RESOLUTION NO. 2005-100
A RESOLUTION AWARDING THE BID FOR THE WATER SYSTEM
INTERCONNECT — PHASE III
WHEREAS, pursuant to an advertisement for bids for the WATER SYSTEM INTERCONNECT
— PHASE III, bids were received, opened and tabulated according to law, and the following bids were
received complying with the advertisement:
Contractor
Base Bid
Chris Riley Utilities, Inc.
$612,000.00
Ellingson Drainage Inc.
$700,000.00
Frontier Pipeline
$707,056.00
Minncomm Utility Construction Co., Inc.
$753,106.00
Push Inc.
$828,610.50
G.M. Contracting, Inc.
$838,082.09
Engineer's Estimate
$768,239.00
AND WHEREAS, Chris Riley Utilities, Inc. is the lowest responsible bidder.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF LAKE ELMO,
MINNESOTA:
1. The mayor and clerk are hereby authorized and directed to enter into a contract with Chris
Riley Utilities, Inc. in the name of the City of Lake Elmo for the Water System Interconnect—
Phase III, according to the plans and specifications therefore approved by the City Council and
on file in the office of the city clerk.
2. The city clerk is hereby authorized and directed to return forthwith to all bidders the deposits
made with their bids, except that the deposits of the successful bidder and the next lowest
bidder shall be retained until a contract has been signed.
ADOPTED, by the Lake Elmo City Council this 201h day of September, 2005.