HomeMy WebLinkAbout#04 - 30th St. N. Gap Segment Improvements STAFF REPORT DATE: January 21, 2025 CONSENT AGENDA ITEM: Accept Improvements and Approve Pay Request No. 3 (Final) for the 30th Street North Gap Segment Improvements SUBMITTED BY: Chad Isakson, Assistant City Engineer REVIEWED BY: Nicole Miller, City Administrator Marty Powers, Public Works Director Clarissa Hadler, Finance Director Nathan Stanley, City Engineer ISSUE BEFORE COUNCIL: Should the City Council accept improvements and approve Pay Request No. 3 (Final) for the 30th Street North Gap Segment Improvements? BACKGROUND: Bituminous Roadways, Inc. was awarded a construction contract on May 7, 2024 to complete the 30th Street North Gap Segment Improvements. The contractor has now completed the work in accordance with the contract, plans, and specifications, including all punch list items. PROPOSAL DETAILS/ANALYSIS: Bituminous Roadways, Inc. has submitted Partial Pay Request No. 3 (Final) in the amount of $17,746.51. The Project Engineer has prepared a Certificate of Completion indicating that all work is completed, including all punch list items, and is recommending the acceptance of the improvements and release of final retainage. The one-year warranty will begin on November 18, 2024 and will extend through November 18, 2025. FISCAL IMPACT: None. Final payment is being recommended within the authorized scope and budget for the project. The final total project cost came in at $476,000 versus the post-bid approved project cost of $495,000. The total final project cost includes contingency funds for professional services required to be performed throughout the warranty period. The improvements were funded through a combination ash on hand and/or the issuance of general obligation bonds. RECOMMENDATION: Staff is recommending that the City Council, as part of the Consent Agenda, accept the improvements and approve Pay Request No. 3 (Final) for the 30th Street North Gap Segment Improvements. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to accept the improvements and approve Pay Request No. 3 (final) to Bituminous Roadways, Inc. in the amount of $17,746.51 for the 30th Street North Gap Segment Improvements”. ATTACHMENTS: 1. Partial Pay Estimate No. 3 (Final). 2. Certificate of Completion. WZK:dWz&KZD WZd/>Wz^d/DdEK͘ WZ/KK&^d/Dd dK WZK:dKtEZ͗ KEdZdKZ͗ ϭ͘KƌŝŐŝŶĂůŽŶƚƌĂĐƚŵŽƵŶƚ Ϯ͘EĞƚŚĂŶŐĞKƌĚĞƌ^Ƶŵ ϯ͘ZĞǀŝƐĞĚŽŶƚƌĂĐƚ;ϭнϮͿ ϰ͘ΎtŽƌŬŽŵƉůĞƚĞĚ ϱ͘Ύ^ƚŽƌĞĚDĂƚĞƌŝĂůƐ ϲ͘^ƵďƚŽƚĂů;ϰнϱͿ ϳ͘ZĞƚĂŝŶĂŐĞΎ ϴ͘WƌĞǀŝŽƵƐWĂLJŵĞŶƚƐ ϵ͘ŵŽƵŶƚƵĞ;ϲͲϳͲϴͿ ΎĞƚĂŝůĞĚƌĞĂŬĚŽǁŶƚƚĂĐŚĞĚ ^dZdd͗KE^,h> ^h^dEd/>KDW>d/KE͗y &/E>KDW>d/KE͗ E'/EZΖ^Zd/&/d/KE͗ <>:ŶŐŝŶĞĞƌŝŶŐ͕ŝŶĐ͘ d KEdZdKZΖ^Zd/&/d/KE͗ KEdZdKZ d WWZKszKtEZ͗/dzK&><>DK͕D/EE^Kd d d z z z^ EK dŚĞƵŶĚĞƌƐŝŐŶĞĚŽŶƚƌĂĐƚŽƌĐĞƌƚŝĨŝĞƐƚŚĂƚƚŽƚŚĞďĞƐƚŽĨƚŚĞŝƌ ŬŶŽǁůĞĚŐĞ͕ŝŶĨŽƌŵĂƚŝŽŶĂŶĚďĞůŝĞĨƚŚĞǁŽƌŬĐŽǀĞƌĞĚďLJƚŚŝƐƉĂLJŵĞŶƚ ĞƐƚŝŵĂƚĞŚĂƐďĞĞŶĐŽŵƉůĞƚĞĚŝŶĂĐĐŽƌĚĂŶĐĞǁŝƚŚƚŚĞĐŽŶƚƌĂĐƚ ĚŽĐƵŵĞŶƚƐ͕ƚŚĂƚĂůůĂŵŽƵŶƚƐŚĂǀĞďĞĞŶƉĂŝĚďLJƚŚĞĐŽŶƚƌĂĐƚŽƌĨŽƌ ǁŽƌŬĨŽƌǁŚŝĐŚƉƌĞǀŝŽƵƐƉĂLJŵĞŶƚĞƐƚŝŵĂƚĞƐǁĂƐŝƐƐƵĞĚĂŶĚƉĂLJŵĞŶƚƐ ƌĞĐĞŝǀĞĚĨƌŽŵƚŚĞŽǁŶĞƌ͕ĂŶĚƚŚĂƚĐƵƌƌĞŶƚƉĂLJŵĞŶƚƐŚŽǁŶŚĞƌĞŝŶŝƐ ŶŽǁĚƵĞ͘ dŚĞƵŶĚĞƌƐŝŐŶĞĚĐĞƌƚŝĨŝĞƐƚŚĂƚƚŚĞǁŽƌŬŚĂƐďĞĞŶƌĞǀŝĞǁĞĚĂŶĚƚŽƚŚĞ ďĞƐƚŽĨƚŚĞŝƌŬŶŽǁůĞĚŐĞĂŶĚďĞůŝĞĨ͕ƚŚĞƋƵĂŶƚŝƚŝĞƐƐŚŽǁŶŝŶƚŚŝƐ ĞƐƚŝŵĂƚĞĂƌĞĐŽƌƌĞĐƚĂŶĚƚŚĞǁŽƌŬŚĂƐďĞĞŶƉĞƌĨŽƌŵĞĚŝŶĂĐĐŽƌĚĂŶĐĞ ǁŝƚŚƚŚĞĐŽŶƚƌĂĐƚĚŽĐƵŵĞŶƚƐ͘ E'/EZ z ϲͬϭͬϮϬϮϰ ϵͬϮϳͬϮϬϮϰ Zs/^z^ ZD/E/E' ϭϭϴ Ϭ ͲϮ ϴͬϯϬͬϮϬϮϰ KZ/'/E>z^ KEdZd,E'KZZ^hDDZz Wz^d/Dd^hDDZz ϯ;&ŝŶĂůͿ ϵͬϮϵͬϮϬϮϰϴͬϭͬϮϬϮϰ&ZKD ϯϬd,^dE'W^'DEd/DWZKsDEd^ WZK:dEK͘ϮϬϮϯ͘ϭϮϮ /dzK&><>DK ϯϴϴϬ>sZEsEhEKZd, ><>DK͕DEϱϱϬϰϮ ddE͗,/^<^KE͕W͕͘͘WZK:dE'/EZ /dhD/EKh^ZKtz^͕/E͘ ϯϬϴϬ>y/E'dKEs^K 'E͕DEϱϱϭϮϭ ddE͗Wh>,/>^d͕WZK:dDE'Z KEdZdd/D dKd>^ ΨϭϬ͕Ϯϰϱ͘ϬϬ Ψϴ͕ϯϵϯ͘ϳϬ Ψϭϳ͕ϳϰϲ͘ϱϭ Ed,E' Ψϭ͕ϴϱϭ͘ϯϬ ΨϬ͘ϬϬϬ͘Ϭй Ψϯϯϳ͕ϭϴϯ͘ϲϰ ΨϬ͘ϬϬ Ψϯϱϰ͕ϵϯϬ͘ϭϱ ϭ ϲͬϮϬͬϮϬϮϰ ΨϭϬ͕Ϯϰϱ͘ϬϬ Ψϯϱϰ͕ϵϯϬ͘ϭϱ Ϯ ϭϭͬϮϵͬϮϬϮϰ Ψϴ͕ϯϵϯ͘ϳϬ Ψϯϱϰ͕ϵϯϬ͘ϭϱ EŽ͘ƉƉƌŽǀĂů ĂƚĞ ŵŽƵŶƚ Ψϯϱϯ͕Ϭϳϴ͘ϴϱ ĚĚŝƚŝŽŶƐ ĞĚƵĐƚŝŽŶƐ Ψϭ͕ϴϱϭ͘ϯϬ &Kh^ŶŐŝŶĞĞƌŝŶŐ͕ŝŶĐ͘WZK:dWzDEd&KZD 12/3/2024 12/3/2024 Mark Rohweder Digitally signed by Mark Rohweder DN: C=US, E=mark.rohweder@kljeng.com, CN=Mark Rohweder Date: 2024.12.03 11:50:04-07'00' PAUL HILDESTAD Digitally signed by PAUL HILDESTAD DN: C=US, E=PAUL.HILDESTAD@BITROADS.COM, CN=PAUL HILDESTAD Date: 2024.12.03 13:45:12-06'00' PARTIAL PAY ESTIMATE NO.3 (Final) 30TH ST N GAP SEGMENT IMPROVEMENTS CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2023.122 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 2021.501/00010 LUMP SUM 1 $45,000.00 $45,000.00 0.00 $0.00 1.00 $45,000.00 2 2101.502/00020 EACH 2 $310.00 $620.00 0.00 $0.00 2.00 $620.00 3 2101.502/00030 EACH 2 $52.00 $104.00 0.00 $0.00 2.00 $104.00 4 2104.502/00820 EACH 2 $180.00 $360.00 0.00 $0.00 0.00 $0.00 5 2104.502/02445 EACH 1 $26.00 $26.00 0.00 $0.00 0.00 $0.00 6 2104.502/03300 EACH 9 $42.00 $378.00 0.00 $0.00 2.00 $84.00 7 2104.503/00205 LIN FT 1038 $2.75 $2,854.50 0.00 $0.00 1,038.00 $2,854.50 8 2104.503/00315 LIN FT 2254 $7.00 $15,778.00 0.00 $0.00 2,254.00 $15,778.00 9 2104.504/00090 SQ YD 2 $27.00 $54.00 0.00 $0.00 97.00 $2,619.00 10 2104.504/00120 SQ YD 1012 $5.30 $5,363.60 0.00 $0.00 1,012.00 $5,363.60 11 2104.602/00400 EACH 1 $64.00 $64.00 0.00 $0.00 0.00 $0.00 12 2104.602/00500 EACH 1 $26.00 $26.00 0.00 $0.00 0.00 $0.00 13 2106.507/00010 CU YD 245 $35.00 $8,575.00 0.00 $0.00 245.00 $8,575.00 14 2106.507/00080 CU YD 245 $25.00 $6,125.00 0.00 $0.00 245.00 $6,125.00 15 2106.507/00130 CU YD 23 $44.00 $1,012.00 0.00 $0.00 65.25 $2,871.00 16 2112.604/00010 SQ YD 510 $7.50 $3,825.00 0.00 $0.00 0.00 $0.00 17 2112.604/00010 SQ YD 2827 $2.00 $5,654.00 0.00 $0.00 2,827.00 $5,654.00 18 2123.610/00410 HOUR 20 $100.00 $2,000.00 0.00 $0.00 9.00 $900.00 19 2130.523/00010 M GALLON 33 $50.00 $1,650.00 0.00 $0.00 10.00 $500.00 20 2211.507/00210 CU YD 186 $38.00 $7,068.00 0.00 $0.00 186.00 $7,068.00 21 2215.504/00010 SQ YD 2549 $3.00 $7,647.00 0.00 $0.00 2,638.00 $7,914.00 22 2215.507/00010 CU YD 142 $32.00 $4,544.00 0.00 $0.00 142.00 $4,544.00 23 2232.504/00060 SQ YD 3986 $3.00 $11,958.00 0.00 $0.00 3,897.00 $11,691.00 24 2355.506/00010 GALLON 12 $17.00 $204.00 0.00 $0.00 0.00 $0.00 25 2357.506/00010 GALLON 477 $1.00 $477.00 0.00 $0.00 450.00 $450.00 26 2360.509/12200 TON 140 $95.00 $13,300.00 0.00 $0.00 169.69 $16,120.55 27 2360.509/12300 TON 834 $90.00 $75,060.00 0.00 $0.00 826.14 $74,352.60 28 2360.509/22305 TON 352 $90.00 $31,680.00 0.00 $0.00 361.09 $32,498.10 29 2504.602/00034 EACH 1 $280.00 $280.00 0.00 $0.00 1.00 $280.00 30 2506.502/06000 EACH 2 $1,600.00 $3,200.00 0.00 $0.00 0.00 $0.00 31 2506.502/06020 EACH 3 $725.00 $2,175.00 0.00 $0.00 0.00 $0.00 32 2531.503/02315 LIN FT 2514 $19.00 $47,766.00 0.00 $0.00 2,514.00 $47,766.00 33 2563.601/00010 LUMP SUM 1 $7,500.00 $7,500.00 0.00 $0.00 1.00 $7,500.00 34 2564.602/01515 EACH 9 $460.00 $4,140.00 0.00 $0.00 2.00 $920.00 35 2564.602/01516 EACH 1 $310.00 $310.00 0.00 $0.00 0.00 $0.00 36 2564.602/01519 EACH 1 $25.20 $25.20 0.00 $0.00 0.00 $0.00 37 2564.602/01520 EACH 1 $25.20 $25.20 0.00 $0.00 0.00 $0.00 38 2564.602/02340 EACH 1 $78.00 $78.00 0.00 $0.00 0.00 $0.00 39 2564.618/00010 SQ FT 17 $63.00 $1,071.00 0.00 $0.00 18.00 $1,134.00 40 2573.502/00110 EACH 11 $100.00 $1,100.00 0.00 $0.00 11.00 $1,100.00 41 2573.503/00060 LIN FT 48 $5.00 $240.00 0.00 $0.00 0.00 $0.00 42 2573.503/00064 LIN FT 1605 $2.35 $3,771.75 0.00 $0.00 2,621.00 $6,159.35 43 2574.507/00100 CU YD 90 $53.00 $4,770.00 0.00 $0.00 102.00 $5,406.00 44 2574.508/00011 POUND 42 $2.30 $96.60 0.00 $0.00 200.00 $460.00 45 2575.508/21111 POUND 21 $4.00 $84.00 0.00 $0.00 85.00 $340.00 46 2575.523/00020 M GALLON 2 $640.00 $1,280.00 0.00 $0.00 5.00 $3,200.00 47 2582.503/40104 LIN FT 2948 $2.25 $6,633.00 0.00 $0.00 2,986.00 $6,718.50 48 2582.503/40106 LIN FT 495 $3.35 $1,658.25 0.00 $0.00 500.00 $1,675.00 49 2582.503/40110 LIN FT 251 $7.10 $1,782.10 0.00 $0.00 247.00 $1,753.70 50 2582.503/40112 LIN FT 174 $9.10 $1,583.40 0.00 $0.00 215.00 $1,956.50 51 2582.503/40404 LIN FT 1605 $4.45 $7,142.25 0.00 $0.00 175.00 $778.75 52 2582.518/04020 SQ FT 62 $80.00 $4,960.00 0.00 $0.00 62.00 $4,960.00 $353,078.85 $0.00 $343,794.15 CHANGE ORDER NO. 1 CO1-1 SQ FT 372 $20.00 $7,440.00 0.00 $0.00 405.00 $8,100.00 CO1-2 SQ FT 46 $55.00 $2,530.00 0.00 $0.00 50.00 $2,750.00 CO1-3 EACH 25 $11.00 $275.00 0.00 $0.00 26.00 $286.00 TOTAL CHANGE ORDER NO. 1 $10,245.00 $0.00 $11,136.00 CHANGE ORDER NO. 2 CO2-1 LUMP SUM 1 -$8,393.70 -$8,393.70 0.00 $0.00 0.00 $0.00 TOTAL CHANGE ORDER NO. 2 -$8,393.70 $0.00 $0.00 TOTALS - REVISED CONTRACT $354,930.15 $0.00 $354,930.15 REMOVE CASTING SALVAGE DELINEATOR/ MARKER PANEL WATER AGGREGATE BASE (CV) CLASS 6 SALVAGE SIGN PANEL SPECIAL EXCAVATION - COMMON SAWING BIT PAVEMENT (FULL DEPTH) REMOVE CURB & GUTTER REMOVE CONCRETE PAVEMENT REMOVE BITUMINOUS PAVEMENT SALVAGE SIGN SPECIAL STREET SWEEPER (WITH PICKUP BROOM) COMMON EMBANKMENT (CV) SUBGRADE PREPARATION SUBGRADE CORRECTION 12'' SOLID LINE MULTI COMP GR IN (WR) FERTILIZER TYPE 1 TYPE SP 12.5 NON WEAR COURSE MIX (2,C) ADJUST VALVE BOX 10'' SOLID LINE MULTI COMP GR IN (WR) DELINEATOR / MARKER SEDIMENT CONTROL LOG TYPE COMPOST CASTING ASSEMBLY COMMON TOPSOIL BORROW 4'' SOLID LINE MULTI COMP GR IN (WR) 6'' SOLID LINE MULTI COMP GR IN (WR) RAPID STABILIZATION METHOD 3 SEDIMENT CONTROL LOG TYPE STRAW STORM DRAIN INLET PROTECTION FULL DEPTH RECLAMATION HAUL FULL DEPTH RECLAMATION (LV) MILL BITUMINOUS SURFACE (2.0'') CONTRACT THIS PERIOD TOTAL TO DATE SALVAGE SIGN ITEM MN/DOT NO.DESCRIPTION OF PAY ITEM UNIT MOBILIZATION CLEARING GRUBBING SELECT GRANULAR EMBANKMENT (CV) BASE BID TOTALS BITUMINOUS MATERIAL FOR FOG SEAL BITUMINOUS MATERIAL FOR TACK COAT TYPE SP 9.5 WEARING COURSE MIX (2,B) TYPE SP 9.5 WEARING COURSE MIX (2,C) PAVT MSSG PREF THERMO GR IN ADJUST FRAME & RING CASTING CONCRETE CURB & GUTTER DESIGN B618 TRAFFIC CONTROL INSTALL SIGN INSTALL SIGN SPECIAL SEED MIXTURE 21-111 INSTALL SIGN PANEL SPECIAL INSTALL DELINEATOR / MARKER PANEL SIGN 4'' DBLE SOLID LINE MULTI COMP GR IN (WR) COMPENSATING CHANGE ORDER CONCRETE CURB RAMP WALK TRUNCATED DOMES DRILL AND GROUT REINF BAR (EPOXY COATED) CITY OF LAKE ELMO, MN 30TH ST IMPROVEMENTS PROJECT NO. 2023.122 CERTIFICATE OF COMPLETION DATE OF ISSUANCE: November 22, 2024 OWNER: CITY OF LAKE ELMO, MN CONTRACTOR: BITUMINOUS ROADWAYS, INC. PROJECT NAME: 30TH ST NORTH GAP SEGEMENT IMPROVEMENTS PROJECT NO.: 2022.122 This Certification of Completion applies to all work under the Contract Documents This Certification of Completion applies to the following specified parts of the Contract Documents I do hereby certify that the work to which this Certificate applies has been constructed in accordance with the Contract dated May 7, 2024. The above-mentioned improvement is hereby declared to be complete and acceptance of this work is recommended. DATE OF COMPLETION: November 18, 2024 Kevin Courtney, P.E. Reg. No. 58728 KLJ Engineering, inc. THE WARRANTY PERIOD BEGINS November 18, 2024 AND ENDS November 18, 2025