HomeMy WebLinkAboutPZ Minutes; 04-25-11APPROVED AS PRESENTED; 6-13-11
Lake Elmo Planning Commission Minutes; 4-25-11 1
City of Lake Elmo
Planning Commission Meeting
Minutes of April 25, 2011
Chairman Van Zandt called to order the meeting of the Lake Elmo Planning Commission
at 7:00 p.m. COMMISSIONERS PRESENT: Bidon, Hall, Obermueller, Van Zandt, and
Haggard (7:02). Absent: Williams, Ziertman, Fliflet, and Pelletier. STAFF PRESENT:
Planning Director Klatt and Planner Matzek.
Agenda
M/S/P, Hall/Bidon, move to approve the agenda. Vote: 5:0.
Minutes -April 11, 2011
Commissioner Haggard said on page two she would like it to reflect that she said
neighborhoods in general that were highly compact, not just the one she lived in.
Planner Matzek read Williams’ comments into the minutes.
M/S/P, Haggard/Hall, move to approve as amended. Vote: 5:0.
Public Hearing- Septic Variance Request 8242 Hidden Bay Trail
Planner Matzek asked the Commission to consider approval of a 50 foot lakeshore
setback variance request for the purpose of installing a replacement septic system twenty-
five feet from the ordinary high waterline. Planner Matzek also described the site,
highlighting an underground weir on the north end of the property, further restricting the
placement of the new septic system.
Pete Ganzel, Washington County Public Health, described the proposed septic system as
an elevated mound system. He also noted that this system would be more effective and
efficient.
Planner Matzek noted that the system currently in use at 8242 Hidden Bay Trail is
classified as a failing system under current state statute.
Chairman Van Zandt asked whether the current system, left as is, would be a threat to the
lake.
Mr. Ganzel noted pathogens could get into the lake as well as drinking water if left as-is.
He also noted that the new system would be safer in this regard.
Commissioner Bidon questioned the placement of the system and wondered whether it
could be placed further to the North.
Planner Matzek provided further clarification with pictures of where on the property the
easement for the weir exists. She also explained that the placement of the septic system
APPROVED AS PRESENTED; 6-13-11
Lake Elmo Planning Commission Minutes; 4-25-11 2
was at that location in order to not be located within the flood plain in the northern
portion of the property.
Commissioner Hall noted that the 75 foot setback from the ordinary high waterline is a
design safety standard, but does not mean that a design that is closer to the waterline is
not safe.
Mr. Ganzel explained the reasoning behind the traditional 75 foot setback. He also noted
that the contractor would have to implement erosion control in order to be careful and
sensitive to the lake.
Commissioner Haggard questioned how close the final product would be from the lake.
Pete Ganzel reassured her that there would be 25 feet. He explained that the absorption
area would be far enough away to not be a concern.
Commissioner Haggard expressed interest in why the relocating of the well was not
considered when placing the septic system.
Planner Matzek speculated that the applicants may not have considered that location due
to the cost of moving a well and the chance they would also need to work with a neighbor
to move the neighbor’s well to maintain the required separation.
CHAIRMAN VAN ZANDT OPENED THE PUBLIC HEARING AT 7:27 P.M.
Planner Matzek stated that Staff had received two letters from neighbors of the
applicants. The first letter, from Bob and Margie Sevenich at 8224 Hidden Bay Trail,
showed support for the approval of the variance. The second letter, from Gordon and
Mary Grundien at 8270 Hidden Bay Trail, showed concerns about the elevation of the
drain field and potential contamination of the lake by the septic system. Planner Matzek
also read an email from Commissioner Williams, in which he also questioned the location
of the septic system.
Commissioner Obermueller wondered whether the current proposal before the
Commission included a lift station.
Pete Ganzel affirmed that is does include a lift system.
THE CHAIRMAN CLOSED THE PUBLIC HEARING AT 7:30 P.M.
M/S, Hall/Obermueller, move to approve the variance request for a reduced lakeshore
setback for the replacement septic system.
Chairman Van Zandt suggested an amendment to the motion that the recommendation of
approval was contingent on all other locations were deemed impractical. The amendment
was approved.
APPROVED AS PRESENTED; 6-13-11
Lake Elmo Planning Commission Minutes; 4-25-11 3
Vote: 5:0.
Public Hearing – Conditional Use Permit Amendment: Jesuit Retreat House Garage and
Greenhouse Structure
Planning Director Klatt introduced a Conditional Use Permit Amendment application at
8243 Demontreville Trail, which is zoned Public Facilities, to build an earth-sheltered
maintenance shop and greenhouse. He summarized activities on the site and stated that
the proposed site is highly screened and hardly visible. Planning Director Klatt outlined
the various conditions of approval for the garage which is planned for servicing vehicles.
He said that the design standards were not covered in staff report and staff is interpreting
that we will regulate it so that the exposed surfaces will meet the requirements.
THE CHAIRMAN OPENED THE PUBLIC HEARING AT 7:53 P.M.
No one spoke.
THE CHAIRMAN CLOSED THE PUBLIC HEARING AT 7:53 P.M.
Commissioner Van Zandt commented that Commissioner Williams (absent) said he
would be supportive of approving the conditional use permit.
M/S/P, Obermueller/Hall move to recommend approval of CUP as submitted by the
applicant. Vote: 5:0.
Public Hearing – Zoning Text Amendment for Public Land Acquisition
Planning Director Klatt said this amendment was briefly discussed at the last meeting.
The proposed amendment allows the purchase of land for municipal purposes to not
count against property owners for acreage standards. He suggested using a percentage to
put a cap on the amount as well.
Commissioner Haggard wondered if the situation could be solved using a variance.
Planning Director Klatt identified that there has been a recent court case that has greatly
limited the city’s ability to approve variances. He said the replacement of failing septic
systems on small lots are the only variances the city has undertaken since that court case,
which would render a house unusable.
Chairman Van Zandt agreed with the benefits of this amendment, noting that it would
allow the city to move forward with infrastructure needs without penalizing the existing
property owners.
Director Klatt explained that generally the city is able to acquire easements to complete
other infrastructure projects, but in the most recent case, the city is trying to site a well
APPROVED AS PRESENTED; 6-13-11
Lake Elmo Planning Commission Minutes; 4-25-11 4
and the Department of Health requires that the city be the fee owner of the land so an
easement is not an option.
THE CHAIRMAN OPENED THE PUBLIC AT 8:09 P.M.
No one spoke.
THE CHAIRMAN CLOSED THE PUBLIC HEARING AT 8:09 P.M.
Chairman Van Zandt read Commissioner Williams’ comments, which were supportive of
the amendment.
M/S/P, Bidon/Haggard, move to recommend approval with changes identified by staff.
Vote: 5:0.
Business Items
None.
Adjournment
The meeting was adjourned 8:12 p.m.
Respectfully submitted,
Kelli Matzek
Planner