HomeMy WebLinkAbout#12 - 2024 Street and Utility Improvements Pay Req STAFF REPORT DATE: January 7, 2025 CONSENT AGENDA ITEM: Accept Improvements and Approve Pay Request No. 6 (Final) for the 2024 Street and Utility Improvements SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Nicole Miller, City Administrator Marty Powers, Public Works Director Clarissa Hadler, Finance Director Mike Rusenovich, Project Engineer ISSUE BEFORE COUNCIL: Should the City Council accept the improvements and approve Pay Request No. 6 (Final) for the 2024 Street and Utility Improvements? BACKGROUND: Northdale Construction Company, Inc. was awarded a construction contract on April 16, 2024 to complete the 2024 Street and Utility Improvements. The work has now been completed in accordance with the contract, plans and specifications, including all punch list items. PROPOSAL DETAILS/ANALYSIS: Northdale Construction Company, Inc. has submitted Pay Request No. 6 (Final) in the amount of $100,594.82. The Project Engineer has prepared a Certificate of Completion indicating that all work is completed, including all punch list items, and is recommending acceptance of the improvements and release of final retainage. Project acceptance will initiate the one-year warranty period for the improvements. The one-year warranty will begin on January 7, 2025 and will extend through January 7, 2026. FISCAL IMPACT: None. Final payment is being recommended within the authorized scope and budget for the project. The estimated total project cost at completion is $2,402,000 versus the post-bid approved project cost of $2,601,000. The total final project cost includes contingency funds for professional services to complete record drawings and perform services through the warranty period. The final project cost breakdown includes $1,980,000 for the street and drainage improvements and $422,000 for the water system improvements. Of these costs, $626,000 have been specially assessed, $422,000 will be funded through the Water Enterprise Fund, and the remaining costs will be funded through the project bond proceeds and general tax levy. RECOMMENDATION: Staff is recommending that the City Council, as part of the Consent Agenda, accept the improvements and approve Pay Request No. 6 (Final) for the 2024 Street and Utility Improvements. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to accept the improvements and approve Pay Request No. 6 (final) to Northdale Construction Company, Inc. in the amount of $100,594.82 for the 2024 Street and Utility Improvements”. ATTACHMENTS: 1. Partial Pay Estimate No. 6 (Final). 2. Certificate of Completion. PARTIAL PAY ESTIMATE NO. 6 (FINAL) 2024 STREET & UTILITY IMPROVEMENTS CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2023.111 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 LS 1 $21,085.00 $21,085.00 0.00 $0.00 1.00 $21,085.00 2 LS 1 $997.50 $997.50 0.00 $0.00 1.00 $997.50 3 LF 60 $1.97 $118.20 0.00 $0.00 16.00 $31.52 4 LF 150 $4.20 $630.00 0.00 $0.00 250.00 $1,050.00 5 EA 2 $250.00 $500.00 0.00 $0.00 4.00 $1,000.00 6 HR 20 $152.25 $3,045.00 0.00 $0.00 45.00 $6,851.25 7 MGAL 10 $65.00 $650.00 0.00 $0.00 0.00 $0.00 8 EA 3 $367.50 $1,102.50 0.00 $0.00 8.00 $2,940.00 9 EA 3 $262.50 $787.50 0.00 $0.00 8.00 $2,100.00 10 HR 5 $86.10 $430.50 0.00 $0.00 5.00 $430.50 11 EA 19 $141.75 $2,693.25 0.00 $0.00 16.00 $2,268.00 12 EA 19 $78.75 $1,496.25 0.00 $0.00 16.00 $1,260.00 13 EA 1 $288.75 $288.75 0.00 $0.00 1.00 $288.75 14 SF 5 $141.75 $708.75 0.00 $0.00 6.00 $850.50 15 CY 790 $28.35 $22,396.50 0.00 $0.00 490.00 $13,891.50 16 SY 300 $2.89 $867.00 0.00 $0.00 467.00 $1,349.63 17 SY 3300 $9.98 $32,934.00 0.00 $0.00 3,133.00 $31,267.34 $90,730.70 $0.00 $87,661.49 18 LF 135 $15.00 $2,025.00 0.00 $0.00 143.00 $2,145.00 19 LF 158 $70.97 $11,213.26 0.00 $0.00 158.00 $11,213.26 20 LF 122 $83.00 $10,126.00 0.00 $0.00 158.00 $13,114.00 21 EA 10 $628.62 $6,286.20 0.00 $0.00 10.00 $6,286.20 22 EA 4 $1,455.93 $5,823.72 0.00 $0.00 4.00 $5,823.72 23 EA 2 $3,281.11 $6,562.22 0.00 $0.00 2.25 $7,382.50 24 LF 290 $2.05 $594.50 0.00 $0.00 369.00 $756.45 25 LF 70 $5.78 $404.60 0.00 $0.00 100.00 $578.00 26 SY 460 $10.00 $4,600.00 0.00 $0.00 407.30 $4,073.00 27 SY 140 $10.00 $1,400.00 0.00 $0.00 127.00 $1,270.00 28 LF 50 $5.00 $250.00 0.00 $0.00 50.00 $250.00 29 SY 3200 $3.68 $11,776.00 0.00 $0.00 3,200.00 $11,776.00 30 CY 130 $24.84 $3,229.20 0.00 $0.00 466.00 $11,575.44 31 CY 130 $34.84 $4,529.20 0.00 $0.00 472.20 $16,451.45 32 SY 3010 $2.00 $6,020.00 0.00 $0.00 3,010.00 $6,020.00 33 CY 80 $20.00 $1,600.00 0.00 $0.00 0.00 $0.00 34 CY 90 $20.00 $1,800.00 0.00 $0.00 90.00 $1,800.00 35 TN 300 $100.80 $30,240.00 0.00 $0.00 290.39 $29,271.31 36 TN 400 $91.35 $36,540.00 0.00 $0.00 312.63 $28,558.75 37 GAL 240 $2.10 $504.00 0.00 $0.00 200.00 $420.00 38 SY 430 $51.50 $22,145.00 0.00 $0.00 408.00 $21,012.00 39 LF 600 $17.80 $10,680.00 0.00 $0.00 620.00 $11,036.00 40 LF 1750 $13.76 $24,080.00 0.00 $0.00 1,720.00 $23,667.20 41 SY 160 $122.17 $19,547.20 0.00 $0.00 128.00 $15,637.76 42 EA 1 $800.00 $800.00 0.00 $0.00 2.00 $1,600.00 $222,776.10 $0.00 $231,718.04 43 LF 874 $7.50 $6,555.00 0.00 $0.00 862.00 $6,465.00 44 EA 1 $1,625.00 $1,625.00 0.00 $0.00 1.00 $1,625.00 45 EA 2 $250.00 $500.00 0.00 $0.00 3.00 $750.00 46 EA 1 $1,366.24 $1,366.24 0.00 $0.00 2.00 $2,732.48 47 LF 694 $5.00 $3,470.00 0.00 $0.00 509.00 $2,545.00 48 EA 12 $100.00 $1,200.00 0.00 $0.00 12.00 $1,200.00 49 LS 1 $13,000.00 $13,000.00 0.00 $0.00 1.00 $13,000.00 50 EA 2 $2,362.87 $4,725.74 0.00 $0.00 3.00 $7,088.61 51 EA 1 $2,867.54 $2,867.54 0.00 $0.00 0.00 $0.00 52 EA 1 $9,572.00 $9,572.00 0.00 $0.00 1.00 $9,572.00 53 EA 1 $2,000.12 $2,000.12 0.00 $0.00 1.00 $2,000.12 54 EA 2 $2,315.13 $4,630.26 0.00 $0.00 2.00 $4,630.26 55 EA 1 $3,116.28 $3,116.28 0.00 $0.00 1.00 $3,116.28 56 EA 2 $5,367.94 $10,735.88 0.00 $0.00 3.00 $16,103.82 57 LF 2 $374.12 $748.24 0.00 $0.00 2.00 $748.24 58 EA 2 $7,011.35 $14,022.70 0.00 $0.00 2.00 $14,022.70 59 LF 1 $1,629.24 $1,629.24 0.00 $0.00 1.00 $1,629.24 6" GATE VALVE AND BOX 8" GATE VALVE AND BOX 12" GATE VALVE AND BOX TOTAL PART 2 - JAMACA COURT STREET AND STORM SEWER PART 3 - JAMACA COURT WATER SYSTEM REMOVE WATERMAIN VALVE BOX EXTENSION HYDRANT HYDRANT EXTENSION B618 CONCRETE CURB AND GUTTER RIBBON CURB 6" CONCRETE DRIVEWAY PAVEMENT ADJUST EXISTING VALVE BOX TEMPORARY WATER SYSTEM CONNECT TO EXISTING 4" WATERMAIN CONNECT TO EXISTING 12" WATERMAIN CUT IN 16" X 12" TEE 4" GATE VALVE AND BOX REMOVE HYDRANT AND GATE VALVE REMOVE GATE VALVE AND BOX REMOVE AND REPLACE VALVE BOX REMOVE WATER SERVICE REMOVE CURB STOP AND BOX SAWCUT BITUMINOUS PAVEMENT SAWCUT CONCRETE PAVEMENT REMOVE AND DISPOSE OF BITUMINOUS PAVEMENT (DRIVEWAY) REMOVE AND DISPOSE OF CONCRETE PAVEMENT (DRIVEWAY) REMOVE AND DISPOSE OF CONCRETE CURB AND GUTTER RECLAIM EXISTING BITUMINOUS AND BASE MATERIAL SUBGRADE CORRECTION (EV) SUBGRADE PREPARATION OF RECLAIMED SURFACE HAUL EXCESS RECLAIMED MATERIAL OFF SITE (EV) EXCAVATION - COMMON (WIDENING AREAS) (EV) SALVAGE AND REINSTALL RECLAIM MATERIAL (WIDENING AREAS) (CV) TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,C) [SPWEA230C] TYPE SP 12.5 BITUMINOUS NON WEARING COURSE MIXTURE (2,C) [SPNWB230C] BITUMINOUS MATERIAL FOR TACK COAT PATCH BITUMINOUS DRIVEWAY ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE TREE TRIMMING SALVAGE AND REINSTALL MAILBOX TEMPORARY MAILBOX SEED MIXTURE 25-131 AND EROSION CONTROL BLANKET SOD REMOVE AND REPLACE PERMANENT BARRICADE SIGN PANELS TYPE C TOPSOIL BORROW (LV) STREET SWEEPING (WITH PICKUP BROOM) REMOVE CULVERT 12" CS PIPE CULVERT 12" RCP STORM SEWER, CL V BASE BID MOBILIZATION 12" CS APRON 12" RCP FLARED END SECTION 4' DIA CBMH WITH CASTING PER DETAIL 406 TRAFFIC CONTROL SILT FENCE, TYPE MACHINE SLICE SEDIMENT CONTROL LOG, TYPE WOOD FIBER CATCH BASIN INLET PROTECTION PART 1 - JAMACA COURT GENERAL TOTAL PART 1 - JAMACA COURT GENERAL PART 2 - JAMACA COURT STREET AND STORM SEWER WATER FOR DUST CONTROL CLEARING GRUBBING QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE 60 LF 15 $95.87 $1,438.05 0.00 $0.00 7.00 $671.09 61 LF 20 $85.82 $1,716.40 0.00 $0.00 18.00 $1,544.76 62 LF 45 $99.53 $4,478.85 0.00 $0.00 48.00 $4,777.44 63 LF 1215 $118.31 $143,746.65 0.00 $0.00 1,212.00 $143,391.72 64 EA 12 $260.09 $3,121.08 0.00 $0.00 12.00 $3,121.08 65 EA 12 $522.78 $6,273.36 0.00 $0.00 12.00 $6,273.36 66 LF 440 $53.09 $23,359.60 0.00 $0.00 394.00 $20,917.46 67 EA 12 $189.38 $2,272.56 0.00 $0.00 12.00 $2,272.56 68 LB 1440 $15.53 $22,363.20 0.00 $0.00 1,758.00 $27,301.74 69 LF 130 $12.00 $1,560.00 0.00 $0.00 130.00 $1,560.00 70 SF 30 $12.29 $368.70 0.00 $0.00 16.10 $197.87 71 EA 3 $157.50 $472.50 0.00 $0.00 4.00 $630.00 $292,935.19 $0.00 $299,887.83 $606,441.99 $0.00 $619,267.36 72 LS 1 $24,130.00 $24,130.00 0.00 $0.00 1.00 $24,130.00 73 LS 1 $4,252.50 $4,252.50 0.00 $0.00 1.00 $4,252.50 74 LF 50 $3.68 $184.00 0.00 $0.00 550.00 $2,024.00 75 EA 30 $250.00 $7,500.00 0.00 $0.00 30.00 $7,500.00 76 HR 40 $152.25 $6,090.00 0.00 $0.00 55.00 $8,373.75 77 MGAL 60 $65.00 $3,900.00 0.00 $0.00 60.00 $3,900.00 78 EA 2 $472.50 $945.00 0.00 $0.00 12.00 $5,670.00 79 EA 2 $367.50 $735.00 0.00 $0.00 16.00 $5,880.00 80 LS 1 $1,260.00 $1,260.00 0.00 $0.00 1.00 $1,260.00 81 EA 19 $141.75 $2,693.25 0.00 $0.00 59.00 $8,363.25 82 EA 19 $78.75 $1,496.25 0.00 $0.00 59.00 $4,646.25 83 EA 9 $105.00 $945.00 0.00 $0.00 9.00 $945.00 84 EA 28 $168.00 $4,704.00 0.00 $0.00 28.00 $4,704.00 85 SF 19 $141.75 $2,693.25 0.00 $0.00 19.00 $2,693.25 86 CY 1940 $28.35 $54,999.00 0.00 $0.00 667.00 $18,909.45 87 SY 700 $2.89 $2,023.00 0.00 $0.00 1,100.00 $3,179.00 88 SY 2200 $9.98 $21,956.00 0.00 $0.00 2,503.00 $24,979.94 $140,506.25 $0.00 $131,410.39 89 EA 10 $2,675.38 $26,753.80 0.00 $0.00 11.00 $29,429.18 90 EA 53 $1,419.65 $75,241.45 0.00 $0.00 52.00 $73,821.80 91 EA 10 $866.67 $8,666.70 0.00 $0.00 11.00 $9,533.37 92 LF 27 $20.00 $540.00 0.00 $0.00 113.00 $2,260.00 93 LF 621 $9.92 $6,160.32 120.00 $1,190.40 841.00 $8,342.72 94 EA 3 $750.00 $2,250.00 0.00 $0.00 4.00 $3,000.00 95 EA 2 $1,000.00 $2,000.00 0.00 $0.00 2.00 $2,000.00 96 EA 1 $1,272.50 $1,272.50 0.00 $0.00 1.00 $1,272.50 97 EA 1 $1,500.00 $1,500.00 0.00 $0.00 1.00 $1,500.00 98 EA 1 $10,483.20 $10,483.20 0.00 $0.00 0.00 $0.00 99 EA 14 $1,625.00 $22,750.00 0.00 $0.00 14.00 $22,750.00 100 EA 3 $2,166.67 $6,500.01 0.00 $0.00 3.00 $6,500.01 101 EA 14 $3,517.25 $49,241.50 0.00 $0.00 14.00 $49,241.50 102 EA 1 $15,468.87 $15,468.87 0.00 $0.00 1.00 $15,468.87 103 EA 2 $4,511.72 $9,023.44 0.00 $0.00 2.00 $9,023.44 104 EA 1 $4,647.97 $4,647.97 0.00 $0.00 1.00 $4,647.97 105 LF 109 $93.42 $10,182.78 0.00 $0.00 222.00 $20,739.24 106 LF 30 $12.00 $360.00 0.00 $0.00 0.00 $0.00 107 CY 210 $130.35 $27,373.50 0.00 $0.00 238.00 $31,023.30 108 CY 15 $390.80 $5,862.00 0.00 $0.00 17.00 $6,643.60 109 LF 421 $10.29 $4,332.09 11.00 $113.19 227.00 $2,335.83 110 LF 430 $2.05 $881.50 0.00 $0.00 968.00 $1,984.40 111 LF 220 $5.78 $1,271.60 0.00 $0.00 337.00 $1,947.86 112 SF 90 $44.10 $3,969.00 0.00 $0.00 0.00 $0.00 113 SY 270 $10.00 $2,700.00 0.00 $0.00 307.33 $3,073.30 114 SY 220 $10.00 $2,200.00 0.00 $0.00 214.00 $2,140.00 115 SY 5 $10.00 $50.00 0.00 $0.00 5.00 $50.00 116 LF 4920 $5.00 $24,600.00 0.00 $0.00 6,745.00 $33,725.00 117 SY 19510 $3.42 $66,724.20 0.00 $0.00 19,510.00 $66,724.20 118 CY 1630 $20.00 $32,600.00 0.00 $0.00 1,630.00 $32,600.00 119 EA 15 $300.00 $4,500.00 0.00 $0.00 15.00 $4,500.00 120 LF 2000 $37.53 $75,060.00 0.00 $0.00 2,003.00 $75,172.59 121 EA 26 $342.65 $8,908.90 0.00 $0.00 26.00 $8,908.90 122 CY 120 $24.84 $2,980.80 0.00 $0.00 120.00 $2,980.80 123 CY 660 $34.84 $22,994.40 0.00 $0.00 16.30 $567.89 REMOVE AND DISPOSE OF BITUMINOUS PAVEMENT (DRIVEWAY) CORE DRILL 4" DRAIN TILE CONNECTION INTO EXISTING CATCH BASIN EXCAVATION - COMMON (PARKING BAYS) (EV) SUBGRADE CORRECTION (EV) TOTAL PART 4 - CARRIAGE STATION GENERAL PART 5 - CARRIAGE STATION STREET AND STORM SEWER REMOVE AND REPLACE CASTING AND RINGS W/ ADAPTER PLATE (R-3067-V) SALVAGE AND REINSTALL MANHOLE CASTING W/ NEW RINGS REMOVE AND REPLACE 12" FES SALVAGE AND REINSTALL 24" HDPE FLARED END SECTION 5' CIPP, 24" HDPE CONNECT EXISTING STORM PIPE TO NEW STRUCTURE REMOVE AND DISPOSE OF EXISTING STORM SEWER STRUCTURE REMOVE STORM SEWER PIPE JET / CLEAN STORM PIPE PATCH DOGHOUSE/INVERT CONSTRUCT CONCRETE COLLAR AND DOGHOUSE RECLAIM EXISTING BITUMINOUS AND BASE MATERIAL HAUL EXCESS RECLAIMED MATERIAL OFF SITE (EV) 2' X 3' CATCH BASIN PER DETAIL 404 5' DIA CBMH WITH SUMP AND CASTING PER DETAIL 405 4' DIA CBMH WITH CASTING PER DETAIL 406 4' DIA MH WITH CASTING PER DETAIL 409 GRANULAR MATERIAL BEDDING RIPRAP W/ FABRIC, CLASS III SAWCUT BITUMINOUS PAVEMENT CONNECT TO EXISTING STRUCTURE 15" RCP STORM SEWER, CLASS 5 STORM SEWER TELEVISING SAWCUT CONCRETE PAVEMENT SALVAGE AND REINSTALL PAVERS POND EXCAVATION (EV) REMOVE AND DISPOSE OF CONCRETE PAVEMENT (DRIVEWAY) REMOVE AND DISPOSE OF CONCRETE PEDESTRIAN RAMP REMOVE AND DISPOSE OF CONCRETE CURB AND GUTTER TOTAL - JAMACA COURT (PARTS 1, 2, & 3) TOTAL PART 3 - JAMACA COURT WATER SYSTEM 1" WATER SERVICE RECONNECT WATER SERVICE DUCTILE IRON FITTINGS GRANULAR MATERIAL BEDDING 4" DIP, CL 52 WATERMAIN, INCL POLY WRAP 6" DIP, CL 52 WATERMAIN, INCL POLY WRAP 8" DIP, CL 52 WATERMAIN, INCL POLY WRAP 12" DIP, CL 52 WATERMAIN, INCL POLY WRAP 1" CORPORATION STOP 1" CURB STOP AND BOX PART 4 - CARRIAGE STATION GENERAL MOBILIZATION CONCRETE HYDRANT SPLASH PAD OFFROAD STRUCTURE MARKER SIGN PANELS TYPE C TOPSOIL BORROW (LV) SEED MIXTURE 35-241 AND EROSION CONTROL BLANKET SOD SALVAGE AND REINSTALL SIGN PANEL ON NEW POST CLEARING GRUBBING CLEARING AND GRUBBING - AREA 1 SALVAGE AND REINSTALL MAILBOX TEMPORARY MAILBOX TRAFFIC CONTROL SEDIMENT CONTROL LOG, TYPE WOOD FIBER CATCH BASIN INLET PROTECTION STREET SWEEPING (WITH PICKUP BROOM) WATER FOR DUST CONTROL STREET NAME BLADES 4" PERFORATED PVC EDGE DRAIN W/ BACKFILL & WRAP DRAIN TILE CLEANOUT QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE 124 SY 19510 $2.00 $39,020.00 0.00 $0.00 19,510.00 $39,020.00 125 LS 1 $13,000.00 $13,000.00 0.00 $0.00 1.00 $13,000.00 126 TN 1940 $93.45 $181,293.00 0.00 $0.00 1,762.00 $164,658.90 127 TN 2590 $89.25 $231,157.50 0.00 $0.00 2,191.22 $195,566.39 128 GAL 1510 $2.10 $3,171.00 0.00 $0.00 950.00 $1,995.00 129 SY 250 $51.50 $12,875.00 0.00 $0.00 306.93 $15,806.90 130 LF 2720 $28.51 $77,547.20 0.00 $0.00 2,252.00 $64,204.52 131 LF 2000 $15.49 $30,980.00 0.00 $0.00 3,575.00 $55,376.75 132 LF 30 $26.88 $806.40 0.00 $0.00 741.00 $19,918.08 133 LF 260 $18.27 $4,750.20 0.00 $0.00 260.00 $4,750.20 134 SY 210 $115.76 $24,309.60 0.00 $0.00 214.00 $24,772.64 135 SY 200 $146.80 $29,360.00 0.00 $0.00 215.00 $31,562.00 136 SF 60 $18.33 $1,099.80 0.00 $0.00 96.00 $1,759.68 137 SF 16 $54.50 $872.00 0.00 $0.00 16.00 $872.00 138 EA 9 $750.01 $6,750.09 0.00 $0.00 0.00 $0.00 $1,197,042.32 $1,303.59 $1,167,171.32 139 EA 3 $1,366.24 $4,098.72 0.00 $0.00 4.00 $5,464.96 140 EA 2 $772.50 $1,545.00 0.00 $0.00 10.00 $7,725.00 141 EA 3 $500.00 $1,500.00 0.00 $0.00 3.00 $1,500.00 142 EA 1 $138.15 $138.15 0.00 $0.00 1.00 $138.15 143 EA 16 $660.93 $10,574.88 0.00 $0.00 16.00 $10,574.88 144 SF 220 $15.75 $3,465.00 0.00 $0.00 144.00 $2,268.00 $21,321.75 $0.00 $27,670.99 $1,358,870.32 $1,303.59 $1,326,252.70 $90,730.70 $0.00 $87,661.49 $222,776.10 $0.00 $231,718.04 $292,935.19 $0.00 $299,887.83 $140,506.25 $0.00 $131,410.39 $1,197,042.32 $1,303.59 $1,167,171.32 $21,321.75 $0.00 $27,670.99 TOTALS - BASE CONTRACT $1,965,312.31 $1,303.59 $1,945,520.06 CO1-1 LF 20 $100.00 $2,000.00 0 $0.00 10 $1,000.00 CO1-2 EA 1 $2,123.68 $2,123.68 0 $0.00 1 $2,123.68 CO1-3 EA 1 $5,481.65 $5,481.65 0 $0.00 1 $5,481.65 $9,605.33 $0.00 $8,605.33 CO2-1 LS 1 $150.00 $150.00 0 $0.00 1 $150.00 CO2-2 LS 1 $10,334.25 $10,334.25 0 $0.00 1 $10,334.25 CO2-3 TN 205.60 $49.92 $10,263.55 0.00 $0.00 205.60 $10,263.55 $20,747.80 $0.00 $20,747.80 CO3-1 TN 300 $12.00 $3,600.00 0 $0.00 300 $3,600.00 CO3-2 LS 1.00 $8,655.00 $8,655.00 0.00 $0.00 1.00 $8,655.00 $12,255.00 $0.00 $12,255.00 CO4-1 LS 1 -$20,792.25 -$20,792.25 0 $0.00 0 $0.00 -$20,792.25 $0.00 $0.00 TOTALS - REVISED CONTRACT $1,987,128.19 $1,303.59 $1,987,128.19 CHANGE ORDER NO. 4 COMPENSATING CHANGE ORDER SUBTOTAL - CHANGE ORDER NO. 4 CHANGE ORDER NO. 3 PLACE RECLAIM AGGREGATE BASE EXTRA DEPTH PAVEMENT REMOVAL AND BASE PREP SUBTOTAL - CHANGE ORDER NO. 3 TOTAL PART 6 - CARRIAGE STATION WATER SYSTEM PATCH BITUMINOUS DRIVEWAY D412 CONCRETE CURB AND GUTTER (HAND POURED) D412 CONCRETE CURB AND GUTTER (MACHINE POURED) B612 CONCRETE CURB AND GUTTER (HAND POURED) B612 CONCRETE CURB AND GUTTER (MACHINE POURED) 8" CONCRETE PARKING PAVEMENT 6" CONCRETE PEDESTRIAN CURB RAMP TRUNCATED DOME PANELS SUBGRADE PREPARATION OF RECLAIMED SURFACE SALVAGE, STOCKPILE, AND RESPREAD RECLAIMED MATERIAL (UTILITY TRENCHES) TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,C) [SPWEA230C] TYPE SP 12.5 BITUMINOUS NON WEARING COURSE MIXTURE (2,C) [SPNWB230C] BITUMINOUS MATERIAL FOR TACK COAT TOTAL PART 6 - CARRIAGE STATION WATER SYSTEM REMOVE AND REPLACE HYDRANT NOZZLE WITH 5" STORZ NOZZLE CONCRETE HYDRANT SPLASH PAD REMOVE AND REPLACE VALVE BOX TOP SECTION SUBTOTAL - CHANGE ORDER NO. 1 SALVAGE AND REINSTALL CATCHBASIN CASTING WITH ADAPTER PLATE AND NEW RING CHANGE ORDER NO. 2 REPAIR SK-4 ACCESS ROUTE SPRINKLER SYSTEM CUT IN 16"x12" DIP TEE PIPE FOUNDATION ROCK SUBTOTAL - CHANGE ORDER NO. 2 REMOVE AND REPLACE TOP SLAB WITH SALVAGED CASTING TOTAL PART 3 - JAMACA COURT WATER SYSTEM TOTAL PART 4 - CARRIAGE STATION GENERAL TOTAL PART 5 - CARRIAGE STATION STREET AND STORM SEWER CHANGE ORDER NO. 1 18" RCP STORM SEWER, CLASS V TOTAL PART 5 - CARRIAGE STATION STREET AND STORM SEWER TOTAL PART 1 - JAMACA COURT GENERAL TOTAL PART 2 - JAMACA COURT STREET & STORM SEWER 6" CONCRETE DRIVEWAY PAVEMENT STRAIGHTEN VALVE BOX TOP SECTION TOTAL - CARRIAGE STATION (PARTS 4, 5, & 6) REMOVE AND REPLACE HYDRANT FLAG ADJUST EXISTING VALVE BOX PART 6 - CARRIAGE STATION WATER SYSTEM REMOVE AND REPLACE VALVE BOX CITY OF LAKE ELMO, MN 2024 STREET IMPROVEMENTS PROJECT NO. 2023.111 CERTIFICATE OF COMPLETION DATE OF ISSUANCE: JANUARY 7, 2025 OWNER: CITY OF LAKE ELMO, MN CONTRACTOR: NORTHDALE CONSTRUCTION COMPANY, INC. PROJECT NAME: 2024 STREET IMPROVEMENTS PROJECT NO.: 2023.111 This Certification of Completion applies to all work under the Contract Documents This Certification of Completion applies to the following specified parts of the Contract Documents I do hereby certify that the work to which this Certificate applies has been constructed in accordance with the Contract dated April 17, 2024. The above-mentioned improvement is hereby declared to be complete and acceptance of this work is recommended. DATE OF COMPLETION: January 7, 2025 Michael Rusenovich Reg. No. 58717 FOCUS Engineering, Inc. THE WARRANTY PERIOD BEGINS January 7, 2025 AND ENDS January 7, 2026