0 0 0 0 0 0 560,000 Produced Using Plan-It CIP Software Hudson Blvd Improvements - Keats to Kramer Lake Ov 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-122 Project Name Hudson Blvd Improvements - Keats to Kramer Lake Ov Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-079 Description MSA Route Reconstruction of gap segments along Hudson Boulevard to improve the roadway to the adopted Hudson Boulevard design standards with pedestrian trail. Gap segments are portions of the roadway not being improved as part of ongoing or upcoming development projects. 2027 Segment - Keats to Kramer Lake Overlook Justification Pavement section nearing or beyond useful life. Improvements have been deferred to extent possible to allow for development paid upgrades along some segments. Gap segments to be addressed to create completed project and complete trail connections. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 2,100,000 0 0 0 0 0 0 0 2,100,000 Total 0 0 2,100,000 0 0 0 0 0 0 0 2,100,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 2,100,000 0 0 0 0 0 0 0 2,100,000 Total 0 0 2,100,000 0 0 0 0 0 0 0 2,100,000 Produced Using Plan-It CIP Software South Frontage Rd (Demontreville Tr to Keats Ave) 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-123 Project Name South Frontage Rd (Demontreville Tr to Keats Ave) Contact Engineer Department Public Works Department Category Street Construction Priority 5 Future Consideration Status Active Useful Life 40 years Old Project Number PW-083 Description Construction of south frontage road between Demontreville Trail and Keats Avenue in order to improve traffic flow and access to TH36. Project to be in accordance with approved South Frotnage Road plan. Justification Necessary to improve traffic safety and access to TH36 along with establishment of east-west collector roadway. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 5,760,000 0 0 0 5,760,000 Total 0 0 0 0 0 0 5,760,000 0 0 0 5,760,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 0 5,760,000 0 0 0 5,760,000 Total 0 0 0 0 0 0 5,760,000 0 0 0 5,760,000 Produced Using Plan-It CIP Software 5th St N - Keats to Lake Elmo Ave 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-124 Project Name 5th St N - Keats to Lake Elmo Ave Contact Engineer Department Public Works Department Category Street Construction Priority 4 Less Important Status New Recommendation Useful Life 25 years Description Partial Developer Paid or Reimbursement? Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 4,600,000 0 0 0 0 4,600,000 Total 0 0 0 0 0 4,600,000 0 0 0 0 4,600,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 3,600,000 0 0 0 0 3,600,000 Grants/Donation 0 0 0 0 0 1,000,000 0 0 0 0 1,000,000 Total 0 0 0 0 0 4,600,000 0 0 0 0 4,600,000 Produced Using Plan-It CIP Software TH36- Lake Elmo Ave (CSAH 17) Imp 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-125 Project Name TH36-Lake Elmo Ave (CSAH 17) Imp Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-074 Description COUNTY PROJECT / COST SHARE Grade separated Interchange Improvements at Lake Elmo Ave and TH 36. Cost Sharing Agreement Pending. Justification County Improvement project with City cost participation requirement. Need and cost estimate determined by Washington County. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 2,500,000 2,500,000 0 0 0 0 0 0 0 5,000,000 Total 0 2,500,000 2,500,000 0 0 0 0 0 0 0 5,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 2,000,000 2,000,000 0 0 0 0 0 0 0 4,000,000 Municipal Sate Aid (MSA)0 500,000 500,000 0 0 0 0 0 0 0 1,000,000 Total 0 2,500,000 2,500,000 0 0 0 0 0 0 0 5,000,000 Produced Using Plan-It CIP Software South Frontage Road (Keats to Lake Elmo Ave) 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-126 Project Name South Frontage Road (Keats to Lake Elmo Ave) Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 40 years Old Project Number PW-076 Description Construction of south frontage road between Keats Avenue and Lake Elmo Avenue in order to improve traffic flow to new Lake Elmo Ave/TH36 Improvement and remove direct private accesses to TH 36 Justification Necessary safety and traffic improvements. May be partially constructed together with TH36 - Lake Elmo Avenue Intersection Project. Could be partially constructed through County Improvement project with City cost participation requirement. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 1,000,000 2,000,000 0 0 0 0 0 0 0 3,000,000 Total 0 1,000,000 2,000,000 0 0 0 0 0 0 0 3,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 1,000,000 2,000,000 0 0 0 0 0 0 0 3,000,000 Total 0 1,000,000 2,000,000 0 0 0 0 0 0 0 3,000,000 Produced Using Plan-It CIP Software Manning/Hudson Stoplight 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-127 Project Name Manning/Hudson Stoplight Contact Engineer Department Public Works Department Category Street Construction Priority 2 Very Important Status Active Useful Life 25 years Old Project Number PW-067 Description COUNTY PROJECT / COST SHARE Traffic Signal to be installed at intersection when Hudson Blvd is realigned with development. Justification County Improvement project with City cost participation requirement. Need determined by Washington County. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 300,000 0 0 0 0 0 0 0 0 300,000 Total 0 300,000 0 0 0 0 0 0 0 0 300,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 0 250,000 0 0 0 0 0 0 0 0 250,000 Infrastructure Reserve Fund (409)0 50,000 0 0 0 0 0 0 0 0 50,000 Total 0 300,000 0 0 0 0 0 0 0 0 300,000 Budget Impact Funding from Four Corners 1st Addition Produced Using Plan-It CIP Software Ideal Ave (CSAH 13)- Phase 3- CSAH 14 to CSAH 6 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-128 Project Name Ideal Ave (CSAH 13)-Phase 3- CSAH 14 to CSAH 6 Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 20 years Old Project Number PW-053 Description Cooperative project between Washington County, City of Oakdale and City of Lake Elmo Per Washington County includes: Safety improvements including widening of shoulders Pavement improvement Turn lane and intersection improvements Pedestrain and non-motorized upgrades Drainage Improvements Justification Amount is just placeholder. County improvement project with City cost participation. Need determined by Washington County. Cost share w/ Developer needed. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 1,000,000 0 0 0 0 0 0 0 1,000,000 Total 0 0 1,000,000 0 0 0 0 0 0 0 1,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 1,000,000 0 0 0 0 0 0 0 1,000,000 Total 0 0 1,000,000 0 0 0 0 0 0 0 1,000,000 Produced Using Plan-It CIP Software CSAH 14 - Klondike to 39th 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-129 Project Name CSAH 14 - Klondike to 39th Contact Engineer Department Public Works Department Category Street Construction Priority 5 Future Consideration Status New Recommendation Useful Life 25 years Description Monitor County CIP status. County Planning / Design in 2027. (Amount is placeholder only.) Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 1,000,000 0 0 0 0 0 1,000,000 Total 0 0 0 0 1,000,000 0 0 0 0 0 1,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 1,000,000 0 0 0 0 0 1,000,000 Total 0 0 0 0 1,000,000 0 0 0 0 0 1,000,000 Produced Using Plan-It CIP Software CSAH 17 Imp - CSAH 14 - 43rd 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-130 Project Name CSAH 17 Imp - CSAH 14 - 43rd Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status New Recommendation Useful Life 25 years Description County Project Monitor County CIP status. County Planning/Design in 2028 Amount TBD - current budget is only placeholder. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 1,000,000 0 0 0 0 1,000,000 Total 0 0 0 0 0 1,000,000 0 0 0 0 1,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 1,000,000 0 0 0 0 1,000,000 Total 0 0 0 0 0 1,000,000 0 0 0 0 1,000,000 Produced Using Plan-It CIP Software Lake Elmo Ave (CSAH 17) & 39th St N Traffic Signal 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-131 Project Name Lake Elmo Ave (CSAH 17) & 39th St N Traffic Signal Contact Engineer Department Public Works Department Category Street Construction Priority 4 Less Important Status Active Useful Life 40 years Old Project Number PW-082 Description COUNTY PROJECT / COST SHARE Traffic Signal to be installed at intersection when warrants are met. Justification Traffic signal to be installed to address higher traffic volumes from new developments. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 500,000 0 0 0 0 500,000 Total 0 0 0 0 0 500,000 0 0 0 0 500,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 500,000 0 0 0 0 500,000 Total 0 0 0 0 0 500,000 0 0 0 0 500,000 Produced Using Plan-It CIP Software CSAH 6/Inwood Signal 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-132 Project Name CSAH 6/Inwood Signal Contact Engineer Department Public Works Department Category Street Construction Priority 4 Less Important Status Active Useful Life 25 years Old Project Number PW-031 Description COUNTY PROJECT / COST SHARE CSAH 6/ Inwood Signal Improvements - to replace 4-way stop. Justification County improvement project with City cost participation requirement. Need determined by Washington County. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 500,000 0 500,000 Total 0 0 0 0 0 0 0 0 500,000 0 500,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 0 0 0 500,000 0 500,000 Total 0 0 0 0 0 0 0 0 500,000 0 500,000 Produced Using Plan-It CIP Software CSAH 10 / CSAH 17 Roundabout 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-133 Project Name CSAH 10 / CSAH 17 Roundabout Contact Engineer Department Public Works Department Category Street Reconstruction Priority 2 Very Important Status New Recommendation Useful Life 40 years Description County Project - Pending County CIP and design. Roundabout at the intersection of 10th St N (CSAH 10) and Lake Elmo Ave N (CSAH 17) due to expected increase in traffic w/ new school building in NW quadrant. Projected City cost share of 25% of project, of which a portion may be paid by school district due to their new building on that corner. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 500,000 0 0 0 0 500,000 Total 0 0 0 0 0 500,000 0 0 0 0 500,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Infrastructure Reserve Fund (409)0 0 0 0 0 500,000 0 0 0 0 500,000 Total 0 0 0 0 0 500,000 0 0 0 0 500,000 Produced Using Plan-It CIP Software T1 - Tower 1 - Langly Ct 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-011 Project Name T1 - Tower 1 - Langly Ct Contact Public Works Director Department Water Department Category Water Priority 3 Important Status Active Useful Life 100 years Old Project Number W-039 Description Decommissioning and removal of water tower #1 on Langly Court. Justification 2026 - Once water tower 3 is constructed in the low pressure area, water tower 1 shuld be decommissioned. If not decommissioned, it will need significant maintenance to upkeep. Location (monopole?) needed to relocate cell antennas Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 50,000 0 0 0 0 0 0 0 0 0 50,000 Total 50,000 0 0 0 0 0 0 0 0 0 50,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 50,000 0 0 0 0 0 0 0 0 0 50,000 Total 50,000 0 0 0 0 0 0 0 0 0 50,000 Produced Using Plan-It CIP Software T2 - Tower 2 - Ideal Ave 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-012 Project Name T2 - Tower 2 - Ideal Ave Contact Public Works Director Department Water Department Category Water Priority 3 Important Status Active Useful Life 20 years Old Project Number W-010 Location/Address Ideal Ave - Public Works Site Description Tower 2 - Ideal Ave (Public Works site) Tower built in 2007 2028 - paint inside and out and correct coroding / maintenance issues Justification Recommended by TKDA Utility study in 2016 Regular maintenance of water tank Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 800,000 0 0 0 0 0 0 0 800,000 Total 0 0 800,000 0 0 0 0 0 0 0 800,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Water Fund 0 0 800,000 0 0 0 0 0 0 0 800,000 Total 0 0 800,000 0 0 0 0 0 0 0 800,000 Produced Using Plan-It CIP Software T4 - Tower 4 - Inwood Ave 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-014 Project Name T4 - Tower 4 - Inwood Ave Contact Public Works Director Department Water Department Category Water Priority 2 Very Important Status Active Useful Life 15 years Old Project Number W-044 Description Clean and paint inside and out of Inwood tower Justification Clean and paint inside and out of 2018 Inwood Tower- 15 yrs Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 0 800,000 0 800,000 Total 0 0 0 0 0 0 0 0 800,000 0 800,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 0 0 0 0 0 800,000 0 800,000 Total 0 0 0 0 0 0 0 0 800,000 0 800,000 Produced Using Plan-It CIP Software WL2 - Well 2 - 55th St 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-017 Project Name WL2 - Well 2 - 55th St Contact Public Works Director Department Water Department Category Water Priority 2 Very Important Status Active Useful Life 8 years Old Project Number W-011 Location/Address 55th St Description Regular maintenance of Well #2 Pump; pull, inspect, and maintenance. Past -- 2017 - Well 2 scheduled pull, inspect and maintenance Future - 2025: pull, inspect and maintain. (also the building upgrade and treatment equipment 100% paid through 3M Grant, which is covered in CIP Project W-042 - TP2 - Treatment 2 Justification routine maintenance every 8-10 yrs, last pull was 2017, and again in 2025 with building and filter upgrades Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 60,000 0 0 0 0 0 0 0 0 0 60,000 Total 60,000 0 0 0 0 0 0 0 0 0 60,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 60,000 0 0 0 0 0 0 0 0 0 60,000 Total 60,000 0 0 0 0 0 0 0 0 0 60,000 Produced Using Plan-It CIP Software WL4 - Well 4 - 50th St 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-019 Project Name WL4 - Well 4 - 50th St Contact Engineer Department Water Department Category Water Priority 3 Important Status Active Useful Life 15 years Old Project Number W-012 Description Regular Maintenance - Well 4 scheduled pull, inspect and maintenance Past - 2022 - Pull and Rebuild Well #4 pump Future - 2031 - Pull and Rebuild Pump Justification Recommended by 2016 TKDA Utility Study to be on a regular rotation Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 50,000 0 0 0 50,000 Total 0 0 0 0 0 0 50,000 0 0 0 50,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 0 0 0 50,000 0 0 0 50,000 Total 0 0 0 0 0 0 50,000 0 0 0 50,000 Produced Using Plan-It CIP Software WL5 - Well 5 - Lily Ave 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-020 Project Name WL5 - Well 5 - Lily Ave Contact Engineer Department Water Department Category Water Priority 3 Important Status Active Useful Life 8 years Old Project Number W-042 Location/Address 4525 LILY AVE Description Well 5 - Lilly Ave Scheduled Maintenance 2030 - pull pump, inspect, maintain. Justification routine maintenance every 8-10 yrs, constructed 2021 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 50,000 0 0 0 0 50,000 Total 0 0 0 0 0 50,000 0 0 0 0 50,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 0 0 50,000 0 0 0 0 50,000 Total 0 0 0 0 0 50,000 0 0 0 0 50,000 Produced Using Plan-It CIP Software WL6 - Well 6 - Future Well & Site Acquisition 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-021 Project Name WL6 - Well 6 - Future Well & Site Acquisition Contact Engineer Department Water Department Category Water Priority 1 Critical Status Active Useful Life 40 years Old Project Number W-037 Description New water supply well to be operationally ready for use with new Treatment Plant. Monitoring well as required by the DNR. Test Well in 2025; Production Well and Site Acquisition in 2025; Well 6 and Treatment Plant ready for early 2027 start-up. (Treatment Plant is separate project - TP1) Justification Needed to replace lost production from Well 2 and to meet growing water demands from growth in water system users both in and outside of MUSA. Treatment Plant (separate project) required to address PFAS in groundwater supply. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 750,000 0 0 0 0 0 0 0 0 0 750,000 Total 750,000 0 0 0 0 0 0 0 0 0 750,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 750,000 0 0 0 0 0 0 0 0 0 750,000 Total 750,000 0 0 0 0 0 0 0 0 0 750,000 Produced Using Plan-It CIP Software WL7 - Well 7 (or 3) - Test Well & Site Acquisition 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-022 Project Name WL7 - Well 7 (or 3) - Test Well & Site Acquisition Contact Engineer Department Water Department Category Water Priority 3 Important Status Active Useful Life 40 years Old Project Number W-048 Description New water supply well to be operationally ready for use in 2029. Connecting raw watermain line to Treatment Plant site. Test Well in 2028; Production Well and Site Acquisition in 2029; Well 7 operationally ready in 2029. Justification Needed to replace lost production from Well 2 and to meet growing water demands from growth in water system users both in and outside of MUSA. Treatment Plant required to address PFAS in groundwater supply. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 750,000 0 0 0 0 0 0 0 0 750,000 Total 0 750,000 0 0 0 0 0 0 0 0 750,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Water Fund 0 750,000 0 0 0 0 0 0 0 0 750,000 Total 0 750,000 0 0 0 0 0 0 0 0 750,000 Produced Using Plan-It CIP Software TP1 - Treatment Plant 1 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-041 Project Name TP1 - Treatment Plant 1 Contact Engineer Department Water Department Category Water Priority 2 Very Important Status Active Useful Life 25 years Old Project Number W-037 Location/Address TBD - near Well 6? Description Treatment Plant and Raw Watermain Located at Well 6 3M Settlement Funds Improved EOC needed. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 24,500,000 24,500,000 0 0 0 0 0 0 0 0 49,000,000 Total 24,500,000 24,500,000 0 0 0 0 0 0 0 0 49,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 24,500,000 24,500,000 0 0 0 0 0 0 0 0 49,000,000 Total 24,500,000 24,500,000 0 0 0 0 0 0 0 0 49,000,000 Produced Using Plan-It CIP Software TP2 - Treatment 2 - Well 2 - GAC Filter System 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-042 Project Name TP2 - Treatment 2 - Well 2 - GAC Filter System Contact Engineer Department Water Department Category Water Priority 1 Critical Status Active Useful Life 25 years Old Project Number W-047 Description Expedited temporary GAC Filter Treatment Plant for Well #2. Funded through 3M Grant. Justification Treatment for PFAS is required to keep Production Well 2 operational over the next 2-3 years and then constructs additional water supply sources. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 2,500,000 0 0 0 0 0 0 0 0 0 2,500,000 Total 2,500,000 0 0 0 0 0 0 0 0 0 2,500,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 2,500,000 0 0 0 0 0 0 0 0 0 2,500,000 Total 2,500,000 0 0 0 0 0 0 0 0 0 2,500,000 Produced Using Plan-It CIP Software Future - Homestead Street & Utility Impr - Water 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-090 Project Name Future - Homestead Street & Utility Impr - Water Contact Engineer Department Water Department Category Water Priority 5 Future Consideration Status Active Useful Life 40 years Old Project Number W-034 Description Due to a change in MPCA grant policy, all 3M Grant Street projects are now unlikely. Moved all back to 2034 and changed to Future Consideration. Extension of watermain for the Homestead subdivison (14th Street North) to address PFAS; including for watermain distribution system costs. Justification Watermain extensions to Homestead. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 935,000 935,000 Total 0 0 0 0 0 0 0 0 0 935,000 935,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 0 0 0 0 0 0 0 0 0 935,000 935,000 Total 0 0 0 0 0 0 0 0 0 935,000 935,000 Produced Using Plan-It CIP Software Future - PP/EP/20th Street & Utility Impr - Water 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-091 Project Name Future - PP/EP/20th Street & Utility Impr - Water Contact Engineer Department Water Department Category Water Priority 5 Future Consideration Status Active Useful Life 40 years Old Project Number W-034 Description Due to a change in MPCA grant policy, all 3M Grant Street & Utility projects are now unlikely. Moved all back to 2034 and changed to Future Consideration. Extension of watermain for the Packard Park, Eden Park and 20th Street Circle to address PFAS; including for watermain distribution system costs. Requires 3M Grant Fund application. 3M-Grant (CDWSP Approved Neighborhood). Justification Watermain extensions to Packard Park, Eden Park and 20th Street Circle due to well advisories or being in Special Well Construction Area. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 2,500,000 2,500,000 Total 0 0 0 0 0 0 0 0 0 2,500,000 2,500,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 0 0 0 0 0 0 0 0 0 2,500,000 2,500,000 Total 0 0 0 0 0 0 0 0 0 2,500,000 2,500,000 Produced Using Plan-It CIP Software Future - Tartan Street & Utility Impr - Water 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-092 Project Name Future - Tartan Street & Utility Impr - Water Contact Engineer Department Water Department Category Water Priority 5 Future Consideration Status Active Useful Life 40 years Old Project Number W-035 Description Due to a change in MPCA grant policy, all 3M Grant Street projects are now unlikely. Moved all back to 2034 and changed to Future Consideration. Watermain extension costs for Tartan Meadows subdivision and Klondike Avenue. Formerly on City's MPCA Grant project list. Due to MPCA 3M Grant Policy change, project is very unlikely. Project would need to be initiated by property owner petition. Justification Watermain extensions to Tartan Park subdivision and Klondike Avenue due to well advisories or being in Special Well Construction Area. Watermain hydrant/valve repairs and replacement (including PRV install) to be completed in conjunction with scheduled street improvements. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 1,900,000 1,900,000 Total 0 0 0 0 0 0 0 0 0 1,900,000 1,900,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 0 0 0 0 0 0 0 0 0 1,900,000 1,900,000 Total 0 0 0 0 0 0 0 0 0 1,900,000 1,900,000 Budget Impact $1,640,000 3m Grant assumes Produced Using Plan-It CIP Software Future - DL/SP/For Street & Utility Impr - Water 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-093 Project Name Future - DL/SP/For Street & Utility Impr - Water Contact Engineer Department Water Department Category Water Priority 5 Future Consideration Status Active Useful Life 40 years Description Due to a change in MPCA grant policy, all 3M Grant Street projects are now unlikely. Moved all back to 2034 and changed to Future Consideration. Extension of watermain for Downs Lake Estates, Sunfish Ponds and Forest subdivisions to address PFAS; including for watermain distribution system costs. Requires 3M Grant Fund application. Not included in CDWSP. Justification Watermain extension to Downs Lake Estates, Sunfish Ponds and Forest subdivisions due to location in special well construction area. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 2,200,000 2,200,000 Total 0 0 0 0 0 0 0 0 0 2,200,000 2,200,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 0 0 0 0 0 0 0 0 0 2,200,000 2,200,000 Total 0 0 0 0 0 0 0 0 0 2,200,000 2,200,000 Produced Using Plan-It CIP Software Future - 45th Street Watermain Extension 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-094 Project Name Future - 45th Street Watermain Extension Contact Engineer Department Water Department Category Water Priority 5 Future Consideration Status Active Useful Life 40 years Old Project Number W-036 Description Due to a change in MPCA grant policy, all 3M Grant extention projects are now unlikely. Moved all back to 2034 and changed to Future Consideration. Total Estimated Project Costs for watermain extension to 9757, 9759 & 9765 45th Street (east of Tapestry Subdivision): Requires 3M Grant Fund application. Not included in current CDWSP. Would only be completed if funding is received from the 3M Grants. Justification Watermain extensions to 9757, 9759 & 9765 45th Street (east of Tapestry Subdivision) due to well advisories or being in Special Well Construction Area. One of three wells on this private drive has a well advisory. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 450,000 450,000 Total 0 0 0 0 0 0 0 0 0 450,000 450,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 0 0 0 0 0 0 0 0 0 450,000 450,000 Total 0 0 0 0 0 0 0 0 0 450,000 450,000 Produced Using Plan-It CIP Software 2025 Street & Utility Improvements - Water portion 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-100 Project Name 2025 Street & Utility Improvements - Water portion Contact Engineer Department Water Department Category Water Priority 3 Important Status Active Useful Life 40 years Old Project Number W-034 Description Annual street program - Extension of watermain along 59th Street Court and Iris Court. 59th St Ct 55th St Julep Way & 57th St Jasper Jerome Irish Ct. 100% Assessed Justification Extension of 1500 ft. 8-inch watermain along 59th Street Court in conjunction with Street Improvement (100% assessed). Extension of 620 ft. 8-inch watermain along Iris Court in conjunction with Street Improvement (100% assessed). Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 320,000 0 0 0 0 0 0 0 0 0 320,000 Total 320,000 0 0 0 0 0 0 0 0 0 320,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Assessment Funded 320,000 0 0 0 0 0 0 0 0 0 320,000 Total 320,000 0 0 0 0 0 0 0 0 0 320,000 Produced Using Plan-It CIP Software 2026 Street & Utility Improvements - Water portion 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-101 Project Name 2026 Street & Utility Improvements - Water portion Contact Engineer Department Water Department Category Water Priority 3 Important Status Active Useful Life 40 years Old Project Number W-035 Description Planned street improvements to Lake Elmo Heights, Innsdale CDS, Inwood CDS. Includes PRV. Justification Watermain hydrant/valve repairs and replacement (including PRV install) to be completed in conjunction with scheduled street improvements. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 327,000 0 0 0 0 0 0 0 0 327,000 Total 0 327,000 0 0 0 0 0 0 0 0 327,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 327,000 0 0 0 0 0 0 0 0 327,000 Total 0 327,000 0 0 0 0 0 0 0 0 327,000 Produced Using Plan-It CIP Software 2028 Street & Utility Improvements - Water portion 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-103 Project Name 2028 Street & Utility Improvements - Water portion Contact Engineer Department Water Department Category Water Priority 4 Less Important Status Active Useful Life 40 years Old Project Number W-046 Description Annual street program - complete repairs/upgrades to existing watermain distribution system. $150,000 for St. Croix Sanctuary. Justification Watermain hydrant/valve repairs and replacement to be completed in conjunction with scheduled street improvements. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 150,000 0 0 0 0 0 0 150,000 Total 0 0 0 150,000 0 0 0 0 0 0 150,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 150,000 0 0 0 0 0 0 150,000 Total 0 0 0 150,000 0 0 0 0 0 0 150,000 Produced Using Plan-It CIP Software 2030 Street & Utility Improvements - Water portion 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-105 Project Name 2030 Street & Utility Improvements - Water portion Contact Engineer Department Water Department Category Water Priority 4 Less Important Status Active Useful Life 40 years Old Project Number W-049 Description Annual street program - complete repairs/upgrades to existing watermain distribution system. Discover Crossing and Hilltop Justification Watermain hydrant/valve repairs and replacement to be completed in conjunction with scheduled street improvements. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 100,000 0 0 0 0 100,000 Total 0 0 0 0 0 100,000 0 0 0 0 100,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 0 0 100,000 0 0 0 0 100,000 Total 0 0 0 0 0 100,000 0 0 0 0 100,000 Produced Using Plan-It CIP Software 2031 Street & Utility Improvements - Water portion 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-106 Project Name 2031 Street & Utility Improvements - Water portion Contact Engineer Department Water Department Category Water Priority 4 Less Important Status Active Useful Life 40 years Old Project Number W-050 Description Annual street program - complete repairs/upgrades to existing watermain distribution system. Tablyn Park subdivision. Justification Watermain hydrant/valve repairs and replacement to be completed in conjunction with scheduled street improvements. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 130,000 0 0 0 130,000 Total 0 0 0 0 0 0 130,000 0 0 0 130,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 0 0 0 130,000 0 0 0 130,000 Total 0 0 0 0 0 0 130,000 0 0 0 130,000 Produced Using Plan-It CIP Software 2032 Street & Utility Improvements - Water portion 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-107 Project Name 2032 Street & Utility Improvements - Water portion Contact Engineer Department Water Department Category Water Priority 4 Less Important Status Active Useful Life 40 years Old Project Number W-051 Description Annual street program - complete repairs/upgrades to existing watermain distribution system. Tapestry at Charlotte's Grove subdivision. Justification Watermain hydrant/valve repairs and replacement to be completed in conjunction with scheduled street improvements. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 210,000 0 0 210,000 Total 0 0 0 0 0 0 0 210,000 0 0 210,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 0 0 0 0 210,000 0 0 210,000 Total 0 0 0 0 0 0 0 210,000 0 0 210,000 Produced Using Plan-It CIP Software 2033 Street & Utility Improvements - Water portion 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-108 Project Name 2033 Street & Utility Improvements - Water portion Contact Engineer Department Water Department Category Water Priority 4 Less Important Status Active Useful Life 40 years Old Project Number PW-084 Description Annual street program: Water Improvements for 36th Street, 37th Street and Irwin Avenue and 47th/50th/Kimbro (Keats to Lake Elmo). Justification In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. City to require property owner petition to initiate improvement (property owners rejected project in 2015 and in 2019 -- 36th, 37th, Irwin). 47th/50th/Kimbro do not need a petition. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 550,000 0 550,000 Total 0 0 0 0 0 0 0 0 550,000 0 550,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Water Fund 0 0 0 0 0 0 0 0 550,000 0 550,000 Total 0 0 0 0 0 0 0 0 550,000 0 550,000 Produced Using Plan-It CIP Software Village East Trunk Watermain & PRV 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-120 Project Name Village East Trunk Watermain & PRV Contact Engineer Department Water Department Category Water Priority 2 Very Important Status Active Useful Life 40 years Old Project Number W-008 Description Trunk watermain connection between north and south Village area neighborhoods to be installed by the city with the Village Parkway Railroad Crossing Improvements. A PRV (pressure reduction valve) will be needed and will be installed at a later date with development activity north of the railroad. Justification Required as part of the Water Distribution System trunk watermain network for adequate and reliable water delivery and pressures throughout the city. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 352,800 230,000 0 0 0 0 0 0 0 0 582,800 Total 352,800 230,000 0 0 0 0 0 0 0 0 582,800 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 352,800 230,000 0 0 0 0 0 0 0 0 582,800 Total 352,800 230,000 0 0 0 0 0 0 0 0 582,800 Produced Using Plan-It CIP Software Hudson Blvd - Trunk Watermain Extension 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-122 Project Name Hudson Blvd - Trunk Watermain Extension Contact Engineer Department Water Department Category Water Priority 4 Less Important Status Active Useful Life 40 years Old Project Number W-038 Description Trunk watermains that have been identified to be needed to maintain adequate system pressures and water delivery as water use and demands increase. Install Hudson Boulevard Trunk Watermain (Keats Avenue to Lake Elmo Avenue) Justification Strategic watermain pipe lines that are needed as part of the water distribution system for adequate and reliable water delivery and pressures throughout the city. Trunk watermains are indentifed through the city's water distribution system modeling program. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 1,800,000 0 0 0 0 0 0 0 1,800,000 Total 0 0 1,800,000 0 0 0 0 0 0 0 1,800,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Water Fund 0 0 1,800,000 0 0 0 0 0 0 0 1,800,000 Total 0 0 1,800,000 0 0 0 0 0 0 0 1,800,000 Produced Using Plan-It CIP Software 5th St N - Keats to Lake Elmo Ave - Water Portion 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-124 Project Name 5th St N - Keats to Lake Elmo Ave - Water Portion Contact Engineer Department Water Department Category Water Priority 4 Less Important Status New Recommendation Useful Life 25 years Description Partial Developer Paid or Reimbursement? Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 1,700,000 0 0 0 0 1,700,000 Total 0 0 0 0 0 1,700,000 0 0 0 0 1,700,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Water Fund 0 0 0 0 0 1,700,000 0 0 0 0 1,700,000 Total 0 0 0 0 0 1,700,000 0 0 0 0 1,700,000 Produced Using Plan-It CIP Software Trunk Watermain Extensions 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-130 Project Name Trunk Watermain Extensions Contact Engineer Department Water Department Category Water Priority 4 Less Important Status Active Useful Life 40 years Old Project Number W-038 Description Trunk watermains that have been identified to be needed to maintain adequate system pressures and water delivery as water use and demands increase. Justification Strategic watermain pipe lines that are needed as part of the water distribution system for adequate and reliable water delivery and pressures throughout the city. Trunk watermains are indeitifed through the city's water distribution system modeling program. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 1,500,000 1,500,000 0 1,500,000 0 0 0 4,500,000 Total 0 0 0 1,500,000 1,500,000 0 1,500,000 0 0 0 4,500,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Water Fund 0 0 0 1,500,000 1,500,000 0 1,500,000 0 0 0 4,500,000 Total 0 0 0 1,500,000 1,500,000 0 1,500,000 0 0 0 4,500,000 Produced Using Plan-It CIP Software Watermain Oversizing 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-160 Project Name Watermain Oversizing Contact Engineer Department Water Department Category Water Priority 3 Important Status Active Useful Life 40 years Old Project Number W-013 Description Oversizing cost of watermain pipe installed by developers. Justification Ensures all pipe in the City will have flow capacity necessary for water system Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Other 150,475 130,000 190,000 0 0 0 0 0 0 0 470,475 Total 150,475 130,000 190,000 0 0 0 0 0 0 0 470,475 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 150,475 130,000 190,000 0 0 0 0 0 0 0 470,475 Total 150,475 130,000 190,000 0 0 0 0 0 0 0 470,475 Budget Impact Watermain oversizing costs identified in Developer Agreements Produced Using Plan-It CIP Software Future - DL/SP/For Street & Util Imp - Sewer 2025 thru 2034 Infrastructure - Sewer - Detail Lake Elmo, MN Project #S-093 Project Name Future - DL/SP/For Street & Util Imp - Sewer Contact Engineer Department Sewer Department Category Wastewater Priority 5 Future Consideration Status Active Useful Life 40 years Old Project Number S-022 Description Due to a change in MPCA grant policy, all 3M Grant Street & Utility projects are now unlikely. Moved all back to 2034 and changed to Future Consideration. Project would need to be initiated by property owner petition. (100% assessed) Justification Not located within the MUSA however there have been many failed septic systems and finding replacement locations has been a challenge Sewer stub is available to Sunfish Ponds HOA property (from Legacy at North Star develompment) Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 380,000 380,000 Total 0 0 0 0 0 0 0 0 0 380,000 380,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Assessment Funded 0 0 0 0 0 0 0 0 0 380,000 380,000 Total 0 0 0 0 0 0 0 0 0 380,000 380,000 Produced Using Plan-It CIP Software 2029 Street Improvements 2025 thru 2034 Infrastructure - Sewer - Detail Lake Elmo, MN Project #S-104 Project Name 2029 Street Improvements Contact Engineer Department Sewer Department Category Wastewater Priority 3 Important Status Active Useful Life 25 years Old Project Number S-026 Description 50th Street + Hill Trail (combine with Low Pressure sewer ext. to Oakdale) Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 1,685,000 0 0 0 0 0 1,685,000 Total 0 0 0 0 1,685,000 0 0 0 0 0 1,685,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Sewer Fund 0 0 0 0 1,685,000 0 0 0 0 0 1,685,000 Total 0 0 0 0 1,685,000 0 0 0 0 0 1,685,000 Produced Using Plan-It CIP Software Tapestry Sanitary Sewer Collection System Upgrades 2025 thru 2034 Infrastructure - Sewer - Detail Lake Elmo, MN Project #S-107 Project Name Tapestry Sanitary Sewer Collection System Upgrades Contact Engineer Department Sewer Department Category Wastewater Priority 5 Future Consideration Status Active Useful Life 40 years Old Project Number S-027 Description The city may consider assuming ownership and maintenance of the sewer collection system within the public right-of-way of the Tapestry subdivision in connection with improvements to the public streets. The neighborhood is connected to city sewer through a lift station and forcemain connection but the HOA continues to own the sanitary collection system within the public right-of-way. A sewer televising/inspection program would be required and all necessary repairs and upgrades would need to be completed with the street project before the city accepted ownership. Justification The City assumed ownership of the neighboring subdivision (Hamlet on Sunfish Lake) sewer system when the development connected to city sewer. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 1,000,000 0 0 1,000,000 Total 0 0 0 0 0 0 0 1,000,000 0 0 1,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Sewer Fund 0 0 0 0 0 0 0 1,000,000 0 0 1,000,000 Total 0 0 0 0 0 0 0 1,000,000 0 0 1,000,000 Budget Impact 100% assessed to benefitting property owners. Produced Using Plan-It CIP Software I- 94 Lift Station and Forcemain Upgrade 2025 thru 2034 Infrastructure - Sewer - Detail Lake Elmo, MN Project #S-108 Project Name I-94 Lift Station and Forcemain Upgrade Contact Engineer Department Sewer Department Category Wastewater Priority 3 Important Status Active Useful Life 40 years Old Project Number S-024 Description Met Council Gravity Sewer Extension: A regional gravity sewer extended along the north side of I-94 from the current MCES 1-WO-500 (aka WONE) connection point in Oakdale east toward the Lake Elmo corporate boundary. The project includes pump upgrades to the City I-94 lift station that discharges through a City-owned forcemain to the MCES gravity sewer connection point. The Met Council will upgrade the gravity line further east toward the Lake Elmo City limits, providing a shorter forcemain route for the lift station by roughly 3,000 feet. Cost estimates and scope of improvements to be further evaluated and revised when Met Council complete their upgrades in 2024. Justification Upgrades to lift station and focremain in order to provide for continued growth in the southwest area of the city Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 900,000 0 0 0 0 0 0 0 0 0 900,000 Total 900,000 0 0 0 0 0 0 0 0 0 900,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Sewer Fund 900,000 0 0 0 0 0 0 0 0 0 900,000 Total 900,000 0 0 0 0 0 0 0 0 0 900,000 Produced Using Plan-It CIP Software Sewer Oversizing 2025 thru 2034 Infrastructure - Sewer - Detail Lake Elmo, MN Project #S-120 Project Name Sewer Oversizing Contact Engineer Department Sewer Department Category Wastewater Priority 4 Less Important Status Active Useful Life 40 years Old Project Number S-013 Description Sewer Oversizing Paid to Developers. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Other 25,920 40,000 50,000 0 0 0 0 0 0 0 115,920 Total 25,920 40,000 50,000 0 0 0 0 0 0 0 115,920 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Sewer Fund 25,920 40,000 50,000 0 0 0 0 0 0 0 115,920 Total 25,920 40,000 50,000 0 0 0 0 0 0 0 115,920 Produced Using Plan-It CIP Software Sewer Oversizing for Sect 16 Extension 2025 thru 2034 Infrastructure - Sewer - Detail Lake Elmo, MN Project #S-121 Project Name Sewer Oversizing for Sect 16 Extension Contact Engineer Department Sewer Department Category Wastewater Priority 4 Less Important Status Active Useful Life 40 years Old Project Number S-013 Description Sewer Oversizing for Section 16 Trunk Sewer Extension - Developer Driven Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Other 0 0 200,000 0 0 0 0 0 0 0 200,000 Total 0 0 200,000 0 0 0 0 0 0 0 200,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Sewer Fund 0 0 200,000 0 0 0 0 0 0 0 200,000 Total 0 0 200,000 0 0 0 0 0 0 0 200,000 Produced Using Plan-It CIP Software Phase 2 Regional Drainage Impr. - Northstar Pond 2025 thru 2034 Infrastructure - Stormwater - Detail Lake Elmo, MN Project #SW-001 Project Name Phase 2 Regional Drainage Impr. - Northstar Pond Contact Engineer Department Storm Water Department Category Storm Sewer/Drainage Priority 3 Important Status Active Useful Life 40 years Old Project Number ?? Description PHASE 2 REGIONAL DRAINAGE IMPROVEMENTS: NORTHSTAR POND OVERSIZE Regional stormwater retention need identified upstream of Old Village near Lake Elmo Ave and CSAH 14 - Northstar Pond Oversize Timing dependent upon development. Compensation for oversizing paid to developer. Justification 2nd Phase to improving the regional drainage issues as identified in Old Village Regional Stormwater Study (2015). Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 285,405 0 0 0 0 0 0 0 0 0 285,405 Total 285,405 0 0 0 0 0 0 0 0 0 285,405 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Storm Water Fund 285,405 0 0 0 0 0 0 0 0 0 285,405 Total 285,405 0 0 0 0 0 0 0 0 0 285,405 Produced Using Plan-It CIP Software Phase 3 Regional Drainage Impr - Lions Park Pond 2025 thru 2034 Infrastructure - Stormwater - Detail Lake Elmo, MN Project #SW-002 Project Name Phase 3 Regional Drainage Impr - Lions Park Pond Contact Engineer Department Storm Water Department Category Storm Sewer/Drainage Priority 4 Less Important Status Active Useful Life 40 years Description PHASE 3 REGIONAL DRAINAGE IMPROVEMENTS: LIONS PARK DRAINAGE RETENTION POND Phase 3 of Regional Drainage Improvements (VFW / Lions Park) Justification 3rd Phase of Regional Drainage Improvements (VFW / Lions Park) as identified in Old Village Regional Stormwater Study Timing dependent upon development. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 575,000 0 0 0 0 0 0 0 575,000 Total 0 0 575,000 0 0 0 0 0 0 0 575,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Stormwater Fund 0 0 575,000 0 0 0 0 0 0 0 575,000 Total 0 0 575,000 0 0 0 0 0 0 0 575,000 Produced Using Plan-It CIP Software Stormwater Reuse - Development Irrigation Systems 2025 thru 2034 Infrastructure - Stormwater - Detail Lake Elmo, MN Project #SW-003 Project Name Stormwater Reuse - Development Irrigation Systems Contact Engineer Department Storm Water Department Category Storm Sewer/Drainage Priority 4 Less Important Status Active Useful Life 40 years Description Identify and pursue opportunities to design and install stormwater reuse irrigation systems within the City. Work with HOAs to convert irrigation systems to full/partial stormwater reuse (e.g. Wildflower, Legacy at Northstar). 2026/2027 - Development Conversions Partner with Valley Branch Watershed District (VBWD) on design and grantfunding. Justification Pursue opportunities to implement stormwater reuse irrigation systems to promote water conservation and minimize the withdrawl of water from the underlying aquifers. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 40,000 40,000 0 0 0 0 0 0 0 80,000 Total 0 40,000 40,000 0 0 0 0 0 0 0 80,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Storm Water Fund 0 40,000 40,000 0 0 0 0 0 0 0 80,000 Total 0 40,000 40,000 0 0 0 0 0 0 0 80,000 Produced Using Plan-It CIP Software Stormwater Reuse - Lions & VFW Park Irrigation 2025 thru 2034 Infrastructure - Stormwater - Detail Lake Elmo, MN Project #SW-004 Project Name Stormwater Reuse - Lions & VFW Park Irrigation Contact Engineer Department Storm Water Department Category Storm Sewer/Drainage Priority 4 Less Important Status Active Useful Life 40 years Description Design and install a stormwater reuse irrigation system for Lions Park and VFW Ballfields. Potential for VBWD grant TBD $70,000 cost to be updated upon scoping study. Partner with VBWD on design and funding. Justification Pursue opportunities to implement stormwater reuse irrigation systems to promote water conservation and minimize the withdrawl of water from the underlying aquifers. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 76,000 0 0 0 0 0 0 0 76,000 Total 0 0 76,000 0 0 0 0 0 0 0 76,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Storm Water Fund 0 0 76,000 0 0 0 0 0 0 0 76,000 Total 0 0 76,000 0 0 0 0 0 0 0 76,000 Produced Using Plan-It CIP Software Stormwater Reuse - Irrigation Systems 2025 thru 2034 Infrastructure - Stormwater - Detail Lake Elmo, MN Project #SW-005 Project Name Stormwater Reuse - Irrigation Systems Contact Engineer Department Storm Water Department Category Storm Sewer/Drainage Priority 4 Less Important Status Active Useful Life 40 years Description Identify and pursue opportunities to design and install a stormwater reuse irrigation systems within the City. Design and install stormwater reuse irrigation systems with any new City ballfields. 2026/2027 - Future City Ballfields (pinwheel) Justification Pursue opportunities to implement stormwater reuse irrigation systems to promote water conservation and minimize withdrawal of water from the underlying aquifers. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 40,000 40,000 0 0 0 0 0 0 0 80,000 Total 0 40,000 40,000 0 0 0 0 0 0 0 80,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Storm Water Fund 0 40,000 40,000 0 0 0 0 0 0 0 80,000 Total 0 40,000 40,000 0 0 0 0 0 0 0 80,000 Budget Impact Partner with VBWD on design and grant funding Produced Using Plan-It CIP Software Hudson Boulevard Culvert Repair 2025 thru 2034 Infrastructure - Stormwater - Detail Lake Elmo, MN Project #SW-006 Project Name Hudson Boulevard Culvert Repair Contact Engineer Department Storm Water Department Category Storm Sewer/Drainage Priority 2 Very Important Status Active Useful Life 25 years Description Hudson Boulevard Culvert Lining Repair (72-inch HDPE Liner in 84-inch CMP). Install 72-inch HDPE Liner in existing failed 84-inch CMP culvert. Cost: $300,000 to $400,000 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 400,000 0 0 0 0 0 0 0 0 0 400,000 Total 400,000 0 0 0 0 0 0 0 0 0 400,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Storm Water Fund 400,000 0 0 0 0 0 0 0 0 0 400,000 Total 400,000 0 0 0 0 0 0 0 0 0 400,000 Produced Using Plan-It CIP Software Future Unidentified Stormwater Projects 2025 thru 2034 Infrastructure - Stormwater - Detail Lake Elmo, MN Project #SW-TBD Project Name Future Unidentified Stormwater Projects Contact Engineer Department Storm Water Department Category Storm Sewer/Drainage Priority 5 Future Consideration Status Active Useful Life 40 years Description Future Unidentified Stormwater Projects Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 50,000 50,000 50,000 50,000 50,000 50,000 50,000 0 350,000 Total 0 0 50,000 50,000 50,000 50,000 50,000 50,000 50,000 0 350,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Storm Water Fund 0 0 50,000 50,000 50,000 50,000 50,000 50,000 50,000 0 350,000 Total 0 0 50,000 50,000 50,000 50,000 50,000 50,000 50,000 0 350,000 Produced Using Plan-It CIP Software 2025 through 2034 Vehicle & Equipment Fund (410) - Funding Sources & Uses Lake Elmo, MN Source Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Vehicle Replacement Fund Beginning Balance 965,000 1,145,000 953,327 1,295,327 1,670,327 1,802,874 2,125,874 2,364,130 2,613,630 3,073,630 Revenues and Other Fund Sources Revenue Capital Levy 400,000 450,000 500,000 550,000 600,000 650,000 700,000 750,000 750,000 750,000 Interfund Loan 0 0 500,000 0 0 0 0 0 0 0 Total 400,000 450,000 1,000,000 550,000 600,000 650,000 700,000 750,000 750,000 750,000 Other Fund Sources Total Revenues and Other Fund Sources 400,000 450,000 1,000,000 550,000 600,000 650,000 700,000 750,000 750,000 750,000 Total Funds available 1,365,000 1,595,000 1,953,327 1,845,327 2,270,327 2,452,874 2,825,874 3,114,130 3,363,630 3,823,630 Expenditures and Uses Capital Projects & Equipment Parks and Recreation Chevy 2500 PR-001 0 0 0 0 30,000 0 0 0 0 0 Air Compressor PR-005 0 0 0 0 0 0 0 25,000 0 0 Kubota SUV PR-002 0 0 0 25,000 0 0 0 0 0 0 Skid Loader PR-006 0 70,000 0 0 0 0 0 0 0 0 John Deere Gator PR-004 0 0 0 50,000 0 0 0 0 0 0 Bobcat ToolCat PR-003 70,000 0 0 0 0 0 0 0 0 0 Total 70,000 70,000 0 75,000 30,000 0 0 25,000 0 0 Public Works Department D5 - Dump Truck 5 - 19 Mack PW-005 0 0 0 0 0 0 260,000 0 0 0 D3 - Dump Truck 3 - 17 Mack PW-003 0 0 0 0 260,000 0 0 0 0 0 D4 - Dump Truck 4 - 19 F-450 PW-004 0 0 0 0 0 0 50,000 0 0 0 D6 - Dump Truck 6 - 20 Mack Tandem PW-006 0 0 0 0 0 0 0 270,000 0 0 Produced Using Plan-It CIP Software D7 - Dump Truck 7 - 21 Mack PW-007 0 0 0 0 0 0 0 0 260,000 0 D8 - Dump Truck 8 - 22 F-550 PW-008 0 0 0 0 0 0 0 0 0 45,000 P1 - Pickup 1 - F-250 PW-011 0 0 60,000 0 0 0 0 0 0 0 P3 - Pickup 3 - F-150 PW-013 0 0 28,000 0 0 0 0 0 0 0 P4 - Pickup 4 - Ranger PW-014 0 0 0 0 0 0 0 18,000 0 0 P5 - Pickup 5 - 3500 PW-015 0 0 0 0 0 0 0 0 0 32,000 E1 - Equip 1 - Case Loader PW-021 0 0 200,000 0 0 0 0 0 0 0 E3 - Equip 3 - Backhoe PW-023 120,000 0 0 0 0 0 0 0 0 0 E5 - Equip 5 -Bobcat Skid PW-025 0 0 0 0 0 0 0 45,000 0 0 E8 - Equip 8 - Asphalt Roller PW-028 0 0 0 0 0 110,000 0 0 0 0 E10 - Equip 10 - Chipper PW-030 0 0 0 0 0 0 0 0 0 48,000 E11 - Equip 11 - Forklift PW-031 0 0 0 0 0 22,000 0 0 0 0 D2 - Dump Truck 2 - 15 Mack Single PW-002 0 0 260,000 0 0 0 0 0 0 0 P2 - Pickup 2 - F-250 PW-012 0 0 60,000 0 0 0 0 0 0 0 E6 - Equip 6 - Service Lift PW-026 0 0 0 0 0 35,000 0 0 0 0 E9 - Equip 9 - Asphalt Trailer PW-029 0 0 0 0 0 0 0 42,500 0 0 Total 120,000 0 608,000 0 260,000 167,000 310,000 375,500 260,000 125,000 Building Department Building Inspection Vehicle 3 B-003 0 0 0 0 0 30,000 0 0 0 0 Building Inspection Vehicle 2 B-002 0 0 0 0 0 30,000 0 0 0 0 Building Inspection Vehicle 4 B-004 0 30,000 0 0 0 0 0 0 30,000 0 Building Inspection Vehicle 1 B-001 0 0 0 0 30,000 0 0 0 0 0 Total 0 30,000 0 0 30,000 60,000 0 0 30,000 0 Fire Department Ladder 1 F-012 0 0 0 0 0 0 0 0 0 2,000,000 Rescue 1 Hose Storage and Equipment Refurbish F-004 30,000 0 0 0 0 0 0 0 0 0 Command Vehicle 1 F-014 0 0 0 0 47,453 0 0 0 0 0 Tender 2 F-009 0 487,673 50,000 0 0 0 0 0 0 0 Source Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Produced Using Plan-It CIP Software Command Vehicle 2 F-015 0 0 0 0 0 0 51,744 0 0 0 UTV 1 F-011 0 54,000 0 0 0 0 0 0 0 0 Total 30,000 541,673 50,000 0 47,453 0 51,744 0 0 2,000,000 Other Uses Repay Interfund Loan 0 0 0 100,000 100,000 100,000 100,000 100,000 0 0 Total 0 0 0 100,000 100,000 100,000 100,000 100,000 0 0 Total Expenditures and Uses 220,000 641,673 658,000 175,000 467,453 327,000 461,744 500,500 290,000 2,125,000 Change in Fund Balance 180,000 -191,673 342,000 375,000 132,547 323,000 238,256 249,500 460,000 -1,375,000 Ending Balance 1,145,000 953,327 1,295,327 1,670,327 1,802,874 2,125,874 2,364,130 2,613,630 3,073,630 1,698,630 Source Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Produced Using Plan-It CIP Software 1 City of Lake Elmo Capital Improvement Program 2025 – 2034 November 13, 2024 Planning Commission Public Hearing December 17, 2024 City Council Final Adoption TABLE OF CONTENTS Introduction What is a CIP? .................................................................................................................1 Scope of the Draft CIP .....................................................................................................1 Funding Sources...............................................................................................................2 Project Priorities ...............................................................................................................2 2025-2034 CIP CIP Overview ...................................................................................................................3 Street Projects ..................................................................................................................3 Vehicle Replacement Fund…………………………………………………………….. 3 CIP Report Descriptions .................................................................................................4 CIP Reports (Appendix) Projects Listings ………………………………………………………………….... A-1 Projects by Year & Department ...………………………………………..……..… A-5 Projects by Year & Priority ...……………………………………………………… A-17 Funding Source Summary …………………………………………………………. A-23 Projects by Funding Source 2025-2034 …………………………………………… A-24 Projects & Funding Sources by Department …………………………..………….. A-30 Project Detail ……………………………….……………………………....……… A-36 Street CIP Map & Schedule ………………………………………………………… A-147 1 INTRODUCTION What is a CIP? A Capital Improvement Program, or CIP, is a multi-year (5 – 10 years) capital expenditure plan for a city’s infrastructure (such as streets, parks and utility systems), vehicles, equipment, and public buildings. It identifies the major projects needed and desired by the community, their potential costs and how they would be financed. Including a project in a CIP does not commit the city to that project. The City Council must specifically authorize each one, and the associated funding, before any project may proceed. When the CIP is reviewed (ideally annually, in conjunction with the budgeting process), projects may go forward as planned, advance ahead of schedule, be removed entirely, or new projects may be added, depending upon changes in circumstances and priorities. The Minnesota Land Planning Act requires that the implementation plan portion of the Comprehensive Plan include a CIP for major infrastructure needs (transportation, wastewater, water supply, parks and open space) for a five-year time period. Cities often expand the scope of their CIPs to include other capital needs (major equipment replacements, for example) and sometimes look beyond the five-year time period, up to 20 years in the future for some projects. Such projects represent more of a “wish-list” that can be evaluated each time the plan is updated. As a part of the Comprehensive Plan, the CIP has some legal standing. Minnesota Statutes Chapter 473.865 provides that “a local governmental unit shall not adopt any official control or fiscal device which is in conflict with its comprehensive plan.” A fiscal device includes a budget or bond issue; so it is important that the plan and CIP be kept-up-to date and in sync with city budgets. The primary benefit of a CIP is as a financial planning tool to help the city plan for the impact of capital needs on future budgets and property taxes, and to help forecast the need for borrowing to undertake major projects. The information developed as part of the capital planning process can help document the need for various projects and assist the City Council to sort out competing priorities. Scope of the CIP Lake Elmo’s CIP includes all capital projects that cost at least $25,000 and have a useful life span of five years or longer. Projects include all capital needs including major repairs to buildings and equipment purchases and replacements. Any projects not meeting these parameters would be reviewed as part of the annual operating budget but would not be included in the CIP. 2 Methodology The City of Lake Elmo moved from a 5-year to a 10-year CIP for the first time in 2024. The process of moving to a 10-year CIP has meant a substantial increase in the number of projects expected. Types of projects listed in the CIP include things like vehicles, equipment, street projects, utility projects, and so on. Some projects, like street reconstructions, will have both a street and a sewer or water component, which are listed separately. This year, staff started an effort to reorganize the project numbering and naming conventions. Part of that process was to assign project numbers of related items the same numerical value. So, you will find that the 2025 Street & Utility Improvements has a project PW-100 for the street portion and a project W-100 for the water portion. Project numbers are also grouped by category; trucks are the lowest numbers, then equipment, annual street improvements are 100+, etc. All cost estimates are preliminary and based on current dollars. No assumptions have been made about inflation. It will be important to refine and update costs each year when the plan is reviewed, especially for projects in the first year or two of the plan. Some purchases that are not likely to occur until slightly beyond the ten-year planning period may also be included in the CIP, such as the Ladder Truck, in order to see their impact on fund balances. Most of these projects are replacements for equipment and vehicles (such as fire trucks) which may have a life span of 10, 15 or 20 years and more. The plan may also include “pending” projects for which timelines (and in most cases, cost estimates) have not yet been identified; such as the previously MPCA grant projects that have currently lost funding. As more information is developed about the need for, cost, and possible funding sources for these projects, they will be included in future CIP updates. Funding Sources The CIP identifies a possible funding source(s) for each project listed. The main funding sources are as follows: Bond Proceeds Projects financed by borrowing, later to be repaid with property taxes or utility funds, and potentially special assessments depending upon the characteristics of the project. General Fund Annual operating budget which occasionally funds CIP projects, primarily funded by property tax revenues. Park Dedication Fund Existing City fund, receipts from cash-in-lieu of land park dedication fees paid by developers and others who subdivide their land. Stormwater Fund Funds come from fees paid by users of the Stormwater system. 3 Wastewater (Sewer) Fund Funds come from fees paid by users of the Wastewater (Sewer) System. Vehicle Fund Fund used to segregate funds set aside for planned vehicle replacements and new acquisitions. Funds are transferred from the operating budget (primarily property taxes) and the sale of equipment. Water Fund Funds come from fees paid by users of the Water System. Municipal State Aid (MSA) State aid funds allocated to the City each year; annual allocation grows as the City grows. Grants/Donations Funds obtained via contributions by outside parties. One of our major funding sources for Water projects has been MPCA dollars from the 3M settlement funds. There are multiple well and treatment projects currently expected to receive funding from that source. In addition to these sources, it is possible that future projects could be funded from user fees, vehicle trade-ins or other sources not listed. Many projects will be funded from a mix of funding sources, such as part cash and part bonding, or part water fund and part sewer fund. City contributions to capital-type funds have varied over the years. Starting in 2025, staff has proposed levies that will contribute directly to capital reserve funds to more transparently show how much we are saving for future capital investments. We have also added more set-aside funds, such as the Infrastructure Reserve, Park Reserve, and City Hall Reserve to plan for increased use of cash in order to reduce future bonding. Project Priorities Capital improvement projects should be prioritized in some way so that limited funding can be allocated to those which are most important. This is difficult because the varying nature of the projects and their benefits and objectives are so disparate as to be essentially not comparable. Some public agencies have developed elaborate rating and ranking systems to try to set priorities. Complicated scoring systems may have some disadvantages because they may give a false sense of objectivity or precision to the priority setting process. Others use simpler systems, or simply do not try to compare projects that are like “apples and oranges.” There is no accepted system or “industry standard” for prioritizing projects. The following system has been utilized by staff: 1. Critical or urgent, high-priority projects that should be done if at all possible; a special effort should be made to find sufficient funding for all of the projects in this group. 2. Very important, high-priority projects that should be done as funding becomes available. 3. Important and worthwhile projects to be considered if funding is available; may be deferred to a subsequent year. 4. Less important, low-priority projects; desirable but not essential. 5. Future Consideration 4 2025 – 2034 CAPITAL IMPROVEMENT PLAN City-Wide Summary For 2025 through 2034, the draft CIP includes 149 projects (active and new recommendations) with a total estimated cost of $162,622,000. The paragraphs below and charts on the following pages provide both a summary and details of projects, timing, funding sources. Projects are a mix of replacements, improvements, and additions. Attached Reports – • Project Totals by Department • Project Totals by Funding Source Department # Projects Admin & Finance Depts 2 Building Dept 4 Fire Dept 10 Parks and Recreation 35 Public Works Dept 54 Sewer Dept 6 Storm Water Dept 7 Water Dept 31 Total 149 Administration & Finance Departments Admin and Finance generally do not have many projects in the CIP. The two budgeted for 2025 include financial software and a prospective land purchase. The land purchase is for future ballfield land, but due to the fact this possible purchase was not included in the CIP for review by the Park Commission last spring and it is largely a City Council led project, it was determined to leave it under Administration for now. Attached Reports – • Admin/Finance – Summary • Admin/Finance – Detail • Ballfield Fund – Funding Sources & Uses Building Department The Building Department has four vehicles for travel to building site for inspections. These vehicles are currently planned for a seven-year rotation with an estimated 15% funded by the trade-in or sale or existing vehicles. Attached Reports – • Building Dept – Summary • Building Dept – Detail Fire Department The Fire Department has 10 items in the 2025-2024 CIP, with a mix of vehicles and equipment. These purchases are almost exclusively funded by the Vehicle Replacement Fund and Trade- 5 ins/Sale of Equipment. Due to the nature of these vehicles the expected life span and the trade-in percentage vary greatly. Attached Reports – • Fire Dept – Summary • Fire Dept – Detail Public Works Departments The “Public Works Departments” encompasses the following; • General Public Works (Streets and General Maintenance) • Parks • Water • Sewer • Stormwater Public Works projects are divided out into these “sub-departments” due largely to the way that we account for government spending and the types of revenues that fund these projects. Parks CIP projects are funded largely by Park Dedication funds that come from developers. Street projects are funded largely by either by the property tax levy or bond proceeds (debt) repaid by the property tax levy. Water, sewer and stormwater projects are paid from those Enterprise Funds or bond proceeds (which are then repaid from those Enterprise Funds). Because many projects have cross-over between the Public Works departments, it seemed most straightforward to review PW CIP items via the following categories; including Vehicles & Equipment, PW Building, Parks, and Infrastructure. Vehicle & Equipment Purchases There are currently 21 items planned for replacement or purchase in the next 10 years, including 12 trucks and 9 small and large pieces of equipment. Attached Reports – • PW Vehicles & Equipment – Summary • PW Vehicles & Equipment – Detail Public Works Building There are currently only four items on the Public Works Building (3445 Ideal Ave N) planned for repair/addition/replacement in the next 10 years. This particular subset of projects will be a focus of future development of this Capital Improvement Plan, so that we can properly plan for repairs as the building ages. Attached Reports – • PW Building – Summary • PW Building – Detail 6 Parks Projects There are currently 35 items on the Parks CIP, most of which is replacement of existing park equipment and facilities. These items were reviewed by the Parks Commission in June and recommended for approval. All projects are currently funded by the Park Dedication Fund, which we expect to be fully-funded for the next 10 years. However, those projections are based on existing development trends and can change significantly depending on what occurs in the housing market.. Some of the projects are labeled simply “New Park Pavillion” without a location. This denotes a plan to replace one pavilion per year, with the actual location being determined by condition and need. Attached Reports – • Parks – Summary • Parks – Detail • Park Dedication Fund (404) – Funding Sources & Uses Infrastructure Projects This subset of projects includes Street, Water, Sewer & Stormwater Projects. At the July 11, 2024 City Council Workshop, City Engineer Jack Griffin presented an updated Pavement Management Plan that outlined the planned Street Reconstructions. This plan has since been updated internally as new information is received and assumptions changed. Street reconstruction projects are planned tentatively for the next 10 years. The final timing of projects is dependent on street condition, project costs, available funding, and other factors. “Street Improvement Projects” are typically done by neighborhood and a portion of the project is assessed to homeowners for a 15-year period. It is these projects that will sometimes have a segment in both Street and Water, as discussed earlier. Other street projects include collector streets that serve more of the city as a whole and may not have as many assessments, or County-led projects with a required City contribution. The list of Utility (Water, Sewer, and Stormwater) projects includes a mix of repairs or replacements of existing facilities, expansion or new facilities to address growth and/or PFAS pollution, and contributions to developments to ensure proper sizing of new infrastructure. Of note in Water projects is the cost of new Treatment Plants. It is currently expected that these facilities will be fully-funded by the MPCA with the 3M Settlement Funds. So, of the approximately $74 million in water projects, over $50 million will come from Grants/Donations. Also of note, and related to those settlement funds, are projects that had been adopted in past years, but are now marked as “Future” because MPCA funding for those projects is no longer expected. These projects may not occur, or if they do, they may be largely funded by Special Assessments. We have left them in the plan as we await additional information. Attached Reports – 7 • Infrastructure – Summaries for Streets, Water, Sewer & Stormwater • Infrastructure – Details for Streets, Water, Sewer & Stormwater Vehicle Replacement Fund The Vehicle Fund is the only capital fund whose purchases are split across departments, and as such it seemed appropriate to bring some attention to it separately. The city has been contributing to the fund regularly since 2019. As we’ve built out the CIP to a 10-year plan, it is clear that those funding levels need to increase. The projected Tax Levy is shown with a starting amount of $400K in 2025 and increasing $50K per year until 2031 and then holding steady. An interfund loan is planned for 2027 to be repaid over a 5-year period to address a shortage in the fund that year. These projected revenues allow for this portion of the CIP to be fully funded for the next 10 years. Attached Reports – • Vehicle Fund (410) – Funding Sources & Uses FUTURE CHANGES This CIP is reviewed annually and adjusted as necessary. As mentioned, the City just moved from a simplistic 5-year CIP to a more comprehensive 10-year CIP in 2024. The software we utilize for maintaining the CIP has provided new budgeting tools. And staff is working to more thoroughly inventory and plan for maintenance of our existing assets as well as plan for new investments to enhance the quality of life of the community. As such, this CIP will continue to grow and each year we will have a better understanding of the long-term capital needs of the City of Lake Elmo. Alongside planning for expenditures, of course, is the need to plan for the revenue to fund these projects. As mentioned earlier, the city will be implementing a separate capital levy in 2025 to more transparently illustrate how taxes are levied for these capital projects, and to grow available cash with the goal of decreasing debt load over time. Utility Rates are reviewed each year with the utility projects herein having a significant effect on the rates needed to maintain revenue sufficiency in those funds. And, finally, the City is in the process of implementing Utility Franchise Fees on local utility companies to allocate toward capital needs. Department 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Admin/Finance Department 2,875,000 100,000 - - - - - - - - 2,975,000 Building Department - 35,000 - - 35,000 70,000 - - 35,000 - 175,000 Fire Department 145,000 622,673 613,774 - 77,453 - 76,744 192,500 - 2,575,000 4,303,144 Parks and Recreation 382,000 898,000 480,000 945,000 1,835,000 460,000 - 150,000 125,000 - 5,275,000 Public Works Department 3,865,200 8,415,000 11,240,000 2,450,000 3,475,000 8,990,000 8,130,000 4,393,500 3,800,000 15,110,000 69,868,700 Sewer Department 925,920 40,000 250,000 - 1,685,000 - - 1,000,000 - 380,000 4,280,920 Storm Water Department 685,405 80,000 781,000 50,000 50,000 50,000 50,000 50,000 50,000 - 1,846,405 Water Department 28,683,275 25,937,000 2,890,000 1,650,000 1,500,000 1,850,000 1,854,537 210,000 1,350,000 8,050,799 73,975,611 Grand Total 37,561,800 36,127,673 16,254,774 5,095,000 8,657,453 11,420,000 10,111,281 5,996,000 5,360,000 26,115,799 162,699,780 2025 through 2034 Capital Improvement Plan Lake Elmo, MN Totals by Department Admin/Finance Department Building Department Fire Department Parks and Recreation Public Works Department Sewer Department Storm Water Department Water Department % 2% 0% 3% 3% 43% 3% 1% 45% 100% Source 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total % Ballfield Fund 2,775,000 - - - - - - - - - 2,775,000 1.7% Bond Proceeds - Assessment Funded 1,106,000 1,137,000 826,500 735,000 652,500 660,000 600,000 1,174,500 900,000 2,340,000 10,131,500 6.2% Bond Proceeds - Stormwater Fund - - 575,000 - - - - - - - 575,000 0.4% Bond Proceeds - Tax Levy 1,834,000 6,478,000 9,028,500 1,715,000 2,522,500 6,640,000 7,160,000 2,740,500 2,600,000 5,790,000 46,508,500 28.6% Bond Proceeds - Water Fund - 750,000 2,600,000 1,500,000 1,500,000 1,700,000 1,500,000 - 550,000 - 10,100,000 6.2% Fire Equipment & Projects Fund 115,000 - 25,000 - - - - 192,500 - 375,000 707,500 0.4% General Fund 75,000 75,000 160,000 - - - - - - 108,500 418,500 0.3% Grants/Donation 27,000,000 24,750,000 - - - 1,000,000 - - - 14,885,000 67,635,000 41.6% Infrastructure Reserve Fund (409)1,065,200 50,000 - - - 500,000 - - - - 1,615,200 1.0% Municipal Sate Aid (MSA)- 500,000 500,000 - - - - - - - 1,000,000 0.6% Park Dedication Fund (404)292,000 828,000 480,000 850,000 1,790,000 460,000 - 125,000 125,000 - 4,950,000 3.0% Sewer Fund 935,920 40,000 250,000 - 1,685,000 - - 1,000,000 - 48,500 3,959,420 2.4% Storm Water Fund 690,405 80,000 206,000 50,000 50,000 50,000 50,000 50,000 50,000 39,500 1,315,905 0.8% Vehicle/Equip Trade-In 45,000 11,000 222,000 20,000 90,000 28,000 120,000 103,000 45,000 280,000 964,000 0.6% Vehicle Replacement Fund 220,000 641,673 1,171,774 75,000 367,453 227,000 361,744 400,500 290,000 2,125,000 5,880,144 3.6% Water Fund 1,408,275 712,000 285,000 150,000 - 150,000 319,537 210,000 800,000 124,299 4,159,111 2.6% Total - Non-MPCA 37,561,800 36,052,673 16,329,774 5,095,000 8,657,453 11,415,000 10,111,281 5,996,000 5,360,000 26,115,799 162,694,780 100% 2025 through 2034 Funding Source Summary - All Projects Lake Elmo, MN Funding Sources Ballfield Fund Bond Proceeds - Assessment Funded Bond Proceeds - Stormwater Fund Bond Proceeds - Tax Levy Bond Proceeds - Water Fund Fire Equipment & Projects Fund General Fund Grants/Donation Infrastructure Reserve Fund (409) Municipal Sate Aid (MSA) Park Dedication Fund (404) Sewer Fund Storm Water Fund Non MPCA-Funded Projects Source 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total % Bond Proceeds - Assessment Fu 320,000 - - - - - - - - 380,000 700,000 3% Bond Proceeds - Stormwater Fu - - 575,000 - - - - - - - 575,000 3% Bond Proceeds - Water Fund 750,000 2,600,000 1,500,000 1,500,000 1,700,000 1,500,000 - 550,000 - 10,100,000 50% Sewer Fund 925,920 40,000 250,000 - 1,685,000 - - 1,000,000 - - 3,900,920 19% Storm Water Fund 685,405 80,000 206,000 50,000 50,000 50,000 50,000 50,000 50,000 - 1,271,405 6% Water Fund 1,363,275 687,000 190,000 150,000 - 150,000 180,000 210,000 800,000 - 3,730,275 18% Total - Non-MPCA 3,294,600 1,557,000 3,821,000 1,700,000 3,235,000 1,900,000 1,730,000 1,260,000 1,400,000 380,000 20,277,600 100% MPCA-Funded Projects Source 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total % Grants/Donation 27,000,000 24,500,000 - - - - - - - 7,985,000 59,485,000 100% Total - MPCA 27,000,000 24,500,000 - - - - - - - 7,985,000 59,485,000 100% 2025 through 2034 Funding Source Summary - Utility Projects Lake Elmo, MN Funding Sources (non-MPCA only) Bond Proceeds - Assessment Funded Bond Proceeds - Stormwater Fund Bond Proceeds - Water Fund Sewer Fund Storm Water Fund Water Fund Dept Status Project #Project Cost Project Admin/Finance Department New Recomm AF - 001 200,000 Financial Software Suite New Recomm AF - 002 2,775,000 Ballfield Property Purchase 2,975,000$ Total 297,500$ 10-Year Average Building Department Active B-001 35,000 Building Inspection Vehicle 1 Active B-002 35,000 Building Inspection Vehicle 2 Active B-003 35,000 Building Inspection Vehicle 3 Active B-004 70,000 Building Inspection Vehicle 4 175,000$ Total 17,500$ 10-Year Average Fire Department Active F-004 30,000 Rescue 1 Hose Storage and Equipment Refurbish Active F-009 1,176,447 Tender 2 Active F-011 60,000 UTV 1 Active F-012 2,200,000 Ladder 1 Active F-014 77,453 Command Vehicle 1 Active F-015 76,744 Command Vehicle 2 Active F-017 375,000 SCBA Replacement Active F-018 192,500 Turnout Gear Replacement Active F-021 40,000 Equipment Decon Cleaning System New Recomm F-031 75,000 Station Alerting System 4,303,144$ Total 430,314$ 10-Year Average Parks and Recreation Active PR-001 45,000 Chevy 2500 Active PR-002 35,000 Kubota SUV Active PR-003 90,000 Bobcat ToolCat Active PR-004 60,000 John Deere Gator Active PR-005 25,000 Air Compressor Active PR-006 70,000 Skid Loader Active PR-027 65,000 Kleis Park Playground - Replacement Active PR-028 125,000 Tana Ridge Park Play Equipment - Replacement Active PR-029 210,000 Tablyn Park Play Equipment - Replacement Lake Elmo, MN Capital Improvement Plan - Project Listing & Status 2025 through 2034 Active PR-030 125,000 Stonegate Park Play Equipment - Replacement Active PR-031 125,000 Reid Park Play Equipment - Replacement Active PR-032 125,000 Ridge Park Play Equipment - Replacement Active PR-034 125,000 Hidden Knoll Park Play Equipment - Replacement Active PR-036 250,000 Carriage Station Park Play Equipment - Replacement Active PR-038 78,000 Trail Additions Active PR-039 250,000 Lions Park Playground Equipment Replacement Active PR-040 30,000 Court Resurfacing Active PR-043 275,000 Lions Park Concession Building Updates Active PR-044 150,000 Skate Park Active PR-045 30,000 Outdoor Fitness Equipment Active PR-046 30,000 Outdoor Fitness Park Active PR-047 30,000 Disk Golf Active PR-048 300,000 Central Play Complex New Recomm PR-049 227,000 Reid Park Parking Lot New Recomm PR-050 30,000 Court Resurfacing New Recomm PR-051 200,000 Trail Connection New Recomm PR-052 225,000 Park Sign Replacement New Recomm PR-053 1,000,000 Multisport Complex Amenities New Recomm PR-054 25,000 Invasive Species Management New Recomm PR-055 80,000 New Park Pavilion New Recomm PR-056 80,000 New Park Pavilion New Recomm PR-057 80,000 New Park Pavilion New Recomm PR-058 80,000 New Park Pavilion New Recomm PR-059 80,000 New Park Pavilion Active PR-069 520,000 Central Greenway Regional Trail 5,275,000$ Total 527,500$ 10-Year Average Public Works Department Active PW-002 300,000 D2 - Dump Truck 2 - 15 Mack Single Active PW-003 300,000 D3 - Dump Truck 3 - 17 Mack Active PW-004 70,000 D4 - Dump Truck 4 - 19 F-450 Active PW-005 300,000 D5 - Dump Truck 5 - 19 Mack Active PW-006 330,000 D6 - Dump Truck 6 - 20 Mack Tandem Active PW-007 300,000 D7 - Dump Truck 7 - 21 Mack Active PW-008 70,000 D8 - Dump Truck 8 - 22 F-550 Active PW-011 75,000 P1 - Pickup 1 - F-250 Active PW-012 75,000 P2 - Pickup 2 - F-250 Active PW-013 45,000 P3 - Pickup 3 - F-150 Active PW-014 31,000 P4 - Pickup 4 - Ranger Active PW-015 55,000 P5 - Pickup 5 - 3500 Active PW-021 230,000 E1 - Equip 1 - Case Loader Active PW-023 145,000 E3 - Equip 3 - Backhoe Active PW-025 70,000 E5 - Equip 5 -Bobcat Skid Active PW-026 40,000 E6 - Equip 6 - Service Lift Active PW-027 160,000 E7 - Equip 7 - Radios Active PW-028 125,000 E8 - Equip 8 - Asphalt Roller Active PW-029 47,500 E9 - Equip 9 - Asphalt Trailer Active PW-030 60,000 E10 - Equip 10 - Chipper Active PW-031 25,000 E11 - Equip 11 - Forklift New Recomm PW-051 35,000 PWB1 - Refinish Public Works Shop Floor Active PW-052 55,000 PWB2 - Public Works Building Generator New Recomm PW-053 30,000 PWB3 - Public Works Building Roof New Recomm PW-054 110,000 PWB4 - Public Works Building Additional Shop Space New Recomm PW-055 80,000 PWB5 - Public Works Building Overhead Garage Doors Active PW-090 1,315,000 Reevaluate- Homestead St & Utility Improvements Active PW-091 4,550,000 Future - PP/EP/20th Street & Utility Improvements Active PW-092 3,500,000 Future - Tartan Street & Utility Improvements Active PW-093 3,400,000 Future - DL/SP/For Street & Utility Improvements Active PW-100 2,620,000 2025 Street Improvements Active PW-101 2,740,000 2026 Street Improvements Active PW-102 2,755,000 2027 Street Improvements Active PW-103 2,450,000 2028 Street Improvements Active PW-104 2,175,000 2029 Street Improvements Active PW-105 2,200,000 2030 Street Improvements Active PW-106 2,000,000 2031 Street Improvements Active PW-107 3,915,000 2032 Street Improvements Active PW-108 3,000,000 2033 Street Improvements New Recomm PW-109 3,200,000 2034 Street Improvements Active PW-120 960,200 UP RR Crossing - Village Parkway Active PW-120-2 105,000 UP RR Crossing - Private Drive Closure Active PW-121 560,000 Hudson Blvd Improvements - Vahli-Hi to Bus Fac. Active PW-122 2,100,000 Hudson Blvd Improvements - Keats to Kramer Lake Ov Active PW-123 5,760,000 South Frontage Rd (Demontreville Tr to Keats Ave) New Recomm PW-124 4,600,000 5th St N - Keats to Lake Elmo Ave Active PW-125 5,000,000 TH36-Lake Elmo Ave (CSAH 17) Imp Active PW-126 3,000,000 South Frontage Road (Keats to Lake Elmo Ave) Active PW-127 300,000 Manning/Hudson Stoplight Active PW-128 1,000,000 Ideal Ave (CSAH 13)-Phase 3- CSAH 14 to CSAH 6 New Recomm PW-129 1,000,000 CSAH 14 - Klondike to 39th New Recomm PW-130 1,000,000 CSAH 17 Imp - CSAH 14 - 43rd Active PW-131 500,000 Lake Elmo Ave (CSAH 17) & 39th St N Traffic Signal Active PW-132 500,000 CSAH 6/Inwood Signal New Recomm PW-133 500,000 CSAH 10 / CSAH 17 Roundabout 69,868,700$ Total 6,986,870$ 10-Year Average Sewer Department Active S-093 380,000 Future - DL/SP/For Street & Util Imp - Sewer Active S-104 1,685,000 2029 Street Improvements Active S-107 1,000,000 Tapestry Sanitary Sewer Collection System Upgrades Active S-108 900,000 I-94 Lift Station and Forcemain Upgrade Active S-120 115,920 Sewer Oversizing Active S-121 200,000 Sewer Oversizing for Sect 16 Extension 4,280,920$ Total 428,092$ 10-Year Average Storm Water Department Active SW-001 285,405 Phase 2 Regional Drainage Impr. - Northstar Pond Active SW-002 575,000 Phase 3 Regional Drainage Impr - Lions Park Pond Active SW-003 80,000 Stormwater Reuse - Development Irrigation Systems Active SW-004 76,000 Stormwater Reuse - Lions & VFW Park Irrigation Active SW-005 80,000 Stormwater Reuse - Irrigation Systems Active SW-006 400,000 Hudson Boulevard Culvert Repair Active SW-TBD 350,000 Future Unidentified Stormwater Projects 1,846,405$ Total 184,641$ 10-Year Average Water Department Active W-001 100,000 W1 - Water 1 - Portable Generator Active W-002 130,000 W2 - Water 2 - F-550 Service Truck Active W-003 44,537 W3 - Water 3 - RAM 3500 Van Active W-004 65,799 W4 - Water 4 - F-250 Service Truck Active W-011 50,000 T1 - Tower 1 - Langly Ct Active W-012 800,000 T2 - Tower 2 - Ideal Ave Active W-014 800,000 T4 - Tower 4 - Inwood Ave Active W-017 60,000 WL2 - Well 2 - 55th St Active W-019 50,000 WL4 - Well 4 - 50th St Active W-020 50,000 WL5 - Well 5 - Lily Ave Active W-021 750,000 WL6 - Well 6 - Future Well & Site Acquisition Active W-022 750,000 WL7 - Well 7 (or 3) - Test Well & Site Acquisition Active W-041 49,000,000 TP1 - Treatment Plant 1 Active W-042 2,500,000 TP2 - Treatment 2 - Well 2 - GAC Filter System Active W-090 935,000 Future - Homestead Street & Utility Impr - Water Active W-091 2,500,000 Future - PP/EP/20th Street & Utility Impr - Water Active W-092 1,900,000 Future - Tartan Street & Utility Impr - Water Active W-093 2,200,000 Future - DL/SP/For Street & Utility Impr - Water Active W-094 450,000 Future - 45th Street Watermain Extension Active W-100 320,000 2025 Street & Utility Improvements - Water portion Active W-101 327,000 2026 Street & Utility Improvements - Water portion Active W-103 150,000 2028 Street & Utility Improvements - Water portion Active W-105 100,000 2030 Street & Utility Improvements - Water portion Active W-106 130,000 2031 Street & Utility Improvements - Water portion Active W-107 210,000 2032 Street & Utility Improvements - Water portion Active W-108 550,000 2033 Street & Utility Improvements - Water portion Active W-120 582,800 Village East Trunk Watermain & PRV Active W-122 1,800,000 Hudson Blvd - Trunk Watermain Extension New Recomm W-124 1,700,000 5th St N - Keats to Lake Elmo Ave - Water Portion Active W-130 4,500,000 Trunk Watermain Extensions Active W-160 470,475 Watermain Oversizing 73,975,611$ Total 7,397,561$ 10-Year Average Produced Using Plan-It CIP Software 2025 through 2034 Admin-Finance Summary Lake Elmo, MN Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Admin/Finance Department Financial Software Suite AF - 001 100,000 100,000 200,000 Ballfield Property Purchase AF - 002 2,775,000 2,775,000 Ballfield Fund 2,775,000 2,775,000 General Fund 75,000 75,000 150,000 Water Fund 25,000 25,000 50,000 Source Grand Total 2,875,000 100,000 0 0 0 0 0 0 0 0 2,975,000 GRAND TOTAL 2,875,000 100,000 0 0 0 0 0 0 0 0 2,975,000 Financial Software Suite 2025 thru 2034 Admin/Finance - Detail Lake Elmo, MN Project #AF - 001 Project Name Financial Software Suite Contact Finance Director Department Admin/Finance Department Category Unassigned Priority 3 Important Status New Recommendation Useful Life 10 years Description The current set-up utilizing different software for financial accounting and utility billing, as well as manual and spreadsheet processes for Special Assessments, Fixed Assets, Escrows and more, creates significant inefficiencies in the Finance Department. New software can incorporate automated Accounts Payable processes, adding efficiencies across the entire organization. Significant savings in staff time will make the department more resilient in the face of employee turnover and community growth. Very preliminary estimates of total costs are estimated at $200,000, which would include a conversion to the new software, as well as new workflows to automate tasks. Costs will be spread across at least two calendar years. The time-value of the increased efficiencies are expected to exceed the annualized costs of the software. In addition, these gained efficiencies will make the department more resilient to employee turnover. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Other 100,000 100,000 0 0 0 0 0 0 0 0 200,000 Total 100,000 100,000 0 0 0 0 0 0 0 0 200,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total General Fund 75,000 75,000 0 0 0 0 0 0 0 0 150,000 Water Fund 25,000 25,000 0 0 0 0 0 0 0 0 50,000 Total 100,000 100,000 0 0 0 0 0 0 0 0 200,000 Produced Using Plan-It CIP Software Ballfield Property Purchase 2025 thru 2034 Admin/Finance - Detail Lake Elmo, MN Project #AF - 002 Project Name Ballfield Property Purchase Contact City Administrator Department Admin/Finance Department Category Land Priority 3 Important Status New Recommendation Useful Life 99 years Description Purchase of two properties for future development of parks and ballfields. Per city council meeting on 8/27/24. Tentative closing in early 2025. Interfund Loan -- repayment over 10 years w/ dedicated levy. $2,700,000 for land + $75,000 for closing costs/incidentals $1,058,280 to be transferred from Park Ded -- Royal Golf ballfield contribution. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Land Acquisition 2,700,000 0 0 0 0 0 0 0 0 0 2,700,000 Other 75,000 0 0 0 0 0 0 0 0 0 75,000 Total 2,775,000 0 0 0 0 0 0 0 0 0 2,775,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Ballfield Fund 2,775,000 0 0 0 0 0 0 0 0 0 2,775,000 Total 2,775,000 0 0 0 0 0 0 0 0 0 2,775,000 Produced Using Plan-It CIP Software 2025 through 2034 Ballfield Fund - Funding Sources & Uses Lake Elmo, MN Source Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Ballfield Fund Beginning Balance 0 0 0 0 0 0 0 0 0 0 Revenues and Other Fund Sources Revenue Ballfield Levy 257,508 248,924 240,341 231,757 223,174 214,590 206,006 197,423 188,839 180,256 Park Dedication 1,058,280 0 0 0 0 0 0 0 0 0 Interfund Loan 1,716,720 0 0 0 0 0 0 0 0 0 Total 3,032,508 248,924 240,341 231,757 223,174 214,590 206,006 197,423 188,839 180,256 Other Fund Sources Total Revenues and Other Fund Sources 3,032,508 248,924 240,341 231,757 223,174 214,590 206,006 197,423 188,839 180,256 Total Funds available 3,032,508 248,924 240,341 231,757 223,174 214,590 206,006 197,423 188,839 180,256 Expenditures and Uses Capital Projects & Equipment Admin/Finance Department Ballfield Property Purchase AF - 002 2,775,000 0 0 0 0 0 0 0 0 0 Total 2,775,000 0 0 0 0 0 0 0 0 0 Other Uses Interfund Loan Payment 257,508 248,924 240,341 231,757 223,174 214,590 206,006 197,423 188,839 180,256 Total 257,508 248,924 240,341 231,757 223,174 214,590 206,006 197,423 188,839 180,256 Total Expenditures and Uses 3,032,508 248,924 240,341 231,757 223,174 214,590 206,006 197,423 188,839 180,256 Change in Fund Balance 0 0 0 0 0 0 0 0 0 0 Ending Balance 0 0 0 0 0 0 0 0 0 0 Produced Using Plan-It CIP Software Produced Using Plan-It CIP Software 2025 through 2034 Building Dept - Summary Lake Elmo, MN Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Building Department Building Inspection Vehicle 1 B-001 35,000 35,000 Building Inspection Vehicle 2 B-002 35,000 35,000 Building Inspection Vehicle 3 B-003 35,000 35,000 Building Inspection Vehicle 4 B-004 35,000 35,000 70,000 Vehicle/Equip Trade-In 5,000 5,000 5,000 5,000 20,000 Vehicle Replacement Fund 30,000 30,000 60,000 30,000 150,000 Source Grand Total 0 35,000 0 0 35,000 65,000 0 0 35,000 0 170,000 GRAND TOTAL 0 35,000 0 0 35,000 70,000 0 0 35,000 0 175,000 Building Inspection Vehicle 1 2025 thru 2034 Building Dept - Detail Lake Elmo, MN Project #B-001 Project Name Building Inspection Vehicle 1 Contact Building Official Department Building Department Category Vehicles Priority 2 Very Important Status Active Useful Life 7 years Dept. Unit Number/Name BLDG-1 Make Chevrolet Model Equinox VIN / SN 3GNAXSEVXNS165061 Year 2022 Color Black License Plate 977305 Location/Address City Hall Description Building Inspection Vehicle 1 Current - 2022 Equinox - purchased 2022 Prior - 2004 S10 Colorado, 20YY S10 Colorado 7 year purchasing cycle. Justification 7 year replacement cycle on 4 Building Inspection vehicles. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 35,000 0 0 0 0 0 35,000 Total 0 0 0 0 35,000 0 0 0 0 0 35,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 30,000 0 0 0 0 0 30,000 Vehicle/Equip Trade-In 0 0 0 0 5,000 0 0 0 0 0 5,000 Total 0 0 0 0 35,000 0 0 0 0 0 35,000 Produced Using Plan-It CIP Software Building Inspection Vehicle 2 2025 thru 2034 Building Dept - Detail Lake Elmo, MN Project #B-002 Project Name Building Inspection Vehicle 2 Contact Building Official Department Building Department Category Vehicles Priority 2 Very Important Status Active Useful Life 7 years Dept. Unit Number/Name BLDG-2 Make Mitsubishi Model Outlander VIN / SN JA4ARUAU8NU024737 Year 2022 Color White License Plate 968478 Location/Address City Hall Description Building Inspection Vehicle 2 Current - 2022 Mitsubishi Outlander (VIN 4737) Prior - 2015 Jeep (sold 12/22/22) 7 year purchasing cycle. Justification 7 year replacment cycle on 4 Building Inspection vehicles. Produced Using Plan-It CIP Software Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 35,000 0 0 0 0 35,000 Total 0 0 0 0 0 35,000 0 0 0 0 35,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 30,000 0 0 0 0 30,000 Total 0 0 0 0 0 30,000 0 0 0 0 30,000 Produced Using Plan-It CIP Software Building Inspection Vehicle 3 2025 thru 2034 Building Dept - Detail Lake Elmo, MN Project #B-003 Project Name Building Inspection Vehicle 3 Contact Building Official Department Building Department Category Vehicles Priority 2 Very Important Status Active Useful Life 7 years Dept. Unit Number/Name BLDG-3 Make Mitsubishi Model Outlander VIN / SN JA4ARUAU7NU024731 Year 2022 Color Black License Plate 977306 Description Building Inspection Vehicle 3 Current - 2022 Mitsubishi Outlander (VIN 4731) Prior - 2017 Equinox (sold 4/18/23) 7 year purchasing cycle. Justification 7 year replacment cycle on 4 Building Inspection vehicles. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 35,000 0 0 0 0 35,000 Total 0 0 0 0 0 35,000 0 0 0 0 35,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 30,000 0 0 0 0 30,000 Vehicle/Equip Trade-In 0 0 0 0 0 5,000 0 0 0 0 5,000 Total 0 0 0 0 0 35,000 0 0 0 0 35,000 Produced Using Plan-It CIP Software Building Inspection Vehicle 4 2025 thru 2034 Building Dept - Detail Lake Elmo, MN Project #B-004 Project Name Building Inspection Vehicle 4 Contact Building Official Department Building Department Category Vehicles Priority 3 Important Status Active Useful Life 7 years Dept. Unit Number/Name BLDG-4 Make Chevrolet Model Equinox VIN / SN 3GNAXUEVOLS538391 Year 2019 Color White Description Building Inspection Vehicle 4 Current - 2019 Chevrolet Equinox 7 year purchasing cycle. Justification 7 year replacement cycle on 4 Building Inspection vehicles. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 35,000 0 0 0 0 0 0 35,000 0 70,000 Total 0 35,000 0 0 0 0 0 0 35,000 0 70,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 30,000 0 0 0 0 0 0 30,000 0 60,000 Vehicle/Equip Trade-In 0 5,000 0 0 0 0 0 0 5,000 0 10,000 Total 0 35,000 0 0 0 0 0 0 35,000 0 70,000 Produced Using Plan-It CIP Software Produced Using Plan-It CIP Software Produced Using Plan-It CIP Software 2025 through 2034 Fire Dept - Summary Lake Elmo, MN Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Fire Department Rescue 1 Hose Storage and Equipment Refurbish F-004 30,000 30,000 Tender 2 F-009 487,673 688,774 1,176,447 UTV 1 F-011 60,000 60,000 Ladder 1 F-012 2,200,000 2,200,000 Command Vehicle 1 F-014 77,453 77,453 Command Vehicle 2 F-015 76,744 76,744 SCBA Replacement F-017 375,000 375,000 Turnout Gear Replacement F-018 192,500 192,500 Equipment Decon Cleaning System F-021 40,000 40,000 Station Alerting System F-031 75,000 75,000 Fire Equipment & Projects Fund 115,000 25,000 192,500 375,000 707,500 Vehicle/Equip Trade-In 6,000 100,000 30,000 25,000 200,000 361,000 Vehicle Replacement Fund 30,000 541,673 563,774 47,453 51,744 2,000,000 3,234,644 Source Grand Total 145,000 547,673 688,774 0 77,453 0 76,744 192,500 0 2,575,000 4,303,144 GRAND TOTAL 145,000 547,673 688,774 0 77,453 0 76,744 192,500 0 2,575,000 4,303,144 Rescue 1 Hose Storage and Equipment Refurbish 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-004 Project Name Rescue 1 Hose Storage and Equipment Refurbish Contact Fire Chief Department Fire Department Category Vehicles Priority 2 Very Important Status Active Useful Life 15 years Make Rosenbauer Description Refurbish existing hose storage area to include preconnected hose capabilities and refurbish tool and equipment areas to better utilize available equipment storage space. Justification The fire department replaces or refurbishes vehicles on a rotating basis based on each individual vehicles need. As department operations are being reevaluated with the new single station operating model, all department apparatus will be used more frequently for its intended use. This project will allow for better apparatus utilization and response capability. The Rescue 1 refurbishment will provide a refurbish of existing hose storage area to include preconnected hose capabilities and refurbish tool and equipment areas to better utilize available storage space. Rescue 1 is utilized by all Fire Department staff to respond to emergency incidents 24 hours a day 365 days per year to provide crew response, firefighter safety, support on emergency incidents, and prevention efforts. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 30,000 0 0 0 0 0 0 0 0 0 30,000 Total 30,000 0 0 0 0 0 0 0 0 0 30,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 30,000 0 0 0 0 0 0 0 0 0 30,000 Total 30,000 0 0 0 0 0 0 0 0 0 30,000 Produced Using Plan-It CIP Software Tender 2 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-009 Project Name Tender 2 Contact Fire Chief Department Fire Department Category Vehicles Priority 1 Critical Status Active Useful Life 20 years Dept. Unit Number/Name Tender 2 Make Spartan Model Gladiator VIN / SN 4S7AX2F996C055229 Year 2007 Color Red Description Replacement of Tender 2 (2007 Rosenbauer/Spartan Tender/Engine) including all necessary response equipment, lighting and graphics. Justification The fire department replaces vehicles on a rotating basis based on each individual vehicles need. The Tender 2 replacement will be utilized by all Fire Department staff to respond to emergency incidents 24 hours a day 365 days per year to provide crew response, firefighter safety, support on emergency incidents, and prevention efforts. This was originally budgeted as a 2027 CIP purchase but due to rapidly increasing costs and the significant length of replacement build time, this request to purchase is being presented now. Current build time is currently estimated at 26 – 30 months from time of order. The vehicle being replaced will be sold upon the arrival of the new engine. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 487,673 688,774 0 0 0 0 0 0 0 1,176,447 Total 0 487,673 688,774 0 0 0 0 0 0 0 1,176,447 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 487,673 563,774 0 0 0 0 0 0 0 1,051,447 Vehicle/Equip Trade-In 0 0 100,000 0 0 0 0 0 0 0 100,000 Fire Equipment & Projects Fund 0 0 25,000 0 0 0 0 0 0 0 25,000 Total 0 487,673 688,774 0 0 0 0 0 0 0 1,176,447 Produced Using Plan-It CIP Software UTV 1 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-011 Project Name UTV 1 Contact Fire Chief Department Fire Department Category Vehicles Priority 2 Very Important Status Active Useful Life 15 years Make Polaris Model Ranger VIN / SN 4XARF68A794733391 Year 2009 Color Red Description Replacement of UTV 1 (2008 Polaris Ranger 6x6) including all necessary response equipment, lighting and graphics. Justification The fire department replaces vehicles on a rotating basis based on each individual vehicles need. The UTV 1 replacement will be utilized by all Fire Department staff to respond to emergency incidents 24 hours a day 365 days per year to provide crew response, firefighter safety, support on emergency incidents, and prevention efforts. This equipment is especially critical for utilization within our parks and trail systems. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 60,000 0 0 0 0 0 0 0 0 60,000 Total 0 60,000 0 0 0 0 0 0 0 0 60,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 54,000 0 0 0 0 0 0 0 0 54,000 Vehicle/Equip Trade-In 0 6,000 0 0 0 0 0 0 0 0 6,000 Total 0 60,000 0 0 0 0 0 0 0 0 60,000 Produced Using Plan-It CIP Software Ladder 1 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-012 Project Name Ladder 1 Contact Fire Chief Department Fire Department Category Vehicles Priority 1 Critical Status Active Useful Life 20 years Dept. Unit Number/Name Ladder 1 Make Rosenbauer Model Commander 78' Aerial VIN / SN 54F2CC702FWM10914 Year 2015 Color Red Description Replacement of Ladder 1 (2015 Rosenbauer 78' Aerial) including all necessary response equipment, lighting and graphics. Justification The fire department replaces vehicles on a rotating basis based on each individual vehicles need. The Ladder 1 replacement will be utilized by all Fire Department staff to respond to emergency incidents 24 hours a day 365 days per year to provide crew response, firefighter safety, support on emergency incidents, and prevention efforts. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 0 0 2,200,000 2,200,000 Total 0 0 0 0 0 0 0 0 0 2,200,000 2,200,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 0 0 0 2,000,000 2,000,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 0 0 200,000 200,000 Total 0 0 0 0 0 0 0 0 0 2,200,000 2,200,000 Produced Using Plan-It CIP Software Command Vehicle 1 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-014 Project Name Command Vehicle 1 Contact Fire Chief Department Fire Department Category Vehicles Priority 1 Critical Status Active Useful Life 8 years Dept. Unit Number/Name C1 Make Chevrolet Model Tahoe VIN / SN 1GNSKLED2MR463377 Year 2021 Color Red License Plate C1 Description Replacement of CV1 (2021 Chevrolet Tahoe) including all necessary response equipment, lighting and graphics. Justification The fire department replaces vehicles on a rotating basis based on each individual vehicles need. The Command Vehicle will be utilized by Fire Department Fire Inspector and officer staff to respond to emergency incidents 24 hours a day 365 days per year to provide critical incident command, firefighter safety, support on emergency incidents, fire inspections and prevention efforts. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 77,453 0 0 0 0 0 77,453 Total 0 0 0 0 77,453 0 0 0 0 0 77,453 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 47,453 0 0 0 0 0 47,453 Vehicle/Equip Trade-In 0 0 0 0 30,000 0 0 0 0 0 30,000 Total 0 0 0 0 77,453 0 0 0 0 0 77,453 Budget Impact Less maintenance/repairs required to upkeep new vehicle Produced Using Plan-It CIP Software Command Vehicle 2 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-015 Project Name Command Vehicle 2 Contact Fire Chief Department Fire Department Category Vehicles Priority 1 Critical Status Active Useful Life 8 years Dept. Unit Number/Name C2 Make Dodge Model Durango VIN / SN 1C4SDJFT3PC676827 Year 2023 Color Black License Plate C2 Description Replacement of Command Vehicle 2 including all necessary response equipment, lighting and graphics. Justification The fire department replaces vehicles on a rotating basis based on each individual vehicles need. The Command Vehicle will be utilized by the Assistant Fire Chief to respond to emergency incidents 24 hours a day 365 days per year to provide critical incident command, firefighter safety, support on emergency incidents, fire inspections and prevention efforts. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 76,744 0 0 0 76,744 Total 0 0 0 0 0 0 76,744 0 0 0 76,744 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 51,744 0 0 0 51,744 Vehicle/Equip Trade-In 0 0 0 0 0 0 25,000 0 0 0 25,000 Total 0 0 0 0 0 0 76,744 0 0 0 76,744 Produced Using Plan-It CIP Software Budget Impact Less maintenance/repairs required to upkeep new vehicle Produced Using Plan-It CIP Software SCBA Replacement 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-017 Project Name SCBA Replacement Contact Fire Chief Department Fire Department Category Equipment: Fire Equip Priority 1 Critical Status Active Useful Life 15 years Make Drager Year 2019 Description Replacement of Self Contained Breathing Apparatus (SCBA) equipment. Justification Replacement of SCBA equipment that have become non-compliant with NFPA and OSHA standards. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 0 0 375,000 375,000 Total 0 0 0 0 0 0 0 0 0 375,000 375,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Fire Equipment & Projects Fund 0 0 0 0 0 0 0 0 0 375,000 375,000 Total 0 0 0 0 0 0 0 0 0 375,000 375,000 Produced Using Plan-It CIP Software Turnout Gear Replacement 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-018 Project Name Turnout Gear Replacement Contact Fire Chief Department Fire Department Category Equipment: Fire Equip Priority 1 Critical Status Active Useful Life 10 years Make GLOBE Year 2019 Description Replacement of 35 sets of turnout gear (Jacket, Pants, Particulate Hood and Boots). Justification Per NFPA 1971, turnout gear is required to be retired and taken out of service after 10 years. The requested sets of turnout gear, additional hoods and boots include the enhanced safety features available through the 2018 NFPA 1971 standard. New safety features include, less water absorption by the turnout gear outer shell, a particle protection barrier on hoods, and better ergonomic design of turnout gear to minimize gaps in protection. The benefit of acquiring this funding will greatly increase the safety of our firefighters during all types of incidents and drills requiring structural firefighting turnout gear. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 192,500 0 0 192,500 Total 0 0 0 0 0 0 0 192,500 0 0 192,500 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Fire Equipment & Projects Fund 0 0 0 0 0 0 0 192,500 0 0 192,500 Total 0 0 0 0 0 0 0 192,500 0 0 192,500 Produced Using Plan-It CIP Software Equipment Decon Cleaning System 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-021 Project Name Equipment Decon Cleaning System Contact Fire Chief Department Fire Department Category Equipment: Fire Equip Priority 1 Critical Status Active Useful Life 20 years Description Equipment decon cleaning system cleans all protective gear and steel, composite, rubber, fabric, plastic equipment in a mechanical, self-contained process. This equipment is permanently installed in the decon room of the fire station. This system offers a quick, easy and safe method of cleaning protective gear in a sealed compartment. This ergonomic process minimizes manual contact with contaminated materials. Justification Exposure to hazardous chemicals and carcinogens is a well known health risk for firefighters. Studies have shown that they run a significantly higher risk of being diagnosed with various forms of cancer than the general population. To reduce this dangerous exposure it is essential to thoroughly, safely and efficiently clean and decontaminate all protective equipment after every use. Cleaning gear with and equipment decon cleaning system, significantly reduces the exposure to cancer causing PAH particles and supports a safer work environment for staff. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 40,000 0 0 0 0 0 0 0 0 0 40,000 Total 40,000 0 0 0 0 0 0 0 0 0 40,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Fire Equipment & Projects Fund 40,000 0 0 0 0 0 0 0 0 0 40,000 Total 40,000 0 0 0 0 0 0 0 0 0 40,000 Produced Using Plan-It CIP Software Station Alerting System 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-031 Project Name Station Alerting System Contact Fire Chief Department Fire Department Category Equipment: Fire Equip Priority 2 Very Important Status New Recommendation Useful Life 25 years Description Purchase of a station alerting system (Phoenix G-2 Alerting System) and associated instillation costs for the system in the fire station. This system was proposed in the planning of the new fire station and was eliminated due to the project budget. Justification The Pheonix G2 Alerting System is a station alerting system used by many fire departments throughout the US including all departments in Ramsey, Anoka and Hennepin Counties. This system alerts station crews of an incoming incident through, lighting, message boards and A/V notifications. Currently, the Washington County Emergency Communications Response Center will be ready with the capabilities to support the Phoenix G2 Alerting System in early 2025. When an incident occurs, the G2 Communications Gateway receives alert data from a dispatcher using CAD and the USDD interactive web-based interface we use today. Dispatch processing time is reduced when said alert data is sent over a high-speed network which can notify fire stations with alerts and information in less than a second. At the fire station, the Phoenix G2 system integrates crystal clear text to speech technology and high- contrast message signs and LED lighting. This helps emergency responders react promptly and efficiently to every call. This systems benefits the on-shift staff by increasing situational awareness and mental preparedness by using clear, consistent station alerting vocals. This helps crews respond more quickly and efficiently. The systems and alerting devices are designed to reduce cardiac stress, anxiety, optical shock, and sleep deprivation through ramped toning and lighting levels. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 75,000 0 0 0 0 0 0 0 0 0 75,000 Total 75,000 0 0 0 0 0 0 0 0 0 75,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Fire Equipment & Projects Fund 75,000 0 0 0 0 0 0 0 0 0 75,000 Total 75,000 0 0 0 0 0 0 0 0 0 75,000 Produced Using Plan-It CIP Software Produced Using Plan-It CIP Software 2025 through 2034 Public Works - Vehicles & Equipment - Summary Lake Elmo, MN Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Parks and Recreation Chevy 2500 PR-001 45,000 45,000 Kubota SUV PR-002 35,000 35,000 Bobcat ToolCat PR-003 90,000 90,000 John Deere Gator PR-004 60,000 60,000 Air Compressor PR-005 25,000 25,000 Skid Loader PR-006 70,000 70,000 Vehicle/Equip Trade-In 20,000 20,000 15,000 55,000 Vehicle Replacement Fund 70,000 70,000 75,000 30,000 25,000 270,000 Source Grand Total 90,000 70,000 0 95,000 45,000 0 0 25,000 0 0 325,000 Public Works Department D2 - Dump Truck 2 - 15 Mack Single PW-002 300,000 300,000 D3 - Dump Truck 3 - 17 Mack PW-003 300,000 300,000 D4 - Dump Truck 4 - 19 F-450 PW-004 70,000 70,000 D5 - Dump Truck 5 - 19 Mack PW-005 300,000 300,000 D6 - Dump Truck 6 - 20 Mack Tandem PW-006 330,000 330,000 D7 - Dump Truck 7 - 21 Mack PW-007 300,000 300,000 D8 - Dump Truck 8 - 22 F-550 PW-008 70,000 70,000 P1 - Pickup 1 - F-250 PW-011 75,000 75,000 P2 - Pickup 2 - F-250 PW-012 75,000 75,000 Produced Using Plan-It CIP Software Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total P3 - Pickup 3 - F-150 PW-013 45,000 45,000 P4 - Pickup 4 - Ranger PW-014 31,000 31,000 P5 - Pickup 5 - 3500 PW-015 55,000 55,000 E1 - Equip 1 - Case Loader PW-021 230,000 230,000 E3 - Equip 3 - Backhoe PW-023 145,000 145,000 E5 - Equip 5 -Bobcat Skid PW-025 70,000 70,000 E6 - Equip 6 - Service Lift PW-026 40,000 40,000 E7 - Equip 7 - Radios PW-027 160,000 160,000 E8 - Equip 8 - Asphalt Roller PW-028 125,000 125,000 E9 - Equip 9 - Asphalt Trailer PW-029 47,500 47,500 E10 - Equip 10 - Chipper PW-030 60,000 60,000 E11 - Equip 11 - Forklift PW-031 25,000 25,000 General Fund 160,000 160,000 Vehicle/Equip Trade-In 25,000 117,000 40,000 23,000 60,000 103,000 40,000 60,000 468,000 Vehicle Replacement Fund 120,000 608,000 260,000 167,000 310,000 375,500 260,000 125,000 2,225,500 Source Grand Total 145,000 0 885,000 0 300,000 190,000 370,000 478,500 300,000 185,000 2,853,500 Water Department W1 - Water 1 - Portable Generator W-001 100,000 100,000 W2 - Water 2 - F-550 Service Truck W-002 130,000 130,000 W3 - Water 3 - RAM 3500 Van W-003 44,537 44,537 W4 - Water 4 - F-250 Service Truck W-004 65,799 65,799 Vehicle/Equip Trade-In 5,000 35,000 20,000 60,000 Water Fund 95,000 139,537 45,799 280,336 Source Grand Total 0 0 100,000 0 0 0 174,537 0 0 65,799 340,336 Produced Using Plan-It CIP Software Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total GRAND TOTAL 235,000 70,000 985,000 95,000 345,000 190,000 544,537 503,500 300,000 250,799 3,518,836 Chevy 2500 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PR-001 Project Name Chevy 2500 Contact Public Works Director Department Parks and Recreation Category Vehicles Priority 3 Important Status Active Useful Life 10 years Make Chevrolet Model Silverado 2500 VIN / SN 2GC2KREGGK1138193 Year 2019 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 45,000 0 0 0 0 0 45,000 Total 0 0 0 0 45,000 0 0 0 0 0 45,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 30,000 0 0 0 0 0 30,000 Vehicle/Equip Trade-In 0 0 0 0 15,000 0 0 0 0 0 15,000 Total 0 0 0 0 45,000 0 0 0 0 0 45,000 Produced Using Plan-It CIP Software Kubota SUV 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PR-002 Project Name Kubota SUV Contact Public Works Director Department Parks and Recreation Category Vehicles Priority 3 Important Status Active Useful Life 12 years Make Kubota Model RTV X1100C VIN / SN A5KC2GDBTEG014726 Year 2014 Old Project Number PR-020 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 35,000 0 0 0 0 0 0 35,000 Total 0 0 0 35,000 0 0 0 0 0 0 35,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 25,000 0 0 0 0 0 0 25,000 Vehicle/Equip Trade-In 0 0 0 10,000 0 0 0 0 0 0 10,000 Total 0 0 0 35,000 0 0 0 0 0 0 35,000 Produced Using Plan-It CIP Software Bobcat ToolCat 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PR-003 Project Name Bobcat ToolCat Contact Public Works Director Department Parks and Recreation Category Vehicles Priority 3 Important Status Active Useful Life 10 years Make Bobcat Model Toolcat VIN / SN AHG812638 Year 2015 Color Black and White Old Project Number PR- 5555555 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 90,000 0 0 0 0 0 0 0 0 0 90,000 Total 90,000 0 0 0 0 0 0 0 0 0 90,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 70,000 0 0 0 0 0 0 0 0 0 70,000 Vehicle/Equip Trade-In 20,000 0 0 0 0 0 0 0 0 0 20,000 Total 90,000 0 0 0 0 0 0 0 0 0 90,000 Produced Using Plan-It CIP Software John Deere Gator 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PR-004 Project Name John Deere Gator Contact Public Works Director Department Parks and Recreation Category Vehicles Priority 2 Very Important Status Active Useful Life 10 years Make John Deere Model Pro-Gator 2020A VIN / SN 1TC202ATPJT100S47 Year 2018 Color Green Old Project Number PR-016 Description 2018 John Deere pro-gator 2020A model to be replaced in 2028. Justification Doesn’t fit our needs anymore/limited uses Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 60,000 0 0 0 0 0 0 60,000 Total 0 0 0 60,000 0 0 0 0 0 0 60,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 50,000 0 0 0 0 0 0 50,000 Vehicle/Equip Trade-In 0 0 0 10,000 0 0 0 0 0 0 10,000 Total 0 0 0 60,000 0 0 0 0 0 0 60,000 Produced Using Plan-It CIP Software Air Compressor 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PR-005 Project Name Air Compressor Contact Public Works Director Department Parks and Recreation Category Equipment: Miscellaneous Priority 3 Important Status Active Useful Life 15 years VIN / SN 270781URH282 Year 1996 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 25,000 0 0 25,000 Total 0 0 0 0 0 0 0 25,000 0 0 25,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 0 25,000 0 0 25,000 Total 0 0 0 0 0 0 0 25,000 0 0 25,000 Produced Using Plan-It CIP Software Skid Loader 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PR-006 Project Name Skid Loader Contact Public Works Director Department Parks and Recreation Category Vehicles Priority 3 Important Status Active Useful Life 10 years Old Project Number PW-054 Description Additional skid loader to be used to mow park trails and asphalt in the summer. During the winter it can be used to aid in snow removal at city parking lots and possibly on park trails and sidewalks (w/blower) 2 speed high flow. - Compact tractor with loader, box blade, disc, slit seeder, aerator, ball field drag, trail mower, etc. Justification Additional skid loader needed due to growth in streets and parks Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 70,000 0 0 0 0 0 0 0 0 70,000 Total 0 70,000 0 0 0 0 0 0 0 0 70,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 70,000 0 0 0 0 0 0 0 0 70,000 Total 0 70,000 0 0 0 0 0 0 0 0 70,000 Produced Using Plan-It CIP Software D2 - Dump Truck 2 - 15 Mack Single 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-002 Project Name D2 - Dump Truck 2 - 15 Mack Single Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 12 years Make Mack Model Single VIN / SN 1M2AX11C1FM001539 Year 2015 Color Green License Plate 943972 Old Project Number PW-062 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 300,000 0 0 0 0 0 0 0 300,000 Total 0 0 300,000 0 0 0 0 0 0 0 300,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 260,000 0 0 0 0 0 0 0 260,000 Vehicle/Equip Trade-In 0 0 40,000 0 0 0 0 0 0 0 40,000 Total 0 0 300,000 0 0 0 0 0 0 0 300,000 Produced Using Plan-It CIP Software D3 - Dump Truck 3 - 17 Mack 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-003 Project Name D3 - Dump Truck 3 - 17 Mack Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 12 years Make Mack VIN / SN 1M2AY11CXJM001919 Year 2017 Color Green License Plate 954700 Old Project Number PW-062 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 300,000 0 0 0 0 0 300,000 Total 0 0 0 0 300,000 0 0 0 0 0 300,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 260,000 0 0 0 0 0 260,000 Vehicle/Equip Trade-In 0 0 0 0 40,000 0 0 0 0 0 40,000 Total 0 0 0 0 300,000 0 0 0 0 0 300,000 Produced Using Plan-It CIP Software D4 - Dump Truck 4 - 19 F- 450 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-004 Project Name D4 - Dump Truck 4 - 19 F-450 Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 12 years Make Ford Model F-450 VIN / SN 1FDUF4HY3KDA07601 Year 2019 Color White License Plate 963707 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 70,000 0 0 0 70,000 Total 0 0 0 0 0 0 70,000 0 0 0 70,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 50,000 0 0 0 50,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 20,000 0 0 0 20,000 Total 0 0 0 0 0 0 70,000 0 0 0 70,000 Produced Using Plan-It CIP Software D5 - Dump Truck 5 - 19 Mack 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-005 Project Name D5 - Dump Truck 5 - 19 Mack Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 12 years Make Mack Model Single Axle VIN / SN 1M2GR2AC2KM001117 Year 2019 Color Green License Plate 960836 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 300,000 0 0 0 300,000 Total 0 0 0 0 0 0 300,000 0 0 0 300,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 260,000 0 0 0 260,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 40,000 0 0 0 40,000 Total 0 0 0 0 0 0 300,000 0 0 0 300,000 Produced Using Plan-It CIP Software D6 - Dump Truck 6 - 20 Mack Tandem 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-006 Project Name D6 - Dump Truck 6 - 20 Mack Tandem Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 12 years Make Mack Model Tandem Axle VIN / SN 1M2GR4GC1LM018434 Year 2020 Color Green License Plate 963050 Old Project Number PW-045 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 330,000 0 0 330,000 Total 0 0 0 0 0 0 0 330,000 0 0 330,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 0 270,000 0 0 270,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 60,000 0 0 60,000 Total 0 0 0 0 0 0 0 330,000 0 0 330,000 Produced Using Plan-It CIP Software D7 - Dump Truck 7 - 21 Mack 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-007 Project Name D7 - Dump Truck 7 - 21 Mack Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 12 years Dept. Unit Number/Name PW- 21-1 Make Mack Model Single Axle VIN / SN 1M2GR2AC2MM001511 Year 2021 Color Green License Plate 963045 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 0 300,000 0 300,000 Total 0 0 0 0 0 0 0 0 300,000 0 300,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 0 0 260,000 0 260,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 0 40,000 0 40,000 Total 0 0 0 0 0 0 0 0 300,000 0 300,000 Produced Using Plan-It CIP Software D8 - Dump Truck 8 - 22 F- 550 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-008 Project Name D8 - Dump Truck 8 - 22 F-550 Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 12 years Make Ford Model F-550 VIN / SN 1FDUF5HNXNEE97688 Year 2022 Color White License Plate 968480 Old Project Number PR-015 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 0 0 70,000 70,000 Total 0 0 0 0 0 0 0 0 0 70,000 70,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 0 0 0 45,000 45,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 0 0 25,000 25,000 Total 0 0 0 0 0 0 0 0 0 70,000 70,000 Produced Using Plan-It CIP Software P1 - Pickup 1 - F- 250 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-011 Project Name P1 - Pickup 1 - F-250 Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 10 years Dept. Unit Number/Name 17-2 Make Ford Model F-250 VIN / SN 1FTBF2B69HEE05924 Year 2017 Color White License Plate 954651 Old Project Number PW-063 Description Lift gate and boss snow v plow Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 75,000 0 0 0 0 0 0 0 75,000 Total 0 0 75,000 0 0 0 0 0 0 0 75,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 60,000 0 0 0 0 0 0 0 60,000 Vehicle/Equip Trade-In 0 0 15,000 0 0 0 0 0 0 0 15,000 Total 0 0 75,000 0 0 0 0 0 0 0 75,000 Produced Using Plan-It CIP Software P2 - Pickup 2 - F- 250 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-012 Project Name P2 - Pickup 2 - F-250 Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 10 years Dept. Unit Number/Name 17-3 Make Ford Model F-250 VIN / SN 1FTBF2B67HEE05923 Year 2017 Color White License Plate 954049 Old Project Number PW-064 Description Lift gate and boss snow v plow Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 75,000 0 0 0 0 0 0 0 75,000 Total 0 0 75,000 0 0 0 0 0 0 0 75,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 60,000 0 0 0 0 0 0 0 60,000 Vehicle/Equip Trade-In 0 0 15,000 0 0 0 0 0 0 0 15,000 Total 0 0 75,000 0 0 0 0 0 0 0 75,000 Produced Using Plan-It CIP Software P3 - Pickup 3 - F- 150 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-013 Project Name P3 - Pickup 3 - F-150 Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 10 years Make Ford Model F-150 VIN / SN 1FTEW1EP6GFB12308 Year 2017 Color White License Plate 950247 Old Project Number PW-061 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 45,000 0 0 0 0 0 0 0 45,000 Total 0 0 45,000 0 0 0 0 0 0 0 45,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 28,000 0 0 0 0 0 0 0 28,000 Vehicle/Equip Trade-In 0 0 17,000 0 0 0 0 0 0 0 17,000 Total 0 0 45,000 0 0 0 0 0 0 0 45,000 Produced Using Plan-It CIP Software P4 - Pickup 4 - Ranger 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-014 Project Name P4 - Pickup 4 - Ranger Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 10 years Make Ford Model Ranger VIN / SN 1FTER1FH2NLD54171 Year 2022 Color White License Plate 976820 Old Project Number PW-019 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 31,000 0 0 31,000 Total 0 0 0 0 0 0 0 31,000 0 0 31,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 0 18,000 0 0 18,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 13,000 0 0 13,000 Total 0 0 0 0 0 0 0 31,000 0 0 31,000 Produced Using Plan-It CIP Software P5 - Pickup 5 - 3500 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-015 Project Name P5 - Pickup 5 - 3500 Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 10 years Make GMC Model Sierra 3500 VIN / SN 1GT39SE72RF373748 Year 2024 Color White License Plate 801178 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 0 0 55,000 55,000 Total 0 0 0 0 0 0 0 0 0 55,000 55,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 0 0 0 32,000 32,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 0 0 23,000 23,000 Total 0 0 0 0 0 0 0 0 0 55,000 55,000 Produced Using Plan-It CIP Software E1 - Equip 1 - Case Loader 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-021 Project Name E1 - Equip 1 - Case Loader Contact Public Works Director Department Public Works Department Category Equipment: PW Equip Priority 3 Important Status Active Useful Life 15 years Make Case Model 721 VIN / SN JFF0122871 Year 1999 Color Yellow Old Project Number PW-004 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 230,000 0 0 0 0 0 0 0 230,000 Total 0 0 230,000 0 0 0 0 0 0 0 230,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 200,000 0 0 0 0 0 0 0 200,000 Vehicle/Equip Trade-In 0 0 30,000 0 0 0 0 0 0 0 30,000 Total 0 0 230,000 0 0 0 0 0 0 0 230,000 Produced Using Plan-It CIP Software E3 - Equip 3 - Backhoe 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-023 Project Name E3 - Equip 3 - Backhoe Contact Public Works Director Department Public Works Department Category Equipment: PW Equip Priority 3 Important Status Active Useful Life 15 years Make Case Model M580 VIN / SN N6C410161 Year 2005 Color Yellow Old Project Number PW-044 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 145,000 0 0 0 0 0 0 0 0 0 145,000 Total 145,000 0 0 0 0 0 0 0 0 0 145,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 120,000 0 0 0 0 0 0 0 0 0 120,000 Vehicle/Equip Trade-In 25,000 0 0 0 0 0 0 0 0 0 25,000 Total 145,000 0 0 0 0 0 0 0 0 0 145,000 Produced Using Plan-It CIP Software E5 - Equip 5 - Bobcat Skid 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-025 Project Name E5 - Equip 5 -Bobcat Skid Contact Public Works Director Department Public Works Department Category Equipment: PW Equip Priority 3 Important Status Active Useful Life 10 years Make Bobcat Model T66 Skid Steer VIN / SN B4SB26144 Year 2022 Color White Old Project Number PW-071 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 70,000 0 0 70,000 Total 0 0 0 0 0 0 0 70,000 0 0 70,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 0 45,000 0 0 45,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 25,000 0 0 25,000 Total 0 0 0 0 0 0 0 70,000 0 0 70,000 Produced Using Plan-It CIP Software E6 - Equip 6 - Service Lift 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-026 Project Name E6 - Equip 6 - Service Lift Contact Public Works Director Department Public Works Department Category Equipment: PW Equip Priority 3 Important Status Active Useful Life 20 years Make Stertil Koni Model 18000 LBS Year 2006 Color White Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 40,000 0 0 0 0 40,000 Total 0 0 0 0 0 40,000 0 0 0 0 40,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 35,000 0 0 0 0 35,000 Vehicle/Equip Trade-In 0 0 0 0 0 5,000 0 0 0 0 5,000 Total 0 0 0 0 0 40,000 0 0 0 0 40,000 Produced Using Plan-It CIP Software E7 - Equip 7 - Radios 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-027 Project Name E7 - Equip 7 - Radios Contact Public Works Director Department Public Works Department Category Equipment: PW Equip Priority 3 Important Status Active Useful Life 10 years Make Motorola Model APX 4000 VIN / SN See picture attachments Year 2007 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 160,000 0 0 0 0 0 0 0 160,000 Total 0 0 160,000 0 0 0 0 0 0 0 160,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total General Fund 0 0 160,000 0 0 0 0 0 0 0 160,000 Total 0 0 160,000 0 0 0 0 0 0 0 160,000 Produced Using Plan-It CIP Software E8 - Equip 8 - Asphalt Roller 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-028 Project Name E8 - Equip 8 - Asphalt Roller Contact Public Works Director Department Public Works Department Category Equipment: PW Equip Priority 3 Important Status Active Useful Life 12 years Make Case Model 721 VIN / SN DDD0DV23NHNTT0402 Year 2018 Color Orange Old Project Number PW-046 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 125,000 0 0 0 0 125,000 Total 0 0 0 0 0 125,000 0 0 0 0 125,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 110,000 0 0 0 0 110,000 Vehicle/Equip Trade-In 0 0 0 0 0 15,000 0 0 0 0 15,000 Total 0 0 0 0 0 125,000 0 0 0 0 125,000 Produced Using Plan-It CIP Software E9 - Equip 9 - Asphalt Trailer 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-029 Project Name E9 - Equip 9 - Asphalt Trailer Contact Public Works Director Department Public Works Department Category Equipment: PW Equip Priority 3 Important Status Active Useful Life 10 years Make STEPP Model Sphd 3.0 VIN / SN 4S9PHD3Y5NS127688 Year 2022 Color Orange Old Project Number PW-049 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 47,500 0 0 47,500 Total 0 0 0 0 0 0 0 47,500 0 0 47,500 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 0 42,500 0 0 42,500 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 5,000 0 0 5,000 Total 0 0 0 0 0 0 0 47,500 0 0 47,500 Produced Using Plan-It CIP Software E10 - Equip 10 - Chipper 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-030 Project Name E10 - Equip 10 - Chipper Contact Public Works Director Department Public Works Department Category Equipment: PW Equip Priority 3 Important Status Active Useful Life 10 years Make Bandit Model 12XP Intimidator VIN / SN 4FMUS1615PR529085 Year 2024 Color Yellow Old Project Number PW-078 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 0 0 60,000 60,000 Total 0 0 0 0 0 0 0 0 0 60,000 60,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 0 0 0 48,000 48,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 0 0 12,000 12,000 Total 0 0 0 0 0 0 0 0 0 60,000 60,000 Produced Using Plan-It CIP Software E11 - Equip 11 - Forklift 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-031 Project Name E11 - Equip 11 - Forklift Contact Public Works Director Department Public Works Department Category Equipment: PW Equip Priority 3 Important Status Active Useful Life 12 years Make Yale Model 50VX VIN / SN B875V12731L Year 2018 Color Yellow Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 25,000 0 0 0 0 25,000 Total 0 0 0 0 0 25,000 0 0 0 0 25,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 22,000 0 0 0 0 22,000 Vehicle/Equip Trade-In 0 0 0 0 0 3,000 0 0 0 0 3,000 Total 0 0 0 0 0 25,000 0 0 0 0 25,000 Produced Using Plan-It CIP Software W1 - Water 1 - Portable Generator 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #W-001 Project Name W1 - Water 1 - Portable Generator Contact Public Works Director Department Water Department Category Vehicles Priority 3 Important Status Active Useful Life 20 years Make Generac Model 4001E Portable Generator Year 2002 Color Yellow Old Project Number PW-085 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 100,000 0 0 0 0 0 0 0 100,000 Total 0 0 100,000 0 0 0 0 0 0 0 100,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 95,000 0 0 0 0 0 0 0 95,000 Vehicle/Equip Trade-In 0 0 5,000 0 0 0 0 0 0 0 5,000 Total 0 0 100,000 0 0 0 0 0 0 0 100,000 Produced Using Plan-It CIP Software W2 - Water 2 - F- 550 Service Truck 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #W-002 Project Name W2 - Water 2 - F-550 Service Truck Contact Public Works Director Department Water Department Category Vehicles Priority 3 Important Status Active Useful Life 12 years Make Ford Model F-550 VIN / SN 1FDUF5HT9KDA26132 Year 2019 Color White License Plate 963714 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 130,000 0 0 0 130,000 Total 0 0 0 0 0 0 130,000 0 0 0 130,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 0 0 0 105,000 0 0 0 105,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 25,000 0 0 0 25,000 Total 0 0 0 0 0 0 130,000 0 0 0 130,000 Produced Using Plan-It CIP Software W3 - Water 3 - RAM 3500 Van 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #W-003 Project Name W3 - Water 3 - RAM 3500 Van Contact Public Works Director Department Water Department Category Vehicles Priority 3 Important Status Active Useful Life 10 years Make Dodge Model RAM Promaster 3500 VIN / SN 3C6FRVHG6ME504541 Year 2021 Color White Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 44,537 0 0 0 44,537 Total 0 0 0 0 0 0 44,537 0 0 0 44,537 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 0 0 0 34,537 0 0 0 34,537 Vehicle/Equip Trade-In 0 0 0 0 0 0 10,000 0 0 0 10,000 Total 0 0 0 0 0 0 44,537 0 0 0 44,537 Produced Using Plan-It CIP Software W4 - Water 4 - F- 250 Service Truck 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #W-004 Project Name W4 - Water 4 - F-250 Service Truck Contact Public Works Director Department Water Department Category Vehicles Priority 3 Important Status Active Useful Life 10 years Make Ford Model F-250 VIN / SN 1FTBF2BA2RED51100 Year 2024 Color White License Plate 801621 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 0 0 65,799 65,799 Total 0 0 0 0 0 0 0 0 0 65,799 65,799 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 0 0 0 0 0 0 45,799 45,799 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 0 0 20,000 20,000 Total 0 0 0 0 0 0 0 0 0 65,799 65,799 Produced Using Plan-It CIP Software Produced Using Plan-It CIP Software 2025 through 2034 Public Works Building - Summary Lake Elmo, MN Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Public Works Department PWB1 - Refinish Public Works Shop Floor PW-051 35,000 35,000 PWB2 - Public Works Building Generator PW-052 55,000 55,000 PWB3 - Public Works Building Roof PW-053 30,000 30,000 PWB4 - Public Works Building Additional Shop Space PW-054 110,000 110,000 PWB5 - Public Works Building Overhead Garage Doors PW-055 80,000 80,000 General Fund 108,500 108,500 Sewer Fund 10,000 48,500 58,500 Storm Water Fund 5,000 39,500 44,500 Water Fund 20,000 78,500 98,500 Source Grand Total 35,000 0 0 0 0 0 0 0 0 275,000 310,000 GRAND TOTAL 35,000 0 0 0 0 0 0 0 0 275,000 310,000 PWB1 - Refinish Public Works Shop Floor 2025 thru 2034 Public Works Building - Detail Lake Elmo, MN Project #PW-051 Project Name PWB1 - Refinish Public Works Shop Floor Contact Public Works Director Department Public Works Department Category Buildings Priority 3 Important Status New Recommendation Useful Life 10 years Description Produced Using Plan-It CIP Software PWB2 - Public Works Building Generator 2025 thru 2034 Public Works Building - Detail Lake Elmo, MN Project #PW-052 Project Name PWB2 - Public Works Building Generator Contact Public Works Director Department Public Works Department Category Buildings Priority 3 Important Status Active Useful Life 10 years Make Cummins Model 100kw VIN / SN E240344533 Year 2024 Old Project Number PW-085 Description Produced Using Plan-It CIP Software PWB3 - Public Works Building Roof 2025 thru 2034 Public Works Building - Detail Lake Elmo, MN Project #PW-053 Project Name PWB3 - Public Works Building Roof Contact Public Works Director Department Public Works Department Category Buildings Priority 3 Important Status New Recommendation Useful Life 10 years Description Produced Using Plan-It CIP Software PWB4 - Public Works Building Additional Shop Space 2025 thru 2034 Public Works Building - Detail Lake Elmo, MN Project #PW-054 Project Name PWB4 - Public Works Building Additional Shop Space Contact Public Works Director Department Public Works Department Category Buildings Priority 3 Important Status New Recommendation Useful Life 10 years Description Per Marty, Adding additional shop space in 10 yearsNext Project Produced Using Plan-It CIP Software PWB5 - Public Works Building Overhead Garage Doors 2025 thru 2034 Public Works Building - Detail Lake Elmo, MN Project #PW-055 Project Name PWB5 - Public Works Building Overhead Garage Doors Contact Public Works Director Department Public Works Department Category Buildings Priority 3 Important Status New Recommendation Useful Life 10 years Description Per Marty, We have a ton of issues with our overhead doors- so we will likely need to find a solution to that- changing to lighter doors and different openers Produced Using Plan-It CIP Software Produced Using Plan-It CIP Software 2025 through 2034 Parks - Summary Lake Elmo, MN Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Parks and Recreation Kleis Park Playground - Replacement PR-027 65,000 65,000 Tana Ridge Park Play Equipment - Replacement PR-028 125,000 125,000 Tablyn Park Play Equipment - Replacement PR-029 210,000 210,000 Stonegate Park Play Equipment - Replacement PR-030 125,000 125,000 Reid Park Play Equipment - Replacement PR-031 125,000 125,000 Ridge Park Play Equipment - Replacement PR-032 125,000 125,000 Hidden Knoll Park Play Equipment - Replacement PR-034 125,000 125,000 Carriage Station Park Play Equipment - Replacement PR-036 250,000 250,000 Trail Additions PR-038 78,000 78,000 Lions Park Playground Equipment Replacement PR-039 250,000 250,000 Court Resurfacing PR-040 30,000 30,000 Lions Park Concession Building Updates PR-043 275,000 275,000 Skate Park PR-044 150,000 150,000 Outdoor Fitness Equipment PR-045 30,000 30,000 Outdoor Fitness Park PR-046 30,000 30,000 Disk Golf PR-047 30,000 30,000 Central Play Complex PR-048 300,000 300,000 Reid Park Parking Lot PR-049 227,000 227,000 Court Resurfacing PR-050 30,000 30,000 Produced Using Plan-It CIP Software Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Trail Connection PR-051 200,000 200,000 Park Sign Replacement PR-052 225,000 225,000 Multisport Complex Amenities PR-053 1,000,000 1,000,000 Invasive Species Management PR-054 25,000 25,000 New Park Pavilion PR-055 80,000 80,000 New Park Pavilion PR-056 80,000 80,000 New Park Pavilion PR-057 80,000 80,000 New Park Pavilion PR-058 80,000 80,000 New Park Pavilion PR-059 80,000 80,000 Central Greenway Regional Trail PR-069 520,000 520,000 Park Dedication Fund (404)417,000 625,000 480,000 850,000 1,790,000 460,000 125,000 125,000 4,872,000 Source Grand Total 417,000 625,000 480,000 850,000 1,790,000 460,000 0 125,000 125,000 0 4,872,000 GRAND TOTAL 417,000 703,000 480,000 850,000 1,790,000 460,000 0 125,000 125,000 0 4,950,000 Kleis Park Playground - Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-027 Project Name Kleis Park Playground - Replacement Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status Active Useful Life 25 years Description Replacement of playground equipment Justification Playset installed in 1993 has exceeded the expected life Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 65,000 0 0 0 0 0 0 0 0 0 65,000 Total 65,000 0 0 0 0 0 0 0 0 0 65,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)65,000 0 0 0 0 0 0 0 0 0 65,000 Total 65,000 0 0 0 0 0 0 0 0 0 65,000 Produced Using Plan-It CIP Software Tana Ridge Park Play Equipment - Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-028 Project Name Tana Ridge Park Play Equipment - Replacement Department Parks and Recreation Category Park Improvements Priority 5 Future Consideration Status Active Useful Life 25 years Description Replace the 2005 play equipment Justification End of its useful life Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 125,000 0 0 0 0 125,000 Total 0 0 0 0 0 125,000 0 0 0 0 125,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 0 125,000 0 0 0 0 125,000 Total 0 0 0 0 0 125,000 0 0 0 0 125,000 Produced Using Plan-It CIP Software Tablyn Park Play Equipment - Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-029 Project Name Tablyn Park Play Equipment - Replacement Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status Active Useful Life 25 years Description Replace the 1997 play equipment Justification End of its useful life Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 210,000 0 0 0 0 0 0 0 0 210,000 Total 0 210,000 0 0 0 0 0 0 0 0 210,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 210,000 0 0 0 0 0 0 0 0 210,000 Total 0 210,000 0 0 0 0 0 0 0 0 210,000 Produced Using Plan-It CIP Software Stonegate Park Play Equipment - Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-030 Project Name Stonegate Park Play Equipment - Replacement Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status Active Useful Life 25 years Description Replace the 1998 play equipment Justification End of its useful life Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 125,000 0 0 0 0 0 0 0 125,000 Total 0 0 125,000 0 0 0 0 0 0 0 125,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 125,000 0 0 0 0 0 0 0 125,000 Total 0 0 125,000 0 0 0 0 0 0 0 125,000 Produced Using Plan-It CIP Software Reid Park Play Equipment - Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-031 Project Name Reid Park Play Equipment - Replacement Department Parks and Recreation Category Park Improvements Priority 5 Future Consideration Status Active Useful Life 25 years Description Replace the 2008 play equipment Justification End of its useful life Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 0 125,000 0 125,000 Total 0 0 0 0 0 0 0 0 125,000 0 125,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 0 0 0 0 125,000 0 125,000 Total 0 0 0 0 0 0 0 0 125,000 0 125,000 Produced Using Plan-It CIP Software Ridge Park Play Equipment - Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-032 Project Name Ridge Park Play Equipment - Replacement Department Parks and Recreation Category Park Improvements Priority 3 Important Status Active Useful Life 25 years Description Replace the 2003 play equipment Justification End of its useful life Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 125,000 0 0 0 0 0 0 0 0 0 125,000 Total 125,000 0 0 0 0 0 0 0 0 0 125,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)125,000 0 0 0 0 0 0 0 0 0 125,000 Total 125,000 0 0 0 0 0 0 0 0 0 125,000 Produced Using Plan-It CIP Software Hidden Knoll Park Play Equipment - Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-034 Project Name Hidden Knoll Park Play Equipment - Replacement Department Parks and Recreation Category Park Improvements Priority 5 Future Consideration Status Active Useful Life 25 years Description Replace the 2007 play equipment Justification Exceeded its useful life Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 125,000 0 0 125,000 Total 0 0 0 0 0 0 0 125,000 0 0 125,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 0 0 0 125,000 0 0 125,000 Total 0 0 0 0 0 0 0 125,000 0 0 125,000 Produced Using Plan-It CIP Software Carriage Station Park Play Equipment - Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-036 Project Name Carriage Station Park Play Equipment - Replacement Department Parks and Recreation Category Park Improvements Priority 5 Future Consideration Status Active Useful Life 25 years Description Replace the 2000 playset Justification End of useful life Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 250,000 0 0 0 0 0 0 250,000 Total 0 0 0 250,000 0 0 0 0 0 0 250,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 250,000 0 0 0 0 0 0 250,000 Total 0 0 0 250,000 0 0 0 0 0 0 250,000 Produced Using Plan-It CIP Software Trail Additions 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-038 Project Name Trail Additions Department Parks and Recreation Category Park Improvements Priority 3 Important Status Active Useful Life 25 years Description Potential Trails connections between developments along Hudson Blvd and the trail connection along Manning Ave from cty 14 south to the Rail Road track Justification Trail would address the following community needs-Deliver students safely to school, bring people to our parks, provide safe recreation, trail diversity-provide feel of Lake Elmo and bring people to the downtown Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 78,000 0 0 0 0 0 0 0 0 78,000 Total 0 78,000 0 0 0 0 0 0 0 0 78,000 Produced Using Plan-It CIP Software Lions Park Playground Equipment Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-039 Project Name Lions Park Playground Equipment Replacement Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status Active Useful Life 25 years Description Replacement of playground equipment Justification Playset installed in 2000 has exceeded the expected life Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 250,000 0 0 0 0 0 0 0 0 250,000 Total 0 250,000 0 0 0 0 0 0 0 0 250,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 250,000 0 0 0 0 0 0 0 0 250,000 Total 0 250,000 0 0 0 0 0 0 0 0 250,000 Produced Using Plan-It CIP Software Court Resurfacing 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-040 Project Name Court Resurfacing Department Parks and Recreation Category Park Improvements Priority 2 Very Important Status Active Useful Life 10 years Description Resurface the playing surfaces at Demontreville, Carriage Station and Lions Justification Seal existing courts playing surface and lining Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 30,000 0 0 0 0 0 0 0 0 30,000 Total 0 30,000 0 0 0 0 0 0 0 0 30,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 30,000 0 0 0 0 0 0 0 0 30,000 Total 0 30,000 0 0 0 0 0 0 0 0 30,000 Produced Using Plan-It CIP Software Lions Park Concession Building Updates 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-043 Project Name Lions Park Concession Building Updates Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status Active Useful Life 20 years Description Building updates to concession stand including update bathrooms and kitchen area Justification Extend life of building and updating 20+ year old interior. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 275,000 0 0 0 0 0 0 0 275,000 Total 0 0 275,000 0 0 0 0 0 0 0 275,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 275,000 0 0 0 0 0 0 0 275,000 Total 0 0 275,000 0 0 0 0 0 0 0 275,000 Produced Using Plan-It CIP Software Skate Park 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-044 Project Name Skate Park Department Parks and Recreation Category Park Improvements Priority 5 Future Consideration Status Active Useful Life 25 years Description Create Skate Park within Park System to include oportunies for BMX Justification New oportunity for teenagers within city Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 150,000 0 0 0 0 0 150,000 Total 0 0 0 0 150,000 0 0 0 0 0 150,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 150,000 0 0 0 0 0 150,000 Total 0 0 0 0 150,000 0 0 0 0 0 150,000 Produced Using Plan-It CIP Software Outdoor Fitness Equipment 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-045 Project Name Outdoor Fitness Equipment Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status Active Useful Life 25 years Description Add fitness equipment to amenaties within park system Justification Additional fitness equipment to be added to park system or along trail based off interest in fitness park. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 30,000 0 0 0 0 0 30,000 Total 0 0 0 0 30,000 0 0 0 0 0 30,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 30,000 0 0 0 0 0 30,000 Total 0 0 0 0 30,000 0 0 0 0 0 30,000 Produced Using Plan-It CIP Software Outdoor Fitness Park 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-046 Project Name Outdoor Fitness Park Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status Active Useful Life 25 years Description Create an outdoor fitness park as an addition to or replacement of a parks playset. Justification Diversity in the city park play equipment, intended use for kids and adults Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 30,000 0 0 0 0 0 0 0 0 30,000 Total 0 30,000 0 0 0 0 0 0 0 0 30,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 30,000 0 0 0 0 0 0 0 0 30,000 Total 0 30,000 0 0 0 0 0 0 0 0 30,000 Produced Using Plan-It CIP Software Disk Golf 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-047 Project Name Disk Golf Department Parks and Recreation Category Park Improvements Priority 5 Future Consideration Status Active Useful Life 25 years Description Create an outdoor disk golf course within the park system. Justification Continue to search for possible location of disk golf within the park system Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 30,000 0 0 0 0 0 30,000 Total 0 0 0 0 30,000 0 0 0 0 0 30,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 30,000 0 0 0 0 0 30,000 Total 0 0 0 0 30,000 0 0 0 0 0 30,000 Produced Using Plan-It CIP Software Central Play Complex 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-048 Project Name Central Play Complex Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status Active Useful Life 25 years Description Identify area to create a central play complex to include a large play structure Justification Create a central park to include play structure and shelter for multi family gatherings Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 300,000 0 0 0 0 0 300,000 Total 0 0 0 0 300,000 0 0 0 0 0 300,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 300,000 0 0 0 0 0 300,000 Total 0 0 0 0 300,000 0 0 0 0 0 300,000 Produced Using Plan-It CIP Software Reid Park Parking Lot 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-049 Project Name Reid Park Parking Lot Department Parks and Recreation Category Park Improvements Priority 3 Important Status New Recommendation Description Remove and replace existing asphalt and curb. Replace curb with concreate to extend to 30th st. Extend parking lot to the East for additional parking. Reconstruct walking trail from ballfield to 30th st. include ramp and crosswalk to existing sidewalk. Justification deteriorating asphalt parking lot and trail. Extend parking to add additional parking space Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 227,000 0 0 0 0 0 0 0 0 0 227,000 Total 227,000 0 0 0 0 0 0 0 0 0 227,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)227,000 0 0 0 0 0 0 0 0 0 227,000 Total 227,000 0 0 0 0 0 0 0 0 0 227,000 Produced Using Plan-It CIP Software Court Resurfacing 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-050 Project Name Court Resurfacing Department Parks and Recreation Category Park Improvements Priority 3 Important Status New Recommendation Description Resurface playing Courts (Tablyn, Pebble) Justification Resurfacing courts every 7 years to increase lifespan, improve safety and aesthetic appeal Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 30,000 0 0 0 0 30,000 Total 0 0 0 0 0 30,000 0 0 0 0 30,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 0 30,000 0 0 0 0 30,000 Total 0 0 0 0 0 30,000 0 0 0 0 30,000 Produced Using Plan-It CIP Software Trail Connection 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-051 Project Name Trail Connection Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status New Recommendation Description Acquire easement or land to construct a trail connection from Wildflower to Tanna Ridge Justification Trail connectivity Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 200,000 0 0 0 0 0 200,000 Total 0 0 0 0 200,000 0 0 0 0 0 200,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 200,000 0 0 0 0 0 200,000 Total 0 0 0 0 200,000 0 0 0 0 0 200,000 Produced Using Plan-It CIP Software Park Sign Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-052 Project Name Park Sign Replacement Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status New Recommendation Description Redesign park enterence signs for all city parks Justification Replace 20 year old signs. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 225,000 0 0 0 0 225,000 Total 0 0 0 0 0 225,000 0 0 0 0 225,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 0 225,000 0 0 0 0 225,000 Total 0 0 0 0 0 225,000 0 0 0 0 225,000 Produced Using Plan-It CIP Software Multisport Complex Amenities 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-053 Project Name Multisport Complex Amenities Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status New Recommendation Description Build baseball and/or multisport fields at sports facility Justification Adding additional amenities to sports complex Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 1,000,000 0 0 0 0 0 1,000,000 Total 0 0 0 0 1,000,000 0 0 0 0 0 1,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 1,000,000 0 0 0 0 0 1,000,000 Total 0 0 0 0 1,000,000 0 0 0 0 0 1,000,000 Produced Using Plan-It CIP Software Invasive Species Management 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-054 Project Name Invasive Species Management Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status New Recommendation Description Conduct assessment or management of Invasive Species within sunfish lake park or park system Justification Match funding Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 25,000 0 0 0 0 0 0 0 0 25,000 Total 0 25,000 0 0 0 0 0 0 0 0 25,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 25,000 0 0 0 0 0 0 0 0 25,000 Total 0 25,000 0 0 0 0 0 0 0 0 25,000 Produced Using Plan-It CIP Software New Park Pavilion 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-055 Project Name New Park Pavilion Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status New Recommendation Description Construct new park pavilion (location to be determined) Justification Provide means of shade and an area to congregate Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 80,000 0 0 0 0 0 0 0 0 80,000 Total 0 80,000 0 0 0 0 0 0 0 0 80,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 80,000 0 0 0 0 0 0 0 0 80,000 Total 0 80,000 0 0 0 0 0 0 0 0 80,000 Produced Using Plan-It CIP Software New Park Pavilion 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-056 Project Name New Park Pavilion Contact Public Works Director Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status New Recommendation Description New Park Pavilion in a park (location to be determined) Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 80,000 0 0 0 0 0 0 0 80,000 Total 0 0 80,000 0 0 0 0 0 0 0 80,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 80,000 0 0 0 0 0 0 0 80,000 Total 0 0 80,000 0 0 0 0 0 0 0 80,000 Produced Using Plan-It CIP Software New Park Pavilion 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-057 Project Name New Park Pavilion Contact Public Works Director Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status New Recommendation Description New Park Pavilion in park (location to be determined) Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 80,000 0 0 0 0 0 0 80,000 Total 0 0 0 80,000 0 0 0 0 0 0 80,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 80,000 0 0 0 0 0 0 80,000 Total 0 0 0 80,000 0 0 0 0 0 0 80,000 Produced Using Plan-It CIP Software New Park Pavilion 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-058 Project Name New Park Pavilion Contact Public Works Director Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status New Recommendation Description New Park Pavilion in Park (location to be determined) Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 80,000 0 0 0 0 0 80,000 Total 0 0 0 0 80,000 0 0 0 0 0 80,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 80,000 0 0 0 0 0 80,000 Total 0 0 0 0 80,000 0 0 0 0 0 80,000 Produced Using Plan-It CIP Software New Park Pavilion 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-059 Project Name New Park Pavilion Contact Public Works Director Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status New Recommendation Description New Park Pavilion on park (location to be determined) Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 80,000 0 0 0 0 80,000 Total 0 0 0 0 0 80,000 0 0 0 0 80,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 0 80,000 0 0 0 0 80,000 Total 0 0 0 0 0 80,000 0 0 0 0 80,000 Produced Using Plan-It CIP Software Central Greenway Regional Trail 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-069 Project Name Central Greenway Regional Trail Contact Engineer Department Parks and Recreation Category Park Improvements Priority 3 Important Status Active Useful Life 25 years Old Project Number PR-009 Description County Project Central Greenway Regional Trail beginning at CSAH 19 and I-94, traveling through Lake Elmo Park Reserve, east along Stillwater Bvld to Manning Ave and then north to TH36. 2023 potential segments include in front of Hagbergs and near Keats/CSAH 10 (if a road project is funded). Justification Trail would address the following community needs: -Deliver students safely to school -Bring people to our downtown -Bring people to our parks -Provide safe recreation -Trail Diversity-Provide feel of Lake Elmo -Omit need to bike down Hwy 5/CSAH 14 -Compatibility with public grant opportunities -Compatibility with private funding opportunities Feasibility of land acquisition will be a consideration Trail likely to be built in segments in conjuction with county road projects and as funding allows through Met Council or other state grants Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 520,000 0 0 0 0 0 0 520,000 Total 0 0 0 520,000 0 0 0 0 0 0 520,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 520,000 0 0 0 0 0 0 520,000 Total 0 0 0 520,000 0 0 0 0 0 0 520,000 Budget Impact Additional trails to maintain-labor and materials for snow removal if desired by city Trail construction cost may be as high as $12 million. City would expect cost share with county as well as grants to offset costs. 2023 costs are for trail through new roundabout at CSAH 19 and CSAH 10 and trail extension abutting Hagebergs Future costs will be added as they are known Produced Using Plan-It CIP Software 2025 through 2034 Park Dedication Fund (404) - Funding Sources & Uses Lake Elmo, MN Source Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Park Dedication Fund (404) Beginning Balance 3,000,000 3,048,522 2,423,522 2,344,472 1,571,483 236,967 981,167 981,167 856,167 1,611,848 Revenues and Other Fund Sources Revenue Park Dedication 1,523,802 0 400,950 77,011 455,484 1,204,200 0 0 880,681 372,684 Total 1,523,802 0 400,950 77,011 455,484 1,204,200 0 0 880,681 372,684 Other Fund Sources Total Revenues and Other Fund Sources 1,523,802 0 400,950 77,011 455,484 1,204,200 0 0 880,681 372,684 Total Funds available 4,523,802 3,048,522 2,824,472 2,421,483 2,026,967 1,441,167 981,167 981,167 1,736,848 1,984,532 Expenditures and Uses Capital Projects & Equipment Parks and Recreation Central Greenway Regional Trail PR-069 0 0 0 520,000 0 0 0 0 0 0 Reid Park Parking Lot PR-049 227,000 0 0 0 0 0 0 0 0 0 Lions Park Playground Equipment Replacement PR-039 0 250,000 0 0 0 0 0 0 0 0 Court Resurfacing PR-040 0 30,000 0 0 0 0 0 0 0 0 Skate Park PR-044 0 0 0 0 150,000 0 0 0 0 0 Court Resurfacing PR-050 0 0 0 0 0 30,000 0 0 0 0 Trail Connection PR-051 0 0 0 0 200,000 0 0 0 0 0 New Park Pavilion PR-056 0 0 80,000 0 0 0 0 0 0 0 New Park Pavilion PR-057 0 0 0 80,000 0 0 0 0 0 0 New Park Pavilion PR-058 0 0 0 0 80,000 0 0 0 0 0 New Park Pavilion PR-059 0 0 0 0 0 80,000 0 0 0 0 Park Sign Replacement PR-052 0 0 0 0 0 225,000 0 0 0 0 Produced Using Plan-It CIP Software Multisport Complex Amenities PR-053 0 0 0 0 1,000,000 0 0 0 0 0 Invasive Species Management PR-054 0 25,000 0 0 0 0 0 0 0 0 New Park Pavilion PR-055 0 80,000 0 0 0 0 0 0 0 0 Tana Ridge Park Play Equipment - Replacement PR-028 0 0 0 0 0 125,000 0 0 0 0 Tablyn Park Play Equipment - Replacement PR-029 0 210,000 0 0 0 0 0 0 0 0 Stonegate Park Play Equipment - Replacement PR-030 0 0 125,000 0 0 0 0 0 0 0 Reid Park Play Equipment - Replacement PR-031 0 0 0 0 0 0 0 0 125,000 0 Ridge Park Play Equipment - Replacement PR-032 125,000 0 0 0 0 0 0 0 0 0 Hidden Knoll Park Play Equipment - Replacement PR-034 0 0 0 0 0 0 0 125,000 0 0 Carriage Station Park Play Equipment - Replacement PR-036 0 0 0 250,000 0 0 0 0 0 0 Outdoor Fitness Equipment PR-045 0 0 0 0 30,000 0 0 0 0 0 Outdoor Fitness Park PR-046 0 30,000 0 0 0 0 0 0 0 0 Kleis Park Playground - Replacement PR-027 65,000 0 0 0 0 0 0 0 0 0 Disk Golf PR-047 0 0 0 0 30,000 0 0 0 0 0 Central Play Complex PR-048 0 0 0 0 300,000 0 0 0 0 0 Lions Park Concession Building Updates PR-043 0 0 275,000 0 0 0 0 0 0 0 Total 417,000 625,000 480,000 850,000 1,790,000 460,000 0 125,000 125,000 0 Other Uses Transfer to Ballfield Fund 1,058,280 0 0 0 0 0 0 0 0 0 Total 1,058,280 0 0 0 0 0 0 0 0 0 Total Expenditures and Uses 1,475,280 625,000 480,000 850,000 1,790,000 460,000 0 125,000 125,000 0 Change in Fund Balance 48,522 -625,000 -79,050 -772,989 -1,334,516 744,200 0 -125,000 755,681 372,684 Ending Balance 3,048,522 2,423,522 2,344,472 1,571,483 236,967 981,167 981,167 856,167 1,611,848 1,984,532 Source Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Produced Using Plan-It CIP Software 2025 through 2034 Infrastructure - Streets - Summary Lake Elmo, MN Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Public Works Department Reevaluate- Homestead St & Utility Improvements PW-090 1,315,000 1,315,000 Future - PP/EP/20th Street & Utility Improvements PW-091 4,550,000 4,550,000 Future - Tartan Street & Utility Improvements PW-092 3,500,000 3,500,000 Future - DL/SP/For Street & Utility Improvements PW-093 3,400,000 3,400,000 2025 Street Improvements PW-100 2,620,000 2,620,000 2026 Street Improvements PW-101 2,740,000 2,740,000 2027 Street Improvements PW-102 2,755,000 2,755,000 2028 Street Improvements PW-103 2,450,000 2,450,000 2029 Street Improvements PW-104 2,175,000 2,175,000 2030 Street Improvements PW-105 2,200,000 2,200,000 2031 Street Improvements PW-106 2,000,000 2,000,000 2032 Street Improvements PW-107 3,915,000 3,915,000 2033 Street Improvements PW-108 3,000,000 3,000,000 2034 Street Improvements PW-109 3,200,000 3,200,000 UP RR Crossing - Village Parkway PW-120 960,200 960,200 UP RR Crossing - Private Drive Closure PW-120-2 105,000 105,000 Hudson Blvd Improvements - Vahli-Hi to Bus Fac.PW-121 560,000 560,000 Hudson Blvd Improvements - Keats to Kramer Lake Ov PW-122 2,100,000 2,100,000 South Frontage Rd (Demontreville Tr to Keats Ave)PW-123 5,760,000 5,760,000 5th St N - Keats to Lake Elmo Ave PW-124 4,600,000 4,600,000 TH36-Lake Elmo Ave (CSAH 17) Imp PW-125 2,500,000 2,500,000 5,000,000 South Frontage Road (Keats to Lake Elmo Ave)PW-126 1,000,000 2,000,000 3,000,000 Manning/Hudson Stoplight PW-127 300,000 300,000 Ideal Ave (CSAH 13)-Phase 3- CSAH 14 to CSAH 6 PW-128 1,000,000 1,000,000 Produced Using Plan-It CIP Software CSAH 14 - Klondike to 39th PW-129 1,000,000 1,000,000 CSAH 17 Imp - CSAH 14 - 43rd PW-130 1,000,000 1,000,000 Lake Elmo Ave (CSAH 17) & 39th St N Traffic Signal PW-131 500,000 500,000 CSAH 6/Inwood Signal PW-132 500,000 500,000 CSAH 10 / CSAH 17 Roundabout PW-133 500,000 500,000 Bond Proceeds - Assessment Funded 786,000 1,137,000 826,500 735,000 652,500 660,000 600,000 1,174,500 900,000 1,960,000 9,431,500 Bond Proceeds - Tax Levy 1,834,000 6,478,000 9,028,500 1,715,000 2,522,500 6,640,000 7,160,000 2,740,500 2,600,000 5,790,000 46,508,500 Grants/Donation 250,000 1,000,000 6,900,000 8,150,000 Infrastructure Reserve Fund (409)1,065,200 50,000 500,000 1,615,200 Municipal Sate Aid (MSA)500,000 500,000 1,000,000 Source Grand Total 3,685,200 8,415,000 10,355,000 2,450,000 3,175,000 8,800,000 7,760,000 3,915,000 3,500,000 14,650,000 66,705,200 GRAND TOTAL 3,685,200 8,415,000 10,355,000 2,450,000 3,175,000 8,800,000 7,760,000 3,915,000 3,500,000 14,650,000 66,705,200 Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Produced Using Plan-It CIP Software 2025 through 2034 Infrastructure - Water - Summary Lake Elmo, MN Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Department T1 - Tower 1 - Langly Ct W-011 50,000 50,000 T2 - Tower 2 - Ideal Ave W-012 800,000 800,000 T4 - Tower 4 - Inwood Ave W-014 800,000 800,000 WL2 - Well 2 - 55th St W-017 60,000 60,000 WL4 - Well 4 - 50th St W-019 50,000 50,000 WL5 - Well 5 - Lily Ave W-020 50,000 50,000 WL6 - Well 6 - Future Well & Site Acquisition W-021 750,000 750,000 WL7 - Well 7 (or 3) - Test Well & Site Acquisition W-022 750,000 750,000 TP1 - Treatment Plant 1 W-041 24,500,000 24,500,000 49,000,000 TP2 - Treatment 2 - Well 2 - GAC Filter System W-042 2,500,000 2,500,000 Future - Homestead Street & Utility Impr - Water W-090 935,000 935,000 Future - PP/EP/20th Street & Utility Impr - Water W-091 2,500,000 2,500,000 Future - Tartan Street & Utility Impr - Water W-092 1,900,000 1,900,000 Future - DL/SP/For Street & Utility Impr - Water W-093 2,200,000 2,200,000 Future - 45th Street Watermain Extension W-094 450,000 450,000 2025 Street & Utility Improvements - Water portion W-100 320,000 320,000 2026 Street & Utility Improvements - Water portion W-101 327,000 327,000 2028 Street & Utility Improvements - Water portion W-103 150,000 150,000 2030 Street & Utility Improvements - Water portion W-105 100,000 100,000 2031 Street & Utility Improvements - Water portion W-106 130,000 130,000 Produced Using Plan-It CIP Software 2032 Street & Utility Improvements - Water portion W-107 210,000 210,000 2033 Street & Utility Improvements - Water portion W-108 550,000 550,000 Village East Trunk Watermain & PRV W-120 352,800 230,000 582,800 Hudson Blvd - Trunk Watermain Extension W-122 1,800,000 1,800,000 5th St N - Keats to Lake Elmo Ave - Water Portion W-124 1,700,000 1,700,000 Trunk Watermain Extensions W-130 1,500,000 1,500,000 1,500,000 4,500,000 Watermain Oversizing W-160 150,475 130,000 190,000 470,475 Bond Proceeds - Assessment Funded 320,000 320,000 Bond Proceeds - Water Fund 750,000 2,600,000 1,500,000 1,500,000 1,700,000 1,500,000 550,000 10,100,000 Grants/Donation 27,000,000 24,500,000 7,985,000 59,485,000 Water Fund 1,363,275 687,000 190,000 150,000 150,000 180,000 210,000 800,000 3,730,275 Source Grand Total 28,683,275 25,937,000 2,790,000 1,650,000 1,500,000 1,850,000 1,680,000 210,000 1,350,000 7,985,000 73,635,275 GRAND TOTAL 28,683,275 25,937,000 2,790,000 1,650,000 1,500,000 1,850,000 1,680,000 210,000 1,350,000 7,985,000 73,635,275 Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Produced Using Plan-It CIP Software 2025 through 2034 Infrastructure - Sewer - Summary Lake Elmo, MN Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Sewer Department Future - DL/SP/For Street & Util Imp - Sewer S-093 380,000 380,000 2029 Street Improvements S-104 1,685,000 1,685,000 Tapestry Sanitary Sewer Collection System Upgrades S-107 1,000,000 1,000,000 I-94 Lift Station and Forcemain Upgrade S-108 900,000 900,000 Sewer Oversizing S-120 25,920 40,000 50,000 115,920 Sewer Oversizing for Sect 16 Extension S-121 200,000 200,000 Bond Proceeds - Assessment Funded 380,000 380,000 Sewer Fund 925,920 40,000 250,000 1,685,000 1,000,000 3,900,920 Source Grand Total 925,920 40,000 250,000 0 1,685,000 0 0 1,000,000 0 380,000 4,280,920 GRAND TOTAL 925,920 40,000 250,000 0 1,685,000 0 0 1,000,000 0 380,000 4,280,920 Produced Using Plan-It CIP Software Produced Using Plan-It CIP Software 2025 through 2034 Infrastructure - Stormwater - Summary Lake Elmo, MN Department Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Storm Water Department Phase 2 Regional Drainage Impr. - Northstar Pond SW-001 285,405 285,405 Phase 3 Regional Drainage Impr - Lions Park Pond SW-002 575,000 575,000 Stormwater Reuse - Development Irrigation Systems SW-003 40,000 40,000 80,000 Stormwater Reuse - Lions & VFW Park Irrigation SW-004 76,000 76,000 Stormwater Reuse - Irrigation Systems SW-005 40,000 40,000 80,000 Hudson Boulevard Culvert Repair SW-006 400,000 400,000 Future Unidentified Stormwater Projects SW-TBD 50,000 50,000 50,000 50,000 50,000 50,000 50,000 350,000 Bond Proceeds - Stormwater Fund 575,000 575,000 Storm Water Fund 685,405 80,000 206,000 50,000 50,000 50,000 50,000 50,000 50,000 1,271,405 Source Grand Total 685,405 80,000 781,000 50,000 50,000 50,000 50,000 50,000 50,000 0 1,846,405 GRAND TOTAL 685,405 80,000 781,000 50,000 50,000 50,000 50,000 50,000 50,000 0 1,846,405 Reevaluate- Homestead St & Utility Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-090 Project Name Reevaluate- Homestead St & Utility Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-040 Description Due to MPCA Grant Policy changes, no longer grant-eligible. Project needs to be reevaluated since grant approval now unlikely - may simply become a street-only project with assessments. Street work is needed. Annual street improvements per recommendation by City Engineer Street improvements. (formerly 3M grant project) Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 1,315,000 0 0 0 0 0 0 0 0 1,315,000 Total 0 1,315,000 0 0 0 0 0 0 0 0 1,315,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 1,000,000 0 0 0 0 0 0 0 0 1,000,000 Bond Proceeds - Assessment Funded 0 315,000 0 0 0 0 0 0 0 0 315,000 Total 0 1,315,000 0 0 0 0 0 0 0 0 1,315,000 Produced Using Plan-It CIP Software Future - PP/EP/20th Street & Utility Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-091 Project Name Future - PP/EP/20th Street & Utility Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 5 Future Consideration Status Active Useful Life 25 years Old Project Number PW-041 Description Due to a change in MPCA grant policy, all 3M Grant Street & Utility projects are now unlikely. Moved all back to 2034 and changed to Future Consideration. Extension of watermain for Packard Park, Eden Park and 20th Street Circle to address PFAS; including budgeted amount for reconstruction of public streets. Requires 3M Grant Fund application. 3M-Grant (CDWSP Approved Neighborhood). Justification Packard Park, Eden Park and 20th Street Circle street improvements to be completed in conjunction with 3M watermain extension to serve neighborhood. In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 4,550,000 4,550,000 Total 0 0 0 0 0 0 0 0 0 4,550,000 4,550,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 0 0 0 0 3,550,000 3,550,000 Bond Proceeds - Assessment Funded 0 0 0 0 0 0 0 0 0 1,000,000 1,000,000 Total 0 0 0 0 0 0 0 0 0 4,550,000 4,550,000 Produced Using Plan-It CIP Software Future - Tartan Street & Utility Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-092 Project Name Future - Tartan Street & Utility Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 5 Future Consideration Status Active Useful Life 25 years Old Project Number PW-042 Description Due to a change in MPCA grant policy, all 3M Grant Street & Utility projects are now unlikely. Moved all back to 2034 and changed to Future Consideration. Extension of watermain for Tartan Park subdivision and Klondike Avenue to address PFAS; including budgeted amount for reconstruction of public streets. Requires 3M Grant Fund application. 3M-Grant application required (Neighborhood not included in CDWSP). Justification Tartan Park subdivision and Klondike Avenue street improvements to be completed in conjunction with 3M watermain extension to serve neighborhood. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 3,500,000 3,500,000 Total 0 0 0 0 0 0 0 0 0 3,500,000 3,500,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 0 0 0 0 0 0 0 0 0 3,500,000 3,500,000 Total 0 0 0 0 0 0 0 0 0 3,500,000 3,500,000 Produced Using Plan-It CIP Software Future - DL/SP/For Street & Utility Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-093 Project Name Future - DL/SP/For Street & Utility Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 5 Future Consideration Status Active Useful Life 25 years Old Project Number PW-055 Description Due to a change in MPCA grant policy, all 3M Grant Street & Utility projects are now unlikely. Moved all back to 2034 and changed to Future Consideration. Extension of watermain for Downs Lake Estates, Sunfish Ponds, and Forest subdivision to address PFAS; including budgeted amount for reconstruction of public streets. Requires 3M Grant Fund application. 3M-Grant applicaiton required (Neighborhood not included in CDWSP). Justification Downs Lake Estates, Sunfish Ponds, and Forest subdivision street improvements to be completed in conjunction with 3M watermain extension to serve neighborhood. In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 3,400,000 3,400,000 Total 0 0 0 0 0 0 0 0 0 3,400,000 3,400,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 0 0 0 0 0 0 0 0 0 3,400,000 3,400,000 Total 0 0 0 0 0 0 0 0 0 3,400,000 3,400,000 Produced Using Plan-It CIP Software 2025 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-100 Project Name 2025 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-041 Description Annual street program for Street Improvements for 59th St Ct/ 55th St/ Julep Way & 57th St/ Jasper/ Jerome/ Irish Ct (30% assessed) Justification In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 2,620,000 0 0 0 0 0 0 0 0 0 2,620,000 Total 2,620,000 0 0 0 0 0 0 0 0 0 2,620,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 1,834,000 0 0 0 0 0 0 0 0 0 1,834,000 Bond Proceeds - Assessment Funded 786,000 0 0 0 0 0 0 0 0 0 786,000 Total 2,620,000 0 0 0 0 0 0 0 0 0 2,620,000 Produced Using Plan-It CIP Software 2026 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-101 Project Name 2026 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-042 Description Annual street program: Street Improvements for the Lake Elmo Heights subdivision, Innsdale Ct, and Inwood Ct (30% assessed). Justification In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 2,740,000 0 0 0 0 0 0 0 0 2,740,000 Total 0 2,740,000 0 0 0 0 0 0 0 0 2,740,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 1,918,000 0 0 0 0 0 0 0 0 1,918,000 Bond Proceeds - Assessment Funded 0 822,000 0 0 0 0 0 0 0 0 822,000 Total 0 2,740,000 0 0 0 0 0 0 0 0 2,740,000 Produced Using Plan-It CIP Software 2027 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-102 Project Name 2027 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-055 Description Annual street program: for Street Improvements for Hidden Bay Tr/ Birchwood/ Cherrywood/ Windbreak/ Jack Pine/ Deer Pond (30% assessed). Justification In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 2,755,000 0 0 0 0 0 0 0 2,755,000 Total 0 0 2,755,000 0 0 0 0 0 0 0 2,755,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 1,928,500 0 0 0 0 0 0 0 1,928,500 Bond Proceeds - Assessment Funded 0 0 826,500 0 0 0 0 0 0 0 826,500 Total 0 0 2,755,000 0 0 0 0 0 0 0 2,755,000 Produced Using Plan-It CIP Software 2028 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-103 Project Name 2028 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-056 Description Annual street program: for Street Improvements for the St. Croix's Sanctuary subdivision (30% assessed). Justification In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 2,450,000 0 0 0 0 0 0 2,450,000 Total 0 0 0 2,450,000 0 0 0 0 0 0 2,450,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 1,715,000 0 0 0 0 0 0 1,715,000 Bond Proceeds - Assessment Funded 0 0 0 735,000 0 0 0 0 0 0 735,000 Total 0 0 0 2,450,000 0 0 0 0 0 0 2,450,000 Produced Using Plan-It CIP Software 2029 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-104 Project Name 2029 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-068 Description 50th Street + Hill Trail (combine with Low Pressure sewer ext. to Oakdale) Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 2,175,000 0 0 0 0 0 2,175,000 Total 0 0 0 0 2,175,000 0 0 0 0 0 2,175,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 1,522,500 0 0 0 0 0 1,522,500 Bond Proceeds - Assessment Funded 0 0 0 0 652,500 0 0 0 0 0 652,500 Total 0 0 0 0 2,175,000 0 0 0 0 0 2,175,000 Produced Using Plan-It CIP Software 2030 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-105 Project Name 2030 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-070 Description Annual street program: for Street Improvements for Discover Crossing subdivision and Hilltop Avenue (30% assessed). Justification In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 2,200,000 0 0 0 0 2,200,000 Total 0 0 0 0 0 2,200,000 0 0 0 0 2,200,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 1,540,000 0 0 0 0 1,540,000 Bond Proceeds - Assessment Funded 0 0 0 0 0 660,000 0 0 0 0 660,000 Total 0 0 0 0 0 2,200,000 0 0 0 0 2,200,000 Produced Using Plan-It CIP Software 2031 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-106 Project Name 2031 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-075 Description Annual street program: for Street Improvements for Tablyn Park subdivision (30% assessed). Justification In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 2,000,000 0 0 0 2,000,000 Total 0 0 0 0 0 0 2,000,000 0 0 0 2,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 0 1,400,000 0 0 0 1,400,000 Bond Proceeds - Assessment Funded 0 0 0 0 0 0 600,000 0 0 0 600,000 Total 0 0 0 0 0 0 2,000,000 0 0 0 2,000,000 Produced Using Plan-It CIP Software 2032 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-107 Project Name 2032 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-080 Description Annual street program: for Street Improvements for Tapestry at Charlotte's Grove subdivision (30% assessed). Justification In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 3,915,000 0 0 3,915,000 Total 0 0 0 0 0 0 0 3,915,000 0 0 3,915,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 0 0 2,740,500 0 0 2,740,500 Bond Proceeds - Assessment Funded 0 0 0 0 0 0 0 1,174,500 0 0 1,174,500 Total 0 0 0 0 0 0 0 3,915,000 0 0 3,915,000 Produced Using Plan-It CIP Software 2033 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-108 Project Name 2033 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 4 Less Important Status Active Useful Life 40 years Old Project Number PW-084 Description Annual street program: for Street Improvements for 36th Street, 37th Street and Irwin Avenue and 47th/50th/Kimbro (Keats to Lake Elmo). (30% assessed). Justification In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 3,000,000 0 3,000,000 Total 0 0 0 0 0 0 0 0 3,000,000 0 3,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 0 0 0 2,100,000 0 2,100,000 Bond Proceeds - Assessment Funded 0 0 0 0 0 0 0 0 900,000 0 900,000 Total 0 0 0 0 0 0 0 0 3,000,000 0 3,000,000 Produced Using Plan-It CIP Software 2034 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-109 Project Name 2034 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status New Recommendation Useful Life 25 years Description DeMontreville-Highlands Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 3,200,000 3,200,000 Total 0 0 0 0 0 0 0 0 0 3,200,000 3,200,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 0 0 0 0 2,240,000 2,240,000 Bond Proceeds - Assessment Funded 0 0 0 0 0 0 0 0 0 960,000 960,000 Total 0 0 0 0 0 0 0 0 0 3,200,000 3,200,000 Produced Using Plan-It CIP Software UP RR Crossing - Village Parkway 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-120 Project Name UP RR Crossing - Village Parkway Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 40 years Old Project Number PW-035 Description Construction of the street, trail and sidewalk segment of Village Parkway that crosses the Union Pacific Railroad (UPRR) and railroad right-of-way, including trunk watermain extension across the railroad right-of-way with pressure reduction valve (to be installed with development), and closure of the adjacent private railroad crossing (separate project PW-120-2). To obtain permitting and approvals, the project includes potential upgrades to the UPRR crossing at Klondike Avenue. Justification Village Parkway crossing is needed to connect the developing Village neighborhoods north and south of the tracks, including pedestrian connectivity for a walkable downtown area. The Private closure (DOT 183913SD) and potential improvements to Klondike Avenue (DOT 183811D) are requirements of the Railroad for obtaining the new improved crossing location. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 960,200 0 0 0 0 0 0 0 0 0 960,200 Total 960,200 0 0 0 0 0 0 0 0 0 960,200 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Infrastructure Reserve Fund (409)960,200 0 0 0 0 0 0 0 0 0 960,200 Total 960,200 0 0 0 0 0 0 0 0 0 960,200 Produced Using Plan-It CIP Software UP RR Crossing - Private Drive Closure 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-120-2 Project Name UP RR Crossing - Private Drive Closure Contact Engineer Department Public Works Department Category Street Construction Priority 2 Very Important Status Active Useful Life 40 years Old Project Number PW-036 Description UP RR Crossing - Private driveway closure required for Village Parkway Crossing Justification Railroad requirement in order to get new crossing at Village Parkway Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 105,000 0 0 0 0 0 0 0 0 0 105,000 Total 105,000 0 0 0 0 0 0 0 0 0 105,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Infrastructure Reserve Fund (409)105,000 0 0 0 0 0 0 0 0 0 105,000 Total 105,000 0 0 0 0 0 0 0 0 0 105,000 Produced Using Plan-It CIP Software Hudson Blvd Improvements - Vahli- Hi to Bus Fac. 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-121 Project Name Hudson Blvd Improvements - Vahli-Hi to Bus Fac. Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-079 Description MSA Route Reconstruction of gap segments along Hudson Boulevard to improve the roadway to the adopted Hudson Boulevard design standards with pedestrian trail. Gap segments are portions of the roadway not being improved as part of ongoing or upcoming development projects. 2025 Segment (Vahli-Hi to Bus Facility). Trail Connection Justification Pavement section nearing or beyond useful life. Improvements have been deferred to extent possible to allow for development paid upgrades along some segments. Gap segments to be addressed to create completed project and complete trail connections. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 560,000 0 0 0 0 0 0 0 0 560,000 Total 0 560,000 0 0 0 0 0 0 0 0 560,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 560,000 0 0 0 0 0 0 0 0 560,000 Total 0 560,000 0 0 0 0 0 0 0 0 560,000 Produced Using Plan-It CIP Software Hudson Blvd Improvements - Keats to Kramer Lake Ov 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-122 Project Name Hudson Blvd Improvements - Keats to Kramer Lake Ov Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-079 Description MSA Route Reconstruction of gap segments along Hudson Boulevard to improve the roadway to the adopted Hudson Boulevard design standards with pedestrian trail. Gap segments are portions of the roadway not being improved as part of ongoing or upcoming development projects. 2027 Segment - Keats to Kramer Lake Overlook Justification Pavement section nearing or beyond useful life. Improvements have been deferred to extent possible to allow for development paid upgrades along some segments. Gap segments to be addressed to create completed project and complete trail connections. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 2,100,000 0 0 0 0 0 0 0 2,100,000 Total 0 0 2,100,000 0 0 0 0 0 0 0 2,100,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 2,100,000 0 0 0 0 0 0 0 2,100,000 Total 0 0 2,100,000 0 0 0 0 0 0 0 2,100,000 Produced Using Plan-It CIP Software South Frontage Rd (Demontreville Tr to Keats Ave) 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-123 Project Name South Frontage Rd (Demontreville Tr to Keats Ave) Contact Engineer Department Public Works Department Category Street Construction Priority 5 Future Consideration Status Active Useful Life 40 years Old Project Number PW-083 Description Construction of south frontage road between Demontreville Trail and Keats Avenue in order to improve traffic flow and access to TH36. Project to be in accordance with approved South Frotnage Road plan. Justification Necessary to improve traffic safety and access to TH36 along with establishment of east-west collector roadway. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 5,760,000 0 0 0 5,760,000 Total 0 0 0 0 0 0 5,760,000 0 0 0 5,760,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 0 5,760,000 0 0 0 5,760,000 Total 0 0 0 0 0 0 5,760,000 0 0 0 5,760,000 Produced Using Plan-It CIP Software 5th St N - Keats to Lake Elmo Ave 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-124 Project Name 5th St N - Keats to Lake Elmo Ave Contact Engineer Department Public Works Department Category Street Construction Priority 4 Less Important Status New Recommendation Useful Life 25 years Description Partial Developer Paid or Reimbursement? Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 4,600,000 0 0 0 0 4,600,000 Total 0 0 0 0 0 4,600,000 0 0 0 0 4,600,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 3,600,000 0 0 0 0 3,600,000 Grants/Donation 0 0 0 0 0 1,000,000 0 0 0 0 1,000,000 Total 0 0 0 0 0 4,600,000 0 0 0 0 4,600,000 Produced Using Plan-It CIP Software TH36- Lake Elmo Ave (CSAH 17) Imp 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-125 Project Name TH36-Lake Elmo Ave (CSAH 17) Imp Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-074 Description COUNTY PROJECT / COST SHARE Grade separated Interchange Improvements at Lake Elmo Ave and TH 36. Cost Sharing Agreement Pending. Justification County Improvement project with City cost participation requirement. Need and cost estimate determined by Washington County. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 2,500,000 2,500,000 0 0 0 0 0 0 0 5,000,000 Total 0 2,500,000 2,500,000 0 0 0 0 0 0 0 5,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 2,000,000 2,000,000 0 0 0 0 0 0 0 4,000,000 Municipal Sate Aid (MSA)0 500,000 500,000 0 0 0 0 0 0 0 1,000,000 Total 0 2,500,000 2,500,000 0 0 0 0 0 0 0 5,000,000 Produced Using Plan-It CIP Software South Frontage Road (Keats to Lake Elmo Ave) 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-126 Project Name South Frontage Road (Keats to Lake Elmo Ave) Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 40 years Old Project Number PW-076 Description Construction of south frontage road between Keats Avenue and Lake Elmo Avenue in order to improve traffic flow to new Lake Elmo Ave/TH36 Improvement and remove direct private accesses to TH 36 Justification Necessary safety and traffic improvements. May be partially constructed together with TH36 - Lake Elmo Avenue Intersection Project. Could be partially constructed through County Improvement project with City cost participation requirement. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 1,000,000 2,000,000 0 0 0 0 0 0 0 3,000,000 Total 0 1,000,000 2,000,000 0 0 0 0 0 0 0 3,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 1,000,000 2,000,000 0 0 0 0 0 0 0 3,000,000 Total 0 1,000,000 2,000,000 0 0 0 0 0 0 0 3,000,000 Produced Using Plan-It CIP Software Manning/Hudson Stoplight 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-127 Project Name Manning/Hudson Stoplight Contact Engineer Department Public Works Department Category Street Construction Priority 2 Very Important Status Active Useful Life 25 years Old Project Number PW-067 Description COUNTY PROJECT / COST SHARE Traffic Signal to be installed at intersection when Hudson Blvd is realigned with development. Justification County Improvement project with City cost participation requirement. Need determined by Washington County. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 300,000 0 0 0 0 0 0 0 0 300,000 Total 0 300,000 0 0 0 0 0 0 0 0 300,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 0 250,000 0 0 0 0 0 0 0 0 250,000 Infrastructure Reserve Fund (409)0 50,000 0 0 0 0 0 0 0 0 50,000 Total 0 300,000 0 0 0 0 0 0 0 0 300,000 Budget Impact Funding from Four Corners 1st Addition Produced Using Plan-It CIP Software Ideal Ave (CSAH 13)- Phase 3- CSAH 14 to CSAH 6 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-128 Project Name Ideal Ave (CSAH 13)-Phase 3- CSAH 14 to CSAH 6 Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 20 years Old Project Number PW-053 Description Cooperative project between Washington County, City of Oakdale and City of Lake Elmo Per Washington County includes: Safety improvements including widening of shoulders Pavement improvement Turn lane and intersection improvements Pedestrain and non-motorized upgrades Drainage Improvements Justification Amount is just placeholder. County improvement project with City cost participation. Need determined by Washington County. Cost share w/ Developer needed. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 1,000,000 0 0 0 0 0 0 0 1,000,000 Total 0 0 1,000,000 0 0 0 0 0 0 0 1,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 1,000,000 0 0 0 0 0 0 0 1,000,000 Total 0 0 1,000,000 0 0 0 0 0 0 0 1,000,000 Produced Using Plan-It CIP Software CSAH 14 - Klondike to 39th 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-129 Project Name CSAH 14 - Klondike to 39th Contact Engineer Department Public Works Department Category Street Construction Priority 5 Future Consideration Status New Recommendation Useful Life 25 years Description Monitor County CIP status. County Planning / Design in 2027. (Amount is placeholder only.) Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 1,000,000 0 0 0 0 0 1,000,000 Total 0 0 0 0 1,000,000 0 0 0 0 0 1,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 1,000,000 0 0 0 0 0 1,000,000 Total 0 0 0 0 1,000,000 0 0 0 0 0 1,000,000 Produced Using Plan-It CIP Software CSAH 17 Imp - CSAH 14 - 43rd 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-130 Project Name CSAH 17 Imp - CSAH 14 - 43rd Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status New Recommendation Useful Life 25 years Description County Project Monitor County CIP status. County Planning/Design in 2028 Amount TBD - current budget is only placeholder. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 1,000,000 0 0 0 0 1,000,000 Total 0 0 0 0 0 1,000,000 0 0 0 0 1,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 1,000,000 0 0 0 0 1,000,000 Total 0 0 0 0 0 1,000,000 0 0 0 0 1,000,000 Produced Using Plan-It CIP Software Lake Elmo Ave (CSAH 17) & 39th St N Traffic Signal 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-131 Project Name Lake Elmo Ave (CSAH 17) & 39th St N Traffic Signal Contact Engineer Department Public Works Department Category Street Construction Priority 4 Less Important Status Active Useful Life 40 years Old Project Number PW-082 Description COUNTY PROJECT / COST SHARE Traffic Signal to be installed at intersection when warrants are met. Justification Traffic signal to be installed to address higher traffic volumes from new developments. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 500,000 0 0 0 0 500,000 Total 0 0 0 0 0 500,000 0 0 0 0 500,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 500,000 0 0 0 0 500,000 Total 0 0 0 0 0 500,000 0 0 0 0 500,000 Produced Using Plan-It CIP Software CSAH 6/Inwood Signal 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-132 Project Name CSAH 6/Inwood Signal Contact Engineer Department Public Works Department Category Street Construction Priority 4 Less Important Status Active Useful Life 25 years Old Project Number PW-031 Description COUNTY PROJECT / COST SHARE CSAH 6/ Inwood Signal Improvements - to replace 4-way stop. Justification County improvement project with City cost participation requirement. Need determined by Washington County. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 500,000 0 500,000 Total 0 0 0 0 0 0 0 0 500,000 0 500,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 0 0 0 500,000 0 500,000 Total 0 0 0 0 0 0 0 0 500,000 0 500,000 Produced Using Plan-It CIP Software CSAH 10 / CSAH 17 Roundabout 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-133 Project Name CSAH 10 / CSAH 17 Roundabout Contact Engineer Department Public Works Department Category Street Reconstruction Priority 2 Very Important Status New Recommendation Useful Life 40 years Description County Project - Pending County CIP and design. Roundabout at the intersection of 10th St N (CSAH 10) and Lake Elmo Ave N (CSAH 17) due to expected increase in traffic w/ new school building in NW quadrant. Projected City cost share of 25% of project, of which a portion may be paid by school district due to their new building on that corner. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 500,000 0 0 0 0 500,000 Total 0 0 0 0 0 500,000 0 0 0 0 500,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Infrastructure Reserve Fund (409)0 0 0 0 0 500,000 0 0 0 0 500,000 Total 0 0 0 0 0 500,000 0 0 0 0 500,000 Produced Using Plan-It CIP Software T1 - Tower 1 - Langly Ct 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-011 Project Name T1 - Tower 1 - Langly Ct Contact Public Works Director Department Water Department Category Water Priority 3 Important Status Active Useful Life 100 years Old Project Number W-039 Description Decommissioning and removal of water tower #1 on Langly Court. Justification 2026 - Once water tower 3 is constructed in the low pressure area, water tower 1 shuld be decommissioned. If not decommissioned, it will need significant maintenance to upkeep. Location (monopole?) needed to relocate cell antennas Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 50,000 0 0 0 0 0 0 0 0 0 50,000 Total 50,000 0 0 0 0 0 0 0 0 0 50,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 50,000 0 0 0 0 0 0 0 0 0 50,000 Total 50,000 0 0 0 0 0 0 0 0 0 50,000 Produced Using Plan-It CIP Software T2 - Tower 2 - Ideal Ave 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-012 Project Name T2 - Tower 2 - Ideal Ave Contact Public Works Director Department Water Department Category Water Priority 3 Important Status Active Useful Life 20 years Old Project Number W-010 Location/Address Ideal Ave - Public Works Site Description Tower 2 - Ideal Ave (Public Works site) Tower built in 2007 2028 - paint inside and out and correct coroding / maintenance issues Justification Recommended by TKDA Utility study in 2016 Regular maintenance of water tank Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 800,000 0 0 0 0 0 0 0 800,000 Total 0 0 800,000 0 0 0 0 0 0 0 800,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Water Fund 0 0 800,000 0 0 0 0 0 0 0 800,000 Total 0 0 800,000 0 0 0 0 0 0 0 800,000 Produced Using Plan-It CIP Software T4 - Tower 4 - Inwood Ave 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-014 Project Name T4 - Tower 4 - Inwood Ave Contact Public Works Director Department Water Department Category Water Priority 2 Very Important Status Active Useful Life 15 years Old Project Number W-044 Description Clean and paint inside and out of Inwood tower Justification Clean and paint inside and out of 2018 Inwood Tower- 15 yrs Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 0 800,000 0 800,000 Total 0 0 0 0 0 0 0 0 800,000 0 800,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 0 0 0 0 0 800,000 0 800,000 Total 0 0 0 0 0 0 0 0 800,000 0 800,000 Produced Using Plan-It CIP Software WL2 - Well 2 - 55th St 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-017 Project Name WL2 - Well 2 - 55th St Contact Public Works Director Department Water Department Category Water Priority 2 Very Important Status Active Useful Life 8 years Old Project Number W-011 Location/Address 55th St Description Regular maintenance of Well #2 Pump; pull, inspect, and maintenance. Past -- 2017 - Well 2 scheduled pull, inspect and maintenance Future - 2025: pull, inspect and maintain. (also the building upgrade and treatment equipment 100% paid through 3M Grant, which is covered in CIP Project W-042 - TP2 - Treatment 2 Justification routine maintenance every 8-10 yrs, last pull was 2017, and again in 2025 with building and filter upgrades Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 60,000 0 0 0 0 0 0 0 0 0 60,000 Total 60,000 0 0 0 0 0 0 0 0 0 60,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 60,000 0 0 0 0 0 0 0 0 0 60,000 Total 60,000 0 0 0 0 0 0 0 0 0 60,000 Produced Using Plan-It CIP Software WL4 - Well 4 - 50th St 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-019 Project Name WL4 - Well 4 - 50th St Contact Engineer Department Water Department Category Water Priority 3 Important Status Active Useful Life 15 years Old Project Number W-012 Description Regular Maintenance - Well 4 scheduled pull, inspect and maintenance Past - 2022 - Pull and Rebuild Well #4 pump Future - 2031 - Pull and Rebuild Pump Justification Recommended by 2016 TKDA Utility Study to be on a regular rotation Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 50,000 0 0 0 50,000 Total 0 0 0 0 0 0 50,000 0 0 0 50,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 0 0 0 50,000 0 0 0 50,000 Total 0 0 0 0 0 0 50,000 0 0 0 50,000 Produced Using Plan-It CIP Software WL5 - Well 5 - Lily Ave 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-020 Project Name WL5 - Well 5 - Lily Ave Contact Engineer Department Water Department Category Water Priority 3 Important Status Active Useful Life 8 years Old Project Number W-042 Location/Address 4525 LILY AVE Description Well 5 - Lilly Ave Scheduled Maintenance 2030 - pull pump, inspect, maintain. Justification routine maintenance every 8-10 yrs, constructed 2021 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 50,000 0 0 0 0 50,000 Total 0 0 0 0 0 50,000 0 0 0 0 50,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 0 0 50,000 0 0 0 0 50,000 Total 0 0 0 0 0 50,000 0 0 0 0 50,000 Produced Using Plan-It CIP Software WL6 - Well 6 - Future Well & Site Acquisition 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-021 Project Name WL6 - Well 6 - Future Well & Site Acquisition Contact Engineer Department Water Department Category Water Priority 1 Critical Status Active Useful Life 40 years Old Project Number W-037 Description New water supply well to be operationally ready for use with new Treatment Plant. Monitoring well as required by the DNR. Test Well in 2025; Production Well and Site Acquisition in 2025; Well 6 and Treatment Plant ready for early 2027 start-up. (Treatment Plant is separate project - TP1) Justification Needed to replace lost production from Well 2 and to meet growing water demands from growth in water system users both in and outside of MUSA. Treatment Plant (separate project) required to address PFAS in groundwater supply. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 750,000 0 0 0 0 0 0 0 0 0 750,000 Total 750,000 0 0 0 0 0 0 0 0 0 750,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 750,000 0 0 0 0 0 0 0 0 0 750,000 Total 750,000 0 0 0 0 0 0 0 0 0 750,000 Produced Using Plan-It CIP Software WL7 - Well 7 (or 3) - Test Well & Site Acquisition 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-022 Project Name WL7 - Well 7 (or 3) - Test Well & Site Acquisition Contact Engineer Department Water Department Category Water Priority 3 Important Status Active Useful Life 40 years Old Project Number W-048 Description New water supply well to be operationally ready for use in 2029. Connecting raw watermain line to Treatment Plant site. Test Well in 2028; Production Well and Site Acquisition in 2029; Well 7 operationally ready in 2029. Justification Needed to replace lost production from Well 2 and to meet growing water demands from growth in water system users both in and outside of MUSA. Treatment Plant required to address PFAS in groundwater supply. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 750,000 0 0 0 0 0 0 0 0 750,000 Total 0 750,000 0 0 0 0 0 0 0 0 750,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Water Fund 0 750,000 0 0 0 0 0 0 0 0 750,000 Total 0 750,000 0 0 0 0 0 0 0 0 750,000 Produced Using Plan-It CIP Software TP1 - Treatment Plant 1 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-041 Project Name TP1 - Treatment Plant 1 Contact Engineer Department Water Department Category Water Priority 2 Very Important Status Active Useful Life 25 years Old Project Number W-037 Location/Address TBD - near Well 6? Description Treatment Plant and Raw Watermain Located at Well 6 3M Settlement Funds Improved EOC needed. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 24,500,000 24,500,000 0 0 0 0 0 0 0 0 49,000,000 Total 24,500,000 24,500,000 0 0 0 0 0 0 0 0 49,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 24,500,000 24,500,000 0 0 0 0 0 0 0 0 49,000,000 Total 24,500,000 24,500,000 0 0 0 0 0 0 0 0 49,000,000 Produced Using Plan-It CIP Software TP2 - Treatment 2 - Well 2 - GAC Filter System 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-042 Project Name TP2 - Treatment 2 - Well 2 - GAC Filter System Contact Engineer Department Water Department Category Water Priority 1 Critical Status Active Useful Life 25 years Old Project Number W-047 Description Expedited temporary GAC Filter Treatment Plant for Well #2. Funded through 3M Grant. Justification Treatment for PFAS is required to keep Production Well 2 operational over the next 2-3 years and then constructs additional water supply sources. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 2,500,000 0 0 0 0 0 0 0 0 0 2,500,000 Total 2,500,000 0 0 0 0 0 0 0 0 0 2,500,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 2,500,000 0 0 0 0 0 0 0 0 0 2,500,000 Total 2,500,000 0 0 0 0 0 0 0 0 0 2,500,000 Produced Using Plan-It CIP Software Future - Homestead Street & Utility Impr - Water 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-090 Project Name Future - Homestead Street & Utility Impr - Water Contact Engineer Department Water Department Category Water Priority 5 Future Consideration Status Active Useful Life 40 years Old Project Number W-034 Description Due to a change in MPCA grant policy, all 3M Grant Street projects are now unlikely. Moved all back to 2034 and changed to Future Consideration. Extension of watermain for the Homestead subdivison (14th Street North) to address PFAS; including for watermain distribution system costs. Justification Watermain extensions to Homestead. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 935,000 935,000 Total 0 0 0 0 0 0 0 0 0 935,000 935,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 0 0 0 0 0 0 0 0 0 935,000 935,000 Total 0 0 0 0 0 0 0 0 0 935,000 935,000 Produced Using Plan-It CIP Software Future - PP/EP/20th Street & Utility Impr - Water 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-091 Project Name Future - PP/EP/20th Street & Utility Impr - Water Contact Engineer Department Water Department Category Water Priority 5 Future Consideration Status Active Useful Life 40 years Old Project Number W-034 Description Due to a change in MPCA grant policy, all 3M Grant Street & Utility projects are now unlikely. Moved all back to 2034 and changed to Future Consideration. Extension of watermain for the Packard Park, Eden Park and 20th Street Circle to address PFAS; including for watermain distribution system costs. Requires 3M Grant Fund application. 3M-Grant (CDWSP Approved Neighborhood). Justification Watermain extensions to Packard Park, Eden Park and 20th Street Circle due to well advisories or being in Special Well Construction Area. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 2,500,000 2,500,000 Total 0 0 0 0 0 0 0 0 0 2,500,000 2,500,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 0 0 0 0 0 0 0 0 0 2,500,000 2,500,000 Total 0 0 0 0 0 0 0 0 0 2,500,000 2,500,000 Produced Using Plan-It CIP Software Future - Tartan Street & Utility Impr - Water 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-092 Project Name Future - Tartan Street & Utility Impr - Water Contact Engineer Department Water Department Category Water Priority 5 Future Consideration Status Active Useful Life 40 years Old Project Number W-035 Description Due to a change in MPCA grant policy, all 3M Grant Street projects are now unlikely. Moved all back to 2034 and changed to Future Consideration. Watermain extension costs for Tartan Meadows subdivision and Klondike Avenue. Formerly on City's MPCA Grant project list. Due to MPCA 3M Grant Policy change, project is very unlikely. Project would need to be initiated by property owner petition. Justification Watermain extensions to Tartan Park subdivision and Klondike Avenue due to well advisories or being in Special Well Construction Area. Watermain hydrant/valve repairs and replacement (including PRV install) to be completed in conjunction with scheduled street improvements. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 1,900,000 1,900,000 Total 0 0 0 0 0 0 0 0 0 1,900,000 1,900,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 0 0 0 0 0 0 0 0 0 1,900,000 1,900,000 Total 0 0 0 0 0 0 0 0 0 1,900,000 1,900,000 Budget Impact $1,640,000 3m Grant assumes Produced Using Plan-It CIP Software Future - DL/SP/For Street & Utility Impr - Water 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-093 Project Name Future - DL/SP/For Street & Utility Impr - Water Contact Engineer Department Water Department Category Water Priority 5 Future Consideration Status Active Useful Life 40 years Description Due to a change in MPCA grant policy, all 3M Grant Street projects are now unlikely. Moved all back to 2034 and changed to Future Consideration. Extension of watermain for Downs Lake Estates, Sunfish Ponds and Forest subdivisions to address PFAS; including for watermain distribution system costs. Requires 3M Grant Fund application. Not included in CDWSP. Justification Watermain extension to Downs Lake Estates, Sunfish Ponds and Forest subdivisions due to location in special well construction area. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 2,200,000 2,200,000 Total 0 0 0 0 0 0 0 0 0 2,200,000 2,200,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 0 0 0 0 0 0 0 0 0 2,200,000 2,200,000 Total 0 0 0 0 0 0 0 0 0 2,200,000 2,200,000 Produced Using Plan-It CIP Software Future - 45th Street Watermain Extension 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-094 Project Name Future - 45th Street Watermain Extension Contact Engineer Department Water Department Category Water Priority 5 Future Consideration Status Active Useful Life 40 years Old Project Number W-036 Description Due to a change in MPCA grant policy, all 3M Grant extention projects are now unlikely. Moved all back to 2034 and changed to Future Consideration. Total Estimated Project Costs for watermain extension to 9757, 9759 & 9765 45th Street (east of Tapestry Subdivision): Requires 3M Grant Fund application. Not included in current CDWSP. Would only be completed if funding is received from the 3M Grants. Justification Watermain extensions to 9757, 9759 & 9765 45th Street (east of Tapestry Subdivision) due to well advisories or being in Special Well Construction Area. One of three wells on this private drive has a well advisory. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 450,000 450,000 Total 0 0 0 0 0 0 0 0 0 450,000 450,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 0 0 0 0 0 0 0 0 0 450,000 450,000 Total 0 0 0 0 0 0 0 0 0 450,000 450,000 Produced Using Plan-It CIP Software 2025 Street & Utility Improvements - Water portion 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-100 Project Name 2025 Street & Utility Improvements - Water portion Contact Engineer Department Water Department Category Water Priority 3 Important Status Active Useful Life 40 years Old Project Number W-034 Description Annual street program - Extension of watermain along 59th Street Court and Iris Court. 59th St Ct 55th St Julep Way & 57th St Jasper Jerome Irish Ct. 100% Assessed Justification Extension of 1500 ft. 8-inch watermain along 59th Street Court in conjunction with Street Improvement (100% assessed). Extension of 620 ft. 8-inch watermain along Iris Court in conjunction with Street Improvement (100% assessed). Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 320,000 0 0 0 0 0 0 0 0 0 320,000 Total 320,000 0 0 0 0 0 0 0 0 0 320,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Assessment Funded 320,000 0 0 0 0 0 0 0 0 0 320,000 Total 320,000 0 0 0 0 0 0 0 0 0 320,000 Produced Using Plan-It CIP Software 2026 Street & Utility Improvements - Water portion 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-101 Project Name 2026 Street & Utility Improvements - Water portion Contact Engineer Department Water Department Category Water Priority 3 Important Status Active Useful Life 40 years Old Project Number W-035 Description Planned street improvements to Lake Elmo Heights, Innsdale CDS, Inwood CDS. Includes PRV. Justification Watermain hydrant/valve repairs and replacement (including PRV install) to be completed in conjunction with scheduled street improvements. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 327,000 0 0 0 0 0 0 0 0 327,000 Total 0 327,000 0 0 0 0 0 0 0 0 327,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 327,000 0 0 0 0 0 0 0 0 327,000 Total 0 327,000 0 0 0 0 0 0 0 0 327,000 Produced Using Plan-It CIP Software 2028 Street & Utility Improvements - Water portion 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-103 Project Name 2028 Street & Utility Improvements - Water portion Contact Engineer Department Water Department Category Water Priority 4 Less Important Status Active Useful Life 40 years Old Project Number W-046 Description Annual street program - complete repairs/upgrades to existing watermain distribution system. $150,000 for St. Croix Sanctuary. Justification Watermain hydrant/valve repairs and replacement to be completed in conjunction with scheduled street improvements. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 150,000 0 0 0 0 0 0 150,000 Total 0 0 0 150,000 0 0 0 0 0 0 150,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 150,000 0 0 0 0 0 0 150,000 Total 0 0 0 150,000 0 0 0 0 0 0 150,000 Produced Using Plan-It CIP Software 2030 Street & Utility Improvements - Water portion 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-105 Project Name 2030 Street & Utility Improvements - Water portion Contact Engineer Department Water Department Category Water Priority 4 Less Important Status Active Useful Life 40 years Old Project Number W-049 Description Annual street program - complete repairs/upgrades to existing watermain distribution system. Discover Crossing and Hilltop Justification Watermain hydrant/valve repairs and replacement to be completed in conjunction with scheduled street improvements. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 100,000 0 0 0 0 100,000 Total 0 0 0 0 0 100,000 0 0 0 0 100,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 0 0 100,000 0 0 0 0 100,000 Total 0 0 0 0 0 100,000 0 0 0 0 100,000 Produced Using Plan-It CIP Software 2031 Street & Utility Improvements - Water portion 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-106 Project Name 2031 Street & Utility Improvements - Water portion Contact Engineer Department Water Department Category Water Priority 4 Less Important Status Active Useful Life 40 years Old Project Number W-050 Description Annual street program - complete repairs/upgrades to existing watermain distribution system. Tablyn Park subdivision. Justification Watermain hydrant/valve repairs and replacement to be completed in conjunction with scheduled street improvements. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 130,000 0 0 0 130,000 Total 0 0 0 0 0 0 130,000 0 0 0 130,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 0 0 0 130,000 0 0 0 130,000 Total 0 0 0 0 0 0 130,000 0 0 0 130,000 Produced Using Plan-It CIP Software 2032 Street & Utility Improvements - Water portion 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-107 Project Name 2032 Street & Utility Improvements - Water portion Contact Engineer Department Water Department Category Water Priority 4 Less Important Status Active Useful Life 40 years Old Project Number W-051 Description Annual street program - complete repairs/upgrades to existing watermain distribution system. Tapestry at Charlotte's Grove subdivision. Justification Watermain hydrant/valve repairs and replacement to be completed in conjunction with scheduled street improvements. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 210,000 0 0 210,000 Total 0 0 0 0 0 0 0 210,000 0 0 210,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 0 0 0 0 210,000 0 0 210,000 Total 0 0 0 0 0 0 0 210,000 0 0 210,000 Produced Using Plan-It CIP Software 2033 Street & Utility Improvements - Water portion 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-108 Project Name 2033 Street & Utility Improvements - Water portion Contact Engineer Department Water Department Category Water Priority 4 Less Important Status Active Useful Life 40 years Old Project Number PW-084 Description Annual street program: Water Improvements for 36th Street, 37th Street and Irwin Avenue and 47th/50th/Kimbro (Keats to Lake Elmo). Justification In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. City to require property owner petition to initiate improvement (property owners rejected project in 2015 and in 2019 -- 36th, 37th, Irwin). 47th/50th/Kimbro do not need a petition. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 550,000 0 550,000 Total 0 0 0 0 0 0 0 0 550,000 0 550,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Water Fund 0 0 0 0 0 0 0 0 550,000 0 550,000 Total 0 0 0 0 0 0 0 0 550,000 0 550,000 Produced Using Plan-It CIP Software Village East Trunk Watermain & PRV 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-120 Project Name Village East Trunk Watermain & PRV Contact Engineer Department Water Department Category Water Priority 2 Very Important Status Active Useful Life 40 years Old Project Number W-008 Description Trunk watermain connection between north and south Village area neighborhoods to be installed by the city with the Village Parkway Railroad Crossing Improvements. A PRV (pressure reduction valve) will be needed and will be installed at a later date with development activity north of the railroad. Justification Required as part of the Water Distribution System trunk watermain network for adequate and reliable water delivery and pressures throughout the city. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 352,800 230,000 0 0 0 0 0 0 0 0 582,800 Total 352,800 230,000 0 0 0 0 0 0 0 0 582,800 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 352,800 230,000 0 0 0 0 0 0 0 0 582,800 Total 352,800 230,000 0 0 0 0 0 0 0 0 582,800 Produced Using Plan-It CIP Software Hudson Blvd - Trunk Watermain Extension 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-122 Project Name Hudson Blvd - Trunk Watermain Extension Contact Engineer Department Water Department Category Water Priority 4 Less Important Status Active Useful Life 40 years Old Project Number W-038 Description Trunk watermains that have been identified to be needed to maintain adequate system pressures and water delivery as water use and demands increase. Install Hudson Boulevard Trunk Watermain (Keats Avenue to Lake Elmo Avenue) Justification Strategic watermain pipe lines that are needed as part of the water distribution system for adequate and reliable water delivery and pressures throughout the city. Trunk watermains are indentifed through the city's water distribution system modeling program. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 1,800,000 0 0 0 0 0 0 0 1,800,000 Total 0 0 1,800,000 0 0 0 0 0 0 0 1,800,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Water Fund 0 0 1,800,000 0 0 0 0 0 0 0 1,800,000 Total 0 0 1,800,000 0 0 0 0 0 0 0 1,800,000 Produced Using Plan-It CIP Software 5th St N - Keats to Lake Elmo Ave - Water Portion 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-124 Project Name 5th St N - Keats to Lake Elmo Ave - Water Portion Contact Engineer Department Water Department Category Water Priority 4 Less Important Status New Recommendation Useful Life 25 years Description Partial Developer Paid or Reimbursement? Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 1,700,000 0 0 0 0 1,700,000 Total 0 0 0 0 0 1,700,000 0 0 0 0 1,700,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Water Fund 0 0 0 0 0 1,700,000 0 0 0 0 1,700,000 Total 0 0 0 0 0 1,700,000 0 0 0 0 1,700,000 Produced Using Plan-It CIP Software Trunk Watermain Extensions 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-130 Project Name Trunk Watermain Extensions Contact Engineer Department Water Department Category Water Priority 4 Less Important Status Active Useful Life 40 years Old Project Number W-038 Description Trunk watermains that have been identified to be needed to maintain adequate system pressures and water delivery as water use and demands increase. Justification Strategic watermain pipe lines that are needed as part of the water distribution system for adequate and reliable water delivery and pressures throughout the city. Trunk watermains are indeitifed through the city's water distribution system modeling program. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 1,500,000 1,500,000 0 1,500,000 0 0 0 4,500,000 Total 0 0 0 1,500,000 1,500,000 0 1,500,000 0 0 0 4,500,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Water Fund 0 0 0 1,500,000 1,500,000 0 1,500,000 0 0 0 4,500,000 Total 0 0 0 1,500,000 1,500,000 0 1,500,000 0 0 0 4,500,000 Produced Using Plan-It CIP Software Watermain Oversizing 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-160 Project Name Watermain Oversizing Contact Engineer Department Water Department Category Water Priority 3 Important Status Active Useful Life 40 years Old Project Number W-013 Description Oversizing cost of watermain pipe installed by developers. Justification Ensures all pipe in the City will have flow capacity necessary for water system Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Other 150,475 130,000 190,000 0 0 0 0 0 0 0 470,475 Total 150,475 130,000 190,000 0 0 0 0 0 0 0 470,475 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 150,475 130,000 190,000 0 0 0 0 0 0 0 470,475 Total 150,475 130,000 190,000 0 0 0 0 0 0 0 470,475 Budget Impact Watermain oversizing costs identified in Developer Agreements Produced Using Plan-It CIP Software Future - DL/SP/For Street & Util Imp - Sewer 2025 thru 2034 Infrastructure - Sewer - Detail Lake Elmo, MN Project #S-093 Project Name Future - DL/SP/For Street & Util Imp - Sewer Contact Engineer Department Sewer Department Category Wastewater Priority 5 Future Consideration Status Active Useful Life 40 years Old Project Number S-022 Description Due to a change in MPCA grant policy, all 3M Grant Street & Utility projects are now unlikely. Moved all back to 2034 and changed to Future Consideration. Project would need to be initiated by property owner petition. (100% assessed) Justification Not located within the MUSA however there have been many failed septic systems and finding replacement locations has been a challenge Sewer stub is available to Sunfish Ponds HOA property (from Legacy at North Star develompment) Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 380,000 380,000 Total 0 0 0 0 0 0 0 0 0 380,000 380,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Assessment Funded 0 0 0 0 0 0 0 0 0 380,000 380,000 Total 0 0 0 0 0 0 0 0 0 380,000 380,000 Produced Using Plan-It CIP Software 2029 Street Improvements 2025 thru 2034 Infrastructure - Sewer - Detail Lake Elmo, MN Project #S-104 Project Name 2029 Street Improvements Contact Engineer Department Sewer Department Category Wastewater Priority 3 Important Status Active Useful Life 25 years Old Project Number S-026 Description 50th Street + Hill Trail (combine with Low Pressure sewer ext. to Oakdale) Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 1,685,000 0 0 0 0 0 1,685,000 Total 0 0 0 0 1,685,000 0 0 0 0 0 1,685,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Sewer Fund 0 0 0 0 1,685,000 0 0 0 0 0 1,685,000 Total 0 0 0 0 1,685,000 0 0 0 0 0 1,685,000 Produced Using Plan-It CIP Software Tapestry Sanitary Sewer Collection System Upgrades 2025 thru 2034 Infrastructure - Sewer - Detail Lake Elmo, MN Project #S-107 Project Name Tapestry Sanitary Sewer Collection System Upgrades Contact Engineer Department Sewer Department Category Wastewater Priority 5 Future Consideration Status Active Useful Life 40 years Old Project Number S-027 Description The city may consider assuming ownership and maintenance of the sewer collection system within the public right-of-way of the Tapestry subdivision in connection with improvements to the public streets. The neighborhood is connected to city sewer through a lift station and forcemain connection but the HOA continues to own the sanitary collection system within the public right-of-way. A sewer televising/inspection program would be required and all necessary repairs and upgrades would need to be completed with the street project before the city accepted ownership. Justification The City assumed ownership of the neighboring subdivision (Hamlet on Sunfish Lake) sewer system when the development connected to city sewer. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 1,000,000 0 0 1,000,000 Total 0 0 0 0 0 0 0 1,000,000 0 0 1,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Sewer Fund 0 0 0 0 0 0 0 1,000,000 0 0 1,000,000 Total 0 0 0 0 0 0 0 1,000,000 0 0 1,000,000 Budget Impact 100% assessed to benefitting property owners. Produced Using Plan-It CIP Software I- 94 Lift Station and Forcemain Upgrade 2025 thru 2034 Infrastructure - Sewer - Detail Lake Elmo, MN Project #S-108 Project Name I-94 Lift Station and Forcemain Upgrade Contact Engineer Department Sewer Department Category Wastewater Priority 3 Important Status Active Useful Life 40 years Old Project Number S-024 Description Met Council Gravity Sewer Extension: A regional gravity sewer extended along the north side of I-94 from the current MCES 1-WO-500 (aka WONE) connection point in Oakdale east toward the Lake Elmo corporate boundary. The project includes pump upgrades to the City I-94 lift station that discharges through a City-owned forcemain to the MCES gravity sewer connection point. The Met Council will upgrade the gravity line further east toward the Lake Elmo City limits, providing a shorter forcemain route for the lift station by roughly 3,000 feet. Cost estimates and scope of improvements to be further evaluated and revised when Met Council complete their upgrades in 2024. Justification Upgrades to lift station and focremain in order to provide for continued growth in the southwest area of the city Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 900,000 0 0 0 0 0 0 0 0 0 900,000 Total 900,000 0 0 0 0 0 0 0 0 0 900,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Sewer Fund 900,000 0 0 0 0 0 0 0 0 0 900,000 Total 900,000 0 0 0 0 0 0 0 0 0 900,000 Produced Using Plan-It CIP Software Sewer Oversizing 2025 thru 2034 Infrastructure - Sewer - Detail Lake Elmo, MN Project #S-120 Project Name Sewer Oversizing Contact Engineer Department Sewer Department Category Wastewater Priority 4 Less Important Status Active Useful Life 40 years Old Project Number S-013 Description Sewer Oversizing Paid to Developers. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Other 25,920 40,000 50,000 0 0 0 0 0 0 0 115,920 Total 25,920 40,000 50,000 0 0 0 0 0 0 0 115,920 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Sewer Fund 25,920 40,000 50,000 0 0 0 0 0 0 0 115,920 Total 25,920 40,000 50,000 0 0 0 0 0 0 0 115,920 Produced Using Plan-It CIP Software Sewer Oversizing for Sect 16 Extension 2025 thru 2034 Infrastructure - Sewer - Detail Lake Elmo, MN Project #S-121 Project Name Sewer Oversizing for Sect 16 Extension Contact Engineer Department Sewer Department Category Wastewater Priority 4 Less Important Status Active Useful Life 40 years Old Project Number S-013 Description Sewer Oversizing for Section 16 Trunk Sewer Extension - Developer Driven Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Other 0 0 200,000 0 0 0 0 0 0 0 200,000 Total 0 0 200,000 0 0 0 0 0 0 0 200,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Sewer Fund 0 0 200,000 0 0 0 0 0 0 0 200,000 Total 0 0 200,000 0 0 0 0 0 0 0 200,000 Produced Using Plan-It CIP Software Phase 2 Regional Drainage Impr. - Northstar Pond 2025 thru 2034 Infrastructure - Stormwater - Detail Lake Elmo, MN Project #SW-001 Project Name Phase 2 Regional Drainage Impr. - Northstar Pond Contact Engineer Department Storm Water Department Category Storm Sewer/Drainage Priority 3 Important Status Active Useful Life 40 years Old Project Number ?? Description PHASE 2 REGIONAL DRAINAGE IMPROVEMENTS: NORTHSTAR POND OVERSIZE Regional stormwater retention need identified upstream of Old Village near Lake Elmo Ave and CSAH 14 - Northstar Pond Oversize Timing dependent upon development. Compensation for oversizing paid to developer. Justification 2nd Phase to improving the regional drainage issues as identified in Old Village Regional Stormwater Study (2015). Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 285,405 0 0 0 0 0 0 0 0 0 285,405 Total 285,405 0 0 0 0 0 0 0 0 0 285,405 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Storm Water Fund 285,405 0 0 0 0 0 0 0 0 0 285,405 Total 285,405 0 0 0 0 0 0 0 0 0 285,405 Produced Using Plan-It CIP Software Phase 3 Regional Drainage Impr - Lions Park Pond 2025 thru 2034 Infrastructure - Stormwater - Detail Lake Elmo, MN Project #SW-002 Project Name Phase 3 Regional Drainage Impr - Lions Park Pond Contact Engineer Department Storm Water Department Category Storm Sewer/Drainage Priority 4 Less Important Status Active Useful Life 40 years Description PHASE 3 REGIONAL DRAINAGE IMPROVEMENTS: LIONS PARK DRAINAGE RETENTION POND Phase 3 of Regional Drainage Improvements (VFW / Lions Park) Justification 3rd Phase of Regional Drainage Improvements (VFW / Lions Park) as identified in Old Village Regional Stormwater Study Timing dependent upon development. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 575,000 0 0 0 0 0 0 0 575,000 Total 0 0 575,000 0 0 0 0 0 0 0 575,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Stormwater Fund 0 0 575,000 0 0 0 0 0 0 0 575,000 Total 0 0 575,000 0 0 0 0 0 0 0 575,000 Produced Using Plan-It CIP Software Stormwater Reuse - Development Irrigation Systems 2025 thru 2034 Infrastructure - Stormwater - Detail Lake Elmo, MN Project #SW-003 Project Name Stormwater Reuse - Development Irrigation Systems Contact Engineer Department Storm Water Department Category Storm Sewer/Drainage Priority 4 Less Important Status Active Useful Life 40 years Description Identify and pursue opportunities to design and install stormwater reuse irrigation systems within the City. Work with HOAs to convert irrigation systems to full/partial stormwater reuse (e.g. Wildflower, Legacy at Northstar). 2026/2027 - Development Conversions Partner with Valley Branch Watershed District (VBWD) on design and grantfunding. Justification Pursue opportunities to implement stormwater reuse irrigation systems to promote water conservation and minimize the withdrawl of water from the underlying aquifers. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 40,000 40,000 0 0 0 0 0 0 0 80,000 Total 0 40,000 40,000 0 0 0 0 0 0 0 80,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Storm Water Fund 0 40,000 40,000 0 0 0 0 0 0 0 80,000 Total 0 40,000 40,000 0 0 0 0 0 0 0 80,000 Produced Using Plan-It CIP Software Stormwater Reuse - Lions & VFW Park Irrigation 2025 thru 2034 Infrastructure - Stormwater - Detail Lake Elmo, MN Project #SW-004 Project Name Stormwater Reuse - Lions & VFW Park Irrigation Contact Engineer Department Storm Water Department Category Storm Sewer/Drainage Priority 4 Less Important Status Active Useful Life 40 years Description Design and install a stormwater reuse irrigation system for Lions Park and VFW Ballfields. Potential for VBWD grant TBD $70,000 cost to be updated upon scoping study. Partner with VBWD on design and funding. Justification Pursue opportunities to implement stormwater reuse irrigation systems to promote water conservation and minimize the withdrawl of water from the underlying aquifers. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 76,000 0 0 0 0 0 0 0 76,000 Total 0 0 76,000 0 0 0 0 0 0 0 76,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Storm Water Fund 0 0 76,000 0 0 0 0 0 0 0 76,000 Total 0 0 76,000 0 0 0 0 0 0 0 76,000 Produced Using Plan-It CIP Software Stormwater Reuse - Irrigation Systems 2025 thru 2034 Infrastructure - Stormwater - Detail Lake Elmo, MN Project #SW-005 Project Name Stormwater Reuse - Irrigation Systems Contact Engineer Department Storm Water Department Category Storm Sewer/Drainage Priority 4 Less Important Status Active Useful Life 40 years Description Identify and pursue opportunities to design and install a stormwater reuse irrigation systems within the City. Design and install stormwater reuse irrigation systems with any new City ballfields. 2026/2027 - Future City Ballfields (pinwheel) Justification Pursue opportunities to implement stormwater reuse irrigation systems to promote water conservation and minimize withdrawal of water from the underlying aquifers. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 40,000 40,000 0 0 0 0 0 0 0 80,000 Total 0 40,000 40,000 0 0 0 0 0 0 0 80,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Storm Water Fund 0 40,000 40,000 0 0 0 0 0 0 0 80,000 Total 0 40,000 40,000 0 0 0 0 0 0 0 80,000 Budget Impact Partner with VBWD on design and grant funding Produced Using Plan-It CIP Software Hudson Boulevard Culvert Repair 2025 thru 2034 Infrastructure - Stormwater - Detail Lake Elmo, MN Project #SW-006 Project Name Hudson Boulevard Culvert Repair Contact Engineer Department Storm Water Department Category Storm Sewer/Drainage Priority 2 Very Important Status Active Useful Life 25 years Description Hudson Boulevard Culvert Lining Repair (72-inch HDPE Liner in 84-inch CMP). Install 72-inch HDPE Liner in existing failed 84-inch CMP culvert. Cost: $300,000 to $400,000 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 400,000 0 0 0 0 0 0 0 0 0 400,000 Total 400,000 0 0 0 0 0 0 0 0 0 400,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Storm Water Fund 400,000 0 0 0 0 0 0 0 0 0 400,000 Total 400,000 0 0 0 0 0 0 0 0 0 400,000 Produced Using Plan-It CIP Software Future Unidentified Stormwater Projects 2025 thru 2034 Infrastructure - Stormwater - Detail Lake Elmo, MN Project #SW-TBD Project Name Future Unidentified Stormwater Projects Contact Engineer Department Storm Water Department Category Storm Sewer/Drainage Priority 5 Future Consideration Status Active Useful Life 40 years Description Future Unidentified Stormwater Projects Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 50,000 50,000 50,000 50,000 50,000 50,000 50,000 0 350,000 Total 0 0 50,000 50,000 50,000 50,000 50,000 50,000 50,000 0 350,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Storm Water Fund 0 0 50,000 50,000 50,000 50,000 50,000 50,000 50,000 0 350,000 Total 0 0 50,000 50,000 50,000 50,000 50,000 50,000 50,000 0 350,000 Produced Using Plan-It CIP Software 2025 through 2034 Vehicle & Equipment Fund (410) - Funding Sources & Uses Lake Elmo, MN Source Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Vehicle Replacement Fund Beginning Balance 965,000 1,145,000 953,327 1,295,327 1,670,327 1,802,874 2,125,874 2,364,130 2,613,630 3,073,630 Revenues and Other Fund Sources Revenue Capital Levy 400,000 450,000 500,000 550,000 600,000 650,000 700,000 750,000 750,000 750,000 Interfund Loan 0 0 500,000 0 0 0 0 0 0 0 Total 400,000 450,000 1,000,000 550,000 600,000 650,000 700,000 750,000 750,000 750,000 Other Fund Sources Total Revenues and Other Fund Sources 400,000 450,000 1,000,000 550,000 600,000 650,000 700,000 750,000 750,000 750,000 Total Funds available 1,365,000 1,595,000 1,953,327 1,845,327 2,270,327 2,452,874 2,825,874 3,114,130 3,363,630 3,823,630 Expenditures and Uses Capital Projects & Equipment Parks and Recreation Chevy 2500 PR-001 0 0 0 0 30,000 0 0 0 0 0 Air Compressor PR-005 0 0 0 0 0 0 0 25,000 0 0 Kubota SUV PR-002 0 0 0 25,000 0 0 0 0 0 0 Skid Loader PR-006 0 70,000 0 0 0 0 0 0 0 0 John Deere Gator PR-004 0 0 0 50,000 0 0 0 0 0 0 Bobcat ToolCat PR-003 70,000 0 0 0 0 0 0 0 0 0 Total 70,000 70,000 0 75,000 30,000 0 0 25,000 0 0 Public Works Department D5 - Dump Truck 5 - 19 Mack PW-005 0 0 0 0 0 0 260,000 0 0 0 D3 - Dump Truck 3 - 17 Mack PW-003 0 0 0 0 260,000 0 0 0 0 0 D4 - Dump Truck 4 - 19 F-450 PW-004 0 0 0 0 0 0 50,000 0 0 0 D6 - Dump Truck 6 - 20 Mack Tandem PW-006 0 0 0 0 0 0 0 270,000 0 0 Produced Using Plan-It CIP Software D7 - Dump Truck 7 - 21 Mack PW-007 0 0 0 0 0 0 0 0 260,000 0 D8 - Dump Truck 8 - 22 F-550 PW-008 0 0 0 0 0 0 0 0 0 45,000 P1 - Pickup 1 - F-250 PW-011 0 0 60,000 0 0 0 0 0 0 0 P3 - Pickup 3 - F-150 PW-013 0 0 28,000 0 0 0 0 0 0 0 P4 - Pickup 4 - Ranger PW-014 0 0 0 0 0 0 0 18,000 0 0 P5 - Pickup 5 - 3500 PW-015 0 0 0 0 0 0 0 0 0 32,000 E1 - Equip 1 - Case Loader PW-021 0 0 200,000 0 0 0 0 0 0 0 E3 - Equip 3 - Backhoe PW-023 120,000 0 0 0 0 0 0 0 0 0 E5 - Equip 5 -Bobcat Skid PW-025 0 0 0 0 0 0 0 45,000 0 0 E8 - Equip 8 - Asphalt Roller PW-028 0 0 0 0 0 110,000 0 0 0 0 E10 - Equip 10 - Chipper PW-030 0 0 0 0 0 0 0 0 0 48,000 E11 - Equip 11 - Forklift PW-031 0 0 0 0 0 22,000 0 0 0 0 D2 - Dump Truck 2 - 15 Mack Single PW-002 0 0 260,000 0 0 0 0 0 0 0 P2 - Pickup 2 - F-250 PW-012 0 0 60,000 0 0 0 0 0 0 0 E6 - Equip 6 - Service Lift PW-026 0 0 0 0 0 35,000 0 0 0 0 E9 - Equip 9 - Asphalt Trailer PW-029 0 0 0 0 0 0 0 42,500 0 0 Total 120,000 0 608,000 0 260,000 167,000 310,000 375,500 260,000 125,000 Building Department Building Inspection Vehicle 3 B-003 0 0 0 0 0 30,000 0 0 0 0 Building Inspection Vehicle 2 B-002 0 0 0 0 0 30,000 0 0 0 0 Building Inspection Vehicle 4 B-004 0 30,000 0 0 0 0 0 0 30,000 0 Building Inspection Vehicle 1 B-001 0 0 0 0 30,000 0 0 0 0 0 Total 0 30,000 0 0 30,000 60,000 0 0 30,000 0 Fire Department Ladder 1 F-012 0 0 0 0 0 0 0 0 0 2,000,000 Rescue 1 Hose Storage and Equipment Refurbish F-004 30,000 0 0 0 0 0 0 0 0 0 Command Vehicle 1 F-014 0 0 0 0 47,453 0 0 0 0 0 Tender 2 F-009 0 487,673 50,000 0 0 0 0 0 0 0 Source Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Produced Using Plan-It CIP Software Command Vehicle 2 F-015 0 0 0 0 0 0 51,744 0 0 0 UTV 1 F-011 0 54,000 0 0 0 0 0 0 0 0 Total 30,000 541,673 50,000 0 47,453 0 51,744 0 0 2,000,000 Other Uses Repay Interfund Loan 0 0 0 100,000 100,000 100,000 100,000 100,000 0 0 Total 0 0 0 100,000 100,000 100,000 100,000 100,000 0 0 Total Expenditures and Uses 220,000 641,673 658,000 175,000 467,453 327,000 461,744 500,500 290,000 2,125,000 Change in Fund Balance 180,000 -191,673 342,000 375,000 132,547 323,000 238,256 249,500 460,000 -1,375,000 Ending Balance 1,145,000 953,327 1,295,327 1,670,327 1,802,874 2,125,874 2,364,130 2,613,630 3,073,630 1,698,630 Source Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Produced Using Plan-It CIP Software