Loading...
HomeMy WebLinkAbout#08 - Baywest Access Agreement STAFF REPORT DATE: 2/04/2025 Regular TO: CITY COUNCIL AGENDA ITEM: Approve Access Agreement with Bay West to conduct PFAS Destruction Research on city owned property FROM: Nicole Miller, City Administrator REVIEWED BY: Marty Powers, Public Works Director BACKGROUND: The City of Lake Elmo supports research focused removing and destroying per- and polyfluoroalkyl substances (PFAS) to provide safe drinking water to our community and the entire East Metro. The City has been a proud partner with MPCA mobilizing a (surface activated foam fractionation) SAFF system at Tablyn Park. The system captures PFAS as foam that is then separated from the water. The foam is then removed and the water is returned to the environment. Bay West in partnership with General Atomics and the US Army Engineer Research and Development Center (ERDC), have proposed conducting testing and research to destroy PFAS substances such as the foam concentrate that was removed from the water using the SAFF system within city limits. Bay West has identified city owned land adjacent to our Public Works department located at 3445 Ideal Avenue as their preferred site. PROPOSAL DETAILS/ANALYSIS: This access agreement will allow Bay West to enter city owned property to mobilize the temporary testing facilities for a timeline of approximately 4-5 weeks beginning mid April 2025. Below are some key considerations regarding this agreement: Access to Public Works facility: Public Works access road will remain open and accessible to employees and visitors. Site improvements that are made will be restored to their original condition with the exception of the gravel pad that will remain in place after Bay West vacates the site. Hours of Operation: The hours for testing will be conducted during the hours of 8 AM to 6 PM that is consistent with the city code. Our city code allows for construction activities exceeding ambient noise levels to be operated between the hours of 7:00 a.m. to 7:00 p.m. on weekdays and on Saturdays from 8:00 a.m. to 6:00 p.m Noise: The noise decibel level from the research equipment as well as on site generators are within the guidelines of the city code and are not expected to disturb residents. There are no structures located within the 40 decibel noise perimeter. For comparison, our city code allows for heavy equipment usage as long as the sound level from the operation exceeds doesn’t exceed 100 decibels measured along any property line. Public Tours and Education Bay West will work with staff to communicate the research and testing being conducted as well as informing the public when tours are available. Permits: Bay West is working with staff to identify and apply for all necessary permits. The access agreement has been reviewed by our City Attorney. ISSUE BEFORE COUNCIL: Should the City Council approve access agreement with Bay West to allow them to conduct PFAS destruction research at the Public Works location 3445 Ideal Avenue? FISCAL IMPACT: No fiscal impact. RECOMMENDATION: “Motion to approve the Access Agreement with Bay West to conduct PFAS Destruction Research at city owned land located at 3445 Ideal Avenue.” ATTACHMENTS: • Access Agreement • Bay West PFAS Destruction Research Presentation Doc# 2596240 Temporary Easement and Access Agreement This Temporary Easement and Access Agreement (“Agreement”) dated as of ____________________, 2025 (the “Effective Date”), is entered into by and between the City of Lake Elmo (“Property Owner”); and Bay West, LLC (together with its successors and assigns, “Bay West”). RECITALS A. Property Owner owns the real property situated within Washington County, State of Minnesota more particularly known as 3445 Ideal Ave, Lake Elmo, MN 55042 (the “Property”). B. Bay West wishes to perform per- and polyfluoroalkyl substances (PFAS) destruction tests as part of a federally funded research project (the “Project”) on the Property. Bay West intends to install certain temporary improvements, including but not limited to reinforcement of an existing access road, installation of testing equipment, including , but not limited to an air compressor and the mobile research unit, piping and conduit to provide temporary electrical and water services to the Property and secondary containment for liquid- holding totes and tanks (collectively and as more particularly described below and as generally depicted in the attached Exhibit A (the “Site Plan”), attached hereto and made a part hereof, the “Testing Facilities”) in connection with the Project. C. Bay West desires to obtain a temporary construction and access easement on the Property to be used during the construction, maintenance, repair, replacement, relocation, use and removal of the Testing Facilities from the Effective Date until 11:59 P.m. on October 1, 2025 (the “Term”). D. Property Owner is willing to grant Bay West certain rights pursuant to the terms and conditions set forth in this Agreement. AGREEMENT 1. Parties. The Parties to this Agreement are: A. Bay West located at 5 Empire Drive, St Paul MN 55103: and B. City of Lake Elmo located at 3880 Laverne Ave North, Lake Elmo, MN 55042. 2. Access. The Property Owner hereby consents and provides authorization and a temporary easement to Bay West, its employees, agents, contractors, members of the public on tours of the Project, and state and federal entities overseeing the Project to enter the Property for the following purposes: Page 2 Doc# 2596240 Page 2 of 9 • Documentation of the work associated with the Project via note taking, surveying, photography, and painting of utility locations • Evaluation of the Property to prepare for the Testing Facilities; • Grading and ground preparation along the Property Owner’s existing gravel road on the Property to the Testing Facilities and the area on which the Testing Facilities will be placed ,conducted in accordance with reasonably agreed-upon procedures and materials such as Class V road base to reinforce the gravel driveway and the Testing Facilities work area. • Staging of materials, supplies, and the Testing Facilities • Daily access during the duration of staged onsite equipment, testing, and site restoration activities during the Term of this Agreement. • Access during the Term of this Agreement for tours as described in Section 4 herein. Visitor parking is noted on the site plan in Appendix A. • The Property Owner’s Public Works Department will have access for public works operations at all times. 3. Bay West obligations. Prior to the initial start of the work on the Property, Bay West will notify the Property Owner at least two business days prior to starting such initial work actions. Work will be conducted during the hours of 8:00 a.m. to 6:00 p.m. unless Bay West receives permission to conduct work during different hours. Bay West is responsible for overseeing, coordinating, and completing site activities from start of ground preparation to completion of agreed-upon site restoration activities. 4. Bay West support of public outreach. Bay West will prepare and provide agreed- upon draft materials to the Property Owner for the purpose of public outreach. It is anticipated that such materials will be discussed and agreed upon 1) prior to start of any onsite work, 2) after completion of site activities, and 3) upon completion of the work associated with the research contract and grant. Bay West and its subcontractor General Atomics will arrange public tours, anticipated to take place after installation of the Testing Facilities and system checks and once a week during testing. 5. Bay West and Property Owner precautions regarding work. A. Bay West will conduct its activities so as to avoid unreasonable interference with the use of the Property by Property Owner, provided Property Owner understands and agrees the work contemplated and authorized by this Agreement in the locations generally depicted on the attached Site Plan shall not constitute unreasonable interference with the Property Owner’s use of the Property. If a portion of the Property, significantly outside of the area to be used for the Project, as depicted in the Site Plan, must be disturbed as a result of Bay West’s activities, Bay West will discuss the proposed disturbance with the Property Owner and agree upon actions and restoration. Bay West will restore the Property as close to its original condition Page 3 Doc# 2596240 Page 3 of 9 as is reasonably possible under the circumstances, provided Bay West shall not be required to remove or otherwise restore the access road and gravel pad as installed by Bay West, as part of its work authorized under this Agreement. Bay West will work with the Property Owner to install reasonable security measures and a work site security fence and gate that allows large vehicular access for Bay West and its agents, contractors, and subcontractors. The gate and fence will be removed as part of site restoration activities. Property Owner may request access to the fenced area upon two business days’ notice, provided it must be escorted by Bay West when accessing areas secured by fencing. B. The Property Owner will take reasonable precautions to ensure that the equipment of Bay West and its contractors on the property is not damaged, and that the work being conducted by Bay West, its employees, agents, and contractors is not disrupted. C. Bay West and its subcontractors will conduct onsite activities in accordance with the Bay West Health & Safety Plan (“H&S Plan”) and Accident Prevention Plan (“APP”), to be presented to Property Owner at least two weeks in advance of onsite activities. Copies of the H&S Plan and APP will be kept in the Project control shed throughout onsite activities and made available to Bay West and Property Owner personnel upon request. 6. Permits. Bay West will obtain all necessary permits for the work performed at the site. The following permits are the only permits Bay West is required to secure from the Property Owner, in its role as regulatory authority over the Property: • Aboveground Tank Installation Permit (if applicable) • Temporary Heating Permit (if applicable) • Building Permit (if applicable) • Zoning Permit (if applicable) • Electrical Permit • Fence Permit • Sign Permit • Grading Permit (if applicable) • Structure Moving Permit (if applicable) • Temporary Construction Permit (if applicable) • List of Hazardous Materials • Plumbing Permit/Connection Permit/Water Application • Special Event Permit (if applicable) As applicable, should permits be required by the Valley Branch Water District (VBWD) regarding erosion control and stormwater management, Bay West will obtain and share with the City. 7. Work to be conducted at the Property. Page 4 Doc# 2596240 Page 4 of 9 A. Site Layout. The Site Plan has been developed and agreed upon by the Property Owner and Bay West. B. Site Preparation. Bay West and its subcontractors will prepare the ground on the gravel access road and at the work site to allow heavy vehicle deliveries. Grading of the site may be required to meet vehicle access and equipment staging requirements. The materials to be used will be discussed and agreed upon with the Property Owner, whose consent shall not be unreasonably withheld conditioned or delayed. Ground preparation is anticipated to meet requirements for installation of equipment and personnel access to conduct the Project. C. Utility connections. Water piping will have backflow prevention installed to code. Power connections and usage meters will be made by the local power utilities company and inspected as required. To the extent practicable, utilities serving the Project will be separately metered to allow Bay West to pay such invoices directly. D. Security fence and signage. A security fence, anticipated to be chain link with steel posts, to a height of feet above level ground, will be installed along with a lockable gate of a width allowing truck access. Signage about the research Project will be discussed and agreed upon with the Property Owner, whose consent shall not be unreasonably withheld conditioned or delayed, and the sign will be placed adjacent to the gate at a reasonable height for reading from the access road. The fence and gate will be removed during Site Restoration activities. E. Vehicles and parking. Expected vehicular traffic are semi-truckers with trailers to transport air compressor and PFAS destruction mobile unit to and from the site; crane for approximately one day to lift these two items of heavy equipment onto the site and approximately one day to remove; forklift for moving tanks and totes; work trucks and cars. During research work activities, Bay West requests that occasional overflow of vehicles such as official inspection vehicles or general public, be allowed to temporarily park along the building access road. Excepting the onsite forklift, Bay West and their subcontractors’ vehicles will be removed daily unless otherwise agreed with the City Public Works Department. F. Research Preparation activities. Major equipment to be staged at the site in general accordance with the Site Plan include air compressor, PFAS destruction mobile unit, temporary cover for the mobile unit that will at least 20 feet in height, a project controls shed, liquid frac tanks and 275-gallon totes with steel frames, and secondary containment. G. Temporary fuel tank installations. Diesel fuel and propane tanks are necessary to run the mobile research unit and air compressor. The tanks will be installed , Page 5 Doc# 2596240 Page 5 of 9 inspected, maintained, and removed after completion of the research Project in accordance with their associated permits. H.Chemical materials. To run the testing mobile unit, chemical materials to be brought onsite and temporarily stored for research use. Chemicals will be stored in containers specific to each chemical compound’s Safety Data Sheet (SDS). The SDS will be kept onsite in the project controls shed during the duration of the project and available for inspection. The chemicals are sodium hydroxide and PFAS-specific feed materials for research purposes. I.Management and disposal of effluent liquids. Liquids remaining after the destruction tests will be piped directly to storage in appropriate frac tanks with sampling ports and secondary containment. The effluent will be analytically tested and the results will be used to determine the method of disposal. 8.Notification. Unless otherwise specified, written requests or other documents sent to the Property Owner shall be addressed to: City of Lake Elmo 3880 Laverne Ave North Attn: Nicole Miller, City Administrator Email: NMiller@lakeelmo.gov Phone: 651-747-3905 All reports or other documents sent to Bay West shall be addressed to: Bay West LLC 5 Empire Drive St. Paul, MN 55103 ATTN: Patricia Corcoran Email: tcorcoran@baywest.com Phone: 651-291-3482 9.Restoration. During the onsite research work, Bay West will oversee weekly removal of trash and debris. Supplies and materials will be contained and managed for site access throughout the onsite activities. At the conclusion of research testing using the mobile unit, Bay West will oversee packing, shipping, and off-site transport of research-related equipment and supplies. Totes containing the treated effluent will remain on secondary containment and covered, until analytical tests are completed for determination of disposition. After removal of the totes and secondary containment, Bay West will conduct a site Page 6 Doc# 2596240 Page 6 of 9 walk with the Property Owner to note any remaining removal or cleaning actions per the agreed-upon activities to complete site restoration. 10. Bay West Liability. Bay West shall assume all liability for the actions and operations of its employees, contractors, consultants, agents, and invitees while performing work on the Property and conducting public visits and tours. Bay West shall indemnify, defend, and hold the City and its officials, employees, agents, and contractors harmless from and against any and all loss, damage, injury, or liability resulting from Bay West’s performance under this Agreement, including allowing the public to access the Property and from any negligent acts of Bay West’s employees, agents, and contractors and their employees and agents. Notwithstanding any provision to the contrary, Bay West shall not be required to indemnify the City, its officials, employees, agents or contractors for any loss, damage, injury or liability was caused by the negligence or willful misconduct of the City, its officials, employees, agents or contractors and Notwithstanding the foregoing, Bay West shall not be liable or otherwise responsible for any existing c ontamination on the Property that was not removed by Bay West during its testing on the Property. 11. This Agreement binds and benefits the parties and their successors and assigns and may only be modified by written agreement of the parties. This Agreement may not be assigned, transferred, or conveyed by either party without the express written consent of the other, which consent may be granted in such other party’s sole and absolute discretion. 12. The laws of the State of Minnesota shall govern this Agreement. 13. All work on the Property completed by Bay West, its employees, contractors or agents and associated with the Project shall be at Bay West’s sole cost and expense. 14. Bay West and its contractors, subcontractors, and agents must carry insurance during the term of this Agreement in accordance with the following requirements: A. Workers’ compensation insurance with limits as provided by statute, with all necessary statutory elections to provide coverage for actions brought by claims made by any person doing work on the Property pursuant to this Agreement. B. Comprehensive auto liability insurance with minimum combined single limits of $1,500,000 per occurrence. C. Comprehensive general liability insurance with minimum combined single limits of $1,500,00 per occurrence. D. The Party(ies) supplying the Testing Facilities and/or any vehicles, materials, or equipment (“Facilities & Equipment”) stored on the Property, shall carry the necessary insurance to cover said Facilities & Equipment. E. The comprehensive general liability insurance policy must include the City as an additional insured. Page 7 Doc# 2596240 Page 7 of 9 15. Bay West agrees that throughout the term of this Agreement it shall not use the Property for the storage, handling, transportation, or disposal of any Hazardous Substances not specifically involved in the project. “Hazardous Substances” for purposes of this Agreement shall be interpreted broadly to include, but not be limited to, any material or substance that is defined, regulated or classified under any Environmental Law of other applicable federal, state or local laws and the regulations promulgated thereunder as: (i) a “hazardous substance” pursuant to Section 101 of the Comprehensive Environmental Response, Compensation and Liability Act, 42 U.S.C. §9601(14), the Federal Water Pollution Control Act, 33 U.S.C. §1321(14), as now or hereafter amended; (ii) a “hazardous waste” pursuant to Section 1004 or Section 3001 of the Resource Conservation and Recovery Act, 42 U.S.C. §§6903(5) , 6921, as now or hereafter amended; (iii) toxic pollutant under section 307(a)(1) of the Federal Water Pollution Control Act, 33 U.S.C. §1317(a)(1) as now or hereafter amended; (iv) a “hazardous air pollutant” under Section 112 of the Clean Air Act, 42 U.S.C. §7412(a)(6), as now or hereafter amended; (v) a “hazardous material” under the Hazardous Materials Transportation Uniform Safety Act of 1990, 49 U.S.C. §5102(2), as now or hereafter amended; (vi) toxic or hazardous pursuant to regulations promulgated now or hereafter under the aforementioned laws or any state or local counterpart to any of the aforementioned laws; or (vii) presenting a risk to human health or the environment under other applicable federal, state or local laws, ordinances or regulations, as now or as may be passed or promulgated in the future. “Hazardous Substances” shall also mean any substance that after release into the environment or upon exposure, ingestion, inhalation, or assimilation, either directly from the environment or directly by ingestion thro ugh food chains, will or may reasonably be anticipated to cause death, disease, behavior abnormalities, cancer, or genetic abnormalities and specifically includes, but is not limited to, asbestos, polychlorinated biphenyls (“PCBs”), radioactive materials, including radon and naturally occurring radio nuclides, natural gas, natural gas liquids, liquefied natural gas, synthetic gas, oil, petroleum and petroleum-based derivatives and urea formaldehyde. “Hazardous Substances” does not include diesel, propane, diesel exhaust fluid (DEF) to reduce NOx emissions from diesel engines, sodium hydroxide and PFAs -specific feed materials for research purposes that are to be used by Bay West for running the testing mobile unit on the Property. Bay West will be solely liable for and will defend, indemnify, and hold City, its officials, employees, contractors, and agents harmless from and against any and all claims, costs and liabilities, including reasonable attorneys’ fees and costs, arising out of or in connection with Bay West’s use, storage, handling, transportation, or disposal of Hazardous Substances on, at or under the Property, including cleanup or restoration of the Property. Notwithstanding the foregoing, Bay West shall not be liable for or required to defend or indemnify the City, its officials, employees, contractors, and agents for any costs or liabilities caused by the negligence, willful act or omission of the City, its officials, employees, contractors, and agents. The obligations of this Section shall survive the expiration or other termination of this Agreement. Page 8 Doc# 2596240 Page 8 of 9 16. Effective Date. This Agreement shall be effective upon the date it is signed by Bay West. By their signatures below, the undersigned represent that they have authority to bind the parties they represent, their agents, successors, and assigns. AGREED BY: BAY WEST LLC PROPERTY OWNER By: By: Name: Name: Title: Title: Mayor Date: Date: By: Name: Title: City Clerk Date: Page 9 Doc# 2596240 Page 9 of 9 Exhibit A Site Drawings and Technical Specifications Exhibit A “Site Plan” is presented as a DRAFT, conceptual site layout with auxiliary drawings and technical specifications subject to changes as agreed upon between Bay West and the Property Owner. A B C D ERDC PFAS DESTRUCTION RESEARCH PHASE II SITE LAKE ELMO, MN VICINITY MAP AND DRAWING INDEX DESIGN JRC JRC DATE DRAWN BY CHECKED BY APPROVED BY DATE SHEET DWG NO. DATE PROJ. NO.J230044 ERDC COVER REV REVISION DESCRIPTION BY CHK APP COVER 2 0 1/21/4 SCALE BAR: MILES LAKE ELMO, MINNESOTA VICINITY MAP DRAWING INDEX COVER VICINITY MAP AND DRAWING INDEX G-01 SPECIFICATIONS, LEGEND, AND ABBREVIATIONS C-01 SITE LAYOUT C-02 ISCWO UTILITY SOURCES C-03A SITE IMPROVEMENTS C-03B SITE IMPROVEMENTS C-03C EROSION CONTROL C-04A EQUIPMENT CROSS SECTIONS C-04B EQUIPMENT CROSS SECTIONS C-05 SECONDARY CONTAINMENT C-06 NOISE MAP C-07 EQUIPMENT LOADING/UNLOADING AREAS C-08 DELIVERY LOADING/UNLOADING AREAS C-09 VISITOR PARKING OPTIONS C-10 SITE RESTORATION SITE 1 3 4 5 6 ERDC PFAS DESTRUCTION RESEARCH PHASE II SITE 3445 IDEAL AVENUE NORTH LAKE ELMO, MN 55042 IMAGE SOURCE: MICROSOFT BING, 2024 MICROSOFT CORPORATION, 2024 MAXAR, CNES (2024) DISTRIBUTION AIRBUS DS MOBILE INDUSTRIAL SUPER CRITICAL WATER OXIDATION (ISCWO) SYSTEM LAYOUT DRAWINGS JANUARY 2025 1/28/25 1/28/2025 LAKE ELMO CITY LIMIT ERW ATJ 1/28/25 1/28/25 ABBREVIATIONS: " IN, INCH ' FT, FOOT, FEET A AMPS AST ABOVE GROUND STORAGE TANK ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS dBA DECIBELS DEG. F/oF DEGREES FAHRENHEIT DIA./Ø DIAMETER DIP DUCTILE IRON PIPE E EAST / EASTING EFF.EFFECTIVE ELEV.ELEVATION FT FOOT, FEET GAL GALLON HP HORSE POWER HPAC HIGH PRESSURE AIR COMPRESSOR IN INCH ISCWO INDUSTRIAL SUPER CRITICAL WATER OXIDATION KW KILOWATTS LF LINEAR FEET MAX.MAXIMUM MIN.MINIMUM MNDOT MINNESOTA DEPARTMENT OF TRANSPORTATION MPH MILES PER HOUR N NORTH / NORTHING NEC NATIONAL ELECTRIC CODE NO.NUMBER PFAS PER- AND POLYFLUOROALKYL SUBSTANCES PPM PARTS PER MILLION PSI POUNDS PER SQUARE INCH PVC POLYVINYL CHLORIDE RPM REVOLUTIONS PER MINUTE SCH SCHEDULE SDR STANDARD DIMENSION RATIO SS STAINLESS STEEL TBD TO BE DETERMINED TYP.TYPICAL V VOLTS VAC VOLTS ALTERNATING CURRENT VDC VOLTS DIRECT CURRENT SPECIFICATIONS: GENERAL: 1.THE TEMPORARY ISCWO SYSTEM WILL BE LOCATED ON THE PARCEL (PARCEL ID: 1602921240002) IMMEDIATELY NORTH OF THE LAKE ELMO PUBLIC WORKS BUILDING LOCATED AT 3445 IDEAL AVENUE NORTH, LAKE ELMO, MN 55042. 2.BAY WEST SHALL COORDINATE ACCESS DURING CONSTRUCTION, SETUP, TESTING, AND SITE RESTORATION WITH THE CITY OF LAKE ELMO. THE TEMPORARY ISCWO SYSTEM WILL BE INSTALLED ON LAND OWNED BY THE CITY OF LAKE ELMO. BAY WEST SHALL BE RESPONSIBLE FOR MAINTAINING CONSTANT COORDINATION BETWEEN ANY SUBCONTRACTORS AND LAKE ELMO. ALL CONSTRUCTION ACTIVITIES PLANNED BY BAY WEST SHALL BE REVIEWED AND APPROVED BY THE OWNER. 3.THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION. IT SHALL BE THE RESPONSIBILITY OF BAY WEST TO LOCATE ALL EXISTING UTILITIES, WHETHER OR NOT SHOWN ON THE DRAWINGS, AND TO PROTECT THEM FROM DAMAGE. WHERE A UTILITY IS ABANDONED OR REQUIRES TO BE PROTECTED, BAY WEST SHALL PROVIDE PROTECTION OF THE UTILITY. BAY WEST SHALL BEAR ALL EXPENSE OF REPAIR, REPLACEMENT, OR ANY OTHER CHARGES RELATED TO EXISTING UTILITIES IN CONJUNCTION WITH THE EXECUTION OF THIS WORK. 4.UNKNOWN SITUATIONS OR CONDITIONS NOT COVERED IN THE CONTRACT DOCUMENTS MAY ARISE DURING CONSTRUCTION. BAY WEST SHALL NOTIFY LAKE ELMO IF SUCH A CONDITION IS IDENTIFIED. 5.ALL MATERIALS WILL BE IN STRICT COMPLIANCE WITH MINNESOTA STANDARD SPECIFICATIONS, LATEST EDITION. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REGULATIONS. SITE IMPROVEMENTS: 1.BAY WEST SHALL CONSTRUCT AN 8-INCH THICK GRAVEL PAD AT THE JOB SITE. THE GRAVEL PAD WILL BE COMPOSED OF RECYCLED MATERIAL CLASS V GRAVEL WITH QUALITY REQUIREMENTS ACCORDING TO MNDOT SPECIFICATIONS. 2.BAY WEST WILL GRADE THE JOB SITE BEFORE GRAVEL PLACEMENT. AS DIRECTED BY LAKE ELMO, BAY WEST WILL STOCKPILE EXCAVATED NATIVE SOIL FOR FUTURE USE AT THE SITE BY THE CITY OF LAKE ELMO. 3.BAY WEST WILL COMPACT THE GRAVEL PAD TO 95% OF MAXIMUM DRY DENSITY IN TWO 4-INCH LIFTS. THE CLASS V GRAVEL WILL BE COMPACTED BY A MECHANICAL OR VIBRATING COMPACTOR. 4.THE GRAVEL PAD WILL BE LEVEL WITH THE EXISTING GRAVEL ROAD (WEST TO EAST) & GROUND GRADE (SOUTH TO NORTH). TEMPORARY ELECTRICAL SETUP: 1.A GENERATOR WILL SUPPLY POWER FOR THE JOB SITE. THE GENERATOR SHALL SUPPLY 480/277 VOLTS AND 1,000 KILOWATTS. THE GENERATOR CONSUMES DIESEL AND DIESEL EXHAUST FLUID (DEF) TO GENERATE POWER. THE GENERATOR WILL BE HOUSED IN A TRAILER. 2.IF NEEDED, XCEL ENERGY MAY INSTALL A LOW VOLTAGE, TEMPORARY POWER DROP TO SUPPLY POWER TO EQUIPMENT (E.G. SECURITY CAMERAS, HEATING DEVICES, ETC) WHICH WILL RUN DURING OFF WORK HOURS 3.IF NEEDED, BAY WEST MAY USE A SMALLER GENERATOR TO POWER EQUIPMENT DURING OFF WORK HOURS 4.ALL ELECTRICAL HOOK-UP AND INSTALLATION WILL BE COMPLETED BY A LICENSED ELECTRICIAN IN ACCORDANCE WITH NATIONAL ELECTRIC CODE (NEC) AND ALL GOVERNING STATE AND LOCAL REGULATIONS. 5.CONTROL PANELS WILL BE NEMA 4 AND ALL CONTROL PANEL COMPONENTS WILL BE UNDERWRITER LABORATORY (UL) LISTED. WATER SUPPLY: 1.BAY WEST WILL DRAW APPROXIMATELY 10 GPM FROM A LAKE ELMO FIRE HYDRANT. BAY WEST WILL GO THROUGH THE LAKE ELMO FIRE DEPARTMENT TO CONNECT THE ISCWO SYSTEM TO THE FIRE HYDRANT. BAY WEST WILL INSTALL A CERTIFIED BACKFLOW PREVENTER AND WATER USAGE METER ON THE FIRE HYDRANT CONNECTION. 2.BAY WEST WILL DISCONNECT FROM THE FIRE HYDRANT AT THE END OF EACH WORKING DAY IN THE EVENT OF AN EMERGENCY AFTER NORMAL WORK HOURS. DURING NORMAL WORK HOURS, BAY WEST WILL ALWAYS HAVE SOMEONE ONSITE TO QUICKLY SHUT DOWN THE SYSTEM AND DISCONNECT FROM THE FIRE HYDRANT, IF NEEDED. EQUIPMENT: 1.THE ISCWO SKID WILL BE HOUSED UNDERNEATH A ISCWO SHELTER, WHICH WILL CONSIST OF STRUCTURE WITH ONLY A ROOF (SIMILAR TO A CARPORT). THE ISCWO STRUCTURE WILL BE CERTIFIED TO WITHSTAND 115 MPH WIND SPEEDS. THE ISCWO SHELTER MAY HAVE AN UNDERGROUND CONCRETE FOUNDATION (SIZE TBD) SECONDARY CONTAINMENT: 1.EQUIPMENT AND STORAGE AREAS WHICH CONTAIN CERTAIN MATERIALS WILL HAVE SECONDARY CONTAINMENT AS OUTLINED IN THESE DRAWINGS. 2.SOME SECONDARY CONTAINMENT OPTIONS ARE CONTAINMENT BERMS, WHICH COLLECT RAINWATER DURING STORM EVENTS. BAY WEST WILL REMOVE WATER FROM CONTAINMENT BERMS DAILY AND PUMP THAT ACCUMULATED WATER INTO THE EFFLUENT FRAC TANK. SAFETY: 1.BAY WEST AND ITS SUBCONTRACTORS WILL CONDUCT ONSITE ACTIVITIES IN ACCORDNACE WITH BAY WEST HEALTH AND SAFETY PLAN (H&S PLAN) AND ACCIDENT PREVENTION PLAN (APP), TO BE PRESENTED TO PROPERTY OWNER AT LEAST TWO WEEKS IN ADVANCE OF ONSITE ACTIVITIES. COPIES OF H&S PLAN AND APP WILL BE KEPT IN THE PROJECT CONTROL SHED THROUGHOUT ONSITE ACTIVITIES AND MADE AVAILABLE TO BAY WEST AND PROPERTY OWNER PRESONNEL UPON REQUEST. GENERAL SYMBOLS KEY: CONCRETE CLASS V GRAVEL NATIVE SOIL TEMPORARY FENCE TEMPORARY WATER FEED LINE (ABOVE GRADE) HIGH PRESSURE AIR FEED LINE DIESEL FEED LINE (WITH SECONDARY CONTAINMENT) PFAS FEED LINE (WITH SECONDARY CONTAINMENT) PROPANE LINE LAKE ELMO WATER MAIN (12" DIA, DIP) 15' OFFSET FROM LAKE ELMO WATER MAIN ISCWO LIQUID EFFLUENT LINE (WITH SECONDARY CONTAINMENT) SECONDARY CONTAINMENT SITE LIMITS (SEE GENERAL NOTES) EXISTING OVERHEAD ELECTRIC LINE PROPOSED TEMPORARY OVERHEAD ELECTRIC LINE EXISTING POWER POLE PROPOSED TEMPORARY POWER POLE SURVEY LOCATION (WITH DESCRIPTION) COLLECTED BY BAY WEST W W W W W W W W W E E E E E E E E E DESCRIPTION DETAIL & CROSS SECTION DESIGNATION: SHEET DETAIL IS LOCATED DETAIL NUMBER 1 C-01 OH OH OH OH OH OH OH OH SPECIFICATIONS CONTINUED: NOISE: 1.OPERATIONAL HOURS DEPENDANT UPON RESULTS OF CONTINUED NOISE LEVEL MEASUREMENTS OF THE ISCWO SYSTEM, HIGH PRESSURE AIR COMPRESSOR, AND GENERATOR TO BE COMPLETED IN JANUARY 2025 & DURING SYSTEM START UP WHILE THE EQUIPMENT IS AT THE LAKE ELMO SITE. 2.BAY WEST DOES NOT EXPECT THE ISCWO EQUIPMENT TO EXCEED THE LAKE ELMO SOUND ORDINANCE (LAKE ELMO CITY CODE 13.00.080) OF AN INCREASE IN SOUND GREATER THAN SIX DECIBELS ABOVE THE AMBIENT NOISE AT THE PROPERTY LINE (DRAWING C-06). BAY WEST ASSUMED THE PROPERTY LINE AS THE WEST SIDE OF IDEAL AVENUE NORTH DUE TO REGULAR TRAFFIC NOISE DURING NORMAL WORKING HOURS. ACCORDING TO THE USDOT NATIONAL TRANSPORTATION NOISE MAP APPLICATION, IDEAL AVENUE NORTH GENERATES APPROXIMATELY 50 TO 54.9 dBA ON AVERAGE OVER A 24-HOUR PERIOD. PREVIOUS NOISE TESTS OF THE ISCWO SYSTEM SUGGEST THAT THE GENERATED NOISE LEVEL AT THE PROPERTY LINE WILL BE LESS THAN 40 dBA. THE ADDITION OF THE ISCWO SYSTEM NOISE TO THE IDEAL AVENUE NORTH NOISE DOES NOT RESULT IN AN INCREASE GREATER THAN SIX DECIBELS ABOVE THE AMBIENT NOISE AT THE PROPERTY LINE PER THE LAKE ELMO SOUND ORDINANCE. SITE SECURITY: 1.JOB SITE WILL BE SURROUNDED BY TEMPORARY FENCING WHICH CONSISTS OF 12' LONG X 6' TALL SEGMENTS SUPPORTED BY ABOVEGROUND STANDS. THE TEMPORARY FENCE LINE WILL INCLUDE TWO GATES WHICH WILL BE LOCKED DURING NON-OPERATIONAL HOURS. 2.THE JOB SITE WILL ALSO INCLUDE SECURITY CAMERAS LOCATED ON EACH OF THE SIDES OF THE FENCE LINE. 1 2 3 4 5 6 A B C D ERDC PFAS DESTRUCTION RESEARCH PHASE II SITE LAKE ELMO, MN SPECIFICATIONS, LEGEND AND ABBREVIATIONS DESIGN JRC JRC DATE DRAWN BY CHECKED BY APPROVED BY DATE SHEET DWG NO. DATE PROJ. NO.J230044 ERDC G-01 REV REVISION DESCRIPTION BY CHK APP G-01 1/28/25 1/28/2025ERW ATJ 1/28/25 1/28/25 E E W W W W W W W W W W W A B C D H G E F JI L K M O 1C-0 4 A 1 C-04B 2 C-04A W P N Q S R GATE GATE 123456 A B C D ERDC PFAS DESTRUCTION RESEARCH PHASE II 3445 IDEAL AVE N, LAKE ELMO, MN SITE LAYOUT DESIGN JRC JRC DATE DRAWN BY CHECKED BY APPROVED BY DATE SHEET DWG NO. DATE PROJ. NO.J230044 ERDC C-01 REV REVISION DESCRIPTION BY CHK APP C-01 WATER FEED LINE (ABOVE GRADE) LAKE ELMO WATER MAIN (12" DIA, DIP) 15' OFFSET FROM LAKE ELMO WATER MAIN TEMPORARY FENCE LINE E ISCWO LIQUID EFFLUENT LINE (WITH SECONDARY CONTAINMENT DRAWING C-04A) HIGH PRESSURE AIR FEED LINE DIESEL FEED LINE (WITH SECONDARY CONTAINMENT - DRAWING C-04A) PFAS FEED LINE (WITH SECONDARY CONTAINMENT - DRAWING C-04A) ID DESCRIPTION A ISCWO SKID B ISCWO SHELTER (W/CONCRETE FOUNDATION) C HIGH PRESSURE AIR COMPRESSOR (HPAC) D OFFICE/CONTROL ROOM (SHIPPING CONTAINER) E FEED MATERIAL STORAGE (8' X 10' SHIPPING CONTAINER) F DOUBLE WALLED DIESEL AST (1,000-GAL) G DIESEL GENERATOR H DOUBLE WALLED EFFLUENT FRAC TANK (18,430-GAL) I INFLUENT WATER TANK (1,000-GAL) J WATER SOFTENER VESSEL K PRE-HEATER EXHAUST STACK (12" DIA) L ISCWO EXHAUST STACK (12" DIA) M PROPANE TANK (500-GAL) N 8' X 10' SHIPPING CONTAINER (WORK BENCH/TOOL STORAGE) O 10% NAOH (275-GAL TOTE) P DIESEL EXHAUST FLUID (55-GAL DRUMS) Q ACTIVATED CARBON OR RESIN VESSELS FOR PRE-TREATMENT (IF NEEDED) R DOUBLE WALLED DIESEL AST (500-GAL) S PORT-A-POTTY W LEGEND SECONDARY CONTAINMENT SITE LIMITS GENERAL NOTES: 1. GRAVEL ROAD, FIRE HYDRANT, AND SITE LIMIT LOCATIONS GATHERED WITH A EOS ARROW GOLD GPS UNIT 2. LAKE ELMO WATER MAIN LOCATION OBTAINED FROM A DRAWING PROVIDED BY THE CITY OF LAKE ELMO PUBLIC WORKS DEPARTMENT 3. SITE LIMITS DEFINED BY A CORNFIELD TO THE NORTH AND A SOIL STORAGE AREA TO THE EAST 4. TEMPORARY FENCE LINE CONSISTS OF 12' LONG BY 6' TALL SEGMENTS SUPPORTED BY ABOVEGROUND STANDS 5. 6,000 LB, DIESEL FORKLIFT WITH PNEUMATIC TIRES TO MOVE EQUIPMENT AND LOAD/UNLOAD CHEMICAL DELIVERIES 6. THE BASEMAP IMAGERY OF THE SITE DOES NOT INCLUDE A GRAVEL ROAD INSTALLED BY THE CITY OF LAKE ELMO. 7. ACTIVATED CARBON VESSELS WOULD REMOVE PFAS FROM LAKE ELMO CITY WATER BEFORE ISCWO PROCESS, IF NEEDED 8. THE DIESEL AST (R) BY THE GENERATOR WILL BE A CONTINGENCY IF FUEL SERVICE CAN'T DELIVER DAILY IMAGE SOURCE: MICROSOFT BING, 2024 MICROSOFT CORPORATION, 2024 MAXAR, CNES (2024) DISTRIBUTION AIRBUS DS 0 40'20' SCALE BAR 1:20 GRAVEL ROAD 36 T H S T R E E T N O R T H PROPANE LINE 1/13/2025 1/13/25 ERW PBD 1/13/25 1/13/25 W W W W W W W W W W W OH OH OH OH OH OH OH OH OH 3456 A B C D ERDC PFAS DESTRUCTION RESEARCH PHASE II 3445 IDEAL AVE N, LAKE ELMO, MN ISCWO UTILITY SOURCES DESIGN JRC JRC DATE DRAWN BY CHECKED BY APPROVED BY DATE SHEET DWG NO. DATE PROJ. NO.J230044 ERDC C-02 REV REVISION DESCRIPTION BY CHK APP C-02 21 LAKE ELMO WATER MAIN (12" DIA, DIP) 15' OFFSET FROM LAKE ELMO WATER MAIN TEMPORARY FENCE LINE LEGEND SITE LIMITS 0 70'35' SCALE BAR 1:35 WATER FEED LINE (ABOVE GRADE)W GENERAL NOTES: 1. GRAVEL ROAD, FIRE HYDRANT, AND SITE LIMIT LOCATIONS GATHERED WITH A EOS ARROW GOLD GPS UNIT 2. LAKE ELMO WATER MAIN LOCATION OBTAINED FROM A DRAWING PROVIDED BY THE CITY OF LAKE ELMO PUBLIC WORKS DEPARTMENT 3. SITE LIMITS DEFINED BY A CORNFIELD TO THE NORTH AND A SOIL STORAGE AREA TO THE EAST 4. TEMPORARY FENCE LINE CONSISTS OF 12' LONG BY 6' TALL SEGMENTS SUPPORTED BY ABOVEGROUND STANDS 5. THE BASEMAP IMAGERY OF THE SITE DOES NOT INCLUDE A GRAVEL ROAD INSTALLED BY THE CITY OF LAKE ELMO 6. CONNECTION AT FIRE HYDRANT WILL INCLUDE WATER METER TO TRACK WATER USAGE AND A CERTIFIED BACKFLOW PREVENTER 7. BAY WEST WILL DISCONNECT FROM THE FIRE HYDRANT AT THE END OF EACH WORKING DAY IN THE EVENT OF AN EMERGENCY AFTER NORMAL WORK HOURS. 8. DURING NORMAL WORK HOURS, BAY WEST WILL ALWAYS HAVE SOMEONE ONSITE TO QUICKLY SHUT DOWN THE SYSTEM AND DISCONNECT FROM THE FIRE HYDRANT, IF NEEDED 9. A TEMPORARY, LOW VOLTAGE POWER DROP MAY BE NEEDED TO OPERATE SECURITY CAMERAS AND HEATING DEVICES OVERNIGHT WITHOUT THE NEED FOR A GENERATOR IMAGE SOURCE: MICROSOFT BING, 2024 MICROSOFT CORPORATION, 2024 MAXAR, CNES (2024) DISTRIBUTION AIRBUS DS LAKE ELMO FIRE HYDRANT GRAVEL ROAD 36 T H S T R E E T N O R T H IDEAL AVENUE NORTH INFLUENT WATER TANK 1/13/25 1/13/2025 EXISTING OVERHEAD ELECTRIC LINEOH PROPOSED TEMPORARY OVERHEAD ELECTRIC LINE (IF NEEDED)OH EXISTING POWER POLE PROPOSED TEMPORARY POWER POLE (IF NEEDED) 1/13/25 1/13/25 ERW ATJ SECONDARY CONTAINMENT 1 C- 0 3 A 2 C-03B 58' 58' 98' 98' 49' 3 C-03B GRAVEL ROA D ~2.8% SLOPE 10" SITE GRAVEL PAD 8-INCHES CLASS V COMPACTED TO 95% OF MAXIMUM DRY DENSITY IN TWO 4-INCH LIFTS NATIVE SOIL 8" 98.00 1 2 3 4 5 6 A B C D ERDC PFAS DESTRUCTION RESEARCH PHASE II 3445 IDEAL AVE N, LAKE ELMO, MN SITE IMPROVEMENTS DESIGN JRC JRC DATE DRAWN BY CHECKED BY APPROVED BY DATE SHEET DWG NO. DATE PROJ. NO.J230044 ERDC C-03A REV REVISION DESCRIPTION BY CHK APP C-03A LAKE ELMO WATER MAIN (12" DIA, DIP) 15' OFFSET FROM LAKE ELMO WATER MAIN TEMPORARY FENCE LINE SITE LIMITS GENERAL NOTES CONTINUED: 1.LAKE ELMO WATER MAIN LOCATION OBTAINED FROM A DRAWING PROVIDED BY THE CITY OF LAKE ELMO PUBLIC WORKS DEPARTMENT 2.SITE LIMITS DEFINED BY A CORNFIELD TO THE NORTH AND A SOIL STORAGE AREA TO THE EAST 3.TEMPORARY FENCE LINE CONSISTS OF 12' LONG BY 6' TALL SEGMENTS SUPPORTED BY ABOVEGROUND STANDS 4.NATIVE SOIL WILL BE EXCAVATED TO PREPARE FOR THE SITE PAD AS SHOWN IN CROSS SECTION 1. EXCAVATED SOIL WILL BE STOCKPILED ACCORDING TO LAKE ELMO TO BE USED BY LAKE ELMO AT A LATER DATE (DRAWING C-03C) 5.SOIL SHALL BE COMPACTED BY MEANS OF A MECHANICAL OR VIBRATING COMPACTOR 8.BAY WEST USED CONTOURS GENERATED IN 2011 FROM THE MINNESOTA GEOSPATIAL COMMONS FOR WASHINGTON COUNTY, MINNESOTA. THE CONTOURS RESEMBLE RELATIVE ELEVATION MEASUREMENTS AS DESCRIBED ABOVE. BAY WEST USED THE 2011 CONTOURS AS A "WORST CASE SCENARIO" SINCE THOSE CONTOURS HAD A LARGER SLOPE COMPARED TO SITE MEASUREMENTS. 9.MATERIAL FOR SITE PAD TO CONSIST OF RECYCLED CLASS V MATERIAL PER MNDOT SPECIFICATIONS IMAGE SOURCE: MICROSOFT BING, 2024 MICROSOFT CORPORATION, 2024 MAXAR, CNES (2024) DISTRIBUTION AIRBUS DS HORIZONTAL 1:15 & VERTICAL: 4:15 GRADING CROSS SECTION1 SITE PAD (COMPOSED OF RECYCLED CLASS V) NATIVE SOIL040'20' SCALE BAR 1:20 GRAVEL ROAD 36TH STREET NORTH ISCWO SHELTER CONCRETE FOUNDATION CERTIFIED FOR WIND SPEEDS OF 115 MPH DIMENSIONS TBD 1/28/2025 1/28/25 CONCRETE ERW PBD 1/28/25 1/28/25 10 1 0 ' 1 0 0 8 ' 10 0 6 ' 10 0 4 ' 1 0 0 2 ' TOPOGRAPHIC LINES GENERAL NOTES: 1.SITE PAD WILL FOLLOW THE SAME GRADE AS THE GRAVEL ROAD. BAY WEST MAY LEVEL SPECIFIC PIECES OF EQUIPMENT WITH EXTRA GRAVEL OR RAILROAD TIES. 2.GRAVEL ROAD, FIRE HYDRANT, AND SITE LIMIT LOCATIONS & RELATIVE ELEVATIONS GATHERED WITH A EOS ARROW GOLD GPS UNIT GRAVEL ROAD 10" APPROXIMATE EXISTING GRADE (~0.3% SLOPE) GRAVEL ROAD SITE PAD 8-INCHES CLASS V COMPACTED TO 95% OF MAXIMUM DRY DENSITY IN TWO 4-INCH LIFTS NATIVE SOIL 58' 8" 10" GRAVEL ROAD APPROXIMATE EXISTING GRADE (~0.7% SLOPE) NATIVE SOIL SITE PAD 8-INCHES CLASS V COMPACTED TO 95% OF MAXIMUM DRY DENSITY IN TWO 4-INCH LIFTS 58'8" 1 2 3 4 5 6 A B C D ERDC PFAS DESTRUCTION RESEARCH PHASE II 3445 IDEAL AVE N, LAKE ELMO, MN SITE IMPROVEMENTS DESIGN JRC JRC DATE DRAWN BY CHECKED BY APPROVED BY DATE SHEET DWG NO. DATE PROJ. NO.J230044 ERDC C-03B REV REVISION DESCRIPTION BY CHK APP C-03B GENERAL NOTES: 1.SITE PAD WILL FOLLOW THE SAME GRADE AS THE CURRENT GRADE. BAY WEST MAY LEVEL SPECIFIC PIECES OF EQUIPMENT WITH EXTRA GRAVEL OR RAILROAD TIES. 2.GRAVEL ROAD LOCATIONS & RELATIVE ELEVATIONS GATHERED WITH A EOS ARROW GOLD GPS UNIT 3.SITE LIMITS DEFINED BY A CORNFIELD TO THE NORTH AND A SOIL STORAGE AREA TO THE EAST 4.TEMPORARY FENCE LINE CONSISTS OF 12' LONG BY 6' TALL SEGMENTS SUPPORTED BY ABOVEGROUND STANDS 5.NATIVE SOIL WILL BE EXCAVATED TO PREPARE FOR THE SITE PAD AS SHOWN IN CROSS SECTION 1. EXCAVATED SOIL WILL BE MOVED TO CONTAINMENT BERMS TO BE USED BY LAKE ELMO AT A LATER DATE (DRAWING C-03C) 6.SOIL SHALL BE COMPACTED BY MEANS OF A MECHANICAL OR VIBRATING COMPACTOR 7.BAY WEST USED CONTOURS GENERATED IN 2011 FROM THE MINNESOTA GEOSPATIAL COMMONS FOR WASHINGTON COUNTY, MINNESOTA. THE CONTOURS RESEMBLE RELATIVE ELEVATION MEASUREMENTS AS DESCRIBED ABOVE. BAY WEST USED THE 2011 CONTOURS AS A "WORST CASE SCENARIO" SINCE THOSE CONTOURS HAD A LARGER SLOPE COMPARED TO SITE MEASUREMENTS. 8.MATERIAL FOR SITE PAD TO CONSIST OF RECYCLED CLASS V MATERIAL PER MNDOT SPECIFICATIONS IMAGE SOURCE: MICROSOFT BING, 2024 MICROSOFT CORPORATION, 2024 MAXAR, CNES (2024) DISTRIBUTION AIRBUS DS HORIZONTAL 1:7.5 & VERTICAL: 4:7.5 WEST GRADING CROSS SECTION2 1/28/2025 1/28/25 ERW PBD 1/28/25 1/28/25 HORIZONTAL 1:7.5 & VERTICAL: 4:7.5 EAST GRADING CROSS SECTION3 SITE PAD (COMPOSED OF RECYCLED CLASS V) NATIVE SOIL LEGEND GRAVEL ROAD APPROXIMATE EXISTING GRADE LAKE ELMO CITY BOUNDARY 3 4 5 6 A B C D ERDC PFAS DESTRUCTION RESEARCH PHASE II 3445 IDEAL AVE N, LAKE ELMO, MN EROSION CONTROL DESIGN JRC JRC DATE DRAWN BY CHECKED BY APPROVED BY DATE SHEET DWG NO. DATE PROJ. NO.J230044 ERDC C-03C REV REVISION DESCRIPTION BY CHK APP C-03C GENERAL NOTES: 1.GRAVEL ROAD AND SITE LIMIT LOCATIONS & RELATIVE ELEVATIONS GATHERED WITH A EOS ARROW GOLD GPS UNIT 2.SITE LIMITS DEFINED BY A CORNFIELD TO THE NORTH AND A SOIL STORAGE AREA TO THE EAST 3.TEMPORARY FENCE LINE CONSISTS OF 12' LONG BY 6' TALL SEGMENTS SUPPORTED BY ABOVEGROUND STANDS 4.NATIVE SOIL WILL BE EXCAVATED TO PREPARE FOR THE SITE PAD. EXCAVATED SOIL WILL BE STOCKPILED AS DIRECTED BY LAKE ELMO TO BE USED BY LAKE ELMO AT A LATER DATE 8.BAY WEST USED CONTOURS GENERATED IN 2011 FROM THE MINNESOTA GEOSPATIAL COMMONS FOR WASHINGTON COUNTY, MINNESOTA. THE CONTOURS RESEMBLE RELATIVE ELEVATION MEASUREMENTS AS DESCRIBED ABOVE. BAY WEST USED THE 2011 CONTOURS AS A "WORST CASE SCENARIO" SINCE THOSE CONTOURS HAD A LARGER SLOPE COMPARED TO SITE MEASUREMENTS. 9.SURFACE WATER FLOW DIRECTION BASED ON THE 2011 CONTOURS 10.MATERIAL FOR SITE PAD TO CONSIST OF RECYCLED CLASS V MATERIAL PER MNDOT SPECIFICATIONS IMAGE SOURCE: MICROSOFT BING, 2024 MICROSOFT CORPORATION, 2024 MAXAR, CNES (2024) DISTRIBUTION AIRBUS DS GRAVEL ROAD 36 T H S T R E E T N O R T H 21 0 150'75' SCALE BAR 1:75 1/28/2025 1/28/25 LAKE ELMO PUBLIC WORKS BUILDING ID E A L A V E N U E N O R T H ERW PBD 1/28/25 1/28/25 10 1 0 ' 10 0 0 ' 9 9 0 ' 10 1 0 ' 1010' 1010' TEMPORARY FENCE LINE SITE LIMITS LEGEND EXCAVATED SOIL STOCKPILE AREA SILT FENCE TOPOGRAPHIC LINES SITE PAD SURFACE WATER FLOW DIRECTION OUTER TUBE CORRUGATED HDPE 4" DIAMATER CONTAINMENT BERM ISCWO GRAVEL PAD ISCWO LIQUID EFFLUENT LINE 1" DIAMETER HOSE ISCWO LIQUID EFFLUENT LINE (FROM ISCWO SKID) ISCWO LIQUID EFFLUENT LINE (TO EFFLUENT FRAC TANKS) SUPPORTS HIGH PRESSURE AIR COMPRESSOR 20.0' 9.5' WOOD RAILROAD TIES (IF NEEDED) NATIVE SOIL ISCWO GRAVEL PAD 1 2 3 4 5 6 A B C D ERDC PFAS DESTRUCTION RESEARCH PHASE II 3445 IDEAL AVE N, LAKE ELMO, MN EQUIPMENT CROSS-SECTIONS DESIGN JRC JRC DATE DRAWN BY CHECKED BY APPROVED BY DATE SHEET DWG NO. DATE PROJ. NO.J230044 ERDC C-04A REV REVISION DESCRIPTION BY CHK APP C-04A GENERAL NOTES: 1. BAY WEST WILL INSTALL DUAL TUBE PIPING SECONDARY CONTAINMENT ON THE LIQUID EFFLUENT LINE (SHOWN ABOVE), THE PFAS FEED LINE, AND THE DIESEL FEED LINE 2. DUAL TUBE PIPING SECONDARY CONTAINMENT WILL CONSIST OF CORRUGATED, HDPE, 4-INCH TUBING 3. BAY WEST MAY NEED TO DISCONNECT FEED AND EFFLUENT LINES FROM THE ISCWO SYSTEM TO FACILITATE FORKLIFT ACCESS AROUND THE ISCWO SYSTEM. BAY WEST WILL DRAIN LINES AND DUAL TUBE PIPING WITHIN A CONTAINMENT BERM BEFORE DISCONNECTION. NOT TO SCALE PIPING SECONDARY CONTAINMENT1 1:5 SCALE HIGH PRESSURE AIR COMPRESSOR2010'5' SCALE BAR 1:5 1/13/25 1/13/2025 SECONDARY CONTAINMENT SITE GRAVEL PAD NATIVE SOIL LEGEND ERW PBD 1/13/25 1/13/25 35.0' 24.0' 20.0' 12.5' ISCWO SHELTER (CARPORT)ISCWO SHELTER METAL ROOF PRE-HEATER EXHAUST STACK 12" DIAMETER PENETRATE THROUGH ISCWO SHELTER ROOF ISCWO EFFLUENT AIR STACK 12" DIAMETER PENETRATE THROUGH ISCWO SHELTER ROOF ISCWO SHELTER SUPPORT POLES ISCWO SHELTER CONCRETE FOUNDATION CERTIFIED FOR WIND SPEEDS OF 115 MPH DIMENSIONS TBD NATIVE SOIL ISCWO SKID SITE GRAVEL PAD CONTAIN- MENT BERM 1 2 3 4 5 6 A B C D ERDC PFAS DESTRUCTION RESEARCH PHASE II 3445 IDEAL AVE N, LAKE ELMO, MN EQUIPMENT CROSS-SECTIONS DESIGN JRC JRC DATE DRAWN BY CHECKED BY APPROVED BY DATE SHEET DWG NO. DATE PROJ. NO.J230044 ERDC C-04B REV REVISION DESCRIPTION BY CHK APP C-04B GENERAL NOTES: 1. ISCWO SHELTER WILL BE CERTIFIED TO WITHSTAND WIND SPEEDS OF 115 MPH 2. ISCWO SHELTER WILL BE 35' LONG X 26' WIDE X 20' TALL (AT THE EDGES) 3. ISCWO SKID WILL BE 24' LONG X 8.4' WIDE X 12.5' TALL (EXCLUDING STACKS) 4. TOP OF ISCWO STACKS WILL CLEAR THE ISCWO SHELTER ROOF BY APPROXIMATELY 1 TO 2 FEET IMAGE SOURCE: BULLDOG STEEL STRUCTURES SCALE 1:5 ISCWO SHELTER & SKID3 0 10'5' SCALE BAR 1:5 LEGEND SECONDARY CONTAINMENT PIPING SECONDARY CONTAINMENT (SEE DRAWING C-04A) 1/13/2025 1/13/25 ERW ATJ 1/13/25 1/13/25 A B C D H G E F JI L K M O P N Q S R EMERGENCY SPILL KIT 123456 A B C D ERDC PFAS DESTRUCTION RESEARCH PHASE II 3445 IDEAL AVE N, LAKE ELMO, MN SECONDARY CONTAINMENT DESIGN JRC JRC DATE DRAWN BY CHECKED BY APPROVED BY DATE SHEET DWG NO. DATE PROJ. NO.J230044 ERDC C-05 REV REVISION DESCRIPTION BY CHK APP C-05 TEMPORARY FENCE LINE LEGEND GENERAL NOTES: 1. GRAVEL ROAD, FIRE HYDRANT, AND SITE LIMIT LOCATIONS GATHERED WITH A EOS ARROW GOLD GPS UNIT 2. SITE LIMITS DEFINED BY A CORNFIELD TO THE NORTH AND A SOIL STORAGE AREA TO THE EAST 3. TEMPORARY FENCE LINE CONSISTS OF 12' LONG BY 6' TALL SEGMENTS SUPPORTED BY ABOVEGROUND STANDS 4. 6,000 LB, DIESEL FORKLIFT WITH PNEUMATIC TIRES TO MOVE EQUIPMENT AND CHEMICAL DELIVERIES 5. THE BASEMAP IMAGERY OF THE SITE DOES NOT INCLUDE A GRAVEL ROAD INSTALLED BY THE CITY OF LAKE ELMO. 6. REFERENCE DRAWING C-04A FOR SECONDARY CONTAINMENT OF PIPING 7. THE ISCWO SKID, FEED MATERIAL STORAGE, EFFLUENT FRAC TANK, AND GENERATOR WILL BE SURROUNDED BY CONTAINMENT BERMS 8. THE WORK BENCH/TOOL STORAGE SHIPPING CONTAINER WILL CONTAIN A SPILL KIT FOR CONTAINING/RECOVERING RELEASES 9. SOME SECONDARY CONTAINMENT OPTIONS ARE CONTAINMENT BERMS, WHICH COLLECT RAINWATER DURING STORM EVENTS. BAY WEST WILL REMOVE WATER FROM CONTAINMENT BERMS DAILY AND PUMP THAT ACCUMULATED WATER INTO THE EFFLUENT FRAC TANK. IMAGE SOURCE: MICROSOFT BING, 2024 MICROSOFT CORPORATION, 2024 MAXAR, CNES (2024) DISTRIBUTION AIRBUS DS040'20' SCALE BAR 1:20 GRAVEL ROAD 36 T H S T R E E T N O R T H SOURCE: IRONCLAD SECONDARY CONTAINMENT REQUIREMENTS FOR ABOVE GROUND STORAGE TANKS SOURCE: ULINE IBC SPILL CONTAINMENT PALLET: SOURCE: WESTERN GLOBAL® SOURCE: DUMPSTER LINERS SPILL CONTAINMENT BERM SOURCE: ULINE DRUM SPILL CONTAINMENT PALLET: 1/13/25 1/13/2025 ID DESCRIPTION A ISCWO SKID B ISCWO SHELTER (W/CONCRETE FOUNDATION) C HIGH PRESSURE AIR COMPRESSOR (HPAC) D OFFICE/CONTROL ROOM (SHIPPING CONTAINER) E FEED MATERIAL STORAGE (8' X 10' SHIPPING CONTAINER) F DOUBLE WALLED DIESEL AST (1,000-GAL) G DIESEL GENERATOR H DOUBLE WALLED EFFLUENT FRAC TANK (18,430-GAL) I INFLUENT WATER TANK (1,000-GAL) J WATER SOFTENER VESSEL K PRE-HEATER EXHAUST STACK (12" DIA) L ISCWO EXHAUST STACK (12" DIA) M PROPANE TANK (500-GAL) N 8' X 10' SHIPPING CONTAINER (WORK BENCH/TOOL STORAGE) O 10% NAOH (275-GAL TOTE) P DIESEL EXHAUST FLUID (55-GAL DRUMS) Q ACTIVATED CARBON OR RESIN VESSELS FOR PRE-TREATMENT (IF NEEDED) R DOUBLE WALLED DIESEL AST (500-GAL) S PORT-A-POTTY ERW PBD 1/13/25 1/13/25 SECONDARY CONTAINMENT EMERGENCY SPILL KIT 40 dBA 50 dBA 55 dBA 60 dBA 75 dBA 90 dBA LAKE ELMO CITY BOUNDARY PARCEL BOUNDARY GRAVEL ROAD 3 4 5 6 A B C D ERDC PFAS DESTRUCTION RESEARCH PHASE II 3445 IDEAL AVE N, LAKE ELMO, MN NOISE MAP DESIGN JRC JRC DATE DRAWN BY CHECKED BY APPROVED BY DATE SHEET DWG NO. DATE PROJ. NO.J230044 ERDC C-06 REV REVISION DESCRIPTION BY CHK APP C-06 21 LEGEND 40 dBA NOISE CONTOUR 50 dBA NOISE CONTOUR 55 dBA NOISE CONTOUR 60 dBA NOISE CONTOUR 75 dBA NOISE CONTOUR > 90 dBA NOISE CONTOUR 50 TO 54.9 dBA NOISE AREA PER USDOT NATIONAL TRANSPORTATION NOISE MAP APPLICATION GENERAL NOTES: 1.BAY WEST DOES NOT EXPECT THE ISCWO EQUIPMENT TO EXCEED THE LAKE ELMO SOUND ORDINANCE (LAKE ELMO CITY CODE 13.00.080) OF AN INCREASE IN SOUND GREATER THAN SIX DECIBELS ABOVE THE AMBIENT NOISE AT THE PROPERTY LINE (DRAWING C-06). BAY WEST ASSUMED THE PROPERTY LINE AS THE WEST SIDE OF IDEAL AVENUE NORTH DUE TO REGULAR TRAFFIC NOISE DURING NORMAL WORKING HOURS. ACCORDING TO THE USDOT NATIONAL TRANSPORTATION NOISE MAP APPLICATION, IDEAL AVENUE NORTH GENERATES APPROXIMATELY 50 TO 54.9 dBA ON AVERAGE OVER A 24-HOUR PERIOD. PREVIOUS NOISE TESTS OF THE ISCWO SYSTEM SUGGEST THAT THE GENERATED NOISE LEVEL AT THE PROPERTY LINE WILL BE LESS THAN 40 dBA. THE ADDITION OF THE ISCWO SYSTEM NOISE TO THE IDEAL AVENUE NORTH NOISE DOES NOT RESULT IN AN INCREASE GREATER THAN SIX DECIBELS ABOVE THE AMBIENT NOISE AT THE PROPERTY LINE PER THE LAKE ELMO SOUND ORDINANCE. 2.BAY WEST WILL ONLY OPERATE (INCLUDING THE GENERATOR, ISCWO SKID, AND HPAC) BETWEEN THE HOURS OF 7:00 AM TO 7:00 PM ON WEEKDAYS. THESE HOURS ARE SUBJECT TO CHANGE BASED ON NOISE MEASUREMENTS RESULTS BEFORE SYSTEM START UP 3.BAY WEST MIGHT USE A SMALLER GENERATOR TO POWER HEATING EQUIPMENT OVERNIGHT 4.NOISE CONTOURS CENTERED AROUND THE HIGH PRESSURE AIR COMPRESSOR (HPAC) 5.NOISE CONTOURS DO NOT TAKE INTO ACCOUNT LOCAL SITE FEATURES (E.G. TREES) 6.NOISE MEASUREMENTS AT THE HPAC ARE APPROXIMATELY 120 dBA 7.NOISE MEASUREMENTS 10 FT FROM THE HPAC ARE APPROXIMATELY 110 dBA 8.NOISE MEASUREMENTS COLLECTED AT GENERAL ATOMICS' SAN DIEGO FACILITY WITH THEIR DEMO AIR COMPRESSOR UNIT 9.THE USDOT NATIONAL TRANSPORTATION NOISE MAP APPLICATION NOISE USES A 24-HR EQUIVALENT, A-WEIGHTED SOUND LEVEL NOISE METRIC. THE METRIC REPRESENTS THE APPROXIMATE AVERAGE NOISE OVER A 24-HR PERIOD. 10.DURING SYSTEM OPERATIONS, HEARING PROTECTION WILL BE REQUIRED WHILE OUTSIDE THE MOBILE OFFICE. 11.PARCEL BOUNDARY OBTAINED FROM WASHINGTON COUNTY PROPERTY MAP 12.GRAVEL ROAD LOCATION DATA GATHERED WITH A EOS ARROW GOLD GPS UNIT 13.THE BASEMAP IMAGERY OF THE SITE DOES NOT INCLUDE A GRAVEL ROAD INSTALLED BY THE CITY OF LAKE ELMO IMAGE SOURCE: MICROSOFT BING, 2024 MICROSOFT CORPORATION, 2024 MAXAR, CNES (2024) DISTRIBUTION AIRBUS DS 36 T H S T R E E T N O R T H 0 150'75' SCALE BAR 1:75 1/28/2025 1/28/25 LAKE ELMO PUBLIC WORKS BUILDING ID E A L A V E N U E N O R T H ERW ATJ 1/28/25 1/28/25 APPROXIMATE MOBILE CRANE LOCATION SEMI-TRAILER CO 3456 A B C D ERDC PFAS DESTRUCTION RESEARCH PHASE II 3445 IDEAL AVE N, LAKE ELMO, MN EQUIPMENT LOADING & UNLOADING AREAS DESIGN JRC JRC DATE DRAWN BY CHECKED BY APPROVED BY DATE SHEET DWG NO. DATE PROJ. NO.J230044 ERDC C-07 REV REVISION DESCRIPTION BY CHK APP C-07 21 LAKE ELMO WATER MAIN (12" DIA, DIP) 15' OFFSET FROM LAKE ELMO WATER MAIN LEGEND SITE LIMITS GENERAL NOTES: 1. EQUIPMENT STAGING WILL INCLUDE A MOBILE CRANE WHICH WILL UNLOAD THE ISCWO SKID AND HIGH PRESSURE AIR COMPRESSOR. 2. BAY WEST WILL SETUP TEMPORARY FENCE AFTER EQUIPMENT STAGING 3. GRAVEL ROAD, FIRE HYDRANT, AND SITE LIMIT LOCATIONS GATHERED WITH A EOS ARROW GOLD GPS UNIT 4. LAKE ELMO WATER MAIN LOCATION OBTAINED FROM A DRAWING PROVIDED BY THE CITY OF LAKE ELMO PUBLIC WORKS DEPARTMENT 5. SITE LIMITS DEFINED BY A CORNFIELD TO THE NORTH AND A SOIL STORAGE AREA TO THE EAST 6. THE BASEMAP IMAGERY OF THE SITE DOES NOT INCLUDE A GRAVEL ROAD INSTALLED BY THE CITY OF LAKE ELMO IMAGE SOURCE: MICROSOFT BING, 2024 MICROSOFT CORPORATION, 2024 MAXAR, CNES (2024) DISTRIBUTION AIRBUS DS GRAVEL ROAD 36 T H S T R E E T N O R T H 0 40'20' SCALE BAR 1:20 1/13/25 1/13/2025 MOBILE CRANE EXAMPLE SOURCE: UNITED RENTALS SITE GRAVEL PAD CONCRETE FOUNDATION FOR ISCWO SHELTER 1/13/25 1/13/25 ERW ATJ A B C D H G E F JI L K M O P N Q S RTANKER TRUCK GATE GATE 3456 A B C D ERDC PFAS DESTRUCTION RESEARCH PHASE II 3445 IDEAL AVE N, LAKE ELMO, MN DELIVERY LOADING & UNLOADING AREAS DESIGN JRC JRC DATE DRAWN BY CHECKED BY APPROVED BY DATE SHEET DWG NO. DATE PROJ. NO.J230044 ERDC C-08 REV REVISION DESCRIPTION BY CHK APP C-08 21 LAKE ELMO WATER MAIN (12" DIA, DIP) 15' OFFSET FROM LAKE ELMO WATER MAIN TEMPORARY FENCE LINE LEGEND SITE LIMITS GENERAL NOTES: 1. DELIVERIES INCLUDE: DIESEL FOR THE ISCWO SKID AND GENERATOR, ISCWO FEED MATERIAL, SODIUM HYDROXIDE, PROPANE, WATER SOFTENER TANK(S), ACTIVATED CARBON VESSEL TANKS (IF NEEDED), PORT-A-POTTY MAINTENANCE, AND DEF FOR THE GENERATOR 2. DELIVERIES WILL ALWAYS REQUIRE A SPOTTER FOR THE DELIVERY VEHICLES 3. HIGH VISIBILITY CONES WILL BE PLACED AROUND THE DIESEL AST 4. GRAVEL ROAD, FIRE HYDRANT, AND SITE LIMIT LOCATIONS GATHERED WITH A EOS ARROW GOLD GPS UNIT 5. LAKE ELMO WATER MAIN LOCATION OBTAINED FROM A DRAWING PROVIDED BY THE CITY OF LAKE ELMO PUBLIC WORKS DEPARTMENT 6. SITE LIMITS DEFINED BY A CORNFIELD TO THE NORTH AND A SOIL STORAGE AREA TO THE EAST 7. THE BASEMAP IMAGERY OF THE SITE DOES NOT INCLUDE A GRAVEL ROAD INSTALLED BY THE CITY OF LAKE ELMO IMAGE SOURCE: MICROSOFT BING, 2024 MICROSOFT CORPORATION, 2024 MAXAR, CNES (2024) DISTRIBUTION AIRBUS DS GRAVEL ROAD 36 T H S T R E E T N O R T H 0 40'20' SCALE BAR 1:20 1/13/2025 1/13/25 ID DESCRIPTION A ISCWO SKID B ISCWO SHELTER (W/CONCRETE FOUNDATION) C HIGH PRESSURE AIR COMPRESSOR (HPAC) D OFFICE/CONTROL ROOM (SHIPPING CONTAINER) E FEED MATERIAL STORAGE (8' X 10' SHIPPING CONTAINER) F DOUBLE WALLED DIESEL AST (1,000-GAL) G DIESEL GENERATOR H DOUBLE WALLED EFFLUENT FRAC TANK (18,430-GAL) I INFLUENT WATER TANK (1,000-GAL) J WATER SOFTENER VESSEL K PRE-HEATER EXHAUST STACK (12" DIA) L ISCWO EXHAUST STACK (12" DIA) M PROPANE TANK (500-GAL) N 8' X 10' SHIPPING CONTAINER (WORK BENCH/TOOL STORAGE) O 10% NAOH (275-GAL TOTE) P DIESEL EXHAUST FLUID (55-GAL DRUMS) Q ACTIVATED CARBON OR RESIN VESSELS FOR PRE-TREATMENT (IF NEEDED) R DOUBLE WALLED DIESEL AST (500-GAL) S PORT-A-POTTY ERW AJT 1/13/25 1/13/25 SECONDARY CONTAINMENT GATE OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH GATE O OH OH OH OH 3456 A B C D ERDC PFAS DESTRUCTION RESEARCH PHASE II 3445 IDEAL AVE N, LAKE ELMO, MN VISITOR PARKING OPTIONS DESIGN JRC JRC DATE DRAWN BY CHECKED BY APPROVED BY DATE SHEET DWG NO. DATE PROJ. NO.J230044 ERDC C-09 REV REVISION DESCRIPTION BY CHK APP C-09 21 LAKE ELMO WATER MAIN (12" DIA, DIP) 15' OFFSET FROM LAKE ELMO WATER MAIN TEMPORARY FENCE LINE LEGEND SECONDARY CONTAINMENT SITE LIMITS GENERAL NOTES: 1. BAY WEST WILL USE HIGH VISIBILITY CONES TO DEMARCATE VISITOR PARKING AREAS 2. GRAVEL ROAD, FIRE HYDRANT, AND SITE LIMIT LOCATIONS GATHERED WITH A EOS ARROW GOLD GPS UNIT 3. LAKE ELMO WATER MAIN LOCATION OBTAINED FROM A DRAWING PROVIDED BY THE CITY OF LAKE ELMO PUBLIC WORKS DEPARTMENT 4. SITE LIMITS DEFINED BY A CORNFIELD TO THE NORTH AND A SOIL STORAGE AREA TO THE EAST 5. THE BASEMAP IMAGERY OF THE SITE DOES NOT INCLUDE A GRAVEL ROAD INSTALLED BY THE CITY OF LAKE ELMO IMAGE SOURCE: MICROSOFT BING, 2024 MICROSOFT CORPORATION, 2024 MAXAR, CNES (2024) DISTRIBUTION AIRBUS DS 36 T H S T R E E T N O R T H 1/13/25 1/13/2025 ID E A L A V E N U E N O R T H VISITOR PARKING AREA #1 BAY WEST,GENERAL ATOMICS, AND CONTRACTOR PARKING LAKE ELMO PUBLIC WORKS BUILDING GRAVEL ROADID E A L A V E N U E N O R T H 030'15' SCALE BAR 1:30 040'20' SCALE BAR 1:40 0 262'131' SCALE BAR 1:262 OH EXISTING OVERHEAD ELECTRIC LINE SITE GRAVEL PAD EXISTING POWER POLE ERW PBD 1/13/25 1/13/25 VISITOR PARKING AREA #3 VI S I T O R P A R K I N G A R E A # 2 36 T H S T R E E T N O R T H 1 2 3 4 5 6 A B C D ERDC PFAS DESTRUCTION RESEARCH PHASE II 3445 IDEAL AVE N, LAKE ELMO, MN SITE RESTORATION DESIGN JRC JRC DATE DRAWN BY CHECKED BY APPROVED BY DATE SHEET DWG NO. DATE PROJ. NO.J230044 ERDC C-10 REV REVISION DESCRIPTION BY CHK APP C-10 WATER FEED LINE (ABOVE GRADE) 15' OFFSET FROM LAKE ELMO WATER MAIN TEMPORARY FENCE LINE W LEGEND IM A G E S O U R C E : M I C R O S O F T B I N G , 2 0 2 4 M I C R O S O F T C O R P O R A T I O N , 2 0 2 4 M A X A R , C N E S ( 2 0 2 4 ) D I S T R I B U T I O N A I R B U S D S 1/28/2025 1/28/25 PRE-SITE RESTORATION POST-SITE RESTORATION REMOVE ISCWO SHELTER CONCRETE FOUNDATION BACKFILL WITH CLASS V AS DESCRIBED IN DRAWING C-03 ADDITIONAL SITE RESTORATION TASKS: 1.REMOVE EQUIPMENT & MATERIALS AS SHOWN IN DRAWING C-01 2.REMOVE LEFTOVER FEED MATERIAL, DIESEL, DEF, NAOH, AND ISCWO LIQUID EFFLUENT, FOR OFFSITE DISPOSAL 3.REMOVE TEMPORARY POWER INFRASTRUCTURE, IF NEEDED 4.REMOVE SILT FENCING, IF NEEDED 5.DISCONNECT FROM LAKE ELMO FIRE HYDRANT AND RESTORE TO ORIGINAL CONDITION 6.REMOVE TEMPORARY FENCE AND GATES 7.RESTORE GRASSY VISITOR PARKING AREAS ALONG 36TH STREET NORTH TO PRE-WORK CONDITIONS WITH HYDROSEED, IF NEEDED GRAVEL ROAD IM A G E S O U R C E : M I C R O S O F T B I N G , 2 0 2 4 M I C R O S O F T C O R P O R A T I O N , 2 0 2 4 M A X A R , C N E S ( 2 0 2 4 ) D I S T R I B U T I O N A I R B U S D S PROPOSED TEMPORARY OVERHEAD ELECTRIC LINE (IF NEEDED) PROPOSED TEMPORARY POWER POLE (IF NEEDED) SITE GRAVEL PAD ISCWO SHELTER CONCRETE FOUNDATION 0 15'7.5' SCALE BAR 1:15 GRAVEL ROAD 58' 98' 98' 58' ERW PBD 1/28/25 1/28/25 City of Lake Elmo Site Access Request 3445 Ideal Avenue Bay West General Atomics US Army ERDC February 4, 2025 Area at 3445 Ideal Avenue Our Request 2 Purpose: Field testing of PFAS materials destruction using iSCWO Technology Why the 3445 Ideal Ave location? Community & State concerns with PFAS; testing to demonstrate system’s destruction at field scale Request Overview •Temporary use of < 6000 sq ft area, located north of Public Works HQ •Costs to City: None, the project is Gov’t funded research •Terms: Bay West and City “Temporary Easement & Access Agreement” defines Bay West and City roles & responsibilities Safety 3 •Bay West manages all projects with H&S Plan, AHA reviews, and in-depth training of all employees •General Atomics’ system developed and sold for over 30 years that meets highest standards – excellent safety record •Onsite: safety fence and signage, Bay West escort for all visitors •City access: BW will coordinate with and ensure City’s PWD access throughout testing Requested areas for visitor parking Fenced area iSCWO shelter – concrete foundations in gravel pad, rated to meet windspeeds of 115 mph Noise 4 •Noise measurements by General Atomics •All structures are outside 40 dBA perimeter. •Hearing protection required during onsite operations •Edge of closest neighborhood (road) is 1,000 feet to the west Materials Storage & Removal 5 •All site activities coordinated and defined by test plans and procedures •All materials are shipped and stored in material-specific, approved containers •Secondary containment throughout •Aboveground permit for temporary diesel fuel tank, other permits listed in “Temporary Easement & Access Agreement” Prevention/Mitigation of Potential Spills– first, manage transport and temporary storage to avoid spills. In the case of a spill, Bay West is a Great Lakes Region recognized expert in spill containment and cleanup. Bay West is responsible for cleanup and site restoration to existing site conditions. Site Restoration: by City request, leave gravel pad 6Now: Google imagery 2025 After test completion: Remove equipment, containers, fence. Leave gravel pad in place. More on Safety and Quality, Our Top Priorities 7 Safety GA iSCWO system has been extensively tested and approved by ASME pressure vessel codes HAZOP (Hazardous Operations) reviews met every review; safety studies; pressure calculations 40-hour OSHA HAZWOPER and GA system operations training PFAS sampling and waste handling follow Bay West Site Health & Safety Plan requirements and procedures Operations for over 30 years without incident Examples of Quality Controls General Atomics’ SCWO unit meets ISO-9001 requirements Analytical sample results reviewed and validated Considerations 8 Technology? Materials are destroyed using supercritical water oxidation (SCWO) which breaks C-F bonds at high temp and pressure in water to produce CO2, water, inorganic salts Volume destroyed? about 300-500 gallons of PFAS materials How long onsite? 4-5 weeks, including system check, equipment staging, testing, and site restoration •Typical day: 1 hour warm up, 5-6 hrs testing, 1 hour shutdown Considerations cont’d 9 How is water managed? •Similar to the Tablyn Park SAFF® study •Onsite, temporary storage using tanks in secondary containment •Test, analysis and then determine best disposal options Noise management? 40 dBA at the middle of Ideal Avenue ~ sound of refrigerator engine hum Public outreach? •Tours will be made available 1x/week to the public at a safe distance •Possible visits by DoD, MPCA, industry, Congressional staff and other Government agencies •Test results will be made public through conference presentations and research papers City and State Benefits 10 •Proactive demonstration of PFAS destruction as an option now •Tablyn Park, advance from removing PFAS from water to PFAS destruction. Removes potential future contamination. •Field deployment of iSCWO aligns with regional PFAS remediation targets •Supports City’s leadership and outreach about PFAS programs •Supports US test programs to identify best method to destroy PFAS waste