Loading...
HomeMy WebLinkAbout2025-04-01 I-94 LS FM Replacement- Authorize PSI-94 LIFT STATION FORCEMAIN REPLACEMENT PROJECT APRIL 1, 2025 I-94 LIFT STATION FORCEMAIN REPLACEMENT AUTHORIZE PLANS AND SPECIFICATIONS I-94 LIFT STATION FORCEMAIN REPLACEMENT PROJECT APRIL 1, 2025 TOPICS TO COVER • Background • Proposed Improvements • Project Schedule • Next Steps I-94 LIFT STATION FORCEMAIN REPLACEMENT PROJECT APRIL 1, 2025 BACKGROUND • Lift station and forcemain were constructed in 1995. • The system serves a large area and conveys significant sewage to the Met Council system. • The forcemain has had 7 breaks since October 2023 resulting in significant problems. • Breaks are costly repairs requiring continuous pumping and trucking of sewage until the pipe can be fixed. • The existing forcemain pipe has shown signs of pipe fatigue – this kind of failure indicates the pipe is past its service life. • Due to the critical nature of the project it was moved forward during the last CIP cycle. I-94 LIFT STATION FORCEMAIN REPLACEMENT PROJECT APRIL 1, 2025 SCOPE OF IMPROVEMENTS • Replace approximately 3,000 feet of existing 8-inch forcemain from the I-94 Lift Station into Oakdale consistent with the City’s Capital Improvement Plan (CIP). • Review anticipated service area flows and provide a recommendation on forcemain size. • Review lift station components functionality with interim and ultimate discharge location conditions. – Met Council system upgrades currently under construction will remove forcemain from the city’s limits. I-94 LIFT STATION FORCEMAIN REPLACEMENT PROJECT APRIL 1, 2025 PROJECT LOCATION MAP I-94 LIFT STATION FORCEMAIN REPLACEMENT I-94 LIFT STATION I-94 LIFT STATION FORCEMAIN REPLACEMENT PROJECT APRIL 1, 2025 PROJECT SCHEDULE I-94 LIFT STATION FORCEMAIN REPLACEMENT PROJECT APRIL 1, 2025 REQUESTED COUNCIL ACTION & NEXT STEPS • It is recommended that the City Council make a motion to authorize preparation of plans and specifications, approve Task Order No. 27 for Design Engineering services to be provided by Bolton & Menk, Inc. in the not-to-exceed amount of $109,537, and authorize the City Administrator to sign a Geotechnical Services Contract in the not-to-exceed amount of $30,000 for the I-94 Lift Station Forcemain Replacement Project.