HomeMy WebLinkAboutPC Packet3880 Laverne Avenue North Lake Elmo, MN 55042 (651) 747-3900 www.lakeelmo.org NOTICE OF MEETING The City of Lake Elmo Planning Commission will conduct a meeting on Wednesday November 13th 2024 at 6:30 p.m. AGENDA 1.Pledge of Allegiance 2.Approve Agenda 3.Approve Minutes of October 28th, 2024 4.Public Hearing a)Royal Golf Conditional Use Permits and Variance. Royal Golf LLC has submitted two conditional use permits and a variance application for the property located at 11441 20th St. The first conditional use permit is for the addition of pickleball courts to the site, the second conditional use permit is for a clubhouse expansion. The variance is required because the site is over the imperious surface maximum. b)Landscape Ordinance Zoning Text Amendments. The City has initiated a zoning text amendment to Article VIII Environmental Performance Standards to correct dated language, update standards, and clarify planting/plan standards. c)Capital Improvements Plan. To review and hear interested persons about the City’s 2024 -2034 Capital Improvement Program (CIP). 5.New/Unfinished Business a)2025 Planning Commission Work Plan. 6.Communications/Updates a)City Council Updates i.Lake Elmo Elementary Subdivision, Variance, and Conditional Use Permit – 11/6/2024 ii.Cannabis Workshop Discussion – 11/12/2024 b)Upcoming Meetings i.November 25th, 2024 ii.December 9th, 2024 7.Adjourn ***Note: Every effort will be made to accommodate person or persons that need special considerations to attend this meeting due to a health condition or disability. Please contact the Lake Elmo City Clerk if you are in need of special accommodations. Lake Elmo Planning Commission Meeting Minutes 10-16-24 City of Lake Elmo Planning Commission Meeting City Council Chambers – 3880 Laverne Avenue North Minutes of Regular Meeting of October 16, 2024 CALL TO ORDER: Commission Chair Risner called to order the meeting of the Lake Elmo Planning Commission at 6:30 P.M. COMMISSIONERS PRESENT: Risner, Bohlig, Rehkamp, Steil, Vrieze COMMISSIONERS ABSENT: Dean STAFF PRESENT: Community Development Director Jason Stopa, City Planner Sophia Jensen, City Planner Ashley Monterusso, Nathan Fuerst with Bolton & Menk Pledge of Allegiance: at 6:30 PM Approve Agenda: M/S/P: Vrieze/Bohlig made a motion to approve the amended agenda. Vote: 5-0, motion carried unanimously Approve Minutes: M/S/P: Steil/Rehkamp made a motion to approve the 9-9-2024 meeting minutes. Vote: 5-0, motion carried unanimously. PUBLIC HEARING a) Lake Elmo Elementary - Stillwater Area School District (ISD 834) has submitted subdivision, variance, and conditional use permit requests for the unaddressed parcel northwest of Lake Elmo Avenue North, and 10th Street North, with a PID 2602921440001. The applications are requested to allow establishment of a new public elementary school facility consistent with a bond passed in 2023. Nathan Fuerst with Bolton & Menk gave presentation and answered questions. Applicant Mark Drommerhausen, (gave no address) with Stillwater Public School District, ISD 834, spoke regarding the reason for the location and answered questions. ISD 834 Rep., Valerie Peterson, with Wold Architects & Engineers, 332 Minnesota Street, Suite W2000, St. Paul, spoke and answered questions. M/S/P: Bohlig / Rehkamp moved to open the public hearing at 7:20 PM. Vote: 5-0, motion carried unanimously. Public Comments: Phil Dreyer, 11040 12th Street North: has concerns regarding all aspects of this project. Mary Sue Schrantz, 11040 12th Street North: has concerns regarding all aspects of this project. Bob & Carrie Mammenga 10699 10th Street North: has concerns regarding traffic and safety factors. Email: Benjamin Johnson, 10841 10th Street N: has concerns regarding tree mitigation. M/S/P: Vrieze/Steil moved to close the public hearing at 7:40 PM. Vote: 5-0, motion carried unanimously. Lake Elmo Planning Commission Meeting Minutes 10-16-24 M/S/P: Vrieze/Risner moved to recommend City Council approval of the Conditional Use Permit, Variances, and Preliminary Plat requested for the Lake Elmo Elementary School proposed by Stillwater Area Public Schools, ISD 834, with the conditions and findings listed in the staff report. Vote: AYE 3 (Risner, Steil, Vrieze)- Nay 2 (Bohlig, Rehkamp) motion carried The Planning Commission urges the City Council take a very close look at the tree mitigation, noise and traffic access points. New/Unfinished Business N/A Communications/Updates: a) City Council Updates i. Old Village Text Amendment and Design Standards - approved 9/3/24 ii.Old Village Moratorium – approved 9/3/24 iii.Open Space Planned Unit Development – approved 10/1/2024 iv.Oak Land Middle School CUP, Variance, Minor Subdivision – approved 10/1/2024 b) Upcoming Meetings: i. October 28th – Canceled ii. November 13th - Wednesday Meeting adjourned at 8:03 PM. Respectfully submitted Diane Wendt Permit Technician STAFF REPORT DATE: NOVEMBER 13TH 2024 REGULAR ITEM#: 4a – PUBLIC HEARING MOTION TO: Planning Commission FROM: Sophia Jensen, City Planner REVIEWED BY: Ashley Monterusso, City Planner Jason Stopa, Community Development Director AGENDA ITEM: Royal Golf Conditional Use Permits and Variance INTRODUCTION: The City received two conditional use permit applications and a variance application from Royal Development Inc. (the “Applicant”) for the property located at 11441 20th St N (The “Subject Property”). The first conditional use permit is to add two pickleball courts to the property as an additional outdoor recreation amenity. The second conditional use permit is for the expansion of the existing clubhouse facility to include expanded restaurant facilities, an indoor golf lesson simulator, and administration space. To achieve the conditional use permits, the applicant must also request an impervious surface variance. The applicant is seeking flexibility from 105.12.720 Table 10-2, which restricts impervious surface to in the GCC zoning to 30%. Due to the existing lot layout and site improvements, the parcel is already over the impervious surface maximum at ~46% hardcover. The appliants is proposing to add 5,979 square feet of impervious surface, which will bring the property total to 56.31%. The clubhouse parcel serves as the amenity parcel for the larger pervious golf course. Request Visual Red box indicates pickleball courts. Blue box indicates clubhouse expansion 2 ISSUE BEFORE PLANNING COMMISSION: The Planning Commission is being asked to hold a public hearing and make a recommendation on the conditional use permits and variance request. GENERAL INFORMATION: Address: 11441 20th Street North PID: 25.029.21.12.0010 Existing Zoning: Golf Course Community (GCC), Shoreland Overlay District, Valley Branch Watershed District Surrounding Zoning: North: Golf Course Community South: Golf Course Community East: Golf Course Community West: Golf Course Community Deadline for Action: Application Complete – 10/18/2024 60 Day Deadline – 12/17/2024 Applicable Regulations: Title 103 – Subdivision Regulations Article V – Zoning Administration Article XII – Urban Districts Article XIX – Shoreland Overlay District REVIEW AND ANALYSIS: Pickleball CUP: Royal Development is requesting a conditional use permit to add two pickleball courts to their site for member use. This request will add 3,861 square feet of impervious surface to the site. Per LEC 105.12.710 Table 10-1 Outdoor recreational facilities require a conditional use permit. The performance standard for outdoor recreation facility requires that uses, such as playing fields or aquatic centers, that generate substantial traffic must be located off a street that has enough capacity and that it must have two points of access. There are more than two access points to reach the courts, although given the number of courts and use by members who may also be traveling by golf cart, bike, or foot, it has been determined that this request alone would not generate substantial traffic. Landscaping is proposed as part of this request in addition to fence netting to mitigate noise. There is no lighting proposed with the courts. Clubhouse CUP: Royal Development is also requesting to expand their existing Clubhouse. Per the Royal Golf Planned Unit Development Resolution 2017-93 (Condition No. 2) any expansion to the clubhouse or intensification of use shall require a conditional use permit. The proposed request includes an addition of 2,114 square feet of impervious surface (~5,400 square feet including the second level). The addition is going to house administration space, a golf simulator for lessons, and a shell for a restaurant. Landscaping is proposed as part of this request and a parking plan has been submitted indicating adequate parking is available for all uses on the site. Variance: The variance request is to allow the property to have a greater maximum impervious coverage percentage that permitted by the City Code (30%). The applicant seeks to increase the parcel’s impervious surface to 56.31%, the parcel is already a legal nonconformity at ~46% hardcover. The subject property (10.9 acres) is surrounded by a pervious golf course (roughly 3 182 acres according to the proposal narrative). When taken as a whole, the golf course’s total impervious surface is far below the 30% threshold. The function of the golf course requires considering the whole set of parcels; the golf course parcels cannot function as intended without the clubhouse parcel, and vice versa. The variance is required for the proposed conditional use permits to move forward. CITY AGENCY REVIEW: This request was distributed to several departments and agencies for review on October 18th, 2024. The following departments provided comments on the applications: • VBWD Email (10/22/24) - Indicated no watershed permit would be required since the project has been revised to be under the impervious surface permit threshold requirements. • Fire Department Memo (10/23/24)- Provided comments regarding drive lanes, parking, fire suppression and fire alarms on the site. • City Engineer Emails (10/29/24) – Provided comments on the watermain easement and potential need for VBWD permit. Plans have since been revised to incorporate watermain comments. • Landscape Architect (11/1/24)– Provided comments on tree preservation plan requirements and stormwater management. They also provided a comment of support for the variance request given the surrounding green space. A condition of approval has been added to address the tree preservation plan comment. • MN DNR- No Comment Provided. FINDINGS: Conditional Use Permit Findings #1 (Pickleball Courts): City Code Section 105.12.290(a) provides findings required for Conditional Use Permit approval. Staff recommends the following findings: 1. The proposed use will not be detrimental to or endanger the public health, safety, comfort, convenience or general welfare of the neighborhood or the city. The conditional use permit should not be detrimental to or endanger the public health, safety, comfort, convenience or general welfare of the neighborhood or City. The applicant is proposing adding fencing and nets for sound mitigation. The closest residential property is ~600 ft away. 2. The use or development conforms to the City of Lake Elmo Comprehensive Plan. Outdoor athletic uses conform to the City of Lake Elmo’s Comprehensive Plan, which recognizes a Golf Course on the land formerly known as Tartan Park as a local and regional amenity that the City wishes to maintain. 3. The use or development is compatible with the existing neighborhood. The use is compatible with the existing neighborhood and should provide an additional healthy recreation opportunity for users. 4. The proposed use meets all specific development standards for such use listed in Article IX specific performance standards. With the approval of the variance, the conditional use permit meets all specific development standards of 105.12.540. 5. If the proposed use is in a flood plain management or shoreland area, the proposed use meets all the specific standards for such use listed in Chapter 105.12.1260 (Shoreland Regulations) and Title 100 (Flood Plain Management). 4 This property is within a flood zone. However, the land use table lists base district uses as an allowed use, subject to a Conditional Use Permit. 6. The proposed use will be designed, constructed, operated and maintained so as to be compatible in appearance with the existing or intended character of the general vicinity and will not change the essential character of that area. The proposed pickleball courts are designed to be compatible through spacing, screening, and landscaping. The character of the general vicinity should not be changed. 7. The proposed use will not be hazardous or create a nuisance as defined under this Chapter to existing or future neighboring structures. The closest home to the east is over 600 ft. away from the proposed courts. The applicant is proposing fence netting and landscaping to buffer the use. Staff believe that the spacing and mitigation techniques are sufficient to prevent any potential nuisances. 8. The proposed use will be served adequately by essential public facilities and services. The pickleball courts should be adequately served by essential public facilities and services. 9. The proposed use will not create excessive additional requirements at public cost for public facilities and services and will not be detrimental to the economic welfare of the community. The pickleball courts should not create additional requirements at public cost, nor will it be detrimental to the economic welfare of the community. 10. The proposed use will not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons, property or the general welfare because of excessive production of traffic, noise, smoke, fumes, glare or odors. The pickleball courts should not produce excessive traffic, noise, smoke, fumes, glare or odors. The courts will not include lighting. The applicant is proposing fence netting and landscaping to buffer the use. 11. Vehicular approaches to the property, where present, will not create traffic congestion or interfere with traffic on surrounding public thoroughfares. Vehicular approaches to the property are not proposed to be changed and the courts should not create traffic congestion. Because it is anticipated that some users will walk, cycle, or take golf-carts in addition to using vehicles, the pickleball courts are not deemed to cause excessive traffic. The proposed use will not result in the destruction, loss or damage of a natural or scenic feature of major importance. The proposed use will not result in the destruction, loss or damage of the natural environment. The site is already subject to recreational and commercial uses. Conditional Use Permit Findings #2 (Clubhouse Expansion): City Code Section 105.12.290(a) provides findings required for Conditional Use Permit approval. Staff recommends the following findings: 1. The proposed use will not be detrimental to or endanger the public health, safety, comfort, convenience or general welfare of the neighborhood or the city. 5 The conditional use permit should not be detrimental to or endanger the public health, safety, comfort, convenience or general welfare of the neighborhood or City. 2. The use or development conforms to the City of Lake Elmo Comprehensive Plan. The clubhouse expansion use(s) conforms to the City of Lake Elmo’s Comprehensive Plan, which recognizes a Golf Course on the land formerly known as Tartan Park as a local and regional amenity. 3. The use or development is compatible with the existing neighborhood. The clubhouse expansion is consistent with the existing clubhouse area, golf course, and neighborhood. 4. The proposed use meets all specific development standards for such use listed in Article IX Specific Development Standards of Article XII With the approval of the variance, the conditional use permit meets all specific development standards listed in Article XII. 5. If the proposed use is in a flood plain management or shoreland area, the proposed use meets all the specific standards for such use listed in Chapter 105.12.1260 (Shoreland Regulations) and Title 100 (Flood Plain Management). This property is within a flood zone. However, the PUD anticipates the clubhouse as an allowed use with expansions subject to a Conditional Use Permit. 6. The proposed use will be designed, constructed, operated and maintained so as to be compatible in appearance with the existing or intended character of the general vicinity and will not change the essential character of that area. The clubhouse expansion should be designed, constructed, operated and maintained to be compatible with the existing or intended character of the general vicinity and will not change the essential character of the area. 7. The proposed use will not be hazardous or create a nuisance as defined under this Chapter to existing or future neighboring structures. The clubhouse expansion should not be hazardous or create a nuisance as defined under this Chapter to existing or future neighboring structures. 8. The proposed use will be served adequately by essential public facilities and services. The clubhouse expansion should not create additional requirements at a public cost, nor will it be detrimental to the economic welfare of the community. 9. The proposed use will not create excessive additional requirements at public cost for public facilities and services and will not be detrimental to the economic welfare of the community. The clubhouse expansion should not create additional requirements at public cost, nor will it be detrimental to the economic welfare of the community. 10. The proposed use will not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons, property or the general welfare because of excessive production of traffic, noise, smoke, fumes, glare or odors. The proposed use should not be detrimental to any persons, property or general welfare because of excessive production of traffic, noise, smoke, fumes, glare or odors. Parking plans are adequate for the proposed expansion. Additionally, it is anticipated that some users will walk, cycle, or take golf-carts in addition to using vehicles to get to the expansion. 11. Vehicular approaches to the property, where present, will not create traffic congestion or interfere with traffic on surrounding public thoroughfares. 6 Vehicular approaches to the property are not proposed to be changed and the clubhouse expansion should not create traffic congestion. Because it is anticipated that some users will walk, cycle, or take golf-carts in addition to using vehicles, the proposed clubhouse expansion should not cause excessive traffic. 12. The proposed use will not result in the destruction, loss or damage of a natural orscenic feature of major importance. The proposed use should not result in the destruction, loss or damage of the natural environment. Variance Findings: An applicant must establish and demonstrate compliance with the variance criteria set forth in Lake Elmo City Code Section 105.12.320 before the City may grant an exception or modification to city code requirements. These criteria are listed below, along with comments from Staff about the applicability of these criteria to the applicant’s request. Staff recommends the following findings: 1)Practical Difficulties. A variance to the provision of this chapter may be granted by the Board of Adjustment upon the application by the owner of the affected property where the strict enforcement of this chapter would cause practical difficulties because of circumstances unique to the individual property under consideration and then only when it is demonstrated that such actions will be in keeping with the spirit and intent of this chapter. Definition of practical difficulties - “Practical difficulties” as used in connection with the granting of a variance, means that the property owner proposes to use the property in a reasonable manner not permitted by an official control. The lot is an existing legal nonconformity in terms of impervious surface and unique shape (barbell) which encloses the nonresidential activities in the Golf Course Community. Nonresidential/commercial are anticipated in a golf course of this size. The GCC code does not differentiate between the residential and nonresidential uses in the zoning district for impervious surface requirements, although both are required to compose a golf course community. 2)Unique Circumstances. The plight of the landowner is due to circumstances unique to the property not created by the landowner. The subject property is the location for parking for the surrounding golf course, clubhouse, amenities, and administrative spaces and as such, it is necessary for the subject property to contain greater impervious coverage. The function of the golf course requires the whole set of parcels; the golf course landscape parcels cannot function as intended without the clubhouse parcel, and vice versa. 3)Character of Locality. The proposed variance will not alter the essential character of the locality in which the property in question is located. The variance will not impact the essential character of the area. The subject property is surrounded by a pervious golf course, which the subject property provides parking and other facilities for. The overall impervious coverage increase for the parcel holistically should not alter the essential character of the community. 4)Adjacent Properties and Traffic. The proposed variance will not impair an adequate supply of light and air to properties adjacent to the property in question or substantially 7 increase the congestion of the public streets or substantially diminish or impair property values within the neighborhood. The subject property is adequately buffered from residential properties through green space and landscaping and as such the variance should not impair adjacent properties. RECOMMENDED CONDITIONS OF APPROVAL: Pickleball CUP: 1. The applicant must obtain all other necessary City, state, and other governing body permits and approvals prior to release of the final plat for recording. 2. The applicant shall address the comments and corrections in the Landscape Architects Memo Dated 11/1/2024. 3. Any desire to add lighting, additional courts, or change fencing shall constitute a conditional use permit amendment. This shall not apply to maintenance or repair. 4. If approved, this conditional use permit shall expire if the work does not commence within 12 months of the date of granting the conditional use permit. Clubhouse CUP: 1. The applicant must obtain all other necessary City, state, and other governing body permits and approvals prior to release of the final plat for recording. 2. The applicant shall address the comments and corrections in the Landscape Architects Memo Dated 11/1/2024 3. The clubhouse addition shall be similar or compatible with the style and composition of the existing structure. 4. Any expansion of the Clubhouse beyond this approval shall require a conditional use permit amendment. 5. If approved, this conditional use permit shall expire if the work does not commence within 12 months of the date of granting the conditional use permit. Variance: 1. The variance is for an impervious surface total of 56.31% of the lot. 2. If approved, this variance shall expire if the work does not commence within 12 months of the date of granting the variance. PUBLIC COMMENT: A public hearing notice was sent to surrounding properties on October 28th, 2024. A public hearing notice was published in the City’s official newspaper on November 1st, 2024. RECOMMENDATIONS: Staff recommends that the Planning Commission recommend approval of the requests from Royal Development for the property located at 11441 20th Street North. Suggested Motions: “Move to recommend approval of the Royal Development impervious surface variance request based on the findings of fact and conditions presented in the staff report.” AND 8 “Move to recommend approval of the Royal Development outdoor athletic facility conditional use permit request for pickleball courts based on the findings of fact and conditions presented in the staff report.” AND “Move to recommend approval of the Royal Development conditional use permit request for the expansion of the clubhouse based on the findings of fact and conditions presented in the staff report.” ATTACHMENTS: 1) Location Map 2) Land Use Applications 3) Project Plans and Written Statements 4) Valley Branch Watershed District Email (10/22/2024) 5) Fire Dept. Memo (10/23/24) 6) City Engineer Email (10/29/2024) 7) Landscape Architect (11/1/2024) ROYALBLVDNMASTERS STN 14THS TNPAL MER DR N KINGSCTN LEGIONAVENLEGIONLNN 20THSTN MASTERSSTN 21STSTN MANNINGTRLN20THSTN AN NIKADRNANNIKAAVENHorseshoeLake ArcGIS Web AppBuilder Parcels Municipals DNR Protected Waters ID 11/4/2024, 11:10:13 AM 0 0.1 0.20.05 mi 0 0.15 0.30.07 km 1:9,028 Washington County, MN | Detailed Reason for Request Applicant is seeking to construct (i) an addition onto the existing clubhouse located on the property and (ii) an outdoor recreational space, specifically including pickleball courts, to be located to the north of the existing Pool and Fitness Center, between Hole 14 of the Golf Course and the existing parking lot. Pursuant to Section 105.12.720, Table 10-2 of the City of Lake Elmo City Code, the maximum impervious coverage permitted in the Golf Course Community district is 30%. The existing impervious coverage, plus the additional impervious coverage following the proposed addition onto the existing clubhouse and proposed outdoor recreational space would exceed the permitted impervious coverage as it would be at approximately 56.31%. Written Statements a. Owner of Record: Royal Golf Club, LLC, a Minnesota limited liability company. 11455 20th Street North, Lake Elmo, MN 55042, Phone: 651-505-9051 Managers/Directors: Hollis Cavner Authorized Agents/Representatives: John Parsons, 11455 20th Street North, Lake Elmo, MN 55042, Phone: 651-505-9051 b. Site Data: The Property address is 11441 20th Street North, Lake Elmo, MN 55042. The current zoning of the Property is Golf Course Community. The Property is approximately 10.9 acres (476,865 SF). The PID is 25.029.21.12.0010. The current legal description is Lot 1, Block 1, The Royal Golf Club Pool and Fitness, Washington County, MN. Land is currently used as part of a golf course and fitness center, specifically, this parcel includes, a maintenance facility/storage building and clubhouse serving the existing golf course, a drive way to access the existing clubhouse and a parking lot to serve the clubhouse and golf course. c. City Code Provisions Seeking Variance From: Lake Elmo City Code, Section 105.12.720, Table 10-2 – Maximum Impervious Coverage for GCC Districts d. Written Description of Proposal: The proposal is to permit the property to have a greater maximum impervious coverage percentage that permitted by the City Code. Allowing such greater maximum impervious coverage would allow the Royal Golf Club to (i) construct an addition on to the existing Clubhouse, the exterior of such addition will mirror the existing Clubhouse, which said addition will be approximately 5,400 square feet; and (ii) to construct an outdoor recreational space to be located to the north of the existing Pool and Fitness Center, between Hole 14 of the Golf Course and the existing parking lot, which said new outdoor recreational space will be approximately 3,861 square feet and will include pickleball courts. Specifically, the applicant seeks to have a variance from the City Code to allow for a maximum impervious coverage on the property in excess of what is permitted under the City Code. Based on site plans provided by applicant’s engineer, applicant would need to be permitted 56.31% impervious coverage as opposed to 30%. e. Narrative on Pre-Application Discussions: The applicant was notified by the City Planner of a potential need for a variance for maximum impervious coverage during the City’s review of the Royal Golf Club’s CUP application to permit construction of an addition to the existing clubhouse and a outdoor recreational facility. Following review of additional information and plan provided by the Royal Golf Club, the City Planner notified the Royal Golf Club of the need to request a variance from the maximum impervious coverage requirements of the City Code. Prior to being notified of the need to request a variance, the issue had not been brought to the applicant’s attention. f. Practical Difficulties: Strict enforcement of Lake Elmo City Code, Section 105.12.720, Table 10-2 – Maximum Impervious Coverage for GCC Districts would cause practical difficulties for various reasons. First, the existing impervious coverage of the parcel is greater than 30%, and a reduction of the parcel’s impervious coverage to be below 30% is not feasible. Second, the parcel is unique in shape and was constructed to be situated almost entirely within the boundary of surrounding parcels which make up the majority of the golf course which the subject parcel serves. Specifically, the subject parcel includes (i) the maintenance facilities and storage shop which houses the maintenance equipment and other golf course equipment necessary for the golf course to operate, (ii) the clubhouse and administrative offices of the golf course, and (iii) the driveway and parking lot which provides access to the shop, the clubhouse, and the golf course in general. The subject parcel was designed and laid out so as to be as de minimis in nature as it could be, while still adequately serving the access, parking, and operational needs of the surrounding golf course. Additionally, the subject parcel was laid out in a manner which would permit access between the clubhouse and administrative offices and 20th Street N without the need of easement or access agreements. Most City Code requirements were designed with more standard lot shapes in mind, and such requirements do not always apply well to uniquely shaped parcels. g. Unique Circumstances: The subject property is subject to Lake Elmo City Code Section 105.12.410, which requires that due to the subject property being a golf course, it must maintain at least 5 spaces per hole plus additional space for meeting or restaurant facilities. As such, the subject property is required, at a minimum, to maintain a certain amount of impervious coverage to support to surrounding golf course. Being that the subject property is the location of all of the parking for the surrounding golf course, as well as the site of the necessary maintenance facilities, clubhouse and administrative offices serving the golf course and the access road to get to such parking and other facilities, it is necessary for the subject property to contain greater impervious coverage. The unique shape of the subject parcel was designed to be de minimis in nature as to not have a greater impact on the surrounding golf course or residential community, while still providing the surrounding golf course facility with the necessary parking and access as required by the City Code. h. Essential Character: The variance, if granted, would not alter the essential character of the locality. Although applicant is requesting an increase to the maximum impervious coverage on the subject property, because the subject property is surrounded by an almost entirely pervious golf course which the subject property provides parking and other facilities for, the overall impervious coverage for the “neighborhood” as a whole would not be altered in any significant manner. Although the subject property is roughly 10.9 acres in area, it provides the parking, driveway access and operational facilities for the surrounding golf course and pool & fitness center, which combined is additional roughly 182.2 acres for a total of roughly 193.1 acres. Altogether, the subject parcel is roughly 5.6% of the total area that makes up the golf course facility. If the maximum impervious coverage was increased to 60% of the subject parcel, that would equal roughly 6.36 acres (10.9 acres * 60%), which would equal roughly 3.1% of the entire golf course facility. As such, an increase in the maximum impervious coverage on the subject parcel should be considered insignificant compared to the entire golf course facility, and should therefore not be considered to alter the essential character of the locality. |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||FMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFM ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >> >>>>>>>>>>>>>>>> >>>>>> >>>>>>>>>> >> >> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >> >>>> >> >> >>>>>>>>>> >> >> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>>>>>>>>>>>>>>>> >> >> >> >> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >> >>>>>>>> >> >> >> >>>>>>>> >>>>>> >> >> >> >>>>>>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >> >>>>>> >> >>>>>>>> >>>>>>>>>>>>>>>>>>>> >>>> >>>>>>>>>>>>>>>>>> >> >> >> >> >>>>>>>>>> >>>>>>>>>>>>>>>>>>>>>>>>>> >>>>>>>>ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe oheohe ohe ohe oheoheoheoheoheohe ohe oheoheoheohe oheohe oheoheohe oheohe oheohe ohe ohe oheohe ohe ohe oheohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe oheohe oheohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe oheohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe oheohe oheohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ue ue ue ue ue ue ue ue ue ue ue ue ue ue ue ue ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ug ug ug ug ug ug ug >>>>>>>>>>>>ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe oheoheoheoheoheoheoheoheoheoheoheohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe oheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe>>>>>>>>>>>>oheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe oheoheoheoheoheoheohe>>>>>>>>>> >> >> >> ohe ohe>>101716151413119718546812321>>>> >> >> >> >>>>>>>>>>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>| > >|ue ue ue ue ue ue ue ue ue uePHASE IIP H A S E I G R A D I N G1ST ADD IT ION 1STADDITIADDITIONGRADINGPHASE IGRADING1ST ADDITIONP H A S E I G R A D I N GON2ND1ST ADDITION2ND ADDITION3RDADDITIONPHASE IIGRADINGP H A S E II G R A D I N GP H A S E III G R A D I N GPHASE 1 GRADING & 1ST ADDITION FINALIZEDPHASE 1 GRADING AND 2ND ADDITION FINALIZED6TH ADD IT ION P H A S E I G R A D I N G 4TH ADD IT ION 4TH ADD IT ION POOL &FITNESS 4TH ADDITIONPOOL &FITNESS5TH ADDITION 5TH ADDITION11455 20TH ST. NClubhouse AdditionKnow what'sbelow.before you dig.CallRBENCHMARKS94 VICINITY MAP Construction PlansThe Royal Golf Club at Lake ElmoLake Elmo, MinnesotaCOVER1A D D I T I O N 1 S T A D D I T I O N 2 N D THE ROYAL GOLF CLUB11455 20th Street NorthLake Elmo, MN 55042ofTHE ROYAL GOLF CLUB AT LAKEELMO - CLUBHOUSE ADDITIONLake Elmo, MNoff:\jobs\6021 - 6040\6036 - tartan park\cad\engineering\final residential plans\additional rgc projects\clubhouse addition\6036_cover.dwgSave Date:09/24/246Revisions:1.9/20/2024 Per City Comments#6036Print Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota9/20/2204JJO9/20/2024Brian J. Krystofiak, P.E.25063BJKA D D I T I O N3 R DSITE2. 10/22/2024 Rev Sheet 3 THE ROYAL GOLF CLUB11455 20th Street NorthLake Elmo, MN 55042ofTHE ROYAL GOLF CLUB AT LAKEELMO - CLUBHOUSE ADDITIONLake Elmo, MNoff:\jobs\6021 - 6040\6036 - tartan park\cad\engineering\final residential plans\additional rgc projects\clubhouse addition\6036-clubhouse.dwgSave Date:09/24/246Revisions:1.9/20/2024 Per City Comments#6036Print Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota9/20/2204JJO9/20/2024Brian J. Krystofiak, P.E.25063BJK2REMOVALSBENCHMARKS 1514THE ROYAL GOLF CLUB11455 20th Street NorthLake Elmo, MN 55042ofTHE ROYAL GOLF CLUB AT LAKEELMO - CLUBHOUSE ADDITIONLake Elmo, MNoff:\jobs\6021 - 6040\6036 - tartan park\cad\engineering\final residential plans\additional rgc projects\clubhouse addition\6036-clubhouse.dwgSave Date:10/23/246Revisions:1.9/20/2024 Per City Comments#6036Print Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota9/20/2204JJO9/20/2024Brian J. Krystofiak, P.E.25063BJK3OVERALL SITEBENCHMARKS2. 10/22/2024 Revise Pickleball Court Impervious THE ROYAL GOLF CLUB11455 20th Street NorthLake Elmo, MN 55042ofTHE ROYAL GOLF CLUB AT LAKEELMO - CLUBHOUSE ADDITIONLake Elmo, MNoff:\jobs\6021 - 6040\6036 - tartan park\cad\engineering\final residential plans\additional rgc projects\clubhouse addition\6036-clubhouse.dwgSave Date:09/24/246Revisions:1.9/20/2024 Per City Comments#6036Print Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota9/20/2204JJO9/20/2024Brian J. Krystofiak, P.E.25063BJK4SITE, UTILITY & GRADING &EROSION CONTROL PLANBENCHMARKS 5DETAILSTHE ROYAL GOLF CLUB11455 20th Street NorthLake Elmo, MN 55042ofTHE ROYAL GOLF CLUB AT LAKEELMO - CLUBHOUSE ADDITIONLake Elmo, MNoff:\jobs\6021 - 6040\6036 - tartan park\cad\engineering\final residential plans\additional rgc projects\clubhouse addition\6036_dtls.dwgSave Date:09/24/246Revisions:1.9/20/2024 Per City Comments#6036Print Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota9/20/2204JJO9/20/2024Brian J. Krystofiak, P.E.25063BJKFRAMECURBFRAME 1SSH2WLC8SSH33WLC3KFG11PCF9AFH5TASYMBOLCODEQTYBOTANICAL NAMECOMMON NAMESIZECONTAINERCONIFEROUS TREESTA5Thuja occidentalis 'Techny'Techny Arborvitae6` Ht.B&BSHRUBSSSH9Hydrangea paniculata 'Rensun'Strawberry Sundae Hydrangea#5 Cont.GRASSESKFG3Calamagrostis x acutiflora `Karl Foerster`Feather Reed Grass#3 Cont.PERENNIALSPCF11Echinacea purpureaPurple Coneflower#1 Cont.AFH9Hosta 'Angel Falls'Angel Falls Hosta#1 Cont.WLC35Nepeta x faassenii `Walkers Low`Walkers Low Catmint#1 Cont.GROUND COVERSHWM480 sfHardwood MulchNon-Woven Geotextile IncidentalDouble Shredded Hardwood Mulch4" DepthSOD960 sfTurf Sod BluegrassKentucky BluegrasssodPLANT SCHEDULETHE ROYAL GOLF CLUB11455 20th Street NorthLake Elmo, MN 55042ofTHE ROYAL GOLF CLUB AT LAKEELMO - CLUBHOUSE ADDITIONLake Elmo, MNoff:\jobs\6021 - 6040\6036 - tartan park\cad\la\2024 clubhouse addition\6036-clubhouse_landscape.dwgSave Date:09/25/246Revisions:1.9/20/2024 Per City Comments#6036Print Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Landscape Architect underthe laws of the State of Minnesota9/20/2204RJR9/20/2024Ryan J. Ruttger, RLA56346RJR6LANDSCAPE PLAN Written Statements A. Contact Information: Owner of Record: Royal Golf Club, LLC, a Minnesota limited liability company. 11455 20th Street North, Lake Elmo, MN 55042, Phone: 651-505-9051 Authorized Agents/Representatives: John Parsons, 11455 20th Street North, Lake Elmo, MN 55042, Phone: 651-505-9051 Engineer: Carlson McCain, attn: Brian Kystofiak, 3890 Pheasant Ridge Drive NE, Suite 100, Blaine, MN 55449, Phone: 763-489-7905 Surveyor: Carlson McCain, attn: Justin Olson, 3890 Pheasant Ridge Drive NE, Suite 100, Blaine, MN 55449, Phone: 763-489-7942 B. Site Data: The Property address is 11441 20th Street North, Lake Elmo, MN 55042. The current zoning of the Property is Golf Course Community. The Property is approximately 10.9 acres (476,865 SF). The PID is 25.029.21.12.0010. The current legal description is Lot 1, Block 1, The Royal Golf Club Pool and Fitness, Washington County, MN. C. Narrative Regarding the history of the Property (current and past uses) and any pre-application discussions with staff: The Property was originally a 475-acrea parcel owned by the 3M Company. It had a golf course, tennis courts, softball fields, archery range, etc., for private use by its employees. It was purchased by the present Owners predecessors (H.C. Golf land, LLC) in 2016, and was subsequently conveyed to the present Owners in 2023. The previous owners built an Arnold Palmer/Annika Sorenstam designed golf course and received approval of 291 homes. In 2023, the original pool and fitness center was relocated from the west side of the Clubhouse parking lot to the east side of the parking lot. D. Proposed Uses: i. The proposal is to construct an addition onto the existing Clubhouse, the exterior of such addition will mirror the existing Clubhouse. The addition will be approximately 5,400 square feet. The addition will consist of additional administrative space on the main level to be used by employees and staff of the Royal Golf Club, new space for indoor golf instruction facilities for members on the main level, and a shell for a future restaurant on the lower level. The proposed addition will allow for more space on the Property for staff to conduct necessary administrative activities, and will also provide additional year-round income producing activities on the Property as a result of now being having a designated indoor golf instruction facility as well as a new restaurant. With the proposed addition on the existing Clubhouse, there should be no effect on current traffic circulation or congestion, nor will it have any effects on existing natural areas on the Property or in the vicinity. The proposed addition will not include any new lighting other than any required exterior walkway and emergency lighting on the exterior of the Clubhouse. The proposed addition would move existing lights to the new exterior walls. ii. The administrative spaces will be used by the staff of The Royal Golf Club, specifically being occupied by the Club’s general manager, the Club’s accountant and the Club’s events team. The indoor golf instruction facilities will be utilized mainly by members of the Royal Golf Club, with occasional usage by non-members invited or accompanied by Royal Golf Club instructors. The future restaurant is intended to be for use by Royal Golf Club members only. The additional space for administrative space and golf instruction facilities will not require additional staffing at this time, and both new facilities will be utilized during normal Golf Club business hours. The future restaurant may require additional staff, however, the exact staffing requirements and hours of operation at this time are unknown. E. Justification: i. The proposed use will not be detrimental to or endanger the public health, safety, comfort, convenience or general welfare of the neighborhood or City. The proposed addition will not be detrimental to the existing facility, nor will it be detrimental to the nearby residents as it will (i) allow for administration aspects of the Club to be conducted more efficiently, (ii) provide additional recreational opportunities for members and residents, and (iii) create a space for future dining options for members. ii. The use or development conforms to the City of Lake Elmo Comprehensive Plan. The use falls in line with the City of Lake Elmo’s Comprehensive Plan and is compatible with the neighborhood. It is similar and common place to many developments, specifically golf course developments. iii. The use or development is compatible with the existing neighborhood. The new facilities provide for (i) additional space for already existing functions within the existing facilities, and (ii) provide for additional healthy opportunities, which combined with the golf, swimming pool, fitness center and walking trails accent the healthy, active lifestyle at the Royal Golf Club. iv. The proposed use meets all specific development standards. The proposed use meets the specific development standards of Article IX of the Zoning Code. Specifically, the additional indoor golf instruction facilities will not generate substantial traffic to the property, and two entry points to the facility shall be provided. For the future restaurant space, music or amplified sounds shall not be audible above a level of normal conversation at the boundary of any surrounding residential district or on any residential property. v. If the proposed use is in a floodplain management or shore land area, the proposed use meets all the standards. The proposed use does not sit in any flood plain or Shoreland district. vi. The proposed use will be designed, constructed, operated, and maintained so it will not change the essential character of that area. The architecture will conform with and complement the existing Clubhouse located on the property. vii. The proposed use will not be hazardous or create a nuisance to existing or future neighboring structures. The proposed use will not be hazardous or detrimental to its surroundings, nor will it create a nuisance to existing or future neighboring structures. viii. The proposed use will be served adequately by essential public facilities and services, including streets police and fore protection, drainage structures refuse disposal, water and sewer systems and schools or will be served adequately by such facilities and services provided by the persons or agencies responsible for the establishment of the proposed use. The proposed use will be adequately served by all existing public services as has the existing property for several years. ix. The proposed use will not create excessive additional requirements at public cost for public facilities and services and will not be detrimental to the economic welfare of the community. The proposed use will not create any excessive or additional costs to the City, its infrastructure or affect the economic welfare of the community. x. The proposed use will not involve uses, activities, processes, materials equipment, and conditions of operation that will be detrimental to any persons, property or the general welfare because of excessive production of traffic, noise, smoke, fumes, glare, or odors. The proposed use, nor its operation, will have an adverse effect on personal property, their value, nor contribute any excessive traffic, noise, air pollutants, glare or odor. The purpose of the proposed use is to create additional space for more efficient operations of the existing property, as well as to add additional healthy opportunities for its members. xi. Vehicular approaches to the property will not create traffic congestion or interfere with traffic on surrounding public thoroughfares. The proposed use will not present any traffic congestion nor interfere with any traffic issues on the surrounding public streets. The proposed use is for the members of the existing Club, a majority of whom reside in the surrounding development in which they have the option to walk to the facility or utilize their golf carts, neither of which contributes to automobile traffic and thus, is environmental friendly. xii. The proposed use will not result in the destruction, loss, or damage of a natural or scenic features of major importance. The proposed use will not damage nor impact any natural or scenic features. |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||FMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFM ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug ug >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >> >> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >> >>>> >> >> >>>>>>>>>> >> >> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>>>>>>>>>>>>>>>> >> >> >> >> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>>>>>>>> >> >> >>>>>>>> >> >>>>>> >> >> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >> >> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >> >>>> >>>>>>>>>>>>>>>>>> >> >> >> >> >>>>>>>>>> >>>>>>>>>>>>>>>>>>>>>> >> >> >>>>>>>>ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe oheoheoheoheoheohe ohe oheoheoheohe oheohe oheoheohe oheohe ohe ohe ohe oheoheohe ohe oheoheohe ohe ohe oheohe ohe oheoheohe ohe ohe oheohe oheohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe oheoheoheohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ue ue ue ue ue ue ue ueue ue ue ue ue ueue ue ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ug ug ug ug ug ug ug >>>>>>>>>>>>ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe oheoheoheoheoheoheoheoheoheoheoheohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe oheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe>>>>>>>>>>>>oheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe oheoheoheoheoheoheohe>>>>>>>>>> >>>>>> ohe ohe>>101716151413119718546812321>>>> >> >> >>>>>>>>>>>>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>| > >|ue ue ue ue ueueue ue ueuePHASE IIP H A S E I G R A D I N G1ST ADD IT ION 1STADDITIADDITIONGRADINGPHASE IGRADING1ST ADDITIONP H A S E I G R A D I N GON2ND1ST ADDITION2ND ADDITION3RDADDITIONPHASE IIGRADINGP H A S E II G R A D I N GP H A S E III G R A D I N GPHASE 1 GRADING & 1ST ADDITION FINALIZEDPHASE 1 GRADING AND 2ND ADDITION FINALIZED6TH ADD IT ION P H A S E I G R A D I N G 4TH ADD IT ION 4TH ADD IT ION POOL & F ITNESS 4TH ADDITIONPOOL &FITNESS5TH ADDITION 5TH ADDITION11441 20TH ST. NPickleball CourtsKnow what'sbelow.before you dig.CallRBENCHMARKS94 VICINITY MAP Construction PlansThe Royal Golf Club at Lake ElmoLake Elmo, MinnesotaCOVER1A D D I T I O N 1 S T A D D I T I O N 2 N D ofTHE ROYAL GOLF CLUB AT LAKEELMO - PICKLEBALL COURTSLake Elmo, MNoff:\jobs\6021 - 6040\6036 - tartan park\cad\engineering\final residential plans\additional rgc projects\pickleball courts\6036_cover.dwgSave Date:10/22/245Revisions:1.05/30/24 - Per Owner Comments, Landscape Added#6036Print Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota05/03/24JJO05/03/24Brian J. Krystofiak, P.E.25063RJRTHE ROYAL GOLF CLUB11455 20th Street NorthLake Elmo, MN 550422. 09/20/24 - Per City Comments3. 10/22/24 - Per Owner Comments4. 10/29/24 - Per City CommentsA D D I T I O N3 R DSITE 1514E X I S T I N GP A R K I N G L O TofTHE ROYAL GOLF CLUB AT LAKEELMO - PICKLEBALL COURTSLake Elmo, MNoff:\jobs\6021 - 6040\6036 - tartan park\cad\engineering\final residential plans\additional rgc projects\pickleball courts\6036-pickleball.dwgSave Date:10/29/245Revisions:1.05/30/24 - Per Owner Comments, Landscape Added#6036Print Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota05/03/24JJO05/03/24Brian J. Krystofiak, P.E.25063RJRTHE ROYAL GOLF CLUB11455 20th Street NorthLake Elmo, MN 550422. 09/20/24 - Per City Comments3. 10/22/24 - Per Owner Comments4. 10/29/24 - Per City Comments2OVERALL SITEBENCHMARKS E X I S T I N GP A R K I N G L O TofTHE ROYAL GOLF CLUB AT LAKEELMO - PICKLEBALL COURTSLake Elmo, MNoff:\jobs\6021 - 6040\6036 - tartan park\cad\engineering\final residential plans\additional rgc projects\pickleball courts\6036-pickleball.dwgSave Date:10/29/245Revisions:1.05/30/24 - Per Owner Comments, Landscape Added#6036Print Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota05/03/24JJO05/03/24Brian J. Krystofiak, P.E.25063RJRTHE ROYAL GOLF CLUB11455 20th Street NorthLake Elmo, MN 550422. 09/20/24 - Per City Comments3. 10/22/24 - Per Owner Comments4. 10/29/24 - Per City Comments3SITE, UTILITY & GRADING &EROSION CONTROL PLANBENCHMARKSPool & Fitness Center1st Addition E X I S T I N GP A R K I N G L O TSYMBOLCODEQTYBOTANICAL NAMECOMMON NAMESIZECONTAINERCONIFEROUS TREESBH2Picea glauca densataBlack Hills Spruce6` Ht.B&BWP1Pinus strobusWhite Pine6` Ht.B&BSHRUBSDBH6Diervilla loniceraDwarf Bush Honeysuckle#5 Cont.MKL6Syringa patula `Miss Kim`Miss Kim Lilac#5 Cont.EVERGREEN SHRUBSJSG6Juniperus chinensis `Sea Green`Sea Green Juniper#5 Cont.GRASSESKFG4Calamagrostis x acutiflora `Karl Foerster`Feather Reed Grass#3 Cont.GROUND COVERSROCK352 sfRock MulchNon-Woven Geotextile Incidental1.5" Trap Rock Mulch4" DepthSOD3,334 sfTurf Sod BluegrassKentucky BluegrasssodTIV3,073 sfType IV - Native Seed MixRefer to notes for acceptable seedingmethods. Seeding Rate 50.0 lb/acMnDOT Seed Mix 35-241seedPLANT SCHEDULEofTHE ROYAL GOLF CLUB AT LAKEELMO - PICKLEBALL COURTSLake Elmo, MNof\\cmihqfs01\public\jobs\6021 - 6040\6036 - tartan park\cad\la\2024 pickleball courts\6036-pickleball_landscape.dwgSave Date:09/25/245Revisions:1.05/30/24 - Per Owner Comments, Landscape Added#6036Print Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Landscape Architect underthe laws of the State of Minnesota05/03/24RJR05/03/24Ryan J. Ruttger, RLA56346RJRTHE ROYAL GOLF CLUB11455 20th Street NorthLake Elmo, MN 550422. 09/20/24 - Per City Comments3. 10/22/24 - Per Owner Comments4LANDSCAPE PLANPool & Fitness Center1st AdditionKnow what'sbelow.before you dig.CallR ofTHE ROYAL GOLF CLUB AT LAKEELMO - PICKLEBALL COURTSLake Elmo, MNof\\cmihqfs01\public\jobs\6021 - 6040\6036 - tartan park\cad\la\2024 pickleball courts\6036-pickleball_landscape.dwgSave Date:09/25/245Revisions:1.05/30/24 - Per Owner Comments, Landscape Added#6036Print Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Landscape Architect underthe laws of the State of Minnesota05/03/24RJR05/03/24Ryan J. Ruttger, RLA56346RJRTHE ROYAL GOLF CLUB11455 20th Street NorthLake Elmo, MN 550422. 09/20/24 - Per City Comments3. 10/22/24 - Per Owner Comments5DETAILS Written Statements A. Contact Information: Owner of Record: Royal Golf Club, LLC, a Minnesota limited liability company. 11455 20th Street North, Lake Elmo, MN 55042, Phone: 651-505-9051 Authorized Agents/Representatives: John Parsons, 11455 20th Street North, Lake Elmo, MN 55042, Phone: 651-505-9051 Engineer: Carlson McCain, attn: Brian Kystofiak, 3890 Pheasant Ridge Drive NE, Suite 100, Blaine, MN 55449, Phone: 763-489-7905 Surveyor: Carlson McCain, attn: Justin Olson, 3890 Pheasant Ridge Drive NE, Suite 100, Blaine, MN 55449, Phone: 763-489-7942 B. Site Data: The Property address is 11441 20th Street North, Lake Elmo, MN 55042. The current zoning of the Property is Golf Course Community. The Property is approximately 10.9 acres (476,865 SF). The PID is 25.029.21.12.0010. The current legal description is Outlot D, The Royal Golf Club at Lake Elmo, Washington County, MN. C. Narrative Regarding the history of the Property (current and past uses) and any pre-application discussions with staff: The Property was originally a 475-acrea parcel owned by the 3M Company. It had a golf course, tennis courts, softball fields, archery range, etc., for private use by its employees. It was purchased by the present Owners predecessors (H.C. Golf land, LLC) in 2016, and was subsequently conveyed to the present Owners in 2023. The previous owners built a Arnold Palmer/Annika Sorenstam designed golf course and received approval of 291 homes. In 2023, the original pool and fitness center was relocated from the west side of the Clubhouse parking lot to the east side of the parking lot. D. Proposed Uses: i. The proposal is to construct an outdoor recreational space to be located to the north of the existing Pool and Fitness Center, between Hole 14 of the Golf Course and the existing parking lot. The new outdoor recreational space will be approximately 3,861 square feet. The outdoor recreational space will include pickleball courts and will be utilized by members of the Royal Golf Club. The proposed outdoor recreational space will create additional recreational opportunities for members of the Club. With the proposed outdoor recreational space, there should be no affect on current traffic circulation or congestion, nor will it have any effects on existing natural areas on the Property or in the vicinity. The outdoor recreational space will not include any new lighting on the property. ii. The outdoor recreational space will be utilized by members of the Royal Golf Club. The outdoor recreational space will not require additional staffing at this time, and will be utilized during normal Golf Club business hours. The outdoor recreational space will not have a dedicated food service, particularly with its proximity to the Clubhouse. E. Justification: i. The proposed use will not be detrimental to or endanger the public health, safety, comfort, convenience or general welfare of the neighborhood or City. The proposed outdoor recreational space will not be detrimental to the existing facility, nor will it be detrimental to the nearby residents as it will provide additional recreational opportunities for members. ii. The use or development conforms to the City of Lake Elmo Comprehensive Plan. The use falls in line with the City of Lake Elmo’s Comprehensive Plan and is compatible with the neighborhood. It is similar and common place to many developments. iii. The use or development is compatible with the existing neighborhood. The new outdoor recreational space will provide for additional healthy opportunities, which combined with the golf, swimming pool, fitness center and walking trails accent the healthy, active lifestyle at the Royal Golf Club. iv. The proposed use meets all specific development standards. The proposed use meets the specific development standards of Article IX of the Zoning Code. Specifically, the outdoor recreational space will not generate substantial traffic to the property, and two entry points to the facility shall be provided. v. If the proposed use is in a floodplain management or shore land area, the proposed use meets all the standards. The proposed use does not sit in any flood plain or Shoreland district. vi. The proposed use will be designed, constructed, operated, and maintained so it will not change the essential character of that area. The architecture will conform with and complement the existing Clubhouse and Pool and Fitness Center located on the property. vii. The proposed use will not be hazardous or create a nuisance to existing or future neighboring structures. The proposed use will not be hazardous or detrimental to its surroundings, nor will it create a nuisance to existing or future neighboring structures. Additional noise resulting from the pickleball courts will be mitigated by use of wind nets attached to the fencing around the perimeter of the pickleball courts as well as additional trees where applicable. viii. The proposed use will be served adequately by essential public facilities and services, including streets police and fore protection, drainage structures refuse disposal, water and sewer systems and schools or will be served adequately by such facilities and services provided by the persons or agencies responsible for the establishment of the proposed use. The proposed use will be adequately served by all existing public services as has the existing property for several years. ix. The proposed use will not create excessive additional requirements at public cost for public facilities and services and will not be detrimental to the economic welfare of the community. The proposed use will not create any excessive or additional costs to the City, its infrastructure or affect the economic welfare of the community. x. The proposed use will not involve uses, activities, processes, materials equipment, and conditions of operation that will be detrimental to any persons, property or the general welfare because of excessive production of traffic, noise, smoke, fumes, glare, or odors. The proposed use, nor its operation, will have an adverse effect on personal property, their value, nor contribute any excessive traffic, noise, air pollutants, glare or odor. The purpose of the proposed use is to create additional space for more efficient operations of the existing property, as well as to add additional healthy opportunities for its members. xi. Vehicular approaches to the property will not create traffic congestion or interfere with traffic on surrounding public thoroughfares. The proposed use will not present any traffic congestion nor interfere with any traffic issues on the surrounding public streets. The proposed use is for the members of the existing Club, a majority of whom reside in the surrounding development in which they have the option to walk to the facility or utilize their golf carts, neither of which contributes to automobile traffic and thus, is environmental friendly. xii. The proposed use will not result in the destruction, loss, or damage of a natural or scenic features of major importance. The proposed use will not damage nor impact any natural or scenic features. From:John P. Hanson To:"John Parsons"; Sophia Jensen Subject:RE: Impervious Reduction Date:Tuesday, October 22, 2024 2:56:47 PM Attachments:image001.jpg Caution: This email originated outside our organization; please use caution. Thank you. No permit is needed from the Valley Branch Watershed District. John From: John Parsons <jparsons@royalclubmn.com> Sent: Tuesday, October 22, 2024 2:31 PM To: John P. Hanson <JHanson@barr.com>; Sophia Jensen <SJensen@lakeelmo.gov> Subject: Impervious Reduction CAUTION: This email originated from outside of your organization. Good Afternoon, I received the attached updated plans from Justin Olson of Carlson McCain. By reducing the pickleball courts by 0.75-feet off all sides of the court, we are now below the 6,000 square feet permit trigger for VBWD. Please let me know if you these updated plans are acceptable. Sophia- If this is sufficient, please let me know if this would change anything from my original submittal or if it would be looked at as an amendment to it. If needed, I can have new plans printed with the updated impervious surface number displayed. Please let me know if anything else is needed from me at this time. Thank you both for your help,John Parsons Director of Facilities Royal Golf Club JParsons@royalclubmn.com Office: 651.505.9051 Cell: 651.503.5991 “We are what we repeatedly do. Excellence, then, is not an act, but a habit.” – Aristotle LAKE ELMO FIRE DEPARTMENT – OFFICE OF THE FIRE MARSHAL Fire Prevention, Code Enforcement, and Public Education “Proudly Serving Neighbors and Friends” October 23, 2024 Sophia Jensen, Planner City of Lake Elmo Re: Sketch Plan Review – Royal Clubhouse Expansion Prepared by: Anthony Svoboda, Fire Marshal Approved by: Dustin Kalis, Fire Chief Applicable Codes: • 2020 Minnesota State Fire Code • 2020 Minnesota State Building Code • Lake Elmo Fire Department Fire Code Policies • NFPA 13, 2016 edition • NFPA 13D, 2016 edition Fire Department Comments: Roads, Drive Lanes, and Parking Areas • All roads and drive lanes shall meet the Lake Elmo Fire Department requirements for widths and turning radiuses. • Approved fire apparatus roads shall be provided and maintained throughout all development phases in coordination with engineering, public works, planning, and fire departments. • An approved signage and marking plan shall be determined for all No Parking and Fire Lane access roads. Parking shall be prohibited on both sides of private drive lanes. • All parking areas shall be capable of supporting the imposed load of fire apparatus weighing up to 75,000 pounds. LAKE ELMO FIRE DEPARTMENT – OFFICE OF THE FIRE MARSHAL Fire Prevention, Code Enforcement, and Public Education “Proudly Serving Neighbors and Friends” Fire Detection and Suppression • A fire sprinkler system shall be installed throughout the expansion area, to match the existing system. A plan review and permit are required prior to any work. • A fire alarm system shall be installed throughout the expansion area, to match the existing system. A plan review and permit are required prior to any work. Questions, clarifications, or the request to provide code documents can be made using the contact information listed below. Respectfully, From:Jack Griffin To:Sophia Jensen Cc:Jason Stopa; Chad Isakson Subject:Royal Golf Club CUP for Clubhouse facility expansion l Date:Monday, October 28, 2024 9:11:06 PM Caution: This email originated outside our organization; please use caution. Sophia,Please see the engineering plan review comments below for the Royal Golf Club CUP forClubhouse facility expansion located at 11441 20th St N PID 25.029.21.12.0010. 1. Engineering has no comments. No public improvements are proposed or appear to beimpacted by the Addition.2. Please let me know if there is any specific review item you would like engineering totake a look at. Thanks ~JackJohn (Jack) W. Griffin, P.E.Principal / Sr. Municipal Engineer 651.300.4264 Jack.Griffin@FOCUSengineeringinc.com From:Jack Griffin To:Sophia Jensen Cc:Jason Stopa; Chad Isakson Subject:Royal Golf Club CUP for new Pichleball facility Date:Monday, October 28, 2024 9:29:44 PM Caution: This email originated outside our organization; please use caution. Sophia,Please see the engineering plan review comments below for the Royal Golf Club CUP for anew Pickleball facility located at 11441 20th St N PID 25.029.21.12.0010. 1. No public improvements are proposed or appear to be impacted by the Addition.However the improvements are proposed immediately adjacent to a City owned andmaintained watermain. The plans should be revised to clearly show the limits of thewatermain easement (easement line labeled and dimensioned on the plans).2. A plan note should be added to the plans to prohibit any field changes that would resultin an easement encroachment.3. No stormwater management permit is required by the City as the new impervioussurface is less than 43,560 SF. However, the VBWD threshold for requiring a permit isonly 6,000 SF. The new impervious surface for both the Clubhouse Addition and thePickleball Court is 6,162 SF. The applicant should be directed to consult with theVBWD to determine if a permit is needed.4. Please let me know if there is any further review requested at this time. Thanks ~JackJohn (Jack) W. Griffin, P.E.Principal / Sr. Municipal Engineer 651.300.4264Jack.Griffin@FOCUSengineeringinc.com From:Jack Griffin To:Sophia Jensen Cc:Jason Stopa; Chad Isakson Subject:oyal Golf Club Variance for Impervious Surface Date:Monday, October 28, 2024 9:34:55 PM Caution: This email originated outside our organization; please use caution. Sophia,Please see the engineering plan review comments below for the Royal Golf Club Variance forImpervious Surface at 11441 20th St N PID 25.029.21.12.0010. 1. Engineering has no comment. However, the applicant should be directed to consult withthe VBWD to determine if a permit is needed for Stormwater Management. The newimpervious surface for both the Clubhouse Addition and the Pickleball Court is 6,162SF, exceeding the VBWD permit threshold of 6,000 SF if both projects are consideredtogether.2. Please let me know if there is any further review requested at this time. Thanks ~JackJohn (Jack) W. Griffin, P.E.Principal / Sr. Municipal Engineer 651.300.4264Jack.Griffin@FOCUSengineeringinc.com Memorandum 800 Washington Avenue North, Suite 103 Minneapolis, MN 55401 November 1, 2024 TO: SOPHIA JENSEN FROM: SARAH EVENSON, PLA RE: CUPS AND VARIANCE LANDSCAPE AND TREE PRESERVATION PLAN REVIEW MEMO SUBMITTALS 1. CUPs and Variance Submittal, received October 18, 2024. REVIEW HISTORY CUPs and Variance Landscape and Tree Preservation Plan Review Memo: 11/1/2024 LOCATION: 11441 20th St N. PID 25.029.21.12.0010 CURRENT LAND USE CATEGORY: GCC ADJACENT AND SURROUNDING LAND USE: GCC to the south, east, and west. Rural Single Family to the north. SPECIAL LANDSCAPE PROVISIONS: partial Shoreland Overlay. REGARDING THE VARIANCE REQUEST: I agree with the applicant that this parcel, which serves the broader golf course, should be allowed to have increased impervious surface. When taken as a whole, the golf course’s total impervious surface is far below the 30% threshold. The function of the golf course requires the whole set of parcels; the golf course landscape parcels cannot function as intended without the clubhouse parcel, and vice versa. However, runoff from any additional impervious surface should be subject to city stormwater requirements prior to leaving the golf course. TREE PRESERVATION PLAN: 105. 12. 470 » The applicant has not included a tree preservation plan with an individual tree inventory for the parcel in graphic and tabular form. Prior to approval, applicant must prepare a tree preservation plan that meets code requirements. Pay specific attention to 105.12.470 (c). » Confirm that the tree protection fencing shown on the plans is correctly sized around the Critical Root Zones (CRZ) of all trees proposed to be protected. CRZ is identified in the code as, “a radius distance of one (1) foot per one (1) inch of tree diameter. E.g., a 20-inch diameter has a critical root zone with a radius of twenty (20) feet.” November 1, 2024 Royal Golf Club Memorandum 2 LANDSCAPE PLAN: 105.12.480 » Landscape plans cannot be approved until a Tree Preservation Plan that meets code is submitted. » Note that only evergreens are being proposed right now, which is not compliant with code. Proposed trees will need to meet 105.12.480 (b)(3) which says that, “No more than 25 percent of the required number of trees and shrubs may consist of any one taxonomic genius. A minimum of 25 percent of the required number of trees shall be deciduous shade trees, and a minimum of 25 percent shall be coniferous trees. Ornamental trees may be used when applied towards landscaping requirements. However, the number of trees shall not exceed 15 percent of the required amount.” RECOMMENDATION: Landscape and tree preservation plans must be prepared according to code prior to approval. Revise and resubmit. Sarah Evenson, PLA (MN) City of Lake Elmo Municipal Landscape Architect P: (262) 391-7653 E: sarah@hkgi.com 1 Error! Unknown document property name. STAFF REPORT DATE: 11-13-2024 Item#: – Public Hearing Motion TO: Planning Commission FROM: HKGI Consultants Tim Solomonson & Sarah Evenson AGENDA ITEM: Landscape Ordinance Zoning Text Amendments. REVIEWED BY: Sophia Jensen, City Planner Ashley Monterusso, City Planner Jason Stopa, Community Development Director Sarah Sonsalla, City Attorney BACKGROUND: The City has initiated a zoning text amendment to Article VIII Environmental Performance Standards to correct dated language, update standards, and clarify planting/plan standards. ISSUE BEFORE THE PLANNING COMMISSION: The Planning Commission is being asked to hold a public hearing and make a recommendation to the City Council on the proposed amendments to the City’s Environmental Performance Standards. PROPOSAL DETAILS: • 105.12.470 (Zoning Code – Tree Preservation) • 105.12.480 (Zoning Code – Landscape Requirements) ANALYSIS OF PROPOSALS: Proposed language is underlined. Deleted language is shown with a strikethrough. 105.12.470 Tree Preservation a) Purpose. Within the City of Lake Elmo, trees and woodlands are considered a valuable asset to the community. The City places a priority on protecting this asset and finds that it is in the best interest to regulate the development and alteration of wooded areas within the community. All applicants shall comply with all the provisions in the Zoning Code which address the preservation of existing significant trees, including this section. All applicants shall demonstrate a good faith effort to maximize tree preservation during the development review phase and shall avoid a mass-grading approach to site development where possible. Applicants are encouraged to preserve all healthy trees of significant value even if the trees do not meet the size requirements to be considered significant trees. b) Definitions. The following words, terms and phrases, when used in this section, shall have the meanings ascribed to them in this subsection, except where the context clearly indicates a different meaning: Applicant means any person or entity submitting an application to the City for approval of a land use permit including preliminary plat, final plat, conditional use permit, interim use permit, planned unit development, 2 Error! Unknown document property name. variance or grading permit. Common tree means and includes Ash, Aspen, Basswood, Catalpa, Elm, Hackberry, Locust, Poplar, Silver Maple, Willow and any other tree not defined as a hardwood deciduous tree or a coniferous/evergreen tree. Coniferous/evergreen tree means a wood plant, which, at maturity, having foliage on the outermost portion of the branches year-round. Tamaracks are included as a coniferous tree species. Construction area means any area in which construction activity has or is occurring. Construction activity means any disturbance to the land that results in the movement of earth, the alteration in the topography or existing soil cover (both vegetative and non-vegetative) that may result in accelerated stormwater runoff, leading to soil erosion and movement of sediment into surface water or drainage systems. Examples of construction activity may include clearing, grading, filling, excavating, building construction and landscaping. Construction damage means any action such as filling, scraping, trenching, or compacting the soil around trees or wounding trees in such a manner that it may result in the eventual death of the tree. Critical root zone (CRZ) means an imaginary circle surrounding the tree trunk with a radius distance of one (1) foot per one (1) inch of tree diameter. E.g., a 20-inch diameter has a critical root zone with a radius of twenty (20) feet. Deciduous hardwood tree means a tree that loses its foliage or leaves annually such as Birch, Cherry, Hickory, Ironwood, Hard Maples, Oak and Walnut. Development means any activity or proposal that requires City approval of a preliminary plat, final plat, building permit, demolition permit, conditional use permit, interim use permit, planned unit development, variance or grading permit. Diameter breast height (DBH) means the diameter of trees at breast height, measured 4 1/2 feet (54 inches) above the ground. Drip line means the farthest distance away from the trunk of a tree that rain or dew will fall directly to the ground from the leaves or the branches of the tree. Healthy tree means a healthy tree has: 1) A live top (live crown) that is greater than one-third (1/3) the total tree height; 2) Dead branches that make up less than fifteen percent (15 %) of the total crown; 3) Less than fifteen percent (15%) of the tree crown with missing branches; 4) Consistent growth of foliage throughout the live portion of the crown; and 5) A tree trunk with no open wounds that are greater than one-third (1/3) the diameter of the tree, with no wounds in contact with the ground and no wounds that have soft, punky wood or other indication of decay. New development means all sites with construction activity or development that are not defined as redevelopment. Nuisance tree means: 1) Any living or standing tree or part thereof infected to any degree with a shade tree disease (see Tree disease below) or shade tree pest; 2) Any logs, stumps, branches, firewood or other part of dead or dying tree(s) infected with a shade tree disease or shade tree pest unless properly treated; and 3) Any standing dead trees or limbs which may threaten human health or property. Also included are noxious or invasive trees such as Amur Maple, Japanese Barberry, Russian Olive, Siberian Elm, Buckthorn, Boxelder, and Cottonwood. 3 Error! Unknown document property name. Ornamental tree means a small tree, usually less than thirty (30) feet in height at maturity, often planted for ornamental characteristics such as flowers or attractive bark. Redevelopment means a site with construction activity that creates new or replaces existing impervious surface, buildings or structures on a parcel that is fully or partially occupied by buildings, structures, or other impervious surfaces. Tree disease or diseased means Dutch elm disease (Ophiostoma ulmi or Ophiostoma novo-ulmi), oak wilt (Ceratocystis fagacearum) or any other tree disease of epidemic nature. Tree pest means Emerald Ash Borer (Agrilus plannipenis), European elm bark beetle (Scolytus multistriatus), Native elm bark beetle (Hylurgopinus rufipes) or any other tree pest with potential to cause widespread damage. Significant tree means a healthy tree measuring a minimum of six (6) inches in diameter for hardwood deciduous trees, nineteen (19) feet in height or eight (8) inches in diameter for coniferous/evergreen trees, or twelve (12) inches in diameter for common trees, as defined herein. Site means a parcel or area of land within which construction activity, development, or redevelopment occurs or is to occur. Specimen tree means a healthy, deciduous hardwood tree measuring equal to or greater than thirty (30) inches in diameter breast height or a healthy coniferous/evergreen tree measuring equal to or greater than twenty-five (25) feet in height. Tree pPreservation pPlan means a plan prepared by a certified landscape architect licensed by the State of Minnesota or forester indicating identifying all of the significant and specimen trees in the proposed development or parcel. A Tree Preservation Plan must include a proposed site plan, a proposed grading plan including all custom graded lots, a tree inventory that includes the size, species, and location of all significant trees proposed to be saved and removed on the area of development, and the measures proposed to protect the significant and specimen trees that are to be saved. The applicant shall have the tTree pPreservation pPlan superimposed on the proposed development grading plan. Woodland evaluation report means a report prepared by a certified forester, landscape architect licensed by the State of Minnesota, forester or land surveyor indicating the general location, condition, and species of significant trees on a parcel planned for future development or grading activity. The report must demonstrate that there will be no impact to existing significant trees as part of the development or grading activity. Finally, the report must include the measures proposed to protect significant trees on the site. c) Tree preservation standards for developing properties. 1) Applicability. a. A tTree pPreservation pPlan, or suitable alternatives as determined by the City, shall be submitted and approved by the City for the following activities: 1. New development or redevelopment in any Zoning District. A Tree Preservation Plan shall be required as part of any new development, redevelopment, or subdivision application. 2. Any grading or excavation project that results in the movement of greater than 400 cubic yards of material per acre of site per Lake Elmo Code Section 105.08.060. 3. If the applicant is able to demonstrate that the proposed development, redevelopment, construction activity or grading activity includes no impact to the significant trees on the site, then the applicant may be exempt from the requirement to submit a Tree Preservation Plan. It is the responsibility of the applicant to demonstrate that there are no impacts to significant trees through a Woodland Evaluation Report or some other form of tree survey or study. The Tree Preservation Plan shall reflect the applicant's best effort to determine the most feasible and practical layout of lots, buildings, parking lots, driveways, streets, storage, storm 4 Error! Unknown document property name. water management facilities and other physical features, so the fewest significant and specimen trees are destroyed or damaged. b. A Tree Preservation Plan is not required for the following activities: 1. The issuance of a development approval for the construction of a single-family residence on an existing platted lot of record. 2. The harvesting of trees. For the purposes of this section, "harvesting" means cutting or clearing trees for purposes relating to forestry operations, as defined in Lake Elmo Code Section 105.12.110. "Harvesting" does not include the clearing of land for purposes of development, even where the trees are sold for purposes of creating lumber for related purposes. 3. Additions to single-family homes, general homes improvements and the construction of accessory buildings (i.e., garages, sheds) on residential properties. 4. Home gardens or an individual's home landscaping, installation, repairs, or maintenance work. 5. Tree removal related to public improvement projects and maintenance or repairs to existing streets, roadways, sewers, parks, storm water facilities and utility infrastructure. 6. Emergency removal of trees to protect the public health and safety or to alleviate immediate dangers to life, limb, property, or natural resources. 7. Tree removal related to public improvement projects to restore or enhance woodlands, savannas, or prairies. 8. Removal of dead or dying trees, unless those trees were planted as part of tree replacement in which case the property owner shall replace such trees based on the City-approved Tree Preservation Plan for the property. 9. Removal of nonnative trees that the City deems as nuisance or as an invasive species. 1) Tree pPreservation pPlan. All applicants shall submit a Tree Preservation Plan prepared by a certified forester or landscape architect licensed by the State of Minnesota in accordance with the provisions of this section. The Tree Preservation Plan shall reflect the applicant's best effort to determine the most feasible and practical layout of lots, buildings, parking lots, driveways, streets, storage, storm water management facilities and other physical features, so that the maximum amount of significant and specimen trees are preserved and protected from development and construction. 2) During the review of an application for a building permit, grading permit, site plan approval, planned unit development, conditional use permit, interim use permit, or preliminary plat, the City will review the project and the Tree Preservation Plans according to in order to ensure that the Tree Preservation Plan has the best available layout in order to preserve significant trees and to ensure that the applicant used the best possible design to mitigate and minimize construction damage to significant trees. 3) Tree pPreservation pPlan requirements. The tTree pPreservation pPlan shall be a separate plan sheet(s) that includes the following information: a. The name(s), certification(s), telephone number(s) and address(es) of the person(s) responsible for tree preservation during the course of the development project. b. Tree inventory. The Tree Preservation Plan must include a Ttree Iinventory through one of the following methods: 1. Individual tree inventory. An individual tree inventory including an identification system linked to metal field tags located four and one-half (4 1/2) feet from grade on all significant trees must be identified on a plan sheet in both graphic and tabular form. 5 Error! Unknown document property name. 2. Tree inventory sampling. In cases of sites with large tracts of significant trees, the City may approve the use of a sampling inventory for all or portions of a site as an alternative to an individual tree inventory. The sampling inventory must include the methodology for sampling, identification ribbon around the perimeter of the sampling areas, and metal field tags located four and one-half (4 1/2) feet from grade on all significant trees in the sampling area. Within the sampling area, the quantity, size, species, health and location of all significant trees must be identified on a plan sheet in both graphic and tabular form. Based on sampling, total estimates and locations of healthy significant trees shall be provided. 3. Combination tree inventory. With the approval of the city City, sites that include both large tracts of significant trees and areas of individual significant trees may utilize a combination of the individual and sampling inventory methods. c. Trees that were planted as part of a commercial business such as a tree farm or nursery do not need to be inventoried on an individual tree basis. A general description of the trees and an outer boundary of the planted area must be provided. The burden of proof shall be on the applicant to provide evidence to support the finding that the trees were planted as part of a commercial business. d. A listing of healthy significant trees inventoried in subsection (c)(3)b of this section. Dead, diseased, nuisance or dying trees do not need to be included in the totals. e. A listing of the healthy significant trees removed, identified by the metal field tag or some other form of identification used in the tree inventory in subsection (c)(3)b of this section. f. A listing of the healthy significant trees to remain, identified by the metal field tag or some other form of identification used in the tree inventory in subsection (c)(3)b of this section. g. Outer boundary of all contiguous wooded areas, with a general description of trees not meeting the significant tree size threshold. h. Locations of the proposed buildings, structures, or impervious surfaces. i. Delineation of all areas to be graded and limits of land alteration and disturbance. j. Identification of all significant trees proposed to be removed within the construction area. These significant trees should be identified in both graphic and tabular form. k. Measures to protect significant and specimen trees and City standard tree protection detail. l. Size, species, number and location of all replacement trees proposed to be planted on the property in accordance with the Mitigation Plan, if necessary. m. Signature of the person(s) preparing the plan. 4) Implementation. All new construction areas, development sites, and redevelopment sites shall be staked, as depicted in the approved Tree Preservation Plan, and the required tree protection fencing shall be installed and approved by the City’s Landscape Architect around the critical root zone before land disturbance is to commence. The City has the right to inspect the site at any time for compliance with the plan. No encroachment, land disturbance, trenching, filling, compaction, or change in soil chemistry shall occur within the fenced areas protecting the critical root zone of the trees to be saved. 5) Allowable tree removal. Up to thirty (30) percent of the diameter inches of significant trees on any parcel of land being developed, redeveloped, graded, or proposed for construction activity may be removed without having to adhere to the tree replacement requirements. Replacement according to the tree replacement schedule is required when removal exceeds more than thirty (30) percent of the total significant tree diameter inches. The following types of trees do not need to be included as part of the tally of tree removals: a. Dead, diseased, nuisance, or dying trees; b. Trees that are transplanted from the site to another appropriate area within the City; c. Trees that were planted as part of a commercial business, such as a tree farm or nursery (subject to verification by the City); or d. Trees that were planted by the current property owner. In making such a determination, the City shall consider consistency of the age of the trees, any patterns in the location of 6 Error! Unknown document property name. trees, historical aerial photography and evidence of intentional planting such as invoices, formal planting plans or cost sharing agreements. 6) Mitigation plan. a. In any new development, redevelopment, new construction area, or grading project where the allowable tree removal is exceeded, the applicant shall mitigate the tree loss by planting replacement trees in appropriate areas within the development in accordance with the Ttree Rreplacement Sschedule. b. The form of mitigation to be provided by the applicant shall be determined by the City. c. The planting of trees for mitigation on residential projects shall be in addition to any other landscape requirements of the City. d. All trees, with the exception of ornamental trees, planted as landscaping on commercial or mixed-use projects may be counted towards tree replacement requirements. 7) Tree replacement calculations. Thirty (30) percent of the total diameter inches of significant trees on the site of new construction, new development, or redevelopment may be removed without replacement. The applicant shall plant all required replacement trees on the site of the proposed new construction, new development, or redevelopment. The following calculation procedure must be used to determine tree replacement requirements: a. Tally the total number of diameter inches of all significant trees on the site. b. A calculation must be provided which breaks out the number of inches removed for hardwood, evergreen/deciduous, and common trees. The thirty (30) percent removal figure applies to each category individually and trees are replaced according to the Tree Replacement Schedule in subsection (c)(8) of this section. 8) Tree replacement schedule. Tree removals over the allowable tree removal limit on the parcel or site of new construction, new development, or redevelopment shall be replaced according to the following schedule: a. Common tree species shall be replaced with new trees at a rate of one-fourth (1/4) the diameter inches removed. b. Coniferous/evergreen tree species shall be replaced with new coniferous or evergreen trees at a rate of one-half (1/2) the diameter inches removed. Since coniferous species are often sold by height rather than diameter inch, the following conversion formula can be used: Height of Replacement Coniferous Tree/2 equals Diameter Inches of Credit. c. Hardwood deciduous tree species shall be replaced with new hardwood deciduous trees at a rate of one-half (1/2) the diameter inches removed. d. Replacement tree size. Replacement trees must meet the minimum sizes listed in Lake Elmo Code Section 105.12.480. 9) Species requirement. The City must approve all species used for tree replacement. Ornamental trees are not acceptable for use as replacement trees. Where ten (10) or more replacement trees are required, not more than thirty (30) percent of the replacement trees shall be of the same species of tree. The planting of native species is encouraged, and hardiness and salt tolerance of the plants should be considered where applicable. 10) Warranty requirement. Any replacement tree which is not alive or healthy, as determined by the City, or which subsequently dies within two (2) years after the date of the initial landscape inspection and acceptance by the City or of the project closure, whichever occurs later shall be removed by the applicant and replaced with a new healthy tree meeting the same minimum size requirement within eight (8) months of removal. 10) 10) Protective measures. The Tree Preservation Plan requires the following measures to be utilized to protect significant trees planned for preservation: a. Before any grading or construction activity, the applicant shall install snow fencing or polyethylene laminate safety netting at the drip line or at the perimeter of the critical root zone, whichever is greater, of significant trees, specimen trees and significant woodlands to be preserved. No grade change, construction activity, parking, or storage of materials shall occur within this fenced in area. 1. See Minnesota Department of Transportation Standard Plan 5-297.301 and Minnesota Department of Transportation Specification Section 2572 for specific requirements related to tree protection and restoration. 7 Error! Unknown document property name. b. Measures to be taken so that oak trees are not wounded, trimmed, pruned, or damaged in any way (root, bark, branches, etc.) between the dates of March 15 and October 31. Measures to be taken to ensure that any oak trees pruned or trimmed have any cut areas sealed with an appropriate nontoxic tree wound sealant. c. Prevention of change in soil chemistry due to concrete washout and leakage or spillage of toxic materials, such as fuels or paints. d. Removal of any nuisance or dead trees located in areas to be preserved. e. Installation of erosion control methods. 11) Additional protective measures. The City encourages applicants to use the following tree protection measures to protect the root zones and to prevent damage to significant and specimen trees that the applicant intends to preserve; a. Installation of retaining walls or tree wells to preserve trees. b. Placement of utilities in common trenches outside of the drip line of significant and specimen trees or use of tunneled utility installation. c. Use of tree root aeration, fertilization, or irrigation systems. 12) Compliance with the tTree pPreservation pPlan. The applicant shall implement the Tree Preservation Plan and receive confirmation of acceptance from the City’s Landscape Architect prior to the start of and during any grading or construction activities. The tree protection measures shall remain in place until all grading, and construction activity is terminated or until a request to remove the tree protection measures is made to, and approved by, the City. a. No significant trees shall be removed until the Tree Preservation Plan is approved by the City and except in accordance with the approved Tree Preservation Plan. b. If an applicant damages or removes a significant tree that is intended to be preserved to the point that City staff believes the tree will not survive, the applicant must remit to the City a cash mitigation, calculated per diameter inch of the removed or damaged tree in the amount set forth in the City fee schedule. c. The City shall have the right to inspect the site in order to determine compliance with the approved Tree Preservation Plan. The cCity shall determine whether the Tree Preservation Plan has been met prior to the release of any financial security obtained for tree preservation. d. Instances where a significant tree is removed due to new development, redevelopment, new construction activity or were disturbed, and the removal was not noted on the landscaping or tree removal plan will result in a one-to-one replacement penalty regardless of if the removal is over the thirty percent (30%) allowance. d) Tree protection standards for non-developing properties. 1) Existing developed commercial, industrial, and mixed-use properties. a. Trees that are removed in an existing commercial, industrial, or mixed-use development must be replaced in accordance with the original landscaping plan, unless the property owner has obtained City approval for an alternative landscaping plan. If the original landscaping plan is not able to be found, trees identified by the most recent aerial photo of the property will be assumed to be part of the original landscape plan. b. Trees that are removed that were part of a designated tree preservation area must be replaced in accordance with the tree replacement requirements outlined in Lake Elmo Code Section 105.12.470. The thirty percent (30%) allowable tree removal limit does not apply in these situations. 8 Error! Unknown document property name. e) Warranty requirement. Any tree installed as a required replacement tree shall have the same two year warranty requirements as trees required by Lake Elmo Code Section 105.12.480 f) Financial security. In cases where mitigation or tree replacement is required, the City may require that a financial security, in a form acceptable to the City, be provided as part of a development agreement, site improvement agreement or applicable permit to ensure compliance and performance of the Mmitigation Pplan. The financial security will be released to the applicant upon verification by the City that the Mmitigation Pplan was followed, and that all replacement trees have been installed in accordance with the approved landscaping plan, match or exceed approved plan quantities, and meet City acceptance requirements to begin the two year landscape warranty.are planted and are healthy The financial security may be used to replace any replacement trees that have become damaged, are not healthy, or are diseased after planting.do not satisfy the warranty criteria. g) Exceptions. 1) Exception standards. Notwithstanding the City's desire to accomplish tree preservation and protection goals, there may be instances where these goals are in conflict with other City objectives. These conflicts will most likely occur on small, heavily-wooded parcels. The City recognizes there may be instances where it is not practical or reasonable to have an applicant plant the total required replacement trees on the site. The City encouragesnters applicants to have the required number of tree replacements tress planted entirely on the site to the extent this is of as much as possible. The City will only approve the use of fee-in-lieu of tree replacement or other mitigation methods when all the required tree replacements cannot practically or reasonably occur on the site in the judgement of the City. Applicants may ask the City to approve exceptions to the City's tree preservation and replacement standards. The City Council may grant exceptions if all of the following conditions exist: a. It is not feasible to combine the subject parcel with adjacent parcels that could use the parcel as required green space; b. Strict adherence to the City's tree preservation and replacement standards would prevent reasonable development that is consistent with the Comprehensive Plan and desirable to the City on the parcel; and c. The exception requested is the minimum needed to accomplish the desired development or redevelopment. 2) Reduced mitigation for exceptions. If the City Council approves an exception to the tree preservation standards, relief from the requirements of the standards may take the form of reduced mitigation requirements, greater allowable tree removal, higher thresholds for determining significant trees, or any combination of the above. The City Council will determine which form of relief best balances the objectives of the City and tree preservation. The City Council may require payment to the City of a fee-in-lieu of tree replacement, payment of additional park dedication fees; the implementation of woodland management practices by the applicant; or the planting of replacement trees on City property by the applicant under direction of the City Public Works Director; or a combination of these methods as a condition of the City approving relief or an exception from the City tree preservation and replacement standards. The amount of the fee-in-lieu of tree replacement is set forth in the City's fee schedule. 105.12.480 Landscape Requirements All development sites shall be landscaped, as provided in this section, in order to control erosion and runoff, promote conservation of water, moderate extremes of temperature and provide shade, aid in energy conservation, preserve habitat, provide visual softening of, especially, urban development, and generally enhance the quality of the physical environment within the cityCity. 9 Error! Unknown document property name. a) Landscape plan requirementsd. A landscaping plan is required for all new commercial, industrial, institutional, and multifamily developments, all planned unit developments, and all subdivisions, with the exception of minor subdivisions, as defined in this chapter. The landscape plan shall be prepared by a certified landscape architect licensed by the State of Minnesota, shall be drawn to a scale identified on the plan, and include the following: 1. Landscape plan(s) must include a legend with all line types and hatch patterns depicted on the plan and backgrounds. Legend items shall match the hatch and line type, and scale depicted on the plans. 2. The landscaping plan(s) shall locate and label all existing and proposed plant materials and ground covers.ion, 3. The landscaping plan(s) shall provide a plant schedule which includes the following information: a. Common Name This name shall align with the corresponding plan symbol or hatch pattern in the legend b. Scientific Name c. Trees shall be ordered in the plant schedule by genus d. Total quantities for deciduous, coniferous, and ornamental trees e. Quantity by species f. Size g. Root ball type h. Height and spread of each plant: 1. at the time of planting and 2. at the time of anticipated maturity. 4. size, quantity, and species of all existing and proposed plant materials. 4. Location and Mmethods for protecting existing trees and other landscape material, consistent with Lake Elmo Tree Preservation Code Section 105.12.470. 5. The plant schedule shall depict the height and spread of each plant type at the time of planting and at the time of maturity. 5. All existing and proposed features such as buildings, structures, parking areas, pervious and impervious pavement, signs, fences, walls, enclosures, natural features, grading, property lines, easements, utilities, and driveways shall shall be clearly shown on the plans. 6. Seeding, sodding, and ground cover materials shall be identified in the landscaping plan with hatching. 7. Provisions for irrigation and other water supplies. A watering plan and schedule shall be provided for all areas where an irrigation system is not included. 8. Elevation view, details, and cross-sections of all required screening. 9. City standard plan notes and planting details, ands well as any additional project specific planting instructions and notes. 10. Topsoil preservation plan that includes: stockpile location, calculations that a sufficient amount of topsoil will be set aside to restore the site with a depth of four (4) inches, erosion control requirements, and a soil report prepared by an independent party verifying topsoil borrow meets or has been altered to meet the composition requirements of Minnesota Department of Transportation MN DOT Specification 3877 as modified to contain no less than than 6% organic matter. b) Design considerations. The following design concepts and requirements shall be considered when developing a landscape plan. 1. To the maximum extent possible, the landscape plan shall incorporate, preserve and protect, existing significant trees and other healthy, non-invasive vegetation on the site. 2. Landscaped areas should be of adequate size to allow for healthy plant growth, to a typical mature size without impeding on roads, walks, trails, buildings or other areas needed for service access or public safety. Planting areas should provide adequate areas for plant maintenance. 3. A variety of trees and shrubs should be used to provide visual interest year-round. No more than 25 percent of the required number of trees and shrubs may consist of any one taxonomic genus. A minimum of 25 percent of the required number of trees shall be deciduous shade trees, and a minimum of 25 percent shall be coniferous trees. Ornamental trees may be used when applied towards landscaping requirements. However, the number of trees shall not exceed 15 percent of the required amount. 4. Final slopes greater than 3:1 will not be permitted without special treatment such as terracing, retaining walls, erosion control blankets, or special ground covers. 10 Error! Unknown document property name. 5. All plant materials, except trees planted per the tree replacement schedule, shall meet the following minimum size standards in Table 6-1. Trees planted per the tree replacement schedule shall meet the minimum requirements outlined in Lake Elmo Code Section 105.12.470(c)(8)d. Table 6-1: Minimum Size Standards for Landscape Materials Plant Type Minimum Size at Planting ** Trees: Evergreen 6 feet in height Deciduous--shade 2.5 inches caliper, measured six inches from base Deciduous--ornamental 2 inches caliper, measured six inches from base Shrubs: Evergreen # five container* Deciduous # five container* Shrubs used for screening (evergreen or deciduous) # five container* * Approximately five gallons. ** See American Standards for Nursery Stock, ANSI 260.1-2004 for exact specifications. * This table and its requirements do not apply to the tree replacement schedule. 6. As an alternative to the minimum standards for landscape materials, a landscape plan prepared by a qualified professional certifying that said plan will meet the intent of this section may be submitted. 7. As a general rule, tTrees should must be planted a minimum of ten feet away from all utilities including water and sewer stubs unless approved by the cCity. No plantings may be placed in or within 5 feet of a drainage and utility easement, unless approved by the Public Works Director. c) Landscaping of setback areas. All required setbacks not occupied by buildings, parking, paths or plazas shall be landscaped with turf grass, native grass, trees, shrubs, vines, perennial flowering plants, and surrounding pervious ground cover. 1. A minimum of one tree per lot or one tree for every 50 feet of street footage, lake shore or stream frontage, or fraction thereof shall be planted at the time of development. The total tree requirement will be whichever quantity is greater. a. Trees adjacent to streets shall be planted within the front yard and may be arranged in a cluster or placed at regular intervals to best complement existing landscape design patterns in the area. b. Salt tolerance, species soil compatibility, and root structure should be considered when selecting tree species adjacent to streets, sidewalks and parking areas. c. Where property abuts a lake or stream, trees shall be planted at intervals of no more than 50 feet along the shoreline, except where natural vegetation is sufficient to meet this requirement. 2. In addition to the requirements of subsection (c)(1) of this section, a minimum of five trees shall be planted for every one acre of land that is disturbed by development activity. Such trees may be used for parking lot landscaping or screening as specified in subsections (d) and (e) of this section. d) Interior parking lot landscaping. The purpose of interior parking lot landscaping is to minimize the expansive appearance of parking lots and provide shaded parking areas. Landscaping shall consist of planting islands, medians and borders, comprising the required planting area specified under subsection (d)(1) of this section. 1. At least five percent of the interior area of parking lots with more than 30 spaces shall be devoted to landscape planting areas. Areas may consist of islands or corner planting beds. 2. Shade trees shall be provided within the interior of parking lots (in islands or corner planting beds) in accordance with the following table: Table 6-2: Minimum Required Tree Planting for Parking Lots 11 Error! Unknown document property name. Number of Parking Spaces Minimum Required Tree Planting 0--30 None required 31--100 1 tree per ten spaces or fraction thereof 101+ 1 tree per 15 spaces or fraction thereof e) Perimeter parking lot landscaping. Parking areas, and especially vehicle headlights, shall be screened from public streets and sidewalks, public open space, and adjacent residential properties. Where applicable an applicant may demonstrate that distance and/or finished grades would achieve this objective, whereupon this requirement may be waived by the Community Development Director. The perimeter of parking areas shall be screened as follows: 1. With the exception of the VMX area, a landscaped frontage strip at least eight feet wide shall be provided between parking areas and road right-of-way. If a parking area contains over 100 spaces, the frontage strip shall be increased to twelve feet in width. a. Within the frontage strip, screening shall consist of either a masonry wall, fence, berm, or hedge or combination that forms a screen a minimum of 3 1/2 and a maximum of four feet in height, and not less than 50 percent opaque on a year-round basis. b. Trees shall be planted at a minimum of one deciduous tree per 50 linear feet within the frontage strip. 2. Along side and rear property lines abutting residential properties or districts, screening shall be provided, consisting of either a masonry wall, fence or berm in combination with landscape material that forms a screen a minimum of four feet in height, a maximum of six feet in height, and not less than 90 percent opaque on a year-round basis. Landscape material shall include trees, planted at a minimum of one deciduous or coniferous tree per 40 linear feet along the property line. a. Figure A: Example cross-section view of perimeter parking lot landscape screening. b. Figure B: Example elevation view of perimeter parking lot landscape screening. 12 Error! Unknown document property name. f) Screening. Screening shall be used to provide visual and noise separation of more intensive uses from less intensive uses. Where screening is required in the City Code between uses or districts, it shall consist of either a wall or fence, or berm in combination with landscape material that forms a screen at least six feet in height, and not less than 90 percent opaque on a year-round basis. Top-of-wall or fence shall be a minimum of six feet above the elevation along the property line(s) from which screening of the less intensive use is required. The cCity may require screening at least eight feet in height were the difference in intensity of uses is greater, such as between lots planned for development with single-family attached and detached residential development and certain service uses such as self-service storage and trade shops, automotive/vehicular uses, or industrial and extractive uses. Landscape material shall include trees, planted at a minimum of one deciduous or coniferous tree per 25 linear feet along the property line. Screening trees shall be adequately sized and offset from the property line so as not to overhang adjacent properties upon reaching mature size. Additional landscape material, such as shade trees or trellises, may be required to partially screen views from above. 1. Figure C: Example cross-section of screening between land uses. 2. Figure D: Example elevation view of screening between land uses. g) Standards, installation, and Mmaintenance, and installation of plant and landscape materials. The preparation, Iinstallation, and maintenance of all landscape materials shall comply with the following standards unless otherwise stipulated in the City’s Landscape Special Provisions: 1. All landscape materials, installation and maintenance shall be installed to current comply with industry the City’s Landscape Special Provisions and the Minnesota Department of Transportation Standard Specifications Section 2571 and Standard Plan 5-297.301 Standard Planting Details A-C. Special attention must be paid to initial soil preparation, drainage, and proper initial planting of plant root mass. 2. A pre-installation conference between the City’s Landscape Architect, developer/builder, and landscape contractor shall be required prior to the installation of any code required plantings or seeding. Any landscaping material not required for erosion control installed without a pre-installation conference will be rejected. a. Prior to the conference, both developer and the developer’s contactor shall have reviewed the pre-installation checklist included in the City’s Landscape Special Provisions to gain familiarity with the requirements and identify areas needing clarification. 3. Irrigation or other water supply to support the specified plant materials adequateWatering of all plant materials and ground cover in the approved development plan shall be provided at the time of 13 Error! Unknown document property name. or immediately after, plant installation to support establishment and shall continue through the entire warranty period. The watering requirements are set forth in the Minnesota Department of Transportation Specification Section 2571. 4. All required landscaping and screening features shall be kept free of refuse, and debris, and noxious weeds. 5. All landscape landscaping, mulch depthbeds, plantings, and seeded, and sodded areas shall be maintained to manage noxious weeds and ensure establishment of intended plant materials. 6. All landscape materials shall be guaranteed for two years. Any landscape material that dies, has a dead or broken central leader, exhibits 30% or more crown death, is damaged by construction, or becomes diseased before the end of the second year after acceptance shall be replaced by the developer. 6. For nonresidential projects, continuing maintenance and replacement of landscape materials shall be the responsibility of the property owner, including after two years of initial installation. Improvements identified on the landscape plan, including non-plant materials, such as fencing, shall be maintained for the life of the project for which the plan was required. h) Topsoil Borrow Requirements. Earthwork and topsoil shall comply with the following standards: 1. The topsoil stock pilestockpile location and erosion controls shall be called out in the plan set when building permit for new residential or commercial construction is submitted to the cCity. All areas disturbed, outside of paved areas, shall be excavated to a depth of four (4) inches and tilled to a depth of six (6) inches ro to remove compaction. The depth of the topsoil borrow shall be no less than four (4) inches, not including sod depth. 2. Only topsoil borrow meeting MinnesotaN Department of TransportationOT Specification 3877 as modified to contain no less than 6% organic matter, is to be placed as the final soil layer on a site to provide the required depth of topsoil borrow cover an and to bring the entire site to grade. 3. Confirmation of topsoil depth and quality shall be submitted as written confirmation from a licensed party before a full Ccertificate of Ooccupancy is issued. i) Warranty 1. All landscape materials shall be guaranteed for a period of at least two years. a. The warranty begins when all approved development plan landscaping meets all required acceptance criteria, as determined by the City’s Landscape Architect, from the Lake Elmo Code Section 105.12.480, the City’s Landscape Special Provisions and in the Minnesota Department of Transportation Standard Specifications Section 2571 and Standard Plan 5- 297.301 Standard Planting Details A-C. b. The warranty period ends when all approved development plan landscaping meets the requirements, as determined by the City’s Landscape Architect, listed in Lake Elmo Code Section 105.12.480(i)(1)(a). c. Meeting the above requirements (i)(1)(a) and (i)(1)(b) may include replacements and corrections to existing plant, tree, seed, sod, and landscaping installations, as well as new installations of any landscaping material in the approved development plan not installed. 2. The developer is required to correct all non-compliant landscaping within 60 days of notification. 3. Warranty compliance inspections will be performed at the initial installation phase and to close out the project at the end of the two year warranty period. Any landscape material that dies, has a dead or broken central leader, exhibits 30% or more crown death or defoliation, is damaged by construction or maintenance, becomes diseased or infested, or is not planted in compliance with the Minnesota Department of Transportation Specification and Standard Plating Details A-C will not be accepted. Acceptance is a requirement to secure release of the financial security portion allocated to that phase of the warranty. a. The developer is responsible for notifying the City when the project is ready for inspection. j) Financial security. The city City will require that a financial security, in a form acceptable to the city City, be provided as part of a development agreement or applicable permit to ensure compliance and performance of the landscape plan. The financial security will be released to the applicant upon verification by the city City that the landscape plan was followed, and that all landscape materials are planted and in a reasonable state of health. The financial security may be used to replace any landscape materials that have become damaged or diseased after planting. Adequate security must be retained to ensure performance for at least two years after the installations have been completedthe required landscaping from the approved development plan meets all City requirements and receives both initial acceptance start the two year landscape warranty period and final acceptance to complete the two year landscape warranty period. 14 Error! Unknown document property name. PUBLIC HEARING: A notice of public hearing was published in the City’s official newspaper on October 28, 2024. No public comments have been received at the time of writing this report. FISCAL IMPACT: None. OPTIONS: • Recommend approval of the proposed amendments. • Recommend changes to the proposed amendments. • Recommend denial of the proposed amendments. RECCOMENDATION: Staff recommends the Planning Commission recommend approval of the proposed text amendments as presented by Staff. “Motion to recommend approval of the proposed text amendments as presented by HKGi Staff” ATTACHMENTS: • Lake Elmo - Developer Landscaping and Site Restoration Checklist (2025) • Minnesota Department of Transportation Standard Plan 5-297.301 • Minnesota Department of Transportation Specification Section 2572 Lake Elmo - Developer Landscaping and Site Restoration Checklist: The following checklist is provided as a summary of high-level expectations to ensure the installation of required landscaping in the City of Lake Elmo meets all City requirements including those in the zoning code, development agreement, and approved development plan. This list is intended to act as a guide to ensure a shared understanding of City expectations for the required landscaping installation work and standards. It is not a comprehensive list of requirements. The developer bears final responsibility for all requirements and shall be responsible for coordination between their contractors and the City. Before the Pre-Installation Conference, the Contractor and Developer shall: • SCHEDULING – The developer shall contact the City to schedule the required pre- installation conference prior to installing any work. o Work installed without completing this step will be rejected, no exceptions. • IRRIGATION - Have read and understood the approved watering plan and schedule prior to the meeting. o The contractor may want to coordinate with the Home-owners Association to control irrigation during the warranty period. • PHASING – To qualify for phased inspections a development be residential and must contain at least 200 trees. There can be at most two phases: o Developer phase: includes all trees lot in front of buildable lots which may be impacted by home construction. o Builder phase: Remaining required landscaping and restoration. o The intent of phased landscaping is to avoid artificially extending the landscape warranty period for improvements installed prior to development build out. Each phase will receive its own acceptance date starting the two- year warranty for that phase within the overall project. o All phases within an overall project or addition must be completed before the initial or final surety releases can be granted.  There will be no partial surety release resulting from the acceptance of a landscaping phase unless previously agreed to by the City. • STAKING - Stake all tree locations for City approval prior to installation. The Contractor and Developer shall: o Coordinate staking to ensure tree locations match the approved development plan. o Ensure adjusted tree locations of more than 10 feet from the approved plan location must are tracked in an ‘as-built’ plan. That plan shall be provided to the City prior to requesting an initial inspection. An inspection will not be conducted without an accurate ‘as-built’ plan. o Stake limits of easements to ensure no tree locations occurs within:  10ft of front and rear lot lines  5ft of side yard or shared property lines  Trees within an easement, regardless of staked location, will require relocation at the time they are identified. • TREE STOCK - Notify the City’s Landscape Architect at least 10 calendar days prior to the installation of trees to schedule an inspection of the tree material prior to installation. This inspection can occur onsite immediately before planting. o Twine, burlap, and cages can be left in place if the contractor can demonstrate that plant stock has been planted with the root flare at the top of the root ball’s soil mass AND that the twine is organic biodegradable material. o At the discretion of the City’s Landscape Architect, trees with trunk wounds, deformities, disease, or significant damage will not be accepted. During the Pre-Installation Conference, the Contractor and Developer shall: • EXAMPLE INSTALLATION - Install three deciduous and three coniferous trees under the observation of the City’s Landscape Architect to confirm understanding of the City’s Landscape Special Provisions, MnDOT Standard Specifications Section 2571 and MnDOT Standard Plan 5-297.301 Standard Planting Details A-C planting requirements. Failure to compile will result in rejection of the tree. o If trees are to be installed on grades greater than 1:5, one observed example installations shall be of that type for both deciduous and coniferous. o Of particular importance is locating, exposing, and placing the root flare at an elevation just above grade. Failure to do so will result in the rejection of the tree, regardless of condition. During or Immediately Following Installation, the Contractor and Developer shall: • INSTALLATION TIMING – Must align with the MnDOT table below unless otherwise agreed to by the City and the City’s Landscape Architect. o The installation timing of landscape material is critical to establishment success. The installation of all plant material for a project shall comply with the Planting Dates table MnDOT Standard Plan 5-297.301 Standard Planting Details A table. • • PLANTING - Ensure tree pits comply with size requirements listed in the MnDOT Standard Plan 5-297.301 Standard Planting Details A-C o Failure to compile with specified hole sizing will result in rejection of the tree. • WATERING - Water-in trees and landscaping at the time of installation to ensure adequate soil moisture and proper soil settlement around the root ball. A minimum of 15 gallons of water per tree shall be applied during the initial watering. o Failure to compile will result in rejection of the tree. • AS-BUILT PLAN - Provide the City’s Landscape Architect with an irrigation as-built plan or, if manual watering is to be performed in lieu of irrigation, a watering plan and schedule to ensure adequate water is supplied to support the establishment of trees and landscaping. • MAINTENANCE - Be responsible for the maintenance of mulch rings, planting beds, and ground cover areas throughout the entire warranty period. This includes: o Replenishing mulch at trees and beds to maintain required depth and size. o Ensuring weed control throughout the growing season. o Preventing soil and seed contamination when restoring seeded areas or after replanting or landscaping. • RESTORATION - Restore ground-cover areas disturbed during the warranty period within 15 calendar days of notification. o Disturbance areas may require regrading to return the area to the designed final grade. o Areas where substantial or repeated erosion occurs will require additional correction that includes erosion control blanketing, until seed has completely established. Inspections, Warranty Timing, and Corrections: • INSPECTION PHASES - o Initial acceptance: Once all material for a project is installed and deemed ready by the developer for inspection the City’s Landscape Architect will inspect for compliance. Compliance for all required landscape materials must be met to begin the warranty period. Financial surety phase one release will not occur until this initial acceptance is obtained. o Final acceptance: Starting no earlier than two years from the date of initial acceptance, the project is eligible for inspection by the City’s Landscape Architect to determine compliance for final acceptance. Compliance for all required landscape materials must be met to close-out the warranty period. Financial surety phase two release will not occur until this final acceptance is obtained. • INSPECTION SCHEDULING - The developer is responsible for contacting the City to request an inspection of completed work. o All landscaping work must be entirely complete, partial work inspections will not be performed. • RESPONSE TO INSPECTION MEMO FINDINGS AND REQUIREMENTS - Following the receipt of inspection findings (memo from the City) the contractor shall have 60 calendar days to perform the corrections and replacements identified in the recommendations section, unless timing of replacements does not meet the requirements in the Planting Dates by Zone table above. In these cases the contractor should perform the corrections at the earliest possible opportunity within the next planting window. If there are concerns about weather, plant material sourcing, etc. these concerns must be communicated to the City within 21 calendar days. • Plant substitution requests must be reviewed and approved by the City’s Landscape Architect prior to use. OFFICE OF ENVIRONMENTAL STEWARDSHIPDAVID LARSON DATE PRINTED:PROJECT MANAGER DRAWN BY TRANSPORTATION BUILDING STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION ST. PAUL, MINNESOTA 55155-1899MINNESOTADEPARTMENTOFTRANSPORTATIONOFFICE OF ENVIRONMENTAL STEWARDSHIP ENV. PLANNING AND DESIGN UNIT SHEET NO.OF SHEETS9 STANDARD PLANTING DETAILS (A) 7STATE PROJECT SP 1901-171 (T.H. 13) PLANT INSTALLATION PERIOD (MnDOT 2571.3F2) ZONE BY DATESPLANTING SPRINGDECIDUOUSROOT BARE 21 APRIL 7 APRIL TO TO 1 JUNE 1 JUNE B&B CONTAINER 21 APRIL 7 APRIL TO TO 30 JUNE 30 JUNE CONIFEROUS 21 APRIL 7 APRIL TO TO 1 JUNE 17 MAY PERENNIALS 1 MAY 1 MAY TO TO 30 JUNE 30 JUNE SEEDLINGS 21 APRIL 7 APRIL TO TO 1 JUNE 1 JUNE FALLDECIDUOUSROOT BARE 1OCT. 10OCT. TO TO 1NOV. 15NOV. B&B CONTAINER 25AUG. 25AUG. TO TO 15OCT. 1NOV. CONIFEROUS 25AUG. 25AUG. TO TO 15SEPT. 15SEPT. PERENNIALS 25AUG. 25AUG. TO TO 15SEPT. 15SEPT. DATES.PLANTING DECIDUOUS FALL THE FOLLOW OR 1STJUNE THAN LATER NO SPRING THE ININSTALLED BE MUST PERENNIALS ROOTBARE1. ENGINEER. THE BYDETERMINED AS CONDITIONS, SEASONALUPON DEPENDING CHANGE MAY DATESACTUAL2. SUMAC. AND OAKS, PLUM/CHERRY,CRABAPPLE, WILLOW, MAPLE, ASH,MOUNTAIN BIRCH, HONEYLOCUST, IRONWOOD,LINDEN, HACKBERRY, POPLAR, DOGWOOD,HAWTHORN, SPECIES: FOLLOWING THE OF FORMROOT BARE FOR ALLOWED NOT IS PLANTINGFALL3. PERIOD. ESTABLISHMENTPLANT THE OF YEAR FIRST THE DURINGPLANTING) (FALL SEPTEMBER AND PLANTING)(SPRING MAY OF MONTH THE DURINGINSTALLED BE MUST PLANTS REPLACEMENTALL4. PROVISIONS. SPECIAL THE INSPECIFIED BE WILL DATES PLANTING MOVEDMACHINED5. 3 4 PLANTING SOIL INPLACE CULTIVATED SOILS THOROUGHLY MIXED WITH SPECIFIED ADDITIVES COMPOST AND OTHER 4 INCHES OF GRADE 21'-0"1'-4"MACHINE SPADING DIRECTION OF MACHINE SPADING DIRECTION OF PRIMARY TILLAGE - PASS 1 INCORPORATION TILLAGE - PASS 2 (MnDOT 2571.3D2) (MnDOT 2571.3D2) DEPTH INPLACE SOIL CULTIVATED 16"12"ACCEPTABLE PLANT STOCK GROWING RANGE LIMITS SOURCE: USDA PLANT HARDINESS ZONE MAP o o o o CANADA ND SD NE MN IA KS MO IL IN OH MI WI MT WY CO PA NY ZONES LEGEND TEMP. MIN. 3 4 FOLLOWS: AS LOCATED, IS SITE PROJECT THE WHERE ZONEMINNESOTA THE IN HARDINESS FOR ACCEPTABILITY DOCUMENT STOCK, PLANT ALLFOR SHOWN. LIMITS ACCEPTABLE THE WITHINYEARS TWO LAST THE LEAST AT FOR GROWN CONTINUOUSLY STOCKPLANTA. OR SHOWN. LIMITS ACCEPTABLE THE FROMORIGINATING STOCK GRAFT AND ROOT OR SOURCE SEED HAVINGLIMITS, RANGE GROWING ACCEPTABLE THE OUTSIDE GROWN STOCK,LANTPB. (MnDOT 3861.2C) -34.4 TO -40 F -28.9 TO -34.4 F o o -26.1 TO -28.9 F5a QUEBEC ONTARIO SASKATCHEWAN MANITOBA LAKE LAKEL AKELAKE LAKE SUPERIOR MICHIGANHUR ONERIE ONTANO 3 4 5a 5b 4 3 4 2 5a ZONES LEGEND ACCEPTABLE ZONES UNACCEPTABLE ZONES 2 1 1 0 LAKEWINNIPEGBAYHUDSON 6 6 5b5b 5b and 6 0, 1, 2, 3 4 CUT PRUNING CORRECT CLOSE TOO LONG TOO SLANTED TOO PRUNING BRANCHES PRUNED TO LIVE BUD BRANCHES PRUNED AT TRUNK B B C C D D X (SHIGO METHOD) LIVE BUD BRANCH COLLAR A A RIDGE BRANCH BARK BRANCH DEAD (MnDOT 2571.3K2a9 and 2571.3E1) :SAW PRUNING WITH PRUNING TOSTEPS A. POINT ATBRANCH THE THROUGH WAY PARTCUT1. A. TO B POINT FROMBRANCH THROUGH COMPLETELYCUT2. D. TO CPOINT FROM CUT COLLARBRANCH AT3. GROWTH. OF SEASON ONEAFTER FORMATION CALLUSDISCONTINUOUS IN RESULT WILL CLOSE)(TOO X TO C POINTFROM CUTINCORRECT GROWTH. OF SEASON ONE AFTERFORMATION CALLUS SHAPEDDOUGHNUT CONTINUOUS IN RESULTWILL ) A TO B POINT FROM STUB THE T NO BUT COLLAR BRANCH(LEAVING D TO C POINTFROM CUTCORRECT : NOTESPRUNING SAW. PRUNINGOR PRUNERTYPE-ISSORC SSHARP AND CLEAN USINGPRUNE1. SPRING.EARLY OR SEASON DORMANTLATE IS PRUNE TO TIME BESTTHE2. JULY. OR JUNEMAY, APRIL, IN OAKS PRUNINGAVOID3. SHELLAC. OR PAINTLATEX WITH WOUND ORSURFACE CUT PAINT IMMEDIATELYJULY, OR JUNE MAY, APRIL, INTREES OAK TO OCCUR WOUNDSIF OR NECESSARY IS PRUNINGIF4. LIVE BRANCH REVISED - JANUARY / 01 / 2014 NOTESGENERAL REQUIREMENTS. PROJECT SPECIFIC FOR PROVISIONS SPECIALSEE REQUIREMENTS.GENERAL FOR PROJECTS" LANDSCAPE MnDOT FOR MANUAL ADMINISTRATIONCONTRACT AND INSPECTION " " THE AND 3861, 2571, SPECIFICATIONS MnDOT TOREFER OPERATIONS. PLANTING INITIAL STARTING BEFORE WORK PREPARATORYCOMPLETE PLANTING. TO PRIOR 3861) (MnDOT WITH ACCORDANCE IN STOCK PLANT ALLACCEPT 4) STEP 2571.3D2 (MnDOT WITH ACCORDANCE INOPERATIONS CULTIVATION SOIL FOR COMPETENCY DEMONSTRATE WILL CONTRACTORTHE 2571.3F1) (MnDOT WITH ACCORDANCE INOPERATIONS INSTALLATION PLANT ALL FOR COMPETENCY DEMONSTRATE WILL CONTRACTORTHE PROTECTION RODENT (C) DETAILS PLANTING STANDARD AND PROVISIONS SPECIALSEE FERTILIZER PROVISIONS SPECIALSEE COMPOST SPECIFIED. OTHERWISE UNLESS 2 GRADE 3890MnDOT MATERIAL MULCH SPECIFIED. OTHERWISE UNLESS 6 TYPE 3882MnDOT BEDS PLANTING MASS (C) DETAILS PLANTING STANDARDSEE BED. PLANTING MASS ENTIRE MULCH IMMEDIATELY.DEFICIENCY OR SURPLUS QUANTITY PLANT GROSS OF ENGINEERNOTIFY SHRUB. THE OF CENTER THE TO TREE THE OF CENTERTHE FROM MEASURED BE WILL RADIUS TREE. CONIFER EACHAROUND RADIUS CLEAR 8' AND TREE DECIDUOUS EACH AROUNDSHRUBS OF CLEAR RADIUS 5' PROVIDE OTHERWISE. SPECIFIEDUNLESS SPACING, TRIANGULAR USE PLANTS. REMAINING WITH INFILL UNIFORMLY THEN FIRST, PERIMETER THE ON ROWSSTAGGERED IN BEDS PLANT SHEETS. ON SPECIFIED OTHERWISE UNLESSLESS, OR ___ AT PLACED PLANTS FOR BEDS PLANTING MASSPREPARE PREVENTION) CRACK (FROST PAINTING TREE BRANCH. MAJORFIRST TO LINE GROUND FROM CIRCUMFERENCE TREE PAINTACCEPTABLE. IS PAINT LATEX WHITE EXTERIOR UNDILUTED ONLYASH. MOUNTAIN AND CRABAPPLE MAPLE, LOCUST, LINDEN, OAK,PAINT DIMENSIONS PLANPLANTING PLAN. FROM SCALING SUPERCEDE DIMENSIONSSTATED 2571.3G) (MnDOT GUIDELINESWATERING TYPEPLANT APPLICATION PERWATER OF GALLONSAVERAGE TREES TRANSPLANTEDMACHINE 50-100 TREES BURLAPPED ANDBALLED 20 TREES CONTAINER AND ROOTBARE 15 SHRUBS BURLAPPED ANDBALLED 10 SHRUBS CONTAINER AND ROOTBARE 7 SEEDLINGSWOODY 4 VINES ANDPERENNIALS 3 REQUIREMENTS. NOT GUIDELINES, ARE ABOVE LISTED AMOUNTS THELEVELS. EXCESSIVE NOT BUT ADEQUATE AT MOISTURE SOILMAINTAIN AND MONITOR TO RESPONSIBILITY CONTRACTOR'S THE ISIT 2015 15' PROJECT LOCATION OFFICE OF ENVIRONMENTAL STEWARDSHIPDAVID LARSON DATE PRINTED:PROJECT MANAGER DRAWN BY TRANSPORTATION BUILDING STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION ST. PAUL, MINNESOTA 55155-1899MINNESOTADEPARTMENTOFTRANSPORTATIONOFFICE OF ENVIRONMENTAL STEWARDSHIP ENV. PLANNING AND DESIGN UNIT SHEET NO.OF SHEETS9 STANDARD PLANTING DETAILS (B) 8STATE PROJECT SP 1901-171 (T.H. 13) 2''831'875 '875 1'4''870'411'411INSTALLATION OF PLANTS 18"12"BA A C BBA REQUIREMENTS SIZE SPADE TREEMINIMUM CALIPER TREE,OAK TREE,CALIPER ORNAMENTAL DECIDUOUS/ HEIGHTTREE, CONIFEROUS 42" 1.5" to1" 3" to2" 7' to5' 60" 2.5" to1.5" 4" to3" 9' to7' 78" 3.5" to2.5" 6" to4" 14' to9' 85" 5" to3.5" 8" to6" 18' to14' SIZE DIAMETER (C) SPADE BALLED & BURLAPPED STOCK HOLE. OF BOTTOM AND SIDESSCARIFY1. . PRUNING CORRECTIVE WITHPROCEED2. INTACT. USED), (IF BASKET,IRE W AND BURLAPWITH GRADE FINISHED THE ABOVE 2" TO UP OR AT ISFLARE ROOT THE SO PLANT INSTALL SOIL. PLANTINGCOMPACTED THOROUGHLY OR SOIL NATIVE UNDISTURBED ON PLANTSET3. INTERVALS. 6" AT BURLAP TREATED REMAININGSLIT4. PLANT. WATER THEN ROOTBALL,THE OF TOP THE OF 12" APPROXIMATELY WITHIN TOBACKFILL5. ROOTS. RDLINGI G STEM CORRECT OR REMOVE TWINE. ALLREMOVE BALL. THE OF 1/3 TOP THE FROM NAILS ANDBURLAP ALL REMOVE GREATER. IS WHICHEVER RINGSHORIZONTAL TWO TOP THE OR BASKET THE OF 1/3 TOP THEREMOVE6. SOIL. PLANTING WITH BACKFILL ANDPLUMB7. VOIDS. FILLAND PLANTS SETTLETO HOURS 2 WITHIN THOROUGHLYWATER8. TIME. SECOND A WATER AND VOIDS FILLBACK9. EXCESSIVE. IS MOISTURE SOILUNLESS WATERING SECOND THE OF HOURS 48 WITHIN MULCHPLACE10. PLANTING. TO PRIOR HOURS 24 THAN MORENOT BUT HOUR ONE LEAST AT FOR WATER IN ROOTSSOAK1. HOLE. OF BOTTOM AND SIDESSCARIFY2. .ROOTS AND TOP THE OF PRUNING CORRECTIVE WITHPROCEED3. SOIL. PLANTING WITH BACKFILLIMMEDIATELY AND PLUMB EVENLY. OUT ROOTS SPREADELEVATION. SOIL FINISHED THE AT IS FLARE ROOT THE SOPLANT SET HOLE. TO WATER FROM DIRECTLY PLANTTRANSFER4. VOIDS. FILL ANDPLANTS SETTLETO HOURS 2 WITHIN THOROUGHLYWATER5. TIME. SECOND A WATER AND VOIDS FILLBACK6. EXCESSIVE. IS MOISTURE SOIL UNLESSWATERING SECOND THE OF HOURS 48 WITHIN MULCHPLACE7. BARE ROOT STOCK HOLE. OF BOTTOM AND SIDESSCARIFY1. . ROOT AND TOP OF PRUNING CORRECTIVE WITHPROCEED2. ROOTS.LINGD GIR STEM CORRECT ORREMOVE ROOTS. FIBROUS CIRCLING PREVENT AND REDIRECTTO MASS SOIL OF OUTSIDE SCORE AND CONTAINERREMOVE3. GRADE. FINISHED THE ABOVE 2"TO UP OR AT IS FLARE ROOT THE OF TOP THE SOPLANT INSTALL SOIL. PLANTING COMPACTEDTHOROUGHLY OR SOIL NATIVE UNDISTURBED ON PLANTSET4. SOIL. PLANTING WITH BACKFILL ANDPLUMB5. VOIDS. FILLAND PLANT SETTLETO HOURS 2 WITHIN THOROUGHLYWATER6. TIME. SECOND A WATER AND VOIDS FILLBACK7. EXCESSIVE. IS MOISTURE SOIL UNLESSWATERING SECOND THE OF HOURS 48 WITHIN MULCHPLACE8. CONTAINER STOCK MACHINE MOVED STOCK HOLE. OF BOTTOM AND SIDESSCARIFY1. PRUNING. CORRECTIVE WITHPROCEED2. GROWN. PREVIOUSLY WAS IT AS DEPTH SAME AT SOIL NATIVE ON PLANTSET3. SOIL. PLANTING WITH BACKFILL ANDPLUMB4. 12". OF DEPTH MINIMUM A AND 18"OF DISTANCE MINIMUM A TO BALLROOT THE TOADJACENT IMMEDIATELY SOIL THE LOOSEN PLANTING,AFTER5. VOIDS. FILLAND PLANT SETTLETO HOURS 2 WITHIN THOROUGHLYWATER6. TIME. SECOND A WATER AND VOIDS FILLBACK7. EXCESSIVE. IS MOISTURE SOIL UNLESSWATERING SECOND THE OF HOURS 48 WITHIN MULCHPLACE8. PLANTING DETAILS (A) DETAIL SEE STANDARD FOR PLANTING SOIL PLANTING DETAILS (A) DETAIL SEE STANDARD FOR PLANTING SOIL PLANTING DETAILS (A) DETAIL SEE STANDARD FOR PLANTING SOIL SOIL LOOSENED PLANTING DETAILS (A) DETAIL SEE STANDARD FOR PLANTING SOIL PLANTING DETAIL (B) SEE STANDARD FOR MULCH DETAIL PLANTING DETAIL (B) SEE STANDARD FOR MULCH DETAIL (MnDOT 2571.3F) DIMENSIONS HOLEPLANTING BALL. SOIL OF BOTTOM TOFLAIR ROOT FROM MEASUREMENT EXCEED NOT SHALL PLANTS CONTAINER AND B&B FOR DEPTHHOLE TYPEPLANT INCLUDINGAND TO UP SIZEPLANT WIDTH HOLE MINIMUM(A) DEPTHHOLE APPROXIMATE(B) TREES ORNAMENTAL &DECIDUOUS B.R.3'46"13" B.R4'46"14" B.R.5'48"14" B.R.6'54"15" B.R7'60"16" B.R.8'66"19" B.R.0.75"48'12" B.R.1"54"14" B.R.1.25"60"14" B.R.1.5 66"15" B.R1.75"72"16" B.R.2"84"19" B.B.4'42"11" B.B.5'48"12" B.B.6'52"14" B.B.8'66"16" B.B.10'66"16" B.B.12'48"16" B.B.1"54"14" B.B.1.25"56"15" B.B.1.5"61"15" B.B.1.75"66"16" B.B.2"72"16" B.B.2.5"84"19" B.B.3"96"20" B.B.3.5"114"23" B.B.4"126"25" PERENNIALSAND ROSESSHRUBS, DECIDUOUS B.R.12"24"7" B.R.15"28"8" B.R.18"30"8" B.R.2'33"9" B.R.3'42"11" B.B.4'48"12" TRENCH.CONTINUOUS A INSPACING ON-CENTERUPON BASED BESHALL WIDTH ANDDEPTH HOLEPERENNIAL B.R.5'54"14" B.R.6'60"14" B.B.18"27"7" B.B.2'30"8" B.B.3'36"9" B.B.4'42"11" B.B.5'48"12" B.B.6'54"14"12"MIN.2 2 2 '211 '4183 x 3 / 5 x HEIGHT MULCH PLACEMENT (MnDOT 2571.3H) SPACING FROM TRUNK '870'HEIGHT PLANT OFTYPE PLANT PER FT.SQ. TREESCONIFEROUS 2 TREESORNAMENTAL ANDDECIDUOUS GRASSORNAMENTAL PERENNIALS, BUSHS,ROSE SHRUBS,DECIDUOUS ANDCONIFEROUS SPACING xSPACING VINES 2 xSPACING 2 MULCH AREA CALCULATOR = 3.1416 6"MAX+3 X SPADE DIAMETER +1 XTREES OR SHRUBS MACHINE-MOVED .STEM MAIN ORTRUNK THE ATSHRUBS ANDS TREEFROM 6" THAN MORENO AND 3" THANLESS NO BACK MULCHPULL1. DEPTH. 3"MINIMUM A ATMAINTAINED IS DEPTH MULCHTHE IF PERIODESTABLISHED THETHROUGHOUT ACCEPTABLEIS MULCHDETERIORATING ORSUBSIDING2. DEPTH.MAXIMUM 6" THE EXCEEDNOT DO, DEPTHMINIMUM 3" THE BELOW WHEN MULCHADD3. REPLACED. ANDREMOVED BE MUST SOILWITH CONTAMINATEDMULCH4. DECIDUOUS TREE (3' min.) TRANSPLANT (RADIUS+2' min.) DECIDUOUS SHRUB (3'min.) CONIFEROUS AND CONIFEROUS TREE (RADIUS+3' min.) '433'4 33 INSTALLATION OF VINES MIN. 2'-0"MIN. 2'-0" CHAIN-LINK FENCE INPLACE WALL OR FENCE AGAINST THE WALL TOP RESTS SNUGLEY AT AN ANGLE SO THE DRIVEN 12" INTO SOIL 1" x 36" WOOD LATH VINE 5' BEYOND TERMINAL BETWEEN VINES AND MULCH CONTINUOUSLY TO RIGHT ROOT STOCK DETAILS TO APPLICABLE PLANT ACCORDING NOTE: BIODEGRADABLE STRING LATH WITH FASTEN LOOSELY TO REVISED - JANUARY / 01 / 2014 DIMENSIONS HOLEPLANTING BALL. SOIL OF BOTTOM TOFLAIR ROOT FROM MEASUREMENT EXCEED NOT SHALL PLANTS CONTAINER AND B&B FOR DEPTHHOLE TYPEPLANT INCLUDINGAND TO UP SIZEPLANT WIDTH HOLE MINIMUM(A) DEPTHHOLE APPROXIMATE(B) TREES CONIFEROUS B.B2'36"10" B.B3'42"11" B.B4'51"13" BUDSTERMINAL CONTAINWILL BRANCHESCONIFER ALL OF 2/3 LEASTAT B.B5'60"13" B.B6'66"15" B.B7'72"16" B.B8'81"18" B.B9'90"20" B.B10'102"21" B.B12'114"24" SHRUBS CONIFEROUS B.B.18"24"7" B.B.3'48"12" (UPRIGHT) SHRUBS CONIFEROUS B.B. SPR18"30"8" B.B. SPR2'36"9" (SPREADING) PLANTSGROWN CONTAINER PLUGS /CELLPACKS 6"2.5" CONT.2.25"7"3" CONT.3.5"10"3" CONT.4"11"4" CONT.4.5"13"4" CONT. QT6"/1 15"5.5" CONT.1#18"6" CONT.2#23"7.5" CONT.3#29"8.5" CONT.5#30"11" CONT.7#37"11" CONT.15#44"14" CONT.10#45"15" CONT.20#60"16" CONT.25#72"17" SEEDLINGS SEEDLING6"15"14" SEEDLING9"18"14" SEEDLING12"23"16" SEEDLING18"30"16" SEEDLING2'36"18" VINES B.R. MED YR.1 15"11" B.R. 1 NO. YR.1 17"14' B.R. MED. YR.2 33"12" B.R. 1 NO. YR.2 42"15" WALL INSTALLATION FENCE INSTALLATION PLANTING DETAILS (A) DETAIL SEE STANDARD FOR PLANTING SOIL OFFICE OF ENVIRONMENTAL STEWARDSHIPDAVID LARSON DATE PRINTED:PROJECT MANAGER DRAWN BY TRANSPORTATION BUILDING STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION ST. PAUL, MINNESOTA 55155-1899MINNESOTADEPARTMENTOFTRANSPORTATIONOFFICE OF ENVIRONMENTAL STEWARDSHIP ENV. PLANNING AND DESIGN UNIT SHEET NO.OF SHEETS9 STANDARD PLANTING DETAILS (C) 9STATE PROJECT SP 1901-171 (T.H. 13) '210'851 8' FOR CONIFEROUS TREES 5' FOR DECIDUOUS TREES CHART ON STANDARD PLANTING DETAILS (B) MINIMUMS FROM THE PLANTING HOLE DIMENSIONS HOLE EXCAVATION WIDTH IN ACCORDANCE WITH PLANTING DETAILS (A) DETAIL SEE STANDARD FOR PLANTING SOIL PLANT SPACING IN MASS BEDS PLANTING DETAIL (B) SEE STANDARD FOR MULCH DETAIL INSTALL GRANULAR FILTER INSTALL TILE DRAINAGE '830 GRADE.FINISHED THAN HIGHER 1"-3" MASS ROOT OF TOP THE PLACING ALLOW TO BED OR HOLEEXCAVATE1. SUBSOIL. DRAIN ADEQUATELY TOLAYER SOIL PAN HARD DRAINED POORLY OR IMPERVIOUS THROUGH ENTIRELY HOLES DIAMETER 8"AUGER2. DRAINAGE. POSITIVE FOR NECESSARY IF 8" ADDITIONAL AN RE-AUGER DRAINAGE. POSITIVE FORTEST3. SOIL. INPLACE 50%AND SAND 50% OF MIXTURE INCORPORATED UNIFORM A WITH HOLES AUGER BACKFILLTHOUROUGHLY4. (B). DETAILS PLANTING STANDARD SEE TYPE.ROOT TO ACCORDING PLANTINGCOMPLETE5. GRADE. FINISHED THANHIGHER 1"-3" MASS ROOT THE OF TOP THE PLACING ALLOW TO BED OR HOLEEXCAVATE1. GRADE. LOWER A AT DAYLIGHTING TILE DRAIN DIAMETER MINIMUM 4"INSTALL2. ). (B DETAILS PLANTING STANDARD SEE TYPE.ROOT TO ACCORDING PLANTINGCOMPLETE3. INSTALL MINI-BERM NOTE: APPROVAL.ENGINEER TO SUBJECT CONTRACTOR, THE BY DETERMINED ARE USE TO TYPEWHICH AND SOILS DRAINED POORLY FOR DETAILS PLANTING USING FOR NEEDTHE1. MASS. ROOT THE OF DEPTH THE 1/4 BED OR HOLEEXCAVATE1. HOLE. IN MASS ROOTSET2. HEIGHT. BERM THETIMES 3 OF WIDTH A TO BASE BERM THE EXTEND. SOILPLANTING WITH BERMCONSTRUCT3. (B). DETAILS PLANTING STANDARD SEE TYPE.ROOT ACCORDING PLANTINGCOMPLETE4. PLANTING DETAIL FOR POORLY DRAINED SOILS MASSROOT1/4 HOLES 8" AUGER TILE 4" DRAIN PLANTING DETAILS (A) DETAIL SEE STANDARD FOR PLANTING SOIL PLANTING DETAILS (A) DETAIL SEE STANDARD FOR PLANTING SOIL PLANTING DETAILS (A) DETAIL SEE STANDARD FOR PLANTING SOIL PLANTING DETAIL (B) SEE STANDARD FOR MULCH DETAIL PLANTING DETAIL (B) SEE STANDARD FOR MULCH DETAIL PLANTING DETAIL (B) SEE STANDARD FOR MULCH DETAIL (MnDOT 2571.3D2 (STEP 8) NOTE: BASIN. WATERING THE OF HALF UPHILLTHE CONSTRUCT NOT DO GREATER, OR SLOPES 1:2ON1. CUT AREA EXISTING GRADE WATER BASIN UPHILL HALF WATER BASIN DOWN HILL HALF PLANTING DETAILS (A) DETAIL SEE STANDARD FOR PLANTING SOIL DETAILS (B) SEE STANDARD PLANTING ROOT TYPE. PLANT ACCORDING TO PLANTING ON SLOPES HOLD WATER IN BASIN. SOIL RIDGE TO PLANTING DETAIL (B) SEE STANDARD FOR MULCH DETAIL RIM. TOPOUTWARD-FLARED AN ANDPERFORATION LINE LASER A WITHTUBES POLYPROPYLENETRANSLUCENT SEMI AND RIGIDTWIN-WALL, EXTRUDED, SEAMLESS,USE1. TWISTING. OR DISLODGINGPREVENT TO STAKE OAK WHITE 1''x 1'' A TO ATTACHED-TIESCABLE NYLON WITH SHELTERSECURE2. ROOTS. TREE THEDISTURBING WITHOUT SURFACE SOILTHE BELOW 1'' OF MINIMUM ATUBE THE OF BOTTOM THEEMBED3. SHOWN. AS DOWNNETTING PULL TUBE. THE OFTOP THE OVER SLEEVE ANDCOVER NETTINGPHOTODEGRADABLE PLASTIC AINSTALL4."872'-01'-0""431'-5 1'-9"1'-0"SEEDLING TREE SHELTER 2'-0" MIN.12" TO 14"PREVAILING WIND RECESS FORMED TUBE SECURE STAKE IN CABLE-TIE TO (LENGTH VARIES) STAKE TUBE SHELTER PERFORATION LASER LINE NETTING (MnDOT 2571.3I4) RODENT PROTECTION 15" WIRE MESH STAKE CONIFEROUS TREES 12" MIN. HT. FOR DECIDUOUS TREES 24" MIN. HT. FOR 2". END CUT THE OVERLAPCLOTH). (HARDWARE MESH WIRE WELDED GALVANIZED GRID 0.25" USING CYLINDER DOUBLE-LAYERED AFORM1. STEM. TREE THE OFCENTER THE FROM 7", GROUND THE INTO STAKES OAK WHITE HEARTWOOD OPPOSING 1" x 1" TWODRIVE2. OVERLAP. THE ALONG CENTER ON 4" APPROXIMATELY SPACE OVERLAP. THE ALONG-TIESCABLE OR WASHERS AND SCREWS EITHER, USING STAKES THE OF OUTSIDE THE TO CYLINDER MESH THESECURE3. WASHERS. WITH LONG 3/4" x DIA. 1/8" GALVANIZED HEAD ROUND BE SHALLSCREWSa. OR .STRENGTH TENSILE 120LB TO 75LB BETWEEN AND LONG 8" LEAST AT, NYLON BE SHALLTIES-CABLEb. ROOTS. TREETHE DISTURBING WITHOUT SURFACE SOIL THE BELOW 1" CYLINDER MESH THE OF EDGE LOWER THEEMBED4. CYLINDER. THE OF TOPTHE WITH FLUSH BE WILL STAKE CYLINDER. THE OF TOP THE AT PERMITTED BE NOT WILL EDGESCUT5. DETAIL. PLACEMENT MULCH IN SPECIFIED ASTRUNK THE FROM BACK PULLED BE SHALL AND DEPTH 3" EXCEED NOT SHALL CYLINDER THE WITHINMULCH6. GUARDS. RODENT HEIGHT MIN. 12" OFINSTALLATION PERMIT TO REMOVED BE TO HAVE MAY BRANCHES LARCH AND PINE OF WHORL BOTTOMTHE7. TREES. SPRUCE ONPLACE NOT DO TREES, LARCH AND PINE DECIDUOUS, ALL ONINSTALL8. (MnDOT 2571.3I2)'814'214'212'832STAKING AND GUYING SIZING POSTSTEEL CALIPER TYPE POSTSTEEL A B C D INCHES4 THENLESS 7'-0"MIN. 3'-0"4'-0"3'-0" INCHES 4THEN GREATER 10'-0"MIN. 4'-0"6'-0"5'-0" A B C D SLOPE. GROUND OFREGARDLESS PLUMB DRIVE BALL.ROOT OF OUTSIDE PLACEWIRES. GUY RETAIN TO DRILLEDOR NOTCHED BE TO POSTSTEELS1. APPROVED.BE NOT WILL SYSTEMSGUYING WIRE AND HOSERUBBER SUBSTITUTE TOREQUESTS2. YEAR. ONEWITHIN REMOVE4. 10 ga WIRE. STRAPS. ATTACH WITH THICK AND 1.5" WIDE POLYETHYLENE, 40 MIL. POLYROPYLENE OR 16" LONG SEE CHART STEEL POST BY THE ENGINEER. PROBLEM, OR AS DIRECTED WIND CONDITIONS ARE A WHERE VANDALISM, SOIL, OR TREES IN A PLUMB CONDITION OR NECESSARY TO MAINTAIN REQUIRED UNLESS SPECIFIED 3. TREE STAKING IS NOT OR APPROVED EQUAL. POST (MnDOT 3401) CHANNEL STEEL SIGN 10', 2.2 LB. FLANGED (MnDOT 2571.3I1) OR APPROVED EQUAL. POST (MnDOT 3403) ROLLED STEEL FENCE REVISED - JANUARY / 01 / 2014 12" 16" STANDARD PLANTING DETAILS ACCEPTABLE PLANT STOCK GROWING RANGE LIMITS SOURCE: USDA PLANT HARDINESS ZONE MAP o o CANADA ND SD NE MN IA KS MO IL IN OH MI WI MT WY CO PA NY ZONES LEGEND TEMP. MIN. 3 4 FOLLOWS: AS LOCATED, IS SITE PROJECT THE WHERE ZONEMINNESOTA THE IN HARDINESS FOR ACCEPTABILITY DOCUMENT STOCK, PLANT ALLFOR SHOWN. LIMITS ACCEPTABLE THE WITHINYEARS TWO LAST THE LEAST AT FOR GROWN CONTINUOUSLY STOCKPLANTA. OR SHOWN. LIMITS ACCEPTABLE THE FROMORIGINATING STOCK GRAFT AND ROOT OR SOURCE SEED HAVINGLIMITS, RANGE GROWING ACCEPTABLE THE OUTSIDE GROWN STOCK,LANTPB. (MnDOT 3861.2C) -34.4 TO -40 F -28.9 TO -34.4 F o -26.1 TO -28.9 F5a QUEBEC ONTARIO SASKATCHEWAN MANITOBA LAKE LAKEL AKELAKE LAKE SUPERIOR MICHIGANHU RO N ERIE ONTANO 3 4 5a 5b 4 3 4 2 5a ZONES LEGEND ACCEPTABLE ZONES UNACCEPTABLE ZONES 2 1 1 0 LAKEWINNIPEGBAYHUDSON 6 6 5b5b 5b and 6 0, 1, 2, PLANTING SOIL INPLACE CULTIVATED SOILS THOROUGHLY MIXED WITH SPECIFIED ADDITIVES COMPOST AND OTHER 4 INCHES OF GRADE 2 MACHINE SPADING DIRECTION OF MACHINE SPADING DIRECTION OF PRIMARY TILLAGE - PASS 1 INCORPORATION TILLAGE - PASS 2 (MnDOT 2571.3D.2) DEPTH INPLACE SOIL CULTIVATED CUT PRUNING CORRECT CLOSE TOO LONG TOO SLANTED TOO PRUNING BRANCHES PRUNED TO LIVE BUD BRANCHES PRUNED AT TRUNK B B C C D D X LIVE BUD BRANCH COLLAR RIDGE BRANCH BARK BRANCH DEAD :SAW PRUNING WITH PRUNING TOSTEPS A. POINT ATBRANCH THE THROUGH WAY PARTCUT1. A. TO B POINT FROMBRANCH THROUGH COMPLETELYCUT2. D. TO CPOINT FROM CUT COLLARBRANCH AT3. GROWTH. OF SEASON ONEAFTER FORMATION CALLUSDISCONTINUOUS IN RESULT WILL CLOSE)(TOO X TO C POINTFROM CUTINCORRECT GROWTH. OF SEASON ONE AFTERFORMATION CALLUS SHAPEDDOUGHNUT CONTINUOUS IN RESULTWILL ) A TO B POINT FROM STUB THE T NO BUT COLLAR BRANCH(LEAVING D TO C POINTFROM CUTCORRECT : NOTESPRUNING SAW. PRUNINGOR PRUNERTYPE-ISSORC SSHARP AND CLEAN USINGPRUNE1. SPRING.EARLY OR SEASON DORMANTLATE IS PRUNE TO TIME BESTTHE2. JULY. OR JUNEMAY, APRIL, IN OAKS PRUNINGAVOID3. SHELLAC. OR PAINTLATEX WITH WOUND ORSURFACE CUT PAINT IMMEDIATELYJULY, OR JUNE MAY, APRIL, INTREES OAK TO OCCUR WOUNDSIF OR NECESSARY IS PRUNINGIF4. (MnDOT 2571.3E.1 and 2571.3K.2.a(9)) NOTESGENERAL REQUIREMENTS. PROJECT SPECIFIC FOR PROVISIONS SPECIALSEE OPERATIONS. PLANTING INITIAL STARTING BEFORE WORK PREPARATORYCOMPLETE PLANTING. TO PRIOR 3861) (MnDOT WITH ACCORDANCE IN STOCK PLANT ALLACCEPT 2571.3D.2) (MnDOT WITH ACCORDANCE INOPERATIONS CULTIVATION SOIL FOR COMPETENCY DEMONSTRATE WILL CONTRACTORTHE 2571.3F1) (MnDOT WITH ACCORDANCE INOPERATIONS INSTALLATION PLANT ALL FOR COMPETENCY DEMONSTRATE WILL CONTRACTORTHE PROTECTION RODENT 3) OF (3 DETAILS PLANTING STANDARD AND PROVISIONS SPECIALSEE FERTILIZER PROVISIONS SPECIALSEE COMPOST MATERIAL MULCH BEDS PLANTING MASS 3) OF (3 DETAILS PLANTING STANDARDSEE BED. PLANTING MASS ENTIRE MULCH IMMEDIATELY.DEFICIENCY OR SURPLUS QUANTITY PLANT GROSS OF ENGINEERNOTIFY SHRUB. THE OF CENTER THE TO TREE THE OF CENTERTHE FROM MEASURED BE WILL RADIUS TREE. CONIFER EACHAROUND RADIUS CLEAR 8' AND TREE DECIDUOUS EACH AROUNDSHRUBS OF CLEAR RADIUS 5' PROVIDE OTHERWISE. SPECIFIEDUNLESS SPACING, TRIANGULAR USE PLANTS. REMAINING WITH INFILL UNIFORMLY THEN FIRST, PERIMETER THE ON ROWSSTAGGERED IN BEDS PLANT SHEETS. ON SPECIFIED OTHERWISE UNLESSLESS, OR 15' AT PLACED PLANTS FOR BEDS PLANTING MASSPREPARE PREVENTION) CRACK (FROST PAINTING TREE BRANCH. MAJORFIRST TO LINE GROUND FROM CIRCUMFERENCE TREE PAINTACCEPTABLE. IS PAINT LATEX WHITE EXTERIOR UNDILUTED ONLYASH. MOUNTAIN AND CRABAPPLE MAPLE, LOCUST, LINDEN, OAK,PAINT DIMENSIONS PLANPLANTING PLAN. FROM SCALING SUPERCEDE DIMENSIONSSTATED 2571.3G) (MnDOT GUIDELINESWATERING TYPEPLANT APPLICATION PERWATER OF GALLONSAVERAGE TREES TRANSPLANTEDMACHINE 50-100 TREES BURLAPPED ANDBALLED 20 TREES CONTAINER AND ROOTBARE 15 SHRUBS BURLAPPED ANDBALLED 10 SHRUBS CONTAINER AND ROOTBARE 7 SEEDLINGSWOODY 4 VINES ANDPERENNIALS 3 REQUIREMENTS. NOT GUIDELINES, ARE ABOVE LISTED AMOUNTS THELEVELS. EXCESSIVE NOT BUT ADEQUATE AT MOISTURE SOILMAINTAIN AND MONITOR TO RESPONSIBILITY CONTRACTOR'S THE ISIT (MnDOT 2571.3D) MnDOT 3890 COMPOST GRADE 2 UNLESS OTHERWISE SPECIFIED. MnDOT 3882 MULCH MATERIAL TYPE 6 UNLESS OTHERWISE SPECIFIED. LIVE BRANCH 3 4 (SHIGO METHOD) A A REFER TO MnDOT SPECIFICATIONS 2571, 2572, 3861, FOR GENERAL REQUIREMENTS.MINNESOTA DEPARTMEN TOF TRANSPORTATION REVISED: APPROVED: 12-11-2015 STATE DESIGN ENGINEER STANDARD PLAN 5-297.301 1 OF 3 CHIEF ENVIRONMENTAL OFFICER REVISION: APPROVED: DECEMBER 11, 2015 ZONE BY DATESPLANTING SPRINGDECIDUOUSROOT BARE 21 APRIL 7 APRIL TO TO 1 JUNE 1 JUNE B&B CONTAINER 21 APRIL 7 APRIL TO TO 30 JUNE 30 JUNE CONIFEROUS 21 APRIL 7 APRIL TO TO 1 JUNE 17 MAY PERENNIALS 1 MAY 1 MAY TO TO 30 JUNE 30 JUNE SEEDLINGS 21 APRIL 7 APRIL TO TO 1 JUNE 1 JUNE FALLDECIDUOUSROOT BARE 1OCT. 10OCT. TO TO 1NOV. 15NOV. B&B CONTAINER 25AUG. 25AUG. TO TO 15OCT. 1NOV. CONIFEROUS 25AUG. 25AUG. TO TO 15SEPT. 15SEPT. PERENNIALS 25AUG. 25AUG. TO TO 15SEPT. 15SEPT. 3 4 DATES.PLANTING DECIDUOUS FALL THE FOLLOW OR1ST JUNE THAN LATER NO SPRING THEIN PLACED BE MUST PERENNIALS ROOTBARE1. ENGINEER. THE BYDETERMINED AS CONDITIONS, SEASONALUPON DEPENDING CHANGE MAY DATESACTUAL2. SUMAC. AND OAKS,PLUM/CHERRY, CRABAPPLE, WILLOW,MAPLE, ASH, MOUNTAIN BIRCH,HONEYLOCUST, IRONWOOD, LINDEN, HACKBERRY,POPLAR, DOGWOOD, HAWTHORN,SPECIES: FOLLOWING THE OF FORM ROOTBARE FOR ALLOWED NOT IS PLANTINGFALL3. PERIOD. ESTABLISHMENT PLANTTHE OF YEAR FIRST THEDURING PLANTING) (FALL SEPTEMBER AND PLANTING)(SPRING MAY OF MONTH THE DURINGPLACED BE MUST PLANTS REPLACEMENTALL4. PLANT INSTALLATION PERIOD BE SPECIFIED IN THE SPECIAL PROVISIONS. 5. MACHINE MOVED PLANTING DATES WILL 2 2 2 MIN. 2'-0" A B12"A BBA C 18" MIN> 2'-0" SPACING FROM TRUNK HEIGHTSTANDARD PLANTING DETAILS PLANTING DETAILS (1 OF 3) DETAIL SEE STANDARD FOR PLANTING SOIL PLANTING DETAILS (1 OF 3) DETAIL SEE STANDARD FOR PLANTING SOIL PLANTING DETAILS (1 OF 3) DETAIL SEE STANDARD FOR PLANTING SOIL PLANTING DETAIL (2 OF 3) SEE STANDARD FOR MULCH DETAIL SOIL LOOSENED (MnDOT 2571.3H) MULCHINSTALLATION OF VINES PLANTING DETAILS (1 OF 3) DETAIL SEE STANDARD FOR PLANTING SOIL PLANTING DETAIL (2 OF 3) SEE STANDARD FOR MULCH DETAIL CHAIN-LINK FENCE INPLACE WALL BIODEGRADABLE STRING LATH WITH FASTEN LOOSELY TO OR FENCE AGAINST THE WALL TOP RESTS SNUGLEY AT AN ANGLE SO THE DRIVEN 12" INTO SOIL 1" x 36" WOOD LATH VINE 5' BEYOND TERMINAL BETWEEN VINES AND MULCH CONTINUOUSLY TO RIGHT ROOT STOCK DETAILS TO APPLICABLE PLANT ACCORDING NOTE: CONIFEROUS TREE (RADIUS+3' min.)'CHIEF ENVIRONMENTAL OFFICER REVISION: APPROVED: DECEMBER 11, 2015 MINNESOTA DEPARTMEN TOF TRANSPORTATION REVISED: APPROVED: 12-11-2015 STATE DESIGN ENGINEER STANDARD PLAN 5-297.301 2 OF 3 BALLED & BURLAPPED STOCK PLANTING. TO PRIOR HOURS 24 THAN MORENOT BUT HOUR ONE LEAST AT FOR WATER IN ROOTSSOAK1. HOLE. OF BOTTOM AND SIDESSCARIFY2. .ROOTS AND TOP THE OF PRUNING CORRECTIVE WITHPROCEED3. SOIL. PLANTING WITH BACKFILLIMMEDIATELY AND PLUMB EVENLY. OUT ROOTS SPREADELEVATION. SOIL FINISHED THE AT IS FLARE ROOT THE SOPLANT SET HOLE. TO WATER FROM DIRECTLY PLANTTRANSFER4. VOIDS. FILL ANDPLANTS SETTLETO HOURS 2 WITHIN THOROUGHLYWATER5. TIME. SECOND A WATER AND VOIDS FILLBACK6. EXCESSIVE. IS MOISTURE SOIL UNLESSWATERING SECOND THE OF HOURS 48 WITHIN MULCHPLACE7. BARE ROOT STOCK HOLE. OF BOTTOM AND SIDESSCARIFY1. . ROOT AND TOP OF PRUNING CORRECTIVE WITHPROCEED2. ROOTS.LINGD GIR STEM CORRECT ORREMOVE ROOTS. FIBROUS CIRCLING PREVENT AND REDIRECTTO MASS SOIL OF OUTSIDE SCORE AND CONTAINERREMOVE3. GRADE. FINISHED THE ABOVE 2"TO UP OR AT IS FLARE ROOT THE OF TOP THE SOPLANT INSTALL SOIL. PLANTING COMPACTEDTHOROUGHLY OR SOIL NATIVE UNDISTURBED ON PLANTSET4. SOIL. PLANTING WITH BACKFILL ANDPLUMB5. VOIDS. FILLAND PLANT SETTLETO HOURS 2 WITHIN THOROUGHLYWATER6. TIME. SECOND A WATER AND VOIDS FILLBACK7. EXCESSIVE. IS MOISTURE SOIL UNLESSWATERING SECOND THE OF HOURS 48 WITHIN MULCHPLACE8. CONTAINER STOCK MACHINE MOVED STOCK HOLE. OF BOTTOM AND SIDESSCARIFY1. PRUNING. CORRECTIVE WITHPROCEED2. GROWN. PREVIOUSLY WAS IT AS DEPTH SAME AT SOIL NATIVE ON PLANTSET3. SOIL. PLANTING WITH BACKFILL ANDPLUMB4. 12". OF DEPTH MINIMUM A AND 18"OF DISTANCE MINIMUM A TO BALLROOT THE TOADJACENT IMMEDIATELY SOIL THE LOOSEN PLANTING,AFTER5. VOIDS. FILLAND PLANT SETTLETO HOURS 2 WITHIN THOROUGHLYWATER6. TIME. SECOND A WATER AND VOIDS FILLBACK7. EXCESSIVE. IS MOISTURE SOIL UNLESSWATERING SECOND THE OF HOURS 48 WITHIN MULCHPLACE8. (MnDOT 2571.3F)MIN. REQUIREMENTS SIZE SPADE TREEMINIMUM HOLE. OF BOTTOM AND SIDESSCARIFY1. PRUNING. CORRECTIVE WITHPROCEED2. INTACT. USED), (IF BASKET, WIRE AND BURLAPWITH GRADE FINISHED THE ABOVE 2" TO UP OR AT ISFLARE ROOT THE SO PLANTPLACE SOIL. PLANTINGCOMPACTED THOROUGHLY OR SOIL NATIVE UNDISTURBED ON PLANTSET3. INTERVALS. 6" AT BURLAP TREATED REMAININGSLIT4. PLANT. WATER THEN ROOTBALL,THE OF TOP THE OF 12" APPROXIMATELY WITHIN TOBACKFILL5. ROOTS. RDLING GI STEM CORRECT OR REMOVE TWINE. ALLREMOVE BALL. THE OF 1/3 TOP THE FROM NAILS ANDBURLAP ALL REMOVE GREATER. IS WHICHEVER RINGSHORIZONTAL TWO TOP THE OR BASKET THE OF 1/3 TOP THEREMOVE6. SOIL. PLANTING WITH BACKFILL ANDPLUMB7. VOIDS. FILLAND PLANTS SETTLE TO HOURS 2 WITHIN THOROUGHLYWATER8. TIME. SECOND A WATER AND VOIDS FILLBACK9. EXCESSIVE. IS MOISTURE SOILUNLESS WATERING SECOND THE OF HOURS 48 WITHIN MULCHPLACE10. DIMENSIONS HOLEPLANTING BALL. SOIL OF BOTTOM TOFLAIR ROOT FROM MEASUREMENT EXCEED NOT SHALL PLANTS CONTAINER AND B&B FOR DEPTHHOLE TYPEPLANT INCLUDINGAND TO UP SIZEPLANT WIDTH HOLE MINIMUM(A) DEPTHHOLE APPROXIMATE(B) TREES ORNAMENTAL &DECIDUOUS B.R.3'46"13" B.R4'46"14" B.R.5'48"14" B.R.6'54"15" B.R7'60"16" B.R.8'66"19" B.R.0.75"48'12" B.R.1"54"14" B.R.1.25"60"14" B.R.1.5 66"15" B.R1.75"72"16" B.R.2"84"19" B.B.4'42"11" B.B.5'48"12" B.B.6'52"14" B.B.8'66"16" B.B.10'66"16" B.B.12'48"16" B.B.1"54"14" B.B.1.25"56"15" B.B.1.5"61"15" B.B.1.75"66"16" B.B.2"72"16" B.B.2.5"84"19" B.B.3"96"20" B.B.3.5"114"23" B.B.4"126"25" PERENNIALSAND ROSESSHRUBS, DECIDUOUS B.R.12"24"7" B.R.15"28"8" B.R.18"30"8" B.R.2'33"9" B.R.3'42"11" B.B.4'48"12" TRENCH.CONTINUOUS A INSPACING ON-CENTERUPON BASED BESHALL WIDTH ANDDEPTH HOLEPERENNIAL B.R.5'54"14" B.R.6'60"14" B.B.18"27"7" B.B.2'30"8" B.B.3'36"9" B.B.4'42"11" B.B.5'48"12" B.B.6'54"14" +3 X +1 X MULCH AREA CALCULATOR PLANT OFTYPE PLANT PER FT.SQ. TREESCONIFEROUS 2 TREESORNAMENTAL ANDDECIDUOUS GRASSORNAMENTAL PERENNIALS, BUSHS,ROSE SHRUBS,DECIDUOUS ANDCONIFEROUS SPACING xSPACING VINES 2 xSPACING 2 = 3.1416 SPADE DIAMETER TREES OR SHRUBS MACHINE-MOVED 3 x .TEMS MAIN ORTRUNK THE AT SHRUBSAND S TREE FROM 6" THANMORE NO AND 3" THANLESS NO BACK MULCHPULL1. DEPTH.3" MINIMUM A ATMAINTAINED IS DEPTH MULCHTHE IF PERIOD ESTABLISHED THE THROUGHOUTACCEPTABLE IS MULCHDETERIORATING ORSUBSIDING2. DEPTH.MAXIMUM 6" THE EXCEEDNOT DO; DEPTHMINIMUM 3" THE BELOWWHEN MULCH ADD3. REPLACED. ANDREMOVED BE MUST SOILWITH CONTAMINATEDMULCH4.WALL INSTALLATION FENCE INSTALLATION DIMENSIONS HOLEPLANTING BALL. SOIL OF BOTTOM TOFLAIR ROOT FROM MEASUREMENT EXCEED NOT SHALL PLANTS CONTAINER AND B&B FOR DEPTHHOLE TYPEPLANT INCLUDINGAND TO UP SIZEPLANT WIDTH HOLE MINIMUM(A) DEPTHHOLE APPROXIMATE(B) TREES CONIFEROUS B.B2'36"10" B.B3'42"11" B.B4'51"13" BUDSTERMINAL CONTAINWILL BRANCHESCONIFER ALL OF 2/3 LEASTAT B.B5'60"13" B.B6'66"15" B.B7'72"16" B.B8'81"18" B.B9'90"20" B.B10'102"21" B.B12'114"24" SHRUBS CONIFEROUS B.B.18"24"7" B.B.3'48"12" (UPRIGHT) SHRUBS CONIFEROUS B.B. SPR18"30"8" B.B. SPR2'36"9" (SPREADING) PLANTSGROWN CONTAINER PLUGS /CELLPACKS 6"2.5" CONT.2.25"7"3" CONT.3.5"10"3" CONT.4"11"4" CONT.4.5"13"4" CONT. QT6"/1 15"5.5" CONT.1#18"6" CONT.2#23"7.5" CONT.3#29"8.5" CONT.5#30"11" CONT.7#37"11" CONT.15#44"14" CONT.10#45"15" CONT.20#60"16" CONT.25#72"17" SEEDLINGS SEEDLING6"15"14" SEEDLING9"18"14" SEEDLING12"23"16" SEEDLING18"30"16" SEEDLING2'36"18" VINES B.R. MED YR.1 15"11" B.R. 1 NO. YR.1 17"14' B.R. MED. YR.2 33"12" B.R. 1 NO. YR.2 42"15" PLANTING DETAILS (1 0f 3) DETAIL SEE STANDARD FOR PLANTING SOIL INSTALLATION OF PLANTS SIZEDIAMETER SPADE(C) CALIPER TREE,OAK RTREE,CALIPE LORNAMENTA /DECIDUOUS HEIGHTTREE, CONIFEROUS 42" 60" 78" 85" 1.5" to1" 2.5" to1.5" 3.5" to2.5" 5" to3.5" 3" to2" 4" to3" 6" to4" 8" to6" 7' to5' 9' to7' 14' to9' 18' to14' 3 / 5 x HEIGHT DECIDUOUS TREE (3' min.) DECIDUOUS SHRUB (3'min.) CONIFEROUS AND TRANSPLANT (RADIUS+2' min.)MAX6" APPROVAL.ENGINEER TO SUBJECT CONTRACTOR, THE BY DETERMINED ARE USE TO TYPEWHICH AND SOILS DRAINED POORLY FOR DETAILS PLANTING USING FOR NEEDTHE1. NOTE:MASSROOT1/41''43115"ABCD8' FOR CONIFEROUS TREES 5' FOR DECIDUOUS TREES '12" TO 14"2'-0" MIN.STANDARD PLANTING DETAILS PLANT SPACING IN MASS BEDS (MnDOT 2571.3D.2(8)) GRANULAR FILTER TILE DRAINAGE MINI-BERM GRADE.FINISHED THAN HIGHER 1"-3" MASS ROOT THE OF TOP THE PLACING ALLOW TO BED OR HOLEEXCAVATE1. GRADE. LOWER A AT DAYLIGHTING TILE DRAIN DIAMETER MINIMUM 4"INSTALL2. ). 3 OF (2 DETAILS PLANTING STANDARD SEE TYPE.ROOT TO ACCORDING PLANTINGCOMPLETE3. GRADE.FINISHED THAN HIGHER 1"-3" MASS ROOT OF TOP THE PLACING ALLOW TO BED OR HOLEEXCAVATE1. SUBSOIL. DRAIN ADEQUATELY TOLAYER SOIL PAN HARD DRAINED POORLY OR IMPERVIOUS THROUGH ENTIRELY HOLES DIAMETER 8"AUGER2. DRAINAGE. POSITIVE FOR NECESSARY IF 8" ADDITIONAL AN RE-AUGER DRAINAGE. POSITIVE FORTEST3. 3). OF (2 DETAILS PLANTING STANDARD SEE TYPE.ROOT TO ACCORDING PLANTINGCOMPLETE5. MASS. ROOT THE OF DEPTH THE 1/4 BED OR HOLEEXCAVATE1. HOLE. IN MASS ROOTSET2. HEIGHT. BERMTHE TIMES 3 OF WIDTH A TO BASE BERM THE EXTEND. SOILPLANTING WITH BERMCONSTRUCT3. 3). OF (2 DETAILS PLANTING STANDARD SEE TYPE.ROOT ACCORDING PLANTINGCOMPLETE4. PLANTING ON SLOPES (MnDOT 2571.3I.4) RIM. TOPOUTWARD-FLARED AN ANDPERFORATION LINE LASER A WITHTUBES POLYPROPYLENETRANSLUCENT SEMI AND RIGIDTWIN-WALL, EXTRUDED, SEAMLESS,USE1. TWISTING. OR DISLODGINGPREVENT TO STAKE OAK WHITE 1''x 1'' A TO ATTACHED-TIESCABLE NYLON WITH SHELTERSECURE2. ROOTS. TREE THEDISTURBING WITHOUT SURFACE SOILTHE BELOW 1'' OF MINIMUM ATUBE THE OF BOTTOM THEEMBED3. SHOWN. AS DOWNNETTING PULL TUBE. THE OFTOP THE OVER SLEEVE ANDCOVER NETTINGPHOTODEGRADABLE PLASTIC APLACE4. (MnDOT 2571.3I.2) 2". END CUT THE OVERLAPCLOTH). (HARDWARE MESH WIRE WELDED GALVANIZED GRID 0.25" USING CYLINDER DOUBLE-LAYERED AFORM1. STEM. TREE THE OFCENTER THE FROM 7" GROUND, THE INTO STAKES OAK WHITE HEARTWOOD OPPOSING 1" x 1" TWODRIVE2. OVERLAP. THE ALONG CENTER ON 4" APPROXIMATELY SPACE OVERLAP. THE ALONG-TIESCABLE OR WASHERS AND SCREWS EITHER, USING STAKES THE OF OUTSIDE THE TO CYLINDER MESH THESECURE3. WASHERS. WITH LONG 3/4" x DIA. 1/8" GALVANIZED HEAD ROUND BE SHALLSCREWSa. OR .STRENGTH TENSILE 120LB TO 75LB BETWEEN AND LONG 8" LEAST AT, NYLON BE SHALLTIES-CABLEb. ROOTS. TREETHE DISTURBING WITHOUT SURFACE SOIL THE BELOW 1" CYLINDER MESH THE OF EDGE LOWER THEEMBED4. CYLINDER. THE OF TOPTHE WITH FLUSH BE WILL STAKE CYLINDER. THE OF TOP THE AT PERMITTED BE NOT WILL EDGESCUT5. DETAIL. PLACEMENT MULCH IN SPECIFIED ASTRUNK THE FROM BACK PULLED BE SHALL AND DEPTH 3" EXCEED NOT SHALL CYLINDER THE WITHINMULCH6. GUARDS. RODENT HEIGHT MIN. 12" OFINSTALLATION PERMIT TO REMOVED BE TO HAVE MAY BRANCHES LARCH AND PINE OF WHORL BOTTOMTHE7. TREES. SPRUCE ONPLACE NOT DO TREES, LARCH AND PINE DECIDUOUS, ALL ONINSTALL8. CONIFEROUS TREES 12" MIN. HT. FOR DECIDUOUS TREES 24" MIN. HT. FOR WIRE MESH STAKE (MnDOT 2571.3I.1) 10 ga WIRE. STRAPS. ATTACH WITH THICK AND 1.5" WIDE POLYETHYLENE, 40 MIL. POLYROPYLENE OR 16" LONG SEE CHART FENCE POST HOT-ROLLED STEEL SIZING POSTSTEEL CALIPER TYPE POSTSTEEL A B C D EQUAL.APPROVED OR 3403) (Mn/DOTPOST FENCE STEELHOT-ROLLED 7'-0"MIN. 3'-0"4'-0"3'-0" EQUAL. APPROVED OR3401) (Mn/DOT POST SIGNCHANNEL FLANGED LB. 2.210', 10'-0"MIN. 4'-0"6'-0"5'-0" PLANTING DETAIL FOR POORLY DRAINED SOILS NOTE: BASIN. WATERING THE OF HALF UPHILLTHE CONSTRUCT NOT DO GREATER, OR SLOPES 1:2ON1. SEEDLING TREE SHELTER PREVAILING WIND RODENT PROTECTION STAKING AND GUYING SLOPE. GROUND OFREGARDLESS PLUMB DRIVE BALL.ROOT OF OUTSIDE PLACEWIRES. GUY RETAIN TO DRILLEDOR NOTCHED BE TO POSTSTEELS1. APPROVED.BE NOT WILL SYSTEMSGUYING WIRE AND HOSERUBBER SUBSTITUTE TOREQUESTS2. YEAR. ONEWITHIN REMOVE4. BY THE ENGINEER. PROBLEM, OR AS DIRECTED WIND CONDITIONS ARE A WHERE VANDALISM, SOIL, OR TREES IN A PLUMB CONDITION OR NECESSARY TO MAINTAIN REQUIRED UNLESS SPECIFIED 3. TREE STAKING IS NOT PLANTING DETAIL (2 OF 3) SEE STANDARD FOR MULCH DETAIL AND 50% INPLACE SOIL. 4. THOROUGHLY BACKFILL AUGER HOLES WITH A UNIFORM INCORPORATED MIXTURE OF 50% SAND INCHES THAN 4 LESS INCHES THAN 4 GREATER CHART ON STANDARD PLANTING DETAILS (2 OF 3) MINIMUMS FROM THE PLANTING HOLE DIMENSIONS HOLE EXCAVATION WIDTH IN ACCORDANCE WITH PLANTING DETAILS (1 OF 3) DETAIL SEE STANDARD FOR PLANTING SOIL (2 OF 3) PLANTING DETAIL SEE STANDARD FOR MULCH DETAIL PLANTING DETAIL (2 OF 3) SEE STANDARD FOR MULCH DETAIL HOLD WATER IN BASIN. SOIL RIDGE TO WATER BASIN DOWN HILL HALF DETAILS (2 OF 3) SEE STANDARD PLANTING ROOT TYPE. PLANT ACCORDING TO PLANTING DETAILS (1 OF 3) DETAIL SEE STANDARD FOR PLANTING SOIL WATER BASIN UPHILL HALF EXISTING GRADE CUT AREA NETTING TUBE SHELTER PERFORATION LASER LINE (LENGTH VARIES) STAKE RECESS FORMED TUBE SECURE STAKE IN CABLE-TIE TO PLANTING DETAILS (1 OF 3) DETAIL SEE STANDARD FOR PLANTING SOIL PLANTING DETAIL (2 OF 3) SEE STANDARD FOR MULCH DETAIL HOLES 8" AUGER PLANTING DETAIL (1 OF 3) SEE STANDARD FOR MULCH DETAIL TILE 4" DRAIN PLANTING DETAILS (1 OF 3) DETAIL SEE STANDARD FOR PLANTING SOIL PLANTING DETAILS (1 OF 3) DETAIL SEE STANDARD FOR PLANTING SOIL CHIEF ENVIRONMENTAL OFFICER REVISION: APPROVED: DECEMBER 11, 2015 MINNESOTA DEPARTMEN TOF TRANSPORTATION REVISED: APPROVED: 12-11-2015 STATE DESIGN ENGINEER STANDARD PLAN 5-297.301 3 OF 3 25'-0" <2" 2-4" >4-9" >9-14" >14-19" >19" 2' 4' 6' 10' 12' 15' 2' 2.5' 2.5' 3' 3.25' 4' TREE PROTECTION ZONE A B CMINNESOTADEPARTMENTOFTRANSPORTATION9"2 1/2"4"2 1/2"12" 6"6"4'-6"B CUTILITY CONSTRUCTION NOTE: TAPE.THE TWIST TO NOT CAREFULBEING DBH,THE AT, TREE THE OF GIRTH THE AROUNDTAPE THE WRAP TAPE, DIAMETER TREE AUSING2. (MnDOT 2572.3A.5)CTIONRY FOR DEPTHCRITICAL ROOT DRIP LINE TEMPORARY FENCE (MnDOT 2572.3A.1) CUT PRUNING CORRECT CLOSE TOO LONG TOO SLANTED TOO PRUNING BRANCHES PRUNED TO LIVE BUD BRANCHES PRUNED AT TRUNK B B C C D D X (SHIGO METHOD) LIVE BUD BRANCH COLLAR RIDGE BRANCH BARK BRANCH DEAD :SAW PRUNING WITH PRUNING TOSTEPS A. POINT ATBRANCH THE THROUGH WAY PARTCUT1. A. TO B POINT FROMBRANCH THROUGH COMPLETELYCUT2. D. TO CPOINT FROM CUT COLLARBRANCH AT3. GROWTH. OF SEASON ONEAFTER FORMATION CALLUSDISCONTINUOUS IN RESULT WILL CLOSE)(TOO X TO C POINTFROM CUTINCORRECT GROWTH. OF SEASON ONE AFTERFORMATION CALLUS SHAPEDDOUGHNUT CONTINUOUS IN RESULTWILL ) A TO B POINT FROM STUB THE T NO BUT COLLAR BRANCH(LEAVING D TO C POINTFROM CUTCORRECT : NOTESPRUNING SAW. PRUNINGOR PRUNERTYPE-ISSORC SSHARP AND CLEAN USINGPRUNE1. SPRING.EARLY OR SEASON DORMANTLATE IS PRUNE TO TIME BESTTHE2. JULY. OR JUNEMAY, APRIL, IN OAKS PRUNINGAVOID3. SHELLAC. OR PAINTLATEX WITH WOUND ORSURFACE CUT PAINT IMMEDIATELYJULY, OR JUNE MAY, APRIL, INTREES OAK TO OCCUR WOUNDSIF OR NECESSARY IS PRUNINGIF4. (MnDOT 2571.3E.1 and 2571.3K.2.a(9)) A A Tree Protection Area DO NOT ENTER THE FENCED AREA construction protect these trees during We appreciate your cooperation to ZONE CRITICAL ROOT DRIP LINE SIGN PROTECTION TREE LIMITS CONSTRUCTION ZONE CRITICAL ROOT DRIP LINE DESIRED A HEIGHT," (DBH). TERMED THE "DIAMETER AT BREAST 4'-6" FEET ABOVE THE GROUND AND IS 1. (A) IS THE DIAMETER OF TREES MEASURED LIVE BRANCH ZONES CRITICAL ROOT DRIP LINE CORNERS. RADIUS 0.75"WITH SIGN 3/8" X 9" X 12"FABRICATE1. LETTERING. BLACK WITH WHITE BE SHALLSIGN2. SCREWS. WOODLENGTH 1" USING POST TO SIGNATTACH3. CONSTRUCTION.ANY TO PRIOR SPECIFIED, AS LIMITS CONSTRUCTION ORDRIPLINE TREE'S THE AT FENCE TEMPORARY INSTALL ANDFURNISH1. LINE. DRIP THE BEYOND FEET 25 FENCE PLACE POSSIBLEWHEN2. INTERVALS. 50' AT FENCE ALONG SIGNS PROTECTION TREEPLACE3. GROUND 4.5 ft ABOVE DIAMETER AT MEASURE TREE FROM TREE TRUNK MINIMUM DISTANCE TREE MACHINE DRILLING DIRECTIONAL BORE TUNNEL TUNNEL DEPTH OF MINIMUM BRIDGE ROOT SYSTEM OF VEGETATION PROTECTION AND RESTORATION'OTHER VEGETATION PROTECTION MEASURES ROOT SYSTEM BRIDGE WOODCHIP MULCH BED TIMBERS STEEL PLATES MULCH 6" WOODCHIP (MnDOT 2572.3A.12) EITHER: MUST CONTRACTOR THEZONES, ROOT OVER PASS MUST VEHICLES CONSTRUCTIONIF TRUNK. TREE THE TORADIALLY PLACED TIMBERS WOOD ON SUPPORTEDPLATE STEEL WITH BRIDGES SYSTEM ROOTCONSTRUCT1. OR 3733). (MnDOT GEOTEXTILE III TYPE AOVER MULCH WOODCHIP OF LAYER INCH 6 APLACE2. CLEAN ROOT CUTTING CONSTRUNECESSAMAXIMUMAREA EXCAVATION CLEAN ROOT CUTTING PLOW OR OTHER APPROVED ROOT CUTTER. ROOTS WILL BE CLEANLY CUT BY A VIBRATORY THE ENGINEER, PRIOR TO EXCAVATION, ALL TREE 1. WHEN DESIGNATED IN THE PLAN OR DIRECTED BY MINIMUM DEPTH NECESSARY FOR CONSTRUCTION. 2. THE TREE ROOTS WILL BE CUT CLEANLY TO THE EXPOSED ROOTS. 3. IMMEDIATELY, AND CLEANLY CUT DAMAGED AND OF ADJACENT SOIL. SHALL BE IMMEDIATELY COVERED WITH A 6" LAYER 4. ROOT ENDS EXPOSED BY EXCAVATION ACTIVITIES AREA UNDISTURBED (MnDOT 2572.3A.2) EXISTING GROUND BACKFILL FILL SANDY LOAM PIPE PERFORATED ZONE (MnDOT 2572.3A.4) .BORROW TOPSOILROOTING UNCOMPACTED ISTREES, OF LINE DRIP THE WITHIN REQUIRED FILLANY1. SYSTEM. AERATION AN ASOPENING END DAYLIGHTED ONE LEAST AT WITHPIPE PERFORATEDINGPLAC REQUIRE MAY FILLEXCESSIVE2. ROOTING TOPSOIL BORROW SLOPE ROUNDING TEMPORARY FENCE REDUCED ROUNDING NORMAL ROUNDING ZONE CRITICAL ROOT DRIP LINE CONTRACTOR. THE BY PRESERVED BE WILL ANDENGINEER THE BY OR PLAN THE IN IDENTIFIED BE WILLLIMITS CONSTRUCTION PROPOSED THE NEAR TREESSIGNIFICANT FENCE. TEMPORARY THEPLACE1. ROUNDING. SLOPE NORMAL BY DISTURBEDARE ZONES ROOT WHERE ROUNDING SLOPEREDUCE2. DAMAGE. ROOT UNNECESSARY ORLOSS TREE AVOID TO STEEPNESS BACKSLOPEVARY3. CHIEF ENVIRONMENTAL OFFICER REVISION: APPROVED: DECEMBER 11, 2015 MINNESOTA DEPARTMEN TOF TRANSPORTATION REVISED: APPROVED: 12-11-2015 STATE DESIGN ENGINEER STANDARD PLAN 5-297.302 1 OF 1 SHELLAC. DRESSING MATERIAL CONSISTING OF LATEX PAINT OR (WITHIN 5 MINUTES) TREATED WITH A WOUND 5. EXPOSED CUT OAK ROOTS SHALL BE IMMEDIATELY 2571 734 Minnesota 2020 Standard Specifications 2565.5 BASIS OF PAYMENT The Department will pay for new Traffic control signal systems on the basis of the following schedule: Item No Item Unit 2565.501 Emergency Vehicle Preemption System lump sum 2565.501 Traffic Control Interconnect lump sum 2565.502 APS Push Button Station each 2565.502 APS Push Button & Sign each 2565.502 APS Cabinet Control Unit each 2565.502 APS Pole Mounting Adaptor each 2565.502 APS Push Button Mounting Spacers each 2565.516 Traffic Control Signal System system 2571 PLANT INSTALLATION AND ESTABLISHMENT 2571.1 DESCRIPTION This Work consists of providing, installing, and establishing trees, shrubs, vines, perennials, and turf of the species, variety, grade, size or age, and root category specified for the locations shown on the Plans, including planting or transplanting plants provided by the Department. Perform this Work in accordance with the Inspection and Contract Administration Manual for MnDOT Landscape Projects (ICAMMLP), current edition at the time of letting. 2571.2 MATERIALS A Nursery Plant Stock .............................................................................................................. 3861 Provide plants of the species shown on the Plans in the variety, grade, and size or age indicated. A.1 Investigations and Supply of Planting Stock and Materials By submitting a proposal and accepting Award of the Contract in accordance with 1205, “Examination of Proposal Package and Site of Work,” the Contractor assures commitments from suppliers, and delivery of the plant stock and Materials required to complete the Contract. A.2 Plant Stock and Materials Documentation Provide the following plant stock and Materials documentation: (1) Fifteen Working Days prior to beginning plant installation and establishment Work, provide the Engineer with a Department-preliminary Certificate of Compliance for Plant Stock, Landscape Materials, and Equipment (copy of form provided in the current edition of ICAMMLP) (2) At least five Working Days before plant stock delivery to the Project, provide the Engineer with the following: (a) A copy of a valid nursery stock, dealer or grower certificate, registered with the Minnesota Department of Agriculture (MDA), a current nursery certificate or license from a state or provincial Department of Agriculture for each plant stock supplier, or both (b) Documentation certifying that plant Material shipped from out-of- state nursery vendors subject to state and federal quarantines, is free of currently regulated pests, including Emerald Ash Borers, and Gypsy Moths. To determine if Minnesota vendors are subject to quarantines, call the MDA Supervisor of Nursery Inspection and Export Certification at (651) 201-6388 2571 Minnesota 2020 Standard Specifications 735 (c) An updated Certificate of Compliance, signed by the Contractor’s authorized representative (3) Upon delivery of plant stock and Materials to the Project, provide the Engineer with the following: (a) Bills of lading or shipping documents for plant stock and landscape Materials delivered to the Project (b) An updated and signed Certificate of Compliance, if necessary, to reflect deviations from the previous Certificate of Compliance documentation (4) As a condition for authorization of payments, provide the Engineer with vendor invoices or billing statements for plant stock and Materials used on the Project The Engineer will consider Work performed with plant stock, Materials, or Equipment that was misrepresented in the documentation, as unauthorized Work. A.3 Substitutions The Engineer may allow substitutions in accordance with 1605, “Substitute Materials.” Upon receipt of written documentation that plants shown on the Plans are not available in quantities to fulfill the Contract requirements, the Engineer, in consultation with the Project designer, may authorize specific substitute plants or may extend the Contract Time to ensure availability of the plants shown on the Plans. Provide substitutions equal to or better than the initially specified Materials. 2571.3 CONSTRUCTION REQUIREMENTS A General A.1 Landscape Specialist Provide a Landscape Specialist, certified by the Department, to perform or supervise plant installation and establishment Work. Provide documentation of the Certified Landscape Specialist prior to beginning plant installation and establishment Work. Landscape Specialists may obtain certification by completing the 1-day Department Landscape Project Inspection and Administration Training Class and passing a test administered by the Department’s Environmental Planning and Design Units. Full certification is valid for 3 years. Landscape Specialists may obtain provisional certification for 1 year by passing a test after completing the Department’s online training class. A.2 Notices by Contractor Notify the Engineer at least 3 Calendar Days before planned deliveries of initial and replacement planting stock to the Project to allow for inspection scheduling. Notify the Engineer at least 24 hours before beginning or changing distinct operations. Include the following in the notice: (1) The Project number (2) Engineer’s name (3) Notification date (4) Intended dates and times for the operations (5) The planned locations of Work Provide notifications in writing, using confirmable e-mail or facsimile transmissions. 2571 736 Minnesota 2020 Standard Specifications A.3 Unauthorized Work The Engineer will consider Work performed as follows to be unauthorized Work: (1) Without required and acceptable documentation and notifications (2) Without supervision by a certified landscape specialist (3) Without conducting required and acceptable competency tests (4) In conflict with the working hours of the Contract A.4 Required Equipment Provide Equipment meeting the requirements of 1805, “Methods and Equipment,” and with the following available on the Project at all times: (1) At least 1 portable compaction tester capable of measuring compaction in the soil to at least 18 inches deep (2) At least 1 soil recovery probe, or a soil moisture probe for assessment of soil moisture conditions (3) At least 1 tree caliper with measurement readings in inches B Preconstruction Work Preconstruction Work includes: (1) Attending a landscaping preconstruction meeting (2) Submitting landscaping preconstruction documentation (3) Mobilizing Equipment and supplies to the landscaping Project (4) Protecting existing vegetation, resources, and property in accordance with the Plans, Special Provisions, and 1712, “Protection and Restoration of Property,” 2031, “Field Office and Laboratory,” 2557, “Fencing,” and 2572, “Protection and Restoration of Vegetation” C Staking Planting Holes and Beds Stake the exact locations and layouts for the landscape designer and Engineer’s approval. To remedy unanticipated, localized, or seasonal conditions that may hinder plant establishment, the Contractor may request the Engineer’s approval to: (1) Relocate plantings (2) Make plant substitutions (3) Modify soil or drainage characteristics D Preparing Planting Holes and Planting Beds To prevent site compaction and damage, do not Work in planting holes and bed areas if the soil moisture is greater than field capacity. D.1 Utilities Before cultivating soil or excavating holes on the Project, meet the requirements of 1507, “Utility Property and Service.” The Contractor may request the Engineer’s approval to relocate plantings to avoid unanticipated conflicts with utilities. D.2 Weed Control and Soil Cultivation Apply herbicide to actively growing vegetation beginning in spring or fall. Before cultivating individual planting holes and bed areas, kill turf and weed growth within the limits of planting areas that will receive mulch in accordance with the following: 2571 Minnesota 2020 Standard Specifications 737 (1) Mow existing vegetation to at least 3 inches at least 7 Calendar Days before spraying herbicide. Remove the cuttings. Allow the vegetation to regrow to a height from 4 inches to 8 inches before applying the herbicide. (2) At least 3 Calendar Days before applying herbicide, submit to the Engineer, labels of the intended herbicides and a copy of a valid MN Pesticide Applicator License, including Category A and Category J. (3) Spray and kill turf and weeds, including the top growth and roots, only within designated areas using a non-selective, non-residual post emergent herbicide containing 41 percent glyphosate as the active ingredient. Ensure personnel, licensed by the MDA and experienced in the use of chemical pesticides perform the Work in accordance with the manufacturer’s instructions and recommendations. Apply the herbicide to dry foliage on actively growing vegetation. Apply the herbicide in August or early September before the fall or spring Plant Installation Period (PIP) as required by the Contract. If an August or September application is not possible for the spring PIP, apply the herbicide in late April or early May. If precipitation occurs within 6 hours after applying herbicide, reapply herbicide as needed to achieve 100 percent kill. (4) Before beginning soil cultivation Work, schedule and perform a competency test to the satisfaction of the Engineer. The Engineer considers a satisfactory competency test one that demonstrates acceptable soil cultivation, incorporation of soil additives, compaction levels, and soil drainage in 1 planting bed area and 1 individual tree planting area. (5) Before placing soil additives as shown on the Plans, use a spading machine to deep cultivate the planting hole and bed areas by loosening the soil to at least 12 inches deep and a compaction level of no more than 200 psi to this depth, as measured from the finished grade elevation of the soil. The Engineer may approve other Equipment to address site constraints, if requested by the Contractor. For hydraulic spade-type, machine-moved tree-transplanting, the Engineer will not require planting hole cultivation, other than loosening the soil outside the soil-ball perimeter in accordance with the Standard Plans shown on the Plans. (6) Unless otherwise shown on the Plans, add 4 inches of Grade 2 compost, in accordance with 3890, “Compost” and other soil additives shown on the Plans or as requested by the Contractor and approved by the Engineer, over the cultivated planting hole and bed areas and use a spading machine to incorporate it to a depth of at least 12 inches, as measured from the finished grade elevation of the soil. (7) Use a compaction tester to ensure compaction in the planting hole and bed areas does not exceed 200 psi to a depth of at least 16 inches. If Contractor- operations result in zones of hardpan or excessively compacted soil, repeat deep cultivation or de-compact the subsoil in accordance with 2106.3I, “Finishing Operations,” specifically the requirements for turf establishment areas, at no additional cost to the Department. (8) Ensure drainage in the planting hole and bed areas. For suspected drainage problems, perform a percolation test by filling a 16 inches deep planting hole with water and measuring the time it takes the water to drain from the hole. The Engineer considers adequate drainage equal to or greater than a percolation rate of 1/2 inch per hour. If drainage does not meet these requirements, request approval from the Engineer to relocate or delete affected planting locations or proceed with Extra Work using one or a combination of the Standard Plans for poorly drained soils, as shown on the Plans. 2571 738 Minnesota 2020 Standard Specifications (9) Apply Temporary Erosion Control Measures in accordance with the NPDES Permit, SWPPP notes, and 2573, “Storm Water Management.” The Contractor may use Type 6 wood chip mulch at a depth no more than 1 inch for temporary erosion control in prepared planting bed areas. D.3 Wet Soils, Rock, and Debris If the Contractor encounters excessively wet soils, bedrock, or excessive quantities of boulders and construction debris, the Contractor may request the Engineer’s approval to relocate or delete plantings, or modify soil or drainage characteristics in accordance with the alternative options in the Standard Plans shown on the Plans. E Delivery and Storage of Plants Before installation, the Engineer will provide for inspection and acceptance of plant stock delivered to the Project in accordance with the current edition of the ICAMMLP and 3861, “Plant Stock.” Install plant stock on the day of delivery to the Project unless using temporary storage methods. Before installation, keep the roots of plants completely covered with a moisture-holding Material consisting of wood chips, straw, sawdust, moss, or soil. Keep the moisture-holding Material continuously moist and protect it from drying winds, direct sunlight, excessive heat, freezing, low humidity, inadequate ventilation, and animal or human harm. Remove tree trunk sleeves prior to inspection, acceptance, and planting. The Engineer will consider plants with damage that occurred or was discovered during temporary storage, unacceptable. Do not store plants from one planting season to the next. E.1 Pruning — Top Growth and Roots Immediately before planting, prune the roots of bare-root plants, except seedlings, and the top growth of deciduous plants. Cut-back broken or badly bruised roots and dry root tips to sound, healthy tissue. Prune to remove dead, rubbing, damaged, diseased, and suckering branches, and to improve plant symmetry, structure, and vigor. Prune coniferous trees and shrubs only to remove damaged growth or a competing leader. Prune in accordance with the horticultural practices specified in the current edition of the ICAMMLP and the Standard Plans on the Plans. Do not prune oak trees during the oak wilt season from April through July, to prevent the spread of oak wilt disease. Immediately treat accidental cuts or wounds to oaks with a wound dressing in accordance with the Standard Plans shown on the Plans. Keep wound-dressing Material on the project during the oak wilt season. E.2 Buried Root Flares The Engineer will consider container-grown and balled and burlapped plant stock unacceptable if provided with more than 4 inches of soil depth above the root flare. The Engineer may accept plants provided with no more than 4 inches of excess soil above the root flare if the excess soil can be removed without damaging the root system of the plants. E.3 Excessive Roots Reject containerized or balled and burlapped plants with roots extending at least 4 inches beyond the container or burlap. F Installation of Plants F.1 General Before proceeding with plant installation Work, schedule and perform a competency test demonstrating acceptable plant installation methods to the Engineer’s satisfaction and in accordance with the Plans and Standard Plans, for each plant Pay Item and root category on the 2571 Minnesota 2020 Standard Specifications 739 Project. The Engineer considers a satisfactory competency test to be one that demonstrates acceptable handling of plants, digging of holes and beds, installation of plants, initial watering, installation of protection Materials and mulching. Before digging planting holes, rake temporary erosion control wood chip mulch off prepared planting areas to prevent wood chip contamination of the planting soil in the holes. The Contractor may respread wood chip mulch formerly used as temporary erosion control around plants to a depth no greater than 1 inch following plant installation, if newly provided and acceptable Type 6 mulch is applied over the top to the depth shown on the Standard Plans in the Plans. Dig planting holes to the configuration and minimum dimensions shown in the Standard Plans on the Plans. If the soil moisture is greater than field capacity, do not Work in planting holes and beds. Ensure drainage in the planting hole and bed areas. For a suspected drainage problem, perform a percolation test by filling a 16 inches deep planting hole with water and measuring the time it takes the water to drain from the hole. The Engineer considers adequate drainage equal to or greater than a percolation rate of 1/2 inch per hour. If drainage does not meet these requirements, request approval from the Engineer to relocate or delete affected planting locations or proceed with Extra Work using one or a combination of the Standard Plans for poorly drained soils as shown on the Plans. G Watering Provide watering Equipment and forces on the Project capable of completely watering plants as often as necessary to maintain soil moisture in the root zones. Within 2 hours of installation, saturate the backfill soil of each plant with water. After settling, provide additional backfill to fill in the voids. H Mulch Before placing mulch, fine grade and level the planting bed soils with hand tools. Place mulch Material in accordance with the Plans and Standard Plans no more than 7 Calendar Days after plant installation. Mulch contaminated with soil during installation or otherwise not complying with the requirements of 3882, “Mulch Material,” is unacceptable. Remove unacceptable mulch from the Project. I Protection of Installed Trees Use protective Materials to ensure the healthy growth and survival of installed trees. Tree protection measures to address fall/winter environmental conditions must be removed the following spring. I.1 Staking and Guying Unless staking and guying is shown on the Plans, only stake and guy trees if necessary to maintain the trees in a plumb condition. The following circumstances may warrant staking and guying: (1) Excessive soil moisture (2) Light-textured soil (3) Steep slopes (4) Exposure to excessive wind (5) The likelihood of vandalism Install staking and guying in accordance with the Standard Plans shown on the Plans. 2571 740 Minnesota 2020 Standard Specifications Remove staking and guying within 1 year of initial installation. I.2 Rodent Protection Place rodent protection around deciduous, pine, and larch trees in accordance with the Standard Plans shown on the Plans. I.3 Seedling Tree Shelters Install seedling tree shelters in accordance with the Standard Plans shown on the Plans. J Cleanup and Restoration Work Perform the following cleanup and restoration Work on an ongoing basis and as the final step of the initial planting operations: (1) Remove excess Materials, rocks, and debris from the Project (2) Repair turf in disturbed areas with seed mixes as shown on the Plans or to match in-place turf (a) Immediately before sowing seed or laying sod, prepare soil as specified in 2574.3, “Construction Requirements” (b) Uniformly broadcast a Type 4 natural base fertilizer, as specified by 3881.2B.4, “Type 4 - Natural Based Fertilizer,” that provides nitrogen at an application rate of 43 lb/acre (c) Lay sod, or uniformly broadcast seed at 1.5 times the rate specified in Table 3876.2-1. Provide seed in accordance with the requirements of 3876, “Seed” and perform seeding in accordance with Table 2575.3-1 (d) Rake and firm seeded areas to ensure seed contact with the soil (e) Broadcast or disc anchor Type 1 mulch in all seeded areas (3) Install erosion control measures to prevent erosion K Plant Establishment Period K.1 Establishment Period A Plant Establishment Period (PEP) of at least 2 calendar years begins on the date that initial planting operations on the Project are completed and continues until final acceptance of the Project, unless otherwise shown on the Plans. K.2 Establishment Work Keep plants in a healthy growing condition in accordance with the current edition of the ICAMMLP throughout the establishment period and submit landscape Contractor scouting reports in accordance with item 1 of 2571.3K.2.a, “All Plants.” Perform plant establishment Work throughout the growing seasons from April through October and as necessary during the dormant seasons from November through March. The Engineer may perform random inspections throughout the PEP to verify compliance. The Engineer will consider the Contractor non-compliant if the Contractor does not maintain plants throughout the PEP and does not submit scouting reports. All Plants In plant establishment Work, perform the following: (1) Scout to assess the condition of the plants and the planting site and factors that may influence plant health, vigor, and establishment success. Scout these conditions at least every two weeks during the growing season and at least every month during the dormant season 2571 Minnesota 2020 Standard Specifications 741 (2) Submit a written scouting report to the Engineer via e-mail by the 1st and 15th of each month during the growing season from April to October and by the 1st of each month during the dormant season from November to March. The Engineer will use the report-frequency and content to assess plant establishment compliance. The report may include scanned copies of the Plan sheets with the Contractor notes, copies of the report form found in the current edition of the ICAMMLP, or both. Include the following in the report: (a) The Project number (b) Engineer’s name (c) Name of Contractor’s responsible scout or representative (d) Dates Work was performed (e) Work locations (f) Work completed (g) Prevailing weather conditions (h) Soil moisture assessments (i) Insect, animal, vehicular, weather, or other damage (j) Disease problems (k) Treatment recommendations (l) Assessment of overall plant conditions including weed competition and control (3) Maintain soil moisture in accordance with the watering guidelines of the Standard Plans shown on the Plans (4) Repair, adjust, or replace staking and guying, planting soil, rodent protection, seedling tree shelters, and other items in accordance with the Plans (5) Maintain healthy, vigorous plants; free of harmful insects, fungus, and disease without the use of systemic insecticides such as neonicotinoids (6) Remove dead, dying, and unsightly plants. Provide and install replacement plants in accordance with 2571.3K.2.b, “Replacement Requirements” (7) Maintain plants in a plumb condition at the planting depth shown on the Standard Plans in the Plans (8) Maintain planting areas in a weed-free condition as follows: (a) Remove weeds, top growth, and roots within the mulch limits by hand pulling. Pre-water mulched areas to ensure weed top growth and roots are entirely removed. Ensure weeding operations do not contaminate the mulch or Project with weed seed, weed-laden soil, or propagating weed parts. Remove State and County regulated noxious weeds to at least 5 feet beyond the mulch limits. Remove weed parts or weed-laden Material from the Project to avoid the spread of weed infestations (b) Do not spray chemicals for weed control in mulched planting areas during the PEP. The Contractor may apply a non- selective, non-residual post-emergent herbicide containing 41 percent glyphosate, as the active ingredient with a surfactant on a spot treatment basis with a brush or wick applicator. The Contractor may also apply a broad-spectrum SECTION 2571.2 K.2.A (2) NOT USED 2571 742 Minnesota 2020 Standard Specifications dichlobenil based granular, pre-emergent herbicide in accordance with product labeling and manufacturer’s recommendations (c) Do not weed whip or weed clip as weed control (d) Mow turf bands around the mulch limits at least 5 feet beyond the limits and at least 4 inches high if the turf height exceeds 9 inches adjacent to mulched planting areas (e) Mow turf areas installed as part of the Project when the growth exceeds 18 inches high. Mow turf from 6 inches to 12 inches high. Control State and County-listed noxious weeds (9) Prune to remove dead, rubbing, damaged, or diseased branches, unwanted suckers, and to improve plant form and structure (10) Prevent or repair rutting and other damage that may lead to soil erosion and weed infestation (11) Perform plant establishment operations consistent with plant care and horticultural practices detailed in the current edition of the ICAMMLP (12) Remove excess Material, obsolete temporary erosion control devices, rocks, and debris from the Project Replacement Requirements Within the first year of the 2-year PEP, determine which plants need replacing. Replace dead, defective, or missing plants and Materials in accordance with initial installation requirements, including plants lost due to accidents, vandalism, theft, rodent damage, damage caused by the Contractor, or if ordered by the Engineer, at no additional cost to the Department. Conduct plant replacement operations during the month of May or September, based on the start of the PEP. At least 7 Calendar Days before plant replacement, submit a summary report of proposed plant replacements to the Engineer. Include by attachment, copies of Plan sheets with the proposed replacement quantities and locations identified and a Department Certificate of Compliance for Plant Stock, Landscape Material, and Equipment, in the report. Using brightly colored paint, mark on site plants requiring replacement. Provide replacement plants and Materials that are equal to or better than the initial Material required by the Contract. If less than a full year remains in the PEP, do not replace plants unless the PEP is extended by a Change Order to provide at least one full year of establishment care. L Acceptance of Work L.1 Acceptance of Preconstruction Work The Engineer will accept the preconstruction Work after the Contractor secures commitments for required Materials, submits a Department Certificate of Compliance for Plant Stock, Landscape Materials, and Equipment, participates in a preconstruction meeting, obtains the Engineer’s approval for the Progress schedule, moves Equipment and supplies to the Project, and provides protection for existing plants. L.2 Acceptance of Preparation of Planting Holes and Beds For the Engineer’s acceptance of preparation of planting holes and beds, complete a competency test, other specified staking, initial weed control, soil cultivation including incorporation of additives, and temporary erosion control Work. 2571 Minnesota 2020 Standard Specifications 743 L.3 Acceptance of Initial Planting Operation The Engineer will accept initial planting operations based on the following: (1) Plant stock acceptance (2) Completion of a competency test (3) Installation of individual plants (4) All Material and Work items shown in the initial planting operations chapter of the current edition of the ICAMMLP, including but not limited to watering, tree protection Materials, mulching, proper drainage, pruning, staking and guying, fertilizing, erosion control, seeding, and clean up, in accordance with 1516.2, “Project Acceptance.” L.4 Final Acceptance As a condition for terminating the PEP and conducting the final inspection, the Engineer may require the Contractor to bring the plant establishment Work into compliance. On or about the date of termination of the PEP, the Engineer will perform a final inspection of the Project. Upon final acceptance, the Engineer will not require further Contractor-care of plantings. The Engineer will make final acceptance at the completion of the two-year PEP and based on a final inspection of the completed Project. 2571.4 METHOD OF MEASUREMENT The Engineer will measure plants separately by the number of acceptable plants for each Contract Item in accordance with 2571.5G, “Payment Schedule.” 2571.5 BASIS OF PAYMENT The Department will make payment for plant installation and establishment at a percentage of the Contract Unit Price per item unit of measure for all costs relating to furnishing, installing, and establishing, the required plants and associated Materials as specified and shown on the Plans. The Department may make full payment, reduced payment or no payment of no more than the maximum eligible partial payment percentage at any payment phase (initial, interim, final) based on the performance of the Contractor and in accordance with 1906, “Partial Payment,” and 1908, “Final Estimate and Payment – Conditions and Process.” A Initial Payment The Department will make payment for plant installation and establishment at a percentage of the Contract Unit Price for each plant for completion of the following Work: A.1 Preconstruction Work The Department will pay no more than 10 percent of the Contract Unit Price for each plant with the completion and acceptance of preconstruction Work as defined in the Preconstruction Work Checklist in the current edition of the ICAMMLP. A.2 Preparation of Planting Holes and Beds The Department will pay no more than 15 percent of the Contract Unit Price for each plant with the completion and acceptance of preparation of planting holes and beds Work as defined in the Preparation of Planting Holes and Beds Checklist in the current edition of the ICAMMLP. SECTION 2571.4 THROUGH 2571.5 NOT USED 2571 744 Minnesota 2020 Standard Specifications A.3 Initial Planting Operations The Department will pay no more than 45 percent of the Contract Unit Price for each plant with the completion and acceptance of initial planting operations Work as defined in the Initial Planting Operations Checklist in the current edition of the ICAMMLP. B Interim Payment At the end of the first calendar year of the PEP, and after completion and acceptance of the Contractor’s Work and continuous compliance with the plant establishment requirements as defined by the Plant Establishment-Year One Checklist in the current edition of the ICAMMLP, the Engineer may authorize no more than 15 percent of the Contract Unit Price for each plant. C Final Payment The Department will make final payment after final inspection and acceptance of the completed Project at the end of the PEP. The Engineer may authorize no more than 15 percent of the Contract Unit Price for each plant as defined by the Plant Establishment Year 2 Checklist in the current edition at the time of letting of the ICAMMLP. The total final payment includes the Plant Establishment Year 2 payment, assessments and reduced payments, if any, and Incentive payment, if eligible. The Department will not pay for replacement plants, unless authorized by the Engineer. The Department may continue to withhold any percentage of initial and interim payments from the final payment. The Department will require a prompt refund of any overpayment, if the final voucher shows that the total of initial and interim payments made exceeds the total amount due the Contractor. D Incentive Payment When 90 percent or more of all plants installed within the initial plant installation period (PIP) and related Contract operations have been continuously acceptable throughout the Contract period, the Department will make an Incentive payment of 10 percent of the total final Contract Unit Price for plant installation and establishment. The Department considers replacement plants, replaced during the initial PIP, to be initially installed plants. Replacement plants made during the PEP are not eligible for Incentives. E Withholdings E.1 Plant Stock and Materials Documentation If the Contractor does not provide the documentation required by 2571.2A.2, “Plant Stock and Materials Documentation,” the Department may withhold a percentage of the PIP payment as described in checklist B2, in accordance with the current edition of ICAMMLP. E.2 Plant Establishment Period The Department may withhold a percentage of the PEP payment as described on checklist B9-B10, in accordance with the current edition of ICAMMLP. F Monetary Adjustments The Department must apply Incentives and Disincentives and may apply monetary deductions for Plant Installation and Establishment. The amounts of these adjustments are deemed reasonable. The Department may make full payment or apply a monetary deduction of no more than the maximum eligible partial payment percentage at any payment phase (initial, interim, final) based on the performance of the Contractor (see Payment Checklist in the current edition of the ICAMMLP). SECTION 2571.4 THROUGH 2571.5 NOT USED 2572 Minnesota 2020 Standard Specifications 745 The Engineer will determine which plants to accept for payment at the Contract Unit Price or at a monetary deduction. G Schedule The Department will pay for plant installation and establishment on the basis of the following schedule: Item No. Item Unit 2571.502 Coniferous Tree Size & Root Category each 2571. 502 Deciduous Tree Size & Root Category each 2571. 502 Ornamental Tree Size & root Category each 2571. 502 Transplant Tree (Spade Size*) each 2571. 502 Coniferous Shrub Size & Root Category each 2571. 502 Deciduous Shrub Size & Root Category each 2571. 502 Transplant Shrub each 2571. 502 Transplant Vine each 2571. 502 Vine Age or Size & Root Category each 2571. 502 Perennial Age or Size & Root Category each 2571. 502 Transplant Perennial each NOTE: State Root Category: Seedling, Bare Root, Machine Moved, Container Grown, Balled and Burlapped * Spade size: 42 inch, 60 inch, 78 inch, 85 inch, 90 inch. 2572 PROTECTION AND RESTORATION OF VEGETATION 2572.1 DESCRIPTION This Work consists of protecting and preserving vegetation from damage and restoring vegetation damaged by the Contractor’s operations. 2572.2 MATERIALS A Plant Materials ...................................................................................................... 2571 and 2575 B Temporary Fence Provide temporary fence meeting the following characteristics and requirements: (1) At least 4 feet (2) Conspicuous in color (see Standard Detail Sheet for Protection and Restoration of Vegetation) (3) Commercially available snow fence or other fencing Material approved by the Engineer C Water Provide municipal potable water or harvested ground water for irrigation. D Rooting Topsoil Borrow ........................................................................................................ 3877 E Tree Growth Retardant (TGR) Provide the TGR paclobutrazol or an equal approved by the Engineer. SECTION 2571.4 THROUGH 2571.5 NOT USED 2572 746 Minnesota 2020 Standard Specifications 2572.3 CONSTRUCTION REQUIREMENTS A Protecting and Preserving Protect and preserve the following: (1) Specimen Trees (2) Threatened and endangered plants listed on the Federal and State threatened and endangered species list (3) Vegetation as required by the Contract (4) Trees, Brush, and natural scenic elements within the Right-of-way and outside the limits of clearing and grubbing in accordance with 2101.3, “Clearing and Grubbing, Construction Requirements” (5) Other vegetation as directed by the Engineer Do not place temporary Structures, store Material, or conduct unnecessary construction activities within 25.25 feet outside of the dripline of trees designated for preservation, unless otherwise approved by the Engineer. Do not place temporary Structures or store Material, including common borrow and topsoil, outside of the construction limits in areas designated for preservation, as required by the Contract or as approved by the Engineer. Do not place or leave waste Material on the Project, including bituminous and concrete waste that would interfere with performing the requirements of 2106.3D, “Preparation of Embankment Foundation,” or 2575, “Establishing Vegetation and Controlling Erosion.” The Department defines concrete waste as excess Material not used on the Project, including Material created from grinding rumble strips. Dispose of excess Material in accordance with 2104.3D, “Disposal of Materials and Debris.” A.1 Temporary Fence Place temporary fences to protect vegetation before starting construction. Place temporary fence at the construction limits and at other locations adjacent to vegetation designated for preservation as required by the Contract or as approved by the Engineer. The Department will provide tree protection signs. Place tree protection signs in accordance with any of the following: (1) Along the temporary fence at 50 foot intervals (2) At least 2 signs per fence (3) As directed by the Engineer Do not remove the fence until all Work is completed or until approved by the Engineer. Ensure the fence prevents traffic movement and the placement of temporary facilities, Equipment, stockpiles, and supplies from harming the vegetation. A.2 Clean Root Cutting Cleanly cut tree roots at the construction limits as required by the Contract or as directed by the Engineer. Immediately and cleanly cut damaged and exposed roots. Cut back damaged roots of trees designated for protection to sound healthy tissue and immediately place topsoil over the exposed roots. Immediately cover root ends exposed by excavation activities with 6 inches of topsoil as measured outward from the cut root ends. Immediately (within 5 minutes) treat cut oak roots with a wound dressing Material consisting of latex paint or shellac. Limit cutting to a minimum depth necessary for construction. Use a vibratory plow, or other approved root cutter 2572 Minnesota 2020 Standard Specifications 747 in accordance with the Standard Detail Sheet for Protection and Restoration of Vegetation, before excavation. A.3 Watering Water root-damaged trees during the growing season that root damage occurs, and water Specified Trees if required by the Contract or directed by the Engineer. Maintain adequate but not excessive soil moisture by saturating the soil within the undisturbed portion of the dripline of impacted or identified trees to a depth of 20 inches. Use a soil recovery probe to check the soil moisture to a depth of 20 inches, and adjust the intervals and frequency of watering in accordance with prevailing moisture and weather conditions. A.4 Rooting Topsoil Borrow Place rooting topsoil borrow instead of common topsoil borrow within the dripline of Specimen Trees as required by the Contract or as directed by the Engineer. Place the topsoil to avoid over-compaction as approved by the Engineer. Establish turf consistent with the adjacent areas as approved by the Engineer. A.5 Utility Construction Bore under roots of trees designated for preservation for utility installations within the tree protection zone in accordance with the following: Table 2572.3-1 Tree Protection Zone Tree diameter at 4.5 feet above ground, inch Minimum distance from face of tree trunk, feet Minimum depth of tunnel, feet <2 2 3 2–4 4 3 >4–9 6 3 >9–14 10 3 >14–19 12 3.25 >19 15 4 Do not perform open trenching within the tree protection zone. Bore under areas of native prairie and protected plant species as required by the Contract or as directed by the Engineer. A.6 Pruning Provide an arborist certified by the International Society of Arboriculture to prune trees as required by the Contract or as directed by the Engineer in accordance with 2571.3E.1, “Pruning – Top Growth and Roots.” Ensure the arborist removes dead, broken, rubbing branches, and limbs that may interfere with the existing and proposed Structures. A.7 Destroyed or Disfigured Vegetation Restore vegetation designated on the Plans for preservation that is damaged or disfigured by the Contractor’s operations at no additional cost to the Department. Restore the damaged vegetation to a condition equal to what existed before the damage. The Engineer may assess damages against the Contractor for damage to vegetation not restored to the previous condition. The Engineer will assess the value of damages to trees and landscaping at not less than the appraisal damages as specified in the Council of Tree and Landscape Appraisers Guide for Plant Appraisal. The Engineer will determine and assess damages of other vegetation. 2572 748 Minnesota 2020 Standard Specifications A.8 Oak Trees Avoid wounding of oak trees during April, May, June, and July to prevent the spread of oak wilt. If the Engineer determines that Work must take place near oak trees during those months, immediately (within 5 minutes) treat resulting wounds with a wound dressing Material consisting of latex paint or shellac. Blend paint colors with the bark color. Maintain a supply of approved wound dressing on the Project at all times during this period. A.9 Tree Growth Retardant (TGR) Provide an arborist certified by the International Society of Arboriculture to treat trees with the TGR as required by the Contract or as directed by the Engineer. Ensure the arborist applies the TGR paclobutrazol as a basal drench or soil injection and in accordance with the label directions. Provide the Engineer with the product label and Material Safety Data Sheet for the product used. A.10 Other Vegetation Protection Measures Provide other vegetation protection measures including root system bridging, compaction reduction, aeration, irrigation systems, J-barriers for Specimen Tree protection, and retaining walls as required by the Contract or as directed by the Engineer. B Quarantined Wood ....................................................................................................... 2101.3D.4 C Plant Installation .................................................................................................................. 2571 D Disposal of Material and Debris ....................................................................................... 2104.3D 2572.4 METHOD OF MEASUREMENT A Temporary Fence The Engineer will measure temporary fence placed, maintained, and removed by length along the bottom of the fence between end posts. B Clean Root Cutting The Engineer will measure clean root cutting by length along the plow line. The Engineer will determine the beginning and ending points for clean root cutting as the intersection of the construction limit and the dripline of the tree or Brush or in accordance with lines shown on the Plans. C Water The Engineer will measure water by volume used to protect and restore vegetation. The Engineer will not measure water otherwise used in performing the Work, such as for maintenance of sod. D Rooting Topsoil Borrow The Engineer will measure rooting topsoil borrow by loose volume as required by the Contract. E Pruning The Engineer will measure pruning by the hours of actual pruning Work. F Tree Growth Retardant (TGR) The Engineer will measure TGR by volume of Material applied for the size of the tree treated. The Engineer will determine the volume of TGR required by the diameter at breast height (DBH) of each tree treated. DBH is defined as 4.5 feet above ground level. The Engineer will use a diameter tape measure to measure DBH. SECTION 2572.4 NOT USED City of Lake Elmo Capital Improvement Program 2025 – 2034 November 13, 2024 Planning Commission Public Hearing TABLE OF CONTENTS Introduction What is a CIP? .............................................................................................................................. 1 Scope of the Draft CIP .................................................................................................................. 1 Methodology ................................................................................................................................. 2 Funding Sources ........................................................................................................................... 2 Project Priorities ........................................................................................................................... 3 2025-2034 CIP City-Wide Summary ..................................................................................................................... 4 Administration & Finance Departments ....................................................................................... 4 Building Department ..................................................................................................................... 4 Fire Department ............................................................................................................................ 5 Public Works Departments ........................................................................................................... 5 Vehicle & Equipment Purchases ..................................................................................... 5 Public Works Building ..................................................................................................... 5 Parks Projects ................................................................................................................... 6 Infrastructure Projects ...................................................................................................... 6 Vehicle Replacement Fund ........................................................................................................... 7 CIP Reports (Appendix) Totals By Department .................................................................................................................. A1 Funding Sources – All Projects ................................................................................................... A2 Project Listing w/ Status & Amount ........................................................................................... A3 Admin/Finance - Summary ......................................................................................................... A7 Admin/Finance - Detail ............................................................................................................... A8 Ballfield Fund – Funding Sources & Uses ............................................................................... A10 Building Dept – Summary ........................................................................................................ A11 Building Dept – Detail .............................................................................................................. A12 Fire Dept – Summary ................................................................................................................ A17 Fire Dept – Detail ...................................................................................................................... A18 PW Vehicles & Equipment – Summary ................................................................................... A28 PW Vehicles & Equipment – Detail ......................................................................................... A30 PW Building – Summary .......................................................................................................... A55 PW Building – Detail ................................................................................................................ A56 Parks – Summary ...................................................................................................................... A61 Parks – Detail ............................................................................................................................ A63 Park Dedication Fund (404) – Funding Sources & Uses .......................................................... A92 Infrastructure – Summaries for Streets, Water, Sewer & Stormwater Infrastructure – Streets – Summary ............................................................................. A94 Infrastructure – Water – Summary .............................................................................. A96 Infrastructure – Sewer – Summary .............................................................................. A98 Infrastructure – Stormwater – Summary ...................................................................... A99 Infrastructure – Details for Streets, Water, Sewer & Stormwater Infrastructure – Streets – Detail ................................................................................. A100 Infrastructure – Water – Detail .................................................................................. A129 Infrastructure – Sewer – Detail .................................................................................. A156 Infrastructure – Stormwater – Detail ......................................................................... A162 Vehicle Fund (410) – Funding Sources & Uses ..................................................................... A169 1 INTRODUCTION What is a CIP? A Capital Improvement Program, or CIP, is a multi-year (5 – 10 years) capital expenditure plan for a city’s infrastructure (such as streets, parks and utility systems), vehicles, equipment, and public buildings. It identifies the major projects needed and desired by the community, their potential costs and how they would be financed. Including a project in a CIP does not commit the city to that project. The City Council must specifically authorize each one, and the associated funding, before any project may proceed. When the CIP is reviewed (ideally annually, in conjunction with the budgeting process), projects may go forward as planned, advance ahead of schedule, be removed entirely, or new projects may be added, depending upon changes in circumstances and priorities. The Minnesota Land Planning Act requires that the implementation plan portion of the Comprehensive Plan include a CIP for major infrastructure needs (transportation, wastewater, water supply, parks and open space) for a five-year period. Cities often expand the scope of their CIPs to include other capital needs (major equipment replacements, for example) and sometimes look beyond the five-year period, up to 20 years in the future for some projects. Such projects represent more of a “wish-list” that can be evaluated each time the plan is updated. As a part of the Comprehensive Plan, the CIP has some legal standing. Minnesota Statutes Chapter 473.865 provides that “a local governmental unit shall not adopt any official control or fiscal device which is in conflict with its comprehensive plan.” A fiscal device includes a budget or bond issue; so, it is important that the plan and CIP be kept-up-to date and in sync with city budgets. The primary benefit of a CIP is as a financial planning tool to help the city plan for the impact of capital needs on future budgets and property taxes, and to help forecast the need for borrowing to undertake major projects. The information developed as part of the capital planning process can help document the need for various projects and assist the City Council to sort out competing priorities. Scope of the CIP Lake Elmo’s CIP includes all capital projects that cost at least $25,000 and have a useful life span of five years or longer. Projects include all capital needs including major repairs to buildings and equipment purchases and replacements. Any projects not meeting these parameters would be reviewed as part of the annual operating budget but would not be included in the CIP. 2 Methodology The City of Lake Elmo moved from a 5-year to a 10-year CIP for the first time in 2024. The process of moving to a 10-year CIP has meant a substantial increase in the number of projects expected. Types of projects listed in the CIP include things like vehicles, equipment, street projects, utility projects, and so on. Some projects, like street reconstructions, will have both a street and a sewer or water component, which are listed separately. This year, staff started an effort to reorganize the project numbering and naming conventions. Part of that process was to assign project numbers of related items the same numerical value. So, you will find that the 2025 Street & Utility Improvements has a project PW-100 for the street portion and a project W-100 for the water portion. Project numbers are also grouped by category; trucks are the lowest numbers, then equipment, annual street improvements are 100+, etc. All cost estimates are preliminary and based on current dollars. No assumptions have been made about inflation. It will be important to refine and update costs each year when the plan is reviewed, especially for projects in the first year or two of the plan. Some purchases that are not likely to occur until slightly beyond the ten-year planning period may also be included in the CIP, such as the Ladder Truck, in order to see their impact on fund balances. Most of these projects are replacements for equipment and vehicles (such as fire trucks) which may have a life span of 10, 15 or 20 years and more. The plan may also include “pending” projects for which timelines (and in most cases, cost estimates) have not yet been identified; such as the previous MPCA grant projects that have currently lost funding. As more information is developed about the need for, cost, and possible funding sources for these projects, they will be included in future CIP updates. Funding Sources The CIP identifies a possible funding source(s) for each project listed. The main funding sources are as follows: Bond Proceeds Projects financed by borrowing, later to be repaid with property taxes or utility funds, and potentially special assessments depending upon the characteristics of the project. General Fund Annual operating budget which occasionally funds CIP projects, primarily funded by property tax revenues. Park Dedication Fund Existing City fund, receipts from cash-in-lieu of land park dedication fees paid by developers and others who subdivide their land. Stormwater Fund Funds come from fees paid by users of the Stormwater system. Wastewater (Sewer) Fund Funds come from fees paid by users of the Wastewater (Sewer) System. 3 Vehicle Fund Fund used to segregate funds set aside for planned vehicle replacements and new acquisitions. Funds are transferred from the operating budget (primarily property taxes) and the sale of equipment. Water Fund Funds come from fees paid by users of the Water System. Municipal State Aid (MSA) State aid funds allocated to the City each year; annual allocation grows as the City grows. Grants/Donations Funds obtained via contributions by outside parties. One of our major funding sources for Water projects has been MPCA dollars from the 3M settlement funds. There are multiple well and treatment projects currently expected to receive funding from that source. In addition to these sources, it is possible that future projects could be funded from user fees, vehicle trade-ins or other sources not listed. Many projects will be funded from a mix of funding sources, such as part cash and part bonding, or part water fund and part sewer fund. City contributions to capital-type funds have varied over the years. Starting in 2025, staff has proposed levies which contribute directly to capital reserve funds to more transparently show how much we are saving for future capital investments. We have also added more set-aside funds, such as the Infrastructure Reserve, Park Reserve, and City Hall Reserve to plan for increased use of cash in order to reduce future bonding. Project Priorities Capital improvement projects should be prioritized in some way so that limited funding can be allocated to those which are most important. This is difficult because the varying nature of the projects and their benefits and objectives are so disparate as to be essentially not comparable. Some public agencies have developed elaborate rating and ranking systems to try to set priorities. Complicated scoring systems may have some disadvantages because they may give a false sense of objectivity or precision to the priority setting process. Others use simpler systems, or simply do not try to compare projects that are like “apples and oranges.” There is no accepted system or “industry standard” for prioritizing projects. The following system has been utilized by staff: 1. Critical or urgent, high-priority projects that should be done if possible; a special effort should be made to find sufficient funding for all projects in this group. 2. Very important, high-priority projects that should be done as funding becomes available. 3. Important and worthwhile projects to be considered if funding is available; may be deferred to a subsequent year. 4. Less important, low-priority projects; desirable but not essential. 5. Future Consideration 4 2025 – 2034 CAPITAL IMPROVEMENT PROGRAM City-Wide Summary For 2025 through 2034, the draft CIP includes 149 projects (active and new recommendations) with a total estimated cost of $162,622,000. The paragraphs below and charts on the following pages provide both a summary and details of projects, timing, funding sources. Projects are a mix of replacements, improvements, and additions. Attached Reports – • Project Totals by Department • Project Totals by Funding Source • Project Listing Department # Projects Admin & Finance Depts 2 Building Dept 4 Fire Dept 10 Parks and Recreation 35 Public Works Dept 54 Sewer Dept 6 Storm Water Dept 7 Water Dept 31 Total 149 Administration & Finance Departments Admin and Finance generally do not have many projects in the CIP. The two budgeted for 2025 include financial software and a prospective land purchase. The land purchase is for future ballfield land, but due to the fact this possible purchase was not included in the CIP for review by the Park Commission last spring and it is largely a City Council led project, it was determined to leave it under Administration for now. Attached Reports – • Admin/Finance – Summary • Admin/Finance – Detail • Ballfield Fund – Funding Sources & Uses Building Department The Building Department has four vehicles for travel to building site for inspections. These vehicles are currently planned for a seven-year rotation with an estimated 15% funded by the trade-in or sale of existing vehicles. Attached Reports – • Building Dept – Summary • Building Dept – Detail 5 Fire Department The Fire Department has 10 items in the 2025-2024 CIP, with a mix of vehicles and equipment. These purchases are almost exclusively funded by the Vehicle Replacement Fund and Trade-ins/Sale of Equipment. Due to the nature of these vehicles the expected life span and the trade-in percentage vary greatly. Attached Reports – • Fire Dept – Summary • Fire Dept – Detail Public Works Departments The “Public Works Departments” encompasses the following; • General Public Works (Streets and General Maintenance) • Parks • Water • Sewer • Stormwater Public Works projects are divided out into these “sub-departments” due largely to the way that we account for government spending and the types of revenues that fund these projects. Parks CIP projects are funded largely by Park Dedication funds that come from developers. Street projects are funded largely by either by the property tax levy or bond proceeds (debt) repaid by the property tax levy. Water, sewer and stormwater projects are paid from those Enterprise Funds or bond proceeds (which are then repaid from those Enterprise Funds). Because many projects have cross-over between the Public Works departments, it seemed most straightforward to review PW CIP items via the following categories; Vehicles & Equipment, PW Building, Parks, and Infrastructure. Vehicle & Equipment Purchases There are currently 21 items planned for replacement or purchase in the next 10 years, including 12 trucks and 9 small and large pieces of equipment. Attached Reports – • PW Vehicles & Equipment – Summary • PW Vehicles & Equipment – Detail Public Works Building There are currently just five items on the Public Works Building (3445 Ideal Ave N) planned for repair/addition/replacement in the next 10 years. This subset of projects will be a focus of future development of this Capital Improvement Program, so that we can properly plan for repairs as the building ages. 6 Attached Reports – • PW Building – Summary • PW Building – Detail Parks Projects There are currently 35 items on the Parks CIP, 29 of which are replacement of existing park equipment and facilities. (Six items that are vehicles & equipment are included in the previously mentioned reports.) These items were reviewed by the Parks Commission in June and recommended for approval. All projects are currently funded by the Park Dedication Fund, which we expect to be fully funded for the next 10 years. However, those projections are based on existing development trends and can change significantly depending on what occurs in the housing market. Some of the projects are labeled simply “New Park Pavilion” without a location. This denotes a plan to replace one like item per year, with the actual location being determined by condition and need. Attached Reports – • Parks – Summary • Parks – Detail • Park Dedication Fund (404) – Funding Sources & Uses Infrastructure Projects This subset of projects includes Street, Water, Sewer & Stormwater Projects. At the July 11, 2024 City Council Workshop, City Engineer Jack Griffin presented an updated Pavement Management Plan that outlined the planned Street Reconstructions. This plan has since been updated internally as new information is received and assumptions changed. Street reconstruction projects are planned tentatively for the next 10 years. The final timing of projects is dependent on street condition, project costs, available funding, and other factors. “Street Improvement Projects” are typically done by neighborhood and a portion of the project is assessed to homeowners for a 15-year period. It is these projects that will sometimes have a segment in both Street and Water, as discussed earlier. Other street projects include collector streets that serve more of the city as a whole and may not have as many assessments, or County-led projects with a required City contribution. The list of Utility (Water, Sewer, and Stormwater) projects includes a mix of repairs or replacements of existing facilities, expansion or new facilities to address growth and/or PFAS pollution, and contributions to developments to ensure proper sizing of new infrastructure. Of note in Water projects is the cost of new Treatment Plants. It is currently expected that these facilities will be fully funded by the MPCA with the 3M Settlement Funds. So, of the approximately $74 million in water projects, over $50 million will come from Grants/Donations. Also of note, and related to those settlement funds, are projects that had been adopted in past 7 years, but are now marked as “Future” because MPCA funding for those projects is no longer expected. These projects may not occur, or if they do, they may be largely funded by Special Assessments. We have left them in the plan for the time being as we await additional information. Attached Reports – • Infrastructure – Summaries for Streets, Water, Sewer & Stormwater • Infrastructure – Details for Streets, Water, Sewer & Stormwater Vehicle Replacement Fund The Vehicle Fund is the only capital fund whose purchases are split across departments, and as such it seemed appropriate to bring some attention to it separately. The city has been contributing to the fund regularly since 2019. As we’ve built out the CIP to a 10-year plan, it is clear that those funding levels need to increase. The projected Tax Levy is shown with a starting amount of $400K in 2025 and increasing $50K per year until 2031 and then holding steady. An interfund loan is planned for 2027 to be repaid over a 5-year period to address a shortage in the fund that year. These projected revenues allow for this portion of the CIP to be fully funded for the next 10 years. Attached Reports – • Vehicle Fund (410) – Funding Sources & Uses Department 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Admin/Finance Department 2,875,000 100,000 - - - - - - - - 2,975,000 Building Department - 35,000 - - 35,000 70,000 - - 35,000 - 175,000 Fire Department 145,000 622,673 613,774 - 77,453 - 76,744 192,500 - 2,575,000 4,303,144 Parks and Recreation 382,000 898,000 480,000 945,000 1,835,000 460,000 - 150,000 125,000 - 5,275,000 Public Works Department 3,805,000 8,415,000 11,240,000 2,450,000 3,475,000 8,990,000 8,130,000 4,393,500 3,800,000 15,110,000 69,808,500 Sewer Department 25,920 40,000 1,150,000 - 1,685,000 - - 1,000,000 - 380,000 4,280,920 Storm Water Department 685,405 80,000 781,000 50,000 50,000 50,000 50,000 50,000 50,000 - 1,846,405 Water Department 28,666,475 25,937,000 2,890,000 1,650,000 1,500,000 1,850,000 1,854,537 210,000 1,350,000 8,050,799 73,958,811 Grand Total 36,584,800 36,127,673 17,154,774 5,095,000 8,657,453 11,420,000 10,111,281 5,996,000 5,360,000 26,115,799 162,622,780 2025 through 2034 Capital Improvement Plan Lake Elmo, MN Totals by Department Admin/Finance Department Building Department Fire Department Parks and Recreation Public Works Department Sewer Department Storm Water Department Water Department A-1 Source 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total % Ballfield Fund 2,775,000 - - - - - - - - - 2,775,000 1.7% Bond Proceeds - Assessment Funded 1,106,000 1,137,000 826,500 735,000 652,500 660,000 600,000 1,174,500 900,000 2,340,000 10,131,500 6.3% Bond Proceeds - Stormwater Fund - - 575,000 - - - - - - - 575,000 0.4% Bond Proceeds - Tax Levy 1,834,000 6,478,000 9,028,500 1,715,000 2,522,500 6,640,000 7,160,000 2,740,500 2,600,000 5,790,000 46,508,500 28.8% Bond Proceeds - Water Fund - 750,000 2,600,000 1,500,000 1,500,000 1,700,000 1,500,000 - 550,000 - 10,100,000 6.3% Fire Equipment & Projects Fund 115,000 - 25,000 - - - - 192,500 - 375,000 707,500 0.4% General Fund 75,000 75,000 160,000 - - - - - - 108,500 418,500 0.3% Grants/Donation 27,000,000 24,750,000 - - - 1,000,000 - - - 14,885,000 67,635,000 41.9% Infrastructure Reserve Fund (409)1,040,000 50,000 - - - 500,000 - - - - 1,590,000 1.0% Municipal Sate Aid (MSA)- 500,000 500,000 - - - - - - - 1,000,000 0.6% Park Dedication Fund (404)292,000 725000 480,000 850,000 790,000 460,000 - 125,000 125,000 - 3,847,000 2.4% Sewer Fund 25,920 40,000 1,150,000 - 1,685,000 - - 1,000,000 - 48,500 3,949,420 2.4% Storm Water Fund 685,405 80,000 206,000 50,000 50,000 50,000 50,000 50,000 50,000 39,500 1,310,905 0.8% Vehicle/Equip Trade-In 45,000 11,000 222,000 20,000 90,000 28,000 120,000 103,000 45,000 280,000 964,000 0.6% Vehicle Replacement Fund 220,000 641,673 1,171,774 75,000 367,453 227,000 361,744 400,500 290,000 2,125,000 5,880,144 3.6% Water Fund 1,371,475 712,000 285,000 150,000 - 150,000 319,537 210,000 800,000 124,299 4,122,311 2.6% Total - Non-MPCA 36,584,800 35,949,673 17,229,774 5,095,000 7,657,453 11,415,000 10,111,281 5,996,000 5,360,000 26,115,799 161,514,780 100% 2025 through 2034 Funding Source Summary - All Projects Lake Elmo, MN Funding Sources Ballfield Fund Bond Proceeds - Assessment Funded Bond Proceeds - Stormwater Fund Bond Proceeds - Tax Levy Bond Proceeds - Water Fund Fire Equipment & Projects Fund General Fund Grants/Donation Infrastructure Reserve Fund (409) Municipal Sate Aid (MSA) Park Dedication Fund (404) Sewer Fund Storm Water Fund A-2 Dept Status Project # Total $ (2025 - 34)Project Administration & Finance Departments New Recomm.AF - 001 200,000$ Financial Software Suite New Recomm.AF - 002 2,775,000$ Ballfield Property Purchase 2,975,000$ Total 297,500$ 10-Year Average Building Department Active B-001 35,000$ Building Inspection Vehicle 1 Active B-002 35,000$ Building Inspection Vehicle 2 Active B-003 35,000$ Building Inspection Vehicle 3 Active B-004 70,000$ Building Inspection Vehicle 4 - purchased twice in CIP period 175,000$ Total 17,500$ 10-Year Average Fire Department Active F-004 30,000$ Rescue 1 Hose Storage and Equipment Refurbish Active F-009 1,176,447$ Tender 2 Active F-011 60,000$ UTV 1 Active F-012 2,200,000$ Ladder 1 Active F-014 77,453$ Command Vehicle 1 Active F-015 76,744$ Command Vehicle 2 Active F-017 375,000$ SCBA Replacement Active F-018 192,500$ Turnout Gear Replacement Active F-021 40,000$ Equipment Decon Cleaning System New Recomm.F-031 75,000$ Station Alerting System 4,303,144$ Total 430,314$ 10-Year Average Parks and Recreation Active PR-001 45,000$ Chevy 2500 Active PR-002 35,000$ Kubota SUV Active PR-003 90,000$ Bobcat ToolCat Active PR-004 60,000$ John Deere Gator Active PR-005 25,000$ Air Compressor Active PR-006 70,000$ Skid Loader Active PR-027 65,000$ Kleis Park Playground - Replacement Active PR-028 125,000$ Tana Ridge Park Play Equipment - Replacement Active PR-029 210,000$ Tablyn Park Play Equipment - Replacement Active PR-030 125,000$ Stonegate Park Play Equipment - Replacement Active PR-031 125,000$ Reid Park Play Equipment - Replacement Active PR-032 125,000$ Ridge Park Play Equipment - Replacement Active PR-034 125,000$ Hidden Knoll Park Play Equipment - Replacement Active PR-036 250,000$ Carriage Station Park Play Equipment - Replacement Lake Elmo, MN Project Listing w/ Status & Amount 2025 through 2034 A-3 Active PR-038 78,000$ Trail Additions Active PR-039 250,000$ Lions Park Playground Equipment Replacement Active PR-040 30,000$ Court Resurfacing Active PR-043 275,000$ Lions Park Concession Building Updates Active PR-044 150,000$ Skate Park Active PR-045 30,000$ Outdoor Fitness Equipment Active PR-046 30,000$ Outdoor Fitness Park Active PR-047 30,000$ Disk Golf Active PR-048 300,000$ Central Play Complex New Recomm.PR-049 227,000$ Reid Park Parking Lot New Recomm.PR-050 30,000$ Court Resurfacing New Recomm.PR-051 200,000$ Trail Connection New Recomm.PR-052 225,000$ Park Sign Replacement New Recomm.PR-053 1,000,000$ Multisport Complex Amenities New Recomm.PR-054 25,000$ Invasive Species Management New Recomm.PR-055 80,000$ New Park Pavilion New Recomm.PR-056 80,000$ New Park Pavilion New Recomm.PR-057 80,000$ New Park Pavilion New Recomm.PR-058 80,000$ New Park Pavilion New Recomm.PR-059 80,000$ New Park Pavilion Active PR-069 520,000$ Central Greenway Regional Trail 5,275,000$ Total 527,500$ 10-Year Average Public Works Department Active PW-002 300,000$ D2 - Dump Truck 2 - 15 Mack Single Active PW-003 300,000$ D3 - Dump Truck 3 - 17 Mack Active PW-004 70,000$ D4 - Dump Truck 4 - 19 F-450 Active PW-005 300,000$ D5 - Dump Truck 5 - 19 Mack Active PW-006 330,000$ D6 - Dump Truck 6 - 20 Mack Tandem Active PW-007 300,000$ D7 - Dump Truck 7 - 21 Mack Active PW-008 70,000$ D8 - Dump Truck 8 - 22 F-550 Active PW-011 75,000$ P1 - Pickup 1 - F-250 Active PW-012 75,000$ P2 - Pickup 2 - F-250 Active PW-013 45,000$ P3 - Pickup 3 - F-150 Active PW-014 31,000$ P4 - Pickup 4 - Ranger Active PW-015 55,000$ P5 - Pickup 5 - 3500 Active PW-021 230,000$ E1 - Equip 1 - Case Loader Active PW-023 145,000$ E3 - Equip 3 - Backhoe Active PW-025 70,000$ E5 - Equip 5 -Bobcat Skid Active PW-026 40,000$ E6 - Equip 6 - Service Lift Active PW-027 160,000$ E7 - Equip 7 - Radios Active PW-028 125,000$ E8 - Equip 8 - Asphalt Roller Active PW-029 47,500$ E9 - Equip 9 - Asphalt Trailer Active PW-030 60,000$ E10 - Equip 10 - Chipper Active PW-031 25,000$ E11 - Equip 11 - Forklift Active PW-052 55,000$ PWB2 - Public Works Building Generator New Recomm.PW-053 30,000$ PWB3 - Public Works Building Roof New Recomm.PW-054 110,000$ PWB4 - Public Works Building Additional Shop Space New Recomm.PW-055 80,000$ PWB5 - Public Works Building Overhead Garage Doors A-4 Active PW-090 1,315,000$ Reevaluate- Homestead St & Utility Improvements Active PW-091 4,550,000$ Future - PP/EP/20th Street & Utility Improvements Active PW-092 3,500,000$ Future - Tartan Street & Utility Improvements Active PW-093 3,400,000$ Future - DL/SP/For Street & Utility Improvements Active PW-100 2,620,000$ 2025 Street Improvements Active PW-101 2,740,000$ 2026 Street Improvements Active PW-102 2,755,000$ 2027 Street Improvements Active PW-103 2,450,000$ 2028 Street Improvements Active PW-104 2,175,000$ 2029 Street Improvements Active PW-105 2,200,000$ 2030 Street Improvements Active PW-106 2,000,000$ 2031 Street Improvements Active PW-107 3,915,000$ 2032 Street Improvements Active PW-108 3,000,000$ 2033 Street Improvements New Recomm.PW-109 3,200,000$ 2034 Street Improvements Active PW-120 935,000$ UP RR Crossing - Village Parkway Active PW-120-2 105,000$ UP RR Crossing - Private Drive Closure Active PW-121 560,000$ Hudson Blvd Improvements - Vahli-Hi to Bus Fac. Active PW-122 2,100,000$ Hudson Blvd Improvements - Keats to Kramer Lake Ov Active PW-123 5,760,000$ South Frontage Rd (Demontreville Tr to Keats Ave) New Recomm.PW-124 4,600,000$ 5th St N - Keats to Lake Elmo Ave Active PW-125 5,000,000$ TH36-Lake Elmo Ave (CSAH 17) Imp Active PW-126 3,000,000$ South Frontage Road (Keats to Lake Elmo Ave) Active PW-127 300,000$ Manning/Hudson Stoplight Active PW-128 1,000,000$ Ideal Ave (CSAH 13)-Phase 3- CSAH 14 to CSAH 6 New Recomm.PW-129 1,000,000$ CSAH 14 - Klondike to 39th New Recomm.PW-130 1,000,000$ CSAH 17 Imp - CSAH 14 - 43rd Active PW-131 500,000$ Lake Elmo Ave (CSAH 17) & 39th St N Traffic Signal Active PW-132 500,000$ CSAH 6/Inwood Signal New Recomm.PW-133 500,000$ CSAH 10 / CSAH 17 Roundabout 69,808,500$ Total 6,980,850$ 10-Year Average Sewer Department Active S-093 380,000$ Future - DL/SP/For Street & Util Imp - Sewer Active S-104 1,685,000$ 2029 Street Improvements Active S-107 1,000,000$ Tapestry Sanitary Sewer Collection System Upgrades Active S-108 900,000$ I-94 Lift Station and Forcemain Upgrade Active S-120 115,920$ Sewer Oversizing Active S-121 200,000$ Sewer Oversizing for Sect 16 Extension 4,280,920$ Total 428,092$ 10-Year Average Storm Water Department Active SW-001 285,405$ Phase 2 Regional Drainage Impr. - Northstar Pond Active SW-002 575,000$ Phase 3 Regional Drainage Impr - Lions Park Pond Active SW-003 80,000$ Stormwater Reuse - Development Irrigation Systems Active SW-004 76,000$ Stormwater Reuse - Lions & VFW Park Irrigation Active SW-005 80,000$ Stormwater Reuse - Irrigation Systems Active SW-006 400,000$ Hudson Boulevard Culvert Repair Active SW-TBD 350,000$ Future Unidentified Stormwater Projects A-5 1,846,405$ Total 184,641$ 10-Year Average Water Department Active W-001 100,000$ W1 - Water 1 - Portable Generator Active W-002 130,000$ W2 - Water 2 - F-550 Service Truck Active W-003 44,537$ W3 - Water 3 - RAM 3500 Van Active W-004 65,799$ W4 - Water 4 - F-250 Service Truck Active W-011 50,000$ T1 - Tower 1 - Langly Ct Active W-012 800,000$ T2 - Tower 2 - Ideal Ave Active W-014 800,000$ T4 - Tower 4 - Inwood Ave Active W-017 60,000$ WL2 - Well 2 - 55th St Active W-019 50,000$ WL4 - Well 4 - 50th St Active W-020 50,000$ WL5 - Well 5 - Lily Ave Active W-021 750,000$ WL6 - Well 6 - Future Well & Site Acquisition Active W-022 750,000$ WL7 - Well 7 (or 3) - Test Well & Site Acquisition Active W-041 49,000,000$ TP1 - Treatment Plant 1 Active W-042 2,500,000$ TP2 - Treatment 2 - Well 2 - GAC Filter System Active W-090 935,000$ Future - Homestead Street & Utility Impr - Water Active W-091 2,500,000$ Future - PP/EP/20th Street & Utility Impr - Water Active W-092 1,900,000$ Future - Tartan Street & Utility Impr - Water Active W-093 2,200,000$ Future - DL/SP/For Street & Utility Impr - Water Active W-094 450,000$ Future - 45th Street Watermain Extension Active W-100 320,000$ 2025 Street & Utility Improvements - Water portion Active W-101 327,000$ 2026 Street & Utility Improvements - Water portion Active W-103 150,000$ 2028 Street & Utility Improvements - Water portion Active W-105 100,000$ 2030 Street & Utility Improvements - Water portion Active W-106 130,000$ 2031 Street & Utility Improvements - Water portion Active W-107 210,000$ 2032 Street & Utility Improvements - Water portion Active W-108 550,000$ 2033 Street & Utility Improvements - Water portion Active W-120 566,000$ Village East Trunk Watermain & PRV Active W-122 1,800,000$ Hudson Blvd - Trunk Watermain Extension New Recomm.W-124 1,700,000$ 5th St N - Keats to Lake Elmo Ave - Water Portion Active W-130 4,500,000$ Trunk Watermain Extensions Active W-160 470,475$ Watermain Oversizing 73,958,811$ Total 7,395,881$ 10-Year Average A-6 Produced Using Plan-It CIP Software 2025 through 2034 Admin-Finance Summary Lake Elmo, MN Department Project # 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Admin/Finance Department Financial Software Suite AF - 001 100,000 100,000 200,000 Ballfield Property Purchase AF - 002 2,775,000 2,775,000 Ballfield Fund 2,775,000 2,775,000 General Fund 75,000 75,000 150,000 Water Fund 25,000 25,000 50,000 Source Grand Total 2,875,000 100,000 0 0 0 0 0 0 0 0 2,975,000 GRAND TOTAL 2,875,000 100,000 0 0 0 0 0 0 0 0 2,975,000 A-7 Financial Software Suite 2025 thru 2034 Admin/Finance - Detail Lake Elmo, MN Project #AF - 001 Project Name Financial Software Suite Contact Finance Director Department Admin/Finance Department Category Unassigned Priority 3 Important Status New Recommendation Useful Life 10 years Description The current set-up utilizing different software for financial accounting and utility billing, as well as manual and spreadsheet processes for Special Assessments, Fixed Assets, Escrows and more, creates significant inefficiencies in the Finance Department. New software can incorporate automated Accounts Payable processes, adding efficiencies across the entire organization. Significant savings in staff time will make the department more resilient in the face of employee turnover and community growth. Very preliminary estimates of total costs are estimated at $200,000, which would include a conversion to the new software, as well as new workflows to automate tasks. Costs will be spread across at least two calendar years. The time-value of the increased efficiencies are expected to exceed the annualized costs of the software. In addition, these gained efficiencies will make the department more resilient to employee turnover. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Other 100,000 100,000 0 0 0 0 0 0 0 0 200,000 Total 100,000 100,000 0 0 0 0 0 0 0 0 200,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total General Fund 75,000 75,000 0 0 0 0 0 0 0 0 150,000 Water Fund 25,000 25,000 0 0 0 0 0 0 0 0 50,000 Total 100,000 100,000 0 0 0 0 0 0 0 0 200,000 Produced Using Plan-It CIP Software A-8 Ballfield Property Purchase 2025 thru 2034 Admin/Finance - Detail Lake Elmo, MN Project #AF - 002 Project Name Ballfield Property Purchase Contact City Administrator Department Admin/Finance Department Category Land Priority 3 Important Status New Recommendation Useful Life 99 years Description Purchase of two properties for future development of parks and ballfields. Per city council meeting on 8/27/24. Tentative closing in early 2025. Interfund Loan -- repayment over 10 years w/ dedicated levy. $2,700,000 for land + $75,000 for closing costs/incidentals $1,058,280 to be transferred from Park Ded -- Royal Golf ballfield contribution. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Land Acquisition 2,700,000 0 0 0 0 0 0 0 0 0 2,700,000 Other 75,000 0 0 0 0 0 0 0 0 0 75,000 Total 2,775,000 0 0 0 0 0 0 0 0 0 2,775,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Ballfield Fund 2,775,000 0 0 0 0 0 0 0 0 0 2,775,000 Total 2,775,000 0 0 0 0 0 0 0 0 0 2,775,000 Produced Using Plan-It CIP Software A-9 2025 through 2034 Ballfield Fund - Funding Sources & UsesLake Elmo, MN Source Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Ballfield Fund Beginning Balance 0 0 0 0 0 0 0 0 0 0 Revenues and Other Fund Sources Revenue Ballfield Levy 257,508 248,924 240,341 231,757 223,174 214,590 206,006 197,423 188,839 180,256 Park Dedication 1,058,280 0 0 0 0 0 0 0 0 0 Interfund Loan 1,716,720 0 0 0 0 0 0 0 0 0 Total 3,032,508 248,924 240,341 231,757 223,174 214,590 206,006 197,423 188,839 180,256 Other Fund Sources Total Revenues and Other Fund Sources 3,032,508 248,924 240,341 231,757 223,174 214,590 206,006 197,423 188,839 180,256 Total Funds available 3,032,508248,924 240,341 231,757 223,174 214,590 206,006 197,423 188,839 180,256 Expenditures and Uses Capital Projects & Equipment Admin/Finance Department Ballfield Property Purchase AF - 002 2,775,000 0 0 0 0 0 0 0 0 0 Total 2,775,000 0 0 0 0 0 0 0 0 0 Other Uses Interfund Loan Payment 257,508 248,924 240,341 231,757 223,174 214,590 206,006 197,423 188,839 180,256 Total 257,508 248,924 240,341 231,757 223,174 214,590 206,006 197,423 188,839 180,256 Total Expenditures and Uses 3,032,508 248,924 240,341 231,757 223,174 214,590 206,006 197,423 188,839 180,256 Change in Fund Balance 0 0 0 0 0 0 0 0 0 0 Ending Balance 0 0 0 0 0 0 0 0 0 0 Produced Using Plan-It CIP Software A-10 Produced Using Plan-It CIP Software 2025 through 2034 Building Dept - Summary Lake Elmo, MN Department Project # 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Building Department Building Inspection Vehicle 1 B-001 35,000 35,000 Building Inspection Vehicle 2 B-002 35,000 35,000 Building Inspection Vehicle 3 B-003 35,000 35,000 Building Inspection Vehicle 4 B-004 35,000 35,000 70,000 Vehicle/Equip Trade-In 5,000 5,000 5,000 5,000 20,000 Vehicle Replacement Fund 30,000 30,000 60,000 30,000 150,000 Source Grand Total 0 35,000 0 0 35,000 65,000 0 0 35,000 0 170,000 GRAND TOTAL 0 35,000 0 0 35,000 70,000 0 0 35,000 0 175,000 A-11 Building Inspection Vehicle 1 2025 thru 2034 Building Dept - Detail Lake Elmo, MN Project #B-001 Project Name Building Inspection Vehicle 1 Contact Building Official Department Building Department Category Vehicles Priority 2 Very Important Status Active Useful Life 7 years Dept. Unit Number/Name BLDG-1 Make Chevrolet Model Equinox VIN / SN 3GNAXSEVXNS165061 Year 2022 Color Black License Plate 977305 Location/Address City Hall Description Building Inspection Vehicle 1 Current - 2022 Equinox - purchased 2022 Prior - 2004 S10 Colorado, 20YY S10 Colorado 7 year purchasing cycle. Justification 7 year replacement cycle on 4 Building Inspection vehicles. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 35,000 0 0 0 0 0 35,000 Total 0 0 0 0 35,000 0 0 0 0 0 35,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 30,000 0 0 0 0 0 30,000 Vehicle/Equip Trade-In 0 0 0 0 5,000 0 0 0 0 0 5,000 Total 0 0 0 0 35,000 0 0 0 0 0 35,000 Produced Using Plan-It CIP Software A-12 Building Inspection Vehicle 2 2025 thru 2034 Building Dept - Detail Lake Elmo, MN Project #B-002 Project Name Building Inspection Vehicle 2 Contact Building Official Department Building Department Category Vehicles Priority 2 Very Important Status Active Useful Life 7 years Dept. Unit Number/Name BLDG-2 Make Mitsubishi Model Outlander VIN / SN JA4ARUAU8NU024737 Year 2022 Color White License Plate 968478 Location/Address City Hall Description Building Inspection Vehicle 2 Current - 2022 Mitsubishi Outlander (VIN 4737) Prior - 2015 Jeep (sold 12/22/22) 7 year purchasing cycle. Justification 7 year replacment cycle on 4 Building Inspection vehicles. Produced Using Plan-It CIP Software A-13 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 35,000 0 0 0 0 35,000 Total 0 0 0 0 0 35,000 0 0 0 0 35,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 30,000 0 0 0 0 30,000 Total 0 0 0 0 0 30,000 0 0 0 0 30,000 Produced Using Plan-It CIP Software A-14 Building Inspection Vehicle 3 2025 thru 2034 Building Dept - Detail Lake Elmo, MN Project #B-003 Project Name Building Inspection Vehicle 3 Contact Building Official Department Building Department Category Vehicles Priority 2 Very Important Status Active Useful Life 7 years Dept. Unit Number/Name BLDG-3 Make Mitsubishi Model Outlander VIN / SN JA4ARUAU7NU024731 Year 2022 Color Black License Plate 977306 Description Building Inspection Vehicle 3 Current - 2022 Mitsubishi Outlander (VIN 4731) Prior - 2017 Equinox (sold 4/18/23) 7 year purchasing cycle. Justification 7 year replacment cycle on 4 Building Inspection vehicles. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 35,000 0 0 0 0 35,000 Total 0 0 0 0 0 35,000 0 0 0 0 35,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 30,000 0 0 0 0 30,000 Vehicle/Equip Trade-In 0 0 0 0 0 5,000 0 0 0 0 5,000 Total 0 0 0 0 0 35,000 0 0 0 0 35,000 Produced Using Plan-It CIP Software A-15 Building Inspection Vehicle 4 2025 thru 2034 Building Dept - Detail Lake Elmo, MN Project #B-004 Project Name Building Inspection Vehicle 4 Contact Building Official Department Building Department Category Vehicles Priority 3 Important Status Active Useful Life 7 years Dept. Unit Number/Name BLDG-4 Make Chevrolet Model Equinox VIN / SN 3GNAXUEVOLS538391 Year 2019 Color White Description Building Inspection Vehicle 4 Current - 2019 Chevrolet Equinox 7 year purchasing cycle. Justification 7 year replacement cycle on 4 Building Inspection vehicles. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 35,000 0 0 0 0 0 0 35,000 0 70,000 Total 0 35,000 0 0 0 0 0 0 35,000 0 70,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 30,000 0 0 0 0 0 0 30,000 0 60,000 Vehicle/Equip Trade-In 0 5,000 0 0 0 0 0 0 5,000 0 10,000 Total 0 35,000 0 0 0 0 0 0 35,000 0 70,000 Produced Using Plan-It CIP Software A-16 Produced Using Plan-It CIP Software 2025 through 2034 Fire Dept - Summary Lake Elmo, MN Department Project # 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Fire Department Rescue 1 Hose Storage and Equipment Refurbish F-004 30,000 30,000 Tender 2 F-009 487,673 688,774 1,176,447 UTV 1 F-011 60,000 60,000 Ladder 1 F-012 2,200,000 2,200,000 Command Vehicle 1 F-014 77,453 77,453 Command Vehicle 2 F-015 76,744 76,744 SCBA Replacement F-017 375,000 375,000 Turnout Gear Replacement F-018 192,500 192,500 Equipment Decon Cleaning System F-021 40,000 40,000 Station Alerting System F-031 75,000 75,000 Fire Equipment & Projects Fund 115,000 25,000 192,500 375,000 707,500 Vehicle/Equip Trade-In 6,000 100,000 30,000 25,000 200,000 361,000 Vehicle Replacement Fund 30,000 541,673 563,774 47,453 51,744 2,000,000 3,234,644 Source Grand Total 145,000 547,673 688,774 0 77,453 0 76,744 192,500 0 2,575,000 4,303,144 GRAND TOTAL 145,000 547,673 688,774 0 77,453 0 76,744 192,500 0 2,575,000 4,303,144 A-17 Rescue 1 Hose Storage and Equipment Refurbish 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-004 Project Name Rescue 1 Hose Storage and Equipment Refurbish Contact Fire Chief Department Fire Department Category Vehicles Priority 2 Very Important Status Active Useful Life 15 years Make Rosenbauer Description Refurbish existing hose storage area to include preconnected hose capabilities and refurbish tool and equipment areas to better utilize available equipment storage space. Justification The fire department replaces or refurbishes vehicles on a rotating basis based on each individual vehicles need. As department operations are being reevaluated with the new single station operating model, all department apparatus will be used more frequently for its intended use. This project will allow for better apparatus utilization and response capability. The Rescue 1 refurbishment will provide a refurbish of existing hose storage area to include preconnected hose capabilities and refurbish tool and equipment areas to better utilize available storage space. Rescue 1 is utilized by all Fire Department staff to respond to emergency incidents 24 hours a day 365 days per year to provide crew response, firefighter safety, support on emergency incidents, and prevention efforts. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 30,000 0 0 0 0 0 0 0 0 0 30,000 Total 30,000 0 0 0 0 0 0 0 0 0 30,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 30,000 0 0 0 0 0 0 0 0 0 30,000 Total 30,000 0 0 0 0 0 0 0 0 0 30,000 Produced Using Plan-It CIP Software A-18 Tender 2 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-009 Project Name Tender 2 Contact Fire Chief Department Fire Department Category Vehicles Priority 1 Critical Status Active Useful Life 20 years Dept. Unit Number/Name Tender 2 Make Spartan Model Gladiator VIN / SN 4S7AX2F996C055229 Year 2007 Color Red Description Replacement of Tender 2 (2007 Rosenbauer/Spartan Tender/Engine) including all necessary response equipment, lighting and graphics. Justification The fire department replaces vehicles on a rotating basis based on each individual vehicles need. The Tender 2 replacement will be utilized by all Fire Department staff to respond to emergency incidents 24 hours a day 365 days per year to provide crew response, firefighter safety, support on emergency incidents, and prevention efforts. This was originally budgeted as a 2027 CIP purchase but due to rapidly increasing costs and the significant length of replacement build time, this request to purchase is being presented now. Current build time is currently estimated at 26 – 30 months from time of order. The vehicle being replaced will be sold upon the arrival of the new engine. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 487,673 688,774 0 0 0 0 0 0 0 1,176,447 Total 0 487,673 688,774 0 0 0 0 0 0 0 1,176,447 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 487,673 563,774 0 0 0 0 0 0 0 1,051,447 Vehicle/Equip Trade-In 0 0 100,000 0 0 0 0 0 0 0 100,000 Fire Equipment & Projects Fund 0 0 25,000 0 0 0 0 0 0 0 25,000 Total 0 487,673 688,774 0 0 0 0 0 0 0 1,176,447 Produced Using Plan-It CIP Software A-19 UTV 1 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-011 Project Name UTV 1 Contact Fire Chief Department Fire Department Category Vehicles Priority 2 Very Important Status Active Useful Life 15 years Make Polaris Model Ranger VIN / SN 4XARF68A794733391 Year 2009 Color Red Description Replacement of UTV 1 (2008 Polaris Ranger 6x6) including all necessary response equipment, lighting and graphics. Justification The fire department replaces vehicles on a rotating basis based on each individual vehicles need. The UTV 1 replacement will be utilized by all Fire Department staff to respond to emergency incidents 24 hours a day 365 days per year to provide crew response, firefighter safety, support on emergency incidents, and prevention efforts. This equipment is especially critical for utilization within our parks and trail systems. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 60,000 0 0 0 0 0 0 0 0 60,000 Total 0 60,000 0 0 0 0 0 0 0 0 60,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 54,000 0 0 0 0 0 0 0 0 54,000 Vehicle/Equip Trade-In 0 6,000 0 0 0 0 0 0 0 0 6,000 Total 0 60,000 0 0 0 0 0 0 0 0 60,000 Produced Using Plan-It CIP Software A-20 Ladder 1 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-012 Project Name Ladder 1 Contact Fire Chief Department Fire Department Category Vehicles Priority 1 Critical Status Active Useful Life 20 years Dept. Unit Number/Name Ladder 1 Make Rosenbauer Model Commander 78' Aerial VIN / SN 54F2CC702FWM10914 Year 2015 Color Red Description Replacement of Ladder 1 (2015 Rosenbauer 78' Aerial) including all necessary response equipment, lighting and graphics. Justification The fire department replaces vehicles on a rotating basis based on each individual vehicles need. The Ladder 1 replacement will be utilized by all Fire Department staff to respond to emergency incidents 24 hours a day 365 days per year to provide crew response, firefighter safety, support on emergency incidents, and prevention efforts. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 0 0 2,200,000 2,200,000 Total 0 0 0 0 0 0 0 0 0 2,200,000 2,200,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 0 0 0 2,000,000 2,000,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 0 0 200,000 200,000 Total 0 0 0 0 0 0 0 0 0 2,200,000 2,200,000 Produced Using Plan-It CIP Software A-21 Command Vehicle 1 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-014 Project Name Command Vehicle 1 Contact Fire Chief Department Fire Department Category Vehicles Priority 1 Critical Status Active Useful Life 8 years Dept. Unit Number/Name C1 Make Chevrolet Model Tahoe VIN / SN 1GNSKLED2MR463377 Year 2021 Color Red License Plate C1 Description Replacement of CV1 (2021 Chevrolet Tahoe) including all necessary response equipment, lighting and graphics. Justification The fire department replaces vehicles on a rotating basis based on each individual vehicles need. The Command Vehicle will be utilized by Fire Department Fire Inspector and officer staff to respond to emergency incidents 24 hours a day 365 days per year to provide critical incident command, firefighter safety, support on emergency incidents, fire inspections and prevention efforts. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 77,453 0 0 0 0 0 77,453 Total 0 0 0 0 77,453 0 0 0 0 0 77,453 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 47,453 0 0 0 0 0 47,453 Vehicle/Equip Trade-In 0 0 0 0 30,000 0 0 0 0 0 30,000 Total 0 0 0 0 77,453 0 0 0 0 0 77,453 Budget Impact Less maintenance/repairs required to upkeep new vehicle Produced Using Plan-It CIP Software A-22 Command Vehicle 2 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-015 Project Name Command Vehicle 2 Contact Fire Chief Department Fire Department Category Vehicles Priority 1 Critical Status Active Useful Life 8 years Dept. Unit Number/Name C2 Make Dodge Model Durango VIN / SN 1C4SDJFT3PC676827 Year 2023 Color Black License Plate C2 Description Replacement of Command Vehicle 2 including all necessary response equipment, lighting and graphics. Justification The fire department replaces vehicles on a rotating basis based on each individual vehicles need. The Command Vehicle will be utilized by the Assistant Fire Chief to respond to emergency incidents 24 hours a day 365 days per year to provide critical incident command, firefighter safety, support on emergency incidents, fire inspections and prevention efforts. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 76,744 0 0 0 76,744 Total 0 0 0 0 0 0 76,744 0 0 0 76,744 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 51,744 0 0 0 51,744 Vehicle/Equip Trade-In 0 0 0 0 0 0 25,000 0 0 0 25,000 Total 0 0 0 0 0 0 76,744 0 0 0 76,744 Produced Using Plan-It CIP Software A-23 SCBA Replacement 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-017 Project Name SCBA Replacement Contact Fire Chief Department Fire Department Category Equipment: Fire Equip Priority 1 Critical Status Active Useful Life 15 years Make Drager Year 2019 Description Replacement of Self Contained Breathing Apparatus (SCBA) equipment. Justification Replacement of SCBA equipment that have become non-compliant with NFPA and OSHA standards. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 0 0 375,000 375,000 Total 0 0 0 0 0 0 0 0 0 375,000 375,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Fire Equipment & Projects Fund 0 0 0 0 0 0 0 0 0 375,000 375,000 Total 0 0 0 0 0 0 0 0 0 375,000 375,000 Produced Using Plan-It CIP Software A-24 Turnout Gear Replacement 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-018 Project Name Turnout Gear Replacement Contact Fire Chief Department Fire Department Category Equipment: Fire Equip Priority 1 Critical Status Active Useful Life 10 years Make GLOBE Year 2019 Description Replacement of 35 sets of turnout gear (Jacket, Pants, Particulate Hood and Boots). Justification Per NFPA 1971, turnout gear is required to be retired and taken out of service after 10 years. The requested sets of turnout gear, additional hoods and boots include the enhanced safety features available through the 2018 NFPA 1971 standard. New safety features include, less water absorption by the turnout gear outer shell, a particle protection barrier on hoods, and better ergonomic design of turnout gear to minimize gaps in protection. The benefit of acquiring this funding will greatly increase the safety of our firefighters during all types of incidents and drills requiring structural firefighting turnout gear. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 192,500 0 0 192,500 Total 0 0 0 0 0 0 0 192,500 0 0 192,500 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Fire Equipment & Projects Fund 0 0 0 0 0 0 0 192,500 0 0 192,500 Total 0 0 0 0 0 0 0 192,500 0 0 192,500 Produced Using Plan-It CIP Software A-25 Equipment Decon Cleaning System 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-021 Project Name Equipment Decon Cleaning System Contact Fire Chief Department Fire Department Category Equipment: Fire Equip Priority 1 Critical Status Active Useful Life 20 years Description Equipment decon cleaning system cleans all protective gear and steel, composite, rubber, fabric, plastic equipment in a mechanical, self-contained process. This equipment is permanently installed in the decon room of the fire station. This system offers a quick, easy and safe method of cleaning protective gear in a sealed compartment. This ergonomic process minimizes manual contact with contaminated materials. Justification Exposure to hazardous chemicals and carcinogens is a well known health risk for firefighters. Studies have shown that they run a significantly higher risk of being diagnosed with various forms of cancer than the general population. To reduce this dangerous exposure it is essential to thoroughly, safely and efficiently clean and decontaminate all protective equipment after every use. Cleaning gear with and equipment decon cleaning system, significantly reduces the exposure to cancer causing PAH particles and supports a safer work environment for staff. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 40,000 0 0 0 0 0 0 0 0 0 40,000 Total 40,000 0 0 0 0 0 0 0 0 0 40,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Fire Equipment & Projects Fund 40,000 0 0 0 0 0 0 0 0 0 40,000 Total 40,000 0 0 0 0 0 0 0 0 0 40,000 Produced Using Plan-It CIP Software A-26 Station Alerting System 2025 thru 2034 Fire Dept - Detail Lake Elmo, MN Project #F-031 Project Name Station Alerting System Contact Fire Chief Department Fire Department Category Equipment: Fire Equip Priority 2 Very Important Status New Recommendation Useful Life 25 years Description Purchase of a station alerting system (Phoenix G-2 Alerting System) and associated instillation costs for the system in the fire station. This system was proposed in the planning of the new fire station and was eliminated due to the project budget. Justification The Pheonix G2 Alerting System is a station alerting system used by many fire departments throughout the US including all departments in Ramsey, Anoka and Hennepin Counties. This system alerts station crews of an incoming incident through, lighting, message boards and A/V notifications. Currently, the Washington County Emergency Communications Response Center will be ready with the capabilities to support the Phoenix G2 Alerting System in early 2025. When an incident occurs, the G2 Communications Gateway receives alert data from a dispatcher using CAD and the USDD interactive web-based interface we use today. Dispatch processing time is reduced when said alert data is sent over a high-speed network which can notify fire stations with alerts and information in less than a second. At the fire station, the Phoenix G2 system integrates crystal clear text to speech technology and high- contrast message signs and LED lighting. This helps emergency responders react promptly and efficiently to every call. This systems benefits the on-shift staff by increasing situational awareness and mental preparedness by using clear, consistent station alerting vocals. This helps crews respond more quickly and efficiently. The systems and alerting devices are designed to reduce cardiac stress, anxiety, optical shock, and sleep deprivation through ramped toning and lighting levels. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 75,000 0 0 0 0 0 0 0 0 0 75,000 Total 75,000 0 0 0 0 0 0 0 0 0 75,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Fire Equipment & Projects Fund 75,000 0 0 0 0 0 0 0 0 0 75,000 Total 75,000 0 0 0 0 0 0 0 0 0 75,000 Produced Using Plan-It CIP Software A-27 Produced Using Plan-It CIP Software 2025 through 2034 Public Works - Vehicles & Equipment - Summary Lake Elmo, MN Department Project # 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Public Works Department D2 - Dump Truck 2 - 15 Mack Single PW-002 300,000 300,000 D3 - Dump Truck 3 - 17 Mack PW-003 300,000 300,000 D4 - Dump Truck 4 - 19 F-450 PW-004 70,000 70,000 D5 - Dump Truck 5 - 19 Mack PW-005 300,000 300,000 D6 - Dump Truck 6 - 20 Mack Tandem PW-006 330,000 330,000 D7 - Dump Truck 7 - 21 Mack PW-007 300,000 300,000 D8 - Dump Truck 8 - 22 F-550 PW-008 70,000 70,000 P1 - Pickup 1 - F-250 PW-011 75,000 75,000 P2 - Pickup 2 - F-250 PW-012 75,000 75,000 P3 - Pickup 3 - F-150 PW-013 45,000 45,000 P4 - Pickup 4 - Ranger PW-014 31,000 31,000 P5 - Pickup 5 - 3500 PW-015 55,000 55,000 E1 - Equip 1 - Case Loader PW-021 230,000 230,000 E3 - Equip 3 - Backhoe PW-023 145,000 145,000 E5 - Equip 5 -Bobcat Skid PW-025 70,000 70,000 E6 - Equip 6 - Service Lift PW-026 40,000 40,000 E7 - Equip 7 - Radios PW-027 160,000 160,000 E8 - Equip 8 - Asphalt Roller PW-028 125,000 125,000 E9 - Equip 9 - Asphalt Trailer PW-029 47,500 47,500 A-28 Produced Using Plan-It CIP Software Department Project # 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total E10 - Equip 10 - Chipper PW-030 60,000 60,000 E11 - Equip 11 - Forklift PW-031 25,000 25,000 General Fund 160,000 160,000 Vehicle/Equip Trade-In 25,000 117,000 40,000 23,000 60,000 103,000 40,000 60,000 468,000 Vehicle Replacement Fund 120,000 608,000 260,000 167,000 310,000 375,500 260,000 125,000 2,225,500 Source Grand Total 145,000 0 885,000 0 300,000 190,000 370,000 478,500 300,000 185,000 2,853,500 Water Department W1 - Water 1 - Portable Generator W-001 100,000 100,000 W2 - Water 2 - F-550 Service Truck W-002 130,000 130,000 W3 - Water 3 - RAM 3500 Van W-003 44,537 44,537 W4 - Water 4 - F-250 Service Truck W-004 65,799 65,799 Vehicle/Equip Trade-In 5,000 35,000 20,000 60,000 Water Fund 95,000 139,537 45,799 280,336 Source Grand Total 0 0 100,000 0 0 0 174,537 0 0 65,799 340,336 GRAND TOTAL 145,000 0 985,000 0 300,000 190,000 544,537 478,500 300,000 250,799 3,193,836 A-29 D2 - Dump Truck 2 - 15 Mack Single 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-002 Project Name D2 - Dump Truck 2 - 15 Mack Single Total Project Cost $300,000 Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 12 years Make Mack Model Single VIN / SN 1M2AX11C1FM001539 Year 2015 Color Green License Plate 943972 Old Project Number PW-062 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 300,000 0 0 0 0 0 0 0 300,000 Total 0 0 300,000 0 0 0 0 0 0 0 300,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 260,000 0 0 0 0 0 0 0 260,000 Vehicle/Equip Trade-In 0 0 40,000 0 0 0 0 0 0 0 40,000 Total 0 0 300,000 0 0 0 0 0 0 0 300,000 Produced Using Plan-It CIP Software A-30 D3 - Dump Truck 3 - 17 Mack 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-003 Project Name D3 - Dump Truck 3 - 17 Mack Total Project Cost $300,000 Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 12 years Make Mack VIN / SN 1M2AY11CXJM001919 Year 2017 Color Green License Plate 954700 Old Project Number PW-062 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 300,000 0 0 0 0 0 300,000 Total 0 0 0 0 300,000 0 0 0 0 0 300,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 260,000 0 0 0 0 0 260,000 Vehicle/Equip Trade-In 0 0 0 0 40,000 0 0 0 0 0 40,000 Total 0 0 0 0 300,000 0 0 0 0 0 300,000 Produced Using Plan-It CIP Software A-31 D4 - Dump Truck 4 - 19 F- 450 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-004 Project Name D4 - Dump Truck 4 - 19 F-450 Total Project Cost $70,000 Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 12 years Make Ford Model F-450 VIN / SN 1FDUF4HY3KDA07601 Year 2019 Color White License Plate 963707 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 70,000 0 0 0 70,000 Total 0 0 0 0 0 0 70,000 0 0 0 70,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 50,000 0 0 0 50,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 20,000 0 0 0 20,000 Total 0 0 0 0 0 0 70,000 0 0 0 70,000 Produced Using Plan-It CIP Software A-32 D5 - Dump Truck 5 - 19 Mack 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-005 Project Name D5 - Dump Truck 5 - 19 Mack Total Project Cost $300,000 Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 12 years Make Mack Model Single Axle VIN / SN 1M2GR2AC2KM001117 Year 2019 Color Green License Plate 960836 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 300,000 0 0 0 300,000 Total 0 0 0 0 0 0 300,000 0 0 0 300,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 260,000 0 0 0 260,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 40,000 0 0 0 40,000 Total 0 0 0 0 0 0 300,000 0 0 0 300,000 Produced Using Plan-It CIP Software A-33 D6 - Dump Truck 6 - 20 Mack Tandem 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-006 Project Name D6 - Dump Truck 6 - 20 Mack Tandem Total Project Cost $330,000 Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 12 years Make Mack Model Tandem Axle VIN / SN 1M2GR4GC1LM018434 Year 2020 Color Green License Plate 963050 Old Project Number PW-045 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 330,000 0 0 330,000 Total 0 0 0 0 0 0 0 330,000 0 0 330,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 0 270,000 0 0 270,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 60,000 0 0 60,000 Total 0 0 0 0 0 0 0 330,000 0 0 330,000 Produced Using Plan-It CIP Software A-34 D7 - Dump Truck 7 - 21 Mack 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-007 Project Name D7 - Dump Truck 7 - 21 Mack Total Project Cost $300,000 Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 12 years Dept. Unit Number/Name PW- 21-1 Make Mack Model Single Axle VIN / SN 1M2GR2AC2MM001511 Year 2021 Color Green License Plate 963045 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 0 300,000 0 300,000 Total 0 0 0 0 0 0 0 0 300,000 0 300,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 0 0 260,000 0 260,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 0 40,000 0 40,000 Total 0 0 0 0 0 0 0 0 300,000 0 300,000 Produced Using Plan-It CIP Software A-35 D8 - Dump Truck 8 - 22 F- 550 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-008 Project Name D8 - Dump Truck 8 - 22 F-550 Total Project Cost $70,000 Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 12 years Make Ford Model F-550 VIN / SN 1FDUF5HNXNEE97688 Year 2022 Color White License Plate 968480 Old Project Number PR-015 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 0 0 70,000 70,000 Total 0 0 0 0 0 0 0 0 0 70,000 70,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 0 0 0 45,000 45,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 0 0 25,000 25,000 Total 0 0 0 0 0 0 0 0 0 70,000 70,000 Produced Using Plan-It CIP Software A-36 P1 - Pickup 1 - F- 250 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-011 Project Name P1 - Pickup 1 - F-250 Total Project Cost $75,000 Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 10 years Dept. Unit Number/Name 17-2 Make Ford Model F-250 VIN / SN 1FTBF2B69HEE05924 Year 2017 Color White License Plate 954651 Old Project Number PW-063 Description Lift gate and boss snow v plow Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 75,000 0 0 0 0 0 0 0 75,000 Total 0 0 75,000 0 0 0 0 0 0 0 75,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 60,000 0 0 0 0 0 0 0 60,000 Vehicle/Equip Trade-In 0 0 15,000 0 0 0 0 0 0 0 15,000 Total 0 0 75,000 0 0 0 0 0 0 0 75,000 Produced Using Plan-It CIP Software A-37 P2 - Pickup 2 - F- 250 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-012 Project Name P2 - Pickup 2 - F-250 Total Project Cost $75,000 Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 10 years Dept. Unit Number/Name 17-3 Make Ford Model F-250 VIN / SN 1FTBF2B67HEE05923 Year 2017 Color White License Plate 954049 Old Project Number PW-064 Description Lift gate and boss snow v plow Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 75,000 0 0 0 0 0 0 0 75,000 Total 0 0 75,000 0 0 0 0 0 0 0 75,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 60,000 0 0 0 0 0 0 0 60,000 Vehicle/Equip Trade-In 0 0 15,000 0 0 0 0 0 0 0 15,000 Total 0 0 75,000 0 0 0 0 0 0 0 75,000 Produced Using Plan-It CIP Software A-38 P3 - Pickup 3 - F- 150 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-013 Project Name P3 - Pickup 3 - F-150 Total Project Cost $45,000 Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 10 years Make Ford Model F-150 VIN / SN 1FTEW1EP6GFB12308 Year 2017 Color White License Plate 950247 Old Project Number PW-061 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 45,000 0 0 0 0 0 0 0 45,000 Total 0 0 45,000 0 0 0 0 0 0 0 45,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 28,000 0 0 0 0 0 0 0 28,000 Vehicle/Equip Trade-In 0 0 17,000 0 0 0 0 0 0 0 17,000 Total 0 0 45,000 0 0 0 0 0 0 0 45,000 Produced Using Plan-It CIP Software A-39 P4 - Pickup 4 - Ranger 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-014 Project Name P4 - Pickup 4 - Ranger Total Project Cost $31,000 Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 10 years Make Ford Model Ranger VIN / SN 1FTER1FH2NLD54171 Year 2022 Color White License Plate 976820 Old Project Number PW-019 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 31,000 0 0 31,000 Total 0 0 0 0 0 0 0 31,000 0 0 31,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 0 18,000 0 0 18,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 13,000 0 0 13,000 Total 0 0 0 0 0 0 0 31,000 0 0 31,000 Produced Using Plan-It CIP Software A-40 P5 - Pickup 5 - 3500 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-015 Project Name P5 - Pickup 5 - 3500 Total Project Cost $55,000 Contact Public Works Director Department Public Works Department Category Vehicles Priority 3 Important Status Active Useful Life 10 years Make GMC Model Sierra 3500 VIN / SN 1GT39SE72RF373748 Year 2024 Color White License Plate 801178 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 0 0 55,000 55,000 Total 0 0 0 0 0 0 0 0 0 55,000 55,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 0 0 0 32,000 32,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 0 0 23,000 23,000 Total 0 0 0 0 0 0 0 0 0 55,000 55,000 Produced Using Plan-It CIP Software A-41 E1 - Equip 1 - Case Loader 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-021 Project Name E1 - Equip 1 - Case Loader Total Project Cost $230,000 Contact Public Works Director Department Public Works Department Category Equipment: PW Equip Priority 3 Important Status Active Useful Life 15 years Make Case Model 721 VIN / SN JFF0122871 Year 1999 Color Yellow Old Project Number PW-004 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 230,000 0 0 0 0 0 0 0 230,000 Total 0 0 230,000 0 0 0 0 0 0 0 230,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 200,000 0 0 0 0 0 0 0 200,000 Vehicle/Equip Trade-In 0 0 30,000 0 0 0 0 0 0 0 30,000 Total 0 0 230,000 0 0 0 0 0 0 0 230,000 Produced Using Plan-It CIP Software A-42 E3 - Equip 3 - Backhoe 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-023 Project Name E3 - Equip 3 - Backhoe Total Project Cost $145,000 Contact Public Works Director Department Public Works Department Category Equipment: PW Equip Priority 3 Important Status Active Useful Life 15 years Make Case Model M580 VIN / SN N6C410161 Year 2005 Color Yellow Old Project Number PW-044 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 145,000 0 0 0 0 0 0 0 0 0 145,000 Total 145,000 0 0 0 0 0 0 0 0 0 145,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 120,000 0 0 0 0 0 0 0 0 0 120,000 Vehicle/Equip Trade-In 25,000 0 0 0 0 0 0 0 0 0 25,000 Total 145,000 0 0 0 0 0 0 0 0 0 145,000 Produced Using Plan-It CIP Software A-43 E5 - Equip 5 - Bobcat Skid 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-025 Project Name E5 - Equip 5 -Bobcat Skid Total Project Cost $70,000 Contact Public Works Director Department Public Works Department Category Equipment: PW Equip Priority 3 Important Status Active Useful Life 10 years Make Bobcat Model T66 Skid Steer VIN / SN B4SB26144 Year 2022 Color White Old Project Number PW-071 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 70,000 0 0 70,000 Total 0 0 0 0 0 0 0 70,000 0 0 70,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 0 45,000 0 0 45,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 25,000 0 0 25,000 Total 0 0 0 0 0 0 0 70,000 0 0 70,000 Produced Using Plan-It CIP Software A-44 E6 - Equip 6 - Service Lift 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-026 Project Name E6 - Equip 6 - Service Lift Total Project Cost $40,000 Contact Public Works Director Department Public Works Department Category Equipment: PW Equip Priority 3 Important Status Active Useful Life 20 years Make Stertil Koni Model 18000 LBS Year 2006 Color White Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 40,000 0 0 0 0 40,000 Total 0 0 0 0 0 40,000 0 0 0 0 40,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 35,000 0 0 0 0 35,000 Vehicle/Equip Trade-In 0 0 0 0 0 5,000 0 0 0 0 5,000 Total 0 0 0 0 0 40,000 0 0 0 0 40,000 Produced Using Plan-It CIP Software A-45 E7 - Equip 7 - Radios 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-027 Project Name E7 - Equip 7 - Radios Total Project Cost $160,000 Contact Public Works Director Department Public Works Department Category Equipment: PW Equip Priority 3 Important Status Active Useful Life 10 years Make Motorola Model APX 4000 VIN / SN See picture attachments Year 2007 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 160,000 0 0 0 0 0 0 0 160,000 Total 0 0 160,000 0 0 0 0 0 0 0 160,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total General Fund 0 0 160,000 0 0 0 0 0 0 0 160,000 Total 0 0 160,000 0 0 0 0 0 0 0 160,000 Produced Using Plan-It CIP Software A-46 E8 - Equip 8 - Asphalt Roller 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-028 Project Name E8 - Equip 8 - Asphalt Roller Total Project Cost $125,000 Contact Public Works Director Department Public Works Department Category Equipment: PW Equip Priority 3 Important Status Active Useful Life 12 years Make Case Model 721 VIN / SN DDD0DV23NHNTT0402 Year 2018 Color Orange Old Project Number PW-046 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 125,000 0 0 0 0 125,000 Total 0 0 0 0 0 125,000 0 0 0 0 125,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 110,000 0 0 0 0 110,000 Vehicle/Equip Trade-In 0 0 0 0 0 15,000 0 0 0 0 15,000 Total 0 0 0 0 0 125,000 0 0 0 0 125,000 Produced Using Plan-It CIP Software A-47 E9 - Equip 9 - Asphalt Trailer 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-029 Project Name E9 - Equip 9 - Asphalt Trailer Total Project Cost $47,500 Contact Public Works Director Department Public Works Department Category Equipment: PW Equip Priority 3 Important Status Active Useful Life 10 years Make STEPP Model Sphd 3.0 VIN / SN 4S9PHD3Y5NS127688 Year 2022 Color Orange Old Project Number PW-049 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 47,500 0 0 47,500 Total 0 0 0 0 0 0 0 47,500 0 0 47,500 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 0 42,500 0 0 42,500 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 5,000 0 0 5,000 Total 0 0 0 0 0 0 0 47,500 0 0 47,500 Produced Using Plan-It CIP Software A-48 E10 - Equip 10 - Chipper 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-030 Project Name E10 - Equip 10 - Chipper Total Project Cost $60,000 Contact Public Works Director Department Public Works Department Category Equipment: PW Equip Priority 3 Important Status Active Useful Life 10 years Make Bandit Model 12XP Intimidator VIN / SN 4FMUS1615PR529085 Year 2024 Color Yellow Old Project Number PW-078 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 0 0 60,000 60,000 Total 0 0 0 0 0 0 0 0 0 60,000 60,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 0 0 0 0 48,000 48,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 0 0 12,000 12,000 Total 0 0 0 0 0 0 0 0 0 60,000 60,000 Produced Using Plan-It CIP Software A-49 E11 - Equip 11 - Forklift 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #PW-031 Project Name E11 - Equip 11 - Forklift Total Project Cost $25,000 Contact Public Works Director Department Public Works Department Category Equipment: PW Equip Priority 3 Important Status Active Useful Life 12 years Make Yale Model 50VX VIN / SN B875V12731L Year 2018 Color Yellow Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 25,000 0 0 0 0 25,000 Total 0 0 0 0 0 25,000 0 0 0 0 25,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Vehicle Replacement Fund 0 0 0 0 0 22,000 0 0 0 0 22,000 Vehicle/Equip Trade-In 0 0 0 0 0 3,000 0 0 0 0 3,000 Total 0 0 0 0 0 25,000 0 0 0 0 25,000 Produced Using Plan-It CIP Software A-50 W1 - Water 1 - Portable Generator 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #W-001 Project Name W1 - Water 1 - Portable Generator Total Project Cost $100,000 Contact Public Works Director Department Water Department Category Vehicles Priority 3 Important Status Active Useful Life 20 years Make Generac Model 4001E Portable Generator Year 2002 Color Yellow Old Project Number PW-085 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 100,000 0 0 0 0 0 0 0 100,000 Total 0 0 100,000 0 0 0 0 0 0 0 100,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 95,000 0 0 0 0 0 0 0 95,000 Vehicle/Equip Trade-In 0 0 5,000 0 0 0 0 0 0 0 5,000 Total 0 0 100,000 0 0 0 0 0 0 0 100,000 Produced Using Plan-It CIP Software A-51 W2 - Water 2 - F- 550 Service Truck 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #W-002 Project Name W2 - Water 2 - F-550 Service Truck Total Project Cost $130,000 Contact Public Works Director Department Water Department Category Vehicles Priority 3 Important Status Active Useful Life 12 years Make Ford Model F-550 VIN / SN 1FDUF5HT9KDA26132 Year 2019 Color White License Plate 963714 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 130,000 0 0 0 130,000 Total 0 0 0 0 0 0 130,000 0 0 0 130,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 0 0 0 105,000 0 0 0 105,000 Vehicle/Equip Trade-In 0 0 0 0 0 0 25,000 0 0 0 25,000 Total 0 0 0 0 0 0 130,000 0 0 0 130,000 Produced Using Plan-It CIP Software A-52 W3 - Water 3 - RAM 3500 Van 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #W-003 Project Name W3 - Water 3 - RAM 3500 Van Total Project Cost $44,537 Contact Public Works Director Department Water Department Category Vehicles Priority 3 Important Status Active Useful Life 10 years Make Dodge Model RAM Promaster 3500 VIN / SN 3C6FRVHG6ME504541 Year 2021 Color White Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 44,537 0 0 0 44,537 Total 0 0 0 0 0 0 44,537 0 0 0 44,537 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 0 0 0 34,537 0 0 0 34,537 Vehicle/Equip Trade-In 0 0 0 0 0 0 10,000 0 0 0 10,000 Total 0 0 0 0 0 0 44,537 0 0 0 44,537 Produced Using Plan-It CIP Software A-53 W4 - Water 4 - F- 250 Service Truck 2025 thru 2034 Public Works - Vehicles & Equipment - Detail Lake Elmo, MN Project #W-004 Project Name W4 - Water 4 - F-250 Service Truck Total Project Cost $65,799 Contact Public Works Director Department Water Department Category Vehicles Priority 3 Important Status Active Useful Life 10 years Make Ford Model F-250 VIN / SN 1FTBF2BA2RED51100 Year 2024 Color White License Plate 801621 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 0 0 65,799 65,799 Total 0 0 0 0 0 0 0 0 0 65,799 65,799 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 0 0 0 0 0 0 45,799 45,799 Vehicle/Equip Trade-In 0 0 0 0 0 0 0 0 0 20,000 20,000 Total 0 0 0 0 0 0 0 0 0 65,799 65,799 Produced Using Plan-It CIP Software A-54 Produced Using Plan-It CIP Software 2025 through 2034 Public Works Building - Summary Lake Elmo, MN Department Project # 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Public Works Department PWB1 - Refinish Public Works Shop Floor PW-051 35,000 35,000 PWB2 - Public Works Building Generator PW-052 55,000 55,000 PWB3 - Public Works Building Roof PW-053 30,000 30,000 PWB4 - Public Works Building Additional Shop Space PW-054 110,000 110,000 PWB5 - Public Works Building Overhead Garage Doors PW-055 80,000 80,000 General Fund 108,500 108,500 Sewer Fund 10,000 48,500 58,500 Storm Water Fund 5,000 39,500 44,500 Water Fund 20,000 78,500 98,500 Source Grand Total 35,000 0 0 0 0 0 0 0 0 275,000 310,000 GRAND TOTAL 35,000 0 0 0 0 0 0 0 0 275,000 310,000 A-55 PWB1 - Refinish Public Works Shop Floor 2025 thru 2034 Public Works Building - Detail Lake Elmo, MN Project #PW-051 Project Name PWB1 - Refinish Public Works Shop Floor Contact Public Works Director Department Public Works Department Category Buildings Priority 3 Important Status New Recommendation Useful Life 10 years Description Produced Using Plan-It CIP Software A-56 PWB2 - Public Works Building Generator 2025 thru 2034 Public Works Building - Detail Lake Elmo, MN Project #PW-052 Project Name PWB2 - Public Works Building Generator Contact Public Works Director Department Public Works Department Category Buildings Priority 3 Important Status Active Useful Life 10 years Make Cummins Model 100kw VIN / SN E240344533 Year 2024 Old Project Number PW-085 Description Produced Using Plan-It CIP Software A-57 PWB3 - Public Works Building Roof 2025 thru 2034 Public Works Building - Detail Lake Elmo, MN Project #PW-053 Project Name PWB3 - Public Works Building Roof Contact Public Works Director Department Public Works Department Category Buildings Priority 3 Important Status New Recommendation Useful Life 10 years Description Produced Using Plan-It CIP Software A-58 PWB4 - Public Works Building Additional Shop Space 2025 thru 2034 Public Works Building - Detail Lake Elmo, MN Project #PW-054 Project Name PWB4 - Public Works Building Additional Shop Space Contact Public Works Director Department Public Works Department Category Buildings Priority 3 Important Status New Recommendation Useful Life 10 years Description Per Marty, Adding additional shop space in 10 yearsNext Project Produced Using Plan-It CIP Software A-59 PWB5 - Public Works Building Overhead Garage Doors 2025 thru 2034 Public Works Building - Detail Lake Elmo, MN Project #PW-055 Project Name PWB5 - Public Works Building Overhead Garage Doors Contact Public Works Director Department Public Works Department Category Buildings Priority 3 Important Status New Recommendation Useful Life 10 years Description Per Marty, We have a ton of issues with our overhead doors- so we will likely need to find a solution to that- changing to lighter doors and different openers Produced Using Plan-It CIP Software A-60 Produced Using Plan-It CIP Software 2025 through 2034 Parks - Summary Lake Elmo, MN Department Project # 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Parks and Recreation Kleis Park Playground - Replacement PR-027 65,000 65,000 Tana Ridge Park Play Equipment - Replacement PR-028 125,000 125,000 Tablyn Park Play Equipment - Replacement PR-029 210,000 210,000 Stonegate Park Play Equipment - Replacement PR-030 125,000 125,000 Reid Park Play Equipment - Replacement PR-031 125,000 125,000 Ridge Park Play Equipment - Replacement PR-032 125,000 125,000 Hidden Knoll Park Play Equipment - Replacement PR-034 125,000 125,000 Carriage Station Park Play Equipment - Replacement PR-036 250,000 250,000 Trail Additions PR-038 78,000 78,000 Lions Park Playground Equipment Replacement PR-039 250,000 250,000 Court Resurfacing PR-040 30,000 30,000 Lions Park Concession Building Updates PR-043 275,000 275,000 Skate Park PR-044 150,000 150,000 Outdoor Fitness Equipment PR-045 30,000 30,000 Outdoor Fitness Park PR-046 30,000 30,000 Disk Golf PR-047 30,000 30,000 Central Play Complex PR-048 300,000 300,000 Reid Park Parking Lot PR-049 227,000 227,000 Court Resurfacing PR-050 30,000 30,000 A-61 Produced Using Plan-It CIP Software Department Project # 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Trail Connection PR-051 200,000 200,000 Park Sign Replacement PR-052 225,000 225,000 Multisport Complex Amenities PR-053 1,000,000 1,000,000 Invasive Species Management PR-054 25,000 25,000 New Park Pavilion PR-055 80,000 80,000 New Park Pavilion PR-056 80,000 80,000 New Park Pavilion PR-057 80,000 80,000 New Park Pavilion PR-058 80,000 80,000 New Park Pavilion PR-059 80,000 80,000 Central Greenway Regional Trail PR-069 520,000 520,000 Park Dedication Fund (404)417,000 625,000 480,000 850,000 1,790,000 460,000 125,000 125,000 4,872,000 Source Grand Total 417,000 625,000 480,000 850,000 1,790,000 460,000 0 125,000 125,000 0 4,872,000 GRAND TOTAL 417,000 703,000 480,000 850,000 1,790,000 460,000 0 125,000 125,000 0 4,950,000 A-62 Kleis Park Playground - Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-027 Project Name Kleis Park Playground - Replacement Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status Active Useful Life 25 years Description Replacement of playground equipment Justification Playset installed in 1993 has exceeded the expected life Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 65,000 0 0 0 0 0 0 0 0 0 65,000 Total 65,000 0 0 0 0 0 0 0 0 0 65,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)65,000 0 0 0 0 0 0 0 0 0 65,000 Total 65,000 0 0 0 0 0 0 0 0 0 65,000 Produced Using Plan-It CIP Software A-63 Tana Ridge Park Play Equipment - Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-028 Project Name Tana Ridge Park Play Equipment - Replacement Department Parks and Recreation Category Park Improvements Priority 5 Future Consideration Status Active Useful Life 25 years Description Replace the 2005 play equipment Justification End of its useful life Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 125,000 0 0 0 0 125,000 Total 0 0 0 0 0 125,000 0 0 0 0 125,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 0 125,000 0 0 0 0 125,000 Total 0 0 0 0 0 125,000 0 0 0 0 125,000 Produced Using Plan-It CIP Software A-64 Tablyn Park Play Equipment - Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-029 Project Name Tablyn Park Play Equipment - Replacement Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status Active Useful Life 25 years Description Replace the 1997 play equipment Justification End of its useful life Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 210,000 0 0 0 0 0 0 0 0 210,000 Total 0 210,000 0 0 0 0 0 0 0 0 210,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 210,000 0 0 0 0 0 0 0 0 210,000 Total 0 210,000 0 0 0 0 0 0 0 0 210,000 Produced Using Plan-It CIP Software A-65 Stonegate Park Play Equipment - Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-030 Project Name Stonegate Park Play Equipment - Replacement Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status Active Useful Life 25 years Description Replace the 1998 play equipment Justification End of its useful life Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 125,000 0 0 0 0 0 0 0 125,000 Total 0 0 125,000 0 0 0 0 0 0 0 125,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 125,000 0 0 0 0 0 0 0 125,000 Total 0 0 125,000 0 0 0 0 0 0 0 125,000 Produced Using Plan-It CIP Software A-66 Reid Park Play Equipment - Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-031 Project Name Reid Park Play Equipment - Replacement Department Parks and Recreation Category Park Improvements Priority 5 Future Consideration Status Active Useful Life 25 years Description Replace the 2008 play equipment Justification End of its useful life Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 0 125,000 0 125,000 Total 0 0 0 0 0 0 0 0 125,000 0 125,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 0 0 0 0 125,000 0 125,000 Total 0 0 0 0 0 0 0 0 125,000 0 125,000 Produced Using Plan-It CIP Software A-67 Ridge Park Play Equipment - Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-032 Project Name Ridge Park Play Equipment - Replacement Department Parks and Recreation Category Park Improvements Priority 3 Important Status Active Useful Life 25 years Description Replace the 2003 play equipment Justification End of its useful life Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 125,000 0 0 0 0 0 0 0 0 0 125,000 Total 125,000 0 0 0 0 0 0 0 0 0 125,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)125,000 0 0 0 0 0 0 0 0 0 125,000 Total 125,000 0 0 0 0 0 0 0 0 0 125,000 Produced Using Plan-It CIP Software A-68 Hidden Knoll Park Play Equipment - Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-034 Project Name Hidden Knoll Park Play Equipment - Replacement Department Parks and Recreation Category Park Improvements Priority 5 Future Consideration Status Active Useful Life 25 years Description Replace the 2007 play equipment Justification Exceeded its useful life Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 125,000 0 0 125,000 Total 0 0 0 0 0 0 0 125,000 0 0 125,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 0 0 0 125,000 0 0 125,000 Total 0 0 0 0 0 0 0 125,000 0 0 125,000 Produced Using Plan-It CIP Software A-69 Carriage Station Park Play Equipment - Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-036 Project Name Carriage Station Park Play Equipment - Replacement Department Parks and Recreation Category Park Improvements Priority 5 Future Consideration Status Active Useful Life 25 years Description Replace the 2000 playset Justification End of useful life Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 250,000 0 0 0 0 0 0 250,000 Total 0 0 0 250,000 0 0 0 0 0 0 250,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 250,000 0 0 0 0 0 0 250,000 Total 0 0 0 250,000 0 0 0 0 0 0 250,000 Produced Using Plan-It CIP Software A-70 Trail Additions 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-038 Project Name Trail Additions Department Parks and Recreation Category Park Improvements Priority 3 Important Status Active Useful Life 25 years Description Potential Trails connections between developments along Hudson Blvd and the trail connection along Manning Ave from cty 14 south to the Rail Road track Justification Trail would address the following community needs-Deliver students safely to school, bring people to our parks, provide safe recreation, trail diversity-provide feel of Lake Elmo and bring people to the downtown Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 78,000 0 0 0 0 0 0 0 0 78,000 Total 0 78,000 0 0 0 0 0 0 0 0 78,000 Produced Using Plan-It CIP Software A-71 Lions Park Playground Equipment Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-039 Project Name Lions Park Playground Equipment Replacement Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status Active Useful Life 25 years Description Replacement of playground equipment Justification Playset installed in 2000 has exceeded the expected life Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 250,000 0 0 0 0 0 0 0 0 250,000 Total 0 250,000 0 0 0 0 0 0 0 0 250,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 250,000 0 0 0 0 0 0 0 0 250,000 Total 0 250,000 0 0 0 0 0 0 0 0 250,000 Produced Using Plan-It CIP Software A-72 Court Resurfacing 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-040 Project Name Court Resurfacing Department Parks and Recreation Category Park Improvements Priority 2 Very Important Status Active Useful Life 10 years Description Resurface the playing surfaces at Demontreville, Carriage Station and Lions Justification Seal existing courts playing surface and lining Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 30,000 0 0 0 0 0 0 0 0 30,000 Total 0 30,000 0 0 0 0 0 0 0 0 30,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 30,000 0 0 0 0 0 0 0 0 30,000 Total 0 30,000 0 0 0 0 0 0 0 0 30,000 Produced Using Plan-It CIP Software A-73 Lions Park Concession Building Updates 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-043 Project Name Lions Park Concession Building Updates Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status Active Useful Life 20 years Description Building updates to concession stand including update bathrooms and kitchen area Justification Extend life of building and updating 20+ year old interior. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 275,000 0 0 0 0 0 0 0 275,000 Total 0 0 275,000 0 0 0 0 0 0 0 275,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 275,000 0 0 0 0 0 0 0 275,000 Total 0 0 275,000 0 0 0 0 0 0 0 275,000 Produced Using Plan-It CIP Software A-74 Skate Park 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-044 Project Name Skate Park Department Parks and Recreation Category Park Improvements Priority 5 Future Consideration Status Active Useful Life 25 years Description Create Skate Park within Park System to include oportunies for BMX Justification New oportunity for teenagers within city Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 150,000 0 0 0 0 0 150,000 Total 0 0 0 0 150,000 0 0 0 0 0 150,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 150,000 0 0 0 0 0 150,000 Total 0 0 0 0 150,000 0 0 0 0 0 150,000 Produced Using Plan-It CIP Software A-75 Outdoor Fitness Equipment 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-045 Project Name Outdoor Fitness Equipment Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status Active Useful Life 25 years Description Add fitness equipment to amenaties within park system Justification Additional fitness equipment to be added to park system or along trail based off interest in fitness park. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 30,000 0 0 0 0 0 30,000 Total 0 0 0 0 30,000 0 0 0 0 0 30,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 30,000 0 0 0 0 0 30,000 Total 0 0 0 0 30,000 0 0 0 0 0 30,000 Produced Using Plan-It CIP Software A-76 Outdoor Fitness Park 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-046 Project Name Outdoor Fitness Park Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status Active Useful Life 25 years Description Create an outdoor fitness park as an addition to or replacement of a parks playset. Justification Diversity in the city park play equipment, intended use for kids and adults Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 30,000 0 0 0 0 0 0 0 0 30,000 Total 0 30,000 0 0 0 0 0 0 0 0 30,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 30,000 0 0 0 0 0 0 0 0 30,000 Total 0 30,000 0 0 0 0 0 0 0 0 30,000 Produced Using Plan-It CIP Software A-77 Disk Golf 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-047 Project Name Disk Golf Department Parks and Recreation Category Park Improvements Priority 5 Future Consideration Status Active Useful Life 25 years Description Create an outdoor disk golf course within the park system. Justification Continue to search for possible location of disk golf within the park system Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 30,000 0 0 0 0 0 30,000 Total 0 0 0 0 30,000 0 0 0 0 0 30,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 30,000 0 0 0 0 0 30,000 Total 0 0 0 0 30,000 0 0 0 0 0 30,000 Produced Using Plan-It CIP Software A-78 Central Play Complex 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-048 Project Name Central Play Complex Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status Active Useful Life 25 years Description Identify area to create a central play complex to include a large play structure Justification Create a central park to include play structure and shelter for multi family gatherings Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 300,000 0 0 0 0 0 300,000 Total 0 0 0 0 300,000 0 0 0 0 0 300,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 300,000 0 0 0 0 0 300,000 Total 0 0 0 0 300,000 0 0 0 0 0 300,000 Produced Using Plan-It CIP Software A-79 Reid Park Parking Lot 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-049 Project Name Reid Park Parking Lot Department Parks and Recreation Category Park Improvements Priority 3 Important Status New Recommendation Description Remove and replace existing asphalt and curb. Replace curb with concreate to extend to 30th st. Extend parking lot to the East for additional parking. Reconstruct walking trail from ballfield to 30th st. include ramp and crosswalk to existing sidewalk. Justification deteriorating asphalt parking lot and trail. Extend parking to add additional parking space Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 227,000 0 0 0 0 0 0 0 0 0 227,000 Total 227,000 0 0 0 0 0 0 0 0 0 227,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)227,000 0 0 0 0 0 0 0 0 0 227,000 Total 227,000 0 0 0 0 0 0 0 0 0 227,000 Produced Using Plan-It CIP Software A-80 Court Resurfacing 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-050 Project Name Court Resurfacing Department Parks and Recreation Category Park Improvements Priority 3 Important Status New Recommendation Description Resurface playing Courts (Tablyn, Pebble) Justification Resurfacing courts every 7 years to increase lifespan, improve safety and aesthetic appeal Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 30,000 0 0 0 0 30,000 Total 0 0 0 0 0 30,000 0 0 0 0 30,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 0 30,000 0 0 0 0 30,000 Total 0 0 0 0 0 30,000 0 0 0 0 30,000 Produced Using Plan-It CIP Software A-81 Trail Connection 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-051 Project Name Trail Connection Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status New Recommendation Description Acquire easement or land to construct a trail connection from Wildflower to Tanna Ridge Justification Trail connectivity Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 200,000 0 0 0 0 0 200,000 Total 0 0 0 0 200,000 0 0 0 0 0 200,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 200,000 0 0 0 0 0 200,000 Total 0 0 0 0 200,000 0 0 0 0 0 200,000 Produced Using Plan-It CIP Software A-82 Park Sign Replacement 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-052 Project Name Park Sign Replacement Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status New Recommendation Description Redesign park enterence signs for all city parks Justification Replace 20 year old signs. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 225,000 0 0 0 0 225,000 Total 0 0 0 0 0 225,000 0 0 0 0 225,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 0 225,000 0 0 0 0 225,000 Total 0 0 0 0 0 225,000 0 0 0 0 225,000 Produced Using Plan-It CIP Software A-83 Multisport Complex Amenities 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-053 Project Name Multisport Complex Amenities Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status New Recommendation Description Build baseball and/or multisport fields at sports facility Justification Adding additional amenities to sports complex Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 1,000,000 0 0 0 0 0 1,000,000 Total 0 0 0 0 1,000,000 0 0 0 0 0 1,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 1,000,000 0 0 0 0 0 1,000,000 Total 0 0 0 0 1,000,000 0 0 0 0 0 1,000,000 Produced Using Plan-It CIP Software A-84 Invasive Species Management 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-054 Project Name Invasive Species Management Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status New Recommendation Description Conduct assessment or management of Invasive Species within sunfish lake park or park system Justification Match funding Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 25,000 0 0 0 0 0 0 0 0 25,000 Total 0 25,000 0 0 0 0 0 0 0 0 25,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 25,000 0 0 0 0 0 0 0 0 25,000 Total 0 25,000 0 0 0 0 0 0 0 0 25,000 Produced Using Plan-It CIP Software A-85 New Park Pavilion 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-055 Project Name New Park Pavilion Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status New Recommendation Description Construct new park pavilion (location to be determined) Justification Provide means of shade and an area to congregate Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 80,000 0 0 0 0 0 0 0 0 80,000 Total 0 80,000 0 0 0 0 0 0 0 0 80,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 80,000 0 0 0 0 0 0 0 0 80,000 Total 0 80,000 0 0 0 0 0 0 0 0 80,000 Produced Using Plan-It CIP Software A-86 New Park Pavilion 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-056 Project Name New Park Pavilion Contact Public Works Director Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status New Recommendation Description New Park Pavilion in a park (location to be determined) Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 80,000 0 0 0 0 0 0 0 80,000 Total 0 0 80,000 0 0 0 0 0 0 0 80,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 80,000 0 0 0 0 0 0 0 80,000 Total 0 0 80,000 0 0 0 0 0 0 0 80,000 Produced Using Plan-It CIP Software A-87 New Park Pavilion 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-057 Project Name New Park Pavilion Contact Public Works Director Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status New Recommendation Description New Park Pavilion in park (location to be determined) Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 80,000 0 0 0 0 0 0 80,000 Total 0 0 0 80,000 0 0 0 0 0 0 80,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 80,000 0 0 0 0 0 0 80,000 Total 0 0 0 80,000 0 0 0 0 0 0 80,000 Produced Using Plan-It CIP Software A-88 New Park Pavilion 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-058 Project Name New Park Pavilion Contact Public Works Director Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status New Recommendation Description New Park Pavilion in Park (location to be determined) Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 80,000 0 0 0 0 0 80,000 Total 0 0 0 0 80,000 0 0 0 0 0 80,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 80,000 0 0 0 0 0 80,000 Total 0 0 0 0 80,000 0 0 0 0 0 80,000 Produced Using Plan-It CIP Software A-89 New Park Pavilion 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-059 Project Name New Park Pavilion Contact Public Works Director Department Parks and Recreation Category Park Improvements Priority 4 Less Important Status New Recommendation Description New Park Pavilion on park (location to be determined) Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 80,000 0 0 0 0 80,000 Total 0 0 0 0 0 80,000 0 0 0 0 80,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 0 0 80,000 0 0 0 0 80,000 Total 0 0 0 0 0 80,000 0 0 0 0 80,000 Produced Using Plan-It CIP Software A-90 Central Greenway Regional Trail 2025 thru 2034 Parks - Detail Lake Elmo, MN Project #PR-069 Project Name Central Greenway Regional Trail Contact Engineer Department Parks and Recreation Category Park Improvements Priority 3 Important Status Active Useful Life 25 years Old Project Number PR-009 Description County Project Central Greenway Regional Trail beginning at CSAH 19 and I-94, traveling through Lake Elmo Park Reserve, east along Stillwater Bvld to Manning Ave and then north to TH36. 2023 potential segments include in front of Hagbergs and near Keats/CSAH 10 (if a road project is funded). Justification Trail would address the following community needs: -Deliver students safely to school -Bring people to our downtown -Bring people to our parks -Provide safe recreation -Trail Diversity-Provide feel of Lake Elmo -Omit need to bike down Hwy 5/CSAH 14 -Compatibility with public grant opportunities -Compatibility with private funding opportunities Feasibility of land acquisition will be a consideration Trail likely to be built in segments in conjuction with county road projects and as funding allows through Met Council or other state grants Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 520,000 0 0 0 0 0 0 520,000 Total 0 0 0 520,000 0 0 0 0 0 0 520,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Park Dedication Fund (404)0 0 0 520,000 0 0 0 0 0 0 520,000 Total 0 0 0 520,000 0 0 0 0 0 0 520,000 Budget Impact Additional trails to maintain-labor and materials for snow removal if desired by city Trail construction cost may be as high as $12 million. City would expect cost share with county as well as grants to offset costs. 2023 costs are for trail through new roundabout at CSAH 19 and CSAH 10 and trail extension abutting Hagebergs Future costs will be added as they are known Produced Using Plan-It CIP Software A-91 2025 through 2034 Park Dedication Fund (404) - Funding Sources & UsesLake Elmo, MN Source Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Park Dedication Fund (404) Beginning Balance 3,000,000 3,048,522 2,423,522 2,344,472 1,571,483 236,967 981,167 981,167 856,167 1,611,848 Revenues and Other Fund Sources Revenue Park Dedication 1,523,802 0 400,950 77,011 455,484 1,204,200 0 0 880,681 372,684 Total 1,523,802 0 400,950 77,011 455,484 1,204,200 0 0 880,681 372,684 Other Fund Sources Total Revenues and Other Fund Sources 1,523,802 0 400,950 77,011 455,484 1,204,200 0 0 880,681 372,684 Total Funds available 4,523,802 3,048,522 2,824,472 2,421,483 2,026,967 1,441,167 981,167 981,167 1,736,848 1,984,532 Expenditures and Uses Capital Projects & Equipment Parks and Recreation Central Greenway Regional Trail PR-069 0 0 0 520,000 0 0 0 0 0 0 Reid Park Parking Lot PR-049 227,000 0 0 0 0 0 0 0 0 0 Lions Park Playground Equipment Replacement PR-039 0 250,000 0 0 0 0 0 0 0 0 Court Resurfacing PR-040 0 30,000 0 0 0 0 0 0 0 0 Skate Park PR-044 0 0 0 0 150,000 0 0 0 0 0 Court Resurfacing PR-050 0 0 0 0 0 30,000 0 0 0 0 Trail Connection PR-051 0 0 0 0 200,000 0 0 0 0 0 New Park Pavilion PR-056 0 0 80,000 0 0 0 0 0 0 0 New Park Pavilion PR-057 0 0 0 80,000 0 0 0 0 0 0 New Park Pavilion PR-058 0 0 0 0 80,000 0 0 0 0 0 New Park Pavilion PR-059 0 0 0 0 0 80,000 0 0 0 0 Park Sign Replacement PR-052 0 0 0 0 0 225,000 0 0 0 0 Produced Using Plan-It CIP Software A-92 Multisport Complex Amenities PR-053 0 0 0 0 1,000,000 0 0 0 0 0 Invasive Species Management PR-054 0 25,000 0 0 0 0 0 0 0 0 New Park Pavilion PR-055 0 80,000 0 0 0 0 0 0 0 0 Tana Ridge Park Play Equipment - Replacement PR-028 0 0 0 0 0 125,000 0 0 0 0 Tablyn Park Play Equipment - Replacement PR-029 0 210,000 0 0 0 0 0 0 0 0 Stonegate Park Play Equipment - Replacement PR-030 0 0 125,000 0 0 0 0 0 0 0 Reid Park Play Equipment - Replacement PR-031 0 0 0 0 0 0 0 0 125,000 0 Ridge Park Play Equipment - Replacement PR-032 125,000 0 0 0 0 0 0 0 0 0 Hidden Knoll Park Play Equipment - Replacement PR-034 0 0 0 0 0 0 0 125,000 0 0 Carriage Station Park Play Equipment - Replacement PR-036 0 0 0 250,000 0 0 0 0 0 0 Outdoor Fitness Equipment PR-045 0 0 0 0 30,000 0 0 0 0 0 Outdoor Fitness Park PR-046 0 30,000 0 0 0 0 0 0 0 0 Kleis Park Playground - Replacement PR-027 65,000 0 0 0 0 0 0 0 0 0 Disk Golf PR-047 0 0 0 0 30,000 0 0 0 0 0 Central Play Complex PR-048 0 0 0 0 300,000 0 0 0 0 0 Lions Park Concession Building Updates PR-043 0 0 275,000 0 0 0 0 0 0 0 Total 417,000 625,000 480,000 850,000 1,790,000 460,000 0 125,000 125,000 0 Other Uses Transfer to Ballfield Fund 1,058,280 0 0 0 0 0 0 0 0 0 Total 1,058,280 0 0 0 0 0 0 0 0 0 Total Expenditures and Uses 1,475,280 625,000 480,000 850,000 1,790,000 460,000 0 125,000 125,000 0 Change in Fund Balance 48,522 -625,000 -79,050 -772,989 -1,334,516 744,200 0 -125,000 755,681 372,684 Ending Balance 3,048,522 2,423,522 2,344,472 1,571,483 236,967 981,167 981,167 856,167 1,611,848 1,984,532 Source Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Produced Using Plan-It CIP Software A-93 Produced Using Plan-It CIP Software 2025 through 2034 Infrastructure - Streets - Summary Lake Elmo, MN Department Project # 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Public Works Department Reevaluate- Homestead St & Utility Improvements PW-090 1,315,000 1,315,000 Future - PP/EP/20th Street & Utility Improvements PW-091 4,550,000 4,550,000 Future - Tartan Street & Utility Improvements PW-092 3,500,000 3,500,000 Future - DL/SP/For Street & Utility Improvements PW-093 3,400,000 3,400,000 2025 Street Improvements PW-100 2,620,000 2,620,000 2026 Street Improvements PW-101 2,740,000 2,740,000 2027 Street Improvements PW-102 2,755,000 2,755,000 2028 Street Improvements PW-103 2,450,000 2,450,000 2029 Street Improvements PW-104 2,175,000 2,175,000 2030 Street Improvements PW-105 2,200,000 2,200,000 2031 Street Improvements PW-106 2,000,000 2,000,000 2032 Street Improvements PW-107 3,915,000 3,915,000 2033 Street Improvements PW-108 3,000,000 3,000,000 2034 Street Improvements PW-109 3,200,000 3,200,000 UP RR Crossing - Village Parkway PW-120 935,000 935,000 UP RR Crossing - Private Drive Closure PW-120-2 105,000 105,000 Hudson Blvd Improvements - Vahli-Hi to Bus Fac.PW-121 560,000 560,000 Hudson Blvd Improvements - Keats to Kramer Lake Ov PW-122 2,100,000 2,100,000 A-94 Produced Using Plan-It CIP Software Department Project # 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total South Frontage Rd (Demontreville Tr to Keats Ave)PW-123 5,760,000 5,760,000 5th St N - Keats to Lake Elmo Ave PW-124 4,600,000 4,600,000 TH36-Lake Elmo Ave (CSAH 17) Imp PW-125 2,500,000 2,500,000 5,000,000 South Frontage Road (Keats to Lake Elmo Ave)PW-126 1,000,000 2,000,000 3,000,000 Manning/Hudson Stoplight PW-127 300,000 300,000 Ideal Ave (CSAH 13)-Phase 3- CSAH 14 to CSAH 6 PW-128 1,000,000 1,000,000 CSAH 14 - Klondike to 39th PW-129 1,000,000 1,000,000 CSAH 17 Imp - CSAH 14 - 43rd PW-130 1,000,000 1,000,000 Lake Elmo Ave (CSAH 17) & 39th St N Traffic Signal PW-131 500,000 500,000 CSAH 6/Inwood Signal PW-132 500,000 500,000 CSAH 10 / CSAH 17 Roundabout PW-133 500,000 500,000 Bond Proceeds - Assessment Funded 786,000 1,137,000 826,500 735,000 652,500 660,000 600,000 1,174,500 900,000 1,960,000 9,431,500 Bond Proceeds - Tax Levy 1,834,000 6,478,000 9,028,500 1,715,000 2,522,500 6,640,000 7,160,000 2,740,500 2,600,000 5,790,000 46,508,500 Grants/Donation 250,000 1,000,000 6,900,000 8,150,000 Infrastructure Reserve Fund (409)1,040,000 50,000 500,000 1,590,000 Municipal Sate Aid (MSA)500,000 500,000 1,000,000 Source Grand Total 3,660,000 8,415,000 10,355,000 2,450,000 3,175,000 8,800,000 7,760,000 3,915,000 3,500,000 14,650,000 66,680,000 GRAND TOTAL 3,660,000 8,415,000 10,355,000 2,450,000 3,175,000 8,800,000 7,760,000 3,915,000 3,500,000 14,650,000 66,680,000 A-95 Produced Using Plan-It CIP Software 2025 through 2034 Infrastructure - Water - Summary Lake Elmo, MN Department Project # 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Department T1 - Tower 1 - Langly Ct W-011 50,000 50,000 T2 - Tower 2 - Ideal Ave W-012 800,000 800,000 T4 - Tower 4 - Inwood Ave W-014 800,000 800,000 WL2 - Well 2 - 55th St W-017 60,000 60,000 WL4 - Well 4 - 50th St W-019 50,000 50,000 WL5 - Well 5 - Lily Ave W-020 50,000 50,000 WL6 - Well 6 - Future Well & Site Acquisition W-021 750,000 750,000 WL7 - Well 7 (or 3) - Test Well & Site Acquisition W-022 750,000 750,000 TP1 - Treatment Plant 1 W-041 24,500,000 24,500,000 49,000,000 TP2 - Treatment 2 - Well 2 - GAC Filter System W-042 2,500,000 2,500,000 Future - Homestead Street & Utility Impr - Water W-090 935,000 935,000 Future - PP/EP/20th Street & Utility Impr - Water W-091 2,500,000 2,500,000 Future - Tartan Street & Utility Impr - Water W-092 1,900,000 1,900,000 Future - DL/SP/For Street & Utility Impr - Water W-093 2,200,000 2,200,000 Future - 45th Street Watermain Extension W-094 450,000 450,000 2025 Street & Utility Improvements - Water portion W-100 320,000 320,000 2026 Street & Utility Improvements - Water portion W-101 327,000 327,000 A-96 Produced Using Plan-It CIP Software Department Project # 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total 2028 Street & Utility Improvements - Water portion W-103 150,000 150,000 2030 Street & Utility Improvements - Water portion W-105 100,000 100,000 2031 Street & Utility Improvements - Water portion W-106 130,000 130,000 2032 Street & Utility Improvements - Water portion W-107 210,000 210,000 2033 Street & Utility Improvements - Water portion W-108 550,000 550,000 Village East Trunk Watermain & PRV W-120 336,000 230,000 566,000 Hudson Blvd - Trunk Watermain Extension W-122 1,800,000 1,800,000 5th St N - Keats to Lake Elmo Ave - Water Portion W-124 1,700,000 1,700,000 Trunk Watermain Extensions W-130 1,500,000 1,500,000 1,500,000 4,500,000 Watermain Oversizing W-160 150,475 130,000 190,000 470,475 Bond Proceeds - Assessment Funded 320,000 320,000 Bond Proceeds - Water Fund 750,000 2,600,000 1,500,000 1,500,000 1,700,000 1,500,000 550,000 10,100,000 Grants/Donation 27,000,000 24,500,000 7,985,000 59,485,000 Water Fund 1,346,475 687,000 190,000 150,000 150,000 180,000 210,000 800,000 3,713,475 Source Grand Total 28,666,475 25,937,000 2,790,000 1,650,000 1,500,000 1,850,000 1,680,000 210,000 1,350,000 7,985,000 73,618,475 GRAND TOTAL 28,666,475 25,937,000 2,790,000 1,650,000 1,500,000 1,850,000 1,680,000 210,000 1,350,000 7,985,000 73,618,475 A-97 Produced Using Plan-It CIP Software 2025 through 2034 Infrastructure - Sewer - Summary Lake Elmo, MN Department Project # 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Sewer Department Future - DL/SP/For Street & Util Imp - Sewer S-093 380,000 380,000 2029 Street Improvements S-104 1,685,000 1,685,000 Tapestry Sanitary Sewer Collection System Upgrades S-107 1,000,000 1,000,000 I-94 Lift Station and Forcemain Upgrade S-108 900,000 900,000 Sewer Oversizing S-120 25,920 40,000 50,000 115,920 Sewer Oversizing for Sect 16 Extension S-121 200,000 200,000 Bond Proceeds - Assessment Funded 380,000 380,000 Sewer Fund 25,920 40,000 1,150,000 1,685,000 1,000,000 3,900,920 Source Grand Total 25,920 40,000 1,150,000 0 1,685,000 0 0 1,000,000 0 380,000 4,280,920 GRAND TOTAL 25,920 40,000 1,150,000 0 1,685,000 0 0 1,000,000 0 380,000 4,280,920 A-98 Produced Using Plan-It CIP Software 2025 through 2034 Infrastructure - Stormwater - Summary Lake Elmo, MN Department Project # 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Storm Water Department Phase 2 Regional Drainage Impr. - Northstar Pond SW-001 285,405 285,405 Phase 3 Regional Drainage Impr - Lions Park Pond SW-002 575,000 575,000 Stormwater Reuse - Development Irrigation Systems SW-003 40,000 40,000 80,000 Stormwater Reuse - Lions & VFW Park Irrigation SW-004 76,000 76,000 Stormwater Reuse - Irrigation Systems SW-005 40,000 40,000 80,000 Hudson Boulevard Culvert Repair SW-006 400,000 400,000 Future Unidentified Stormwater Projects SW-TBD 50,000 50,000 50,000 50,000 50,000 50,000 50,000 350,000 Bond Proceeds - Stormwater Fund 575,000 575,000 Storm Water Fund 685,405 80,000 206,000 50,000 50,000 50,000 50,000 50,000 50,000 1,271,405 Source Grand Total 685,405 80,000 781,000 50,000 50,000 50,000 50,000 50,000 50,000 0 1,846,405 GRAND TOTAL 685,405 80,000 781,000 50,000 50,000 50,000 50,000 50,000 50,000 0 1,846,405 A-99 Reevaluate- Homestead St & Utility Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-090 Project Name Reevaluate- Homestead St & Utility Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-040 Description Due to MPCA Grant Policy changes, no longer grant-eligible. Project needs to be reevaluated since grant approval now unlikely - may simply become a street-only project with assessments. Street work is needed. Annual street improvements per recommendation by City Engineer Street improvements. (formerly 3M grant project) Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 1,315,000 0 0 0 0 0 0 0 0 1,315,000 Total 0 1,315,000 0 0 0 0 0 0 0 0 1,315,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 1,000,000 0 0 0 0 0 0 0 0 1,000,000 Bond Proceeds - Assessment Funded 0 315,000 0 0 0 0 0 0 0 0 315,000 Total 0 1,315,000 0 0 0 0 0 0 0 0 1,315,000 Produced Using Plan-It CIP Software A-100 Future - PP/EP/20th Street & Utility Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-091 Project Name Future - PP/EP/20th Street & Utility Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 5 Future Consideration Status Active Useful Life 25 years Old Project Number PW-041 Description Due to a change in MPCA grant policy, all 3M Grant Street & Utility projects are now unlikely. Moved all back to 2034 and changed to Future Consideration. Extension of watermain for Packard Park, Eden Park and 20th Street Circle to address PFAS; including budgeted amount for reconstruction of public streets. Requires 3M Grant Fund application. 3M-Grant (CDWSP Approved Neighborhood). Justification Packard Park, Eden Park and 20th Street Circle street improvements to be completed in conjunction with 3M watermain extension to serve neighborhood. In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 4,550,000 4,550,000 Total 0 0 0 0 0 0 0 0 0 4,550,000 4,550,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 0 0 0 0 3,550,000 3,550,000 Bond Proceeds - Assessment Funded 0 0 0 0 0 0 0 0 0 1,000,000 1,000,000 Total 0 0 0 0 0 0 0 0 0 4,550,000 4,550,000 Produced Using Plan-It CIP Software A-101 Future - Tartan Street & Utility Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-092 Project Name Future - Tartan Street & Utility Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 5 Future Consideration Status Active Useful Life 25 years Old Project Number PW-042 Description Due to a change in MPCA grant policy, all 3M Grant Street & Utility projects are now unlikely. Moved all back to 2034 and changed to Future Consideration. Extension of watermain for Tartan Park subdivision and Klondike Avenue to address PFAS; including budgeted amount for reconstruction of public streets. Requires 3M Grant Fund application. 3M-Grant application required (Neighborhood not included in CDWSP). Justification Tartan Park subdivision and Klondike Avenue street improvements to be completed in conjunction with 3M watermain extension to serve neighborhood. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 3,500,000 3,500,000 Total 0 0 0 0 0 0 0 0 0 3,500,000 3,500,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 0 0 0 0 0 0 0 0 0 3,500,000 3,500,000 Total 0 0 0 0 0 0 0 0 0 3,500,000 3,500,000 Produced Using Plan-It CIP Software A-102 Future - DL/SP/For Street & Utility Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-093 Project Name Future - DL/SP/For Street & Utility Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 5 Future Consideration Status Active Useful Life 25 years Old Project Number PW-055 Description Due to a change in MPCA grant policy, all 3M Grant Street & Utility projects are now unlikely. Moved all back to 2034 and changed to Future Consideration. Extension of watermain for Downs Lake Estates, Sunfish Ponds, and Forest subdivision to address PFAS; including budgeted amount for reconstruction of public streets. Requires 3M Grant Fund application. 3M-Grant applicaiton required (Neighborhood not included in CDWSP). Justification Downs Lake Estates, Sunfish Ponds, and Forest subdivision street improvements to be completed in conjunction with 3M watermain extension to serve neighborhood. In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 3,400,000 3,400,000 Total 0 0 0 0 0 0 0 0 0 3,400,000 3,400,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 0 0 0 0 0 0 0 0 0 3,400,000 3,400,000 Total 0 0 0 0 0 0 0 0 0 3,400,000 3,400,000 Produced Using Plan-It CIP Software A-103 2025 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-100 Project Name 2025 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-041 Description Annual street program for Street Improvements for 59th St Ct/ 55th St/ Julep Way & 57th St/ Jasper/ Jerome/ Irish Ct (30% assessed) Justification In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 2,620,000 0 0 0 0 0 0 0 0 0 2,620,000 Total 2,620,000 0 0 0 0 0 0 0 0 0 2,620,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 1,834,000 0 0 0 0 0 0 0 0 0 1,834,000 Bond Proceeds - Assessment Funded 786,000 0 0 0 0 0 0 0 0 0 786,000 Total 2,620,000 0 0 0 0 0 0 0 0 0 2,620,000 Produced Using Plan-It CIP Software A-104 2026 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-101 Project Name 2026 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-042 Description Annual street program: Street Improvements for the Lake Elmo Heights subdivision, Innsdale Ct, and Inwood Ct (30% assessed). Justification In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 2,740,000 0 0 0 0 0 0 0 0 2,740,000 Total 0 2,740,000 0 0 0 0 0 0 0 0 2,740,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 1,918,000 0 0 0 0 0 0 0 0 1,918,000 Bond Proceeds - Assessment Funded 0 822,000 0 0 0 0 0 0 0 0 822,000 Total 0 2,740,000 0 0 0 0 0 0 0 0 2,740,000 Produced Using Plan-It CIP Software A-105 2027 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-102 Project Name 2027 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-055 Description Annual street program: for Street Improvements for Hidden Bay Tr/ Birchwood/ Cherrywood/ Windbreak/ Jack Pine/ Deer Pond (30% assessed). Justification In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 2,755,000 0 0 0 0 0 0 0 2,755,000 Total 0 0 2,755,000 0 0 0 0 0 0 0 2,755,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 1,928,500 0 0 0 0 0 0 0 1,928,500 Bond Proceeds - Assessment Funded 0 0 826,500 0 0 0 0 0 0 0 826,500 Total 0 0 2,755,000 0 0 0 0 0 0 0 2,755,000 Produced Using Plan-It CIP Software A-106 2028 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-103 Project Name 2028 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-056 Description Annual street program: for Street Improvements for the St. Croix's Sanctuary subdivision (30% assessed). Justification In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 2,450,000 0 0 0 0 0 0 2,450,000 Total 0 0 0 2,450,000 0 0 0 0 0 0 2,450,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 1,715,000 0 0 0 0 0 0 1,715,000 Bond Proceeds - Assessment Funded 0 0 0 735,000 0 0 0 0 0 0 735,000 Total 0 0 0 2,450,000 0 0 0 0 0 0 2,450,000 Produced Using Plan-It CIP Software A-107 2029 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-104 Project Name 2029 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-068 Description 50th Street + Hill Trail (combine with Low Pressure sewer ext. to Oakdale) Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 2,175,000 0 0 0 0 0 2,175,000 Total 0 0 0 0 2,175,000 0 0 0 0 0 2,175,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 1,522,500 0 0 0 0 0 1,522,500 Bond Proceeds - Assessment Funded 0 0 0 0 652,500 0 0 0 0 0 652,500 Total 0 0 0 0 2,175,000 0 0 0 0 0 2,175,000 Produced Using Plan-It CIP Software A-108 2030 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-105 Project Name 2030 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-070 Description Annual street program: for Street Improvements for Discover Crossing subdivision and Hilltop Avenue (30% assessed). Justification In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 2,200,000 0 0 0 0 2,200,000 Total 0 0 0 0 0 2,200,000 0 0 0 0 2,200,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 1,540,000 0 0 0 0 1,540,000 Bond Proceeds - Assessment Funded 0 0 0 0 0 660,000 0 0 0 0 660,000 Total 0 0 0 0 0 2,200,000 0 0 0 0 2,200,000 Produced Using Plan-It CIP Software A-109 2031 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-106 Project Name 2031 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-075 Description Annual street program: for Street Improvements for Tablyn Park subdivision (30% assessed). Justification In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 2,000,000 0 0 0 2,000,000 Total 0 0 0 0 0 0 2,000,000 0 0 0 2,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 0 1,400,000 0 0 0 1,400,000 Bond Proceeds - Assessment Funded 0 0 0 0 0 0 600,000 0 0 0 600,000 Total 0 0 0 0 0 0 2,000,000 0 0 0 2,000,000 Produced Using Plan-It CIP Software A-110 2032 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-107 Project Name 2032 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-080 Description Annual street program: for Street Improvements for Tapestry at Charlotte's Grove subdivision (30% assessed). Justification In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 3,915,000 0 0 3,915,000 Total 0 0 0 0 0 0 0 3,915,000 0 0 3,915,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 0 0 2,740,500 0 0 2,740,500 Bond Proceeds - Assessment Funded 0 0 0 0 0 0 0 1,174,500 0 0 1,174,500 Total 0 0 0 0 0 0 0 3,915,000 0 0 3,915,000 Produced Using Plan-It CIP Software A-111 2033 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-108 Project Name 2033 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 4 Less Important Status Active Useful Life 40 years Old Project Number PW-084 Description Annual street program: for Street Improvements for 36th Street, 37th Street and Irwin Avenue and 47th/50th/Kimbro (Keats to Lake Elmo). (30% assessed). Justification In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 3,000,000 0 3,000,000 Total 0 0 0 0 0 0 0 0 3,000,000 0 3,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 0 0 0 2,100,000 0 2,100,000 Bond Proceeds - Assessment Funded 0 0 0 0 0 0 0 0 900,000 0 900,000 Total 0 0 0 0 0 0 0 0 3,000,000 0 3,000,000 Produced Using Plan-It CIP Software A-112 2034 Street Improvements 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-109 Project Name 2034 Street Improvements Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status New Recommendation Useful Life 25 years Description DeMontreville-Highlands Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 3,200,000 3,200,000 Total 0 0 0 0 0 0 0 0 0 3,200,000 3,200,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 0 0 0 0 2,240,000 2,240,000 Bond Proceeds - Assessment Funded 0 0 0 0 0 0 0 0 0 960,000 960,000 Total 0 0 0 0 0 0 0 0 0 3,200,000 3,200,000 Produced Using Plan-It CIP Software A-113 UP RR Crossing - Village Parkway 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-120 Project Name UP RR Crossing - Village Parkway Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 40 years Old Project Number PW-035 Description Construction of the street, trail and sidewalk segment of Village Parkway that crosses the Union Pacific Railroad (UPRR) and railroad right-of-way, including trunk watermain extension across the railroad right-of-way with pressure reduction valve (to be installed with development), and closure of the adjacent private railroad crossing (separate project PW-120-2). To obtain permitting and approvals, the project includes potential upgrades to the UPRR crossing at Klondike Avenue. Justification Village Parkway crossing is needed to connect the developing Village neighborhoods north and south of the tracks, including pedestrian connectivity for a walkable downtown area. The Private closure (DOT 183913SD) and potential improvements to Klondike Avenue (DOT 183811D) are requirements of the Railroad for obtaining the new improved crossing location. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 935,000 0 0 0 0 0 0 0 0 0 935,000 Total 935,000 0 0 0 0 0 0 0 0 0 935,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Infrastructure Reserve Fund (409)935,000 0 0 0 0 0 0 0 0 0 935,000 Total 935,000 0 0 0 0 0 0 0 0 0 935,000 Produced Using Plan-It CIP Software A-114 UP RR Crossing - Private Drive Closure 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-120-2 Project Name UP RR Crossing - Private Drive Closure Contact Engineer Department Public Works Department Category Street Construction Priority 2 Very Important Status Active Useful Life 40 years Old Project Number PW-036 Description UP RR Crossing - Private driveway closure required for Village Parkway Crossing Justification Railroad requirement in order to get new crossing at Village Parkway Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 105,000 0 0 0 0 0 0 0 0 0 105,000 Total 105,000 0 0 0 0 0 0 0 0 0 105,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Infrastructure Reserve Fund (409)105,000 0 0 0 0 0 0 0 0 0 105,000 Total 105,000 0 0 0 0 0 0 0 0 0 105,000 Produced Using Plan-It CIP Software A-115 Hudson Blvd Improvements - Vahli- Hi to Bus Fac. 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-121 Project Name Hudson Blvd Improvements - Vahli-Hi to Bus Fac. Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-079 Description MSA Route Reconstruction of gap segments along Hudson Boulevard to improve the roadway to the adopted Hudson Boulevard design standards with pedestrian trail. Gap segments are portions of the roadway not being improved as part of ongoing or upcoming development projects. 2025 Segment (Vahli-Hi to Bus Facility). Trail Connection Justification Pavement section nearing or beyond useful life. Improvements have been deferred to extent possible to allow for development paid upgrades along some segments. Gap segments to be addressed to create completed project and complete trail connections. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 560,000 0 0 0 0 0 0 0 0 560,000 Total 0 560,000 0 0 0 0 0 0 0 0 560,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 560,000 0 0 0 0 0 0 0 0 560,000 Total 0 560,000 0 0 0 0 0 0 0 0 560,000 Produced Using Plan-It CIP Software A-116 Hudson Blvd Improvements - Keats to Kramer Lake Ov 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-122 Project Name Hudson Blvd Improvements - Keats to Kramer Lake Ov Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-079 Description MSA Route Reconstruction of gap segments along Hudson Boulevard to improve the roadway to the adopted Hudson Boulevard design standards with pedestrian trail. Gap segments are portions of the roadway not being improved as part of ongoing or upcoming development projects. 2027 Segment - Keats to Kramer Lake Overlook Justification Pavement section nearing or beyond useful life. Improvements have been deferred to extent possible to allow for development paid upgrades along some segments. Gap segments to be addressed to create completed project and complete trail connections. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 2,100,000 0 0 0 0 0 0 0 2,100,000 Total 0 0 2,100,000 0 0 0 0 0 0 0 2,100,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 2,100,000 0 0 0 0 0 0 0 2,100,000 Total 0 0 2,100,000 0 0 0 0 0 0 0 2,100,000 Produced Using Plan-It CIP Software A-117 South Frontage Rd (Demontreville Tr to Keats Ave) 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-123 Project Name South Frontage Rd (Demontreville Tr to Keats Ave) Contact Engineer Department Public Works Department Category Street Construction Priority 5 Future Consideration Status Active Useful Life 40 years Old Project Number PW-083 Description Construction of south frontage road between Demontreville Trail and Keats Avenue in order to improve traffic flow and access to TH36. Project to be in accordance with approved South Frotnage Road plan. Justification Necessary to improve traffic safety and access to TH36 along with establishment of east-west collector roadway. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 5,760,000 0 0 0 5,760,000 Total 0 0 0 0 0 0 5,760,000 0 0 0 5,760,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 0 5,760,000 0 0 0 5,760,000 Total 0 0 0 0 0 0 5,760,000 0 0 0 5,760,000 Produced Using Plan-It CIP Software A-118 5th St N - Keats to Lake Elmo Ave 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-124 Project Name 5th St N - Keats to Lake Elmo Ave Contact Engineer Department Public Works Department Category Street Construction Priority 4 Less Important Status New Recommendation Useful Life 25 years Description Partial Developer Paid or Reimbursement? Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 4,600,000 0 0 0 0 4,600,000 Total 0 0 0 0 0 4,600,000 0 0 0 0 4,600,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 3,600,000 0 0 0 0 3,600,000 Grants/Donation 0 0 0 0 0 1,000,000 0 0 0 0 1,000,000 Total 0 0 0 0 0 4,600,000 0 0 0 0 4,600,000 Produced Using Plan-It CIP Software A-119 TH36- Lake Elmo Ave (CSAH 17) Imp 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-125 Project Name TH36-Lake Elmo Ave (CSAH 17) Imp Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 25 years Old Project Number PW-074 Description COUNTY PROJECT / COST SHARE Grade separated Interchange Improvements at Lake Elmo Ave and TH 36. Cost Sharing Agreement Pending. Justification County Improvement project with City cost participation requirement. Need and cost estimate determined by Washington County. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 2,500,000 2,500,000 0 0 0 0 0 0 0 5,000,000 Total 0 2,500,000 2,500,000 0 0 0 0 0 0 0 5,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 2,000,000 2,000,000 0 0 0 0 0 0 0 4,000,000 Municipal Sate Aid (MSA)0 500,000 500,000 0 0 0 0 0 0 0 1,000,000 Total 0 2,500,000 2,500,000 0 0 0 0 0 0 0 5,000,000 Produced Using Plan-It CIP Software A-120 South Frontage Road (Keats to Lake Elmo Ave) 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-126 Project Name South Frontage Road (Keats to Lake Elmo Ave) Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 40 years Old Project Number PW-076 Description Construction of south frontage road between Keats Avenue and Lake Elmo Avenue in order to improve traffic flow to new Lake Elmo Ave/TH36 Improvement and remove direct private accesses to TH 36 Justification Necessary safety and traffic improvements. May be partially constructed together with TH36 - Lake Elmo Avenue Intersection Project. Could be partially constructed through County Improvement project with City cost participation requirement. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 1,000,000 2,000,000 0 0 0 0 0 0 0 3,000,000 Total 0 1,000,000 2,000,000 0 0 0 0 0 0 0 3,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 1,000,000 2,000,000 0 0 0 0 0 0 0 3,000,000 Total 0 1,000,000 2,000,000 0 0 0 0 0 0 0 3,000,000 Produced Using Plan-It CIP Software A-121 Manning/Hudson Stoplight 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-127 Project Name Manning/Hudson Stoplight Contact Engineer Department Public Works Department Category Street Construction Priority 2 Very Important Status Active Useful Life 25 years Old Project Number PW-067 Description COUNTY PROJECT / COST SHARE Traffic Signal to be installed at intersection when Hudson Blvd is realigned with development. Justification County Improvement project with City cost participation requirement. Need determined by Washington County. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 300,000 0 0 0 0 0 0 0 0 300,000 Total 0 300,000 0 0 0 0 0 0 0 0 300,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 0 250,000 0 0 0 0 0 0 0 0 250,000 Infrastructure Reserve Fund (409)0 50,000 0 0 0 0 0 0 0 0 50,000 Total 0 300,000 0 0 0 0 0 0 0 0 300,000 Budget Impact Funding from Four Corners 1st Addition Produced Using Plan-It CIP Software A-122 Ideal Ave (CSAH 13)- Phase 3- CSAH 14 to CSAH 6 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-128 Project Name Ideal Ave (CSAH 13)-Phase 3- CSAH 14 to CSAH 6 Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status Active Useful Life 20 years Old Project Number PW-053 Description Cooperative project between Washington County, City of Oakdale and City of Lake Elmo Per Washington County includes: Safety improvements including widening of shoulders Pavement improvement Turn lane and intersection improvements Pedestrain and non-motorized upgrades Drainage Improvements Justification Amount is just placeholder. County improvement project with City cost participation. Need determined by Washington County. Cost share w/ Developer needed. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 1,000,000 0 0 0 0 0 0 0 1,000,000 Total 0 0 1,000,000 0 0 0 0 0 0 0 1,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 1,000,000 0 0 0 0 0 0 0 1,000,000 Total 0 0 1,000,000 0 0 0 0 0 0 0 1,000,000 Produced Using Plan-It CIP Software A-123 CSAH 14 - Klondike to 39th 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-129 Project Name CSAH 14 - Klondike to 39th Contact Engineer Department Public Works Department Category Street Construction Priority 5 Future Consideration Status New Recommendation Useful Life 25 years Description Monitor County CIP status. County Planning / Design in 2027. (Amount is placeholder only.) Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 1,000,000 0 0 0 0 0 1,000,000 Total 0 0 0 0 1,000,000 0 0 0 0 0 1,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 1,000,000 0 0 0 0 0 1,000,000 Total 0 0 0 0 1,000,000 0 0 0 0 0 1,000,000 Produced Using Plan-It CIP Software A-124 CSAH 17 Imp - CSAH 14 - 43rd 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-130 Project Name CSAH 17 Imp - CSAH 14 - 43rd Contact Engineer Department Public Works Department Category Street Construction Priority 3 Important Status New Recommendation Useful Life 25 years Description County Project Monitor County CIP status. County Planning/Design in 2028 Amount TBD - current budget is only placeholder. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 1,000,000 0 0 0 0 1,000,000 Total 0 0 0 0 0 1,000,000 0 0 0 0 1,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 1,000,000 0 0 0 0 1,000,000 Total 0 0 0 0 0 1,000,000 0 0 0 0 1,000,000 Produced Using Plan-It CIP Software A-125 Lake Elmo Ave (CSAH 17) & 39th St N Traffic Signal 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-131 Project Name Lake Elmo Ave (CSAH 17) & 39th St N Traffic Signal Contact Engineer Department Public Works Department Category Street Construction Priority 4 Less Important Status Active Useful Life 40 years Old Project Number PW-082 Description COUNTY PROJECT / COST SHARE Traffic Signal to be installed at intersection when warrants are met. Justification Traffic signal to be installed to address higher traffic volumes from new developments. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 500,000 0 0 0 0 500,000 Total 0 0 0 0 0 500,000 0 0 0 0 500,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 500,000 0 0 0 0 500,000 Total 0 0 0 0 0 500,000 0 0 0 0 500,000 Produced Using Plan-It CIP Software A-126 CSAH 6/Inwood Signal 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-132 Project Name CSAH 6/Inwood Signal Contact Engineer Department Public Works Department Category Street Construction Priority 4 Less Important Status Active Useful Life 25 years Old Project Number PW-031 Description COUNTY PROJECT / COST SHARE CSAH 6/ Inwood Signal Improvements - to replace 4-way stop. Justification County improvement project with City cost participation requirement. Need determined by Washington County. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 500,000 0 500,000 Total 0 0 0 0 0 0 0 0 500,000 0 500,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Tax Levy 0 0 0 0 0 0 0 0 500,000 0 500,000 Total 0 0 0 0 0 0 0 0 500,000 0 500,000 Produced Using Plan-It CIP Software A-127 CSAH 10 / CSAH 17 Roundabout 2025 thru 2034 Infrastructure - Streets - Detail Lake Elmo, MN Project #PW-133 Project Name CSAH 10 / CSAH 17 Roundabout Contact Engineer Department Public Works Department Category Street Reconstruction Priority 2 Very Important Status New Recommendation Useful Life 40 years Description County Project - Pending County CIP and design. Roundabout at the intersection of 10th St N (CSAH 10) and Lake Elmo Ave N (CSAH 17) due to expected increase in traffic w/ new school building in NW quadrant. Projected City cost share of 25% of project, of which a portion may be paid by school district due to their new building on that corner. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 500,000 0 0 0 0 500,000 Total 0 0 0 0 0 500,000 0 0 0 0 500,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Infrastructure Reserve Fund (409)0 0 0 0 0 500,000 0 0 0 0 500,000 Total 0 0 0 0 0 500,000 0 0 0 0 500,000 Produced Using Plan-It CIP Software A-128 T1 - Tower 1 - Langly Ct 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-011 Project Name T1 - Tower 1 - Langly Ct Contact Public Works Director Department Water Department Category Water Priority 3 Important Status Active Useful Life 100 years Old Project Number W-039 Description Decommissioning and removal of water tower #1 on Langly Court. Justification 2026 - Once water tower 3 is constructed in the low pressure area, water tower 1 shuld be decommissioned. If not decommissioned, it will need significant maintenance to upkeep. Location (monopole?) needed to relocate cell antennas Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 50,000 0 0 0 0 0 0 0 0 0 50,000 Total 50,000 0 0 0 0 0 0 0 0 0 50,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 50,000 0 0 0 0 0 0 0 0 0 50,000 Total 50,000 0 0 0 0 0 0 0 0 0 50,000 Produced Using Plan-It CIP Software A-129 T2 - Tower 2 - Ideal Ave 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-012 Project Name T2 - Tower 2 - Ideal Ave Contact Public Works Director Department Water Department Category Water Priority 3 Important Status Active Useful Life 20 years Old Project Number W-010 Location/Address Ideal Ave - Public Works Site Description Tower 2 - Ideal Ave (Public Works site) Tower built in 2007 2028 - paint inside and out and correct coroding / maintenance issues Justification Recommended by TKDA Utility study in 2016 Regular maintenance of water tank Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 800,000 0 0 0 0 0 0 0 800,000 Total 0 0 800,000 0 0 0 0 0 0 0 800,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Water Fund 0 0 800,000 0 0 0 0 0 0 0 800,000 Total 0 0 800,000 0 0 0 0 0 0 0 800,000 Produced Using Plan-It CIP Software A-130 T4 - Tower 4 - Inwood Ave 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-014 Project Name T4 - Tower 4 - Inwood Ave Contact Public Works Director Department Water Department Category Water Priority 2 Very Important Status Active Useful Life 15 years Old Project Number W-044 Description Clean and paint inside and out of Inwood tower Justification Clean and paint inside and out of 2018 Inwood Tower- 15 yrs Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 0 800,000 0 800,000 Total 0 0 0 0 0 0 0 0 800,000 0 800,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 0 0 0 0 0 800,000 0 800,000 Total 0 0 0 0 0 0 0 0 800,000 0 800,000 Produced Using Plan-It CIP Software A-131 WL2 - Well 2 - 55th St 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-017 Project Name WL2 - Well 2 - 55th St Contact Public Works Director Department Water Department Category Water Priority 2 Very Important Status Active Useful Life 8 years Old Project Number W-011 Location/Address 55th St Description Regular maintenance of Well #2 Pump; pull, inspect, and maintenance. Past -- 2017 - Well 2 scheduled pull, inspect and maintenance Future - 2025: pull, inspect and maintain. (also the building upgrade and treatment equipment 100% paid through 3M Grant, which is covered in CIP Project W-042 - TP2 - Treatment 2 Justification routine maintenance every 8-10 yrs, last pull was 2017, and again in 2025 with building and filter upgrades Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 60,000 0 0 0 0 0 0 0 0 0 60,000 Total 60,000 0 0 0 0 0 0 0 0 0 60,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 60,000 0 0 0 0 0 0 0 0 0 60,000 Total 60,000 0 0 0 0 0 0 0 0 0 60,000 Produced Using Plan-It CIP Software A-132 WL4 - Well 4 - 50th St 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-019 Project Name WL4 - Well 4 - 50th St Contact Engineer Department Water Department Category Water Priority 3 Important Status Active Useful Life 15 years Old Project Number W-012 Description Regular Maintenance - Well 4 scheduled pull, inspect and maintenance Past - 2022 - Pull and Rebuild Well #4 pump Future - 2031 - Pull and Rebuild Pump Justification Recommended by 2016 TKDA Utility Study to be on a regular rotation Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 0 50,000 0 0 0 50,000 Total 0 0 0 0 0 0 50,000 0 0 0 50,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 0 0 0 50,000 0 0 0 50,000 Total 0 0 0 0 0 0 50,000 0 0 0 50,000 Produced Using Plan-It CIP Software A-133 WL5 - Well 5 - Lily Ave 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-020 Project Name WL5 - Well 5 - Lily Ave Contact Engineer Department Water Department Category Water Priority 3 Important Status Active Useful Life 8 years Old Project Number W-042 Location/Address 4525 LILY AVE Description Well 5 - Lilly Ave Scheduled Maintenance 2030 - pull pump, inspect, maintain. Justification routine maintenance every 8-10 yrs, constructed 2021 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Equip/Vehicles/Furnishings 0 0 0 0 0 50,000 0 0 0 0 50,000 Total 0 0 0 0 0 50,000 0 0 0 0 50,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 0 0 50,000 0 0 0 0 50,000 Total 0 0 0 0 0 50,000 0 0 0 0 50,000 Produced Using Plan-It CIP Software A-134 WL6 - Well 6 - Future Well & Site Acquisition 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-021 Project Name WL6 - Well 6 - Future Well & Site Acquisition Contact Engineer Department Water Department Category Water Priority 1 Critical Status Active Useful Life 40 years Old Project Number W-037 Description New water supply well to be operationally ready for use with new Treatment Plant. Monitoring well as required by the DNR. Test Well in 2025; Production Well and Site Acquisition in 2025; Well 6 and Treatment Plant ready for early 2027 start-up. (Treatment Plant is separate project - TP1) Justification Needed to replace lost production from Well 2 and to meet growing water demands from growth in water system users both in and outside of MUSA. Treatment Plant (separate project) required to address PFAS in groundwater supply. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 750,000 0 0 0 0 0 0 0 0 0 750,000 Total 750,000 0 0 0 0 0 0 0 0 0 750,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 750,000 0 0 0 0 0 0 0 0 0 750,000 Total 750,000 0 0 0 0 0 0 0 0 0 750,000 Produced Using Plan-It CIP Software A-135 WL7 - Well 7 (or 3) - Test Well & Site Acquisition 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-022 Project Name WL7 - Well 7 (or 3) - Test Well & Site Acquisition Contact Engineer Department Water Department Category Water Priority 3 Important Status Active Useful Life 40 years Old Project Number W-048 Description New water supply well to be operationally ready for use in 2029. Connecting raw watermain line to Treatment Plant site. Test Well in 2028; Production Well and Site Acquisition in 2029; Well 7 operationally ready in 2029. Justification Needed to replace lost production from Well 2 and to meet growing water demands from growth in water system users both in and outside of MUSA. Treatment Plant required to address PFAS in groundwater supply. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 750,000 0 0 0 0 0 0 0 0 750,000 Total 0 750,000 0 0 0 0 0 0 0 0 750,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Water Fund 0 750,000 0 0 0 0 0 0 0 0 750,000 Total 0 750,000 0 0 0 0 0 0 0 0 750,000 Produced Using Plan-It CIP Software A-136 TP1 - Treatment Plant 1 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-041 Project Name TP1 - Treatment Plant 1 Contact Engineer Department Water Department Category Water Priority 2 Very Important Status Active Useful Life 25 years Old Project Number W-037 Location/Address TBD - near Well 6? Description Treatment Plant and Raw Watermain Located at Well 6 3M Settlement Funds Improved EOC needed. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 24,500,000 24,500,000 0 0 0 0 0 0 0 0 49,000,000 Total 24,500,000 24,500,000 0 0 0 0 0 0 0 0 49,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 24,500,000 24,500,000 0 0 0 0 0 0 0 0 49,000,000 Total 24,500,000 24,500,000 0 0 0 0 0 0 0 0 49,000,000 Produced Using Plan-It CIP Software A-137 TP2 - Treatment 2 - Well 2 - GAC Filter System 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-042 Project Name TP2 - Treatment 2 - Well 2 - GAC Filter System Contact Engineer Department Water Department Category Water Priority 1 Critical Status Active Useful Life 25 years Old Project Number W-047 Description Expedited temporary GAC Filter Treatment Plant for Well #2. Funded through 3M Grant. Justification Treatment for PFAS is required to keep Production Well 2 operational over the next 2-3 years and then constructs additional water supply sources. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 2,500,000 0 0 0 0 0 0 0 0 0 2,500,000 Total 2,500,000 0 0 0 0 0 0 0 0 0 2,500,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 2,500,000 0 0 0 0 0 0 0 0 0 2,500,000 Total 2,500,000 0 0 0 0 0 0 0 0 0 2,500,000 Produced Using Plan-It CIP Software A-138 Future - Homestead Street & Utility Impr - Water 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-090 Project Name Future - Homestead Street & Utility Impr - Water Contact Engineer Department Water Department Category Water Priority 5 Future Consideration Status Active Useful Life 40 years Old Project Number W-034 Description Due to a change in MPCA grant policy, all 3M Grant Street projects are now unlikely. Moved all back to 2034 and changed to Future Consideration. Extension of watermain for the Homestead subdivison (14th Street North) to address PFAS; including for watermain distribution system costs. Justification Watermain extensions to Homestead. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 935,000 935,000 Total 0 0 0 0 0 0 0 0 0 935,000 935,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 0 0 0 0 0 0 0 0 0 935,000 935,000 Total 0 0 0 0 0 0 0 0 0 935,000 935,000 Produced Using Plan-It CIP Software A-139 Future - PP/EP/20th Street & Utility Impr - Water 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-091 Project Name Future - PP/EP/20th Street & Utility Impr - Water Contact Engineer Department Water Department Category Water Priority 5 Future Consideration Status Active Useful Life 40 years Old Project Number W-034 Description Due to a change in MPCA grant policy, all 3M Grant Street & Utility projects are now unlikely. Moved all back to 2034 and changed to Future Consideration. Extension of watermain for the Packard Park, Eden Park and 20th Street Circle to address PFAS; including for watermain distribution system costs. Requires 3M Grant Fund application. 3M-Grant (CDWSP Approved Neighborhood). Justification Watermain extensions to Packard Park, Eden Park and 20th Street Circle due to well advisories or being in Special Well Construction Area. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 2,500,000 2,500,000 Total 0 0 0 0 0 0 0 0 0 2,500,000 2,500,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 0 0 0 0 0 0 0 0 0 2,500,000 2,500,000 Total 0 0 0 0 0 0 0 0 0 2,500,000 2,500,000 Produced Using Plan-It CIP Software A-140 Future - Tartan Street & Utility Impr - Water 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-092 Project Name Future - Tartan Street & Utility Impr - Water Contact Engineer Department Water Department Category Water Priority 5 Future Consideration Status Active Useful Life 40 years Old Project Number W-035 Description Due to a change in MPCA grant policy, all 3M Grant Street projects are now unlikely. Moved all back to 2034 and changed to Future Consideration. Watermain extension costs for Tartan Meadows subdivision and Klondike Avenue. Formerly on City's MPCA Grant project list. Due to MPCA 3M Grant Policy change, project is very unlikely. Project would need to be initiated by property owner petition. Justification Watermain extensions to Tartan Park subdivision and Klondike Avenue due to well advisories or being in Special Well Construction Area. Watermain hydrant/valve repairs and replacement (including PRV install) to be completed in conjunction with scheduled street improvements. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 1,900,000 1,900,000 Total 0 0 0 0 0 0 0 0 0 1,900,000 1,900,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 0 0 0 0 0 0 0 0 0 1,900,000 1,900,000 Total 0 0 0 0 0 0 0 0 0 1,900,000 1,900,000 Budget Impact $1,640,000 3m Grant assumes Produced Using Plan-It CIP Software A-141 Future - DL/SP/For Street & Utility Impr - Water 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-093 Project Name Future - DL/SP/For Street & Utility Impr - Water Contact Engineer Department Water Department Category Water Priority 5 Future Consideration Status Active Useful Life 40 years Description Due to a change in MPCA grant policy, all 3M Grant Street projects are now unlikely. Moved all back to 2034 and changed to Future Consideration. Extension of watermain for Downs Lake Estates, Sunfish Ponds and Forest subdivisions to address PFAS; including for watermain distribution system costs. Requires 3M Grant Fund application. Not included in CDWSP. Justification Watermain extension to Downs Lake Estates, Sunfish Ponds and Forest subdivisions due to location in special well construction area. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 2,200,000 2,200,000 Total 0 0 0 0 0 0 0 0 0 2,200,000 2,200,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 0 0 0 0 0 0 0 0 0 2,200,000 2,200,000 Total 0 0 0 0 0 0 0 0 0 2,200,000 2,200,000 Produced Using Plan-It CIP Software A-142 Future - 45th Street Watermain Extension 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-094 Project Name Future - 45th Street Watermain Extension Contact Engineer Department Water Department Category Water Priority 5 Future Consideration Status Active Useful Life 40 years Old Project Number W-036 Description Due to a change in MPCA grant policy, all 3M Grant extention projects are now unlikely. Moved all back to 2034 and changed to Future Consideration. Total Estimated Project Costs for watermain extension to 9757, 9759 & 9765 45th Street (east of Tapestry Subdivision): Requires 3M Grant Fund application. Not included in current CDWSP. Would only be completed if funding is received from the 3M Grants. Justification Watermain extensions to 9757, 9759 & 9765 45th Street (east of Tapestry Subdivision) due to well advisories or being in Special Well Construction Area. One of three wells on this private drive has a well advisory. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 450,000 450,000 Total 0 0 0 0 0 0 0 0 0 450,000 450,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Grants/Donation 0 0 0 0 0 0 0 0 0 450,000 450,000 Total 0 0 0 0 0 0 0 0 0 450,000 450,000 Produced Using Plan-It CIP Software A-143 2025 Street & Utility Improvements - Water portion 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-100 Project Name 2025 Street & Utility Improvements - Water portion Contact Engineer Department Water Department Category Water Priority 3 Important Status Active Useful Life 40 years Old Project Number W-034 Description Annual street program - Extension of watermain along 59th Street Court and Iris Court. 59th St Ct 55th St Julep Way & 57th St Jasper Jerome Irish Ct. 100% Assessed Justification Extension of 1500 ft. 8-inch watermain along 59th Street Court in conjunction with Street Improvement (100% assessed). Extension of 620 ft. 8-inch watermain along Iris Court in conjunction with Street Improvement (100% assessed). Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 320,000 0 0 0 0 0 0 0 0 0 320,000 Total 320,000 0 0 0 0 0 0 0 0 0 320,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Assessment Funded 320,000 0 0 0 0 0 0 0 0 0 320,000 Total 320,000 0 0 0 0 0 0 0 0 0 320,000 Produced Using Plan-It CIP Software A-144 2026 Street & Utility Improvements - Water portion 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-101 Project Name 2026 Street & Utility Improvements - Water portion Contact Engineer Department Water Department Category Water Priority 3 Important Status Active Useful Life 40 years Old Project Number W-035 Description Planned street improvements to Lake Elmo Heights, Innsdale CDS, Inwood CDS. Includes PRV. Justification Watermain hydrant/valve repairs and replacement (including PRV install) to be completed in conjunction with scheduled street improvements. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 327,000 0 0 0 0 0 0 0 0 327,000 Total 0 327,000 0 0 0 0 0 0 0 0 327,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 327,000 0 0 0 0 0 0 0 0 327,000 Total 0 327,000 0 0 0 0 0 0 0 0 327,000 Produced Using Plan-It CIP Software A-145 2028 Street & Utility Improvements - Water portion 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-103 Project Name 2028 Street & Utility Improvements - Water portion Contact Engineer Department Water Department Category Water Priority 4 Less Important Status Active Useful Life 40 years Old Project Number W-046 Description Annual street program - complete repairs/upgrades to existing watermain distribution system. $150,000 for St. Croix Sanctuary. Justification Watermain hydrant/valve repairs and replacement to be completed in conjunction with scheduled street improvements. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 150,000 0 0 0 0 0 0 150,000 Total 0 0 0 150,000 0 0 0 0 0 0 150,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 150,000 0 0 0 0 0 0 150,000 Total 0 0 0 150,000 0 0 0 0 0 0 150,000 Produced Using Plan-It CIP Software A-146 2030 Street & Utility Improvements - Water portion 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-105 Project Name 2030 Street & Utility Improvements - Water portion Contact Engineer Department Water Department Category Water Priority 4 Less Important Status Active Useful Life 40 years Old Project Number W-049 Description Annual street program - complete repairs/upgrades to existing watermain distribution system. Discover Crossing and Hilltop Justification Watermain hydrant/valve repairs and replacement to be completed in conjunction with scheduled street improvements. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 100,000 0 0 0 0 100,000 Total 0 0 0 0 0 100,000 0 0 0 0 100,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 0 0 100,000 0 0 0 0 100,000 Total 0 0 0 0 0 100,000 0 0 0 0 100,000 Produced Using Plan-It CIP Software A-147 2031 Street & Utility Improvements - Water portion 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-106 Project Name 2031 Street & Utility Improvements - Water portion Contact Engineer Department Water Department Category Water Priority 4 Less Important Status Active Useful Life 40 years Old Project Number W-050 Description Annual street program - complete repairs/upgrades to existing watermain distribution system. Tablyn Park subdivision. Justification Watermain hydrant/valve repairs and replacement to be completed in conjunction with scheduled street improvements. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 130,000 0 0 0 130,000 Total 0 0 0 0 0 0 130,000 0 0 0 130,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 0 0 0 130,000 0 0 0 130,000 Total 0 0 0 0 0 0 130,000 0 0 0 130,000 Produced Using Plan-It CIP Software A-148 2032 Street & Utility Improvements - Water portion 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-107 Project Name 2032 Street & Utility Improvements - Water portion Contact Engineer Department Water Department Category Water Priority 4 Less Important Status Active Useful Life 40 years Old Project Number W-051 Description Annual street program - complete repairs/upgrades to existing watermain distribution system. Tapestry at Charlotte's Grove subdivision. Justification Watermain hydrant/valve repairs and replacement to be completed in conjunction with scheduled street improvements. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 210,000 0 0 210,000 Total 0 0 0 0 0 0 0 210,000 0 0 210,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 0 0 0 0 0 0 0 210,000 0 0 210,000 Total 0 0 0 0 0 0 0 210,000 0 0 210,000 Produced Using Plan-It CIP Software A-149 2033 Street & Utility Improvements - Water portion 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-108 Project Name 2033 Street & Utility Improvements - Water portion Contact Engineer Department Water Department Category Water Priority 4 Less Important Status Active Useful Life 40 years Old Project Number PW-084 Description Annual street program: Water Improvements for 36th Street, 37th Street and Irwin Avenue and 47th/50th/Kimbro (Keats to Lake Elmo). Justification In accordance with Pavement Management Plan. Annual street improvement confirmed per Engineering and Public Works recommendation. City to require property owner petition to initiate improvement (property owners rejected project in 2015 and in 2019 -- 36th, 37th, Irwin). 47th/50th/Kimbro do not need a petition. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 550,000 0 550,000 Total 0 0 0 0 0 0 0 0 550,000 0 550,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Water Fund 0 0 0 0 0 0 0 0 550,000 0 550,000 Total 0 0 0 0 0 0 0 0 550,000 0 550,000 Produced Using Plan-It CIP Software A-150 Village East Trunk Watermain & PRV 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-120 Project Name Village East Trunk Watermain & PRV Contact Engineer Department Water Department Category Water Priority 2 Very Important Status Active Useful Life 40 years Old Project Number W-008 Description Trunk watermain connection between north and south Village area neighborhoods to be installed by the city with the Village Parkway Railroad Crossing Improvements. A PRV (pressure reduction valve) will be needed and will be installed at a later date with development activity north of the railroad. Justification Required as part of the Water Distribution System trunk watermain network for adequate and reliable water delivery and pressures throughout the city. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 336,000 230,000 0 0 0 0 0 0 0 0 566,000 Total 336,000 230,000 0 0 0 0 0 0 0 0 566,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 336,000 230,000 0 0 0 0 0 0 0 0 566,000 Total 336,000 230,000 0 0 0 0 0 0 0 0 566,000 Produced Using Plan-It CIP Software A-151 Hudson Blvd - Trunk Watermain Extension 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-122 Project Name Hudson Blvd - Trunk Watermain Extension Contact Engineer Department Water Department Category Water Priority 4 Less Important Status Active Useful Life 40 years Old Project Number W-038 Description Trunk watermains that have been identified to be needed to maintain adequate system pressures and water delivery as water use and demands increase. Install Hudson Boulevard Trunk Watermain (Keats Avenue to Lake Elmo Avenue) Justification Strategic watermain pipe lines that are needed as part of the water distribution system for adequate and reliable water delivery and pressures throughout the city. Trunk watermains are indentifed through the city's water distribution system modeling program. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 1,800,000 0 0 0 0 0 0 0 1,800,000 Total 0 0 1,800,000 0 0 0 0 0 0 0 1,800,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Water Fund 0 0 1,800,000 0 0 0 0 0 0 0 1,800,000 Total 0 0 1,800,000 0 0 0 0 0 0 0 1,800,000 Produced Using Plan-It CIP Software A-152 5th St N - Keats to Lake Elmo Ave - Water Portion 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-124 Project Name 5th St N - Keats to Lake Elmo Ave - Water Portion Contact Engineer Department Water Department Category Water Priority 4 Less Important Status New Recommendation Useful Life 25 years Description Partial Developer Paid or Reimbursement? Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 1,700,000 0 0 0 0 1,700,000 Total 0 0 0 0 0 1,700,000 0 0 0 0 1,700,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Water Fund 0 0 0 0 0 1,700,000 0 0 0 0 1,700,000 Total 0 0 0 0 0 1,700,000 0 0 0 0 1,700,000 Produced Using Plan-It CIP Software A-153 Trunk Watermain Extensions 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-130 Project Name Trunk Watermain Extensions Contact Engineer Department Water Department Category Water Priority 4 Less Important Status Active Useful Life 40 years Old Project Number W-038 Description Trunk watermains that have been identified to be needed to maintain adequate system pressures and water delivery as water use and demands increase. Justification Strategic watermain pipe lines that are needed as part of the water distribution system for adequate and reliable water delivery and pressures throughout the city. Trunk watermains are indeitifed through the city's water distribution system modeling program. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 1,500,000 1,500,000 0 1,500,000 0 0 0 4,500,000 Total 0 0 0 1,500,000 1,500,000 0 1,500,000 0 0 0 4,500,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Water Fund 0 0 0 1,500,000 1,500,000 0 1,500,000 0 0 0 4,500,000 Total 0 0 0 1,500,000 1,500,000 0 1,500,000 0 0 0 4,500,000 Produced Using Plan-It CIP Software A-154 Watermain Oversizing 2025 thru 2034 Infrastructure - Water - Detail Lake Elmo, MN Project #W-160 Project Name Watermain Oversizing Contact Engineer Department Water Department Category Water Priority 3 Important Status Active Useful Life 40 years Old Project Number W-013 Description Oversizing cost of watermain pipe installed by developers. Justification Ensures all pipe in the City will have flow capacity necessary for water system Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Other 150,475 130,000 190,000 0 0 0 0 0 0 0 470,475 Total 150,475 130,000 190,000 0 0 0 0 0 0 0 470,475 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Water Fund 150,475 130,000 190,000 0 0 0 0 0 0 0 470,475 Total 150,475 130,000 190,000 0 0 0 0 0 0 0 470,475 Budget Impact Watermain oversizing costs identified in Developer Agreements Produced Using Plan-It CIP Software A-155 Future - DL/SP/For Street & Util Imp - Sewer 2025 thru 2034 Infrastructure - Sewer - Detail Lake Elmo, MN Project #S-093 Project Name Future - DL/SP/For Street & Util Imp - Sewer Contact Engineer Department Sewer Department Category Wastewater Priority 5 Future Consideration Status Active Useful Life 40 years Old Project Number S-022 Description Due to a change in MPCA grant policy, all 3M Grant Street & Utility projects are now unlikely. Moved all back to 2034 and changed to Future Consideration. Project would need to be initiated by property owner petition. (100% assessed) Justification Not located within the MUSA however there have been many failed septic systems and finding replacement locations has been a challenge Sewer stub is available to Sunfish Ponds HOA property (from Legacy at North Star develompment) Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 0 0 380,000 380,000 Total 0 0 0 0 0 0 0 0 0 380,000 380,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Assessment Funded 0 0 0 0 0 0 0 0 0 380,000 380,000 Total 0 0 0 0 0 0 0 0 0 380,000 380,000 Produced Using Plan-It CIP Software A-156 2029 Street Improvements 2025 thru 2034 Infrastructure - Sewer - Detail Lake Elmo, MN Project #S-104 Project Name 2029 Street Improvements Contact Engineer Department Sewer Department Category Wastewater Priority 3 Important Status Active Useful Life 25 years Old Project Number S-026 Description 50th Street + Hill Trail (combine with Low Pressure sewer ext. to Oakdale) Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 1,685,000 0 0 0 0 0 1,685,000 Total 0 0 0 0 1,685,000 0 0 0 0 0 1,685,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Sewer Fund 0 0 0 0 1,685,000 0 0 0 0 0 1,685,000 Total 0 0 0 0 1,685,000 0 0 0 0 0 1,685,000 Produced Using Plan-It CIP Software A-157 Tapestry Sanitary Sewer Collection System Upgrades 2025 thru 2034 Infrastructure - Sewer - Detail Lake Elmo, MN Project #S-107 Project Name Tapestry Sanitary Sewer Collection System Upgrades Contact Engineer Department Sewer Department Category Wastewater Priority 5 Future Consideration Status Active Useful Life 40 years Old Project Number S-027 Description The city may consider assuming ownership and maintenance of the sewer collection system within the public right-of-way of the Tapestry subdivision in connection with improvements to the public streets. The neighborhood is connected to city sewer through a lift station and forcemain connection but the HOA continues to own the sanitary collection system within the public right-of-way. A sewer televising/inspection program would be required and all necessary repairs and upgrades would need to be completed with the street project before the city accepted ownership. Justification The City assumed ownership of the neighboring subdivision (Hamlet on Sunfish Lake) sewer system when the development connected to city sewer. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 0 0 0 0 0 1,000,000 0 0 1,000,000 Total 0 0 0 0 0 0 0 1,000,000 0 0 1,000,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Sewer Fund 0 0 0 0 0 0 0 1,000,000 0 0 1,000,000 Total 0 0 0 0 0 0 0 1,000,000 0 0 1,000,000 Budget Impact 100% assessed to benefitting property owners. Produced Using Plan-It CIP Software A-158 I- 94 Lift Station and Forcemain Upgrade 2025 thru 2034 Infrastructure - Sewer - Detail Lake Elmo, MN Project #S-108 Project Name I-94 Lift Station and Forcemain Upgrade Contact Engineer Department Sewer Department Category Wastewater Priority 3 Important Status Active Useful Life 40 years Old Project Number S-024 Description Met Council Gravity Sewer Extension: A regional gravity sewer extended along the north side of I-94 from the current MCES 1-WO-500 (aka WONE) connection point in Oakdale east toward the Lake Elmo corporate boundary. The project includes pump upgrades to the City I-94 lift station that discharges through a City-owned forcemain to the MCES gravity sewer connection point. The Met Council will upgrade the gravity line further east toward the Lake Elmo City limits, providing a shorter forcemain route for the lift station by roughly 3,000 feet. Cost estimates and scope of improvements to be further evaluated and revised when Met Council complete their upgrades in 2024. Justification Upgrades to lift station and focremain in order to provide for continued growth in the southwest area of the city Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 900,000 0 0 0 0 0 0 0 900,000 Total 0 0 900,000 0 0 0 0 0 0 0 900,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Sewer Fund 0 0 900,000 0 0 0 0 0 0 0 900,000 Total 0 0 900,000 0 0 0 0 0 0 0 900,000 Produced Using Plan-It CIP Software A-159 Sewer Oversizing 2025 thru 2034 Infrastructure - Sewer - Detail Lake Elmo, MN Project #S-120 Project Name Sewer Oversizing Contact Engineer Department Sewer Department Category Wastewater Priority 4 Less Important Status Active Useful Life 40 years Old Project Number S-013 Description Sewer Oversizing Paid to Developers. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Other 25,920 40,000 50,000 0 0 0 0 0 0 0 115,920 Total 25,920 40,000 50,000 0 0 0 0 0 0 0 115,920 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Sewer Fund 25,920 40,000 50,000 0 0 0 0 0 0 0 115,920 Total 25,920 40,000 50,000 0 0 0 0 0 0 0 115,920 Produced Using Plan-It CIP Software A-160 Sewer Oversizing for Sect 16 Extension 2025 thru 2034 Infrastructure - Sewer - Detail Lake Elmo, MN Project #S-121 Project Name Sewer Oversizing for Sect 16 Extension Contact Engineer Department Sewer Department Category Wastewater Priority 4 Less Important Status Active Useful Life 40 years Old Project Number S-013 Description Sewer Oversizing for Section 16 Trunk Sewer Extension - Developer Driven Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Other 0 0 200,000 0 0 0 0 0 0 0 200,000 Total 0 0 200,000 0 0 0 0 0 0 0 200,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Sewer Fund 0 0 200,000 0 0 0 0 0 0 0 200,000 Total 0 0 200,000 0 0 0 0 0 0 0 200,000 Produced Using Plan-It CIP Software A-161 Phase 2 Regional Drainage Impr. - Northstar Pond 2025 thru 2034 Infrastructure - Stormwater - Detail Lake Elmo, MN Project #SW-001 Project Name Phase 2 Regional Drainage Impr. - Northstar Pond Contact Engineer Department Storm Water Department Category Storm Sewer/Drainage Priority 3 Important Status Active Useful Life 40 years Old Project Number ?? Description PHASE 2 REGIONAL DRAINAGE IMPROVEMENTS: NORTHSTAR POND OVERSIZE Regional stormwater retention need identified upstream of Old Village near Lake Elmo Ave and CSAH 14 - Northstar Pond Oversize Timing dependent upon development. Compensation for oversizing paid to developer. Justification 2nd Phase to improving the regional drainage issues as identified in Old Village Regional Stormwater Study (2015). Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 285,405 0 0 0 0 0 0 0 0 0 285,405 Total 285,405 0 0 0 0 0 0 0 0 0 285,405 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Storm Water Fund 285,405 0 0 0 0 0 0 0 0 0 285,405 Total 285,405 0 0 0 0 0 0 0 0 0 285,405 Produced Using Plan-It CIP Software A-162 Phase 3 Regional Drainage Impr - Lions Park Pond 2025 thru 2034 Infrastructure - Stormwater - Detail Lake Elmo, MN Project #SW-002 Project Name Phase 3 Regional Drainage Impr - Lions Park Pond Contact Engineer Department Storm Water Department Category Storm Sewer/Drainage Priority 4 Less Important Status Active Useful Life 40 years Description PHASE 3 REGIONAL DRAINAGE IMPROVEMENTS: LIONS PARK DRAINAGE RETENTION POND Phase 3 of Regional Drainage Improvements (VFW / Lions Park) Justification 3rd Phase of Regional Drainage Improvements (VFW / Lions Park) as identified in Old Village Regional Stormwater Study Timing dependent upon development. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 575,000 0 0 0 0 0 0 0 575,000 Total 0 0 575,000 0 0 0 0 0 0 0 575,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Bond Proceeds - Stormwater Fund 0 0 575,000 0 0 0 0 0 0 0 575,000 Total 0 0 575,000 0 0 0 0 0 0 0 575,000 Produced Using Plan-It CIP Software A-163 Stormwater Reuse - Development Irrigation Systems 2025 thru 2034 Infrastructure - Stormwater - Detail Lake Elmo, MN Project #SW-003 Project Name Stormwater Reuse - Development Irrigation Systems Contact Engineer Department Storm Water Department Category Storm Sewer/Drainage Priority 4 Less Important Status Active Useful Life 40 years Description Identify and pursue opportunities to design and install stormwater reuse irrigation systems within the City. Work with HOAs to convert irrigation systems to full/partial stormwater reuse (e.g. Wildflower, Legacy at Northstar). 2026/2027 - Development Conversions Partner with Valley Branch Watershed District (VBWD) on design and grantfunding. Justification Pursue opportunities to implement stormwater reuse irrigation systems to promote water conservation and minimize the withdrawl of water from the underlying aquifers. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 40,000 40,000 0 0 0 0 0 0 0 80,000 Total 0 40,000 40,000 0 0 0 0 0 0 0 80,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Storm Water Fund 0 40,000 40,000 0 0 0 0 0 0 0 80,000 Total 0 40,000 40,000 0 0 0 0 0 0 0 80,000 Produced Using Plan-It CIP Software A-164 Stormwater Reuse - Lions & VFW Park Irrigation 2025 thru 2034 Infrastructure - Stormwater - Detail Lake Elmo, MN Project #SW-004 Project Name Stormwater Reuse - Lions & VFW Park Irrigation Contact Engineer Department Storm Water Department Category Storm Sewer/Drainage Priority 4 Less Important Status Active Useful Life 40 years Description Design and install a stormwater reuse irrigation system for Lions Park and VFW Ballfields. Potential for VBWD grant TBD $70,000 cost to be updated upon scoping study. Partner with VBWD on design and funding. Justification Pursue opportunities to implement stormwater reuse irrigation systems to promote water conservation and minimize the withdrawl of water from the underlying aquifers. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 76,000 0 0 0 0 0 0 0 76,000 Total 0 0 76,000 0 0 0 0 0 0 0 76,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Storm Water Fund 0 0 76,000 0 0 0 0 0 0 0 76,000 Total 0 0 76,000 0 0 0 0 0 0 0 76,000 Produced Using Plan-It CIP Software A-165 Stormwater Reuse - Irrigation Systems 2025 thru 2034 Infrastructure - Stormwater - Detail Lake Elmo, MN Project #SW-005 Project Name Stormwater Reuse - Irrigation Systems Contact Engineer Department Storm Water Department Category Storm Sewer/Drainage Priority 4 Less Important Status Active Useful Life 40 years Description Identify and pursue opportunities to design and install a stormwater reuse irrigation systems within the City. Design and install stormwater reuse irrigation systems with any new City ballfields. 2026/2027 - Future City Ballfields (pinwheel) Justification Pursue opportunities to implement stormwater reuse irrigation systems to promote water conservation and minimize withdrawal of water from the underlying aquifers. Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 40,000 40,000 0 0 0 0 0 0 0 80,000 Total 0 40,000 40,000 0 0 0 0 0 0 0 80,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Storm Water Fund 0 40,000 40,000 0 0 0 0 0 0 0 80,000 Total 0 40,000 40,000 0 0 0 0 0 0 0 80,000 Budget Impact Partner with VBWD on design and grant funding Produced Using Plan-It CIP Software A-166 Hudson Boulevard Culvert Repair 2025 thru 2034 Infrastructure - Stormwater - Detail Lake Elmo, MN Project #SW-006 Project Name Hudson Boulevard Culvert Repair Contact Engineer Department Storm Water Department Category Storm Sewer/Drainage Priority 2 Very Important Status Active Useful Life 25 years Description Hudson Boulevard Culvert Lining Repair (72-inch HDPE Liner in 84-inch CMP). Install 72-inch HDPE Liner in existing failed 84-inch CMP culvert. Cost: $300,000 to $400,000 Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 400,000 0 0 0 0 0 0 0 0 0 400,000 Total 400,000 0 0 0 0 0 0 0 0 0 400,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Storm Water Fund 400,000 0 0 0 0 0 0 0 0 0 400,000 Total 400,000 0 0 0 0 0 0 0 0 0 400,000 Produced Using Plan-It CIP Software A-167 Future Unidentified Stormwater Projects 2025 thru 2034 Infrastructure - Stormwater - Detail Lake Elmo, MN Project #SW-TBD Project Name Future Unidentified Stormwater Projects Contact Engineer Department Storm Water Department Category Storm Sewer/Drainage Priority 5 Future Consideration Status Active Useful Life 40 years Description Future Unidentified Stormwater Projects Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Construction/Maintenance 0 0 50,000 50,000 50,000 50,000 50,000 50,000 50,000 0 350,000 Total 0 0 50,000 50,000 50,000 50,000 50,000 50,000 50,000 0 350,000 Funding Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total Storm Water Fund 0 0 50,000 50,000 50,000 50,000 50,000 50,000 50,000 0 350,000 Total 0 0 50,000 50,000 50,000 50,000 50,000 50,000 50,000 0 350,000 Produced Using Plan-It CIP Software A-168 2025 through 2034 Vehicle & Equipment Fund (410) - Funding Sources & UsesLake Elmo, MN Source Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Vehicle Replacement Fund Beginning Balance 965,000 1,145,000 953,327 1,295,327 1,670,327 1,802,874 2,125,874 2,364,130 2,613,630 3,073,630 Revenues and Other Fund Sources Revenue Capital Levy 400,000 450,000 500,000 550,000 600,000 650,000 700,000 750,000 750,000 750,000 Interfund Loan 0 0 500,000 0 0 0 0 0 0 0 Total 400,000 450,000 1,000,000 550,000 600,000 650,000 700,000 750,000 750,000 750,000 Other Fund Sources Total Revenues and Other Fund Sources 400,000 450,000 1,000,000 550,000 600,000 650,000 700,000 750,000 750,000 750,000 Total Funds available 1,365,000 1,595,000 1,953,327 1,845,327 2,270,327 2,452,874 2,825,874 3,114,130 3,363,630 3,823,630 Expenditures and Uses Capital Projects & Equipment Parks and Recreation Chevy 2500 PR-001 0 0 0 0 30,000 0 0 0 0 0 Air Compressor PR-005 0 0 0 0 0 0 0 25,000 0 0 Kubota SUV PR-002 0 0 0 25,000 0 0 0 0 0 0 Skid Loader PR-006 0 70,000 0 0 0 0 0 0 0 0 John Deere Gator PR-004 0 0 0 50,000 0 0 0 0 0 0 Bobcat ToolCat PR-003 70,000 0 0 0 0 0 0 0 0 0 Total 70,000 70,000 0 75,000 30,000 0 0 25,000 0 0 Public Works Department D5 - Dump Truck 5 - 19 Mack PW-005 0 0 0 0 0 0 260,000 0 0 0 D3 - Dump Truck 3 - 17 Mack PW-003 0 0 0 0 260,000 0 0 0 0 0 D4 - Dump Truck 4 - 19 F-450 PW-004 0 0 0 0 0 0 50,000 0 0 0 D6 - Dump Truck 6 - 20 Mack Tandem PW-006 0 0 0 0 0 0 0 270,000 0 0 Produced Using Plan-It CIP Software A-169 D7 - Dump Truck 7 - 21 Mack PW-007 0 0 0 0 0 0 0 0 260,000 0 D8 - Dump Truck 8 - 22 F-550 PW-008 0 0 0 0 0 0 0 0 0 45,000 P1 - Pickup 1 - F-250 PW-011 0 0 60,000 0 0 0 0 0 0 0 P3 - Pickup 3 - F-150 PW-013 0 0 28,000 0 0 0 0 0 0 0 P4 - Pickup 4 - Ranger PW-014 0 0 0 0 0 0 0 18,000 0 0 P5 - Pickup 5 - 3500 PW-015 0 0 0 0 0 0 0 0 0 32,000 E1 - Equip 1 - Case Loader PW-021 0 0 200,000 0 0 0 0 0 0 0 E3 - Equip 3 - Backhoe PW-023 120,000 0 0 0 0 0 0 0 0 0 E5 - Equip 5 -Bobcat Skid PW-025 0 0 0 0 0 0 0 45,000 0 0 E8 - Equip 8 - Asphalt Roller PW-028 0 0 0 0 0 110,000 0 0 0 0 E10 - Equip 10 - Chipper PW-030 0 0 0 0 0 0 0 0 0 48,000 E11 - Equip 11 - Forklift PW-031 0 0 0 0 0 22,000 0 0 0 0 D2 - Dump Truck 2 - 15 Mack Single PW-002 0 0 260,000 0 0 0 0 0 0 0 P2 - Pickup 2 - F-250 PW-012 0 0 60,000 0 0 0 0 0 0 0 E6 - Equip 6 - Service Lift PW-026 0 0 0 0 0 35,000 0 0 0 0 E9 - Equip 9 - Asphalt Trailer PW-029 0 0 0 0 0 0 0 42,500 0 0 Total 120,000 0 608,000 0 260,000 167,000 310,000 375,500 260,000 125,000 Building Department Building Inspection Vehicle 3 B-003 0 0 0 0 0 30,000 0 0 0 0 Building Inspection Vehicle 2 B-002 0 0 0 0 0 30,000 0 0 0 0 Building Inspection Vehicle 4 B-004 0 30,000 0 0 0 0 0 0 30,000 0 Building Inspection Vehicle 1 B-001 0 0 0 0 30,000 0 0 0 0 0 Total 0 30,000 0 0 30,000 60,000 0 0 30,000 0 Fire Department Ladder 1 F-012 0 0 0 0 0 0 0 0 0 2,000,000 Rescue 1 Hose Storage and Equipment Refurbish F-004 30,000 0 0 0 0 0 0 0 0 0 Command Vehicle 1 F-014 0 0 0 0 47,453 0 0 0 0 0 Tender 2 F-009 0 487,673 50,000 0 0 0 0 0 0 0 Source Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Produced Using Plan-It CIP Software A-170 Command Vehicle 2 F-015 0 0 0 0 0 0 51,744 0 0 0 UTV 1 F-011 0 54,000 0 0 0 0 0 0 0 0 Total 30,000 541,673 50,000 0 47,453 0 51,744 0 0 2,000,000 Other Uses Repay Interfund Loan 0 0 0 100,000 100,000 100,000 100,000 100,000 0 0 Total 0 0 0 100,000 100,000 100,000 100,000 100,000 0 0 Total Expenditures and Uses 220,000 641,673 658,000 175,000 467,453 327,000 461,744 500,500 290,000 2,125,000 Change in Fund Balance 180,000 -191,673 342,000 375,000 132,547 323,000 238,256 249,500 460,000 -1,375,000 Ending Balance 1,145,000 953,327 1,295,327 1,670,327 1,802,874 2,125,874 2,364,130 2,613,630 3,073,630 1,698,630 Source Project #2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Produced Using Plan-It CIP Software A-171 Staff Report DATE: 11/13/2024 MOTION AGENDA ITEM: Planning Commission 2025 Work Plan SUBMITTED BY: Sophia Jensen, City Planner BACKGROUND: Per Section 3.12.280 of the Lake Elmo City Code, the Planning Commission is tasked with reviewing and recommending an annual work plan. Staff built off the 2024 work plan to establish the 2025 Planning Commission Work Plan. ISSUE BEFORE THE PLANNING COMMISSION: The Planning Commission is being asked to make a recommendation on the proposed Planning Commission Work Plan for 2025. DETAILS AND ANALYSIS: The work plan follows a similar ranking system to the Parks Commission work plan with a priority system of 1-5 (1 being the highest priority). Items that have been completed in the 2024 work plan include the following: 1. Housekeeping amendments identified in 2023 were completed in two batches, both approved in February. 2. The Sign Ordinance was reviewed and amended, approved in August. 3. The OP PUD Ordinance was reviewed and amended, approved in October. 4. Planning Commission training was held in May. 5. Streamline policies/procedures was completed with the hire of three new Community Development staff (Director, Planner, Assistant). 6. The City is making the transition from PermitWorks to Cloud Permit. This new software has a planning and code enforcement module. 7. Educational materials on active land use projects have been added to the City’s website under the planning & zoning tab. This was initiated in January and updated quarterly. 8. The CIP is being reviewed at this meeting. OPTIONS: 1. Recommend approval of the Planning Commission 2025 Work Plan 2. Recommend amendments to the Planning Commission 2025 Work Plan FISCAL IMPACT: None RECOMMENDATION: Staff recommends the following motion: “Motion to recommend approval of the 2025 Planning Commission Work Plan as presented by Staff.” ATTACHMENTS: 1. 2024 Planning Commission Work Plan 2. Proposed 2025 Planning Commission Work Plan 1 2024 Planning Commission Work Plan Reviewed by the Planning Commission: 11/13/2023_ Reviewed by the City Council: 3/6/2024 Key Status C – Complete IP – In Progress PL Priority Level (1-5 with 1 being the highest priority) Project and Description PL Status Code Amendments • Process the package of clean up amendments identified by City Staff in 2023. 3 C • Review and update the City’s sign ordinance. 2 IP • Review the City’s OP-PUD ordinance. 3 Comprehensive Plan Amendments • Planning Commission review of City Capital Improvement Plan for consistency with Comprehensive Plan. 3 Other Planning Initiatives • Provide training to Planning Commission. 2 • Hold a quarterly joint Planning Commission City Council work session. 2 • Streamline and improve policies/procedures for handling of routine land matters, including but not limited to variances, site plan review, setbacks et al; 1 IP • When possible, add Planning Module from Permit works or equivalent to track planning and zoning applications. 4 IP • Create educational materials that may include a brochure, website, or other publication to communicate the intended and planned development patterns in the urbanizing area. 5 C Ongoing Planning Activities • Zoning Map Amendments – as amendments are requested. 1 • Zoning Code Amendments – as amendments are requested. 1 • Comprehensive Plan Amendments – as amendments are requested. 1 1 2025 Planning Commission Work Plan Reviewed by the Planning Commission: 11/13/2024 Reviewed by the City Council: 2/18/2025 Key Status C – Complete IP – In Progress PL Priority Level (1-5 with 1 being the highest priority) Project and Description PL Status Code Amendments •Process the housekeeping amendments identified by City Staff in2024. 2 •Review MN Cannabis regulations and add zoning/licensingrequirements 3 IP •Review the Old Village Area Zoning and Future Land Use Maps inresponse to the Old Village Study Conducted in 2024 4 Comprehensive Plan Amendments •Planning Commission complete their annual review of City Capital Improvement Plan for consistency with Comprehensive Plan. 2 Other Planning Initiatives •Provide annual training to Planning Commission.2 •Hold annual joint Planning Commission City Council work session.2 2/11/25 •Promote sustainability through the Gold Leaf, B3 and GreenStepsprograms 4 •Implement an interactive city map for residents 2 Ongoing Planning Activities •Zoning Code Amendments – as amendments are requested.1 •Comprehensive Plan Amendments – as amendments are requested.1 •Zoning Map Amendments – as amendments are requested.1