HomeMy WebLinkAbout2025-04-01 I-94 LS FM Replacement- Authorize PSI-94 LIFT STATION FORCEMAIN REPLACEMENT PROJECT
APRIL 1, 2025
I-94 LIFT STATION FORCEMAIN REPLACEMENT
AUTHORIZE PLANS AND SPECIFICATIONS
I-94 LIFT STATION FORCEMAIN REPLACEMENT PROJECT
APRIL 1, 2025
TOPICS TO COVER
• Background
• Proposed Improvements
• Project Schedule
• Next Steps
I-94 LIFT STATION FORCEMAIN REPLACEMENT PROJECT
APRIL 1, 2025
BACKGROUND
• Lift station and forcemain were constructed in 1995.
• The system serves a large area and conveys significant sewage to the
Met Council system.
• The forcemain has had 7 breaks since October 2023 resulting in
significant problems.
• Breaks are costly repairs requiring continuous pumping and trucking of
sewage until the pipe can be fixed.
• The existing forcemain pipe has shown signs of
pipe fatigue – this kind of failure indicates the
pipe is past its service life.
• Due to the critical nature of the project it was
moved forward during the last CIP cycle.
I-94 LIFT STATION FORCEMAIN REPLACEMENT PROJECT
APRIL 1, 2025
SCOPE OF IMPROVEMENTS
• Replace approximately 3,000 feet of existing 8-inch forcemain from the
I-94 Lift Station into Oakdale consistent with the City’s Capital
Improvement Plan (CIP).
• Review anticipated service area flows and provide a recommendation
on forcemain size.
• Review lift station components functionality with interim and ultimate
discharge location conditions.
– Met Council system upgrades currently under construction will remove forcemain
from the city’s limits.
I-94 LIFT STATION FORCEMAIN REPLACEMENT PROJECT
APRIL 1, 2025
PROJECT LOCATION MAP
I-94 LIFT STATION FORCEMAIN REPLACEMENT
I-94 LIFT
STATION
I-94 LIFT STATION FORCEMAIN REPLACEMENT PROJECT
APRIL 1, 2025
PROJECT SCHEDULE
I-94 LIFT STATION FORCEMAIN REPLACEMENT PROJECT
APRIL 1, 2025
REQUESTED COUNCIL ACTION & NEXT STEPS
• It is recommended that the City Council make a motion to authorize preparation of plans and
specifications, approve Task Order No. 27 for Design Engineering services to be provided by
Bolton & Menk, Inc. in the not-to-exceed amount of $109,537, and authorize the City
Administrator to sign a Geotechnical Services Contract in the not-to-exceed amount of $30,000
for the I-94 Lift Station Forcemain Replacement Project.