Loading...
HomeMy WebLinkAbout02-18-26 Parks Commission Meeting PacketParks Commission Meeting 3880 Laverne Avenue North February 18, 2026 6:30 p.m. AGENDA Call To Order Pledge Of Allegiance Approve Agenda Approval Of Minutes JANUARY 2026_CITY OF LAKE ELMO PARKS COMISSION MINUTES JANUARY 2026_ CITY OF LAKE ELMO PARKS COMMISSION MINUTES.PDF HIGHPOINTE CROSSING REVISED CONCEPT PLAN PARKS REPORT - HIGHPOINTE CROSSING REVISED CONCEPT.PDF WASHINGTON COUNTY REGIONAL TRAIL WASHINGTON COUNTY LEPK RT LRP_LAKE ELMO PARKS COMMISSION 03182026.PDF Ridge Park Concept RIDGE PARK 2ND CONCEPT REPORT.PDF 2026 -02 -12_UPDATED CONCEPT PLAN_REDUCED.PDF Public Comment Communications/Updates Adjourn Our Mission is to Provide Quality Public Services in a Fiscally Responsible Manner in Partnership with our Community. 1. 2. 3. 4. a. Documents: 5. Documents: 6. Documents: 7. Documents: 8. 9. 10. Parks Commission Meeting3880 Laverne Avenue NorthFebruary 18, 20266:30 p.m.AGENDACall To OrderPledge Of AllegianceApprove AgendaApproval Of MinutesJANUARY 2026_CITY OF LAKE ELMO PARKS COMISSION MINUTESJANUARY 2026_ CITY OF LAKE ELMO PARKS COMMISSION MINUTES.PDFHIGHPOINTE CROSSING REVISED CONCEPT PLANPARKS REPORT - HIGHPOINTE CROSSING REVISED CONCEPT.PDFWASHINGTON COUNTY REGIONAL TRAILWASHINGTON COUNTY LEPK RT LRP_LAKE ELMO PARKS COMMISSION 03182026.PDFRidge Park ConceptRIDGE PARK 2ND CONCEPT REPORT.PDF2026-02 -12_UPDATED CONCEPT PLAN_REDUCED.PDFPublic Comment Communications/Updates Adjourn Our Mission is to Provide Quality Public Services in a Fiscally Responsible Manner in Partnership with our Community. 1.2.3.4.a.Documents:5.Documents:6.Documents:7.Documents:8. 9. 10. City of Lake Elmo Parks Commission Minutes 14 January 2026 Members Present: Chair Hank Hoelscher, Vice Chair Ellen Esch, Commissioners; Giovanni Bloyer, Peter Kastler, Tracy Petersen and Tammy Sturtz Absent: Pat Barrett Staff Present: Public Works Interim Director, Adam Swanepoel The meeting was called to order by Hoelscher at 6:30PM. Petersen moved to accept the agenda, Kastler seconded. Motion passed 6-0. Approval of December Meeting Minutes The noted approval of the November meeting, stated: “Sturtz suggested including attachments”. Correction; Sturtz suggested including amendments. Esch moved to accept the December minutes. Sturtz seconded. Motion passed 6-0. Election of Officer Hoelscher nominated Esch for Chair of Parks Commission, Sturtz seconded. Motion passed 6-0 Hoelscher nominated Peterson for Vice Chair of Parks Commission, Kastler seconded. Motion passed 6-0 Future Playground Replacement Swanepoel, Public Works Interim Director, gave background information. Council asked commissioners review and assess the amenities and playgrounds at each park. The life cycle of most playground equipment is 25 years. Assessment recommended looking at these parks a year prior to end of their lifespan. Lake Elmo has15 playground total, 5 slated for replacement in the next 8 years. How would Park Commission like to prioritize or review the playground replacement? Esch recommends looking at each park on the CIP followed by general discussion. Swanepoel recommends having agreed upon criteria outlined for each park. (accessibility, usage, demographics, trail access) Agreed upon criteria Does the park classification merit a play feature? Current or proposed classification. Is the play feature redundant? Is there a nearby playground that is accessible(location)/suitable if said playground was removed? If so, are there suitable alternative amenities that would be a good fit? What is the community feedback? Is the park being used and is neighborhood anticipated to change soon? (demographics/population, etc.) Considering the new sports complex Agreed upon process Starting with document listing criteria. Look at each park separately. Recommend to Council findings Discussion between Tablyn Park (community park) and Ridge Park (neighborhood park). Esch requests Swanepoel gather community feedback from above criteria. Communications/Updates Ice rink conditions have been poor due to warm weather. PW has and will be adding layer of water in the next few days with the colder weather coming back. Grooming operations – done twice this year, due to lack of snow. Thank you for attending the Parks and City Council workshop. We hope to continue these meetings in the future, as they foster strong communication and collaboration. Discussion of the Ridge Park concept is scheduled for February. Update on Lions Park: The item was brought to City Council; however, the deadline for a cost reduction was missed, resulting in an additional $10,000. A request for funds will be addressed at the City Council meeting on the 20th. If denied, Public Works will install the safety chips and remain within the approved budget. The hiring of the Public Works Director will be discussed at the next City Council meeting. Next Parks Commission Meeting: Wednesday 18 February, 6:30pm Esch adjourned to end the meeting at 8:07 PM. Peterson seconded. Motion passed 6-0. Esch adjourned the meeting.  Respectfully Submitted Angie Gruber - Administrative Assistant, PW/F  STAFF REPORT DATE: 2/18/2026 Item#: _____ Motion TO: Parks Commission FROM: Sophia Jensen, Senior City Planner AGENDA ITEM: Concept Review – Revised Highpointe Crossing Concept Plan REVIEWED BY: Jason Stopa, Community Development Director Nathan Fuerst, Planning Consultant Bolton and Menk BACKGROUND: In 2023 the Parks Commission reviewed a request from Rachel Development for an open space planned unit development (OP-PUD) concept plan application. The proposal is for 64 single-family homes with a community septic system. The project had private open space with grass trails and rest areas. The Parks Commission voted to recommend acceptance of fee in lieu of land for this concept. Since the project’s approval in fall of 2024, additional testing and due diligence on the soils for the community septic system resulted in a finding that the system would not be viable. The developer has since revised the plans to meet the Residential Estate (RE) zoning district with an 18 unit large rural lot development with independent septic systems. Since the site has had significant revisions, it is required to be re-reviewed by the Parks Commission. The property is roughly 78.24 acres and currently used for agricultural activities. The proposed project would require approval of a PUD and plat. No development rights are granted at this stage. ISSUE BEFORE THE PARKS COMMISSION: The Parks Commission is being asked to review the revised concept to provide feedback on the proposal to meet the Park Land Dedication Requirements. GENERAL INFORMATION: • Property Owner: Caroline M Eberhard Trs • Applicant: Rachel Development • Parcels: 21.029.21.32.0001 • Site Area: 78.24 acres • Land Use Guidance: Rural Single Family (RSF) • Zoning: Open Space Planned Unit Development (OP-PUD) • Surrounding Land Use: The property abuts Inwood Ave and the Lake Elmo Park Reserve to the East, rural residential estate zoning to the North and South, and the City of Oakdale to the West. PARKS PROPOSAL DETAILS/ANALYSIS: To satisfy park dedication requirements for land in a rural residential zoning district the City has three options: 1) Fee in Lieu of Land (~$119,631) the actual fee will be determined once the development moves into the final plat stage, or 2) 5% of the land area (3.9 acres), or 3) A combination of both. Comprehensive Plan – Parks. Chapter 6 Parks, Trails & Open Space has area and site specific recommendations that should influence the recommendation of the Parks Commission. The plan identifies the property is not within a park search area. 2 Comprehensive Plan - Trails. Chapter 6 Parks, Trails & Open Space has area and site specific recommendations that should influence the recommendation of the Parks Commission. The plan identifies that the property is not within the trail search corridor. The City of Oakdale has expressed interest in a possible trail connection through this development to allow Oakdale residents to access the Lake Elmo Park Reserve. City Staff is still reviewing the feasibility of this request based on site conditions. Parks Master Plan – Gap Analysis. Figure 3.13 All Park Distribution and Gap Analysis Map illustrates the current park system and identifies gaps in service areas that should influence the recommendation of the Parks Commission. The plan identifies this area to be served by multiple parks and is not located in a gap. FINDINGS 1. The site is not within a park search area in the 2040 Comprehensive Plan. 2. The site is not within a trail search area in the 2040 Comprehensive Plan. 3. The site is not located in a gap area in the 2024 Parks Master Plan. 4. The site is within 1 mile of the Lake Elmo Regional Park Reserve, a neighborhood park, and a natural area park. 5. The developer is proposing large lots with room for independent recreation on each lot. 3 OPTIONS: The Commission may recommend to that: • The City accept cash in lieu of land; or • The City accept land in lieu of cash; or • The City accept a combination of both. RECOMMENDATION: Staff recommends the Parks Commission recommend to the City Council the following motion (this is the same recommendation as the prior concept review from 2023): “Move to recommend approval of the Revised Highpointe Crossing Concept Plan with the acceptance of cash in lieu of land based on the findings listed in the staff report.” ATTACHMENT: 1. Application Package 2. Map 6-7. Search Areas for New Parks and Facilities (Comprehensive Plan) 3. Map 6-8. Future Trail Plan (Comprehensive Plan) 4. Figure 3.13 All Park Distribution and Gap Analysis Map (2024 Parks Master Plan) 4180 Napier Ct NE St. Michael, MN 55376 Office: 763.424.1500 www.racheldevelopment.com January 9, 2026 City of Lake Elmo Staff and Council Sketch Plan Narrative RE: Residential Estate Plan for Highpointe Crossing – 2298 Inwood Background: At the October 17, 2025 City Council meeting, we discussed alternatives to the previously approved 65-lot plan for the property, for which sanitary sewer service was being pursued. Two rural, large-lot alternatives were presented: an 11-lot plan and a 30-lot plan. During that discussion, the Council indicated a preference for the lower-density, 11 Lot concept. I explained at the time that implementing that plan would require several exceptions to City code and policy, including the use of private wells instead of City water and shared private driveways in lieu of a City roadway. Following the meeting, we met with City staff and came to understand that obtaining those exceptions would likely be challenging and time consuming. As a result, we reevaluated the project and shifted our focus to using the City’s existing Residential Estate zoning district. The Residential Estate district is one of the two zoning districts identifled in the Comprehensive Plan that were later combined into the Rural Single Family land use category that guides this property. This zoning district was also used for the two adjacent developments and aligns with what both the Planning Commission and neighboring residents have indicated is their preferred development pattern. While it appears that Residential Estate zoning has not been used since 2009, it remains an adopted zoning district and provides a clear and predictable framework for moving forward. Unlike the earlier OP-PUD concept, we proactively identifled suitable septic locations on each lot and submitted them to the County for approval. . That approval letter is attached in Exhibit B. 2 Our proposal still requires some minor fiexibilities. Most of these fiexibilities or exceptions would not have been considered exceptions or fiexibilities in past Residential Estate neighborhoods and were actually commonly found in Residential Estate developments. They include ponding and wetlands within the lotted areas and use of rural roadway sections. These items will be addressed is greater detail later in the narrative. Proposal 1. Basic Facts a. Acres i. Gross Acres - 78 ii. ROW – 5.12 Acres iii. Lotted Area – 64 .3 Acres iv. Ponding Outlots – 6.58 acres b. 18 Lots (including one lot with existing homestead) c. Gross Density - 0.25 units/acre d. Average Density – 78/18 = 4.3 acres/unit (exceeds the 3.3 acres/unit required by Residential Estate) 2. Comprehensive Plan As mentioned in the background above the property we are developing is guided Residential Single Family (RSF). This land use combination Rural Single Family and Residential Estate land uses. We have been told that the City intended to create a new zoning district to best flt this guiding but that never happened. We tried the OP- PUD but could ultimately not get a community septic system approved so now we are following the Residential Estate zoning which is at the lower end of the density range allowed within RSF. The allowed density range within RSF is 0.1 to 2.0 units per acre. Our proposal is 0.25 units per acre. 3. Zoning We are using the city’s existing Residential Estate Zoning District. 4. Residential Estate Lot Standards We are following all of the Residential Estate Zoning Standards. In the past I have mentioned that many of the standards in the Residential Estate Zoning are not friendly or practical standards. That said, we have nonetheless designed the neighborhood to accommodate the standards as stated in the code. They include: 3 a. Setbacks i. Front 100’ ii. Rear 100’ iii. Side 50’ iv. Side (Public Street) – 80’ b. Minimum Lot Area - 2.5 acres c. Average Density - 3.3 overall average (proposed 4.3 acres/unit) d. Other Code requirements i. 250’ radius needs to flt inside each lot (shown on plans) ii. 3:1- Lot depth to lot width (ex. 200’ wide lots can be 600’ deep) All of the lots meet this criteria when length is measured at the middle of the lot and width at the front setback. 5. Site Plan In addition to the formal plan set two colored site plans are attached highlighting our preferred plan with storm water ponds within the lots and the current plan with the storm ponds in outlots. 6. Wetlands The site contains Type 2 wetlands, which require a 50-foot buffer or a 25-foot buffer with approved buffer averaging. Buffer averaging has been applied where appropriate and is shown on the plans. 7. Septic We have completed the required initial testing for both primary and secondary areas. The County has issued their preliminary approval (Exhibit B). As a part of their approval process, they ask for a 10,000 sf area of suitable soils. According to the County this is enough area for a primary and secondary areas, so they no longer require showing two separate areas. a. Setbacks to treatment areas follow county and state setbacks and rules i. 10’ to property lines ii. 10’ to watermains iii. 10’ to occupied buildings iv. 75’ to wetland or unclassifled body of water (this does not include ponds). There was an initial comment from staff about setback to storm water ponds. None are required by the state or county. b. Finally, the methodology used for the initial approval is meant to show that the time of platting a lot there is enough area on the lot to accommodate 4 primary and secondary septic sites. A flnal detailed septic design is required as a part of building a new home. That design process often ends up with septic systems being located in areas outside of the original 10,000 sf test area. 8. Flexibilities and/or Possible Flexibilities a. Keeping existing driveway on Inwood - We believe this is a County issue and we will be meeting with the County on this and on the type of bypass lane needed for our development. We assume that Lot 1, Block 1 can keep its existing driveway since this was already approved by the County with the previously approved preliminary plat for Highpointe Crossing. b. Setback for existing home and accessory structures . We are leaving the option open to sell the existing homestead as is. Much like with the previously approved preliminary plat we will need a 20’ front yard set-back variance to accommodate the existing homestead. In large part this is needed because of dedicating additional ROW for Inwood and because the RE zoning has a signiflcantly increased front yard setback from historic standards. c. Wetlands(Lot Area) – Including wetlands within the lotted area of lots has been the past practice in all Residential Estate developments to date. There is no code requirement that we could flnd requiring wetlands to be excluded from lots. From what we can tell excluding wetlands has been an unwritten policy of City for more recent urban development projects. It is unclear if this is now applied to rural areas so we are asking for this fiexibility proactively if needed. d. Ponds – Although we have shown that we can accommodate ponds in outlots we are also asking the City to waive this engineering policy. This policy much like wetlands has been a practice used in more urban styled developments but has not historically been applied in the rural areas and rural developments within the City. e. 3:1 Length to Width Ratio – We believe that all of the lots meet this criteria when length is measured at the middle of the lot and width at the front setback. If length is measured at the longest side of a lot there are three lots 5 that could be slightly over this ratio with the longest lot having a ratio of 3.2:1. If these ratios are rounded to the nearest whole number we would also meet this code requirement. In any case we believe we meet the intent of the code as well as how the code has been implemented in past Residential Estate developments but are bringing this up proactively in case fiexibility is needed. 9. Storm Water Treatment Unlike past Residential Estate Development, we will need to meet today’s modern storm water treatment requirements which will require more ponding areas than previous RE developments. We are working with Valley Branch Watershed District (VBWD) on designing a storm water system to meet their code. This will likely include a combination of ponds and flltration areas. We will likely have met with VBWD prior to the February Council Meeting and will be able to better address how we will comply with their rules. As mentioned above the storm water system will be designed with flltration areas and ponds but will also include swales. These swales will contribute to the treatment of the water but also convey water between the lots to the ponding and flltration areas. Most of these swales will be located in drainage and utility easements and not in outlots. As shown we have placed the ponds and ponds accesses in city outlots. We would prefer that these also be located within in the lots and in drainage and utility easement and not outlots. This appear to have been the practice in all Residential Estate developments in the City to date. 10. Roadway You may recall that one of the fiexibilities we were asking for was to use a rural roadway without ribbon curb. From our discussions it was clear that this City wanted more protection of the roadway edges. We discussed the City’s ribbon curb standard which had been used in more recent rural roadway projects. While I believe that there are numerous rural roadways across the state that function without this added protection we are no longer asking for that fiexibility and plan on following the standard (Exhibit A) for rural roadways. 6 We are proposing to build a 28’ wide public road with ribbon curb within a 70’ right of way. 11. Utilities You may recall that I asked the City to consider PVC versus ductile iron for watermain. Ductile iron is an outdated standard that the majority of cities have gone away from. That said, we are planning on water connections to Inwood and Imperial using ductile iron pipe and we are no longer asking for any exception to this standard. The City has told us that the water system we are installing will require a pressure reducing value. We respectfully ask that those details be provided to us for preparation of our preliminary plat. 12. County We are working with County on roadway access. We will have had a meeting with the County prior to meeting with the Council in February. We look forward to discussing our Residential Estate plans with the Council. We hope and believe you do as well that this will be the last plan you will need to review for developing this property. Paul Robinson Development Director, Rachel Development 37 FIGURE 3.13 | ALL PARK DISTRIBUTION AND GAP ANALYSIS MAP Washington County Lake Elmo to Phalen-Keller Regional Trail Lake Elmo Parks Commission –February 18, 2026 2 Agenda •Introduction •Lake Elmo to Phalen-Keller Regional Trail Long Range Plan •Other Projects at Lake Elmo Park Reserve •Questions/Discussion 3 County Park & Trail System •5000+ acres •12+ miles regional trail •Regional and County Parks •Park Reserves •Regional Trails •Historic Courthouse •1.9 million annual visits 4 Lake Elmo to Phalen-Keller Regional Trail Long Range Plan 5 Regional Trail Long Range Plans Regional Trails •“Tree trunks” or "highways" of system •Standard: 10 ft wide paved trail, with 10 ft buffer •Quality signage and amenities Long Range Plans •Guidance on future alignment, development, management •Eligible for funding •Engagement with partners and public 6 Regional Trail Project Timeline Community Vision Long Range Plan •Develop high- level concept •Identify areas for additional study Feasibility Study / Preliminary Design •Reengage stakeholders •Work through challenges, refine designs and costs Final Design •Finalize design •Formalize funding and agreements Construction • Construction coordination, likely in phases Open to Public Stakeholder Engagement 7 Corridor Background •~5 mile West -East Arterial Trail •West: County line •East: Lake Elmo Ave •Link between Lake Elmo, Oakdale, & Maplewood / Ramsey County •Build on existing plans & studies, including Central Greenway Regional Trail 8 Engagement Structure KEY STAKEHOLDERS PROJECT LEADERSHIP PMT Planning Parks Engineering Consultant TAC GENERAL PUBLIC Popup Tables City & Town Meetings Open Houses County Staff State/Fed Agencies City/Townships Parks Commission 9 Long Range Plan Timeline Winter – Spring 2026 •Visioning & Site Analysis Summer – Fall •Engagement & Data Collection Fall - Winter •Route Development & Plan Drafting Spring – Summer 2027 •Final Draft & Approval Process 10 Other Projects at Lake Elmo Park Reserve •2027: Lake Elmo Park Reserve Single Track Trail – Phase 1 (PARK-3020) •2027-2028: Lake Elmo Park Reserve Pavilion Facilities (PARK -3021) •Ongoing: Natural resource restoration and maintenance projects (e.g. native seeding, seasonal burning, invasive species removal) •2027: CSAH 14 - Lake Elmo Park Reserve to 39th Street Study (RB-2702) Andrea Rehm Planner II 651-430-4332 andrea.rehm@washingtoncountymn.gov Questions & Discussion STAFF REPORT DATE:02/18/2026 Discussion TO: PARKS COMMISSION FROM: Assistant Public Works Director – Adam Swanepoel AGENDA ITEM: Ridge Park Concept Design CORE STRATEGIES: ☒ Vibrant, inclusive, connected community ☐ Efficient, reliable, innovative services ☒ Responsive, transparent, adaptive governance ☐ Balanced Finances now and future ☐ Managed Growth ☐ Resilient Infrastructure BACKGROUND: In October 2025 staff presented two separate concept plans that were prepared for Ridge Park by Bolten and Menk. Initiatives from the Parks Master Plan were integrated to make a strategic vision that accommodates future growth and phased implementation. Several community members were in attendance at the meeting and provided input and feedback on the concepts. Overall concern from the public was the large rendering and changes throughout the park and potential noise that could occur from users. Attendees supported future improvements but were concerned about the toll the changes might take on their community. Commissioners provided feedback and were interested in seeing what other amenities could be used in the park in place of a ball field or soccer fields. In addition, commissions were interested in other amenities that may fit into this park that the city currently does not have. ISSUE BEFORE PARKS COMMISSION: Are there any questions about the rendered Ridge Park concept plan? PROPOSAL DETAILS/ANALYSIS: Bolton & Menk has created an additional concept plan for Ridge Park, incorporating valuable feedback and insights provided by city staff. This refined concept builds upon the two earlier designs to create a larger vision that aligns with both community needs and park planning goals. By combining the strengths of the previous concepts, the final plan offers a flexible framework that supports future amenities, recreational opportunities, while conserving environmental stewardship. The new concept addresses key concerns raised during the planning process—such as accessibility, environmental impacts, and neighborhood impacts—ensuring that Ridge Park continues to be attractive to users, inclusive, and engaging public space for all users. FISCAL IMPACT: There is no financial obligation, commissions members should take into consideration the annual cost of their items for budgeting purposes. RECOMMENDATION: At this time, staff is not presenting a formal recommendation. Instead, staff encourage the Commission to use the information provided to make recommendations to the park and CIP going forward. RIDGE PARK | CONCEPT DESIGN LAKE ELMO, MN IV O R Y A V E N 15TH ST N5 2 1 3 4 7 8 6 1 2 3 4 5 6 7 89 9 10 11 LEGEND: 1. EXPANDABLE PARKING LOT - Parking lot can be expanded in each direction based on future parking demand. 2. PLAYGROUND - Surfacing Type to be determined. Bench seating around perimeter 3. PICNIC SHELTER - Accomodates 2-4 Picnic Tables 4. POTENTIAL AMENITY LOCATION - Considerations include Tennis, Basketball, Fitness Court, Ice Skating, Skatepark, Basketball Court, or other use. 5. OPEN FLEX LAWN SPACE - Can accomodate various field sports (Football field shown for scale) 6. POTENTIAL BRIDGE/BOARDWALK AND STOMRWATER FEATURE, at low area of park. 7. TRAIL NODE - Seating and signage opportunities, connection to nature trails. 8. DISC GOLF COURSE - 9 holes shown - Varying hole lengths from 200-450’. 9. EXISTING TREE BUFFER to Remain 10. PAVED BITUMINOUS TRAIL LOOP - Circles main park area 11. GRAVEL SECONDARY TRAILS - Throughout southern portion of the park. INWOOD AVE N