My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2005-086
LakeElmo
>
City Council
>
Resolutions (1970's to 2020)
>
2000's
>
2005
>
Resolution 2005-086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2025 2:40:26 PM
Creation date
2/12/2014 4:23:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RESOLUTION NO 2005-086 <br />WHEREAS, on the 21" day of April, 2005, MBM Development, LLC <br />( "Applicant ") and Elizabeth Lundquist submitted a completed application requesting that <br />the City of Lake Elmo approve an Open Space Preservation Development Concept Plan <br />for 24 residential lots on 71.6 acres; and <br />WHEREAS, on the 9th day of May, 2005, at a public hearing, the Lake Elmo <br />Planning Commission reviewed the Development Application, the City Planner's reports <br />and comments, the comments of the Applicant and the Applicant's representatives, and <br />recommended approval of the Development Application; AND <br />WHEREAS, on the 25th day of July, 2005, at a public hearing, the Lake Elmo <br />Planning Commission reviewed the Development Stage Application, the City Planner's <br />reports and comments, the comments of the Applicant and the Applicant's <br />representatives, and recommended approval of the Development Application based upon <br />the following Findings: <br />1. The application is in compliance with the approved Concept Plan. <br />2. The application generally complies with the OP Ordinance Design Standards, <br />3. The OP Development Stage Plan and Preliminary Plat complies with City Code <br />for issuance of a Conditional Use Permit for an OP Project. <br />4. The Preliminary Plat and Plan, upon compliance with the City Engineer's <br />recommendations, comply with the Development Stage Plan and design standards <br />of the Subdivision Code. <br />And subject to the following Conditions: <br />I . Deletion of the project monument sign. <br />2. The Final Plat shall include no more than 25 building lots unless the <br />Comprehensive Plan/Zoning Ordinance has been officially amended to allow a <br />higher lot count. The final platting of Outlots A, B and /or C will only be on the <br />basis of the Zoning Ordinance density allowed for OP development. <br />3. Compliance with Valley Branch Watershed District recommendations as <br />determined to be applicable by the City Engineer. <br />4. Compliance with the recommendations of the City Engineer, specifically as to <br />street widths. <br />
The URL can be used to link to this page
Your browser does not support the video tag.