Loading...
HomeMy WebLinkAbout#08 - Stillwater Area School DIst Utility Improvements (1) STAFF REPORT DATE: May 20, 2025 REGULAR TO: City Council FROM: Chad Isakson, Assistant City Engineer AGENDA ITEM: Approve Resolution Accepting Bids and Awarding a Contract for the Stillwater Area School District Utility Improvements REVIEWED BY: Nicole Miller, City Administrator Clarissa Hadler, Finance Director Marty Powers, Public Works Director Nate Stanley, City Engineer CORE STRATEGIES: ☐ Vibrant, inclusive, connected community ☐ Efficient, reliable, innovative services ☒ Responsive, transparent, adaptive governance ☐ Balanced Finances now and future ☒ Managed Growth ☒ Resilient Infrastructure BACKGROUND: On April 1, 2025 the City Council ordered an advertisement for bids for the Stillwater Area School District Utility Improvements. The project was advertised on QuestCDN.com and in the Stillwater Gazette in accordance with the Minnesota Competitive Bidding requirements. ISSUE BEFORE COUNCIL: Should the City Council accept bids and award a construction contract for the project? PROPOSAL DETAILS/ANALYSIS: The Stillwater Area School District Utility Improvements include the extension of City utilities to accommodate the requested connection to city water and sanitary sewer for the Oak-Land Middle School and new Elementary School. There is one additional property located at 11817 10th Street North that will benefit. The improvements include the following: • Extension of gravity sanitary sewer to the Oakland Middle School property, from the existing Royal Golf Club lift station located at Palmer Drive and 10th Street (to be City owned/maintained). • Extension of 12-inch watermain to the Oakland Middle School property, from the intersection of Palmer Drive and 10th Street (to be City owned/maintained). • Construction of a new 4,200 LF, 8-inch forcemain along 10th Street, from the existing RGC lift station located at Palmer Drive to Lake Elmo Avenue. Abandon the existing 6-inch forcemain in place. • Construction of a new 3,100 LF, 10-inch forcemain along Lake Elmo Avenue, from 10th Street to an existing gravity sewer at Lake Elmo Avenue and 5th Street. • The school district would be required to make private utility extensions on each school site as needed to connect to the public water and sewer improvements. Contractor bids were received and opened electronically on April 29, 2025. The City received seven bids for this project, with GM Contracting Inc. providing the lowest bid in the amount of $1,044,814.00. Following review and verification of the bid tabulations, the City Engineer and Design Engineer are recommending that the City Council award the contract to the lowest responsible bidder, GM Contracting, Inc., as outlined in the attached letter. The table below provides a total project cost comparison to the estimate included in the feasibility report. Table 1: Project Costs Feasibility Report Post Bid Total Estimated Project Cost: $1,754,000 $1,464,000 As part of this contract award, staff is also requesting the Council to authorize the City Administrator to enter into a construction material testing contract for the project construction phase services in the not-to- exceed amount of $30,000. Staff will be receiving proposals from both Braun Intertec and AET. FISCAL IMPACT: Approval of this resolution commits the City to enter into a construction contract for the project. The estimated post-bid project cost is $1,464,000 based on bids received coming in under the estimate and lowering project contingencies to 8% for unforeseen conditions incurred during construction and potential lift station modification needs. The final assessment calculations will be updated at the end of the project when final project costs are known. The City Council will have the opportunity to adjust the assessment amounts according to the known costs this fall to reflect any savings realized on the project. The improvements will be funded through a combination of special assessments. OPTIONS: • Accept the Bids and Award a Contract to GM Contracting, Inc. • Do not move forward with this project RECOMMENDATION: Staff are recommending the City Council approve a Resolution Accepting Bids and Awarding a Contract to GM Contracting, Inc. for the bid amount of $1,044,814.00 for the Stillwater Area School District Utility Improvements. The Recommended motion is as follows: Motion to approve Resolution No. 2025-040, Accepting Bids and Awarding a Contract to GM Contracting, Inc, for the bid amount of $1,044,814.00 for Stillwater Area School District Utility Improvements. Staff are also recommending the City Council authorize the City Administrator to enter into a material testing contract for the project construction phase services in the not-to-exceed amount of $30,000. The Recommended motion is as follows: Motion to authorize the City Administrator to enter into a material testing contract for the project construction phase services in the not-to-exceed amount of $30,000 for the Stillwater Area School District Utility Improvements. ATTACHMENTS: 1. Resolution Accepting Bids and Awarding a Contract for the Stillwater Area School District Utility Improvements. 2. Engineer’s Letter of Award Recommendation and Tabulation of Bids. 3. Proposed Improvements. 4. Project Schedule. CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2025-040 A RESOLUTION ACCEPTING BIDS AND AWARDING A CONTRACT FOR THE STILLWATER AREA SCHOOL DISTRICT UTILITY IMPROVEMENTS WHEREAS, pursuant to an advertisement for bids for the Stillwater Area School District Utility Improvements, bids were received, opened, and tabulated according to law, and bids were received complying with the advertisement; and WHEREAS, bids were tabulated, checked and summarized to verify that all requirements of the submittal were met; and WHEREAS, the project engineer reviewed the bids and has provided a letter recommending the award of the contract to the lowest responsible bidder, GM Contracting, Inc., for the bid amount of $1,044,814.00. NOW, THEREFORE, BE IT RESOLVED, 1. That the Mayor and City Clerk are hereby authorized and directed to enter into a Contract in the accordance with the above ordered Project, in the amount of the Contractor’s lowest responsible bid, and according to the plans and specifications thereof approved by the City Council. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposits of the successful bidder and the next two lowest bidders shall be retained until a contract has been signed. ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE TWENTIETH DAY OF MAY, 2025. CITY OF LAKE ELMO By: __________________________ Charles Cadenhead (Seal) Mayor ATTEST: ________________________________ Julie Johnson City Clerk h:\lkelmn\24x134951000\6_plans-specs\b_bid documents\134951 award ltr.docx April 29, 2025 Nate Stanley, P.E. City Engineer City of Lake Elmo 3880 Laverne Avenue N Lake Elmo, Minnesota 55042 RE: Stillwater Area School District Utility Improvement Project City of Lake Elmo, MN City Project No. 134951 BMI Project No. 24X.134951 Dear Mr. Stanley, Attached is the bid abstract for the project referenced above. Seven bids were received at 10:00 a.m. on Tuesday, April 29, 2025. The following is a summary of the bids received: Bidder Total Bid GM Contracting, Inc. $1,044,814.00 Geislinger & Sons, Inc. $1,288,336.90 Pember Companies, Inc. $1,289,652.55 Miller Excavating, Inc. $1,316,722.95 Meyer Contracting, Inc. $1,390,500.07 Minger Construction Co., Inc. $1,498,294.25 A-1 Excavating LLC $1,659,049.00 We have reviewed the bids and recommend awarding this bid to GM Contracting, Inc. in the amount of $1,044,814.00. Sincerely, Bolton & Menk, Inc. Michael R. Warner, P.E. Principal Engineer Enclosure ABSTRACT OF BIDS STILLWATER AREA SCHOOL DISTRICT UTILITY IMPROVEMENTS PROJECT NO. 134951 CITY OF LAKE ELMO, MN BID DATE: APRIL 29, 2025 AT 10:00 AM 1 2 NO. ITEM UNIT QTY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE BASE BID 1 MOBILIZATION LS 1 $77,889.40 $77,889.40 $58,000.00 $58,000.00 2 TRAFFIC CONTROL LS 1 $78,500.00 $78,500.00 $96,000.00 $96,000.00 3 INLET PROTECTION EA 1 $150.00 $150.00 $500.00 $500.00 4 SILT FENCE, MACHINE SLICED LF 1,016 $2.30 $2,336.80 $2.35 $2,387.60 5 SEDIMENT CONTROL LOG, TYPE WOOD FIBER LF 200 $3.25 $650.00 $4.10 $820.00 6 CLEARING LS 1 $1,500.00 $1,500.00 $5,000.00 $5,000.00 7 GRUBBING LS 1 $500.00 $500.00 $2,500.00 $2,500.00 8 TRANSPLANT TREE EA 7 $357.14 $2,499.98 $2,000.00 $14,000.00 9 SALVAGE AND REINSTALL SIGN EA 3 $400.00 $1,200.00 $1,900.00 $5,700.00 10 BYPASS PUMPING LS 1 $5,369.00 $5,369.00 $11,000.00 $11,000.00 11 CONNECT TO EXISTING FORCEMAIN EA 1 $3,274.41 $3,274.41 $9,000.00 $9,000.00 12 DISCONNECT 6" FORCEMAIN FROM 16" FORCEMAIN EA 1 $1,959.68 $1,959.68 $8,000.00 $8,000.00 13 CONNECT EXISTING PIPE TO NEW STRUCTURE EA 4 $1,819.36 $7,277.44 $11,000.00 $44,000.00 14 DUCTILE IRON FITTINGS LBS 1,608 $10.00 $16,080.00 $14.35 $23,074.80 15 COAT MANHOLE EA 1 $5,900.00 $5,900.00 $6,300.00 $6,300.00 16 6" DIP SANITARY SEWER FORCEMAIN, CL 52, INCL POLYWRAP LF 10 $100.99 $1,009.90 $150.00 $1,500.00 17 8" PVC SANITARY FORCEMAIN, C900, OPEN CUT LF 100 $80.92 $8,092.00 $100.00 $10,000.00 18 8" HDPE SANITARY FORCEMAIN, DR 11, DIRECTIONAL DRILL LF 3,925 $52.65 $206,651.25 $80.00 $314,000.00 19 10" HDPE SANITARY FORCEMAIN, DR 11, DIRECTIONAL DRILL LF 3,155 $69.77 $220,124.35 $96.00 $302,880.00 20 8" PVC SANITARY SEWER, SDR 26 LF 643 $77.00 $49,511.00 $90.00 $57,870.00 21 4" PVC SANITARY SEWER SERVICE LF 20 $81.27 $1,625.40 $50.00 $1,000.00 22 4' DIAMETER SANITARY AIR RELEASE MANHOLE, INCL CASTING AND RINGS EA 1 $28,822.57 $28,822.57 $35,000.00 $35,000.00 23 4' DIAMETER SANITARY MANHOLE, INCL CASTING AND RINGS EA 5 $9,246.68 $46,233.40 $9,000.00 $45,000.00 24 7' DIAMETER SANITARY MANHOLE, INCL CASTING AND RINGS EA 1 $22,996.81 $22,996.81 $30,000.00 $30,000.00 25 TELEVISING LF 643 $5.38 $3,459.34 $3.00 $1,929.00 26 CONNECT TO EXISTING 12" WATERMAIN EA 1 $2,693.62 $2,693.62 $3,500.00 $3,500.00 27 6" GATE VALVE AND BOX EA 2 $2,870.79 $5,741.58 $2,100.00 $4,200.00 28 8" GATE VALVE AND BOX EA 1 $3,861.17 $3,861.17 $3,000.00 $3,000.00 29 12" GATE VALVE AND BOX EA 1 $5,975.85 $5,975.85 $5,000.00 $5,000.00 30 VALVE BOX EXTENSION LF 1 $404.50 $404.50 $350.00 $350.00 31 HYDRANT EA 1 $7,321.12 $7,321.12 $8,000.00 $8,000.00 32 HYDRANT EXTENSION LF 1 $1,806.28 $1,806.28 $1,400.00 $1,400.00 33 6" DIP WATER MAIN, CL 52, INCL POLYWRAP LF 15 $74.51 $1,117.65 $80.00 $1,200.00 34 12" DIP WATER MAIN, CL 52, INCL POLYWRAP LF 500 $117.65 $58,825.00 $110.00 $55,000.00 35 1" WATER SERVICE LF 10 $69.10 $691.00 $60.00 $600.00 36 1" CORPORATION STOP EA 1 $644.66 $644.66 $2,200.00 $2,200.00 37 1" CURB STOP AND BOX EA 1 $751.72 $751.72 $2,300.00 $2,300.00 GEISLINGER & SONS, INC.GM CONTRACTING, INC. 38 GRANULAR MATERIAL BEDDING LF 60 $5.37 $322.20 $30.00 $1,800.00 39 CONCRETE HYDRANT SPLASH PAD SF 10 $177.18 $1,771.80 $50.00 $500.00 40 SALVAGE AND REINSTALL STORM SEWER PIPE LF 50 $62.31 $3,115.50 $80.00 $4,000.00 41 SALVAGE AND REINSTALL STORM SEWER STRUCTURE EA 1 $4,444.07 $4,444.07 $2,000.00 $2,000.00 42 SAWCUT BITUMINOUS PAVEMENT LF 460 $3.91 $1,798.60 $3.00 $1,380.00 43 REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT SY 910 $8.33 $7,580.30 $5.00 $4,550.00 44 REMOVE AND REPLACE CONCRETE CURB AND GUTTER LF 10 $32.04 $320.40 $200.00 $2,000.00 45 COMMON EXCAVATION (EV) CY 440 $27.13 $11,937.20 $25.50 $11,220.00 46 AGGREGATE BASE, CLASS 5 TN 220 $43.64 $9,600.80 $25.00 $5,500.00 47 AGGREGATE BASE, CLASS 6 TN 100 $57.08 $5,708.00 $25.00 $2,500.00 48 SELECT GRANULAR BORROW TN 550 $20.03 $11,016.50 $15.00 $8,250.00 49 TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,B) [SPWEA230B] - DRIVEWAY/TRAIL TN 30 $134.93 $4,047.90 $142.00 $4,260.00 50 TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (3,C) [SPWEA330C] - STREET PATCH TN 210 $143.72 $30,181.20 $151.00 $31,710.00 51 TYPE SP 12.5 BITUMINOUS WEARING COURSE MIXTURE (3,C) [SPNWB330C] - STREET PATCH TN 5 $135.05 $675.25 $142.00 $710.00 52 BITUMINOUS MATERIAL FOR TACK COAT GAL 50 $8.00 $400.00 $10.00 $500.00 53 TOPSOIL BORROW (LV) CY 870 $37.52 $32,642.40 $22.00 $19,140.00 54 SEED MIXTURE RT & EROSION CONTROL BLANKET SY 5,690 $5.70 $32,433.00 $2.15 $12,233.50 55 STREET SWEEPER WITH PICK UP BROOM HR 10 $150.00 $1,500.00 $200.00 $2,000.00 56 4" MULTI-COMPONENT SOLID LINE - WHITE LF 55 $3.60 $198.00 $3.60 $198.00 57 4" MULTI-COMPONENT SOLID LINE - YELLOW LF 133 $3.60 $478.80 $3.60 $478.80 58 6" MULTI-COMPONENT SOLID LINE - WHITE LF 121 $4.00 $484.00 $4.00 $484.00 59 24" MULTI-COMPONENT SOLID LINE - YELLOW LF 28 $25.40 $711.20 $25.40 $711.20 TOTAL BASE BID $1,044,814.00 $1,288,336.90 3 4 5 6 7 UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE $35,690.00 $35,690.00 $49,623.80 $49,623.80 $69,757.64 $69,757.64 $72,000.00 $72,000.00 $140,000.00 $140,000.00 $73,500.00 $73,500.00 $117,870.54 $117,870.54 $69,000.00 $69,000.00 $70,500.00 $70,500.00 $125,000.00 $125,000.00 $150.00 $150.00 $548.89 $548.89 $500.00 $500.00 $220.00 $220.00 $500.00 $500.00 $2.45 $2,489.20 $2.58 $2,621.28 $3.61 $3,667.76 $3.00 $3,048.00 $3.00 $3,048.00 $3.40 $680.00 $4.50 $900.00 $5.36 $1,072.00 $5.00 $1,000.00 $5.00 $1,000.00 $3,150.00 $3,150.00 $27,444.60 $27,444.60 $10,000.00 $10,000.00 $15,350.00 $15,350.00 $1,800.00 $1,800.00 $1,600.00 $1,600.00 $18,662.33 $18,662.33 $4,175.00 $4,175.00 $12,250.00 $12,250.00 $2,900.00 $2,900.00 $600.00 $4,200.00 $798.14 $5,586.98 $1,500.00 $10,500.00 $675.00 $4,725.00 $800.00 $5,600.00 $425.00 $1,275.00 $2,180.23 $6,540.69 $1,920.34 $5,761.02 $490.00 $1,470.00 $2,200.00 $6,600.00 $8,500.00 $8,500.00 $42,168.47 $42,168.47 $21,895.59 $21,895.59 $23,000.00 $23,000.00 $20,000.00 $20,000.00 $4,500.00 $4,500.00 $4,496.08 $4,496.08 $1,752.35 $1,752.35 $10,600.00 $10,600.00 $4,600.00 $4,600.00 $2,550.00 $2,550.00 $4,067.84 $4,067.84 $3,285.67 $3,285.67 $8,730.00 $8,730.00 $3,600.00 $3,600.00 $2,425.00 $9,700.00 $5,166.48 $20,665.92 $1,723.17 $6,892.68 $175.00 $700.00 $3,300.00 $13,200.00 $17.00 $27,336.00 $17.36 $27,914.88 $20.96 $33,703.68 $38.00 $61,104.00 $16.00 $25,728.00 $6,255.00 $6,255.00 $9,880.05 $9,880.05 $5,900.00 $5,900.00 $7,240.00 $7,240.00 $7,000.00 $7,000.00 $140.00 $1,400.00 $57.39 $573.90 $130.79 $1,307.90 $120.00 $1,200.00 $140.00 $1,400.00 $121.00 $12,100.00 $297.97 $29,797.00 $299.38 $29,938.00 $100.00 $10,000.00 $140.00 $14,000.00 $65.00 $255,125.00 $68.81 $270,079.25 $83.89 $329,268.25 $86.75 $340,493.75 $110.00 $431,750.00 $83.50 $263,442.50 $80.56 $254,166.80 $89.38 $281,993.90 $105.00 $331,275.00 $120.00 $378,600.00 $252.00 $162,036.00 $86.66 $55,722.38 $170.00 $109,310.00 $170.00 $109,310.00 $190.00 $122,170.00 $113.00 $2,260.00 $42.92 $858.40 $109.74 $2,194.80 $135.00 $2,700.00 $230.00 $4,600.00 $28,000.00 $28,000.00 $24,441.74 $24,441.74 $31,072.45 $31,072.45 $32,550.00 $32,550.00 $22,000.00 $22,000.00 $7,700.00 $38,500.00 $8,767.23 $43,836.15 $10,210.99 $51,054.95 $11,550.00 $57,750.00 $8,200.00 $41,000.00 $19,700.00 $19,700.00 $21,990.06 $21,990.06 $22,500.13 $22,500.13 $34,150.00 $34,150.00 $23,900.00 $23,900.00 $5.00 $3,215.00 $4.64 $2,983.52 $4.33 $2,784.19 $6.50 $4,179.50 $6.00 $3,858.00 $3,940.00 $3,940.00 $2,883.95 $2,883.95 $2,305.50 $2,305.50 $4,250.00 $4,250.00 $2,800.00 $2,800.00 $2,540.00 $5,080.00 $3,058.96 $6,117.92 $2,952.67 $5,905.34 $3,390.00 $6,780.00 $2,700.00 $5,400.00 $3,585.00 $3,585.00 $4,105.95 $4,105.95 $4,192.24 $4,192.24 $4,560.00 $4,560.00 $4,000.00 $4,000.00 $5,860.00 $5,860.00 $6,831.68 $6,831.68 $6,880.76 $6,880.76 $7,070.00 $7,070.00 $6,600.00 $6,600.00 $180.00 $180.00 $1,485.72 $1,485.72 $295.97 $295.97 $575.00 $575.00 $330.00 $330.00 $7,800.00 $7,800.00 $7,711.57 $7,711.57 $8,710.45 $8,710.45 $11,150.00 $11,150.00 $9,200.00 $9,200.00 $1,600.00 $1,600.00 $1,506.89 $1,506.89 $1,506.71 $1,506.71 $1,170.00 $1,170.00 $1,800.00 $1,800.00 $120.00 $1,800.00 $56.25 $843.75 $127.14 $1,907.10 $145.00 $2,175.00 $180.00 $2,700.00 $157.50 $78,750.00 $131.85 $65,925.00 $145.18 $72,590.00 $155.00 $77,500.00 $190.00 $95,000.00 $130.00 $1,300.00 $80.19 $801.90 $57.68 $576.80 $72.00 $720.00 $290.00 $2,900.00 $455.00 $455.00 $533.26 $533.26 $1,172.01 $1,172.01 $1,640.00 $1,640.00 $360.00 $360.00 $570.00 $570.00 $1,642.84 $1,642.84 $856.74 $856.74 $1,770.00 $1,770.00 $570.00 $570.00 A-1 EXCAVATING LLCPEMBER COMPANIES, INC. MILLER EXCAVATING, INC. MEYER CONTRACTING, INC. MINGER CONSTRUCTION CO., INC. $8.35 $501.00 $8.17 $490.20 $8.96 $537.60 $21.00 $1,260.00 $12.00 $720.00 $68.50 $685.00 $94.75 $947.50 $50.00 $500.00 $61.00 $610.00 $60.00 $600.00 $120.00 $6,000.00 $50.17 $2,508.50 $84.74 $4,237.00 $62.00 $3,100.00 $140.00 $7,000.00 $1,800.00 $1,800.00 $2,939.64 $2,939.64 $2,656.24 $2,656.24 $2,730.00 $2,730.00 $3,600.00 $3,600.00 $3.50 $1,610.00 $1.88 $864.80 $4.51 $2,074.60 $2.50 $1,150.00 $3.00 $1,380.00 $11.30 $10,283.00 $5.47 $4,977.70 $4.17 $3,794.70 $11.00 $10,010.00 $5.00 $4,550.00 $100.00 $1,000.00 $170.24 $1,702.40 $193.09 $1,930.90 $200.00 $2,000.00 $170.00 $1,700.00 $55.00 $24,200.00 $22.14 $9,741.60 $27.32 $12,020.80 $37.00 $16,280.00 $35.00 $15,400.00 $35.55 $7,821.00 $24.25 $5,335.00 $56.86 $12,509.20 $60.00 $13,200.00 $30.00 $6,600.00 $34.95 $3,495.00 $32.57 $3,257.00 $58.76 $5,876.00 $75.00 $7,500.00 $30.00 $3,000.00 $35.40 $19,470.00 $13.56 $7,458.00 $32.71 $17,990.50 $34.00 $18,700.00 $25.00 $13,750.00 $199.00 $5,970.00 $383.64 $11,509.20 $134.93 $4,047.90 $165.00 $4,950.00 $200.00 $6,000.00 $181.00 $38,010.00 $219.73 $46,143.30 $143.72 $30,181.20 $175.00 $36,750.00 $166.00 $34,860.00 $277.00 $1,385.00 $652.14 $3,260.70 $135.05 $675.25 $165.00 $825.00 $310.00 $1,550.00 $8.50 $425.00 $4.93 $246.50 $8.00 $400.00 $10.00 $500.00 $10.00 $500.00 $57.80 $50,286.00 $61.78 $53,748.60 $67.73 $58,925.10 $29.00 $25,230.00 $1.00 $870.00 $6.05 $34,424.50 $2.36 $13,428.40 $2.15 $12,233.50 $2.50 $14,225.00 $3.00 $17,070.00 $170.00 $1,700.00 $227.75 $2,277.50 $185.00 $1,850.00 $205.00 $2,050.00 $200.00 $2,000.00 $5.85 $321.75 $3.95 $217.25 $3.60 $198.00 $4.50 $247.50 $5.00 $275.00 $5.85 $778.05 $3.95 $525.35 $3.60 $478.80 $4.50 $598.50 $5.00 $665.00 $6.35 $768.35 $4.39 $531.19 $4.00 $484.00 $5.00 $605.00 $5.00 $605.00 $15.90 $445.20 $27.88 $780.64 $25.40 $711.20 $31.00 $868.00 $30.00 $840.00 $1,289,652.55 $1,316,722.95 $1,390,500.07 $1,498,294.25 $1,659,049.00 >>||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||l ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll l||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||l l l ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll l>>>> >>>> >> >> >> S S S S S S S S S S L ll ll l l l l l lllllllllllllllllllllllllllllllllllllllll>>>>>> >> >> >> >>>>>>>>>>>>>>D D D D >>>>OAK-L A N D MI D D L E S C H O O L ROYA L G O L F C L U B 10TH STREET (CSAH 10)MANNING AVENUE (CSAH 15)10TH STREET (CSAH 10)LAKE ELMO AVENUE (CSAH 17)5TH STREET PA LM ER DR IV E LAVERNE AVENUELAYTON AVENUELEEWARD AVENUECIMA R R O N FUTU R E L A K E EL M O ELEM E N T A R Y S C H O OL LEGEND EXISTING FORCEMAIN (CITY OWNED) PROPOSED FORCEMAIN (CITY OWNED) PROPOSED FORCEMAIN (PRIVATE) EXISTING SANITARY SEWER (CITY OWNED) PROPOSED SANITARY SEWER (CITY OWNED) PROPOSED SANITARY SEWER (PRIVATE) EXISTING WATERMAIN (CITY OWNED) PROPOSED WATERMAIN (CITY OWNED) PROPOSED WATERMAIN (PRIVATE)||||||l ll ll ll lPRIVATE GRAVITY SEWER. ALIGNMENT TO BE DETERMINED BY ISD 834 PRIVATE ELEMENTARY SCHOOL LIFT STATION AND FORCEMAIN. ALIGNMENT AND SIZE TO BE DETERMINED BY ISD 834 (FORCEMAIN SIZE ASSUMED TO BE 4").>>>>>ROYAL GOLF CLUB SOUTH LIFT STATION (CITY OWNED). NO MODIFICATIONS NEEDED WITH LARGER FORCEMAIN. CONSTRUCT 4,200 LF OF 8" HDPE FORCEMAIN (CITY OWNED) DISCONNECT EXISTING 6" HDPE ROYAL GOLF CLUB FORCEMAIN FROM EXISTING 16" HDPE OLD VILLAGE FORCEMAIN. CONNECT NEW 8" HDPE FORCEMAIN TO NEW ELEMENTARY SCHOOL FORCEMAIN AND CONSTRUCT AIR RELIEF MANHOLE. EXISTING 16" HDPE OLD VILLAGE FORCEMAIN (CITY OWNED) CONSTRUCT 3,100 LF OF 10" HDPE FORCEMAIN (CITY OWNED) PARALLEL WITH EXISTING 16" HDPE OLD VILLAGE FORCEMAIN EXISTING 6" HDPE ROYAL GOLF CLUB FORCEMAIN (ABANDON IN PLACE) EXISTING 16" HDPE OLD VILLAGE FORCEMAIN (CITY OWNED) CONNECT 10" HDPE FORCEMAIN TO EXISTING GRAVITY SYSTEM (CITY OWNED)llllllllll>>>>>>>>>llll>>>>>PRIVATE WATER SERVICE. ALIGNMENT TO BE DETERMINED BY ISD 834 >>lllllllllAIR RELIEF MANHOLE CIMA R R O N CIMA R R O N PRIVATE PUBLIC P R I V A T E P U B L I C 11603 11109 1027 11228 1028 1025 1020 1019 11817 H:\LKELMN\24X134951000\CAD\C3D\FIGR-134951-Sanitary Sewer.dwg 10/4/2024 1:05:07 PMR STILLWATER AREA SCHOOL DISTRICT UTILITY IMPROVEMENTS CITY OF LAKE ELMO, MN FIGURE 1: UTILITY PLAN OCTOBER 2024 FEETSCALE 0 200 400 HORZ. R 3507 High Point Drive North Bldg. 1 – Suite E130 Oakdale, MN 55128 Phone: (651) 704-9970 Bolton-Menk.com Stillwater Area School District Utility Improvements Lake Elmo, MN City Project No.: 2024.113 MAY 8, 2024 City receives Petition to connect the Oak-Land Middle School to public water and sewer, and the new Elementary School to public sewer. MAY 21, 2024 Council accepts the Petition from the Stillwater Area Public School District (District) and authorizes the preparation of a Feasibility Report. OCOTBER 15, 2024 Council accepts the Feasibility Report and Calls for Public Hearing. NOVEMBER 19, 2024 Public Improvement Hearing. Council receives signed Waiver Agreement from Stillwater Area School District. Council Orders the Improvement and authorizes the preparation of Plans and Specifications. APRIL 1, 2025 Council approves Plans and Specifications and orders Advertisement for Bids. APRIL 29, 2025 Project Bid Date: Receive contractor Bids. MAY 20, 2025 Council accepts Bids and awards Contract. JUNE 16, 2025 Conduct Pre-Construction meeting and issue Notice to Proceed. · SEPTEMBER 26, 2025 Substantial Completion. · OCTOBER 31, 2025 Final Completion. *Final Assessment Hearing Schedule TDB