HomeMy WebLinkAbout#11 - I-94 Lift Station and Forcemain Repair STAFF REPORT DATE: July 15, 2025 REGULAR TO: City Council FROM: Nate Stanley, City Engineer AGENDA ITEM: Approve Resolution Accepting Bids and Awarding a Contract for the I-94 Lift Station and Forcemain Replacement Project REVIEWED BY: Nicole Miller, City Administrator Clarissa Hadler, Finance Director Marty Powers, Public Works Director Chad Isakson, Assistant City Engineer CORE STRATEGIES: ☐ Vibrant, inclusive, connected community ☐ Efficient, reliable, innovative services ☒ Responsive, transparent, adaptive governance ☐ Balanced Finances now and future ☒ Managed Growth ☒ Resilient Infrastructure BACKGROUND: On June 17, 2025 the City Council ordered an advertisement for bids for the I-94 Lift Station and Forcemain Replacement Project. The project was advertised on QuestCDN.com and in the Stillwater Gazette in accordance with the Minnesota Competitive Bidding requirements. ISSUE BEFORE COUNCIL: Should the City Council accept bids and award a construction contract for the project? PROPOSAL DETAILS/ANALYSIS: The improvements include the replacement of an existing 8-inch forcemain with a new 16-inch HDPE forcemain, sized to meet the ultimate service flows to the I-94 Lift Station. The new forcemain will be installed in the approximate location of the existing forcemain, which will be abandoned in place, and will be installed through a combination of directional drilling and open cut trenching. The improvements also include the replacement of the existing 90-inch culvert as it crosses Hudson Boulevard. The failed culvert was discovered last fall as part of the Amira Subdivision Improvements and was then incorporated in the 2025 CIP to be addressed as a City project. New pumps were also ordered to support the increased forcemain size and new operating conditions. Contractor bids were received and opened electronically on July 8, 2025. The City received five bids for this project, with A-1 Excavating LLC. providing the lowest bid in the amount of $1,248,683.00. Following review and verification of the bid tabulations, the City Engineer and Design Engineer are recommending that the City Council award the contract to the lowest responsible bidder, A-1 Excavating LLC., as outlined in the attached letter. The table below provides a total project cost comparison to the Capital Improvement Plan budget. The costs include the pump purchase amount in the total estimated project cost. Table 1: Project Costs CIP Post Bid Total Estimated Project Cost: $1,300,000 $1,767,700 Sanitary Sewer Fund $900,000 $1,383,300 Storm Sewer Fund $400,000 $384,400 The bids received were competitive and represent the actual cost of completing construction efforts for the project As part of this contract award, staff is also requesting the Council to authorize the City Administrator to enter into a construction material testing contract for the project construction phase services in the not-to- exceed amount of $25,000. Staff will be receiving proposals from both Braun Intertec and AET. FISCAL IMPACT: Approval of this resolution commits the City to enter into a construction contract for the project. The estimated post-bid project cost is $1,767,700 based on bids received and lowering project contingencies to 7.5% for unforeseen conditions incurred during construction. The improvements will be funded through a combination of sanitary sewer and storm sewer utility funds. OPTIONS: • Accept the Bids and Award a Contract to A-1 Excavating LLC. • Do not move forward with this project RECOMMENDATION: Staff are recommending the City Council approve a Resolution Accepting Bids and Awarding a Contract to A-1 Excavating LLC. for the bid amount of $1,248,683.00 for the I-94 Lift Station and Forcemain Replacement Project. The Recommended motion is as follows: Motion to approve Resolution No. 2025-055, Accepting Bids and Awarding a Contract to A-1 Excavating LLC, for the bid amount of $1,248,683.00 for the I-94 Lift Station Forcemain Replacement Project. Staff are also recommending the City Council authorize the City Administrator to enter into a material testing contract for the project construction phase services in the not-to-exceed amount of $25,000. The Recommended motion is as follows: Motion to authorize the City Administrator to enter into a material testing contract for the project construction phase services in the not-to-exceed amount of $25,000 for the I-94 Lift Station Forcemain Replacement Project. ATTACHMENTS: 1. Resolution Accepting Bids and Awarding a Contract for the I-94 Lift Station and Forcemain Replacement Project. 2. Engineer’s Letter of Award Recommendation and Tabulation of Bids. 3. Proposed Improvements Map. 4. Project Schedule. CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2025-055 A RESOLUTION ACCEPTING BIDS AND AWARDING A CONTRACT FOR THE I-94 LIFT STATION FORCEMAIN REPLACEMENT PROJECT WHEREAS, pursuant to an advertisement for bids for the I-94 Lift Station and Forcemain Replacement Project, bids were received, opened, and tabulated according to law, and bids were received complying with the advertisement; and WHEREAS, bids were tabulated, checked and summarized to verify that all requirements of the submittal were met; and WHEREAS, the project engineer reviewed the bids and has provided a letter recommending the award of the contract to the lowest responsible bidder, A-1 Excavating LLC., for the bid amount of $1,248,683.00. NOW, THEREFORE, BE IT RESOLVED, 1. That the Mayor and City Clerk are hereby authorized and directed to enter into a Contract in the accordance with the above ordered Project, in the amount of the Contractor’s lowest responsible bid, and according to the plans and specifications thereof approved by the City Council. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposits of the successful bidder and the next two lowest bidders shall be retained until a contract has been signed. ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE FIFTEENTH DAY OF JULY, 2025. CITY OF LAKE ELMO By: __________________________ Charles Cadenhead (Seal) Mayor ATTEST: ________________________________ Julie Johnson City Clerk h:\lkelmn\25x138495000\6_plans-specs\b_bid documents\138495 award ltr.docx July 8, 2025 Nate Stanley, P.E. City Engineer City of Lake Elmo 3880 Laverne Avenue N Lake Elmo, Minnesota 55042 RE: I-94 Lift Station Forcemain Replacement Project City of Lake Elmo, MN City Project No. 138495 BMI Project No. 25X.138495 Dear Mr. Stanley, Attached is the bid abstract for the project referenced above. Five bids were received at 9:00 a.m. on Tuesday, July 8, 2025. The following is a summary of the bids received: Bidder Total Bid A-1 Excavating LLC $1,248,683.00 Pember Companies, Inc. $1,280,156.40 New Look Contracting, Inc. $1,367,879.50 Geislinger & Sons, Inc. $1,713,627.50 GM Contracting, Inc. $1,837,582.21 We have reviewed the bids and recommend awarding this bid to A-1 Excavating LLC in the amount of $1,248,683.00. Sincerely, Bolton & Menk, Inc. Michael R. Warner, P.E. Principal Engineer Enclosure ABSTRACT OF BIDS I-94 LIFT STATION FORCEMAIN REPLACEMENT PROJECT NO. 138495 CITY OF LAKE ELMO, MN BID DATE: JULY 8, 2025 AT 9:00 AM 1 2 3 NO. ITEM UNIT QTY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE BASE BID 1 MOBILIZATION LS 1 $97,500.00 $97,500.00 $37,900.00 $37,900.00 $150,000.00 $150,000.00 2 TRAFFIC CONTROL LS 1 $42,500.00 $42,500.00 $36,000.00 $36,000.00 $28,000.00 $28,000.00 3 INLET PROTECTION (CATCH BASIN) EA 5 $500.00 $2,500.00 $145.00 $725.00 $150.00 $750.00 4 INLET PROTECTION (CULVERT) EA 2 $200.00 $400.00 $250.00 $500.00 $150.00 $300.00 5 SILT FENCE, MACHINE SLICED LF 340 $3.00 $1,020.00 $3.65 $1,241.00 $7.50 $2,550.00 6 CLEARING LS 1 $10,000.00 $10,000.00 $5,425.00 $5,425.00 $12,200.00 $12,200.00 7 GRUBBING LS 1 $7,000.00 $7,000.00 $2,400.00 $2,400.00 $6,100.00 $6,100.00 8 BYPASS PUMPING LS 1 $10,000.00 $10,000.00 $105,000.00 $105,000.00 $1.00 $1.00 9 REMOVE SANITARY SEWER PIPE LF 10 $50.00 $500.00 $40.00 $400.00 $35.00 $350.00 10 REMOVE GATE VALVE & BOX EA 2 $500.00 $1,000.00 $200.00 $400.00 $1,100.00 $2,200.00 11 CUT AND PLUG 8" FORCEMAIN EA 2 $4,000.00 $8,000.00 $700.00 $1,400.00 $915.00 $1,830.00 12 CONNECT TO EXISTING 10" FORCEMAIN EA 1 $8,000.00 $8,000.00 $8,765.00 $8,765.00 $3,950.00 $3,950.00 13 CONNECT TO EXISTING 12" FORCEMAIN EA 1 $8,000.00 $8,000.00 $9,020.00 $9,020.00 $4,250.00 $4,250.00 14 DUCTILE IRON FITTINGS LBS 4,700 $1.00 $4,700.00 $16.20 $76,140.00 $16.00 $75,200.00 15 16" HDPE DIPS DR 11 SANITARY FORCEMAIN, DIRECTIONAL DRILL LF 2,790 $193.00 $538,470.00 $160.00 $446,400.00 $205.00 $571,950.00 16 16" DIP CL 52 SANITARY SEWER, INCL POLY WRAP LF 100 $330.00 $33,000.00 $360.00 $36,000.00 $430.00 $43,000.00 17 5' DIAMETER SANITARY AIR RELEASE MANHOLE, INCL CASTING AND RINGS EA 1 $35,500.00 $35,500.00 $40,000.00 $40,000.00 $49,000.00 $49,000.00 18 16" GATE VALVE AND BOX EA 2 $19,400.00 $38,800.00 $15,675.00 $31,350.00 $20,000.00 $40,000.00 19 4" INSULATION SY 10 $100.00 $1,000.00 $89.00 $890.00 $75.00 $750.00 20 GRANULAR BACKFILL TN 180 $20.00 $3,600.00 $41.00 $7,380.00 $28.00 $5,040.00 21 OFF ROAD STRUCTURE MARKER EA 6 $220.00 $1,320.00 $210.00 $1,260.00 $210.00 $1,260.00 22 SALVAGE AND REINSTALL SIGN EA 1 $1,100.00 $1,100.00 $1,060.00 $1,060.00 $1,150.00 $1,150.00 23 REMOVE GUARDRAIL LF 355 $8.00 $2,840.00 $11.00 $3,905.00 $9.00 $3,195.00 24 REMOVE CONCRETE HEADWALL LS 1 $4,000.00 $4,000.00 $1,575.00 $1,575.00 $2,650.00 $2,650.00 25 REMOVE 90" CSP STORM SEWER PIPE LF 216 $50.00 $10,800.00 $36.50 $7,884.00 $78.00 $16,848.00 26 SALVAGE AND REINSTALL STORM SEWER PIPE LF 88 $80.00 $7,040.00 $97.00 $8,536.00 $81.00 $7,128.00 27 SALVAGE AND REINSTALL STORM SEWER STRUCTURE EA 1 $4,000.00 $4,000.00 $1,770.00 $1,770.00 $4,850.00 $4,850.00 28 REMOVE AND REPLACE 4" PVC DRAINTILE LF 50 $30.00 $1,500.00 $45.00 $2,250.00 $42.00 $2,100.00 29 72" RCP STORM SEWER, CLASS II LF 200 $520.00 $104,000.00 $565.00 $113,000.00 $456.00 $91,200.00 30 72" RCP FLARED END SECTION EA 2 $5,900.00 $11,800.00 $5,775.00 $11,550.00 $8,650.00 $17,300.00 31 RIPRAP CLASS III CY 30 $150.00 $4,500.00 $160.00 $4,800.00 $153.00 $4,590.00 32 ADJUST MH CASTING EA 2 $500.00 $1,000.00 $705.00 $1,410.00 $1,275.00 $2,550.00 33 SAWCUT BITUMINOUS PAVEMENT LF 670 $4.00 $2,680.00 $3.60 $2,412.00 $3.75 $2,512.50 34 REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT - STREET SY 1,030 $19.00 $19,570.00 $6.50 $6,695.00 $4.00 $4,120.00 35 REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT - DRIVEWAY/TRAIL SY 240 $23.00 $5,520.00 $6.70 $1,608.00 $4.00 $960.00 36 REMOVE AND REPLACE CONCRETE CURB AND GUTTER LF 50 $86.00 $4,300.00 $53.50 $2,675.00 $138.50 $6,925.00 37 REMOVE AND REPLACE CONCRETE DRIVEWAY SY 40 $196.00 $7,840.00 $111.55 $4,462.00 $226.00 $9,040.00 38 REMOVE BOLLARD EA 3 $300.00 $900.00 $210.00 $630.00 $275.00 $825.00 39 AGGREGATE BASE, CLASS 2 TN 10 $50.00 $500.00 $100.00 $1,000.00 $75.00 $750.00 40 AGGREGATE BASE, CLASS 5 TN 240 $30.00 $7,200.00 $62.65 $15,036.00 $32.00 $7,680.00 41 AGGREGATE BASE, CLASS 6 TN 360 $30.00 $10,800.00 $60.25 $21,690.00 $36.00 $12,960.00 42 SELECT GRANULAR BORROW TN 700 $30.00 $21,000.00 $54.70 $38,290.00 $22.00 $15,400.00 43 TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,B) - DRIVEWAY/TRAIL TN 40 $145.00 $5,800.00 $132.55 $5,302.00 $143.50 $5,740.00 PEMBER COMPANIES, INC. NEW LOOK CONTRACTING, INC.A-1 EXCAVATING LLC ABSTRACT OF BIDS I-94 LIFT STATION FORCEMAIN REPLACEMENT PROJECT NO. 138495 CITY OF LAKE ELMO, MN BID DATE: JULY 8, 2025 AT 9:00 AM 1 2 3 NO. ITEM UNIT QTY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE BASE BID PEMBER COMPANIES, INC. NEW LOOK CONTRACTING, INC.A-1 EXCAVATING LLC 44 TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (3,C) - STREET PATCH TN 140 $130.00 $18,200.00 $176.00 $24,640.00 $157.00 $21,980.00 45 TYPE SP 12.5 BITUMINOUS NON-WEARING COURSE MIXTURE (3,C) - STREET PATCH TN 140 $125.00 $17,500.00 $146.35 $20,489.00 $148.00 $20,720.00 46 BITUMINOUS MATERIAL FOR TACK COAT GAL 80 $4.00 $320.00 $3.70 $296.00 $10.00 $800.00 47 TOPSOIL BORROW (LV) CY 180 $15.00 $2,700.00 $98.00 $17,640.00 $48.00 $8,640.00 48 SEED MIXTURE RT & EROSION CONTROL BLANKET SY 1,080 $3.00 $3,240.00 $5.40 $5,832.00 $2.50 $2,700.00 49 SEED MIXTURE RT & HYDRAULIC MATRIX MULCH SY 650 $3.00 $1,950.00 $4.20 $2,730.00 $4.25 $2,762.50 50 SEED MIXTURE MI & HYDRAULIC MATRIX MULCH SY 550 $3.00 $1,650.00 $4.40 $2,420.00 $4.25 $2,337.50 51 STREET SWEEPER WITH PICK UP BROOM HR 10 $200.00 $2,000.00 $180.00 $1,800.00 $250.00 $2,500.00 52 4" SOLID LINE MULTI-COMPONENT - WHITE LF 680 $3.00 $2,040.00 $0.95 $646.00 $2.75 $1,870.00 53 4" DOUBLE SOLID LINE MULTI-COMPONENT - YELLOW LF 240 $5.00 $1,200.00 $1.90 $456.00 $5.50 $1,320.00 54 PAVEMENT MESSAGE PREFORM THERMOPLASTIC GROUND IN SF 31 $33.00 $1,023.00 $24.40 $756.40 $70.00 $2,170.00 55 LOCATE EXISTING FORCEMAIN HR 12 $400.00 $4,800.00 $500.00 $6,000.00 $750.00 $9,000.00 56 LOCATE EXISTING CASING - INWOOD AVENUE LS 1 $3,000.00 $3,000.00 $7,925.00 $7,925.00 $3,775.00 $3,775.00 57 TEMPORARY BYPASS - INWOOD AVENUE LS 1 $34,000.00 $34,000.00 $45,500.00 $45,500.00 $45,750.00 $45,750.00 58 REMOVE AND REPLACE FORCEMAIN IN EXISTING CASING LF 140 $454.00 $63,560.00 $263.50 $36,890.00 $160.00 $22,400.00 TOTAL BASE BID $1,248,683.00 $1,280,156.40 $1,367,879.50 ABSTRACT OF BIDS I-94 LIFT STATION FORCEMAIN REPLACEMENT PROJECT NO. 138495 CITY OF LAKE ELMO, MN BID DATE: JULY 8, 2025 AT 9:00 AM NO. ITEM UNIT QTY BASE BID 1 MOBILIZATION LS 1 2 TRAFFIC CONTROL LS 1 3 INLET PROTECTION (CATCH BASIN) EA 5 4 INLET PROTECTION (CULVERT) EA 2 5 SILT FENCE, MACHINE SLICED LF 340 6 CLEARING LS 1 7 GRUBBING LS 1 8 BYPASS PUMPING LS 1 9 REMOVE SANITARY SEWER PIPE LF 10 10 REMOVE GATE VALVE & BOX EA 2 11 CUT AND PLUG 8" FORCEMAIN EA 2 12 CONNECT TO EXISTING 10" FORCEMAIN EA 1 13 CONNECT TO EXISTING 12" FORCEMAIN EA 1 14 DUCTILE IRON FITTINGS LBS 4,700 15 16" HDPE DIPS DR 11 SANITARY FORCEMAIN, DIRECTIONAL DRILL LF 2,790 16 16" DIP CL 52 SANITARY SEWER, INCL POLY WRAP LF 100 17 5' DIAMETER SANITARY AIR RELEASE MANHOLE, INCL CASTING AND RINGS EA 1 18 16" GATE VALVE AND BOX EA 2 19 4" INSULATION SY 10 20 GRANULAR BACKFILL TN 180 21 OFF ROAD STRUCTURE MARKER EA 6 22 SALVAGE AND REINSTALL SIGN EA 1 23 REMOVE GUARDRAIL LF 355 24 REMOVE CONCRETE HEADWALL LS 1 25 REMOVE 90" CSP STORM SEWER PIPE LF 216 26 SALVAGE AND REINSTALL STORM SEWER PIPE LF 88 27 SALVAGE AND REINSTALL STORM SEWER STRUCTURE EA 1 28 REMOVE AND REPLACE 4" PVC DRAINTILE LF 50 29 72" RCP STORM SEWER, CLASS II LF 200 30 72" RCP FLARED END SECTION EA 2 31 RIPRAP CLASS III CY 30 32 ADJUST MH CASTING EA 2 33 SAWCUT BITUMINOUS PAVEMENT LF 670 34 REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT - STREET SY 1,030 35 REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT - DRIVEWAY/TRAIL SY 240 36 REMOVE AND REPLACE CONCRETE CURB AND GUTTER LF 50 37 REMOVE AND REPLACE CONCRETE DRIVEWAY SY 40 38 REMOVE BOLLARD EA 3 39 AGGREGATE BASE, CLASS 2 TN 10 40 AGGREGATE BASE, CLASS 5 TN 240 41 AGGREGATE BASE, CLASS 6 TN 360 42 SELECT GRANULAR BORROW TN 700 43 TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,B) - DRIVEWAY/TRAIL TN 40 4 5 UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE $104,000.00 $104,000.00 $184,744.93 $184,744.93 $70,000.00 $70,000.00 $40,000.00 $40,000.00 $250.00 $1,250.00 $200.00 $1,000.00 $500.00 $1,000.00 $250.00 $500.00 $5.00 $1,700.00 $10.17 $3,457.80 $8,000.00 $8,000.00 $15,000.00 $15,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $10,000.00 $10,000.00 $72,000.00 $72,000.00 $5.00 $50.00 $40.69 $406.90 $125.00 $250.00 $1,024.28 $2,048.56 $1,000.00 $2,000.00 $2,048.54 $4,097.08 $40,000.00 $40,000.00 $12,045.35 $12,045.35 $40,000.00 $40,000.00 $12,298.21 $12,298.21 $17.00 $79,900.00 $28.09 $132,023.00 $235.00 $655,650.00 $248.96 $694,598.40 $300.00 $30,000.00 $215.21 $21,521.00 $50,000.00 $50,000.00 $54,115.03 $54,115.03 $30,000.00 $60,000.00 $18,028.95 $36,057.90 $65.00 $650.00 $41.84 $418.40 $22.00 $3,960.00 $34.36 $6,184.80 $250.00 $1,500.00 $200.00 $1,200.00 $1,000.00 $1,000.00 $1,000.00 $1,000.00 $25.00 $8,875.00 $50.00 $17,750.00 $6,000.00 $6,000.00 $4,097.07 $4,097.07 $25.00 $5,400.00 $77.85 $16,815.60 $130.00 $11,440.00 $75.48 $6,642.24 $6,000.00 $6,000.00 $4,427.93 $4,427.93 $40.00 $2,000.00 $49.65 $2,482.50 $1,200.00 $240,000.00 $948.90 $189,780.00 $8,000.00 $16,000.00 $8,608.80 $17,217.60 $175.00 $5,250.00 $208.39 $6,251.70 $450.00 $900.00 $714.94 $1,429.88 $10.00 $6,700.00 $8.00 $5,360.00 $8.00 $8,240.00 $11.93 $12,287.90 $6.00 $1,440.00 $12.80 $3,072.00 $85.00 $4,250.00 $111.97 $5,598.50 $200.00 $8,000.00 $247.82 $9,912.80 $150.00 $450.00 $682.85 $2,048.55 $50.00 $500.00 $39.82 $398.20 $22.00 $5,280.00 $36.12 $8,668.80 $24.00 $8,640.00 $37.19 $13,388.40 $22.00 $15,400.00 $31.82 $22,274.00 $115.00 $4,600.00 $113.32 $4,532.80 GEISLINGER & SONS, INC. GM CONTRACTING, INC. ABSTRACT OF BIDS I-94 LIFT STATION FORCEMAIN REPLACEMENT PROJECT NO. 138495 CITY OF LAKE ELMO, MN BID DATE: JULY 8, 2025 AT 9:00 AM NO. ITEM UNIT QTY BASE BID 44 TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (3,C) - STREET PATCH TN 140 45 TYPE SP 12.5 BITUMINOUS NON-WEARING COURSE MIXTURE (3,C) - STREET PATCH TN 140 46 BITUMINOUS MATERIAL FOR TACK COAT GAL 80 47 TOPSOIL BORROW (LV) CY 180 48 SEED MIXTURE RT & EROSION CONTROL BLANKET SY 1,080 49 SEED MIXTURE RT & HYDRAULIC MATRIX MULCH SY 650 50 SEED MIXTURE MI & HYDRAULIC MATRIX MULCH SY 550 51 STREET SWEEPER WITH PICK UP BROOM HR 10 52 4" SOLID LINE MULTI-COMPONENT - WHITE LF 680 53 4" DOUBLE SOLID LINE MULTI-COMPONENT - YELLOW LF 240 54 PAVEMENT MESSAGE PREFORM THERMOPLASTIC GROUND IN SF 31 55 LOCATE EXISTING FORCEMAIN HR 12 56 LOCATE EXISTING CASING - INWOOD AVENUE LS 1 57 TEMPORARY BYPASS - INWOOD AVENUE LS 1 58 REMOVE AND REPLACE FORCEMAIN IN EXISTING CASING LF 140 TOTAL BASE BID 4 5 UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE GEISLINGER & SONS, INC. GM CONTRACTING, INC. $125.00 $17,500.00 $123.99 $17,358.60 $120.00 $16,800.00 $116.63 $16,328.20 $9.00 $720.00 $8.50 $680.00 $50.00 $9,000.00 $71.56 $12,880.80 $5.25 $5,670.00 $5.10 $5,508.00 $4.00 $2,600.00 $3.95 $2,567.50 $4.25 $2,337.50 $4.10 $2,255.00 $200.00 $2,000.00 $165.00 $1,650.00 $3.00 $2,040.00 $2.40 $1,632.00 $5.00 $1,200.00 $4.80 $1,152.00 $35.00 $1,085.00 $30.00 $930.00 $1,200.00 $14,400.00 $450.00 $5,400.00 $20,000.00 $20,000.00 $5,400.00 $5,400.00 $45,000.00 $45,000.00 $28,567.48 $28,567.48 $300.00 $42,000.00 $579.42 $81,118.80 $1,713,627.50 $1,837,582.21 |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||| || || || || || || || || || | | | | | ||||| ||l ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll l>>>>> > > >>>>>>> >>>>>> > > > > > > > > > > > > >Hudson Bou leva rdInwood Avenue NEagle Point Boulevard 4th Street N I-9 4 E x i t R a m p 3rd Street N >>>>>>>>>>CONNECT TO MET COUNCIL INTERCEPTOR S S S S S S S S S SSS S L S>>>>H:\LKELMN\25X138495000\CAD\C3D\FIGR-138495 Site Plan.dwg 6/11/2025 1:12:09 PMR I-94 Lift Station Forcemain Replacement Project City of Lake Elmo Figure 1: Proposed Sanitary Forcemain and Culvert June 2025 FEETSCALE 0 100 200 HORZ. R S L >> |||||| l l l l EXISTING SANITARY SEWER EXISTING SANITARY FORCEMAIN EXISTING SANITARY STRUCTURES PROPOSED SANITARY FORCEMAIN PROPOSED CULVERT REPLACEMENT>>>> 3507 High Point Drive North Bldg. 1 – Suite E130 Oakdale, MN 55128 Phone: (651) 704-9970 Bolton-Menk.com I-94 Lift Station Forcemain Replacement Project Lake Elmo, MN APRIL 1, 2025 Council authorizes the preparation of Plans and Specifications. JUNE 17, 2025 Council approves Plans and Specifications and orders Advertisement for Bids. JULY 8, 2025 Project Bid Date: Receive contractor Bids. JULY 15, 2025 Council accepts Bids and awards Contract. AUGUST 4, 2025 Conduct Pre-Construction meeting and issue Notice to Proceed. · OCTOBER 15, 2025 Substantial Completion. · DECEMBER 31, 2025 Final Completion.