HomeMy WebLinkAboutUpper 33rd Street StripingSTAFF REPORT DATE: March 12, 2019 DISCUSSION AGENDA ITEM: Upper 33rd Street Striping/Parking Plan SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator ISSUE BEFORE COUNCIL: Should staff be directed to bring forth a future council agenda item regarding the striping/parking plan along Upper 33rd Street, from Laverne Avenue to Lake Elmo Avenue? BACKGROUND: In 2015 Upper 33rd Street was reconstructed from Laverne Avenue to Lake Elmo Avenue as part of the Old Village Phase 1 Improvements. The approved design consisted of a 30-foot wide street that could accommodate 2 – 11-foot drive lanes and a 7-foot wide bump-out on-street parking bay along the north side (see attached Typical Section). After the design was complete the City was approached by the property owner located at 11320 Upper 33rd Street North to review shifting the new roadway further north from his existing commercial building. Upon extensive staff review, property ownership and right-of-way verification, it was determined that it is not possible to shift the roadway. To address the property owner’s concerns, staff worked with the design engineer to propose a revised striping plan which would direct traffic further away from the building by repurposing the drive lane locations within the paved surfaces. By changing only the pavement striping the roadway improvements, including curb locations, were constructed as originally proposed. The council approved the revised stripping plan which resulted in the elimination of 5 on-street public parking spaces. PROPOSAL DETAILS/ANALYSIS: Recently, the City council directed staff to identify the costs/implications of restriping Upper 33 Street back to its original plan in order to restore the 5 on-street public parking spaces. Staff has obtained quotes for restriping the roadway and will be present to discuss impacts, options and staff recommendations for completing the work as part of standard seal coat maintenance practices. OPTIONS: 1) Direct staff to take no action and to leave the in-place striping plan. 2) Direct staff to bring this issue before a future council meeting with recommendations for restriping Upper 33rd Street to restore the 5 on-street parking spaces to be completed in 2019 as a stand-alone improvement. 3) Direct staff to bring this issue before a future council meeting with recommendations for restriping Upper 33rd Street to restore the 5 on-street parking spaces to be completed in conjunction with a standard seal coat maintenance project. ATTACHMENTS: • Upper 33rd Street Typical Section. • Upper 33rd Street Existing Striping Plan. • Upper 33rd Street Original Striping Plan. • Quote from AAA Striping Company. 11’ THRU 11’ THRU 11’ THRU 14’ 12’ THRU (TO F/C) 12’ THRU (TO F/C) 11’ THRU 40 SCALE IN FEET 1:30 ROADWAY EDGE PRECONSTRUCTION ADJUST CURB LINE 10-27-15 LANE SHIFT UPPER 33RD STEPHEN D JOHNSON #11320 #11178 & VICKY REHAK JOHN LENZMEIER #3469 US POST OFFICE #3459 FLY SHOP BOB MITCHELL’S #3459 INSURANCE NATIONAL AMERICAN#3479A R C H IT E C T U R EFIN E L IN E #3407SANDRA J EDERWILLIAM J &#3417 MARGARET BUILFOYLE JOHN W BAILLIE & ST CROIX COUNSELING CRAFTY CHICKS CHIROPRACTOR LAKE ELMO AUTO SALES PSYCHOLOGIST KLM ENGINEERING #3394 JOSHUA L TAYLOR BLDG #3481BLDG LLCCREAMERYLAKE ELMO #3481BLDG LLCCREAMERYLAKE ELMO UNION PACIFIC RAILROAD #3880 CITY OF LAKE ELMO 10/27/20154:28:16 PMS:\UZ\W\Washc\126774\5-final-dsgn\51-cadd\junk\F126774_cp1_33rdBumpout.dgnOF Exhibit 33Laverne no BumpoutFILE NO. WASHC126774 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651)490-2000 P.O. Box 339, Rogers MN 55374 5392 Quam Ave NE, St Michael MN 5537612220 43rd St NE, St Michael MN 55376 March 1, 2019 To Mike Rusenovich: We are quoting the following project Project Upper 33rd Striping Reconfiguration Location Lake Elmo Item Description Qty U/M Unit Amount 2021.501 Mobilization 1 LS $2,000.00 $2,000.00 2102.502 Pavement Marking Removal 1,061 LF $2.00 $2,122.00 2582.502 4" Solid Line White - Epoxy 174 LF $2.00 $348.00 2582.502 4" Double Line Yellow - Epoxy 330 LF $4.00 $1,320.00 Total $5,790.00 Removal by grinding method Prices firm for 30 days. Bond included in quote Sincerely, Dean E Erickson Estimator