HomeMy WebLinkAboutPresentation - Pavement Management Plan UpdatePAVEMENT MANAGEMENT PLAN UPDATE APPROVE PAVEMENT MANAGEMENT PLAN DATED J ULY, 2025 JULY 1, 2025 INVENTORY AND CONDITION ASSESSMENT 1)City uses Goodpointe Technology and their ICON Pavement Management Software Program to manage and maintain the street network inventory and condition ratings. 2)City wide inventory and condition ratings were completed in 2016 and in 2021. 3)Formalized Pavement Management Plan was approved by City Council in 2023, based on the 2021 ratings projected through 2023. 4)One of the recommendations adopted in the 2023 PMP is to perform the pavement condition assessment every 4 years to maintain current assessment data. 5)A detailed surface condition assessment identifies pavement distress type, quantity, severity, and extent. The condition or PCI is then reported on a scale from 1 to 100. 6)The Pavement Condition Index (PCI) methodology is used nationwide and is endorsed by the American Public Works Association (APWA) and has been standardized by the American Society of Testing and Materials (ASTM). Surrounding communities have 2.0X+ more people to pay for every mile of road STREET INVENTORY / METRICS CITY POPULATION MILES OF STREETS PEOPLE / STREET MILE LAKE ELMO 2013 2025 8,177 13,756 70 97 117 142 NORTH ST. PAUL 11,601 43 270 STILLWATER 18,464 80 231 OAKDALE 27,743 92 302 MAPLEWOOD 38,472 135 285 WOODBURY 67,787 230 295 •There are currently 98 miles of city roadways. The city has added 27 miles of new streets since 2013. EXISTING CITY STREET SECTIONS & RECLAIM PROJECT In many cases we have minimal to no neighborhood drainage system No drainage layer In situ soils remain in place EXISTING CITY STREET SECTIONS & RECLAIM PROJECT NEW CITY STANDARD •City will inherit many new miles of streets •Staff will require council support of quality street design •Long term financial health of the city depends upon quality infrastructure •Potential for 50-year road life with engineered base and subbase ENGINEERED STREET Standard includes Subbase drainage layer (12”-24” select sand with drain tile) CURRENT PAVEMENT CONDITION REPORT PCI - Pavement Conditions Breakdown PCI Category PCI Range Maintenance/Rehabilitation Needs % (SF)Est. Miles Excellent 85 100 Preventative Maintenance 79.7%76.2 Good 70 84 8.3%7.8 Fair 55 69 Rehabilitation / Mill and Overlay 6.5%5.7 Poor 40 54 Reclamation / Reconstruction 1.3%1.5 Failing 0 39 Reconstruction 4.2%4.4 Total Street Miles 95.6 PCI - Pavement Conditions Breakdown PCI Category PCI Range Maintenance/Rehabilitation Needs % (SF)Est. Miles Excellent 85 100 Preventative Maintenance 65.8%63.9 Good 70 84 12.5%12.1 Fair 55 69 Rehabilitation / Mill and Overlay 6.3%6.1 Poor 40 54 Reclamation / Reconstruction 7.3%7.1 Failing 0 39 Reconstruction 8.2%7.9 Total Street Miles 97.0 2025 PCI RATINGS 2023 PCI RATINGS 88% of the Street network is in the “good” or “excellent” category. Up from 78.3% in 2023 2025 PCI RATINGS 2021 PCI RATINGS Street Conditions masked by 2023 Seal Coat Street Conditions masked by 2020 Seal Coat STREET INVENTORY RATINGS DATABASE CURRENT PAVEMENT CONDITION REPORT 1)The average condition rating for today’s streets is 89 (88.6). This overall rating has increased from 83 (82.7) in 2023. 2)The average PCI has assumed that the 2025 Street CIP Improvement have been completed. 3)Historical average PCI. Year 2025 PCI = 89 96.60 Miles of Streets Year 2023 PCI = 83 95.60 Miles of Streets Year 2021 PCI = 79 93.80 Miles of Streets Year 2016 PCI = 73 78.85 Miles of Streets 4)Other Network PCI indicators. –PCI for Local Streets 87.8 (82.8 in 2023) –PCI for Collector/MSA Streets 90.5 (82.5 in 2023) –PCI for Local & Collectors with curb 96.3 (94.4 in 2023) –PCI for Local & Collectors with No curb 74.7 (72.1 in 2023) TREATMENT STRATEGIES 1)Crack Sealing (non-structural). Hot rubberized sealant placed in cracks after routing and cleaning. 2)Seal Coating (non-structural). Always completed with crack sealing. An emulsified asphalt spread over the pavement followed by uniform cover of crushed trap rock. 3)Mill and Overlay (structural): Removal of a portion of the bituminous layer followed by paving 1-1/2 to 2-inch new bituminous. 4)Full Depth Reclamation (FDR) – with and without new concrete curb and gutter. 5)Reconstruction. Removal and replacement of full roadway section. Maintenance or Construction Cost Total Project Cost Rehabilitation Method Unit Cost ($/SF) Unit Cost ($/SF) Seal Coating $ 0.24 $ 0.30 Mill and Overlay $ 1.60 $ 2.00 Reclamation – No curb $ 5.20 $ 6.50 Reclamation – New curb $ 8.15 $11.00 Reconstruction $14.80 $20.00 PAVEMENT LIFE CYCLE PAVEMENT LIFE CYCLE MAINTENANCE SCHEDULE Maintenance or Construction Cost Total Project Cost Rehabilitation Method Unit Cost ($/SF) Unit Cost ($/SF) Seal Coating $ 0.24 $ 0.30 Mill and Overlay $ 1.60 $ 2.00 Reclamation – No curb $ 5.20 $ 6.50 Reclamation – New curb $ 8.15 $11.00 Reconstruction $14.80 $20.00 2026-2035 STREET CAPITAL IMPROVEMENT PLAN Annual local street improvements County Roadways (City cost share) Collector street/MSA improvements 2026-2035 STREET CAPITAL IMPROVEMENT PLAN TOTAL 10-year Cost $47.6M ($61.5M in 2023) Local Streets $26.7M ($36.2M in 2023) Collector/MSA Streets $12.6M ($15.8M in 2023) County Cost Participation $8.3M ($9.5M in 2023) •Estimated MSA Funding $12.0M •Estimated Assessments $8.0M 2023-2025 COMPLETED PROJECTS FINDINGS 1)There are currently 98 miles of city roadways . The city has added 27 miles of new streets since 2013. 2)The average condition rating for today’s streets is 89 (88.6). This represents a street network in very good to excellent condition and has increased from 83 (82.7) in 2023. 3)The average PCI rating falls to 74.7 for streets with no curb. 4)88.0% of streets are in the “good” or “excellent” category and require only preventative maintenance. This is up from 78.3% in 2023. 5)6.5% of streets are in the “fair” category and will require additional maintenance considerations, such as a Mill and Overlay. 6)5.5% of streets are in the “poor” and “failing” categories, requiring a Full Depth Reclamation or complete Reconstruction. This is down from 15.5% in 2023. 7)The later years of the CIP are based on pavement aging and reflect streets that are currently in good condition. RECOMMENDATIONS 1)Implement street maintenance and rehabilitation in general accordance with the Street Life Cycle Maintenance and Rehabilitation Schedule outlined in the Report. Pavement condition ratings should be conducted every 4 years. 2)Maintain an annualized street maintenance budget in the amount of $600,000 over the next 10 years. This includes crack sealing, seal coating and Mill and Overlays. 3)Continue to investigate alternative maintenance treatments to replace multiple seal coat treatments. 4)Implement the recommended 2026–2035 Street Capital Improvement Plan to address the 5% +/- of streets that remain “poor” to “failing”. 1)Estimated $26.7 million for local street improvements. 2)Estimated $12.6 million for collector street improvements. 3)Estimated $8.3 million in cost participation for County Roadways. 5)Full Depth Reclamations (FDR) with new concrete curb and gutter continue to be the recommended improvements for streets with existing bituminous curb, even when the street remains in the “fair” rating category. FDR is an assessable improvement. 6)Full Depth Reclamations (FDR) without new concrete curb and gutter will provide the city with an effective and cost- efficient rehabilitation technique for its pavement management program in the years to come. This will become the go-to rehabilitation technique when today’s newer streets are ready for rehabilitation. Requested Council Action •Council is asked to consider approving the Pavement Management update, dated July, 2025. Questions? THANK YOU!