Loading...
HomeMy WebLinkAbout55thSTAFF REPORT DATE: November 10, 2020 DISCUSSION AGENDA ITEM: 55th St N Vacated Street SUBMITTED BY: Kristina Handt, City Administrator BACKGROUND: At June work session council the council began discussions about getting back the portion of 55th St N that was previously vacated. Information from the city attorney about the current ownership, Carriage Station (Lots 1-9, Block 4 and Outlot A), and some of the lots deeded land to the properties to the north as required during the vacation was discussed at that meeting as well as the anticipated costs to get the right of way deeded back to the city (high level estimate was $40,000 per property). If the City wishes to re-establish this right-of-way, since all of the vacated right-of-way property is owned in fee by the adjacent property owners, the City will need to acquire easements from these property owners. If the property owners do not wish to give the City an easement, the City may condemn for these purposes. ISSUE BEFORE COUNCIL: Should the city pursue re-establishing 55th St to connect the Sanctuary neighborhood? If so, which road alignment should staff focus on? PROPOSAL DETAILS/ANALYSIS: Following the June work session staff was asked to look further into what would be needed to re-establish 55th St N. The city engineer did a high level estimate of a couple options. The first would be to acquire the land back and place the road in the same location it previously was. This would have it centered over the existing trail. The estimated construction costs (does not include land acquisition) would be $580,000. This would require the acquisition of land from 11 property owners. The second option would be to shift the road to the north once past the intersection with Marquess Trail. The construction costs for this option is $200,000 more or $780,000. This would require the acquisition of land from 2 property owners. FISCAL IMPACT: Option 1: High level estimate is $1,020,000 Option 2: High level estimate is $860,000 ATTACHMENT: • City Engineer emailed info • Option 1 Construction Cost Estimate from City Engineer • Option 2 Construction Cost Estimate from City Engineer From:Jack Griffin To:Kristina Handt Cc:Marty Powers; Chad Isakson Subject:55th Street Extension - EOC Date:Tuesday, August 18, 2020 3:03:46 PM Attachments:55th Street Improvements EOC-Ex Alignment.pdf 55th Street Improvements EOC-Shift North.pdf Caution: This email originated outside our organization; please use caution. Attached are my estimate of costs for the extension of 55th Street along the north side of Carriage Station. The first EOC is for the extension, roughly 1,200 feet of roadway (26 feet in width to match the segment abutting CSAH 14) with the alignment centered over the existing public trail. Amount is $580,000. The second estimate is for the extension, roughly 1,200 feet of roadway (26 feet in width to match the segment abutting CSAH 14) with the alignment shifting to the north, once past the intersection with Marquess Trail. Amount is $780,000 or plus another $200K. Both estimates are conservative and assume extensive tree clearing and grubbing, and both assume significant soil correction and subgrade preparation being required before the road can be constructed. However, the latter estimate involves grading and soil correction work over a much larger area. No R/W acquisition has been included for either option. The second estimate has the added benefit of allowing the existing trail to remain with the roadway construction to the north of the trail. Perhaps the roadway can be made more narrow with the trail being in place. Both estimates are preliminary and should not be used beyond high level planning. Thanks ~Jack John (Jack) W. Griffin, P.E. Principal / Sr. Municipal Engineer FOCUS ENGINEERING, INC. 651.300.4264 jack.griffin@focusengineeringinc.com 55TH STREET NORTH FROM MARQUESS TRAIL TO WELL NO. 2 STREET AND STROM SEWER IMPROVEMENTS CITY OF LAKE ELMO, MINNESOTA ENGINEER'S OPINION OF PROBABLE COST 55TH STREET NORTH EXTENSION ‐ FOLLOWING EXISTING TRAIL ALIGNMENT DATE: AUGUST 2020 Item Description Quantity Unit Unit price Total Cost 1 MOBILIZATION 1.00 LS $19,400.00 $19,400 2 TRAFFIC CONTROL 1.00 LS $9,700.00 $9,700 3SILT FENCE 1,800.00 LF $3.00 $5,400 4 CLEAR AND GRUB 1.00 LS $20,000.00 $20,000 5 SAWCUT PAVEMENT (ALL TYPES) 52.00 LF $3.00 $156 6 REMOVE & DISPOSE OF EXIST. BITUMINOUS PAVEMENT 3,682.42 SY $3.00 $11,047 7 FULL DEPTH RECLAIM 615.75 SY $2.00 $1,232 8 COMMON EXCAVATION (CV) (P) 4,254.17 CY $13.00 $55,304 9 SUBGRADE CORRECTION 255.56 CY $26.00 $6,644 10 GEOTEXTILE FABRIC TYPE S 3,466.67 SY $5.00 $17,333 11 SUBGRADE PREPARATION  12.90 RS $200.00 $2,580 12 SELECT GRANULAR BORROW (CV), SPEC 3149.2B 3,002.95 CY $16.00 $48,047 13 CLASS 6, AGGREGATE BASE, 100% CRUSHED LIMESTONE 1,579.98 TN $15.00 $23,700 14 TYPE SP 12.5 BITUMINOUS NON‐WEARING COURSE (SPNWB230C) 422.93 TN $70.00 $29,605 15 TYPE SP 9.5 BITUMINOUS WEARING COURSE (SPWEA230C) 422.93 TN $65.00 $27,491 16 BITUMINOUS MATERIAL FOR TACK COAT 248.44 GAL $3.00 $745 17 CLASS 6 AGGREGATE SHOULDERING ‐ 100% CRUSHED LIMESTONE 137.45 TN $20.00 $2,749 18 CONCRETE CURB AND GUTTER 2,682.74 LF $13.00 $34,876 19 4" PVC PERF EDGE DRAIN W/BACKFILL & WRAP 1,082.74 LF $18.00 $19,489 20 2 X 3 CATCH BASIN W/CASTING 3.00 EA $2,000.00 $6,000 21 STORM SEWER MANHOLE 3.00 EA $3,500.00 $10,500 22 STORM SEWER MANHOLE W/ SUMP 1.00 EA $4,000.00 $4,000 23 12" RCP STORM SEWER PIPE 78.00 LF $38.00 $2,964 24 15" RCP STORM SEWER PIPE 350.00 LF $40.00 $14,000 25 18" RCP STORM SEWER PIPE 600.00 LF $45.00 $27,000 26 18" FLARED END SECTION 1.00 EA $1,200.00 $1,200 27 CLASS 3 RIP RAP W/GEOTEXTILE FABRIC 6.00 CY $100.00 $600 28 IMPORT AND PLACE TOPSOIL BORROW 401.17 CY $20.00 $8,023 29 SEEDING, FERTILIZER AND WOOD FIBER BLANKET 2,407.00 SY $2.50 $6,018 Estimated TOTAL Construction Cost $415,804 Contingencies at 10%$42,000 Easement Acquisition (Legal and Land Survey Services) $0 Engineering Services: Feasibility Report:$12,000 Engineering Services: Design and Construction Administration: $60,000 Full‐Time Construction Observation:$26,000 Geotechnical Engineering:$15,000 Legal, Fiscal and Administration:$9,000 Total Estimated Project Cost:$580,000 55TH STREET NORTH FROM MARQUESS TRAIL TO WELL NO. 2 STREET AND STROM SEWER IMPROVEMENTS CITY OF LAKE ELMO, MINNESOTA ENGINEER'S OPINION OF PROBABLE COST 55TH STREET NORTH EXTENSION ‐ SHIFTING ALIGNMENT TO THE NORTH DATE: AUGUST 2020 Item Description Quantity Unit Unit price Total Cost 1 MOBILIZATION 1.00 LS $19,400.00 $19,400 2 TRAFFIC CONTROL 1.00 LS $9,700.00 $9,700 3SILT FENCE 1,800.00 LF $3.00 $5,400 4 CLEAR AND GRUB 1.00 LS $20,000.00 $20,000 5 SAWCUT PAVEMENT (ALL TYPES) 52.00 LF $3.00 $156 6 REMOVE & DISPOSE OF EXIST. BITUMINOUS PAVEMENT 3,682.42 SY $3.00 $11,047 7 FULL DEPTH RECLAIM 615.75 SY $2.00 $1,232 8 COMMON EXCAVATION (CV) (P) 4,254.17 CY $13.00 $55,304 9 SUBGRADE CORRECTION 255.56 CY $26.00 $6,644 10 GEOTEXTILE FABRIC TYPE S 3,466.67 SY $5.00 $17,333 11 SUBGRADE PREPARATION  12.90 RS $200.00 $2,580 12 SELECT GRANULAR BORROW (CV), SPEC 3149.2B 3,002.95 CY $16.00 $48,047 13 CLASS 6, AGGREGATE BASE, 100% CRUSHED LIMESTONE 1,579.98 TN $15.00 $23,700 14 TYPE SP 12.5 BITUMINOUS NON‐WEARING COURSE (SPNWB230C) 422.93 TN $70.00 $29,605 15 TYPE SP 9.5 BITUMINOUS WEARING COURSE (SPWEA230C) 422.93 TN $65.00 $27,491 16 BITUMINOUS MATERIAL FOR TACK COAT 248.44 GAL $3.00 $745 17 CLASS 6 AGGREGATE SHOULDERING ‐ 100% CRUSHED LIMESTONE 137.45 TN $20.00 $2,749 18 CONCRETE CURB AND GUTTER 2,682.74 LF $13.00 $34,876 19 4" PVC PERF EDGE DRAIN W/BACKFILL & WRAP 1,082.74 LF $18.00 $19,489 20 2 X 3 CATCH BASIN W/CASTING 3.00 EA $2,000.00 $6,000 21 STORM SEWER MANHOLE 3.00 EA $3,500.00 $10,500 22 STORM SEWER MANHOLE W/ SUMP 1.00 EA $4,000.00 $4,000 23 12" RCP STORM SEWER PIPE 78.00 LF $38.00 $2,964 24 15" RCP STORM SEWER PIPE 350.00 LF $40.00 $14,000 25 18" RCP STORM SEWER PIPE 600.00 LF $45.00 $27,000 26 18" FLARED END SECTION 1.00 EA $1,200.00 $1,200 27 CLASS 3 RIP RAP W/GEOTEXTILE FABRIC 6.00 CY $100.00 $600 28 IMPORT AND PLACE TOPSOIL BORROW 401.17 CY $20.00 $8,023 29 SEEDING, FERTILIZER AND WOOD FIBER BLANKET 2,407.00 SY $2.50 $6,018 30 ADDITIONAL CLEARING, GRADING, SUBGRADE CORRECTION FOR REALIGNMENT 1.00 LS $154,000 $154,000 Estimated TOTAL Construction Cost $569,804 Contingencies at 10%$57,000 Easement Acquisition (Legal and Land Survey Services) $0 Engineering Services: Feasibility Report:$15,000 Engineering Services: Design and Construction Administration: $75,000 Full‐Time Construction Observation:$34,000 Geotechnical Engineering:$18,000 Legal, Fiscal and Administration:$11,000 Total Estimated Project Cost:$780,000