HomeMy WebLinkAbout06-16-26 City Council Meeting PacketCity Council Meeting
Tuesday, June 16, 2026 7:00 p.m.
City of Lake Elmo | 3880 Laverne Avenue North
AGENDA
Call To Order/Pledge Of Allegiance
Approval Of Agenda
Presentations
Public Comments/Inquiries
Approval Of Minutes
05 -05 -26 CITY COUNCIL MEETING MINUTES.PDF
Consent Agenda
Approve Payments And Disbursements
APPROVE PAYMENTS AND DISBURSEMENTS 2.PDF
Approve Metropolitan Council Water Efficiency Grant Agreement
STAFF REPORT - WATER EFFICIENCY GRANT - CONSENT.PDF
2026 -2028 WATER EFFICIENCY GRANT AGREEMENT - UNSIGNED.PDF
2026 -2028 WATER EFFICIENCY GRANT - AWARD LETTER.PDF
Approve Massage Therapy License Renewal
MASSAGE THERAPY LICENSE RENEWAL.PDF
Approve Northport 1st, 2nd, And 3rd Addition Landscape Security Release
CC MEMO - NORTHPORT 1 -3 LANDSCAPE SECURITY REDUCTION.PDF
Accept Bids And Award Contract For Elmo's Pup Park Parking Lot Improvements
PUP PARK PARKING LOT.PDF
RESOLUTION 2026 -044 -AWARD CONTRACT.PDF
2026 -06 -02 ENG PUP PARK AWARD REC LETTER.PDF
LOCATION MAP -PUP PARK.PDF
PROJECT SCHEDULE -PUP PARK.PDF
Approve Lake Elmo Baseball Special Event Permit And Temporary Liquor License
STAFF REPORT - LE BASEBALL SPECIAL EVENT PERMIT.PDF
LE BASEBALL SPECIAL EVENT PERMIT APP.PDF
LE BASEBALL TEMP LIQUOR LICENSE APP.PDF
Approve Chama Mission, LLC -License Agreement For Entering Lions Park
CHAMA MISSION, LLC -LICENSE AGREEMENT FOR ENTERING LIONS
PARK.PDF
Approve Pay Request 1 For The 2026 Street And Utility Improvements
STAFF REPORT - 2026 STREET IMPROVEMENTS PAY REQ 1.PDF
1 -2026 -06 -08 SIGNED 139309 PAY REQUEST 1.PDF
Accept Quotes And Award A Contract For The 2026 Crack Seal Project
0 -2026 CRACK SEAL AWARD CONTRACT AGENDA ITEM.PDF
2026 CRACK SEAL ATTACHMENTS.PDF
Approve The Local Road Improvement Program Grant Agreement Terms And Conditions
For The Trunk Highway (TH) 36 And Lake Elmo Avenue (CSAH 17) Improvements
APPROVE THE LOCAL ROAD IMPROVEMENT PROGRAM GRANT
AGREEMENT TERMS AND CONDITIONS FOR THE.PDF
Regular Agenda
Inwood Commercial Preliminary Plat
Senior City Planner Sophia Jensen presenting
COUNCIL MEMO - INWOOD COMMERCIAL PRELIMINARY PLAT.PDF
RESOLUTION 2026 -041 INWOOD COMMERCIAL PRELIMINARY PLAT.PDF
COUNCIL PRESENTATION -INWOOD COMMERCIAL PRELIM PLAT.PDF
Sketch Plan Review –Bridgewater Village Townhomes
Consulting Planner Nathan Fuerst presenting
CC REPORT -BRIDGEWATER TOWNHOMES.PDF
PRESENTATION -BRIDGEWATER VILLAGE TOWNHOMES.PDF
2040 Comprehensive Plan Update For Community Forecasts
Consulting Planner Nathan Fuerst presenting
1 -CC SR -2040 COMPREHENSIVE PLAN AMENDMENT.PDF
2 -RESOLUTION 2026 -043 2040 COMP PLAN AMENDMENT -POP.
FORECASTS.PDF
3 -ATTACHMENT -FORECAST -METHODOLOGY -FOR -WHITE -BEAR -LAKE -
AREA.PDF
PRESENTATION -POPULATION FORECAST OPTIONS.PDF
Approve The Revised Crosswalk Policy And 2026 Crosswalk Improvements
Municipal Sr. Project Manager Jack Griffin presenting
0 -COUNCIL MEMO -APPROVE 2026 CROSSWALK IMP -RFFB POLICY.PDF
1 -LAKE ELMO CROSSWALK POLICY -REVISED JUNE 2026.PDF
2 -LOCATION MAPS.PDF
3 -PROPOSED CROSSWALK IMPROVEMENTS.PDF
PRESENTATION - APPROVE 2026 CROSSWALK IMP -RFFB POLICY.PDF
Council Reports
Staff Reports
Future Agenda Items
FUTURE AGENDA ITEMS.PDF
Adjourn
In accordance with the requirements of Minn. Stat. Section 13D.02, members may participate
remotely via interactive technology.
Our Mission is to Provide Quality Public Services in a Fiscally Responsible Manner in Partnership
with our Community
A.
B.
C.
D.
E.
Documents:
F.
1.
Documents:
2.
Documents:
3.
Documents:
4.
Documents:
5.
Documents:
6.
Documents:
7.
Documents:
8.
Documents:
9.
Documents:
10.
Documents:
G.
1.
Documents:
2.
Documents:
3.
Documents:
4.
Documents:
H.
I.
J.
Documents:
K.
City Council MeetingTuesday, June 16, 2026 7:00 p.m.City of Lake Elmo | 3880 Laverne Avenue NorthAGENDACall To Order/Pledge Of AllegianceApproval Of AgendaPresentationsPublic Comments/InquiriesApproval Of Minutes05-05 -26 CITY COUNCIL MEETING MINUTES.PDFConsent AgendaApprove Payments And DisbursementsAPPROVE PAYMENTS AND DISBURSEMENTS 2.PDFApprove Metropolitan Council Water Efficiency Grant AgreementSTAFF REPORT - WATER EFFICIENCY GRANT - CONSENT.PDF2026-2028 WATER EFFICIENCY GRANT AGREEMENT - UNSIGNED.PDF2026-2028 WATER EFFICIENCY GRANT - AWARD LETTER.PDFApprove Massage Therapy License RenewalMASSAGE THERAPY LICENSE RENEWAL.PDF
Approve Northport 1st, 2nd, And 3rd Addition Landscape Security Release
CC MEMO - NORTHPORT 1 -3 LANDSCAPE SECURITY REDUCTION.PDF
Accept Bids And Award Contract For Elmo's Pup Park Parking Lot Improvements
PUP PARK PARKING LOT.PDF
RESOLUTION 2026 -044 -AWARD CONTRACT.PDF
2026 -06 -02 ENG PUP PARK AWARD REC LETTER.PDF
LOCATION MAP -PUP PARK.PDF
PROJECT SCHEDULE -PUP PARK.PDF
Approve Lake Elmo Baseball Special Event Permit And Temporary Liquor License
STAFF REPORT - LE BASEBALL SPECIAL EVENT PERMIT.PDF
LE BASEBALL SPECIAL EVENT PERMIT APP.PDF
LE BASEBALL TEMP LIQUOR LICENSE APP.PDF
Approve Chama Mission, LLC -License Agreement For Entering Lions Park
CHAMA MISSION, LLC -LICENSE AGREEMENT FOR ENTERING LIONS
PARK.PDF
Approve Pay Request 1 For The 2026 Street And Utility Improvements
STAFF REPORT - 2026 STREET IMPROVEMENTS PAY REQ 1.PDF
1 -2026 -06 -08 SIGNED 139309 PAY REQUEST 1.PDF
Accept Quotes And Award A Contract For The 2026 Crack Seal Project
0 -2026 CRACK SEAL AWARD CONTRACT AGENDA ITEM.PDF
2026 CRACK SEAL ATTACHMENTS.PDF
Approve The Local Road Improvement Program Grant Agreement Terms And Conditions
For The Trunk Highway (TH) 36 And Lake Elmo Avenue (CSAH 17) Improvements
APPROVE THE LOCAL ROAD IMPROVEMENT PROGRAM GRANT
AGREEMENT TERMS AND CONDITIONS FOR THE.PDF
Regular Agenda
Inwood Commercial Preliminary Plat
Senior City Planner Sophia Jensen presenting
COUNCIL MEMO - INWOOD COMMERCIAL PRELIMINARY PLAT.PDF
RESOLUTION 2026 -041 INWOOD COMMERCIAL PRELIMINARY PLAT.PDF
COUNCIL PRESENTATION -INWOOD COMMERCIAL PRELIM PLAT.PDF
Sketch Plan Review –Bridgewater Village Townhomes
Consulting Planner Nathan Fuerst presenting
CC REPORT -BRIDGEWATER TOWNHOMES.PDF
PRESENTATION -BRIDGEWATER VILLAGE TOWNHOMES.PDF
2040 Comprehensive Plan Update For Community Forecasts
Consulting Planner Nathan Fuerst presenting
1 -CC SR -2040 COMPREHENSIVE PLAN AMENDMENT.PDF
2 -RESOLUTION 2026 -043 2040 COMP PLAN AMENDMENT -POP.
FORECASTS.PDF
3 -ATTACHMENT -FORECAST -METHODOLOGY -FOR -WHITE -BEAR -LAKE -
AREA.PDF
PRESENTATION -POPULATION FORECAST OPTIONS.PDF
Approve The Revised Crosswalk Policy And 2026 Crosswalk Improvements
Municipal Sr. Project Manager Jack Griffin presenting
0 -COUNCIL MEMO -APPROVE 2026 CROSSWALK IMP -RFFB POLICY.PDF
1 -LAKE ELMO CROSSWALK POLICY -REVISED JUNE 2026.PDF
2 -LOCATION MAPS.PDF
3 -PROPOSED CROSSWALK IMPROVEMENTS.PDF
PRESENTATION - APPROVE 2026 CROSSWALK IMP -RFFB POLICY.PDF
Council Reports
Staff Reports
Future Agenda Items
FUTURE AGENDA ITEMS.PDF
Adjourn
In accordance with the requirements of Minn. Stat. Section 13D.02, members may participate
remotely via interactive technology.
Our Mission is to Provide Quality Public Services in a Fiscally Responsible Manner in Partnership
with our Community
A.B.C.D.E.Documents:F.1.Documents:2.Documents:3.Documents:
4.
Documents:
5.
Documents:
6.
Documents:
7.
Documents:
8.
Documents:
9.
Documents:
10.
Documents:
G.
1.
Documents:
2.
Documents:
3.
Documents:
4.
Documents:
H.
I.
J.
Documents:
K.
City Council MeetingTuesday, June 16, 2026 7:00 p.m.City of Lake Elmo | 3880 Laverne Avenue NorthAGENDACall To Order/Pledge Of AllegianceApproval Of AgendaPresentationsPublic Comments/InquiriesApproval Of Minutes05-05 -26 CITY COUNCIL MEETING MINUTES.PDFConsent AgendaApprove Payments And DisbursementsAPPROVE PAYMENTS AND DISBURSEMENTS 2.PDFApprove Metropolitan Council Water Efficiency Grant AgreementSTAFF REPORT - WATER EFFICIENCY GRANT - CONSENT.PDF2026-2028 WATER EFFICIENCY GRANT AGREEMENT - UNSIGNED.PDF2026-2028 WATER EFFICIENCY GRANT - AWARD LETTER.PDFApprove Massage Therapy License RenewalMASSAGE THERAPY LICENSE RENEWAL.PDFApprove Northport 1st, 2nd, And 3rd Addition Landscape Security ReleaseCC MEMO - NORTHPORT 1 -3 LANDSCAPE SECURITY REDUCTION.PDFAccept Bids And Award Contract For Elmo's Pup Park Parking Lot ImprovementsPUP PARK PARKING LOT.PDFRESOLUTION 2026 -044 -AWARD CONTRACT.PDF2026-06 -02 ENG PUP PARK AWARD REC LETTER.PDFLOCATION MAP -PUP PARK.PDFPROJECT SCHEDULE -PUP PARK.PDFApprove Lake Elmo Baseball Special Event Permit And Temporary Liquor LicenseSTAFF REPORT - LE BASEBALL SPECIAL EVENT PERMIT.PDFLE BASEBALL SPECIAL EVENT PERMIT APP.PDFLE BASEBALL TEMP LIQUOR LICENSE APP.PDFApprove Chama Mission, LLC -License Agreement For Entering Lions ParkCHAMA MISSION, LLC -LICENSE AGREEMENT FOR ENTERING LIONS PARK.PDFApprove Pay Request 1 For The 2026 Street And Utility ImprovementsSTAFF REPORT - 2026 STREET IMPROVEMENTS PAY REQ 1.PDF1-2026 -06 -08 SIGNED 139309 PAY REQUEST 1.PDFAccept Quotes And Award A Contract For The 2026 Crack Seal Project0-2026 CRACK SEAL AWARD CONTRACT AGENDA ITEM.PDF2026 CRACK SEAL ATTACHMENTS.PDFApprove The Local Road Improvement Program Grant Agreement Terms And Conditions For The Trunk Highway (TH) 36 And Lake Elmo Avenue (CSAH 17) ImprovementsAPPROVE THE LOCAL ROAD IMPROVEMENT PROGRAM GRANT AGREEMENT TERMS AND CONDITIONS FOR THE.PDFRegular AgendaInwood Commercial Preliminary Plat
Senior City Planner Sophia Jensen presenting
COUNCIL MEMO - INWOOD COMMERCIAL PRELIMINARY PLAT.PDF
RESOLUTION 2026 -041 INWOOD COMMERCIAL PRELIMINARY PLAT.PDF
COUNCIL PRESENTATION -INWOOD COMMERCIAL PRELIM PLAT.PDF
Sketch Plan Review –Bridgewater Village Townhomes
Consulting Planner Nathan Fuerst presenting
CC REPORT -BRIDGEWATER TOWNHOMES.PDF
PRESENTATION -BRIDGEWATER VILLAGE TOWNHOMES.PDF
2040 Comprehensive Plan Update For Community Forecasts
Consulting Planner Nathan Fuerst presenting
1 -CC SR -2040 COMPREHENSIVE PLAN AMENDMENT.PDF
2 -RESOLUTION 2026 -043 2040 COMP PLAN AMENDMENT -POP.
FORECASTS.PDF
3 -ATTACHMENT -FORECAST -METHODOLOGY -FOR -WHITE -BEAR -LAKE -
AREA.PDF
PRESENTATION -POPULATION FORECAST OPTIONS.PDF
Approve The Revised Crosswalk Policy And 2026 Crosswalk Improvements
Municipal Sr. Project Manager Jack Griffin presenting
0 -COUNCIL MEMO -APPROVE 2026 CROSSWALK IMP -RFFB POLICY.PDF
1 -LAKE ELMO CROSSWALK POLICY -REVISED JUNE 2026.PDF
2 -LOCATION MAPS.PDF
3 -PROPOSED CROSSWALK IMPROVEMENTS.PDF
PRESENTATION - APPROVE 2026 CROSSWALK IMP -RFFB POLICY.PDF
Council Reports
Staff Reports
Future Agenda Items
FUTURE AGENDA ITEMS.PDF
Adjourn
In accordance with the requirements of Minn. Stat. Section 13D.02, members may participate
remotely via interactive technology.
Our Mission is to Provide Quality Public Services in a Fiscally Responsible Manner in Partnership
with our Community
A.B.C.D.E.Documents:F.1.Documents:2.Documents:3.Documents:4.Documents:5.Documents:6.Documents:7.Documents:8.Documents:9.Documents:10.Documents:G.1.
Documents:
2.
Documents:
3.
Documents:
4.
Documents:
H.
I.
J.
Documents:
K.
City Council MeetingTuesday, June 16, 2026 7:00 p.m.City of Lake Elmo | 3880 Laverne Avenue NorthAGENDACall To Order/Pledge Of AllegianceApproval Of AgendaPresentationsPublic Comments/InquiriesApproval Of Minutes05-05 -26 CITY COUNCIL MEETING MINUTES.PDFConsent AgendaApprove Payments And DisbursementsAPPROVE PAYMENTS AND DISBURSEMENTS 2.PDFApprove Metropolitan Council Water Efficiency Grant AgreementSTAFF REPORT - WATER EFFICIENCY GRANT - CONSENT.PDF2026-2028 WATER EFFICIENCY GRANT AGREEMENT - UNSIGNED.PDF2026-2028 WATER EFFICIENCY GRANT - AWARD LETTER.PDFApprove Massage Therapy License RenewalMASSAGE THERAPY LICENSE RENEWAL.PDFApprove Northport 1st, 2nd, And 3rd Addition Landscape Security ReleaseCC MEMO - NORTHPORT 1 -3 LANDSCAPE SECURITY REDUCTION.PDFAccept Bids And Award Contract For Elmo's Pup Park Parking Lot ImprovementsPUP PARK PARKING LOT.PDFRESOLUTION 2026 -044 -AWARD CONTRACT.PDF2026-06 -02 ENG PUP PARK AWARD REC LETTER.PDFLOCATION MAP -PUP PARK.PDFPROJECT SCHEDULE -PUP PARK.PDFApprove Lake Elmo Baseball Special Event Permit And Temporary Liquor LicenseSTAFF REPORT - LE BASEBALL SPECIAL EVENT PERMIT.PDFLE BASEBALL SPECIAL EVENT PERMIT APP.PDFLE BASEBALL TEMP LIQUOR LICENSE APP.PDFApprove Chama Mission, LLC -License Agreement For Entering Lions ParkCHAMA MISSION, LLC -LICENSE AGREEMENT FOR ENTERING LIONS PARK.PDFApprove Pay Request 1 For The 2026 Street And Utility ImprovementsSTAFF REPORT - 2026 STREET IMPROVEMENTS PAY REQ 1.PDF1-2026 -06 -08 SIGNED 139309 PAY REQUEST 1.PDFAccept Quotes And Award A Contract For The 2026 Crack Seal Project0-2026 CRACK SEAL AWARD CONTRACT AGENDA ITEM.PDF2026 CRACK SEAL ATTACHMENTS.PDFApprove The Local Road Improvement Program Grant Agreement Terms And Conditions For The Trunk Highway (TH) 36 And Lake Elmo Avenue (CSAH 17) ImprovementsAPPROVE THE LOCAL ROAD IMPROVEMENT PROGRAM GRANT AGREEMENT TERMS AND CONDITIONS FOR THE.PDFRegular AgendaInwood Commercial Preliminary PlatSenior City Planner Sophia Jensen presentingCOUNCIL MEMO - INWOOD COMMERCIAL PRELIMINARY PLAT.PDFRESOLUTION 2026 -041 INWOOD COMMERCIAL PRELIMINARY PLAT.PDFCOUNCIL PRESENTATION -INWOOD COMMERCIAL PRELIM PLAT.PDFSketch Plan Review –Bridgewater Village TownhomesConsulting Planner Nathan Fuerst presentingCC REPORT -BRIDGEWATER TOWNHOMES.PDFPRESENTATION -BRIDGEWATER VILLAGE TOWNHOMES.PDF2040 Comprehensive Plan Update For Community ForecastsConsulting Planner Nathan Fuerst presenting1 -CC SR -2040 COMPREHENSIVE PLAN AMENDMENT.PDF2 -RESOLUTION 2026 -043 2040 COMP PLAN AMENDMENT -POP. FORECASTS.PDF3 -ATTACHMENT -FORECAST -METHODOLOGY -FOR -WHITE -BEAR -LAKE -AREA.PDFPRESENTATION -POPULATION FORECAST OPTIONS.PDFApprove The Revised Crosswalk Policy And 2026 Crosswalk ImprovementsMunicipal Sr. Project Manager Jack Griffin presenting0 -COUNCIL MEMO -APPROVE 2026 CROSSWALK IMP -RFFB POLICY.PDF1 -LAKE ELMO CROSSWALK POLICY -REVISED JUNE 2026.PDF2 -LOCATION MAPS.PDF3 -PROPOSED CROSSWALK IMPROVEMENTS.PDFPRESENTATION - APPROVE 2026 CROSSWALK IMP -RFFB POLICY.PDFCouncil ReportsStaff ReportsFuture Agenda ItemsFUTURE AGENDA ITEMS.PDFAdjournIn accordance with the requirements of Minn. Stat. Section 13D.02, members may participate
remotely via interactive technology.
Our Mission is to Provide Quality Public Services in a Fiscally Responsible Manner in Partnership
with our Community
A.B.C.D.E.Documents:F.1.Documents:2.Documents:3.Documents:4.Documents:5.Documents:6.Documents:7.Documents:8.Documents:9.Documents:10.Documents:G.1.Documents:2.Documents:3.Documents:4.Documents:H.I.J.Documents:K.
Page 1 | 7
CITY OF LAKE ELMO
CITY COUNCIL MINUTES
May 5, 2026
CALL TO ORDER/PLEDGE OF ALLEGIANCE
Mayor Cadenhead called the meeting to order at 7:00 pm.
PRESENT: Mayor Charles Cadenhead and Councilmembers Nick Dragisich, Matt Hirn, Jeff Holtz,
and Nick Kragness.
Staff present: Administrator Miller, City Attorney Sonsalla, City Engineer Stanley, Municipal Sr.
Project Manager Griffin, Contract Planner Fuerst, Fire Chief Kalis and Assistant Fire Chief
Svoboda.
APPROVAL OF AGENDA
Councilmember Holtz, seconded by Councilmember Kragness, moved TO APPROVE THE
AGENDA AS PRESENTED. Motion passed 5 – 0.
PRESENTATIONS
Biofilm Mediated Destruction of PFAS in Groundwater Research
Seth Thompson, Freshwater, discussed the project team and overview of the project funded by
the state of Minnesota to treat PFAS sites with biofilm.
PUBLIC COMMENTS / INQUIRIES
Colleen Swedberg, Landscape Revival, announced the third annual perennial sale at Rockpoint
Church on June 6th and noted the event will also include exhibits and a food truck.
Anne Bucheck, 2301 Legion Avenue, urged the Council to deny the proposed short term rental
ordinance and expressed concern over corporate ownership of rentals and safety concerns.
Don Pinz, 8309 38th Street North, stated he was informed by a neighbor about the proposed
short term rental ordinance and asked if the city should have notified him.
Page 2 | 7
Geraldine Breheim, 8415 38th Street North, stated she does not want temporary rentals with
unknown people moving in and out.
Peter Kastler, 9130 55th Street North, stated he uses a second home on his property as a short
term rental and has not had any negative issues.
Stephanie Checkley, 8382 Hidden Bay Trail, local realtor, stated that she represents properties
in Lake Elmo and has never had anyone purchase a home for use as a short term rental and
spoke in support of short term rentals.
Susan Dunn, 11018 Upper 33rd Street North, spoke in opposition to allowing short term rentals
and suggested the city do more research.
Brook Duerr, 4870 Jerome Avenue North, stated he also owns a second home in the city and
opposes property owner rights being taken away.
Todd Williams, 3025 Lake Elmo Avenue North, submitted written comments opposing short
term rentals.
ACCEPT MINUTES
Councilmember Holtz, seconded by Councilmember Hirn, moved TO ACCEPT THE MINUTES OF
THE APRIL 14, 2026 CITY COUNCIL WORKSHOP AND APRIL 21, 2026 CITY COUNCIL MEETING
AS PRESENTED. Motion passed 5 – 0.
CONSENT AGENDA
1. Approved Payment of Disbursements
2. Deny Stormwater Appeal for 4180 Irvin Circle N
3. Approve Stormwater Appeal for 11243 30th St N
4. Deny Stormwater Appeal for 11018 Upper 31st St N
5. Accept Donation to the Fire Department from Snowell Raleigh
6. Approve Plans and Specifications and Order Advertisement for Bids for the Elmo’s Pup
Park Parking Lot Improvements
Councilmember Holtz, seconded by Councilmember Kragness, moved TO APPROVE THE
CONSENT AGENDA AS PRESENTED.
Page 3 | 7
Councilmember Dragisich requested removal of items 2, 3 and from the consent agenda.
Motion to approve the Consent Agenda as amended passed 5 - 0.
REGULAR AGENDA
ITEM 1: Polco Contract for Community Engagement Subscription
City Administrator Miller reported that staff is proposing use of Polco for community surveys.
Alec Vice, Polco Director of Account Management, presented services provided by Polco.
Discussion was held regarding features and capabilities of the survey platform and limiting
responses to only Lake Elmo residents.
Councilmember Holtz, seconded by Councilmember Kragness, moved to approve the received
quote and scope of service from Polco. Motion passed 5 – 0.
ITEM 2: Zoning Text Amendment – Short Term Rentals
Councilmember Hirn recused himself and stepped away from the council dais due to a conflict
of interest based on his family’s ownership of a rental property.
Community Development Director reviewed the need for updates to the short term rental
ordinance and reviewed processes in place in similar communities. Director Stopa also
reviewed current bed and breakfast licenses issued in Lake Elmo. Discussion was held
concerning possible restrictions, lodging tax and enforcement.
Councilmember Holtz, seconded by Councilmember Kragness, moved to adopt Ordinance
2026-06 approving the proposed text amendments and fee schedule updates for short-term
rentals as presented by Staff.
Councilmember Dragisich, seconded by Mayor Cadenhead, moved to amend the motion to
restrict short term rentals to the following zoning districts: RT, A, RR, RS, RE and commercial
mixed use business park. Motion failed 1 – 3. (Cadenhead, Holtz, Kragness – nay)
Mayor Cadenhead, seconded by Councilmember Holtz, moved to amend the primary motion
to enforce the policy that the manager or ownership needs to be within 30 miles of the
property to be licensed. Motion passed 3 – 1. (Dragisich – nay)
Page 4 | 7
Councilmember Holtz, seconded by Mayor Cadenhead, moved to amend the primary motion
to add an insurance requirement applicable to this type of use under the performance
standards section. Motion passed 4 – 0.
Councilmember Dragisich, seconded by Councilmember Kragness, moved to amend the
primary motion under paragraph 2 of section D, Maintenance Standards, that would require
annual inspections for conformance to city codes. Motion passed 4 – 0.
Primary motion passed 3 – 1. (Dragisich – nay)
Mayor Cadenhead, seconded by Councilmember Holtz, moved to adopt Resolution 2026-029
Summary of Publication of Ordinance 2026-06. Motion failed 3 – 1. (Dragisich – nay)
ITEM 3: Preliminary Plat, Rezoning and Variances – Highpointe Crossing
Consulting Planner Fuerst presented a request from Rachel Development for preliminary plat
approval, rezoning and variances for a rural development of 18 single family homes on
approximately 80 acres. Planner Fuerst reviewed staff recommendations, draft findings and
conditions of approval.
Councilmember Hirn, seconded by Councilmember Dragisich, moved to adopt Ordinance 2026-
07, approving the rezoning requested by Rachel Development on the subject property based
on the findings of fact therein. Motion passed 5 – 0.
Councilmember Hirn, seconded by Councilmember Holtz, moved to adopt Resolution 2026-
030, approving the preliminary plat for Highpointe Crossing requested by Rachel
Development on the subject property based on the findings of fact and conditions therein.
Motion passed 5 – 0.
Councilmember Hirn, seconded by Councilmember Holtz, moved to adopt Resolution 2026-
031, approving the front yard setback variance, Resolution 2026-032, approving the
landscaping variance, and Resolution 2026-033, approving the sidewalk variance for
Highpointe Crossing as requested by Rachel Development on the subject property based on
the findings of fact and conditions therein. Motion passed 5 – 0.
Councilmember Hirn, seconded by Councilmember Kragness, moved to adopt Resolution 2026-
034, approving the summary publication of Ordinance 2026-07. Motion passed 5 – 0.
Page 5 | 7
ITEM 4: Approve Cooperative Cost Share Agreements with Washington County for the TH36
and CSAH 17 (Lake Elmo Ave) Interchange and South Frontage Road Improvements
Municipal Sr. Project Manager Griffin reviewed the background and location of the project for
intersection and frontage road improvements at the intersection of Highway 36 and Lake Elmo
Avenue. Manager Griffin also reviewed the agreements with Washington County and MnDOT
related to the project, noting the city share of the project cost. Discussion was held regarding
Council input on change orders.
Councilmember Holtz, seconded by Councilmember Kragness, moved to approve Resolution
No. 2026-024 Approving Cooperative Agreements with Washington County for the TH 36 and
CSAH 17 (Lake Elmo Avenue) Interchange and South Frontage Road Improvements. Motion
passed 5 – 0.
ITEM 5: Approve Cooperative Construction Agreement, MnDOT Contract No. 1060495, for the
TH 36 and CSAH 17 (Lake Elmo Avenue) Interchange and South Frontage Road Improvements
Councilmember Holtz, seconded by Councilmember Hirn, moved to approve Resolution No.
2026-025 Approving Cooperative Construction Agreement, MnDOT Contract No. 1060495.
Motion passed 5 – 0.
ITEM 6: Approve the Change of Roadway Jurisdiction Agreement, MnDOT Contract No.
1062311, for a portion of the South Frontage Road Improvements
Councilmember Holtz, seconded by Councilmember Dragisich, moved to approve Resolution
No. 2026-026 Approving the Change of Roadway Jurisdiction Agreement, MnDOT Contract
No. 1062311. Motion passed 5 – 0.
ITEM 7: Open Burning Ordinance Amendments
Assistant Fire Chief Svoboda presented proposed updates to the city’s open burning ordinance
to address concerns related to safety and nuisance smoke.
Councilmember Holtz, seconded by Councilmember Dragisich, moved to adopt Ordinance
2026-05, approving the amendments to 1. Ordinance 5.12-IV Open Burning. Motion passed 5
– 0.
Page 6 | 7
Councilmember Holtz, seconded by Councilmember Kragness, moved to adopt Resolution
2026-027, approving the summary publication of Ordinance 2026-05. Motion passed 5 – 0.
ITEM 8: RFP for the Sports Complex and Central Park Master Plan
Community Development Director Stopa reviewed the background of the need for a sports
complex, noting that hiring a consultant is the next step in the process. Director Stopa
presented an overview of criteria included in the proposed RFP.
Councilmember Holtz, seconded by Councilmember Dragisich, moved to approve the RFP as
presented by staff Motion passed 5 – 0.
ITEM 9: Stormwater Management Utility Code Review
City Engineer Stanley reviewed the proposed scope for providing a review of the stormwater
utility code.
Councilmember Holtz, seconded by Councilmember Dragisich, moved to approve the scope for
review of Stormwater Utility Code as provided by Bolton & Menk, Inc. Motion passed 5 – 0.
Consent Agenda Item 2: Deny Stormwater Appeal for 4180 Irving Circle North
Public Works Director Tholen reported on his inspection of the property.
Mayor Cadenhead, seconded by Councilmember Holtz, moved to deny the stormwater appeal
for 4180 Irving Circle North. Motion passed 5 – 0.
Consent Agenda Item 3: Approve Stormwater Appeal for 11243 30th Street North
Public Works Director Tholen reported on his inspection of the property.
Councilmember Holtz, seconded by Mayor Cadenhead, moved to approve the stormwater
appeal for 11243 30th Street North. Motion passed 5 – 0.
Consent Agenda Item 4: Deny Stormwater Appeal for 11018 Upper 33rd Street North
Page 7 | 7
Public Works Director Tholen reported on his inspection of the property. Homeowner Susan
Dunn stated that she does have a rain barrel and water does not drain off her property.
Mayor Cadenhead, seconded by Councilmember Hirn, moved to deny stormwater appeal for
11018 Upper 33rd Street North. Motion passed 5 – 0.
COUNCIL REPORTS
Councilmember Kragness: Will attend the Lake Elmo Airport Advisory Committee meeting and
provide a report at the next Council meeting.
STAFF REPORTS AND ANNOUNCEMENTS
None
Meeting adjourned at 10:44 p.m.
LAKE ELMO CITY COUNCIL
ATTEST:
______________________________
Charles Cadenhead, Mayor
_______________________________
Julie Johnson, City Clerk
STAFF REPORT
DATE: 06/16/2026
CONSENT
TO: Mayor and Councilmembers
FROM: Clarissa Hadler, Finance Director, Mike Kuehn, Finance
AGENDA ITEM: Payments & Disbursements
CORE STRATEGIES:
☐ Vibrant, inclusive, connected community
☐ Responsive, transparent, adaptive governance
☐Managed Growth
☐ Efficient, reliable, innovative services
☒ Balanced Finances now and future
☐ Resilient Infrastructure
BACKGROUND:
The City of Lake Elmo maintains a fiduciary responsibility to conduct normal business operations. Below is a
summary of current claims scheduled for disbursement and payment in full compliance with applicable state
statutes and City policies and procedures.
ISSUE BEFORE COUNCIL:
Should the Council approve “Payments & Disbursements”.
FISCAL IMPACT:
Claim # Amount Description
ACH/Chks $ 179,164.34 Payroll 06/11/2026
ACH/Chks $ 7,538.38 Accounts Payable – CC Pmt
ACH/Chks $ 562,770.43 Accounts Payable
TOTAL $ 749,473.15
RECOMMENDATION: (if pulled from Consent)
“Motion to approve the aforementioned disbursements in the amount of $ 749,473.15
ATTACHMENTS:
1. Invoice DistribuƟon Report (8 Pg CC Pmt Rpt & 23 Pg Rpt)
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
Vendor: ZORO.COM
Fund: 101 GENERAL FUND
Department: 3100 Public Works
101-3100-42000 OFFICE SUPPLIES ZORO.COM OFFICE SUPPLIES 57.75 None
Total Department 3100 Public Works 57.75
Department: 5200 Parks & Recreation
101-5200-42210 PW_MATERIALS_ SLING ZORO.COM PW_MATERIALS_ SLING 9.03 None
Total Department 5200 Parks & Recreation 9.03
Total Fund 101 GENERAL FUND 66.78
Fund: 601 WATER
Department: 9400 WATER
601-9400-42000 OFFICE SUPPLIES ZORO.COM OFFICE SUPPLIES 57.75 None
601-9400-42210 PW_MATERIALS_ SLING ZORO.COM PW_MATERIALS_ SLING 9.02 None
Total Department 9400 WATER 66.77
Total Fund 601 WATER 66.77
Fund: 602 SEWER
Department: 9450 SEWER
602-9450-42000 OFFICE SUPPLIES ZORO.COM OFFICE SUPPLIES 57.75 None
Total Department 9450 SEWER 57.75
Total Fund 602 SEWER 57.75
Fund: 603 STORMWATER
Department: 9500 SURFACE WATER
603-9500-42000 OFFICE SUPPLIES ZORO.COM OFFICE SUPPLIES 57.78 None
603-9500-42210 PW_MATERIALS_ SLING ZORO.COM PW_MATERIALS_ SLING 9.03 None
Total Department 9500 SURFACE WATER 66.81
Total Fund 603 STORMWATER 66.81
Total Vendor ZORO.COM:258.11
Vendor: Amazon Capital Services
Fund: 101 GENERAL FUND
Department: 2220 Fire
101-2220-42400 UTV RECOVERY KIT Amazon Capital Services UTV RECOVERY KIT 151.99 None
101-2220-42400 SHACKLES Amazon Capital Services SHACKLES 89.99 None
101-2220-42400 COMMAND BOARDS Amazon Capital Services COMMAND BOARDS 112.14 None
101-2220-44040 UTV BATTERY CHARGER Amazon Capital Services UTV BATTERY CHARGER 66.08 None
Total Department 2220 Fire 420.20
Department: 3100 Public Works
101-3100-42150 PW - MISC OPERATING SUPPLI Amazon Capital Services PW - MISC OPERATING SUPPLIES 12.39 None
101-3100-42150 PW - MISC OPERATING SUPPLI Amazon Capital Services PW - MISC OPERATING SUPPLIES 7.76 None
101-3100-44375 PW - PPE Amazon Capital Services PW - PPE 12.59 None
Total Department 3100 Public Works 32.74
Department: 5200 Parks & Recreation
101-5200-42000 PW - COMPUTER WEB CAM Amazon Capital Services PW - COMPUTER WEB CAM 9.74 None
101-5200-42150 PW - MISC OPERATING SUPPLI Amazon Capital Services PW - MISC OPERATING SUPPLIES 12.39 None
101-5200-42150 PW - MISC OPERATING SUPPLI Amazon Capital Services PW - MISC OPERATING SUPPLIES 7.75 None
101-5200-44375 PW - PPE Amazon Capital Services PW - PPE 12.59 None
06/02/2026 09:45 AM Page:1/8
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
Vendor: Amazon Capital Services
Fund: 101 GENERAL FUND
Department: 5200 Parks & Recreation
Total Department 5200 Parks & Recreation 42.47
Total Fund 101 GENERAL FUND 495.41
Fund: 601 WATER
Department: 9400 WATER
601-9400-42000 PW - COMPUTER WEB CAM Amazon Capital Services PW - COMPUTER WEB CAM 9.75 None
601-9400-42150 PW - MISC OPERATING SUPPLI Amazon Capital Services PW - MISC OPERATING SUPPLIES 12.39 None
601-9400-42150 PW - MISC OPERATING SUPPLI Amazon Capital Services PW - MISC OPERATING SUPPLIES 7.75 None
601-9400-44375 PW - PPE Amazon Capital Services PW - PPE 12.59 None
Total Department 9400 WATER 42.48
Total Fund 601 WATER 42.48
Fund: 602 SEWER
Department: 9450 SEWER
602-9450-42000 PW - COMPUTER WEB CAM Amazon Capital Services PW - COMPUTER WEB CAM 9.75 None
602-9450-42150 PW - MISC OPERATING SUPPLI Amazon Capital Services PW - MISC OPERATING SUPPLIES 12.39 None
602-9450-42150 PW - MISC OPERATING SUPPLI Amazon Capital Services PW - MISC OPERATING SUPPLIES 7.75 None
602-9450-44375 PW - PPE Amazon Capital Services PW - PPE 12.59 None
Total Department 9450 SEWER 42.48
Total Fund 602 SEWER 42.48
Fund: 603 STORMWATER
Department: 9500 SURFACE WATER
603-9500-42000 PW - COMPUTER WEB CAM Amazon Capital Services PW - COMPUTER WEB CAM 9.75 None
603-9500-42150 PW - MISC OPERATING SUPPLI Amazon Capital Services PW - MISC OPERATING SUPPLIES 12.39 None
603-9500-42150 PW - MISC OPERATING SUPPLI Amazon Capital Services PW - MISC OPERATING SUPPLIES 7.75 None
603-9500-44375 PW - PPE Amazon Capital Services PW - PPE 12.60 None
Total Department 9500 SURFACE WATER 42.49
Total Fund 603 STORMWATER 42.49
Total Vendor Amazon Capital Services:622.86
Vendor: American Planning Association
Fund: 101 GENERAL FUND
Department: 1910 Planning & Zoning
101-1910-44330 APA MEMBERSHIP American Planning Associat APA MEMBERSHIP - JS 554.40 None
Total Department 1910 Planning & Zoning 554.40
Total Fund 101 GENERAL FUND 554.40
Total Vendor American Planning Association:554.40
Vendor: CITY OF LAKE ELMO
Fund: 101 GENERAL FUND
Department: 1520 Finance
101-1520-44300 TESTING PAYMENT SETUP CITY OF LAKE ELMO TESTING PAYMENT SETUP 1.53 None
Total Department 1520 Finance 1.53
Total Fund 101 GENERAL FUND 1.53
Total Vendor CITY OF LAKE ELMO:1.53
06/02/2026 09:45 AM Page:2/8
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
Vendor: CK HOLIDAY
Fund: 101 GENERAL FUND
Department: 2220 Fire
101-2220-44300 MONTHY VEHICLE WASH CK HOLIDAY MONTHY VEHICLE WASH 70.41 None
Total Department 2220 Fire 70.41
Total Fund 101 GENERAL FUND 70.41
Total Vendor CK HOLIDAY:70.41
Vendor: D&T APPLIANCE SERVICE
Fund: 101 GENERAL FUND
Department: 2220 Fire
101-2220-44010 DUTY CRERW WASHING MACHINE D&T APPLIANCE SERVICE DUTY CRERW WASHING MACHINE REPAIR 174.95 None
Total Department 2220 Fire 174.95
Total Fund 101 GENERAL FUND 174.95
Total Vendor D&T APPLIANCE SERVICE:174.95
Vendor: ENGINEERSUPPLY
Fund: 601 WATER
Department: 9400 WATER
601-9400-42150 LOCATOR PARTS ENGINEERSUPPLY LOCATOR PARTS 22.08 None
Total Department 9400 WATER 22.08
Total Fund 601 WATER 22.08
Fund: 602 SEWER
Department: 9450 SEWER
602-9450-42150 LOCATOR PARTS ENGINEERSUPPLY LOCATOR PARTS 22.09 None
Total Department 9450 SEWER 22.09
Total Fund 602 SEWER 22.09
Total Vendor ENGINEERSUPPLY:44.17
Vendor: EYEWASH DIRECT
Fund: 601 WATER
Department: 9400 WATER
601-9400-42210 PARTS - EYEWASH STATION WE EYEWASH DIRECT PARTS - EYEWASH STATION WELL #4 100.44 None
Total Department 9400 WATER 100.44
Total Fund 601 WATER 100.44
Total Vendor EYEWASH DIRECT:100.44
Vendor: Governmt Finance Officers Assn
Fund: 101 GENERAL FUND
Department: 1520 Finance
101-1520-44330 4-1-2026 - 03-31-2027 MEMB Governmt Finance Officers GFOA RENEWAL 500.00 None
Total Department 1520 Finance 500.00
Total Fund 101 GENERAL FUND 500.00
Total Vendor Governmt Finance Officers Assn:500.00
Vendor: GRANDVIEW LODGE
Fund: 601 WATER
06/02/2026 09:45 AM Page:3/8
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
Vendor: GRANDVIEW LODGE
Fund: 601 WATER
Department: 9400 WATER
601-9400-44370 APWA CONF STAY GRANDVIEW LODGE 89.55 None
Total Department 9400 WATER 89.55
Total Fund 601 WATER 89.55
Fund: 602 SEWER
Department: 9450 SEWER
602-9450-44370 APWA CONF STAY GRANDVIEW LODGE 89.55 None
Total Department 9450 SEWER 89.55
Total Fund 602 SEWER 89.55
Total Vendor GRANDVIEW LODGE:179.10
Vendor: ICC CODE COUNCIL
Fund: 101 GENERAL FUND
Department: 2400 Building Inspection
101-2400-44330 ICC MEMBERSHIP - JT - 2932 ICC CODE COUNCIL ICC MEMBERSHIP - JT - 2932M1 70.00 None
Total Department 2400 Building Inspection 70.00
Total Fund 101 GENERAL FUND 70.00
Total Vendor ICC CODE COUNCIL:70.00
Vendor: IDLH TACTICAL WORKSHEET
Fund: 101 GENERAL FUND
Department: 2220 Fire
101-2220-42400 INCIDENT COMMAND BOARDS IDLH TACTICAL WORKSHEET INCIDENT COMMAND BOARDS 365.10 None
Total Department 2220 Fire 365.10
Total Fund 101 GENERAL FUND 365.10
Total Vendor IDLH TACTICAL WORKSHEET:365.10
Vendor: IMPERIAL DADE
Fund: 101 GENERAL FUND
Department: 5200 Parks & Recreation
101-5200-42150 PARKS - TRASH BAGS IMPERIAL DADE WATER METER & PARKS SUPPLIES 1,534.75 None
Total Department 5200 Parks & Recreation 1,534.75
Total Fund 101 GENERAL FUND 1,534.75
Fund: 601 WATER
Department: 9400 WATER
601-9400-42300 METER SUPPLIES IMPERIAL DADE WATER METER & PARKS SUPPLIES 41.73 None
Total Department 9400 WATER 41.73
Total Fund 601 WATER 41.73
Total Vendor IMPERIAL DADE:1,576.48
Vendor: Kwik Trip Inc
Fund: 101 GENERAL FUND
Department: 5200 Parks & Recreation
101-5200-42120 FUEL- PW SMALL ENGINE ITEM Kwik Trip Inc FUEL- PW SMALL ENGINE ITEMS 40.06 None
06/02/2026 09:45 AM Page:4/8
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
Vendor: Kwik Trip Inc
Fund: 101 GENERAL FUND
Department: 5200 Parks & Recreation
Total Department 5200 Parks & Recreation 40.06
Total Fund 101 GENERAL FUND 40.06
Fund: 601 WATER
Department: 9400 WATER
601-9400-42120 FUEL- PW SMALL ENGINE ITEM Kwik Trip Inc FUEL- PW SMALL ENGINE ITEMS 40.06 None
Total Department 9400 WATER 40.06
Total Fund 601 WATER 40.06
Fund: 602 SEWER
Department: 9450 SEWER
602-9450-42120 FUEL- PW SMALL ENGINE ITEM Kwik Trip Inc FUEL- PW SMALL ENGINE ITEMS 40.06 None
Total Department 9450 SEWER 40.06
Total Fund 602 SEWER 40.06
Fund: 603 STORMWATER
Department: 9500 SURFACE WATER
603-9500-42120 FUEL- PW SMALL ENGINE ITEM Kwik Trip Inc FUEL- PW SMALL ENGINE ITEMS 40.07 None
Total Department 9500 SURFACE WATER 40.07
Total Fund 603 STORMWATER 40.07
Total Vendor Kwik Trip Inc:160.25
Vendor: LAKEWOOD TAVERN
Fund: 101 GENERAL FUND
Department: 2220 Fire
101-2220-44300 INTERVIEW PANEL MEALS LAKEWOOD TAVERN INTERVIEW PANEL MEALS 105.17 None
Total Department 2220 Fire 105.17
Total Fund 101 GENERAL FUND 105.17
Total Vendor LAKEWOOD TAVERN:105.17
Vendor: League of MN Cities
Fund: 101 GENERAL FUND
Department: 1110 Mayor & Council
101-1110-44370 2026 LMC CONFERENCE-CHARLE League of MN Cities 2026 LMC CONFERENCE-CHARLES CADENHEAD 475.00 None
Total Department 1110 Mayor & Council 475.00
Department: 1910 Planning & Zoning
101-1910-44370 LMC CONFERENCE CC PURCHASE League of MN Cities LMC CONFERENCE REG - JS 425.00 None
Total Department 1910 Planning & Zoning 425.00
Total Fund 101 GENERAL FUND 900.00
Total Vendor League of MN Cities:900.00
Vendor: M&M TOOL AND MACHINERY
Fund: 601 WATER
Department: 9400 WATER
601-9400-42150 WATER - LOCATOR PARTS M&M TOOL AND MACHINERY LOCATOR PARTS 10.02 None
Total Department 9400 WATER 10.02
06/02/2026 09:45 AM Page:5/8
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
Vendor: M&M TOOL AND MACHINERY
Fund: 601 WATER
Total Fund 601 WATER 10.02
Fund: 602 SEWER
Department: 9450 SEWER
602-9450-42150 SEWER - LOCATOR PARTS M&M TOOL AND MACHINERY LOCATOR PARTS 10.02 None
Total Department 9450 SEWER 10.02
Total Fund 602 SEWER 10.02
Total Vendor M&M TOOL AND MACHINERY:20.04
Vendor: MBFTE
Fund: 101 GENERAL FUND
Department: 2220 Fire
101-2220-44330 MN FIREFIGHTER LICENSE REN MBFTE MN FIREFIGHTER LICENSE RENEWAL 75.00 None
Total Department 2220 Fire 75.00
Total Fund 101 GENERAL FUND 75.00
Total Vendor MBFTE:75.00
Vendor: MINNESOTA RECREATION & PARK ASSOC
Fund: 101 GENERAL FUND
Department: 5200 Parks & Recreation
101-5200-44370 PARK PLAYGROUND CERT COURS MINNESOTA RECREATION & PAR PARK PLAYGROUND CERT COURSE 750.00 None
Total Department 5200 Parks & Recreation 750.00
Total Fund 101 GENERAL FUND 750.00
Total Vendor MINNESOTA RECREATION & PARK ASSOC:750.00
Vendor: Verizon
Fund: 101 GENERAL FUND
Department: 1320 Administration
101-1320-43210 WIRELESS CHARGES 84206596 Verizon VERIZON - APRIL 76.78 None
Total Department 1320 Administration 76.78
Department: 1910 Planning & Zoning
101-1910-43210 WIRELESS CHARGES 842065966 Verizon VERIZON - APRIL 38.39 None
Total Department 1910 Planning & Zoning 38.39
Department: 2400 Building Inspection
101-2400-43210 WIRELESS CHARGES 842065966 Verizon VERIZON - APRIL 192.97 None
Total Department 2400 Building Inspection 192.97
Department: 3100 Public Works
101-3100-43210 WIRELESS CHARGES 842065966 Verizon VERIZON - APRIL 213.54 None
Total Department 3100 Public Works 213.54
Department: 5200 Parks & Recreation
101-5200-43210 WIRELESS CHARGES 842065966 Verizon VERIZON - APRIL 115.17 None
Total Department 5200 Parks & Recreation 115.17
Total Fund 101 GENERAL FUND 636.85
Fund: 601 WATER
Department: 9400 WATER
06/02/2026 09:45 AM Page:6/8
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
Vendor: Verizon
Fund: 601 WATER
Department: 9400 WATER
601-9400-43210 WIRELESS CHARGES 842065966 Verizon VERIZON - APRIL 243.62 None
Total Department 9400 WATER 243.62
Total Fund 601 WATER 243.62
Fund: 602 SEWER
Department: 9450 SEWER
602-9450-43210 WIRELESS CHARGES 842065966 Verizon VERIZON - APRIL 121.75 None
Total Department 9450 SEWER 121.75
Total Fund 602 SEWER 121.75
Fund: 603 STORMWATER
Department: 9500 SURFACE WATER
603-9500-43210 WIRELESS CHARGES 842065966 Verizon VERIZON - APRIL 8.15 None
Total Department 9500 SURFACE WATER 8.15
Total Fund 603 STORMWATER 8.15
Total Vendor Verizon:1,010.37
06/02/2026 09:45 AM Page:7/8
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
--- TOTALS BY FUND ---
101 GENERAL FUND 6,340.41
601 WATER 656.75
602 SEWER 383.70
603 STORMWATER 157.52
Total For All Funds:7,538.38
06/02/2026 09:45 AM Page:8/8
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
Vendor: Alex Air Apparatus 2 LLC
Fund: 101 GENERAL FUND
Department: 2220 Fire
101-2220-44040 4 GAS METER CALIBRATION RE Alex Air Apparatus 2 LLC 4 GAS METER CALIBRATION REPAIR 151.00 None
Total Department 2220 Fire 151.00
Total Fund 101 GENERAL FUND 151.00
Total Vendor Alex Air Apparatus 2 LLC:151.00
Vendor: ALL ABOUT EROSION
Fund: 601 WATER
Department: 0000 General
601-0000-22901 REFUNDABLE WATER METER DEP ALL ABOUT EROSION HYDRANT METER DEPOSIT REFUND LESS WAT 1,387.84 None
Total Department 0000 General 1,387.84
Total Fund 601 WATER 1,387.84
Total Vendor ALL ABOUT EROSION:1,387.84
Vendor: Bolton & Menk, Inc
Fund: 101 GENERAL FUND
Department: 1910 Planning & Zoning
101-1910-43030 Planning Dept-Eng Supp Bolton & Menk, Inc Planning Dept-Eng Supp 2,900.00 None
101-1910-43150 GENERAL Bolton & Menk, Inc MONTHLY PLANNING SERVICES 4,372.50 None
Total Department 1910 Planning & Zoning 7,272.50
Department: 1930 Engineering Services
101-1930-43030 General Eng Retainer Bolton & Menk, Inc General Eng Retainer 3,500.00 None
Total Department 1930 Engineering Services 3,500.00
Department: 3100 Public Works
101-3100-43030 2026 Crosswalk Improvement Bolton & Menk, Inc 2026 Crosswalk Improvements 352.50 None
101-3100-43030 Public Works-Eng Support Bolton & Menk, Inc Public Works-Eng Support 2,042.50 None
101-3100-43030 Right-Of-Way Management Bolton & Menk, Inc Right-Of-Way Management 3,661.50 None
Total Department 3100 Public Works 6,056.50
Total Fund 101 GENERAL FUND 16,829.00
Fund: 404 PARK DEDICATION
Department: 8153 ELMO'S PUP PARK & PW PARKING LOT IMPROV
404-8153-43030-8153 Elmo Pup Park / PW Parking Bolton & Menk, Inc Elmo Pup Park / PW Parking Lot 12,801.50 None
Total Department 8153 ELMO'S PUP PARK & PW PARKING LOT IMPROV 12,801.50
Total Fund 404 PARK DEDICATION 12,801.50
Fund: 408 STREET MAINTENANCE
Department: 3100 Public Works
408-3100-43030 2026 Street Maintenance Bolton & Menk, Inc 2026 Street Maintenance 6,099.00 None
Total Department 3100 Public Works 6,099.00
Total Fund 408 STREET MAINTENANCE 6,099.00
Fund: 409 INFRASTRUCTURE RESERVE
Department: 8137 CSAH 10/17/17B INTERSECTION
409-8137-43030-8137 CSAH 10/17/17B Intersectio Bolton & Menk, Inc CSAH 10/17/17B Intersection 470.00 None
Total Department 8137 CSAH 10/17/17B INTERSECTION 470.00
06/11/2026 04:17 PM Page:1/23
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
Vendor: Bolton & Menk, Inc
Fund: 409 INFRASTRUCTURE RESERVE
Department: 8139 CSAH 13 - 34TH TO STILLWATER BLVD
409-8139-43030-8139 CSAH 13 34th Stillwater Bl Bolton & Menk, Inc CSAH 13 34th Stillwater Blvd 1,057.50 None
Total Department 8139 CSAH 13 - 34TH TO STILLWATER BLVD 1,057.50
Total Fund 409 INFRASTRUCTURE RESERVE 1,527.50
Fund: 430 RAILROAD IMPROVEMENTS
Department: 8091 RR Crossing Improvements
430-8091-43030-8091 Village Pkwy UPRR Cross Bolton & Menk, Inc Village Pkwy UPRR Cross 420.00 None
Total Department 8091 RR Crossing Improvements 420.00
Total Fund 430 RAILROAD IMPROVEMENTS 420.00
Fund: 440 TH36-LAKE ELMO AVE IMPROVEMENT
Department: 8112 TH36-Lake Elmo Ave Improvement
440-8112-43030-8112 TH 36-Lake Elmo Ave Imp Bolton & Menk, Inc TH 36-Lake Elmo Ave Imp 13,814.50 None
Total Department 8112 TH36-Lake Elmo Ave Improvement 13,814.50
Total Fund 440 TH36-LAKE ELMO AVE IMPROVEMENT 13,814.50
Fund: 446 HUDSON BLVD IMP-SEG A-INWDHDRX
Department: 8129 HUDSON BLVD IMP-SEG A-INWDHDRX
446-8129-43030-8129 Hudson Blvd Imp Seg A Bolton & Menk, Inc Hudson Blvd Imp Seg A 80.00 None
Total Department 8129 HUDSON BLVD IMP-SEG A-INWDHDRX 80.00
Total Fund 446 HUDSON BLVD IMP-SEG A-INWDHDRX 80.00
Fund: 449 2025 STREET & UTILITY IMPROVEMENTS
Department: 8133 2025 STREET & UTILITY IMPROVEMENTS
449-8133-43030-8133 2025 Street & Utility Bolton & Menk, Inc 2025 Street & Utility 2,710.00 None
Total Department 8133 2025 STREET & UTILITY IMPROVEMENTS 2,710.00
Total Fund 449 2025 STREET & UTILITY IMPROVEMENTS 2,710.00
Fund: 450 STILLWATER AREA SCH DIST UTILITY IMPROVE
Department: 8135 STILLWATER AREA SCHOOL DIST UTILITIES
450-8135-43030-8135 ISD 834 Utility Improve Bolton & Menk, Inc ISD 834 Utility Improve 79.50 None
Total Department 8135 STILLWATER AREA SCHOOL DIST UTILITIES 79.50
Total Fund 450 STILLWATER AREA SCH DIST UTILITY IMPROVE 79.50
Fund: 451 2026 STREET & UTILITY IMPROVEMENTS
Department: 8138 2026 STREET & UTILITY IMPROVEMENTS
451-8138-43030-8138 2026 Street Improvements Bolton & Menk, Inc 2026 Street Improvements 47,590.00 None
Total Department 8138 2026 STREET & UTILITY IMPROVEMENTS 47,590.00
Total Fund 451 2026 STREET & UTILITY IMPROVEMENTS 47,590.00
Fund: 601 WATER
Department: 8126 SOUTH AREA PROD WELLS/TREATMT
601-8126-43030-8126 South PFAS WTP & Wells Bolton & Menk, Inc South PFAS WTP & Wells 2,080.00 None
Total Department 8126 SOUTH AREA PROD WELLS/TREATMT 2,080.00
Department: 8132 MPCA-3M GRANT ADMIN SVCS
601-8132-43030-8132 MPCA 3M Grant Admin Bolton & Menk, Inc MPCA 3M Grant Admin 1,592.50 None
Total Department 8132 MPCA-3M GRANT ADMIN SVCS 1,592.50
06/11/2026 04:17 PM Page:2/23
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
Vendor: Bolton & Menk, Inc
Fund: 601 WATER
Department: 8140 CSAH 14 (17-LAYTON) WATERMAIN IMPROVE
601-8140-43030-8140 CSAH 14 Watermain Improvem Bolton & Menk, Inc CSAH 14 Watermain Improvements 10,998.50 None
Total Department 8140 CSAH 14 (17-LAYTON) WATERMAIN IMPROVE 10,998.50
Department: 9400 WATER
601-9400-43030 Municipal Water System Bolton & Menk, Inc Municipal Water System 2,051.50 None
Total Department 9400 WATER 2,051.50
Total Fund 601 WATER 16,722.50
Fund: 602 SEWER
Department: 8136 I-94 LIFT STATION FORCEMAIN IMP
602-8136-43030-8136 I-94 Lift Station Forcemai Bolton & Menk, Inc I-94 Lift Station Forcemain 259.00 None
Total Department 8136 I-94 LIFT STATION FORCEMAIN IMP 259.00
Department: 9450 SEWER
602-9450-43030 Sanitary Sewer System Bolton & Menk, Inc Sanitary Sewer System 615.00 None
Total Department 9450 SEWER 615.00
Total Fund 602 SEWER 874.00
Fund: 603 STORMWATER
Department: 9500 SURFACE WATER
603-9500-43030 Surface Water-Storm Sew Bolton & Menk, Inc Surface Water-Storm Sew 1,410.00 None
Total Department 9500 SURFACE WATER 1,410.00
Total Fund 603 STORMWATER 1,410.00
Fund: 611 WATER - CAPITAL
Department: 8143 NORTH WTP SITE EVALUATION STUDY
611-8143-43030-8143 Well 4 & 5 PFAS Treatment Bolton & Menk, Inc Well 4 & 5 PFAS Treatment 587.50 None
Total Department 8143 NORTH WTP SITE EVALUATION STUDY 587.50
Total Fund 611 WATER - CAPITAL 587.50
Fund: 612 SEWER - CAPITAL
Department: 9450 SEWER
612-9450-43030-8152 Section 16 Sewer Extension Bolton & Menk, Inc Section 16 Sewer Extension 11,341.50 None
Total Department 9450 SEWER 11,341.50
Total Fund 612 SEWER - CAPITAL 11,341.50
Fund: 803 ESCROW FUND
Department: 9008 E008 - AT HOME APTS
803-9008-43030 AT HOME APARTMENTS Bolton & Menk, Inc At Home Apartments 770.50 None
Total Department 9008 E008 - AT HOME APTS 770.50
Department: 9016 E016 - EBERHARD (HIGHPOINTE CROSSING -22
803-9016-43030 HIGHPOINTE CROSSING Bolton & Menk, Inc Highpointe Crossing 6,123.00 None
803-9016-43035 EBERHARD-HIGHPOINTE Bolton & Menk, Inc MONTHLY PLANNING SERVICES 2,146.50 None
Total Department 9016 E016 - EBERHARD (HIGHPOINTE CROSSING -22 8,269.50
Department: 9020 E020 - INWOOD TOWNHOMES
803-9020-43030 Towns of Inwood Bolton & Menk, Inc Towns of Inwood 14,455.50 None
Total Department 9020 E020 - INWOOD TOWNHOMES 14,455.50
06/11/2026 04:17 PM Page:3/23
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
Vendor: Bolton & Menk, Inc
Fund: 803 ESCROW FUND
Department: 9021 E021 - INWOOD 9TH
803-9021-43030 Inwood Commercial Bolton & Menk, Inc Inwood Commercial 235.00 None
Total Department 9021 E021 - INWOOD 9TH 235.00
Department: 9023 E023 - LAKE ELMO ELEMENTARY
803-9023-43030 Lake Elmo Elementary Bolton & Menk, Inc Lake Elmo Elementary 2,392.50 None
803-9023-43035 LAKE ELMO ELEMENTARY Bolton & Menk, Inc MONTHLY PLANNING SERVICES 238.50 None
Total Department 9023 E023 - LAKE ELMO ELEMENTARY 2,631.00
Department: 9026 E026 - LAKEWOOD CROSSING - STARBUCKS
803-9026-43030 Lakewood Crossing 3rd - St Bolton & Menk, Inc Lakewood Crossing 3rd - Starbucks 352.50 None
Total Department 9026 E026 - LAKEWOOD CROSSING - STARBUCKS 352.50
Department: 9031 E031 - GRANVIA PRESERVE / LEGENDS AT LAK
803-9031-43030 GRANVIA-LEGENDS AT LAKE EL Bolton & Menk, Inc GRANVIA-LEGENDS AT LAKE ELMO ADDITION 470.00 None
Total Department 9031 E031 - GRANVIA PRESERVE / LEGENDS AT LAK 470.00
Department: 9033 E033 - LIMERICK VILLAGE
803-9033-43030 Limerick Village Bolton & Menk, Inc Limerick Village 1,762.50 None
803-9033-43035 LIMERICK Bolton & Menk, Inc MONTHLY PLANNING SERVICES 1,922.00 None
Total Department 9033 E033 - LIMERICK VILLAGE 3,684.50
Department: 9038 E038 - OAK-LAND MIDDLE SCHOOL
803-9038-43030 ISD 834 Oak-Land Middle Bolton & Menk, Inc ISD 834 Oak-Land Middle 538.50 None
Total Department 9038 E038 - OAK-LAND MIDDLE SCHOOL 538.50
Department: 9040 E040 - PRIMROSE DAYCARE
803-9040-43030 Primrose Daycare Bolton & Menk, Inc Primrose Daycare 952.50 None
Total Department 9040 E040 - PRIMROSE DAYCARE 952.50
Department: 9042 E042 - ROERS LE MULTIFAMILY
803-9042-43030 Roers Multifamily Bolton & Menk, Inc Roers Multifamily 1,879.00 None
Total Department 9042 E042 - ROERS LE MULTIFAMILY 1,879.00
Department: 9045 E045 - ROYAL GOLF 5TH - LIFT STATION
803-9045-43030 Royal Golf Club 5th Add Bolton & Menk, Inc Royal Golf Club 5th Add 180.00 None
Total Department 9045 E045 - ROYAL GOLF 5TH - LIFT STATION 180.00
Department: 9049 E049 - SCHILTGEN/NORTHSTAR 1ST
803-9049-43030 Northstar 1st Addition (Sc Bolton & Menk, Inc Northstar 1st Addition (Schiltgen Far 80.00 None
Total Department 9049 E049 - SCHILTGEN/NORTHSTAR 1ST 80.00
Department: 9050 E050 - SCHILTGEN/NORTHSTAR 2ND
803-9050-43030 Schiltgen - Northstar 2nd Bolton & Menk, Inc Schiltgen - Northstar 2nd 5,136.50 None
Total Department 9050 E050 - SCHILTGEN/NORTHSTAR 2ND 5,136.50
Department: 9052 E052 - SPRINGS AT LAKE ELMO
803-9052-43030 Springs at Lake Elmo Bolton & Menk, Inc Springs at Lake Elmo 117.50 None
Total Department 9052 E052 - SPRINGS AT LAKE ELMO 117.50
Department: 9061 E061
803-9061-43030 Schilten/Northstar 3rd Add Bolton & Menk, Inc Schilten/Northstar 3rd Add 470.00 None
Total Department 9061 E061 470.00
Department: 9064 E064
803-9064-43030 Highpointe Medical CUP Bolton & Menk, Inc Highpointe Medical CUP 2,115.00 None
06/11/2026 04:17 PM Page:4/23
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
Vendor: Bolton & Menk, Inc
Fund: 803 ESCROW FUND
Department: 9064 E064
Total Department 9064 E064 2,115.00
Department: 9065 E065
803-9065-43030 Summergate Assemblage Bolton & Menk, Inc Summergate Assemblage 117.50 None
803-9065-43035 SUMMERGATE Bolton & Menk, Inc MONTHLY PLANNING SERVICES 126.00 None
Total Department 9065 E065 243.50
Department: 9066 E066
803-9066-43030 Bridgewater Village Townho Bolton & Menk, Inc Bridgewater Village Townhomes 235.00 None
803-9066-43035 BRIDGEWATER Bolton & Menk, Inc MONTHLY PLANNING SERVICES 79.50 None
Total Department 9066 E066 314.50
Department: 9067 E067
803-9067-43030 Schiltgen South (Frattalon Bolton & Menk, Inc Schiltgen South (Frattalone)705.00 None
Total Department 9067 E067 705.00
Total Fund 803 ESCROW FUND 43,600.50
Total Vendor Bolton & Menk, Inc:176,487.00
Vendor: Bound Tree Medical LLC
Fund: 703 CITY CENTER OPERATIONS (ISF)
Department: 0000 General
703-0000-42111 CITY CENTER AED PADS Bound Tree Medical LLC CITY CENTER AED PADS 155.98 None
Total Department 0000 General 155.98
Total Fund 703 CITY CENTER OPERATIONS (ISF)155.98
Total Vendor Bound Tree Medical LLC:155.98
Vendor: Century College
Fund: 101 GENERAL FUND
Department: 2220 Fire
101-2220-44370 AERIAL APPRATUS OPERATOR C Century College AERIAL APPRATUS OPERATOR CLASS - PH 550.00 None
101-2220-44370 EV STORED ENERGY TRAINING Century College EV STORED ENERGY TRAINING COURSE 695.00 None
101-2220-44370 LIVE BURN INSTRUCTOR TRAIN Century College LIVE BURN INSTRUCTOR TRAIN THE TRAINE 1,350.00 None
Total Department 2220 Fire 2,595.00
Total Fund 101 GENERAL FUND 2,595.00
Total Vendor Century College:2,595.00
Vendor: Century Power Equipment
Fund: 101 GENERAL FUND
Department: 5200 Parks & Recreation
101-5200-42400 PW_BRUSH CUTTER AND MOWING Century Power Equipment PW_BRUSH CUTTER AND MOWING HEAD 429.99 None
101-5200-44040 PW_BRUSH CUTTER AND MOWING Century Power Equipment PW_BRUSH CUTTER AND MOWING HEAD 79.98 None
Total Department 5200 Parks & Recreation 509.97
Total Fund 101 GENERAL FUND 509.97
Total Vendor Century Power Equipment:509.97
Vendor: Cintas
Fund: 101 GENERAL FUND
06/11/2026 04:17 PM Page:5/23
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
Vendor: Cintas
Fund: 101 GENERAL FUND
Department: 3100 Public Works
101-3100-43150 First Aid Supplies Cintas First Aid - Cinc OH 5.37 None
Total Department 3100 Public Works 5.37
Department: 5200 Parks & Recreation
101-5200-43150 Cintas First Aid - Cinc OH 5.37 None
Total Department 5200 Parks & Recreation 5.37
Total Fund 101 GENERAL FUND 10.74
Fund: 601 WATER
Department: 9400 WATER
601-9400-43150 Cintas First Aid - Cinc OH 5.37 None
Total Department 9400 WATER 5.37
Total Fund 601 WATER 5.37
Fund: 602 SEWER
Department: 9450 SEWER
602-9450-43150 Cintas First Aid - Cinc OH 5.37 None
Total Department 9450 SEWER 5.37
Total Fund 602 SEWER 5.37
Fund: 603 STORMWATER
Department: 9500 SURFACE WATER
603-9500-43150 Cintas First Aid - Cinc OH 5.37 None
Total Department 9500 SURFACE WATER 5.37
Total Fund 603 STORMWATER 5.37
Total Vendor Cintas:26.85
Vendor: Cintas Corp
Fund: 101 GENERAL FUND
Department: 3100 Public Works
101-3100-42150 RUGS/SOAP/RAGS Cintas Corp CLEANING, MAINT & SUPPLIES - PW 95.98 None
101-3100-42150 RUGS/SOAP/RAGS Cintas Corp CLEANING, MAINT & SUPPLIES - PW 168.65 None
101-3100-42150 RUGS/SOAP/RAGS Cintas Corp CLEANING, MAINT & SUPPLIES - PW 28.70 None
101-3100-44170 PW - UNIFORMS Cintas Corp CLEANING, MAINT & SUPPLIES - PW 97.12 None
101-3100-44170 PW - UNIFORMS Cintas Corp CLEANING, MAINT & SUPPLIES - PW 100.18 None
101-3100-44170 PW - UNIFORMS Cintas Corp CLEANING, MAINT & SUPPLIES - PW 135.14 None
Total Department 3100 Public Works 625.77
Department: 5200 Parks & Recreation
101-5200-44170 PARK & REC - UNIFORMS Cintas Corp CLEANING, MAINT & SUPPLIES - PW 22.41 None
101-5200-44170 PARK & REC - UNIFORMS Cintas Corp CLEANING, MAINT & SUPPLIES - PW 23.12 None
101-5200-44170 PARK & REC - UNIFORMS Cintas Corp CLEANING, MAINT & SUPPLIES - PW 31.19 None
Total Department 5200 Parks & Recreation 76.72
Total Fund 101 GENERAL FUND 702.49
Fund: 601 WATER
Department: 9400 WATER
601-9400-44170 WATER - UNIFORMS Cintas Corp CLEANING, MAINT & SUPPLIES - PW 17.94 None
601-9400-44170 WATER - UNIFORMS Cintas Corp CLEANING, MAINT & SUPPLIES - PW 18.49 None
06/11/2026 04:17 PM Page:6/23
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
Vendor: Cintas Corp
Fund: 601 WATER
Department: 9400 WATER
601-9400-44170 WATER - UNIFORMS Cintas Corp CLEANING, MAINT & SUPPLIES - PW 24.95 None
Total Department 9400 WATER 61.38
Total Fund 601 WATER 61.38
Fund: 602 SEWER
Department: 9450 SEWER
602-9450-44170 SEWER - UNIFORMS Cintas Corp CLEANING, MAINT & SUPPLIES - PW 7.47 None
602-9450-44170 SEWER - UNIFORMS Cintas Corp CLEANING, MAINT & SUPPLIES - PW 7.71 None
602-9450-44170 SEWER - UNIFORMS Cintas Corp CLEANING, MAINT & SUPPLIES - PW 10.40 None
Total Department 9450 SEWER 25.58
Total Fund 602 SEWER 25.58
Fund: 603 STORMWATER
Department: 9500 SURFACE WATER
603-9500-44170 SURFACE WATER - UNIFORMS Cintas Corp CLEANING, MAINT & SUPPLIES - PW 4.48 None
603-9500-44170 SURFACE WATER - UNIFORMS Cintas Corp CLEANING, MAINT & SUPPLIES - PW 4.62 None
603-9500-44170 SURFACE WATER - UNIFORMS Cintas Corp CLEANING, MAINT & SUPPLIES - PW 6.22 None
Total Department 9500 SURFACE WATER 15.32
Total Fund 603 STORMWATER 15.32
Fund: 703 CITY CENTER OPERATIONS (ISF)
Department: 0000 General
703-0000-42110 JANITORIAL SUPPLIES Cintas Corp JANITORIAL / RUGS 249.13 None
703-0000-42110 JANITORIAL SUPPLIES Cintas Corp JANITORIAL / RUGS 214.83 None
703-0000-44011 RUGS Cintas Corp JANITORIAL / RUGS 159.70 None
703-0000-44011 RUGS Cintas Corp JANITORIAL / RUGS 159.70 None
Total Department 0000 General 783.36
Total Fund 703 CITY CENTER OPERATIONS (ISF)783.36
Total Vendor Cintas Corp:1,588.13
Vendor: City of Saint Paul
Fund: 101 GENERAL FUND
Department: 3100 Public Works
101-3100-42240 POTHOLE MIX City of Saint Paul POTHOLE MIX 652.34 None
Total Department 3100 Public Works 652.34
Total Fund 101 GENERAL FUND 652.34
Total Vendor City of Saint Paul:652.34
Vendor: Cornerstone Chevrolet Stillwater
Fund: 101 GENERAL FUND
Department: 2220 Fire
101-2220-44040 CV1 OIL CHNAGE / SERVICE Cornerstone Chevrolet Stil CV1 OIL CHNAGE / SERVICE 187.47 None
Total Department 2220 Fire 187.47
Total Fund 101 GENERAL FUND 187.47
Total Vendor Cornerstone Chevrolet Stillwater:187.47
06/11/2026 04:17 PM Page:7/23
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
Vendor: CORNERSTONE LAND SURVEYING INC
Fund: 101 GENERAL FUND
Department: 5200 Parks & Recreation
101-5200-43150 LIONS PARK LAND SURVEY CORNERSTONE LAND SURVEYING LIONS PARK LAND SURVEY 800.00 None
Total Department 5200 Parks & Recreation 800.00
Total Fund 101 GENERAL FUND 800.00
Total Vendor CORNERSTONE LAND SURVEYING INC:800.00
Vendor: Eckberg Lammers
Fund: 101 GENERAL FUND
Department: 2150 Prosecution
101-2150-43045 MONTHLY PRO SVCS PROS Eckberg Lammers MONTHLY PROSECUTION SERVICES - MAY 4,415.25 None
Total Department 2150 Prosecution 4,415.25
Total Fund 101 GENERAL FUND 4,415.25
Total Vendor Eckberg Lammers:4,415.25
Vendor: ECM Publishers Inc
Fund: 101 GENERAL FUND
Department: 1320 Administration
101-1320-43510 PUBLIC NOTICE ORD 2026-06 ECM Publishers Inc PUBLIC NOTICE ORD 2026-06 - FEE SCHED 34.00 None
Total Department 1320 Administration 34.00
Department: 1910 Planning & Zoning
101-1910-43510 JUNE 8 PH LE 2040 COMP PLA ECM Publishers Inc JUNE 8 PH - LIMERICK/INWOOD/2040 COMP 36.84 None
101-1910-43510 JUN 16 PH EDA - 180 ACRES ECM Publishers Inc JUN 16 PH EDA - 180 ACRES - PUBLISHIN 85.00 None
Total Department 1910 Planning & Zoning 121.84
Total Fund 101 GENERAL FUND 155.84
Fund: 408 STREET MAINTENANCE
Department: 3100 Public Works
408-3100-43510 2026 SEAL COAT PROJ BID PU ECM Publishers Inc 2026 SEAL COAT PROJ BID PUBLISHING 144.50 None
Total Department 3100 Public Works 144.50
Total Fund 408 STREET MAINTENANCE 144.50
Fund: 803 ESCROW FUND
Department: 9021 E021 - INWOOD 9TH
803-9021-43510 JUNE 8 PH - INWOOD COMM - ECM Publishers Inc JUNE 8 PH - LIMERICK/INWOOD/2040 COMP 36.83 None
Total Department 9021 E021 - INWOOD 9TH 36.83
Department: 9033 E033 - LIMERICK VILLAGE
803-9033-43510 JUNE 8 PH - LIMERICK VILL ECM Publishers Inc JUNE 8 PH - LIMERICK/INWOOD/2040 COMP 36.83 None
Total Department 9033 E033 - LIMERICK VILLAGE 36.83
Total Fund 803 ESCROW FUND 73.66
Total Vendor ECM Publishers Inc:374.00
Vendor: Emergency Apparatus Maint Inc
Fund: 101 GENERAL FUND
Department: 2220 Fire
101-2220-44040 ENGINE 1 - WINDOW REPAIR Emergency Apparatus Maint ENGINE 1 - WINDOW REPAIR 1,650.18 None
Total Department 2220 Fire 1,650.18
06/11/2026 04:17 PM Page:8/23
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
Vendor: Emergency Apparatus Maint Inc
Fund: 101 GENERAL FUND
Total Fund 101 GENERAL FUND 1,650.18
Total Vendor Emergency Apparatus Maint Inc:1,650.18
Vendor: Equipment Management Company
Fund: 101 GENERAL FUND
Department: 2220 Fire
101-2220-44040 ANNUAL EXTRICATION TOOL MA Equipment Management Compa ANNUAL EXTRICATION TOOL MAINTENANCE 1,430.00 None
Total Department 2220 Fire 1,430.00
Total Fund 101 GENERAL FUND 1,430.00
Total Vendor Equipment Management Company:1,430.00
Vendor: Ferguson Waterworks #2518
Fund: 601 WATER
Department: 9401 WELL 2 TREATMENT O&M
601-9401-42210 WATER_REPAIR MAINTENANCE S Ferguson Waterworks #2518 WATER_REPAIR MAINTENANCE SUPPLIES 126.24 None
Total Department 9401 WELL 2 TREATMENT O&M 126.24
Total Fund 601 WATER 126.24
Total Vendor Ferguson Waterworks #2518:126.24
Vendor: Fury Motors Stillwater
Fund: 101 GENERAL FUND
Department: 2220 Fire
101-2220-44040 C2 OIL CHANGE / SERVICE Fury Motors Stillwater C2 OIL CHANGE / SERVICE 1,388.59 None
Total Department 2220 Fire 1,388.59
Total Fund 101 GENERAL FUND 1,388.59
Total Vendor Fury Motors Stillwater:1,388.59
Vendor: Gopher State One Call
Fund: 601 WATER
Department: 9400 WATER
601-9400-43150 WATER - TICKET COST Gopher State One Call TICKET COSTS 274.95 None
Total Department 9400 WATER 274.95
Total Fund 601 WATER 274.95
Fund: 602 SEWER
Department: 9450 SEWER
602-9450-43150 SEWER - TICKET COST Gopher State One Call TICKET COSTS 274.95 None
Total Department 9450 SEWER 274.95
Total Fund 602 SEWER 274.95
Fund: 603 STORMWATER
Department: 9500 SURFACE WATER
603-9500-43150 STORM - TICKET COST Gopher State One Call TICKET COSTS 274.95 None
Total Department 9500 SURFACE WATER 274.95
Total Fund 603 STORMWATER 274.95
Total Vendor Gopher State One Call:824.85
06/11/2026 04:17 PM Page:9/23
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
Vendor: GWSA Land Development LLC
Fund: 803 ESCROW FUND
Department: 9049 E049 - SCHILTGEN/NORTHSTAR 1ST
803-9049-22910 DEVELOPER ESCROW RELEASE 1 GWSA Land Development LLC DEVELOPER ESCROW RELEASE 10880 STILLW 5,000.00 None
Total Department 9049 E049 - SCHILTGEN/NORTHSTAR 1ST 5,000.00
Total Fund 803 ESCROW FUND 5,000.00
Total Vendor GWSA Land Development LLC:5,000.00
Vendor: Hailies Cleaning Svcs LLC
Fund: 703 CITY CENTER OPERATIONS (ISF)
Department: 0000 General
703-0000-44011 CITY HALL MONTHLY CLEANING Hailies Cleaning Svcs LLC MONTHLY CLEANING SERVICES-MAY 1,980.00 None
Total Department 0000 General 1,980.00
Total Fund 703 CITY CENTER OPERATIONS (ISF)1,980.00
Total Vendor Hailies Cleaning Svcs LLC:1,980.00
Vendor: HealthPartners Occupational Medicine
Fund: 101 GENERAL FUND
Department: 3100 Public Works
101-3100-44300 NEW HIRE SCREEN - PW NEW H HealthPartners Occupationa DRUG SCREEN - PW - LS 33.00 None
Total Department 3100 Public Works 33.00
Total Fund 101 GENERAL FUND 33.00
Total Vendor HealthPartners Occupational Medicine:33.00
Vendor: Industrial Health Svcs Network
Fund: 101 GENERAL FUND
Department: 3100 Public Works
101-3100-44300 Drug Screen/MRO Svcs - B51 Industrial Health Svcs Net Drg Screening/MRO Svcs 49.90 None
Total Department 3100 Public Works 49.90
Total Fund 101 GENERAL FUND 49.90
Total Vendor Industrial Health Svcs Network:49.90
Vendor: Innovative Office Solutions LLC
Fund: 101 GENERAL FUND
Department: 1320 Administration
101-1320-42000 PENS Innovative Office Solution PENS 7.64 None
Total Department 1320 Administration 7.64
Department: 1520 Finance
101-1520-42000 PENS Innovative Office Solution PENS 7.64 None
Total Department 1520 Finance 7.64
Total Fund 101 GENERAL FUND 15.28
Total Vendor Innovative Office Solutions LLC:15.28
Vendor: IUOE Local 49
Fund: 101 GENERAL FUND
Department: 0000 General
101-0000-21712 MONTHLY LOCAL 49 UNION DUE IUOE Local 49 LOCAL 49 UNION DUES - MONTHLY - JULY 315.00 None
06/11/2026 04:17 PM Page:10/23
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
Vendor: IUOE Local 49
Fund: 101 GENERAL FUND
Department: 0000 General
Total Department 0000 General 315.00
Total Fund 101 GENERAL FUND 315.00
Total Vendor IUOE Local 49:315.00
Vendor: IUOE Local 49 Fringe Benefit Fund
Fund: 101 GENERAL FUND
Department: 0000 General
101-0000-21713 Local 49 monthly Health In IUOE Local 49 Fringe Benef LOCAL 49 MONTHLY HEALTH INS PREM-JULY 15,075.00 None
Total Department 0000 General 15,075.00
Total Fund 101 GENERAL FUND 15,075.00
Total Vendor IUOE Local 49 Fringe Benefit Fund:15,075.00
Vendor: Kath Fuel Oil Service Co
Fund: 101 GENERAL FUND
Department: 2220 Fire
101-2220-42120 FIRE - OFF ROAD Kath Fuel Oil Service Co OFF ROAD 1,660.03 None
Total Department 2220 Fire 1,660.03
Department: 2400 Building Inspection
101-2400-42120 BUILDING - UNLEADED FUEL Kath Fuel Oil Service Co UNLEADED FUEL 178.16 None
101-2400-42120 BUILDING - UNLEADED FUEL Kath Fuel Oil Service Co UNLEADED FUEL 156.44 None
Total Department 2400 Building Inspection 334.60
Department: 3100 Public Works
101-3100-42120 STREET - UNLEADED FUEL Kath Fuel Oil Service Co UNLEADED FUEL 697.94 None
101-3100-42120 STREET - UNLEADED FUEL Kath Fuel Oil Service Co UNLEADED FUEL 547.51 None
101-3100-42120 STREET - OFF ROAD Kath Fuel Oil Service Co OFF ROAD 0.00 None
Total Department 3100 Public Works 1,245.45
Department: 5200 Parks & Recreation
101-5200-42120 PARKS - UNLEADED FUEL Kath Fuel Oil Service Co UNLEADED FUEL 261.72 None
101-5200-42120 PARKS - UNLEADED FUEL Kath Fuel Oil Service Co UNLEADED FUEL 205.32 None
101-5200-42120 PARKS - OFF ROAD Kath Fuel Oil Service Co OFF ROAD 0.00 None
Total Department 5200 Parks & Recreation 467.04
Total Fund 101 GENERAL FUND 3,707.12
Fund: 601 WATER
Department: 9400 WATER
601-9400-42120 WATER - UNLEADED FUEL Kath Fuel Oil Service Co UNLEADED FUEL 348.97 None
601-9400-42120 WATER - UNLEADED FUEL Kath Fuel Oil Service Co UNLEADED FUEL 273.75 None
601-9400-42120 WATER - OFF ROAD Kath Fuel Oil Service Co OFF ROAD 0.00 None
Total Department 9400 WATER 622.72
Total Fund 601 WATER 622.72
Fund: 602 SEWER
Department: 9450 SEWER
602-9450-42120 SEWER - UNLEADED FUEL Kath Fuel Oil Service Co UNLEADED FUEL 348.97 None
602-9450-42120 SEWER - UNLEADED FUEL Kath Fuel Oil Service Co UNLEADED FUEL 273.75 None
602-9450-42120 SEWER - OFF ROAD Kath Fuel Oil Service Co OFF ROAD 0.00 None
06/11/2026 04:17 PM Page:11/23
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
Vendor: Kath Fuel Oil Service Co
Fund: 602 SEWER
Department: 9450 SEWER
Total Department 9450 SEWER 622.72
Total Fund 602 SEWER 622.72
Fund: 603 STORMWATER
Department: 9500 SURFACE WATER
603-9500-42120 STORMWATER - UNLEADED FUEL Kath Fuel Oil Service Co UNLEADED FUEL 87.25 None
603-9500-42120 STORMWATER - UNLEADED FUEL Kath Fuel Oil Service Co UNLEADED FUEL 68.44 None
603-9500-42120 STORMWATER - OFF ROAD Kath Fuel Oil Service Co OFF ROAD 0.00 None
Total Department 9500 SURFACE WATER 155.69
Total Fund 603 STORMWATER 155.69
Total Vendor Kath Fuel Oil Service Co:5,108.25
Vendor: Keys Well Drilling Company
Fund: 601 WATER
Department: 9400 WATER
601-9400-43150 BOOSTER AND WELL 5 SERVICE Keys Well Drilling Company BOOSTER AND WELL 5 SERVICE 4,600.00 None
Total Department 9400 WATER 4,600.00
Total Fund 601 WATER 4,600.00
Total Vendor Keys Well Drilling Company:4,600.00
Vendor: Kwik Trip Inc
Fund: 101 GENERAL FUND
Department: 2220 Fire
101-2220-42120 Fuel, Oil and Fluids Kwik Trip Inc FUEL 838.78 None
Total Department 2220 Fire 838.78
Total Fund 101 GENERAL FUND 838.78
Total Vendor Kwik Trip Inc:838.78
Vendor: Lennar Minnesota
Fund: 803 ESCROW FUND
Department: 0000 General
803-0000-22900 ESCROW RELEASE - 11464 QUE Lennar Minnesota ESCROW RELEASE - 11464 QUEENS CT - 20 10,000.00 None
803-0000-22900 ESCROW RELEASE Lennar Minnesota ESCROW RELEASE - 11455 QUEENS CT - 20 10,000.00 None
803-0000-22900 ESCROW RELEASE Lennar Minnesota ESCROW RELEASE - 11453 QUEENS CT - 20 10,000.00 None
803-0000-22900 ESCROW RELEASE Lennar Minnesota ESCROW RELEASE - 1636 ROYAL BLVD - 20 10,000.00 None
803-0000-22900 ESCROW RELEASE Lennar Minnesota ESCROW RELEASE - 1644 ROYAL BLVD - 20 10,000.00 None
803-0000-22900 ESCROW RELEASE Lennar Minnesota ESCROW RELEASE - 1708 ROYAL BLVD - 20 10,000.00 None
803-0000-22900 ESCROW RELEASE Lennar Minnesota ESCROW RELEASE - 1980 ROYAL BLVD - 20 10,000.00 None
803-0000-22900 ESCROW RELEASE Lennar Minnesota ESCROW RELEASE - 1955 ROYAL BLVD - 20 10,000.00 None
803-0000-22900 ESCROW RELEASE Lennar Minnesota ESCROW RELEASE - 1903 ROYAL BLVD - 20 10,000.00 None
803-0000-22900 ESCROW RELEASE Lennar Minnesota ESCROW RELEASE - 1932 ROYAL BLVD - 20 10,000.00 None
803-0000-22900 ESCROW RELEASE Lennar Minnesota ESCROW RELEASE - 1920 ROYAL BLVD - 20 10,000.00 None
Total Department 0000 General 110,000.00
Total Fund 803 ESCROW FUND 110,000.00
Total Vendor Lennar Minnesota:110,000.00
06/11/2026 04:17 PM Page:12/23
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
Vendor: LRS Portables LLC
Fund: 101 GENERAL FUND
Department: 5200 Parks & Recreation
101-5200-44120 PARKS PORTABLE RENTALS LRS Portables LLC PARKS PORTABLE RENTALS 1,425.00 None
Total Department 5200 Parks & Recreation 1,425.00
Total Fund 101 GENERAL FUND 1,425.00
Total Vendor LRS Portables LLC:1,425.00
Vendor: Main Street Builders
Fund: 803 ESCROW FUND
Department: 0000 General
803-0000-22900 ESCROW RELEASE - 4525 LAKE Main Street Builders ESCROW RELEASE - 4525 LAKE ELMO AVE 10,000.00 None
Total Department 0000 General 10,000.00
Total Fund 803 ESCROW FUND 10,000.00
Total Vendor Main Street Builders:10,000.00
Vendor: Maroney's Sanitation Inc
Fund: 101 GENERAL FUND
Department: 3100 Public Works
101-3100-43840 Public Works - Sanitation Maroney's Sanitation Inc TRASH SERVICE - MONTHY - 05.31.25 44.78 None
Total Department 3100 Public Works 44.78
Department: 5200 Parks & Recreation
101-5200-43840 Public Works - Sanitation Maroney's Sanitation Inc TRASH SERVICE - MONTHY - 05.31.25 313.42 None
Total Department 5200 Parks & Recreation 313.42
Total Fund 101 GENERAL FUND 358.20
Fund: 601 WATER
Department: 9400 WATER
601-9400-43840 Public Works - Sanitation Maroney's Sanitation Inc TRASH SERVICE - MONTHY - 05.31.25 44.78 None
Total Department 9400 WATER 44.78
Total Fund 601 WATER 44.78
Fund: 602 SEWER
Department: 9450 SEWER
602-9450-43840 Public Works - Sanitation Maroney's Sanitation Inc TRASH SERVICE - MONTHY - 05.31.25 44.78 None
Total Department 9450 SEWER 44.78
Total Fund 602 SEWER 44.78
Fund: 703 CITY CENTER OPERATIONS (ISF)
Department: 0000 General
703-0000-43840 City Center - Sanitation Maroney's Sanitation Inc TRASH SERVICE - MONTHY - 05.31.25 352.44 None
Total Department 0000 General 352.44
Total Fund 703 CITY CENTER OPERATIONS (ISF)352.44
Total Vendor Maroney's Sanitation Inc:800.20
Vendor: Martin Marietta Materials
Fund: 101 GENERAL FUND
Department: 3100 Public Works
101-3100-42240 POTHOLE MIX Martin Marietta Materials POTHOLE MIX 419.02 None
06/11/2026 04:17 PM Page:13/23
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
Vendor: Martin Marietta Materials
Fund: 101 GENERAL FUND
Department: 3100 Public Works
101-3100-42240 POTHOLE MIX Martin Marietta Materials POTHOLE MIX 167.25 None
101-3100-42240 POTHOLE MIX Martin Marietta Materials POTHOLE MIX 120.54 None
Total Department 3100 Public Works 706.81
Total Fund 101 GENERAL FUND 706.81
Total Vendor Martin Marietta Materials:706.81
Vendor: Menards - Oakdale
Fund: 101 GENERAL FUND
Department: 2220 Fire
101-2220-44010 STATION SUPPLIES Menards - Oakdale STATION SUPPLIES 60.72 None
Total Department 2220 Fire 60.72
Department: 3100 Public Works
101-3100-42210 PW GUARDRAIL REPAIR MATERI Menards - Oakdale PW GUARDRAIL REPAIR MATERIALS_JAMACA 26.91 None
101-3100-42210 PW GUARDRAIL REPAIR MATERI Menards - Oakdale PW GUARDRAIL REPAIR MATERIALS_JAMACA (5.52)None
101-3100-42210 PARKS_SUPPLIES Menards - Oakdale PARKS_SUPPLIES 109.91 None
Total Department 3100 Public Works 131.30
Department: 5200 Parks & Recreation
101-5200-44030 MATERIALS/SUPPLIES Menards - Oakdale MATERIALS/SUPPLIES 103.94 None
101-5200-44030 MATERIALS/SUPPLIES Menards - Oakdale MATERIALS/SUPPLIES 500.00 None
Total Department 5200 Parks & Recreation 603.94
Total Fund 101 GENERAL FUND 795.96
Fund: 603 STORMWATER
Department: 9500 SURFACE WATER
603-9500-42270 MATERIALS_MORTAR MIX Menards - Oakdale MATERIALS_MORTAR MIX 8.63 None
Total Department 9500 SURFACE WATER 8.63
Total Fund 603 STORMWATER 8.63
Total Vendor Menards - Oakdale:804.59
Vendor: METRO - INET
Fund: 101 GENERAL FUND
Department: 1110 Mayor & Council
101-1110-43185 Monthly IT Support METRO - INET MONTHLY IT SUPPORT - JUNE 482.55 None
Total Department 1110 Mayor & Council 482.55
Department: 1320 Administration
101-1320-43185 Monthly IT Support METRO - INET MONTHLY IT SUPPORT - JUNE 2,120.12 None
Total Department 1320 Administration 2,120.12
Department: 1520 Finance
101-1520-43185 Monthly IT Support METRO - INET MONTHLY IT SUPPORT - JUNE 1,415.31 None
Total Department 1520 Finance 1,415.31
Department: 1910 Planning & Zoning
101-1910-43185 Monthly IT Support METRO - INET MONTHLY IT SUPPORT - JUNE 1,255.12 None
Total Department 1910 Planning & Zoning 1,255.12
Department: 2100 POLICE
06/11/2026 04:17 PM Page:14/23
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
Vendor: METRO - INET
Fund: 101 GENERAL FUND
Department: 2100 POLICE
101-2100-43185 MONTHLY IT SUPPORT METRO - INET MONTHLY IT SUPPORT - JUNE 114.09 None
Total Department 2100 POLICE 114.09
Department: 2220 Fire
101-2220-43185 Monthly IT Support METRO - INET MONTHLY IT SUPPORT - JUNE 2,150.72 None
Total Department 2220 Fire 2,150.72
Department: 2400 Building Inspection
101-2400-43185 MONTHLY IT SUPPORT METRO - INET MONTHLY IT SUPPORT - JUNE 1,333.06 None
Total Department 2400 Building Inspection 1,333.06
Department: 3100 Public Works
101-3100-43185 Monthly IT Support METRO - INET MONTHLY IT SUPPORT - JUNE 802.14 None
Total Department 3100 Public Works 802.14
Department: 5200 Parks & Recreation
101-5200-43185 Monthly IT Support METRO - INET MONTHLY IT SUPPORT - JUNE 401.07 None
Total Department 5200 Parks & Recreation 401.07
Total Fund 101 GENERAL FUND 10,074.18
Fund: 601 WATER
Department: 9400 WATER
601-9400-43185 Monthly IT Support METRO - INET MONTHLY IT SUPPORT - JUNE 802.14 None
Total Department 9400 WATER 802.14
Total Fund 601 WATER 802.14
Fund: 602 SEWER
Department: 9450 SEWER
602-9450-43185 Monthly IT Support METRO - INET MONTHLY IT SUPPORT - JUNE 802.14 None
Total Department 9450 SEWER 802.14
Total Fund 602 SEWER 802.14
Fund: 603 STORMWATER
Department: 9500 SURFACE WATER
603-9500-43185 Monthly IT Support METRO - INET MONTHLY IT SUPPORT - JUNE 200.54 None
Total Department 9500 SURFACE WATER 200.54
Total Fund 603 STORMWATER 200.54
Total Vendor METRO - INET:11,879.00
Vendor: Metropolitan Council
Fund: 602 SEWER
Department: 0000 General
602-0000-20802 SAC CHARGES - 7 SING FAM Metropolitan Council MET COUNCIL MONTHLY SAC CHRGS 17,395.00 None
602-0000-37220 SAC CHARGES - PROMPT PAY D Metropolitan Council MET COUNCIL MONTHLY SAC CHRGS (173.95)None
Total Department 0000 General 17,221.05
Department: 9450 SEWER
602-9450-43820 Monthly Waste Water Svcs D Metropolitan Council MONTHLY WASTE WATER SVCS DEF REV 69,222.83 None
Total Department 9450 SEWER 69,222.83
06/11/2026 04:17 PM Page:15/23
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
Vendor: Metropolitan Council
Fund: 602 SEWER
Total Fund 602 SEWER 86,443.88
Total Vendor Metropolitan Council:86,443.88
Vendor: MN CLN Services Inc
Fund: 101 GENERAL FUND
Department: 3100 Public Works
101-3100-43150 PW OFFICE CLEANING MN CLN Services Inc PW OFFICE CLEANING 343.72 None
Total Department 3100 Public Works 343.72
Department: 5200 Parks & Recreation
101-5200-43150 PW OFFICE CLEANING MN CLN Services Inc PW OFFICE CLEANING 66.56 None
Total Department 5200 Parks & Recreation 66.56
Total Fund 101 GENERAL FUND 410.28
Fund: 601 WATER
Department: 9400 WATER
601-9400-43150 PW OFFICE CLEANING MN CLN Services Inc PW OFFICE CLEANING 60.84 None
Total Department 9400 WATER 60.84
Total Fund 601 WATER 60.84
Fund: 602 SEWER
Department: 9450 SEWER
602-9450-43150 PW OFFICE CLEANING MN CLN Services Inc PW OFFICE CLEANING 34.84 None
Total Department 9450 SEWER 34.84
Total Fund 602 SEWER 34.84
Fund: 603 STORMWATER
Department: 9500 SURFACE WATER
603-9500-43150 PW OFFICE CLEANING MN CLN Services Inc PW OFFICE CLEANING 14.04 None
Total Department 9500 SURFACE WATER 14.04
Total Fund 603 STORMWATER 14.04
Total Vendor MN CLN Services Inc:520.00
Vendor: MN Dept of Labor & Industry
Fund: 703 CITY CENTER OPERATIONS (ISF)
Department: 0000 General
703-0000-44300 ELV-395518 Elevator Annual MN Dept of Labor & Industr ELV-395518 ELEVATOR ANNUAL OP - CITY 145.00 None
Total Department 0000 General 145.00
Total Fund 703 CITY CENTER OPERATIONS (ISF)145.00
Total Vendor MN Dept of Labor & Industry:145.00
Vendor: MN PEIP
Fund: 101 GENERAL FUND
Department: 0000 General
101-0000-21706 MONTHLY HEALTH INSURANCE P MN PEIP MONTHLY HEALTH INSURANCE PREMIUM 27,552.22 None
Total Department 0000 General 27,552.22
Total Fund 101 GENERAL FUND 27,552.22
06/11/2026 04:17 PM Page:16/23
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
Vendor: MN PEIP
Total Vendor MN PEIP:27,552.22
Vendor: Oakdale Rental Center Inc
Fund: 101 GENERAL FUND
Department: 3100 Public Works
101-3100-42120 PROPANE FILL Oakdale Rental Center Inc PROPANE FILL 16.04 None
101-3100-42120 PROPANE FILL Oakdale Rental Center Inc PROPANE FILL 16.04 None
Total Department 3100 Public Works 32.08
Total Fund 101 GENERAL FUND 32.08
Fund: 601 WATER
Department: 9400 WATER
601-9400-42120 PROPANE FILL Oakdale Rental Center Inc PROPANE FILL 16.04 None
Total Department 9400 WATER 16.04
Total Fund 601 WATER 16.04
Fund: 602 SEWER
Department: 9450 SEWER
602-9450-42120 PROPANE FILL Oakdale Rental Center Inc PROPANE FILL 16.05 None
Total Department 9450 SEWER 16.05
Total Fund 602 SEWER 16.05
Total Vendor Oakdale Rental Center Inc:64.17
Vendor: PIONEER LANDSCAPING LLC
Fund: 101 GENERAL FUND
Department: 3100 Public Works
101-3100-43150 STREETS - MOWING SERVICE PIONEER LANDSCAPING LLC MOWING SERVICE 4,024.98 None
Total Department 3100 Public Works 4,024.98
Department: 5200 Parks & Recreation
101-5200-43150 PARKS - MOWING SERVICE PIONEER LANDSCAPING LLC MOWING SERVICE 13,340.55 None
Total Department 5200 Parks & Recreation 13,340.55
Total Fund 101 GENERAL FUND 17,365.53
Fund: 601 WATER
Department: 9400 WATER
601-9400-43150 WATER - MOWING SERVICE PIONEER LANDSCAPING LLC MOWING SERVICE 1,399.14 None
Total Department 9400 WATER 1,399.14
Total Fund 601 WATER 1,399.14
Fund: 602 SEWER
Department: 9450 SEWER
602-9450-43150 SEWER - MOWING SERVICE PIONEER LANDSCAPING LLC MOWING SERVICE 2,075.07 None
Total Department 9450 SEWER 2,075.07
Total Fund 602 SEWER 2,075.07
Fund: 703 CITY CENTER OPERATIONS (ISF)
Department: 0000 General
703-0000-44013 CITY HALL - MOWING SERVICE PIONEER LANDSCAPING LLC MOWING SERVICE 367.20 None
Total Department 0000 General 367.20
06/11/2026 04:17 PM Page:17/23
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
Vendor: PIONEER LANDSCAPING LLC
Fund: 703 CITY CENTER OPERATIONS (ISF)
Total Fund 703 CITY CENTER OPERATIONS (ISF)367.20
Total Vendor PIONEER LANDSCAPING LLC:21,206.94
Vendor: POLICY CONFLUENCE, INC
Fund: 101 GENERAL FUND
Department: 1320 Administration
101-1320-43150 HALF PAYMENT NCS POLICY CONFLUENCE, INC HALF PAYMENT FOR NCS 12,100.00 None
Total Department 1320 Administration 12,100.00
Total Fund 101 GENERAL FUND 12,100.00
Total Vendor POLICY CONFLUENCE, INC:12,100.00
Vendor: RESOLUTE LAW LLC
Fund: 101 GENERAL FUND
Department: 1320 Administration
101-1320-43040 INTERNAL INVESTIGATION RESOLUTE LAW LLC INTERNAL INVESTIGATION 2,537.70 None
Total Department 1320 Administration 2,537.70
Total Fund 101 GENERAL FUND 2,537.70
Total Vendor RESOLUTE LAW LLC:2,537.70
Vendor: Safebuilt LLC
Fund: 101 GENERAL FUND
Department: 2400 Building Inspection
101-2400-43150 Inspector Contract Service Safebuilt LLC MAY 2026 INVOICE 700.00 None
Total Department 2400 Building Inspection 700.00
Total Fund 101 GENERAL FUND 700.00
Total Vendor Safebuilt LLC:700.00
Vendor: Short Elliott Hendrickson, Inc
Fund: 611 WATER - CAPITAL
Department: 8143 NORTH WTP SITE EVALUATION STUDY
611-8143-43030-8143 NORTH WTP SITE EVAL Short Elliott Hendrickson,NORTH WTP SITE EVAL 6,231.76 None
Total Department 8143 NORTH WTP SITE EVALUATION STUDY 6,231.76
Total Fund 611 WATER - CAPITAL 6,231.76
Total Vendor Short Elliott Hendrickson, Inc:6,231.76
Vendor: Shred Right
Fund: 101 GENERAL FUND
Department: 1320 Administration
101-1320-43150 Monthly Shredding Services Shred Right SHREDDING SERVICES 54.45 None
Total Department 1320 Administration 54.45
Total Fund 101 GENERAL FUND 54.45
Total Vendor Shred Right:54.45
Vendor: St Croix Scuba & Snorkeling
Fund: 101 GENERAL FUND
Department: 2220 Fire
06/11/2026 04:17 PM Page:18/23
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
Vendor: St Croix Scuba & Snorkeling
Fund: 101 GENERAL FUND
Department: 2220 Fire
101-2220-44040 ANNUAL SCUBA SERVICE St Croix Scuba & Snorkelin ANNUAL SCUBA SERVICE 307.50 None
Total Department 2220 Fire 307.50
Total Fund 101 GENERAL FUND 307.50
Total Vendor St Croix Scuba & Snorkeling:307.50
Vendor: Stabner Electric LLC
Fund: 101 GENERAL FUND
Department: 5200 Parks & Recreation
101-5200-44030 BALL FIELD LIGHT REPAIR Stabner Electric LLC BALL FIELD LIGHT REPAIR 479.25 None
Total Department 5200 Parks & Recreation 479.25
Total Fund 101 GENERAL FUND 479.25
Total Vendor Stabner Electric LLC:479.25
Vendor: Stantec Consulting Services Inc
Fund: 101 GENERAL FUND
Department: 8142 SALE OF OLD FIRE HALL
101-8142-43150-8142 OLD FIRE STATION ENVIRONME Stantec Consulting Service OLD FIRE STATION ENVIRONMENTAL PFAS T 12,230.44 None
Total Department 8142 SALE OF OLD FIRE HALL 12,230.44
Total Fund 101 GENERAL FUND 12,230.44
Total Vendor Stantec Consulting Services Inc:12,230.44
Vendor: T&T TRAILER SALES AND RENTAL
Fund: 410 VEHICLE REPLACEMENT
Department: 2220 Fire
410-2220-45500 UTV1 REPLACMENT - TRAILER T&T TRAILER SALES AND RENT UTV1 REPLACMENT - TRAILER 9,795.00 None
Total Department 2220 Fire 9,795.00
Total Fund 410 VEHICLE REPLACEMENT 9,795.00
Total Vendor T&T TRAILER SALES AND RENTAL:9,795.00
Vendor: Tennant Company
Fund: 101 GENERAL FUND
Department: 2220 Fire
101-2220-44040 SERVICE / MAINTENANCE Tennant Company SERVICE / MAINTENANCE 174.52 None
Total Department 2220 Fire 174.52
Department: 3100 Public Works
101-3100-44010 SERVICE / MAINTENANCE Tennant Company SERVICE / MAINTENANCE 34.90 None
Total Department 3100 Public Works 34.90
Department: 5200 Parks & Recreation
101-5200-44030 SERVICE / MAINTENANCE Tennant Company SERVICE / MAINTENANCE 34.90 None
Total Department 5200 Parks & Recreation 34.90
Total Fund 101 GENERAL FUND 244.32
Fund: 601 WATER
Department: 9400 WATER
601-9400-44030 SERVICE / MAINTENANCE Tennant Company SERVICE / MAINTENANCE 34.90 None
06/11/2026 04:17 PM Page:19/23
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
Vendor: Tennant Company
Fund: 601 WATER
Department: 9400 WATER
Total Department 9400 WATER 34.90
Total Fund 601 WATER 34.90
Fund: 602 SEWER
Department: 9450 SEWER
602-9450-44030 SERVICE / MAINTENANCE Tennant Company SERVICE / MAINTENANCE 34.90 None
Total Department 9450 SEWER 34.90
Total Fund 602 SEWER 34.90
Fund: 603 STORMWATER
Department: 9500 SURFACE WATER
603-9500-44030 SERVICE / MAINTENANCE Tennant Company SERVICE / MAINTENANCE 34.92 None
Total Department 9500 SURFACE WATER 34.92
Total Fund 603 STORMWATER 34.92
Total Vendor Tennant Company:349.04
Vendor: Tennis Roll Off LLC
Fund: 101 GENERAL FUND
Department: 3100 Public Works
101-3100-43840 REFUSE Tennis Roll Off LLC REFUSE 931.76 None
Total Department 3100 Public Works 931.76
Total Fund 101 GENERAL FUND 931.76
Total Vendor Tennis Roll Off LLC:931.76
Vendor: T-Mobile
Fund: 101 GENERAL FUND
Department: 2220 Fire
101-2220-43210 CAD / CELL DATA T-Mobile CAD / CELL DATA THRU 05/21/26 390.12 None
Total Department 2220 Fire 390.12
Total Fund 101 GENERAL FUND 390.12
Total Vendor T-Mobile:390.12
Vendor: Tri State Bobcat
Fund: 101 GENERAL FUND
Department: 3100 Public Works
101-3100-44040 PW WINDSHIELD REPLACEMENT Tri State Bobcat PW WINDSHIELD REPLACEMENT 1,509.65 None
101-3100-44040 PW_AIR FILTERS Tri State Bobcat PW_AIR FILTERS 81.60 None
Total Department 3100 Public Works 1,591.25
Total Fund 101 GENERAL FUND 1,591.25
Total Vendor Tri State Bobcat:1,591.25
Vendor: TruGreen LP
Fund: 101 GENERAL FUND
Department: 3100 Public Works
101-3100-43150 STILLWATER/JAMACA LAWN SER TruGreen LP LAWN SERVICES - MONTHLY 236.58 None
101-3100-43150 LAWN SERVICE - STREET TruGreen LP LAWN SERVICES - MONTHLY 487.79 None
06/11/2026 04:17 PM Page:20/23
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
Vendor: TruGreen LP
Fund: 101 GENERAL FUND
Department: 3100 Public Works
Total Department 3100 Public Works 724.37
Department: 5200 Parks & Recreation
101-5200-43150 LAWN SERVICE_PARKS TruGreen LP LAWN SERVICES - MONTHLY 5,988.59 None
Total Department 5200 Parks & Recreation 5,988.59
Total Fund 101 GENERAL FUND 6,712.96
Fund: 601 WATER
Department: 9400 WATER
601-9400-43150 LAWN SERVICE _ WATER TruGreen LP LAWN SERVICES - MONTHLY 927.11 None
Total Department 9400 WATER 927.11
Total Fund 601 WATER 927.11
Fund: 703 CITY CENTER OPERATIONS (ISF)
Department: 0000 General
703-0000-44013 LAWN SERVICE - CITY HALL TruGreen LP LAWN SERVICES - MONTHLY 209.69 None
Total Department 0000 General 209.69
Total Fund 703 CITY CENTER OPERATIONS (ISF)209.69
Total Vendor TruGreen LP:7,849.76
Vendor: Washington County
Fund: 101 GENERAL FUND
Department: 1910 Planning & Zoning
101-1910-43150 AGR - P710454 Washington County AGR - P710454 46.00 None
Total Department 1910 Planning & Zoning 46.00
Total Fund 101 GENERAL FUND 46.00
Total Vendor Washington County:46.00
Vendor: Xcel Energy
Fund: 101 GENERAL FUND
Department: 2500 Emergency Communications
101-2500-43810 ELECTRIC UTILITY - 51-4504 Xcel Energy 51-4504807-7 14.05 None
Total Department 2500 Emergency Communications 14.05
Department: 3100 Public Works
101-3100-43810 ELECTRIC UTILITY - 51-4504 Xcel Energy 51-4504807-7 1,014.47 None
101-3100-43811 51-6736544-2 - ELECTRIC UT Xcel Energy 51-6736544-2 - STREET LIGHTS 6,030.66 None
Total Department 3100 Public Works 7,045.13
Department: 5200 Parks & Recreation
101-5200-43810 ELECTRIC UTILITY - 51-4504 Xcel Energy 51-4504807-7 510.24 None
Total Department 5200 Parks & Recreation 510.24
Total Fund 101 GENERAL FUND 7,569.42
Fund: 601 WATER
Department: 9400 WATER
601-9400-43810 ELECTRIC UTILITY - 51-4504 Xcel Energy 51-4504807-7 293.27 None
Total Department 9400 WATER 293.27
06/11/2026 04:17 PM Page:21/23
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
Vendor: Xcel Energy
Fund: 601 WATER
Total Fund 601 WATER 293.27
Fund: 602 SEWER
Department: 9450 SEWER
602-9450-43810 ELECTRIC UTILITY - 51-4504 Xcel Energy 51-4504807-7 0.00 None
Total Department 9450 SEWER 0.00
Total Fund 602 SEWER 0.00
Fund: 703 CITY CENTER OPERATIONS (ISF)
Department: 0000 General
703-0000-43810 GAS UTILITY - 51-4504807-7 Xcel Energy 51-4504807-7 0.00 None
Total Department 0000 General 0.00
Total Fund 703 CITY CENTER OPERATIONS (ISF)0.00
Total Vendor Xcel Energy:7,862.69
06/11/2026 04:17 PM Page:22/23
INVOICE DISTRIBUTION REPORT BY VENDOR FOR THE CITY OF LAKE ELMO
GL Number
Invoice
Line Desc Vendor Name
Invoice
Description Amount
Check
Number
--- TOTALS BY FUND ---
101 GENERAL FUND 156,127.38
404 PARK DEDICATION 12,801.50
408 STREET MAINTENANCE 6,243.50
409 INFRASTRUCTURE RESERVE 1,527.50
410 VEHICLE REPLACEMENT 9,795.00
430 RAILROAD IMPROVEMENTS 420.00
440 TH36-LAKE ELMO AVE IMPROVEMENT 13,814.50
446 HUDSON BLVD IMP-SEG A-INWDHDRX 80.00
449 2025 STREET & UTILITY IMPROVEMENTS 2,710.00
450 STILLWATER AREA SCH DIST UTILITY IMPR 79.50
451 2026 STREET & UTILITY IMPROVEMENTS 47,590.00
601 WATER 27,379.22
602 SEWER 91,254.28
603 STORMWATER 2,119.46
611 WATER - CAPITAL 6,819.26
612 SEWER - CAPITAL 11,341.50
703 CITY CENTER OPERATIONS (ISF)3,993.67
803 ESCROW FUND 168,674.16
Total For All Funds:562,770.43
06/11/2026 04:17 PM Page:23/23
STAFF REPORT
DATE: June 4th, 2026
CONSENT
TO: Mayor and Councilmembers
FROM: Clarissa Hadler, Finance Director
AGENDA ITEM: Metropolitan Council Water Efficiency Grant Agreement
CORE STRATEGIES:
☐ Vibrant, inclusive, connected community
☐ Responsive, transparent, adaptive governance
☐ Managed Growth
☒ Efficient, reliable, innovative services
☒ Balanced Finances now and future
☐ Resilient Infrastructure
BACKGROUND:
ISSUE BEFORE COUNCIL:
Should the City Council approve the Grant Agreement with the Metropolitan Council for the Water Efficiency Grant?
PROPOSAL DETAILS/ANALYSIS:
The Metropolitan Council will reimburse 80% of the cost of the water efficiency replacement rebate program. We will
expand the program to apply to all grant eligible activities: Eligible water efficiency devices consist of the following:
Toilet replacement with a US EPA WaterSense labeled toilet
Irrigation controller replacement with a US EPA WaterSense labeled controller, either weather-based or soil
moisture-based
Clothes washing machine replacement with a US DOE Energy Star labeled clothes washing machine
Irrigation system audit by an Irrigation Professional certified by a US EPA WaterSense program
Staff will prepare advertisements, mailings, newsletters, online updates and social media updates to residents to
encourage participation in the program. Residents who are municipal water customers will be required to submit proof
of purchase of an eligible device and will receive reimbursement as a rebate posted to their water account the following
quarter. New construction and new developments are not eligible.
FISCAL IMPACT:
The grant provides for an initial reimbursement of up to $49,000. Additional funding is available if there is a greater level
of program participation than anticipated. The city must provide a 20% match ($12,250) of any Met Council grant funds
for a total two year budget of $61,250. In addition, the city and met council contributions cannot cover 100% of the cost
of the purchase. To simplify meeting this requirement, the city will ask that water customers cover an amount equal to
the sales tax associated with the purchase.
OPTIONS:
Approve the Clean Water Fund Grant Agreement with the Metropolitan Council
Do not approve the Clean Water Fund Grant Agreement with the Metropolitan Council
RECOMMENDATION: (if pulled from Consent)
If removed from the consent agenda:
Motion to approve the Water Efficiency Grant Agreement with the Metropolitan Council and authorize the City
Administrator to execute all necessary documents.
ATTACHMENTS:
Clean Water Fund Grant Award Letter
Clean Water Fund Grant Agreement
City of Lake Elmo METROPOLITAN COUNCIL
CLEAN WATER FUND GRANT AGREEMENT
Recipient: City of Lake Elmo
Grant No: SG-26E-03-14
Met Council Action: 2026-95 SW
Maximum Grant Amount: $ 49000
Recipient Match (20% of total program excluding low-income option): $ 12250
Recipient’s Authorized Representative:
Name: Clarissa Hadler
Mailing Address: 3880 Laverne Ave, Lake Elmo, MN 55042
Phone: 651-747-3909
Email Address: CHadler@lakeelmo.gov
This Clean Water Fund Grant Agreement (“Grant Agreement”) is entered into between the Metropolitan
Council, a public corporation and political subdivision of the State of Minnesota (“Met Council”) and the
Recipient named above.
RECITALS
1. Minnesota Session Laws 2025, Chapter 36, Article 2, Section 8(b), appropriated to the Met Council
$1,400,000 in funds from the Legacy Amendment's Clean Water Fund ("Clean Water Fund") for State
fiscal years 2026 and 2027, for water demand reduction grants to assist municipalities in the
metropolitan area with implementing water demand reduction measures to ensure the reliability and
protection of drinking water supplies.
2. The Met Council is authorized by Minnesota Statutes sections 473.129, subdivision 4 to apply for and
use grants from the State for any Metropolitan Council purpose and may dispose of the money in
accordance with the terms of the appropriation.
3. The Recipient is authorized to receive grants from the Clean Water Fund for a water demand reduction
program to implement measures to reduce water demand to ensure the reliability and protection of
drinking water supplies.
4. On May 13, 2026, the Met Council authorized the granting $1,399,000 of the appropriation to the
Recipients participating in the grant program.
5. The Recipient is authorized to receive grants from the Clean Water Fund for a water demand reduction
program to implement measures to reduce water demand to ensure the reliability and protection of
drinking water supplies.
6. The Recipient represents that it is duly qualified and agrees to perform all services described in this
Grant Agreement to the reasonable satisfaction of the Met Council.
GRANT AGREEMENT
1. Term of Grant Agreement.
1.1. Effective Date. The Effective Date of this Grant Agreement is the date this agreement is fully
executed, provided the Grant Agreement is fully executed on or after July 1, 2026. If the Grant
Agreement is fully executed prior to July 1, 2026, the effective date shall be July 1, 2026.
1.2. Grant Activity Period. The Grant Activity Period runs from the Effective Date through the
Expiration Date.
1.3. Expiration Date. The Expiration Date is the earlier of Recipient’s satisfactory fulfillment of
obligations or June 30, 2028.
1.4. Survival of Terms. The following clauses survive the expiration, termination or cancellation of
this Grant Agreement:
• 9. Liability and Insurance;
• 10. Audits;
• 11. Government Data Practices;
• 13. Data Availability;
• 14. Governing Law, Jurisdiction, and Venue;
• 16. Data Disclosure; and
• 18.7 Future Eligibility.
2. Duties, Representations and Warranties of Recipient and Use of Grant Funds.
2.1. The Recipient will conduct, administer and complete in a satisfactory manner and in accordance
with the terms of this Grant Agreement the program (“Recipient Program”) which is described in
Recipient's application to the Met Council for assistance under the Met Council's Clean Water Fund
grant program. The Recipient’s application is incorporated into this Grant Agreement as Exhibit A.
Recipient will perform the Recipient Program in accordance with the timeline in Exhibit B of this Grant
Agreement and to undertake the financial responsibilities described in Exhibit B which is incorporated
into this Grant Agreement. The Recipient must complete the Recipient Program as described in Exhibits
A and B. The Met Council makes no representation or warranties with respect to the success and
effectiveness of the Recipient Program. The Met Council acknowledges that Recipient Program work
may be limited to soliciting participation by its residents and businesses in the Recipient Program and
requires additional work by the Recipient only to the extent that residents and businesses choose to
participate in the Recipient Program, as described in Exhibit B.
The Grant Funds must be entirely passed through and can only be used for authorized rebates or grants
for qualifying activities.
2.2. Recipient Representations and Warranties. The Recipient represents and warrants to Met
Council, as follows:
A. It has the legal authority to enter into this Grant Agreement and to conduct and administer
the Recipient Program and use the Grant Funds for the purpose or purposes described in this Agreement.
B. It has taken all actions necessary for its execution of the Agreement and has provided to
Met Council a copy of the resolution by its governing body authorizing Recipient to enter into this
Agreement, if required. If a resolution is not required by the Recipient, Recipient shall provide the Met
Council documents acceptable to the Council indicating that the appropriate person(s) has authority to
enter into this agreement on behalf of the Recipient, such as a city policy or city ordinance.
C. It has the legal authority to undertake the Recipient Program, including the Recipient’s
financial responsibilities in Exhibit B.
D. Only its Authorized Representative may provide certifications required in this Grant
Agreement and submit pay claims for reimbursement of Recipient Program costs.
E. It will comply with all the terms of this Grant Agreement.
F. It will comply with all requirements of Clean Water Funding legislation and
appropriations, except for requirements that this Grant Agreement explicitly states will be handled by
the Met Council.
G. It has made no material false statement or misstatement of fact in connection with the
Grant Funds, and all of the information it has submitted or will submit to the Met Council relating to the
Grant Funds or the disbursement of any of the Grant Funds is and will be true and correct. It agrees that
all representations contained in its application for the Clean Water Fund Grant are material
representations of fact upon which the Met Council relied in awarding this Grant and are incorporated
into this Agreement by reference.
H. It is not in violation of any provisions of its charter or of the laws of the State of
Minnesota, and there are no material actions, suits, or proceedings pending, or to its knowledge
threatened, before any judicial body or governmental authority against or affecting it and is not in
default with respect to any order, writ, injunction, decree, or demand of any court or any governmental
authority which would impair its ability to enter into this Grant Agreement, or to perform any of the acts
required of it in the Agreement.
I. Compliance with the requirements of this Grant Agreement is not prevented by, is a
breach of, or will result in a breach of, any term, condition, or provision of any agreement to which it is
bound.
J. The Recipient Program will not violate any applicable zoning or use statute, ordinance,
building code, rule or regulation, or any covenant or agreement of record relating thereto.
K. The Recipient Program will be conducted in full compliance with all applicable laws,
statutes, rules, ordinances, and regulations issued by any federal, state, or political subdivisions having
jurisdiction over the Recipient Program.
L. It will comply with the financial responsibility requirements contained in Exhibit B.
M. It will furnish satisfactory evidence regarding these representations if requested by the
Met Council.
3. Time.
Recipient must comply with all time requirements described in this Grant Agreement. In the
performance of this Grant Agreement, time is of the essence.
4. Eligible Costs.
Eligible costs are those costs incurred by parties within the jurisdiction of the Recipient for 80%
of rebate or grant payments as defined in Exhibit B (and not including low-income cost assistance grant
activities). The Met Council will not reimburse Recipient for non-eligible costs. Any cost not defined
as an eligible cost or not included in the Recipient Program or approved in writing by the Met Council is
a non-eligible cost.
5. Consideration and Payment.
5.1 Consideration. The Met Council will reimburse the Recipient for eligible costs performed by the
Recipient during the Grant Activity Period up to the Maximum Grant Amount as specified in this
agreement. The Met Council bears no responsibility for any cost overruns that may be incurred by the
Recipient or any sub-recipients. The Recipient may be eligible to receive additional grant amounts or an
adjustment of the Maximum Grant Amount in accordance with the procedure in the Grant Amendment
Form attached and incorporated as Exhibit C. A fully executed Exhibit C will amend this Grant by the
amount in Exhibit C.
5.2. Advance. The Met Council will make no advance of the Grant Amount to Recipient.
5.3. Payment. To receive payment, the Recipient must submit a Reimbursement Request on forms
provided by the Met Council, including electronically scanned receipts to verify the cost of eligible
devices reported for each reporting period. Reimbursement Request must be submitted quarterly, even if
there are no eligible costs to report. The Recipient must describe its compliance with its the financial
requirements, work completed including specific addresses where work was done, and provide sufficient
documentation of grant eligible expenditures and any other information the Met Council reasonably
requests. The Met Council will promptly pay the Recipient after the Recipient presents to the Met
Council a Reimbursement Request and scanned copies of all receipts verifying the cost for all eligible
devices reported and the Met Council’s Authorized Representative accepts the invoiced services.
6. Conditions of Payment.
6.1. For each approved grant activity for which Recipient requests payment, Recipient must certify
the following to the Met Council:
(1) the device or other grant activity has been purchased or paid for during the Grant Activity
Period;
(2) Recipient has determined the device, grant activity, or resident (in cases of the low-income
cost assistance option), is eligible;
(3) Recipient received receipts for the device, installation cost, or other grant activity; and
(4) the purchase was not performed in violation of federal, state, or local law, or regulation.
6.2. Conditions Precedent to Any Reimbursement Request. The obligation of the Met Council to
make reimbursement payments is subject to the following conditions precedent:
A. The Met Council’s receipt of a Reimbursement Request/Progress Report for the funds
requested, and electronic copies of receipts verifying the cost for all eligible devices for that reporting
period;
B. If requested by the Met Council (in form and substance acceptable to the Met Council),
evidence that (i) the Recipient has legal authority to and has taken all actions necessary to enter into this
Agreement and (ii) this Agreement is binding and enforceable against the Recipient;
C. There is no Event of Default under this Grant Agreement or event which would constitute
an Event of Default but for the requirement that notice be given or that a period of grace or time elapse;
and
D. The Recipient has supplied to the Met Council all other items that the Met Council may
reasonably require to assure good fiscal oversight of state's funding through the Clean Water Fund.
7. Authorized Representative.
The Met Council’s Authorized Representative is:
Name: Henry McCarthy or successor
Title: Senior Environmental Scientist
Mailing Address: 390 North Robert Street
St. Paul, MN 55101
Phone: (651) 602-1946
E-Mail Address: henry.mccarthy@metc.state.mn.us
The Met Council’s Authorized Representative has the responsibility to monitor the Recipient’s
performance and the authority to accept the services provided under this Grant Agreement. If the
services are satisfactory, the Met Council’s Authorized Representative will certify acceptance on each
invoice submitted for payment.
The Recipient’s Authorized Representative is noted on the first page of this Grant Agreement. If the
Recipient’s Authorized Representative changes at any time during this Grant Agreement, the Recipient
must immediately notify the Met Council and within 30 days provide a new City resolution (if such
resolution is necessary) specifying the new Representative. If a resolution is not required by the City,
the City’s notification to the Met Council must be in writing.
8. Assignment, Amendments, Waiver, Grant Agreement Complete, and Order of Precedence.
8.1 Assignment. The Recipient may neither assign nor transfer any rights or obligations under this
Grant Agreement without the prior written consent of the Met Council and a fully executed Assignment
Agreement.
8.2 Amendments. Except as provided in this Section 8.2, any amendment to this Grant Agreement
must be in writing and will not be effective until it has been executed and approved by the appropriate
parties. If requested by the Recipient in writing, the Met Council may, at its sole discretion, authorize in
writing a minor change (administrative, compliance, or operational adjustments that do not alter the core
scope, objectives, or funding level of the award) to the Recipient Program in Exhibit A, without a formal
executed amendment to this Grant Agreement. Met Council further reserves the right to amend grant
agreements, in collaboration with grantee municipality, if quarterly reporting indicates rebate or grant
programs will not fully utilize grant awards within the grant period or for other documented purposes
that will advance the legislative objectives of the pilot program.
8.3 Waiver. If the Met Council fails to enforce any provision of this Grant Agreement, that failure
does not waive the provision or its right to enforce it.
8.4 Grant Agreement Complete. This Grant Agreement contains all negotiations and agreements
between the Met Council and the Recipient. No other understanding regarding this Grant Agreement,
whether written or oral, may be used to bind either party.
8.5 Order of Precedence. This Grant Agreement will be interpreted in the following order of
precedence:
(1) Grant Agreement excluding exhibits;
(2) Exhibit B; and
(3) Exhibit A.
9. Liability and Insurance.
9.1 Liability. The Recipient and the Met Council are each responsible for their own acts and the acts
of their employees and the results thereof. To the extent authorized by law, a party is not responsible for
the acts of the other party and the results thereof. The liability of the Parties is governed by Minnesota
Statutes Chapter 466 and other applicable laws. Neither Party waives any applicable limits on liability
or immunities.
9.2 Relationship of the Parties. Nothing contained in this Grant Agreement is intended or should be
construed in any manner as creating or establishing the relationship of co-partners or a joint venture
between the Recipient and the Met Council, nor will the Recipient be considered or deemed to be an
agent, representative, or employee of the Met Council in the performance of this Grant Agreement, or
the Recipient Program.
The Recipient represents that it has already or will secure or cause to be secured all personnel required
for the performance of this Grant Agreement and the Recipient Program. All personnel of the Recipient
or other persons while engaging in the performance of this Grant Agreement or the Recipient Program
will not have any contractual relationship with the Met Council related to the work of the Recipient
Program and will not be considered employees of the Met Council. In addition, all claims that may arise
on behalf of said personnel or other persons out of employment or alleged employment including, but
not limited to, claims under the Workers’ Compensation Act of the State of Minnesota, claims of
discrimination against the Recipient, its officers, agents, contractors, or employees will in no way be the
responsibility of the Met Council. Such personnel or other persons may not require nor be entitled to
any compensation, rights or benefits of any kind whatsoever from the Met Council, including but not
limited to, tenure rights, medical and hospital care, sick and vacation leave, disability benefits, severance
pay and retirement benefits.
10. Audits.
Under Minn. Stat. § 16C.05, subd. 5, the Recipient’s books, records, documents, and accounting
procedures and practices relevant to this Grant Agreement are subject to examination by the Met
Council and/or the State Auditor or Legislative Auditor, as appropriate, for a minimum of six years from
the termination date of this Grant Agreement.
11. Government Data Practices.
The Recipient and Met Council must comply with the Minnesota Government Data Practices Act, Minn.
Stat. Chapter 13, as it applies to all data provided by the Met Council under this grant contract, and as it
applies to all data created, collected, received, stored, used, maintained, or disseminated by the Recipient
under this Grant Agreement. The civil remedies of Minn. Stat. § 13.08 apply to the release of the data
referred to in this clause by either the Recipient or the Met Council. If the Recipient receives a request
to release the data referred to in this Clause, the Recipient must immediately notify the Met Council.
12. Workers’ Compensation.
The Recipient certifies that it is in compliance with Minn. Stat. § 176.181, subd. 2, pertaining to
workers’ compensation insurance coverage. The Recipient’s employees and agents will not be
considered Met Council employees. Any claims that may arise under the Minnesota Workers
Compensation Act on behalf of these employees and any claims made by any third party as a
consequence of any act or omission on the part of these employees are in no way the Met Council’s
obligation or responsibility.
13. Data Availability.
To the extent and as requested by the Met Council, Recipient agrees to comply with Minn.
Stat. § 114D.50, subd. 5 requirements for data collected by the Recipient Programs funded with money
from the Clean Water Fund that have value for planning and management of natural resources,
emergency preparedness and infrastructure investments, including but not limited to the requirement that
to the extent practicable, summary data and results of Recipient Programs funded with money from the
Clean Water Fund should be readily accessible on the internet and identified as a Clean Water Fund
Recipient Program. The Met Council will put overall summary information on the internet and will
encourage the Recipient put its municipality information on the web. Recipient understands and agrees
that Met Council may list its name and summary information on the internet or in any other Grantor
reporting.
Data collected by the Recipient Program, if any, funded with money from the Clean Water Fund that
have value for planning and management of natural resources, emergency preparedness, and
infrastructure investments must conform to the enterprise information architecture developed by the
Department of Information Technology Services. Spatial data must conform to geographic information
system guidelines and standards outlined in that architecture and adopted by the Minnesota Geographic
Data Clearinghouse at the Minnesota Geospatial Information Office. A description of these data that
adheres to the Department of Information Technology Services geographic metadata standards must be
submitted to the Minnesota Geospatial Information Office to be made available online through the
clearinghouse and the data must be accessible and free to the public unless made private under chapter
13. To the extent practicable, summary data and results of projects funded with money from the clean
water fund should be readily accessible on the Internet and identified as a clean water fund project.
14. Governing Law, Jurisdiction, and Venue.
This Grant Agreement will be construed and enforced under the laws of the State of Minnesota without
regard to its conflict of law provisions. The venue for any legal proceedings arising out of this Grant
Agreement will be the appropriate state or federal court in Ramsey County, Minnesota.
15. Termination.
The Met Council may cancel this Grant Agreement at any time, with or without cause, upon 30 days’
written notice to the Recipient. Upon termination, the Recipient will be entitled to payment for services
prequalified and satisfactorily performed before the termination notice.
16. Data Disclosure.
Under Minn. Stat. § 270C.65, subd. 3, and other applicable law, the Recipient consents to disclosure of
its federal employer tax identification number, and/or Minnesota tax identification number, already
provided to the Met Council, to federal and state tax agencies and Met Council personnel involved in the
payment of Met Council obligations. Recipient will require compliance with this Section 16 by
Recipient’s subrecipient of Grant funds and shall submit evidence of such compliance to Met Council as
requested.
17. Notices.
In addition to any notice required under applicable law to be given in another manner, any notices
required hereunder must be in writing and must be personally served or sent by email or United States
mail, to the Authorized Representative of the party to whom it is directed.
18. Miscellaneous.
18.1 Report to Legislature. As provided in Minn. Stat. § 3.195, the Met Council must submit a
report on the expenditure and use of money appropriated under the Clean Water Fund to the
legislature by January 15 of each year. The report must detail the outcomes in terms of additional
use of Clean Water Fund resources, user satisfaction surveys, and other appropriate outcomes. The
Recipient agrees to provide to the Met Council by January 1 of each year a report on any user
satisfaction surveys it has related to this Recipient Program, and other appropriate outcomes of the
Recipient Program as prescribed in Section 18.3 of this Agreement.
18.2 Supplement. The funds granted under this agreement are to supplement and shall not
substitute for traditional sources of funding. Recipient certifies to the Met Council that there was
and is no traditional Recipient sources of funding for the grant work, as described in Exhibit A.
18.3 Measurable Outcomes. A Recipient Program or program receiving funding from the Clean
Water Fund must meet or exceed the constitutional requirement to protect, enhance, and restore
water quality in lakes, rivers and streams and to protect groundwater and drinking water from
degradation. A Recipient Program or program receiving funding from the Clean Water Fund must
include measurable outcomes, as defined in Minn. Stat. § 3.303, subdivision 10, and a plan for
measuring and evaluating the results. A Recipient Program or program must be consistent with
current science and incorporate state-of-the-art technology. All information for funded Recipient
Program work, including the proposed measurable outcomes, must be made available for
publication on the web site required under Minn. Stat. § 3.303, subdivision 10, as soon as
practicable and forwarded to the Met Council and the Legislative Coordinating Commission under
the provisions of Minn. Stat. § 3.303, subd. 10. The Recipient must compile and submit all
information for funded Recipient Programs or programs, including the proposed measurable
outcomes and all other items required under Minn. Stat. § 3.303, subdivision 10, to the Met
Council and, if requested by the Met Council, the Legislative Coordinating Commission as soon as
practicable or by January 15 of the applicable fiscal year, whichever comes first.
18.4 Minn. Stat. § 16B.98. Grants funded by the Clean Water Fund must be implemented
according to section 16B.98 and must account for all expenditures.
18.5 Benefit to Minnesota Waters. Money from the Clean Water Fund may only be spent on
Recipient Programs that benefit Minnesota waters.
18.6 Website. If the Recipient has information on its website about the water efficiency grant
program under Minn. Stat. § 114D.50, the Recipient will when practicable in accordance with
Minn. Stat. § 114D.50, subd. 4(f) prominently display on the Recipient’s website home page the
Legacy logo accompanied by the phrase "Click here for more information." When a person clicks
on the Legacy logo image, the website must direct the person to a web page that includes both the
contact information that a person may use to obtain additional information, as well as a link to the
Met Council’s and Legislative Coordinating Commission Website required under section 3.303,
subdivision 10.
18.7 Future Eligibility. Future eligibility for money from the Clean Water Fund is contingent
upon the Recipient satisfying all application requirements related to Met Council’s fulfillment of
Minn. Stat. § 114D.50 as well as any additional requirements contained in Minnesota Session
Laws 2025, Chapter 36, Article 2, Section 8(b).
18.8 Prevailing Wages. The Recipient agrees to comply with all of the applicable provisions
contained in chapter 177 of the Minnesota Statutes, and specifically those provisions contained in Minn.
Stat. §§ 177.41 through 177.50, as they may be amended, modified or replaced from time to time with
respect to the Recipient Program. By agreeing to this provision, the Recipient is not acknowledging or
agreeing that the cited provisions apply to the Recipient Program.
18.9 Disability Access. Where appropriate, Recipient of clean water funds, in consultation with the
Council on Disability and other appropriate governor-appointed disability councils, boards, committees,
and commissions, should make progress toward providing greater access to programs, print publications,
and digital media for people with disabilities related to the programs the recipient funds using
appropriations made in this agreement.
18.10. General Provisions.
(i) Lawsuit. This Grant shall be canceled if a court determines that the appropriation
illegally substitutes for a traditional source of funding.
(ii) Termination Due to Lack of Funds. Recipient recognizes that Met Council’s obligation
to reimburse Recipient for eligible Recipient Program costs is dependent upon Met Council’s
receipt of funds from the State of Minnesota appropriated to Met Council under 2025 Session
Law, Chapter 40, Article 2, Section 8(b). Should the State of Minnesota terminate such
appropriation or should such funds become unavailable to Met Council for any reason, Met
Council shall, upon written notice to Recipient of termination or unavailability of such funds,
have no further obligations for reimbursement or otherwise under this Grant Agreement. In the
event of such written notice, Recipient has no further obligation to complete the Recipient
Program as required by this Grant Agreement.
18.11. Counterparts and Electronic Signatures. This Grant Agreement may be executed in any number
of counterparts, each of which when executed will be deemed to be an original and the counterparts will
together constitute one agreement. A copy of this Grant Agreement, including its signature pages, will
be binding and deemed to be an original. Electronic signatures using Adobe Sign or a similar program
will be deemed an original signature.
19. Default and Remedies.
19.1 Defaults. The Recipient's failure to fully comply with any of the provisions contained in this
Grant Agreement constitute an event of default ("Event of Default").
19.2. Remedies. Upon an event of default, the Met Council may exercise any one or more of the
following remedies:
a. Refrain from disbursing the Grant;
b. Demand that all or any portion of the Grant already disbursed be repaid to it, and upon
such demand the Recipient shall repay such amount to the Met Council; and
c. Enforce any additional remedies the Met Council may have at law or in equity.
IN WITNESS WHEREOF, the parties have caused this agreement to be executed by their duly
authorized representatives.
METROPOLITAN COUNCIL
By: ________________________________
Regional Administrator, successor, or delegate
Date: _______________________________
RECIPIENT:
The Recipient certifies that the appropriate
person(s) have executed the this agreement on
behalf of the Recipient as required by
applicable articles, bylaws, resolutions, or
ordinances.
By: ________________________________
_____________________________________
Printed Name and Title
Date: _______________________________
EXHIBIT A: Application from community
Page - 1
2026 – 2028
METROPOLITAN COUNCIL WATER EFFICIENCY GRANT PROGRAM
APPLICATION FORM
updated 02 / 25 / 2026
1. Applicant information:
MUNICIPALITY:
MUNICIPAL UTILITY:
MAILING ADDRESS:
2.Primary contact information:
Municipality primary authorized representative (all correspondence regarding the Water Efficiency
Grant Program should be addressed to individual named below):
Name:
Title:
Phone:
Email:
Mailing Address:
3. Secondary contact information:
Municipality secondary authorized representative:
Name:
Title:
Phone:
Email:
Mailing Address:
Page - 2 | METROPOLITAN COUNCIL
4. Water use information:
Municipal Total Per Capita Water Use, in gallons per person-day (2025):
Municipal Residential Per Capita Water Use, in gallons per person-day (2025):
Municipal Ratio of Peak Month to Winter Month Water Use (2025):
Program design
The following questions help describe the type of program your municipality is proposing, including
planned grant activities and optional program elements. For more information about the low-income
cost assistance option and grant activities on municipal properties, see the Guidelines document.
5.Will your proposed program be a rebate or grant program?
6.Will your proposed program include a low-income cost assistance option?
7.Will your proposed program include approved grant activities on municipal properties
(for example, device replacements or turfgrass conversion)?
8.If your proposed program includes approved grant activities on municipal properties,
does the funding supplement and not supplant? (Additional documentation may be
requested.)
9. Approximately what portion of your requested grant amount will be used for approved
grant activities on municipal properties?
Page - 3 | METROPOLITAN COUNCIL
10.Planned grant activities
Which eligible grant activities will your program include? Please provide an estimated number of device
replacements/other grant activities for each category you plan to include in your program.
Grant activity Property type
Residential Commercial Municipal Indoor water use Toilet replacement
Clothes washer replacement
Dishwasher replacement
Showerhead replacement
Faucet replacement or faucet accessory Outdoor water use Irrigation system audit*
Irrigation controller replacement*
Irrigation spray sprinkler body replacement*
Turfgrass conversion/replacement
*Please note, the Met Council strongly encourages an irrigation system audit be conducted before the
replacement of an irrigation controller or spray sprinkler bodies. An initial audit ensures the user has
information for proper set-up and operation of their irrigation system.
11.Estimated water savings per device from WaterSense and Energy Star (if available) will auto-
populate in quarterly reporting forms to establish baseline consistency in estimates. Some
municipalities may have developed (or plan to develop) specific water savings calculations
based on household size, age of device being replaced, and other factors. Municipalities are
welcome to submit water savings estimates other than those provided by the WaterSense and
Energy Star programs. If your municipality has plans to calculate estimated water savings
in-house or using an external resource, please describe below.
Page - 4 | METROPOLITAN COUNCIL
12.If your proposed program includes grant activities at municipal properties, please walk
through your plans for device replacements and/or turfgrass conversion. In the case of
turfgrass conversion, please describe where the work will occur, area removed, species
removed, area replaced, species replaced, watering and maintenance needs, and
estimated annual gallons of water saved (with explanation of estimate).
Page - 5 | METROPOLITAN COUNCIL
Program budget and administration
13.Please outline the amount of funding your municipality is requesting, including – if
applicable – an estimate of funds that will be used for low-income cost assistance (no
municipality match required).
Grants will be made available in amounts with a minimum of $5,000 and a maximum of $75,000. In the
event that there are unused or returned funds, municipalities may apply for a grant amendment to
increase their award beyond $75,000 (at the discretion of Met Council). Additionally, if a municipality
offers low-income cost assistance, it can apply for an additional $10,000 (max grant of $85,000).
A Requested grant amount
(must be 80% of row C):
B Required municipality matching amount
(must be 20% of row C):
C Traditional grant program subtotal
(row A + row B):
D (OPTIONAL) Low-income cost assistance requested amount
(100% covered by Met Council funds):
E Total program budget
(row C + row D):
Example calculation:
A Requested grant amount
(must be 80% of row C): $16,000
B Required municipality matching amount
(must be 20% of row C): $4,000
C Traditional grant program subtotal
(row A + row B): $20,000
D (OPTIONAL) Low-income cost assistance requested amount
(100% covered by Met Council funds): $5,000
E Total program budget
(row C + row D): $25,000
Page - 6 | METROPOLITAN COUNCIL
14.Please outline what cost coverage your municipality plans to offer for each of the
selected grant activities.
For example: 70% of the cost of a toilet, up to a maximum of $200. Limited to 2 per household.
15.Please indicate ways in which you will advertise your program and water conservation.
(Examples to be provided in program work plan.)
Newsletter Radio
Flyer in water bill Television
Email Newspaper
Tabling at events TikTok
Municipality website Instagram
Billboard / physical display Facebook
Nextdoor
Other
16. Work plan
In your application submission, please attach a work plan that details the municipality’s
schedule, strategy for promoting the program and communications with potential participants –
including example communications, program administration, and spending down the requested
grant amount by 6/30/28.
Example work plan structure:
Task description Responsible
person
Start date Completion
date
See last page of this PDF
Page - 7 | METROPOLITAN COUNCIL
Evaluating applications
Program proposals will be evaluated based on the answers provided in the application form as well as
the attached work plan. Strong applications will include clear answers to the questions in the application
form and a thoughtful work plan that outlines strategies for structuring, administering, and promoting (if
applicable) the program. For municipalities intending to conduct grant activities on municipal property,
applications should include intended plans for device/landscape installation and estimated hours/cost of
labor (whether being done by the municipality or a contractor).
In the event that funds requested exceed funds available, the following criteria will be used to determine
the amount granted to a given municipality.
• Municipal residential per capita water use
• Municipal ratio of peak month to winter month water use
• Estimated water savings from proposed program
Additionally, municipalities may be asked to provide additional information and/or be awarded less than
their requested grant amount if their application is lacking detail, a clear work plan, etc. In future grant
cycles, a past participant’s record of spending down their award may be used to inform award amounts.
Applications are due by April 13, 2026
2026-2028 Water Efficiency Grant Work Plan
City of Lake Elmo
1. Submit Grant Application, Approve Grant Agreement
Responsible Party - Finance Director
Due Date: 4/17/2026
2. Update and expand program advertisements for print newsletter, e-newsletter,
social media, and utility bill updates
Responsible Pa rties - Communications Coordinator, Public Works, Finance Teams
Due Date: Ongoing
3. Rebate Program Administration: Processing applications and applying rebates to
utility accounts.
Responsible Parties – Finance Analyst and Finance Department
Due Date: As Needed
4. Quarterly Reporting to Metropolitan Council
Responsible Parties: Finance Analyst/Finance Director and City Administrator
Due Date: End of each Quarter
THE ITY OF LAKE ELMO
Weekly News & Updates
Friday, April 17, 2026
Lake Elmo City Hall Public
Meetings
Parks Commission Meeting
Monday, April 20, 2026 - 6:30 p.m.
City Council Meeting
Tuesday, April 21, 2026 - 7:00 p.m.
Meetings are held at City Hall, 3880 Laverne
Ave N., Lake Elmo, MN 55042. Changes or
cancellations will be posted
at La keelmo.gov/calendar.
https://www.lakeelmo.gov/calendar].
How to Watch
Watch online
https://www..youtube.com/(@CitvofLakeElm
oMN/videos] or on cable television SCCTV
https://vod.scctv.org/internetchannel/?
channel=101
Find meeting agendas and minutes at the
City of Lake Elmo, MN
https://www.lakeelmo.gov agendacenterI
2026 Lake Elmo Roadwork and Construction Updates
Minnesota's Other Season -
Road Construction
Welcome to Minnesota's other season —road
construction ?,
As roadwork ramps up across the
community, we'll keep you informed on
projects, timelines, and any impacts
throughout the summer. Stay tuned for
updates to help you plan ahead and travel
safely!
Road Projects:
Intersection of Trunk Highway 36 and Lake Elmo
Avenue (County State Aid Highway 17) located
in the Cities of Grant and Lake Elmo will begin
construction this month, clearing trees around
the highway. A preconstruction open house is
set for May, and highway construction begins
in June. This project will be ongoing through
the fall of 2027. Visit Washington County's Road
update here.
CSAH 14 (Stillwater Boulevard) will be closed to
westbound traffic from 39th Street to Gorman's
Restaurant. The anticipated start date of this
work is May 26th and it will be in place for two
months. The detour will be 39th Street to Lake
Elmo Avenue.
Now Hiring: Three Full -Time
Fire Captains
The City is excited to announce an
opportunity to join our team as we hire three
full-time Fire Captains. This is a key
leadership role within the department,
responsible for guiding personnel,
overseeing daily operations, and ensuring a
high level of service to the community.
Fire Captains play a vital role in emergency
response, training and development, and
maintaining safety standards across all
operations. We are seeking experienced,
motivated professionals who are committed
to leadership, teamwork, and public service.
This is a unique opportunity to step into a
leadership position and help shape the
future of our fire department.
Join our team and lead with integrity,
professionalism, and dedication.
Visit Lakeelmo.gov jobs.aspx
Lakeelmo.gov jobs.aspx1 for full job
details and application information.
Mosquito Control Field Season
Underway
The Metropolitan Mosquito Control District
MMCD) has begun its field season.
Residents may see trucks, helicopters,
drones, and staff working in neighborhoods,
parks, and wetlands.
Field staff wear bright yellow safety vests
and carry identification. As part of routine
monitoring and treatment, they may enter
properties without notice to check standing
water and control mosquito populations. All
work is conducted by trained professionals
using methods safe for people, pets, and the
environment.
To learn more or report mosquito concerns,
visit MMCD's website
https://www.mmcd.org/] or contact their
office directly.
NWiAl
National Work Zor
Awareness Week
CELEBRATE
EARTH DAY 2026
Lake Orrids Amual
Arbor Day Tree Gwea"
Sabrrck y April 25, 2026
National Workzone Awareness
Week - April 20-24
As the official start of road construction,
Monday marks the start of ATSSA's National
Work Zone Awareness Week, an annual
reminder that safe actions save lives! !
Did you know that over 100,000 crashes
occur in work zones annually? Workers,
commuters, and pedestrians are all
affected. Let's keep roadway workers and
each other safe. Your actions behind the
wheel can be forever. When you see the
orange cones, it's a sign to put down the
phone and slow down.
Because everyone deserves to make it
home. #NWZAW #SafeWorkZonesForAll
Celebrate Earth Day
Celebrate Earth Day outdoors with
Washington County Parks on Tuesday, April
22. In honor of the day, park entry fees will be
waived - making it the perfect opportunity to
explore county parks and trails and
reconnect with the environment.
Visit Washington County Parks webpage
https: washingtoncountymn.gov/493/Free
Admission-Days-in-the-Parks]for more
information. #LakeElmoParkReserve
EarthDay
Celebrate Arbor Day with Us
Celebrate Arbor Day with us! Join the City of
Lake Elmo at Public Works on Saturday, April
25 from 8-10 a.m. to receive a free tree.
This annual Arbor Day Tree Giveaway is a
City -sponsored event.
Public Works Address:
3445 Ideal Ave. N.
Lake Elmo, MN 55042
Must be a Lake Elmo resident to participate.
Elmo's Pup Park Clean -Up Day
After you pick up a tree Saturday at Public
Works, meet us at Lake Elmo's Pup Park to
help spruce up the park.
Bring your work gloves, some scoops, extra
bags, and community spirit as we work
together to keep this favorite spot clean,
safe, and enjoyable for all —both two -legged
and four -legged visitors.
Volunteers of all ages are welcome. It's a
great way to give back, meet neighbors, and
enjoy the outdoors.
We hope to see you there! (photo credit Nick
Narusiewicz)
Elmo's Pup Park
Saturday, April 25, 2026
10 a.m. - 12:00 p.m.
4259 Jamaca Ave. N,
Lake Elmo, MN 55042
Friends Group Forming for
Schiltgen Park
Meet up at the Schiltgen Park sign on
Saturday, April 25th,10 am, if you are
interested in working together as Friends of
Schiltgen Park. We will talk a walk on the
trails and pick up any loose garbage we see,
so bring a garbage bag to help with the
cleanup.
Visit https://www.sminc-lake-
elmo.org schiltgen-park
https://www.sminc-lake-
el mo.orgschiltgen-park] to learn more. Public
Works is Hiring! Looking
for a hands-on career where you can
make a visible impact in your community?
The City is currently hiring for Public
Works positions! From maintaining streets
and utilities to caring for parks and public
spaces, our Public Works team plays a
vital role in keeping the community safe, functional,
and beautiful. If
you enjoy working outdoors, operating equipment,
and being part of a dedicated team,
we encourage you to apply today. Visit
Lake Elmo Jobs to learn more and apply.
We also have an opportunity for a seasonal
employee this summer.
Visit Lakeel mo.gov jobs. aspx https://
www.lakeelmo.gov/Jobs.aspx]to learn
more an apply. Nature
Center / Bell Museum Mash -
Up! Join
us Saturday, April 25, from 10 a.m. to 12 p.
m. at the Sally Mazara Interpretive Nature Center
for a Nature Center/Bell Museum mash -
up. Enjoy hands-on science activities led
by Bell Museum volunteers —free to attend (
donations appreciated). We'
re also partnering with University of Minnesota
Master Naturalists for the City Nature
Challenge, featuring a live bioblitz at Sunfish
Lake Park. Learn how to participate using
the Naturalist app. Activities
include Engineer a Bird Beak, Soil Cores,
Rocket Engineers, Cloud Formation, and
more. Visit
Sally Manzara Interpretive Nature Center [
https://sminc-lake-elmo.org] for more
information. Utility
Rate Adjustments Take Effect
in April To
support ongoing infrastructure and operations,
the City Council approved utility rate
adjustments effective in April: water rates
will increase by 20%, sewer rates by 15%,
and a stormwater service rate will be added
at 8%. The average residential bill is expected
to rise about 14%, or about $7 per month,
based on typical usage. To
streamline bill payments, you can register online
to manage your account, set up autopay,
make payments, or choose paperless
billing. Just follow this link https://
bsoonline.com/SiteSearch/Advance dRecordSearch?
advancedRecordSearchSessionGuid=
46a5e 4e7-
3c53-42c2- b1c0- aed6lc00d746&
uid=3270] to the new Utility Billing
Portal at BS&A.
C'.
Visit the Utility Rates page
https://www.lakeelmo.gov/226/Utility_
Rates]on the website to learn more.
Shredded Paper Reminder
Did you know shredded paper cannot be
recycled in your curbside recycling bin.
What can you do with it? Washington County
hosts one -day collection events at
Mahtomedi Middle School Ballfields April
25, and Lily Lake Ice Arena in Stillwater May
16 and you can get up to four boxes of
shredded paper recycled there. See the
Washington County One Day Collection
events to learn more.
https:/f www.washingtoncountymn.gov 194
2/One- Day -Col lection- Events]
North Yard Waste Summer
Hours
Summer hours are now in effect for the North
Yard Waste site. Leaves, grass clippings,
brush, tree waste, and other plant materials
are accepted from Washington County
households. No Business waste.
Visit WashCoRecycles.com/YardWaste
http://www.washcorecycles.com/YardWast
e ].
Irrigation Restrictions Continue
This Year
Now that spring is here, please remember
the irrigation restrictions affecting The City of
Lake Elmo will continue again this year.
To learn more about zone schedules visit the
website.
https://www.lakeelmo.gov/261/Watering-
Irrigation].
What Do My Taxes Pay For?
The City Council adopted the 2026 Budget
on December 16, 2025. City Finance staff
Rom` 1.—.`y?".f^•
have developed a downloadable property
tax calculator that estimates 2026 city taxes
no other jurisdictions) on your home. It
shows approximately how much of your
taxes are allocated to each service area.
Check it out here.
https://www.lakeelmo.gov 230 Property_
Tax -Calculator].
If you need to search your property, you can
view the Washington County Property Tax
Search here. [https://mn-
washington.publicaccessnow.com/j
City of Lake Elmo 13880 Laverne Ave. N. I Lake Elmo, MN 55042
https://www.lakeelmo.gov]www.lakeelmo.gov
https: / /www.la keel mo.gov].
f Share on Facebook y Share on Twitter ® Share via Email
Copyright 2026 The City of Lake Elmo. All Rights Powered by
Reserved. C CIVICSEND3880LaverneAve. N, Lake Elmo, MN 55042
INSIDE THIS ISSUE
2026 Budget summary
ULI / TAP project
2026 Streets projects
Boulevard tree program
New utility billing platform
Message from the Mayor
Reminders
Winter parking ordinances remain in effect through March 31.
Public Works will be working on storm water maintenance in
February, parks spring cleanup in March and April, pothole
patching and street sweeping in April, among other projects.
Lake Elmo’s Pup Park will see improvements late this spring, with
both the parking lot and the water access area leading to the trails
scheduled to be paved.
Stay connected with Lake Elmo by signing up for email or text
notifications. Receive The Fresh weekly newsletter, meeting
updates, events, job postings, road construction news, and public
hearing notices. Visit lakeelmo.gov and click the Notifications
button on the homepage.
VOLUME16WINTER2026THESOURCETHE
SOURCETHE SOURCE PHOTOCREDITS: LEO A. DALY AND
TOM GRADY City leaders recently came together to plan for the year ahead and advocate
for Lake Elmo at the state level. The mayor, City Council members, and city staff met
with Rep.Wayne Johnson and Sen. Judy Seeberger to discuss Lake Elmo’s
2026 legislative priorities and how state partnerships can support the community’s long-
term goals.At the top of the list was water quality and sustainability, reflecting Lake
Elmo’s continued commitment to protecting its lakes, groundwater, and natural
resources for future generations. Leaders also emphasized the need for reliable
water treatment and long-term funding solutions to ensure safe, resilient infrastructure as
the
city grows.Transportation was another key focus, with discussion centered on the
State Highway 36 / Lake Elmo Avenue road project and its importance for safety,
access, and economic vitality. The meeting provided an opportunity to share Lake Elmo’
s priorities directly, strengthen relationships at the state level, and continue
advocating for investments that support a sustainable, well-
connected community.Lake Elmo leaders set 2026
A MESSAGE FROM THE MAYOR
Reflecting on progress and
looking ahead
As we move forward together, I want to take a
moment to reflect on what we accomplished as
a community over the past year and share what
residents can expect in the year ahead. Lake
Elmo continues to be a city defined by strong
community spirit, thoughtful planning, and a
shared commitment to preserving what makes
our city such a special place to live.
A Year of Community and Celebration
One of the greatest strengths of Lake Elmo is
our sense of community, and this year was filled
with memorable events that brought neighbors
together. Our July 4th Kids Parade once again
showcased the joy and creativity of our
youngest residents and remains a cherished
tradition for families across the city. We also
proudly celebrated Lake Elmo’s 100th Year
Anniversary, a milestone that honored our
history while reminding us how far we have
come together. The year concluded with Light
Up Lake Elmo, which brought warmth, music,
and holiday cheer to our downtown and
highlighted the generosity and togetherness
that define our community.
These events would not be possible without the
dedication of volunteers, city staff, local
organizations, and residents who give their time
and energy to make Lake Elmo a welcoming
place to live.
Investing in Infrastructure and Public
Services
This year also marked important progress on
roadway and infrastructure improvements
across the city. We successfully completed
several projects to maintain and improve
essential services, including the repair of a
sanitary sewer in the southwest part of the city,
which had been a long-standing maintenance
concern. Addressing issues like this proactively
helps protect public health, ensures system
reliability, and saves costs over the long term.
Traffic Planning to Support a Growing
Community
Looking ahead, traffic planning will be an
important focus as our community continues to
grow. Residents will see future traffic changes
at the intersections of 10th Street/CSAH 10 and
Lake Elmo Avenue/CSAH 17. These changes
will begin with a temporary wooden pole traffic
signal system, which will allow traffic operations
to be managed safely and efficiently in the near
term. Washington County is designing these
improvements to handle anticipated increases
in traffic related to the new elementary school,
which is expected to open in fall 2026. These
interim measures will help ensure safety for
students, families, and commuters while
longer-term solutions are finalized.
Major Projects on the Horizon
Later this year, Washington County will begin
the TH 36 and Lake Elmo Avenue Project, a
significant investment that will improve safety,
traffic flow, and connectivity in one of our most
heavily traveled areas. At the same time, we
remain focused on long-term water treatment
solutions for PFAS in our city water system.
Ensuring safe, reliable drinking water is one of
the City’s highest priorities, and we are
committed to responsible, sustainable solutions
that protect public health today and well into
the future.
Moving Forward Together
None of these accomplishments—or the
important work ahead—would be possible
without the support and engagement of our
residents, businesses, and city staff. Your
involvement, feedback, and care for Lake Elmo
make a meaningful difference.
Thank you for being part of this community and
for helping shape a strong, resilient future for
Lake Elmo. I look forward to another year of
progress, partnership, and pride in the city we
all call home.
With gratitude,
Charles Cadenhead
Mayor of Lake Elmo
Page 2 The Source | Winter 2026 Lakeelmo.gov
ADMINISTRATION
Finance departmentimplementsnewbillingsoftware
The look of your utility bills is about to change!
The old-style postcards are no more.
Be on the lookout for an envelope from the City of
Lake Elmo, which will include a full-size utility
statement as well as other pertinent and timely
information for City residents.
You’ll find a much more detailed statement as well
as details on how to sign up for the new platform,
paperless billing, and autopay!
Understanding franchise fees in Lake Elmo
Under Minnesota law, cities may charge utility companies a franchise fee for using public
rights-of-way to deliver gas and electric service. These public areas—typically located along
roadways—are used for utility lines, construction access, and snow storage. The City of Lake
Elmo has franchise agreements with Xcel Energy and CenterPoint Energy that allow these
companies to place infrastructure in the right-of-way to serve local customers.
Lake Elmo’s current franchise fees were established through an ordinance mutually agreed
upon by the City and the utility companies in 2025.These fees help the City offset the rising
costs of providing essential public services without increasing property taxes or imposing
special assessments on homeowners. By spreading costs across all gas and electric users,
franchise fees create smaller individual contributions while ensuring those who benefit from
city services help support them.
Revenue collected from franchise fees is evenly divided, with 50 percent dedicated to
infrastructure improvements and 50 percent supporting the City’s Parks Capital Fund—helping
maintain and invest in community assets that residents enjoy every day.
Page3TheSource | Winter 2026
City Updates
Some voters in Lake Elmo will see a new location this fall
Precinct 2 voters, who have been voting at the old city
hall building, will move to Rockpoint Church, providing
voters with a convenient and accessible new location this
fall on Election Day.
Residents assigned to this polling place will receive
official notification with updated details prior to the
election. Voters are encouraged to review their notice or
check their polling location in advance to ensure a
smooth voting experience.
Lakeelmo.gov
FINANCE
Page 4 The Source | Winter 2026 Lakeelmo.gov
2026 Budget summary
The city’s budget is a financial plan that
prioritizes high-quality services while remaining
fiscally responsible. The process to develop the
budget is a collaborative effort of the city
finance team, management team, and city
council. Careful planning and preparation
ensure our core values guide the way. The 2026
city budget is $8,859,606.
2026 Property tax levy
The overall City Levy is made up of the
General Fund Levy, Debt Levy, and Capital
Levy. The change from 2025 to 2026 is
1,413,766, or 14.02%.
Where do my taxes go?
The median home value
increased from $581,700 for tax
year 2025 to $585,700 for tax
year 2026.
When applying the estimated tax
rate to a median value home, you
would see an increase of $179 in
city tax for the year, or less than
15 per month.
Tax impact on MVHThe 2026 Lake Elmo
operations budget is shaped by several key
cost drivers that support essential
city services. Personnel costs remain the
most significant factor,reflecting competitive
wages, benefits, and staffing needed to
maintain service levels amid a
growing community. Inflationary increases in
contracts, supplies, and equipment continue to
impact Public Works,Parks, and
Public Safety operations. Technology and software
investments are also driving costs as the
City modernizes systems to improve
efficiency, transparency, and customer service. Additionally,
rising costs for utilities, facility
maintenance, and fleet operations contribute
to overall operational needs. Together, these
drivers ensure Lake Elmo can continue
delivering high-quality services while responsibly
planning
for
the
future.
2026 LAKE ELMO
Budget & Tax
Levy 2025 2026 General Fund $5,588,958 $
6,300,000 Debt Service $3,251,728 $
3,417,785 Capital $1,243,333 $
1,780,000 Total Levy $10,084,019 $
11,497,785 Local Tax Rate 26.
Lake E lm o co mmuni ty solar garden
now power s local hom es
The City of Lake Elmo continues to pursue practical,
locally focused sustainability initiatives that support long-
term community well-being.
A recent example is the Lake Elmo Community Solar
Garden, developed by Cooperative Energy Futures. The
project provides residents with access to clean, affordable,
renewable energy without upfront costs or the need for
rooftop installation.
The solar garden is located on land north of Sunfish Lake,
owned by Lake Elmo resident and Economic Development
Authority Commission Chair Tony Manzara. Revenue from
the solar lease will help fund the Sally Mazara Interpretive
Nature Center in the long term.
The project also participates in the state’s Low- and
Moderate-Income Accessible Community Solar Garden
Program, which requires at least 30% of the solar capacity
to serve qualifying households. According to Andrew
Ulasich of the Minnesota Department of Commerce,
participants are guaranteed savings on their utility bills.
Overall, members of Cooperative Energy Futures typically
see energy cost savings of 10–20%. Subscribers saw their
first bill credits in December, and the project is now fully
subscribed.
Page5TheSource | Winter 2026
Lake Elmo EconomicDevelopmentAuthorityChairTonyManzaraandcouncilmemberJeffHoltzcuttheribbonforthelaunchoftheCommunitySolarGarden.
Kickstart your plastic-f ree journey: TakethePlastic-Free Challenge
With so many single-use plastic items in our lives, avoiding
them can feel overwhelming. Fortunately, there is a lot we
can do to help create a world with less plastic. Are you up for
the challenge? Join the Plastic-Free Challenge
tcplasticfree.ecochallenge.org) to explore what’s possible.
During the one-month challenge, you learn about plastic
recycling, make plastic-free swaps, and advocate for
changes in your community. By joining a community acting
together, you’ll see how our individual actions add up to a big
impact!
About the Plastic-Free Challenge
The Plastic-Free Challenge is a month-long effort starting
February 1 to reduce how many plastics you use in your life
in ways that best fit your lifestyle and have the most impact
on reducing your footprint.
The challenge has over 80 actions to choose from in eight
categories. Learn more, sign up, and get ready to kickstart
your plastic-free journey at tcplasticfree.ecochallenge.org.
Lakeelmo.gov
COMMUNITY DEVELOPMENT
CITY PROJECTS
Page 6 The Source | Winter 2026
As part of the City’s Street Capital Improvement
Program, the City of Lake Elmo has identified its
2026 Street Improvement Projects. Work will
take place in the Lake Elmo Heights and Eagle
Point Creek Estates neighborhoods and will
focus on preserving existing streets through
targeted roadway and drainage improvements.
Planned work includes reclaiming the existing
pavement, installing a new concrete curb and
gutter, and placing a new bituminous surface
over the reclaimed aggregate base. Storm sewer
maintenance and repairs are also included. No
street widening or geometric changes are
proposed, and “No Parking” signage will be
installed in cul-de-sac circles in accordance with
the City’s Parking Restriction Guidance Policy.
No municipal sanitary sewer extensions are
planned, as there is no publicly owned sanitary
sewer in the project areas, and all streets are
located outside the City’s MUSA boundary.
Existing public water mains, installed
approximately 20 years ago, are in good
condition with no history of issues and will not
require improvements at this time.
Construction schedules and potential impacts will
be communicated in advance, and access to
homes will be maintained as much as possible
throughout the construction season. A pre-
construction meeting is planned for March, with
final completion anticipated in October 2026.
Visit the Public Works & Engineering page at
lakeelmo.gov for project updates and additional
information.
2026 Lake Elmo Streets Projects
Planning for the Future: ULI
TAP Study Looks at 180 Acres
in Lake Elmo
The City of Lake Elmo is taking a long-
range, community-driven approach to
planning approximately 180 acres of land
near the Public Works facility. In November
2025, the City partnered with ULI Minnesota
through its Technical Assistance Panel
TAP) program to evaluate how the site
could best support Lake Elmo’s future.
The panel’s recommendations reflect
community input and focus on fiscal
strength, jobs and services, housing options,
sustainability, and preserving Lake Elmo’s
character.
The concept includes a phased mix of
business, limited commercial, and housing
uses, with strong attention to buffering, open
space, and trail connections.
The TAP study does not approve
development. Any future proposals would
involve additional public engagement and
City Council review.
Lakeelmo.gov
PUBLIC WORKS
Overuse of winter de-icers is harming Minnesota’s lakes, wetlands, streams, and groundwater, and
just one teaspoon of de-icing salt can permanently pollute five gallons of water.
Created by the Hennepin County Chloride Initiative and Metro Watershed Partners, the Low Salt,
No Salt Minnesota initiative helps communities maintain winter safety while reducing harmful
chloride pollution. Chlorides are difficult to remove once they enter the environment and can damage
infrastructure, landscaping, and flooring; plus salt also harms fish and other aquatic life, degrades
drinking water sources, and contributes to blue-green algae blooms.
Research from the University of Minnesota shows that about 75% of de-icer stays where it’s applied,
where it can damage soil and prematurely age pavement and concrete. When temperatures are very
cold, salt is often ineffective, making alternatives such as sand or chicken grit a better choice.
Chicken grit provides traction without harming the environment and is easy to sweep and reuse.
Use salt wisely this winter:
Shovel early to prevent snow from turning to ice
Use sand or chicken grit for traction when it’s below 15°F
Apply salt only where needed—one coffee cup covers a 20-foot driveway
Using less salt helps keep walkways safe, saves money, and protects Lake Elmo’s water resources.
Page7TheSource | Winter 2026
Use less salt this winter to protect our water
University of Minnesota tests
low input grass in Lake Elmo
To reduce water use and fertilizer, the University
of Minnesota began researching various low-input
grass species in Lake Elmo, on a plot of land at
120 Lake Elmo Ave., to redefine sustainable grass
and its application in Minnesota.
The goal of this research is to improve
conservation by developing drought-resistant
grass that requires less fertilizer and irrigation
water, while still maintaining an attractive lawn
appearance.
The UofM has installed the test plot, a temporary
irrigation system, and public informational signs,
and will maintain the grasses for the first year. The
university will cover the cost of irrigation water,
and performance evaluations will occur in 2026
and 2027.
Lakeelmo.gov
PARKS
New Lake Elmo Boulevard tree
program
The City of Lake Elmo is excited to announce the
launch of its new Boulevard Tree Program in
February 2026! Boulevard trees are an essential
part of the landscape, providing a range of
benefits to residents, including improved air
quality, cleaner stormwater, and improved mental
health.
The program will offer eligible residents a
boulevard tree at no cost and will provide
guidance on proper care techniques to ensure the
trees thrive. Eligibility requirements and a list of
potential species for selection will be shared at
the program launch.
Interested residents are encouraged to apply
through the city’s official website in February with
an anticipated sign-up window lasting until March.
Planting is expected to begin in late Spring.
Additional updates will be provided in the City's
newsletter The Fresh, on social media, and on the
City’s website in February.
Page 8 The Source | Winter 2026
Arbor Day tree giveaway
returns April 25
Lake Elmo residents are invited to celebrate
Arbor Day by taking part in the City’s annual
free tree giveaway on Saturday, April 25, from
8–10 a.m. at the Lake Elmo Public Works
building.
Residents can stop by to receive a bare-root
seedling tree and learn more about Arbor Day
in Minnesota. The event offers a simple,
meaningful way for residents to help grow Lake
Elmo’s tree canopy.
Lake Elmo has participated in the Tree City
USA community for more than 20 years. In
2024, the City planted nearly 1,100 trees in
parks, developments, and open spaces, and
gave away nearly 450 trees through last year ’s
Arbor Day event.
The annual giveaway costs about $600, a small
investment that helps create a healthier,
greener community for generations to come.
Registration is now open for Lake Elmo parks reservations!
This year, we have a new policy and fee structure for reservations. Reservations are made
online, but payment (cash or check) must be mailed or dropped off at City Hall. Reservations
won’t be finalized until fees/deposits are paid.
Courts can be reserved for up to a month at a time, for 3 hours per day. Ballfields can be
reserved for the day during the spring season (April – July) or the fall season (August – October.)
Visit the City of Lake Elmo website to view available programs, dates, and registration details.
Lakeelmo.gov
LAKE ELMO FIRE & PUBLIC SAFETY
The Lake Elmo Fire Department provides our residents and businesses with three options for
CPR instruction. Courses offered:
Hands-Only CPR Classes:
Hands-Only CPR is a type of CPR that does not include rescue breaths. If you see a teen or
adult collapse, you can perform hands-only CPR with just two easy steps:
1) Call 911 and
2) Push hard and fast in the center of the chest.
This instruction does not result in a certification. The online form allows you to request on-site
hands-only CPR for community groups. There is no fee for this instruction.
Heart Saver CPR/AED/First Aid:
Heart Saver CPR teaches adults and children how to use CPR/AED and relieve choking in
adults, children, and infants. This course is designed for anyone with limited or no medical
training who needs a course completion card for job requirements for CPR and AED use. The
First Aid portion can be included upon request. Afee is associated with completing this course,
resulting in an American Heart Association completion certificate.
Basic Life Support (BLS):
Basic Life Support (BLS) CPR training, which is offered to those requesting certification. The
BLS Provider course is for healthcare professionals who need to know how to perform CPR and
other lifesaving skills. A fee is associated with certification, and successful completion of this
course will result in an American Heart Association BLS Provider card.
CPR Class Request Form can be found on our Fire Department website. Please submit a
request form or call the fire department at 651-747-3930 for current offerings.
For up-to-date information and activities of your fire department, follow us on Facebook
https://www.facebook.com/lakeelmofd/
CPR Training Provided by the Lake Elmo Fire Department
Page9TheSource | Winter 2026
Sound The Alarm is a freeprogram offered by the Lake
Elmo FireDepartment through a partnership with the
American Red Cross. All owner-occupied dwellings in the
City are eligible to receive:
A safety inspection conducted by Fire
Department staff.
Guidance on home evacuation plans.
Test and, if necessary, replace smoke detectors and carbon monoxide (CO) alarms.
Hardwired alarms will be provided to the Homeowner if install cannot be completed do to
electrical connections.
Give general fire safety tips.
There are no costs for Sound The Alarm services or products.
Apply for a Sound The Alarm Visit Today
Complete the Sound The Alarm visit request form online found on our fire department website. A
representative from the fire department will contact you to schedule a home visit.
Sound the Alarm: Smoke alarm replacement campaign
Lakeelmo.gov
LIFE IN LAKE ELMO
Page 10 The Source | Winter 2026
Light Up Lake Elmo sparkled
with holiday cheer
Lake Elmo Elementary update
The project is led by Stillwater Schools, in
partnership with local contractors and
community stakeholders.
The district anticipates welcoming students into
the new building for the 2026/2027 school year
and will continue to share updates as the project
moves toward completion. You can follow the
progress at
https://www.stillwaterschools.org/our-
district/bond-projects.
Lakeelmo.gov
Downtown Lake Elmo glowed with holiday spirit in
December as families, friends, and neighbors
gathered for Connect Lake Elmo’s annual Light Up
Lake Elmo celebration. Despite the winter chill, the
atmosphere was warm with music, laughter, and
the season’s excitement.
The afternoon featured festive activities for all
ages, including local shops offering holiday crafts,
hot cocoa, and seasonal treats. As dusk settled in,
Santa arrived on the Lake Elmo Fire Truck, ready
to greet all the kids and even said hello to a few of
his elves.
The highlight of the night arrived—the official
lighting of the holiday tree—with caroling led by
City Council member Jeff Holtz, and a few words
from Mayor Cadenhead, lighting up the heart of
the community.
Progress continues on the new Lake Elmo
Elementary School building, marking an exciting
milestone for students, families, and the broader
community. Construction remains on schedule,
with major structural work completed and crews
now focused on interior spaces and site
improvements.
The new facility is designed to support modern
learning, enhance safety, and provide flexible
spaces for students and staff. Once complete,
the building will offer updated classrooms,
improved common areas, and infrastructure that
supports current and future educational needs.
April 2025
January 2026
NEW RESIDENT GUIDE
Page11TheSource | Winter2026Lakeelmo.gov
Utilities
Water
On the website, visit the How Do I page under the
Apply For section. You’ll find directions to
start/stop utility services, or contact the City of
Lake Elmo utilities at 651-747-3906
Other Utilities
Electric and Gas Service – Xcel Energy or
CenterPoint Energy
Garbage - Find more at lakeelmo.gov/278/Waste-
Haulers
Parks and recreation
With over 500 acres of city parkland and more
than 80 miles of trails, Lake Elmo features an
extensive park and trail system for residents
and visitors to enjoy and explore. Our park
and trail system provides a diverse range of
recreational opportunities, including organized
sports, casual play, nature appreciation,
hiking, cross-country skiing, horseback riding,
picnicking, relaxation, and many other outdoor
activities.
Fire department
The Lake Elmo Fire Department is
administered by a career Fire Chief and
Assistant Fire Chief, who are responsible for
day-to-day operations. The remaining
command staff consists of two paid-on-call
Captains and one paid-on-call Lieutenant.
The Department also has a strong focus on
community outreach programs throughout the
year. Visit the Department website for more
information at LakeElmo.gov/248/fire-
department and follow us on Facebook
https://www.facebook.com/lakeelmofd/.
City ordinances
The City Code, along with its established ordinances, helps make Lake Elmo an exceptional place to
live, work, and visit. A complete list of ordinances is available at LakeElmo.gov/172/City-Code.
Code Regulations
Parking is prohibited on City streets Nov. 1 to March 31, from 2 a.m. – 6 a.m. to facilitate snow
removal.
Recreational fires are subject to Fire Department guidelines, find them online at
lakeelmo.gov/250/Recreational-Fires.
Licenses and Permits
The city issues many types of licenses and permits from construction and signs to fires, swimming
pools, and more. Visit LakeElmo.gov on the How Do I page under Apply For for details.
Water rebate program
In an effort to improve municipal water use The
City of Lake Elmo, in partnership with the
Metropolitan Council, is offering a rebate program
for purchases of eligible water-efficient products.
This funding has enabled Lake Elmo to provide a
rebate to current water customers who replace
existing devices with specified water-efficient
products, or who have an irrigation system audit
completed by a professional. Qualifying
purchases are eligible for a rebate on your water
bill.
Go to the Water Rebate Program page at
www.LakeElmo.gov for guidelines, restrictions
and a list of qualifying items.
PRSRT STD
US POSTAGE PAID
LAKE ELMO, MN
PERMIT NO. 19
CityHall3880Laverne Ave. N.
Lake Elmo, MN55042LakeElmo.gov | (651) 747-3900
The Source is a publication of the City of Lake Elmo.
REPORT A STREET OUTAGE
Go to Xcel Energy
https://mn.my.xcelenergy.com/s/partner-
resources/municipalities/outdoor-
lighting/outdoor-lighting-reporting. Either
Report it Now” or “Check Outage Status“.
HOW DO I?
PAY MY UTILITY BlLL
With your City of Lake Elmo utility account
number, proceed to the new BS&A portal at
the link below to register, manage your
account, set up autopay, or make payments.
Lakeelmo.gov/ub.
If you need assistance, reach out to us at
RNess@LakeElmo.gov
or call 651-747-3906.
POSTAL PATRON
LAKE ELMO, MN 55042
Reminders:
Winter Parking Restrictions began November 1. Cars are prohibited from parking on city streets
between 2 am and 7 am, November 1 to March 31.
Sign up on the City’s website to receive notifications about city meetings, road projects, parks
events, and the Fresh Weekly Newsletter. Stay informed and never miss important updates!
LAKE ELMO CITY COUNCIL
Mayor Charles Cadenhead
Council
Nick Dragisich
Matt Hirn
Jeff Holtz
Nick Kragness
City Administrator Nicole Miller
OfficeHoursMon - Fri: 8 AM - 4:30 PM
SummerHoursMemorialDay - LaborDayMon-Th: 7 a.m. to 4:30 PM / Fri: 8AM - Noon
651-300-9641
651-303-6378
715-432-3608
651-705-6675
952-288-5401
651-747-3905
2026
LAKE
ELMO
Utility billing is new and improved! We have
implemented a new City financial software with
integrated utility billing, which allows for better
financial controls and more efficient processes.
Part of the change includes a new utility
payment system called BS&A Payments.
The new system will allow paperless billing and
autopay. The current system, Paya-Nuvei, is no
longer available.
Go to the website below to get started!
https://www.lakeelmo.gov/ub.
New Utility Bills!
Water Conservation
Conserving water in Lake Elmo is a top priority. As our
population continues to grow, so do our water needs.
Here are some simple tips to help conserve water:
Irrigate Wisely (see irrigating section)
Install water-saving showerheads, faucets
Fix leaking or running toilets, spigots, etc
Run full loads of laundry and/or use minimal water use
setting
Opt for the dishwasher over hand-washing
Turn the faucet off when brushing your teeth
Shower instead of bathing
Use rain barrels for water runoff to water gardens
Use your water meter to check for hidden water leaks
Irrigate Wisely
Water Rebate Program
In partnership with the
Metropolitan Council, the City of
Lake Elmo is offering a rebate
program for purchases of eligible
water-efficient products. This
funding has enabled Lake Elmo to
provide a rebate to current water
customers who replace existing
devices with specified water-
efficient products, or who have an
irrigation system audit completed
by a professional.
Qualifying purchases are eligible
for a rebate on your water bill.
These credits range from $150 to
$500, dependent on your rebate
type.
Go to the Water Rebate Program
page at www.LakeElmo.gov for
guidelines, restrictions and a list of
qualifying items.
For the average resident, irrigating wisely has the highest impact on water conservation. Watering
appropriate amounts and at appropriate times is key. Following city-wide restrictions will help
make the best use of water for your lawn and will help ensure water and water pressure are
available at high-demand times. Consult your irrigation professional to determine an appropriate
amount of water for your lawn.
You may find information on irrigation zones/days/times on the Watering & Irrigation link on our
website at www.LakeElmo.gov
Clean Water
In Minnesota, public water supply systems are regularly tested
by the Minnesota Department of Health for various
contaminants. The water from all three Lake Elmo wells is
tested daily for various chemicals and at longer intervals for
others, to ensure it meets health standards. Ensuring clean
water for residents has always been a top priority, and Lake
Elmo provides safe and reliable drinking water that complies
with federal and state water quality standards.
The Lake Elmo Public Works team has worked to reduce and
effectively remove pollutants from our drinking water and, as
part of that plan, the installation of the new water treatment
system at Well 2 is now complete and operational.
More information on water quality in Lake Elmo can be found
at www.LakeElmo.gov
Protect our Lakes and Streams
For more information visit Lakeelmo.gov/finance
Our lakes and streams are affected by rain
and snowmelt that wash off streets, lawns,
and rooftops. This runoff can carry dirt,
fertilizer, oil, trash, and salt directly into the
water.
Residents can reduce this pollution in
several important ways.
Keep water cleaner and reduce flooding
by using things like rain barrels and
gardens, trees, permeable pavement,
and green spaces
Avoid sending grass cuttings and leaves
into the street.
Pick up pet waste
Prevent leaves from vehicles
Minimize use of toxic lawn care products
Ways the City helps reduce pollution:
Street sweeping keeps leaves and dirt from
entering our water system
Using smart salting methods for winter street
maintenance
Upgrade and maintain City systems to trap
pollutants before they flow into lakes and
streams
The results for residents include:
Cleaner water for swimming, fishing, and
boating
Less flooding after heavy rain and snow melt
Healthier neighborhoods and wildlife
Protected property values
A stronger, more resilient community
EXHIBIT B: Grant program guidelines
2026 – 2028
METROPOLITAN COUNCIL WATER EFFICIENCY GRANT PROGRAM
GUIDELINES
updated 02 / 26 / 2026
1. Overview
The Metropolitan Council (Met Council) will implement a Water Efficiency Grant Program (WEGP)
effective July 1, 2026 to June 30, 2028. Grants will be awarded on a competitive basis to municipalities
that operate or are served by a municipal public water supply system.
In this program, municipalities design and operate their own rebate or grant programs, which are
funded by the Met Council with pass-through funds from the Clean Water Land & Legacy Amendment.
The Met Council will provide 80% of the program cost; the municipality must provide the remaining 20%
of the program cost.
The WEGP focuses on grant activities that reduce existing water use at residential, commercial, and
municipal properties. Met Council-approved grant activities include the replacement of specific water-
using devices with more efficient alternatives, irrigation system audits, and the conversion of turfgrass
to low-input, drought-tolerant landscapes at municipal properties. Residents and businesses
participating in a municipality’s program must be connected to municipal water.
Grants will be made available in amounts with a minimum of $5,000 and a maximum of $75,000. In the
event that there are unused or returned funds, municipalities may apply for a grant amendment to
increase their award beyond $75,000 (at the discretion of Met Council). Grantees will be required to
submit quarterly reimbursement requests and provide actual or estimated water savings achieved
through this program for Clean Water, Land & Legacy Amendment reporting purposes.
Grant program goal
The goal of the Water Efficiency Grant Program is to support technical and behavioral changes that
improve municipal water use efficiency in the seven-county metropolitan area.
Changes for 2026-2028
Several changes to the WEGP have been made from past grant cycles. These changes are outlined in
the bulleted list below.
• Maximum grant amount: $50,000 $75,000
• Clearer guidelines for grant activity/device eligibility and property type
o Faucets and faucet accessories added
o Flushing urinals and flushometer-valve toilets added
o Commercial clothes washers and commercial dishwashers added
• Met Council strongly encourages (not a requirement) that an irrigation system audit be
conducted before the replacement of an irrigation controller or spray sprinkler bodies. An
irrigation system audit from an Irrigation Professional certified by a US EPA WaterSense
program ensures the user has information for proper set-up and operation of their irrigation
system.
• Municipal facility grant activity option added
o Replacement of water using devices in municipal properties
o Property turfgrass conversion/replacement
• Low-income cost assistance option added (additional $10,000 available to expand maximum
grant amount to $85,000)
o Full cost coverage for eligible residents on indoor water use devices
• Updated reporting form
• Standardized estimated water savings built into reporting for most grant activities (with option for
municipalities to provide more specific water savings estimates)
Additional detail about the low-income cost assistance option, newly eligible devices/grant activities,
and new eligibility requirements is provided in the following pages.
Critical points to remember
• The applying municipality must be served by a municipal public water supply system
• New construction and new developments are not eligible
• A portion of each eligible grant activity’s cost must be paid by the property owner
• Funds are for rebates or grants only; consulting and city staff time are ineligible
• Grant recipients must display the Clean Water, Land and Legacy Amendment logo and the
Metropolitan Council logo on program-related web pages and paper communications
• Applications are due April 13, 2026
• Funds must be spent down by June 30, 2028 (municipalities and Met Council will work together
to monitor spending and adjust/reallocate funds as needed)
• Grant activities on municipal properties must supplement and not supplant dedicated municipal
funding sources
2. Grant program structure
Administration and funding source
The 2026-2028 WEGP will be administered by the Met Council and will be funded with $1,400,000
appropriated by the 2025 Minnesota Legislature. Grant applications will be reviewed and scored by
Metropolitan Council Water Resources staff.
Legislative Directive:
Minnesota 2025 Session Law
$650,000 the first year and $750,000 the second year are for
grants that implement water demand reduction measures. The
grants are to assist municipalities in the metropolitan area with
implementing water demand reduction measures to ensure the
reliability and protection of drinking water supplies.
Grants will be awarded to municipalities in amounts ranging from $5,000 to $75,000 for providing
rebates or grants to property owners and their renters. (An additional $10,000 will be available for Low
Income Cost Assistance, as discussed below). Municipalities will be responsible for the design and
operation of their rebate or grant program and its details. Grant payments to the municipality will be for
80% of approved program amounts. The municipality must provide the remaining 20% of the
granted/rebated amount to the property owner. Municipality rebates or grants are eligible for
reimbursement on device replacements and other approved grant activities conducted July 1, 2026
through June 30, 2028 (purchases of eligible devices or grant activities must be made on or after the
day the grant agreement is fully executed).
Grant program components
Each municipality is expected to design their own program to whatever meets their community needs.
Three potential components are residential/commercial grant activities, municipal grant activities, and
low-income cost assistance for residential properties.
Municipalities may include any combination of property type and grant activity offering in their program
design. Program design has varied by municipality among past participants, with some focusing on a
single type of device replacement such as toilets, and others offering a range of options. In the
application form and work plan, municipalities will be asked to lay out the grant activities and property
types that would be included in the proposed program. While past grant cycles have occasionally
included participants pursuing commercial- and municipal-focused grant activities, the 2026-2028
WEGP guidelines more clearly define, and expand, the options available to municipalities that are
interested in designing commercial- or internal-facing programs.
Residential and/or commercial grant activities
Municipalities may choose to design their programs to include grant activities at residential and
commercial properties. This the most common approach among participating communities. The
participating community selects which devices or other approved grant activities (irrigation audits) to
offer to residents or businesses within the municipality. The participating community also determines
how much of an eligible grant activity’s cost is covered by the program. Property owners must pay a
portion of the eligible grant activity’s cost.
Eligible grant activities for residential and commercial properties are listed in the table in the Eligible
Grant Activities section.
Municipal grant activities
Municipalities may also choose to design their programs to include grant activities occurring on
municipal properties. Grant activities eligible for municipal properties are device replacements, irrigation
system audits, and the conversion of existing turfgrass to low-input landscaping/drought-tolerant
alternative turf. Municipalities that choose to conduct grant activities on municipal properties shall
provide measured water savings (ideally) or calculated water savings estimates. These municipalities
will also be required to display signage near the grant activity areas that includes the Metropolitan
Council and Clean Water Fund logos as well as an explanation of the work done. Participating
municipalities must cover the 20% “municipal match” as normal.
This funding is intended to promote and supplement funding for device replacement or turf grass
conversion efforts. It is not intended to supplant dedicated municipal funding sources for projects.
Eligible grant activities for municipal properties are listed in the table in the Eligible Grant Activities
section.
Low-income cost assistance grant activities
Municipalities operating a residential-facing rebate or grant program may elect to include a low-income
cost assistance option in their program. Residents or households who meet a certain income threshold
are eligible to receive full cost coverage* for the replacement of one indoor water-using device (toilet,
clothes washer, dishwasher, showerhead, or faucet/faucet accessory) with a WaterSense or Energy
Star alternative. If a municipality decides to offer the low-income cost assistance option, they can apply
for an additional $10,000 (max grant amount of $85,000).
Municipalities that choose to include this option in their residential rebate or grant programs will be
required to verify resident eligibility. No municipal match will be required. Residents are eligible for this
cost assistance element if:
• The resident is enrolled in a county assistance program
o Hennepin County Water Assistance Program
o Ramsey and Washington Counties Water Bill Assistance
o Scott, Carver, Dakota Counties Energy Assistance Program
Scott County Financial Assistance
Carver County Emergency Programs
Dakota County Emergency Assistance
o Anoka County Energy Assistance
• The resident is enrolled in SNAP benefits
Eligibility for low-income cost assistance can be verified with appropriate paperwork showing
participation in one of the above programs.
*Cost of device and installation is fully covered by Met Council up to:
• $550 for toilets
• $1200 for clothes washers
• $1200 for dishwashers
• $100 for showerheads
• $100 for faucets and faucet accessories
Application funding request
The application form will include a table like the one below, where applying municipalities will lay out
their funding request. Row A is the requested grant amount, which covers grant activities at any
combination of property types and makes up 80% of the traditional grant program subtotal. Row B is
the required municipality match of 20% of the traditional grant program subtotal. Row C is the traditional
grant program subtotal. In Row D, applying municipalities may enter the low-income cost assistance
amount they expect to spend. The funds in Row D do not require a municipality match. Row E is the
sum of Rows C and D.
A
Requested grant amount for residential, commercial, or municipal grant activities
(funding from Met Council)
(80% of traditional grant program subtotal):
$16,000
B Required municipality matching amount
(20% of traditional grant program subtotal): $4,000
C Traditional grant program subtotal
(sum of Met Council grant amount and required municipality match): $20,000
D (OPTIONAL) Low-income cost assistance requested amount (funding from Met Council)
(100% covered by Met Council funds): $5,000
E Total program budget
(sum of traditional grant program subtotal and low-income cost assistance funds): $25,000
*in cases where municipalities have opted in to the low-income cost assistance element, the percent covered by Met Council
may exceed 80%
Eligibility
Requirements for applying municipalities
This grant program is limited to municipalities in the seven-county metropolitan area that operate or are
served by a municipal public water supply system.
Grants are only for water efficiency programs offering rebates or grants to property owners and their
renters who are customers of the municipal water supply system and who replace specified water-using
devices with approved devices that use substantially less water (or conduct other grant activities such
as irrigation audits or, for municipalities, turfgrass conversion). In municipalities where only some
neighborhoods or areas are served by a municipal public water supply system, only those served by
the municipal public water supply system are eligible.
Municipalities eligible per above must apply to participate and, if approved, sign a Met Council Grant
Agreement, before any eligible rebates or grants can be submitted for reimbursement. Agreements
shall require that municipalities:
• Entirely pass through grants received (as is being done by Met Council)
• Verify purchase of devices or other grant activities to receive grants
• Retain records and cooperate with any audits
• Conduct all communications with property owners and ensure all written communications to
property owners include both the Clean Water, Land and Legacy Amendment and the
Metropolitan Council’s logo
• Provide quantitative information for state reporting purposes
Eligible grant activities
The table below walks through the approved grant activities in the WEGP. Included in the table is information related to the property type
(residential, commercial, municipal) where grant activities occur as well as information about estimated water savings. Expenses eligible for
reimbursement are the out-of-pocket cost of the device and its installation only, not to include any owner labor costs. In addition, new
construction and new developments are ineligible as this program is intended as a current infrastructure replacement program.
Eligible grant activity
(with hyperlink to product lookup tool) Estimated water savings
Indoor
water use
Toilets
Residential toilet replacement with a WaterSense labeled residential
toilet 13,000 gallons per year (source)
Commercial / Municipal toilet replacement with a WaterSense
labeled commercial toilet
790 gallons when replacing a 1.6gpf
model and 5,500 when replacing a
3.5gpf model
Commercial / Municipal urinal replacement with a WaterSense
labeled urinal 4,600 gallons per year (source)
Clothes washing
machines
Residential clothes washing machine replacement with an Energy
Star labeled residential clothes washer
2,700 gallons per year
(based on WRF average clothes
washer use and Energy Star estimated
percent savings)
Commercial clothes washing machine replacement with an Energy
Star labeled commercial clothes washer
45% less water than standard models
(source)
Dishwashers
Residential dishwasher replacement with an Energy Star labeled
residential dishwasher 8,400 gallons per year (source)
Commercial dishwasher replacement with an Energy Star labeled
commercial clothes washer 5,600 gallons per year (source)
Showerhead replacement with a WaterSense labeled showerhead 2,700 gallons per year (source)
Faucet replacement or faucet accessory with a WaterSense labeled faucet or faucet
accessory 700 gallons per year (source)
Outdoor
water use
Irrigation system audit by an Irrigation Professional certified by a US EPA WaterSense
program
See report from Irrigation Professional
who conducted audit
Irrigation
controllers
(Met Council
strongly
encourages an
irrigation system
audit before the
installation of a
new smart
controller)
Irrigation controller replacement with a WaterSense labeled
weather-based controller (this type of controller is most common) 7,600 gallons per year (source)
Irrigation controller replacement with a WaterSense labeled soil
moisture-based controller 15,000 gallons per year (source)
Irrigation spray sprinkler body replacement with a WaterSense labeled spray sprinkler
body
(Met Council strongly encourages an irrigation system audit before the installation of new
spray sprinkler bodies)
5,600 per year
(for an average household using
50,500 gallons outdoors, operating at
or above 60 pounds per square inch)
(source)
Turfgrass conversion/replacement to a low-input, drought-tolerant landscape at municipal
properties
(Municipal properties only)
Refer to municipality’s pre- and post-
replacement water use to calculate
water savings. If unable to measure
specific water use, municipality will
provide estimated annual water
savings with explanation of calculation.
Please note, the Met Council strongly encourages an irrigation system audit be conducted before the replacement of an irrigation controller
or spray sprinkler bodies. An initial audit ensures the user has information for proper set-up and operation of their irrigation system.
Quarterly reporting
Reporting requirements and payment process
Utilizing a reporting form provided by Met Council, the following information about each grant activity
must be reported on a quarterly basis:
• Property address and property type (residential, commercial, municipal)
• Low-income assistance (Y/N) (if applicable)
• Grant activity (device replacement, audit, or municipal turfgrass conversion)
• Brand/model info of new device
• Purchase date (must be on or after effective date of grant agreement)
• Cost per device/approved grant activity
• Number of devices/activities
• Rebate or grant per device
• Estimated annual gallons of water saved per device installation/approved grant activity
• Optional notes column for explaining water use calculations if different from those provided
• Municipality matching funds disbursed
• Number of unmet funding requests from property owners, if any
Municipalities are required to submit a signed and dated quarterly reporting form as well as a PDF(s) of
receipts corresponding to each entry in the quarterly reporting form.
Upon review and confirmation of the above information, Met Council will process a grant payment in the
amount of 80% of approved total rebates or grants for the reporting period (in cases where
municipalities have opted in to the low-income cost assistance element, the percent covered by Met
Council may exceed 80%).
Met Council will provide confirmation of grant balances available upon request and reserves the right to
amend grant agreements, in collaboration with grantee municipality, if quarterly reporting indicates
rebate or grant programs will not fully utilize grant awards within the grant period.
Determining estimated water savings
Annual water savings estimates may come from a variety of sources. Manufacturers may include water
savings estimates in their device descriptions or specifications, irrigation professionals report estimated
savings after performing an irrigation system audit, and some past participants of the WEGP have
calculated specific water savings estimates based on factors such as household size.
Unless a city has specifically calculated estimated water savings or is referring to manufacturer or audit
estimates, the recommended sources for estimated water savings are WaterSense and Energy Star.
Water savings estimates from WaterSense and Energy Star are included in the table of eligible grant
activities.
In quarterly reports, municipalities will be asked to note the source of their estimates if they different
from the estimates provided above. In the case of irrigation system audits and turfgrass conversion on
municipal properties, estimates have not been provided by Met Council as these metrics will be
calculated by an Irrigation Professional or the municipality, respectively. In any situation where it is
possible to report actual water savings, this is preferred.
3. Application process
Application requirements
The application window for the 2026-2028 Water Efficiency Grant Program will open on Friday, March
13, 2026. Applications are due by Monday, April 13, 2026. The application form will be available on the
Met Council website.
Required information in the application form includes:
o the municipality’s rebate or grant program design and work plan
o proposed examples of communications to property owners
o requested total grant amount
o estimated annual amount of water saved by the applying municipality
• Application form is available at: https://metrocouncil.org/Wastewater-Water/Funding-
Finance/Available-Funding-Grants.aspx
• Submit competed application to: henry.mccarthy@metc.state.mn.us
• Metropolitan Council will notify municipalities of grant awards in approximately May 2026
Evaluating applications
Program proposals will be evaluated based on the answers provided in the application form as well as
the attached work plan. Strong applications will include clear answers to the questions in the application
form and a thoughtful work plan that outlines strategies for structuring, administering, and promoting (if
applicable) the program. For municipalities intending to conduct grant activities on municipal property,
applications should include intended plans for device/landscape installation and estimated hours/cost of
labor (whether being done by the municipality or a contractor).
In the event that funds requested exceed funds available, the following criteria will be used to determine
the amount granted to a given municipality:
• Municipal residential per capita water use
• Municipal ratio of peak month to winter month water use
• Estimated water savings from proposed program
Additionally, municipalities may be asked to provide additional information and/or be awarded less than
their requested grant amount if their application is lacking detail, a clear work plan, etc. In future grant
cycles, a past participant’s record of spending down their award may be used to inform award amounts.
EXHIBIT C: Grant amendment form
Revision #
METROPOLITAN COUNCIL ENVIRONMENTAL SERVICES
2026-2028 CLEAN WATER FUND WATER EFFICIENCY GRANT PROGRAM
GRANT AMENDMENT FORM
NOTICE TO RECIPIENT: Submission of this form is required to modify the Maximum Grant Amount in
your Grant Agreement with Metropolitan Council 2026-2028 Clean Water Fund Water Efficiency Grant
Program (Grant Program).
After determination of your municipality’s Maximum Grant Amount, completion and submission of this form
is necessary when 1) you are requesting additional grant funds to meet unexpected rebate or grant demand, or
2) when your municipality has determined that the previously approved program’s rebate or grant demand will
not be met, requiring less grant funds than anticipated when the agreement was signed, or 3) when your
municipality wishes to substantially change the structure of its program from what was described in the
application form and the work plan supplied in the application form.
The process for modifying your Grant Agreement is as follows:
1. Your municipality’s authorized representative submits one signed copy of Exhibit C to the Met
Council, with any additional information requested by Met Council.
2. Upon receipt and any Met Council approval of signed Exhibit C, the Met Council’s authorized
representative will obtain Met Council authorized signatures returns a fully executed copy of Exhibit
C indicating the new Maximum Grant Amount to Municipality’s designated authorized representative.
---------------------------------------------------------------------------------------------------------------------------------
Instructions: Indicate the date of your change request in #1 box. Indicate the number of this particular change
request in #2 box (and in box at top of page – must match). Enter the current grant agreement amount (as
Met Council approved) in #3 box. If you wish to increase your municipality’s grant amount, enter the amount
you are requesting in #4 box. If you wish to decrease your grant amount due to less demand than
anticipated, enter the amount in #5 box. Enter in #6 box the amount derived from adding #3 to #4 or derived
from
subtracting #5 from #3. If you do not wish to modify your municipality’s Maximum Grant Amount, leave
boxes #4, #5, and #6 blank or enter “N/A.” If you wish to secure approval for changes to the scope of the
approved project in the Water Efficiency Grant Program application form, please document the reasons for the
amendment in box #7. Please specify what changes are desired in box #8. Please note that all other
requirements as found in the Grant Agreement continue to apply.
Grant Agreement #
1. Date of change request:
2. Change request number:
3. Current Grant Agreement Amount (as Met Council approved):
4. Increase due to request for additional funding:
5. Decrease due to less demand:
6. Amended Maximum Grant Agreement Amount requested:
7. Reasons for modifying program structure:
8. Proposed changes to program structure:
MUNICIPALITY NAME:_________________________________________________________________
MUNICIPALITY AUTHORIZED REPRESENTATIVE (signature and date):
______________________________________________________________________________________
METROPOLITAN COUNCIL PROGRAM ADMINISTRATOR APPROVAL (signature and date):
______________________________________________________________________________________
METROPOLITAN COUNCIL AUTHORIZED SIGNATURE AND DATE
______________________________________________________________________________________
---------------------------------------------------------------------------------------------------------------------------------
Questions may be directed to the Met Council Authorized Representative:
Metropolitan Council (Regional Office & Environmental Services)
390 Robert Street North, Saint Paul, MN 55101-1805
P 651.602.1000 | F 651.602.1550 | TTY 651.291.0904
metrocouncil.org
An Equal Opportunity Employer
Clarissa Hadler
Finance Director
3880 Laverne Ave
Lake Elmo, MN 55042
May 19, 2026
The Metropolitan Council is pleased to award the City of Lake Elmo the amount of $49,000 as part of our
2026-2028 Water Efficiency Grant Program. The amount of matching funds required from your city,
based on the grant award above, is $12,250 (this amount will deviate from the 20% of the total program
cost in cases where the community is including a low-income cost assistance option). The City of Lake
Elmo is one of 43 in the Twin Cities metro area accepted into this grant program. We are pleased to
report that all available grant funds have been awarded and that all applicants will receive an award.
The amount of funds requested totaled $1,683,575, while the amount of funds available is $1,400,000.
Because funds requested exceed funds available, a set of ranking factors and an objective scoring
system were used to distribute the available funds.
Below are some critical points to remember:
• New construction and new developments are not eligible
• A portion of each eligible grant activity’s cost must be paid by the property owner (unless
participating in the low-income cost assistance option)
• Funds are for rebates or grants only; consulting and city staff time are ineligible
• Grant recipients must display the Clean Water, Land and Legacy Amendment logo and the
Metropolitan Council logo on program-related web pages and paper communications
• Funds must be spent down by June 30, 2028 (municipalities and Met Council will work together to
monitor spending and adjust/reallocate funds as needed)
• Grant activities on municipal properties must supplement and not supplant dedicated municipal
funding sources
The Clean Water, Land and Legacy Amendment is available here: https://www.legacy.mn.gov/download-
legacy-logo
To obtain electronic and print versions of the Metropolitan Council logo, please contact me at
henry.mccarthy@metc.state.mn.us.
Page - 2 | May 19, 2026 | METROPOLITAN COUNCIL
As you prepare your municipality’s program, please be aware that the following information must be
reported on a quarterly basis, on forms to be provided by the Metropolitan Council:
• Property address and property type (residential, commercial, municipal)
• Low-income assistance (Y/N) (if applicable)
• Grant activity (device replacement, audit, or municipal turfgrass conversion)
• Brand/model info of new device
• Purchase date (must be on or after effective date of grant agreement)
• Cost per device/approved grant activity
• Number of devices/activities
• Rebate or grant per device
• Estimated annual gallons of water saved per device installation/approved grant activity
• Municipality matching funds disbursed
• Number of unmet funding requests from property owners, if any
Quarterly reporting instructions will be sent to participating communities in summer 2026. Quarterly
reporting periods and reporting form due dates are shown below.
Quarterly Period Reporting Form Due Date
July 1, 2026 – September 30, 2026 October 31, 2026
October 1, 2026 – December 31, 2026 January 31, 2027
January 1, 2027 – March 31, 2027 April 30, 2027
April 1, 2027 – June 30, 2027 July 31, 2027
July 1, 2027 – September 30, 2027 October 31, 2027
October 1, 2027 – December 31, 2027 January 31, 2028
January 1, 2028 – March 31, 2028 April 30, 2028
April 1, 2028 – June 30, 2028 July 31, 2028
A Grant Legal Agreement will be sent to your city for signature in approximately two weeks. Completion
instructions will be provided in that correspondence.
Congratulations on your grant award! We look forward to working with you to increase the water
efficiency of our region.
Sincerely,
Henry McCarthy
Senior Environmental Scientist | Water Resources | Policy and Planning
Phone: 651-602-1946
henry.mccarthy@metc.state.mn.us
Jen Kostrzewski
Assistant Manager | Water Resources | Policy and Planning
Phone: 651-602-1078
jennifer.kostrzewski@metc.state.mn.us
Judy Sventek
Manager | Water Resources
Phone: 651-602-1156
judy.sventek@metc.state.mn.us
STAFF REPORT
DATE:June 16, 2026
CONSENT
TO: Mayor and Councilmembers
FROM: City Clerk Julie Johnson
AGENDA ITEM: Approve Massage Therapy License Renewal
CORE STRATEGIES:
☒ Vibrant, inclusive, connected community ☐ Efficient, reliable, innovative services
☒ Responsive, transparent, adaptive governance ☐ Balanced Finances now and future
☐ Managed Growth ☐ Resilient Infrastructure
BACKGROUND:
The City of Lake Elmo has a city license for massage therapy to better regulate the practice of
therapeutic massage in Lake Elmo. Licenses are subject to approval by the City Council.
ISSUE BEFORE COUNCIL:
Should Council approve the requested license renewal?
PROPOSAL:
The City has received a license renewal request from Jacob Hagen, Renewed Bodywork.
Appropriate fees have been paid and all required paperwork has been submitted.
FISCAL IMPACT:
Renewal fee: $25.00
OPTIONS:
1)Approve license renewal
2)Deny license renewal
RECOMMENDATION:
If removed from the consent agenda, staff recommends the following motion:
“Motion to approve massage therapy license renewal for Jacob Hagen, Renewed Bodywork.”
ATTACHMENTS:
None
STAFF REPORT
DATE: 6/16/26
CONSENT
TO: Mayor and Councilmembers
FROM: Sophia Jensen, Senior City Planner
AGENDA ITEM: Northport 1st, 2nd, and 3rd Addition Landscape Security Release
CORE STRATEGIES:
☐Vibrant, inclusive, connected community
☐Responsive, transparent, adaptive governance
☒Managed Growth
☐Efficient, reliable, innovative services
☒Balanced Finances now and future
☐Resilient Infrastructure
ISSUE BEFORE COUNCIL: Should the City Council approve release of warranty security for landscaping in
Northport 1st, 2nd, and 3rd addition?
PROPOSAL DETAILS/ANALYSIS: Staff has received and processed requests to reduce the development security
for landscaping improvements in Northport 1st, 2nd, and 3rd Additions. These additions were inspected and
accepted by the landscape architect on 5/29/2026. Below is a breakdown of security remaining for the
development.
Addition Current Security Amount Proposed Security Amount
1st Addition $60,007.81 $0
2nd Addition $0
3rd Addition
$16,406
$13,594 $0
FISCAL IMPACT: It is the goal of the City to retain, at all times during the subdivision improvements, a security
amount that is adequate to ensure completion of all elements of the improvements as protection to the Tax
Payers against potential default of the project. Once the security is no longer needed it should be returned.
RECOMMENDATION: (if pulled from Consent): Staff is recommending to the City Council, as part of the consent
agenda, the security reduction be approved. If removed from the consent agenda, the recommended motion
is as follows:
“Move to approve the security release for Northport 1st, 2nd, and 3rd additions as detailed in the respective Security
Reduction Worksheets, contingent on the developer being current with all other payments and obligations in accordance
with the development agreement, including positive escrow balance as required by the City”
ATTAC HMENTS:
• HKGi Inspection Memos (1st-3rd )
• Engineering Security Reduction Workshee ts (1st-3rd)
Memorandum
1
TO: Sophia Jensen
FROM: Patrick O’Keeffe, PLA
DATE: 6/5/2026
RE: - Landscape Warranty Inspection | Northport – 3rd Addition
Initial
Inspection
Initial
Re-inspection
(Acceptance)
1-Year
Inspection
1-Year
Re-
inspection
2-Year
Inspection
2-Year
Re-inspection
Final
Inspection
Acceptance
Northport – 3rd Addition
07/19/2023 09/05/2024 09/05/2025
09/17/2025
10/03/2025
05/29/2026
Inspectors
• Patrick O’Keeffe, PLA
Inspection Summary
• An on-site landscape inspection was conducted with the landscape contractor, to assess the condition
and performance of the installed landscape elements. Based on this review, the site has met the City’s
requirements for final acceptance.
Required Actions
No further actions are required.
Patrick O’Keeffe, PLA (MN, CO)
Landscape Architect
P: (651) 324-5277 | E: Patrick@hkgi.com
800 WASHINGTON AVE N STE 207 MPLS, MN 55401 | HKGI.COM
Memorandum
1
TO: Sophia Jensen
FROM: Patrick O’Keeffe, PLA
DATE: 6/5/2026
RE: - Landscape Warranty Inspection | Northport – 2nd Addition
Initial
Inspection
Initial
Re-inspection
(Acceptance)
1-Year
Inspection
1-Year
Re-
inspection
2-Year
Inspection
2-Year
Re-inspection
Final
Inspection
Acceptance
Northport – 2nd Addition
07/19/2023 09/13/2024 09/02/2025
09/17/2025
10/03/2025
05/29/2026
Inspectors
• Patrick O’Keeffe, PLA
Inspection Summary
• An on-site landscape inspection was conducted with the landscape contractor, to assess the condition
and performance of the installed landscape elements. Based on this review, the site has met the City’s
requirements for final acceptance.
Required Actions
No further actions are required.
Patrick O’Keeffe, PLA (MN, CO)
Landscape Architect
P: (651) 324-5277 | E: Patrick@hkgi.com
800 WASHINGTON AVE N STE 207 MPLS, MN 55401 | HKGI.COM
Memorandum
1
TO: Sophia Jensen
FROM: Patrick O’Keeffe, PLA
DATE: 6/5/2026
RE: - Landscape Warranty Inspection | Northport – 1st Addition
Initial
Inspection
Initial
Re-
inspection
(Acceptance)
1-Year
Inspection
1-Year
Re-
inspection
2-Year
Inspection
2-Year
Re-inspection
Final
Inspection
Acceptance
Northport – 1st Addition
09/12/2024 09/02/2025
09/17/2025
10/03/2025
05/29/2026
Inspectors
• Patrick O’Keeffe, PLA
Inspection Summary
• An on-site landscape inspection was conducted with the landscape contractor, to assess the condition
and performance of the installed landscape elements. Based on this review, the site has met the City’s
requirements for final acceptance.
Required Actions
No further actions are required.
Patrick O’Keeffe, PLA (MN, CO)
Landscape Architect
P: (651) 324-5277 | E: Patrick@hkgi.com
800 WASHINGTON AVE N STE 207 MPLS, MN 55401 | HKGI.COM
NORTHPORT 1ST ADDITIONTime of Performance: October 31, 2018DEVELOPMENT AGREEMENT AMOUNTSCATEGORYCONSTRUCTION125%REMARKS#1#2#3#4#5#6#7GradingNA$114,100Included in Phase 1 $114,100Sanitary Sewer$480,346$600,433$450,324$150,108Watermain$362,155$452,694$339,520$113,173Storm Sewer (w/pond structures)$591,406$739,258$369,629$184,814$184,814Streets + Sidewalks + Turn Lanes$636,008$795,010$397,505$198,753$198,753Bituminous Trails$34,876$43,595$32,696$10,899Surface Water Facilities$50,000$62,500$46,875$15,625Street Lighting$72,000$90,000$67,500$22,500Street Signs and Traffic Control Signs$2,600$3,250$2,438$813Private Utilities (electricity, natural gas, telephone, and cable)Landscaping$192,025$240,031$180,023$60,007.81Tree Preservation and RestorationNANAWetland Mitigation and BuffersNANAMonuments$4,860$6,075$4,556$1,519Erosion Control$23,670$29,588$22,191$7,397Miscellaneous FacilitiesNANARecord Drawings$30,000$37,500$28,125$9,375TOTALS$2,479,946$3,214,034RELEASED AMOUNTS:$1,556,978$114,100$587,948$263,282$180,023$451,694$60,008$774,983CUMMULATIVE AMOUNTS:$1,556,978$1,671,078$2,259,026$2,522,308$2,702,331$3,154,025$3,214,033SECURITY AMOUNT REMAINING:$1,657,055$1,542,955$955,008$691,726$511,703$60,008$0DATE:1/15/2019 11/5/2019 12/6/2022 12/20/2022 12/5/2023 1/2/2024 6/16/2026REDUCTIONS
NORTHPORT 2ND ADDITIONTime of Performance: October 31, 2018DEVELOPMENT AGREEMENT AMOUNTSCATEGORYCONSTRUCTION125%REMARKS#1#2#3#4#5#6#7GradingNANAIncluded in Phase 1Sanitary Sewer$73,001$91,251$68,438$22,813Watermain$60,130$75,163$56,372$18,791Storm Sewer (w/pond structures)$234,091$292,614$146,307$73,153$73,154Streets + Sidewalks$237,114$296,393$148,196$74,098$74,098Bituminous Trails$7,500$9,375$7,031$2,344Surface Water FacilitiesNANAStreet Lighting$12,000$15,000$11,250$3,750Street Signs and Traffic Control Signs$625$781$586$195Private Utilities (electricity, natural gas, telephone, and cable)Landscaping$52,500$65,625$49,219$16,406Tree Preservation and RestorationNANAWetland Mitigation and BuffersNANAMonuments$2,900$3,625$2,719$906Erosion ControlNANAMiscellaneous FacilitiesNANARecord Drawings$5,000$6,250$4,688$1,562TOTALS$684,861$856,077RELEASED AMOUNTS:$124,810$294,503$173,525$41,603$49,219$156,009$16,406CUMMULATIVE AMOUNTS:$124,810$419,313$592,838$634,442$683,661$839,671$856,077SECURITY AMOUNT REMAINING:$731,267$436,764$263,239$221,635$172,417$16,406$0DATE:1/15/2019 10/1/2019 12/6/2022 12/20/2022 12/5/2023 1/2/2024 6/16/2026REDUCTIONS
NORTHPORT 3RD ADDITIONTime of Performance: October 31, 2021DEVELOPMENT AGREEMENT AMOUNTSCATEGORYCONSTRUCTION125%REMARKS#1#2#3#4#5#6GradingNANAIncluded in Phase 1Sanitary Sewer$215,014$268,768100%$201,576$67,192Watermain$210,346$262,933100%$197,199$65,733Storm Sewer (w/pond structures)$232,695$290,869100%$145,434$72,717$72,717Streets + Sidewalks$458,706$573,383100%$286,691$143,346$143,346Bituminous Trails$15,723$19,654100%$14,740$4,913Surface Water FacilitiesNANAIncluded in Phase 1Street Lighting$40,000$50,000100%$37,500$12,500Street Signs and Traffic Control Signs$4,098$5,123100%$3,842$1,281Private Utilities (electricity, natural gas, telephone, and cable)Landscaping$43,500$54,375100%$40,781$13,594Tree Preservation and RestorationNANAWetland Mitigation and BuffersNANAMonuments$4,100$5,125100%$3,844$1,281Erosion Control$10,000$12,500100%$9,375$3,125Miscellaneous FacilitiesNANARecord Drawings$10,000$12,500100%$9,375$3,125TOTALS$1,244,182$1,555,228RELEASED AMOUNTS:$830,901$40,781$427,664$242,288$13,594$0CUMMULATIVE AMOUNTS:$830,901$871,682$1,299,346$1,541,634$1,555,228SECURITY AMOUNT REMAINING:$724,327$683,546$255,882$13,594$0DATE:1/4/2022 12/5/2023 1/16/2024 6/3/2025 6/16/2026REDUCTIONS
STAFF REPORT
DATE: 06/16/2026
Consent
TO: CITY COUNCIL
FROM: Adam Swanepoel – Assistant Public Works Director
AGENDA ITEM: Elmo’s Pup Park Parking Lot Improvement Project.
CORE STRATEGIES:
☐ Vibrant, inclusive, connected community
☐ Responsive, transparent, adaptive governance☒
☐ Managed Growth
☐ Efficient, reliable, innovative services
☐ Balanced Finances now and future
☒ Resilient Infrastructure
BACKGROUND:
On May 5, the City Council approved the plans and specifications for the paving and regrading of Elmo’s Pup
Park Parking Lot Improvement Project. The project area includes both the Public Works storage building parking
lot and the adjacent dog park parking lot.
The existing Public Works parking lot has exceeded its useful life and is in need of significant repairs. The current
dog park parking lot is unpaved, and the proposed improvements will provide a durable paved surface while also
improving drainage conditions in the area. These upgrades are expected to reduce maintenance needs, enhance
accessibility, and create a safer and more functional parking area for visitors and staff.
In addition to improvements to the parking facilities, the project also includes upgrades to a short section of trail
located within the dog park. The paving and regrading work is intended to improve site accessibility, enhance
drainage, and provide a safer and more durable surface for both vehicles and park users. These improvements
will help extend the life of the facilities while enhancing the overall functionality and appearance of the site.
ISSUE BEFORE COUNCIL:
Should Council award the contract for the paving the Elmo’s Pup Parking Lot project?
PROPOSAL DETAILS/ANALYSIS:
Bolten and Menk prepared the bids and specifications for the paving of the parking lot for the Public Works
storage building and dog park. Bids for the project were opened on June 2nd. Of the bids submitted, Miller
Excavating Inc. provided the lowest bid in the amount of $179,015.23. Bolten and Menk reviewed the bids and
made the recommendation that City Council award the contract to Miller Excavating, Inc. as outlined in the
attached letter.
FISCAL IMPACT:
Approval of this resolution commits the City to enter into a construction contract for the project in the amount
of $172,076.73. This project was budgeted for $327,000, with engineering and surveying expenses staff expects
the project to cost around $253,000.
From Finance Director Hadler:
The Jamaca Building Parking Lot was originally in the CIP as being funded by the General Fund ($277K).
However, the amount didn’t make it into the actual General Fund Budget spreadsheet, as Finance has
been moving away from paying for CIP projects from the General Fund and had intended to start a
Public Works Facilities fund for the Ideal Ave and the Jamaca buildings. That fund has since been
created and we will be bringing various budget amendments and fund transfers in July that will include
money for this project.
There is $50,000 in the Park Dedication Budget for the Pup Park parking lot portion of the project.
OPTIONS:
Accept the Bid and award a contract to Miller Excavating Inc.
Do not move forward with the project.
RECOMMENDATION:
Motion to approve Resolution No. 2026-044, Accepting the Bid and Awarding a Contract to Miller Excavating Inc.
for the amount of $179,015.23 for the Pup Park Parking Lot project
ATTACHMENTS:
Resolution 2026-044
Engineers’ Letter of Award Recommendation and Tabulation of Bids
Pup Park Parking lot map
Project Schedule
CITY OF LAKE ELMO
WASHINGTON COUNTY
STATE OF MINNESOTA
RESOLUTION NO. 2026-044
A RESOLUTION ACCEPTING BIDS AND AWARDING A CONTRACT FOR THE
ELMO’S PUP PARK PARKING LOT IMPROVEMENTS
WHEREAS, pursuant to an advertisement for bids for the Elmo’s Pup Park Parking Lot
Improvements, bids were received, opened, and tabulated according to law, and bids were received
complying with the advertisement; and
WHEREAS, bids were tabulated, checked and summarized to verify that all requirements
of the submittal were met; and
WHEREAS, the project engineer reviewed the bids and has provided a letter
recommending the award of the contract to the lowest responsible bidder, Miller Excavating, Inc.,
for the bid amount of $179,015.23 .
NOW, THEREFORE, BE IT RESOLVED,
1.That the Mayor and City Clerk are hereby authorized and directed to enter into a Contract
in the accordance with the above ordered Project, in the amount of the Contractor’s lowest
responsible bid, and according to the plans and specifications thereof approved by the City
Council.
2.The City Clerk is hereby authorized and directed to return forthwith to all bidders the
deposits made with their bids, except that the deposits of the successful bidder and the next
two lowest bidders shall be retained until a contract has been signed.
ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE SIXTEENTH DAY OF JUNE 2026.
CITY OF LAKE ELMO
By: __________________________
Mayor
(Seal)
ATTEST:
________________________________
City Clerk
h:\lkelmn\26x143425000\6_plans-specs\b_bid documents\143425 award ltr.docx
June 2, 2026
Nate Stanley, P.E.
City Engineer
City of Lake Elmo
3880 Laverne Avenue N
Lake Elmo, Minnesota 55042
RE: Elmo’s Pup Park Parking Lot Improvements
City of Lake Elmo, MN
City Project No. 143425
BMI Project No. 26X.143425
Dear Mr. Stanley,
Attached is the bid abstract for the project referenced above. Six bids were received at 10:00 a.m. on
Tuesday, June 2, 2026. The following is a summary of the bids received:
BIDDERS BASE BID ALTERNATE BASE BID +
ALTERNATE
1 Miller Excavating, Inc. $165,365.50 $13,649.73 $179,015.23
2 Winberg Companies LLC $183,268.25 $15,239.36 $198,507.62
3 Dreamland Contracting LLC $186,425.62 $11,867.70 $198,293.32
4 Bituminous Roadways, Inc. $194,050.40 $14,105.75 $208,156.15
5 Asphalt Surface Technologies
Corporation a/k/a ASTECH Corp. $201,808.30 $15,004.77 $216,813.07
6 JCF Builders, LLC $235,231.00 $25,626.00 $260,857.00
We have reviewed the bids and recommend awarding the base bid and alternate bid to Miller Excavating,
Inc. in the amount of $179,015.23.
Sincerely,
Bolton & Menk, Inc.
Chad Isakson, P.E.
Project Engineer
Enclosure
ABSTRACT OF BIDSELMO'S PUP PARK PARKING LOT IMPROVEMENTSCITY OF LAKE ELMO, MNPROJECT NO. 143425BID DATE: 6/2/2026TIME: 10:00 AM123ITEM APPROX.NO. ITEM QUANT. UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT1 MOBILIZATION 1 LS $5,379.06 $5,379.06 $4,657.50 $4,657.50 $9,048.00 $9,048.002 6" RECLAIM EXISTING BITUMINOUS AND BASE MATERIAL 3770 SY $1.74 $6,559.80 $1.45 $5,462.73 $1.06 $3,996.203 SUBGRADE PREPARATION OF RECLAIM SURFACE (P) 5730 SY $1.04 $5,959.20 $0.78 $4,448.20 $2.91 $16,674.304 TYPE SP 9.5 WEARING COURSE MIXTURE (2,C) [SPWEA230C] 550 TN $104.59 $57,524.50 $117.47 $64,609.88 $112.58 $61,919.005 TYPE SP 12.5 NON-WEARING COURSE MIXTURE (2,C) [SPNWB230C] 730 TN $101.89 $74,379.70 $107.64 $78,577.20 $107.59 $78,540.706 BITUMINOUS MATERIAL FOR TACK COAT 410 GAL $5.08 $2,082.80 $4.14 $1,697.40 $4.63 $1,898.307 SAWCUT BITUMINOUS PAVEMENT 50 LF $3.81 $190.50 $2.07 $103.50 $8.32 $416.008 SEDIMENT CONTROL LOGS 52 LF $3.11 $161.72 $2.59 $134.55 $4.16 $216.329 STREET SWEEPING 2 HR $201.71 $403.42 $124.20 $248.40 $124.80 $249.6010 SUBGRADE CORRECTION (EV) 100 CY $24.41 $2,441.00 $71.42 $7,141.50 $27.70 $2,770.0011 SUBGRADE STABILIZING AGGREGATE (CV) 100 CY $38.59 $3,859.00 $76.59 $7,659.00 $21.09 $2,109.0012 SALVAGE, HAUL AND STOCKPILE EXCESS RECLAMED MATERIAL OFFSITE (LV) 100 CY $17.74$1,774.00 $24.84 $2,484.00 $27.70 $2,770.0013 COMMON EXCAVATION (EV)(P) 120 CY $18.06 $2,167.20 $27.43 $3,291.30 $32.28 $3,873.6014 SALVAGE AND INSTALL RECLAIM MATERIAL ONSITE (CV) 140 CY $17.74 $2,483.60 $19.67 $2,753.10 $13.89 $1,944.60BASE BID TOTAL BID: $165,365.50 $183,268.25 $186,425.6215 MOBILIZATION 1 LS $868.95 $868.95 $2,940.00 $2,940.00 $1,497.60 $1,497.6016 TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) [SPWEA230B] 60 TN $154.78 $9,286.80 $156.45 $9,387.00 $136.29 $8,177.4017 SUBGRADE PREPARATION OF GRAVEL SURFACE (P) 461 SY $6.88 $3,171.68 $4.20 $1,936.20 $4.04 $1,862.4418 SEDIMENT CONTROL LOGS 46 LF $3.15 $144.90 $6.38 $293.66 $4.16 $191.3619 SALVAGE AND INSTALL RECLAIM MATERIAL ONSITE (CV) 10 CY $17.74 $177.40 $68.25 $682.50 $13.89 $138.90ADD ALTERNATE TOTAL BID: $13,649.73 $15,239.36 $11,867.70TOTAL AMOUNT BID (BASE + ALTERNATE): $179,015.23 $198,507.62 $198,293.32Winberg Companies LLCShafer, MNDreamland Contracting LLCOsceola, WIADD ALTERNATEMiller Excavating, Inc.Stillwater, MNBASE BID
ABSTRACT OF BIDSELMO'S PUP PARK PARKING LOT IMPROVEMENTSCITY OF LAKE ELMO, MNPROJECT NO. 143425BID DATE: 6/2/2026TIME: 10:00 AMITEM APPROX.NO. ITEM QUANT. UNIT1 MOBILIZATION 1 LS2 6" RECLAIM EXISTING BITUMINOUS AND BASE MATERIAL 3770 SY3 SUBGRADE PREPARATION OF RECLAIM SURFACE (P) 5730 SY4 TYPE SP 9.5 WEARING COURSE MIXTURE (2,C) [SPWEA230C] 550 TN5 TYPE SP 12.5 NON-WEARING COURSE MIXTURE (2,C) [SPNWB230C] 730 TN6 BITUMINOUS MATERIAL FOR TACK COAT 410 GAL7 SAWCUT BITUMINOUS PAVEMENT 50 LF8 SEDIMENT CONTROL LOGS 52 LF9 STREET SWEEPING 2 HR10 SUBGRADE CORRECTION (EV) 100 CY11 SUBGRADE STABILIZING AGGREGATE (CV) 100 CY12 SALVAGE, HAUL AND STOCKPILE EXCESS RECLAMED MATERIAL OFFSITE (LV) 100 CY13 COMMON EXCAVATION (EV)(P) 120 CY14 SALVAGE AND INSTALL RECLAIM MATERIAL ONSITE (CV) 140 CYBASE BID TOTAL BID:15 MOBILIZATION 1 LS16 TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) [SPWEA230B] 60 TN17 SUBGRADE PREPARATION OF GRAVEL SURFACE (P) 461 SY18 SEDIMENT CONTROL LOGS 46 LF19 SALVAGE AND INSTALL RECLAIM MATERIAL ONSITE (CV) 10 CYADD ALTERNATE TOTAL BID:TOTAL AMOUNT BID (BASE + ALTERNATE):ADD ALTERNATEBASE BID456UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT$7,000.00 $7,000.00 $25,600.00 $25,600.00 $25,000.00 $25,000.00$2.25 $8,482.50 $2.75 $10,367.50 $1.50 $5,655.00$1.30 $7,449.00 $2.09 $11,975.70 $3.50 $20,055.00$120.00 $66,000.00 $105.16 $57,838.00 $128.00 $70,400.00$112.00 $81,760.00 $99.33 $72,510.90 $128.00 $93,440.00$0.01 $4.10 $3.50 $1,435.00 $7.00 $2,870.00$4.60 $230.00 $4.00 $200.00 $5.50 $275.00$7.40 $384.80 $4.40 $228.80 $18.00 $936.00$260.00 $520.00 $231.00 $462.00 $150.00 $300.00$42.00 $4,200.00 $35.20 $3,520.00 $30.00 $3,000.00$55.00 $5,500.00 $37.95 $3,795.00 $30.00 $3,000.00$34.00 $3,400.00 $19.80 $1,980.00 $25.00 $2,500.00$48.00 $5,760.00 $49.72 $5,966.40 $30.00 $3,600.00$24.00 $3,360.00 $42.35 $5,929.00 $30.00 $4,200.00$194,050.40 $201,808.30 $235,231.00$3,200.00 $3,200.00 $1,100.00 $1,100.00 $3,000.00 $3,000.00$142.00 $8,520.00 $145.31 $8,718.60 $220.00 $13,200.00$2.75 $1,267.75 $9.57 $4,411.77 $18.00 $8,298.00$8.00 $368.00 $4.40 $202.40 $18.00 $828.00$75.00 $750.00 $57.20 $572.00 $30.00 $300.00$14,105.75 $15,004.77 $25,626.00$208,156.15 $216,813.07 $260,857.00Asphalt Surface Technologies Corporationa/k/a ASTECH Corp.St. Cloud, MNJCF Builders, LLCPine City, MNBituminous Roadways, Inc.Mendota Heights, MN
IvyCtN4 2 n d S t N JamacaAveNJamacaAveNJamacaAveN4 2 n d S t N
8989895989358909
4260
4235
4255
8989894989098895
8980
4215
4240
4220
9057 9679
LAKE ELMO
Lake Elmo GIS
Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, (c)
OpenStreetMap contributors, and the GIS User Community,
Microsoft, Vantor
City Limits
Parcels
3/31/2026, 3:57:01 PM
0 180 36090 ft
0 50 10025 m
1:2,050
3507 High Point Drive North
Bldg. 1 – Suite E130
Oakdale, MN 55128
Phone: (651) 704-9970
Bolton-Menk.com
Elmo’s Pup Park Parking Lot Improvements Project
Lake Elmo, MN
APRIL 7, 2026 Council authorizes the preparation of Plans and Specifications.
MAY 5, 2026 Council approves Plans and Specifications and orders
Advertisement for Bids.
JUNE 2, 2026 Project Bid Date: Receive contractor Bids.
JUNE 16, 2026 Council accepts Bids and awards Contract.
JULY, 2026 Conduct Pre-Construction meeting and issue Notice to Proceed.
• SEPTEMBER 18, 2026 Substantial Completion.
• OCTOBER 30, 2026 Final Completion.
STAFF REPORT
DATE: June 16, 2026
CONSENT
TO: Mayor and Councilmembers
FROM: City Clerk Julie Johnson
AGENDA ITEM: Approve Lake Elmo Baseball Special Event Permit
CORE STRATEGIES:
☒ Vibrant, inclusive, connected community
☐ Responsive, transparent, adaptive governance
☐Managed Growth
☐ Efficient, reliable, innovative services
☐ Balanced Finances now and future
☐ Resilient Infrastructure
BACKGROUND:
Lake Elmo Baseball has applied for a special event permit and temporary liquor license for an event on Saturday,June 27,
2026. The city requires a special event permit for gatherings of over 100 people.
ISSUE BEFORE COUNCIL:
Should the Council approve the special event permit and temporary liquor license for the event?
PROPOSAL DETAILS/ANALYSIS:
Lake Elmo Baseball has submitted a special event permit application in conjunction with their annual JDP Baseball
Tournament. The tournament raises awareness of opioids in memory of a Lake Elmo Baseball board member’s son. This
year they are requesting the addition of beer sales and closure of a section of Laverne Avenue alongside Lion’s Park.
The applicant is working with Twin Point Tavern to provide beer sales and plans to also have a pizza vendor. Street
closure would occur just prior to the event, and barricades will be removed after the event. City staff will notify
neighboring property owners of the street closure via mail. The applicant has agreed to keep the street open until after
the Lake Elmo Library closes at 2:00 to ensure library patron has access to the library parking lot.
Public Safety and Public Works staff have reviewed the application and provided their input. Sgt. Jacobson noted that
the tournament has been held in prior years with no issues. Staff recommend approval of the application.
Event Timetable:
4:00 p.m. – 10:00 p.m. June 27, 2026 with road closure and initial setup starting around 4:00 PM.
Location:
The event will be held at Lions Park with baseball games on baseball diamond. Beer and pizza sales will be located at the
picnic shelter, and a guest speaker will address the event at 5:30.
Parking:
Parking will be available along the nearby streets.
Insurance:
Lake Elmo Baseball will secure liability insurance through their carrier as a condition of approval.
Restrooms:
Event attendees will have access to the Lion’s Park restrooms, and the applicant will supply additional on-site portable
restrooms.
Entertainment:
Baseball games and guest speaker.
FISCAL IMPACT:
Cost for mailing notices to neighboring properties will be covered by the special event permit fee of $75.The city will also
receive a $25 fee for the temporary liquor license.
OPTIONS:
1)Approve the permit, temporary liquor license and road closure.
2)Amend and approve the permit.
3)Do not approve the permit.
RECOMMENDATION: (if pulled from Consent)
“Move to approve the special event permit for the Lake Elmo Baseball Event at Lion’s Park from 4:00pm to 10:00pm on
Saturday,June 27,2026,temporary liquor license and the closure of Laverne Ave N from 36th St to the entrance of the
baseball diamond”
ATTACHMENTS:
Special event permit application
Temporary liquor license application
STAFF REPORT
DATE: 6.16.26
CONSENT
TO: Mayor and Councilmembers
FROM: Peter Tholen - Public Works Director
AGENDA ITEM: Chama Mission, LLC-License Agreement for Entering Lions Park
CORE STRATEGIES:
☐ Vibrant, inclusive, connected community
☒ Responsive, transparent, adaptive governance
☐Managed Growth
☐ Efficient, reliable, innovative services
☐ Balanced Finances now and future
☐ Resilient Infrastructure
BACKGROUND:
The property that is the subject of this agreement is located on the east side of Lions Park. For several years,
Public Works staff have accessed the ice rink area within Lions Park through the property located at 11320
Upper 33rd St. N. to perform winter maintenance activities, including snow removal and flooding of the ice
rink. The City was recently informed that the property owner does not wish City staff to continue accessing the
park through his property without a formal agreement in place. As a result, the city’s attorney has worked
with the property owner to develop an agreement that would allow continued access to the ice rink area for
maintenance and operational purposes while addressing the property owner's concerns.
ISSUE BEFORE COUNCIL:
Whether the City Council should approve a license agreement with the property owner to provide City staff
access through private property for snow removal, ice rink maintenance, and other operational activities
associated with Lions Park.
PROPOSAL DETAILS/ANALYSIS:
The proposed agreement would provide the City with permission to access Lions Park through the private
property located at 11320 Upper 33rd St. N. for the purpose of maintaining and operating the ice rink area if
needed. Public Works staff have historically used this access route to perform snow removal operations and
flood the ice rink during the winter season. The property owner has informed the City that continued access
through the property will require a formal agreement. The proposed license agreement establishes the terms
and conditions under which City staff may access the property and clarifies the rights and responsibilities of
both parties.
FISCAL IMPACT:
There is no direct fiscal impact associated with approval of the proposed license agreement. The agreement
would allow the City to continue utilizing an existing access route that has historically been used for
maintenance and operation of the Lions Park ice rink area. If the agreement is not approved, the City may
need to identify, construct, or maintain an alternative access route, which could result in additional
operational and maintenance costs in the future.
OPTIONS:
Option 1 – Approve the Agreement as Presented
Approve the proposed license agreement with the property owner at 11320 Upper 33rd St. N. and authorize
City staff to continue accessing Lions Park through the property for ice rink maintenance and related
operational activities.
Option 2 – Approve the Agreement with Modifications
Approve the license agreement with changes directed by the City Council, such as modifying the terms, access
provisions, duration of the agreement, or other conditions.
RECOMMENDATION: (if pulled from Consent)
Approve the proposed license agreement with the property owner at 11320 Upper 33rd St. N. and authorize
City staff to continue accessing Lions Park through the property for ice rink maintenance and related
operational activities.
ATTACHMENTS:
License Agreement
1
LA515\1\1096671.v1
LICENSE AGREEMENT BETWEEN
CHAMA MISSION, LLC AND THE CITY OF LAKE ELMO
THIS LICENSE AGREEMENT (this “Agreement”) is made by and between Chama Mission,
LLC, a Minnesota limited liability company (“Licensor”) and the City of Lake Elmo (“City” or
“Licensee”), a Minnesota municipal corporation.
WHEREAS, the Licensor is the owner of the properties located at 3481 Laverne Avenue North,
Lake Elmo, MN 55042 / 11320 Upper 33rd Street North, Lake Elmo, MN 55042 (collectively,
the “Property”); and
WHEREAS, the Licensee desires to utilize the Property for surfaces access to Lions Park and has
requested permission to use it; and
WHEREAS, the Licensor desires to grant a license to the Licensee for the purpose of limited
surface access by Licensees to Lions Park.
NOW, THEREFORE, in consideration of the mutual promises in this Agreement, the parties
agree as follows:
1. Incorporation. The above recitals are a material part of this Agreement and are incorporated
herein.
2. Grant of License and Term. The Licensor hereby grants to Licensee a revocable, non-exclusive
license to make surface use of the Property, which area is described on the
attached Exhibit A, (hereinafter “License Area”) subject to the terms of this Agreement. The
term of this Agreement
shall commence on June 1st of 2026 and expire on April 30th of 2028 (“Term”).
3. Permitted Use. The License Area may only be used by Licensee for the purposes of accessing
Lions Park. Licensee shall not install any structures or improvements within the License Area.
4. Maintenance and Repair of Premises. The Licensor shall, at its sole cost and expense, keep and
maintain the License Area in good condition and shall not damage it.
5. Compliance with all Applicable Laws. Throughout the term, Licensee shall obtain and
maintain, at its sole cost and expense, all approvals, permits, or licenses required by any
governmental authority which are necessary for Licensee’s permitted use of the License Area;
further, Licensee shall, at its sole cost and expense, at all times during the term hereof comply
with all applicable laws, ordinances, rules, regulations, and requirements of any governmental
authority having jurisdiction over the Property and the requests of the Licensor.
6. Indemnification. To the fullest extent permitted by law, the Licensee assumes liability for and
shall save and protect, hold harmless, indemnify, and defend the Licensor and its officials,
2
LA515\1\1096671.v1
officers, agents, and employees from and against all claims, suits, demands, damages, losses,
expenses, and liabilities including, without limitation, attorneys’ fees, for bodily injury or
property damage arising out of, resulting from, or relating in any manner to Licensee's use of
the License Area by Licensee or its park users, officials, agents, contractors, and employees,
and provided that any such claim, suit, demand, damage, loss, expense, or liability is caused
in whole or in part by any act or omission of the Licensee or by anyone directly or indirectly
employed by Licensee or its contractors, except to the extent such claim, suit, demand,
damage, loss, expense, or liability is caused by the willful or negligent act or omission of the
Licensor. The provisions of this paragraph shall survive the expiration or termination of this
Agreement.
7. Surrender of Premises. Licensee hereby agrees upon the expiration or termination of this
Agreement to vacate the Property and re-deliver the License Area to the Licensor in good
order, condition, and repair (and in the same condition as delivered, ordinary wear and tear
excepted).
8. Termination. Either party may terminate this Agreement, with or without cause, at any time
by giving written notice to the other, specifying the date of termination, such notice to be
given not less than 30 days prior to the date specified in such notice for the date of
termination. In the event of a breach of this Agreement by Licensee, Licensor may terminate
this Agreement upon providing 24 hours prior written notice to Licensee. Notwithstanding any
termination, the covenants of this Agreement governing indemnification and waiver shall
survive.
9. Compensation. Licensor will not receive any monetary compensation from Licensee for
allowing use of the License Area by the Licensee.
9.5 Waiver. Licensee waives and releases any claims of ownership or prescriptive rights to the
License Area and acknowledges that the same is and has been permissive.
10. Additional Covenants of Licensee.
A. Contact Information. Licensee shall provide the Licensor with one or more emergency
contacts, including phone numbers, who shall be available during all times that
Licensee is utilizing the License Area.
B. Damage to Premises. Licensee shall be liable for all damages to the Property caused
by or arising out of the Licensee’s use under this Agreement (ordinary wear
and tear excepted).
11. Governing Law. It is agreed that this Agreement shall be governed by, construed, and enforced
in accordance with the laws of the State of Minnesota.
12. Entire Agreement. This Agreement shall constitute the entire agreement between the parties
and
3
LA515\1\1096671.v1
any prior understanding or representation of any kind preceding the date of this Agreement
shall
not be binding upon either party except to the extent incorporated in this Agreement.
13. Modification. Any modification of this Agreement or additional obligation assumed by either
party in connection with this Agreement shall be binding only if evidenced in writing signed
by
each party or an authorized representative of each party.
14. Not Assignable. This Agreement may not be assigned.
15. Notices. Any notice provided for or concerning this Agreement shall be in writing and shall
be
deemed sufficiently given when sent by certified or registered mail if sent to the respective
address of each party as set forth below:
Licensor
Chama Mission, LLC
2201 O’Neil Road
Hudson, WI 54016
Phone: 651-955-1346
Email: david@johnsonturner.com
Licensee
City Administrator
City of Lake Elmo
3800 Laverne Ave N
Lake Elmo, MN 55042
Phone: (651) 747-3905
Email: nmiller@lakeelmo.gov
IN WITNESS WHEREOF, each party to this Agreement has caused it to be executed on the date
indicated below:
CHAMA MISSION, LLC
By: __________________________________________
Brian Zeller
Its: Owner
Dated: ____________ , 2026.
4
LA515\1\1096671.v1
CITY OF LAKE ELMO
By: __________________________________________
Charles Cadenhead
Its: Mayor
Dated: ____________ , 2026.
By: ____________________________________
Julie Johnson
Its: City Clerk
Dated: _____________, 2026.
5
LA515\1\1096671.v1
EXHIBIT A
License Area
(Cross-hatched area)
STAFF REPORT
DATE: June 16, 2026
CONSENT
TO: Mayor and Councilmembers
FROM: Mike Rusenovich, Project Engineer
AGENDA ITEM: Approve Pay Request #1 for the 2026 Street Improvements Project
CORE STRATEGIES:
☐ Vibrant, inclusive, connected community
☐ Responsive, transparent, adaptive governance
☐Managed Growth
☐ Efficient, reliable, innovative services
☒ Balanced Finances now and future
☒ Resilient Infrastructure
BACKGROUND: On February 17, 2026 the City Council awarded the contract for the 2026 Street
Improvements project to McNamara Contracting, Inc. Work remains in progress with a substantial completion
date of October 2, 2026 and a final completion date of November 13, 2026.
ISSUE BEFORE COUNCIL: Should the City Council approve Pay Request No. 1 for the 2026 Street
Improvements Project?
PROPOSAL DETAILS/ANALYSIS: McNamara Contracting, Inc. has submitted Partial Pay Request No. 1 in the
amount of $485,063.26. The request has been reviewed and payment is recommended in the amount
requested. In accordance with the contract documents, the City has retained 5% of the total work completed.
The amount retained as of this pay request is $25,529.65.
FISCAL IMPACT: The partial payment in the amount of $485,063.26 is in accordance with the Contract for the
project. Payment remains within the authorized scope and budget.
RECOMMENDATION: (if pulled from Consent): Motion to approve Pay Request #1 in the amount of
$485,063.26 to McNamara Contracting, Inc for the 2026 Street Improvements Project.
ATTACHMENTS:
1.Partial Pay Estimate No. 1
Contractor's Application for PaymentOwner's Project No.:Engineer's Project No.:Agency's Project No.:1 From05/04/26to 05/31/26A C D E F F1 F2 G H I J K LItem Quantity UnitsUnit Price($)Value of Bid Item(C X E)($)Quantity Previous EstimateValue Previous EstimateEstimated Quantity Incorporated in the WorkValue of Work Completed to Date(E X G)($)1 1.00 LS 29,000.00 29,000.00 - 1.00 29,000.00 29,000.00 100% - 2 1.00 LS 4,000.00 4,000.00 - 1.00 4,000.00 4,000.00 100% - 3 80.00 LF 10.00 800.00 - 36.00 360.00 360.00 45% 440.00 4 2,310.00 LF 4.00 9,240.00 - 1,195.00 4,780.00 4,780.00 52% 4,460.00 5 21.00 EA 190.00 3,990.00 - 11.00 2,090.00 2,090.00 52% 1,900.00 6 130.00 HR 75.00 9,750.00 - - - - 9,750.00 7 90.00 MGAL 40.00 3,600.00 - - - - 3,600.00 8 7.00 EA 440.00 3,080.00 - - - - 3,080.00 9 7.00 EA 160.00 1,120.00 - 7.00 1,120.00 1,120.00 100% - 10 50.00 EA 175.00 8,750.00 - 21.00 3,675.00 3,675.00 42% 5,075.00 11 50.00 EA 75.00 3,750.00 - 53.00 3,975.00 3,975.00 106% (225.00)12 10.00 EA 36.00 360.00 - - - - 360.00 13 64.00 SF 63.00 4,032.00 - - - - 4,032.00 14 6.00 EA 250.00 1,500.00 - - - - 1,500.00 15 1,550.00 CY 59.00 91,450.00 - - - - 91,450.00 16 9,270.00 SY 9.50 88,065.00 - - - - 88,065.00 17 700.00 SY 9.50 6,650.00 - - - - 6,650.00 18 1.00 EA 1,000.00 1,000.00 - - - - 1,000.00 19 4.00 EA 420.00 1,680.00 - - - - 1,680.00 20 14.00 EA 775.00 10,850.00 - 14.00 10,850.00 10,850.00 100% - 21 274.00 LF 19.00 5,206.00 - 189.00 3,591.00 3,591.00 69% 1,615.00 22 6.00 EA 3,700.00 22,200.00 - 6.00 22,200.00 22,200.00 100% - 23 7.00 EA 6,200.00 43,400.00 - 7.00 43,400.00 43,400.00 100% - 24 3.00 EA 8,500.00 25,500.00 - 3.00 25,500.00 25,500.00 100% - 25 1.00 EA 6,000.00 6,000.00 - 1.00 6,000.00 6,000.00 100% - 26 5.00 EA 495.00 2,475.00 - 2.00 990.00 990.00 40% 1,485.00 27 56.00 LF 62.00 3,472.00 - 68.00 4,216.00 4,216.00 121% (744.00)28 314.00 LF 70.00 21,980.00 - 305.00 21,350.00 21,350.00 97% 630.00 29 137.00 LF 75.00 10,275.00 - 63.00 4,725.00 4,725.00 46% 5,550.00 30 16.00 LF 85.00 1,360.00 - 5.00 425.00 425.00 31% 935.00 31 16.00 LF 90.00 1,440.00 - 31.00 2,790.00 2,790.00 194% (1,350.00)32 2.00 EA 175.00 350.00 - 2.00 350.00 350.00 100% - 33 17.00 CY 185.00 3,145.00 - - - - 3,145.00 34 892.00 LF 10.00 8,920.00 - - - - 8,920.00 35 1,431.00 LF 5.00 7,155.00 - - - - 7,155.00 36 20.00 LF 18.00 360.00 - - - - 360.00 37 960.00 LF 1.00 960.00 - 777.50 777.50 777.50 81% 182.50 38 230.00 LF 1.00 230.00 - 171.65 171.65 171.65 75% 58.35 39 530.00 SY 26.00 13,780.00 - 251.80 6,546.80 6,546.80 48% 7,233.20 40 130.00 SY 26.00 3,380.00 - 102.74 2,671.24 2,671.24 79% 708.76 41 62.00 SF 2.00 124.00 - - - - 124.00 42 73.00 LF 16.30 1,189.90 - 12.00 195.60 195.60 16% 994.30 43 29,710.00 SY 1.40 41,594.00 - 12,986.00 18,180.40 18,180.40 44% 23,413.60 44 2,890.00 CY 27.00 78,030.00 - - - - 78,030.00 45 1.00 LS 500.00 500.00 - - - - 500.00 46 2.00 EA 1,500.00 3,000.00 - 5.00 7,500.00 7,500.00 250% (4,500.00)47 11.00 EA 1,275.00 14,025.00 - 11.00 14,025.00 14,025.00 100% - 48 2,047.00 LF 25.00 51,175.00 - 2,013.00 50,325.00 50,325.00 98% 850.00 49 25.00 EA 295.00 7,375.00 - 25.00 7,375.00 7,375.00 100% - SALVAGE, STOCKPILE, AND RESPREAD RECLAMED MATERIALCONNECT TO EXISTING STORM SEWER STRUCTURECONNECT TO EXISTING STORM SEWER PIPE4" PERFORATED PVC EDGE DRAIN W/ BACKFILL & WRAPDRAIN TILE CLEANOUTREMOVE CONCRETE FLUMEREMOVE AND DISPOSE OF CONCRETE CURB AND GUTTER8" RECLAIM EXISTING BITUMINOUS AND BASE MATERIALHAUL EXCESS RECLAIM MATERIAL OFF SITE (LV)TELEVISING STORM SEWERDITCH GRADINGSAWCUT BITUMINOUS PAVEMENTSAWCUT CONCRETE PAVEMENTREMOVE AND DISPOSE OF BITUMINOUS PAVEMENT REMOVE AND REPLACE STEPSRIPRAP W/ FABRIC, CLASS IIIJET / CLEAN STORM SEWER PIPE4' DIA MH WITH CASTING PER DETAIL 409PATCH DOGHOUSE / INVERT12" RCP STORM SEWER, CLASS 515" RCP STORM SEWER, CLASS 518" RCP STORM SEWER, CLASS 5REMOVE AND DISPOSE OF CONCRETE PAVEMENT 4' DIA CBMH WITH CASTING PER DETAIL 4064' DIA CBMH WITH SUMP AND CASTING PER DETAIL 405TOPSOIL BORROW (LV)SODDING TYPE LAWNSEED RESTORATION AREA AND WOOD FIBER BLANKETSALVAGE AND REINSTALL MANHOLE CASTING W/ NEW SALVAGE AND REINSTALL CATCH BASIN CASTING W/ NEW 21" RCP STORM SEWER, CLASS 324" RCP STORM SEWER, CLASS 3Progress Estimate - Unit Price WorkCity of Lake ElmoBolton & Menk, Inc.McNamara Contracting, Inc.2026 Street and Utility ImprovementsOwner:25X.139309139309Engineer:Contractor:Project:Contract:Contract InformationBid Item No.SILT FENCE, TYPE MACHINE SLICESEDIMENT CONTROL LOG, TYPE WOOD FIBERSALVAGE AND REINSTALL MAILBOXTEMPORARY MAILBOXINLET PROTECTIONSTREET SWEEPING (WITH PICKUP BROOM)WATER FOR DUST CONTROLTRAFFIC CONTROLDescriptionWork CompletedMaterials Currently Stored (not in G)($)Work Completed and Materials Stored to Date (H + I)($)Previous EstimateCLEARINGGRUBBINGApplication Date:Application Period:Application No.:MOBILIZATION06/08/26BBASE BID% of Value of Item (J / F)(%)Balance to Finish (F - J)($)REMOVE SIGN AND POSTSIGN PANELS TYPE CSTREET NAME BLADE W/ POSTREMOVE AND DISPOSE OF EXISTING STORM SEWER REMOVE AND DISPOSE OF EXISTING STORM SEWER PIPE2' X 3' CATCH BASIN PER DETAIL 404Unit PriceEJCDC C-620 Contractor's Application for Payment(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved.77 of 80
Contractor's Application for PaymentOwner's Project No.:Engineer's Project No.:Agency's Project No.:1 From05/04/26to 05/31/26A C D E F F1 F2 G H I J K LItem Quantity UnitsUnit Price($)Value of Bid Item(C X E)($)Quantity Previous EstimateValue Previous EstimateEstimated Quantity Incorporated in the WorkValue of Work Completed to Date(E X G)($)Progress Estimate - Unit Price WorkCity of Lake ElmoBolton & Menk, Inc.McNamara Contracting, Inc.2026 Street and Utility ImprovementsOwner:25X.139309139309Engineer:Contractor:Project:Contract:Contract InformationBid Item No. DescriptionWork CompletedMaterials Currently Stored (not in G)($)Work Completed and Materials Stored to Date (H + I)($)Previous EstimateApplication Date:Application Period:Application No.: 06/08/26B% of Value of Item (J / F)(%)Balance to Finish (F - J)($)50 510.00 CY 32.00 16,320.00 - 133.00 4,256.00 4,256.00 26% 12,064.00 51 280.00 CY 32.00 8,960.00 - 280.00 8,960.00 8,960.00 100% - 52 1,550.00 CY 32.00 49,600.00 - 455.00 14,560.00 14,560.00 29% 35,040.00 53 790.00 CY 19.00 15,010.00 - 445.82 8,470.58 8,470.58 56% 6,539.42 54 420.00 CY 5.00 2,100.00 - 382.00 1,910.00 1,910.00 91% 190.00 55 30,950.00 SY 1.00 30,950.00 - 12,986.00 12,986.00 12,986.00 42% 17,964.00 56 2,430.00 TN 81.00 196,830.00 - - - - 196,830.00 57 3,220.00 TN 81.00 260,820.00 - 757.79 61,380.99 61,380.99 24% 199,439.01 58 2,050.00 GAL 2.00 4,100.00 - 75.00 150.00 150.00 4% 3,950.00 59 590.00 SY 42.00 24,780.00 - - - - 24,780.00 60 15,980.00 LF 16.00 255,680.00 - 4,615.00 73,840.00 73,840.00 29% 181,840.00 61 190.00 SY 93.75 17,812.50 - 116.78 10,948.13 10,948.13 61% 6,864.37 62 188.00 SF 10.40 1,955.20 - 7.31 76.02 76.02 4% 1,879.18 63 40.00 SF 37.00 1,480.00 - - - - 1,480.00 64 25.00 EA 850.00 21,250.00 - - - - 21,250.00 65 139.00 SF 12.00 1,668.00 - - - - 1,668.00 1,570,583.60$ -$ 500,692.91$ -$ 500,692.91$ 32% 1,069,890.69$ 66 1.00 EA 2,900.00 2,900.00 - 1.00 2,900.00 2,900.00 100% - 67 1.00 LS 7,000.00 7,000.00 - 1.00 7,000.00 7,000.00 100% - 9,900.00$ -$ 9,900.00$ -$ 9,900.00$ 100% -$ 1,580,483.60$ -$ 510,592.91$ -$ 510,592.91$ 32% 1,069,890.69$ CONCRETE HYDRANT SPLASH PADB418 CONCRETE CURB AND GUTTER6" CONCRETE DRIVEWAY PAVEMENTCONCRETE FLUMESALVAGE AND REINSTALL PAVERSADJUST EXISTING VALVE BOXSUBGRADE PREPARATION OF RECLAIMED SURFACETYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,C) TYPE SP 12.5 BITUMINOUS NON WEARING COURSE MIXTURE BITUMINOUS MATERIAL FOR TACK COATPATCH BITUMINOUS DRIVEWAYSUBGRADE EXCAVATION (EV)COMMON EXCAVATION - STREETCOMMON EXCAVATION - BOULEVARDSUBGRADE STABILIZING AGGREGATE (CV)SALVAGE AND REINSTALL RECLAM MATERIAL INNSDALE PROJECT TOTALCHANGE ORDER TOTALBASE BID + CHANGE ORDERCHANGE ORDER27" CATCH BASIN PER DETAIL 402REMOVE AND REPLACE EX FES-14BASE BID TOTALUnit PriceEJCDC C-620 Contractor's Application for Payment(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved.78 of 80
STAFF REPORT
DATE: June 16, 2026
CONSENT
TO: Mayor and Councilmembers
FROM: Mike Rusenovich, Project Engineer
AGENDA ITEM: Accept Quotes and Award a Contract for the 2026 Crack Seal Project
CORE STRATEGIES:
☐ Vibrant, inclusive, connected community
☐ Responsive, transparent, adaptive governance
☐Managed Growth
☒ Efficient, reliable, innovative services
☐ Balanced Finances now and future
☒ Resilient Infrastructure
BACKGROUND: In accordance with the City’s annual street maintenance program, certain streets have been
scheduled to be crack sealed in 2026. See attached Location Map. The street maintenance work programmed
in 2026 was reviewed jointly by Public Works and Engineering to confirm the work to be completed.
ISSUE BEFORE COUNCIL: Should the City Council accept quotes and award a contract for the 2026 Crack Seal
Project?
PROPOSAL DETAILS/ANALYSIS: Quotes for crack sealing were solicited from seven qualified contractors and
three quotes were received on June 5, 2026. Of the quotes provided, Gopher State Sealcoat, Inc. provided the
lowest quote of $172,076.73. Following review and verification of the quotes, the City Engineer and Design
Engineer are recommending that the City Council award the contract to Gopher State Sealcoat, Inc. as outlined
in the attached letter.
FISCAL IMPACT: Approval of this resolution commits the City to enter into a construction contract for the
project in the amount of $172,076.73. The project will be funded through the Street Maintenance Fund.
OPTIONS:
Accept the Quote and Award a Contract to Gopher State Sealcoat, Inc.
Do not move forward with this project.
RECOMMENDATION: (if pulled from Consent): Motion to approve Resolution No. 2026-XXX, Accepting Quotes
and Awarding a Contract to Gopher State Sealcoat, Inc. for the amount of $172,076.73 for the 2026 Crack Seal
Project.
ATTACHMENTS:
1.Engineer’s Letter of Award Recommendation and Tabulation of Quotes
2.2026 Crack Seal Project Location Map
3.2026 Crack Seal Project Schedule
h:\lkelmn\26x142139000\6_plans-specs\c_bids received\crack seal\2026-06-08 award ltr.docx
June 8, 2026
Nate Stanley, P.E.
City Engineer
City of Lake Elmo
3880 Laverne Avenue N
Lake Elmo, Minnesota 55042
RE: 2026 Crack Seal Project
City of Lake Elmo, MN
City Project No. 142139
BMI Project No. 26X.142139
Dear Mr. Stanley,
Attached is the quote abstract for the project referenced above. Three quotes were received on Friday,
June 5, 2026. The following is a summary of the quotes received:
Bidder Total Bid
Gopher State Sealcoat, Inc. $172,076.73
Allied Blacktop Company $226,416.75
Fahrner Asphalt Sealers, LLC $238,061.04
ACI Asphalt Contractors No Quote Submitted
Asphalt Surface Technologies Corp. No Quote Submitted
Bargen Incorporated No Quote Submitted
MP Asphalt Maintenance No Quote Submitted
We have reviewed the quotes and recommend awarding this bid to Gopher State Sealcoat, Inc. in the
amount of $172,076.73.
Sincerely,
Bolton & Menk, Inc.
Michael Rusenovich, P.E.
Project Engineer
Enclosure
CITY OF LAKE ELMO
Feet
0 2500 5000
2026 STREET
MAINTENANCE
MAP
LEGEND
2026 CRACK SEAL ONLY
2026 CRACK SEAL & SEAL COAT
WELL #2
PUMPHOUSE
WELL #5
WELLHOUSE
WELL #4
WELLHOUSE
INWOOD BOOSTER
STATION
TAPESTRY
LIFT STATION
32ND STREET
LIFT STATION
ROYAL GOLF NE
LIFT STATION
ROYAL GOLF W
LIFT STATION
ROYAL GOLF S
LIFT STATION
CITY HALL
PARKING
LOT
INWOOD WATER
TOWER
GOOSE LAKE PARK
PARKING LOT
3507 High Point Drive North
Bldg. 1 – Suite E130
Oakdale, MN 55128
Phone: (651) 704-9970
Bolton-Menk.com
2026 Street Maintenance Project
Lake Elmo, MN
Project No.: 26X.142139.000
CRACK SEAL PROJECT
May 22, 2026 Solicit Quotations
June 5, 2026 Receive Contractor Quotes (Two Weeks)
June 16, 2026 Council awards Contract
July 6, 2026 Contractor begins work
July 31, 2026 Substantial completion of work
SEAL COAT PROJECT
June 5, 2026 Ad for Bid, QuestCDN Project Posted
June 26, 2026 Receive Contractor Bids (21-day bidding period)
July 7, 2026 Council accepts bids and awards Contract
August 10, 2026 Contractor begins work (Or sooner if crack seal schedule allows)
September 4, 2026 Substantial completion of work
September 25, 2026 Final completion of work
STRIPING PROJECT
June 5, 2026 Solicit Quotations
June 19, 2026 Receive Contractor Quotes (2-weeks)
July 7, 2026 Council awards Contract
September 25, 2026 Contractor begins work
October 23, 2026 Final completion of work
STAFF REPORT
DATE: 6/16/2026
CONSENT
TO: Mayor and Councilmembers
FROM: Jack Griffin. Municipal Sr. Project Manager
REVIEWED BY: Sarah Sonsalla, City Attorney
AGENDA ITEM: Approve the Local Road Improvement Program Grant Agreement Terms and Conditions for the
Trunk Highway (TH) 36 and Lake Elmo Avenue (CSAH 17) Improvements
CORE STRATEGIES:
☐ Vibrant, inclusive, connected community
☐ Responsive, transparent, adaptive governance
☒ Managed Growth
☒ Efficient, reliable, innovative services
☐ Balanced Finances now and future
☒ Resilient Infrastructure
BACKGROUND:
Washington County is leading an intersection improvement project at Trunk Highway (TH) 36 and Lake Elmo
Avenue (CSAH 17), including the construction of a South Frontage Road from Keats Avenue to approximately 0.4
miles east of Lake Elmo Avenue (CSAH 17), to improve safety, capacity, and operation of the intersection and
surrounding area. The Project is planned to begin construction in June 2026 and is scheduled to be completed in
the fall 2027.
On December 16, 2025, the City Council approved a resolution approving Municipal Support for the Improvements
including the South Frontage Road Extension to Keats Avenue and including a right-turn-only access from
eastbound TH 36 to southbound Keats Avenue.
On May 5, 2026, the City Council approved a Cooperative Cost Share Agreement with the County, estimating the
Net cost share participation by Lake Elmo to be $2,430,000.
ISSUE BEFORE COUNCIL:
Should the City Council approve the Local Road Improvement Program (LRIP) Grant Agreement Terms and
Conditions for the Trunk Highway (TH) 36 and Lake Elmo Avenue (CSAH 17) Improvements in the amount of
$3,407,393.77?
PROPOSAL DETAILS/ANALYSIS:
As part of the Project funding, Washington County and the City of Lake Elmo received Local Road Improvement
funding as appropriated in 2023 and as amended in 2026, in the amount of $10,000,000.00 in general obligation
bond funds “for property acquisition and to predesign, design, construct, furnish, and equip a new interchange at
marked Trunk Highway 36 and County State-Aid Highway 17, known as Lake Elmo Avenue, in Washington County.”
The portion of the funds appropriated to the City of Lake Elmo is $3,407,393.77 in LRIP funding for right-of-way
acquisition. The amended appropriation does not change the City estimated cost share in the Project, as the LRIP
funding was already anticipated at the time of approving the Cooperative Cost Share Agreement. However, the
LRIP Grant Agreement must be fully executed between Lake Elmo and MnDOT before the LRIP grant can be
authorized.
FISCAL IMPACT:
The County is requesting cost participation in the Project by the City of Lake Elmo. The current estimated Net cost
share participation by Lake Elmo is $2,430,000, per the previously approved Cooperative Cost Share Agreement
with Washington County. By acceptance of this LRIP grant, the estimated City cost share does not change as the
previous estimates already assumed receipt of the LRIP grant amounts.
RECOMMENDATION:
Staff is recommending that the City Council approve, as part of the consent agenda, a Resolution approving the
Local Road Improvement Program Grant Agreement Terms and Conditions for the Trunk Highway (TH) 36 and
Lake Elmo Avenue (CSAH 17) Improvements. If removed from the consent agenda, the recommended motion for
the action is as follows:
“Move to approve Resolution No. 2026-042 Approving the Local Road Improvement Program Grant
Agreement Terms and Conditions for the Trunk Highway (TH) 36 and Lake Elmo Avenue (CSAH 17)
Improvements.”
ATTACHMENTS:
• Resolution Approving the LRIP Grant Agreement.
• Notice of LRIP Funding Letter dated May 26, 2026.
• Local Road Improvement Program (LRIP) Grant Agreement.
CITY OF LAKE ELMO
WASHINGTON COUNTY
STATE OF MINNESOTA
RESOLUTION NO. 2026-042
A RESOLUTION APPROVING THE LOCAL ROAD IMPROVEMENT PROGRAM
GRANT AGREEMENT TERMS AND CONDITIONS
SP No. 206-020-005, tied to 082-617-014 and SP 8204-57
WHEREAS, the City of Lake Elmo has applied to the Commissioner of Transportation for a grant
from the Local Road Improvement Fund; and
WHEREAS, the Commissioner of Transportation has given notice that funding for this project is
available; and
WHEREAS, the amount of the grant has been determined to be $3,407,393.77 by reason of the
lowest responsible bid;
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF LAKE ELMO, that
the City of Lake Elmo does hereby agree to the terms and conditions of the grant consistent with Minnesota
Statutes, section 174.52, and will pay any additional amount by which the cost exceeds the estimate and
will return to the Local Road Improvement Fund any amount appropriated for the project but not required.
The proper City officers are authorized to execute a grant agreement and any amendments thereto with the
Commissioner of Transportation concerning the above-referenced grant.
ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE SIXTEENTH DAY OF JUNE 2026.
CITY OF LAKE ELMO
By: __________________________
Charles Cadenhead
(Seal) Mayor
ATTEST:
________________________________
City Clerk
State Aid for Local Transportation
395 John Ireland Blvd., MS 500
St. Paul, MN 55155
Phone: 651-366-3800
1 of 2 206-020-005LRIPFundLtr.docx
May 26, 2026
Jack Griffin
Lake Elmo City Engineer
1305 Interlachen Drive
Eagan, MN 55123
In reference to:
Local Road Improvement Program (LRIP) Grant
State Aid Accounting System Account No. 392 (2023 LRIP General Obligation Bond Funds)
MnDOT Grant Agreement No. 1063561
SP 206-020-005, tied to 082-617-014 and SP 8204-57
Dear Mr. Griffin,
You are now authorized to advance the status of this project. In 2023 laws, Chapter 72, Article 1, Section 16,
Subdivision 19, as amended by 2026 laws, H719 (as of the date of this funding letter, the law has not been
signed into law and thus a Chapter number has not yet been assigned), Article 3, Section 3, $10,000,000.00 in
general obligation bond funds was appropriated for one of more grants to Washington County, the city of Lake
Elmo, or the city of Grant, or any combination of these entities “for property acquisition and to predesign,
design, construct, furnish, and equip a new interchange at marked Trunk Highway 36 and County State-Aid
Highway 17, known as Lake Elmo Avenue, in Washington County.” This portion of the project will be funded
from that appropriation, with $3,407,393.77 in LRIP funding for right of way acquisition. Note that additional
earmark LRIP funding under SAAS Accts 392, 371, and 411 are applied to this project for construction, right of
way acquisition, and engineering as grants to Washington County under separate funding letters, which each
will require separate grant agreements. Grant funds to the City of Lake Elmo from SAAS Acct 392 are highlighted
in yellow in the funding summary below.
This project funding requires the execution of a MnDOT grant agreement before the LRIP funds can be
authorized. After the bid opening, please work through the various DCP steps as you work towards awarding the
project. After award and following submittal of DCP-08, Metro District will issue the final funding participation
distribution. After this, Mohamed Farah from State Aid Finance will issue the LRIP encumbrance letter to the
county. The county should use the numbers from the encumbrance letter in assembling the LRIP grant
agreement.
The MnDOT grant agreement must be fully executed before the grant can be authorized, and the grant
agreement should be fully executed before work begins on the project. Please contact me if this will be an
issue.
The MnDOT agreement number is 1063561 and should be included in the upper right corner of the LRIP grant
agreement. Please submit a draft agreement to Olga Kruglova (olga.kruglova@state.mn.us) from my office for
review prior to obtaining local agency signatures. Then submit a pdf of the grant agreement with local agency
signatures to Ms. Kruglova for approval and final execution. The templates for the 2023 LRIP general obligation
bond grant agreement and resolution can be found on the state aid website. During construction, you will need
to work with the District State Aid Engineer on submitting and approving documentation and state aid pay
requests for this work.
2 of 2 206-020-005LRIPFundLtr.docx
Project Estimate – Right of Way Acquisition
2023 LRIP GO (SAAS Acct 392) - ROW acquisition 206-020-005 $ 3,407,393.77
2023 LRIP GF (SAAS Acct 411) - ROW acquisition 082-617-014 $ 94,258.54
2023 LRIP GO (SAAS Acct 392) - ROW acquisition 082-617-014 $ 3,063,040.55
CSAH $ 2,136,959.45
Local City $ 1,248,347.69
Total $ 9,950,000.00
Sincerely,
Marc Briese
State Aid State Programs Manager
copy: Wayne Sandberg, Washington County Engineer
Dan Erickson, Metro District State Aid Engineer
Luke Lortie, Metro District State Aid Programs Engineer
Brandon Anderson, Metro District Assistant State Aid Programs Engineer
Colleen Brown, Metro District Federal Aid Program Coordinator
Rob Wielinski, Metro District Federal Aid Project Manager
Mohamed Farah, State Aid Finance
Olga Kruglova, State Aid Programs
MnDOT Agreement No. 1063561
SP No. 206-020-005, tied to 082-617-014 and SP 8204-57
Revised October 2024 1
LOCAL ROAD IMPROVEMENT PROGRAM (LRIP)
GRANT AGREEMENT
This Agreement between the Minnesota Department of Transportation (“MnDOT”) and the
Grantee named below is made pursuant to Minnesota Statutes Section 174.52 and pursuant to
Minn. Laws 2023, Chapter 72- H.F. 669. The provisions in that section and the Exhibits attached
hereto and incorporated by reference constitute this Agreement and the persons signing below
agree to fully comply with all of the requirements of this Agreement. This Agreement will be
effective on the date State obtains all required signatures under Minnesota Statutes §16C.05,
subdivision 2.
1. Public Entity (Grantee) name, address and contact person:
City of Lake Elmo
3880 Laverne Avenue N.
Lake Elmo, MN 55042
Contact: Nicole Miller, City Administrator
2. Project(s):
Name of Project & Project
Number
(See Exhibit C for location)
Amount of
LRIP Funds
Amount of Required
Matching Funds
Completion Date
SP 206-020-005, tied to
082-617-014 and
SP 8204-57
$3,407,393.77
$6,542,606.23
May 31, 2031
3. Total Amount of LRIP Grant for all projects under this Agreement: $3,407,393.77
4. The following Exhibits for each project are attached and incorporated by reference as part of
this Agreement:
Exhibit A Completed Sources and Uses of Funds Schedule
Exhibit B Project Schedule, Workforce Certificate, and Equal Pay Certificate
Exhibit C Bond Financed Property Certification
Exhibit D Grant Application
Exhibit E Grantee Resolution Approving Grant Agreement
Exhibit F General Terms and Conditions
MnDOT Agreement No. 1063561
SP No. 206-020-005, tied to 082-617-014 and SP 8204-57
Revised October 2024 2
5. Additional requirements, if any: None
6. Any modification of this Agreement must be in writing and signed by both parties.
(The remaining portion of this page was intentionally left blank.)
MnDOT Agreement No. 1063561
SP No. 206-020-005, tied to 082-617-014 and SP 8204-57
Revised October 2024 3
PUBLIC ENTITY (GRANTEE)
The Grantee certifies that the appropriate person(s)
have executed the grant agreement on behalf of the
Grantee as required by applicable articles, bylaws,
resolutions, or ordinances.
By: __________________________________
Title: ________________________________
Date: ________________________________
By: __________________________________
Title: ________________________________
Date: ________________________________
DEPARTMENT OF TRANSPORTATION
Approval and Certifying Encumbrance as required by
Minnesota Statutes § 16A.15 and 16C.05
By: __________________________________
State Aid Programs Manager
(with delegated authority)
Date: ________________________________
DEPARTMENT OF TRANSPORTATION
CONTRACT MANAGEMENT
By: __________________________________
Date: ________________________________
MnDOT Agreement No. 1063561
SP No. 206-020-005, tied to 082-617-014 and SP 8204-57
Revised October 2024 4
EXHIBIT A
SOURCES AND USES OF FUNDS SCHEDULE
SOURCES OF FUNDS USES OF FUNDS
Entity Supplying Funds Amount Expenses Amount
State Funds: Items Paid for with LRIP
Grant Funds:
2023 LRIP GO Grant
(SAAS Acct 392)
$3,407,393.77
Right of Way Acquisition
$3,407,393.77
Other:
Right of Way Acquisition
$3,157,299.09 2023 LRIP GF Grant
(SAAS Acct 411)
Via agreement 1063263
$94,258.54
2023 LRIP GO
(SAAS Acct 392)
Via agreement 1063264
$3,063,040.55
Subtotal $6,564,692.86 Subtotal $6,564,692.86
Public Entity Funds: Items paid for with Non-
LRIP Grant Funds:
Local Match $3,385,307.14 Right of Way Acquisition $3,385,307.14
Subtotal $ 3,385,307.14 Subtotal $3,385,307.14
TOTAL FUNDS $9,950,000.00 = TOTAL PROJECT
COSTS
$9,950,000.00
MnDOT Agreement No. 1063561
SP No. 206-020-005, tied to 082-617-014 and SP 8204-57
Revised October 2024 5
EXHIBIT B
PROJECT SCHEDULE, WORKFORCE CERTIFICATE, AND EQUAL PAY CERTIFICATE
Award Date: June 16, 2026
Construction Start Date: June 22, 2026
Construction Substantial Complete Date: October 31, 2027
Contract Final Completion Date: May 31, 2031
MnDOT Agreement No. 1063561
SP No. 206-020-005, tied to 082-617-014 and SP 8204-57
Revised October 2024 6
INSERT APPARENT LOW BIDDER WORKFORCE CERTIFICATE BID FORM
This grant is not subject to workforce certificate requirements since it provides funding entirely for
right of way acquisition.
MnDOT Agreement No. 1063561
SP No. 206-020-005, tied to 082-617-014 and SP 8204-57
Revised October 2024 7
INSERT APPARENT LOW BIDDER EQUAL PAY CERTIFICATE BID FORM
This grant is not subject to equal pay certificate requirements since it provides funding entirely for
right-of-way acquisition.
MnDOT Agreement No. 1063561
SP No. 206-020-005, tied to 082-617-014 and SP 8204-57
Revised October 2024 8
EXHIBIT C
BOND FINANCED PROPERTY CERTIFICATION
State of Minnesota
General Obligation Bond Financed Property
The undersigned states that it has a fee simple, leasehold and/or easement interest in the real
property located in the County(ies) of Washington, State of Minnesota that is generally described or
illustrated graphically in Attachment 1 attached hereto and all improvements thereon (the “Restricted
Property”) and acknowledges that the Restricted Property is or may become State bond-financed
property. To the extent that the Restricted Property is or becomes State bond-financed property, the
undersigned acknowledges that:
A. The Restricted Property is State bond-financed property under Minn. Stat. Sec.
16A.695, is subject to the requirements imposed by that statute, and cannot be
sold, mortgaged, encumbered or otherwise disposed of without the approval of the
Commissioner of Minnesota Management and Budget; and
B. The Restricted Property is subject to the provisions of the Local Road
Improvement Program Grant Agreement between the Minnesota Department of
Transportation and the undersigned dated ________________, 20___; and
C. The Restricted Property shall continue to be deemed State bond-financed property
for 37.5 years or until the Restricted Property is sold with the written approval of
the Commissioner of Minnesota Management and Budget.
Date: __________________, 20____
_____________________________________
City of Lake Elmo, a political subdivision of the
State of Minnesota
By: ________________________________
Name: _______________________________
Title: _______________________________
By: ________________________________
Name: _______________________________
Title: _______________________________
MnDOT Agreement No. 1063561
SP No. 206-020-005, tied to 082-617-014 and SP 8204-57
Revised October 2024 9
Attachment 1 to Exhibit C
GENERAL DESCRIPTION OF RESTRICTED PROPERTY
U
U
MB
18" RCP18" CMP
18" CMP
12" RCP15" RCPMC
MP
18"
C
M
P12"NWL = 964.0
BTM = 961.0
KEATS WET POND
MATTHEW A. WASSMAN
1/21/2026 26883
DRAINAGE PLANS
BEGIN CONSTRUCTION TO TH 36 EB STA 241+00
SP 8204-57 (TH 36) / SP 082-617-014 / SP 206-020-005
226 533
...\Projects\2021\1210145\FINAL\DESIGN\Plan Sheets\cd820457_300drp.dgn2/3/20269:22:57 AMDATENO DWN CKD REVISIONS SHEET NO.OF SHEETSUNDER THE LAWS OF THE STATE OF MINNESOTA.
I AM A DULY LICENSED PROFESSIONAL ENGINEER
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT
I HEREBY CERTIFY THAT THIS SHEET WAS PREPARED PRINT NAME:
SIGNATURE:
DATE LICENSE #
230 235 240
230 235 240
510
505BTM
NWL
60TH ST N (SFR)
TH 36 EB
TH 36 WB
60TH ST N
WET DITCH A
WET DITCH C
WET DITCH B
KEATS AVE
R KEATS AVE59TH ST N59TH ST CT N 12' THRU12' THRU4' SHLD4' SHLD12' THRU
12' THRU
4' SHLD
4' SHLD
12' THRU
12' THRU
10' SHLD
12' THRU
12' THRU
3' SHLD
3' SHLD
12' THRU
12' THRU
10' SHLD
PLACEMENT LOCATIONS.
SECTIONS AND STANDARD PLANS FOR EXACT
SCHEMATICALLY FOR CLARITY. SEE TYPICAL
SUBSURFACE DRAINS ARE DRAWNC.
BASINS TO BE REMOVED.
STORM SEWER, CULVERT, MANHOLE, AND CATCH
SEE INPLACE DRAINAGE & REMOVAL PLANS FORB.
NOTED FOR GUTTER LOW POINTS.
ROADWAY PROFILE GRADE UNLESS OTHERWISE
ALL HIGH AND LOW POINTS SHOWN ARE ON THEA.
GENERAL NOTES
TH 36 EB STA 227+75.77
BEGIN SP 8204-57 (TH 36)
BEGIN CONSTRUCTION
CITY OF GRANT
CITY OF LAKE ELMO
SFR STA 506+64.02
SP 082-617-014
BEGIN SP 206-020-005 (60TH ST N (SFR))
BEGIN CONSTRUCTION
R
EXISTING DITCH
PROPOSED DITCH
EXISTING STORM STRUCTURE
PROPOSED STORM STRUCTURE
SURFACE FLOW DIRECTION
EXISTING STORM SEWER/CULVERT
PROPOSED STEEL CASING PIPE
PROPOSED STORM SEWER/CULVERT
PROPOSED SUBSURFACE DRAIN
STANDARD PLATE
RANDOM RIPRAP PLACED PER MATCHLINE TH 36 EB STA 241+00100
SCALE IN FEET
LEGEND
EXISTING STRUCTURE NUMBER
PROPOSED STRUCTURE NUMBER
DELINEATED WET DITCH
DELINEATED WETLAND
PERMANENT EASEMENT
TEMPORARY EASEMENT
PROPOSED RIGHT-OF-WAY
EXISTING RIGHT-OF-WAY
CONSTRUCTION LIMITS
M
5XXX
XXXX
5003
5004
5007
5008
5009
5010
MnDOT ROW
Washington County ROW
City of Lake Elmo ROW
Existing City D&U Easement
Proposed City D&U Easement
DRAFT
COPY
WELL
WELL
WELL
MB
EL. 974.26
STA. 513+24.11
60TH ST N (SFR)
LOW POINT
EL. 976.01
STA. 515+40.73
60TH ST N (SFR)
HIGH POINT24" CMP
MATTHEW A. WASSMAN
1/21/2026 26883
DRAINAGE PLANS
TH 36 EB STA 241+00 TO STA 254+00
SP 8204-57 (TH 36) / SP 082-617-014 / SP 206-020-005
227 533
...\Projects\2021\1210145\FINAL\DESIGN\Plan Sheets\cd820457_300drp.dgn2/3/20269:22:59 AMDATENO DWN CKD REVISIONS SHEET NO.OF SHEETSUNDER THE LAWS OF THE STATE OF MINNESOTA.
I AM A DULY LICENSED PROFESSIONAL ENGINEER
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT
I HEREBY CERTIFY THAT THIS SHEET WAS PREPARED PRINT NAME:
SIGNATURE:
DATE LICENSE #
245 250
245 250
515 520 525
TH 36 EB
TH 36 WB
60TH ST N
WET DITCH D
PEMB / PEMC / PUBH
TYPE 2 / TYPE 3 / TYPE 5
WETLAND A
60TH ST N (SFR)
R
4' SHLD
12' THRU
12' THRU
4' SHLD
10' SHLD
12' THRU
12' THRU
3' SHLD
3' SHLD
12' THRU
12' THRU
10' SHLD
12' THRU
12' THRU
CITY OF GRANT
CITY OF LAKE ELMO
CONNECT TO EXISTING STORM SEWER.1
SPECIFIC NOTES
60TH ST LN N1
PLACEMENT LOCATIONS.
SECTIONS AND STANDARD PLANS FOR EXACT
SCHEMATICALLY FOR CLARITY. SEE TYPICAL
SUBSURFACE DRAINS ARE DRAWNC.
BASINS TO BE REMOVED.
STORM SEWER, CULVERT, MANHOLE, AND CATCH
SEE INPLACE DRAINAGE & REMOVAL PLANS FORB.
NOTED FOR GUTTER LOW POINTS.
ROADWAY PROFILE GRADE UNLESS OTHERWISE
ALL HIGH AND LOW POINTS SHOWN ARE ON THEA.
GENERAL NOTES
SENSITIVITY
ENVIRONMENTAL
AREA OF
EXISTING DITCH
PROPOSED DITCH
EXISTING STORM STRUCTURE
PROPOSED STORM STRUCTURE
SURFACE FLOW DIRECTION
EXISTING STORM SEWER/CULVERT
PROPOSED STEEL CASING PIPE
PROPOSED STORM SEWER/CULVERT
PROPOSED SUBSURFACE DRAIN
STANDARD PLATE
RANDOM RIPRAP PLACED PERMATCHLINE TH 36 EB STA 254+00MATCHLINE TH 36 EB STA 241+00100
SCALE IN FEET
LEGEND
EXISTING STRUCTURE NUMBER
PROPOSED STRUCTURE NUMBER
DELINEATED WET DITCH
DELINEATED WETLAND
PERMANENT EASEMENT
TEMPORARY EASEMENT
PROPOSED RIGHT-OF-WAY
EXISTING RIGHT-OF-WAY
CONSTRUCTION LIMITS
M
5XXX
XXXX
5006
5005
5012
5011
6000
5300
5302
53035301
MnDOT ROW
Washington County ROW
City of Lake Elmo ROW
Existing City D&U Easement
Proposed City D&U Easement
DRAFT
COPY
MM MBMBMBMBMBMBMBMB24" RCP15" CMP 15" CMP 18" CMP 10" CMP
12" CPP
18" CMP
MATTHEW A. WASSMAN
1/21/2026 26883
DRAINAGE PLANS
TH 36 EB STA 254+00 TO STA 266+50
SP 8204-57 (TH 36) / SP 082-617-014 / SP 206-020-005
228 533
...\Projects\2021\1210145\FINAL\DESIGN\Plan Sheets\cd820457_300drp.dgn2/3/20269:23:00 AMDATENO DWN CKD REVISIONS SHEET NO.OF SHEETSUNDER THE LAWS OF THE STATE OF MINNESOTA.
I AM A DULY LICENSED PROFESSIONAL ENGINEER
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT
I HEREBY CERTIFY THAT THIS SHEET WAS PREPARED PRINT NAME:
SIGNATURE:
DATE LICENSE #
255 260 265
255 260
265
110 115
530 535
60TH ST N (NFR)
TH 36 EB
TH 36 WB
60TH ST N
WET DITCH D
60TH ST N (SFR)
R
4' SHLD
12' THRU
12' THRU
4' SHLD
12' THRU
12' THRU
4' SHLD
10' SHLD
12' THRU
3' SHLD
12' THRU
10' SHLD
12' THRU
12' THRU
CITY OF GRANT
CITY OF LAKE ELMO60TH ST LN N12' THRU
12' THRU
4' SHLD
12' ACCEL. LANE
8' SHLD
PLACEMENT LOCATIONS.
SECTIONS AND STANDARD PLANS FOR EXACT
SCHEMATICALLY FOR CLARITY. SEE TYPICAL
SUBSURFACE DRAINS ARE DRAWNC.
BASINS TO BE REMOVED.
STORM SEWER, CULVERT, MANHOLE, AND CATCH
SEE INPLACE DRAINAGE & REMOVAL PLANS FORB.
NOTED FOR GUTTER LOW POINTS.
ROADWAY PROFILE GRADE UNLESS OTHERWISE
ALL HIGH AND LOW POINTS SHOWN ARE ON THEA.
GENERAL NOTES
EXISTING DITCH
PROPOSED DITCH
EXISTING STORM STRUCTURE
PROPOSED STORM STRUCTURE
SURFACE FLOW DIRECTION
EXISTING STORM SEWER/CULVERT
PROPOSED STEEL CASING PIPE
PROPOSED STORM SEWER/CULVERT
PROPOSED SUBSURFACE DRAIN
STANDARD PLATE
RANDOM RIPRAP PLACED PER MATCHLINE TH 36 EB STA 266+50MATCHLINE TH 36 EB STA 254+00100
SCALE IN FEET
LEGEND
EXISTING STRUCTURE NUMBER
PROPOSED STRUCTURE NUMBER
DELINEATED WET DITCH
DELINEATED WETLAND
PERMANENT EASEMENT
TEMPORARY EASEMENT
PROPOSED RIGHT-OF-WAY
EXISTING RIGHT-OF-WAY
CONSTRUCTION LIMITS
M
5XXX
XXXX
5304 5306
5305 5307
MnDOT ROW
Washington County ROW
City of Lake Elmo ROW
Existing City D&U Easement
Proposed City D&U Easement
DRAFT
COPY
WELL
M
GP
M
GP
WELL
MBMBMBMBEL. 940.86
STA. 544+97.07
60TH ST N (SFR)
LOW POINT
EL. 947.03
STA. 549+75.00
60TH ST N (SFR)
HIGH POINT
EL. 937.77
STA. 124+21.06
60TH ST N (NFR)
LOW POINT
EL. 944.61
STA. 273+34.57
TH 36 WB
LOW POINT
EL. 945.31
STA. 273+56.34
TH 36 EB
LOW POINT
EL. 945.60
STA. 128+74.05
60TH ST N (NFR)
HIGH POINT
EL. 944.17
STA. 132+30.34
60TH ST N (NFR)
LOW POINT
EL. 943.84
STA. 62+45.75
TH 36 WB ENTRANCE
LOW POINT
EL. 944.35
STA. 71+48.41
TH 36 WB EXIT
LOW POINT
EL. 944.65
STA. 80+65.26
TH 36 EB EXIT
LOW POINT
EL. 944.65
STA. 90+76.17
TH 36 EB ENTRANCE
LOW POINT
EL. 945.64
STA. 81+92.78
TH 36 EB EXIT
HIGH POINT
EL. 944.73
STA. 60+86.78
TH 36 WB ENTRANCE
HIGH POINT
18" CMP
15" RCPNWL=935.0
BTM = 931.0
WET POND
ZIERTMAN
BTM = 932.0
SHAMROCK INFILTRATION BASIN
NWL = 938.0
BTM = 931.0
MOUCHET WET POND
BTM = 935.0
KELVIN INFILTRATION BASIN
MATTHEW A. WASSMAN
1/21/2026 26883
DRAINAGE PLANS
TH 36 EB STA 266+50 TO STA 281+50
SP 8204-57 (TH 36) / SP 082-617-014 / SP 206-020-005
229 533
...\Projects\2021\1210145\FINAL\DESIGN\Plan Sheets\cd820457_300drp.dgn2/3/20269:23:01 AMDATENO DWN CKD REVISIONS SHEET NO.OF SHEETSUNDER THE LAWS OF THE STATE OF MINNESOTA.
I AM A DULY LICENSED PROFESSIONAL ENGINEER
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT
I HEREBY CERTIFY THAT THIS SHEET WAS PREPARED PRINT NAME:
SIGNATURE:
DATE LICENSE #82927262
270 275 2807060
9080270 275 280
120
125
130
540
545550
BTM
BTM
BTM
BTM
NWL
NWL
60TH ST N (NFR)
TH 36 EBTH 36 WB
TH 36 WB ENTRANCE
TH 36 WB EXIT
TH 36 EB ENTRANCETH 36 EB EXIT
WET DITCH 2
WET DITCH 1
RWALL 1
PEMB / PUBH
TYPE 2 / TYPE 5
WETLAND 3
PEMB / PEMC / PUBH
TYPE 2 / TYPE 3 / TYPE 5
WETLAND 1
PEMB / PEMC / PUBH
TYPE 2 / TYPE 3 / TYPE 5
WETLAND 2
CASING PIPE
50' x 54" STEEL
60TH ST N (SFR)
4' SHLD
12' THRU
12' THRU
4' SHLD
12' THRU
12' THRU
3' SHLD
12' THRU
12' THRU
10' SHLD
12' THRU
13' LTL
4' SHLD
14' THRU
4' SHLD
12' THRU
4' SHLD
12' THRU
13' RTL
CITY OF GRANT
CITY OF LAKE ELMO
DITCH BLOCK. SEE DRAINAGE DETAILS.9
SEE DRAINAGE DETAILS.
DRAINAGE STRUCTURE DESIGN SPECIAL 5.4
SEE DRAINAGE DETAILS.
DRAINAGE STRUCTURE DESIGN SPECIAL 2.3
SEE DRAINAGE DETAILS.
DRAINAGE STRUCTURE DESIGN SPECIAL 1.2
SPECIFIC NOTES
12' THRU
12' THRU
4' SHLD
4' SHLD
13' LTL
12' THRU
4' SHLD
12' THRU
12
' THRU
4
' SHLD
12' THRU/RTL
4' SHLD
12' THRU
12' THRU
10' SHLD
4' SHLD
12' THRU
12' THRU
4' SHLD
12' DECEL. LANE
8' SHLD
12' THRU
12' THRU
4' SHLD
12' ACCEL. LANE
8' SHLD
12' THRU
12' THRU
12' DECEL. LANE
8' SHLD
4' SHLD
12' THRU
12' THRU
4' SHLD
12' ACCEL. LANE
8' SHLD
547
3
2
PLACEMENT LOCATIONS.
SECTIONS AND STANDARD PLANS FOR EXACT
SCHEMATICALLY FOR CLARITY. SEE TYPICAL
SUBSURFACE DRAINS ARE DRAWNC.
BASINS TO BE REMOVED.
STORM SEWER, CULVERT, MANHOLE, AND CATCH
SEE INPLACE DRAINAGE & REMOVAL PLANS FORB.
NOTED FOR GUTTER LOW POINTS.
ROADWAY PROFILE GRADE UNLESS OTHERWISE
ALL HIGH AND LOW POINTS SHOWN ARE ON THEA.
GENERAL NOTES
SENSITIVITY
ENVIRONMENTAL
AREA OF
SENSITIVITY
ENVIRONMENTAL
AREA OF
SENSITIVITY
ENVIRONMENTAL
AREA OF
4
R
R
9
R R
RR
R
MATCHLINE TH 36 EB STA 266+50MATCHLINE TH 36 EB STA 281+50SFR STA 553+00MATCHLINEMATCHLINE NFR STA 133+50100
SCALE IN FEET
5016 5021
51545153 5032
5033
5034
5026
5025
5027
5029
5030
5022 505350545055
5060
5023
5040 5039
5038
5047
5048
5050
5049
5042
5041
5045 5046
5079507850
7
75075
5074
5073
5065
505250515076
5028
5062
5061
5037 5036
5035
5024
5044
5043
5017 5018
5019
5020
5308
5309
5310
5311
R
EXISTING DITCH
PROPOSED DITCH
EXISTING STORM STRUCTURE
PROPOSED STORM STRUCTURE
SURFACE FLOW DIRECTION
EXISTING STORM SEWER/CULVERT
PROPOSED STEEL CASING PIPE
PROPOSED STORM SEWER/CULVERT
PROPOSED SUBSURFACE DRAIN
STANDARD PLATE
RANDOM RIPRAP PLACED PER
LEGEND
EXISTING STRUCTURE NUMBER
PROPOSED STRUCTURE NUMBER
DELINEATED WET DITCH
DELINEATED WETLAND
PERMANENT EASEMENT
TEMPORARY EASEMENT
PROPOSED RIGHT-OF-WAY
EXISTING RIGHT-OF-WAY
CONSTRUCTION LIMITS
M
5XXX
XXXX
MnDOT ROW
Washington County ROW
City of Lake Elmo ROW
Existing City D&U Easement
Proposed City D&U Easement
DRAFT
COPY
WELL
MM
MM
M
M
MMMM
M
M
M
M M
T
T
T
M
M
M
MM
M
M
M
WELLMBMBMBFMBMBMBEL. 946.67
STA. 136+75.81
60TH ST N (NFR)
HIGH POINT
EL. 943.20
STA. 139+04.38
60TH ST N (NFR)
LOW POINT
EL. 942.82
STA. 141+31.31
60TH ST N (NFR)
LOW POINT
EL. 933.14
STA. 558+56.97
60TH ST N (SFR)
LOW POINT
EL. 930.48
STA. 563+46.54
60TH ST N (SFR)
LOW POINT
EL. 963.39
STA. 288+48.25
TH 36 WB
HIGH POINT
EL. 959.94
STA. 294+64.43
TH 36 WB
LOW POINT
EL. 963.28
STA. 288+37.12
TH 36 EB
HIGH POINT
EL. 959.59
STA. 294+60.71
TH 36 EB
LOW POINT
1
5
" CPP
M6" PVC 12" CMP12" CMPNWL=925.0
BTM = 919.0
WET POND
COZZIE SOUTH
BTM = 925.0
SUNFARM INFILTRATION BASIN
BTM = 927.0
ELMO INFILTRATION BASIN
NWL= 927.0
BTM = 922.0
DAVID WET POND
MATTHEW A. WASSMAN
1/21/2026 26883
DRAINAGE PLANS
TH 36 EB STA 281+50 TO STA 295+50
SP 8204-57 (TH 36) / SP 082-617-014 / SP 206-020-005
230 533
...\Projects\2021\1210145\FINAL\DESIGN\Plan Sheets\cd820457_300drp.dgn2/3/20269:23:02 AMDATENO DWN CKD REVISIONS SHEET NO.OF SHEETSUNDER THE LAWS OF THE STATE OF MINNESOTA.
I AM A DULY LICENSED PROFESSIONAL ENGINEER
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT
I HEREBY CERTIFY THAT THIS SHEET WAS PREPARED PRINT NAME:
SIGNATURE:
DATE LICENSE #3426285 290 295
30285 290 295
135 140 145
555560 565
BTM
BTM
NWL
NWL
BTM
BTM
60TH ST N (NFR)
TH 36 EB
TH 36 WB
CSAH 17
BRIDGE NO 82053
BRIDGE NO 82054
WET DITCH 4
WET DITCH 3
WET DITCH 2
RWALL 2
RWALL 3 RWALL 4
RWALL 5
RWALL 6
RWALL 7
RWALL 10
RWALL 9
RWALL 8
CASING PIPE
17' x 24" STEEL
CASING PIPE
160' x 54" STEEL
60TH ST N (SFR)
12' THRU
12' THRU
CITY OF GRANT
CITY OF LAKE ELMO
ONNECT TO EXISTING STORM SEWER.C1
SPECIFIC NOTES
SEE GENERAL NOTES ON PREVIOUS SHEET.B.
SEE LEGEND ON PREVIOUS SHEET.A.
GENERAL NOTES
8' SHLD12' THRU13' LTL12' THRU14' RTL12' THRU8' SHLD13' LTL12' THRU14' RTL10' BLVD10' WALK12' THRU13' LTL12' THRU14' RTL12' THRU12' THRU8' SHLD13' LTL14' RTL14' RTL
12' THRU
12' THRU
13' LTL
6' SHLD
12' THRU
12' THRU
13' LTL
14' RTL
4' SHLD
12' THRU
12' THRU
4' SHLD
12' ACCEL. LANE
8' SHLD
4' SHLD
12' THRU
12' THRU
10' SHLD
4' SHLD
12' THRU
12' THRU
10' SHLD
12' THRU
12' THRU
4' SHLD
12' ACCEL. LANE
8' SHLD
12' THRU
12' THRU
13' LTL
14' RTL
4' SHLD
12' THRU
12' THRU
13' LTL
13' RTL
4' SHLD
12' T
H
R
U
12' T
H
R
U
4' S
HL
D
4' S
HL
D
4' SHLD
12' THRU
12' THRU
4' SHLD8' SHLD6
1
R
5
DITCH BLOCK. SEE DRAINAGE DETAILS.9
SEE DRAINAGE DETAILS.
DRAINAGE STRUCTURE DESIGN SPECIAL 4.6
SEE DRAINAGE DETAILS.
DRAINAGE STRUCTURE DESIGN SPECIAL 3.5
9
CSAH 17 STA 32+39.83
END SP 206-020-005
MATCHLINE TH 36 EB STA 295+50SFR STA 568+50MATCHLINEMATCHLINE CSAH 17 STA 25+50
MATCHLINE CSAH 17 STA 34+50
MATCHLINE TH 36 EB STA 281+50MATCHLINE NFR STA 133+50SFR STA 553+00MATCHLINE100
SCALE IN FEET
5163
5166 5165
5167
5149
5169
5147
5170
5173
5172
5180
5181
5182
5070
5063
5071
5066
5064
5072
5123
5120
5121
5122
5129
5128
5126
51275131
5130
5125
5124
5146
5084
5145
5144
50815068
50825083
5085
5143 5086
5092
5091 5090
5093
5096
5094
5095
5097
5098
5100
5101
5102
5104
5105
5108
5110
5109
5171
5162
5106
5067
5168
5178
5177
5176
5148
5105
5103
5069
5202
5201 5200
5099
5312
5313
5314
MnDOT ROW
Washington County ROW
City of Lake Elmo ROW
Existing City D&U Easement
Proposed City D&U Easement
DRAFT
COPY
WELL
T
WELL MBF
MB18" RCP12" CPP 18" CMP 15" CMP12" CMP
8" PVC
18" CMP
MATTHEW A. WASSMAN
1/21/2026 26883
DRAINAGE PLANS
TH 36 EB STA 295+50 TO END CONSTRUCTION
SP 8204-57 (TH 36) / SP 082-617-014 / SP 206-020-005
231 533
...\Projects\2021\1210145\FINAL\DESIGN\Plan Sheets\cd820457_300drp.dgn2/3/20269:23:03 AMDATENO DWN CKD REVISIONS SHEET NO.OF SHEETSUNDER THE LAWS OF THE STATE OF MINNESOTA.
I AM A DULY LICENSED PROFESSIONAL ENGINEER
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT
I HEREBY CERTIFY THAT THIS SHEET WAS PREPARED PRINT NAME:
SIGNATURE:
DATE LICENSE #
300 305 310
300
305 310
150 155
570
575 580
60TH ST N (NFR)
TH 36 EB
TH 36 WB
60TH ST N
PEMA
TYPE 1
WETLAND 5
60TH ST N (SFR)
R
4' SHLD
12' THRU
12' THRU
4' SHLD
4' SHLD
12' THRU12' THRU
4' SHLD
12' THRU
12' THRU
2' SHLD
12' THRU
12' THRU
10' SHLD
3' SHLD
3' SHLD
12' THRU
12' THRU
10' SHLD
TH 36 EB STA 310+07.74
END SP 8204-57 (TH 36)
END CONSTRUCTION
CITY OF GRANT
CITY OF LAKE ELMO
DITCH BLOCK. SEE DRAINAGE DETAILS.9
SPECIFIC NOTES
4' SHLD
12' THRU
12' THRU
10' SHLD
4' SHLD
12' THRU
12' THRU
10' SHLD
SFR STA 583+28.58
SP 082-617-014
END SP 206-020-005 (60TH ST N (SFR))
END CONSTRUCTION
PLACEMENT LOCATIONS.
SECTIONS AND STANDARD PLANS FOR EXACT
SCHEMATICALLY FOR CLARITY. SEE TYPICAL
SUBSURFACE DRAINS ARE DRAWNC.
BASINS TO BE REMOVED.
STORM SEWER, CULVERT, MANHOLE, AND CATCH
SEE INPLACE DRAINAGE & REMOVAL PLANS FORB.
NOTED FOR GUTTER LOW POINTS.
ROADWAY PROFILE GRADE UNLESS OTHERWISE
ALL HIGH AND LOW POINTS SHOWN ARE ON THEA.
GENERAL NOTES
SENSITIVITY
ENVIRONMENTAL
AREA OF
9
EXISTING DITCH
PROPOSED DITCH
EXISTING STORM STRUCTURE
PROPOSED STORM STRUCTURE
SURFACE FLOW DIRECTION
EXISTING STORM SEWER/CULVERT
PROPOSED STEEL CASING PIPE
PROPOSED STORM SEWER/CULVERT
PROPOSED SUBSURFACE DRAIN
STANDARD PLATE
RANDOM RIPRAP PLACED PERMATCHLINE TH 36 EB STA 295+50SFR STA 568+50MATCHLINE100
SCALE IN FEET
LEGEND
EXISTING STRUCTURE NUMBER
PROPOSED STRUCTURE NUMBER
DELINEATED WET DITCH
DELINEATED WETLAND
PERMANENT EASEMENT
TEMPORARY EASEMENT
PROPOSED RIGHT-OF-WAY
EXISTING RIGHT-OF-WAY
CONSTRUCTION LIMITS
M
5XXX
XXXX
5160
5159
5158
5161
5156
5155
5157
5116
5115
5204 5203
MnDOT ROW
Washington County ROW
City of Lake Elmo ROW
Existing City D&U Easement
Proposed City D&U Easement
DRAFT
COPY
WELL
WELL
T
T
T
T
WELL
WELL
MB
MB
18"
CPP
M
36" CPP
12" RCP
15" RCP15" RCP
MATTHEW A. WASSMAN
1/21/2026 26883
DRAINAGE PLANS
BEGIN CONSTRUCTION TO CSAH 17 STA 25+50
SP 8204-57 (TH 36) / SP 082-617-014 / SP 206-020-005
232 533
...\Projects\2021\1210145\FINAL\DESIGN\Plan Sheets\cd820457_300drp.dgn2/3/20269:23:04 AMDATENO DWN CKD REVISIONS SHEET NO.OF SHEETSUNDER THE LAWS OF THE STATE OF MINNESOTA.
I AM A DULY LICENSED PROFESSIONAL ENGINEER
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT
I HEREBY CERTIFY THAT THIS SHEET WAS PREPARED PRINT NAME:
SIGNATURE:
DATE LICENSE #2025CSAH 1757TH ST COVE NTYPE 5 / PUBHx
WETLAND 4
WET DITCH 4
R
12' THRU12' THRU8' SHLD8' SHLDCITY OF LAKE ELMO
CONNECT TO EXISTING STORM SEWER.1
SPECIFIC NOTES
1:4014' RTL12' THRU12' THRU8' SHLD14' RTL12' THRU13' LTL12' THRU8' SHLD1
R
PLACEMENT LOCATIONS.
SECTIONS AND STANDARD PLANS FOR EXACT
SCHEMATICALLY FOR CLARITY. SEE TYPICAL
SUBSURFACE DRAINS ARE DRAWNC.
BASINS TO BE REMOVED.
STORM SEWER, CULVERT, MANHOLE, AND CATCH
SEE INPLACE DRAINAGE & REMOVAL PLANS FORB.
NOTED FOR GUTTER LOW POINTS.
ROADWAY PROFILE GRADE UNLESS OTHERWISE
ALL HIGH AND LOW POINTS SHOWN ARE ON THEA.
GENERAL NOTES
R
CSAH 17 STA 18+09.45
SP 206-020-005
BEGIN SP 082-617-014 (CSAH 17)
BEGIN CONSTRUCTION
EXISTING DITCH
PROPOSED DITCH
EXISTING STORM STRUCTURE
PROPOSED STORM STRUCTURE
SURFACE FLOW DIRECTION
EXISTING STORM SEWER/CULVERT
PROPOSED STEEL CASING PIPE
PROPOSED STORM SEWER/CULVERT
PROPOSED SUBSURFACE DRAIN
STANDARD PLATE
RANDOM RIPRAP PLACED PER
MATCHLINE CSAH 17 STA 25+50
100
SCALE IN FEET
LEGEND
EXISTING STRUCTURE NUMBER
PROPOSED STRUCTURE NUMBER
DELINEATED WET DITCH
DELINEATED WETLAND
PERMANENT EASEMENT
TEMPORARY EASEMENT
PROPOSED RIGHT-OF-WAY
EXISTING RIGHT-OF-WAY
CONSTRUCTION LIMITS
M
5XXX
XXXX
5184
5183
5185
51955186
5190
5197
5189
5187
51965188
MnDOT ROW
Washington County ROW
City of Lake Elmo ROW
Existing City D&U Easement
Proposed City D&U Easement
DRAFT
COPY
WELLWELLWELLWELL
WELL
WELLWELL
WELL
M
U
U
U
T
M
WELL
WELLWELL
WELL
WELLWELLWELL WELL
MBMB
MB
MBMBMBMB
MBMB
MB
15" CMP18" CMP12" CPP
12" CMP
MATTHEW A. WASSMAN
1/21/2026 26883
DRAINAGE PLANS
CSAH 17 STA 34+50 TO END CONSTRUCTION
SP 8204-57 (TH 36) / SP 082-617-014 / SP 206-020-005
233 533
...\Projects\2021\1210145\FINAL\DESIGN\Plan Sheets\cd820457_300drp.dgn2/3/20269:23:05 AMDATENO DWN CKD REVISIONS SHEET NO.OF SHEETSUNDER THE LAWS OF THE STATE OF MINNESOTA.
I AM A DULY LICENSED PROFESSIONAL ENGINEER
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT
I HEREBY CERTIFY THAT THIS SHEET WAS PREPARED PRINT NAME:
SIGNATURE:
DATE LICENSE #3540CSAH 17
R
62ND ST N
12' THRU12' THRU8' SHLD8' SHLDCSAH 17 STA 41+04.72
END SP 082-617-014 (CSAH 17)
END CONSTRUCTION
CITY OF GRANT
8' SHLD12' THRU12' THRU8' SHLD14' RTL12' THRU13' LTL12' THRU8' SHLDPLACEMENT LOCATIONS.
SECTIONS AND STANDARD PLANS FOR EXACT
SCHEMATICALLY FOR CLARITY. SEE TYPICAL
SUBSURFACE DRAINS ARE DRAWNC.
BASINS TO BE REMOVED.
STORM SEWER, CULVERT, MANHOLE, AND CATCH
SEE INPLACE DRAINAGE & REMOVAL PLANS FORB.
NOTED FOR GUTTER LOW POINTS.
ROADWAY PROFILE GRADE UNLESS OTHERWISE
ALL HIGH AND LOW POINTS SHOWN ARE ON THEA.
GENERAL NOTES
EXISTING DITCH
PROPOSED DITCH
EXISTING STORM STRUCTURE
PROPOSED STORM STRUCTURE
SURFACE FLOW DIRECTION
EXISTING STORM SEWER/CULVERT
PROPOSED STEEL CASING PIPE
PROPOSED STORM SEWER/CULVERT
PROPOSED SUBSURFACE DRAIN
STANDARD PLATE
RANDOM RIPRAP PLACED PER
MATCHLINE CSAH 17 STA 34+50
100
SCALE IN FEET
LEGEND
EXISTING STRUCTURE NUMBER
PROPOSED STRUCTURE NUMBER
DELINEATED WET DITCH
DELINEATED WETLAND
PERMANENT EASEMENT
TEMPORARY EASEMENT
PROPOSED RIGHT-OF-WAY
EXISTING RIGHT-OF-WAY
CONSTRUCTION LIMITS
M
5XXX
XXXX
5152
5151
5140
5141
5142 5150
5139
MnDOT ROW
Washington County ROW
City of Lake Elmo ROW
Existing City D&U Easement
Proposed City D&U Easement
DRAFT
COPY
MnDOT Agreement No. 1063561
SP No. 206-020-005, tied to 082-617-014 and SP 8204-57
Revised October 2024 10
EXHIBIT D
GRANT APPLICATION
In 2023 laws, Chapter 72, Article 1, Section 16, Subdivision 19, as amended by 2026 laws, Chapter
130, Article 3, Section 3, $10,000,000.00 in general obligation bond funds was appropriated for
one of more grants to Washington County, the city of Lake Elmo, or the city of Grant, or any
combination of these entities “for property acquisition and to predesign, design, construct,
furnish, and equip a new interchange at marked Trunk Highway 36 and County State-Aid Highway
17, known as Lake Elmo Avenue, in Washington County.”
This portion of the project will be funded from that appropriation, with $3,407,393.77 in LRIP
funding for right of way acquisition.
MnDOT Agreement No. 1063561
SP No. 206-020-005, tied to 082-617-014 and SP 8204-57
Revised October 2024 11
EXHIBIT E
GRANTEE RESOLUTION APPROVING GRANT AGREEMENT
MnDOT Agreement No. 1063561
SP No. 206-020-005, tied to 082-617-014 and SP 8204-57
Revised October 2024 12
CITY OF LAKE ELMO
WASHINGTON COUNTY
STATE OF MINNESOTA
RESOLUTION NO. 2026-0XX
A RESOLUTION APPROVING THE LOCAL ROAD IMPROVEMENT PROGRAM
GRANT AGREEMENT TERMS AND CONDITIONS
SP No. 206-020-005, tied to 082-617-014 and SP 8204-57
WHEREAS, the City of Lake Elmo has applied to the Commissioner of Transportation for a grant
from the Local Road Improvement Fund; and
WHEREAS, the Commissioner of Transportation has given notice that funding for this project is
available; and
WHEREAS, the amount of the grant has been determined to be $3,407,393.77 by reason of the
lowest responsible bid;
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF LAKE ELMO, that
the City of Lake Elmo does hereby agree to the terms and conditions of the grant consistent with Minnesota
Statutes, section 174.52, and will pay any additional amount by which the cost exceeds the estimate and
will return to the Local Road Improvement Fund any amount appropriated for the project but not required.
The proper City officers are authorized to execute a grant agreement and any amendments thereto with the
Commissioner of Transportation concerning the above-referenced grant.
ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE SIXTEENTH DAY OF JUNE 2026.
CITY OF LAKE ELMO
By: __________________________
Charles Cadenhead
(Seal) Mayor
ATTEST:
________________________________
City Clerk
MnDOT Agreement No. 1063561
SP No. 206-020-005, tied to 082-617-014 and SP 8204-57
Revised October 2024 13
EXHIBIT F
GENERAL TERMS AND CONDITIONS FOR
LOCAL ROAD IMPROVEMENT PROGRAM (LRIP) GRANTS
Article I
DEFINITIONS
Section 1.01 Defined Terms. The following terms shall have the meanings set out respectively after
each such term (the meanings to be equally applicable to both the singular and plural forms of the terms
defined) unless the context specifically indicates otherwise:
“Advance(s)” - means an advance made or to be made by MnDOT to the Public Entity and disbursed
in accordance with the provisions contained in Article VI hereof.
“Agreement” - means the Local Road Improvement Program Grant Agreement between the Public
Entity and the Minnesota Department of Transportation to which this Exhibit is attached.
“Certification” - means the certification, in the form attached as Exhibit C, in which the Public Entity
acknowledges that its interest in the Real Property is bond financed property within the meaning of Minn.
Stat. Sec. 16A.695 and is subject to certain restrictions imposed thereby.
“Code” - means the Internal Revenue Code of 1986, as amended, and all treasury regulations, revenue
procedures and revenue rulings issued pursuant thereto.
“Commissioner” - means the Commissioner of Minnesota Management & Budget.
“Commissioner’s Order” - means the “Fourth Order Amending Order of the Commissioner of
Minnesota Management & Budget Relating to Use and Sale of State Bond Financed Property” dated July
30, 2012, as it may be amended or supplemented.
“Completion Date” - means the projected date for completion of the Project as indicated in the
Agreement.
“Construction Contract Documents” - means the document or documents, in form and substance
acceptable to MnDOT, including but not limited to any construction plans and specifications and any
exhibits, amendments, change orders, modifications thereof or supplements thereto, which collectively
form the contract between the Public Entity and the Contractor(s) for the completion of the Construction
Items on or before the Completion Date for either a fixed price or a guaranteed maximum price.
“Construction Items” - means the work to be performed under the Construction Contract Documents.
“Contractor” - means any person engaged to work on or to furnish materials and supplies for the
Construction Items including, if applicable, a general contractor.
“Draw Requisition” - means a draw requisition that the Public Entity, or its designee, submits to
MnDOT when an Advance is requested, as referred to in Section 4.02.
MnDOT Agreement No. 1063561
SP No. 206-020-005, tied to 082-617-014 and SP 8204-57
Revised October 2024 14
“G.O. Bonds” - means the state general obligation bonds issued under the authority granted in Article
XI, Sec. 5(a) of the Minnesota Constitution, the proceeds of which are used to fund the LRIP Grant, and
any bonds issued to refund or replace such bonds.
“Grant Application” - means the grant application that the Public Entity submitted to MnDOT which
is attached as Exhibit D.
“LRIP Grant” - means a grant from MnDOT to the Public Entity under the LRIP in the amount
specified in the Agreement, as such amount may be modified under the provisions hereof.
“LRIP” - means the Local Road Improvement Program pursuant to Minn. Stat. Sec. 174.52 and rules
relating thereto.
“MnDOT” - means the Minnesota Department of Transportation.
“Outstanding Balance of the LRIP Grant” - means the portion of the LRIP Grant that has been
disbursed to the Public Entity minus any amounts returned to the Commissioner.
“Project” - means the Project identified in the Agreement to be totally or partially funded with a LRIP
grant.
“Public Entity” - means the grantee of the LRIP Grant and identified as the Public Entity in the
Agreement.
“Real Property” - means the real property identified in the Agreement on which the Project is located.
Article II
GRANT
Section 2.01 Grant of Monies. MnDOT shall make the LRIP Grant to the Public Entity, and disburse
the proceeds in accordance with the terms and conditions herein.
Section 2.02 Public Ownership, The Public Entity acknowledges and agrees that the LRIP Grant is
being funded with the proceeds of G.O. Bonds, and as a result all of the Real Property must be owned by
one or more public entities. The Public Entity represents and warrants to MnDOT that it has one or more
of the following ownership interests in the Real Property: (i) fee simple ownership, (ii) an easement that is
for a term that extends beyond the date that is 37.5 years from the Agreement effective date, or such shorter
term as authorized by statute, and which cannot be modified or terminated early without the prior written
consent of MnDOT and the Commissioner; and/or (iii) a prescriptive easement for a term that extends
beyond the date that is 37.5 years from the Agreement effective date.
Section 2.03 Use of Grant Proceeds. The Public Entity shall use the LRIP Grant solely to reimburse
itself for expenditures it has already made, or will make, to pay the costs of one of the following applicable
activities: (i) preliminary, final construction and engineering and administration (ii) constructing or
reconstructing city streets, county highways, or town roads with statewide or regional significance that
have not been fully funded through other state, federal, or local funding sources; or (iii) capital
improvement projects on county state-aid highways that are intended primarily to reduce traffic crashes,
deaths, injuries, and property damage. The Public Entity shall not use the LRIP Grant for any other purpose,
including but not limited to, any work to be done on a state trunk highway or within a trunk highway
easement.
MnDOT Agreement No. 1063561
SP No. 206-020-005, tied to 082-617-014 and SP 8204-57
Revised October 2024 15
Section 2.04 Operation of the Real Property. The Real Property must be used by the Public Entity
in conjunction with or for the operation of a county highway, county state-aid highway, town road, or city
street and for other uses customarily associated therewith, such as trails and utility corridors, and for no
other purposes or uses. The Public Entity shall have no intention on the effective date of the Agreement to
use the Real Property as a trunk highway or any part of a trunk highway. The Public Entity must annually
determine that the Real Property is being used for the purposes specified in this Section and, upon written
request by either MnDOT or the Commissioner, shall supply a notarized statement to that effect.
Section 2.05 Sale or Lease of Real Property. The Public Entity shall not (i) sell or transfer any part
of its ownership interest in the Real Property, or (ii) lease out or enter into any contract that would allow
another entity to use or operate the Real Property without the written consent of both MnDOT and the
Commissioner. The sale or transfer of any part of the Public Entity’s ownership interest in the Real
Property, or any lease or contract that would allow another entity to use or operate the Real Property, must
comply with the requirements imposed by Minn. Stat. Sec. 16A.695 and the Commissioner’s Order
regarding such sale or lease.
Section 2.06 Public Entity’s Representations and Warranties. The Public Entity represents and
warrants to MnDOT that:
A. It has legal authority to execute, deliver and perform the Agreement and all documents referred
to therein, and it has taken all actions necessary to its execution and delivery of such documents.
B. It has the ability and a plan to fund the operation of the Real Property for the purposes specified
in Section 2.04, and will include in its annual budget all funds necessary for the operation of
the Real Property for such purposes.
C. The Agreement and all other documents referred to therein are the legal, valid and binding
obligations of the Public Entity enforceable against the Public Entity in accordance with their
respective terms.
D. It will comply with all of the provisions of Minn. Stat. Sec. 16A.695, the Commissioner’s Order
and the LRIP. It has legal authority to use the G.O. Grant for the purpose or purposes described
in this Agreement.
E. All of the information it has submitted or will submit to MnDOT or the Commissioner relating
to the LRIP Grant or the disbursement of the LRIP Grant is and will be true and correct.
F. It is not in violation of any provisions of its charter or of the laws of the State of Minnesota,
and there are no actions or proceedings pending, or to its knowledge threatened, before any
judicial body or governmental authority against or affecting it relating to the Real Property, or
its ownership interest therein, and it is not in default with respect to any order, writ, injunction,
decree, or demand of any court or any governmental authority which would impair its ability
to enter into the Agreement or any document referred to herein, or to perform any of the acts
required of it in such documents.
G. Neither the execution and delivery of the Agreement or any document referred to herein nor
compliance with any of the provisions or requirements of any of such documents is prevented
by, is a breach of, or will result in a breach of, any provision of any agreement or document to
which it is now a party or by which it is bound.
MnDOT Agreement No. 1063561
SP No. 206-020-005, tied to 082-617-014 and SP 8204-57
Revised October 2024 16
H. The contemplated use of the Real Property will not violate any applicable zoning or use statute,
ordinance, building code, rule or regulation, or any covenant or agreement of record relating
thereto.
I. The Project will be completed and the Real Property will be operated in full compliance with
all applicable laws, rules, ordinances, and regulations of any federal, state, or local political
subdivision having jurisdiction over the Project and the Real Property.
J. All applicable licenses, permits and bonds required for the performance and completion of the
Project and for the operation of the Real Property as specified in Section 2.04 have been, or
will be, obtained.
K. It reasonably expects to possess its ownership interest in the Real Property described in Section
2.02 for at least 37.5 years, and it does not expect to sell such ownership interest.
L. It does not expect to lease out or enter into any contract that would allow another entity to use
or operate the Real Property.
M. It will supply whatever funds are needed in addition to the LRIP Grant to complete and fully
pay for the Project.
N. The Construction Items will be completed substantially in accordance with the Construction
Contract Documents by the Completion Date and all such items will be situated entirely on the
Real Property.
O. It will require the Contractor or Contractors to comply with all rules, regulations, ordinances,
and laws bearing on its performance under the Construction Contract Documents.
P. It shall furnish such satisfactory evidence regarding the representations and warranties
described herein as may be required and requested by either MnDOT or the Commissioner.
Q. It has made no material false statement or misstatement of fact in connection with its receipt of
the G.O. Grant, and all the information it has submitted or will submit to the State Entity or
Commissioner of MMB relating to the G.O. Grant or the disbursement of any of the G.O. Grant
is and will be true and correct.
Section 2.07 Event(s) of Default. The following events shall, unless waived in writing by MnDOT
and the Commissioner, constitute an Event of Default under the Agreement upon either MnDOT or the
Commissioner giving the Public Entity 30 days’ written notice of such event and the Public Entity’s failure
to cure such event during such 30-day time period for those Events of Default that can be cured within 30
days or within whatever time period is needed to cure those Events of Default that cannot be cured within
30 days as long as the Public Entity is using its best efforts to cure and is making reasonable progress in
curing such Events of Default; however, in no event shall the time period to cure any Event of Default
exceed six (6) months unless otherwise consented to, in writing, by MnDOT and the Commissioner.
A. If any representation, covenant, or warranty made by the Public Entity herein or in any other
document furnished pursuant to the Agreement, or to induce MnDOT to disburse the LRIP
Grant, shall prove to have been untrue or incorrect in any material respect or materially
misleading as of the time such representation, covenant, or warranty was made.
MnDOT Agreement No. 1063561
SP No. 206-020-005, tied to 082-617-014 and SP 8204-57
Revised October 2024 17
B. If the Public Entity fails to fully comply with any provision, covenant, or warranty contained
herein.
C. If the Public Entity fails to fully comply with any provision, covenant or warranty contained
in Minn. Stat. Sec. 16A.695, the Commissioner’s Order, or Minn. Stat. Sec. 174.52 and all
rules related thereto.
D. If the Public Entity fails to use the proceeds of the LRIP Grant for the purposes set forth in
Section 2.03, the Grant Application, and in accordance with the LRIP.
E. If the Public Entity fails to operate the Real Property for the purposes specified in Section 2.04.
F. If the Public Entity fails to complete the Project by the Completion Date.
G. If the Public Entity sells or transfers any portion of its ownership interest in the Real Property
without first obtaining the written consent of both MnDOT and the Commissioner.
H. If the Public Entity fails to provide any additional funds needed to fully pay for the Project.
I. If the Public Entity fails to supply the funds needed to operate the Real Property in the manner
specified in Section 2.04.
Notwithstanding the foregoing, any of the above events that cannot be cured shall, unless waived in writing
by MnDOT and the Commissioner, constitute an Event of Default under the Agreement immediately upon
either MnDOT or the Commissioner giving the Public Entity written notice of such event.
Section 2.08 Remedies. Upon the occurrence of an Event of Default and at any time thereafter until
such Event of Default is cured to the satisfaction of MnDOT, MnDOT or the Commissioner may enforce
any or all of the following remedies.
A. MnDOT may refrain from disbursing the LRIP Grant; provided, however, MnDOT may make
such disbursements after the occurrence of an Event of Default without waiving its rights and
remedies hereunder.
B. If the Event of Default involves a sale of the Public Entity’s interest in the Real Property in
violation of Minn. Stat. Sec. 16A.695 or the Commissioner’s Order, the Commissioner, as a
third party beneficiary of the Agreement, may require that the Public Entity pay the amounts
that would have been paid if there had been compliance with such provisions. For other Events
of Default, the Commissioner may require that the Outstanding Balance of the LRIP Grant be
returned to it.
C. Either MnDOT or the Commissioner, as a third party beneficiary of the Agreement, may
enforce any additional remedies it may have in law or equity.
The rights and remedies specified herein are cumulative and not exclusive of any rights or remedies that
MnDOT or the Commissioner would otherwise possess.
If the Public Entity does not repay the amounts required to be paid under this Section or under any other
provision contained herein within 30 days of demand by the Commissioner, or any amount ordered by a
court of competent jurisdiction within 30 days of entry of judgment against the Public Entity and in favor
MnDOT Agreement No. 1063561
SP No. 206-020-005, tied to 082-617-014 and SP 8204-57
Revised October 2024 18
of MnDOT and/or the Commissioner, then such amount may, unless precluded by law, be offset against
any aids or other monies that the Public Entity is entitled to receive from the State of Minnesota.
Section 2.09 Notification of Event of Default. The Public Entity shall furnish to MnDOT and the
Commissioner, as soon as possible and in any event within seven (7) days after it has obtained knowledge
of the occurrence of each Event of Default, a statement setting forth details of each Event of Default and
the action which the Public Entity proposes to take with respect thereto.
Section 2.10 Effect of Event of Default. The Agreement shall survive Events of Default and remain
in full force and effect, even upon full disbursement of the LRIP Grant, and shall only be terminated under
the circumstances set forth in Section 2.11.
Section 2.11 Termination of Agreement and Modification of LRIP Grant.
A. If the Project is not started within five (5) years after the effective date of the Agreement or the
LRIP Grant has not been disbursed within four (4) years after the date the Project was started, MnDOT’ s
obligation to fund the LRIP Grant shall terminate. In such event, (i) if none of the LRIP Grant has been
disbursed by such date, MnDOT shall have no obligation to fund the LRIP Grant and the Agreement will
terminate, and (ii) if some but not all of the LRIP Grant has been disbursed by such date, MnDOT shall
have no further obligation to provide any additional funding for the LRIP Grant and the Agreement shall
remain in force but shall be modified to reflect the amount of the LRIP Grant that was actually disbursed
and the Public Entity is still obligated to complete the Project by the Completion Date.
B. The Agreement shall terminate upon the Public Entity’s sale of its interest in the Real Property
and transmittal of the required portion of the proceeds of the sale to the Commissioner in compliance with
Minn. Stat. Sec. 16A.695 and the Commissioner’s Order, or upon the termination of the Public Entity’s
ownership interest in the Real Property if such ownership interest is an easement.
Section 2.12 Excess Funds. If the full amount of the G.O. Grant and any matching funds referred to
in Section 5.13 are not needed to complete the Project, then, unless language in the G.O. Bonding
Legislation indicates otherwise, the G.O. Grant shall be reduced by the amount not needed.
Article III
COMPLIANCE WITH MINNESOTA STATUTE, SEC. 16A.695
AND THE COMMISSIONER’S ORDER
Section 3.01 State Bond Financed Property. The Public Entity acknowledges that its interest in
the Real Property is, or when acquired by it will be, “state bond financed property”, as such term is used in
Minn. Stat. Sec. 16A.695 and the Commissioner’s Order and, therefore, the provisions contained in such
statute and order apply, or will apply, to its interest in the Real Property, even if the LRIP Grant will only
pay for a portion of the Project.
Section 3.02 Preservation of Tax Exempt Status. In order to preserve the tax-exempt status of the
G.O. Bonds, the Public Entity agrees as follows:
A. It will not use the Real Property or use or invest the LRIP Grant or any other sums treated as
“bond proceeds” under Section 148 of the Code (including “investment proceeds,” “invested
sinking funds” and “replacement proceeds”) in such a manner as to cause the G.O. Bonds to be
classified as “arbitrage bonds” under Code Section 148.
MnDOT Agreement No. 1063561
SP No. 206-020-005, tied to 082-617-014 and SP 8204-57
Revised October 2024 19
B. It will deposit and hold the LRIP Grant in a segregated non-interest-bearing account until such
funds are used for payments for the Project.
C. It will, upon written request, provide the Commissioner all information required to satisfy the
informational requirements set forth in the Code, including Sections 103 and 148, with respect
to the G.O. Bonds.
D. It will, upon the occurrence of any act or omission by the Public Entity that could cause the
interest on the G.O. Bonds to no longer be tax exempt and upon direction from the
Commissioner, take such actions and furnish such documents as the Commissioner determines
to be necessary to ensure that the interest to be paid on the G.O. Bonds is exempt from federal
taxation, which such action may include: (i) compliance with proceedings intended to classify
the G.O. Bonds as a “qualified bond” within the meaning of Code Section 141(e), or (ii)
changing the nature of the use of the Real Property so that none of the net proceeds of the G.O.
Bonds will be deemed to be used, directly or indirectly, in an “unrelated trade or business” or
for any “private business use” within the meaning of Code Sections 141(b) and 145(a).
E. It will not otherwise use any of the LRIP Grant or take, permit or cause to be taken, or omit to
take, any action that would adversely affect the exemption from federal income taxation of the
interest on the G.O. Bonds, and if it should take, permit or cause to be taken, or omit to take,
as appropriate, any such action, it shall take all lawful actions necessary to correct such actions
or omissions promptly upon obtaining knowledge thereof.
Section 3.03 Changes to G.O. Compliance Legislation or the Commissioner’s Order. If Minn.
Stat. Sec. 16A.695 or the Commissioner’s Order is amended in a manner that reduces any requirement
imposed against the Public Entity, or if the Public Entity’s interest in the Real Property becomes exempted
from Minn. Stat. Sec. 16A.695 and the Commissioner’s Order, then upon written request by the Public
Entity, MnDOT shall execute an amendment to the Agreement to implement such amendment or exempt
the Public Entity’s interest in the Real Property from Minn. Stat. Sec. 16A.695 and the Commissioner’s
Order.
Article IV
DISBURSEMENT OF GRANT PROCEEDS
Section 4.01 The Advances. MnDOT agrees, on the terms and subject to the conditions set forth
herein, to make Advances of the LRIP Grant to the Public Entity from time to time in an aggregate total
amount not to exceed the amount of the LRIP Grant. If the amount of LRIP Grant that MnDOT
cumulatively disburses hereunder to the Public Entity is less than the amount of the LRIP Grant delineated
in Section 1.01, then MnDOT and the Public Entity shall enter into and execute whatever documents
MnDOT may request in order to amend or modify this Agreement to reduce the amount of the LRIP Grant
to the amount actually disbursed. Provided, however, in accordance with the provisions contained in
Section 2.11, MnDOT’s obligation to make Advances shall terminate as of the dates specified in Section
2.11 even if the entire LRIP Grant has not been disbursed by such dates.
Advances shall only be for expenses that (i) are for those items of a capital nature delineated in Source
and Use of Funds that is attached as Exhibit A, (ii) accrued no earlier than the effective date of the
legislation that appropriated the funds that are used to fund the LRIP Grant, or (iii) have otherwise been
consented to, in writing, by the Commissioner.
It is the intent of the parties hereto that the rate of disbursement of the Advances shall not exceed the rate
MnDOT Agreement No. 1063561
SP No. 206-020-005, tied to 082-617-014 and SP 8204-57
Revised October 2024 20
of completion of the Project or the rate of disbursement of the matching funds required, if any, under Section
5.13. Therefore, the cumulative amount of all Advances disbursed by the State Entity at any point in time
shall not exceed the portion of the Project that has been completed and the percentage of the matching funds
required, if any, under Section 5.13 that have been disbursed as of such point in time. This requirement is
expressed by way of the following two formulas:
Formula #1:
Cumulative Advances < (Program Grant) × (percentage of matching funds, if any, required under
Section 5.13 that have been disbursed)
Formula #2:
Cumulative Advances < (Program Grant) × (percentage of Project completed)
Section 4.02 Draw Requisitions. Whenever the Public Entity desires a disbursement of a portion
of the LRIP Grant the Public Entity shall submit to MnDOT a Draw Requisition duly executed on behalf
of the Public Entity or its designee. Each Draw Requisition with respect to construction items shall be
limited to amounts equal to: (i) the total value of the classes of the work by percentage of completion as
approved by the Public Entity and MnDOT, plus (ii) the value of materials and equipment not incorporated
in the Project but delivered and suitably stored on or off the Real Property in a manner acceptable to
MnDOT, less (iii) any applicable retainage, and less (iv) all prior Advances.
Notwithstanding anything herein to the contrary, no Advances for materials stored on or off the Real
Property will be made by MnDOT unless the Public Entity shall advise MnDOT, in writing, of its intention
to so store materials prior to their delivery and MnDOT has not objected thereto.
At the time of submission of each Draw Requisition, other than the final Draw Requisition, the Public
Entity shall submit to MnDOT such supporting evidence as may be requested by MnDOT to substantiate
all payments which are to be made out of the relevant Draw Requisition or to substantiate all payments
then made with respect to the Project.
The final Draw Requisition shall not be submitted before completion of the Project, including any
correction of material defects in workmanship or materials (other than the completion of punch list items).
At the time of submission of the final Draw Requisition the Public Entity shall submit to MnDOT: (I) such
supporting evidence as may be requested by MnDOT to substantiate all payments which are to be made
out of the final Draw Requisition or to substantiate all payments then made with respect to the Project, and
(ii) satisfactory evidence that all work requiring inspection by municipal or other governmental authorities
having jurisdiction has been duly inspected and approved by such authorities and that all requisite
certificates and other approvals have been issued.
If on the date an Advance is desired the Public Entity has complied with all requirements of this
Agreement and MnDOT approves the relevant Draw Requisition, then MnDOT shall disburse the amount
of the requested Advance to the Public Entity.
Section 4.03 Additional Funds. If MnDOT shall at any time in good faith determine that the sum
of the undisbursed amount of the LRIP Grant plus the amount of all other funds committed to the Project
is less than the amount required to pay all costs and expenses of any kind which reasonably may be
anticipated in connection with the Project, then MnDOT may send written notice thereof to the Public
Entity specifying the amount which must be supplied in order to provide sufficient funds to complete the
Project. The Public Entity agrees that it will, within 10 calendar days of receipt of any such notice, supply
or have some other entity supply the amount of funds specified in MnDOT's notice.
MnDOT Agreement No. 1063561
SP No. 206-020-005, tied to 082-617-014 and SP 8204-57
Revised October 2024 21
Section 4.04 Condition Precedent to Any Advance. The obligation of MnDOT to make any
Advance hereunder (including the initial Advance) shall be subject to the following conditions precedent:
A. MnDOT shall have received a Draw Requisition for such Advance specifying the amount of
funds being requested, which such amount when added to all prior requests for an Advance
shall not exceed the amount of the LRIP Grant set forth in Section 1.01.
B. No Event of Default under this Agreement or event which would constitute an Event of Default
but for the requirement that notice be given or that a period of grace or time elapse shall have
occurred and be continuing.
C. No determination shall have been made by MnDOT that the amount of funds committed to the
Project is less than the amount required to pay all costs and expenses of any kind that may
reasonably be anticipated in connection with the Project, or if such a determination has been
made and notice thereof sent to the Public Entity under Section 4.03, then the Public Entity has
supplied, or has caused some other entity to supply, the necessary funds in accordance with
such section or has provided evidence acceptable to MnDOT that sufficient funds are available.
D. The State Entity shall have received evidence, in form and substance acceptable to the State
Entity, that the Public Entity has sufficient funds to fully and completely pay for the Project
and all other expenses that may occur in conjunction therewith.
E. The Public Entity has supplied to the State Entity all other items that the State Entity may
reasonably require
Section 4.05 Processing and Disbursement of Advances. The Public Entity acknowledges and
agrees as follows:
A. Advances are not made prior to completion of work performed on the Project.
B. All Advances are processed on a reimbursement basis.
C. The Public Entity must first document expenditures to obtain an Advance.
D. Reimbursement requests are made on a partial payment basis or when the Project is completed.
E. All payments are made following the “Delegated Contract Process or State Aid Payment Request”
as requested and approved by the appropriate district state aid engineer.
Section 4.06 Construction Inspections. The Public Entity shall be responsible for making its own
inspections and observations regarding the completion of the Project, and shall determine to its own
satisfaction that all work done or materials supplied have been properly done or supplied in accordance
with all contracts that the Public Entity has entered into regarding the completion of the Project.
Article V
MISCELLANEOUS
Section 5.01 Insurance. If the Public Entity elects to maintain general comprehensive liability
insurance regarding the Real Property, then the Public Entity shall have MnDOT named as an additional
named insured therein.
MnDOT Agreement No. 1063561
SP No. 206-020-005, tied to 082-617-014 and SP 8204-57
Revised October 2024 22
Section 5.02 Condemnation. If, after the Public Entity has acquired the ownership interest set forth
in Section 2.02, all or any portion of the Real Property is condemned to an extent that the Public Entity can
no longer comply with Section 2.04, then the Public Entity shall, at its sole option, either: (i) use the
condemnation proceeds to acquire an interest in additional real property needed for the Public Entity to
continue to comply with Section 2.04 and to provide whatever additional funds that may be needed for such
purposes, or (ii) submit a request to MnDOT and the Commissioner to allow it to sell the remaining portion
of its interest in the Real Property. Any condemnation proceeds which are not used to acquire an interest
in additional real property shall be applied in accordance with Minn. Stat. Sec. 16A.695 and the
Commissioner’s Order as if the Public Entity’s interest in the Real Property had been sold. If the Public
Entity elects to sell its interest in the portion of the Real Property that remains after the condemnation, such
sale must occur within a reasonable time period after the date the condemnation occurred and the cumulative
sum of the condemnation and sale proceeds applied in accordance with Minn. Stat. Sec. 16A.695 and the
Commissioner’s Order.
If MnDOT receives any condemnation proceeds referred to herein, MnDOT agrees to or pay over to the
Public Entity all of such condemnation proceeds so that the Public Entity can comply with the requirements
of this Section.
Section 5.03 Use, Maintenance, Repair and Alterations. The Public Entity shall not, without the
written consent of MnDOT and the Commissioner, (i) permit or allow the use of any of the Real Property
for any purpose other than the purposes specified in Section 2.04, (ii) substantially alter any of the Real
Property except such alterations as may be required by laws, ordinances or regulations, or such other
alterations as may improve the Real Property by increasing its value or which improve its ability to be used
for the purposes set forth in Section 2.04, (iii) take any action which would unduly impair or depreciate the
value of the Real Property, (iv) abandon the Real Property, or (v) commit or permit any act to be done in
or on the Real Property in violation of any law, ordinance or regulation.
If the Public Entity fails to maintain the Real Property in accordance with this Section, MnDOT may
perform whatever acts and expend whatever funds necessary to so maintain the Real Property, and the
Public Entity irrevocably authorizes MnDOT to enter upon the Real Property to perform such acts as may
be necessary to so maintain the Real Property. Any actions taken or funds expended by MnDOT shall be
at its sole discretion, and nothing contained herein shall require MnDOT to take any action or incur any
expense and MnDOT shall not be responsible, or liable to the Public Entity or any other entity, for any such
acts that are performed in good faith and not in a negligent manner. Any funds expended by MnDOT
pursuant to this Section shall be due and payable on demand by MnDOT and will bear interest from the
date of payment by MnDOT at a rate equal to the lesser of the maximum interest rate allowed by law or
18% per year based upon a 365-day year.
Section 5.04 Recordkeeping and Reporting. The Public Entity shall maintain books and records
pertaining to Project costs and expenses needed to comply with the requirements contained herein, Minn.
Stat. Sec. 16A.695, the Commissioner’s Order, and Minn. Stat. Sec. 174.52 and all rules related thereto,
and upon request shall allow MnDOT, its auditors, the Legislative Auditor for the State of Minnesota, or
the State Auditor for the State of Minnesota, to inspect, audit, copy, or abstract all of such items. The Public
Entity shall use generally accepted accounting principles in the maintenance of such items, and shall retain
all of such books and records for a period of six years after the date that the Project is fully completed and
placed into operation.
Section 5.05 Inspections by MnDOT. The Public Entity shall allow MnDOT to inspect the Real
Property upon reasonable request by MnDOT and without interfering with the normal use of the Real
Property.
MnDOT Agreement No. 1063561
SP No. 206-020-005, tied to 082-617-014 and SP 8204-57
Revised October 2024 23
Section 5.06 Liability. The Public Entity and MnDOT agree that each will be responsible for its own
acts and the results thereof to the extent authorized by law, and neither shall be responsible for the acts of
the other party and the results thereof. The liability of MnDOT and the Commissioner is governed by the
provisions of Minn. Stat. Sec. 3.736. If the Public Entity is a “municipality” as that term is used in Minn.
Stat. Chapter 466, then the liability of the Public Entity is governed by the provisions of Chapter 466. The
Public Entity’s liability hereunder shall not be limited to the extent of insurance carried by or provided by
the Public Entity, or subject to any exclusion from coverage in any insurance policy.
Section 5.07 Relationship of the Parties. Nothing contained in the Agreement is to be construed as
establishing a relationship of co-partners or joint venture among the Public Entity, MnDOT, or the
Commissioner, nor shall the Public Entity be considered to be an agent, representative, or employee of
MnDOT, the Commissioner, or the State of Minnesota in the performance of the Agreement or the Project.
No employee of the Public Entity or other person engaging in the performance of the Agreement or the
Project shall be deemed have any contractual relationship with MnDOT, the Commissioner, or the State of
Minnesota and shall not be considered an employee of any of those entities. Any claims that may arise on
behalf of said employees or other persons out of employment or alleged employment, including claims
under the Workers’ Compensation Act of the State of Minnesota, claims of discrimination against the Public
Entity or its officers, agents, contractors, or employees shall in no way be the responsibility of MnDOT,
the Commissioner, or the State of Minnesota. Such employees or other persons shall not require nor be
entitled to any compensation, rights or benefits of any kind whatsoever from MnDOT, the Commissioner,
or the State of Minnesota, including tenure rights, medical and hospital care, sick and vacation leave,
disability benefits, severance pay and retirement benefits.
Section 5.08 Notices. In addition to any notice required under applicable law to be given in another
manner, any notices required hereunder must be in writing and personally served or sent by prepaid,
registered, or certified mail (return receipt requested), to the address of the party specified below or to such
different address as may in the future be specified by a party by written notice to the others:
To the Public Entity: At the address indicated on the first page of the Agreement.
To MnDOT at: Minnesota Department of Transportation
Office of State Aid
395 John Ireland Blvd., MS 500
Saint Paul, MN 55155
Attention: Marc Briese, State Aid Programs Engineer
To the Commissioner at: Minnesota Management & Budget
400 Centennial Office Bldg.
658 Cedar St.
St. Paul, MN 55155
Attention: Commissioner
Section 5.09 Assignment or Modification. Neither the Public Entity nor MnDOT may assign any
of its rights or obligations under the Agreement without the prior written consent of the other party.
Section 5.10 Waiver. Neither the failure by the Public Entity, MnDOT, or the Commissioner, as a
third party beneficiary of the Agreement, in one or more instances to insist upon the complete observance
or performance of any provision hereof, nor the failure of the Public Entity, MnDOT, or the Commissioner
to exercise any right or remedy conferred hereunder or afforded by law shall be construed as waiving any
MnDOT Agreement No. 1063561
SP No. 206-020-005, tied to 082-617-014 and SP 8204-57
Revised October 2024 24
breach of such provision or the right to exercise such right or remedy thereafter. In addition, no delay by
any of the Public Entity, MnDOT, or the Commissioner in exercising any right or remedy hereunder shall
operate as a waiver thereof, nor shall any single or partial exercise of any right or remedy preclude other or
further exercise thereof or the exercise of any other right or remedy.
Section 5.11 Choice of Law and Venue. All matters relating to the validity, interpretation,
performance, or enforcement of the Agreement shall be determined in accordance with the laws of the State
of Minnesota. All legal actions arising from any provision of the Agreement shall be initiated and venued
in the State of Minnesota District Court located in St. Paul, Minnesota.
Section 5.12 Severability. If any provision of the Agreement is finally judged by any court to be
invalid, then the remaining provisions shall remain in full force and effect and they shall be interpreted,
performed, and enforced as if the invalid provision did not appear herein.
Section 5.13 Matching Funds. Any matching funds as shown on Page 1 of the Grant Agreement
that are required to be obtained and supplied by the Public Entity must either be in the form of (i) cash
monies, (ii) legally binding commitments for money, or (iii) equivalent funds or contributions, including
equity, which have been or will be used to pay for the Project. The Public Entity shall supply to MnDOT
whatever documentation MnDOT may request to substantiate the availability and source of any matching
funds.
Section 5.14 Sources and Uses of Funds. The Public Entity represents to MnDOT and the
Commissioner that the Sources and Uses of Funds Schedule attached as Exhibit A accurately shows the
total cost of the Project and all of the funds that are available for the completion of the Project. The Public
Entity will supply any other information and documentation that MnDOT or the Commissioner may request
to support or explain any of the information contained in the Sources and Uses of Funds Schedule. If any
of the funds shown in the Sources and Uses of Funds Schedule have conditions precedent to the release of
such funds, the Public Entity must provide to MnDOT a detailed description of such conditions and what
is being done to satisfy such conditions.
Section 5.15 Project Completion Schedule. The Public Entity represents to MnDOT and the
Commissioner that the Project Completion Schedule attached as Exhibit B correctly and accurately sets
forth the projected schedule for the completion of the Project.
Section 5.16 Third-Party Beneficiary. The Governmental Program will benefit the State of
Minnesota and the provisions and requirements contained herein are for the benefit of both the State Entity
and the State of Minnesota. Therefore, the State of Minnesota, by and through its Commissioner of MMB,
is and shall be a third-party beneficiary of this Agreement.
Section 5.17 Public Entity Tasks. Any tasks that the Agreement imposes upon the Public Entity
may be performed by such other entity as the Public Entity may select or designate, provided that the failure
of such other entity to perform said tasks shall be deemed to be a failure to perform by the Public Entity.
Section 5.18 Data Practices. The Public Entity agrees with respect to any data that it possesses
regarding the G.O. Grant or the Project to comply with all of the provisions and restrictions contained in
the Minnesota Government Data Practices Act contained in Minnesota Statutes Chapter 13, as such may
subsequently be amended or replaced from time to time.
Section 5.19 Non-Discrimination. The Public Entity agrees to not engage in discriminatory
employment practices regarding the Project and it shall fully comply with all of the provisions contained in
MnDOT Agreement No. 1063561
SP No. 206-020-005, tied to 082-617-014 and SP 8204-57
Revised October 2024 25
Minnesota Statutes Chapters 363A and 181, as such may subsequently be amended or replaced from time
to time.
Section 5.20 Worker’s Compensation. The Public Entity agrees to comply with all of the provisions
relating to worker’s compensation contained in Minn. Stat. Secs. 176.181 subd. 2 and 176.182, as they may
be amended or replaced from time to time with respect to the Project.
Section 5.21 Antitrust Claims. The Public Entity hereby assigns to MnDOT and the Commissioner
of MMB all claims it may have for over charges as to goods or services provided with respect to the Project
that arise under the antitrust laws of the State of Minnesota or of the United States of America.
Section 5.22 Prevailing Wages. The Public Entity agrees to comply with all of the applicable
provisions contained in Minnesota Statutes Chapter 177, and specifically those provisions contained in
Minn. Stat.§. 177.41 through 177.435 as they may be amended or replaced from time to time with respect
to the Project. By agreeing to this provision, the Public Entity is not acknowledging or agreeing that the
cited provisions apply to the Project.
Section 5.23 Entire Agreement. The Agreement and all of the exhibits attached thereto embody the
entire agreement between the Public Entity and MnDOT, and there are no other agreements, either oral or
written, between the Public Entity and MnDOT on the subject matter hereof.
Section 5.24 E-Verification. The Public Entity agrees and acknowledges that it is aware of
Minn.Stat. § 16C.075 regarding e-verification of employment of all newly hired employees to confirm that
such employees are legally entitled to work in the United States, and that it will, if and when applicable,
fully comply with such order.
Section 5.25 Telecommunications Certification. If federal funds are included in Exhibit A, by
signing this agreement, Contractor certifies that, consistent with Section 889 of the John S. McCain
National Defense Authorization Act for Fiscal Year 2019, Pub. L. 115-232 (Aug. 13, 2018), and 2 CFR
200.216, Contractor will not use funding covered by this agreement to procure or obtain, or to extend,
renew, or enter into any contract to procure or obtain, any equipment, system, or service that uses “covered
telecommunications equipment or services” (as that term is defined in Section 889 of the Act) as a
substantial or essential component of any system or as critical technology as part of any system. Contractor
will include this certification as a flow down clause in any contract related to this agreement.
Section 5.26 Title VI/Non-discrimination Assurances. Public Entity agrees to comply with all
applicable US DOT Standard Title VI/Non-Discrimination Assurances contained in DOT Order No.
1050.2A, and in particular Appendices A and E, which can be found at: https://edocs-
public.dot.state.mn.us/edocs_public/DMResultSet/download?docId=11149035. If federal funds are
included in Exhibit A, Public Entity will ensure the appendices and solicitation language within the
assurances are inserted into contracts as required. MnDOT may conduct a review of the Public Entity’s
compliance with this provision. The Public Entity must cooperate with MnDOT throughout the review
process by supplying all requested information and documentation to MnDOT, making Public Entity staff
and officials available for meetings as requested, and correcting any areas of non-compliance as determined
by MnDOT.
Section 5.27 Electronic Records and Signatures. The parties agree to contract by electronic
means. This includes using electronic signatures and converting original documents to electronic records.
Section 5.28 Certification. By signing this Agreement, the Grantee certifies that it is not suspended
or debarred from receiving federal or state awards.
STAFF REPORT
DATE: 6/16/2026
Regular
Motion
TO: City Council
FROM: Sophia Jensen, Senior City Planner
AGENDA ITEM: Inwood Commercial Preliminary Plat
REVIEWED BY: Nathan Fuerst Planning Consultant
Jason Stopa, Community Development Director
CORE STRATEGIES:
☒Vibrant, inclusive, connected community
☒Responsive, transparent, adaptive governance
☒Managed Growth
☐Efficient, reliable, innovative services
☐Balanced Finances now and future
☒Resilient Infrastructure
BACKGROUND:
Vadnais Associates LLC (Applicant/Property Owner) has requested Preliminary Plat approval. This parcel was
anticipated to be a commercial site based on the Inwood Master Plan that was approved in 2014 and has already
been mass graded. The project, to be called Inwood Commercial, will contain five commercial lots. The current
request only includes subdivision of the property to create the individual commercial lots. After the subdivision
is created, any parties interested in establishing commercial uses on the lots must conform with all standard
requirements and receive the necessary approvals at the time they are proposed.
ISSUE BEFORE THE CITY COUNCIL:
The City Council is being asked to hold a public hearing and make a recommendation on the preliminary plat
request.
GENERAL INFORMATION:
Applicant/Property Owner : Vadnais Associates LLC
Location: Outlot K of InWood
PID#s: 33.029.21.12.0006
Request: Preliminary Plat
Site Area: 17.34 acres
Current Zoning and 2040 FLU: C – Commercial and Partial Shoreland Overlay
Surrounding: Rural Residential (north); Low Density Residential and Public Facilities (east);
Commercial (south); City of Oakdale (west)
History: The parcel is undeveloped and a part of the 2014 InWood master plan
Wetland: There are no wetlands on site.
Deadline: Application Complete – 4/23/26
120 Day Deadline – 8/21/26
Applicable Code: Article 7- General Regulations
Article 15- Commercial Districts
Title 103 – Subdivision Regulations
Lake Elmo Design Guidelines
PROPOSAL DETAILS/ANALYSIS:
Site Data. This property was anticipated Commercial as part of the InWood master plan developed in 2014.
The property has already been mass graded (roadways and curb cuts) with the prior phases. Site area could
vary slightly based on requirements for Right of Way from Washington County, or the City of Lake Elmo.
Total Site Area 17.34 acres
Right-of-Way (R/W) 3.18 acres
Commercial (C) Area 14.16 acres
Wetlands None identified on site
Land Use(s): The purpose of the C district is to provide for the establishment of commercial and service
activities which draw from and serve customers from the entire community or region and are located in areas
that are well served by collector or arterial street facilities outside the village area. It is intended to allow the
widest range of commercial uses, especially those that are oriented towards the traveling public or that need
large sites with highway access and visibility.
At this time the developer is not proposing tenant approvals for the buildout of the individual commercial lots
within the subdivision. Each future user will be subject to a complete review at the time a new use is proposed
in addition to receiving land use approvals. It is noted that most of the commercial lots, with the exception of
Lot 1, are labeled “ghost plat”. The developer has indicated Lot 1 is proposed to be a Gaming Café. This use
has been determined to be Indoor Recreation, Retail Sales, and Standard Restaurant. A Conditional Use
permit will be required for the Indoor Recreation. No development rights or site plan approvals are granted
though the platting process.
Site Plan Review. The commercial lots were reviewed by staff for conformance with applicable zoning and
subdivision requirements. No flexibility is requested by the Applicant from City Code. Therefore, any standards
not reviewed through this process will be reviewed at the time of site plan review on each commercial lot.
Lots must be developed to all relevant city standards at the time they are requested.
Parking. Off-street parking is required consistent with City Code Section 105.12.410. Since the proposed land
uses and floor areas of the proposed buildings will be subject to change based on site layout, tenant, or
property owner needs, etc., staff will conduct a review of parking requirements at the time of site plan review.
Signage. No signage is proposed on the plans or discussed in the Applicant’s narrative. Signage will be reviewed
when requested by the Applicant or subsequent property owners.
Commercial Lot Performance Standards. The proposed commercial lots will be subject to other site and building
design performance standards which may not be mentioned in this report. Those standards include, but are not
limited to the City’s Design Guidelines Standards Manual, landscaping requirements, lighting, parking lot
landscaping, off-street loading areas, etc. No flexibility to any City standards is requested by the Applicant at
this time. All individual lots will have to meet the performance standards in the zoning ordinance at the time of
permit application.
Subdivision Requirements. The subdivision has been reviewed according to City Zoning and Subdivision
requirements. The platted lots will meet City standards for areas and locations as proposed. Driveways and
access for the lots is consistent with City Standards. A Development Agreement will be required as part of future
plat approval. The City Engineer has reviewed for conformance with engineering standards and provided memo
dated May 18th, 2026, attached, and all items are to be addressed as part of the final plat submittal.
Landscaping and Tree Preservation. The Landscape Architect is suggesting minor revisions to the submitted
landscaping plans as a condition of preliminary plat approval. No tree preservation is required on this site as it
was mass graded, and no significant trees exist on site. Boulevard plantings are required at the time subdivision
improvements are installed. The City Code requirements on number of plantings has been met by the developer.
As the commercial lots develop landscaping will be required on each lot to provide the required screening from
the adjacent residential use. Berming, fencing, or walls (in addition to landscaping) will be required to achieve
screening requirements on the tenant’s lots.
Parkland Dedication: The City’s ordinance requires parkland dedication in the amount of $6,000 per acre for
commercial projects. The fee ($104,040) will be paid as part of the Development Agreement prior to recording
the final plat.
Wetlands: The Applicant’s surveyor and engineer have provided a statement indicating that no wetlands are
present on site.
Stormwater Management: Stormwater management for this commercial development was planned as part of
the InWood master plan. As such, regional ponds will treat stormwater generated by this project, including the
proposed roadways. As the commercial lots develop, or if treatment standards change, it is possible that
additional stormwater treatment could be required on each lot. The City Engineer and SWWD have reviewed
the plans accordingly.
Streets, Trails, Access: This subdivision will have two public streets as proposed in the plans the location of
these streets were designed with the original master plan and the curb cuts are installed in the streets. The City
ROW width is required to be 60 feet and minimum roadway width is 28 feet. The City Engineer and County
Engineer have reviewed the plans accordingly. As part of the development, they will install appliable sidewalks
and trails around and within the development.
AGENCY REVIEW :
City Engineer Comments 5/18/2026: See attached memo dated May 18th, 2026. The City Engineer has
suggested that approval, if granted, should be conditional upon addressing each review comment in the
Engineer’s review memo. Additional information is required from the Applicant, and any public improvements
shall be consistent with the City Engineering Design Standards Manual.
Fire Chief Comments 5/12/2026: Provided standard comments regarding drive lanes, access points, signage,
hydrants, fire suppression, addressing, EMS systems, KNOX systems, and EV charging.
Landscape Architect Memo 5/7/2026 : Revisions are required to the landscape plan. Boulevard trees will be
provided with this application. As the single lots develop landscaping and screening will be required.
MN DNR 5/15/2026: Provided comments that the impervious surface limit is 30% and that commercial uses in
the shoreland districts of natural environment (NE) lakes require a conditional use permit.
City of Oakdale 5/7/2026: Provided comments that they would like to ensure a full access at the intersection of
9th Street and Inwood Avenue North on the Oakdale side.
Washington County: Provided comments that their plans have addressed their preliminary comments regarding
intersections in the memo dated November 10th, 2025, and they have no further comments at this time.
South Washington Watershed District: The applicant is in communication with the SWWD and seeking to
coordinate on permitting reviews and timelines as necessary.
City Attorney Review: The City Attorney will need to review the plat documents and title commitment. A plat
opinion is required prior to recording the final plat. A condition has been added.
RECOMMENDED FINDINGS FOR APPROVAL:
Staff recommends approval of the Preliminary Plat based on the following findings:
1. That the Preliminary Plat would be consistent with the intent of the 2040 Lake Elmo Comprehensive
Plan and the 2040 Land Use Map for this area.
2. That the preliminary plat generally complies with the City’s Subdivision regulations and does not meet
the criteria for denial in Section 103.00.090 (d)(2).
3. That the preliminary plat complies with the City’s Zoning Code.
4. That the preliminary plat generally complies with the City’s design standards.
RECOMMENDED CONDITIONS OF APPROVAL:
Staff recommends approval of the Preliminary Plat with the following conditions (the underlined condition was added
based on Planning Commission feedback):
1. Prior to the City finding any application for a final plat and final PUD complete, the applicant shall fully
address all comments in the following review memos to the satisfaction of the City:
a. City Engineer’s memo dated 5/18/2026
b. City Landscape Architect’s memo dated 5/7/2026
c. City Fire Chief’s memo dated 5/12/2026
d. Washington County Memo Dated 11/10/2025
2. The City Attorney shall issue a plat opinion certifying that the final plat, title evidence, and all
agreements and documents meet the requirements of the City Code and state statutes prior to the City
Council review or approval of the final plat.
3. The final plat shall include all necessary and additional public right-of-way and easements.
4. No flexibility from City standards is provided by this approval. All lots to be platted in this subdivision
must meet existing City standards at the time of building permit submittal.
5. Sign permits are required and must comply with the City Code.
6. That the Applicant must obtain all necessary permits including but not limited to all applicable City
permits (building, grading, wetland, sign, etc.), NPDES/SWPPP permits and SWWD permits before
starting any grading or construction activities.
7. The applicant/developer is responsible, at their own expense, for installing all required right of way and
pedestrian improvements.
8. The applicant shall consider enhanced landscaping on the East side of Irene Avenue North subject to
review and approval by City Staff.
9. The applicant/developer shall provide the City a fee in lieu of park land dedication as required by
Section 103.00.150 to be paid prior to recording of the final plat.
10. If applicable, a landscape and irrigation license agreement in a form acceptable to the City shall be
executed and recorded with the final plat.
11. If applicable, a stormwater reuse irrigation and license agreement in a form acceptable to the City shall
be executed and recorded with the final plat.
12. If applicable, a storm water maintenance and easement agreement in a form acceptable to the City
shall be executed and recorded with the final plat.
13. Before the execution and recording of a final plat for the development, the developer or the Applicant
shall enter into a Development Agreement with the City. Such an agreement must be approved by the
City Attorney. The Development Agreement must be approved by the City Council. The agreement
shall delineate who is responsible for the design, construction, and payment for the required
improvements with financial guarantees, therefore.
14. If necessary, the Applicant must provide the City with a copy of written permission from adjacent
property owners for any off-site grading work and storm sewer discharges to adjacent properties
before starting any site work, grading and as part of any final plat application.
15. The Applicant or developer must enter into a separate grading agreement with the City before starting
any grading activity in advance of final plat approval. The City Engineer shall review any grading plan
that is submitted in advance of a final plat and said plan shall document the extent of any proposed
grading on the site.
16. The Applicant must submit a revised preliminary plat and project plans meeting all conditions of
approval for City review and approval. The revised Applicant project plans and other materials shall
meet all of the above conditions before the City will find complete any final plat application for the
development and before the start of any clearing or grading activity on the site.
17. That the Applicant must submit the final plat within 180 days after City Council approval of the
preliminary plat or approval of the preliminary plat shall be considered void unless a request for a time
extension is submitted in writing and approved by the City Council.
PUBLIC HEARING:
A public hearing was mailed to surrounding property owners within 500’ on May 18th, 2026. The notice was
also published in the City’s official paper, the Stillwater Gazette, on May 22nd 2026. Below is a summary of the
comments received:
Alan and Lou Stocker – 8680 Upper 7th Pl – Provided written comments in support of development but
requested consideration for screening of vehicle headlights and additional tree plantings.
Inwood Petition – a petition was submitted, signed by 32 different Inwood residential parcels, which notes
concerns for traffic, light, noise. They are requesting a soundproof wall of structure and traffic calming
measures for the commercial development.
Paul Prior 8674 Irving Cir N – Provided comments on the berming and how the elevations may be insufficient
for screening headlights alone. Additional measures such as a berm, fence, or retaining wall should be taken to
screen headlights on the roadways. Would like tenant lighting to be considerate of adjacent residents. The trail
connection should be extended.
Dolly Ladner 994 Irving Ct N – Provided comments about concerns with safety and privacy with the roadway
adjacent to the residential area and requested a wall. She noted concerns with the tenant build out and
parking lot locations. She requested something more substantial than landscaping for screening. Noted the
Business View magazine Lake Elmo article about development.
Dan Moralez 8669 Lower 8th Pl N – Provided comments on existing trees and that they are sparce and
scattered. He does not believe that landscape alone will fix the headlight screening. Grading issues will create
challenges for screening of headlights on the roadway. He also provided concerns about construction traffic
using Island Trail North during build out of the area.
Tim Duyer – 8644 Irving Cir N – Was in agreement with Dolly. Noted concerns with security and requested
fencing to buffer and protect the residential area which will also mitigate light and noise.
PLANNING COMMISSION:
The Planning Commission reviewed this request at their June 8th, 2026, meeting. The Commission voted to
recommend approval of the preliminary plat subject to the recommended findings and conditions with an
additional condition that the developer add additional screening on the East side of Irene Ave (Vote 6-0).
The reason for the Commission amendment was to address neighborhood comment regarding vehicle
headlight screening on the new roadways. Staff would note that the developer has indicated that they will
review feasibility of enhanced landscaping and screening prior to the final plat submittal and make revisions
were able. Screening improvement will become a City responsibility due to the location in the Right of Way, a
structure to achieve screening is not recommended by Staff due to long term maintenance and the limited
space available. A condition of approval regarding enhanced landscaping has been added.
FISCAL IMPACT:
Approval of the Applicant’s requests grants entitlements to the Applicant, however there would be no fiscal
impact to the City at this time. A final plat is required along with a Development Agreement which will detail
public improvements and address fiscal impacts. When the property begins to develop it will have urban
services and will require development fees.
RECOMMENDATION:
Staff recommend approval of the request. Suggested motion provided below:
“Move to adopt Resolution 2026- 041 approving the preliminary plat requested by Vadnais Associates on the subject
property based on the findings of fact and recommended conditions of approval listed in the staff report.”
ATTACHMENTS:
1.Application Documents
2.Preliminary Plat and Project Plans
3.Fire Chief Memo 5/12/2026
4.Landscape Architect Memo 5/7/2026
5.City Engineer Memo 5/18/2026
6.Washington County Memo 11/10/2025
7.DNR Email 5/15/2026
8.City of Oakdale Email 5/7/2026
9.Public Comment
Subdivision of 17.35 acre outlot within the existing Inwood PUD into five (5) commercial
lots for future development by others. See project narrative for additional information.
Date: April 23, 2026
To: Sophia Jensen, Senior City Planner
Jason Stopa, Community Development Director
City of Lake Elmo
Applicant: Judy Siebel
Vadnais Associates
Re: Inwood Commercial Preliminary Plat Application
Ms. Jensen,
We are pleased to submit this Preliminary Plat Application on behalf of Judy Siebel, for the
proposed Inwood Commercial subdivision. We appreciate the feedback received on the two Concept
Plans previously submitted and look forward to continuing our work with the City of Lake Elmo on
this project.
Below you will find the Written Statements from the application checklist, as well as a complete
list of attachments included with this application. Please contact us with any questions.
Sincerely,
Ryan J. Ruttger, RLA
Landscape Architect / Planner
Carlson Engineering
CC: Brian Krystofiak, PE
Kyle Ogren, EIT
Attachments:
1) Completed Land Use Application Forms / Checklist
2) Certified Address List
3) Preliminary Plan Set, dated 04/23/26
4) Stormwater Management Plan, dated 04/23/26
5) Storm Sewer Design
6) Existing Pond Impervious Exhibit
7) Future Intersection Exhibit – 9th Street N & Inwood Avenue N
8) 2nd Concept Review Memo, Responses dated 04/23/26
9) Geotechnical Report, dated 12/03/14
Carlson Engineering, LLC Page 2
Written Statements
A) Contact Information
Owner: Vadnais Associates, LLC / Judy Siebel
2935 Country Drive, Suite 102
Little Canada, MN 55117
(612)325-5945
Engineer: Brian J. Krystofiak, PE
Carlson Engineering
3890 Pheasant Ridge Drive NE, Suite 100
Blaine, MN 55449
763-489-7905 (office) / 763-443-5963 (cell)
B) Site Data
Address: Unassigned, Lake Elmo
Current Zoning: Commercial Planned Unit Development (C-PUD)
with partial Shoreland Overlay
Parcel Size: 17.34 acres / 755,859 square feet
PID: 33.029.21.12.0006
Current Legal Desc: That part of Outlot K, INWOOD as recorded in Washington
County Surveyor’s Office.
C) General Information
Proposed Name: Inwood Commercial
Number of Lots: Five (5) commercial lots
Public Open Space: None
Dedicated Right-of-Way: 3.18 acres
D) Sketch Plan Comments – See attached comment responses.
E) Project Narrative:
This project involves the subdivision of a 17.35 acre outlot within the existing Inwood PUD
into five commercial parcels. Initial development will include the construction of internal
public streets, turn lanes, sidewalks, trails and boulevard trees consistent with the original
PUD concept for this area. Public utilities, including water, sanitary sewer, and stormwater
infrastructure, will be extended to serve each parcel. This project provides opportunities for
orderly infill development of future commercial uses, providing sufficient access and
flexibility, while ensuring compliance with municipal standards and zoning requirements.
F) Proposed Density: N/A – lots for future development, no uses proposed.
G) Proposed Infrastructure / Phasing
Streets. Consistent with the Inwood PUD, Irene Avenue will extend along the east side of
the parcel from 5th Street N to 10th Street N. (C.S.A.H 10). Near the midpoint of the site, 9th
Street N will extend west to Inwood Ave. N. (C.S.A.H. 13). Both intersections with the
County roads will be ¾ access with turn lanes into the site. Additional right-of-way is
proposed to accommodate a future signalized intersection at 9th Street and Inwood Ave.
Carlson Engineering, LLC Page 3
Utilities. The proposed utilities are consistent with the engineering comments received
during Concept Plan Review and will be provided to each lot from Irene Ave. Water main
will connect to both an existing 8” stub off 5th Street N and the existing 12” water main
along 10th Street N creating a looped system. Sanitary sewer will be extended from the
existing 8” stub at the intersection of Irene Ave and 5th Street N. Stormwater will be
directed to the existing pond to the east, which was designed with the Inwood PUD to
accommodate the maximum allowable impervious with future development of this site.
Sidewalk / Trail. An 8’ bituminous trail is proposed along the east side of Irene Ave, from
the existing 5th Street trail to 9th Street N. This trail will also connect to an existing trail
within the Inwood residential area to provide access to this site from the adjacent
neighborhood. A 6’ concrete sidewalk is proposed along the west side of Irene Ave and
along the south side of 9th Street N.
Additionally, a separate trail is being proposed along Inwood Ave N and 10th Street N,
consistent with the 2040 Comprehensive Plan and which Washington County has also
expressed support for. Constructing this trail fully within the county right-of-way would
require relocating a significant amount of utility infrastructure, including multiple utility
poles, fire hydrants and electrical transformers. For this reason, the trail is proposed to be
located 1’ within the private lot areas along the west and north boundaries of the site. A 10’
trail easement will be granted to the county after the Inwood Commercial final plat is
recorded. Because the trail easement will be located within the required drainage and
utility easements, those easements have been expanded to 20’ along Inwood Ave. and 30’
along 10th Street N to accommodate the proposed trail and existing water main.
Phasing. This project is proposed to be graded and constructed in one phase. Future
development of the platted lots will be done separately from this project.
H) Neighborhood Concerns / Issues:
While public feedback has yet to be received, we expect comments to reflect the knowledge
that future commercial development has always been planned for this site. The adjacent
residential area is also part of the Inwood PUD and was designed with concept plans for
commercial development on this site. The existing stormwater pond within Outlot D and
additional open space within Outlot E provide a buffer between the planned uses. A 6-8’
berm and significant tree plantings were installed with the previous residential
construction to provide additional screening, and a trail was built to provide access to
future commercial amenities.
I) Land Use Conflicts:
Being a planned part of the existing Inwood PUD, the proposed development of this site is
consistent with the City’s Future Land Use Plan. Commercial development is well suited to
the adjacent county roads and has been incorporated into the design of the adjacent
residential area.
Carlson Engineering, LLC Page 4
J) Public Burden:
No uses are being proposed for the platted lots with this project, and therefore the impact
to traffic and public facilities and services is expected to be negligible. This project is
consistent with the previously approved Inwood planned development. The water, sewer
and stormwater systems have been designed to accommodate the future commercial
development that this project is providing access for. The developer will be responsible for
all applicable costs associated with infrastructure construction, design, review, inspection,
and administration, ensuring that no additional burden is placed on the city.
K) Lakeshore Access – Not applicable.
L) Parks & Open Space:
Parks and open space for this project are consistent with the original Inwood PUD. This
project will provide public access to the proposed trails, but no additional areas are
proposed for public dedication. Future development on this site will meet the shoreland
requirements for impervious area, preserving 70% open space within the private lot areas.
Park dedication will be provided consistent with city policy, with consideration for trail
construction to be determined.
M) Proposed Development Schedule
The developer hopes to begin construction as soon as possible and anticipates starting this
fall (2026). Plans are consistent with the mass grading that was completed with Inwood.
Clearing and grading work will be minimal, followed immediately by utility and street
construction. Site restoration will be ongoing as work is completed. Landscaping will
follow curb / gutter, sidewalk and trail installation, with tree planting potentially deferred
to spring 2027 depending on weather. Overall construction is expected to be completed in
6-8 weeks.
VADNAIS ASSOCIATES, LLC2935 Country Drive, Suite 102Little Canada, MN 55117ofINWOOD COMMERCIALLake Elmo, MNoff:\jobs\5161 - 5180\5172-05- inwood commercial (outlot k, inwood)\cad c3d\engineering\preliminary\5172-05_cover.dwgSave Date:04/21/2615Revisions:1.Print Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota04/23/26KRO04/23/26Brian J. Krystofiak, P.E.25063BJK#5172-05COVER1INWOOD COMMERCIALLake Elmo, Minnesota VICINITY MAP Know what'sbelow.before you dig.CallRSITEI N W O O D5 T H A D D I T I O
N
I N
W
O
O
D3 R D
A
D
D
I
T
I
O
N
I
N
W
O
O
D1 S
T
A
D
D
I
T
I
O
NG H
O
S
TP L
A
TG H
O
S
TP L
A
TG H O S TP L A TG H O S TP L A TB YO T
H
E
R
S
OWNER:OWNER:OWNER:OW
N
E
R
:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:O
W
N
E
R
:
OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:f:\jobs\5161 - 5180\5172-05- inwood commercial (outlot k, inwood)\cad c3d\survey\preliminary\5172-05_excon.dwgSave Date:04/21/26VADNAIS ASSOCIATES, LLC2935 Country Drive, Suite 102Little Canada, MN 55117ofINWOOD COMMERCIALLake Elmo, MinnesotaEXISTING CONDITIONSThomas R. Balluff, L.S.I hereby certify that this survey, planor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Land Surveyor underthe laws of the State of MinnesotaPrint Name:Signature:Date:License #:40361DRAWN BY:ISSUE DATE:FILE NO:Revisions:152NJS2938LEGEND 4/23/264/23/26
OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:
OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:O
W
N
E
R
:
OWNER:IRENE AVENUEN.9TH ST. N.OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:f:\jobs\5161 - 5180\5172-05- inwood commercial (outlot k, inwood)\cad c3d\survey\preliminary\5172-05_preplat.dwgSave Date:04/22/26VADNAIS ASSOCIATES, LLC2935 Country Drive, Suite 102Little Canada, MN 55117ofINWOOD COMMERCIALLake Elmo, MinnesotaPRELIMINARY PLATThomas R. Balluff, L.S.I hereby certify that this survey, planor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Land Surveyor underthe laws of the State of MinnesotaPrint Name:Signature:Date:License #: 4/23/2640361DRAWN BY:ISSUE DATE:FILE NO:Revisions:153NJS4/23/262938LEGEND SITE DATA
REMOVALS PLAN4VADNAIS ASSOCIATES, LLC2935 Country Drive, Suite 102Little Canada, MN 55117ofINWOOD COMMERCIALLake Elmo, MNoff:\jobs\5161 - 5180\5172-05- inwood commercial (outlot k, inwood)\cad c3d\engineering\preliminary\5172-05_removals.dwgSave Date:04/22/2615Revisions:1.Print Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota04/23/26KRO04/23/26Brian J. Krystofiak, P.E.25063BJK#5172-05I N W O O D5 T H A D D I T I O NI N W O O D3 R D A D D I T I O NI N W O O D1 S T A D D I T I O NI N W O O D1 S T A D D I T I O N
I
N
W
O
O
D
3
R
D
A
D
D
I
T
I
O
N
I
N
W
O
O
D
1
S
T
A
D
D
I
T
I
O
N
G
H
O
S
T
P
L
A
T
G H O S T P L A TG H O S T P L A T I N W O O D5 T H A D D I T I O NB
Y
O
T
H
E
R
SC I T Y O FO A K D A L EG
H
O
S
T
P
L
A
T
5SHORELAND EXHIBITVADNAIS ASSOCIATES, LLC2935 Country Drive, Suite 102Little Canada, MN 55117ofINWOOD COMMERCIALLake Elmo, MNoff:\jobs\5161 - 5180\5172-05- inwood commercial (outlot k, inwood)\cad c3d\engineering\preliminary\5172-05_shoreland.dwgSave Date:04/22/2615Revisions:1.Print Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota04/23/26KRO04/23/26Brian J. Krystofiak, P.E.25063BJK#5172-05 SITE DATA LEGAL DESCRIPTION NOTE LEGEND LOT DATA (FUTURE DEVELOPMENT SCENARIOS BY OTHERS)
6Know what'sbelow.before you dig.CallRPRELIMINARY SITE &UTILITY PLAN INDEXVADNAIS ASSOCIATES, LLC2935 Country Drive, Suite 102Little Canada, MN 55117ofINWOOD COMMERCIALLake Elmo, MNoff:\jobs\5161 - 5180\5172-05- inwood commercial (outlot k, inwood)\cad c3d\engineering\preliminary\5172-05_site.dwgSave Date:04/22/2615Revisions:1.Print Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota04/23/26KRO04/23/26Brian J. Krystofiak, P.E.25063BJK#5172-05I N W O O D5 T H A D D I T I
O
N
I N
W
O
O
D3 R D
A
D
D
I
T
I
O
N
I
N
W
O
O
D1 S
T
A
D
D
I
T
I
O
NG H
O
S
TP L
A
TG H
O
S
TP L
A
TG H O S TP L A TG H O S TP L A TSITE PLAN LEGEND
I N W O O D3 R D A D D I T I O N
I
N
W
O
O
D
1
S
T
A
D
D
I
T
I
O
N
G H
O
S
T
P L
A
T
G H O S T P L A T
B
Y
O
T
H
E
R
S
PRELIMINARY SITE &UTILITY PLAN7VADNAIS ASSOCIATES, LLC2935 Country Drive, Suite 102Little Canada, MN 55117ofINWOOD COMMERCIALLake Elmo, MNoff:\jobs\5161 - 5180\5172-05- inwood commercial (outlot k, inwood)\cad c3d\engineering\preliminary\5172-05_site.dwgSave Date:04/22/2615Revisions:1.Print Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota04/23/26KRO04/23/26Brian J. Krystofiak, P.E.25063BJK#5172-05SITE PLAN LEGEND
I
N
W
O
O
D
3
R
D
A
D
D
I
T
I
O
N
G
H
O
S
T
G
H
O
S
T
P
L
A
T
G H
O
S
T
P L
A
T
G H O S T P L A T I N W O O D5 T H A D D I T I O NPRELIMINARY SITE &UTILITY PLAN8VADNAIS ASSOCIATES, LLC2935 Country Drive, Suite 102Little Canada, MN 55117ofINWOOD COMMERCIALLake Elmo, MNoff:\jobs\5161 - 5180\5172-05- inwood commercial (outlot k, inwood)\cad c3d\engineering\preliminary\5172-05_site.dwgSave Date:04/22/2615Revisions:1.Print Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota04/23/26KRO04/23/26Brian J. Krystofiak, P.E.25063BJK#5172-05SITE PLAN LEGEND
I N W O O D3 R D A D D I T I O N
I
N
W
O
O
D
1
S
T
A
D
D
I
T
I
O
N
G H
O
S
T
P L
A
T
G H O S T P L A T
SIGNING, STRIPING, ANDLIGHTING PLAN9VADNAIS ASSOCIATES, LLC2935 Country Drive, Suite 102Little Canada, MN 55117ofINWOOD COMMERCIALLake Elmo, MNoff:\jobs\5161 - 5180\5172-05- inwood commercial (outlot k, inwood)\cad c3d\engineering\preliminary\5172-05_sign_stripe_light.dwgSave Date:04/22/2615Revisions:1.Print Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota04/23/26KRO04/23/26Brian J. Krystofiak, P.E.25063BJK#5172-05
I
N
W
O
O
D
3
R
D
A
D
D
I
T
I
O
N
G
H
O
S
T
G
H
O
S
T
P
L
A
T
G H
O
S
T
P L
A
T
G H O S T P L A T I N W O O D5 T H A D D I T I O NSIGNING, STRIPING, ANDLIGHTING PLAN10VADNAIS ASSOCIATES, LLC2935 Country Drive, Suite 102Little Canada, MN 55117ofINWOOD COMMERCIALLake Elmo, MNoff:\jobs\5161 - 5180\5172-05- inwood commercial (outlot k, inwood)\cad c3d\engineering\preliminary\5172-05_sign_stripe_light.dwgSave Date:04/22/2615Revisions:1.Print Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota04/23/26KRO04/23/26Brian J. Krystofiak, P.E.25063BJK#5172-05
GRADING INDEX11Know what'sbelow.before you dig.CallRVADNAIS ASSOCIATES, LLC2935 Country Drive, Suite 102Little Canada, MN 55117ofINWOOD COMMERCIALLake Elmo, MNoff:\jobs\5161 - 5180\5172-05- inwood commercial (outlot k, inwood)\cad c3d\engineering\preliminary\5172-05_gr.dwgSave Date:04/22/2615Revisions:1.Print Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota04/23/26KRO04/23/26Brian J. Krystofiak, P.E.25063BJK#5172-05I N W O O D5 T H A D D I T I
O
N
I N
W
O
O
D3 R D
A
D
D
I
T
I
O
N
I
N
W
O
O
D1 S
T
A
D
D
I
T
I
O
NG H
O
S
TP L
A
TG H
O
S
TP L
A
TG H O S TP L A TG H O S TP L A T
I N W O O D3 R D A D D I T I O NI N
W
O
O
D
1 S
T
A
D
D
I
T
I
O
N
G H O
S
T
P L
A
T
G H O S T P L A T
PRELIMINARY GRADING& EROSION CONTROL PLAN12VADNAIS ASSOCIATES, LLC2935 Country Drive, Suite 102Little Canada, MN 55117ofINWOOD COMMERCIALLake Elmo, MNoff:\jobs\5161 - 5180\5172-05- inwood commercial (outlot k, inwood)\cad c3d\engineering\preliminary\5172-05_gr.dwgSave Date:04/22/2615Revisions:1.Print Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota04/23/26KRO04/23/26Brian J. Krystofiak, P.E.25063BJK#5172-05
I
N
W
O
O
D
3
R
D
A
D
D
I
T
I
O
N
I
N
W
O
O
D
1
S
T
A
D
D
I
T
I
O
N
G
H
O
S
T
P
L
A
T
G
H
O
S
T
P
L
A
T
G
H
O
S
T
P
L
A
T
G H O S T P L A T I N W O O D5 T H A D D I T I O NPRELIMINARY GRADING& EROSION CONTROL PLAN13VADNAIS ASSOCIATES, LLC2935 Country Drive, Suite 102Little Canada, MN 55117ofINWOOD COMMERCIALLake Elmo, MNoff:\jobs\5161 - 5180\5172-05- inwood commercial (outlot k, inwood)\cad c3d\engineering\preliminary\5172-05_gr.dwgSave Date:04/22/2615Revisions:1.Print Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota04/23/26KRO04/23/26Brian J. Krystofiak, P.E.25063BJK#5172-05
DETAILS14VADNAIS ASSOCIATES, LLC2935 Country Drive, Suite 102Little Canada, MN 55117ofINWOOD COMMERCIALLake Elmo, MNoff:\jobs\5161 - 5180\5172-05- inwood commercial (outlot k, inwood)\cad c3d\engineering\preliminary\5172-05_details.dwgSave Date:04/21/2615Revisions:1.Print Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota04/23/26KRO04/23/26Brian J. Krystofiak, P.E.25063BJK#5172-05
DETAILS15VADNAIS ASSOCIATES, LLC2935 Country Drive, Suite 102Little Canada, MN 55117ofINWOOD COMMERCIALLake Elmo, MNoff:\jobs\5161 - 5180\5172-05- inwood commercial (outlot k, inwood)\cad c3d\engineering\preliminary\5172-05_details.dwgSave Date:04/21/2615Revisions:1.Print Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota04/23/26KRO04/23/26Brian J. Krystofiak, P.E.25063BJK#5172-05
I
N
W
O
O
D
3
R
D
A
D
D
I
T
I
O
N
I
N
W
O
O
D
1
S
T
A
D
D
I
T
I
O
N
G
H
O
S
T
P
L
A
T
G
H
O
S
T
P
L
A
T
G H O S T P L A T G H O S T P L A T I N W O O D5 T H A D D I T I O NB
Y
O
T
H
E
R
S 2RM7KC12WP6JL5BL2RM12AE2CA2CA16BH6FM5BL8HB2RM9WO6JL2RM7HLC I T Y O F O A K D A L EL1Know what'sbelow.before you dig.CallRPRELIMINARYLANDSCAPE PLANVADNAIS ASSOCIATES, LLC2935 Country Drive, Suite 102Little Canada, MN 55117ofINWOOD COMMERCIALLake Elmo, MNoff:\jobs\5161 - 5180\5172-05- inwood commercial (outlot k, inwood)\cad c3d\landscape\5172-05_landscape_prelim.dwgSave Date:04/21/26Revisions:1.#5172-052Print Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Landscape Architect underthe laws of the State of Minnesota04/23/26RJR04/23/26Ryan J. Ruttger, RLA56346RJR
SYMBOLCODEQTYBOTANICAL NAMECOMMON NAMESIZECONTAINERTREESRM8Acer rubrum `Northwood`Northwoods Red Maple2.5" Cal.B&BFM6Acer x freemanii `Sienna`Sienna Glen Maple2.5" Cal.B&BHB8Celtis occidentalisCommon Hackberry2.5" Cal.B&BHL7Gleditsia triacanthos inermis `Harve`Northern Acclaim Thornless Honey Locust2.5" Cal.B&BKC7Gymnocladus dioica `Espresso`Kentucky Coffeetree2.5" Cal.B&BWO9Quercus bicolorSwamp White Oak2.5" Cal.B&BBL10Tilia americana `Boulevard`Boulevard Linden2.5" Cal.B&BAE12Ulmus americana `Princeton`American Elm2.5" Cal.B&B67SUBTOTAL:CONIFEROUS TREESBH16Picea glauca densataBlack Hills Spruce6` Ht.B&BWP12Pinus strobusWhite Pine6` Ht.B&B28SUBTOTAL:ORNAMENTAL TREESCA4Malus x `Prairiefire`Red Flowers, Clump Form, 2" CalEquivalentPrairiefire Crabapple7` Ht.B&BJL12Syringa reticulata `Ivory Silk`White FlowersIvory Silk Japanese Tree Lilac2" Cal.B&B16SUBTOTAL:GROUND COVERSTI59,623 sfType I - Turf Seed MixRefer to notes for acceptable seedingmethodsSeeding Rate 200 lb/acMnDOT Residential Turfgrass (RT)seedTII100,748 sfType II - Native Seed Mix (A)Refer to notes for acceptable seedingmethodsSeeding Rate 39 lb/acMnDOT Southern Shortgrass Roadside (SSR)seedTIII34,739 sfType III - Native Seed Mix (B)Refer to notes for acceptable seedingmethodsSeeding Rate 39 lb/acMnDOT Southern Tallgrass Roadside (STR)seed195,110 sfSUBTOTAL:PLANT SCHEDULEL2PRELIMINARYLANDSCAPE PLANVADNAIS ASSOCIATES, LLC2935 Country Drive, Suite 102Little Canada, MN 55117ofINWOOD COMMERCIALLake Elmo, MNoff:\jobs\5161 - 5180\5172-05- inwood commercial (outlot k, inwood)\cad c3d\landscape\5172-05_landscape_prelim.dwgSave Date:04/21/26Revisions:1.#5172-052Print Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Landscape Architect underthe laws of the State of Minnesota04/23/26RJR04/23/26Ryan J. Ruttger, RLA56346RJR
3890 PHEASANT RIDGE DRIVE NE, SUITE 100
BLAINE, MN 55449
TEL 763.489.7900
FAX 763.489.7959
CARLSON-ENGINEERING.COM
ENGINEERING \ SURVEYING \ PLANNING
STORMWATER MANAGEMENT PLAN
INWOOD COMMERCIAL
Lake Elmo, Minnesota
Carlson Engineering Project No.: 5172 -05
Prepared for:
Vadnais Associates, LLC
2935 Country Drive, Suite 102
Little Canada, MN 55117
April 23, 2026
Stormwater Management Plan
Inwood Commercial
Carlson Engineering, Inc. Page i
TABLE OF CONTENTS
1.0 INTRODUCTION ................................................................................................... 1
1.1 Existing Conditions ...................................................................................................... 1
1.2 Proposed Conditions .................................................................................................... 1
1.3 Soil Information ........................................................................................................... 2
STORMWATER ANALYSIS ............................................................................................ 3
1.4 Peak Elevations ............................................................................................................ 3
1.5 Rate Control Analysis .................................................................................................. 4
1.6 Water Quality and Volume Reduction Analysis ....................................................... 4
1.7 Storm Sewer Design ..................................................................................................... 4
1.8 Other Considerations................................................................................................... 5
1.9 Conclusion .................................................................................................................... 5
2.0 CERTIFICATION .................................................................................................... 6
FIGURES
Figure 1 Site Location Map
Figure 2 Existing Conditions Drainage Map
Figure 3 Proposed Conditions Drainage Map
Figure 4 Storm Sewer Drainage Map
Figure 5 Impervious To Existing Ponds Exhibit
APPENDICES
Appendix A Inwood Proposed Drainage Area Map
Appendix B Storm Sewer Design
Appendix C Soil Information
Stormwater Management Plan
Inwood Commercial
Carlson Engineering, Inc. Page 1 of 6
1.0 INTRODUCTION
This document provides detailed information on the proposed surface water management system
for the development of property located between 10th Street N and 5th Street N, along Inwood
Avenue N and the western property line of the Inwood development in Lake Elmo, Washington
County, Minnesota. Vadnais Associates, LLC plans on platting the site into 5 separate lots, with
corresponding public streets and utilities, which will all be developed separately. Included in
this document is a general rate control analysis and storm sewer design. See Figure 1 for a site
location map.
1.1 Existing Conditions
The site is located between 10th Street N and 5th Street N, along Inwood Avenue N and the western
property line of the Inwood development in Lake Elmo, Washington County, Minnesota. The site
is bounded on the west by the Inwood development, on the north and east by 10th Street North,
on the south by 5th Street N, and on the west by Inwood Avenue N (C.S.A.H. 13). The site is
currently undeveloped grassland, but was mass graded for future development as part of the
Inwood Development. The site boundary consists of 17.35 acres. There are no existing
impervious surfaces onsite.
The site has a gradually sloped topography, with elevations ranging from 1060 in the north
eastern portion of the site, down to about 1010 in the south eastern portion of the site. There is
an existing stormwater pond located just east of the site, and another across from 5th Street N,
behind the existing Kwik Trip lot located in the southeast quadrant of the 5th Street N and Inwood
Avenue N intersection. The majority of the stormwater from the site drains from north to south
through the site, where it either accumulates at the previously graded low points in the future
street section, or off-site to the south on 5th Street N, where it is collected by existing storm sewer
and discharged to an existing pond south of 5th Street N. This stormwater pond discharges to an
existing ditch that drains south under Interstate Highway 94 and ultimately to Wilmes Lake. The
remainder drains off site to the existing ditches along 10th Street N and Inwood Avenue N, which
ultimately flows south, away from the site. See Figure 2 for an existing conditions drainage map.
There are no wetlands onsite. Goose Lake is within one mile of the site and is classified as an
impaired water. The site does not drain towards this lake so no additional construction BMP’s
are necessary.
1.2 Proposed Conditions
Vadnais Associates, LLC plans on platting the site into 5 separate lots, with corresponding public
streets and utilities, which will all be developed separately. Currently, the first phase of
construction will include the construction of all public streets, sidewalks, trails, and
accompanying utilities. After the first phase of construction, each individual lot will be sold and
developed separately. The majority of the site lies within the 1,000 Foot Shoreland District
Stormwater Management Plan
Inwood Commercial
Carlson Engineering, Inc. Page 2 of 6
Boundary, which limits the amount of new impervious surface to 30% of the square footage of
each lot within the boundary. All lot areas outside of the district boundary is limited to 75% of
the lot square footage. During the first phase of construction, approximately 6.24 acres will be
disturbed. After the initial construction, the site will contain approximately 2.57 acres of
impervious surface. When the site is fully built out, the site will contain a maximum allowable
impervious surface area of approximately 5.67 acres. This 5.67 acres combines the 8.24 acres from
the public streets, trail, sidewalks, and additional impervious from the turn lane construction,
and a maximum allowable total lot impervious of approximately 5.67.
Stormwater from the site will be collected in storm sewer and routed to the existing stormwater
pond located immediately east of the site, and the existing pond south of the site, behind the
existing Kwik Trip. These stormwater ponds were designed to provide water quality treatment
and rate control for the site in a fully developed condition. See Figure 3 for a proposed conditions
drainage map.
For new outlets into the pond immediately east of the site, a sump catch basin manhole will be
used in the most downstream manhole to prevent suspended sediment from being discharged to
the pond. When tying into existing storm sewer stubs provided for this site, which will be utilized
with the development of Lot 2, Block 2, existing 4-foot sumps were provided on the most
downstream storm sewer structure. This prevents suspended solids from being discharged to
the pond behind Kwik Trip. No additional stormwater treatment practices are proposed for the
site.
1.3 Soil Information
For the entire Inwood Site, in November 2014, Braun Intertec drilled seven soil boings to
approximate near surface soils in the western and southern portion of the site. These borings
indicated near surface soils consist primarily of the silty sand and course graded sand, with areas
of clay.
According to the Natural Resources Conservation Service web soil survey onsite soils fall within
the Hydrologic Soil Group (HSG) “B” and “C”.
See Appendix C for soil information.
Stormwater Management Plan
Inwood Commercial
Carlson Engineering, Inc. Page 3 of 6
STORMWATER ANALYSIS
The proposed site is part of a master development known as Inwood. The site was mass graded
in 2015, including grading for the Inwood Commercial and adjacent commercial lots. As part of
the mass grading, two regional stormwater ponds and a regional infiltration basin were
constructed to provide water quality treatment and rate control for the area in question, as well
as portions of the residential area to the west. The analysis presented below is based on a review
of the approved Inwood Stormwater Management Plan prepared by Carlson Engineering, last
revised February 16, 2015.
1.4 Peak Elevations
Based on the Inwood Stormwater Management Plan, the table below summarizes the existing
high water levels for the existing Ponds 100 and Infiltration Basin 400 located south of the existing
Kwik Trip, and Pond 200 located immediately east of the site.
Table 1
High Water Elevations
Inwood Development
Lake Elmo, Minnesota
Basin Bottom Outlet 2y HWL 10y HWL 100y HWL
Pond 100 986.0 995.0 996.9 998.1 1000.7*
Pond 200 996.0 1006.0 1007.9 1008.9 1011.0*
Basin 400 994.0 995.0 996.6 997.5 998.6*
*Note the revised HydroCAD model and final grading plans for Inwood list the 100-year HWL
for Pond 100 at 1001.3, for Pond 200 at 1010.4 and for Basin 400 at 998.8.
The previously approved Inwood development stormwater management plan accounted for a
maximum allowable impervious area of 3.330 acres of the proposed site to flow to Pond 200.
The current Inwood Commercial plan is proposing a total of 3.184 acres of impervious (from the
public streets and ghost plat lots) to Pond 200. Therefore, the approved Inwood stormwater
plan is more conservative than the proposed Inwood Commercial layout, and Pond 200 will see
no adverse effects of the full build out of Inwood Commercial. Pond 100 is in a similar situation
with a maximum allowable impervious area of 2.850 acres, which was previously accounted for
in the approved Inwood stormwater plan, and a proposed impervious area of 2.377 acres with
Inwood Commercial development. Thus, Pond 100 will see no adverse effects from the full
build out of the Inwood Commercial site.
Stormwater Management Plan
Inwood Commercial
Carlson Engineering, Inc. Page 4 of 6
1.5 Rate Control Analysis
All stormwater from the site drains to existing stormwater ponds 100 and 200. Based on the
Inwood Stormwater Management Plan, Inwood Commercial areas were assumed to have 30
percent impervious area within the 1,000 Foot Shoreland District Boundary, and 75% of the area
outside of the district boundary, which is indicated in the notes section on Figure 3 of the Inwood
Stormwater Management Plan (See Appendix A). The majority of the Inwood Commercial site
was slated to drain to Stormwater Pond 200, and a small southern portion to drain to Stormwater
Pond 100. It will be up to the future lot development plans to correctly discharge the future
impervious area to the right pond and not exceed the maximum allowable.
Since the Inwood Commercial proposed impervious amount, which includes 4 ghost platted lots,
is less than maximum allowable from each catchment area, proposed runoff rates will be less than
the design runoff rates. Please see Figure 5 for an impervious exhibit.
When the 5 individual lots develop, a percent impervious analysis should be completed to
ensure that runoff rates are not increased to the ponds.
1.6 Water Quality and Volume Reduction Analysis
Based on the Inwood Stormwater Management Plan, the ponds were designed to meet NURP
standards as well as South Washington Watershed District phosphorus reduction requirements.
Additionally, the infiltration basin was designed to provide volume reduction meeting the South
Washington Watershed District and MPCA requirements for the entire site in a fully developed
condition.
Because the proposed site will have less impervious than the original assumptions used in the
water quality and volume reductions calculations, the site will generate less runoff and require
less water quality treatment and volume reduction than the approved master development plan.
1.7 Storm Sewer Design
Proposed storm sewer will be used to collect stormwater from the site and to route it to existing
pond 200. Lot 2, Block 2 will need utilize existing storm sewer stubs into the site from 5 th Street N
to route stormwater south to existing Pond 100, behind Kwik Trip, as to not exceed the maximum
allowable impervious to Pond 200. The rational method was used to determine anticipated flows
to each catch basin and the pipes were sized using those flows along with Manning’s equation.
All proposed storm sewer has been designed to accommodate a 10-year storm at a minimum. See
Figure 4 for Storm Sewer Drainage Map and Appendix B for storm sewer design spreadsheet.
Stormwater Management Plan
Inwood Commercial
Carlson Engineering, Inc. Page 5 of 6
1.8 Other Considerations
Sump catch basin manholes will be installed at the most downstream structure of the pipe
network to prevent suspended solids from being discharged to the existing pond. Riprap will be
used at the outlet to the existing pond to provide energy dissipation. When additional storm
sewer is tied into an existing storm sewer network, sumps were previously installed along with
riprap at the outlet to the existing pond.
1.9 Conclusion
The proposed development will result in less impervious surface and less runoff rate and volume
from the site than what was originally planned for under the Inwood Development stormwater
management system. All storm sewers have been designed to accommodate a 10-year storm at a
minimum. Sump catch basins will be utilized to prevent sediment from being conveyed
downstream.
Stormwater Management Plan
Inwood Commercial
Carlson Engineering, Inc. Page 6 of 6
2.0 CERTIFICATION
I hereby certify that this plan, specification or report was prepared by me or under my direct
supervision and that I am a duly Licensed Professional Engineer under the laws of the State of
Minnesota.
This Stormwater Management Plan was prepared by:
4/23/2026
Justin J. Olson, P.E. Date
License #: 54231
FIGURES
SOURCE: USGS LAKE ELMO 7.5 MIN. QUADRANGLE
SITE LOCATION
FIGURE 1
SITE LOCATION MAP
INWOOD COMMERCIAL
Lake Elmo, MN
f:\jobs\5161 - 5180\5172-05- inwood commercial (outlot k, inwood)\cad c3d\engineering\5172-05_drain.dwgSave Date:04/22/26 #5172-05
1 S
T
A
D
D
I
T
I
O
N
I
N
W
O
O
D3 R
D
A
D
D
I
T
I
O
NFIGURE 2.1EXISTING CONDITIONSDRAINAGE MAPNOTES:LEGENDCATCHMENT LINEf:\jobs\5161 - 5180\5172-05- inwood commercial (outlot k, inwood)\cad c3d\engineering\5172-05_drain.dwgSave Date:04/23/26#5412-05VADNAIS ASSOCIATES, LLC2935 Country Drive, Suite 102Little Canada, MN 55117INWOOD COMMERCIALLake Elmo, MN
I
N
W
O
O
D1 S
T
A
D
D
I
T
I
O
N
I N W O O D3 R D A D D I T I O NFIGURE 2.2EXISTING CONDITIONSDRAINAGE MAPNOTES:LEGENDCATCHMENT LINEf:\jobs\5161 - 5180\5172-05- inwood commercial (outlot k, inwood)\cad c3d\engineering\5172-05_drain.dwgSave Date:04/23/26E X
I
S
T
I
N
GK W
I
K
T
R
I
P#5412-05VADNAIS ASSOCIATES, LLC2935 Country Drive, Suite 102Little Canada, MN 55117INWOOD COMMERCIALLake Elmo, MN
1 S
T
A
D
D
I
T
I
O
N
I
N
W
O
O
D3 R
D
A
D
D
I
T
I
O
NFIGURE 3.1EXISTING CONDITIONSDRAINAGE MAPNOTES:LEGENDCATCHMENT LINEf:\jobs\5161 - 5180\5172-05- inwood commercial (outlot k, inwood)\cad c3d\engineering\5172-05_drain.dwgSave Date:04/23/26G H
O
S
TP L
A
TG H
O
S
TP L
A
TG H
O
S
TP L
A
TG H
O
S
TP L
A
TNOTE:CURRENTLY, THERE IS NO GRADING PLANFOR ANY OF THE PROPOSED PLATTED LOTS,BUT IT IS ASSUMED THAT THE MAJORITYOF EACH LOT WILL BE COLLECTED BYFUTURE STORM SEWER AND ROUTED TOTHE DENOTED POND, EXCEPT FOR A SMALLSTRIP ALONG 10TH STREET N ANDINWOOD AVENUE N, WHICH WILL DRAINDIRECTLY TO THE EXISTING COUNTY ROADDITCHES. 4 OF THE 5 LOTS ARECURRENTLY GHOST PLATS.#5412-05VADNAIS ASSOCIATES, LLC2935 Country Drive, Suite 102Little Canada, MN 55117INWOOD COMMERCIALLake Elmo, MN
I
N
W
O
O
D1 S
T
A
D
D
I
T
I
O
N
I N W O O D3 R D A D D I T I O NFIGURE 3.2EXISTING CONDITIONSDRAINAGE MAPNOTES:#5412-05LEGENDCATCHMENT LINEVADNAIS ASSOCIATES, LLC2935 Country Drive, Suite 102Little Canada, MN 55117INWOOD COMMERCIALLake Elmo, MNf:\jobs\5161 - 5180\5172-05- inwood commercial (outlot k, inwood)\cad c3d\engineering\5172-05_drain.dwgSave Date:04/23/26E X
I
S
T
I
N
GK W
I
K
T
R
I
PB YO T
H
E
R
SG H
O
S
TP L
A
TG H O S TP L A TNOTE:CURRENTLY, THERE IS NO GRADING PLANFOR ANY OF THE PROPOSED PLATTED LOTS,BUT IT IS ASSUMED THAT THE MAJORITYOF EACH LOT WILL BE COLLECTED BYFUTURE STORM SEWER AND ROUTED TOTHE DENOTED POND, EXCEPT FOR A SMALLSTRIP ALONG 10TH STREET N ANDINWOOD AVENUE N, WHICH WILL DRAINDIRECTLY TO THE EXISTING COUNTY ROADDITCHES. 4 OF THE 5 LOTS ARECURRENTLY GHOST PLATS.
336335334333332350
346345331347
348
3413403303
6
0
3
6
1
362371370f:\jobs\5161 - 5180\5172-05- inwood commercial (outlot k, inwood)\cad c3d\engineering\5172-05_stm swr catchment.dwgSave Date:04/22/26NOTES:#5172-05VADNAIS ASSOCIATES, LLC2935 Country Drive, Suite 102Little Canada, MN 55117INWOOD COMMERCIALLake Elmo, MinnesotaFIGURE 4STORM SEWERCATCHMENT AREAS060120240LEGENDCATCHMENT LINESTRUCTURE NUMBER105
I N W O O D3 R D A D D I T I O NI N W O O D5 T H A D D I T I O NC I T Y O FO A K D A L EVADNAIS ASSOCIATES, LLC2935 Country Drive, Suite 102Little Canada, MN 55117ofINWOOD COMMERCIALLAKE ELMO, MNoff:\jobs\5161 - 5180\5172-05- inwood commercial (outlot k, inwood)\cad c3d\engineering\exhibits\z_old_5172-05_stormwater exhibit.dwgSave Date:04/22/261Revisions:#5172-051FIGURE 5IMPERVIOUS TO EXISTINGPONDS EXHIBIT LEGEND POND 200 (CATCHMENT 201S) IMPERVIOUS SUMMARY POND 100 (CATCHMENTS 101S & 102S) IMPERVIOUS SUMMARY
APPENDIX A
FIGURE 3PROPOSED CONDITIONSDRAINAGE MAPHANS HAGEN HOMES941 NE Hillwind RoadFridley, MN 55432REVISIONS1.2.3.4.5.6.DRAWN BY:DESIGNED BY:ISSUE DATE:JTRJTR10/10/14INWOODLake Elmo, Minnesotaf:\jobs\5161 - 5180\5172 - lake elmo property\cad\engineer\5172_drain.dwgSave Date:02/16/15248 Apollo Dr, Suite 100, Lino Lakes, MN 55014Phone: 763-489-7900 Fax: 763-489-7959ENVIRONMENTAL ◦ ENGINEERING ◦ SURVEYINGNOTESLEGENDCATCHMENT LINECATCHMENTCOLLECTION POINTDRAINAGE ARROWNOTESASSUMED 75% IMPERVIOUSASSUMED 30% IMPERVIOUS (SHORELAND OVERLAY)ASSUMED 30% IMPERVIOUS (SHORELAND OVERLAY)
APPENDIX B
10 year
0.013
varies
STRUCTURE AREA
CBMH
(from)CBMH (to) Size
Inc. Area
(ac)Inc. "C" Inc. CA Cum. CA T (min) I (in/hr)
Q = CAI
(cfs)D (in) % Grade
Qfull
(cfs)
Vfull
(fps)L (ft) Invert (in)
Invert
(out)Rim El. Build (ft)
371 370 24x36 0.31 0.65 0.20 0.20 10 5.8 1.16 12 0.50% 2.52 3.21 34 1006.39 1006.22 1010.89 4.50
370 fes 48 (sump) 0.30 0.65 0.19 0.39 10 5.8 2.28 15 0.35% 3.82 3.11 45 1006.05 1005.90 1011.09 9.04
1006.00
st362 361 4.20 0.65 2.73 2.73 11 5.6 15.31 21 1.20% 17.34 7.21 27 1008.50 1008.18 1016.50 8.00
361 360 48 0.19 0.65 0.12 2.86 11 5.6 16.00 24 0.60% 17.51 5.57 28 1008.01 1007.84 1015.06 7.05
360 fes 48 (sump) 0.16 0.65 0.10 2.96 11 5.6 16.59 27 0.35% 18.31 4.60 63 1006.22 1006.00 1015.25 13.03
1006.00
st350 333 2.01 0.65 1.30 1.30 11 5.6 7.30 18 1.00% 10.50 5.94 53 1021.00 1020.47 1029.50 8.50
348 347 24x36 0.22 0.65 0.15 0.15 10 5.8 0.84 12 0.50% 2.52 3.21 26 1014.35 1014.22 1018.85 4.50
347 345 48 0.22 0.65 0.14 0.29 10 5.8 1.68 15 0.50% 4.56 3.72 42 1014.05 1013.84 1018.85 4.80
st346 345 2.35 0.65 1.53 1.53 12 5.4 8.25 21 0.50% 11.20 4.65 30 1014.50 1014.35 1021.50 7.00
345 331 48 0.27 0.65 0.17 1.99 12 5.4 10.75 21 0.60% 12.26 5.10 26 1013.51 1013.35 1019.46 5.95
st341 340 2.75 0.65 1.78 1.78 12 5.4 9.64 21 0.50% 11.20 4.65 27 1012.25 1012.12 1019.25 7.00
340 330 48 0.23 0.65 0.15 1.94 12 5.4 10.46 21 0.60% 12.26 5.10 26 1012.12 1011.96 1017.55 5.43
st336 335 2.85 0.65 1.85 1.85 13 5.3 9.83 21 0.50% 11.20 4.65 74 1018.30 1017.93 1029.30 11.00
335 334 48 0.34 0.65 0.22 2.08 13 5.3 11.00 21 0.55% 11.74 4.88 26 1017.93 1017.79 1027.64 9.71
334 333 48 0.73 0.65 0.47 2.55 13 5.3 13.50 21 0.75% 13.71 5.70 106 1017.79 1016.99 1027.64 9.85
333 332 48 0.05 0.65 0.03 3.89 13 5.3 20.60 24 0.90% 21.44 6.83 93 1016.83 1015.99 1028.17 11.34
332 331 60 0.09 0.65 0.06 3.95 13 5.3 20.91 27 0.50% 21.88 5.50 307 1015.82 1014.29 1027.17 11.35
331 330 60 0.72 0.65 0.47 6.41 13 5.3 33.95 27 1.50% 37.90 9.53 142 1013.02 1010.89 1019.46 6.44
330 fes 84 0.45 0.65 0.30 8.64 13 5.3 45.78 48 0.15% 55.59 4.42 91 1006.14 1006.00 1017.55 15.41
1006.00
GENERAL DESIGN PROFILE INFORMATION
DESIGN CRITERIA
Storm Frequency
Manning's "n"
"C" coefficient
LOCATION
PROJECT NAME: Inwood Commercial
PROJECT LOCATION: Lake Elmo, MN
CARLSON ENGINEERING PROJECT NO.: 5172-05
DATE: 04/23/2026
BY: KRO
"C" COEFFICIENT
APPENDIX C
Table of Contents
Description Page
A. Introduction......................................................................................................................................1
A.1. Project Description..............................................................................................................1
A.2. Background Information and Reference Documents..........................................................2
A.3. Scope of Services.................................................................................................................2
A.4. Boring Locations..................................................................................................................3
B. Results..............................................................................................................................................3
B.1. Exploration Logs..................................................................................................................3
B.1.a. Log of Boring Sheets...............................................................................................3
B.1.b. Geologic Origins .....................................................................................................3
B.2. Geologic Profile...................................................................................................................4
B.2.a. Topsoil....................................................................................................................4
B.2.b. Glacial Deposits......................................................................................................4
B.2.c. Groundwater..........................................................................................................4
B.3. Laboratory Test Results.......................................................................................................5
C. Basis for Recommendations.............................................................................................................5
D. Recommendations ...........................................................................................................................6
D.1. Site Grading and Building Pad Preparation.........................................................................7
D.1.a. Excavations.............................................................................................................7
D.1.b. Excavation Support.................................................................................................8
D.1.c. Placement and Compaction of Backfill and Fill......................................................8
D.1.d. Grade Raises...........................................................................................................9
D.2. Spread Footings...................................................................................................................9
D.2.a. Embedment Depth.................................................................................................9
D.2.b. Net Allowable Bearing Pressure.............................................................................9
D.3. Interior Slabs .......................................................................................................................9
D.3.a. Subgrade Modulus.................................................................................................9
D.3.b. Moisture Vapor Protection ..................................................................................10
D.4. Exterior Slabs.....................................................................................................................10
D.5. Utilities ..............................................................................................................................11
D.6. Pavements.........................................................................................................................11
D.6.a. Subgrade Preparation ..........................................................................................11
D.6.b. Subgrade Proofroll ...............................................................................................12
D.6.c. R-Value.................................................................................................................12
D.6.d. Pavement Sections...............................................................................................12
D.7. Stormwater Management.................................................................................................13
D.8. Additional Evaluation........................................................................................................13
E. Procedures......................................................................................................................................14
E.1. Penetration Test Borings...................................................................................................14
E.2. Material Classification and Testing ...................................................................................14
E.2.a. Visual and Manual Classification..........................................................................14
E.2.b. Laboratory Testing ...............................................................................................14
E.3. Groundwater Measurements............................................................................................14
F. Qualifications..................................................................................................................................14
Table of Contents (continued)
Description Page
F.1. Variations in Subsurface Conditions..................................................................................14
F.2. Continuity of Professional Responsibility..........................................................................15
F.2.a. Plan Review..........................................................................................................15
F.2.b. Construction Observations and Testing...............................................................15
F.3. Use of Report.....................................................................................................................15
F.4. Standard of Care................................................................................................................15
Appendix
Boring Location Sketch
Log of Boring Sheets ST-1 to ST-7
AET Subsurface Boring Logs 1, 2, 4, 5 and 9
Descriptive Terminology
A.Introduction
A.1.Project Description
It is our understanding that Inwood 10 LLC is proposing to develop a 154-acre area for both commercial
and residential use in Lake Elmo, Minnesota. A geotechnical evaluation has already been performed for
the residential portion of the project by American Engineering Testing, Inc. (AET). The residential portion
includes the construction of a subdivision in the center and northwest portions of the development as
shown on the sketch below. Our evaluation was performed for only the commercial area as outlined in
the sketch below.
Figure 1. Proposed Commercial Development Concept Plan
The majority of the parcel is agricultural fields with small isolated areas with trees. The surface also has a
general downward slope across the site towards the southwest.
Commercial parcel
Residential parcel
Inwood 10 LLC
Project B14-08413
December 3, 2014
Page 2
The purpose of this preliminary geotechnical evaluation is to assist Inwood 10 LLC and their design team
in evaluating the soil and groundwater conditions in the area of the proposed commercial development
and to provide preliminary recommendations for design and construction of foundations, slabs on grade,
utilities, and pavements.
A.2.Background Information and Reference Documents
To facilitate our evaluation, we were provided with or reviewed the following information or documents:
A proposed boring location sketch outlining the commercial development, the proposed
boring locations, and previously performed soil borings by American Engineering Testing, Inc.
A development concept sketch titled as, “PUD Concept Plan Inwood”, and dated August 28,
2014.
A Geotechnical Evaluation prepared by AET and dated May 13, 2014 for the residential
portion of the project generally located at the northwest portion of the parcel.
Discussions with Rick Schreier of Inwood 10 LLC in regard to the commercial development
grading, building pad preparation, and features.
A.3.Scope of Services
Our scope of services for this project was originally submitted as a Proposal to Rick Schreier of Inwood 10
LLC and dated October 24, 2014. We received authorization to proceed on October 30, 2014. Tasks
completed in accordance with our authorized scope of services are described below.
Staking the boring locations at the locations provided by Rick Schreier and determining
ground surface elevations at the boring locations.
Coordinating the locating of underground public utilities near the boring locations.
Conducting 7 standard penetration borings in the proposed commercial development to a
nominal depth of 20 feet below existing grade.
Classifying the samples and preparing boring logs.
Inwood 10 LLC
Project B14-08413
December 3, 2014
Page 3
Conducting a limited laboratory testing program.
Analyzing the results of the field and laboratory tests.
Formulating recommendations and submitting a preliminary geotechnical evaluation report
containing logs of the borings, our analysis of the field and laboratory tests, and preliminary
recommendations for design of foundations, slabs on grade, utilities, and pavements.
A.4.Boring Locations
The soil boring locations and surface elevations were determined using GPS (Global Positioning System)
technology uses the Minnesota Department of Transportation's permanent GPS Virtual Reference
Network (VRN). The boring locations are shown on the attached sketch.
Prior to commencing with our subsurface exploration activities, we coordinated the clearing of the soil
boring of underground utilities through Gopher State One Call.
B.Results
B.1.Exploration Logs
B.1.a.Log of Boring Sheets
Log of Boring sheets for our penetration test borings are included in the Appendix. The logs identify and
describe the geologic materials penetrated, the results of penetration resistance and laboratory tests
performed on penetration test samples retrieved from them, and groundwater observations.
Strata boundaries were inferred from changes in the penetration test samples and the drill auger
cuttings. Because sampling was not performed continuously, the strata boundary depths are only
approximate. The boundary depths likely vary away from the boring locations, and the boundaries
themselves may also occur as gradual rather than abrupt transitions.
B.1.b.Geologic Origins
Geologic origins presented for each stratum on the Log of Boring sheets are based on the soil types,
blows per foot, and available common knowledge of the geological history of the site. Because of the
Inwood 10 LLC
Project B14-08413
December 3, 2014
Page 4
complex glacial and post-glacial depositional environments, geologic origins can be difficult to ascertain.
A detailed investigation of the geologic history of the site was not performed.
B.2.Geologic Profile
The types of soils encountered in the borings are described below. The soils are generally described in
the order they were encountered; i.e., beginning at the ground surface. Please reference the Logs of
Borings attached in the Appendix for additional details.
B.2.a.Topsoil
Topsoil was encountered at the surface at our boring locations with thicknesses of about 8 inches to
1 foot. The topsoil encountered by our soil borings consisted of lean clay with sand.
In soil borings 1 through 5 and 9 performed by AET nearest the commercial development, a “plow zone”
layer was encountered at the surface. This layer had a thickness of 2 feet and the soils encountered were
similar to the topsoil encountered in our soil borings. We noted the depth of soils that were interpreted
to have the organic contents high enough that they were estimated to impact structural properties of the
soil.
B.2.b.Glacial Deposits
The borings we performed encountered glacial deposits beneath the topsoil consisted predominately of
silty sands and silty clayey sands with lesser amounts of poorly graded sand, poorly graded sand with silt,
clayey sand, and lean clay with sand. The penetration resistances recorded in the cohesionless (sand)
soils varied from 4 to 47 blows per foot (BPF), indicating a very loose to dense relative density. The
penetration resistances recorded in the cohesive (clay) deposits varied from 8 to 38 BPF, indicating a
medium to hard consistency. Some of the higher blow counts are likely due to gravel.
The glacial deposits our soil borings encountered are consistent with the soils AET encountered. One
difference is that our glacial outwash sands were generally classified as alluvial soils by AET. Also of note
is that in AET borings 1 and 5 a layer of soft clay was encountered.
B.2.c.Groundwater
Water was encountered in soil boring ST-4 at approximate elevation 991. Based on the moisture contents
of the geologic material beneath this elevation, it does not appear our soil boring penetrated the
hydrostatic groundwater surface but instead encountered perched deposits of groundwater trapped in
Inwood 10 LLC
Project B14-08413
December 3, 2014
Page 5
the sand. Due to variations in site elevations, soil borings ST-3, ST-4, ST- 5, and ST-6 extended beyond
this elevation and water was not encountered.
In AET’s soil boring 1, water was encountered approximately 11 feet below the surface which
corresponds to an elevation of about 997.5. In their report, the water encountered was judged to be
water accumulating in fast draining soil layers above slower draining soil layers during wetter periods of
the year.
The elevations at which perched groundwater accumulates seasonally and annually will likely vary and
could be shallower/higher at the exploration locations and between the exploration locations.
Piezometers or monitoring wells would be required to confirm if groundwater was present within the
depths explored.
B.3.Laboratory Test Results
Selected soil samples were submitted to our laboratory for testing. The laboratory tests were completed
in general accordance with current ASTM procedures. The test results can be found on the Log of Boring
sheets opposite the soil sample tested.
Moisture content tests on selected granular soil samples generally ranged from 3 to 10 percent,
indicating the majority of the sandy soils tested were likely at or below their estimated optimum
moisture content. Moisture conditioning of granular soils may be needed to meet required densities if
used for fill or backfill. The moisture content test on the selected cohesive soil sample was 9 percent,
indicating the clayey soil tested was near its estimated optimum moisture content.
Our mechanical analyses (grain size accumulation curve) indicated the selected samples contained 9 to
34 percent silt and clay by weight and was used to classify the soil and may be used to estimate
infiltration or to evaluate the material for reuse on site.
C.Basis for Recommendations
We understand the project includes the construction of multiple buildings of the office/ warehouse style
common to business parks. At the time of this report, design loads, anticipated grades, and final locations
of structures have not been provided. Only conceptual aspects of the development were presented.
Aspects of the conceptual design include the construction of roadways separating the residential and
Inwood 10 LLC
Project B14-08413
December 3, 2014
Page 6
commercial developments, multiple commercial and multi-family residential structures, and stormwater
ponds.
Per conversations with Rick Schreier of Inwood 10 LLC, this preliminary geotechnical evaluation will be
utilized by the project design team to assist in developing plans and specifications for the project,
specifically related to site grading. Existing grades, in the commercial development area as shown on the
sketch in the Appendix, range between 1003 and 1031.
We have attempted to describe our understanding of the proposed construction to the extent it was
reported to us by others. Depending on the extent of available information, assumptions may have been
made based on our experience with similar projects. If we have not correctly recorded or interpreted the
project details, we should be notified. New or changed information could require additional evaluation,
analyses and/or recommendations.
D.Recommendations
Based on the soil borings, we anticipate that the site would be prepared typical to similar commercial
buildings, namely:
Site grading will likely include stripping the vegetation and topsoil and any very loose sands
or soft clays.
Surface compaction within the building pads once stripping is complete for areas to be filled.
Cutting to grade or filling with suitable soils. A majority of material below the topsoil is
anticipated to be considered suitable for engineered fill, though it should be noted moisture
conditioning may be needed.
In our judgment, the on-site clays could be reused as engineered fill, but will require drying so
compaction can be achieved. To dry these soils, extensive farming of these clays will likely be required
and is easier to accomplish in the drier months of June to September. If site grading is done in the spring
or fall, on-site drying of these soils may not prove to be feasible and the importing of drier soils may be
required. If time or space is not available to dry these soils, then drier soils may need to be imported. The
reuse of these materials should be discussed at the bidding stages of the project.
Inwood 10 LLC
Project B14-08413
December 3, 2014
Page 7
In areas where clays would comprise a majority of the fill where grades are raised or where there are
significant grade raises placed upon clay, the thickness of clay placed may need to be restricted to limit
the amount of post-construction settlement which occurs from the excavation backfill compressing
under its own weight. Usually fills on the order of 5 to 10 feet can be accommodated within a
construction schedule provided the transition is gradual.
Once the final design, grades, and locations of each structure are determined, our evaluation should be
finalized. This final evaluation may revise or provide additional recommendations and may include
additional field exploration utilizing soil borings or test pits.
D.1.Site Grading and Building Pad Preparation
D.1.a.Excavations
To prepare the building pads, encountered organic topsoil, very loose sands, and soft clays should be
removed and replaced. The following tabulation outlines the anticipated depths needed at the boring
locations to remove the topsoil and possible loose or soft soils.
Table 1. Anticipated Excavation Depths of Building Pads
Soil Boring
Approximate Surface
Elevation
Anticipated Depth of
Excavation
(Feet)
Anticipated Bottom of
Excavation
(Elevation)
ST-1 1030.7 1 1030
ST-2 1019.9 1 1019
ST-3 1011.5 1 1010 1/2
ST-4 1003.6 1 1002 1/2
ST-5 1005.1 1 1004
ST-6 1005.5 1 1004 1/2
ST-7 1012.7 1 1011 1/2
AET 1 1008.5 9 999 1/2
AET 2 1019.6 4 1015 1/2
AET 3 1021.4 2 1019
AET 4 1015.8 2 1013 1/2
AET 5 1019.9 4 1015 1/2
AET 9 1020.5 2 - 4 1018 1/2 - 1016 1/2
Inwood 10 LLC
Project B14-08413
December 3, 2014
Page 8
The excavation depths indicated in the above tabulation are approximate and will vary. The actual depth
of excavation needs to be determined in the field at the time of construction. An experienced
geotechnical engineering technician, under the direction of a geotechnical engineer, should work closely
with the excavating contractor during excavation to make the necessary field judgments regarding the
suitability of the exposed soils and to determine the extent of soft soils.
To provide lateral support and control settlement to the structural loads they will support, we
recommend oversizing (widening) the excavations 1 foot horizontally beyond the footings for each foot
the excavations extend below bottom-of-footing elevations.
Prior to the placement of engineered fill or footings, we recommend the exposed sand soils in the
bottoms of the excavations be surface compacted using a minimum of 5 passes over an area with a large
(minimum 3-foot-diameter drum), self-propelled vibratory drum compactor.
D.1.b.Excavation Support
Sandy soils are prevalent in the near surface soils, and portions of the sands are described as poorly
graded sand and would be classified as Type C Soil under OSHA guidelines. Based on this classification it
should be anticipated unsupported excavations be maintained at a gradient no steeper than 1 1/2 to 1
(horizontal: vertical). In areas of the site encountering only silty sand tills the soils would be classified as
Type B Soil under OSHA guidelines. Based on this classification it should be anticipated unsupported
excavations be maintained at a gradient no steeper than 1 to 1 (horizontal: vertical). Slopes constructed
in this manner may still exhibit surface sloughing. If site constraints do not allow the construction of
temporary slopes with these dimensions, then temporary shoring may be required, and we should be
consulted for additional recommendations.
An OSHA approved competent person should review this soil classification in the field. Excavations must
comply with the requirements of OSHA 29 CFR, Part 1926, Subpart P, “Excavations and Trenches.” This
document states excavation safety is the responsibility of the contractor. Reference to these OSHA
requirements should be included in the project specifications.
D.1.c.Placement and Compaction of Backfill and Fill
Based on the results of the borings and laboratory tests, the sand soils frequently encountered below the
topsoil appear generally suitable for use as engineered fill. Any clay soils encountered being fine-grained,
will be more difficult to compact if wet or allowed to become wet, or if spread and compacted over wet
surfaces.
Inwood 10 LLC
Project B14-08413
December 3, 2014
Page 9
If site grading and construction is anticipated during cold weather, snow and ice should be removed from
cut and fill areas prior to additional grading. No fill should be placed on frozen subgrades. No frozen soils
should be used as fill. Frost should not be allowed to penetrate below the footings. If winter excavation
and filling activities are planned, we recommend material selected for backfill and fill (to achieve design
grades) consist of clean, coarse sand with less than 12 percent passing a #200 sieve. Frost should not be
permitted to penetrate below footings. Compaction effort will vary with depth of fill placed and the
structure it intends to support. Based on the anticipated fill depths, soil types and structures, in most
areas we anticipate typical levels of compaction in the range of 95 to 100 percent of standard Proctor
would be suitable, but would be further defined as part of the final evaluation.
D.1.d.Grade Raises
As final grades were not provided for this preliminarily evaluation, should engineered fill be placed to
raise grades, considerations should be made in regards to long term consolidation of the native soils.
Small grade raises on the order of 2 to 5 feet may be made with minimal risk of post construction
consolidation of the exposed underlying native soils and the fill itself. Long-term consolidation of the
soils, especially if clay is used for fill or filled upon, may be a consideration if grade raises extend above
5 feet.
D.2.Spread Footings
D.2.a.Embedment Depth
For frost protection, we recommend embedding perimeter footings at least 42 inches below the lowest
exterior grade in heated portions of the building. Interior footings may be placed directly below floor
slabs. We recommend embedding building footings not heated during construction, and footings in
unheated areas at least 60 inches below the lowest exterior grade.
D.2.b.Net Allowable Bearing Pressure
Based on the soil boring results and the above-described site grading procedures, it is our opinion the
exposed glacial soils and engineered fill would be anticipated for support of spread footings sized for an
allowable soil bearing pressure from 2,000 to 5,000 pounds per square foot.
D.3.Interior Slabs
D.3.a.Subgrade Modulus
After the site grading and building pad preparation has been completed, we anticipate the floor subgrade
will be engineered fill or suitable native soils. We recommend using a modulus of subgrade reaction, k, of
Inwood 10 LLC
Project B14-08413
December 3, 2014
Page 10
150 pounds per square inch per inch of deflection (pci) to design the slabs. If 6 inches of compacted
aggregate base is placed immediately below the slab, the k- value may be increased by 50 pci. An
aggregate base will also be a more stable platform for construction equipment during construction and is
less weather sensitive.
D.3.b.Moisture Vapor Protection
As large portions of the building are anticipated to have an exposed concrete floor, vapor transmission
through the floor may not be a major concern. However, it may still be a benefit to put a vapor barrier
below the floor due to:
Materials placed on the floor may be damaged by absorbed moisture.
Less water vapor in the air may result in a reduction in heating and cooling costs.
The vapor barrier will be in place for any future remodeling.
Excess transmission of water vapor could cause floor dampness, certain types of floor bonding agents to
separate, or mold to form under floor coverings. If floor coverings or coatings less permeable than the
concrete slab will be used, we recommend a vapor retarder or vapor barrier be place immediately
beneath the slab. We recommend consulting with floor covering manufacturers regarding the
appropriate type, use and installation of the vapor retarder or barrier to preserve warranty assurances.
We recommend the vapor retarder or barrier be observed prior to concrete placement so holes, tears or
gaps in the vapor retarder or barrier can be identified and patched or realigned as needed. We further
recommend performing moisture vapor transmission tests after the concrete slabs have cured, but
before flooring are installed. Flooring manufacturers typically recommend upper limits of moisture vapor
transmission can be used to set schedules for flooring installation but, more importantly, may impact
warranties.
D.4.Exterior Slabs
For general exterior slabs we recommend subgrades be prepared similar as to what is described in
section D.6 for pavements. If portions of the exterior surface will have higher expectations for
performance for example a paver patio, additional preparations would be recommended to limit frost
heave and post construction settlement.
We anticipate exterior slabs will be underlain with silty sands, which are considered moderately to highly
frost susceptible. If these soils become saturated and freeze, unfavorable amounts of heaving could
Inwood 10 LLC
Project B14-08413
December 3, 2014
Page 11
occur. Grading to direct surface drainage away from buildings helps limit the potential for saturation and
subsequent heaving to occur. Still, even limited amounts of movement can create tripping hazards to
building employees and guests. One way to help limit the potential for heaving to occur is to remove
frost-susceptible soils present below the overlying slab “footprints” down to bottom-of-footing grades,
and replace them with non-frost-susceptible (NFS) backfill consisting of medium to coarse grained sands
having less than 5 percent of the particles by weight passing a #200 sieve. We recommend differential
frost heave should be accommodated at transition areas.
D.5.Utilities
Based on the borings, we anticipate the soils at typical invert elevations should be suitable for utility
support. However, if unfavorable conditions such as soft clay, organic soils or perched water are
encountered at invert grades, the unsuitable soils may require some additional subcutting and
replacement with sand or crushed rock to prepare a proper subgrade for pipe support. Utilities should
not be placed within the 1:1 oversizing of foundations. If it is necessary to place utilities within the
oversizing of the footings, we should review the documents prior to construction as it may be necessary
to backfill with lean concrete or lower the footing elevations near the utility trenches. We anticipate
utilities can be installed per manufacturer bedding requirements.
A majority of the soil borings indicated the site predominantly consists of sandy soils. These soils are
considered non- to only slightly corrosive to metallic conduits. If utilities extend through clay soils, the
utilities should be bedded in sandy soil free of any clay lumps or the utilities should be constructed with
non-corrosive materials.
D.6.Pavements
D.6.a.Subgrade Preparation
We recommend the vegetation and topsoil be removed from the upper 3 feet below the pavement
section. In areas requiring engineered fill to establish pavement grades, the excavation should be
oversized at least 1 foot beyond the outside edge of the paved areas for each foot of fill placed below the
roads or parking lot.
Prior to the placement of engineered fill or pavements, we recommend the exposed sandy soils in the
bottoms of the excavations be thoroughly compacted by a minimum of 5 passes with a large (3-foot-
diameter drum minimum), self-propelled drum compactor. This is recommended to further densify the
underlying native soils and to provide a more uniform base to place additional fill or pavement.
Inwood 10 LLC
Project B14-08413
December 3, 2014
Page 12
On-site soils free of organic soil and debris can be considered for placement up to design subgrade
elevations in pavement areas. Note again the clay soils will be more difficult to compact if wet or allowed
to become wet, or if spread and compacted over wet surfaces.
D.6.b.Subgrade Proofroll
Prior to the placement of the aggregate base, we recommend the subgrade soils be proofrolled with a
fully loaded tandem-axle truck and the proofroll be observed by a geotechnical engineer. This will assist
in identifying soft or weak areas will require additional soil correction work. Areas that display excessive
yielding or rutting during the proofroll should be corrected. In areas where subgrade correction is
deemed necessary, unsuitable soils should be removed to soils of adequate density or to a maximum
depth of 3 feet. Failed areas should be compacted, or if too wet, subcut and replaced with suitable soil or
additional aggregate base and compacted as previously specified.
D.6.c.R-Value
Laboratory tests to determine an R-value for pavement design were not included in the scope of this
project. Based on our experience with similar soil conditions, however, it is our opinion an R-value of 30
can be assumed for design purposes. This R-value is based on a pavement section directly supported on a
poorly graded sand to silty clayey sand subgrade. If clayey sand or sandy lean clay subgrades are
anticipated on final grades, lower R-values in the range of 12 to 20 may be needed and the pavement
section may be supported on engineered fill. In that case the R-value will have to be reevaluated based
on the engineered fill material.
D.6.d.Pavement Sections
Based on our experience with typical commercial sites as illustrated on your conceptual design in
Section A, we anticipate the parking lots and roadways will likely have a larger volume of automobiles
and delivery or garbage trucks than the residential portion of the development. In these areas a light-
duty pavement section ranging from 3 to 3 1/2 inches of bituminous pavement over 6 to 9 inches of
aggregate base material are anticipated. If any of these proposed buildings or roadways is expecting
larger amounts of large truck traffic, thicker sections may be needed. These sections are anticipated to
be on the order of 4 to 5 inches of bituminous pavement over 8 to 12 inches of aggregate base material.
In areas with high point loads such as truck parking areas or loading docks, concrete pavement should be
considered. Wherever concrete pavements will be utilized, the appropriate panel sizing, jointing,
doweling and edge reinforcement are critical to the ridged pavement performance.
Inwood 10 LLC
Project B14-08413
December 3, 2014
Page 13
D.7.Stormwater Management
Based on the provided conceptual sketch, it appears the design and construction of stormwater
management features are part of the development. These features appear to be large infiltration basins
located in the southwest corner of the site in the vicinity of soil boring ST-4 and near the center of the
development in the vicinity of AET’s soil borings 4 and 5. The soil profiles at soil boring locations ST-3 and
ST-4, dependent on final grades, may provide challenges to infiltration. Typically, the profiles in these
areas have layers of silty clayey sand, clayey sand and sandy lean clay which are not conducive to high
infiltration rates. AET boring 5 encountered sand with silt and sand with gravel 4 feet below the surface
to boring termination. This location may yield higher infiltration rates. Infiltration rates were estimated
for some of the soils we observed in our soil borings and are listed in Table 2.
Table 2. Estimated Design Infiltration Rates Based on Soil Classification
Soil Type
Infiltration Rate *
(in/hr)
Sands with less than 12% fines
Poorly graded or well graded sands 0.8
Silty sands, silty gravelly sands 0.45
Silts, very fine sands, silty or clayey fine sands 0.2
Clayey sands and clays 0.06
*From Minnesota Stormwater Manual Section 12.8 with December 16 updates. Rates may differ at individual sites.
In any case, infiltration rates can be calculated based on field testing with Double Ring Infiltrometer
testing (ASTM D3385). Additional soil borings and geotechnical evaluation should also be performed in
infiltration basins once the location and grades are determined. This geotechnical evaluation does not
constitute a review of site suitability for stormwater infiltration or evaluate the potential impacts, if any,
from infiltration of large amount of stormwater.
D.8.Additional Evaluation
This preliminary geotechnical evaluation is not considered sufficient to provide detailed geotechnical
design recommendations for the commercial buildings. Once the location, framing system, structural
loads, building layout, etc. have been finalized for each structure, additional borings and evaluation
should be done. The information contained in this report should be reviewed as part of the design
evaluation.
Inwood 10 LLC
Project B14-08413
December 3, 2014
Page 14
E.Procedures
E.1.Penetration Test Borings
The penetration test borings were drilled with a floatation tired-mounted core and auger drill equipped
with hollow-stem auger. The borings were performed in accordance with ASTM D 1586. Penetration test
samples were taken at 2 1/2- or 5-foot intervals. Actual sample intervals and corresponding depths are
shown on the boring logs.
E.2.Material Classification and Testing
E.2.a.Visual and Manual Classification
The geologic materials encountered were visually and manually classified in accordance with ASTM Test
Method D 2488. A chart explaining the classification system is attached. Samples were sealed in jars and
returned to our facility for review and storage.
E.2.b.Laboratory Testing
The results of the laboratory tests performed on geologic material samples are noted on or follow the
appropriate attached exploration logs. The tests were performed in accordance with ASTM procedures.
E.3.Groundwater Measurements
The drillers checked for groundwater as the penetration test borings were advanced, and again after
auger withdrawal. The boreholes were then backfilled as noted on the boring logs.
F.Qualifications
F.1.Variations in Subsurface Conditions
F.1.a.Material Strata
Our evaluation, analyses and recommendations were developed from a limited amount of site and
subsurface information. It is not standard engineering practice to retrieve material samples from
exploration locations continuously with depth, and therefore strata boundaries and thicknesses must be
Inwood 10 LLC
Project B14-08413
December 3, 2014
Page 15
inferred to some extent. Strata boundaries may also be gradual transitions, and can be expected to vary
in depth, elevation and thickness away from the exploration locations.
Variations in subsurface conditions present between exploration locations may not be revealed until
additional exploration work is completed, or construction commences. If any such variations are
revealed, our recommendations should be re-evaluated. Such variations could increase construction
costs, and a contingency should be provided to accommodate them.
F.2.Continuity of Professional Responsibility
F.2.a.Plan Review
This report is based on a limited amount of information, and a number of assumptions were necessary to
help us develop our recommendations. It is recommended that our firm review the geotechnical aspects
of the designs and specifications, and evaluate whether the design is as expected, if any design changes
have affected the validity of our recommendations, and if our recommendations have been correctly
interpreted and implemented in the designs and specifications.
F.2.b.Construction Observations and Testing
It is recommended that we be retained to perform observations and tests during construction. This will
allow correlation of the subsurface conditions encountered during construction with those encountered
by the borings, and provide continuity of professional responsibility.
F.3.Use of Report
This report is for the exclusive use of the parties to which it has been addressed. Without written
approval, we assume no responsibility to other parties regarding this report. Our evaluation, analyses
and recommendations may not be appropriate for other parties or projects.
F.4.Standard of Care
In performing its services, Braun Intertec used that degree of care and skill ordinarily exercised under
similar circumstances by reputable members of its profession currently practicing in the same locality. No
warranty, express or implied, is made.
Appendix
8
12
10
11
14
27
9
Benchmark:
Elevations were
obtained using
GPS and the State
of Minnesota's
permanent base
station network.
No sample
recovery.
4
CL
SM
SP-
SM
SC-
SM
LEAN CLAY with SAND, brown, moist.
(Topsoil)
SILTY SAND, fine- to medium-grained, brown to
reddish brown, moist, loose.
(Glacial Outwash)
POORLY GRADED SAND with SILT, fine- to
medium-grained, reddish brown, moist, medium dense.
(Glacial Outwash)
SILTY CLAYEY SAND, fine- to medium-grained, with
Sand seams and Gravel, brown, wet, loose to medium
dense.
(Glacial Till)
END OF BORING.
Auger met refusal at the 15-foot depth.
Water not observed while drilling.
Water not observed to cave-in depth of 14 feet
immediately after withdrawal of auger.
Boring immediately backfilled.
1030.0
1026.7
1023.7
1014.7
0.7
4.0
7.0
16.0
11/11/14 1" = 4'DATE:SCALE:DRILLER:
Tests or NotesWL
Braun Intertec Corporation, Bloomington MN 55438 ST-1 page 1 of 1
3 1/4" HSA, AutohammerK. Keck
L O G O F B O R I N G
(See Descriptive Terminology sheet for explanation of abbreviations)LOCATION: See attached sketch.
(Soil-ASTM D2488 or D2487, Rock-USACE EM1110-1-2908)
Description of Materials
ST-1
METHOD:
BORING:
BPF
B14-08413LOG OF BORING N:\GINT\PROJECTS\AX PROJECTS\2014\08413.GPJ BRAUN_V8_CURRENT.GDT 12/3/14 10:43Braun Project B14-08413
GEOTECHNICAL EVALUATION
Inwood and 10th Development
Southeast Quadrant of Inwood Avenue N and 10th Street N
Lake Elmo, Minnesota
P200
%
MC
%Symbol
Elev.
feet
1030.7
Depth
feet
0.0
7
32
26
30
18
22
19
349
CL
SM
SP-
SM
SC-
SM
SP
SC-
SM
LEAN CLAY with SAND, brown, moist.
(Topsoil)
SILTY SAND, fine- to medium-grained, brown to
reddish brown, moist, loose.
(Glacial Outwash)
POORLY GRADED SAND with SILT, Gravely, brown
to reddish brown, moist, dense.
(Glacial Outwash)
SILTY CLAYEY SAND, fine- to medium-grained, with
Gravel, brown, wet, medium dense.
(Glacial Till)
POORLY GRADED SAND, fine-grained, brown, moist,
medium dense.
(Glacial Outwash)
SILTY CLAYEY SAND, fine- to medium-grained, with
Gravel, brown to reddish brown, wet, medium dense.
(Glacial Till)
END OF BORING.
Water not observed while drilling.
Water not observed to cave-in depth of 14 feet
immediately after withdrawal of auger.
Boring immediately backfilled.
1018.9
1015.9
1012.9
1010.9
1007.9
998.9
1.0
4.0
7.0
9.0
12.0
21.0
11/11/14 1" = 4'DATE:SCALE:DRILLER:
Tests or NotesWL
Braun Intertec Corporation, Bloomington MN 55438 ST-2 page 1 of 1
3 1/4" HSA, AutohammerK. Keck
L O G O F B O R I N G
(See Descriptive Terminology sheet for explanation of abbreviations)LOCATION: See attached sketch.
(Soil-ASTM D2488 or D2487, Rock-USACE EM1110-1-2908)
Description of Materials
ST-2
METHOD:
BORING:
BPF
B14-08413LOG OF BORING N:\GINT\PROJECTS\AX PROJECTS\2014\08413.GPJ BRAUN_V8_CURRENT.GDT 12/3/14 10:43Braun Project B14-08413
GEOTECHNICAL EVALUATION
Inwood and 10th Development
Southeast Quadrant of Inwood Avenue N and 10th Street N
Lake Elmo, Minnesota
P200
%
MC
%Symbol
Elev.
feet
1019.9
Depth
feet
0.0
5
15
23
24
33
21
24
4
CL
SM
SC-
SM
LEAN CLAY with SAND, brown, moist.
(Topsoil)
SILTY SAND, fine- to medium-grained, with Clayey
Sand seams and Gravel, reddish brown to brown, moist
to wet, loose to medium dense.
(Glacial Outwash)
SILTY CLAYEY SAND, fine- to medium-grained, with
Sand seams and Gravel, reddish brown to brown, wet,
medium dense to dense.
(Glacial Till)
END OF BORING.
Water not observed while drilling.
Water not observed to cave-in depth of 16 1/2 feet
immediately after withdrawal of auger.
Boring immediately backfilled.
1010.5
1002.5
990.5
1.0
9.0
21.0
11/11/14 1" = 4'DATE:SCALE:DRILLER:
Tests or NotesWL
Braun Intertec Corporation, Bloomington MN 55438 ST-3 page 1 of 1
3 1/4" HSA, AutohammerK. Keck
L O G O F B O R I N G
(See Descriptive Terminology sheet for explanation of abbreviations)LOCATION: See attached sketch.
(Soil-ASTM D2488 or D2487, Rock-USACE EM1110-1-2908)
Description of Materials
ST-3
METHOD:
BORING:
BPF
B14-08413LOG OF BORING N:\GINT\PROJECTS\AX PROJECTS\2014\08413.GPJ BRAUN_V8_CURRENT.GDT 12/3/14 10:43Braun Project B14-08413
GEOTECHNICAL EVALUATION
Inwood and 10th Development
Southeast Quadrant of Inwood Avenue N and 10th Street N
Lake Elmo, Minnesota
MC
%Symbol
Elev.
feet
1011.5
Depth
feet
0.0
8
6
19
21
24
36
38
27
An open triangle in
the water level
(WL) column
indicates the depth
at which
groundwater was
observed while
drilling.
Groundwater
levels fluctuate.
7
10
9
CL
CL
SM
SP-
SM
SC
SM
SC
LEAN CLAY with SAND, dark brown, moist.
LEAN CLAY with SAND, brown, wet, medium.
(Glacial Till)
SILTY SAND, fine- to medium-grained, brown, moist to
wet, loose to medium dense.
(Glacial Outwash)
With Gravel at 7 1/2 feet.
POORLY GRADED SAND with SILT, fine- to
medium-grained, wet, medium dense.
(Glacial Outwash)
CLAYEY SAND, with Gravel, brown to reddish brown,
wet, very stiff.
(Glacial Till)
SILTY SAND, fine- to medium-grained, brown to
reddish brown, wet, dense.
(Glacial Till)
CLAYEY SAND, with Sand seams, brown to reddish
brown, wet, hard.
(Glacial Till)
END OF BORING.
Water observed at 12 1/2 feet with 12 feet of
hollow-stem auger in the ground.
Water not observed to cave-in depth of 13 feet
immediately after withdrawal of auger.
Boring immediately backfilled.
1002.6
999.6
994.6
991.6
989.6
985.6
982.6
1.0
4.0
9.0
12.0
14.0
18.0
21.0
11/11/14 1" = 4'DATE:SCALE:DRILLER:
Tests or NotesWL
Braun Intertec Corporation, Bloomington MN 55438 ST-4 page 1 of 1
3 1/4" HSA, AutohammerK. Keck
L O G O F B O R I N G
(See Descriptive Terminology sheet for explanation of abbreviations)LOCATION: See attached sketch.
(Soil-ASTM D2488 or D2487, Rock-USACE EM1110-1-2908)
Description of Materials
ST-4
METHOD:
BORING:
BPF
B14-08413LOG OF BORING N:\GINT\PROJECTS\AX PROJECTS\2014\08413.GPJ BRAUN_V8_CURRENT.GDT 12/3/14 10:43Braun Project B14-08413
GEOTECHNICAL EVALUATION
Inwood and 10th Development
Southeast Quadrant of Inwood Avenue N and 10th Street N
Lake Elmo, Minnesota
P200
%
MC
%Symbol
Elev.
feet
1003.6
Depth
feet
0.0
6
4
8
10
21
23
20 No recovery. Sample
from cuttings.
10
CL
SM
SP-
SM
SP
SC
LEAN CLAY with SAND, dark brown, wet.
(Topsoil)
SILTY SAND, with Gravel, reddish brown, wet, loose.
(Glacial Outwash)
POORLY GRADED SAND with SILT, fine- to
medium-grained, with Gravel, brown to reddish brown,
moist, very loose.
(Glacial Outwash)
POORLY GRADED SAND, with Clayey Sand lenses
and Gravel, brown to reddish brown, wet, loose to
medium dense.
(Glacial Outwash)
CLAYEY SAND, Gravely, reddish brown, wet, very stiff.
(Glacial Till)
END OF BORING.
Water not observed while drilling.
Water not observed to cave-in depth of 16 feet
immediately after withdrawal of auger.
Boring immediately backfilled.
1004.3
1001.1
998.1
987.1
984.1
0.8
4.0
7.0
18.0
21.0
11/12/14 1" = 4'DATE:SCALE:DRILLER:
Tests or NotesWL
Braun Intertec Corporation, Bloomington MN 55438 ST-5 page 1 of 1
3 1/4" HSA, AutohammerK. Keck
L O G O F B O R I N G
(See Descriptive Terminology sheet for explanation of abbreviations)LOCATION: See attached sketch.
(Soil-ASTM D2488 or D2487, Rock-USACE EM1110-1-2908)
Description of Materials
ST-5
METHOD:
BORING:
BPF
B14-08413LOG OF BORING N:\GINT\PROJECTS\AX PROJECTS\2014\08413.GPJ BRAUN_V8_CURRENT.GDT 12/3/14 10:43Braun Project B14-08413
GEOTECHNICAL EVALUATION
Inwood and 10th Development
Southeast Quadrant of Inwood Avenue N and 10th Street N
Lake Elmo, Minnesota
MC
%Symbol
Elev.
feet
1005.1
Depth
feet
0.0
13
18
15
21
35
36
25
3
CL
SC
SP
SC-
SM
SP
SC
LEAN CLAY with SAND, dark brown, wet.
(Topsoil)
CLAYEY SAND, with Sand seams, reddish brown,
moist, stiff.
(Glacial Till)
POORLY GRADED SAND, fine-grained, brown, moist,
medium dense.
(Glacial Outwash)
SILTY CLAYEY SAND, fine- to medium-grained, with
Gravel, reddish brown, wet, medium dense.
(Glacial Till)
POORLY GRADED SAND, fine-grained, brown, moist,
dense.
(Glacial Outwash)
With Gravel at 15 feet.
CLAYEY SAND, with Gravel, reddish brown, wet, very
stiff.
(Glacial Till)
END OF BORING.
Water not observed while drilling.
Water not observed to cave-in depth of 15 feet
immediately after withdrawal of auger.
Boring immediately backfilled.
1004.5
1001.5
998.5
993.5
987.5
984.5
1.0
4.0
7.0
12.0
18.0
21.0
11/11/14 1" = 4'DATE:SCALE:DRILLER:
Tests or NotesWL
Braun Intertec Corporation, Bloomington MN 55438 ST-6 page 1 of 1
3 1/4" HSA, AutohammerK. Keck
L O G O F B O R I N G
(See Descriptive Terminology sheet for explanation of abbreviations)LOCATION: See attached sketch.
(Soil-ASTM D2488 or D2487, Rock-USACE EM1110-1-2908)
Description of Materials
ST-6
METHOD:
BORING:
BPF
B14-08413LOG OF BORING N:\GINT\PROJECTS\AX PROJECTS\2014\08413.GPJ BRAUN_V8_CURRENT.GDT 12/3/14 10:44Braun Project B14-08413
GEOTECHNICAL EVALUATION
Inwood and 10th Development
Southeast Quadrant of Inwood Avenue N and 10th Street N
Lake Elmo, Minnesota
MC
%Symbol
Elev.
feet
1005.5
Depth
feet
0.0
10
25
47
30
34
37
18
10
8
5
CL
SC-
SM
SP-
SM
SM
SP
SC-
SM
LEAN CLAY with SAND, dark brown, moist.
(Topsoil)
SILTY CLAYEY SAND, fine- to medium-grained, brown
to reddish brown, moist, loose.
(Glacial Till)
POORLY GRADED SAND with SILT, fine- to
medium-grained, with Gravel, brown to reddish brown,
moist, medium dense.
(Glacial Outwash)
SILTY SAND, fine- to medium-grained, with Gravel,
brown to reddish brown, moist, dense.
(Glacial Outwash)
POORLY GRADED SAND, fine-grained, with Clayey
Sand seams and Gravel, brown to reddish brown,
moist, medium dense.
(Glacial Outwash)
SILTY CLAYEY SAND, fine- to medium-grained, with
Gravel, reddish brown, wet, medium dense to dense.
(Glacial Till)
END OF BORING.
Water not observed while drilling.
Water not observed to cave-in depth of 17 feet
immediately after withdrawal of auger.
Boring immediately backfilled.
1011.7
1008.7
1005.7
1003.7
1000.7
991.7
1.0
4.0
7.0
9.0
12.0
21.0
11/11/14 1" = 4'DATE:SCALE:DRILLER:
Tests or NotesWL
Braun Intertec Corporation, Bloomington MN 55438 ST-7 page 1 of 1
3 1/4" HSA, AutohammerK. Keck
L O G O F B O R I N G
(See Descriptive Terminology sheet for explanation of abbreviations)LOCATION: See attached sketch.
(Soil-ASTM D2488 or D2487, Rock-USACE EM1110-1-2908)
Description of Materials
ST-7
METHOD:
BORING:
BPF
B14-08413LOG OF BORING N:\GINT\PROJECTS\AX PROJECTS\2014\08413.GPJ BRAUN_V8_CURRENT.GDT 12/3/14 10:44Braun Project B14-08413
GEOTECHNICAL EVALUATION
Inwood and 10th Development
Southeast Quadrant of Inwood Avenue N and 10th Street N
Lake Elmo, Minnesota
P200
%
MC
%Symbol
Elev.
feet
1012.7
Depth
feet
0.0
Descriptive Terminology of Soil
Standard D 2487 - 00
Classification of Soils for Engineering Purposes
(Unified Soil Classification System)
Rev. 7/07
DD Dry density, pcf
WD Wet density, pcf
MC Natural moisture content, %
LL Liqiuid limit, %
PL Plastic limit, %
PI Plasticity index, %
P200 % passing 200 sieve
OC Organic content, %
S Percent of saturation, %
SG Specific gravity
C Cohesion, psf
Angle of internal friction
qu Unconfined compressive strength, psf
qp Pocket penetrometer strength, tsf
Liquid Limit (LL)
Laboratory TestsPlasticity Index (PI)Drilling Notes
Standard penetration test borings were advanced by 3 1/4” or 6 1/4”
ID hollow-stem augers unless noted otherwise, Jetting water was used
to clean out auger prior to sampling only where indicated on logs.
Standard penetration test borings are designated by the prefix “ST”
(Split Tube). All samples were taken with the standard 2” OD split-tube
sampler, except where noted.
Power auger borings were advanced by 4” or 6” diameter continuous-
flight, solid-stem augers. Soil classifications and strata depths were in-
ferred from disturbed samples augered to the surface and are, therefore,
somewhat approximate. Power auger borings are designated by the
prefix “B.”
Hand auger borings were advanced manually with a 1 1/2” or 3 1/4”
diameter auger and were limited to the depth from which the auger could
be manually withdrawn. Hand auger borings are indicated by the prefix
“H.”
BPF: Numbers indicate blows per foot recorded in standard penetration
test, also known as “N” value. The sampler was set 6” into undisturbed
soil below the hollow-stem auger. Driving resistances were then counted
for second and third 6” increments and added to get BPF. Where they
differed significantly, they are reported in the following form: 2/12 for the
second and third 6” increments, respectively.
WH: WH indicates the sampler penetrated soil under weight of hammer
and rods alone; driving not required.
WR: WR indicates the sampler penetrated soil under weight of rods
alone; hammer weight and driving not required.
TW indicates thin-walled (undisturbed) tube sample.
Note: All tests were run in general accordance with applicable ASTM
standards.
Particle Size Identification
Boulders ............................... over 12”
Cobbles ............................... 3” to 12”
Gravel
Coarse ............................ 3/4” to 3”
Fine ................................. No. 4 to 3/4”
Sand
Coarse ............................ No. 4 to No. 10
Medium ........................... No. 10 to No. 40
Fine ................................. No. 40 to No. 200
Silt ....................................... No. 200, PI 4 or
below “A” line
Clay ..................................... No. 200, PI 4 and
on or above “A” line
Relative Density of
Cohesionless Soils
Very loose ................................ 0 to 4 BPF
Loose ....................................... 5 to 10 BPF
Medium dense ......................... 11 to 30 BPF
Dense ...................................... 31 to 50 BPF
Very dense ............................... over 50 BPF
Consistency of Cohesive Soils
Very soft ................................... 0 to 1 BPF
Soft ....................................... 2 to 3 BPF
Rather soft ............................... 4 to 5 BPF
Medium .................................... 6 to 8 BPF
Rather stiff ............................... 9 to 12 BPF
Stiff ....................................... 13 to 16 BPF
Very stiff ................................... 17 to 30 BPF
Hard ....................................... over 30 BPF
a. Based on the material passing the 3-in (75mm) sieve.
b. If field sample contained cobbles or boulders, or both, add “with cobbles or boulders or both” to group name.
c. Cu = D60 / D10 Cc = (D30)2
D10 x D60
d. If soil contains 15% sand, add “with sand” to group name.
e. Gravels with 5 to 12% fines require dual symbols:
GW-GM well-graded gravel with silt
GW-GC well-graded gravel with clay
GP-GM poorly graded gravel with silt
GP-GC poorly graded gravel with clay
f. If fines classify as CL-ML, use dual symbol GC-GM or SC-SM.
g. If fines are organic, add “with organic fines” to group name.
h. If soil contains 15% gravel, add “with gravel” to group name.
i. Sands with 5 to 12% fines require dual symbols:
SW-SM well-graded sand with silt
SW-SC well-graded sand with clay
SP-SM poorly graded sand with silt
SP-SC poorly graded sand with clay
j. If Atterberg limits plot in hatched area, soil is a CL-ML, silty clay.
k. If soil contains 10 to 29% plus No. 200, add “with sand” or “with gravel” whichever is predominant.
l. If soil contains 30% plus No. 200, predominantly sand, add “sandy” to group name.
m. If soil contains 30% plus No. 200 predominantly gravel, add “gravelly” to group name.
n. PI 4 and plots on or above “A” line.
o. PI 4 or plots below “A” line.
p. PI plots on or above “A” line.
q. PI plots below “A” line.
Poorly graded sand h
Peat
Well-graded gravel d
PI plots on or above “A” line
PI 7 and plots on or above “A” line j
PI 4 or plots below “A” line j
Fine-grained Soils50% or more passed theNo. 200 sieveCoarse-grained Soilsmore than 50% retained onNo. 200 sieveSoils Classification
Gravels
More than 50% of
coarse fraction
retained on
No. 4 sieve
Sands
50% or more of
coarse fraction
passes
No. 4 sieve
Silts and Clays
Liquid limit
less than 50
Highly Organic Soils
Silts and clays
Liquid limit
50 or more
Primarily organic matter, dark in color and organic odor
Group
Symbol
Criteria for Assigning Group Symbols and
Group Names Using Laboratory Tests a
Group Name b
GW
GP
GM
GC
SW
SP
SM
CL
ML
OL
OL
SC
Poorly graded gravel d
Silty gravel d f g
Clean Gravels
5% or less fines e
Gravels with Fines
More than 12% fines e
Clean Sands
5% or less fines i
Sands with Fines
More than 12% i
Fines classify as ML or MH
Fines classify as CL or CH Clayey gravel d f g
Well-graded sand h
Fines classify as CL or CH
Fines classify as ML or MH Silty sand f g h
Clayey sand f g h
Inorganic
Organic Liquid limit - oven dried
Liquid limit - not dried 0.75
Inorganic
Organic
PI plots below “A” line
Lean clay k l m
Liquid limit - oven dried
Liquid limit - not dried 0.75
CH
MH
OH
OH
Fat clay k l m
Elastic silt k l m
Organic clay k l m n
Organic silt k l m o
Organic clay k l m p
Organic silt k l m q
Cu 6 and 1 Cc 3 C
PT
Cu 4 and 1 Cc 3 C
Cu 4 and/or 1 Cc 3 C
Cu 6 and/or 1 CC 3 C
0 10 16 20
30 40 50 60 70 80
90 100 110
7 “U” Line“A” Line
10
20
30
40
50
60
4
0
ML or OL
MH or OHCL or
OL
CH or
O
H
CL - ML
Silt k l m
I N W O O D3 R D A D D I T I O NI N W O O D5 T H A D D I T I O NC I T Y O FO A K D A L EVADNAIS ASSOCIATES, LLC2935 Country Drive, Suite 102Little Canada, MN 55117ofINWOOD COMMERCIALLAKE ELMO, MNoff:\jobs\5161 - 5180\5172-05- inwood commercial (outlot k, inwood)\cad c3d\engineering\exhibits\z_old_5172-05_stormwater exhibit.dwgSave Date:04/22/261Revisions:#5172-051FIGURE 5IMPERVIOUS TO EXISTINGPONDS EXHIBIT LEGEND POND 200 (CATCHMENT 201S) IMPERVIOUS SUMMARY POND 100 (CATCHMENTS 101S & 102S) IMPERVIOUS SUMMARY
G H
O
S
T
P L
A
TG H
O
S
T
P L
A
TVADNAIS ASSOCIATES, LLC2935 County Drive, Suite 102Little Canada, MN 55117ofINWOOD COMMERCIALLake Elmo, MNf:\jobs\5161 - 5180\5172-05- inwood commercial (outlot k, inwood)\cad c3d\engineering\exhibits\5172-05_9th street full intersection exhibit.dwgSave Date:04/20/26119TH ST. & INWOOD AVE.FULL INTERSECTIONEXHIBITNOTES:#5172-05
Table of Contents
Description Page
A. Introduction......................................................................................................................................1
A.1. Project Description..............................................................................................................1
A.2. Background Information and Reference Documents..........................................................2
A.3. Scope of Services.................................................................................................................2
A.4. Boring Locations..................................................................................................................3
B. Results..............................................................................................................................................3
B.1. Exploration Logs..................................................................................................................3
B.1.a. Log of Boring Sheets...............................................................................................3
B.1.b. Geologic Origins .....................................................................................................3
B.2. Geologic Profile...................................................................................................................4
B.2.a. Topsoil....................................................................................................................4
B.2.b. Glacial Deposits......................................................................................................4
B.2.c. Groundwater..........................................................................................................4
B.3. Laboratory Test Results.......................................................................................................5
C. Basis for Recommendations.............................................................................................................5
D. Recommendations ...........................................................................................................................6
D.1. Site Grading and Building Pad Preparation.........................................................................7
D.1.a. Excavations.............................................................................................................7
D.1.b. Excavation Support.................................................................................................8
D.1.c. Placement and Compaction of Backfill and Fill......................................................8
D.1.d. Grade Raises...........................................................................................................9
D.2. Spread Footings...................................................................................................................9
D.2.a. Embedment Depth.................................................................................................9
D.2.b. Net Allowable Bearing Pressure.............................................................................9
D.3. Interior Slabs .......................................................................................................................9
D.3.a. Subgrade Modulus.................................................................................................9
D.3.b. Moisture Vapor Protection ..................................................................................10
D.4. Exterior Slabs.....................................................................................................................10
D.5. Utilities ..............................................................................................................................11
D.6. Pavements.........................................................................................................................11
D.6.a. Subgrade Preparation ..........................................................................................11
D.6.b. Subgrade Proofroll ...............................................................................................12
D.6.c. R-Value.................................................................................................................12
D.6.d. Pavement Sections...............................................................................................12
D.7. Stormwater Management.................................................................................................13
D.8. Additional Evaluation........................................................................................................13
E. Procedures......................................................................................................................................14
E.1. Penetration Test Borings...................................................................................................14
E.2. Material Classification and Testing ...................................................................................14
E.2.a. Visual and Manual Classification..........................................................................14
E.2.b. Laboratory Testing ...............................................................................................14
E.3. Groundwater Measurements............................................................................................14
F. Qualifications..................................................................................................................................14
Table of Contents (continued)
Description Page
F.1. Variations in Subsurface Conditions..................................................................................14
F.2. Continuity of Professional Responsibility..........................................................................15
F.2.a. Plan Review..........................................................................................................15
F.2.b. Construction Observations and Testing...............................................................15
F.3. Use of Report.....................................................................................................................15
F.4. Standard of Care................................................................................................................15
Appendix
Boring Location Sketch
Log of Boring Sheets ST-1 to ST-7
AET Subsurface Boring Logs 1, 2, 4, 5 and 9
Descriptive Terminology
A.Introduction
A.1.Project Description
It is our understanding that Inwood 10 LLC is proposing to develop a 154-acre area for both commercial
and residential use in Lake Elmo, Minnesota. A geotechnical evaluation has already been performed for
the residential portion of the project by American Engineering Testing, Inc. (AET). The residential portion
includes the construction of a subdivision in the center and northwest portions of the development as
shown on the sketch below. Our evaluation was performed for only the commercial area as outlined in
the sketch below.
Figure 1. Proposed Commercial Development Concept Plan
The majority of the parcel is agricultural fields with small isolated areas with trees. The surface also has a
general downward slope across the site towards the southwest.
Commercial parcel
Residential parcel
Inwood 10 LLC
Project B14-08413
December 3, 2014
Page 2
The purpose of this preliminary geotechnical evaluation is to assist Inwood 10 LLC and their design team
in evaluating the soil and groundwater conditions in the area of the proposed commercial development
and to provide preliminary recommendations for design and construction of foundations, slabs on grade,
utilities, and pavements.
A.2.Background Information and Reference Documents
To facilitate our evaluation, we were provided with or reviewed the following information or documents:
A proposed boring location sketch outlining the commercial development, the proposed
boring locations, and previously performed soil borings by American Engineering Testing, Inc.
A development concept sketch titled as, “PUD Concept Plan Inwood”, and dated August 28,
2014.
A Geotechnical Evaluation prepared by AET and dated May 13, 2014 for the residential
portion of the project generally located at the northwest portion of the parcel.
Discussions with Rick Schreier of Inwood 10 LLC in regard to the commercial development
grading, building pad preparation, and features.
A.3.Scope of Services
Our scope of services for this project was originally submitted as a Proposal to Rick Schreier of Inwood 10
LLC and dated October 24, 2014. We received authorization to proceed on October 30, 2014. Tasks
completed in accordance with our authorized scope of services are described below.
Staking the boring locations at the locations provided by Rick Schreier and determining
ground surface elevations at the boring locations.
Coordinating the locating of underground public utilities near the boring locations.
Conducting 7 standard penetration borings in the proposed commercial development to a
nominal depth of 20 feet below existing grade.
Classifying the samples and preparing boring logs.
Inwood 10 LLC
Project B14-08413
December 3, 2014
Page 3
Conducting a limited laboratory testing program.
Analyzing the results of the field and laboratory tests.
Formulating recommendations and submitting a preliminary geotechnical evaluation report
containing logs of the borings, our analysis of the field and laboratory tests, and preliminary
recommendations for design of foundations, slabs on grade, utilities, and pavements.
A.4.Boring Locations
The soil boring locations and surface elevations were determined using GPS (Global Positioning System)
technology uses the Minnesota Department of Transportation's permanent GPS Virtual Reference
Network (VRN). The boring locations are shown on the attached sketch.
Prior to commencing with our subsurface exploration activities, we coordinated the clearing of the soil
boring of underground utilities through Gopher State One Call.
B.Results
B.1.Exploration Logs
B.1.a.Log of Boring Sheets
Log of Boring sheets for our penetration test borings are included in the Appendix. The logs identify and
describe the geologic materials penetrated, the results of penetration resistance and laboratory tests
performed on penetration test samples retrieved from them, and groundwater observations.
Strata boundaries were inferred from changes in the penetration test samples and the drill auger
cuttings. Because sampling was not performed continuously, the strata boundary depths are only
approximate. The boundary depths likely vary away from the boring locations, and the boundaries
themselves may also occur as gradual rather than abrupt transitions.
B.1.b.Geologic Origins
Geologic origins presented for each stratum on the Log of Boring sheets are based on the soil types,
blows per foot, and available common knowledge of the geological history of the site. Because of the
Inwood 10 LLC
Project B14-08413
December 3, 2014
Page 4
complex glacial and post-glacial depositional environments, geologic origins can be difficult to ascertain.
A detailed investigation of the geologic history of the site was not performed.
B.2.Geologic Profile
The types of soils encountered in the borings are described below. The soils are generally described in
the order they were encountered; i.e., beginning at the ground surface. Please reference the Logs of
Borings attached in the Appendix for additional details.
B.2.a.Topsoil
Topsoil was encountered at the surface at our boring locations with thicknesses of about 8 inches to
1 foot. The topsoil encountered by our soil borings consisted of lean clay with sand.
In soil borings 1 through 5 and 9 performed by AET nearest the commercial development, a “plow zone”
layer was encountered at the surface. This layer had a thickness of 2 feet and the soils encountered were
similar to the topsoil encountered in our soil borings. We noted the depth of soils that were interpreted
to have the organic contents high enough that they were estimated to impact structural properties of the
soil.
B.2.b.Glacial Deposits
The borings we performed encountered glacial deposits beneath the topsoil consisted predominately of
silty sands and silty clayey sands with lesser amounts of poorly graded sand, poorly graded sand with silt,
clayey sand, and lean clay with sand. The penetration resistances recorded in the cohesionless (sand)
soils varied from 4 to 47 blows per foot (BPF), indicating a very loose to dense relative density. The
penetration resistances recorded in the cohesive (clay) deposits varied from 8 to 38 BPF, indicating a
medium to hard consistency. Some of the higher blow counts are likely due to gravel.
The glacial deposits our soil borings encountered are consistent with the soils AET encountered. One
difference is that our glacial outwash sands were generally classified as alluvial soils by AET. Also of note
is that in AET borings 1 and 5 a layer of soft clay was encountered.
B.2.c.Groundwater
Water was encountered in soil boring ST-4 at approximate elevation 991. Based on the moisture contents
of the geologic material beneath this elevation, it does not appear our soil boring penetrated the
hydrostatic groundwater surface but instead encountered perched deposits of groundwater trapped in
Inwood 10 LLC
Project B14-08413
December 3, 2014
Page 5
the sand. Due to variations in site elevations, soil borings ST-3, ST-4, ST- 5, and ST-6 extended beyond
this elevation and water was not encountered.
In AET’s soil boring 1, water was encountered approximately 11 feet below the surface which
corresponds to an elevation of about 997.5. In their report, the water encountered was judged to be
water accumulating in fast draining soil layers above slower draining soil layers during wetter periods of
the year.
The elevations at which perched groundwater accumulates seasonally and annually will likely vary and
could be shallower/higher at the exploration locations and between the exploration locations.
Piezometers or monitoring wells would be required to confirm if groundwater was present within the
depths explored.
B.3.Laboratory Test Results
Selected soil samples were submitted to our laboratory for testing. The laboratory tests were completed
in general accordance with current ASTM procedures. The test results can be found on the Log of Boring
sheets opposite the soil sample tested.
Moisture content tests on selected granular soil samples generally ranged from 3 to 10 percent,
indicating the majority of the sandy soils tested were likely at or below their estimated optimum
moisture content. Moisture conditioning of granular soils may be needed to meet required densities if
used for fill or backfill. The moisture content test on the selected cohesive soil sample was 9 percent,
indicating the clayey soil tested was near its estimated optimum moisture content.
Our mechanical analyses (grain size accumulation curve) indicated the selected samples contained 9 to
34 percent silt and clay by weight and was used to classify the soil and may be used to estimate
infiltration or to evaluate the material for reuse on site.
C.Basis for Recommendations
We understand the project includes the construction of multiple buildings of the office/ warehouse style
common to business parks. At the time of this report, design loads, anticipated grades, and final locations
of structures have not been provided. Only conceptual aspects of the development were presented.
Aspects of the conceptual design include the construction of roadways separating the residential and
Inwood 10 LLC
Project B14-08413
December 3, 2014
Page 6
commercial developments, multiple commercial and multi-family residential structures, and stormwater
ponds.
Per conversations with Rick Schreier of Inwood 10 LLC, this preliminary geotechnical evaluation will be
utilized by the project design team to assist in developing plans and specifications for the project,
specifically related to site grading. Existing grades, in the commercial development area as shown on the
sketch in the Appendix, range between 1003 and 1031.
We have attempted to describe our understanding of the proposed construction to the extent it was
reported to us by others. Depending on the extent of available information, assumptions may have been
made based on our experience with similar projects. If we have not correctly recorded or interpreted the
project details, we should be notified. New or changed information could require additional evaluation,
analyses and/or recommendations.
D.Recommendations
Based on the soil borings, we anticipate that the site would be prepared typical to similar commercial
buildings, namely:
Site grading will likely include stripping the vegetation and topsoil and any very loose sands
or soft clays.
Surface compaction within the building pads once stripping is complete for areas to be filled.
Cutting to grade or filling with suitable soils. A majority of material below the topsoil is
anticipated to be considered suitable for engineered fill, though it should be noted moisture
conditioning may be needed.
In our judgment, the on-site clays could be reused as engineered fill, but will require drying so
compaction can be achieved. To dry these soils, extensive farming of these clays will likely be required
and is easier to accomplish in the drier months of June to September. If site grading is done in the spring
or fall, on-site drying of these soils may not prove to be feasible and the importing of drier soils may be
required. If time or space is not available to dry these soils, then drier soils may need to be imported. The
reuse of these materials should be discussed at the bidding stages of the project.
Inwood 10 LLC
Project B14-08413
December 3, 2014
Page 7
In areas where clays would comprise a majority of the fill where grades are raised or where there are
significant grade raises placed upon clay, the thickness of clay placed may need to be restricted to limit
the amount of post-construction settlement which occurs from the excavation backfill compressing
under its own weight. Usually fills on the order of 5 to 10 feet can be accommodated within a
construction schedule provided the transition is gradual.
Once the final design, grades, and locations of each structure are determined, our evaluation should be
finalized. This final evaluation may revise or provide additional recommendations and may include
additional field exploration utilizing soil borings or test pits.
D.1.Site Grading and Building Pad Preparation
D.1.a.Excavations
To prepare the building pads, encountered organic topsoil, very loose sands, and soft clays should be
removed and replaced. The following tabulation outlines the anticipated depths needed at the boring
locations to remove the topsoil and possible loose or soft soils.
Table 1. Anticipated Excavation Depths of Building Pads
Soil Boring
Approximate Surface
Elevation
Anticipated Depth of
Excavation
(Feet)
Anticipated Bottom of
Excavation
(Elevation)
ST-1 1030.7 1 1030
ST-2 1019.9 1 1019
ST-3 1011.5 1 1010 1/2
ST-4 1003.6 1 1002 1/2
ST-5 1005.1 1 1004
ST-6 1005.5 1 1004 1/2
ST-7 1012.7 1 1011 1/2
AET 1 1008.5 9 999 1/2
AET 2 1019.6 4 1015 1/2
AET 3 1021.4 2 1019
AET 4 1015.8 2 1013 1/2
AET 5 1019.9 4 1015 1/2
AET 9 1020.5 2 - 4 1018 1/2 - 1016 1/2
Inwood 10 LLC
Project B14-08413
December 3, 2014
Page 8
The excavation depths indicated in the above tabulation are approximate and will vary. The actual depth
of excavation needs to be determined in the field at the time of construction. An experienced
geotechnical engineering technician, under the direction of a geotechnical engineer, should work closely
with the excavating contractor during excavation to make the necessary field judgments regarding the
suitability of the exposed soils and to determine the extent of soft soils.
To provide lateral support and control settlement to the structural loads they will support, we
recommend oversizing (widening) the excavations 1 foot horizontally beyond the footings for each foot
the excavations extend below bottom-of-footing elevations.
Prior to the placement of engineered fill or footings, we recommend the exposed sand soils in the
bottoms of the excavations be surface compacted using a minimum of 5 passes over an area with a large
(minimum 3-foot-diameter drum), self-propelled vibratory drum compactor.
D.1.b.Excavation Support
Sandy soils are prevalent in the near surface soils, and portions of the sands are described as poorly
graded sand and would be classified as Type C Soil under OSHA guidelines. Based on this classification it
should be anticipated unsupported excavations be maintained at a gradient no steeper than 1 1/2 to 1
(horizontal: vertical). In areas of the site encountering only silty sand tills the soils would be classified as
Type B Soil under OSHA guidelines. Based on this classification it should be anticipated unsupported
excavations be maintained at a gradient no steeper than 1 to 1 (horizontal: vertical). Slopes constructed
in this manner may still exhibit surface sloughing. If site constraints do not allow the construction of
temporary slopes with these dimensions, then temporary shoring may be required, and we should be
consulted for additional recommendations.
An OSHA approved competent person should review this soil classification in the field. Excavations must
comply with the requirements of OSHA 29 CFR, Part 1926, Subpart P, “Excavations and Trenches.” This
document states excavation safety is the responsibility of the contractor. Reference to these OSHA
requirements should be included in the project specifications.
D.1.c.Placement and Compaction of Backfill and Fill
Based on the results of the borings and laboratory tests, the sand soils frequently encountered below the
topsoil appear generally suitable for use as engineered fill. Any clay soils encountered being fine-grained,
will be more difficult to compact if wet or allowed to become wet, or if spread and compacted over wet
surfaces.
Inwood 10 LLC
Project B14-08413
December 3, 2014
Page 9
If site grading and construction is anticipated during cold weather, snow and ice should be removed from
cut and fill areas prior to additional grading. No fill should be placed on frozen subgrades. No frozen soils
should be used as fill. Frost should not be allowed to penetrate below the footings. If winter excavation
and filling activities are planned, we recommend material selected for backfill and fill (to achieve design
grades) consist of clean, coarse sand with less than 12 percent passing a #200 sieve. Frost should not be
permitted to penetrate below footings. Compaction effort will vary with depth of fill placed and the
structure it intends to support. Based on the anticipated fill depths, soil types and structures, in most
areas we anticipate typical levels of compaction in the range of 95 to 100 percent of standard Proctor
would be suitable, but would be further defined as part of the final evaluation.
D.1.d.Grade Raises
As final grades were not provided for this preliminarily evaluation, should engineered fill be placed to
raise grades, considerations should be made in regards to long term consolidation of the native soils.
Small grade raises on the order of 2 to 5 feet may be made with minimal risk of post construction
consolidation of the exposed underlying native soils and the fill itself. Long-term consolidation of the
soils, especially if clay is used for fill or filled upon, may be a consideration if grade raises extend above
5 feet.
D.2.Spread Footings
D.2.a.Embedment Depth
For frost protection, we recommend embedding perimeter footings at least 42 inches below the lowest
exterior grade in heated portions of the building. Interior footings may be placed directly below floor
slabs. We recommend embedding building footings not heated during construction, and footings in
unheated areas at least 60 inches below the lowest exterior grade.
D.2.b.Net Allowable Bearing Pressure
Based on the soil boring results and the above-described site grading procedures, it is our opinion the
exposed glacial soils and engineered fill would be anticipated for support of spread footings sized for an
allowable soil bearing pressure from 2,000 to 5,000 pounds per square foot.
D.3.Interior Slabs
D.3.a.Subgrade Modulus
After the site grading and building pad preparation has been completed, we anticipate the floor subgrade
will be engineered fill or suitable native soils. We recommend using a modulus of subgrade reaction, k, of
Inwood 10 LLC
Project B14-08413
December 3, 2014
Page 10
150 pounds per square inch per inch of deflection (pci) to design the slabs. If 6 inches of compacted
aggregate base is placed immediately below the slab, the k- value may be increased by 50 pci. An
aggregate base will also be a more stable platform for construction equipment during construction and is
less weather sensitive.
D.3.b.Moisture Vapor Protection
As large portions of the building are anticipated to have an exposed concrete floor, vapor transmission
through the floor may not be a major concern. However, it may still be a benefit to put a vapor barrier
below the floor due to:
Materials placed on the floor may be damaged by absorbed moisture.
Less water vapor in the air may result in a reduction in heating and cooling costs.
The vapor barrier will be in place for any future remodeling.
Excess transmission of water vapor could cause floor dampness, certain types of floor bonding agents to
separate, or mold to form under floor coverings. If floor coverings or coatings less permeable than the
concrete slab will be used, we recommend a vapor retarder or vapor barrier be place immediately
beneath the slab. We recommend consulting with floor covering manufacturers regarding the
appropriate type, use and installation of the vapor retarder or barrier to preserve warranty assurances.
We recommend the vapor retarder or barrier be observed prior to concrete placement so holes, tears or
gaps in the vapor retarder or barrier can be identified and patched or realigned as needed. We further
recommend performing moisture vapor transmission tests after the concrete slabs have cured, but
before flooring are installed. Flooring manufacturers typically recommend upper limits of moisture vapor
transmission can be used to set schedules for flooring installation but, more importantly, may impact
warranties.
D.4.Exterior Slabs
For general exterior slabs we recommend subgrades be prepared similar as to what is described in
section D.6 for pavements. If portions of the exterior surface will have higher expectations for
performance for example a paver patio, additional preparations would be recommended to limit frost
heave and post construction settlement.
We anticipate exterior slabs will be underlain with silty sands, which are considered moderately to highly
frost susceptible. If these soils become saturated and freeze, unfavorable amounts of heaving could
Inwood 10 LLC
Project B14-08413
December 3, 2014
Page 11
occur. Grading to direct surface drainage away from buildings helps limit the potential for saturation and
subsequent heaving to occur. Still, even limited amounts of movement can create tripping hazards to
building employees and guests. One way to help limit the potential for heaving to occur is to remove
frost-susceptible soils present below the overlying slab “footprints” down to bottom-of-footing grades,
and replace them with non-frost-susceptible (NFS) backfill consisting of medium to coarse grained sands
having less than 5 percent of the particles by weight passing a #200 sieve. We recommend differential
frost heave should be accommodated at transition areas.
D.5.Utilities
Based on the borings, we anticipate the soils at typical invert elevations should be suitable for utility
support. However, if unfavorable conditions such as soft clay, organic soils or perched water are
encountered at invert grades, the unsuitable soils may require some additional subcutting and
replacement with sand or crushed rock to prepare a proper subgrade for pipe support. Utilities should
not be placed within the 1:1 oversizing of foundations. If it is necessary to place utilities within the
oversizing of the footings, we should review the documents prior to construction as it may be necessary
to backfill with lean concrete or lower the footing elevations near the utility trenches. We anticipate
utilities can be installed per manufacturer bedding requirements.
A majority of the soil borings indicated the site predominantly consists of sandy soils. These soils are
considered non- to only slightly corrosive to metallic conduits. If utilities extend through clay soils, the
utilities should be bedded in sandy soil free of any clay lumps or the utilities should be constructed with
non-corrosive materials.
D.6.Pavements
D.6.a.Subgrade Preparation
We recommend the vegetation and topsoil be removed from the upper 3 feet below the pavement
section. In areas requiring engineered fill to establish pavement grades, the excavation should be
oversized at least 1 foot beyond the outside edge of the paved areas for each foot of fill placed below the
roads or parking lot.
Prior to the placement of engineered fill or pavements, we recommend the exposed sandy soils in the
bottoms of the excavations be thoroughly compacted by a minimum of 5 passes with a large (3-foot-
diameter drum minimum), self-propelled drum compactor. This is recommended to further densify the
underlying native soils and to provide a more uniform base to place additional fill or pavement.
Inwood 10 LLC
Project B14-08413
December 3, 2014
Page 12
On-site soils free of organic soil and debris can be considered for placement up to design subgrade
elevations in pavement areas. Note again the clay soils will be more difficult to compact if wet or allowed
to become wet, or if spread and compacted over wet surfaces.
D.6.b.Subgrade Proofroll
Prior to the placement of the aggregate base, we recommend the subgrade soils be proofrolled with a
fully loaded tandem-axle truck and the proofroll be observed by a geotechnical engineer. This will assist
in identifying soft or weak areas will require additional soil correction work. Areas that display excessive
yielding or rutting during the proofroll should be corrected. In areas where subgrade correction is
deemed necessary, unsuitable soils should be removed to soils of adequate density or to a maximum
depth of 3 feet. Failed areas should be compacted, or if too wet, subcut and replaced with suitable soil or
additional aggregate base and compacted as previously specified.
D.6.c.R-Value
Laboratory tests to determine an R-value for pavement design were not included in the scope of this
project. Based on our experience with similar soil conditions, however, it is our opinion an R-value of 30
can be assumed for design purposes. This R-value is based on a pavement section directly supported on a
poorly graded sand to silty clayey sand subgrade. If clayey sand or sandy lean clay subgrades are
anticipated on final grades, lower R-values in the range of 12 to 20 may be needed and the pavement
section may be supported on engineered fill. In that case the R-value will have to be reevaluated based
on the engineered fill material.
D.6.d.Pavement Sections
Based on our experience with typical commercial sites as illustrated on your conceptual design in
Section A, we anticipate the parking lots and roadways will likely have a larger volume of automobiles
and delivery or garbage trucks than the residential portion of the development. In these areas a light-
duty pavement section ranging from 3 to 3 1/2 inches of bituminous pavement over 6 to 9 inches of
aggregate base material are anticipated. If any of these proposed buildings or roadways is expecting
larger amounts of large truck traffic, thicker sections may be needed. These sections are anticipated to
be on the order of 4 to 5 inches of bituminous pavement over 8 to 12 inches of aggregate base material.
In areas with high point loads such as truck parking areas or loading docks, concrete pavement should be
considered. Wherever concrete pavements will be utilized, the appropriate panel sizing, jointing,
doweling and edge reinforcement are critical to the ridged pavement performance.
Inwood 10 LLC
Project B14-08413
December 3, 2014
Page 13
D.7.Stormwater Management
Based on the provided conceptual sketch, it appears the design and construction of stormwater
management features are part of the development. These features appear to be large infiltration basins
located in the southwest corner of the site in the vicinity of soil boring ST-4 and near the center of the
development in the vicinity of AET’s soil borings 4 and 5. The soil profiles at soil boring locations ST-3 and
ST-4, dependent on final grades, may provide challenges to infiltration. Typically, the profiles in these
areas have layers of silty clayey sand, clayey sand and sandy lean clay which are not conducive to high
infiltration rates. AET boring 5 encountered sand with silt and sand with gravel 4 feet below the surface
to boring termination. This location may yield higher infiltration rates. Infiltration rates were estimated
for some of the soils we observed in our soil borings and are listed in Table 2.
Table 2. Estimated Design Infiltration Rates Based on Soil Classification
Soil Type
Infiltration Rate *
(in/hr)
Sands with less than 12% fines
Poorly graded or well graded sands 0.8
Silty sands, silty gravelly sands 0.45
Silts, very fine sands, silty or clayey fine sands 0.2
Clayey sands and clays 0.06
*From Minnesota Stormwater Manual Section 12.8 with December 16 updates. Rates may differ at individual sites.
In any case, infiltration rates can be calculated based on field testing with Double Ring Infiltrometer
testing (ASTM D3385). Additional soil borings and geotechnical evaluation should also be performed in
infiltration basins once the location and grades are determined. This geotechnical evaluation does not
constitute a review of site suitability for stormwater infiltration or evaluate the potential impacts, if any,
from infiltration of large amount of stormwater.
D.8.Additional Evaluation
This preliminary geotechnical evaluation is not considered sufficient to provide detailed geotechnical
design recommendations for the commercial buildings. Once the location, framing system, structural
loads, building layout, etc. have been finalized for each structure, additional borings and evaluation
should be done. The information contained in this report should be reviewed as part of the design
evaluation.
Inwood 10 LLC
Project B14-08413
December 3, 2014
Page 14
E.Procedures
E.1.Penetration Test Borings
The penetration test borings were drilled with a floatation tired-mounted core and auger drill equipped
with hollow-stem auger. The borings were performed in accordance with ASTM D 1586. Penetration test
samples were taken at 2 1/2- or 5-foot intervals. Actual sample intervals and corresponding depths are
shown on the boring logs.
E.2.Material Classification and Testing
E.2.a.Visual and Manual Classification
The geologic materials encountered were visually and manually classified in accordance with ASTM Test
Method D 2488. A chart explaining the classification system is attached. Samples were sealed in jars and
returned to our facility for review and storage.
E.2.b.Laboratory Testing
The results of the laboratory tests performed on geologic material samples are noted on or follow the
appropriate attached exploration logs. The tests were performed in accordance with ASTM procedures.
E.3.Groundwater Measurements
The drillers checked for groundwater as the penetration test borings were advanced, and again after
auger withdrawal. The boreholes were then backfilled as noted on the boring logs.
F.Qualifications
F.1.Variations in Subsurface Conditions
F.1.a.Material Strata
Our evaluation, analyses and recommendations were developed from a limited amount of site and
subsurface information. It is not standard engineering practice to retrieve material samples from
exploration locations continuously with depth, and therefore strata boundaries and thicknesses must be
Inwood 10 LLC
Project B14-08413
December 3, 2014
Page 15
inferred to some extent. Strata boundaries may also be gradual transitions, and can be expected to vary
in depth, elevation and thickness away from the exploration locations.
Variations in subsurface conditions present between exploration locations may not be revealed until
additional exploration work is completed, or construction commences. If any such variations are
revealed, our recommendations should be re-evaluated. Such variations could increase construction
costs, and a contingency should be provided to accommodate them.
F.2.Continuity of Professional Responsibility
F.2.a.Plan Review
This report is based on a limited amount of information, and a number of assumptions were necessary to
help us develop our recommendations. It is recommended that our firm review the geotechnical aspects
of the designs and specifications, and evaluate whether the design is as expected, if any design changes
have affected the validity of our recommendations, and if our recommendations have been correctly
interpreted and implemented in the designs and specifications.
F.2.b.Construction Observations and Testing
It is recommended that we be retained to perform observations and tests during construction. This will
allow correlation of the subsurface conditions encountered during construction with those encountered
by the borings, and provide continuity of professional responsibility.
F.3.Use of Report
This report is for the exclusive use of the parties to which it has been addressed. Without written
approval, we assume no responsibility to other parties regarding this report. Our evaluation, analyses
and recommendations may not be appropriate for other parties or projects.
F.4.Standard of Care
In performing its services, Braun Intertec used that degree of care and skill ordinarily exercised under
similar circumstances by reputable members of its profession currently practicing in the same locality. No
warranty, express or implied, is made.
Appendix
8
12
10
11
14
27
9
Benchmark:
Elevations were
obtained using
GPS and the State
of Minnesota's
permanent base
station network.
No sample
recovery.
4
CL
SM
SP-
SM
SC-
SM
LEAN CLAY with SAND, brown, moist.
(Topsoil)
SILTY SAND, fine- to medium-grained, brown to
reddish brown, moist, loose.
(Glacial Outwash)
POORLY GRADED SAND with SILT, fine- to
medium-grained, reddish brown, moist, medium dense.
(Glacial Outwash)
SILTY CLAYEY SAND, fine- to medium-grained, with
Sand seams and Gravel, brown, wet, loose to medium
dense.
(Glacial Till)
END OF BORING.
Auger met refusal at the 15-foot depth.
Water not observed while drilling.
Water not observed to cave-in depth of 14 feet
immediately after withdrawal of auger.
Boring immediately backfilled.
1030.0
1026.7
1023.7
1014.7
0.7
4.0
7.0
16.0
11/11/14 1" = 4'DATE:SCALE:DRILLER:
Tests or NotesWL
Braun Intertec Corporation, Bloomington MN 55438 ST-1 page 1 of 1
3 1/4" HSA, AutohammerK. Keck
L O G O F B O R I N G
(See Descriptive Terminology sheet for explanation of abbreviations)LOCATION: See attached sketch.
(Soil-ASTM D2488 or D2487, Rock-USACE EM1110-1-2908)
Description of Materials
ST-1
METHOD:
BORING:
BPF
B14-08413LOG OF BORING N:\GINT\PROJECTS\AX PROJECTS\2014\08413.GPJ BRAUN_V8_CURRENT.GDT 12/3/14 10:43Braun Project B14-08413
GEOTECHNICAL EVALUATION
Inwood and 10th Development
Southeast Quadrant of Inwood Avenue N and 10th Street N
Lake Elmo, Minnesota
P200
%
MC
%Symbol
Elev.
feet
1030.7
Depth
feet
0.0
7
32
26
30
18
22
19
349
CL
SM
SP-
SM
SC-
SM
SP
SC-
SM
LEAN CLAY with SAND, brown, moist.
(Topsoil)
SILTY SAND, fine- to medium-grained, brown to
reddish brown, moist, loose.
(Glacial Outwash)
POORLY GRADED SAND with SILT, Gravely, brown
to reddish brown, moist, dense.
(Glacial Outwash)
SILTY CLAYEY SAND, fine- to medium-grained, with
Gravel, brown, wet, medium dense.
(Glacial Till)
POORLY GRADED SAND, fine-grained, brown, moist,
medium dense.
(Glacial Outwash)
SILTY CLAYEY SAND, fine- to medium-grained, with
Gravel, brown to reddish brown, wet, medium dense.
(Glacial Till)
END OF BORING.
Water not observed while drilling.
Water not observed to cave-in depth of 14 feet
immediately after withdrawal of auger.
Boring immediately backfilled.
1018.9
1015.9
1012.9
1010.9
1007.9
998.9
1.0
4.0
7.0
9.0
12.0
21.0
11/11/14 1" = 4'DATE:SCALE:DRILLER:
Tests or NotesWL
Braun Intertec Corporation, Bloomington MN 55438 ST-2 page 1 of 1
3 1/4" HSA, AutohammerK. Keck
L O G O F B O R I N G
(See Descriptive Terminology sheet for explanation of abbreviations)LOCATION: See attached sketch.
(Soil-ASTM D2488 or D2487, Rock-USACE EM1110-1-2908)
Description of Materials
ST-2
METHOD:
BORING:
BPF
B14-08413LOG OF BORING N:\GINT\PROJECTS\AX PROJECTS\2014\08413.GPJ BRAUN_V8_CURRENT.GDT 12/3/14 10:43Braun Project B14-08413
GEOTECHNICAL EVALUATION
Inwood and 10th Development
Southeast Quadrant of Inwood Avenue N and 10th Street N
Lake Elmo, Minnesota
P200
%
MC
%Symbol
Elev.
feet
1019.9
Depth
feet
0.0
5
15
23
24
33
21
24
4
CL
SM
SC-
SM
LEAN CLAY with SAND, brown, moist.
(Topsoil)
SILTY SAND, fine- to medium-grained, with Clayey
Sand seams and Gravel, reddish brown to brown, moist
to wet, loose to medium dense.
(Glacial Outwash)
SILTY CLAYEY SAND, fine- to medium-grained, with
Sand seams and Gravel, reddish brown to brown, wet,
medium dense to dense.
(Glacial Till)
END OF BORING.
Water not observed while drilling.
Water not observed to cave-in depth of 16 1/2 feet
immediately after withdrawal of auger.
Boring immediately backfilled.
1010.5
1002.5
990.5
1.0
9.0
21.0
11/11/14 1" = 4'DATE:SCALE:DRILLER:
Tests or NotesWL
Braun Intertec Corporation, Bloomington MN 55438 ST-3 page 1 of 1
3 1/4" HSA, AutohammerK. Keck
L O G O F B O R I N G
(See Descriptive Terminology sheet for explanation of abbreviations)LOCATION: See attached sketch.
(Soil-ASTM D2488 or D2487, Rock-USACE EM1110-1-2908)
Description of Materials
ST-3
METHOD:
BORING:
BPF
B14-08413LOG OF BORING N:\GINT\PROJECTS\AX PROJECTS\2014\08413.GPJ BRAUN_V8_CURRENT.GDT 12/3/14 10:43Braun Project B14-08413
GEOTECHNICAL EVALUATION
Inwood and 10th Development
Southeast Quadrant of Inwood Avenue N and 10th Street N
Lake Elmo, Minnesota
MC
%Symbol
Elev.
feet
1011.5
Depth
feet
0.0
8
6
19
21
24
36
38
27
An open triangle in
the water level
(WL) column
indicates the depth
at which
groundwater was
observed while
drilling.
Groundwater
levels fluctuate.
7
10
9
CL
CL
SM
SP-
SM
SC
SM
SC
LEAN CLAY with SAND, dark brown, moist.
LEAN CLAY with SAND, brown, wet, medium.
(Glacial Till)
SILTY SAND, fine- to medium-grained, brown, moist to
wet, loose to medium dense.
(Glacial Outwash)
With Gravel at 7 1/2 feet.
POORLY GRADED SAND with SILT, fine- to
medium-grained, wet, medium dense.
(Glacial Outwash)
CLAYEY SAND, with Gravel, brown to reddish brown,
wet, very stiff.
(Glacial Till)
SILTY SAND, fine- to medium-grained, brown to
reddish brown, wet, dense.
(Glacial Till)
CLAYEY SAND, with Sand seams, brown to reddish
brown, wet, hard.
(Glacial Till)
END OF BORING.
Water observed at 12 1/2 feet with 12 feet of
hollow-stem auger in the ground.
Water not observed to cave-in depth of 13 feet
immediately after withdrawal of auger.
Boring immediately backfilled.
1002.6
999.6
994.6
991.6
989.6
985.6
982.6
1.0
4.0
9.0
12.0
14.0
18.0
21.0
11/11/14 1" = 4'DATE:SCALE:DRILLER:
Tests or NotesWL
Braun Intertec Corporation, Bloomington MN 55438 ST-4 page 1 of 1
3 1/4" HSA, AutohammerK. Keck
L O G O F B O R I N G
(See Descriptive Terminology sheet for explanation of abbreviations)LOCATION: See attached sketch.
(Soil-ASTM D2488 or D2487, Rock-USACE EM1110-1-2908)
Description of Materials
ST-4
METHOD:
BORING:
BPF
B14-08413LOG OF BORING N:\GINT\PROJECTS\AX PROJECTS\2014\08413.GPJ BRAUN_V8_CURRENT.GDT 12/3/14 10:43Braun Project B14-08413
GEOTECHNICAL EVALUATION
Inwood and 10th Development
Southeast Quadrant of Inwood Avenue N and 10th Street N
Lake Elmo, Minnesota
P200
%
MC
%Symbol
Elev.
feet
1003.6
Depth
feet
0.0
6
4
8
10
21
23
20 No recovery. Sample
from cuttings.
10
CL
SM
SP-
SM
SP
SC
LEAN CLAY with SAND, dark brown, wet.
(Topsoil)
SILTY SAND, with Gravel, reddish brown, wet, loose.
(Glacial Outwash)
POORLY GRADED SAND with SILT, fine- to
medium-grained, with Gravel, brown to reddish brown,
moist, very loose.
(Glacial Outwash)
POORLY GRADED SAND, with Clayey Sand lenses
and Gravel, brown to reddish brown, wet, loose to
medium dense.
(Glacial Outwash)
CLAYEY SAND, Gravely, reddish brown, wet, very stiff.
(Glacial Till)
END OF BORING.
Water not observed while drilling.
Water not observed to cave-in depth of 16 feet
immediately after withdrawal of auger.
Boring immediately backfilled.
1004.3
1001.1
998.1
987.1
984.1
0.8
4.0
7.0
18.0
21.0
11/12/14 1" = 4'DATE:SCALE:DRILLER:
Tests or NotesWL
Braun Intertec Corporation, Bloomington MN 55438 ST-5 page 1 of 1
3 1/4" HSA, AutohammerK. Keck
L O G O F B O R I N G
(See Descriptive Terminology sheet for explanation of abbreviations)LOCATION: See attached sketch.
(Soil-ASTM D2488 or D2487, Rock-USACE EM1110-1-2908)
Description of Materials
ST-5
METHOD:
BORING:
BPF
B14-08413LOG OF BORING N:\GINT\PROJECTS\AX PROJECTS\2014\08413.GPJ BRAUN_V8_CURRENT.GDT 12/3/14 10:43Braun Project B14-08413
GEOTECHNICAL EVALUATION
Inwood and 10th Development
Southeast Quadrant of Inwood Avenue N and 10th Street N
Lake Elmo, Minnesota
MC
%Symbol
Elev.
feet
1005.1
Depth
feet
0.0
13
18
15
21
35
36
25
3
CL
SC
SP
SC-
SM
SP
SC
LEAN CLAY with SAND, dark brown, wet.
(Topsoil)
CLAYEY SAND, with Sand seams, reddish brown,
moist, stiff.
(Glacial Till)
POORLY GRADED SAND, fine-grained, brown, moist,
medium dense.
(Glacial Outwash)
SILTY CLAYEY SAND, fine- to medium-grained, with
Gravel, reddish brown, wet, medium dense.
(Glacial Till)
POORLY GRADED SAND, fine-grained, brown, moist,
dense.
(Glacial Outwash)
With Gravel at 15 feet.
CLAYEY SAND, with Gravel, reddish brown, wet, very
stiff.
(Glacial Till)
END OF BORING.
Water not observed while drilling.
Water not observed to cave-in depth of 15 feet
immediately after withdrawal of auger.
Boring immediately backfilled.
1004.5
1001.5
998.5
993.5
987.5
984.5
1.0
4.0
7.0
12.0
18.0
21.0
11/11/14 1" = 4'DATE:SCALE:DRILLER:
Tests or NotesWL
Braun Intertec Corporation, Bloomington MN 55438 ST-6 page 1 of 1
3 1/4" HSA, AutohammerK. Keck
L O G O F B O R I N G
(See Descriptive Terminology sheet for explanation of abbreviations)LOCATION: See attached sketch.
(Soil-ASTM D2488 or D2487, Rock-USACE EM1110-1-2908)
Description of Materials
ST-6
METHOD:
BORING:
BPF
B14-08413LOG OF BORING N:\GINT\PROJECTS\AX PROJECTS\2014\08413.GPJ BRAUN_V8_CURRENT.GDT 12/3/14 10:44Braun Project B14-08413
GEOTECHNICAL EVALUATION
Inwood and 10th Development
Southeast Quadrant of Inwood Avenue N and 10th Street N
Lake Elmo, Minnesota
MC
%Symbol
Elev.
feet
1005.5
Depth
feet
0.0
10
25
47
30
34
37
18
10
8
5
CL
SC-
SM
SP-
SM
SM
SP
SC-
SM
LEAN CLAY with SAND, dark brown, moist.
(Topsoil)
SILTY CLAYEY SAND, fine- to medium-grained, brown
to reddish brown, moist, loose.
(Glacial Till)
POORLY GRADED SAND with SILT, fine- to
medium-grained, with Gravel, brown to reddish brown,
moist, medium dense.
(Glacial Outwash)
SILTY SAND, fine- to medium-grained, with Gravel,
brown to reddish brown, moist, dense.
(Glacial Outwash)
POORLY GRADED SAND, fine-grained, with Clayey
Sand seams and Gravel, brown to reddish brown,
moist, medium dense.
(Glacial Outwash)
SILTY CLAYEY SAND, fine- to medium-grained, with
Gravel, reddish brown, wet, medium dense to dense.
(Glacial Till)
END OF BORING.
Water not observed while drilling.
Water not observed to cave-in depth of 17 feet
immediately after withdrawal of auger.
Boring immediately backfilled.
1011.7
1008.7
1005.7
1003.7
1000.7
991.7
1.0
4.0
7.0
9.0
12.0
21.0
11/11/14 1" = 4'DATE:SCALE:DRILLER:
Tests or NotesWL
Braun Intertec Corporation, Bloomington MN 55438 ST-7 page 1 of 1
3 1/4" HSA, AutohammerK. Keck
L O G O F B O R I N G
(See Descriptive Terminology sheet for explanation of abbreviations)LOCATION: See attached sketch.
(Soil-ASTM D2488 or D2487, Rock-USACE EM1110-1-2908)
Description of Materials
ST-7
METHOD:
BORING:
BPF
B14-08413LOG OF BORING N:\GINT\PROJECTS\AX PROJECTS\2014\08413.GPJ BRAUN_V8_CURRENT.GDT 12/3/14 10:44Braun Project B14-08413
GEOTECHNICAL EVALUATION
Inwood and 10th Development
Southeast Quadrant of Inwood Avenue N and 10th Street N
Lake Elmo, Minnesota
P200
%
MC
%Symbol
Elev.
feet
1012.7
Depth
feet
0.0
Descriptive Terminology of Soil
Standard D 2487 - 00
Classification of Soils for Engineering Purposes
(Unified Soil Classification System)
Rev. 7/07
DD Dry density, pcf
WD Wet density, pcf
MC Natural moisture content, %
LL Liqiuid limit, %
PL Plastic limit, %
PI Plasticity index, %
P200 % passing 200 sieve
OC Organic content, %
S Percent of saturation, %
SG Specific gravity
C Cohesion, psf
Angle of internal friction
qu Unconfined compressive strength, psf
qp Pocket penetrometer strength, tsf
Liquid Limit (LL)
Laboratory TestsPlasticity Index (PI)Drilling Notes
Standard penetration test borings were advanced by 3 1/4” or 6 1/4”
ID hollow-stem augers unless noted otherwise, Jetting water was used
to clean out auger prior to sampling only where indicated on logs.
Standard penetration test borings are designated by the prefix “ST”
(Split Tube). All samples were taken with the standard 2” OD split-tube
sampler, except where noted.
Power auger borings were advanced by 4” or 6” diameter continuous-
flight, solid-stem augers. Soil classifications and strata depths were in-
ferred from disturbed samples augered to the surface and are, therefore,
somewhat approximate. Power auger borings are designated by the
prefix “B.”
Hand auger borings were advanced manually with a 1 1/2” or 3 1/4”
diameter auger and were limited to the depth from which the auger could
be manually withdrawn. Hand auger borings are indicated by the prefix
“H.”
BPF: Numbers indicate blows per foot recorded in standard penetration
test, also known as “N” value. The sampler was set 6” into undisturbed
soil below the hollow-stem auger. Driving resistances were then counted
for second and third 6” increments and added to get BPF. Where they
differed significantly, they are reported in the following form: 2/12 for the
second and third 6” increments, respectively.
WH: WH indicates the sampler penetrated soil under weight of hammer
and rods alone; driving not required.
WR: WR indicates the sampler penetrated soil under weight of rods
alone; hammer weight and driving not required.
TW indicates thin-walled (undisturbed) tube sample.
Note: All tests were run in general accordance with applicable ASTM
standards.
Particle Size Identification
Boulders ............................... over 12”
Cobbles ............................... 3” to 12”
Gravel
Coarse ............................ 3/4” to 3”
Fine ................................. No. 4 to 3/4”
Sand
Coarse ............................ No. 4 to No. 10
Medium ........................... No. 10 to No. 40
Fine ................................. No. 40 to No. 200
Silt ....................................... No. 200, PI 4 or
below “A” line
Clay ..................................... No. 200, PI 4 and
on or above “A” line
Relative Density of
Cohesionless Soils
Very loose ................................ 0 to 4 BPF
Loose ....................................... 5 to 10 BPF
Medium dense ......................... 11 to 30 BPF
Dense ...................................... 31 to 50 BPF
Very dense ............................... over 50 BPF
Consistency of Cohesive Soils
Very soft ................................... 0 to 1 BPF
Soft ....................................... 2 to 3 BPF
Rather soft ............................... 4 to 5 BPF
Medium .................................... 6 to 8 BPF
Rather stiff ............................... 9 to 12 BPF
Stiff ....................................... 13 to 16 BPF
Very stiff ................................... 17 to 30 BPF
Hard ....................................... over 30 BPF
a. Based on the material passing the 3-in (75mm) sieve.
b. If field sample contained cobbles or boulders, or both, add “with cobbles or boulders or both” to group name.
c. Cu = D60 / D10 Cc = (D30)2
D10 x D60
d. If soil contains 15% sand, add “with sand” to group name.
e. Gravels with 5 to 12% fines require dual symbols:
GW-GM well-graded gravel with silt
GW-GC well-graded gravel with clay
GP-GM poorly graded gravel with silt
GP-GC poorly graded gravel with clay
f. If fines classify as CL-ML, use dual symbol GC-GM or SC-SM.
g. If fines are organic, add “with organic fines” to group name.
h. If soil contains 15% gravel, add “with gravel” to group name.
i. Sands with 5 to 12% fines require dual symbols:
SW-SM well-graded sand with silt
SW-SC well-graded sand with clay
SP-SM poorly graded sand with silt
SP-SC poorly graded sand with clay
j. If Atterberg limits plot in hatched area, soil is a CL-ML, silty clay.
k. If soil contains 10 to 29% plus No. 200, add “with sand” or “with gravel” whichever is predominant.
l. If soil contains 30% plus No. 200, predominantly sand, add “sandy” to group name.
m. If soil contains 30% plus No. 200 predominantly gravel, add “gravelly” to group name.
n. PI 4 and plots on or above “A” line.
o. PI 4 or plots below “A” line.
p. PI plots on or above “A” line.
q. PI plots below “A” line.
Poorly graded sand h
Peat
Well-graded gravel d
PI plots on or above “A” line
PI 7 and plots on or above “A” line j
PI 4 or plots below “A” line j
Fine-grained Soils50% or more passed theNo. 200 sieveCoarse-grained Soilsmore than 50% retained onNo. 200 sieveSoils Classification
Gravels
More than 50% of
coarse fraction
retained on
No. 4 sieve
Sands
50% or more of
coarse fraction
passes
No. 4 sieve
Silts and Clays
Liquid limit
less than 50
Highly Organic Soils
Silts and clays
Liquid limit
50 or more
Primarily organic matter, dark in color and organic odor
Group
Symbol
Criteria for Assigning Group Symbols and
Group Names Using Laboratory Tests a
Group Name b
GW
GP
GM
GC
SW
SP
SM
CL
ML
OL
OL
SC
Poorly graded gravel d
Silty gravel d f g
Clean Gravels
5% or less fines e
Gravels with Fines
More than 12% fines e
Clean Sands
5% or less fines i
Sands with Fines
More than 12% i
Fines classify as ML or MH
Fines classify as CL or CH Clayey gravel d f g
Well-graded sand h
Fines classify as CL or CH
Fines classify as ML or MH Silty sand f g h
Clayey sand f g h
Inorganic
Organic Liquid limit - oven dried
Liquid limit - not dried 0.75
Inorganic
Organic
PI plots below “A” line
Lean clay k l m
Liquid limit - oven dried
Liquid limit - not dried 0.75
CH
MH
OH
OH
Fat clay k l m
Elastic silt k l m
Organic clay k l m n
Organic silt k l m o
Organic clay k l m p
Organic silt k l m q
Cu 6 and 1 Cc 3 C
PT
Cu 4 and 1 Cc 3 C
Cu 4 and/or 1 Cc 3 C
Cu 6 and/or 1 CC 3 C
0 10 16 20
30 40 50 60 70 80
90 100 110
7 “U” Line“A” Line
10
20
30
40
50
60
4
0
ML or OL
MH or OHCL or
OL
CH or
O
H
CL - ML
Silt k l m
LAKE ELMO FIRE DEPARTMENT – OFFICE OF THE FIRE MARSHAL
Fire Prevention, Code Enforcement, and Public Education
May 12, 2026
Sophia Jensen, Planner
City of Lake Elmo
Re: Inwood Commercial
Prepared by: Anthony Svoboda, Fire Marshal
Approved by: Dustin Kalis, Fire Chief
Applicable Codes:
• 2020 Minnesota State Fire Code
• 2020 Minnesota State Building Code
• Lake Elmo Fire Department Fire Code Policies
• NFPA 13, 2016 edition
• NFPA 13D, 2016 edition
Fire Department Comments:
1) All roads and drive lanes shall meet the Lake Elmo Fire Department requirements for widths and turning
radiuses.
2) Approved fire apparatus roads shall be provided and maintained in coordination with engineering, public works,
planning, and fire departments. In accordance with MSFC D104.2, two fire apparatus access roads shall be
required and always maintained.
3) Project construction phasing shall always accommodate emergency access to the entire construction zone,
generally meaning two separate means of entrance/exit as defined in the code. Phasing plan to be approved by
the fire department prior to construction.
4) An approved signage and marking plan shall be determined for all No Parking and Fire Lane access roads. On-
street parking shall be provided in approved locations following review by Engineering and Public Works. Parking
shall be prohibited on both sides of private drive lanes.
5) Street names and addressing shall be consistent with the Washington County Uniform Street Naming and
Property Numbering System.
6) Fire hydrants and watermains shall be provided in approved locations following review by Engineering and
Public Works.
7) Building address numbers shall be plainly visible from the street fronting the property and shall be contrasting
color from the background. Size and placement of address numbers shall be approved by the fire and planning
departments.
LAKE ELMO FIRE DEPARTMENT – OFFICE OF THE FIRE MARSHAL
Fire Prevention, Code Enforcement, and Public Education
“Proudly Serving Neighbors and Friends”
8) A fire sprinkler system shall be installed in commercial buildings in accordance with the Minnesota State Fire
Code and Chapter 1306 of the Minnesota State Building Code. A permit is required prior to work.
a. Fire Department sprinkler connection locations shall be approved prior to installation.
9) A fire alarm system shall be installed in commercial buildings in accordance with the Minnesota State Fire Code
(907.2.3) and Lake Elmo Ordinances. A permit is required prior to work.
10) An emergency responder radio coverage amplifier shall be installed throughout the building if the fire
department determines that signal strength is not reliable.
11) An exterior door numbering system shall be utilized to determine exterior doors on all sides of the building.
Door numbering convention shall be approved by the fire department prior to installation.
12) A KNOX rapid access lockbox shall be installed in an approved location, on all commercial buildings.
a. Multiple KNOX rapid access lockboxes may be required as determined by the fire department.
13) KNOX locking Fire Department Connection Caps shall be installed on all fire department connections.
14) All gates, whether manual or electric, shall be accompanied by either a KNOX lock or KNOX gate control switch
for rapid access.
15) All parking areas shall be capable of supporting the imposed load of fire apparatus weighing up to 75,000
pounds.
16) Locations of all EV charging stations or Electric Vehicle Supply Equipment shall be reviewed and installed in
approved locations. All electric vehicle supply equipment installed in the apartment building underground
parking area may require additional fire suppression considerations and restrictions on installation
locations. An electric vehicle supply equipment plan is required. This plan shall be reviewed by the fire
department, building contractor, building owner and building insurance provider.
Questions, clarifications, or the request to provide code documents can be made using the contact information listed
below.
Respectfully,
Memorandum
800 Washington Avenue North, Suite 207
Minneapolis, MN 55401
May 7, 2026
TO : SOPHIA JENSEN
FROM: SARAH EVENSON, PLA
RE: INWOOD COMMERCIAL- LANDSCAPE AND TREE PRESERVATION PRELIMINARY PLAT REVIEW
SUBMITTALS
1. Concept Plan Submittal, dated October 7, 2025, received October 17, 2025.
2. Preliminary Plat Submittal, dated April 23, 2026, received April 29, 2026.
REVIEW HISTORY
1. November 4, 2025 – Inwood Commercial Concept Plan- Landscape and Tree Preservation Plan Review
2. May 7, 2026 – Inwood Commercial Preliminary Plat- Landsca pe and Tree Preservation Plan Review
LOCATION: PID 33.029.21.12.0006. East of Inwood Ave between 5th Street and 10th Street.
CURRENT LAND USE CATEGORY: Commercial PUD
ADJACENT AND SURROUNDING LAND USE: Low Density Residential and Public Facilities to the east,
City of Oakdale commercial and golf course to the west, Commercial PUD to the south, Rural
Residential to the north
SPECIAL LANDSCAPE PROVISIONS: Shoreland Overlay District for Armstrong Lake
TREE PRESERVATION PLAN: 105. 12. 470
• A tree preservation plan was marked “N/A” in the preliminary plat application. Plans indicate there are
no significant trees within the subject parcels. A tree preservation plan is not required.
LANDSCAPE PLAN: 105.12.480
• Applicant notes that parking lot landscaping and any screening provisions will be incorporated as
individual parcels are developed. This phase of the project satisfies landscape requirements for street
frontage and acres of land disturbed.
• A preliminary landscape plan has been submitted that largely meets code, but requires the following
adjustments prior to approval:
o Applicant must swap out the city standard details on sheet L2 for the updated 2025 details that can
be found here: https://www.lakeelmo.gov/DocumentCenter/View/334/Landscaping-and-Irrigation-
Standards-PDF?bidId=
o The location of a topsoil stockpile and notes indicating that the quantity of soil shall be sufficient to
cover all landscaped areas at least 4” deep must be provided somewhere in the drawing set.
May 7, 2026
Inwood Commercial
Memorandum 2
RECOMMENDATION:
In future submittals, the applicant must address the above-noted items in their landscape plans.
Sarah Evenson, PLA (MN)
City of Lake Elmo Municipal Landscape Architect
P: (262) 391-7653 E: sarah@hkgi.com
MEMORANDUM
Date: May 18, 2026
To: Sophia Jensen, Senior Planner Re: Inwood Commercial Addition
Nathan Fuerst, Planning Consultant Preliminary Plat/Plans
Jason Stopa, Community Development Director
Pete Tholen, Public Works Director
Nate Stanley, City Engineer
Chad Isakson, Assistant City Engineer
From: Jack Griffin, Sr. Project Manager
An engineering review has been completed for the Inwood Commercial Addition Preliminary Plat/Plans
for a 5-lot commercial subdivision located at PID 3302921120006. The review consisted of the following
documentation received April 29, 2026:
· Inwood Commercial Addition Preliminary Plat/Plans dated April 23, 2026.
· Inwood Commercial Addition Stormwater Management Plan dated April 23, 2026.
· Inwood Commercial Addition Storm Sewer Design dated April 23, 2026.
· Inwood Avenue/9th Street Full Intersection Exhibit dated April 20, 2026.
STATUS/FINDINGS: As a condition of Preliminary Plat approval the applicant must revise and resubmit
Preliminary Plat/Plans to address each review comment and condition of approval to the satisfaction of
City staff prior to commencement of grading or prior to the City accepting a Final Plat/Plan application.
All subdivision improvements must be constructed in accordance with the City Engineering Design
Standards dated March 2026. All plan notes and details must be updated accordingly.
PRELIMINARY PLAT/PLANS
1. No Outlots are proposed as part of this Subdivision.
2. The Preliminary Plat and Plans must be revised to provide additional right-of-way along Irene
Avenue at the intersection with 10th Street. A minimum boulevard of 16-feet is required from the
back of curb from the proposed right-turn lane.
3. The Preliminary Plat and Plans must be revised to provide additional easement width over the
proposed bituminous trails along both Inwood Avenue and 10th Street. Trail location and minimum
easement width to be determined jointly by Washington County and Lake Elmo Public Works.
Page: 2
SITE PLANS, TRAFFIC AND ACCESS MANAGEMENT
1. Access Management. The Preliminary Plans propose public roadway access at three locations as
required, including access to 10th Street (CSAH 10), Inwood Avenue (CSAH 13), and 5th Street
(designated Municipal State Aid route).
Irene Avenue and 10th Street (CSAH 10) Intersection. A ¾ intersection with limited turning
movements, including right-in/right-out and left-in has been shown on the Preliminary
Plans as required. Plan revisions may be required as part of the Construction Plans and
Final Plat application to address intersection revisions per Washington County review
comments. A County roadway access permit will be required as part of this Project.
9th Street and Inwood Avenue (CSAH 13). A ¾ intersection with limited turning
movements, including right-in/right-out and left-in has been shown on the Preliminary
Plans as required. Plan revisions may be required as part of the Construction Plans and
Final Plat application to address intersection revisions per Washington County review
comments. A County roadway access permit will be required as part of this Project.
As part of the final construction plans, all County roadway and right-of-way improvements
must be incorporated into the plans for City review and approval.
2. County Road Right-of-way dedication. Washington County has confirmed (per letter dated March
6, 2026) that no additional right-of-way dedication will be required along the full length of Inwood
Avenue (CSAH 13) and 10th Street (CSAH 10).
3. City Street Turn Lane Improvements/Intersection Geometrics. Dedicated turn lanes have been
shown on the Preliminary Plans as required and as follows:
A right turn lane along Irene Avenue at 5th Street.
A right-out only on Irene Avenue at 10th Street.
A right-out only on 9th Street at Inwood Avenue.
The 9th Street approach to Inwood Avenue provides additional right-of-way and lane width
as required for a future signalized intersection that may allow for a dedicated right-turn
lane and a through/left lane at the traffic signal.
4. Driveway Access Management. The Preliminary Plans show proposed driveway locations for each
Lot. A minimum 150-ft centerline offset between driveways has been shown as required. Revisions
to the driveway locations may be needed as the construction plans are finalized. The Lot 1, Block
1, and Lot 2, Block 2 driveways are located fully outside of the Irene Avenue turn lane tapers as
required.
5. Public Streets. Irene Avenue and 9th Street will be public streets and must meet the City’s
Engineering Design Standards including right-of-way width (60-feet) and pavement width (28-feet).
As commercial access roadways, pavement markings have been incorporated into the Preliminary
Plans as required, including centerline, fog line and turn lane striping. Both streets have been
posted no parking along both sides of the street. All street intersections must be at 90 degrees and
maintain 50-ft of tangent with maximum longitudinal slopes of 2.5%.
6. Pedestrian Connectivity. Sidewalk/trail improvements have been incorporated as required by the
City. Trail revisions may be needed along Inwood Avenue and 10th Street as part of the
construction plans and Final Plat application.
7. Dedicated drainage and utility easements, minimum 10-feet wide, have been shown along all
public roadway frontage, including 5th Street, Inwood Avenue, 10th Street, 9th Street, and Irene
Avenue. All easement areas must be free from all encroachments other than those approved by
the City Engineer and upon execution of an easement encroachment agreement. Prohibited
encroachments include, but are not limited to trees, structures, landscaping, fences, retaining
walls, storm sewer running parallel with the easement, stormwater basins and BMPs, and grading
that exceeds 4:1.
Page: 3
STORMWATER MANAGEMENT
1. The proposed subdivision is subject to a Stormwater Management Plan (SWMP) meeting State,
South Washington Watershed District (SWWD) and City rules. A SWWD permit is required.
2. The Preliminary Plat/Plans propose improvements that reside within the larger Inwood
subdivision in which stormwater management provisions have been previously designed,
permitted and constructed.
3. The allowable maximum impervious surface for each Lot has been documented on the Preliminary
Stormwater Management Plan and is consistent with the approved Inwood Stormwater
Management Plan. As final construction plans are prepared for the Subdivision, and future lot
build-outs, the impervious surfaces must remain below the maximum allowable, and the
stormwater drainage systems must be designed to direct runoff to the allocated stormwater
management basin.
4. The site design will create a maximum of 5.561 acres of new impervious surface once all public
improvements and all 5 lots have developed. A maximum of 3.184 acres of new impervious
surface will be conveyed and managed through Pond 200 (located east of the site) while a
maximum of 2.377 acres of new impervious surface will be conveyed and managed through Pond
100 (located on the south side of 5th Street).
The SWMP must be revised to add an exhibit that clearly presents the impervious surface
limits for each lot, including impervious surface allowed for each lot within the shoreland
district boundary and the impervious surface allowed for each lot outside of the shoreland
district boundary. The exhibit must also label and call-out the required storm sewer
connection location for each lot together with a delineated drainage shed that is allowed
to drain to each connection location. Lot labeling must be consistent with the proposed
preliminary and final plat.
The SWMP must be revised to account for and address the new impervious surfaces
created within the County right-of-way and bituminous trails.
The Grading Plans and SWMP must be revised to account for the bituminous trail
construction along Inwood Avenue and 10th Street and the drainage limits must be clearly
identified for the areas allowed to drain to County right-of-way.
2. Approval of the Preliminary Plat/Plans for the development is contingent upon all SWMP revisions,
as required by the SWWD or other applicable permitting agency, being submitted to the City for
review and approval.
3. Approval of the preliminary grading and storm sewer plans for the development is contingent upon
all grading plans being reviewed and approved by the City Engineer prior to the start of any grading
or construction.
The grading plans must include lot corner and lot line spot elevations to clearly define
limits of the public right-of-way improvements and tie-in elevations for future lot grading
activities.
Overland emergency overflow (EOF) elevations are required throughout the site at all
localized low points. Low openings for adjacent structures must maintain 1-foot above
any adjacent EOF in the as-built condition.
The grading plans must include minimum low floor and/or low opening elevations for
each lot based on the SWMP and emergency overflow elevations.
The storm sewer plans must be revised to eliminate the 21-inch storm sewer stub being
extended to Lot 2, Block 2 as runoff from this area to Pond 200 is inconsistent with the
proposed SWMP. Connections to existing storm sewer stubs along 5th Street must be
called out for use by this Lot and the downstream storm sewer system capacity must be
modeled and verified.
4. Plan revisions may be required to meet City design standards and to mitigate encroachments.
Page: 4
MUNICIPAL WATER SUPPLY
1. Connection to the public watermain system is required. The developer will be responsible for
extending public watermain internally throughout the subdivision in accordance with the City
engineering design standards and to serve each proposed parcel. Public watermain improvements
must be completed at developer’s sole cost.
2. The extension of public watermain is shown along Irene Avenue as required with service stubs
extended to each proposed lot, and connecting to the existing watermain at both 5th Street and
10th Street.
3. Hydrants and service valves will be required as directed by the Fire Department and Public Works
Department at the time of final construction plan review. All fire hydrants and connecting
watermains will be owned and maintained by the City.
4. Minimum 30-foot easements centered over the pipe/hydrant will be required when not located
within the public right-of-way. Easements must be free from all encroachments, including
retaining walls, trees, fences, small/dry utilities, or storm water management BMPs. Dedicated
utility easements must be shown on all site, grading, utility, and landscape plans when submitting
a Preliminary and Final Plat application. Easements are shown over Lot 2, Block 2 as required.
MUNICIPAL SANITARY SEWER
1. The proposed subdivision is located in the Southwest Planning MUSA and current Regional Sewer
Staging Plan area and would discharge to the MCES WONE Interceptor. Recent communications
with Met Council have revealed potential discharge limitations within the Met Council
infrastructure that may restrict sewer flows within this sewer service district. Investigations are
ongoing. The proposed subdivision provides for 5 commercial lots within no reported sewer flow
requirements.
2. Connection to the municipal sanitary sewer system is required. The developer will be responsible
for extending sanitary sewer service internally throughout the subdivision to serve each platted
lot/parcel and in accordance with the City engineering design standards. All sanitary sewer
improvements must be completed at developer’s sole cost.
3. The extension of sanitary sewer is shown along Irene Avenue as required with service stubs
extended to each proposed lot, and connecting to the existing sewer system at the intersection
of 5th Street and Irene Avenue.
4. All public sanitary sewer mains placed within the development will require minimum 30-foot
easements centered over the pipe/structure, if not located within a public right-of-way.
Easements must be free from all encroachments, including retaining walls, trees, fences,
small/dry utilities, or storm water management BMPs. Dedicated utility easements must be
shown on all site, grading, utility, and landscape plans when submitting a Preliminary and Final
Plat application.
North Shop | 11660 Myeron Road North | Stillwater, MN 55082-9537
P: 651-430-4300 | F: 651-430-4350 | TTY: 651-430-6246
www.washingtoncountymn.gov
Washington County is an equal opportunity organization and employer
November 10, 2025
Sophia Jensen
Senior Planner
City of Lake Elmo
3880 Laverne Ave N
Lake Elmo, MN 55042
Comments on Inwood Commercial Development
Thank you for the opportunity to review and comment on the Inwood Commercial Development located
adjacent to CSAH 10 (10th St N) and CSAH 13 (Inwood Ave N) Our development review team has reviewed
the application and offers the following comments.
The Washington County 2040 Comprehensive Plan guides the County’s transportation network plan and
contains such things as access criteria for county roads related to spacing, sight lines, availability of local
road connections, and corridor classification. This corridor is currently classified as a “Minor Reliever and
Minor Expander,” and this classification was based on the comprehensive plan process. Development
along these corridors must meet County access spacing and intersection control guidelines to preserve
safety and mobility for the traveling public.
The only access that meets County spacing guidelines is the proposed access at 5th Street. The remaining
access points do not meet spacing requirements and are candidates for future closure or consolidation.
The County recommends that the developer and City evaluate the elimination of at least one of the
proposed access points to ensure consistency with County standards. Access permits will be needed for
the construction of new street connections within the county right -of-way.
The County supports the addition of a trail along both C SAH 13 and CSAH 10 to provide safe multimodal
connections consistent with County and regional trail plans.
The comprehensive plan for this area indicates a need for 180 feet of right-of-way which would be 90 feet
along the property from the centerline. Please document that the right-of-way dedicated is found on the
site plan applications and is sufficient.
Washington County's policy is to assist local governments in promoting compatibility between land use
and highways. Traffic noise from this highway could exceed noise standards established by the Minnesota
Pollution Control Agency (MPCA), the U.S. Department of Housing and Urban Development, and the U.S.
Department of Transportation. Minnesota Rule 7030.0030 states that municipalities are responsible for
taking all reasonable measures to prevent land use activities listed in the MPCA's Noise Area Classification
(NAC), where the establishment of the land use would result in violations of established noise standards.
Minnesota Statute 116.07, Subpart 2a exempts County Roads and County State Aid Highways from noise
PUBLIC WORKS
Wayne Sandberg, P.E., Director, County Engineer
Frank D. Ticknor, P.E., Deputy Director
North Shop | 11660 Myeron Road North | Stillwater, MN 55082-9537
P: 651-430-4300 | F: 651-430-4350 | TTY: 651-430-6246
www.washingtoncountymn.gov
Washington County is an equal opportunity organization and employer
thresholds. County policy regarding development adjacent to existing highways prohibits the expenditure
of highway funds for noise mitigation measures. The developer should assess the noise situation and take
any action outside of County right of way deemed necessary to minimize the impact of any highway noise.
A right-of-way permit will be required for any work within the County highway right of way as it relates to the
development. As the development progresses, a plan set will be required with the application and include
any grading, culvert installation, water and sewer services, parallel trail development, signage, and any
landscaping and other improvements within the County right of way.
Additionally, the developer or the City will need to submit a drainage report and calculations for review of
any downstream impacts to the county drainage system. Along with the drainage calculations, we will
request written conclusions that the volume and rate of stormwater run-off into the county right of way will
stay the same as part of the project. Confirmation that the developments stormwater plan meets all
watershed requirements will be required prior to any permit approvals.
All utility connections to County highway right of way for the development require Washington County Right
of Way permits. Typically, these utility connection permits are the responsibility of the utility companies.
Thank you for the opportunity to provide comments on the concept plan application for the Inwood
Commercial Development. We look forward to continuing to work with the City of Lake Elmo to ensure that
development in this area is successful and well-served by the transportation network.
If you have any questions, please get in touch with me at 651-430-4307 or
daniel.elder@washingtoncountymn.gov
Sincerely,
Daniel Elder
Planner II
Cc (email only):
Wayne Sandberg, Public Works Director/County Engineer
Frank Ticknor, Deputy Director Public Works
Lyssa Leitner, Public Works Planning Director
Joe Gustafson, Traffic Engineer
Kevin Peterson, Design Engineer
Gary Bruns. Environmental Program Supervisor
From:Scollan, Daniel (DNR)
To:Sophia Jensen
Subject:RE: Land Use Review Request - City of Lake Elmo May 1st Batch
Date:Friday, May 15, 2026 11:58:24 AM
Attachments:image004.png
image005.png
image006.png
image007.png
image001.png
Hello Sophia,
Inwood Commercial Preliminary Plat
This plat lies within the shoreland district of Armstrong Lake, a Natural Environment Lake.
Note that the impervious surface limit in the shoreland district is 30% in sewered areas. Please
also note that Table 17-3 of the city’s shoreland ordinance requires commercial development
in the shoreland districts of Natural Environment Lakes to be processed as a conditional use.
Best Regards,
Dan Scollan
East Metro Area Hydrologist – Ramsey and Washington Counties
Division of Ecological and Water Resources
Minnesota Department of Natural Resources
1200 Warner Road
St. Paul, MN 55106
Phone: 651-259-5732
Fax: 651-772-7977
Email: daniel.scollan@state.mn.us
mndnr.gov
From:Luke McClanahan
To:Sophia Jensen
Cc:Nathan Fuerst; Ashley Monterusso; Jason Stopa; Andrew Gitzlaff; Mark Statz
Subject:RE: Land Use Review Request - City of Lake Elmo May 1st Batch
Date:Thursday, May 7, 2026 8:54:25 AM
Attachments:image002.png
image003.png
Hi Sophia,
Oakdale City staff reviewed the Inwood Commercial preliminary plat. We maintain our
previous comment about ensuring that full access is maintained at the intersection of
9th Street North and County Highway 13/Inwood Avenue North on the Oakdale side. No
further comments beyond that.
We appreciate the opportunity to review the proposal.
Respectfully,
Luke McClanahan, AICP | Planning Manager
City of Oakdale | Community Development Dept.
1584 Hadley Avenue N, Oakdale, MN 55128
Office: (651) 730-2720
luke.mcclanahan@oakdalemn.gov
From:ALAN STOCKER
To:Sophia Jensen
Subject:Inwood Commercial Preliminary Plat concern
Date:Thursday, June 4, 2026 10:16:16 AM
You don't often get email from astocker@comcast.net. Learn why this is important
Hi Sophia,
We are Alan and Lou Stocker and we live at 8680 Upper 7th Place in the Inwood 1st addition.
We are excited to see the development of the property along Inwood Ave behind our home.
Our concern is the screening behind our home along Irene Avenue. The proposed drawings
show Irene Avenue curving in such a way that traffic traveling toward 5th Street would have
headlights shining directly into our back windows. In addition, the proposed parking lot
behind the Gaming Cafe has several parking spaces that would also have cars headlights
aimed at our back windows. There are several neighbors that have the same situation. The
proposed drawings show many trees planned along Irene Avenue north of 9th Street along
Inwood 3rd addition and Inwood 5th addition, but no additional screening along Inwood 1st
addition. We would like to see the additional tree screening along Inwood 1st addition. There
is limited screening now that was planted when the Inwood 1st addition was built, and a
couple of those trees have died. We are concerned that proper screening has not been planned
for Inwood 1st Addition.
Thanks,
Alan and Lou Stocker
8680 Upper 7th Place
1
CITY OF LAKE ELMO
WASHINGTON COUNTY
STATE OF MINNESOTA
RESOLUTION NO. 2026-041
RESOLUTION APPROVING THE PRELIMINARY PLAT OF INWOOD COMMERCIAL
WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing
under the laws of the State of Minnesota; and
WHEREAS, Vadnais Associates LLC (the “Applicant”) submitted an application to the
City of Lake Elmo for a preliminary plat of Inwood Commercial for the property legally
described on the attached Exhibit A (the “Property”), a copy of the preliminary plat is on file in
the City of Lake Elmo Community Development Department; and
WHEREAS, the Lake Elmo Planning Commission held a public hearing on June 8th
2026 to review and consider the preliminary plat application; and
WHEREAS, the Lake Elmo Planning Commission has submitted its report and
unanimous recommendation of approval of the preliminary plat with an added condition
regarding screening on Irene Avenue North to the City Council as part of a staff report dated
June 16th 2026; and
WHEREAS, the City Council considered the preliminary plat at its June 16th 2026,
meeting and hereby makes the following findings of fact:
1. That the Preliminary Plat would be consistent with the intent of the 2040 Lake Elmo
Comprehensive Plan and the 2040 Land Use Map for this area.
2. That the preliminary plat generally complies with the City’s Subdivision regulations and
does not meet the criteria for denial in Section 103.00.090 (d)(2).
3. That the preliminary plat complies with the City’s Zoning Code.
4. That the preliminary plat generally complies with the City’s design standards.
NOW, THEREFORE, BE IT RESOLVED THATda the City Council does hereby
approve the Inwood Commercial preliminary plat subject to the following conditions:
1. Prior to the City finding any application for a final plat and final PUD complete, the
applicant shall fully address all comments in the following review memos to the
satisfaction of the City:
a.City Engineer’s memo dated 5/18/2026
b. City Landscape Architect’s memo dated 5/7/2026
c.City Fire Chief’s memo dated 5/12/2026
d. Washington County Memo Dated 11/10/2025
2.The City Attorney shall issue a plat opinion certifying that the final plat, title evidence,
and all agreements and documents meet the requirements of the City Code and state
statutes prior to the City Council review or approval of the final plat.
2
3. The final plat shall include all necessary and additional public right-of-way and
easements.
4. No flexibility from City standards is provided by this approval. All lots to be platted in
this subdivision must meet existing City standards at the time of building permit
submittal.
5. Sign permits are required and must comply with the City Code.
6.That the Applicant must obtain all necessary permits including but not limited to all
applicable City permits (building, grading, wetland, sign, etc.), NPDES/SWPPP permits
and SWWD permits before starting any grading or construction activities.
7. The applicant/developer is responsible, at their own expense, for installing all required
right of way and pedestrian improvements.
8. The applicant shall consider enhanced landscaping on the East side of Irene Avenue
North subject to review and approval by City Staff.
9. The applicant/developer shall provide the City a fee in lieu of park land dedication as
required by Section 103.00.150 to be paid prior to recording of the final plat.
10.If applicable, a landscape and irrigation license agreement in a form acceptable to the
City shall be executed and recorded with the final plat.
11.If applicable, a stormwater reuse irrigation and license agreement in a form acceptable to
the City shall be executed and recorded with the final plat.
12.If applicable, a storm water maintenance and easement agreement in a form acceptable to
the City shall be executed and recorded with the final plat.
13. Before the execution and recording of a final plat for the development, the developer or
the Applicant shall enter into a Development Agreement with the City. Such an
agreement must be approved by the City Attorney. The Development Agreement must
be approved by the City Council. The agreement shall delineate who is responsible for
the design, construction, and payment for the required improvements with financial
guarantees therefore.
14. If necessary, the Applicant must provide the City with a copy of written permission from
adjacent property owners for any off-site grading work and storm sewer discharges to
adjacent properties before starting any site work, grading and as part of any final plat
application.
15.The Applicant or developer must enter into a separate grading agreement with the City
before starting any grading activity in advance of final plat approval. The City Engineer
shall review any grading plan that is submitted in advance of a final plat and said plan
shall document the extent of any proposed grading on the site.
16.The Applicant must submit a revised preliminary plat and project plans meeting all
conditions of approval for City review and approval. The revised Applicant project plans
and other materials shall meet all of the above conditions before the City will find
complete any final plat application for the development and before the start of any
clearing or grading activity on the site.
17. That the Applicant must submit the final plat within 180 days after City Council approval
of the preliminary plat or approval of the preliminary plat shall be considered void unless
a request for a time extension is submitted in writing and approved by the City Council.
3
Passed and duly adopted this 16th day of June, 2026, by the City Council of the City of Lake
Elmo, Minnesota
________________________________________
Mayor Charles Cadenhead
ATTEST:
____________________________________
Julie Johnson, City Clerk
4
Resolution 2026-____
Exhibit A
Legal Description of Subject Property
Outlot K, INWOOD as recorded in Washington County Surveyors Office
Inwood Commercial Preliminary Plat
City Council | June 16 th , 2026
Background
Applicant: Vadnais Associates LLC
Location: Outlot K of InWood (PID 33.029.21.12.0006)
Area: 17.34 Acres
Current Zoning: Commercial (C) and Partial
Shoreland Overlay
2040 Comprehensive Plan: Commercial (C)
History: This parcel was included in the InWood
Master development plan from 2014 as an
anticipated commercial area.
Request: Preliminary Plat for a 5 Lot Commercial
Subdivision
10th St
Oak Marsh Golf
Course and
Inwood Ave
5th St and Kwik Trip
Inwood
Residential Area
PlatNorth South
Preliminary Plat Review
•Land Use/Zoning
•Bulk Standards
•Tree Preservation/Landscaping
•Grading/Stormwater/Wetland Impacts
•Public Infrastructure (Streets, Access, Utilities)
•Parkland Dedication
•Consistency with Existing Master Plan
Land Use and Performance Standards– The developer is not proposing tenant approvals for the
buildout of the individual commercial lots within the subdivision. Each future user will be subject
to a complete review at the time it is proposed in addition to receiving land use approvals. It is
noted that most of the commercial lots, except for Lot 1, are labeled “ghost plat”. The developer
has indicated Lot 1 is proposed to be a Gaming Café.
Traffic/Access/Parking – This subdivision will have 2 public streets, the alignment for these
streets was determined with the original master plan and curb cuts are installed on City and
County roads. The City ROW width is required to be 60 feet and minimum roadway width is 28
feet. Off-street parking is required consistent with City Code Section 105.12.410. Since the proposed
land uses and floor areas of the proposed buildings will be subject to change based on site
layout, tenant, or property owner needs, etc., staff will conduct a review of parking requirements
and screening at the time of site plan review.
Signage- No signage is proposed. Signage will be reviewed when requested by the Applicant or
subsequent property owners.
Park Dedication – Set fee in the City’s fee schedule. $6,000 per acre.
Review Considerations
Review Considerations
Stormwater Management - Stormwater management for this area was planned as part of the 2014
Inwood master plan. As such, regional ponds will treat stormwater generated by this project,
including the proposed roadways. As the commercial lots develop, or if treatment standards change,
it is possible that additional stormwater treatment could be required on each lot.
Shoreland Overlay – The property is within the shoreland overlay district; the parcels are only
allowed 30% impervious surface. There will be larger green space than the typical commercial land
use which allows up to 75% impervious surface. A Conditional Use Permit is required for commercial
uses in the Natural Environment overlay.
Landscaping – Minor revisions are required to the landscaping plans. No tree preservation is
required on this site as it was previously mass graded, and no significant trees exist on site.
Boulevard plantings are required at the time subdivision improvements are installed. The City Code
requirements on number of plantings has been met by the developer. Proposed species include
maple, hackberry, locust, coffeetree, oak, elm, linden, spruce, pine, crabapple, and lilac.
Screening/Buffering - As the commercial lots develop improvements will be required on each lot to
provide the required screening from the adjacent residential use for the structures and parking.
Screening will be comprised of a combination of landscaping, berm, or fencing to achieve the City
standard.
North South
Existing Trees
Buffering to be
Provided with
Future Users
Proposed Trees
Landscape Plan
North South
Trails
Sidewalks
Sidewalk/Trail PlanExisting Trails
Review Comments
Below is a summary of the agency review comments received. Conditions of approval have been added where
applicable.
Fire Dept: Provided standard comments regarding drive lanes, access points, signage, hydrants, fire suppression,
addressing, EMS systems, KNOX systems, and EV charging.
Landscape Architect: Revisions are required to the landscape plan. Boulevard trees will be provided with this
application. As the single lots develop landscaping and screening will be required. No tree preservation plan is required
with this application.
MN DNR: Provided comments that the impervious surface limit is 30% and that commercial uses in the shoreland
districts of natural environment (NE) lakes require a conditional use permit.
City of Oakdale: Provided comments that they would like to ensure a full access at the intersection of 9th Street and
Inwood Ave.
Washington County: Provided comments that their plans have addressed their preliminary comments regarding
intersections in the memo dated November 10th, 2025.
South Washington Watershed District: The applicant is in communication with the SWWD and seeking to coordinate
on permitting reviews and timelines, as necessary.
City Attorney: The City Attorney will need to review the plat documents and title commitment. A plat opinion is
required prior to recording of the final plat.
4 Findings of Fact
Staff recommends approval of the Preliminary Plat based on the following findings:
•That the Preliminary Plat would be consistent with the intent of the 2040 Lake Elmo
Comprehensive Plan and the 2040 Land Use Map for this area.
•That the preliminary plat generally complies with the City’s Subdivision regulations
and does not meet the criteria for denial in Section 103.00.090 (d)(2).
•That the preliminary plat complies with the City’s Zoning Code.
•That the preliminary plat generally complies with the City’s design standards.
17 Conditions for Approval
Satisfaction of Staff review memos:
•City Engineer
•Fire Chief
•Landscape Architect
•W ashington County
Standard conditions for Preliminary Plat requests, in summary:
•Agreements (DA, Stormwater, Landscape, Grading)
•Fees (Development Security, Park Dedication)
•Permits (MDH, MPCA)
•18 0 -day Expiration
•Additional Reviews
Unique Condition (Added after Planning Commission)
•Enhance screening on the East side of Irene Ave N subject to review by City Staff
Public Hearing
Mailed to Property Owners within 500’ and pushed on May 18th, 2026. The Notice was published in the Stillwater Gazette on May
22nd, 2026. It was also sent as a Push Notification via the City website to subscribers.
•Alan and Lou Stocker – 8680 Upper 7th Pl – Provided written comments in support of development but requested
consideration for screening of vehicle headlights and additional tree plantings.
•Inwood Petition – a petition was submitted, signed by 32 different Inwood residential parcels, which notes concerns for
traffic, light, noise. They are requesting a soundproof wall of structure and traffic calming measures for the commercial
development.
•Paul Prior 8674 Irving Cir N – Provided comments on the berming and how the elevations may be insufficient for screening
headlights alone. Additional measures such as a berm, fence, or retaining wall should be taken to screen headlights on the
roadways. Would like tenant lighting to be considerate of adjacent residents. The trail connection should be extended.
•Dolly Ladner 994 Irving Ct N – Provided comments about concerns with safety and privacy with the roadway adjacent to
the residential area and requested a wall. She noted concerns with the tenant build out and parking lot locations. She
requested something more substantial than landscaping for screening. Noted the Business View magazine Lake Elmo
article about development.
•Dan Moralez 8669 Lower 8th Pl N – Provided comments on existing trees and that they are sparce and scattered. He does
not believe that landscape alone will fix the headlight screening. Grading issues will create challenges for screening of
headlights on the roadway. He also provided concerns about construction traffic using Island Trail North during build out of
the area.
•Tim Duyer – 8644 Irving Cir N – Agreed with Dolly. Noted concerns with security and requested fencing to buffer and
protect the residential area which will also mitigate light and noise.
Planning Commission
•The Planning Commission reviewed this request at their June 8th, 2026, meeting. The
Commission voted to recommend approval of the preliminary plat subject to the
recommended findings and conditions with an additional condition that the developer add
additional screening on the East side of Irene Ave (Vote 6-0).
•The reason for the Commission amendment was to address neighborhood comment
regarding vehicle headlight screening on the new roadways. The developer has indicated
that they will review feasibility of enhanced landscaping and screening prior to the final plat
submittal and make revisions were appliable.
• Screening improvement will become a City responsibility due to the location in the Right of
Way, a structure to achieve screening is not recommended by Staff due to long term
maintenance and the limited space available. A condition of approval regarding enhanced
landscaping has been added.
Recommendation
Staff is therefore recommending the Council approve the Preliminary Plat request
subject to the recommended conditions and findings. Example Motion:
“Move to adopt Resolution 2026-___ approving of the preliminary plat
requested by Vadnais Associates on the subject property based on the findings
of fact and recommended conditions of approval listed in the staff report.”
STAFF REPORT
DATE: 6/16/2026
REGULAR
TO: Mayor and Councilmembers
FROM: Nathan Fuerst, AICP Consulting Planner
REVIEWED BY: Jason Stopa, Community Development Director
Jack Griffin, Sr. Engineering Project Manager
AGENDA ITEM: Sketch Plan Review – Bridgewater Village Townhomes
CORE STRATEGIES:
☒ Vibrant, inclusive, connected community
☒ Responsive, transparent, adaptive governance
☒ Managed Growth
☐ Efficient, reliable, innovative services
☐ Balanced Finances now and future
☒ Resilient Infrastructure
BACKGROUND:
The City is in receipt of a Sketch Plan application from Pulte Homes, for the proposed concept plan currently
called Bridgewater Village Townhomes. The townhome development is proposed on two vacant outlots that are
part of the Bridgewater Village subdivision which is bound by Stillwater Way, Stillwater Boulevard, and Manning
Avenue. The site’s gross area includes approximately 16 acres. The submittal includes 82 attached townhomes
that are rear loaded, with primary building entrances oriented to the surrounding public streets. The project
would be connected to city water and sewer services and contain private drives internal to the site with public
utilities within in easement corridors along the drives.
In 2024, after approval of the preliminary plat for Bridgewater Village, the City changed standards for the Village
Medium Density Residential zoning district to only allow 25% of attached townhomes or similar units. As the
Bridgewater Village development was platted with an entirely attached townhome project in mind, the
Developer has requested flexibility through a Planned Unit Development to achieve the development layout
originally envisioned in the Bridgewater Village plat.
ISSUE BEFORE COUNCIL:
The City Council should provide feedback regarding the concept plan and advise Pulte Homes on City
preferences. The following discussion is suggested by staff:
Should the City allow for 100% attached townhomes and private drives through a PUD in the proposed
Bridgewater Village Townhomes concept plan?
PROPOSAL DETAILS/ANALYSIS:
A high-level review of the proposal is found in this report.
Environmental Review:
An Alternative Urban Areawide Review (AUAR) was completed for the Village area. This project does not exceed
statutory thresholds for a mandatory Environmental Assessment Worksheet. Therefore, further environmental
review is not required.
Land Use Guidance Overview:
This site is guided by both the Comprehensive Plan and Zoning Code as Village Medium Density Residential, V-
MDR, where residential land uses at the proposed density are permitted. Located within the City’s sewered
Village area, this proposed project is within the current MUSA phasing period for development.
Conformance with Density
requirements
Net Acres
Proposed
Units
Proposed
Density
Proposed Min – Max Units
V-MDR (3.01 – 8 u/a) 16.01 82 5.12 49 – 129
Section 105.12.770 (b) only permits a maximum of 25% single family attached, duplexes, and townhome/villa
housing types in new developments. A PUD will therefore requested by the Applicant to permit 100% of the
development to be attached townhomes, as originally envisioned with the Bridgewater Village development was
platted.
Lot Configuration:
This project would re-plat Outlots E and D of the Bridgewater Village final plat. The Applicant’s narrative
describes the project as an owner-occupied townhome development with an HOA for common area
maintenance. This means that the development would have platted property lines around each individual unit.
Staff have therefore reviewed for setbacks consistent with this form of development.
It should be anticipated that the private drive corridors must be platted as separate Outlots to be owned and
maintained by the Homeowner’s Association.
PUD Flexibilities Anticipated:
The following flexibilities are anticipated to standards in the V-MDR zoning district:
1. 100% attached townhomes (over 25% max).
2. Minimum Lot Area – 1210 sq ft (under 2500 sq ft min)
3. Minimum Lot Width – 22 ft (under 25 ft min)
4. Primary entrances not facing a public street (specific units)
Performance Standards:
Other than flexibilities 1-3 noted above, the proposed plans appear to comply with bulk standards listed in
section 105.12.790.
Section 105.12.820 (a)(3) contains specific standards for attached townhome units in the Village area. With the
exception of flexibility number 4, noted above, proposed plans are consistent with specific use-based standards.
Utilities:
The proposed project would be served with public utilities, with connections made to utility stubs planned with
the Bridgewater Village project. With private streets proposed, drainage and utility easement corridors will be
required over the private drives at the standard width of 65’ created with the Inwood Townhomes project.
Private utilities may not run within public utility easements and will be required to be planned with corridors
running elsewhere in the development.
Streets and Access:
As proposed, the private drives must be built and platted to the standard that the City has created for these
features. The City Engineering memo provides additional detail on this topic.
Access points where located with the Bridgewater Village development for the development of the subject
outlots (D & E). The Applicant is showing a plan that would remove one access from the east side of Linora Ave.
N. to Outlot D along with a relocated access on Upper 40th St. N. Additional coordination may be required on the
relocated access, as the public utilities run under the current access location.
Landscaping & Screening:
As proposed, the project plans indicate that the City’s tree planting requirements are met for disturbed acre and
street frontage trees. Street trees were planted along new public streets as part of the improvements in the first
phase of the Bridgewater Village Development.
At present, no street trees are found on the south side of Stillwater Way corridor abutting this site. The
development plans shall be revised to provide a continuous row of street trees along Stillwater way. Additional
coordination will likely be needed to ensure that street trees are planted outside of any drainage and utility
easements.
Christ Lutheran Cemetery
Cemeteries and other burial sites are protected under Minnesota State Statute Chapter 307. If grading activities
are to occur in close proximity to the Christ Lutheran Cemetery bordering the development site on the west, the
City may require an archaeological literature review on the likelihood that any remains are located within the
disturbance area. The City may also require archaeological observation of grading activities in close proximity to
the cemetery.
Parkland Dedication:
This development could contain 200 or more residents using Lake Elmo’s average household size. These
residents will need access to, and create a demand on, the City’s parks and trail system. Chapter 6 of the City’s
Comprehensive Plan contains guidelines on the City’s need for park land as it continues to develop. This project
is located in a search area for a community park, but is not large enough to provide land for one. Currently, the
developer is proposing no parks in the development and but is providing sufficient open space to meet City
requirements along with private amenities. Two Lake Elmo parks are just over a half mile from this site. The
Parks Commission will review this project at its regular meeting on June 15, 2026.
Entitlements Required:
Staff have reviewed the concept level plan against the adopted 2040 Comprehensive Plan and the City’s Zoning
standards. The following approvals will be required for this project to be permitted:
1. Planned Unit Development (PUD) – Provide flexibility to allow the developer to deviate from the City
Code requirements of the proposed base zoning districts, LDR & MDR.
2. Major Subdivision – Required for the purposes of necessary Right of Way and Easement dedications.
FISCAL IMPACT:
This development will connect to existing infrastructure and is planned at densities anticipated by the City.
Public and private infrastructure required to serve this project will be provided by the Applicant at their cost.
Development fees will be required with future applications.
OPTIONS:
Concept plan reviews are advisory and intended to provide nonbinding feedback to the Developer.
RECOMMENDATION:
The City Council is asked to discuss the project. A discussion question is posed on the second page of this report.
ATTACHMENTS:
• Concept Plans and Narrative
• City Engineering memo – forthcoming
• City Landscape Architect memo – 5/26/2026
1
“Building Incredible Places Where People Can Live Their Dreams.”
Bridgewater Village Townhomes
APPLICATION FOR:
Planned Unit Development (PUD) Pre Application Conference
Lake Elmo, Minnesota
May 4, 2026
Introduction
Pulte Homes of Minnesota, LLC (“Pulte”) is pleased to be submitting this application.
Our company's mission statement is “Building Incredible Places Where People Can Live Their
Dreams.” We currently operate under three distinct brands of homebuilding throughout the country:
Pulte Homes, Centex Homes, and Del Webb. The office for Pulte’s Minnesota Division is in Bloomington.
We will sell and build over 600 homes in the Twin Cities a year under the Pulte Homes and Del Webb
brands.
Pulte will act as both the property developer and the builder of the homes. The primary contact for Pulte is
Haley Daily-Sievers, Manager of Land Planning & Entitlement. Haley’s contact information has been
provided to City Staff.
There is one owner of the property:
Bridgewater Bancshares, INC
Attn. Jerry Baack
4450 Excelsior Avenue, Suite 100
St. Louis Park, MN 55416
The planner, surveyor, civil engineer, and landscape architect are:
Stantec
Attn: Patrick Sveum
733 Marquette Ave, Suite 1000
Minneapolis, MN 55402
2
The Property
Property Address:
Parcel 1: 4189 Linden Ave N, Lake Elmo, MN 55042 (Bridgewater Village, Outlot A)
Parcel 2: 4050 Linden Ave N, Lake Elmo, MN 55042(Bridgewater Village, Outlot B)
Parcel 3: 11809 Upper 40th St N Lake Elmo, MN 55042 (Bridgewater Village, Outlot C)
Parcel 4: 4136 Linden Ave N, Lake Elmo, MN 55042 (Bridgewater Village, Outlot D)
Parcel 5: 4030 Linora Ave N, Lake Elmo, MN 55042 (Bridgewater Village, Outlot E)
Key Facts
Existing Zoning Village Medium Density Residential
Guided Land Use Village Medium Density Residential
Proposed Zoning V-MDR, Planned Unit Development
Proposed Use 82 attached townhome units
Net Density Calculations:
o Gross Area 16.01 acres
o Net Area 16.01 acres
o Net Density 5.12 units/acre
Open Space Calculations:
o Total Open Space 7.23 acres (45%)
i. Private Amenity/Open Space Only 0.68 acres
ii. Open Space 3.30 acres
iii. Stormwater Basins/Ponds 3.26 acres
Dimensions/Setbacks
o Minimum lot width 22 feet
o Side yard setback to adjacent outlots 10 feet
o Front setback to public ROW 25 feet
o Building separation 20 feet
o Garage 30 feet (to back of curb)
Previous Approvals
We are proposing a new residential townhouse within the existing Bridgewater Village master
development. The Bridgewater Development is composed of commercial and future residential. During
the original approval process, the previous developer estimated a future residential unit count ranging
from 49 to 130 units. As outlined in greater detail below, our proposal includes 82 attached, rear-loaded
townhome units featuring LP siding on all four sides. We are excited to bring forward a product that aligns
with the originally anticipated density while enhancing the overall quality and character of the
development.
Proposed Land Use and Zoning
The City of Lake Elmo guides the subject parcels as Village-Medium Density Residential (V-MDR),
allowing 3.01-8 units per acre. We are proposing a rear-loaded attached townhome neighborhood with a
density of 5.12 units per net acre. Our proposed density falls within the allowed range and is at the lower
end of the range allowed by the Comprehensive Plan. The current zoning is listed as Village-Medium
Density Residential. Based on staff feedback, we propose rezoning the development to Village Medium
Density Residential - Planned Unit Development. Our requested flexibilities will be discussed in greater
detail below.
Proposed Neighborhood
We are seeking feedback on a proposed neighborhood of attached, rear-loaded townhomes within the
Bridgewater Village development. When designing our plan, we looked carefully at the City’s
Comprehensive Plan and the Lake Elmo Village Vision Study. The future community will consist of 82
3
units in 4- or 6-unit string buildings. Our proposed product is rear-loaded, with the fronts of the homes
facing public streets where possible and the garages at the back. We will discuss our product in more
detail below; however, we believe attached townhomes are a suitable fit for this area given the parcel’s
limited size, proximity to major roadways, and adjacent commercial parcels. Below is a breakdown of the
outlots and intended uses.
Outlot A – Existing Landscaping
Outlot B – Existing Stormwater Pond
Outlot C – Existing Stormwater Pond
Outlot D – Proposed Townhomes
Outlot E – Proposed Townhomes
Access and Internal Private Alleys
The outlots we propose for townhomes are part of the larger Bridgewater Village development, which has
already been built. Linora Avenue North and Upper 40th Street North already exist and connect to
Stillwater Way North and Stillwater Boulevard North. Primary access to the western residential area
(Outlot E) would come from Linora Avenue North. The eastern residential area (Outlot D) would have two
connections to Upper 40th Street North. Within the residential townhomes, we would propose 24’ private
alleys, which are allowed per the Lake Elmo Municipal Code 105.12.810 (General Site Design
Considerations; Village Districts). Since our product is rear-loaded, primary access to the homes' garages
would come from the private alleys, and the Homeowner’s Association would be responsible for
maintaining them. Additionally, by using private alleys, we can orient our townhomes to face the public
right-of-way, which we understand is an important city goal.
Parking Requirements
We realize that providing sufficient parking is a critical component of any subdivision design and
recognize the City’s preference for parallel on-street parking rather than perpendicular configurations.
Each townhome unit is designed to accommodate four parking spaces: two in the garage and two in the
driveway. With 82 proposed townhome units, this results in 328 resident parking spaces. In addition, we
are proposing 9 parallel on-street parking spaces, which satisfy the City’s requirement for providing 10%
visitor parking. In total, the development will provide 337 parking spaces, ensuring adequate parking
supply for both residents and guests.
Utilites
Utilities currently exist along Linora Avenue North and Upper 40th Street North. A concept utility plan has
been prepared for the City’s review to demonstrate potential utility connections and layout for the
proposed development. Additionally, we propose that utilities within the townhome area remain public.
We would record a Drainage and Utility Easement over areas containing public utilities, including internal
private alleys. This approach allows the City’s Public Works Department, with its expertise and familiarity
with municipal systems, to maintain and operate the infrastructure in a manner that is consistent with City
standards and long-term maintenance expectations.
Proposed Setbacks
We are proposing a 25’ setback for all buildings facing public streets, including Stillwater Way North,
Linora Avenue North, and Upper 40th Street North. We are proposing a 30’ setback from the garage to the
back of the curb. Lastly, we are also proposing a setback of 20’ between each building.
Stormwater Management
Currently, a wet detention and irrigation reuse system has been constructed on Outlot B, and an
infiltration pond has been built on Outlot C. Based on our discussions with our engineer, these ponds
have been designed to accommodate the proposed residential development up to the 50% maximum
impervious area per city code. Our proposal is to utilize the existing wet pond, reuse and infiltration basin,
which have already been constructed and designed to support our development. As the project
progresses, we will work with the required agencies to meet all stormwater requirements.
4
Impervious Surface Calculations
We have completed impervious surface calculations, and based on the outlots that we would plat, we are
at 40% impervious for the five outlots, which is under the 50% requirement. See the table below for more
details.
Landscaping
For the previous overall master development, we understand they were required to provide trees along
street frontages (1 tree per 50 ft) and 5 trees per acre of land disturbance. While these requirements have
been met throughout the development, we recognize the importance of enhanced landscaping and have
prepared a conceptual plan to supplement the original plantings. We are proposing additional trees
throughout the site to improve the streetscape and overall character of the development. Our proposed
landscaping plan includes additional screening on the west side of Outlot E as well.
We are proposing trees at various spots along Stillwater Way North, where possible. However, there are
existing constraints in this corridor, including overhead utility lines and other infrastructure. In these areas,
we are proposing tree species and placements that will allow for healthy growth while avoiding conflicts
with existing utilities. We look forward to continuing to refine the landscape plan in coordination with City
staff to ensure it meets both City expectations and long-term viability.
Open Space, Amenities & Park Fees
We would anticipate paying park dedication fees in lieu of dedicating land to the city. We are proposing a
private amenity north of the stormwater pond. The final design of the amenity area has not yet been
finalized; however, we anticipate it will be a gathering place for future residents. We would have a private
amenity, such as a fire pit, with landscaping and green space for residents to enjoy and connect. Lastly,
we exceed the 20% open space PUD requirements. Please see the calculations below and the concept
plan for more details.
Requested Flexibilities
As part of our application, we are seeking the following flexibilities -
Minimum Lot Area (square feet): The V-MDR zoning code requires a minimum lot area of 2,500
square feet per single-family attached unit. We are requesting a minimum lot area of 1,210
square feet. We understand that incorporating rear-loaded townhomes is an important goal of the
City. Our rear-loaded product is a three-story townhome that is 22’ in width. These units are
individually platted at approximately 22’ by 55’, resulting in a 1,210 square-foot lot. This reduced
lot size is necessary to support the design and functionality of a rear-loaded product, including
alley-loaded access, efficient site planning, and meet density requirements.
Minimum Lot Width: The V-MDR zoning code requires a minimum lot width of 25’ for single-family
attached units. The proposed townhome product is designed with a 22’ wide, which is necessary
to accommodate our rear-loaded townhome designs. We are requesting flexibility to allow this
5
reduced lot width to meet density requirements and to provide a product that fronts the public
right-of-way, with garages accessed from the rear.
Max 25% of the site being townhomes: The V-MDR zoning code limits townhomes to 25% of the
overall development. We are requesting flexibility from this requirement based on several site-
specific considerations:
o The property is located adjacent to major roadways and commercial uses, which
represent higher-intensity land uses. It is consistent with planning principles to transition
these areas to higher-density residential products.
o The net buildable area of the site is constrained. Outlots D and E, where the townhomes
are proposed, comprise approximately 8.08 acres. A traditional single-family detached
development would likely not efficiently utilize the site nor achieve the density anticipated
for this zoning district. Additionally, we believe the market is better suited to support
townhome products in this location than traditional single-family detached homes, given
the adjacent uses.
PUD Identified Objectives
The development meets the City’s minimum PUD requirements: it is larger than 5 acres, at least 20% of
the site is open space, which will be protected by a drainage and utility easement, and streets are
designed to maximize connectivity in each area.
We believe the following PUD objectives are met with this site plan:
1. Innovation in land development techniques that may be more suitable for a given parcel
than conventional approaches.
a. Private alleys are a unique tool and need to achieve the required density while enabling
rear-loaded townhomes. This design reduces front-facing garages, enhances the
streetscape, and supports a more pedestrian-friendly environment, while still providing
adequate and efficient circulation.
2. Promotion of integrated land uses, allowing for a mixture of residential, commercial, and
public facilities.
a. The proposed development advances an integrated land use pattern by thoughtfully
locating attached townhomes with adjacent commercial uses. This design promotes a
cohesive, walkable environment where residential and commercial functions support one
another, enhancing convenience, activity, and overall site functionality
3. Establishment of appropriate transitions between differing land uses.
a. The proposal meets required public street setbacks and enhances transitions through
additional landscaping. The inclusion of numerous trees and buffering elements softens
visual impacts, reinforces spatial separation, and creates a well-designed transition that
is compatible with adjacent uses.
4. Provision of more adequate, usable, and suitably located open space, recreational
amenities, natural resource protection and other public facilities than would otherwise be
provided under conventional land development techniques.
a. Although the parcels are limited in size, our plan provides a centrally located open space
positioned adjacent to the reuse pond, maximizing both visibility and accessibility. This
placement creates a usable and attractive amenity area.
5. Accommodation of housing of all types with convenient access to employment
opportunities and/or commercial facilities; and especially to create additional
opportunities for lifecycle housing to all income and age groups.
a. We are proposing for sale rear-loaded townhomes that support a wide range of residents.
We find that our townhome buyers include first-time buyers, singles, and empty nesters,
thereby contributing to diverse lifecycle housing opportunities. Their proximity to
commercial uses provides convenient access to services and employment, reinforcing a
connected, accessible living environment.
6. Preservation and enhancement of important environmental features through careful and
sensitive placement of buildings and facilities.
a. The proposal preserves environmental features by focusing development on previously
graded outlots, minimizing disturbance to natural resources. Building placement has been
6
thoughtfully designed to align with public streets, supporting community design
objectives.
7. Coordination of architectural styles and building forms to achieve greater compatibility
within the development and surrounding land uses.
a. The proposed development enhances architectural compatibility through thoughtfully
designed rear-loaded townhomes that orient toward public streets, creating an active and
visually engaging streetscape. Our townhomes are constructed with high-quality
materials, including LP siding on all sides. Additionally, we are proposing extensive
landscaping to supplement the master development trees and further enhance the
community and its compatibility with the surrounding land uses.
8. Creation of more efficient provision of public utilities and services, lessened demand on
transportation, and the promotion of energy resource conservation.
a. The development promotes efficient use of infrastructure by utilizing private streets
maintained by the HOA, reducing demand on City resources such as roadway
maintenance and snow removal. Additionally, on-site stormwater management will be
privately maintained, further minimizing impacts on public systems while supporting
sustainable and efficient service provision.
9. Establishing measures to protect and preserve groundwater storage.
a. Our proposal supports groundwater protection by utilizing the existing wet detention and
irrigation reuse system that has been constructed on Outlot B, and an infiltration pond
has been built on Outlot C. Per our initial review with our engineers, the existing ponds
have been built to service all the outlots within the original Bridgewater Village
development. Additionally, the proposed stormwater management system for the
Bridgewater Village development:
i. Reduces peak discharge rates and volumes to the maximum extent practicable
for all locations where discharge leaves the site for the 2-, 10- 100-year 24-hour
and 100-year 10-day snowmelt events,
ii. Provides volume reduction greater than 1.1-inches of runoff over new and
reconstructed impervious surfaces through a combination of irrigation reuse and
surface infiltration,
iii. Pretreats stormwater runoff to greater than 25-percent TSS removal prior to
infiltration,
iv. Provides greater than two feet of separation between minimum building elevation
and 100-year HWL,
v. Meets permanent pool volume requirements as defined by the NPDES permit,
and
vi. Limits discharge from the stormwater pond to less than 5.66-cfs/ac for the 1.1-
inch water quality event as defined by the NPDES permit.
10. Allowing the development to operate in concert with a redevelopment plan in certain areas
of the City and to ensure the redevelopment goals and objectives will be achieved.
a. The proposal advances the City’s redevelopment objectives by facilitating continued
buildout within the approved Bridgewater Development. It remains consistent with the
Lake Elmo Comprehensive Plan and the Lake Elmo Village Vision Study, reinforcing the
City’s long-term vision for coordinated, high-quality development.
Pulte Townhomes and Homeowners Association
Pulte Homes is known for the extraordinary steps that we take to ensure that we are designing and
building homes that meet the needs and desires of home buyers. You can visit this link to learn more
about Pulte’s homebuilding process https://www.pulte.com/design/life-tested. We continually reach out to
home buyers and Pulte homeowners to get feedback to improve our home designs. It is what we call Life
Tested®. Through this intensive process, we have conceived of and incorporated innovative features
such as the Pulte Planning Center, the Everyday Entry, Super Laundry, Oversized Pantry, and the
Owner’s Retreat. This exhaustive process has played a major part in Pulte’s success in “Building
Incredible Places Where People Can Live Their Dreams.”
7
To remain aligned with the evolving preferences of today’s homebuyers, we continually refine and update
our home designs. These revisions are informed by ongoing market feedback and the design review
process outlined above. The proposed townhome product will consist of three-story homes arranged in
buildings of four to six units each, providing architectural variety and a unique building pattern. Our
townhomes will feature LP siding on all 4-sides. Our townhomes will be for sale, and we anticipate they
will sell in the low $400,000s.
We will establish a homeowner’s association (HOA) to provide lawn care, snow removal, and exterior
building maintenance. Additionally, the HOA will be responsible for maintaining the stormwater system
onsite as well as the future maintenance of the private alleys. We have found that our townhomes appeal
to singles and first-time home-buying families. We have also found that approximately 30% of buyers of
this home are empty nesters, who purchase the units for multiple reasons. We receive feedback that they
are attracted to the HOA's lawn maintenance and snow removal services. Combined, these traits have
made our townhomes very popular among singles, first-time homebuyers, and empty nesters.
Townhomes – Home Specifications
2,175 square feet
3 bedrooms
2.5 bathrooms
2-stall garage
Three stories
LP siding on all 4 sides
Conceptual Home Elevations
Please refer to the pages following the “Summary” section for renderings of the proposed townhomes.
Energy Efficiency and Sustainability
The homes that Pulte will be constructing will have extremely high energy efficiency. Each home is tested
using the Home Energy Rating System (HERS) index, which is the industry standard for measuring
energy efficiency. Heating, cooling, and water heating constitute the largest cost of homeownership
outside of the mortgage. The U.S. Department of Energy has determined that a typical resale home
scores 130 on the HERS Index while a home built to the 2004 International Energy Conservation Code is
awarded a rating of 100 (lower is more energy efficient). Pulte Homes measures the HERS score of every
new home constructed. The average HERS score for our homes runs in the range of 47 to 53. We are
building extremely energy-efficient homes that dramatically exceed the International Energy Conservation
Code threshold.
Phasing & Schedule
Due to the site’s limited size, we will construct the project in a single phase. The City of Lake Elmo
application schedule suggests that staff review, and possible Planning Commission and City Council
consideration would occur as follows:
Preliminary plat approval summer 2026
Site development starts fall 2026
Model home opens early 2027
Complete build of homes mid to late 2029
Summary
The proposed community will consist of 82 attached, rear-loaded townhomes, which align with the City of
Lake Elmo Comprehensive Plan and the Lake Elmo Village Vision Study. We look forward to working with
city staff, Commissions, and Council as this application progresses through the review process. We
respectfully request the City’s support for this application. Thank you for your consideration.
PROPOSED WET PONDFOR IRRIGATION REUSEAREA: 1.42 ACRESBOTTOM: 916.0NWL: 926.0HWL: 931.9EOF: 934.35PROPOSED INFILTRATIONBASINAREA: 0.81 ACRESBOTTOM: 925.0NWL: 925.0HWL: 929.5EOF: 932.48933934
9339349349169169179179189189199199209209219219229229239239249249259259269269279279289289299299309309319319329329339339
3
4
9349
3
5
9
3
6
9
3
7
9
3
8
9
3
9939
937
938938
938
9
3
9
9399
4
0
940938 9389399349
3
5
934935925926927929934
9349359369379
3
8
9
3
9939
941933 9349359369
3
6
9369
3
7
937932933934934 9349359359+190+
9
3
1+002+003+004+005+006+007+008+009+0014+550+001+002+003+004+005+006
+
0
0
7+00 8+00 9+00 10+00 11+00
12+00 13+0014+008+230+00 1+00 2+00 3+00 4+005+00 6+00 7+008+00933
934
932
933
934
934 935935
936
936
93
8934934935935936936937937
9389
3
9
93
923.5'20'10'010203040506070809101112151617181920353433313029284847464543424130'22'30'1314212223242526626059585756545352512732364930'30'3
0
'30'30'25'2
0
'
2
0
'
2
5
'24'6
'30'4
'4'4
'
R
2
5807978778230'66646330'747372717630'70686730'20'24'41'4'4'3938374030'40'25'157.6'86.3'445055618165756915.3'26.9'24'30'5'5'22'24'12'24'8'22'146.6'162'R25'R
2
5
'31'28.3'20'20'24'26.9'22'24'11.6'5'5'9.6'11.6'6
.
1
'26'10'34.5'8'8'8'2
0
.
5
'26.3'09080743.4'2
4
'062
0
'
5
'0203040524'22'8'5
1
.
5
'
R2
530'30'24'26.9'6'25'35.6'22'8'2
4
'22'8
'24'12'1
2
'12'5.7'01INV=928.26 (311LF @1%)INV=929.75 (823LF @1%)25'STILLWATER BOULEVARD NSTILLWATER
BOULEVARD N
S
T
I
L
LW
A
T
E
R
W
A
Y
NO
R
T
HUPPER 40TH ST NLINORA AVE N
LINDEN AVE N 17'2
5
'25'10'10'25'25'1
3
.
3
'10'2
5
'INV=925.1540LF 8" PVC @ 0.52% FROM INV=924.94PER 12/17/25 RECORD DRAWINGSINV=921.5137LF 8" PVC @ 2.00% FROM INV=920.77PER 12/17/25 RECORD DRAWINGSC-101CONCEPT PUD PLANDWN BY:ISSUE DATE:PROJECT NO.:\\US0291-PPFSS01\workgroup\1938\business_development\Pursuit_Folders_LDev\Pulte Group\2025 Lake Elmo - Bridgewater Village\2026-0420 Bridgewater Village Lake Elmo Impervious(10).dwg 5/4/2026 SVEUM, PATRICK
DESCRIPTION:DATE:ISSUE NO.:ISSUE NO.:SHEET NO.:SHEET TITLE:CLIENT:PROJECT TITLE:CHK'D BY:APP'D BY:CERTIFICATION:BRIDGEWATER_VILLAGE
LAKE_ELMO_MN_WASHINGTON_COUNTY
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N 733 MARQUETTE AVENUE 1000MINNEAPOLIS, MN 55402PHONE: 612-712-2000WWW.STANTEC.COMDATE:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.LICENSE NO.:04/20/2026( IN FEET )GRAPHIC SCALE01 inch = 40 ft.4080401650 WEST 82ND STREET, SUITE 300BLOOMINGTON, MN 5543114/20/2026 CONCEPT_PUD_PLAN
►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►
►
►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►PROPOSED WET PONDFOR IRRIGATION REUSEAREA: 1.42 ACRESBOTTOM: 916.0NWL: 926.0HWL: 931.9EOF: 934.35PROPOSED INFILTRATIONBASINAREA: 0.81 ACRESBOTTOM: 925.0NWL: 925.0HWL: 929.5EOF: 932.48UEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEU
E
U
E
U
E
U
E►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►IIIIIII I I I IIIIIIIIIIIIIII I I I I
I
I
II I I I
IIIIIII
IIIIIIIIIIIIIIIIIIIIIII I I I I I IIIIIIIIIIIIIIIIIIIIIIIIII
I
I
I I I I I I
I
IIIII
IIIIIIIIIII933934
9339349349209209259259309309
3
5
9169169179179189189199199219219229229239239249249269269279279289289299299319319329329339339
3
4
9349
3
6
9
3
7
9
3
8
9
3
9939
937
938938
9
4
0
940938
9
3
9
939938 9389399349
3
5
934935925926927929935934
9349369379
3
8
9
3
9
939
941935933 9349369
3
6
9369
3
7
937935935932933934934 934933
934
935935
932
933
934
934
936
936
93
8935935934934
936936937937
9389
3
9
93
901020304050607080910111215161718192035343331302928484746454342411314212223242526626059585756545352512732364930'30'8079787782666463747372717670686720'393837404450556181657569090807060203040501FUTURE AMENITY SPACESTILLWATER BOULEVARD NSTILLWATER
BOULEVARD N
S
T
I
L
LW
A
T
E
R
W
A
Y
NO
R
T
HUPPER 40TH ST NLINORA AVE N
LINDEN AVE N SYMBOLCODECOMMON NAMEEVERGREEN TREESPDBLACK HILLS SPRUCEPS2WHITE PINEPGWHITE SPRUCEOVERSTORY TREESTBBOULEVARD AMERICAN LINDENGDKENTUCKY COFFEETREEANNORTHWOOD RED MAPLEUPPRAIRIE EXPEDITION ELMPTQUAKING ASPENQRRED OAKBRRIVER BIRCHASSIENNA GLEN MAPLEQBSWAMP WHITE OAKUNDERSTORY TREESAS2AUTUMN BRILLIANCE SERVICEBERRYSSCOPPER CURLS PEKING LILACSIIVORY SILK JAPANESE TREE LILACGROUND COVERSLMBLOW MAINTENANCE TURFL-101PRELIMINARYLANDSCAPE PLANDWN BY:ISSUE DATE:PROJECT NO.:V:\1938\business_development\Pursuit_Folders_LDev\Pulte Group\2025 Lake Elmo - Bridgewater Village\2026-0420 Bridgewater Village Lake Elmo L-100 LANDSCAPE PLAN.dwg 4/22/2026 FLICKER, MARK
DESCRIPTION:DATE:ISSUE NO.:ISSUE NO.:SHEET NO.:SHEET TITLE:CLIENT:PROJECT TITLE:CHK'D BY:APP'D BY:CERTIFICATION:BRIDGEWATER_VILLAGE
LAKE_ELMO_MN_WASHINGTON_COUNTY 733 MARQUETTE AVENUE 1000MINNEAPOLIS, MN 55402PHONE: 612-712-2000WWW.STANTEC.COMDATE:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.LICENSE NO.:04/20/2026( IN FEET )GRAPHIC SCALE01 inch = 40 ft.4080401650 WEST 82ND STREET, SUITE 300BLOOMINGTON, MN 5543114/20/2026 CONCEPT_PUD_PLAN PLANT PALETTEDATE:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY LICENSED LANDSCAPEARCHITECT UNDER THE LAWS OF THESTATE OF MINNESOTA.LICENSE NO.:04/20/2026N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
NPROPOSED TREE PER MASTERDEVELOPMENT PLAN, TYP.1.TREE LOCATIONS1.1.MINIMUM 5' FROM BACK OF CURB OR EDGE OF SIDEWALK.1.2.MINIMUM 10' FROM UTILITIES.1.3.(5) TREES FOR EVERY (1) ACRE OF LAND DISTURBED1.3.1.8.07 ACRES DISTURBED1.3.1.1.TREES REQUIRED: 411.3.1.2.TREES PROPOSED: 411.4.MIN. ONE (1) TREE PER EVERY FIFTY (50) FEET STREET FRONTAGE: 908 LF1.4.1.STREET FRONTAGE TREES REQUIRED: 201.4.2.STREET FRONTAGE TREES PROPOSED: 20MUNICIPAL LANDSCAPE REQUIREMENTSFIRE PIT
►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►
►
►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►PROPOSED WET PONDFOR IRRIGATION REUSEAREA: 1.42 ACRESBOTTOM: 916.0NWL: 926.0HWL: 931.9EOF: 934.35PROPOSED INFILTRATIONBASINAREA: 0.81 ACRESBOTTOM: 925.0NWL: 925.0HWL: 929.5EOF: 932.48UEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEU
E
U
E
U
E
►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►IIIIIII I I I IIIIIIIIIIIIIII I I I I
I
I
II I
I
I
IIIIIII
IIIIIIIIIIIIIIIIIIIIIII I I I I I IIIIIIIIIIIIIIIIIIIIIIIIII
I
I
I I I I I I
I
IIIII
IIIIIIIIIII933934
9339349349169169179179189189199199209209219219229229239239249249259259269269279279289289299299309309319319329329339339
3
4
9349
3
5
9
3
6
9
3
7
9
3
8
9
3
9939
937
938938
938
9
3
9
9399
4
0
940938 9389399349
3
5
934935925926927929934
9349359369379
3
8
9
3
9939
941933 9349359369
3
6
9369
3
7
937932933934934 9349359359+190+
9
3
1+002+003+004+005+006+007+008+009+0014+550+001+002+003+004+005+006
+
0
0
7+00 8+00 9+00 10+00 11+00
12+00 13+0014+008+230+00 1+00 2+00 3+00 4+005+00 6+00 7+008+00933
934
932
933
934
934 935935
936
93615" RCP15" RCP24" RCP36" RCP
18" RCP18" RCP18" RCP42" RCP42" RCP24" RCP30" RCP30" RCP18" RCP24" RCP30" RCP18" RCP18" RCP18" RCP18" RCP1
8
"
R
C
P
24" RCP
18"
R
C
P 15" RCP42" RCP42" RCP15" RCP21" RCP15" RCP15" RCP15" RCP36" RCP15" RCP18" RCP15" RCP15" RCP18" RCP 15" RCP15" RCP15" RCP15" RCP15" RCP24" RCP1
5
"
RCP
21" RCP
12" RCP12" RCP12" RCP18" RCP24" RCP24" RCP24" RCP24" RCP
15" RCP15" RCP15" RCP15" RCP15" RCP15" RCP15" RCP15"
RCP
93
8934934935935936936937937
9389
3
9
93
9CBMH-123CBMH-122CBMH-121CBMH-152CBMH-151CBMH-120STMH-169CBMH-167CBMH-149CBMH-119CBMH-124CBMH-118CBMH-159TEMP CBMH-168STMH-156CBMH-117STMH-138STMH-131STMH-132CBMH-128STMH-125CBMH-165CBMH-150CBMH-127STMH-104CBMH-158CBMH-107CBMH-110FES-16612" INV=932.61STMH-139STMH-133CBMH-105CBMH-106CBMH-103CBMH-112STMH-171CBMH-170STMH-143CBMH-101CBMH-102CBMH-108STMH-135CBMH-109CBMH-148TEMP CBMH-114CBMH-111CBMH-157CBMH-129STMH-137STMH-136CBMH-174FES-18015" INV=929.24STMH-141FES-10042" INV=926.00CBMH-173FES-18215" INV=928.32FES-14415" INV=928.00FES-11530" INV=926.00FES-11324" INV=926.00FES-14215" INV=925.00FES-130FES-17118" INV=925.00FES-17215" INV=925.00FES-13418" INV=923.50FES-14018" INV=923.50CBMH-116CBMH-153CBMH-17501020304050607080910111215161718192035343331302928484746454342411314212223242526626059585756545352512732364980797877826664637473727176706867393837404450556181657569090807060203040501►►►►►►►►
I I I I I I I I I I I
I►►►►►►►►►►►I►I►IIIIII►I►II►I►II►I►II►I►II►I►II►I►II►II►II►II►II►II►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►IIIIII I I I I I I I I IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII►I►I►I►I►II►II►II►II►II►II►II►I►I►I►I►I►I►II►I
►►►►I
►I
►I
►I
►I
►II►I►►►►►►►►►►►►►►►►►►►►►►IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII►II►II►II►II►II►II►IIII
I ►I►I►I►I►ISSWR MH-07SSWR MH-01INV=928.26 (311LF @1%)INV=929.75 (823LF @1%)STILLWATER BOULEVARD NSTILLWATER
BOULEVARD N
S
T
I
L
LW
A
T
E
R
W
A
Y
NO
R
T
HUPPER 40TH ST NLINORA AVE N
LINDEN AVE NINV=925.1540LF 8" PVC @ 0.52% FROM INV=924.94PER 12/17/25 RECORD DRAWINGSINV=921.5137LF 8" PVC @ 2.00% FROM INV=920.77PER 12/17/25 RECORD DRAWINGSC-101CONCEPT PUD PLANDWN BY:ISSUE DATE:PROJECT NO.:\\US0291-PPFSS01\workgroup\1938\business_development\Pursuit_Folders_LDev\Pulte Group\2025 Lake Elmo - Bridgewater Village\2026-0420 Bridgewater Village Lake Elmo Impervious(10).dwg 4/22/2026 SVEUM, PATRICK
DESCRIPTION:DATE:ISSUE NO.:ISSUE NO.:SHEET NO.:SHEET TITLE:4/22/2026 11:32:54 AM
CLIENT:PROJECT TITLE:CHK'D BY:APP'D BY:CERTIFICATION:BRIDGEWATER_VILLAGE
LAKE_ELMO_MN_WASHINGTON_COUNTY
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N 733 MARQUETTE AVENUE 1000MINNEAPOLIS, MN 55402PHONE: 612-712-2000WWW.STANTEC.COMDATE:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.LICENSE NO.:04/20/2026( IN FEET )GRAPHIC SCALE01 inch = 40 ft.4080401650 WEST 82ND STREET, SUITE 300BLOOMINGTON, MN 5543114/20/2026 CONCEPT_PUD_PLAN
WE BUILD CONSUMER INSPIRED HOMES AND COMMUNITIES TO MAKE LIVES BETTER.
PROPOSED TOWNHOMES
*Subject to change based on market conditions*
WE BUILD CONSUMER INSPIRED HOMES AND COMMUNITIES TO MAKE LIVES BETTER.
PROPOSED TOWNHOMES
*Subject to change based on market conditions*
Memorandum
800 Washington Avenue North, Suite 207
Minneapolis, MN 55401
May 26, 2026
TO : SOPHIA JENSEN
FROM: SARAH EVENSON, PLA
RE: BRIDGEWATER VILLAGE TOWNHOMES LANDSCAPE PLAN REVIEW
SUBMITTALS
1. Bridgewater Village Townho mes Concept Plan and PUD dated 4/21/26, received 5/6/26.
REVIEW HISTORY
1. Bridgewater Village Townhomes Concept Landscape Plan Review 5/26/2025
LOCATION: West of Manning Avenue N, south of Stillwater Way N, north Stillwater Blvd N. Outlots A, B,
C, D, and E of Bridgewater Village.
CURRENT ZONING: V-MDR
ADJACENT ZONING: Commercial to the east, Public Facilities to the west, V-MDR/Commercial to the
south, OP-PUD and Rural Residential to the north
SPECIAL LANDSCAPE PROVISIONS: none
TREE PRESERVATION PLAN: 105. 12. 470
Tree preservation was addressed as part of the Bridgewater Village project.
LANDSCAPE PLAN: 105.12.480
The landscape plan for Bridgewater Village Townhomes proposes adding 41 trees to account for the 8.07 acres
disturbed as a part of this development, along with 20 trees to meet the requirement of 1 tree for every 50’ of
their 908 linear feet of street frontage. These quantities meet the code’s landscape requirements.
• The landscape plan will need to be revised to meet other code requirements, including, but not
limited to:
o Adding a plant schedule that includes the size, quantity, and species of all proposed plant
materials
o Showing the location of a topsoil stockpile and notes indicating that the quantity of soil shall be
sufficient to cover all landscaped areas at least 4” deep
o Confirming per 105.12.480 (b) (7) that trees shall be planted ten feet away from utilities including
water and sewer stubs
o Ensuring that the quantities of evergreen, deciduous and ornamental trees meet sitewide tree
composition requirements (at least 25% of all trees are deciduous and at least 25% are evergreen
trees, and no more than 15% are ornamental trees)
May 26th, 2026
Bridgewater Village Townhomes
Memorandum 2
RECOMMENDATION:
The landscape plan must be revised and resubmitted based on the above comments.
Sarah Evenson, PLA (MN)
City of Lake Elmo Municipal Landscape Architect
P: (262) 391-7653 E: sarah@hkgi.com
Bridgewater Village Townhomes
Concept Plan Review
City Council | June 16, 2026
Overview
Overview
Three Parcels – PIDs :
•12.029.21.44.0033 &
•12.029.21.44.0034
Total Acreage
•16 .0 1 a c re s
•No Wetlands
Exis ting Land Us e – vacant
Requests:
•Concept Plan Review
•8 2 units (s ingle family attac he d)
Issue for Council
Should the City consider PUD flexibility for a development with 100% attached single family
residential in the Village Medium Density Residential area?
Anticipated PUD Flexibilities:
1.100% attached townhomes (over 25% max)
2.Minimum Lot Area – 1210 sq ft (under 2500 sq ft min)
3.Minimum Lot Width – 22 ft (under 25 ft min)
4.Primary entrances not facing a public street (specific units)
Land Use Analysis
Future Land Use Zoning
Bridgewater Village “ghost plat”
Performance Standards
Primary entrance on
public street
500 sq ft. open space per
unit
Parking not permitted in
front yard
Front loaded garages not
permitted
Utilities, Roads, Access
Public Utilities
Private Roads – 6 5 ’ Utility
Easement Corridors
One removed access
point
One relocated access
point
Landscaping and Screening
Existing Landscaping on
public streets
Street Trees to be required
along Stillwater Way
Cemetery Regulations
MN Chapter 307
•Regulatory protection of all private
burial s ite s / re mains
Cons ide rations :
•Literature review – cemetery
boundaries
•On site grading observation
Parkland Dedication
Parks Commission Review 6/15
•Recommendation for Cash in Lieu
Cons ide rations :
•Project will create a demand on
parks and trail system
•Two parks just over .5 miles away
with access to trails
•On site open space and private
ame nitie s
Key Considerations
Discussion is advisory, non-binding feedback is provided to developer.
Should the City consider PUD flexibility for a development with 100% attached single family
residential in the Village Medium Density Residential area?
Anticipated PUD Flexibilities:
1.100% attached townhomes (over 25% max)
2.Minimum Lot Area – 1210 sq ft (under 2500 sq ft min)
3.Minimum Lot Width – 22 ft (under 25 ft min)
4.Primary entrances not facing a public street (specific units
QUESTIONS?
STAFF REPORT
DATE: 6/16/2026
Regular
TO: Lake Elmo City Council
FROM: Nathan Fuerst, Consulting City Planner
Jason Stopa, Community Development Director
REVIEWED BY: Sophia Jensen, Senior City Planner
AGENDA ITEM: 2040 Comprehensive Plan Update for Community Forecasts
CORE STRATEGIES:
☐ Vibrant, inclusive, connected community
☒ Responsive, transparent, adaptive governance
☒ Managed Growth
☐ Efficient, reliable, innovative services
☐ Balanced Finances now and future
☐ Resilient Infrastructure
BACKGROUND:
The Met Council releases system statements containing community forecasts based on regional population
models. After release, communities have 60 days to appeal. Historically, Met Council staff have been willing to
work with communities to amend population forecasts periodically, including outside of the comprehensive
planning process, where there may be inconsistencies between the regional population model and local
realities.
The White Bear Lake lawsuit has caused the Met Council to take a new position on water that was not
understood during the review period for system statements. In a White Bear Lake Methodology Memo (“WBL
Memo”) the Met Council states that it will effectively cap population forecasts based on availability of water.
This has complicated the City’s review and would have likely resulted in a different determination on how to
proceed regarding its system statement.
Staff are proposing a Comprehensive Plan Amendment that will create realistic household and population
forecasts for the upcoming 2050 Comprehensive Plan Update. To do this, the City must modify the 2040
Comprehensive Plan household and population forecasts.
ISSUE BEFORE COUNCIL:
How should the City Council proceed with the Comprehensive Plan Amendments proposed by Staff?
DETAILS/ANALYSIS:
Timeline
In September 22, 2025, system statements were released and communities began to review. Lake Elmo staff
reviewed the system statements and identified that the population estimate seemed low based on current
development trends.
On October 24, 2025, Lake Elmo staff sought a meeting with Met Council staff to discuss the implications.
Several questions were sent to the Met Council in anticipation of meeting:
What data sources/trends informed the population and household estimates?
What happens if development exceeds forecasted growth?
On October 28, 2025, City planning staff and the Met Council sector representative to discuss these questions.
Regional trends were cited as the primary driver for the downward change in population forecasts. Generally,
the feedback was that the Met Council is open to periodic forecast adjustments provided there was rationale
supporting a change. Small adjustments can be made administratively, while larger adjustments need to be
approved by the Met Council. Given ability of the Met Council to amend the forecasts, it was communicated that
the City is not “punished’ or limited in growth if population growth exceeds forecasts.
On October 29, 2025, additional follow-up information was provided based on the questions asked to the Met
Council. While considerable information was provided on methodology for regional and local forecasts, water
systems, water appropriation, or the WBL Memo methodology were not communicated. It was also noted that
forecast adjustments could be adjusted unless projected growth outstripped the transportation and wastewater
systems serving a community. Water systems were not mentioned.
November 21, 2025, the appeals period for the 2025 system statements expired. Prior to this, and based on the
communications above, staff determined that an appeal to the forecast found in the system statement would
not be necessary. Given the ability to periodically and collaboratively make adjustments, it was concluded that
the population could be increased as the City moved through the Comprehensive Planning process when it
would have a better idea about needs for forecast adjustments.
January 15, 2026, the City of Lake Elmo received the WBL Memo dated October 22, 2025 from City of Hugo staff.
This memo, nor any indication of the methodology and position on system statements within, had not been
provided in any correspondence prior from the Met Council in the period between the system statements being
released and the expiration of the appeal period. At this time, and due to the implications of the Met Council’s
policy position, staff began to take considerable efforts to understand what options the City has moving
forward.
February 19, 2025, the City of Lake Elmo staff met with Met Council Principal Forecaster and sector
representative to discuss population forecasts and options the City has. Prior to this meeting, staff compiled
data on development projections and permitting history which support a higher population forecast. Met
Council staff agreed to an interim adjustment of Lake Elmo’s population forecast.
March 6, 2026, City of Lake Elmo staff received an email from the Senior Manager of Local Planning Assistance
with the option for the City of Lake Elmo would be to adjust its 2030 and 2040 decade forecasts as follows:
Raise the 2030 forecast to 7,200 households @ 2.66 average household size = 19,200 pop. Of this
number, 2,472 households unsewered and the remainder sewer-serviced.
Adjust the 2040 forecast to 8,250 households @ 2.59 average household size = 21,400 pop. Of this
number, 2,200 households unsewered and the remainder sewer-serviced.
The Met Council has not changed its position on increasing population estimates until June 2027, after which,
the White Bear Lake working group is expected to have identified a solution and timeline to resolve issues of
water availability in the White Bear Lake Area.
White Bear Lake Memo (WBL Memo)
Attached to this report is the Forecast Methodology for the White Bear Lake Area Communities (WBL Memo)
which documents the methodology and policy position of the Met Council. Generally, the WBL Memo can be
summarized as follows:
Summary of overall methodology used in regional/local population forecasts.
Reference to legislatively directed White Bear Lake Comprehensive Plan Group – deadline of June 30,
2027 for completion of a long term plan with supporting analysis, to convert some or all wells to surface
water.
Policy positions:
o “Until the White Bear Lake Area Work Group concludes and there is an identified response to
legislative direction and judicial decisions, the Met Council determined it prudent to withhold its
consent of additional growth in local jurisdictions affected by the White Bear Lake Area Court
decision until the Council is assured additional growth does not conflict with Court orders that
cities must abide.”
o “as it relates to requesting an upward adjustment to forecasts for growth in this area prior to
completion of the White Bear Lake Area Comprehensive Plan being prepared with assistance
from the legislatively identified Work Group Members and modification of the court order,
communities should be aware that the Council will only consider forecast adjustments in the
future, not during System Statements review. If a request is made, it may only be considered
after modification of the court order, a change in local conditions, or a solution to water supply
constraints are determined and implemented.”
The Bottom Line for Lake Elmo
The Met Council refuses to allow for a higher population projection than the City’s 2040 plan provides, but has
agreed that the September 2025 forecasts are low. The City has the option from the Met Council to use the
numbers from its Thrive 2040 plan, ending at a total of 21,400 by 2040. For the time being, the City may need to
work with the following projections by decade:
2030: 19,200 (7,200 households @ 2.66 average household size)
2040: 21,400 (8,250 households @ 2.59 average household size)
2050: (to be informally proposed by Met Council based on growth trends above)
From the Met Council’s Senior Manager of Local Planning Assistance, Angela Torres: “We routinely have staff-to-
staff agreements on forecast adjustments during development of the decennial Plan updates and we are willing
to discuss an expanded 2050 forecast in mid-2027 after the White Bear Lake Area Comprehensive Plan Work
Group concludes. At that point, we’d know more about everyone’s comfort (neighboring cities, DNR, etc.) and
local systems preparedness. Until then, Met Council will limit forecast increases as described in "Forecast
Methodology for the White Bear Lake Area Communities.”
Amending the 2040 Plan:
The above communication from Angela Torres, Senior Manager of Local Planning Assistance with the Met
Council, states that for the City to utilize the population forecast numbers from its 2040 Plan a comprehensive
plan amendment is necessary. However, the Met Council has not agreed to use the numbers found in the
adopted plan with modifications identified based primarily on fluctuations in average household size in the
region.
The Following comparison articulates the differences between what is in the current 2040 Plan and how it would
be amended:
Adopted vs Amended 2040
Plan Forecasts
2030 (as amended with average
household size of 2.66 instead of 2.77)
2040 (as amended with average
household size of 2.59 instead of 2.72)
Households Unsewered 2642 (2472)2742 (2200)
Households MUSA 3858 (4728)5458 (6050)
Total Households 6500 (7200)8200 (8250)
Total Population 18,005 (19,200)22,304 (21,400)
Employment Unsewered 562 562
Employment MUSA 2788 3238
Total Employment 3350 3800
Unsewered Households
Staff have requested clarification from the Met Council’s staff on why the projected unsewered household
numbers were projected to decrease. The City has approved several rural (unswered) developments since
adoption of the 2040 plan. Therefore, it is likely that the number has either stayed the same (if failed septic
systems are taken int account) or increased.
Supporting Data - Staff generated population projection
The table below represents a population projection generated by staff based on approved and known
development projects, the adopted 2040 Comprehensive Plan’s future land use guidance, and MUSA staging
plan. The table uses a conservative estimate of average household size, 2.5 residents per household.
Year 2026 2030 2035 2040
Cumulative Building Starts*962 2359 2555 3059
Population 15127 18952 20689 22027
2025 System Statement
Population
n/a 15200 n/a 16900
Adjusted Forecasts n/a 19,200 n/a 21,400
* This means the number of building permits issued from 2024 to 2026, 2030, 2035, and 2040.
Supporting Data – 10 Year Permitting History
The table below represents permitting history for detached and attached residential units. On average, the City
has issued permits for 171 detached single family homes alone per year over the last decade. Assuming a
conservative average household size of 2.5 residents per unit, this would mean a yearly population gain of 428
residents on average every year.
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Detached 41 120 200 265 244 244 265 236 105 91 84 157
Attached 0 20 51 34 28 6 44 61 95 75 0 47
Total 41 140 251 299 272 250 309 297 200 166 84 204
Next Steps
Staff find that the adjusted numbers are reasonable given that there is an expected net increase in households
but a reduction in population through 2040 given the regionwide trend of reduced household size. The above
amended forecast is both generally consistent with the adopted 2040 plan and would be accepted by the Met
Council as it does not represent additional growth which would not be supported by the Met Council’s WBL
Memo policy. Staff are therefore supportive of, and recommend the amendment to the 2040 plan. This would
provide a reasonable starting point for Comprehensive Planning effort that is now underway and allow further
discussions with the Met Council in 2027 or beyond following conclusion of the WBL Area Work Group study.
The Process to amend the City’s 2040 plan generally includes the following steps and timeline.
1.In progress - City Notices a self-initiated comprehensive plan amendment
2.6/8/26 - Planning Commission review and Public Hearing
3.6/16/26 - City Council Review and Determination
4.~1-2 weeks after approval - Approved Amendment Submitted to Met Council for Review and
Approval
a.Note – At the time of writing, staff are confirming with the Met Council whether an
affected and adjacent jurisdiction notice is required. If so, this could cause a delay in the
submittal to Met Council for review/approval
5.~60 days from submittal - Met Council review and approval memo received by City.
OPTIONS:
1.Approve the amendments as proposed by staff in conjunction with the Met Council. The City
can work through the 2050 Comprehensive Planning Process using the realistic forecasts for
2030 and 2040 provided by the Met Council staff in March.
2.Recommend denial of the amendments. This is not recommended as it will place the City in an
unfavorable position with respect to constraints of artificially lowered and unreasonable
population projections.
PUBLIC HEARING:
A public hearing was published in the City’s official paper, the Stillwater Gazette, on May 22nd 2026. The duly
noticed public hearing was held at the Planning Commission’s regular meeting on June 8, 2026. Since the
meeting will be held after the publication of this report, staff will verbally convey a summary of public
comments to the City Council. At the time of writing this report, no public comments have been received.
RECOMMENDATION:
Staff recommend that the City Council approve the Comprehensive Plan Amendments. These amendments will
allow for the City to continue a general development trend that is predictable for current landowners, City staff
and consultants, and the development community.
Example Motion:
“Move to adopt Resolution 2026-043 approving the amendments proposed to the forecasts found in the Lake
Elmo 2040 Comprehensive Plan with the findings and conditions therein.”
ATTACHMENTS:
Draft Resolution 2026-043 Approving Comprehensive Plan Amendment
Forecast Methodology for the White Bear Lake Area Communities (WBL Memo)
LA515-137-923090.v2
CITY OF LAKE ELMO
WASHINGTON COUNTY
STATE OF MINNESOTA
RESOLUTION NO. 2026-043
RESOLUTION APPROVING AN AMENDMENT TO THE CITY OF LAKE ELMO 2040
COMPREHENSIVE PLAN.
WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing
under the laws of the State of Minnesota; and
WHEREAS, the City of Lake Elmo has established a Comprehensive Plan that includes
background data, policy statements, standards, and maps that help to guide the future physical,
social, and economic development of the City; and
WHEREAS, the Metropolitan Council establishes population forecasts for the purpose of
coordinated regional planning, which may be modified from time to time based on community
needs and market pressures; and
WHEREAS, the City of Lake Elmo has initiated an amendment to its adopted 2040
Comprehensive Plan Table 1-7 to align its expectations for population growth with those of the
Metropolitan Council; and
WHEREAS, the Comprehensive Plan amendment will amend the residential household
and population forecasts found in Table 1-7 of the 2040 Comprehensive Plan as established in the
City Staff report to the Lake Elmo City Council dated June 16, 2026, appended as Exhibit A to
this Resolution; and
WHEREAS, approval of an amendment to the Comprehensive Plan is required in order
for the City of Lake Elmo’s population and household growth trends to be accepted by the
Metropolitan Council for the 2050 Comprehensive Plan Update; and
WHEREAS, the public hearing notice was published and posted pursuant to the Lake
Elmo Zoning Ordinance, City Code Section 105.12.250, and Minnesota Statutes Section 462.355;
and
WHEREAS, the Lake Elmo Planning Commission held a public hearing on the proposed
Comprehensive Plan amendment on June 8, 2026; and
WHEREAS, the Lake Elmo Planning Commission has submitted its report and
recommendation of approval to the City Council as part of a staff report dated June 16, 2026; and
WHEREAS, the City Council considered the Comprehensive Plan amendment at its June
16, 2026, meeting and made the following findings of fact:
LA515-137-923090.v2
1.The City has initiated an amendment in accordance with the procedures established by the
Lake Elmo Planning Department and the Lake Elmo Planning Commission; and
2.That the request is to amend the Table 1-7, of the 2040 Comprehensive Plan; and
3.That the proposed amendment is consistent with the overall goals and objectives of the
Lake Elmo Comprehensive Plan.
NOW, THEREFORE, BE IT RESOLVED THAT the City Council does hereby approve the
comprehensive plan amendment subject to the following condition:
1.Submission of the Comprehensive Plan amendment to the Metropolitan Council and the
receipt of formal notification from the Metropolitan Council that it has reviewed and
approved the proposed amendment.
This resolution was adopted by the City Council of the City of Lake Elmo on this 16th day of June,
2026.
_____________________________
Charles Cadenhead, Mayor
ATTEST:
___________________________
Julie Johnson, City Clerk
LA515-137-923090.v2
Resolution 2026-____
Exhibit A
Revised Table 1-7, Lake Elmo 2040 Comprehensive Plan
Adopted vs Amended
2040 Plan Forecasts
2030 (as amended with average
household size of 2.66 instead of 2.77)
2040 (as amended with average
household size of 2.59 instead of 2.72)
Households
Unsewered
2642 (2472)2742 (2200)
Households MUSA 3858 (4728)5458 (6050)
Total Households 6500 (7200)8200 (8250)
Total Population 18,005 (19,200)22,304 (21,400)
Employment
Unsewered
562 562
Employment MUSA 2788 3238
Total Employment 3350 3800
FORECAST METHODOLOGY FOR THE WHITE BEAR LAKE AREA
COMMUNITIES
LOCAL
PLANNING HANDBOOK
BACKGROUND
As directed by state law, the Met Council develops forecasts of when, where, and how much population, household,
and job growth the seven-county region and local jurisdictions can expect over a 30-year horizon. These long-range
forecasts provide a shared foundation for coordinated comprehensive planning. The forecasts describe likely and reasoned
expectations of regional growth based on an understanding and modeling of regional dynamics. Regional total results were
published in April 2023.
Met Council’s local forecasting involves the geographic allocation of regional employment and households totals to specifc
places. Met Council uses the local forecasts as a basis and benchmark for regional systems planning and deployment (MN
Statutes 473.146); the local forecasts are our commitment to serve the forecasted population levels with transportation plans
and wastewater capacity. While the Met Council does not provide or guarantee water supply, water supply limitations are a
consideration in forecasts. Imagine 2050’s local forecasts were formally adopted by the Metropolitan Council on February 12,
2025.
The Met Council uses UrbanSim, a real estate market simulation model, to project the geographic pattern of expected future
growth and allocate the regional totals to locations. UrbanSim’s methodology is online, here. The model is provided a large
collection of neighborhood-level data for every location in the 7-county metro region; all of these locations are in competition
with one another to attract shares of the metro region total.
The main determinants of local forecasts are real estate dynamics, location characteristics and amenities, activity patterns
and accessibility (travel within the region). However, as part of forecast development, the Met Council may make manual
adjustments to the model outputs based on known issues as well as policy direction. This is the case with the White Bear
Lake Area communities impacted by court decisions.
Additionally, demographic trends through the region also indicate deceleration, as migration to the region has declined, birth
rates have fallen, and death rates have stabilized. These factors contributed to a downward adjustment of approximately
100,000 persons in the regional population forecast. Because each community’s forecast is a share of the regional total, a
reduction at the regional level results in corresponding decreases in local level projections.
WHITE BEAR LAKE
The Minnesota legislature directed the Met Council to “develop a comprehensive plan to ensure communities in the
White Bear Lake area have access to suffcient safe drinking water to allow for municipal growth while simultaneously
ensuring the sustainability of surface water and groundwater resources to supply the needs of future generations.” This
included establishing a White Bear Lake Comprehensive Plan Group, inclusive of 14 local governments and other named
stakeholders. This comprehensive plan was directed to be completed by June 30, 2027. This work is underway.
The Council is statutorily directed to plan for the orderly and economical development of the region. In this role, the
Council must act responsibly to ensure that adequate public services are available to accommodate forecasted growth.
Until the White Bear Lake Area Work Group concludes and there is an identifed response to legislative direction and
judicial decisions, the Met Council determined it prudent to withhold its consent of additional growth in local jurisdictions
affected by the White Bear Lake Area Court decision until the Council is assured additional growth does not confict with
Court orders that cities must abide.
1
2050 PLAN UPDATES
The 2050 local comprehensive planning process was formally initiated when system statements, including local
forecasts, were distributed to communities on September 22, 2025. Per statute, communities have the opportunity
to dispute their forecasts and work with Council staff to make adjustments. Any jurisdiction impacted by this
methodology and the court decision may still do that in accordance with state statutes. However, as it relates to
requesting an upward adjustment to forecasts for growth in this area prior to completion of the White Bear Lake
Area Comprehensive Plan being prepared with assistance from the legislatively identifed Work Group Members and
modifcation of the court order, communities should be aware that the Council will only consider forecast adjustments
in the future, not during System Statements review. If a request is made, it may only be considered after modifcation
of the court order, a change in local conditions, or a solution to water supply constraints are determined and
implemented.
Council staff and Sector Representatives are available to assist local governments as they prepare for their 2050
planning process. If a deeper discussion about forecast methodology is desired, contact Todd Graham, Principal
Forecaster at Todd.Graham@metc.state.mn.us.
October 22, 2025
Todd Graham, Principal Forecaster
Angela R Torres, Senior Manager, Local
Planning Assistance
LOCAL
PLANNING
HANDBOOK
Metropolitan Council Main: 651.602.1000
390 Robert Street North TTY: 651.291.0904
Saint Paul, MN 55101 Public Information: 651.602.1500
public.info@metc.state.mn.us
metrocouncil.org
2
Comprehensive Plan Amendment:
2040 Comp Plan Forecasts
City Council Meeting | June 16 th 2026
Background
•System Statements begin the
Comprehensive Plan update period
•Limited time to Appeal (60 days)
•Majority of communities do not appeal
•White Bear Lake Case has caused Met
Council to deflate population forecasts
in the WBL area
What are System Statements?
Individualized documents indicating how
communities are impacted by regional plans for:
•Transportation/Aviation
•Water Resources
•Regional Parks and Trails
Once released, communities have three years to
amend/update comprehensive plans to comply
with regional system plans.
2025 System Statement
Forecast Implications/Uses
•Guide updates to Comprehensive Plans (need to accommodate
a proportionate share of regional growth)
•Aids in long range wastewater system planning
•Forecasts may be used by other agencies (MnDNR) for
understanding growth trends
Timeline of Events
•September 22, 2025 – System statements released by Met Council (online)
•October 24, 2025 – City staff meet with Met Council, specific questions asked:
•What data sources/trends informed the population and household estimates?
•What happens if development exceeds forecasted growth?
•October 28, 2025 – Meeting with Met Council Sector Rep., staff learned that:
•Primary changes to forecast were due to regional trends. (WBL issue not cited)
•Openness from Met Council on adjustments to forecasts.
•Clarification that city is not “punished” for growing faster than projected.
•October 29, 2025 –Follow up from Met Council after meeting indicated:
•Specific methodologies for regional forecasts (WBL issue not cited)
•Clarification that forecasts could be adjusted unless regional systems could not
support growth
Timeline of Events, cont.
•November 21, 2025 – Period of appeals for system statements is closed. Staff
recommendation not to appeal based on:
•Ability to periodically adjust forecasts in collaboration with Met Council staff
•Growth projections best understood as City moves through Comp Plan Update
•January 15, 2026 – City staff receive WBL Methodology Memo from City of Hugo.
•City staff identify options to move forward and compile permitting/development
pipeline data to Met Council, countering low forecasts.
•February 19, 2026 – City staff meet with Met Council Forecaster and Sector Rep:
•Met Council staff acknowledge permitting data and low forecasts
•Met Council staff agree that a solution is needed for more reasonable forecasts
Data Provided: Development Projection
Year 2026 2030 2035 2040
Cumulative Building Starts*962 2359 2555 3059
Population 15127 18952 20689 22027
2025 System Statement
Population
n/a 15200 n/a 16900
Adjusted Forecasts n/a 19,200 n/a 21,400
Data Provided: Permitting History
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Detached 41 120 200 265 244 244 265 236 105 91 84 157
Attached 0 20 51 34 28 6 44 61 95 75 0 47
Total 41 140 251 299 272 250 309 297 200 166 84 204
Timeline of Events, cont.
•March 6, 2026 – City receives email from Angela Torres, Sr. Manager of Planning at Met
Council:
•City can amend its 2040 Plan to adjust forecasts for 2030 and 2040:
•Raise the 2030 forecast to 7,200 households @ 2.66 average household size = 19,200 pop. Of
this number, 2,472 households unsewered and the remainder sewer-serviced.
•Adjust the 2040 forecast to 8,250 households @ 2.59 average household size = 21,400 pop. Of
this number, 2,200 households unsewered and the remainder sewer-serviced.
•Met Council has not changed its policy position regarding population estimates
higher than 2040 plans found in WBL Memo
WBL Memo
•Summary of overall methodology used in regional/local population forecasts.
•Reference to legislatively directed White Bear Lake Comprehensive Plan Group – deadline of June 30, 2027 for
completion of a long term plan with supporting analysis, to convert some or all wells to surface water.
•Policy positions:
•“Until the White Bear Lake Area Work Group concludes and there is an identified response to legislative
direction and judicial decisions, the Met Council determined it prudent to withhold its consent of additional
growth in local jurisdictions affected by the White Bear Lake Area Court decision until the Council is assured
additional growth does not conflict with Court orders that cities must abide.”
•“as it relates to requesting an upward adjustment to forecasts for growth in this area prior to completion of the
White Bear Lake Area Comprehensive Plan being prepared with assistance from the legislatively identified
Work Group Members and modification of the court order, communities should be aware that the Council will
only consider forecast adjustments in the future, not during System Statements review. If a request is made, it
may only be considered after modification of the court order, a change in local conditions, or a solution to
water supply constraints are determined and implemented.”
Bottom Line
The Met Council refuses to allow for a higher population projection than the City’s 2040 plan
provides, but has agreed that the September 2025 forecasts are low. The City has the option from
the Met Council to use the numbers from its Thrive 2040 plan, ending at a total of 21,400 by 2040.
For the time being, the City may need to work with the following projections by decade:
•2030: 19,200 (7,200 households @ 2.66 average household size)
•2040: 21,400 (8,250 households @ 2.59 average household size)
•2050: 21,400 (no increase)
From the Met Council’s Senior Manager of Local Planning Assistance, Angela Torres:
“We routinely have staff-to-staff agreements on forecast adjustments during development of
the decennial Plan updates and we are willing to discuss an expanded 2050 forecast in mid-
2027 after the White Bear Lake Area Comprehensive Plan Work Group concludes. At that point,
we’d know more about everyone’s comfort (neighboring cities, DNR, etc.) and local systems
preparedness. Until then, Met Council will limit forecast increases as described in "Forecast
Methodology for the White Bear Lake Area Communities.”
Amending the 2040 Plan
Adopted vs Amended
2040 Plan Forecasts
2030 (as amended with average
household size of 2.66 instead of
2.77)
2040 (as amended with average
household size of 2.59 instead of
2.72)
Households Unsewered 2642 (2472)2742 (2200)
Households MUSA 3858 (4728)5458 (6050)
Total Households 6500 (7200)8200 (8250)
Total Population 18,005 (19,200)22,304 (21,400)
Employment Unsewered 562 562
Employment MUSA 2788 3238
Total Employment 3350 3800
Timeline for Amendment
In progress - City Notices a self-initiated comprehensive plan amendment (this includes adjacent and
affected jurisdiction notices to surrounding communities and other levels of government)
6/8/26 - Planning Commission review and Public Hearing
6/16/26 - City Council Review and Determination
(1 week post approval) Approved Amendment Submitted to Met Council for Review and Approval
(~60 days post approval) Met Council review and approval memo received by City.
Public Hearing
Posted early April in paper of record.
Public Hearing held on June 8, 2026.
Example Comprehensive Plan Amendment approval motion:
“Move to adopt Resolution 2026-XX approving the amendments proposed to the forecasts found in the Lake Elmo 2040
Comprehensive Plan with the findings and conditions therein.”
MOTION
STAFF REPORT
DATE: 6/16/2026
REGULAR
TO: Mayor and Councilmembers
FROM: Jack Griffin. Municipal Sr. Project Manager
AGENDA ITEM: Approve the Revised Crosswalk Policy and 2026 Crosswalk Improvements
CORE STRATEGIES:
☐ Vibrant, inclusive, connected community
☐ Responsive, transparent, adaptive governance
☒ Managed Growth
☒ Efficient, reliable, innovative services
☐ Balanced Finances now and future
☒ Resilient Infrastructure
BACKGROUND:
On December 3,2024,the City Council adopted a Pedestrian Crosswalk Policy to guide the City in determining
when to mark a crosswalk and when to leave a crosswalk unmarked.
In November 2025,staff received a constituent request to install marked crosswalks along 5th Street North,
between Inwood Avenue (CSAH 13)and Keats Avenue (CSAH 19).These intersections were reviewed by City staff
to determine where crosswalks should be marked along this corridor.From this review,two intersections were
identified that met the policy for crosswalk markings.
The intersection of 5th Street and Ivwood Circle meets the policy recommendations for a marked crosswalk since
the intersection is immediately adjacent to Ivywood Park,and the intersection of 5th Street and Julia Avenue
meets the policy recommendations for a marked crosswalk since the intersection is immediately adjacent to
Savona Park.As part of this review process,staff identified an additional intersection at Village Parkway and Lower
31st Street that is also immediately adjacent to a park (Northport HOA Park).
In response to constituent requests,the City retained SRF to provide crosswalk improvement recommendations
for the three intersections,including 5th Street and Ivywood Avenue,5th Street and Julia Avenue,and at Village
Parkway and Lower 31st Street.The scope of services is limited to the proposed layouts with estimated
implementation costs together with a review of the City Pedestrian Crosswalk Policy to better address enhanced
crosswalk treatments, specifically Rectangular Rapid Flashing Beacons (RRFB).
ISSUE BEFORE COUNCIL:
Should the City Council approve the Revised Crosswalk Policy and authorize engineering services to implement
the 2026 Crosswalk Improvements?
PROPOSAL DETAILS/ANALYSIS:
SRF has completed the preliminary review of the requested intersections.Preliminary layouts include
recommendations for signage,pavement markings and pedestrian ramp improvements for ADA compliance.
Enhanced treatments were also evaluated,and in some cases recommended,such as raised median extensions,
curb extensions, turn lane elimination, and RRFBs.
Through the evaluation process,revisions to the Pedestrian Crosswalk Policy were also prepared to better address
warrants for RRFB installation.
FISCAL IMPACT:
The Total Estimated Project Cost for the proposed 2026 Crosswalk Improvements is $140,000,including $65,000
at the intersection of 5th Street and Ivy Avenue,$50,000 at the intersection of 5th Street and Julia Avenue,and
$25,000 at the intersection of Village Parkway and Lower 31st Street.As a constituent driven request in late 2025,
these improvements were not programmed in the 2026 CIP or Budget.
Should the City Council decide to move forward with the improvements,staff should be directed to review and
make recommendations regarding available funding sources and alternatives,including whether to construct the
improvements in 2026 or 2027.
RECOMMENDATION:
Staff recommends that the City Council approve the Revised Crosswalk Policy and authorize engineering services
to implement the 2026 Crosswalk Improvements as recommended.The recommended motion for the action is as
follows:
“Move to approve the Lake Elmo Crosswalk Policy -Revised June 2026.”
and
“Move to authorize design and construction phase engineering services for the 2026 Crosswalk
Improvements, including Option 1 for Village Parkway and Lower 31st Street, in the estimated amount
of $18,000.”
ATTACHMENTS:
Lake Elmo Crosswalk Policy -Revised June 2026
2026 Crosswalk Improvements -Location Maps
Proposed 2026 Crosswalk Improvements
CITY OF LAKE ELMO
PEDESTRIAN CROSSWALK POLICY
PREPARED BY:
CITY OF LAKE ELMO
PUBLIC WORKS DEPARTMENT
Revised June 2026
December 2024
TABLE OF CONTENTS
Purpose ................................................................................................................................................................................ 1
Background ......................................................................................................................................................................... 1
Crosswalk Marking Policy .............................................................................................................................................. 2
All Way Stop Control and Signalized Intersections .......................................................................................... 2
Side-Street Stop Control Intersection ................................................................................................................... 2
Roundabouts ................................................................................................................................................................. 2
Mid-BLock Crossings .................................................................................................................................................. 2
Uncontrolled Intersection ......................................................................................................................................... 3
Criteria Definitions………………………………………………………………………………………………………………………….4
Removal of Crossing Infrastructure ....................................................................................................................... 4
Rectangular Rapid Flashing Beacon Policy…………………………………………………………………………………………..5
Policy Intent…………..…………………………………………………………………………………………………………………………..5
Policy Application…………….………………………………………………………………………………………………………………..5
Evaluation Process..…………………………………………………………………………………………………………………………...5
Design Standards.……………………………………………………………………………………………………………………………..5
MnDOT Safe Transportation for Every Pedestrian (STEP) Chart, as revised within this Policy……..…6
Appendix……………………………………………………………………………………………………………………………………………...7
APPENDIX
Crossing Evaluation Process
Minnesota State Statute
Crosswalk Marking Definitions
Crossing Control Definitions
Crossing Infrastructure Treatments
1
PURPOSE
Pedestrian safety is a top priority for the City of Lake Elmo. With an increasing number of distractions
for both pedestrians and drivers, it is important to understand that it is everyone's responsibility to
ensure pedestrian safety.
Pedestrian crosswalks are an integral part of our transportation infrastructure. To be effective and
promote safety, marked crosswalks should be limited in use and must be installed only after careful
consideration and review. The review shall be done with adherence to accepted guidelines and good
engineering practice. The City of Lake Elmo has developed this Policy to determine when a crosswalk
will be marked or remain unmarked throughout the City.
BACKGROUND
Whether marked or unmarked, legal crosswalks exist at all legs of all intersections where sidewalks
normally exist, including T-intersections, except where closed and appropriately signed. Marking a
crosswalk will not necessarily increase the safety for pedestrians crossing the roadway. Some studies
have found that crosswalk markings can create a false sense of security in a pedestrian, and markings
do not necessarily result in higher compliance with vehicles stopping for pedestrians. Therefore, the
City carefully reviews each request for crosswalks to determine if installing a crosswalk is appropriate
for that intersection.
As defined in Minnesota State Statute Chapter 169, motorists are required to stop for pedestrians
who have entered a legal crosswalk at any intersection, regardless of whether crosswalk markings
are present, until the pedestrian has passed the lane in which the vehicle is stopped. Pedestrians are
also permitted to cross the street between intersections, provided they yield right of way to vehicles,
and they do not cross between adjacent intersections with traffic signals.
2
CROSSWALK MARKING POLICY
This policy applies to streets owned and maintained by the City of Lake Elmo. Roadways not owned
by the city must be addressed by the appropriate jurisdictional authority.
A marked crosswalk is any crosswalk that is delineated by markings placed on the pavement for the
purpose of directing pedestrians to use a particular location to cross the street. Marked crosswalks
should connect to established sidewalks/trails at both ends. ADA accessible ramps should be
included at both ends of marked crosswalk installations unless there are engineering reasons they
cannot be provided. Street lighting should be considered at all crosswalk locations. The provisions
of the Minnesota Manual on Uniform Traffic Control Devices (MN MUTCD) shall be followed.
ALL WAY STOP CONTROL AND SIGNALIZED
INTERSECTIONS
At locations controlled by a traffic signal or all way stop, it is the City Policy that crosswalks should
be marked at all legs if a sidewalk or shared use path exists at the intersection.
Although no explicit industry standard exists for all way stop control and signalized intersections,
many local agencies mark crosswalks at all legs when such a crossing is warranted due to existing
walking/biking connections at the intersection. This is further supported by guidance from the
National Association of Transportation Officials (NACTO) advising the marking of a crosswalk at all
legs when warranted.
SIDE-STREET STOP CONTROL INTERSECTION
At locations across a stop-controlled leg of a side street stop-controlled intersection, it is the City
Policy that crosswalks will remain unmarked, unless the crossing directly serves a key destination as
defined in the “Criteria Definitions” section.
ROUNDABOUTS
It is the City Policy that crosswalks at roundabouts should be marked in accordance with roundabout
engineering design.
MID-BLOCK CROSSINGS
The use of mid-block, uncontrolled crosswalks is generally discouraged unless an engineering study
determines a specific need for this type of crosswalk. If permitted and established by the City, mid-
block crosswalks will be marked and may include additional safety features and enhancements as
determined by an engineering evaluation and the Public Works Director.
3
UNCONTROLLED INTERSECTION
Marked crosswalks at uncontrolled locations must be carefully selected and designed to ensure that
they enhance, rather than reduce, pedestrian safety. Each uncontrolled crossing location requires
staff review and engineering evaluation in accordance with criteria outlined in this Policy and the
following flowchart.
4
Criteria Definitions
· Minimum vehicle volume threshold: Marked crosswalks should generally not be considered
for roadways with less than 1,000 average annual vehicles per day (AADT) unless as part of a
designated school walking route.
· Minimum pedestrian/bicycle volume threshold: The pedestrian and bicycle crossing demand
during a 24-hour period meets one or more of the following criteria. The count hours do not
need to be consecutive. Follow this process to complete the criteria:
1. Collect a total of 24 hours of pedestrian and bicycle counts that are broken down by 1-
hour increments.
2. Select the 4 highest, 1-hour increment pedestrian/bicycle counts from the 24-hour period
of collected data.
3. The minimum pedestrian/bicycle volume threshold must meet one or more of the
following criteriay:
20 pedestrian/bicycle crossings in 1 of the 4 hours
15 pedestrian/bicycle crossings in 2 of the 4 hours
10 pedestrian/bicycle crossings in 3 of the 4 hours
5 pedestrian/bicycle crossings in 4 of the 4 hours
· Pedestrian or bicycle involved crash in the last ten years: ≥1 crash involving a pedestrian or
bicyclist at the existing point crossing under review over the last 10 years. A crash not
addressable by engineering design (e.g., impaired driver, etc.) does not count.
· Location directly serves a key destination: For this Policy a key destination includes a school
or public park immediately adjacent to the crossing location, and established school route,
or the crossing location is along a designated walking/bicycle route to/from the Old Village
in a plan that has been formally adopted by the City of Lake Elmo.
· Sight distance requirement: The required sight distance for a vehicle to come to a complete
stop at the point of crossing per AASHTO’s guidance using the roadway’s design speed.
· Remove obstruction: If an obstruction is present (e.g., sign, tree, utility pole, etc.), reviewing
if the obstruction can be removed to meet the specific crossing sight distance requirement.
REMOVAL OF CROSSING INFRASTRUCTURE
Conditions that contribute to the need for a crossing enhancement may change over time, or a
crossing may no longer be needed. When a roadway surface is to be impacted by reconstruction or
resurfacing, a review should be performed to determine their use and need. If a crosswalk or crossing
meets the criteria outlined in this assessment, it should be maintained. If it does not meet the criteria,
it should be brought to the City Engineer and Public Works Director for consideration of removal. In
lieu of a removal, a crossing may also be reviewed for changes to align with the latest guidance or
changing conditions.
5
RECTANGULAR RAPID FLASHING BEACON POLICY
POLICY INTENT
Rectangular Rapid Flashing Beacons (RRFBs) are a supplemental crossing enhancement used to
improve driver yielding and pedestrian/bicyclist safety at uncontrolled marked crosswalks. RRFBs are
not intended to be the default crossing treatment. Their use shall be targeted to high-need locations,
supported by data and engineering judgment, and coordinated with other safety improvements. The
City prioritizes context-sensitive design and appropriate alternatives when RRFBs are not the most
suitable treatment. This policy ensures RRFBs are applied consistently, effectively, and only where
they enhance safety.
POLICY APPLICATION
RRFBs shall only be considered after a crossing is determined appropriate in accordance with this
Crosswalk Policy. Further consideration follows MnDOT guidance, including the MnDOT Safe
Transportation for Every Pedestrian (STEP) Chart and engineering judgment to ensure roadway
context, speeds, and traffic volumes are appropriate for RRFB use.
EVALUATION PROCESS
The City evaluates roadway configuration, posted speed limits, and traffic volumes to determine
whether RRFBs are appropriate using the STEP Chart and engineering judgment. As part of this
evaluation the City may consider opportunities to improve safety through speed reduction, lane or
turn lane removal, or other geometric improvements to reduce crossing distance and conflicts.
An RRFB will only be considered when all the following conditions are met unless immediately
adjacent to a school:
1. The crossing meets all applicable Crosswalk Policy criteria
2. An RRFB is appropriate based on the STEP Chart and after consideration of other
supplemental geometric improvements
3. The crossing is located at a minimum of 1,000 feet from an existing RRFB
4. The crossing demonstrates a minimum of 20 pedestrian/bicycle crossings within a peak hour
If criterion is not met, RRFBs shall not be installed, and alternative improvements may be considered.
DESIGN STANDARDS
RRFB crossings are designed in accordance with MnDOT’s RRFB Design Guide, including signage,
lighting, equipment placement, and consideration of supplemental treatments such as curb
extensions or median refuges.
6
Gray: An RRFB should not be considered. Low risk
to warrant RRFB installation due to low speeds,
narrow roadways, and/or lower traffic volumes.
Green: An RRFB should be considered in
conjunction with other countermeasures (e.g.,
curb extensions, medians, lighting, etc.).
Red: An RRFB should not be considered. High risk
to warrant RRFB installation due to high speeds,
wide roadways, and/or high traffic volumes.
7
APPENDIX
1
CROSSING EVALUATION PROCESS
The following steps are guidance for reviewing each uncontrolled crossing location. This process is
intended to help guide the reviewer through a methodical and data driven process such that
engineering judgment can be effectively applied.
1. Performing field review and preliminary data collection to understand existing conditions and
potential issues. Preliminary data collection includes existing, easily accessible data that the
reviewer may use to determine if the crossing is acceptable for additional review performed
by steps 2, and 3.
2. Collect data to complete the review using recommended data points. The process includes
the following steps:
a. Identify crossing location
b. Collect traffic volumes
c. Collect pedestrian and bicycle volumes
3. Evaluate the point of crossing using the flowchart and perform a high-level review to
understand if a location is appropriate for consideration of an enhanced crossing.
DATA COLLECTION
Data collection is a key component of this analysis. It is critical that all data points identified below
are collected and properly organized to ensure the uncontrolled crossing location is successfully
reviewed for potential improvements. Sometimes staff may be very familiar with the location and
have a good understanding which may allow some of the data to be “approximated”, though it is
important that all data inputs are completed to maintain the integrity of the process.
Crossing Identification
Major Street: Name of the street crossed by the location under review.
Minor Street or Crossing Location: The connecting street of an intersection or specific
location identified for the mid-block crossing.
Key Destination: Review if the crossing is: 1) immediately adjacent to a school or public park,
2) along a designated school walking route, or 3) along a city-approved walking/biking route
to/from the Old Village Area.
Traffic Data
Traffic Control: If a crossing under review is at an intersection, identify the traffic control
present (side-street stop control, all-way stop, or traffic signal).
Existing AADT: The most recent average annual daily traffic (AADT) available at the point of
crossing.
2
Multimodal Data
Sidewalk: Identify if a sidewalk directly connects to the crossing under review.
Shared-use Path: Identify if a shared-use path/multiuse trail directly connects to the crossing
under review.
Crosswalk Lighting: Identify if lighting is present that would illuminate the crossing and
specifically note if that lighting is pedestrian-scale.
Pedestrian and Bicycle Volume: Record the four peak hour totals for pedestrians and
bicyclists. A best practice is collecting data between 6 a.m. and 7 p.m. during warmer months
(i.e., April-June or September-October) and when school is in session. Collecting both a
weekday and weekend count is also recommended. Previously collected count data within
two years of this assessment can be applied if location conditions have not changed
significantly.
Pedestrian Crashes: The total number of pedestrian-involved crashes that are recorded at
the point of crossing in the last ten years. Highlight serious injury or fatal crashes and remove
preventable crashes (e.g., driver impaired, etc.) if present.
Bicycle Crashes: The total number of bicycle-involved crashes that are recorded at the point
of crossing in the last ten years. Highlight serious injury or fatal crashes and remove
preventable crashes (e.g., driver impaired, etc.) if present.
3
MINNESOTA STATE STATUTE
Minnesota State Statute Chapter 169 defines a crosswalk and pedestrians, as well as the rights of
pedestrians and motorists regarding when and where to yield right-of-way. The definitions and legal
language detailed in this section provide a foundation for how pedestrian crossings are viewed in
Minnesota and considered by this assessment.
169.011 Definitions
Subdivision 20. Crosswalk.
"Crosswalk" means (1) that portion of a roadway ordinarily included with the prolongation or
connection of the lateral lines of sidewalks at intersections; (2) any portion of a roadway distinctly
indicated for pedestrian crossing by lines or other markings on the surface.
Subdivision 20. Pedestrian.
"Pedestrian" means any person afoot or in a wheelchair.
169.21 Pedestrian
Subdivision 2. Rights in absence of signal.
(a) Where traffic-control signals are not in place or in operation, the driver of a vehicle shall stop to
yield the right-of-way to a pedestrian crossing the roadway within a marked crosswalk or at an
intersection with no marked crosswalk. The driver must remain stopped until the pedestrian has
passed the lane in which the vehicle is stopped. No pedestrian shall suddenly leave a curb or other
place of safety and walk or run into the path of a vehicle which is so close that it is impossible for the
driver to yield. This provision shall not apply under the conditions as otherwise provided in this
subdivision.
(b) When any vehicle is stopped at a marked crosswalk or at an intersection with no marked crosswalk
to permit a pedestrian to cross the roadway, the driver of any other vehicle approaching from the
rear shall not overtake and pass the stopped vehicle.
(c) It is unlawful for any person to drive a motor vehicle thro ugh a column of school children crossing
a street or highway or past a member of a school safety patrol or adult crossing guard, while the
member of the school safety patrol or adult crossing guard is directing the movement of children
across a street or highway and while the school safety patrol member or adult crossing guard is
holding an official signal in the stop position. A peace officer may arrest the driver of a motor vehicle
if the peace officer has probable cause to believe that the driver has operated the vehicle in violation
of this paragraph within the past four hours.
(d) A person who violates this subdivision is guilty of a misdemeanor. A person who violates this
subdivision a second or subsequent time within one year of a previous conviction under this
subdivision is guilty of a gross misdemeanor.
4
Subdivision 3. Crossing between intersections.
(a) Every pedestrian crossing a roadway at any point other than within a marked crosswalk or at an
intersection with no marked crosswalk shall yield the right-of-way to all vehicles upon the roadway.
(b) Any pedestrian crossing a roadway at a point where a pedestrian tunnel or overhead pedestrian
crossing has been provided shall yield the right-of-way to all vehicles upon the roadway.
(c) Between adjacent intersections at which traffic-control signals are in operation pedestrians shall
not cross at any place except in a marked crosswalk.
(d) Notwithstanding the other provisions of this section every driver of a vehicle shall (1) exercise due
care to avoid colliding with any bicycle or pedestrian upon any roadway and (2) give an audible
signal when necessary and exercise proper precaution upon observing any child or any obviously
confused or incapacitated person upon a roadway.
5
CROSSWALK MARKING DEFINITIONS
Unmarked crosswalk: A legal crosswalk that does not feature any crosswalk striping or
markings per state statute.
Marked crosswalk: A legal crosswalk that features crosswalk striping or pavement markings.
Left: Example of crosswalk visibility
enhancements (crosswalk marking,
signage, and lighting). Source: Federal
Highway Administration
Above: Example of a continental crosswalk
marking which is a industry recognized
best practice. Source: Kittelson &
Associates
6
CROSSING CONTROL DEFINITIONS
Uncontrolled crossing: A legal crossing of a roadway intersection approach or mid-block
crossing of a roadway between two intersections with no traffic control at the point of
crossing.
Controlled crossing: A legal crossing of a roadway intersection approach or mid-block
crossing of a roadway between two intersections controlled by a stop sign or traffic signal.
7
CROSSING INFRASTRUCTURE TREATMENTS
Any location reviewed for a crosswalk should in tandem have a detailed engineering review
completed to determine if additional crossing infrastructure enhancements should be implemented.
TRAFFIC VOLUME REVIEW
Review the number of lanes at the point of crossing to ensure that the total number of lanes (travel
and turn lanes) at the point of crossing is adequate for the traffic volumes. Right sizing the crossing
distance is critical to all modes of travel, but particularly important to pedestrians and bicyclists, as
the goal is to minimize their time in the hazard zone.
Engineering review of right- and left-turn lanes if applicable at the point of crossing to verify
if they are necessary or if they can be removed.
If roadway design or turn lanes are not appropriate, consider lane reductions or turn lane
removal before proceeding.
The overall objective of this is to eliminate the multilane
threat by removing lanes to improve visibility. When
one car stops for a person crossing the roadway, the
second car may not be visible to the person crossing
nor is that person visible to the second driver.
ROADWAY GEOMETRIC TREATMENT ASSESSMENT
The following process reviews opportunities to slow speeds, reduce crossing distance, and improve
visibility of people crossing the roadway.
1. Narrow Travel Lanes: MnDOT identifies the following lane width best practices per the
Performance-Based Practical Design – Process and Design Guidance. These are superseded
by MnDOT’s own design standards though used as an example for consideration by the City
of Lake Elmo. Studies have credited tighter lane widths by neutrally or positively impacting
safety without affecting traffic operations.
Rural Roadways: 11- or 12-foot-wide lanes
Urban and Suburban Roadways: 10-foot-wide lanes (≤35 mph and turn lanes), 11-
foot-wide lanes (suitable for all other typologies), 12-foot-wide lanes (≥50 mph
and/or non-motorized traffic is absent).
8
2. Reduce Conflict Points: Consider moving the crossing to a location with the least number of
conflict points depending upon engineering judgement. This could include an intersection
leg with lower turning vehicles or overall traffic, as well as moving a crossing entirely out of
an intersection and to a mid-block location.
3. Crossing Lighting: Ensure lighting is present that illuminates the entire crossing (curb ramp
to curb ramp) per state and federal guidance.
4. Geometric Improvements: Context-specific traffic calming measures using geometric
improvements should be considered. Each item is further defined in the section below.
Curb Radius: Review the turning curb radius to understand if a reduced radius can be
achieved based upon context-specific needs and design vehicles. Reducing the radius
to as small as practical can create significant benefits via reduced crossing distance
and vehicle turning speeds.
Curb Extension: An extension or bump out of the curb into the roadway and typically
a minimum of six-feet-wide though design is context specific. This could include
removal or narrowing of a roadway shoulder to reduce the crossing distance. Special
attention should be given to existing on-street bicycle infrastructure (e.g., bike lane)
to ensure it does not remove space at the intersection for that connection.
Pedestrian Refuge Island: A raised median that is a minimum of eight-feet-wide
though ten-feet or greater is preferred to ensure it is wide enough to accommodate
bikes.
5. Signage Improvements:
Pedestrian Warning Sign: Static sign used at marked crosswalks following the MN
MUTCD.
Rectangular Rapid Flashing Beacon (RRFB): A crossing enhancement that is activated
by a pedestrian or bicyclist and uses two rapid and alternate flashing yellow
rectangular beacons. RRFBs are applicable on roadways with higher pedestrian
demand, traffic volumes, and traffic speeds. Use MnDOT guidance to determine if a
location is appropriate.
IslandTrailRdE a g le Poin
t
BlvdHud
sonBl
v
dNH u d s on Blvd N
JadeTrailN5th St N
InwoodAveNInwoodAveNStonegate Par k
94
W o odb ury Lakes Rd
Hudson Blvd N
InwoodAveNJadeTrailN5 t h St N
5 th S tNJulepAveN7th
StN
8th St N
JamesAveN6
t
h
S
t
N
J
e
w
elAveN
Jas m i n e A v e N
4th S tN JuniperAveNJunc
o
R
d
N
6
thStre e tLnNLo w e r 8 t h St N
94
H u d s o n B l v d N
Lake Elmo GIS
Vantor, Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, (c)
OpenStreetMap contributors, and the GIS User Community
Lakes
Local Trails
Public Trail Paved
Private Trail
County Trails
County/Regional
Parks
City Limits
11/9/2025, 9:23:34 PM
0 820 1,640410 ft
0 250 500125 m
1:12,592
Vi
l
l
agePkwyN32nd S t NLilacAveNUpper33rdStN33rdSt
N
3 3 r d S t N LindenAveNManningAveNVFW P a r k
Lake E lmo
A ir por t
VillagePkwyN3 0 t h S t N 3 0 t h S t N
3 1 s t S t N
Lisbon Avenu
e
Ct
NLegionAveNLisbonAveNManningAveN30t
h
S
t
N
Lake Elmo GIS
Vantor, Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, (c)
OpenStreetMap contributors, and the GIS User Community
Lakes
Local Trails
Bike Trail
Public Trail Paved
Public Trail Soft Surface
Private Trail
Null
Parks
City Limits
11/9/2025, 9:25:24 PM
0 820 1,640410 ft
0 250 500125 m
1:12,592
H:\Projects\19000\19733\TechData\CADDesign\L2-RefFiles2D\19733_gma.dwg : 5th&Ivywood_1Job # 197332/2/2026 - 12:51PM5th Street & Ivywood Circle - Option 1Pedestrian Crossing Improvement stLake Elmo, MNFigure 15th St NIvywood Cir N
H:\Projects\19000\19733\TechData\CADDesign\L2-RefFiles2D\19733_gma.dwg : 5th&Julia_1Job # 197332/2/2026 - 12:51PM5th Street & Julia Ave - Option 1Pedestrian Crossing Improvement stLake Elmo, MNFigure 35th St NJulia Ave N
H:\Projects\19000\19733\TechData\CADDesign\L2-RefFiles2D\19733_gma.dwg : Village Pkwy&Lower 31st_1Job # 197332/2/2026 - 12:51PMVillage Parkway & Lower 31st Street - Option 1Pedestrian Crossing Improvement stLake Elmo, MNFigure 5Lower 31st St NVillage P
k
w
y
N
H:\Projects\19000\19733\TechData\CADDesign\L2-RefFiles2D\19733_gma.dwg : Village Pkwy&Lower 31st_2Job # 197332/2/2026 - 12:51PMVillage Parkway & Lower 31st Street - Option 2Pedestrian Crossing Improvement stLake Elmo, MNFigure 6Lower 31st St NVillage P
k
w
y
N
City of Lake Elmo
RRFB Policy Update | Crossing Review
Lake Elmo City Council Meeting | June 16, 2026
RRFB Policy Update
Crossing Review
Next Steps
Agenda
Adopted City Crosswalk Policy (2024)
Adopted policy for identifying marked crosswalks feeds in RRFB process
If a location is not appropriate for a crosswalk, it will not be considered for an RRFB
Advantages
Increase driver awareness and yield compliance for peds/bikes in crosswalk
Crash reduction of up to 47%(per FHWA)
More cost effective then larger signal systems
Disadvantages
Effectiveness can vary widely depending upon the roadway design, traffic volumes, and speeds (overuse could reduce effectiveness)
Maintenance
Rectangular Rapid Flashing Beacons (RRFB)~$40,000+ per crossing
An RRFB will only be considered when all the following conditions are met unless immediately adjacent from a school:1.The crossing meets all applicable Crosswalk Policy criteria2.An RRFB is appropriate based on the STEP Chart and after consideration of other supplemental geometric improvements3.The crossing is located at a minimum of 1,000 feet from an existing RRFB4.The crossing demonstrates a minimum of 20 pedestrian/bicycle crossings within a peak hour
If criterion aren’t met, RRFBs shall not be installed, and alternative improvements may be considered.
RRFB Evaluation Process
Gray: An RRFB should not be considered. Low risk to warrant RRFB installation due to low speeds, narrow roadways, and/or lower traffic volumes.
Green: An RRFB should be considered in conjunction with other countermeasures (e.g., curb extensions, medians, lighting, etc.).
Red: An RRFB should not be considered. High risk to warrant RRFB installation due to high speeds, wide roadways, and/or high traffic volumes.
MnDOT STEP Chart
5th Sreet / Ivywood
Project Recommendation:1.Update to ADA-compliant curb ramps2.Crosswalk markings3.Pedestrian warning signage
*Consider RRFBs in future if:- Speed limit reduced to 35 mph, OR- Right-turn lane removed
$65,000
5th Street / Julia Avenue
Project Recommendation:1.Update to ADA-compliant curb ramp2.Add median nose for crossing refuge3.Crosswalk markings4.Pedestrian warning signage
*Consider RRFBs in future if:- 20 peds/bikes per hour are recorded
$50,000
Village Parkway / Lower 31st Street - Option 1
1.New ADA-compliant curb ramps2.Crosswalk markings3.Pedestrian warning signage
$25,000
Village Parkway / Lower 31st Street - Option 2
1.New ADA-compliant curb ramps and extensions2.Crosswalk markings3.Pedestrian warning signage
$55,000
Advantages:
Increase visibility and reduce crossing distance for peds/bikes
Crash reduction of up to 45% (per FHWA)
Encourage slower speeds
Challenges:
Stormwater/drainage impacts
Maintenance
Turning vehicles (if larger trucks are present)
Curb Extensions~$20,000+ per quadrant
Date Type Due date for
packet Order Agenda Section Agenda item
7/7/2026 CC Meeting 6/30/26 Closed Session before
meeting Potential litigation discussion (tentative)
Consent Agenda Approve appointment of election judges
Consent Agenda 2nd Quarter Dashboards and Financials
Lake Elmo Elementary - Development Agreement First Amendment
Oak Land Middle School - Site Improvement Agreement First Amendment
Regular Agenda 2025 Audit Presentation
Regular Agenda Purchasing Policy
Regular Agenda 2nd Quarter Goals Update
Regular Agenda Limerick Village Preliminary Plat and PUD
Regular Agenda Stormwater Utility Code Review
Regular Agenda Wash Co. Middle St Croix Valley to Phalen-Keller Regional Trail Long-Range Plan
7/14/2026 CC Workshop 7/7/26 Discussion Old City Hall
Discussion Sports Complex/76 acre Consultant Discussion (tentative)
Discussion Street parking Royal Golf
Discussion Draft 2027 - 2036 Capital Improvement Program
Discussion Strategic Financial Plan - Initial Review of Models, Assumptions, and Strategic Financial Goals
Discussion Street Light Replacement
Closed Session before
meeting Sale of Fire Station and Parks Building (tentative)
7/21/2026 CC Meeting 7/14/26 Consent Agenda 180 Acres AUAR Approval (tentative)
Consent Agenda Fund Transfers
Regular Agenda Social host ordinance
Closed Session before
meeting Ryan Companies offer (tentative)
Closed Session Discuss sale of 11052 34TH ST N (tentative)
8/5/2026 CC Meeting 7/30/26
Consent Agenda Sunfish Deer Hunting
Consent Agenda PW Snow Groomer Purchase
8/11/2026 CC Workshop 8/4/26
Discussion Draft 2027 Budget & Levy
Community Engagement Results - City 180
8/18/2026 CC Meeting 8/11/26
9/1/2026 CC Meeting 8/25/26
9/8/2026 CC Workshop 9/1/26 Obstructions in ROW
Future Council Agenda Items
*Please note: This list is subject to change*
9/15/2026 CC Meeting 9/8/26 Regular Agenda 2027 Preliminary Levy
Consent Agenda Appoint Election Judges
10/6/2026 CC Meeting 9/29/26 Consent Agenda 3rd Quarter Dashboards and Financials
Regular Agenda 3rd Quarter Goals Update
10/13/2026 CC Workshop 10/6/26 CIP F-012 Ladder 1 Replacement Approval
10/20/2026 CC Meeting 10/13/26 Regualr Agenda CIP F-012 Ladder 1 Replacement Approval
11/4/2026 CC Meeting Regular Agenda Bonding
11/10/2026 Special Meeting Canvass Election Results
11/10/2026 CC Workshop Employee Policies Updates
11/17/2026 CC Meeting
Regular Agenda
12/1/2026 CC Meeting
Regular Agenda
12/8/2026 CC Workshop
12/15/2026 CC Meeting