HomeMy WebLinkAbout07-13-09 PZMADOPTED AS AMENDED 8-10-09
City of Lake Elmo
Planning Commission Meeting
Minutes of July 13, 2009
Chairman Van Zandt called to order the meeting of the Lake Elmo Planning Commission
at 7:00 p.m. COMMISSIONERS PRESENT: Anderson, Bidon, Britz, Fliflet (7:04),
Hall, Pearson, Van Erem, Van Zandt, Williams, Ziertman. Absent: McGinnis. STAFF
PRESENT: Planner Matzek, Planning Director Klatt.
Introduction of New Commissioner – Todd Williams.
Mr. Williams provided his background and experience to the commission as he
introduced himself.
Agenda
M/S/P, Hall/Anderson, to approve the agenda as presented. Vote 9:0.
Minutes – None.
Public Hearings – None.
Business Items – Wireless Telecommunication Tower Ordinance
Planning Director Klatt provided a summary of what work had been done to date and
raised some questions for the Planning Commission to consider and provide feedback.
Mr. Klatt introduced consultant Garrett Lysiak with Owl Engineering.
Mr. Lysiak described his work experience and his thoughts on city requirements for
wireless tower applications, placement, search areas, and setback requirements.
Commissioner Bidon asked if companies pick locations that make the most economical
sense for their coverage as the towers are expensive for the company to build. He
believed it was important to provide service in parks.
Mr. Lysiak said a clear ordinance is necessary to identify the city’s priority in placement
of the towers. He also said that monopoles in which the technology is located inside the
structure results in more towers as it limits the ability to update the antennas. He stated
that a height requirement of 199 feet or less would not require lighting under current
FAA guidelines.
Commissioner Hall asked if there was a threshold of service reduction that the city could
not or should not ask of the applicant if requesting them to move their proposed tower to
another location.
Mr. Lysiak said that if he helps to write the ordinance, it will be fair with possible
wording added such as “reasonable accommodation.”
Lake Elmo Planning Commission Minutes; July 13, 2009
ADOPTED AS AMENDED 8-10-09
Commissioner Williams asked if Mr. Lysiak could provide a table of coverage based on
tower height to help evaluate how many more towers would be required based on the
height requirement.
Mr. Lysiak said he could provide some general information, but it depends upon
vegetation and elevation as well. He did not recommend that the City study individual
sites as it would be very costly and provide little benefit to the City verses responding to
individual applications from wireless carriers. He said that generally, at one hundred
feet, four towers would be needed to substitute one tower at 199 feet.
Planning Director Klatt asked the commission to discuss the current minimum lot size
requirement of 10 acres.
Commissioner Fliflet said properties less than 10 acres could be suitable, but her opinion
would be to maintain a drop zone setback requirement. She suggested leaving a
minimum acreage requirement out of the code.
A straw vote was held: eight in favor of fewer, taller towers; seven in favor of removing
the minimum acreage (Pearson and Ziertman was against because they believed there
should be some minimum acreage required).
Commissioner Fliflet said she would like to see performance standards for the associated
equipment building located on the ground. She suggested they maintain a rural
appearance.
Chairman Van Zandt took a straw poll to suggest expediting this item despite a
moratorium until the end of the year. 8:1. (Fliflet against as she wanted to ensure
everyone was heard.)
A five minute break was taken at 9:00 p.m.
Business Items – Buffer Setback in Open Space Preservation Developments
Planner Matzek introduced the item by saying that staff has found that a number of non-
conformities have been created by the 2001 revision to the Buffer Setback in Open Space
Preservation developments. In most cases, it appears this was unintentional as the older
developments now have entire lots that would be considered unbuildable. Unfortunately,
many of the newer developments also do not have reduced setbacks, thereby making
vacant, platted lots unbuildable as well.
Commissioner Williams suggested adding the buffer setback information to the setback
chart and not providing a City Council with too much authority in reducing or eliminating
a buffer setback requirement in any future change to the ordinance.
Commissioner Fliflet said she would prefer to view each OP development individually to
address non-conformities rather than providing a generic setback.
Lake Elmo Planning Commission Minutes; July 13, 2009
ADOPTED AS AMENDED 8-10-09
Lake Elmo Planning Commission Minutes; July 13, 2009
Commission Ziertman expressed a concern in reducing the buffer setbacks for existing
OP developments and suggested taking into account the neighbors of those living
adjacent to OP developments.
Business Items – Recommendation on Economic Development Activities – Tabled.
Business Items – Special Event Permit Ordinance - Tabled
City Council Updates
Planning Director Klatt stated that the City Council tabled the sign ordinance and
approved the Storm Water Management and Erosion and Sediment Control Ordinance at
the June 16th Council meeting. He said that the buffer setback was discussed at the July
7th Council meeting which resulted in the withdrawal of an appeal application from Mr.
Pelletier for the denial of a building permit due to the setback and the approval of a
setback reduction in the Tana Ridge and Parkview Estates developments.
Meeting adjourned 10:14 p.m.
Respectfully submitted,
Kelli Matzek
Planner