Loading...
HomeMy WebLinkAbout#12 - 2025 Street Improvements STAFF REPORT DATE: March 18, 2025 REGULAR TO: City Council FROM: Chad Isakson, Assistant City Engineer AGENDA ITEM: Approve Resolution Receiving Feasibility Report, Calling Hearing on Improvement, Approving Plans and Specifications, and Ordering Advertisement for Bids for the 2025 Street and Utility Improvements REVIEWED BY: Nicole Miller, City Administrator Clarissa Hadler, Finance Director Marty Powers, Public Works Director Nate Stanley, City Engineer CORE STRATEGIES: ☐ Vibrant, inclusive, connected community ☐ Efficient, reliable, innovative services ☒ Responsive, transparent, adaptive governance ☒ Balanced Finances now and future ☐ Managed Growth ☒ Resilient Infrastructure BACKGROUND: The City Council authorized the preparation of a feasibility report for the 2025 Street and Utility Improvements project on September 17, 2024 and final design at the February 18, 2025 meeting. ISSUE BEFORE COUNCIL: Should the City Council accept the Feasibility Report, call a Public Hearing, approve the Plans and Specifications, and Order the Advertisement for Bids for the 2025 Street and Utility Improvements, with the Improvement Hearing to be held at the May 6, 2025 council meeting? PROPOSAL DETAILS/ANALYSIS: Feasibility Reports have been prepared to address street and drainage improvements programmed for construction in 2025. The reports serve to identify the necessary improvements, the estimated project costs, and to consider the assessment of a portion of the project costs to the benefitting properties. The 2025 Street Improvement project includes 5 different neighborhood areas as categorized below. Irish Court Neighborhood: • Irish Court North, from Lake Jane Trail to south end cul-de-sac. Teal Pass Estates Neighborhood: • Jasper Avenue North, from Jane Road to the north cul-de-sac. • 49th Street North, from Jasper Avenue to Jerome Avenue. • Jerome Avenue North, from 49th Street to the east cul-de-sac. 55th Street / 57th Street / Julep Way Neighborhood: • 55th Street North, from 57th Street to the north cul-de-sac (Judith Mary Manor). • 57th Street North, from 55th Street to Julep Way (Rolling Hills Estates). • Julep Way North, from 57th Street to the south cul-de-sac (Lake Elmo Vista). Lake Elmo Vista (55th Street): • 55th Street North, from Keats Avenue to the west cul-de-sac. Prairie Hamlet Neighborhood: • 59th Street Court North, from Keats Avenue to the west loop. The proposed improvements in all five areas include a full depth reclamation of the street pavement section, with new bituminous pavement and installation of concrete curb and gutter. Storm sewer maintenance items are included in the scope including cleanup of outlet pipes, ditch grading, draintile installation, extension of storm sewer pipe, and replacement of catch basins as recommended in the design documents. No street widening or geometric changes are proposed. It is recommended that “No Parking” signage be installed in accordance with the City’s Parking Restriction Guidance Policy as presented to the City Council with the preliminary design findings and recommendations. The reports include an estimate of total project costs for each neighborhood. The proposed street and drainage improvements would be partially assessed against the benefiting properties consistent with the city’s Special Assessment Policy. Street and drainage improvements are assessed at a rate of 30% of the total project costs for residential properties using a unit method. The remaining 70% of the project costs are paid through the city general fund. Residential properties with direct access to the street, vacant lots, and lots with direct access from a private street are included as benefitting properties. Each property is assessed one unit unless the property can be subdivided using the current underlying land use and zoning regulations. Corner lots with direct access to two public streets are assessed 50% of the per unit basis when each street is improved. Street and drainage improvement assessments are levied over a 15-year period. All assessments are charged an interest rate of 1% over the bond rate for the project. The preliminary assessment rolls detailing each benefiting property’s proposed assessment amount are included in the Appendix of this report with are summarized below. Table 1: Project Costs and Proposed Assessments Neighborhood Total Estimated Project Costs City Share of Project Cost Proposed Unit Assessment Total Assessment Revenue Irish Court $248,000 $173,100 $10,700 for 7 units $74,900 Teal Pass Estates $759,000 $531,500 $17,500 for 13 units $227,500 55th St / 57th St / Julep Way $757,000 $529,800 $14,200 for 16 units $227,200 Lake Elmo Vista (55th St) $408,000 $285,350 $22,300 for 5 units $11,150 for 1 unit $122,650 Prairie Hamlet $437,000 $305,250 $7,750 for 17 units $131,750 Totals $2,609,000 $1,825,000 $784,000 In addition, the plans and specifications have been completed for the improvements and are ready to be advertised for contractor bids. A bid date has been scheduled for April 22, 2025, with the intent of recommending a contract award at the May 6, 2025 City Council meeting. FISCAL IMPACT: The total project cost is estimated to be $2,609,000. The project is proposed to be paid from a combination of special assessments, general funds, and issuance of bonds. OPTIONS: • Accept the Feasibility Report, call a Public Hearing, approve the Plans and Specifications, and Order the Advertisement for Bids for the 2025 Street and Utility Improvements • Table the item and provide direction to Staff on next steps related to this project. • Do not move forward with this project. RECOMMENDATION: Staff is recommending that the City Council approve a Resolution, receiving the Feasibility Report, calling a public hearing, approving the plans and specifications, and ordering the advertisement for bids for the 2025 Street and Utility Improvements. The recommended motion for this action is as follows: Motion to approve Resolution No. 2025-030, receiving the Feasibility Report, Calling Hearing on Improvement, Approving the Plans and Specifications, and Ordering the Advertisement for Bids for the 2025 Street and Utility Improvements. ATTACHMENTS: 1. Resolution Receiving a Feasibility Report, Calling for Hearing on Improvement, Approving Plans and Specifications, and Ordering Advertisement for Bids. 2. Notice of Hearing on Improvement. 3. Preliminary Assessment Roll. 4. Location Map. 5. Proposed Improvements Exhibit. 6. Project Schedule 7. Advertisement for Bids Feasibility Reports (available for review at City Hall). CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2025-030 A RESOLUTION RECEIVING FEASIBILITY REPORTS, CALLING HEARINGS ON IMPROVEMENT, APPROVING PLANS AND SPECIFICATIONS AND ORDERING ADVERTISEMENT FOR BIDS FOR THE 2025 STREET AND UTILITY IMPROVEMENTS WHEREAS, pursuant to City Council resolution, adopted on September 17, 2024, feasibility reports for the Irish Court Neighborhood, Teal Pass Estates Neighborhood, 55th Street / 57th Street / Julep Way Neighborhood, Lake Elmo Vista (55th Street) Neighborhood, and the Prairie Hamlet Neighborhood have been prepared by Bolton & Menk, Inc. for the 2025 Street and Utility Improvements; and WHEREAS, the feasibility reports recommend that benefiting properties be assessed all or a portion of the cost of the improvements pursuant to the City’s Special Assessment Policy and Minnesota Statutes, Chapter 429; and WHEREAS, the feasibility reports provide information regarding whether the proposed improvement is necessary, cost-effective, and feasible; whether it should best be made as proposed or in connection with some other improvement; the estimated cost of the improvements as recommended; and a description of the methodology used to calculate individual assessments for affected parcels; and WHEREAS, pursuant to City Council resolution, adopted on February 18, 2025, the City Engineer, together with Bolton and Menk, Inc., has prepared plans and specifications for the 2025 Street and Utility Improvements and has presented such plans and specifications to the Council for approval. NOW, THEREFORE, BE IT RESOLVED, 1. That the City Council will consider the improvements in accordance with the reports and the assessments of the abutting properties for all or a portion of the cost of the improvements pursuant to Minnesota Statues, Chapter 429 at an estimated total project cost of $2,609,000. 2. A public hearing shall be held on such proposed improvements on the 6th day of May, 2025 in the council chambers of City Hall, at or approximately after 7:00 P.M. and the clerk shall give mailed and published notice of such hearing and improvement as required by law. 3. Such plans and specifications, a copy of which is on file at Lake Elmo City Hall, and made a part hereof, are hereby approved. 4. The City Clerk shall prepare and cause to be inserted in the official paper and posted online with Quest Construction Data Network (QuestCDN.com) an advertisement for bids upon the making of such improvements under such approved plans and specifications. The advertisement shall be published for at least 21 days, shall specify the work to be done, and shall state that sealed bids provided by following required electronic bidding procedures outlined by QuestCDN prior to the specified bid date and time and accompanied by a bid bond or cashier’s check made payable to the City of Lake Elmo in an amount not less than 5% of the amount of such bid will be considered. ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE EIGHTEENTH DAY OF MARCH, 2024. CITY OF LAKE ELMO By: __________________________ Charles Cadenhead (Seal) Mayor ATTEST: ________________________________ Julie Johnson City Clerk CITY OF LAKE ELMO NOTICE OF HEARING ON IMPROVEMENT 2025 STREET AND UTILITY IMPROVEMENTS Notice is hereby given that the City Council of Lake Elmo will conduct a public hearing on Tuesday, May 6, 2025, at or approximately after 7:00 PM to consider the making of the following improvements, pursuant to Minnesota Statutes, Sections 429.011 to 429.111: Street and drainage improvements consisting of full depth reclamation of the street pavement section, with new bituminous pavement and new concrete curb and gutter. As part of the improvements the project will incorporate the restoration of the existing drainage system along the streets and right-of-way, including repair and/or replacement of existing drainage pipe and structures. The project includes approximately 7,800 feet (1.5 miles) of public streets including the following segments: Irish Court Neighborhood: • Irish Court North, from Lake Jane Trail to south end cul-de-sac. Teal Pass Estates Neighborhood: • Jasper Avenue North, from Jane Road to the north cul-de-sac. • 49th Street North, from Jasper Avenue to Jerome Avenue. • Jerome Avenue North, from 49th Street to the east cul-de-sac. 55th Street / 57th Street / Julep Way Neighborhood: • 55th Street North, from 57th Street to the north cul-de-sac (Judith Mary Manor). • 57th Street North, from 55th Street to Julep Way (Rolling Hills Estates). • Julep Way North, from 57th Street to the south cul-de-sac (Lake Elmo Vista). Lake Elmo Vista (55th Street): • 55th Street North, from Keats Avenue to the west cul-de-sac. Prairie Hamlet Neighborhood: • 59th Street Court North, from Keats Avenue to the west loop. The area proposed to be assessed for these improvements include properties abutting or properties that gain direct driveway access from the above referenced streets. The estimated total cost for the street and drainage improvements is $248,000 for the Irish Court Neighborhood, $759,000 for the Teal Pass Estates Neighborhood, $757,000 for 55th Street / 57th Street / Julep Way Neighborhood, $408,000 for Lake Elmo Vista (55th Street), and $437,000 for the Prairie Hamlet Neighborhood. A reasonable estimate of the impact of the assessment will be available at the hearing. Such persons as desiring to be heard with reference to the proposed improvements will be heard during this meeting. DATED: March 18, 2025 BY ORDER OF THE LAKE ELMO CITY COUNCIL Charles Cadenhead, Mayor (Published in the Stillwater Gazette on March 21, 2025 and March 28, 2025) CITY OF LAKE ELMO, MN. MARCH, 2025 2025 STREET AND UTILITY IMPROVEMENTS IRISH COURT N PRELIMINARY ASSESSMENT ROLL PAGE 1 of 1 NO.NAME PID RESIDENTIAL EQUIVALENT LOTS STREET AND DRAINAGE ASSESSMENT AMOUNT 1 GILBERT CYNTHIA D 4190 IRISH CT N 4190 IRISH CT N LAKE ELMO MN 55042 0902921430017 1 $10,700 2 LEROL MARVIN J JR & KAREN J 4150 IRISH CT N 4150 IRISH CT N LAKE ELMO MN 55042 0902921430018 1 $10,700 3 STUCCI GARY M & MARIE D 4110 IRISH CT N 4110 IRISH CT N LAKE ELMO MN 55042 0902921430019 1 $10,700 4 BOTTOLFSON KEVIN & JEAN 4070 IRISH CT N 4070 IRISH CT N LAKE ELMO MN 55042 0902921430020 1 $10,700 5 MILLER CRAIG A & CHERYL M 4071 IRISH CT N 4071 IRISH CT N LAKE ELMO MN 55042 0902921430021 1 $10,700 6 FALCO KATHLEEN M & MICHAEL J 4101 IRISH CT N 4101 IRISH CT N LAKE ELMO MN 55042 0902921430022 1 $10,700 7 HILL ERIC C & EILEEN M 4141 IRISH CT N 4141 IRISH CT N LAKE ELMO MN 55042 0902921430023 1 $10,700 TOTAL $74,900 ADDRESS MAILING ADDRESS Ir i s h C o u r t N 42nd Street N Ir v i n C i r c l e N 4141 4101 40714070 4110 4150 4190 H: \ L K E L M N \ 2 4 X 1 3 6 2 1 5 0 0 0 \ C A D \ C 3 D \ F e a s i b i l i t y R e p o r t F i g u r e s \ F I G R - 1 3 6 2 1 5 - A s s e s s a b l e P r o p e r t i e s . d w g 3 / 1 1 / 2 0 2 5 1 0 : 0 7 : 1 8 A M R 2025 Street and Utility Improvements City of Lake Elmo Assessable Properties - Irish Court N March 2025 LEGEND ASSESSABLE PROPERTY R FEETSCALE 0 50 100 HORZ. CITY OF LAKE ELMO, MN. MARCH, 2025 2025 STREET AND UTILITY IMPROVEMENTS TEAL PASS ESTATES PRELIMINARY ASSESSMENT ROLL PAGE 1 of 1 NO.NAME PID RESIDENTIAL EQUIVALENT LOTS STREET AND DRAINAGE ASSESSMENT AMOUNT 1 BACHO BASSAM & KARA PETTIGREW 9160 JANE RD N 9160 JANE RD N LAKE ELMO MN 55042 1002921220013 1 $17,500 2 HAWKINS RICHARD CARMON & ANN M 4850 JASPER AVE N 4850 JASPER AVE N LAKE ELMO MN 55042 1002921220018 1 $17,500 3 JOHNSON THOMAS R JR & NANCY T JOHNSON 4960 JASPER AVE N 4960 JASPER AVE N LAKE ELMO MN 55042 1002921220020 1 $17,500 4 JOHNSON DAVID J & MARY B 4980 JASPER AVE N 4980 JASPER AVE N LAKE ELMO MN 55042 1002921220021 1 $17,500 5 PORCHER HELMUT S K & JOAN P A 4990 JASPER AVE N 4990 JASPER AVE N LAKE ELMO MN 55042 0302921330017 1 $17,500 6 EDWIN A RANEY LIVING TRS 4989 JASPER AVE N 4989 JASPER AVE N LAKE ELMO MN 55042 0302921330018 1 $17,500 7 LARSON ERIC G & SARAH J 9191 49TH ST N 9191 49TH ST N LAKE ELMO MN 55042 1002921220022 1 $17,500 8 TORGRIMSON TYLER & KARA JOHNSON 4880 JEROME AVE N 4880 JEROME AVE N LAKE ELMO MN 55042 1002921220023 1 $17,500 9 DUERR BROOK F & BARBARA KEMP DUERR 4870 JEROME AVE N 4870 JEROME AVE N LAKE ELMO MN 55042 1002921210018 1 $17,500 10 ZENO MICHAEL R & ELIZABETH R 4860 JEROME AVE N 4860 JEROME AVE N LAKE ELMO MN 55042 1002921210019 1 $17,500 11 TREVIS CHRISTINE M 4850 JEROME AVE N 4850 JEROME AVE N LAKE ELMO MN 55042 1002921210020 1 $17,500 12 MOBERG MARK A & RACHAEL K 4855 JEROME AVE N 4855 JEROME AVE N LAKE ELMO MN 55042 1002921210021 1 $17,500 13 MARKIE DENNIS E & BARBARA E 4865 JEROME AVE N 4865 JEROME AVE N LAKE ELMO MN 55042 1002921210022 1 $17,500 TOTAL $227,500 ADDRESS MAILING ADDRESS Je r o m e A v e n u e 49th S t r e e t Jerome Avenue N Ja s p e r A v e n u e N Jane Ro a d N 9160 4850 4960 4980 4990 4989 9191 4880 4870 4860 4850 48554865 H: \ L K E L M N \ 2 4 X 1 3 6 2 1 5 0 0 0 \ C A D \ C 3 D \ F e a s i b i l i t y R e p o r t F i g u r e s \ F I G R - 1 3 6 2 1 5 - A s s e s s a b l e P r o p e r t i e s . d w g 3 / 1 1 / 2 0 2 5 1 0 : 0 7 : 2 4 A M R 2025 Street and Utility Improvements City of Lake Elmo Assessable Properties - Teal Pass Estates March 2025 LEGEND ASSESSABLE PROPERTY R FEETSCALE 0 100 200 HORZ. CITY OF LAKE ELMO, MN. MARCH, 2025 2025 STREET AND UTILITY IMPROVEMENTS 55TH ST / 57TH ST / JULEP WAY PRELIMINARY ASSESSMENT ROLL PAGE 1 of 1 NO.NAME PID RESIDENTIAL EQUIVALENT LOTS STREET AND DRAINAGE ASSESSMENT AMOUNT 1 KARL E BROGREN & SANDRA J BROGREN JT TRS 9696 55TH ST N 9696 55TH ST N LAKE ELMO MN 55042 0302921210004 1 $14,200 2 CONBOY KIMBERLY P & THOMAS 9744 55TH ST N 9744 55TH ST N LAKE ELMO MN 55042 0302921210005 1 $14,200 3 SANDBERG ROCHELLE M 9798 55TH ST N 9798 55TH ST N LAKE ELMO MN 55042 0302921210006 1 $14,200 4 HUGHES ALEXANDER 9747 55TH ST N 9747 55TH ST N LAKE ELMO MN 55042 0302921210007 1 $14,200 5 PAWLUK GARTH R & SUSAN M 9719 55TH ST N 9719 55TH ST N LAKE ELMO MN 55042 0302921210008 1 $14,200 6 TAIPALE HARVEY J & GAYLE E 9275 57TH ST N 9275 57TH ST N LAKE ELMO MN 55042 0302921240006 1 $14,200 7 BERGIE BRADLEY L TRS & MARCIA A BERGIE TRS 9481 57TH ST N 9481 57TH ST N LAKE ELMO MN 55042 0302921130006 1 $14,200 8 MOUA REBA & XIONG 9543 57TH ST N 9543 57TH ST N LAKE ELMO MN 55042 0302921130007 1 $14,200 9 JOSTES ERIK E & DENISE 9568 57TH ST N 9568 57TH ST N LAKE ELMO MN 55042 0302921130005 1 $14,200 10 KENFIELD GREG & NATALIA CASCI 9605 57TH ST N 9605 57TH ST N LAKE ELMO MN 55042 0302921130008 1 $14,200 11 LISA L BURBAN TRS 9612 57TH ST N 9612 57TH ST N LAKE ELMO MN 55042 0302921130004 1 $14,200 12 VANG BLIA Y 5660 JULEP WAY N 5660 JULEP WAY N LAKE ELMO MN 55042 0302921130014 1 $14,200 13 WADE A FICK TRS 5638 JULEP WAY N 5638 JULEP WAY N LAKE ELMO MN 55042 0302921130013 1 $14,200 14 YOUNG JAMES & BREE 5611 JULEP WAY N 5611 JULEP WAY N LAKE ELMO MN 55042 0302921130012 1 $14,200 15 RICHARD K KAISER & RHONDA J KIMLER TRS 5629 JULEP WAY N 5629 JULEP WAY N LAKE ELMO MN 55042 0302921130011 1 $14,200 16 WARNSHOLZ REYNOLD A & LINDA M RAMSAY 5673 JULEP WAY N 5673 JULEP WAY N LAKE ELMO MN 55042 0302921130010 1 $14,200 TOTAL $227,200 ADDRESS MAILING ADDRESS Ju l e p W a y 57th Street N 55 t h S t r e e t N 5 7 t h S t r e e t N 9696 9744 9798 9747 9719 9275 9481 9543 9605 9568 9612 5660 5638 5611 5629 5673 H: \ L K E L M N \ 2 4 X 1 3 6 2 1 5 0 0 0 \ C A D \ C 3 D \ F e a s i b i l i t y R e p o r t F i g u r e s \ F I G R - 1 3 6 2 1 5 - A s s e s s a b l e P r o p e r t i e s . d w g 3 / 1 1 / 2 0 2 5 1 1 : 2 1 : 0 4 A M R 2025 Street and Utility Improvements City of Lake Elmo Assessable Properties - 55th St / 57th St / Julep Way March 2025 LEGEND ASSESSABLE PROPERTY R FEETSCALE 0 120 240 HORZ. CITY OF LAKE ELMO, MN. MARCH, 2025 2025 STREET AND UTILITY IMPROVEMENTS LAKE ELMO VISTA (55TH STREET) PRELIMINARY ASSESSMENT ROLL PAGE 1 of 1 NO.NAME PID RESIDENTIAL EQUIVALENT LOTS STREET AND DRAINAGE ASSESSMENT AMOUNT 1 KATHERINE ANN TODD REV TRS 9961 55TH ST N 9961 55TH ST N LAKE ELMO MN 55042 0302921140009 1 $22,300 2 ANTONELLO JOSEPH R & ANGELEEN M ANTONELLO 9873 55TH ST N 9873 55TH ST N LAKE ELMO MN 55042 0302921140010 1 $22,300 3 GRANOVSKY MARK R & KAREN E 9855 55TH ST N 9855 55TH ST N LAKE ELMO MN 55042 0302921140011 1 $22,300 4 VANG PHIA N & VUE YER 9830 55TH ST N 9830 55TH ST N LAKE ELMO MN 55042 0302921140013 1 $22,300 5 JENNIFER L ANDERSON TRS 9800 55TH ST N 9800 55TH ST N LAKE ELMO MN 55042 0302921140012 1 $22,300 6 BOETTCHER JEFFREY A & KARISSA 5630 KEATS AVE N 5630 KEATS AVE N LAKE ELMO MN 55042 0302921140008 0.5 $11,150 TOTAL $122,650 ADDRESS MAILING ADDRESS 55th Street N Ke a t s A v e n u e N 99619873 9855 9830 9800 5630 H: \ L K E L M N \ 2 4 X 1 3 6 2 1 5 0 0 0 \ C A D \ C 3 D \ F e a s i b i l i t y R e p o r t F i g u r e s \ F I G R - 1 3 6 2 1 5 - A s s e s s a b l e P r o p e r t i e s . d w g 3 / 1 1 / 2 0 2 5 1 2 : 3 5 : 0 2 P M R 2025 Street and Utility Improvements City of Lake Elmo Assessable Properties - Lake Elmo Vista (55th Street) March 2025 LEGEND ASSESSABLE PROPERTY ASSESSABLE PROPERTY AT 50% R FEETSCALE 0 50 100 HORZ. CITY OF LAKE ELMO, MN. MARCH, 2025 2025 STREET AND UTILITY IMPROVEMENTS PRAIRIE HAMLET (59TH ST CT N) PRELIMINARY ASSESSMENT ROLL PAGE 1 of 1 NO.NAME PID RESIDENTIAL EQUIVALENT LOTS STREET AND DRAINAGE ASSESSMENT AMOUNT 1 KOSLOWSKI LINDA A 9917 59TH STREET CT N 9917 59TH STREET CT N LAKE ELMO MN 55042 0302921110023 1 $7,750 2 CALIGIURI PHILIP A & GAIL A 9913 59TH STREET CT N 9913 59TH STREET CT N LAKE ELMO MN 55042 0302921110024 1 $7,750 3 SANDRA L DEUTSCH REV TRS 9905 59TH STREET CT N 9905 59TH STREET CT N LAKE ELMO MN 55042 0302921110025 1 $7,750 4 SULLIVAN JUDITH J & TERRY A 9901 59TH STREET CT N 9901 59TH STREET CT N LAKE ELMO MN 55042 0302921110026 1 $7,750 5 HER LUE & KITA 9885 59TH STREET CT N 9885 59TH STREET CT N LAKE ELMO MN 55042 0302921110016 1 $7,750 6 LYNSKEY MICHAEL J JR 9867 59TH STREET CT N PO BOX 36 STILLWATER MN 55082 0302921110015 1 $7,750 7 ZABEL ELIZABETH & ADAM SLINGER 9849 59TH STREET CT N 9849 59TH STREET CT N LAKE ELMO MN 55042 0302921110014 1 $7,750 8 ANDRUS DOUGLAS E & PATRICIA A 9831 59TH STREET CT N 9831 59TH STREET CT N LAKE ELMO MN 55042 0302921110013 1 $7,750 9 HILGERS MICHAEL E & KIM MARIE 9818 59TH STREET CT N 9818 59TH STREET CT N LAKE ELMO MN 55042 0302921110012 1 $7,750 10 FAUST DAVID J & DENISE M 9836 59TH STREET CT N 9836 59TH STREET CT N LAKE ELMO MN 55042 0302921110011 1 $7,750 11 BENNING CARLA 9858 59TH STREET CT N 9858 59TH STREET CT N LAKE ELMO MN 55042 0302921110010 1 $7,750 12 DELGRECO PETER & JONNILEE 9880 59TH STREET CT N 9880 59TH STREET CT N LAKE ELMO MN 55042 0302921110009 1 $7,750 13 ELLIS RICHARD P & MARY E 9902 59TH STREET CT N 9902 59TH STREET CT N LAKE ELMO MN 55042 0302921110019 1 $7,750 14 ANN MARIE WIELAND TRS 9910 59TH STREET CT N 9910 59TH STREET CT N LAKE ELMO MN 55042 0302921110020 1 $7,750 15 HENDRICKSON BOB C & MARY L 9918 59TH STREET CT N 9918 59TH STREET CT N LAKE ELMO MN 55042 0302921110021 1 $7,750 16 ALT ROBERT A & VALERIE J 9924 59TH STREET CT N 9924 59TH STREET CT N LAKE ELMO MN 55042 0302921110022 1 $7,750 17 DOUGLAS & MEREDITH LOVETT JT REV TRS 9940 59TH STREET CT N 9940 59TH STREET CT N LAKE ELMO MN 55042 0302921120005 1 $7,750 TOTAL $131,750 ADDRESS MAILING ADDRESS 59t h S t r e e t Cou r t N Ke a t s A v e n u e N 9568 9924991899109902 9880 9858 9836 9818 9831 9849 9867 9885 9901 9905 9913 9917 9940 H: \ L K E L M N \ 2 4 X 1 3 6 2 1 5 0 0 0 \ C A D \ C 3 D \ F e a s i b i l i t y R e p o r t F i g u r e s \ F I G R - 1 3 6 2 1 5 - A s s e s s a b l e P r o p e r t i e s . d w g 3 / 1 1 / 2 0 2 5 1 1 : 2 1 : 1 7 A M R 2025 Street and Utility Improvements City of Lake Elmo Assessable Properties - Prairie Hamlet March 2025 LEGEND ASSESSABLE PROPERTY R FEETSCALE 0 70 140 HORZ. LOCATION MAP FIGURE NO. 1 CITY OF LAKE ELMO PROJECT NEIGHBORHOOD LEGEND IMPROVEMENTS PROJECT NO. 2024.114 PROJECT STREETS IRISH COURT N PRAIRIE HAMLET LAKE ELMO VISTAROLLING HILLS ESTATES JUDITH MARY MANOR TEAL PASS ESTATES 2025 STREET & UTILITY R46' F/C D C D C C C D D >>>>>>>>>>>>>> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l D D >> >> >> >>>>>>>>>>>>>>>>>>>> >> >> E- D E- D E- D E- D E- D E- D E- D E- D E- D E- D E- D E- D E- D E- D E- D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D OEOEOEOEOEOEOEOE E-D OE OE C-D C-D C - D C - D C- D C- D C- D C- D C- D C- D C- D C- D C-DC-D C- D C- D C- D C- D C-DC-DC-D G-DG-D G- D G- D G- D G- D G- D G- D G - D G- D G-D G-D G- D G - D G-D G- D G- D G- D G- D G- D G-DG-DG-DG-DG-DG-DG-DG-DG-DG-DG-DG-DG-DG-D F-DF-DF-DF-DF-DF-DF-DF-D F- D F- D F- D F- D C-DC-DC-DC-DC-DC-DC-DC-D C- D C- D C- D C- D C-DC-DC-DC-DC-DC-DC-DC-DC-DC-DC-DC-DC-DC-D G- D G- D G- D G- D E-D E-D E - D E-D E-D E-DE-DE-D E- D E-D E-D E-D E-D E-D E-D E-D E-D E-D G-D G-D G-D G-D G- D G- D G- D C C- D C-D C-D C- D E - D E- D E-D E-D E- D E - D E-D E-D E- D E- D E- D E- D E- D E- D E- D Ir i s h C o u r t N 42nd Street N Ir v i n C i r c l e N STORM SEWER REPAIR AND REPLACEMENT AS NEEDED (TYP.) 32' F/C TO F/C 60' ROW H: \ L K E L M N \ 2 4 X 1 3 6 2 1 5 0 0 0 \ C A D \ C 3 D \ F e a s i b i l i t y R e p o r t F i g u r e s \ F I G R - 1 3 6 2 1 5 - P r o p o s e d S t r e e t I m p r o v e m e n t s . d w g 3/ 1 1 / 2 0 2 5 1 0 : 0 6 : 0 6 A M R 2025 Street and Utility Improvements City of Lake Elmo Proposed Street and Storm Improvements March 2025 LEGEND STREET IMPROVEMENTS: RECLAMATION WITH NEW CURB AND GUTTER EXISTING STORM SEWER PROPOSED STORM SEWER IMPROVEMENTS R FEETSCALE 0 50 100 HORZ. >>D >> Je r o m e A v e n u e N 49th S t r e e t N R50' F/C R60' ROW (TYP) C CLVT CLVT C C C CC CC C C CC D D > > >> >> >> E- D E- D E- D E- D E- D E- D E - D E - D E - D E- D E- D E - D E - D E - D E - D E- D E- D E-D E-D E-D E-D E-D E-D E-D E - D E - D E-D E-D E-D G-D G-D G-D G - D G-D G-D G-D G-D G-D G-D G- D G - D G - D G-D G-D G- D G- D G- D G- D G- D G- D G- D G - D G - D G - D G- D G- D G - D G-D G-D G-D G-D G-D G-D G-D G-D C-D C-D C-D C- D C- D C- D C- D C- D C- D C-D C - D C - D C - D C- D C- D C - D C-D C-D C-D C-D C-D C-D C-D C- D C - D C - D C-D C-D C-D C C-D C-D C-D C-D C-D C- D C - D C - D C-D C-D C-D C-D C-D C-D C-D C-D C- D C-DC-D C-D C-D C- D C-D C-D C- D C- D C- D C- D C- D C- D C- D C- D C - D C - D C - D C- D C- D C-D C-D C-D C-D G-D G-D G- D E-D E-D E-D E-D E- D OE OE E- D E-D E-D E-D E-D E-D OE E-D C- D C - D >> Jerome Avenue N Ja s p e r A v e n u e N Jane Ro a d N Ja m a c a A v e n u e N Ja n e C i r c l e N STORM SEWER REPAIR AND REPLACEMENT AS NEEDED (TYP) CLEAR VEGETATION, DITCH GRADING, AND CLEAN/REPLACE RIP RAP AT FLARED END SECTIONS AS NEEDED (TYP) 32' F/C TO F/C 60' ROW (TYP) H: \ L K E L M N \ 2 4 X 1 3 6 2 1 5 0 0 0 \ C A D \ C 3 D \ F e a s i b i l i t y R e p o r t F i g u r e s \ F I G R - 1 3 6 2 1 5 - P r o p o s e d S t r e e t I m p r o v e m e n t s . d w g 3/ 1 1 / 2 0 2 5 1 0 : 0 6 : 1 3 A M R 2025 Street and Utility Improvements City of Lake Elmo Proposed Street and Storm Improvements March 2025 LEGEND STREET IMPROVEMENTS: RECLAMATION WITH NEW CURB AND GUTTER EXISTING STORM SEWER PROPOSED STORM SEWER IMPROVEMENTS FEETSCALE 0 100 200 HORZ. >>D >> R CC C C CC CC C C C C C C C C > > >>>>>>>> >> >> >> E-D E-D E-D E- D E- D E-D E- D E - D E- D E- D G-D G-D G-D G-D G-D G-D G-D G- D G- D G- D G- D G - D G-D G - D G - D G- D G- D G- D G-D G- D G - D G-D G-D E-D E-D E-D E-D C-D C-D C- D C- D C-D C- D C- D C-D C - D C- D C- D C-D C- D C- D C - D C - D C - D C - D C - D C - D C- D C- D C-D C-D C-D C - D C-D C-D C-D C-D C-D C - D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E- D E-D E- D E - D E - D E - D E - D E- D E- D E-D E- D E - D E-D E-D E-D E-D E-D E-D E-D E-D E-D E - D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D G-D G-D G-D G-D G-D G - D G-D G - D G - D G - D G - D G- D G-D G-D G- D G- D G - D G - D C - D C - D C - D C- D C-D C - D C-D C- D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C- D C- D C - D C C-D C-D C-D C-D C-D C- D C- D C-D G-D G-D G-D G- D C-D > > > > Ju l e p W a y 57th Street N 55 t h S t r e e t N 5 7 t h S t r e e t N CLEAR VEGETATION, DITCH GRADING, AND CLEAN/REPLACE RIP RAP AT FLARED END SECTIONS AS NEEDED (TYP) PROPOSED STORM SEWER EXTENSIONS (TYP) 28' F/C TO F/C 60' ROW 28' F/C TO F/C 60' ROW 24' F/C TO F/C 50' ROW 22' F/C TO F/C H: \ L K E L M N \ 2 4 X 1 3 6 2 1 5 0 0 0 \ C A D \ C 3 D \ F e a s i b i l i t y R e p o r t F i g u r e s \ F I G R - 1 3 6 2 1 5 - P r o p o s e d S t r e e t I m p r o v e m e n t s . d w g 3/ 1 1 / 2 0 2 5 1 0 : 0 6 : 3 2 A M R 2025 Street and Utility Improvements City of Lake Elmo Proposed Street and Storm Improvements March 2025 LEGEND STREET IMPROVEMENTS: RECLAMATION WITH NEW CURB AND GUTTER EXISTING STORM SEWER PROPOSED STORM SEWER IMPROVEMENTS FEETSCALE 0 100 200 HORZ. >>D >> R C C C CLVT C C C C >> l l l l l l l l l l l l l l l l l l l l l l l l l l l l XXXXXXXXXXXXXXXXXE-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E- D G- D G- D G- D G- D C- D C- D G-D G-D G- D G - D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D E-D E- D E - D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D C- D C-D C-D C- D C - D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C- D C - D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C C-D C- D C- D C- D C- D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C- D E-D E-D E - D E-D >> >>>>>>>>>>>> 55th Street N Ke a t s A v e n u e N 24' F/C TO F/C 50' ROW 22' F/C TO F/C STORM SEWER REPAIR AND REPLACEMENT AS NEEDED (TYP) H: \ L K E L M N \ 2 4 X 1 3 6 2 1 5 0 0 0 \ C A D \ C 3 D \ F e a s i b i l i t y R e p o r t F i g u r e s \ F I G R - 1 3 6 2 1 5 - P r o p o s e d S t r e e t I m p r o v e m e n t s . d w g 3/ 1 1 / 2 0 2 5 1 0 : 0 6 : 2 1 A M R 2025 Street and Utility Improvements City of Lake Elmo Proposed Street and Storm Improvements March 2025 LEGEND STREET IMPROVEMENTS: RECLAMATION WITH NEW CURB AND GUTTER EXISTING STORM SEWER PROPOSED STORM SEWER IMPROVEMENTS FEETSCALE 0 50 100 HORZ. >>D >> R CC C C CC S HC CC C CC D S D E C C >> l l l l l l l l l l l l D >> > > > > > > > > > > > > > > >>> > > > > > > > CO CO l l l l l l l l l l l l l l l l l l S LS SSS L LMS CO CO S S S S S SCO L E- D E - D E - D E - D E- D E-D E-D E-D E - D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E- D G- D G - D G - D G - D G- D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G- D G- D G - D G- D G-D G-D G-D G-D G-D G-D G-D G-D G-D C- D C- D C - D C - D C- D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C- D G- D G- D G- D G- D G- D G- D G- D G- D G- D G- D G- D G-D C-D C-D F- D F- D F- D F- D F- D F- D F- D F- D C- D C- D C-D C-D C-DC C- D C-D C - D C - D C- D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C - D C - D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C- D E-D E-D E-D E- D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-DE-D E-D E-D E-D OE OE OE OE OE OE OE E-D E-D >> >> >> >> >>>>>> 59t h S t r e e t Cou r t N Ke a t s A v e n u e N EXISTING PRIVATE SANITARY SEWER TO REMAIN IN PLACE REPAIR AS NECESSARY 24' F/C TO F/C 50' ROW H: \ L K E L M N \ 2 4 X 1 3 6 2 1 5 0 0 0 \ C A D \ C 3 D \ F e a s i b i l i t y R e p o r t F i g u r e s \ F I G R - 1 3 6 2 1 5 - P r o p o s e d S t r e e t I m p r o v e m e n t s . d w g 3/ 1 1 / 2 0 2 5 1 0 : 0 6 : 4 0 A M R 2025 Street and Utility Improvements City of Lake Elmo Proposed Street and Storm Improvements March 2025 LEGEND STREET IMPROVEMENTS: RECLAMATION WITH NEW CURB AND GUTTER EXISTING STORM SEWER EXISTING PRIVATE SANITARY SEWER PROPOSED STORM SEWER IMPROVEMENTS >>D FEETSCALE 0 50 100 HORZ. >> >SS R 3507 High Point Drive North Bldg. 1 – Suite E130 Oakdale, MN 55128 Phone: (651) 704-9970 Bolton-Menk.com 2025 Street and Utility Improvements Lake Elmo, MN Project No.: 2024.114 SEPTEMBER 17, 2024 Council authorizes preparation of Preliminary Design, Geotechnical Services and Feasibility Report. JANUARY 28 and 29, 2025 Neighborhood informational meeting(s) on scope of improvements. FEBRUARY 18, 2025 Presentation of Preliminary Design Findings and Recommendations. Authorize preparation of Plans and Specifications. MARCH 18, 2025 Council accepts the Feasibility Report and Calls for Public Hearing. Council approves Plans and Specifications and orders Advertisement for Bids. APRIL 22, 2025 Project Bid Date: Receive contractor bids. APRIL 24, 2025 Neighborhood informational meeting(s) on Preliminary Assessments. MAY 6, 2025 Public Improvement Hearing. Council Orders the Improvement (4/5th Vote). Council accepts Bids and awards Contract. MAY, 2025 Conduct Pre-Construction Meeting and issue Notice to Proceed.  SEPTEMBER 12, 2025 Substantial Completion.  OCTOBER 31, 2025 Final Completion. *Final Assessment Hearing Schedule TDB LAKE ELMO, MN. | PROJECT NO. 137240 ADVERTISEMENT FOR BIDS 0100-1 SECTION 0100 – ADVERTISEMENT FOR BIDS 2025 STREET IMPROVEMENTS PROJECT NO. 137240 FOR THE CITY OF LAKE ELMO WASHINGTON COUNTY, MINNESOTA Notice is hereby given that bids will be received online through QuestCDN.com until 10:00 AM CDST, on Tuesday, April 22, 2025, via QuestCDN for furnishing all work and materials for the construction, complete in place, of the 2025 Street Improvements project, consisting of the major work items in the following approximate quantities: 16 EA Clearing & Grubbing 25 EA Storm Sewer Structures 1,150 LF 12”-18” RCP Storm Sewer 3,100 LF 4” Drain Tile w/ Backfill and Wrap 27,800 SY Reclaim Existing Bituminous and Base Material 2,700 CY Haul Excess Reclaimed Material Off Site 5,300 TN Bituminous Pavement 900 SY Patch Bituminous Driveway 300 SY Patch Concrete Driveway 15,300 LF Concrete Curb and Gutter 100 SF Sign Type C 3,000 SY Seed and Blanket 7,300 SY Sod 2,300 CY Topsoil Borrow This project is subject to Responsible Contractor Certification. The bid opening will be conducted via Microsoft TEAMS Meeting, at which time the bids will be publicly opened and read aloud: Lake Elmo 2025 Street Improvements Bid Opening Tuesday, April 22, 2025 10:00 AM (CDST) http://tiny.cc/LakeElmo2025StreetImprov Any person monitoring the meeting remotely may be responsible for any documented costs. Message and data rates may apply. Bids must be submitted electronically through QuestCDN no later than the date and time noted above, on the Proposal Forms provided in accordance with the Contract Documents, Plans, and Specifications as prepared by Bolton & Menk, Inc., www.bolton-menk.com, which are on file for inspection in the office of the City Clerk and City Engineer. For this project, the City will only be accepting online electronic bids through QuestCDN. To access the electronic bid form, download the project document and click the bidding button at the top of the advertisement. LAKE ELMO, MN. | PROJECT NO. 137240 ADVERTISEMENT FOR BIDS 0100-2 Prospective bidders must be on the plan holders list through QuestCDN for bids to be accepted. Bids will only be accepted from Contractors who purchase Bidding Documents as specified above. Complete digital Proposal Forms, Plans, and Specifications for use by Contractors submitting a bid are available at www.QuestCDN.com. Digital plan documents may be downloaded for a non-refundable fee of $50.00 by inputting Quest Project No. 9551431 on the website’s Project search page. Please contact QuestCDN at (952) 233-1632 or info@QuestCDN.com for assistance in free membership registration, downloading, and working with this digital project information. No bid will be considered unless submitted online prior to the time noted above for the closing of the bids, and accompanied by a bid bond in an amount not less than five percent (5%) of the total bid as a guarantee that the bidder, if successful, will enter into a contract with the City to perform the work described in the proposal. This deposit will be subject to forfeiture as provided by law. The deposits for the three lowest bidders will be retained by the City until the contract has been awarded and executed but not longer than sixty (60) days. No bid may be withdrawn for a period of sixty (60) days following the bid opening. The City reserves the right to reject any or all bids, to waive informalities or to award the contract to the lowest responsible bidder, in the best interest of the City. For Bids exceeding $50,000, the Bidder shall submit to the City a signed statement under oath by an owner or officer verifying compliance with each of the minimum criteria in Minnesota Statutes, section 16C.285, subdivision 3 on the Responsible Contractor Verification Form included with the Bid Proposal. Dated: March 18, 2025 Julie Johnson, City Clerk City of Lake Elmo PUBLISHED: QuestCDN.com: March 21, 2025 Stillwater Gazette: March 21, 2025