Loading...
HomeMy WebLinkAbout2026-018CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2026-018 A RESOLUTION ADOPTING THE ENGINEERING DESIGN STANDARD UPDATES DATED MARCH 2O26 WHEREAS, the City of Lake Elmo has prepared engineering design standards, standard specifications, and standard details for public infrastructure within the city; and, WHEREAS, the city has compiled this information into an Engineering Design and Construction Standards Manual; and, WHEREAS, this Manual will serve as the engineering standards and guidelines for the design and construction requirements for new public infrastructure within the City of Lake Elmo, including streets, sanitary sewer, watermain, storm water facilities, right-of-way and boulevard layout; and, WHEREAS, the engineering design standards are established to set minimum requirements to be met for all new public infrastructure projects in the city in the spirit of promoting consistent infrastructure systems throughout the community; to clearly communicate with the development community these minimum expectations and requirements; and to expedite plan design, preparation and city plan review and approvals; and, WHEREAS, the standards are not intended to be all inclusive and shall be used as a design guide, thereby allowing exceptions to these standards to be considered on a case -by -case basis when deemed appropriate for a specific application. NOW, THEREFORE, BE IT RESOLVED, 1. That the City Council shall adopt the Engineering Design Standard Updates and Revisions dated March 2026. ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE SEVENTEENTH DAY OF MARCH, 2026. CITY OF LAKE ELMO /./� .'� MOP/ MA (Seal) ATTEST: ity Jerk UV