Loading...
HomeMy WebLinkAboutPZ Agenda Packet; 6-22-15 3800 Laverne Avenue North Lake Elmo, MN 55042 (651) 747-3900 www.lakeelmo.org NOTICE OF MEETING The City of Lake Elmo Planning Commission will conduct a meeting on Wednesday, June 22, 2015 at 7:00 p.m. AGENDA 1. Pledge of Allegiance 2. Approve Agenda 3. Approve Minutes a. June 8, 2015 4. Public Hearing a. PRELIMINARY PLAT AND CONDITIONAL USE PERMIT – Lennar Homes has submitted an application for a Preliminary Plat and Conditional Use permit for a 48-Unit single family attached (townhouse) subdivision to be located immediately north of 5th Street and east of Lake Elmo Avenue within the City’s I- 94 Corridor planning area. A conditional use permit is required because the developer is proposing to serve the subdivision with a private road. This project area is 15.11 acres in size. The PID’s associated with the application are as follows: 36.029.21.32.0002 and 36.029.21.32.0034 5. Business Items a. ZONING TEXT AMENDMENT - ACCESSORY BUILDING SETBACKS, URBAN RESIDENTIAL DISTRICTS. The Planning Commission is being asked to consider advancing a Zoning Text Amendment to amend the rear yard setback requirement for accessory buildings in the urban residential zoning districts. b. ZONING TEXT AMENDMENT - SUBDIVISION IDENTIFICATION SIGNS. The Planning Commission is being asked to consider advancing a Zoning Text Amendment to amend the Sign Ordinance to provide greater clarity and direction on subdivision identification signs. 6. Updates a. City Council Updates – June 9, 2015 Meeting i. Phase 1 Downtown Street and Utility Project – City concurrence to award contract approved ii. Cooperative Agreement w/Washington County approved iii. Easton Village Development Agreement amended iv. East Village Trunk Sewer Agreement approved v. Zoning Text Amendment – Freeway Signs denied w/written findings 2 b. Staff Updates i. Upcoming Meetings:  July 13, 2015  July 27, 2015 c. Commission Concerns 7. Adjourn Lake Elmo Planning Commission Minutes; 6-8-15 City of Lake Elmo Planning Commission Meeting Minutes of June 8, 2015 Chairman Dodson called to order the meeting of the Lake Elmo Planning Commission at 7:00 p.m. COMMISSIONERS PRESENT: Dodson, Dorschner, Williams, Fields, and Griffin COMMISSIONERS ABSENT: Kreimer STAFF PRESENT: City Planner Johnson Approve Agenda: The agenda was accepted as presented. Approve Minutes: May 27, 2015 M/S/P: Dorschner/Griffin, move to approve minutes as amended, Vote: 5-0, motion carried with Haggard and Larson not voting. Business Item: Proposed Nature Center, Sunfish Lake Park – Tony Manzara Planner Johnson stated the Mr. Manzara would be presenting tonight. He also stated that the role of the Planning Commission tonight is to determine if this proposal meets the Comprehensive Plan. This proposal has already gone through the Park Commission. Mr. Manzara began his presentation about the proposed nature center in Sunfish Lake Park. He talked about the non-profit that would be set up to fundraise to support this use to minimize the tax burden to the City. Once the building was built, the ownership would transfer to the City. He noted several community benefits associated with the nature center. First, there would be an educational benefit that may include a relationship with the ISD 834 school district. He then described how the City’s Comprehensive Plan relates to the proposal. In addition, Mr. Manzara highlighted how the proposed use would be allowed under the existing conservation easement on Sunfish Lake Park with the Minnesota Land Trust. Dodson asked about additional parking. Manzara stated that if the parking lot was marked, you could use striping for bus lanes. There is also room for expansion. Manzara stated that he is contributing $125K and the rest will be obtained through fundraising. 2 Lake Elmo Planning Commission Minutes; 6-8-15 Mr. Manzara then showed an aerial photo of the parking area of Sunfish Lake Park. He described two possible locations for the proposed building. Moving on to the building itself, he showed several examples of proposed designs for the building. In addition, he described interior uses of the building. Goals for the building include low maintenance design, exhibit space, classroom or presentation space, a possible gift shop, restrooms, among other uses. As far as utilities go, electrical is available, geothermal would be possible for heating, and water could be available through a well. With regards to process and timeline, Mr. Manzara identified the activities he has completed to date. He presented a proposed timeline with next steps. Next steps include presentation to the City Council, establishment of the non-profit organization, completion of plans, and construction to start in May of 2016. Mr. Manzara also identified other parties that he intends to contact for further feedback. Fields asked if there is an Oak Savannah area in Sunfish Lake Park. Larson confirmed that the park contains the largest stand of oak savannah in Washington County. Fields also encouraged Mr. Manzara to determine annual maintenance costs. Haggard noted that some nature centers have difficulty being fully staffed because of funding. She also suggested a partnership with Stillwater High School. Students often need volunteer credits for science related courses. Dodson asked if Mr. Manzara has contacted the MN Land Trust. In addition, he asked about contacting the Ski Club. Manzara will contact both of these organizations prior to presenting to the City Council. Dodson suggested considering some form of agricultural themed architecture. Williams supports the idea and finds it consistent with the Comprehensive plan. He feels the Planning Commission should recommend approval of the request. Haggard supports the idea. She offered two points: 1) There is concern about the cost of operation and maintenance, and 2) proposed location #1 for the building may be preferable as it is further away from the residential home. Larson stated that North Star Ski Club uses the park frequently. There is enough demand in his view to warrant exploration of the proposal. Larson noted that he served on the Park Commission, and the proposed location is consistent with the desire of the previous Park Commission that developed the conservation easement for the park. Larson provided feedback about the proposed locations based on his knowledge of the park. Dodson asked for best location for a septic drainfield. Larson noted that it would be best to the south of the structure. 3 Lake Elmo Planning Commission Minutes; 6-8-15 Griffin asked about exterior lighting. Mr. Manzara noted that he will use downcast lighting. Johnson noted that any lighting would be required to meet the City’s Dark Sky Ordinance. M/S/P: Williams/Fields, move that the proposed nature center should be pursued and is consistent with the Comprehensive Plan, Vote: 7-0 motion carried unanimously. Council Updates – June 2, 2015 Meeting 1. Village Preserve Developers Agreement – passed. 2. Wedding Venue Ordinance Amendment – postponed. Williams was concerned that the City Council seemed not be willing to change parts of the ordinance and seemed to have more of a take it or leave it kind of approach. Johnson stated that sometimes if there are major changes to what is presented, staff is asked to bring it back to the Planning Commission with those changes. 3. Interim Ordinance – postponed. Staff Updates 1. Upcoming Meetings a. June 22, 2015 b. July 13, 2015 Commission Concerns Williams noted his concern about the Easton Village construction not starting. Johnson noted that Easton Village is working with Gonyea and Engstrom to finalize plans to complete construction on the final sewer segment. Meeting adjourned at 7:51 pm Respectfully submitted, Joan Ziertman Planning Program Assistant PUBLIC HEARING ITEM 4a – ACTION ITEM PLANNING COMMISSION DATE: 6/22/15 AGENDA ITEM: 4A – PUBLIC HEARING CASE # 2015-19 ITEM: Diedrich Property Townhouses (Lennar) – Preliminary Plat and Conditional Use Permit SUBMITTED BY: Kyle Klatt, Planning Director REVIEWED BY: Nick Johnson, City Planner Jack Griffin, City Engineer SUMMARY AND ACTION REQUESTED: The Planning Commission is being asked to consider a Preliminary Plat request from Lennar Corporation for a 46-unit single-family attached (townhouse) development to be located on slightly over 15 acres of land immediately east of Lake Elmo Avenue and north of the Hunters Crossing development. The site is located within the I-94 Corridor Planning Area and is therefore on property that has been guided for public sewer and water services. The application as originally submitted included a request for a Conditional Use Permit to allow the use of a private street to serve the individual townhouse units. The applicant has since updated the proposed site plan and plat to incorporate a public street within the development, which will eliminate the need for a conditional use permit. Staff is recommending approval of the request with conditions as listed in the below report. GENERAL INFORMATION Applicant: Lennar Corporation (Paul Tabone); 16305 36th Avenue North, Suite 600, Plymouth MN 55446 Property Owner: Tammy Diedrich and Gerhard Rieder, 7401 Wyndham Way, Woodbury, MN 55125 Location: Part of Section 36 in Lake Elmo, north of I-94, east of Lake Elmo Avenue, and south of the Cimarron Golf Course property. Immediately north of 404 Lake Elmo Avenue North. PID: 36.029.21.32.0002 Request: Application for a preliminary plat related to a 46-unit townhouse subdivision. A request for a conditional use permit is no longer need based on the submission of an updated site plan with a public street. Existing Land Use and Zoning: Vacant with fairly heavy tree cover. Current Zoning: RT – Rural Transitional; Proposed Zoning: MDR – Medium Density Residential Surrounding Land Use: North – Cimarron Manufactured Home Park and golf course; East – Trans-City industrial building; West – Rural Residential property and The Forest residential subdivision; South – 2 PUBLIC HEARING ITEM 4a – ACTION ITEM Hunters Crossing single family residential development; also one existing home site adjacent to Lake Elmo Avenue. Surrounding Zoning: MDR – Medium Density Residential, RT – Rural Development Transitional; LDR – Low Density Residential Comprehensive Plan: Urban Medium Density Residential (4 – 7.5 units per acre) History: No history on file with the City. Site has been vacant or used for agricultural purposes for a long period of time. The sketch plan was reviewed by the City in February and March of 2015. Staff did not find any information in the City’s land use files for the site that would impact the proposed subdivision. Deadline for Action: Application Complete – 6/3/15 60 Day Deadline – 8/2/15 Extension Letter Mailed – No 120 Day Deadline – 10/1/15 Applicable Regulations: Chapter 153 – Subdivision Regulations Article 10 – Urban Residential Districts (MDR) §150.270 Storm Water, Erosion, and Sediment Control REQUEST DETAILS The City of Lake Elmo has received a request from Lennar Corporation for a preliminary plat for a 46 unit townhouse development tentatively called the Diedrich Property Preliminary Plat. Please note that the original application and all of the construction plans as submitted were for a 48-unit project utilizing a private street. Due to several issues concerning the original configuration of lots and in order to address City, County, and watershed district comments and concerns, the applicant has submitted a revised site plan that now includes a public street and a reduced number of lots. The applicant may still be seeking some variation from City standards in order to plat a public street, and Staff is suggesting that any variations from the City’s zoning and subdivision regulations be addressed at the final plat stage. The City previously reviewed a sketch plan for the property earlier in the spring of this year, and the current application has been preceded by a Comprehensive Plan amendment that changed the future land use designation of this parcel from HDR – High Density Residential to MDR – Medium Density Residential. The site under consideration is situated between the Cimarron Golf Course and the Hunters Crossing development north of the planned 5th Street corridor and west of Lake Elmo Avenue. The property is currently vacant, and there is no record of any buildings or structures being constructed on the site. When the City was initially planning the trunk sewer line project to serve the Village Area, the original alignment of the trunk sewer through this property followed the northern and eastern property boundaries. After subsequent discussions with the property owners, this alignment was changed to the southern boundary of the site, within what eventually become the planned right-of- way for 5th Street. The City has acquired easements for both 5th Street and the sewer and water main serving this area that cross the southern property boundary of the applicant’s property. These easements may eventually be vacated since the preliminary plat will formally dedicate the required right-of-way for the road, sewer, water, and other utilities as 5th Street. A similar dedication of the road and utility right-of-way was provided with Hunters Crossing to the South. 3 PUBLIC HEARING ITEM 4a – ACTION ITEM The proposed access into the development is now proposed to occur via a new public road immediately across from the entrance to Hunters Crossing (Lavern Avenue North). The City has previously approved the use of private roads to serve the townhouse units with Lennar’s Savona subdivision, and the plan as originally drawn out called for a private road to be used to access the proposed townhouses. The road as originally planned would have been located within a 30-foot wide Outlot, however, the City Engineer expressed concern that this outlot was not wide enough to accommodate all necessary infrastructure (both private and public) to serve the development. In order to address these (and other) concerns, the applicant has propose a modified plan that accommodates a public street meeting all City standards. This updated plan has been submitted as a supplement to the original application materials that still include a 30-foot outlot with a private street. Any future plan submissions and reviews will need to address revised review comments from Staff, and specifically, the City Engineer, prior to approval of a final plat. The overall site plan is generally consistent with sketch plan submitted earlier this year. The two notable exceptions are that the (now revised) preliminary plat reduced the overall number of units from 50 to 46. The developer is proposing to construct a sidewalk along the main entrance into the development in addition to a sidewalk connecting the western cul-de-sac with the planned 5th Street trail. There are no interior sidewalks depicted on the preliminary development plans, and the applicant has stated that they believe that interior sidewalks will not be necessary given the low traffic volumes expected on the interior streets. Staff is recommending that if the project does includes a public street and right-of-way meeting City standards that a sidewalk on one side of all street be included in the final development plans. One of the reasons that the applicant originally requested the use of a private street is that it would allow them to slightly vary the setbacks of the townhouse units in order to help minimize the visual impact of a row of townhouses all at the same setback. The developer is still looking for ways to add some variation to the setbacks, and will be seeking some minor modifications as part of the final plat submission in order to address this issue. Consistent with the City’s specifications for the 5th Street roadway segment, the applicant has provided for a 100-foot wide right-of-way, which will provide sufficient room for the construction of a parkway with turning lanes, 10-foot bituminous trail, sidewalk, trees, lighting, and other design elements as planned by the City. In this case, the applicant is retaining the existing easement width of 110 feet at the intersection of 5th Street and Lake Elmo Avenue and narrowing the right-of-way down to match the 100 foot right-of-way platting within Hunters Crossing. Both Ryland Homes and Lennar are still working towards a joint project to build 5th Street at one time verses splitting the construction up into northern and southern segments. The preliminary plat has been developed in response to the City’s recently adopted Comprehensive Plan, which identifies all of the applicant’s property for urban medium density residential development. The plat incorporates 46 single family attached lots, most of which are designed with widths around 40 feet each. Given the limited access to the site and relatively small nature of the property, the applicant has worked to incorporate some variety into the arrangement of lots as is possible given these restrictions. Public sanitary sewer service is presently available on the site, which was constructed as part of the Village trunk line project completed late last year. Water was extended to the site as part of the 2014 Lake Elmo Avenue water main project. Like other developments along this line, the developer will be expected to pay the full water availability charges for each planned lot ($3,000) at the time of the final plat, even if the project is broken up into different stages. 4 PUBLIC HEARING ITEM 4a – ACTION ITEM PLANNING AND ZONING ISSUES The Diedrich Townhouse site is guided for urban medium density development in the City’s Comprehensive Plan, and the appropriate zoning for the site will be MDR – Medium Density Residential. The actual rezoning of the property is a necessary step prior to development of this site that will need to be completed prior to approval of the final plat. The overall subdivision plan has therefore been prepared in order to comply with the district standards for the MDR districts in terms of lot size, lot widths, building setbacks, and other design criteria. Within the MDR district, townhouses are allowed that do not meet minimum frontage requirements or that are located along a private street as a conditional use permit. The planned road serving the townhouse lots extends due north from 5th Street and then splits east and west through the middle of the property to provide access to the townhouses. There are no planned connections to the east, west, or north of the property because these sites have previously been developed or will connect into 5th Street once on either side of the site under consideration. Given the site characteristics and the immediately adjacent land uses (which are all different than single family), the applicant has had to design the site as an isolated island that is impractical to connect to adjacent properties. The streets as originally planned and later updated will meet the City’s minimum standards for construction. The sidewalks within the subdivision are limited to those mentioned in the previous section of this report, and there are no sidewalks planned along the east/west private road. Please note that the plat as originally submitted did not dedicate the amount of right-of-way that has been requested by Washington County. The County has previously requested that the developer dedicate an additional 42 feet of right-of-way along Lake Elmo Avenue, and that this right-of-way width be incorporated into the final plat. The additional right-of-way does impact the location of the planned storm water pond over Outlot A, and this pond and associated grading work will need to be adjusted in order to account for the expanded right-of-way. Updated plans must be reviewed and approved by the City, County, and Watershed District prior to the City’s approval of a final plat for this subdivision. As noted in the preceding section, the developer has submitted an updated site plan that retains the same general layout, and configuration of lots, but changes the proposed private street outlot of 30 feet to a public right-of-way 60 feet in width. The additional right-of-way has been requested by the City Engineer to help ensure that there is adequate room for future maintenance and upkeep of public utilities (sewer, water, and other private utilities) within this subdivision. All final construction plans will need to be updated to reflect the public right-of-way and reconfiguration of lots. The preliminary site plan included as part of the application materials includes a description of the lot size, dimensions, and all required setbacks for the development. All of the lots meet the City’s minimum area requirement of 4,000 for single-family attached lots in a MDR district, with the smallest lot proposed at 5,527 square feet. The site plans further illustrate that throughout the subdivision the lots will average 8,782 square feet, which exceeds the minimum requirements by a fairly wide margin. The following is a general summary of the subdivision design elements that have proposed as part of the Diedrich Townhouses preliminary plat and plans: Zoning and Site Information: • Existing Zoning: RT – Rural Transitional 5 PUBLIC HEARING ITEM 4a – ACTION ITEM • Proposed Zoning: MDR – Medium Density Residential • Total Site Area: 15.11 acres (includes Outlot D of Hunters Crossing) • Total Residential Units: 48 • Proposed Density (Net): 4 units per acre • REC Units from Comp Plan: 57 (based on a gross calculation) Proposed Lot Dimensional Standards: • Min. Lot Width: 40 ft. • Lot Depth: 134 ft. (140 ft. typical) • Lot Area: 4,000 sq. ft. (8,000 typical) • Front Yard Setback: 25 ft. • Side Yard Setback: 10 ft. • Rear Yard Setback: 20 ft. Proposed Street Standards: • ROW Width – Local 60 ft. (potentially could be reduced to 50 ft. for a limited access road) • ROW Width – Minor Collector 110-100 feet • Street Widths – Local: 28 ft.(per City standard) • Street Width – Minor Collector Varies – parkway design proposed The standards listed above are all in compliance with the applicable requirements from the City’s zoning and subdivision regulations, including the revised public street and associated right-of-way. Based on Staff’s review of the preliminary plat, the applicant has demonstrated compliance with all applicable code requirements at the level of detail that is required for a preliminary plat. The applicant will need to address the review comments from the City and County, and the final plat and final construction plans will specifically need to be updated to reflect the wider public street right-of- way and expanded Lake Elmo Avenue (CSAH 17) right-of-way. Any variations from setbacks and other standards because of the amended road section will need to be addressed with the final plat. As with any new subdivision the City Code requires that a portion of the plat be set aside for public park use. In this case, the applicant is not proposing to dedicate any land specifically for a public park, and is instead asking to pay a fee in lieu of land dedication. This is not a site or general location that would suitable for a public park or any specific trail connections; therefore, Staff is supportive of the applicant’s request to pay a fee instead of dedicating any public land with the subdivision. The required dedication for the 15.11 acre site would be 1.51 acres, or a cash payment of approximately $90,000 based on previous appraisals of land in this area. REVIEW AND ANALYSIS City Staff has reviewed the proposed preliminary plat, and has forwarded the plans to appropriate reviewing agencies in advance of the Planning Commission meeting. In general, the proposed plat will meet all applicable City requirements for approval, and any deficiencies or additional work that is needed is noted as part of the review record and can be imported in the final plat and final construction plans. The City has received a detailed list of comments from the City Engineer concerning the proposed subdivision; these comments are attached to this report for consideration by the Planning Commission. 6 PUBLIC HEARING ITEM 4a – ACTION ITEM In addition to the general comments that have been provided in the preceding sections of this report, Staff would like the Planning Commission to consider the issues and comments related to the following discussion areas as well: • Comprehensive Plan. The proposed subdivision is consistent with the Lake Elmo Comprehensive Plan for this area and with the densities that were approved as part of this plan (as recently amended). The net densities for the development fall within the low end of the range allowed for the urban medium density, and depending on the specific amount of land that will be dedicated for 5th Street and Lake Elmo Avenue, this density will be somewhere in the 3.8 to 4.0 units per acre range. Given the site constraints and need to accommodate additional right-of-way within the plat, Staff has found that the proposed density is in keeping the spirit and intent of the Comprehensive Plan for this area. Other aspects of the Comprehensive Plan relate to the Hunter’s Crossing subdivision as follows: o Transportation. The City’s transportation plan calls for the construction of a minor collector road that will connect the eastern and western portions of the I-94 Corridor. Staff views this road as a critical piece of the transportation infrastructure that is needed to serve the densities that have been planned for this area. The City’s previous acquisition of easements through this area anticipated the future alignment of 5th Street through the southern portion of the applicant’s property and the proposed subdivision will officially plat this right-of-way with the final plat. Both Lennar and Ryland are still working towards a joint project to build all of 5th Street between their properties later this summer, and regardless of whether or not a joint project occurs, Lennar will need to build at least its half of 5th Street in order to provide access to the proposed townhouses. Staff will continue to work with both parties to work towards a joint project that addresses the needs of the private developers and the City for access. o Parks. The City’s park plan identifies proposed locations for neighborhood parks based on the anticipated population that should be served by each park. This subdivision is located at the periphery of a park search area for the area east of Lake Elmo Avenue. During its review of the sketch plan for this subdivision, the Park Commission did not recommend the dedication of land within the subdivision for a new park, and instead agreed with the developer’s request to submit a cash payment in lieu of land dedication. Staff anticipates that a larger park that could be designed in conjunction with the School District near Oakland Junior High would better serve existing and future residents in this portion of the City. o Water. Public water service has been extended to this area via the public improvement project that installed a new water main along Lake Elmo Avenue last year. The final construction plans will need to abide by any recommendations of the City Engineer concerning the extension of water service through this site to service other adjacent sites (which will likely not be required given the exiting development on either side of the applicant’s site). o Sanitary Sewer. The developer will be required to connect to the gravity sewer main that has been installed under the 5th Street right-of-way. The utility plans provided by the applicant document this connection. 7 PUBLIC HEARING ITEM 4a – ACTION ITEM o Phasing. The Lennar townhouse subdivision is located within the Stage 2 phasing area for the I-94 Corridor. The City’s Comprehensive Plan allows the City to consider accelerating development stages when adequate public services are available. In this case, the sewer and water projects already completed help this project meet this threshold. The developer will also be required to pay all water availability charges for the project at the time of platting regardless of project staging. • Zoning. The proposed zoning for the site is MDR – Low Density Residential and the subdivision has been designed to comply with all applicable requirements of this zoning district. • Subdivision Requirements. The City’s Subdivision Ordinance includes a fairly lengthy list of standards that must be met by all new subdivisions, and include requirements for blocks, lots, easements, erosion and sediment control, drainage systems, monuments, sanitary sewer and water facilities, streets, and other aspects of the plans. The majority of these requirements have been addressed as part of the City Engineer’s comments (which are detailed in the Engineer’s comment letter) or have been reviewed as part of Staff’s ongoing communications with the applicant regarding the project. The elimination of the private street will help the project comply with several of the concerns previously expressed by the City Engineer and other Staff. • Infrastructure. The developer will be required to construct all streets, sewer, water, storm water ponds, and other infrastructure necessary to serve the development. • Landscaping. The applicant has provided a landscape plan for the development that is intended to comply with the City’s requirements for number, size and spacing of trees along the public streets. This plan should be reviewed by the City’s consulting landscape architect prior to the submission of a final plat. The applicant has also submitted a tree inventory that documents the type and size of all trees on the property and all those that will be impacted by construction to determine compliance with the City’s tree preservation and protection plan as described below. • Tree Preservation and Protection. The City recently adopted a tree preservation and protection ordinance, and the applicant has prepared a tree inventory and tree preservation plan for the site. Overall, there are 1,387 caliper inches of trees on the subject property, and all of these trees will be removed in order to build the subdivision as planned. This means the developer will need to mitigate for 485 caliper inches (the amount that exceeds the allowed 30% removal) in accordance with the ordinance replacement schedule. The species and mix of replacement plantings should be also be reviewed by the City’s consulting landscape architect. • Green Belt/Buffer/Screening. There are no planned green belts or buffers on or around the site under consideration. The proposed landscape plan incorporates plantings along all edges of the property and within the internal outlots. • Streets and Transportation. The proposed street system, as revised, has been designed to comply with all applicable subdivision requirements and City engineering standards. The developer must also commit to the construction of at least the northern portion of 5th Street in 8 PUBLIC HEARING ITEM 4a – ACTION ITEM order for the project to move forward as a final plat. The timing of this road will be somewhat dependent on whether or not Ryland and Lennar are able to come to an agreement to build 5th Street as a joint project. The final construction plans should reflect how 5th Street will be built, and must include the northern portion if a join project does not move forward. The City has received and reviewed a complete set of construction plans for 5th Street as part of the Hunters Crossing development. o County Comments. Comments received form Washington County during the concept plan review, which focus on needed improvements to Lake Elmo Avenue (CSAH 17) to serve the development, are included in an attached letter from the County’s Senior Planner dated March 3, 2015. Staff is recommending that compliance with the County’s comments be added as a condition of approval for the plat. • Trails. The Planning Commission comments during the sketch plan review encouraged the developer to incorporate a trail connection between 5th Street and the eastern cul-de-sac. The developer has indicated that given the tight constraints on the site (even with the elimination of four units) that there is not sufficient room to provide for this trail connection. Staff would also like to note that the overall distance from the cul-de-sac to 5th Street is not a large distance even without a direct trail connection. • Street Names. Staff has forwarded its recommendation for street names to Lennar, and these names should be included on the final plat documents. • Adjacent Parcels. The proposed landscape plan includes additional plantings between the proposed townhouses and the industrial facility to the east. The landscape plan will need to be updated to reflect the revised site plan, and in particular, the plan should continue to provide for screening between the eastern-most townhouses and the adjacent industrial land. • City Engineer Review. The City Engineer has provided the Planning Department with a detailed comment letter as a summary of his preliminary plat review. Staff has incorporated the more significant issues identified by the Engineer as part of the recommended conditions of approval, and has also included a general condition that all issues identified by the City Engineer must be addressed by the applicant prior to approval of a final plat for any portion of the Diedrich townhouses. With the general site plan revisions that have been proposed by the applicant, the construction plans will need to be updated to reflect this revisions. Any additional comments or concerns from the City Engineer that arise from the plan updates will need to be addressed as part of a final plat submission. • Watershed District. The project area lies within the Valley Branch Watershed District and the developer will need to secure permits from the watershed district in order to proceed with the development as planned. One of the recommended conditions of approval is that the applicant receive plan approval from the watershed district prior to submission of a final plat for the subdivision. • Storm Water Management. In order to accommodate the County’s requirement for additional right-of-way along Lake Elmo Avenue, the developer has had to readjust the size and configuration of the planned storm water basin over Outlot A. The County will not allow any portion of the storm water facility to be located within its right-of-way; therefore, the 9 PUBLIC HEARING ITEM 4a – ACTION ITEM plans will need to be updated to reconfigure and adjust the location and size of this pond. These updated plans will be subject to review by the City Engineer and Valley Branch Watershed District. The developer is also requesting to use the proposed pond as part of a water re-use system through lawn irrigation. The City Engineer is seeking additional details concerning this system prior to making any recommendations concerning the viability of the system as proposed. • Washington County Review. County Staff has previously provided review comments to the City concerning the sketch plan for the Diedrich townhouses subdivision to the City in a letter dated March 5, 2015. The most significant of the County’s concerns is that the applicant will need to make improvements to the County road system in order to provide the necessary access to the subdivision. As a condition of approval, Staff has noted that the applicant will be responsible for including all improvements to TH17 as required by the County as part of the construction plans for the development. In addition, the County has noted that the required right-of-way dedication for Lake Elmo Avenue should be 92 feet as opposed to the 90 feet shown. This request does impact the proposed storm water plan as noted above. Based on the above Staff report and analysis, Staff is recommending approval of the preliminary plat with several conditions intended to address the outstanding issues noted above and to further clarify the City’s expectations in order for the developer to move forward with a final plat. The recommended conditions are as follows: Recommended Conditions of Approval: 1) The landscape plan and tree preservation plan shall be reviewed and approved by an independent forester or landscape architect in advance of the approval of a final plat and final construction plans. 2) The final landscape plan shall incorporate additional plantings where feasible adjacent to the shared property lines with parcel at 11490 Hudson Boulevard. 3) The applicant shall be responsible for updating the final construction plans to include the construction of all improvements within the Lake Elmo Avenue (CSAH 17) right-of-way as required by Washington County and further described in the review letter received from the County dated March 3, 2015. The required improvements shall include, but not be limited to the construction of a northbound right turn lane and southbound center turn lane. 4) The developer shall follow all of the rules and regulations spelled out in the Wetland Conservation Act, and shall acquire the needed permits from the Valley Branch Watershed District prior to the commencement of any grading or development activity on the site. 5) The applicant shall enter into a maintenance agreement with the City that clarifies the individuals or entities responsible for any landscaping installed in areas outside of land dedicated as public park and open space on the final plat. 6) The developer shall be required to pay a fee in lieu of park land dedication equivalent to the fair market value for the amount of land that is required to be dedicated for such purposes in 10 PUBLIC HEARING ITEM 4a – ACTION ITEM the City’s Subdivision Ordinance. A cash payment in lieu of land dedication shall be paid by the applicant prior to the release of the final plat for recording. 7) The applicant must enter into a separate grading agreement with the City prior to the commencement of any grading activity in advance of final plat and plan approval. The City Engineer shall review any grading plan that is submitted in advance of a final plat, and said plan shall document extent of any proposed grading on the site. 8) All required modifications to the plans as requested by the City Engineer in a review letter dated June 17, 2015 shall be incorporated into the plans prior to consideration of a final plat. 9) The applicant shall update all of the landscaping and construction plans to reflect the updated site plan that includes a public right-of-way within the project area. These updated plan shall be subject to review and approval by the City Engineer. 10) Although the updated site plan does not incorporate a private street, any request for flexibility from City regulations and standards must be considered and addressed as part of the final plat submission. 11) The final construction plans for the Diedrich Townhouses subdivision shall include, at a minimum, the northern portion of 5th Street if a joint construction project between the applicant and Ryland Homes does not proceed in advance of a final plat submission for the applicant’s site. 12) The architectural covenants for the homeowner’s association shall include provisions that discourage blank garage doors. All garage doors shall incorporate windows or decorative trim to minimize the visual impact of the garage-forward home design. 13) Prior to recording the Final Plat for any portion of the area shown in the Preliminary Plat, the Developer shall enter into a Developers Agreement acceptable to the City Attorney that delineates who is responsible for the design, construction, and payment of public improvements. 14) The site plan and construction plans shall be revised to include a sidewalk along at least one side of all streets within the subdivision. DRAFT FINDINGS Staff is recommending that the Planning Commission consider the following findings with regards to the proposed Lennar/Diedrich Townhouses preliminary plat: • That the preliminary plat is consistent with the Lake Elmo Comprehensive Plan and the Future Land Use Map for this area. • That the preliminary plat complies with the City’s Urban Medium Density Residential zoning district regulations. 11 PUBLIC HEARING ITEM 4a – ACTION ITEM • That the preliminary plat complies with all other applicable zoning requirements, including the City’s landscaping, storm water, sediment and erosion control and other ordinances with the plan revisions as requested by City Staff and consultants • That the preliminary plat complies with the City’s subdivision ordinance. • That the preliminary plat is consistent with the City’s engineering standards provided the plans are updated to address the City Engineer’s comments documented in a letter dated June 17, 2014. RECCOMENDATION: Staff recommends that the Planning Commission recommend approval of the Lennar/Diedrich preliminary plat with the 14 conditions of approval as listed in the Staff report. Suggested motion: “Move to recommend approval of the Lennar/Diedrich preliminary plat with the 14 conditions of approval as drafted by Staff” ATTACHMENTS: 1. Application Forms 2. Application Narrative and Information 3. Location Map 4. Tree Inventory 5. Review Comments: a. City Engineer b. Washington County 6. Preliminary Plat and Plans (20 sheets) a. Revised Site Plan (Dated 6/19/15) b. Cover Sheet c. Legend Sheet d. Existing Conditions e. Preliminary Plat f. Preliminary Site Plan g. Preliminary Utility Plan h. Preliminary Grading Plan i. Erosion Control Plan j. Preliminary Seeding Plan k. Preliminary Street Profiles l. Details m. Landscape Plan n. Tree Preservation Plan ORDER OF BUSINESS: - Introduction ........................................................................................ Planning Staff 12 PUBLIC HEARING ITEM 4a – ACTION ITEM - Report by Staff ................................................................................... Planning Staff - Questions from the Commission ............................ Chair & Commission Members - Open the Public Hearing .................................................................................. Chair - Close the Public Hearing .................................................................................. Chair - Discussion by the Commission .............................. Chair & Commission Members - Action by the Commission ..................................... Chair & Commission Members The Forest LanducciProperty CimarronPark L a k e E l m o A v e ")17 H u d s o n B l v d N 3 r d S t P l N Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX, Getmapping,Aerogrid, IGN , IGP, swisstopo, and the GIS User Community Data S cource: Washington County, MN10-22 -2013 Lo cation Map: Diedrich Property (PIN: 36.029.21.32.0002) K05001,000250 Feet 1"=50 0' §¨¦94 Diedrich Property PAGE 1 of 4 MEMORANDUM Date: June 17, 2015 To: Kyle Klatt, Planning Director Re: Diedrich Property – Preliminary Plan Review From: Jack Griffin, P.E., City Engineer An engineering review has been completed for the Preliminary Plat submittal for the Diedrich Property. The submittal consisted of the following documentation prepared by Pioneer Engineering: • Diedrich Property Preliminary Plan Set, Sheets 1-14, L1 and T1, dated June 17, 2015. • Stormwater Management Plan dated June 3, 2015. STATUS/FINDINGS: Engineering has prepared the following review comments: PRELIMINARY PLAT • Outlot A is proposed as City owned to accommodate the storm water pond with an HOA owned and operated water re-use irrigation system. See comments below under Stormwater Management. • Outlot B is proposed as HOA owned to accommodate a “Private Street”. See comments below under residential streets. • The applicant must submit to the City written correspondence from the County indicating that adequate CSAH 17 R/W is being dedicated as part of this Plat. If additional R/W is required by the County the Plat must be revised and resubmitted. • The plat must be revised to include the Xcel Energy Transmission Easement along the north property line. • Permanent grading and drainage easements are required to implement the improvements as proposed. These easements must be obtained prior to grading activities and prior to the City accepting an application for final plat. All public improvements constructed to support the development must be designed and constructed in accordance with the City Engineering Design Standards Manual available on the City website and dated February 2015. GRADING PLAN, STORMWATER MANAGEMENT AND STORM SEWER SYSTEM • The site plan is subject to a storm water management plan meeting State, VBWD and City rules and regulations. Storm water facilities proposed as part of the site plan to meet State and VBWD permitting requirements must be constructed in accordance with the City Engineering Design Standards Manual available on the City website. A finalized storm water management plan must be approved by the City and the VBWD permit must be obtained prior to grading activities. • The Stormwater Management Plan incorporates storm water re-use through lawn irrigation. The re-use system is necessary for the applicant’s plan to meet State and Watershed permit requirements for water quality treatment (volume control). Outlot A is proposed as City owned to accommodate the storm water FOCUS ENGINEERING, inc. Cara Geheren, P.E. 651.300.4261 Jack Griffin, P.E. 651.300.4264 Ryan Stempski, P.E. 651.300.4267 Chad Isakson, P.E. 651.300.4283 PAGE 2 of 4 pond. The water re-use irrigation system is proposed to be HOA operated and maintained on City property. Details of this plan are limited in the application. The following considerations should be noted.  Stormwater re-use, when implemented correctly can be an effective method to reduce reliance of potable water use while reducing storm water discharges. It would help to reduce peak demands on the potable water system that typically occurs during the summer irrigation and landscape watering season. These benefits make storm water re-use worth consideration.  However, the City has no design standards or guidelines for implementation and currently has no experience with storm water reuse operations.  The two most notable concerns for storm water reuse includes the pollutants in the storm water (addressing treatment needs) and designing a system that provides a properly balanced hydraulic system (sizing the storage, and balancing the drawdown to the projected use in a variable climate).  Pollutants in the storm water reuse system may be a concern for three basic reasons: 1) the health risks associated with human contact; 2) the impact on the environment given the various uses (i.e. bacteria or chlorides from salts); 3) issues for the system equipment and operational impacts.  Preliminary Plat should be conditioned upon the following:  The developer must sign an operation and maintenance agreement for the storm water reuse system in a form acceptable to the City Attorney. The agreement must indemnify and hold harmless the City from any and all activities related to the developer and HOA’s operation of this system.  The storm water pond must be designed with a hydraulic capacity acceptable to the City Engineer that ensures adequate flood protection without accounting for any water reuse from the system.  The storm water pond must be designed and constructed in accordance with the City Engineering Design Standards.  A detailed design of the irrigation system together with a detailed operations and maintenance plan must be submitted prior to any grading or construction activity on the site. • Per City requirements, all storm water facilities, including infiltration basins, must be placed in Outlots deeded to the City for maintenance purposes. The Stormwater Facility Outlots must fully incorporate the 100-year HWL, 10 foot maintenance bench and all maintenance access roads.  The pond grading must be revised to add a 10-foot maintenance bench around the entire pond, per the standard pond detail.  The maintenance access road must be revised to access the pond from 5th Street North, not CSAH 17. • Overland emergency overflows or outlets will be required as part of the site plan and must be located within drainage easements, must be in Bold Type on the plans, and must provide 1 foot of vertical separation to the low opening of any building structure. Lot information details must include the lowest opening in addition to the lowest floor elevation. • The ultimate discharge rate and location is an important consideration to avoid negative impacts to downstream properties. The storm water management plan indicates the pond outfall pipe to discharge to the northerly property. The plan as proposed cannot be implemented without permanent drainage and utility easements from the adjacent property. Permission should be provided to the City prior to accepting a final plat application or allowing grading activities. • Significant grading is proposed along the northerly property to accommodate many of the proposed building pads. Without written permission to permanently alter grades on the adjacent property, the site would require a redesign. Property owner permission or easements should be provided to the City prior to accepting a final plat application or allowing grading activities. • The storm sewer system shall be designed to maintain the City standard minimum pipe cover of 3.0 feet. • Per City requirements all storm sewer pipe easements must be a minimum 30-feet in width. • The maximum allowable curb run along streets without catch basins is 350 feet. Catch basins should be added along Street B, easterly cul-de-sac to maintain maximum curb run of 350 ft. • Sump manholes are required prior to all discharge points, located at the last manhole or catch basin prior to leaving a paved area. All sump manholes must be 4-foot deep. PAGE 3 of 4 MUNICIPAL SANITARY SEWER • Municipal sanitary sewer service is readily available within the 5th Street R/W located adjacent to the plat. • The applicant is responsible to extend the municipal sanitary sewer to the development to serve the proposed properties. • No trunk sewer oversizing is anticipated. The area can be served without a lift station. • Sanitary sewer must be realigned to better maintain street centerline alignment. • The sanitary sewer is proposed to be placed within Oulot B to be HOA owned and maintained as a private street. The Outlot width must be a minimum of 40 feet with a 5 foot drainage and utility easement along each side of the street for the corridor to be acceptable for the placement of publicly owned and maintained utilities. MUNICIPAL WATER SUPPLY • Municipal water service is readily available within the 5th Street R/W located adjacent to the plat. • The applicant is responsible to extend municipal water into the development to serve the proposed properties. • Two connection points to the existing City system should be required. • No trunk watermain oversizing is anticipated for this development. • Additional hydrants and system valves will be required as part of the final design. • Watermain must be realigned to maintain 10-foot separation from the sanitary sewer once the sanitary sewer is realigned as previously noted. • The watermain is proposed to be placed within Oulot B to be HOA owned and maintained as a private street. The Outlot width must be a minimum of 40 feet with a 5 foot drainage and utility easement along each side of the street for the corridor to be acceptable for the placement of publicly owned and maintained utilities. TRANSPORTATION IMPROVEMENTS • Access to the development must be from 5th Street as shown, directly across from the Hunters Crossing access roadway. • The applicant will be responsible to construct the north half of 5th Street from CSAH 17 to the east plat edge of the Hunters Crossing development. This improvement must be completed at the developer’s cost. • The plat must dedicate the existing 5th Street roadway easement as City R/W. The plan indicates the minimum 100 foot R/W as required. A ten (10) foot utility easement must be provided along the north side of the 5th Street R/W. • The proposed 2-lane collector parkway street (5th Street) design and geometrics must meet all Municipal State Aid design standards for urban streets (8820.9936) for ADT > 10,000; 40 mph design speed; and must be consistent with the detailed parkway cross section installed throughout the remaining corridor segments and as outlined in the 5th Street Collector Design Guidelines as prepared by City staff. • Right and left turn lanes must be incorporated along 5th Street North per the City design standards to maintain mobility along the Parkway since there is only one travel lane in each direction. • Additional streetscape amenities are required along 5th Street consistent with the remaining corridor segments. 5th Street Amenities include a north side off-road bituminous trail, minimum 10 foot width with 5 foot clear zone; a south side concrete sidewalk, minimum 6 foot width with 2 foot clear zone; landscaping elements including a center landscape median; and street lighting. • The applicant will also be partially responsible for the improvements required by Washington County at the intersection of 5th Street and CSAH 17. RESIDENTIAL STREETS • Street A must include a 50 foot tangent per City standards at the intersection with 5th Street before initiating the proposed horizontal curve. • Street B, east cul-de-sac geometrics must be revised to eliminate turns greater than 90-degrees. PAGE 4 of 4 • It is preferable that Public Streets be constructed to serve this development and designed to meet the City’s Engineering Design Standards including R/W width, street width and cul-de-sac radii. • If the streets remain HOA Privately owned, the following recommendations apply:  The street/boulevard section must be widened to allow for adequate ownership and maintenance by the City for the public utilities (watermain, sanitary sewer and storm sewer).  The street Outlot should be a minimum width of 40 feet (14 feet pavement + 6 foot boulevard) with 5- foot minimum utility easement on each side. This will enable any future construction activity to remain 100% within the Street Outlot plus the utility easement. No additional encroachment on the properties/sidewalks should be necessary during future construction.  The typical section should be updated to include storm sewer and should show the small utilities, demonstrating the 3-foot separation between gas and joint trench. • Street A vertical alignment should be revised to provide a K = 37 minimum at STA 0+71.00. 4GXKUKQPU+JGTGD[EGTVKH[VJCVVJKURNCPYCURTGRCTGFD[ OGQTWPFGTO[FKTGEVUWRGTXKUKQPCPFVJCV+ COCFWN[.KEGPUGF2TQHGUUKQPCN'PIKPGGT WPFGTVJGNCYUQHVJG5VCVGQH/KPPGUQVC E 1(&+'&4+%*2412'46; .#-''./1/+00'516# .'00#4 6*#8'07'057+6' ÄÄ0COG 4GI0Q&CVG &CVG &GUKIPGF &TCYP 2KQPGGT'PIKPGGTKPI2# /GPFQVC*GKIJVU/0 'PVGTRTKUG&TKXG  Ä (CZÄYYYRKQPGGTGPIEQO .#0&5%#2'#4%*+6'%65.#0&5748';145.#0&2.#00'45%+8+.'0)+0''45 2.;/176*/+00'516# +JGTGD[EGTVKH[VJCVVJKURNCPYCURTGRCTGFD[ OGQTWPFGTO[FKTGEVUWRGTXKUKQPCPFVJCV+ COCFWN[.KEGPUGF2TQHGUUKQPCN5WTXG[QT WPFGTVJGNCYUQHVJG5VCVGQH/KPPGUQVC +JGTGD[EGTVKH[VJCVVJKURNCPYCURTGRCTGFD[ OGQTWPFGTO[FKTGEVUWRGTXKUKQPCPFVJCV+ COCFWN[.KEGPUGF.CPFUECRG#TEJKVGEV WPFGTVJGNCYUQHVJG5VCVGQH/KPPGUQVC ,GPPKHGT.6JQORUQP 5+6'2.#0,.6 ,.6 . .1%#6+10/#2 Ä'0)ÄÄ5*''6Ä%184  &+'&4+%*2412'46; 24'.+/+0#4;2.#6 .#-''./1/+00'516# %18'45*''6 4GXKUKQPU ÄÄ%+6;%1//'065 +JGTGD[EGTVKH[VJCVVJKURNCPYCURTGRCTGFD[ OGQTWPFGTO[FKTGEVUWRGTXKUKQPCPFVJCV+ COCFWN[.KEGPUGF2TQHGUUKQPCN'PIKPGGT WPFGTVJGNCYUQHVJG5VCVGQH/KPPGUQVC E 1(&+'&4+%*2412'46; .#-''./1/+00'516# .'00#4 6*#8'07'057+6' ÄÄ 2,%$0/ ,&/ 0COG 4GI0Q&CVG &CVG &GUKIPGF &TCYP 2KQPGGT'PIKPGGTKPI2# /GPFQVC*GKIJVU/0 'PVGTRTKUG&TKXG  Ä (CZÄYYYRKQPGGTGPIEQO .#0&5%#2'#4%*+6'%65.#0&5748';145.#0&2.#00'45%+8+.'0)+0''45 ÄÄ 2CWN,%JGTPG 2.;/176*/+00'516# &'6#+.5 '415+10%10641.2.#024'.+/+0#4;)4#&+0)2.#0 ':+56+0)%10&+6+105 %18'45*''65*''6+0&':   Ä 24'.+/+0#4;2.#624'.+/+0#4;5+6'2.#0 .#0&5%#2'2.#0.64''24'5'48#6+102.#06 24'.+/+0#4;76+.+6;2.#0Ä .')'0&5*''6 24'.+/+0#4;5''&+0)2.#024'.+/+0#4;564''6241(+.'5 Ä'0)ÄÄ5*''6Ä.')'0& .')'0&5*''6 4GXKUKQPU ÄÄ%+6;%1//'065 +JGTGD[EGTVKH[VJCVVJKURNCPYCURTGRCTGFD[ OGQTWPFGTO[FKTGEVUWRGTXKUKQPCPFVJCV+ COCFWN[.KEGPUGF2TQHGUUKQPCN'PIKPGGT WPFGTVJGNCYUQHVJG5VCVGQH/KPPGUQVC E 1(&+'&4+%*2412'46; .#-''./1/+00'516# .'00#4 6*#8'07'057+6' ÄÄ 2,%$0/ ,&/ 0COG 4GI0Q&CVG &CVG &GUKIPGF &TCYP 2KQPGGT'PIKPGGTKPI2# /GPFQVC*GKIJVU/0 'PVGTRTKUG&TKXG  Ä (CZÄYYYRKQPGGTGPIEQO .#0&5%#2'#4%*+6'%65.#0&5748';145.#0&2.#00'45%+8+.'0)+0''45 ÄÄ 2CWN,%JGTPG 2.;/176*/+00'516# Ä'0)ÄÄ5*''6Ä5+6' 5+6'2.#0 4GXKUKQPU ÄÄ%+6;%1//'065 +JGTGD[EGTVKH[VJCVVJKURNCPYCURTGRCTGFD[ OGQTWPFGTO[FKTGEVUWRGTXKUKQPCPFVJCV+ COCFWN[.KEGPUGF2TQHGUUKQPCN'PIKPGGT WPFGTVJGNCYUQHVJG5VCVGQH/KPPGUQVC E 1(&+'&4+%*2412'46; .#-''./1/+00'516# .'00#4 6*#8'07'057+6' ÄÄ 2,%$0/ ,&/ 0COG 4GI0Q&CVG &CVG &GUKIPGF &TCYP 2KQPGGT'PIKPGGTKPI2# /GPFQVC*GKIJVU/0 'PVGTRTKUG&TKXG  Ä (CZÄYYYRKQPGGTGPIEQO .#0&5%#2'#4%*+6'%65.#0&5748';145.#0&2.#00'45%+8+.'0)+0''45 ÄÄ 2CWN,%JGTPG 2.;/176*/+00'516# .16&'6#+. Ä'0)ÄÄ5*''6Ä5594 5#0+6#4;5'9'4 9#6'4/#+0 4GXKUKQPU ÄÄ%+6;%1//'065 +JGTGD[EGTVKH[VJCVVJKURNCPYCURTGRCTGFD[ OGQTWPFGTO[FKTGEVUWRGTXKUKQPCPFVJCV+ COCFWN[.KEGPUGF2TQHGUUKQPCN'PIKPGGT WPFGTVJGNCYUQHVJG5VCVGQH/KPPGUQVC E 1(&+'&4+%*2412'46; .#-''./1/+00'516# .'00#4 6*#8'07'057+6' ÄÄ 2,%$0/ ,&/ 0COG 4GI0Q&CVG &CVG &GUKIPGF &TCYP 2KQPGGT'PIKPGGTKPI2# /GPFQVC*GKIJVU/0 'PVGTRTKUG&TKXG  Ä (CZÄYYYRKQPGGTGPIEQO .#0&5%#2'#4%*+6'%65.#0&5748';145.#0&2.#00'45%+8+.'0)+0''45 ÄÄ 2CWN,%JGTPG 2.;/176*/+00'516# Ä'0)ÄÄ5*''6Ä564/ 5614/5'9'4 4GXKUKQPU ÄÄ%+6;%1//'065 +JGTGD[EGTVKH[VJCVVJKURNCPYCURTGRCTGFD[ OGQTWPFGTO[FKTGEVUWRGTXKUKQPCPFVJCV+ COCFWN[.KEGPUGF2TQHGUUKQPCN'PIKPGGT WPFGTVJGNCYUQHVJG5VCVGQH/KPPGUQVC E 1(&+'&4+%*2412'46; .#-''./1/+00'516# .'00#4 6*#8'07'057+6' ÄÄ 2,%$0/ ,&/ 0COG 4GI0Q&CVG &CVG &GUKIPGF &TCYP 2KQPGGT'PIKPGGTKPI2# /GPFQVC*GKIJVU/0 'PVGTRTKUG&TKXG  Ä (CZÄYYYRKQPGGTGPIEQO .#0&5%#2'#4%*+6'%65.#0&5748';145.#0&2.#00'45%+8+.'0)+0''45 ÄÄ 2CWN,%JGTPG 2.;/176*/+00'516# Ä'0)ÄÄ5*''6Ä)4#& )4#&+0)2.#0 4GXKUKQPU ÄÄ%+6;%1//'065 +JGTGD[EGTVKH[VJCVVJKURNCPYCURTGRCTGFD[ OGQTWPFGTO[FKTGEVUWRGTXKUKQPCPFVJCV+ COCFWN[.KEGPUGF2TQHGUUKQPCN'PIKPGGT WPFGTVJGNCYUQHVJG5VCVGQH/KPPGUQVC E 1(&+'&4+%*2412'46; .#-''./1/+00'516# .'00#4 6*#8'07'057+6' ÄÄ 2,%$0/ ,&/ 0COG 4GI0Q&CVG &CVG &GUKIPGF &TCYP 2KQPGGT'PIKPGGTKPI2# /GPFQVC*GKIJVU/0 'PVGTRTKUG&TKXG  Ä (CZÄYYYRKQPGGTGPIEQO .#0&5%#2'#4%*+6'%65.#0&5748';145.#0&2.#00'45%+8+.'0)+0''45 ÄÄ 2CWN,%JGTPG 2.;/176*/+00'516# .')'0& Ä'0)ÄÄ5*''6Ä'415 '415+10%10641.2.#0 4GXKUKQPU ÄÄ%+6;%1//'065 +JGTGD[EGTVKH[VJCVVJKURNCPYCURTGRCTGFD[ OGQTWPFGTO[FKTGEVUWRGTXKUKQPCPFVJCV+ COCFWN[.KEGPUGF2TQHGUUKQPCN'PIKPGGT WPFGTVJGNCYUQHVJG5VCVGQH/KPPGUQVC E 1(&+'&4+%*2412'46; .#-''./1/+00'516# .'00#4 6*#8'07'057+6' ÄÄ 2,%$0/ ,&/ 0COG 4GI0Q&CVG &CVG &GUKIPGF &TCYP 2KQPGGT'PIKPGGTKPI2# /GPFQVC*GKIJVU/0 'PVGTRTKUG&TKXG  Ä (CZÄYYYRKQPGGTGPIEQO .#0&5%#2'#4%*+6'%65.#0&5748';145.#0&2.#00'45%+8+.'0)+0''45 ÄÄ 2CWN,%JGTPG 2.;/176*/+00'516# Ä'0)ÄÄ5*''6Ä5''& 5''&+0)2.#0 4GXKUKQPU ÄÄ%+6;%1//'065 +JGTGD[EGTVKH[VJCVVJKURNCPYCURTGRCTGFD[ OGQTWPFGTO[FKTGEVUWRGTXKUKQPCPFVJCV+ COCFWN[.KEGPUGF2TQHGUUKQPCN'PIKPGGT WPFGTVJGNCYUQHVJG5VCVGQH/KPPGUQVC E 1(&+'&4+%*2412'46; .#-''./1/+00'516# .'00#4 6*#8'07'057+6' ÄÄ 2,%$0/ ,&/ 0COG 4GI0Q&CVG &CVG &GUKIPGF &TCYP 2KQPGGT'PIKPGGTKPI2# /GPFQVC*GKIJVU/0 'PVGTRTKUG&TKXG  Ä (CZÄYYYRKQPGGTGPIEQO .#0&5%#2'#4%*+6'%65.#0&5748';145.#0&2.#00'45%+8+.'0)+0''45 ÄÄ 2CWN,%JGTPG 2.;/176*/+00'516# 564''6$ 564''6# Ä'0)ÄÄ5*''6Ä564''6241(5 564''6241(+.'5 4GXKUKQPU ÄÄ%+6;%1//'065 +JGTGD[EGTVKH[VJCVVJKURNCPYCURTGRCTGFD[ OGQTWPFGTO[FKTGEVUWRGTXKUKQPCPFVJCV+ COCFWN[.KEGPUGF2TQHGUUKQPCN'PIKPGGT WPFGTVJGNCYUQHVJG5VCVGQH/KPPGUQVC E 1(&+'&4+%*2412'46; .#-''./1/+00'516# .'00#4 6*#8'07'057+6' ÄÄ 2,%$0/ ,&/ 0COG 4GI0Q&CVG &CVG &GUKIPGF &TCYP 2KQPGGT'PIKPGGTKPI2# /GPFQVC*GKIJVU/0 'PVGTRTKUG&TKXG  Ä (CZÄYYYRKQPGGTGPIEQO .#0&5%#2'#4%*+6'%65.#0&5748';145.#0&2.#00'45%+8+.'0)+0''45 ÄÄ 2CWN,%JGTPG 2.;/176*/+00'516# 564''6# 564''6$ ȭ ȭ x x x x x x Ä'0)ÄÄ5*''6Ä)4&6.5 )4#&+0)&'6#+.5 4GXKUKQPU ÄÄ%+6;%1//'065 +JGTGD[EGTVKH[VJCVVJKURNCPYCURTGRCTGFD[ OGQTWPFGTO[FKTGEVUWRGTXKUKQPCPFVJCV+ COCFWN[.KEGPUGF2TQHGUUKQPCN'PIKPGGT WPFGTVJGNCYUQHVJG5VCVGQH/KPPGUQVC E 1(&+'&4+%*2412'46; .#-''./1/+00'516# .'00#4 6*#8'07'057+6' ÄÄ 2,%$0/ ,&/ 0COG 4GI0Q&CVG &CVG &GUKIPGF &TCYP 2KQPGGT'PIKPGGTKPI2# /GPFQVC*GKIJVU/0 'PVGTRTKUG&TKXG  Ä (CZÄYYYRKQPGGTGPIEQO .#0&5%#2'#4%*+6'%65.#0&5748';145.#0&2.#00'45%+8+.'0)+0''45 ÄÄ 2CWN,%JGTPG 2.;/176*/+00'516# Ä'0)ÄÄ5*''6Ä)4&6.5 )4#&+0)&'6#+.5 4GXKUKQPU ÄÄ%+6;%1//'065 +JGTGD[EGTVKH[VJCVVJKURNCPYCURTGRCTGFD[ OGQTWPFGTO[FKTGEVUWRGTXKUKQPCPFVJCV+ COCFWN[.KEGPUGF2TQHGUUKQPCN'PIKPGGT WPFGTVJGNCYUQHVJG5VCVGQH/KPPGUQVC E 1(&+'&4+%*2412'46; .#-''./1/+00'516# .'00#4 6*#8'07'057+6' ÄÄ 2,%$0/ ,&/ 0COG 4GI0Q&CVG &CVG &GUKIPGF &TCYP 2KQPGGT'PIKPGGTKPI2# /GPFQVC*GKIJVU/0 'PVGTRTKUG&TKXG  Ä (CZÄYYYRKQPGGTGPIEQO .#0&5%#2'#4%*+6'%65.#0&5748';145.#0&2.#00'45%+8+.'0)+0''45 ÄÄ 2CWN,%JGTPG 2.;/176*/+00'516# Ä'0)ÄÄ5*''6Ä)4&6.5 )4#&+0)&'6#+.5 4GXKUKQPU ÄÄ%+6;%1//'065 +JGTGD[EGTVKH[VJCVVJKURNCPYCURTGRCTGFD[ OGQTWPFGTO[FKTGEVUWRGTXKUKQPCPFVJCV+ COCFWN[.KEGPUGF2TQHGUUKQPCN'PIKPGGT WPFGTVJGNCYUQHVJG5VCVGQH/KPPGUQVC E 1(&+'&4+%*2412'46; .#-''./1/+00'516# .'00#4 6*#8'07'057+6' ÄÄ 2,%$0/ ,&/ 0COG 4GI0Q&CVG &CVG &GUKIPGF &TCYP 2KQPGGT'PIKPGGTKPI2# /GPFQVC*GKIJVU/0 'PVGTRTKUG&TKXG  Ä (CZÄYYYRKQPGGTGPIEQO .#0&5%#2'#4%*+6'%65.#0&5748';145.#0&2.#00'45%+8+.'0)+0''45 ÄÄ 2CWN,%JGTPG 2.;/176*/+00'516# 4GXKUKQPU ÄÄ%+6;%1//'065 E 1(&+'&4+%*2412'46; .#-''./1/+00'516# .'00#4 6*#8'07'057+6' ÄÄ0COG 4GI0Q&CVG &CVG &GUKIPGF &TCYP 2KQPGGT'PIKPGGTKPI2# /GPFQVC*GKIJVU/0 'PVGTRTKUG&TKXG  Ä (CZÄYYYRKQPGGTGPIEQO .#0&5%#2'#4%*+6'%65.#0&5748';145.#0&2.#00'45%+8+.'0)+0''45 ÄÄ2.;/176*/+00'516# +JGTGD[EGTVKH[VJCVVJKURNCPYCURTGRCTGFD[ OGQTWPFGTO[FKTGEVUWRGTXKUKQPCPFVJCV+ COCFWN[.KEGPUGF.CPFUECRG#TEJKVGEV WPFGTVJGNCYUQHVJG5VCVGQH/KPPGUQVC  ,GPPKHGT.6JQORUQP .#0&5%#2'2.#0,.6 ,.6 . Ä'0)ÄÄ':+$Ä5'%6+10&6.5 &'6#+.':*+$+6 4GXKUKQPU ÄÄ%+6;%1//'065 +JGTGD[EGTVKH[VJCVVJKURNCPYCURTGRCTGFD[ OGQTWPFGTO[FKTGEVUWRGTXKUKQPCPFVJCV+ COCFWN[.KEGPUGF2TQHGUUKQPCN'PIKPGGT WPFGTVJGNCYUQHVJG5VCVGQH/KPPGUQVC E 1(&+'&4+%*2412'46; .#-''./1/+00'516# .'00#4 6*#8'07'057+6' ÄÄ 2,%$0/ ,&/ 0COG 4GI0Q&CVG &CVG &GUKIPGF &TCYP 2KQPGGT'PIKPGGTKPI2# /GPFQVC*GKIJVU/0 'PVGTRTKUG&TKXG  Ä (CZÄYYYRKQPGGTGPIEQO .#0&5%#2'#4%*+6'%65.#0&5748';145.#0&2.#00'45%+8+.'0)+0''45 ÄÄ 2CWN,%JGTPG 2.;/176*/+00'516#  BUSINESS ITEM 5A PLANNING COMMISSION DATE: 6/22/15 AGENDA ITEM: 5A – BUSINESS ITEM CASE # 2015-22 ITEM: Zoning Text Amendment – Accessory Building Setbacks in the Urban Residential Districts SUBMITTED BY: Nick Johnson, City Planner REVIEWED BY: Kyle Klatt, Community Development Director Casey Riley, Planning Intern SUMMARY AND ACTION REQUESTED: The Planning Commission is being asked to consider advancing an effort to complete a Zoning Text Amendment to amend the rear yard setback for accessory buildings in the urban residential zoning districts. The City has received an inquiry from a property owner in the Savona subdivision, the first sewered subdivision in Lake Elmo. Upon review of the setback requirements, staff is recommending that the Planning Commission direct staff to prepare a Zoning Text Amendment to reduce the rear- yard setback for accessory buildings in the urban residential zoning districts. GENERAL INFORMATION Applicant: City of Lake Elmo Property Owners: N/A Location: N/A – Proposed zoning text amendment would apply to residential properties in the urban residential zoning districts (LDR, MDR and HDR) Request: The City has received an inquiry with regards to the rear-yard setbacks in the urban residential districts. Upon review of the city’s building setback requirements for accessory buildings in the LDR zoning district, staff is recommending that the City consider a minor amendment to the rear-yard setback requirements for accessory buildings. Should the Planning Commission concur with this recommended action, they can direct staff to prepare a public hearing for the proposed zoning text amendment. Existing Land Use: N/A Existing Zoning: N/A Surrounding Land Use: N/A Surrounding Zoning: N/A Comprehensive Plan: N/A Proposed Zoning: N/A History: The urban residential zoning districts were adopted as part of the Zoning Code Update Project in 2012/13. As part of this effort, the City adopted three residential 2 BUSINESS ITEM 5A zoning districts intended to be utilized in the City’s urban planning areas (I-94 Corridor and Village Area). These zoning districts include lot dimension and building bulk requirements that include the setback requirements for both principal and accessory structures. Applicable Regulations: Article X – Urban Residential Districts (154.452 Lot Dimensions and Building Bulk Requirements) BACKGROUND City staff has recently received an inquiry about the required setbacks for accessory buildings in the Urban Low Density Residential (LDR) zoning districts. Upon review of the setback requirements as found in §154.452 for accessory buildings, it was discovered that the required rear-yard setback for accessory buildings is 20 feet. Given the limited usable area within the rear-yard of residential properties in the LDR district, this setback requirements will likely pose a challenge for many property owners to site any type of accessory structure. This situation is the same concern that the property owner within the Savona subdivision identified when reviewing the setback requirements. The rear-yard setback would in effect require that any type of accessory building be located in the middle of the back yard, as opposed to closer to the property line. Although the limited rear-yard area prevents large accessory structures from being constructed, tool and other storage sheds are not uncommon in these residential districts. Once this concern was received, staff completed some research of other communities that utilize similar residential zoning districts of the same size and dimensional standard as the City’s LDR zoning district. The purpose of this research was to determine what is typically required for accessory buildings with regards to setbacks. The results of the research can be found in Attachment #2, which includes a chart of the findings derived from 8 surrounding cities. What the research revealed is that most communities have rear-yard setbacks that are 10 feet or less, as compared to the LDR standard of 20 feet. Given that the urban residential districts are being newly implemented in Lake Elmo and residential subdivision are now under construction, it is not surprising that the City is now receiving inquiries from property owners within the developments. Multiple Certificates of Occupancy have been issued within the Savona residential subdivision, and permits for accessory buildings and decks typically follow as some point once these homes are occupied. It is not uncommon for some elements of the underlying zoning to need to be amended when implementing new zoning districts. STAFF REVIEW COMMENTS: In reviewing the standards established for accessory buildings in sewered residential districts in other communities, it is clear that the 20-foot rear-yard setback in the LDR district exceeds all of the other communities researched. In addition, the rear-yard setback for accessory buildings in the Rural Single Family (RS) zoning district is also 10 feet. Based upon the research completed and the standard established in the RS zoning district, staff would recommend that the rear-yard setback for detached accessory building in the LDR zoning district be reduced to 10 feet in size. This dimension would provide for an adequate setback, as well as keep the structures outside of the City’s general drainage and utility easements. It is the recommendation of staff that amending the accessory structure rear-yard setback prior to many of the homes being occupied is prudent in this case. Should 3 BUSINESS ITEM 5A the Planning Commission concur, staff will commence drafting the proposed ordinance amendment and schedule a public hearing. RECCOMENDATION: Staff is recommending that the Planning Commission direct staff to prepare a Zoning Text Amendment to amend the rear-yard setback for accessory structures in the urban residential zoning districts and schedule the applicable public hearing. The suggested motion is as follows: “Move to recommend that staff draft a Zoning Text Amendment to change the rear-yard setback for accessory structure in urban residential districts from 20 feet to 10 feet.” ATTACHMENTS: 1. 154.452 Lot Dimensions and Building Bulk Requirements 2. Accessory Structure Regulations Comparison ORDER OF BUSINESS: - Introduction ....................................................... Community Development Director - Report by Staff ..................................................................................... City Planner - Questions from the Commission ............................ Chair & Commission Members - Discussion by the Commission .............................. Chair & Commission Members - Action by the Commission ..................................... Chair & Commission Members § 154.452 LOT DIMENSIONS AND BUILDING BULK REQUIREMENTS. Lot area and setback requirements shall be as specified in Table 10-2, Lot Dimension and Setback Requirements. Table 10-2: Lot Dimension and Setback Requirements, Residential Districts LDR MDR HDR Minimum Lot Area (sq. ft.) Single family detached dwelling 8,000 7,000 5,000 Two-family dwelling (per unit) a 5,000 4,000 3,000 Single-family attached (per unit) b - 4,000 2,500 Multi-family dwelling (per unit) - 4,000 1,800 Secondary dwelling see 155.102 Live-work unit - - 3,600 Congregate housing - see 155.102 see 155.102 Manufactured home park - see 155.102 - Minimum Lot Width (feet) Single family detached dwelling 60 50 50 Two-family dwelling (per unit) a 35 30 20 Single-family attached (per unit) b - 25 20 Multi-family dwelling (per building) - 75 60 Live-work unit - - 25 Maximum Height (feet) 35 35 50 Maximum Impervious Coverage 40% 50% 75% Minimum Building Setbacks (feet) Front yard 25 c 25 c 20 c LDR MDR HDR Minimum Building Setbacks (feet) Interior side yard e Principal Buildings f,g 10 10 10d Attached Garage or Accessory Structures f,g 5 5 10d Corner side yard g,h 15 15 15 Rear yard 20 20 20 Notes to Urban Residential Districts Table a. Common open space areas may be used in the determining whether or not the minimum lot areas within a development are met, when provided as part of an overall development plan. b. Two-family units may be side-by-side with a party wall between them (“twin”) or located on separate floors in a building on a single lot (“duplex”). The per-unit measurements in this table apply to “twin” units, whether on a single lot or separate lots. The standards for single-family detached dwelling shall apply to a “duplex” containing two vertically-separated units on a single lot. c. In the case of single-family attached dwellings that are not situated on individual lots, minimum lot size shall be applied to each unit as a measure of density; i.e. 1 unit per 2,500 square feet. This standard is also used for multifamily dwellings. d. Single family dwellings (both attached and detached) and two-family dwellings may use the side yard setbacks within MDR zoning districts. e. In a block where the majority of the block face has been developed with the same or similar setbacks, the front setback for the remaining lots on that block face shall fall within the range established by the existing setbacks. f. In situations where a garage or accessory building is set back less than 7 feet from a side property line, the maximum permitted encroachment for anything attached to said building (including eaves, overhangs, steps, chimneys, and other appurtenances as described in Section 154.081) will be two (2) feet. g. Side yards setbacks shall apply to the ends of attached or two-family dwellings. h. Corner properties: The side façade of a corner building adjoining a public street shall maintain the front setback of the adjacent property fronting upon the same public street, or the required front yard setback, whichever is less. If no structure exists on the adjacent property, the setback shall be as shown in the table. (Ord. 2012-062, passed 9-18-2012; Am. Ord. 08-071, passed 3-5-2013) Accessory Structure Regulations – Comparison Chart City Maximum Size Max Number Setbacks Other Cottage Grove 5’ Side, 10’ Rear 30’ height maximum. Residents have to provide 400 SF of usable open space on their lot. In no cases can more than 30% of lot be covered with structures. Hugo 260 SF for lots < 1.5 acre If accessory building is less than 120 SF, 10’ rear, 6’ side. Lots > 1.5 acres but < 2.99 acres, Max size for all accessory buildings is 1,500 SF Inver Grove Heights 1,000 SF 1 30’ Front, 5’ Side, 8’ Rear Max Height: 25’ Maplewood Lot area under 8,000 SF: 768 SF Combo of Detached and Attached Garage Building: 1188 SF 5’ Rear, 5’ Side If the lot area is greater than 8,000 SF and less than 16,000 SF, the accessory structure can be 1,000 SF. The Combination of both can be 1,420 SF. Oakdale 30’ Front, 20’ Corner Side, 5’ Side, 5’ Rear The minimum distance between buildings at any point shall be equal to the height of the exterior wall or 15 feet, whichever is greater. Stillwater 500 SF 1 5’ Side, 10’ Rear 20 ft max building height White Bear 1,000 SF for garage, 120 SF for 2nd accessory structure 2 5’ Rear, 5’ Side Must be in rear or side yard. Woodbury 400 SF 1 5 ft. rear and side Cannot be on easement, cannot be in front of principle building, wall cannot exceed 12 ft in height, shall not occupy more than 25% of rear yard BUSINESS ITEM 5B PLANNING COMMISSION DATE: 6/22/15 AGENDA ITEM: 5B – BUSINESS ITEM CASE # 2015-23 ITEM: Zoning Text Amendment – Subdivision Identification Signs SUBMITTED BY: Nick Johnson, City Planner REVIEWED BY: Kyle Klatt, Community Development Director Joan Ziertman, Planning Program Assistant Casey Riley, Planning Intern SUMMARY AND ACTION REQUESTED: The Planning Commission is being asked to consider advancing an effort to complete a Zoning Text Amendment to provide greater clarity with regards to what type of signage is allowed for residential subdivision identification. The City has been contacted by Lennar Homes to inquire about the possibility of installing additional neighborhood identification signs. City staff has reviewed the City’s Sign Ordinance to determine if additional signage is allowed. Upon review of the ordinance, it is Staff’s opinion that the section that pertains to subdivision identification signs could benefit from additional regulations to establish clearer expectations about what type and quantity of signage is allowed. Staff is recommend the Planning Commission discuss potential changes to the ordinance and, if in agreement with the proposed changes, direct staff to draft an ordinance amendment. GENERAL INFORMATION Applicant: City of Lake Elmo Property Owners: N/A Location: N/A – Proposed zoning text amendment would apply to existing and future residential subdivisions throughout the community. Request: The Planning Commission is respectfully asked to discuss potential changes to the Sign Ordinance with regards to subdivision identification signs. Existing Land Use: N/A Existing Zoning: N/A Surrounding Land Use: N/A Surrounding Zoning: N/A Comprehensive Plan: N/A Proposed Zoning: N/A History: The City updated the Sign Ordinance in 2013 as part of the Zoning Code Update Project. The provisions that regulate subdivision identification signs were included in the 2013 update. 2 BUSINESS ITEM 5B Applicable Regulations: §154.212 – Sign Regulations BACKGROUND Lennar Homes is currently in process of constructing the 2nd phase of the Savona residential subdivision. They have contacted the City to inquire about the possibility of installing additional identification signage and other landscape features at separate entrances to the development. In responding to the request, City staff referenced the Sign Ordinance to determine how much signage is permitted. With regards to subdivision identification signs, the Sign Ordinance states that in residential districts, the following is allowed: A subdivision identification sign not exceeding thirty-two (32) square feet in sign area as approved by the City. Under this language, staff would interpret the ordinance to allow a single neighborhood identification sign up to thirty-two square feet in area. While the ordinance is simple and uncomplicated, it also does not take different locational circumstances or sign types into much consideration. Based on the simplicity of this provision in the Sign Ordinance, staff thought it would be beneficial to research other ordinance in the Metro Area to see if Lake Elmo’s ordinance could be improved to add greater direction and detail to set clear expectations. The general results of the staff’s research can be found in Attachment #1, Subdivision Signs from Metro Cities. Further detail of staff’s research will be presented at the Planning Commission meeting. STAFF REVIEW COMMENTS: Building off the research conducted of other metro cities, staff asks the Planning Commission to consider the following with regards to neighborhood identification signs: • Number. The typical allowance for subdivision identifications signs varies between 1 and 2 signs. However, some communities allow one sign per entrance to the development. In these instances, cities typically qualify that the only neighborhood entrances that are allowed signage are entrances off arterial or collector roads. • Content. Some cities do not allow any text on neighborhood identification signs other than the name of the subdivision. This provision would preclude any builder names or other commercial messages. • Sub-Monuments. Staff would ask the Planning Commission if there should be any allowance for sub-monuments within residential subdivisions. Sub-monuments are sometimes incorporated into landscape features or community gathering spaces. This type of signage would be significantly less in size. • Definition of Subdivision. For the purposes of clarity, staff would ask the Planning Commission to confirm whether or not “subdivision” refers to the totality of the residential development, or if individual phases or different hosing types inform the allowed amount of signage. 3 BUSINESS ITEM 5B These items represent some of the areas of further clarification that were included in the signage provisions of other communities. With additional residential subdivisions being planned and constructed in the community, staff anticipates the number of requests for subdivision identification signage to increase. Providing greater clarification in advance of these requests would assist in the interpretation of what is allowed for subdivision identification signs. RECCOMENDATION: Staff recommends that the Planning Commission discuss areas of potential improvement based on the staff report and presentation. Should the Planning Commission reach consensus on potential changes, they can direct staff to prepare a Zoning Text Amendment, ATTACHMENTS: 1. Subdivision Signs from Metro Cities ORDER OF BUSINESS: - Introduction ....................................................... Community Development Director - Report by Staff ..................................................................................... City Planner - Questions from the Commission ............................ Chair & Commission Members - Discussion by the Commission .............................. Chair & Commission Members - Action by the Commission ..................................... Chair & Commission Members Residential Entry/Identification Sign Requirements from Metro Cities City Number Dimensions Setback Bloomington Two signs permitted Max area: 40 sq ft Per neighborhood Inver Grove Heights One sign per entrance from a public street, there must be 3 dwelling units. Max area: 32 sq ft Lino Lakes One Max area: 50 sq ft Max height: 8 ft 10 ft from any property line Maple Grove One sign per entrance street Max area: 35 sq ft Max height: 8 ft Minnetrista Two permitted at each entrance to subdivision. Max area: 24 sq ft Max height: 6 ft 10 ft from any property line Minnetonka One per unified development entrance. Maximum two signs total. 50 sq ft max copy and graphic area. 100 sq ft max monument size Max height: 10 ft Osseo One sign per 6 dwelling units Max area: 6 sq ft, only one surface, not double sided. Plymouth Two per subdivision, at entrances Max area: 32 sq ft per sign Max height: 10 ft Shoreview One sign per entry, up to two signs total. Must have 20 dwelling units for SF, 6 DU for MF Max area: 32 ft Max height: 12 ft