STAFF REPORT
DATE: May 6, 2025
PUBLIC HEARING
TO: City Council
FROM: Chad Isakson, Assistant City Engineer
AGENDA ITEM: Public Improvement Hearing: Approve Resolution Ordering the
Improvement, Accept Bids, and Award a Contract for the 2025 Street and
Utility Improvements
REVIEWED BY: Nicole Miller, City Administrator
Clarissa Hadler, Finance Director
Marty Powers, Public Works Director
Nate Stanley, City Engineer
CORE STRATEGIES:
☐ Vibrant, inclusive, connected community ☐ Efficient, reliable, innovative services
☒ Responsive, transparent, adaptive governance ☐ Balanced Finances now and future
☐ Managed Growth ☒ Resilient Infrastructure
BACKGROUND: The City Council authorized the final design of the 2025 Street and Utility
Improvements at the February 18th meeting. Feasibility Reports were Accepted, Plans and Specifications
Approved, and an Advertisement for Bids was Ordered at the March 18th meeting. The project was
advertised on QuestCDN.com and in the Stillwater Gazette in accordance with the Minnesota
Competitive Bidding requirements.
Also at the March 18th meeting, the City Council called for a Public Improvement Hearing. Pursuant to
Minnesota Statutes, Section 429.011 to 429.111, a Public Improvement Hearing was noticed for May 6,
2025 to consider making the improvements. The attached notice was published in the official newspaper
and individual notifications were sent to each address that will be assessed for the improvements.
ISSUE BEFORE COUNCIL: The City Council is respectfully requested to open the Public Improvement
Hearing for the 2025 Street and Utility Improvements. Following the hearing, should the City Council
Order the Improvements, Accept Bids, and Award a Construction Contract for the project?
PROPOSAL DETAILS/ANALYSIS: The 2025 Street and Utility Improvements include pavement
rehabilitation of five neighborhoods programmed for construction in 2025, as categorized below:
Irish Court Neighborhood:
• Irish Court North, from Lake Jane Trail to south end cul-de-sac.
Teal Pass Estates Neighborhood:
• Jasper Avenue North, from Jane Road to the north cul-de-sac.
• 49th Street North, from Jasper Avenue to Jerome Avenue.
• Jerome Avenue North, from 49th Street to the east cul-de-sac.
55th Street / 57th Street / Julep Way Neighborhood:
• 55th Street North, from 57th Street to the north cul-de-sac (Judith Mary Manor).
• 57th Street North, from 55th Street to Julep Way (Rolling Hills Estates).
• Julep Way North, from 57th Street to the south cul-de-sac (Lake Elmo Vista).
Lake Elmo Vista (55th Street):
• 55th Street North, from Keats Avenue to the west cul-de-sac.
Prairie Hamlet Neighborhood:
• 59th Street Court North, from Keats Avenue to the west loop.
The proposed improvements in all five areas include a full depth reclamation of the street pavement section,
with new bituminous pavement and installation of concrete curb and gutter. Storm sewer maintenance items
are included in the scope including cleanup of outlet pipes, ditch grading, draintile installation, extension
of storm sewer pipe, and replacement of catch basins as shown in the approved plans. No street widening
or geometric changes are proposed. “No Parking” signage is proposed to be installed in accordance with
the City’s Parking Restriction Guidance Policy.
As outlined in the approved feasibility reports, the street and drainage improvements are proposed to be
partially assessed against the benefiting properties consistent with the City’s Special Assessment Policy.
Street and drainage improvements are assessed at a rate of 30% of the total project costs for residential
properties using a unit method. The remaining 70% of the project costs are paid through the city general
fund.
Residential properties with direct access to the street, vacant lots, and lots with direct access from a private
street are included as benefitting properties. Each property is assessed one unit unless the property can be
subdivided using the current underlying land use and zoning regulations. Corner lots with direct access to
two public streets are assessed 50% of the per unit basis when each street is improved. Street and drainage
improvement assessments are levied over a 15-year period. All assessments are charged an interest rate of
1% over the bond rate for the project. The preliminary assessment rolls detailing each benefiting property’s
proposed assessment amount are included in the Feasibility Reports and are summarized below.
Table 1: Estimated Project Costs and Proposed Assessments
Neighborhood Total Estimated
Project Costs
City Share of
Project Cost
Proposed Unit
Assessment
Total Assessment
Revenue
Irish Court $248,000 $173,100 $10,700 for 7 units $74,900
Teal Pass Estates $759,000 $531,500 $17,500 for 13 units $227,500
55th St / 57th St /
Julep Way
$757,000 $529,800 $14,200 for 16 units $227,200
Lake Elmo Vista
(55th St)
$408,000 $285,350 $22,300 for 5 units
$11,150 for 1 unit
$122,650
Prairie Hamlet $437,000 $305,250 $7,750 for 17 units $131,750
Totals $2,609,000 $1,825,000 $784,000
In addition, contractor bids were received and opened electronically on April 22, 2025. The City received
seven bids for this project, with Valley Paving, Inc. providing the lowest bid in the amount of
$1,485,436.50. Following review and verification of the bid tabulations, the City Engineer and Design
Engineer are recommending that the City Council award the contract to the lowest responsible bidder,
Valley Paving, Inc., as outlined in the attached letter.
As part of this contract award, staff is also requesting Council to authorize the City Administrator to enter
into a construction material testing contract for the project construction phase services in the not-to-exceed
amount of $30,000. Staff will be receiving proposals from both Braun Intertec and AET.
FISCAL IMPACT: Approval of this resolution commits the City to enter into a construction contract for
the project. The estimated post-bid project cost is $2,098,000 based on bids received coming in under the
estimate and lowering project contingencies to 5% for unforeseen conditions incurred curing construction.
The final assessment calculations will be updated at the end of the project when final project costs are
known. The City Council will have the opportunity to adjust the assessment amounts according to the
known costs this fall to reflect any savings realized on the project.
The improvements will be funded through a combination of special assessments and the general tax levy.
OPTIONS:
• Open a Public Improvement Hearing for the 2025 Street and Utility Improvements
Following the Hearing:
• Order the Public Improvements, Accept the Bids, and Award a Contract to Valley Paving, Inc.
• Do not move forward with this project
RECOMMENDATION: Staff is recommending the City Council approve a Resolution Ordering the
Improvement, Accepting Bids, and Awarding a Contract to Valley Paving, Inc. for the bid amount of
$1,485,436.50 for the 2025 Street and Utility Improvements. The Recommended motion is as follows:
Motion to approve Resolution No. 2025-038, Ordering the Improvements, Accepting Bids, and
Awarding a Contract to Valley Paving, Inc, for the bid amount of $1,485,436.50 for the 2025 Street
and Utility Improvements.
Staff is also recommending the City Council authorize the City Administrator to enter into a material testing
contract for the project construction phase services in the not-to-exceed amount of $30,000. The
Recommended motion is as follows:
Motion to authorize the City Administrator to enter into a material testing contract for the project
construction phase services in the not-to-exceed amount of $30,000 for the 2025 Street and Utility
Improvements.
ATTACHMENTS:
1. Resolution Ordering the Improvements, Accepting Bids and Awarding a Contract for the 2025
Street and Utility Improvements.
2. Notice of Hearing on Improvements.
3. Preliminary Assessment Roll.
4. Engineer’s Letter of Award Recommendation and Tabulation of Bids.
5. Location Map.
6. Proposed Improvements.
7. Project Schedule.
CITY OF LAKE ELMO
WASHINGTON COUNTY
STATE OF MINNESOTA
RESOLUTION NO. 2025-038
A RESOLUTION ORDERING THE IMPROVEMENT, ACCEPTING BIDS AND
AWARDING A CONTRACT FOR THE
2025 STREET AND UTILITY IMPROVEMENTS
WHEREAS, pursuant to a resolution passed by the City Council on the 17th day of
September 2024, feasibility reports have been prepared by Bolton and Menk, Inc. for the 2025
Street and Utility Improvements; and
WHEREAS, ten days mailed notice and two weeks published notice of the hearing was
given, and the hearing was held thereon on the 6th day of May 2025, at which all persons desiring
to be heard were given the opportunity to be heard thereon; and
WHEREAS, the feasibility reports prepared by Bolton and Menk, Inc., and dated March
2025 state that the project is necessary, cost-effective, and feasible; and
WHEREAS, pursuant to an advertisement for bids for the 2025 Street and Utility
Improvements, bids were received, opened, and tabulated according to law, and bids were received
complying with the advertisement; and
WHEREAS, bids were tabulated, checked and summarized to verify that all requirements
of the submittal were met; and
WHEREAS, the project engineer reviewed the bids and has provided a letter
recommending the award of the contract to the lowest responsible bidder, Valley Paving, Inc., for
the bid amount of $1,485,436,50.
NOW, THEREFORE, BE IT RESOLVED,
1. Such improvement is deemed necessary, cost-effective, and feasible as detailed in the
Feasibility Reports dated March 2025.
2. Such improvement is hereby ordered as proposed in the council resolution adopted this 6th
day of May, 2025.
3. The city council declares its official intent to reimburse itself for the costs of the
improvement from the proceeds of tax-exempt bonds.
4. That the Mayor and City Clerk are hereby authorized and directed to enter into a Contract
in the accordance with the above ordered Project, in the amount of the Contractor’s lowest
responsible bid, and according to the plans and specifications thereof approved by the City
Council.
5. The City Clerk is hereby authorized and directed to return forthwith to all bidders the
deposits made with their bids, except that the deposits of the successful bidder and the next
two lowest bidders shall be retained until a contract has been signed.
ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE SIXTH DAY OF MAY, 2025.
CITY OF LAKE ELMO
By: __________________________
Charles Cadenhead
(Seal) Mayor
ATTEST:
________________________________
Julie Johnson
City Clerk
CITY OF LAKE ELMO
NOTICE OF HEARING ON IMPROVEMENT
2025 STREET AND UTILITY IMPROVEMENTS
Notice is hereby given that the City Council of Lake Elmo will conduct a public hearing on
Tuesday, May 6, 2025, at or approximately after 7:00 PM to consider the making of the
following improvements, pursuant to Minnesota Statutes, Sections 429.011 to 429.111:
Street and drainage improvements consisting of full depth reclamation of the street
pavement section, with new bituminous pavement and new concrete curb and gutter. As
part of the improvements the project will incorporate the restoration of the existing
drainage system along the streets and right-of-way, including repair and/or replacement of
existing drainage pipe and structures. The project includes approximately 7,800 feet (1.5
miles) of public streets including the following segments:
Irish Court Neighborhood:
• Irish Court North, from Lake Jane Trail to south end cul-de-sac.
Teal Pass Estates Neighborhood:
• Jasper Avenue North, from Jane Road to the north cul-de-sac.
• 49th Street North, from Jasper Avenue to Jerome Avenue.
• Jerome Avenue North, from 49th Street to the east cul-de-sac.
55th Street / 57th Street / Julep Way Neighborhood:
• 55th Street North, from 57th Street to the north cul-de-sac (Judith Mary Manor).
• 57th Street North, from 55th Street to Julep Way (Rolling Hills Estates).
• Julep Way North, from 57th Street to the south cul-de-sac (Lake Elmo Vista).
Lake Elmo Vista (55th Street):
• 55th Street North, from Keats Avenue to the west cul-de-sac.
Prairie Hamlet Neighborhood:
• 59th Street Court North, from Keats Avenue to the west loop.
The area proposed to be assessed for these improvements include properties abutting or properties
that gain direct driveway access from the above referenced streets. The estimated total cost for the
street and drainage improvements is $248,000 for the Irish Court Neighborhood, $759,000 for the
Teal Pass Estates Neighborhood, $757,000 for 55th Street / 57th Street / Julep Way Neighborhood,
$408,000 for Lake Elmo Vista (55th Street), and $437,000 for the Prairie Hamlet Neighborhood.
A reasonable estimate of the impact of the assessment will be available at the hearing. Such
persons as desiring to be heard with reference to the proposed improvements will be heard during
this meeting.
DATED: March 18, 2025
BY ORDER OF THE LAKE ELMO CITY COUNCIL
Charles Cadenhead, Mayor
(Published in the Stillwater Gazette on March 21, 2025 and March 28, 2025)
CITY OF LAKE ELMO, MN.
MARCH, 2025
2025 STREET AND UTILITY IMPROVEMENTS
IRISH COURT N
PRELIMINARY ASSESSMENT ROLL
PAGE 1 of 1
NO.NAME PID
RESIDENTIAL
EQUIVALENT
LOTS
STREET AND
DRAINAGE
ASSESSMENT
AMOUNT
1 GILBERT CYNTHIA D 4190 IRISH CT N 4190 IRISH CT N LAKE ELMO MN 55042 0902921430017 1 $10,700
2 LEROL MARVIN J JR & KAREN J 4150 IRISH CT N 4150 IRISH CT N LAKE ELMO MN 55042 0902921430018 1 $10,700
3 STUCCI GARY M & MARIE D 4110 IRISH CT N 4110 IRISH CT N LAKE ELMO MN 55042 0902921430019 1 $10,700
4 BOTTOLFSON KEVIN & JEAN 4070 IRISH CT N 4070 IRISH CT N LAKE ELMO MN 55042 0902921430020 1 $10,700
5 MILLER CRAIG A & CHERYL M 4071 IRISH CT N 4071 IRISH CT N LAKE ELMO MN 55042 0902921430021 1 $10,700
6 FALCO KATHLEEN M & MICHAEL J 4101 IRISH CT N 4101 IRISH CT N LAKE ELMO MN 55042 0902921430022 1 $10,700
7 HILL ERIC C & EILEEN M 4141 IRISH CT N 4141 IRISH CT N LAKE ELMO MN 55042 0902921430023 1 $10,700
TOTAL $74,900
ADDRESS MAILING ADDRESS
Ir
i
s
h
C
o
u
r
t
N
42nd Street N
Ir
v
i
n
C
i
r
c
l
e
N
4141
4101
40714070
4110
4150
4190
H:
\
L
K
E
L
M
N
\
2
4
X
1
3
6
2
1
5
0
0
0
\
C
A
D
\
C
3
D
\
F
e
a
s
i
b
i
l
i
t
y
R
e
p
o
r
t
F
i
g
u
r
e
s
\
F
I
G
R
-
1
3
6
2
1
5
-
A
s
s
e
s
s
a
b
l
e
P
r
o
p
e
r
t
i
e
s
.
d
w
g
3
/
1
1
/
2
0
2
5
1
0
:
0
7
:
1
8
A
M
R
2025 Street and Utility Improvements
City of Lake Elmo
Assessable Properties - Irish Court N
March 2025
LEGEND
ASSESSABLE PROPERTY
R
FEETSCALE
0 50 100
HORZ.
CITY OF LAKE ELMO, MN.
MARCH, 2025
2025 STREET AND UTILITY IMPROVEMENTS
TEAL PASS ESTATES
PRELIMINARY ASSESSMENT ROLL
PAGE 1 of 1
NO.NAME PID
RESIDENTIAL
EQUIVALENT
LOTS
STREET AND
DRAINAGE
ASSESSMENT
AMOUNT
1 BACHO BASSAM & KARA PETTIGREW 9160 JANE RD N 9160 JANE RD N LAKE ELMO MN 55042 1002921220013 1 $17,500
2 HAWKINS RICHARD CARMON & ANN M 4850 JASPER AVE N 4850 JASPER AVE N LAKE ELMO MN 55042 1002921220018 1 $17,500
3 JOHNSON THOMAS R JR & NANCY T JOHNSON 4960 JASPER AVE N 4960 JASPER AVE N LAKE ELMO MN 55042 1002921220020 1 $17,500
4 JOHNSON DAVID J & MARY B 4980 JASPER AVE N 4980 JASPER AVE N LAKE ELMO MN 55042 1002921220021 1 $17,500
5 PORCHER HELMUT S K & JOAN P A 4990 JASPER AVE N 4990 JASPER AVE N LAKE ELMO MN 55042 0302921330017 1 $17,500
6 EDWIN A RANEY LIVING TRS 4989 JASPER AVE N 4989 JASPER AVE N LAKE ELMO MN 55042 0302921330018 1 $17,500
7 LARSON ERIC G & SARAH J 9191 49TH ST N 9191 49TH ST N LAKE ELMO MN 55042 1002921220022 1 $17,500
8 TORGRIMSON TYLER & KARA JOHNSON 4880 JEROME AVE N 4880 JEROME AVE N LAKE ELMO MN 55042 1002921220023 1 $17,500
9 DUERR BROOK F & BARBARA KEMP DUERR 4870 JEROME AVE N 4870 JEROME AVE N LAKE ELMO MN 55042 1002921210018 1 $17,500
10 ZENO MICHAEL R & ELIZABETH R 4860 JEROME AVE N 4860 JEROME AVE N LAKE ELMO MN 55042 1002921210019 1 $17,500
11 TREVIS CHRISTINE M 4850 JEROME AVE N 4850 JEROME AVE N LAKE ELMO MN 55042 1002921210020 1 $17,500
12 MOBERG MARK A & RACHAEL K 4855 JEROME AVE N 4855 JEROME AVE N LAKE ELMO MN 55042 1002921210021 1 $17,500
13 MARKIE DENNIS E & BARBARA E 4865 JEROME AVE N 4865 JEROME AVE N LAKE ELMO MN 55042 1002921210022 1 $17,500
TOTAL $227,500
ADDRESS MAILING ADDRESS
Je
r
o
m
e
A
v
e
n
u
e
49th
S
t
r
e
e
t
Jerome Avenue N
Ja
s
p
e
r
A
v
e
n
u
e
N
Jane Ro
a
d
N
9160
4850
4960
4980
4990
4989
9191
4880 4870
4860
4850
48554865
H:
\
L
K
E
L
M
N
\
2
4
X
1
3
6
2
1
5
0
0
0
\
C
A
D
\
C
3
D
\
F
e
a
s
i
b
i
l
i
t
y
R
e
p
o
r
t
F
i
g
u
r
e
s
\
F
I
G
R
-
1
3
6
2
1
5
-
A
s
s
e
s
s
a
b
l
e
P
r
o
p
e
r
t
i
e
s
.
d
w
g
3
/
1
1
/
2
0
2
5
1
0
:
0
7
:
2
4
A
M
R
2025 Street and Utility Improvements
City of Lake Elmo
Assessable Properties - Teal Pass Estates
March 2025
LEGEND
ASSESSABLE PROPERTY
R
FEETSCALE
0 100 200
HORZ.
CITY OF LAKE ELMO, MN.
MARCH, 2025
2025 STREET AND UTILITY IMPROVEMENTS
55TH ST / 57TH ST / JULEP WAY
PRELIMINARY ASSESSMENT ROLL
PAGE 1 of 1
NO.NAME PID
RESIDENTIAL
EQUIVALENT
LOTS
STREET AND
DRAINAGE
ASSESSMENT
AMOUNT
1 KARL E BROGREN & SANDRA J BROGREN JT TRS 9696 55TH ST N 9696 55TH ST N LAKE ELMO MN 55042 0302921210004 1 $14,200
2 CONBOY KIMBERLY P & THOMAS 9744 55TH ST N 9744 55TH ST N LAKE ELMO MN 55042 0302921210005 1 $14,200
3 SANDBERG ROCHELLE M 9798 55TH ST N 9798 55TH ST N LAKE ELMO MN 55042 0302921210006 1 $14,200
4 HUGHES ALEXANDER 9747 55TH ST N 9747 55TH ST N LAKE ELMO MN 55042 0302921210007 1 $14,200
5 PAWLUK GARTH R & SUSAN M 9719 55TH ST N 9719 55TH ST N LAKE ELMO MN 55042 0302921210008 1 $14,200
6 TAIPALE HARVEY J & GAYLE E 9275 57TH ST N 9275 57TH ST N LAKE ELMO MN 55042 0302921240006 1 $14,200
7 BERGIE BRADLEY L TRS & MARCIA A BERGIE TRS 9481 57TH ST N 9481 57TH ST N LAKE ELMO MN 55042 0302921130006 1 $14,200
8 MOUA REBA & XIONG 9543 57TH ST N 9543 57TH ST N LAKE ELMO MN 55042 0302921130007 1 $14,200
9 JOSTES ERIK E & DENISE 9568 57TH ST N 9568 57TH ST N LAKE ELMO MN 55042 0302921130005 1 $14,200
10 KENFIELD GREG & NATALIA CASCI 9605 57TH ST N 9605 57TH ST N LAKE ELMO MN 55042 0302921130008 1 $14,200
11 LISA L BURBAN TRS 9612 57TH ST N 9612 57TH ST N LAKE ELMO MN 55042 0302921130004 1 $14,200
12 VANG BLIA Y 5660 JULEP WAY N 5660 JULEP WAY N LAKE ELMO MN 55042 0302921130014 1 $14,200
13 WADE A FICK TRS 5638 JULEP WAY N 5638 JULEP WAY N LAKE ELMO MN 55042 0302921130013 1 $14,200
14 YOUNG JAMES & BREE 5611 JULEP WAY N 5611 JULEP WAY N LAKE ELMO MN 55042 0302921130012 1 $14,200
15 RICHARD K KAISER & RHONDA J KIMLER TRS 5629 JULEP WAY N 5629 JULEP WAY N LAKE ELMO MN 55042 0302921130011 1 $14,200
16 WARNSHOLZ REYNOLD A & LINDA M RAMSAY 5673 JULEP WAY N 5673 JULEP WAY N LAKE ELMO MN 55042 0302921130010 1 $14,200
TOTAL $227,200
ADDRESS MAILING ADDRESS
Ju
l
e
p
W
a
y
57th Street N
55
t
h
S
t
r
e
e
t
N
5
7
t
h
S
t
r
e
e
t
N
9696 9744
9798 9747
9719
9275
9481 9543
9605
9568
9612
5660
5638
5611
5629
5673
H:
\
L
K
E
L
M
N
\
2
4
X
1
3
6
2
1
5
0
0
0
\
C
A
D
\
C
3
D
\
F
e
a
s
i
b
i
l
i
t
y
R
e
p
o
r
t
F
i
g
u
r
e
s
\
F
I
G
R
-
1
3
6
2
1
5
-
A
s
s
e
s
s
a
b
l
e
P
r
o
p
e
r
t
i
e
s
.
d
w
g
3
/
1
1
/
2
0
2
5
1
1
:
2
1
:
0
4
A
M
R
2025 Street and Utility Improvements
City of Lake Elmo
Assessable Properties - 55th St / 57th St / Julep Way
March 2025
LEGEND
ASSESSABLE PROPERTY
R
FEETSCALE
0 120 240
HORZ.
CITY OF LAKE ELMO, MN.
MARCH, 2025
2025 STREET AND UTILITY IMPROVEMENTS
LAKE ELMO VISTA (55TH STREET)
PRELIMINARY ASSESSMENT ROLL
PAGE 1 of 1
NO.NAME PID
RESIDENTIAL
EQUIVALENT LOTS
STREET AND
DRAINAGE
ASSESSMENT
AMOUNT
1 KATHERINE ANN TODD REV TRS 9961 55TH ST N 9961 55TH ST N LAKE ELMO MN 55042 0302921140009 1 $22,300
2 ANTONELLO JOSEPH R & ANGELEEN M ANTONELLO 9873 55TH ST N 9873 55TH ST N LAKE ELMO MN 55042 0302921140010 1 $22,300
3 GRANOVSKY MARK R & KAREN E 9855 55TH ST N 9855 55TH ST N LAKE ELMO MN 55042 0302921140011 1 $22,300
4 VANG PHIA N & VUE YER 9830 55TH ST N 9830 55TH ST N LAKE ELMO MN 55042 0302921140013 1 $22,300
5 JENNIFER L ANDERSON TRS 9800 55TH ST N 9800 55TH ST N LAKE ELMO MN 55042 0302921140012 1 $22,300
6 BOETTCHER JEFFREY A & KARISSA 5630 KEATS AVE N 5630 KEATS AVE N LAKE ELMO MN 55042 0302921140008 0.5 $11,150
TOTAL $122,650
ADDRESS MAILING ADDRESS
55th Street N
Ke
a
t
s
A
v
e
n
u
e
N
99619873
9855
9830
9800
5630
H:
\
L
K
E
L
M
N
\
2
4
X
1
3
6
2
1
5
0
0
0
\
C
A
D
\
C
3
D
\
F
e
a
s
i
b
i
l
i
t
y
R
e
p
o
r
t
F
i
g
u
r
e
s
\
F
I
G
R
-
1
3
6
2
1
5
-
A
s
s
e
s
s
a
b
l
e
P
r
o
p
e
r
t
i
e
s
.
d
w
g
3
/
1
1
/
2
0
2
5
1
2
:
3
5
:
0
2
P
M
R
2025 Street and Utility Improvements
City of Lake Elmo
Assessable Properties - Lake Elmo Vista (55th Street)
March 2025
LEGEND
ASSESSABLE PROPERTY
ASSESSABLE PROPERTY AT 50%
R
FEETSCALE
0 50 100
HORZ.
CITY OF LAKE ELMO, MN.
MARCH, 2025
2025 STREET AND UTILITY IMPROVEMENTS
PRAIRIE HAMLET (59TH ST CT N)
PRELIMINARY ASSESSMENT ROLL
PAGE 1 of 1
NO.NAME PID
RESIDENTIAL
EQUIVALENT
LOTS
STREET AND
DRAINAGE
ASSESSMENT
AMOUNT
1 KOSLOWSKI LINDA A 9917 59TH STREET CT N 9917 59TH STREET CT N LAKE ELMO MN 55042 0302921110023 1 $7,750
2 CALIGIURI PHILIP A & GAIL A 9913 59TH STREET CT N 9913 59TH STREET CT N LAKE ELMO MN 55042 0302921110024 1 $7,750
3 SANDRA L DEUTSCH REV TRS 9905 59TH STREET CT N 9905 59TH STREET CT N LAKE ELMO MN 55042 0302921110025 1 $7,750
4 SULLIVAN JUDITH J & TERRY A 9901 59TH STREET CT N 9901 59TH STREET CT N LAKE ELMO MN 55042 0302921110026 1 $7,750
5 HER LUE & KITA 9885 59TH STREET CT N 9885 59TH STREET CT N LAKE ELMO MN 55042 0302921110016 1 $7,750
6 LYNSKEY MICHAEL J JR 9867 59TH STREET CT N PO BOX 36 STILLWATER MN 55082 0302921110015 1 $7,750
7 ZABEL ELIZABETH & ADAM SLINGER 9849 59TH STREET CT N 9849 59TH STREET CT N LAKE ELMO MN 55042 0302921110014 1 $7,750
8 ANDRUS DOUGLAS E & PATRICIA A 9831 59TH STREET CT N 9831 59TH STREET CT N LAKE ELMO MN 55042 0302921110013 1 $7,750
9 HILGERS MICHAEL E & KIM MARIE 9818 59TH STREET CT N 9818 59TH STREET CT N LAKE ELMO MN 55042 0302921110012 1 $7,750
10 FAUST DAVID J & DENISE M 9836 59TH STREET CT N 9836 59TH STREET CT N LAKE ELMO MN 55042 0302921110011 1 $7,750
11 BENNING CARLA 9858 59TH STREET CT N 9858 59TH STREET CT N LAKE ELMO MN 55042 0302921110010 1 $7,750
12 DELGRECO PETER & JONNILEE 9880 59TH STREET CT N 9880 59TH STREET CT N LAKE ELMO MN 55042 0302921110009 1 $7,750
13 ELLIS RICHARD P & MARY E 9902 59TH STREET CT N 9902 59TH STREET CT N LAKE ELMO MN 55042 0302921110019 1 $7,750
14 ANN MARIE WIELAND TRS 9910 59TH STREET CT N 9910 59TH STREET CT N LAKE ELMO MN 55042 0302921110020 1 $7,750
15 HENDRICKSON BOB C & MARY L 9918 59TH STREET CT N 9918 59TH STREET CT N LAKE ELMO MN 55042 0302921110021 1 $7,750
16 ALT ROBERT A & VALERIE J 9924 59TH STREET CT N 9924 59TH STREET CT N LAKE ELMO MN 55042 0302921110022 1 $7,750
17 DOUGLAS & MEREDITH LOVETT JT REV TRS 9940 59TH STREET CT N 9940 59TH STREET CT N LAKE ELMO MN 55042 0302921120005 1 $7,750
TOTAL $131,750
ADDRESS MAILING ADDRESS
59t
h
S
t
r
e
e
t
Cou
r
t
N
Ke
a
t
s
A
v
e
n
u
e
N
9568
9924991899109902
9880
9858
9836
9818
9831 9849
9867
9885
9901
9905
9913
9917
9940
H:
\
L
K
E
L
M
N
\
2
4
X
1
3
6
2
1
5
0
0
0
\
C
A
D
\
C
3
D
\
F
e
a
s
i
b
i
l
i
t
y
R
e
p
o
r
t
F
i
g
u
r
e
s
\
F
I
G
R
-
1
3
6
2
1
5
-
A
s
s
e
s
s
a
b
l
e
P
r
o
p
e
r
t
i
e
s
.
d
w
g
3
/
1
1
/
2
0
2
5
1
1
:
2
1
:
1
7
A
M
R
2025 Street and Utility Improvements
City of Lake Elmo
Assessable Properties - Prairie Hamlet
March 2025
LEGEND
ASSESSABLE PROPERTY
R
FEETSCALE
0 70 140
HORZ.
h:\lkelmn\24x136215000\6_plans-specs\b_bid documents\136215 award ltr.docx
April 22, 2025
Nate Stanley, P.E.
City Engineer
City of Lake Elmo
3880 Laverne Avenue N
Lake Elmo, Minnesota 55042
RE: 2025 Street and Utility Improvements
City of Lake Elmo, MN
City Project No. 137240
BMI Project No. 24X.136215
Dear Mr. Stanley,
Attached is the bid abstract for the project referenced above. Seven bids were received at 10:00 a.m. on
Tuesday, April 22, 2025. The following is a summary of the bids received:
Bidder Total Bid
Valley Paving, Inc. $1,485,436.50
OMG Midwest, Inc. dba Minnesota Paving & Materials $1,625,664.20
Park Construction Company $1,699,596.00
Bituminous Roadways, Inc. $1,790,694.50
Dresel Contracting, Inc. $1,842,654.46
Miller Excavating, Inc. $1,866,387.78
Forest Lake Contracting, Inc. $1,909,051.00
We have reviewed the bids and recommend awarding this bid to Valley Paving, Inc. in the amount of
$1,485,436.50.
Sincerely,
Bolton & Menk, Inc.
Michael R. Warner, P.E.
Principal Engineer
Enclosure
ABSTRACT OF BIDS
2025 STREET AND UTILITY IMPROVEMENTS
CITY PROJECT NO. 137240
CITY OF LAKE ELMO, MN
BID DATE: APRIL 22, 2025 AT 10:00 AM 1 2 3 4
NO. ITEM UNIT QTY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE
BASE BID
1 MOBILIZATION LS 1 $37,000.00 $37,000.00 $52,000.00 $52,000.00 $237,500.00 $237,500.00 $90,000.00 $90,000.00
2 TRAFFIC CONTROL LS 1 $3,350.00 $3,350.00 $2,260.00 $2,260.00 $2,310.00 $2,310.00 $5,000.00 $5,000.00
3 SILT FENCE, TYPE MACHINE SLICE LF 4,290 $2.25 $9,652.50 $2.20 $9,438.00 $2.25 $9,652.50 $2.50 $10,725.00
4 SEDIMENT CONTROL LOG, TYPE WOOD FIBER LF 120 $5.00 $600.00 $5.00 $600.00 $4.95 $594.00 $5.00 $600.00
5 CATCH BASIN INLET PROTECTION EA 31 $100.00 $3,100.00 $180.00 $5,580.00 $205.00 $6,355.00 $175.00 $5,425.00
6 STREET SWEEPING (WITH PICKUP BROOM) HR 140 $200.00 $28,000.00 $92.00 $12,880.00 $174.00 $24,360.00 $150.00 $21,000.00
7 WATER FOR DUST CONTROL MGAL 70 $44.00 $3,080.00 $20.00 $1,400.00 $57.10 $3,997.00 $50.00 $3,500.00
8 CLEARING EA 1 $1,030.00 $1,030.00 $600.00 $600.00 $1,540.00 $1,540.00 $600.00 $600.00
9 GRUBBING EA 34 $412.00 $14,008.00 $175.00 $5,950.00 $513.00 $17,442.00 $175.00 $5,950.00
10 TREE TRIMMING HR 8 $515.00 $4,120.00 $402.00 $3,216.00 $513.00 $4,104.00 $400.00 $3,200.00
11 SALVAGE AND REINSTALL MAILBOX EA 59 $154.50 $9,115.50 $151.00 $8,909.00 $154.00 $9,086.00 $150.00 $8,850.00
12 TEMPORARY MAILBOX EA 59 $77.25 $4,557.75 $76.00 $4,484.00 $76.90 $4,537.10 $75.00 $4,425.00
13 SALVAGE AND REINSTALL ADDRESS POST EA 4 $283.25 $1,133.00 $151.00 $604.00 $154.00 $616.00 $150.00 $600.00
14 SALVAGE AND REINSTALL SIGN AND POST EA 3 $283.25 $849.75 $246.00 $738.00 $251.00 $753.00 $245.00 $735.00
15 SALVAGE AND REINSTALL SIGN PANEL ON NEW POST EA 10 $334.75 $3,347.50 $266.00 $2,660.00 $272.00 $2,720.00 $265.00 $2,650.00
16 SIGN PANELS TYPE C SF 89 $78.30 $6,968.70 $69.00 $6,141.00 $69.70 $6,203.30 $68.00 $6,052.00
17 STREET NAME BLADE EA 8 $335.00 $2,680.00 $351.00 $2,808.00 $359.00 $2,872.00 $350.00 $2,800.00
18 TOPSOIL BORROW (LV) CY 2,570 $20.00 $51,400.00 $38.00 $97,660.00 $0.01 $25.70 $55.00 $141,350.00
19 SEED TURFGRASS AND EROSION CONTROL BLANKET SY 3,670 $3.25 $11,927.50 $3.20 $11,744.00 $3.25 $11,927.50 $3.25 $11,927.50
20 SEED SOUTHERN TALLGRASS ROADSIDE AND EROSION CONTROL BLANKET SY 840 $3.95 $3,318.00 $3.85 $3,234.00 $3.90 $3,276.00 $3.75 $3,150.00
21 SODDING TYPE LAWN SY 7,190 $9.00 $64,710.00 $8.85 $63,631.50 $9.05 $65,069.50 $9.00 $64,710.00
22 SALVAGE AND REINSTALL MANHOLE CASTING W/ NEW RINGS EA 3 $1,250.00 $3,750.00 $1,310.00 $3,930.00 $1,110.00 $3,330.00 $600.00 $1,800.00
23 SALVAGE AND REINSTALL CATCH BASIN CASTING W/ NEW RINGS EA 2 $405.00 $810.00 $781.00 $1,562.00 $378.00 $756.00 $600.00 $1,200.00
24 REMOVE AND DISPOSE OF EXISTING STORM SEWER STRUCTURE EA 16 $550.00 $8,800.00 $575.00 $9,200.00 $602.00 $9,632.00 $400.00 $6,400.00
25 REMOVE AND DISPOSE OF EXISTING STORM SEWER PIPE LF 436 $13.00 $5,668.00 $25.00 $10,900.00 $25.50 $11,118.00 $20.00 $8,720.00
26 REMOVE AND DISPOSE OF EXISTING DRAIN TILE PIPE LF 100 $4.00 $400.00 $18.40 $1,840.00 $41.70 $4,170.00 $11.00 $1,100.00
27 REMOVE AND REPLACE DRAIN TILE PIPE LF 20 $65.00 $1,300.00 $40.00 $800.00 $41.70 $834.00 $35.00 $700.00
28 POTHOLE EXISTING SANITARY SEWER SERVICE HR 6 $450.00 $2,700.00 $836.00 $5,016.00 $876.00 $5,256.00 $400.00 $2,400.00
29 ROTATE TOP SLAB OF EXISTING STORM STRUCTURE EA 1 $850.00 $850.00 $866.00 $866.00 $908.00 $908.00 $5,000.00 $5,000.00
30 DITCH GRADING LF 300 $13.50 $4,050.00 $4.05 $1,215.00 $41.30 $12,390.00 $10.00 $3,000.00
31 CONNECT EXISTING STORM PIPE TO NEW STRUCTURE EA 7 $640.00 $4,480.00 $1,115.00 $7,805.00 $1,170.00 $8,190.00 $1,700.00 $11,900.00
32 CONNECT PIPE TO EXISTING STRUCTURE EA 1 $1,400.00 $1,400.00 $1,325.00 $1,325.00 $1,390.00 $1,390.00 $2,300.00 $2,300.00
33 CORE DRILL CONNECTION TO EXISTING STRUCTURE (18" RCP) EA 1 $2,300.00 $2,300.00 $1,325.00 $1,325.00 $1,390.00 $1,390.00 $2,200.00 $2,200.00
34 2' X 3' CATCH BASIN PER DETAIL 404 EA 12 $2,585.00 $31,020.00 $997.00 $11,964.00 $3,520.00 $42,240.00 $3,400.00 $40,800.00
35 4' DIA CBMH WITH CASTING PER DETAIL 406 EA 10 $3,135.00 $31,350.00 $3,587.00 $35,870.00 $3,830.00 $38,300.00 $4,900.00 $49,000.00
36 5' DIA CBMH WITH CASTING PER DETAIL 406 EA 1 $4,685.00 $4,685.00 $5,725.00 $5,725.00 $6,070.00 $6,070.00 $7,100.00 $7,100.00
37 4' DIA MH WITH CASTING PER DETAIL 409 EA 2 $3,885.00 $7,770.00 $4,950.00 $9,900.00 $5,030.00 $10,060.00 $5,250.00 $10,500.00
38 18" CS PIPE CULVERT LF 40 $62.00 $2,480.00 $116.00 $4,640.00 $121.00 $4,840.00 $100.00 $4,000.00
39 12" RCP STORM SEWER, CLASS 5 LF 132 $65.00 $8,580.00 $68.00 $8,976.00 $71.30 $9,411.60 $90.00 $11,880.00
40 15" RCP STORM SEWER, CLASS 5 LF 620 $66.00 $40,920.00 $73.00 $45,260.00 $76.50 $47,430.00 $95.00 $58,900.00
41 18" RCP STORM SEWER, CLASS 5 LF 388 $71.00 $27,548.00 $77.15 $29,934.20 $80.90 $31,389.20 $105.00 $40,740.00
42 18" CS PIPE APRON EA 2 $825.00 $1,650.00 $668.00 $1,336.00 $700.00 $1,400.00 $700.00 $1,400.00
43 12" RC FLARED END SECTION EA 4 $1,200.00 $4,800.00 $1,250.00 $5,000.00 $1,310.00 $5,240.00 $1,750.00 $7,000.00
44 18" RC FLARED END SECTION EA 2 $1,300.00 $2,600.00 $1,385.00 $2,770.00 $1,450.00 $2,900.00 $2,000.00 $4,000.00
45 RIPRAP W/ FABRIC, CLASS III CY 37 $125.00 $4,625.00 $169.00 $6,253.00 $177.00 $6,549.00 $250.00 $9,250.00
46 SAWCUT BITUMINOUS PAVEMENT LF 1,085 $1.90 $2,061.50 $3.00 $3,255.00 $1.90 $2,061.50 $1.00 $1,085.00
47 SAWCUT CONCRETE PAVEMENT LF 330 $4.65 $1,534.50 $3.20 $1,056.00 $4.60 $1,518.00 $3.00 $990.00
48 REMOVE AND DISPOSE OF BITUMINOUS PAVEMENT (DRIVEWAY) SY 470 $2.50 $1,175.00 $7.50 $3,525.00 $15.60 $7,332.00 $11.50 $5,405.00
49 REMOVE AND DISPOSE OF CONCRETE PAVEMENT (DRIVEWAY) SY 240 $10.50 $2,520.00 $10.55 $2,532.00 $13.60 $3,264.00 $17.00 $4,080.00
VALLEY PAVING, INC.OMG MIDWEST, INC. DBA
MINNESOTA PAVING & MATERIALS PARK COSNTRUCTION COMPANY BITUMINOUS ROADWAYS, INC.
ABSTRACT OF BIDS
2025 STREET AND UTILITY IMPROVEMENTS
CITY PROJECT NO. 137240
CITY OF LAKE ELMO, MN
BID DATE: APRIL 22, 2025 AT 10:00 AM 1 2 3 4
NO. ITEM UNIT QTY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE
VALLEY PAVING, INC.OMG MIDWEST, INC. DBA
MINNESOTA PAVING & MATERIALS PARK COSNTRUCTION COMPANY BITUMINOUS ROADWAYS, INC.
50 REMOVE CONCRETE CARRIAGE WALK/FLUME SF 90 $1.80 $162.00 $7.75 $697.50 $5.75 $517.50 $10.00 $900.00
51 REMOVE AND DISPOSE OF CONCRETE CURB AND GUTTER LF 270 $10.00 $2,700.00 $14.25 $3,847.50 $12.30 $3,321.00 $13.00 $3,510.00
52 RECLAIM EXISTING BITUMINOUS AND BASE MATERIAL SY 27,540 $1.12 $30,844.80 $4.50 $123,930.00 $0.99 $27,264.60 $2.00 $55,080.00
53 HAUL EXCESS RECLAIMED MATERIAL OFF SITE (LV) CY 2,030 $14.60 $29,638.00 $28.25 $57,347.50 $3.75 $7,612.50 $29.00 $58,870.00
54 HAUL EXCESS RECLAIMED MATERIAL TO LAKE ELMO PUBLIC WORKS (LV) CY 1,000 $9.40 $9,400.00 $12.00 $12,000.00 $13.50 $13,500.00 $25.50 $25,500.00
55 CORE DRILL 4" DRAIN TILE CONNECTION INTO CATCH BASIN EA 4 $300.00 $1,200.00 $810.00 $3,240.00 $847.00 $3,388.00 $700.00 $2,800.00
56 CONNECT 4" DRAIN TILE TO STRUCTURE EA 17 $225.00 $3,825.00 $810.00 $13,770.00 $847.00 $14,399.00 $330.00 $5,610.00
57 4" PERFORATED PVC EDGE DRAIN W/ BACKFILL & WRAP LF 1,970 $27.00 $53,190.00 $29.00 $57,130.00 $29.90 $58,903.00 $22.50 $44,325.00
58 DRAIN TILE CLEANOUT EA 21 $695.00 $14,595.00 $562.00 $11,802.00 $589.00 $12,369.00 $300.00 $6,300.00
59 SUBGRADE CORRECTION (EV) CY 1,000 $32.00 $32,000.00 $33.25 $33,250.00 $28.70 $28,700.00 $47.00 $47,000.00
60 SUBGRADE PREPARATION OF RECLAIMED SURFACE SY 29,450 $1.25 $36,812.50 $1.06 $31,217.00 $1.65 $48,592.50 $1.00 $29,450.00
61 SALVAGE, STOCKPILE, AND RESPREAD RECLAIMED MATERIAL (UTILITY TRENCHES) LS 1 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $11,500.00 $11,500.00 $10,000.00 $10,000.00
62 TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,C) [SPWEA230C] TN 2,280 $87.65 $199,842.00 $86.00 $196,080.00 $84.60 $192,888.00 $97.00 $221,160.00
63 TYPE SP 12.5 BITUMINOUS NON WEARING COURSE MIXTURE (2,C) [SPNWB230C] TN 3,040 $80.50 $244,720.00 $81.00 $246,240.00 $79.30 $241,072.00 $88.00 $267,520.00
64 BITUMINOUS MATERIAL FOR TACK COAT GAL 1,870 $1.90 $3,553.00 $2.00 $3,740.00 $3.10 $5,797.00 $1.00 $1,870.00
65 PATCH BITUMINOUS STREET SY 100 $34.20 $3,420.00 $35.00 $3,500.00 $71.00 $7,100.00 $55.00 $5,500.00
66 PATCH BITUMINOUS DRIVEWAY SY 530 $28.00 $14,840.00 $40.00 $21,200.00 $58.00 $30,740.00 $40.00 $21,200.00
67 PATCH GRAVEL DRIVEWAY SY 30 $24.00 $720.00 $38.00 $1,140.00 $22.00 $660.00 $13.00 $390.00
68 B418 CONCRETE CURB AND GUTTER LF 15,620 $18.80 $293,656.00 $16.25 $253,825.00 $17.10 $267,102.00 $16.50 $257,730.00
69 SURMOUNTABLE CURB AND GUTTER LF 150 $32.30 $4,845.00 $32.25 $4,837.50 $33.30 $4,995.00 $34.00 $5,100.00
70 6" CONCRETE DRIVEWAY PAVEMENT SY 250 $87.00 $21,750.00 $85.25 $21,312.50 $86.10 $21,525.00 $90.00 $22,500.00
71 CONCRETE CARRIAGE WALK/FLUME SF 80 $11.85 $948.00 $13.00 $1,040.00 $13.00 $1,040.00 $12.50 $1,000.00
72 ADJUST EXISTING VALVE BOX EA 4 $1,000.00 $4,000.00 $300.00 $1,200.00 $575.00 $2,300.00 $320.00 $1,280.00
TOTAL BASE BID $1,485,436.50 $1,625,664.20 $1,699,596.00 $1,790,694.50
ABSTRACT OF BIDS
2025 STREET AND UTILITY IMPROVEMENTS
CITY PROJECT NO. 137240
CITY OF LAKE ELMO, MN
BID DATE: APRIL 22, 2025 AT 10:00 AM
NO. ITEM UNIT QTY
BASE BID
1 MOBILIZATION LS 1
2 TRAFFIC CONTROL LS 1
3 SILT FENCE, TYPE MACHINE SLICE LF 4,290
4 SEDIMENT CONTROL LOG, TYPE WOOD FIBER LF 120
5 CATCH BASIN INLET PROTECTION EA 31
6 STREET SWEEPING (WITH PICKUP BROOM) HR 140
7 WATER FOR DUST CONTROL MGAL 70
8 CLEARING EA 1
9 GRUBBING EA 34
10 TREE TRIMMING HR 8
11 SALVAGE AND REINSTALL MAILBOX EA 59
12 TEMPORARY MAILBOX EA 59
13 SALVAGE AND REINSTALL ADDRESS POST EA 4
14 SALVAGE AND REINSTALL SIGN AND POST EA 3
15 SALVAGE AND REINSTALL SIGN PANEL ON NEW POST EA 10
16 SIGN PANELS TYPE C SF 89
17 STREET NAME BLADE EA 8
18 TOPSOIL BORROW (LV) CY 2,570
19 SEED TURFGRASS AND EROSION CONTROL BLANKET SY 3,670
20 SEED SOUTHERN TALLGRASS ROADSIDE AND EROSION CONTROL BLANKET SY 840
21 SODDING TYPE LAWN SY 7,190
22 SALVAGE AND REINSTALL MANHOLE CASTING W/ NEW RINGS EA 3
23 SALVAGE AND REINSTALL CATCH BASIN CASTING W/ NEW RINGS EA 2
24 REMOVE AND DISPOSE OF EXISTING STORM SEWER STRUCTURE EA 16
25 REMOVE AND DISPOSE OF EXISTING STORM SEWER PIPE LF 436
26 REMOVE AND DISPOSE OF EXISTING DRAIN TILE PIPE LF 100
27 REMOVE AND REPLACE DRAIN TILE PIPE LF 20
28 POTHOLE EXISTING SANITARY SEWER SERVICE HR 6
29 ROTATE TOP SLAB OF EXISTING STORM STRUCTURE EA 1
30 DITCH GRADING LF 300
31 CONNECT EXISTING STORM PIPE TO NEW STRUCTURE EA 7
32 CONNECT PIPE TO EXISTING STRUCTURE EA 1
33 CORE DRILL CONNECTION TO EXISTING STRUCTURE (18" RCP) EA 1
34 2' X 3' CATCH BASIN PER DETAIL 404 EA 12
35 4' DIA CBMH WITH CASTING PER DETAIL 406 EA 10
36 5' DIA CBMH WITH CASTING PER DETAIL 406 EA 1
37 4' DIA MH WITH CASTING PER DETAIL 409 EA 2
38 18" CS PIPE CULVERT LF 40
39 12" RCP STORM SEWER, CLASS 5 LF 132
40 15" RCP STORM SEWER, CLASS 5 LF 620
41 18" RCP STORM SEWER, CLASS 5 LF 388
42 18" CS PIPE APRON EA 2
43 12" RC FLARED END SECTION EA 4
44 18" RC FLARED END SECTION EA 2
45 RIPRAP W/ FABRIC, CLASS III CY 37
46 SAWCUT BITUMINOUS PAVEMENT LF 1,085
47 SAWCUT CONCRETE PAVEMENT LF 330
48 REMOVE AND DISPOSE OF BITUMINOUS PAVEMENT (DRIVEWAY) SY 470
49 REMOVE AND DISPOSE OF CONCRETE PAVEMENT (DRIVEWAY) SY 240
5 6 7
UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE
$135,440.00 $135,440.00 $80,758.21 $80,758.21 $93,000.00 $93,000.00
$5,670.00 $5,670.00 $2,353.73 $2,353.73 $9,000.00 $9,000.00
$2.70 $11,583.00 $2.30 $9,867.00 $3.00 $12,870.00
$2.48 $297.60 $5.07 $608.40 $5.00 $600.00
$203.23 $6,300.13 $246.08 $7,628.48 $200.00 $6,200.00
$231.43 $32,400.20 $180.41 $25,257.40 $150.00 $21,000.00
$72.00 $5,040.00 $40.39 $2,827.30 $40.00 $2,800.00
$1,620.00 $1,620.00 $627.66 $627.66 $1,000.00 $1,000.00
$648.00 $22,032.00 $183.07 $6,224.38 $200.00 $6,800.00
$540.00 $4,320.00 $418.44 $3,347.52 $400.00 $3,200.00
$162.00 $9,558.00 $156.92 $9,258.28 $200.00 $11,800.00
$81.00 $4,779.00 $78.46 $4,629.14 $150.00 $8,850.00
$162.00 $648.00 $156.92 $627.68 $150.00 $600.00
$264.60 $793.80 $256.29 $768.87 $245.00 $735.00
$286.20 $2,862.00 $277.22 $2,772.20 $265.00 $2,650.00
$73.44 $6,536.16 $71.14 $6,331.46 $68.00 $6,052.00
$378.00 $3,024.00 $366.14 $2,929.12 $350.00 $2,800.00
$45.76 $117,603.20 $28.57 $73,424.90 $38.00 $97,660.00
$2.16 $7,927.20 $3.31 $12,147.70 $4.00 $14,680.00
$2.43 $2,041.20 $4.00 $3,360.00 $4.00 $3,360.00
$10.75 $77,292.50 $9.23 $66,363.70 $9.00 $64,710.00
$707.20 $2,121.60 $1,035.83 $3,107.49 $1,000.00 $3,000.00
$742.20 $1,484.40 $1,131.16 $2,262.32 $1,000.00 $2,000.00
$384.75 $6,156.00 $358.90 $5,742.40 $750.00 $12,000.00
$21.40 $9,330.40 $714.55 $311,543.80 $23.00 $10,028.00
$6.06 $606.00 $13.31 $1,331.00 $10.00 $1,000.00
$22.80 $456.00 $24.20 $484.00 $45.00 $900.00
$1,120.00 $6,720.00 $386.15 $2,316.90 $900.00 $5,400.00
$480.00 $480.00 $632.42 $632.42 $1,000.00 $1,000.00
$16.00 $4,800.00 $31.54 $9,462.00 $35.00 $10,500.00
$342.86 $2,400.02 $2,588.92 $18,122.44 $1,500.00 $10,500.00
$480.00 $480.00 $2,122.03 $2,122.03 $1,900.00 $1,900.00
$1,800.00 $1,800.00 $1,521.03 $1,521.03 $3,300.00 $3,300.00
$2,024.40 $24,292.80 $3,408.84 $40,906.08 $4,900.00 $58,800.00
$4,068.52 $40,685.20 $4,000.98 $40,009.80 $7,600.00 $76,000.00
$6,943.20 $6,943.20 $5,503.46 $5,503.46 $9,300.00 $9,300.00
$4,129.65 $8,259.30 $3,540.08 $7,080.16 $7,600.00 $15,200.00
$75.06 $3,002.40 $80.30 $3,212.00 $119.00 $4,760.00
$88.47 $11,678.04 $54.73 $7,224.36 $123.00 $16,236.00
$90.68 $56,221.60 $59.95 $37,169.00 $126.00 $78,120.00
$91.52 $35,509.76 $63.80 $24,754.40 $130.00 $50,440.00
$481.18 $962.36 $455.17 $910.34 $1,500.00 $3,000.00
$1,179.90 $4,719.60 $1,107.91 $4,431.64 $2,100.00 $8,400.00
$1,283.86 $2,567.72 $1,623.19 $3,246.38 $2,300.00 $4,600.00
$118.46 $4,383.02 $127.04 $4,700.48 $165.00 $6,105.00
$2.43 $2,636.55 $1.80 $1,953.00 $4.00 $4,340.00
$3.00 $990.00 $4.19 $1,382.70 $6.00 $1,980.00
$10.75 $5,052.50 $6.65 $3,125.50 $20.00 $9,400.00
$12.31 $2,954.40 $9.39 $2,253.60 $25.00 $6,000.00
MILLER EXCAVATING, INC. FOREST LAKE CONTRACTING, INC.DRESEL CONTRACTING, INC.
ABSTRACT OF BIDS
2025 STREET AND UTILITY IMPROVEMENTS
CITY PROJECT NO. 137240
CITY OF LAKE ELMO, MN
BID DATE: APRIL 22, 2025 AT 10:00 AM
NO. ITEM UNIT QTY
50 REMOVE CONCRETE CARRIAGE WALK/FLUME SF 90
51 REMOVE AND DISPOSE OF CONCRETE CURB AND GUTTER LF 270
52 RECLAIM EXISTING BITUMINOUS AND BASE MATERIAL SY 27,540
53 HAUL EXCESS RECLAIMED MATERIAL OFF SITE (LV) CY 2,030
54 HAUL EXCESS RECLAIMED MATERIAL TO LAKE ELMO PUBLIC WORKS (LV) CY 1,000
55 CORE DRILL 4" DRAIN TILE CONNECTION INTO CATCH BASIN EA 4
56 CONNECT 4" DRAIN TILE TO STRUCTURE EA 17
57 4" PERFORATED PVC EDGE DRAIN W/ BACKFILL & WRAP LF 1,970
58 DRAIN TILE CLEANOUT EA 21
59 SUBGRADE CORRECTION (EV) CY 1,000
60 SUBGRADE PREPARATION OF RECLAIMED SURFACE SY 29,450
61 SALVAGE, STOCKPILE, AND RESPREAD RECLAIMED MATERIAL (UTILITY TRENCHES) LS 1
62 TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,C) [SPWEA230C] TN 2,280
63 TYPE SP 12.5 BITUMINOUS NON WEARING COURSE MIXTURE (2,C) [SPNWB230C] TN 3,040
64 BITUMINOUS MATERIAL FOR TACK COAT GAL 1,870
65 PATCH BITUMINOUS STREET SY 100
66 PATCH BITUMINOUS DRIVEWAY SY 530
67 PATCH GRAVEL DRIVEWAY SY 30
68 B418 CONCRETE CURB AND GUTTER LF 15,620
69 SURMOUNTABLE CURB AND GUTTER LF 150
70 6" CONCRETE DRIVEWAY PAVEMENT SY 250
71 CONCRETE CARRIAGE WALK/FLUME SF 80
72 ADJUST EXISTING VALVE BOX EA 4
TOTAL BASE BID
5 6 7
UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE
MILLER EXCAVATING, INC. FOREST LAKE CONTRACTING, INC.DRESEL CONTRACTING, INC.
$3.67 $330.30 $1.38 $124.20 $5.00 $450.00
$11.67 $3,150.90 $5.44 $1,468.80 $20.00 $5,400.00
$3.33 $91,708.20 $0.94 $25,887.60 $2.00 $55,080.00
$22.46 $45,593.80 $17.00 $34,510.00 $22.00 $44,660.00
$18.35 $18,350.00 $13.88 $13,880.00 $21.00 $21,000.00
$935.00 $3,740.00 $1,521.01 $6,084.04 $600.00 $2,400.00
$362.35 $6,159.95 $2,122.01 $36,074.17 $75.00 $1,275.00
$28.49 $56,125.30 $16.62 $32,741.40 $22.00 $43,340.00
$277.25 $5,822.25 $326.01 $6,846.21 $1,000.00 $21,000.00
$20.55 $20,550.00 $25.23 $25,230.00 $44.00 $44,000.00
$3.14 $92,473.00 $1.14 $33,573.00 $3.00 $88,350.00
$14,025.00 $14,025.00 $5,195.04 $5,195.04 $12,000.00 $12,000.00
$90.98 $207,434.40 $93.31 $212,746.80 $87.00 $198,360.00
$82.82 $251,772.80 $84.94 $258,217.60 $82.00 $249,280.00
$0.01 $18.70 $1.05 $1,963.50 $2.00 $3,740.00
$54.06 $5,406.00 $49.17 $4,917.00 $50.00 $5,000.00
$30.09 $15,947.70 $30.86 $16,355.80 $70.00 $37,100.00
$47.43 $1,422.90 $15.38 $461.40 $26.00 $780.00
$16.80 $262,416.00 $16.11 $251,638.20 $16.00 $249,920.00
$33.39 $5,008.50 $32.80 $4,920.00 $32.00 $4,800.00
$103.95 $25,987.50 $88.40 $22,100.00 $134.00 $33,500.00
$15.38 $1,230.40 $12.03 $962.40 $13.00 $1,040.00
$630.00 $2,520.00 $466.69 $1,866.76 $500.00 $2,000.00
$1,842,654.46 $1,866,387.78 $1,909,051.00
LOCATION MAP
FIGURE NO. 1
CITY OF
LAKE ELMO
PROJECT NEIGHBORHOOD
LEGEND
IMPROVEMENTS
PROJECT NO. 2024.114
PROJECT STREETS
IRISH COURT N
PRAIRIE HAMLET
LAKE ELMO
VISTAROLLING HILLS
ESTATES
JUDITH MARY
MANOR
TEAL PASS
ESTATES
2025 STREET & UTILITY
R46' F/C
D
C D C
C
C
D
D
>>>>>>>>>>>>>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
l l l l l l l l l l l l l l l l l l l l l l l l
l
l l l l l l l l l l l l l l l l l l l
l
l
l
l
l
l
D
D
>>
>>
>>
>>>>>>>>>>>>>>>>>>>>
>>
>>
E-
D
E-
D
E-
D
E-
D
E-
D
E-
D
E-
D
E-
D
E-
D
E-
D
E-
D
E-
D
E-
D
E-
D
E-
D
E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D
OEOEOEOEOEOEOEOE
E-D
OE
OE
C-D
C-D
C
-
D
C
-
D
C-
D
C-
D
C-
D
C-
D
C-
D
C-
D
C-
D
C-
D
C-DC-D
C-
D
C-
D
C-
D
C-
D
C-DC-DC-D
G-DG-D
G-
D
G-
D
G-
D
G-
D
G-
D
G-
D
G
-
D
G-
D
G-D
G-D
G-
D
G
-
D
G-D
G-
D
G-
D
G-
D
G-
D
G-
D
G-DG-DG-DG-DG-DG-DG-DG-DG-DG-DG-DG-DG-DG-D F-DF-DF-DF-DF-DF-DF-DF-D
F-
D
F-
D
F-
D
F-
D
C-DC-DC-DC-DC-DC-DC-DC-D
C-
D
C-
D
C-
D
C-
D
C-DC-DC-DC-DC-DC-DC-DC-DC-DC-DC-DC-DC-DC-D
G-
D
G-
D
G-
D
G-
D
E-D
E-D
E
-
D
E-D
E-D
E-DE-DE-D
E-
D
E-D E-D E-D E-D E-D E-D E-D
E-D
E-D
G-D
G-D
G-D
G-D
G-
D
G-
D
G-
D
C
C-
D
C-D
C-D
C-
D
E
-
D
E-
D
E-D
E-D
E-
D
E
-
D
E-D
E-D
E-
D
E-
D
E-
D
E-
D
E-
D
E-
D
E-
D
Ir
i
s
h
C
o
u
r
t
N
42nd Street N
Ir
v
i
n
C
i
r
c
l
e
N
STORM SEWER REPAIR AND
REPLACEMENT AS NEEDED (TYP.)
32' F/C TO F/C
60' ROW
H:
\
L
K
E
L
M
N
\
2
4
X
1
3
6
2
1
5
0
0
0
\
C
A
D
\
C
3
D
\
F
e
a
s
i
b
i
l
i
t
y
R
e
p
o
r
t
F
i
g
u
r
e
s
\
F
I
G
R
-
1
3
6
2
1
5
-
P
r
o
p
o
s
e
d
S
t
r
e
e
t
I
m
p
r
o
v
e
m
e
n
t
s
.
d
w
g
3/
1
1
/
2
0
2
5
1
0
:
0
6
:
0
6
A
M
R
2025 Street and Utility Improvements
City of Lake Elmo
Proposed Street and Storm Improvements
March 2025
LEGEND
STREET IMPROVEMENTS: RECLAMATION WITH NEW CURB AND GUTTER
EXISTING STORM SEWER
PROPOSED STORM SEWER IMPROVEMENTS
R
FEETSCALE
0 50 100
HORZ.
>>D
>>
Je
r
o
m
e
A
v
e
n
u
e
N
49th
S
t
r
e
e
t
N
R50' F/C
R60' ROW (TYP)
C
CLVT
CLVT
C
C
C
CC
CC
C
C
CC
D
D
>
>
>>
>>
>>
E-
D
E-
D
E-
D
E-
D
E-
D
E-
D
E
-
D
E
-
D
E
-
D
E-
D
E-
D
E
-
D
E
-
D
E
-
D
E
-
D
E-
D
E-
D
E-D
E-D
E-D
E-D
E-D
E-D E-D
E
-
D
E
-
D
E-D
E-D E-D
G-D G-D
G-D
G
-
D
G-D
G-D
G-D
G-D
G-D
G-D
G-
D
G
-
D
G
-
D
G-D
G-D
G-
D
G-
D
G-
D
G-
D
G-
D
G-
D
G-
D
G
-
D
G
-
D
G
-
D
G-
D
G-
D
G
-
D
G-D
G-D
G-D
G-D
G-D
G-D
G-D
G-D
C-D
C-D
C-D
C-
D
C-
D
C-
D
C-
D
C-
D
C-
D
C-D
C
-
D
C
-
D
C
-
D
C-
D
C-
D
C
-
D
C-D
C-D C-D
C-D
C-D
C-D
C-D
C-
D
C
-
D
C
-
D
C-D
C-D C-D
C
C-D
C-D
C-D
C-D
C-D
C-
D
C
-
D
C
-
D
C-D
C-D C-D C-D C-D
C-D
C-D
C-D
C-
D
C-DC-D C-D
C-D
C-
D
C-D
C-D
C-
D
C-
D
C-
D
C-
D
C-
D
C-
D
C-
D
C-
D
C
-
D
C
-
D
C
-
D
C-
D
C-
D
C-D
C-D
C-D
C-D
G-D
G-D
G-
D
E-D E-D
E-D
E-D
E-
D
OE
OE
E-
D
E-D
E-D
E-D
E-D
E-D
OE
E-D
C-
D
C
-
D
>>
Jerome Avenue N
Ja
s
p
e
r
A
v
e
n
u
e
N
Jane Ro
a
d
N
Ja
m
a
c
a
A
v
e
n
u
e
N
Ja
n
e
C
i
r
c
l
e
N
STORM SEWER REPAIR AND
REPLACEMENT AS NEEDED (TYP)
CLEAR VEGETATION, DITCH GRADING,
AND CLEAN/REPLACE RIP RAP AT
FLARED END SECTIONS AS NEEDED (TYP)
32' F/C TO F/C
60' ROW (TYP)
H:
\
L
K
E
L
M
N
\
2
4
X
1
3
6
2
1
5
0
0
0
\
C
A
D
\
C
3
D
\
F
e
a
s
i
b
i
l
i
t
y
R
e
p
o
r
t
F
i
g
u
r
e
s
\
F
I
G
R
-
1
3
6
2
1
5
-
P
r
o
p
o
s
e
d
S
t
r
e
e
t
I
m
p
r
o
v
e
m
e
n
t
s
.
d
w
g
3/
1
1
/
2
0
2
5
1
0
:
0
6
:
1
3
A
M
R
2025 Street and Utility Improvements
City of Lake Elmo
Proposed Street and Storm Improvements
March 2025
LEGEND
STREET IMPROVEMENTS: RECLAMATION WITH NEW CURB AND GUTTER
EXISTING STORM SEWER
PROPOSED STORM SEWER IMPROVEMENTS
FEETSCALE
0 100 200
HORZ.
>>D
>>
R
CC
C
C
CC
CC
C
C
C
C
C
C
C
C
>
>
>>>>>>>>
>>
>>
>>
E-D E-D E-D
E-
D
E-
D
E-D
E-
D
E
-
D
E-
D
E-
D
G-D G-D G-D G-D G-D G-D G-D
G-
D
G-
D
G-
D
G-
D
G
-
D
G-D
G
-
D
G
-
D
G-
D
G-
D
G-
D
G-D
G-
D
G
-
D
G-D G-D
E-D E-D E-D E-D
C-D C-D
C-
D
C-
D
C-D
C-
D
C-
D
C-D
C
-
D
C-
D
C-
D
C-D
C-
D
C-
D
C
-
D
C
-
D
C
-
D
C
-
D
C
-
D
C
-
D
C-
D
C-
D
C-D
C-D
C-D
C
-
D
C-D
C-D
C-D
C-D
C-D
C
-
D
E-D E-D E-D E-D
E-D E-D E-D E-D
E-D
E-D
E-
D
E-D
E-
D
E
-
D
E
-
D
E
-
D
E
-
D
E-
D
E-
D
E-D
E-
D
E
-
D
E-D
E-D
E-D
E-D
E-D
E-D
E-D
E-D E-D
E
-
D
E-D
E-D
E-D
E-D
E-D
E-D
E-D
E-D
E-D
E-D
E-D
E-D
E-D
E-D
G-D
G-D
G-D
G-D
G-D
G
-
D
G-D
G
-
D
G
-
D
G
-
D
G
-
D
G-
D
G-D
G-D
G-
D
G-
D
G
-
D
G
-
D
C
-
D
C
-
D
C
-
D
C-
D
C-D
C
-
D
C-D
C-
D
C-D
C-D
C-D
C-D
C-D
C-D
C-D C-D C-D C-D C-D
C-D
C-
D
C-
D
C
-
D
C
C-D C-D C-D C-D
C-D
C-
D
C-
D
C-D
G-D
G-D
G-D
G-
D
C-D
>
>
>
>
Ju
l
e
p
W
a
y
57th Street N
55
t
h
S
t
r
e
e
t
N
5
7
t
h
S
t
r
e
e
t
N
CLEAR VEGETATION, DITCH GRADING,
AND CLEAN/REPLACE RIP RAP AT
FLARED END SECTIONS AS NEEDED (TYP)
PROPOSED STORM SEWER
EXTENSIONS (TYP)
28' F/C TO F/C
60' ROW
28' F/C TO F/C
60' ROW
24' F/C TO F/C
50' ROW
22' F/C TO F/C
H:
\
L
K
E
L
M
N
\
2
4
X
1
3
6
2
1
5
0
0
0
\
C
A
D
\
C
3
D
\
F
e
a
s
i
b
i
l
i
t
y
R
e
p
o
r
t
F
i
g
u
r
e
s
\
F
I
G
R
-
1
3
6
2
1
5
-
P
r
o
p
o
s
e
d
S
t
r
e
e
t
I
m
p
r
o
v
e
m
e
n
t
s
.
d
w
g
3/
1
1
/
2
0
2
5
1
0
:
0
6
:
3
2
A
M
R
2025 Street and Utility Improvements
City of Lake Elmo
Proposed Street and Storm Improvements
March 2025
LEGEND
STREET IMPROVEMENTS: RECLAMATION WITH NEW CURB AND GUTTER
EXISTING STORM SEWER
PROPOSED STORM SEWER IMPROVEMENTS
FEETSCALE
0 100 200
HORZ.
>>D
>>
R
C
C
C
CLVT
C C
C
C >>
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
XXXXXXXXXXXXXXXXXE-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D E-D
E-
D
G-
D
G-
D
G-
D
G-
D
C-
D
C-
D
G-D
G-D
G-
D
G
-
D
G-D
G-D
G-D
G-D
G-D
G-D
G-D
G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D
E-D
E-
D
E
-
D
E-D E-D
E-D
E-D
E-D
E-D
E-D
E-D E-D E-D E-D E-D E-D
C-
D
C-D
C-D
C-
D
C
-
D
C-D C-D
C-D
C-D
C-D
C-D
C-D C-D C-D C-D C-D C-D C-D
C-D
C-D
C-
D
C
-
D
C-D
C-D
C-D
C-D
C-D
C-D
C-D
C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D
C
C-D
C-
D
C-
D
C-
D
C-
D
C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D
C-
D
E-D
E-D
E
-
D
E-D >>
>>>>>>>>>>>>
55th Street N
Ke
a
t
s
A
v
e
n
u
e
N
24' F/C TO F/C
50' ROW
22' F/C TO F/C
STORM SEWER REPAIR AND
REPLACEMENT AS NEEDED (TYP)
H:
\
L
K
E
L
M
N
\
2
4
X
1
3
6
2
1
5
0
0
0
\
C
A
D
\
C
3
D
\
F
e
a
s
i
b
i
l
i
t
y
R
e
p
o
r
t
F
i
g
u
r
e
s
\
F
I
G
R
-
1
3
6
2
1
5
-
P
r
o
p
o
s
e
d
S
t
r
e
e
t
I
m
p
r
o
v
e
m
e
n
t
s
.
d
w
g
3/
1
1
/
2
0
2
5
1
0
:
0
6
:
2
1
A
M
R
2025 Street and Utility Improvements
City of Lake Elmo
Proposed Street and Storm Improvements
March 2025
LEGEND
STREET IMPROVEMENTS: RECLAMATION WITH NEW CURB AND GUTTER
EXISTING STORM SEWER
PROPOSED STORM SEWER IMPROVEMENTS
FEETSCALE
0 50 100
HORZ.
>>D
>>
R
CC
C
C
CC
S
HC
CC
C
CC
D
S
D
E
C
C
>>
l
l
l
l
l
l
l
l
l
l
l
l
D
>>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>>>
>
>
>
>
>
>
>
CO
CO
l
l
l
l
l
l
l
l
l
l
l
l l l l l l l
S
LS
SSS L
LMS
CO
CO
S
S
S
S
S
SCO
L
E-
D
E
-
D
E
-
D
E
-
D
E-
D
E-D
E-D
E-D
E
-
D
E-D
E-D
E-D
E-D
E-D
E-D
E-D E-D E-D
E-D
E-D
E-D
E-D
E-D
E-D E-D E-D
E-D
E-D E-D
E-D
E-D
E-D
E-D
E-
D
G-
D
G
-
D
G
-
D
G
-
D
G-
D
G-D
G-D
G-D
G-D
G-D
G-D
G-D
G-D
G-D G-D G-D G-D
G-D
G-D G-D
G-D
G-D
G-D
G-D
G-D
G-D
G-D
G-
D
G-
D
G
-
D
G-
D
G-D G-D G-D
G-D
G-D
G-D
G-D G-D G-D
C-
D
C-
D
C
-
D
C
-
D
C-
D
C-D
C-D
C-D
C-D
C-D
C-D
C-D
C-D
C-D
C-D C-D C-D C-D C-D
C-D
C-D
C-D
C-D
C-D C-D C-D
C-D C-D C-D
C-D
C-D
C-D
C-D
C-D
C-D
C-D
C-
D
G-
D
G-
D
G-
D
G-
D
G-
D
G-
D
G-
D
G-
D
G-
D
G-
D
G-
D
G-D
C-D C-D
F-
D
F-
D
F-
D
F-
D
F-
D
F-
D
F-
D
F-
D
C-
D
C-
D
C-D C-D C-DC
C-
D
C-D
C
-
D
C
-
D
C-
D
C-D
C-D
C-D
C-D
C-D
C-D
C-D
C-D
C-D
C-D C-D C-D C-D
C-D
C-D
C-D
C-D
C-D
C-D C-D C-D
C
-
D
C
-
D
C-D C-D C-D C-D
C-D C-D C-D
C-D
C-D
C-D
C-D
C-D
C-D
C-D
C-
D
E-D
E-D
E-D
E-
D
E-D
E-D
E-D
E-D
E-D
E-D
E-D
E-D
E-D
E-D E-DE-D E-D
E-D
E-D
OE
OE
OE
OE
OE
OE
OE
E-D
E-D
>>
>>
>>
>>
>>>>>>
59t
h
S
t
r
e
e
t
Cou
r
t
N
Ke
a
t
s
A
v
e
n
u
e
N
EXISTING PRIVATE SANITARY
SEWER TO REMAIN IN PLACE
REPAIR AS NECESSARY 24' F/C TO F/C
50' ROW
H:
\
L
K
E
L
M
N
\
2
4
X
1
3
6
2
1
5
0
0
0
\
C
A
D
\
C
3
D
\
F
e
a
s
i
b
i
l
i
t
y
R
e
p
o
r
t
F
i
g
u
r
e
s
\
F
I
G
R
-
1
3
6
2
1
5
-
P
r
o
p
o
s
e
d
S
t
r
e
e
t
I
m
p
r
o
v
e
m
e
n
t
s
.
d
w
g
3/
1
1
/
2
0
2
5
1
0
:
0
6
:
4
0
A
M
R
2025 Street and Utility Improvements
City of Lake Elmo
Proposed Street and Storm Improvements
March 2025
LEGEND
STREET IMPROVEMENTS: RECLAMATION WITH NEW CURB AND GUTTER
EXISTING STORM SEWER
EXISTING PRIVATE SANITARY SEWER
PROPOSED STORM SEWER IMPROVEMENTS
>>D
FEETSCALE
0 50 100
HORZ.
>>
>SS
R
3507 High Point Drive North
Bldg. 1 – Suite E130
Oakdale, MN 55128
Phone: (651) 704-9970
Bolton-Menk.com
2025 Street and Utility Improvements
Lake Elmo, MN
Project No.: 2024.114
SEPTEMBER 17, 2024 Council authorizes preparation of Preliminary Design, Geotechnical
Services and Feasibility Report.
JANUARY 28 and 29, 2025 Neighborhood informational meeting(s) on scope of improvements.
FEBRUARY 18, 2025 Presentation of Preliminary Design Findings and Recommendations.
Authorize preparation of Plans and Specifications.
MARCH 18, 2025 Council accepts the Feasibility Report and Calls for Public Hearing. Council
approves Plans and Specifications and orders Advertisement for Bids.
APRIL 22, 2025 Project Bid Date: Receive contractor bids.
APRIL 24, 2025 Neighborhood informational meeting(s) on Preliminary Assessments.
MAY 6, 2025 Public Improvement Hearing. Council Orders the Improvement (4/5th
Vote). Council accepts Bids and awards Contract.
MAY, 2025 Conduct Pre-Construction Meeting and issue Notice to Proceed.
SEPTEMBER 12, 2025 Substantial Completion.
OCTOBER 31, 2025 Final Completion.
*Final Assessment Hearing Schedule TDB