HomeMy WebLinkAboutPZ Agenda Packet Part 1; 8-24-15
3800 Laverne Avenue North
Lake Elmo, MN 55042
(651) 747-3900
www.lakeelmo.org
NOTICE OF MEETING
The City of Lake Elmo
Planning Commission will conduct a meeting on
Monday, August 24, 2015 at 7:00 p.m.
AGENDA
1. Pledge of Allegiance
2. Approve Agenda
3. Approve Minutes
a. August 10, 2015
4. Public Hearing
a. FINAL PLAT AND PRELIMINARY AND FINAL PUD PLANS – NE METRO
916 INTERMEDIATE SCHOOL DISTRICT. The Planning Commission is
asked to consider an application from BWBR Architects on behalf of Northwest
Metro 916 Intermediate School District, 2450 County Road F East, White Bear
Lake, MN for a preliminary and final plat and preliminary and final Planned Unit
Development (PUD) plans for a site within the Eagle Point Business Park.
5. Business Items
a. FINAL PLAT – INWOOD 2nd ADDITION. The Planning commission will
consider a request from Hans Hagen Homes, for a Final Plat for the second phase
of the InWood development. The final plat will facilitate the subdivision of a
larger outlot within the subdivision that has been previously served with public
infrastructure and will include 21 lots.
b. SAVONA THIRD ADDITION – FINAL PLAT. The Planning Commission will
consider a Final Plat for Savona 3rd Addition, which includes 21 single-family
detached and 99 single-family attached residential homes.
c. FUTURE HOUSEHOLD PROJECTIONS DISCUSSION. Staff will be
presenting an update concerning the City’s future projections for households.
6. Updates
a. City Council Updates – August 18, 2015 Meeting
i. Preliminary Plat/Plan and PUD Plat/Plan – Auto Owners – Passed.
ii. Zoning Text Amendment – Subdivision Identification Signs – Passed with
changes.
iii. Projected City Growth Analysis – Update.
b. Staff Updates
i. Upcoming Meetings:
2
September 14, 2015
September 28, 2015
c. Commission Concerns
7. Adjourn
Lake Elmo Planning Commission Minutes; 8-10-15
City of Lake Elmo
Planning Commission Meeting
Minutes of August 10, 2015
Chairman Dodson called to order the meeting of the Lake Elmo Planning Commission at
7:00 p.m.
COMMISSIONERS PRESENT: Dodson, Dorschner, Williams, Fields, Larson, and Griffin
Kreimer (joined late)
COMMISSIONERS ABSENT: Haggard
STAFF PRESENT: Community Development Director Klatt, Contract City Planner Gozola,
and Interim Administrator Schroeder
Approve Agenda:
The agenda was accepted as presented.
Approve Minutes: July 13, 2015
M/S/P: Williams/Fields, move to approve minutes as presented, Vote: 7-0, motion
carried unanimously.
Presentations: Manning Avenue Project Presentation – Washington County
Ticknor presented an overview of the project and the corridor. There is a proposed
realignment of Trunk Highway 5 and Manning Avenue. Highway 5 was recently turned
back to the County. The Council is interested in how some of these alternatives will
affect the land use for this area. Manning is an important corridor as it is the primary
north/south arterial roadway and is part of the regional transportation system.
Larson stated that it is a good plan but is concerned about intersec tions at TH5 and
access from neighborhoods. Why not add a round -a-bout or other controlled
intersection to help manage this traffic.
Ticknor stated that the proposed spacing would allow for future signalization.
Williams asked why the realigned 14 would not follow the section line? Ticknor stated
that the proposed alignment allows for turning movements into the Holiday Station
store, shifts the road further from private property owners along the corridor, and
minimizes the curve of the road through existing farmland.
2
Lake Elmo Planning Commission Minutes; 8-10-15
The Commission had questions about the cul-de-sac. Dodson asked where the airport
safety zones crossed this area and what happens north of the project area. Ticknor
stated that they will need to expand to four lanes and the county is looking at the need
for a signal at 50th Street.
Dodson asked if a new traffic signal at 17 will make it easier to get on and off of Highway
5? Ticknor stated that there is not much of an impact. It is mostly driven by overall
increases in development. Dodson asked if the narrower shoulders will be six feet
minimum. Ticknor stated that yes on both sides and saves four feet.
Klatt presented a summary of land use issue in the area. There is a question regarding
the commercial at the existing intersection and also about the airport buffer zones.
There were other questions from the Planning Commission.
Public Comments:
John Hodler, Fields of St. Croix Assoc, proposed removing the existing highway 5 from
the plans to help eliminate shortcuts and other problems.
Jim Ogren, Fields of St. Croix Assoc, Concern with lack of signal, cut-through traffic using
the old highway 5 road. He would like to see techniques used to slow traffic including
some signage.
Williams would like to see a signal at old highway 5 and Manning Avenue. Concept C
with a signal at old Highway 5 would be preferred.
M/S/P: Williams/Larson, Move to support signal light at old Highway 5 and Manning
along with concept C that shows road going through, Vote: 7-0, motion carried
unanimously.
Williams would like to see airport zones and realignment before the land use can be
talked about. Klatt presented a runway plan and stated that the City’s position would
be to adopt zoning first as a negotiating tool to use with the MAC . Dorschner thinks
there might be an opportunity for mixed use zoning.
M/S/P: Dodson/Williams, Move to endorse maintenance of buffer zone throughout this
area, Vote: 7-0, motion carried unanimously.
M/S/P: Dorschner/Griffin, Move to recommend a mixed use similar to the I -94 corridor
zoning category allowing a wider range of options, Vote: 7-0, motion carried
unanimously.
Fields would like the City to consider preserving land for commercial development and
to keep it for higher value uses.
3
Lake Elmo Planning Commission Minutes; 8-10-15
Public Hearing: Open Space Development Concept Plan – Legends - Withdrawn
Public Hearing: Preliminary Plat/Plan and Final Plat/Plan – Owners Insurance
Company
Gozola presented summary and report concerning proposed preliminary and final PUD
plans for Auto Owners Insurance. This application would replat Outlot A to create HOA
3rd addition within the Eagle Point Business Park in order to construct an approximate
30,000 square foot office building with potential future expansion to 44,000 square feet.
The company predicts they will bring 150 new jobs to the City with that number rising to
250 with the expansion.
This plans shows 2 signs on it, but if this plan is approved, the signs and locations would
not be approved with it. That would be a separate review. The building does meet size
and setback requirements. The height is met as well as the design stand ards. There will
be no roof equipment. That will all be inside. The lot is accessed off of Eagle Point
Circle. This site is served by City Sewer and Water. They will be required to meet the
BMP for Surface Water Management. There is 156 stalls for parking which meets City
requirements and setback requirements. There will be a sidewalk connecting to the
Machine Shed.
Staff is recommending approval with conditions in staff report in addition to 2 suggested
by the City Engineer.
Williams has concern with the roofline as it has no peaks or valleys and no articulation in
the walls. He feels other buildings in the business park have a better design. There was
a general discussion and questions for the applicant.
Dan Keefe, Auto Owners, stated that they are excited about this opportunity to build in
Lake Elmo. They are a fortune 500 national business and will be celebrating their 100
year anniversary in business. Todd Gutt, the architect spoke regarding the plan and
roofline. The applicant was open to looking at alternatives for the roofline.
Public Hearing opened at 9:38pm
The City received no written or electronic correspondence.
Public Hearing closed at 9:39 pm
Gozola recommended addition of 2 conditions suggested by the City Engineer and one
additional condition concerning a storm water easement, which Gozola suggested
should read, “ The applicant shall enter into an agreement with the property owner to
4
Lake Elmo Planning Commission Minutes; 8-10-15
the West agreeing to take on that site’s stormwater as identified by the proposed
plans”. These conditions would be numbered 11, 12 and 13.
M/S/P: Dorschner/Fields, Move to recommend approval with findings as drafted with
the 13 conditions as recommended, Vote: 7-0, motion carried unanimously.
M/S/P: Williams/Larson, motion to amend, findings B – add “but the design could
benefit from additional roofline and wall façade articulation.” Vote: 7-0, motion carried
unanimously.
Business Items: Zoning Text Amendment – Subdivision Identification Signs
Klatt started his presentation by going through the history. This item went to City
Council on July 21, 2015 and the Council requested that the Planning Commission
consider reducing the maximum size of the neighborhood identification sign from 32
square feet to 24 square feet. The draft ordinance has been updated to reflect that
change.
Williams is concerned with the size of the support structure and would like to see it
proportionate to the actual sign. Klatt stated that the monument signs are part of the
subdivision submittal with the landscape plan. He brought up the Savona sign for an
example for discussion.
M/S/P: Williams/Fields, Move to recommend the size of the sign be 24 square feet and
add 6th section that face area of support structure shall be no more than 2x the area of
the sign, Vote: 5-2 motion carried. Kreimer voted no as he is ok with the size, but not
regulating support structures. Dorschner voted no as he wants to make sure the sign
can look nice and is concerned about dictating size of support structure.
General discussion regarding the number of signs. The Commission consensus was to
keep it at 2 per neighborhood.
Council Updates – July 7, 2015 Meeting
1. Zoning Text Amendment – Accessory Building Setbacks Urban Districts –
Passed.
2. Lennar Twin Home Preliminary Plat – Passed.
3. Easton Village Trunk Sewer Update.
4. Zoning Text Amendment – Commercial Wedding Venue – Tabled.
5. Preliminary & Final Plat – Halcyon Cemetery – Tabled.
6. Final Plat, Final PUD and Zoning Map Amendment – Wildflower at Lake
Elmo – Passed.
Staff Updates
5
Lake Elmo Planning Commission Minutes; 8-10-15
1. Upcoming Meetings
a. August 24, 2015
b. September 14, 2015
Commission Concerns
Dorchner asked about the status of Hammes Estates. Klatt stated that there has been a
dispute between the trust, the land owner and the developer concerning aspects of the
project. Klatt stated that they are beyond the deadline for getting the plat recorded.
There has been grading done, but that was done under the mining operation. At this
point, there has been no specific approvals given by the City.
Dodson would like to request commercial buildings put in bike lockers and shower
facilities for commuters. The rest of the Commission felt that a decision like that should
be left to each business owner.
Meeting adjourned at 10:30 pm
Respectfully submitted,
Joan Ziertman
Planning Program Assistant
C:\Users\243\Documents\Temp Working Document\ES_ISD 916 DRAFT Report_PC_08-24-15 v2.docx
City of Lake Elmo Planning Commission Agenda Item
Executive Summary
Title of Item: Preliminary & Final PUD Plan/Plat: Application from ISD 916 to
create Lot 1, Block 1, Eagle Point Business Park, 8th Addition; within
the Eagle Point Business Park in order to construct an approximate
75,000 square foot public school.
Meeting Date: 8-24-15
Staff Reporting: Kyle Klatt, City Planner
Summary: Independent School District 916 is proposing to construct a public school
within the Eagle Point Business Park that, with minor amendments, will
be in compliance with City design standards for buildings within a
Business Park. In completing our review of the Preliminary & Final
Plat/Plans, we find that everything is in order such that the Planning
Commission can conditionally recommend approval of the plans at this
time.
Recommendation: The commission is asked to consider all facts outlined in the report,
and make a recommendation of approval or denial for Council
consideration.
Staff is recommending approval with conditions
Template motions and ten (10) suggested conditions of approval
are provided on pages 12 through 14.
ATTACHMENTS:
1. Area Map
2. Staff Report
3. Engineering Memo
4. Resolution Approving the CUP authorizing the school use
5. Applicant’s Submittals
6. Applicant Letter to Bremer Bank
C:\Users\243\Documents\Temp Working Document\ES_ISD 916 DRAFT Report_PC_08-24-15 v2.docx
ORDER OF BUSINESS:
- Introduction ........................................................................................... City Planner
- Report by Staff ...................................................................................... City Planner
- Questions from the Commission .............................Chair & Commission Members
- Questions to the Applicant ......................................Chair & Commission Members
- Open the Public Hearing .................................................................................. Chair
- Close the Public Hearing ................................................................................. Chair
- Discussion by the Commission ...............................Chair & Commission Members
- Action by the Commission ...................................................... Chair & Commission
ISD 916
SITE IDENTIFICATION MAP
Location within the City of Lake Elmo
E a g l e P o i n t B o u l e v a r d
E a g l e P o i nt B o u l e v a r dFoth
Engineering
Northwestern
Mutual
City & County
Credit Union
I n w o o d A v e n u e N
Hudson Boulevard N
Bremer
Bank
Machine Shed Auto Owners
City of Lake Elmo Planning Department
Preliminary & Final PUD Plan/Plat
To: Planning Commission
From: Kyle Klatt, City Planner
Meeting Date: August 24th, 2015
Applicants: Northeast Metro Intermediate School District 916
Location: Outlot A, Eagle Point Business Park, 7th Addition
Introductory Information
Request: The Northeast Metro Intermediate School District 916 is seeking approval of a
preliminary and final plan/plat for Eagle Point Business Park 8th Addition within the Eagle
Point Business Park.
The original platting and approval of the Eagle Point Business Park entailed the creation
of multiple Outlots which were to be developed through platting as businesses came
forward. This request would re-plat Outlot A of Eagle Point Business Park, 7th Addition
into Lot 1, Block 1, Eagle Point Business Park, 8th Addition.
In addition to the requested platting, this PUD application would approve a site plan
authorizing construction of an approximate 75,000 square foot building. The building
would house a school for children with special needs in first through eighth grade. The
school will have a total of twenty-one (21) classrooms, although two (2) of these rooms
are anticipated to be earmarked for special activities and will not be used full time. Each
classroom will hold a maximum of six (6) students, and it is anticipated that only eighty
(80) students will be on-site in any given year. Should every classroom be used to its
assigned maximum, a total of 126 students could be served from this site. A total of
seventy-five (75) jobs are anticipated from this development (≈50 teachers and 25
administrative/support positions). The typical hours of operation for the school are 7:00
a.m. to 4:00 p.m. daily.
Construction is anticipated to begin in spring of 2016 with completion of the building in
the summer of 2017.
Process:
The Eagle Point Business Park was approved as a Planned Unit Development in the early
2000’s, and the initial installation of roads and utilities has already occurred throughout
the park. Development of individual building sites such as this is to be completed through
the simultaneous review of preliminary and final plans, with this review ensuring that
everything is ready for final approval.
Preliminary & Final PUD Plan/Plat Review
Northeast Metro ISD 916
Planning Commission Report; 8-24-15
Page 2
(cont.) In 2013, BWBR Architects, on behalf of ISD 916, applied for and received a conditional
use permit to allow construction of a new public school on the subject site. This review
takes the conditions of that approval under consideration, and provides updates where
necessary.
Site Data: Existing Zoning – BP (Business Park)
Land Use Guidance – Business Park
Parcel size – 19.49 acres (848,981 square feet)
Property Identification Numbers (PIDs) – 33-029-21-42-0013
Current Legal Description – Outlot A, Eagle Point Business Park 7th Addition,
according to the recorded plat thereof, Washington County, Minnesota
Review
IN GENERAL:
Site Character: The entire site is largely natural grasses with a few scattered trees. The eastern portion
of the site and the middle of the site is nearly flat. The western portion of the site
gently slopes downward from east to west to a DNR protected water course
(intermittent stream) that runs along the west lot line.
Lot
Configuration:
This plat would create a single lot utilizing existing Outlot A, 7nd Addition.
The lot configuration was previously reviewed and approved as a future building site
by the Eagle Point Business Park 7nd Addition PUD plat review.
Area
Calculations:
Parks and public open space: No public parks are proposed as part of this
developmet.
Public street rights-of-way: none proposed
Wetlands: the applicant is in the process of seeking a no loss determination
(application included within this packet). As a condition of approval, staff would
recommend that approval of all wetlands (or lack thereof) shall be completed prior to
filing of the final plat.
Future parcel
development:
The proposed plat and site plan would fully develop this parcel.
Preliminary & Final PUD Plan/Plat Review
Northeast Metro ISD 916
Planning Commission Report; 8-24-15
Page 3
Adjacent parcel
dev.:
Adjacent parcels to the southwest are already fully developed, so this proposal will
not impact future development.
Proposed Use:
“Schools, public and private” is a conditionally permitted use within the Eagle Point
Business Park.
On December 17th, 2013, the Lake Elmo City Council passed Resolution No. 2013-
107, approving a conditional use permit to allow a public school building within the
Eagle Point Business Park. The CUP was granted with the following conditions:
– The applicant shall submit final development plans and a final plat consistent with
the City’s Planned Unit Development and Subdivision requirements prior to the
issuance of a building permit and prior to the commencement of any grading
activity on the site.
– This is the process that is currently under review. Criteria met.
– The applicant shall secure any required permits form the South Washington
Watershed District prior to commencing any grading or construction activity on
the site.
– As a condition of approval, any further watershed district approvals that might
be necessary shall be obtained prior to issuance of a building permit. Criteria
met.
– The final development plans shall include detailed landscape plans that conform
to the Lake Elmo Zoning Ordinance and Eagle Point Business Park PUD
Standards.
– Detailed landscape plans have been provided and are reviewed herein.
Criteria met.
– The applicant shall submit detailed architectural plans at the time of the final
development plan review by the City. These plans shall conform to the City’s
Design Guidelines and Standards Manual and the Eagle Point Business Park
Design Guidelines.
– Details of the proposed exterior have been provided for review and are
analyzed herein. Criteria met.
– The final development plans shall include a signage plan.
– Details of the proposed signs have been provided for review and are analyzed
herein. Criteria met.
Preliminary & Final PUD Plan/Plat Review
Northeast Metro ISD 916
Planning Commission Report; 8-24-15
Page 4
(cont.) – The applicant shall pay a fee in lieu of park land dedication as determined by the
City prior to the final plat being released for recording.
– Required park dedication is analyzed herein, and is typically paid for prior to
issuance of a building permit. Criteria met.
– The final plat shall include all easements for drainage and utility and other
purposes as required by the City Engineer.
– Proposed easements are shown on the preliminary and final plat/plans, and are
analyzed herein. Criteria met.
– The applicant shall enter into a service agreement with the City prior to issuance
of a building permit for the site.
– This condition of approval would carry over with any approvals for this
application. Criteria met.
– The Conditional Use Permit shall be valid for a period of 24 months. The permit
shall become void id an application for a final development plan is not submitted
within 24 months of the date on which the conditional use permit was granted by
the City Council.
– Application for preliminary and final plat/plan approval was submitted prior
to the 24 month deadline. Criteria met.
– The applicant shall work with the City and neighboring property owners to
develop an amicable resolution to the traffic and access spacing concerns that
were voiced during the public hearing by a business owner within the Eagle Point
Business Park.
– The concerns over possible problems between bus routes and employee traffic
have been addressed since the conditional use permit was approved. Further
details on this resolution are listed under “Resident Concerns” on page 6.
Criteria met.
Building
Location:
The proposed building will be more than 50’ from ROW and more than 10’ away from
all other lot lines as required by code.
Building placement is in accordance with encouraged development standards allowing
for effective auto and pedestrian circulation, building setbacks, and open space along
Eagle Point Boulevard.
Preliminary & Final PUD Plan/Plat Review
Northeast Metro ISD 916
Planning Commission Report; 8-24-15
Page 5
Building Size: The proposed building foundation will exceed the required minimum of 10,000 square
feet.
Building
Height:
No Business Park structure shall exceed 60’ in height, and parapet walls shall not
exceed more than 4 feet above the height permitted of the building.
This one-story structure will be compliant with the allowed height maximum.
Building
Design:
While not mandated, design standards encourage architectural treatments around the
building with windows and doors that reflect the architectural style of the structure.
As demonstrated by the plans, there are interesting elements included on all four sides
of the structure, and the intermixing of brick and metal will provide visual interest
from all directions.
– While not noted on the plans, all exterior metal appears to be painted or colored
with earth tones, but such is listed herein as a condition of approval to ensure that
is the case.
Except for four (4) chimney/vents central to the structure, all roof equipment is
proposed to be enclosed within the new building thereby eliminating a main concern
to exterior aesthetics.
Entryways for school facilities have special security considerations not typical for uses
within the Business Park district, so staff is inclined to defer to the school district on
best locations and positioning that best accomplish those goals. That said, overhangs
or awnings are provided at the two main entry points off the front of the building
adjacent to the proposed parking lot in accordance with the design standards.
The one area that is currently lacking in the current design is the need to incorporate
parapets of varying heights. While some minor deviations are proposed, the vast
majority of the building from the north, west, and south will appear to be of a single
uniform height. It is recommend that the plans be updated to include additional
parapet walls on all four sides of the building to address this deficiency.
Lot Access: The lot will have direct access to a public road (Eagle Point Boulevard).
There will be two entry points from Eagle Point Boulevard, one at the northern edge
of the site and the other at the eastern edge. Both will connect to the building’s parking
facilities.
Both accesses to the lot will have a monument sign indicating the name and address
of the school. These signs are analyzed under the heading of “Signage” on page 7.
Preliminary & Final PUD Plan/Plat Review
Northeast Metro ISD 916
Planning Commission Report; 8-24-15
Page 6
Easements: All standard drainage and utility easements are shown on the preliminary plan and
final plat documents.
Engineering comments regarding easements may be found on the Engineer’s memo
attached to this report.
Resident
Concerns:
Owners of the Bremer Bank adjacent to the site initially raised concerns about traffic
conflicts with school buses during the Conditional Use public hearing. The applicant
met with Kathy Tucci of Bremer Bank, and the Bank has since communicated with
the City in writing that all concerns have been addressed.
A letter from ISD 916 to Bremer Bank is also included in this packet documenting
closure of this concern.
INFRASTRUCTURE:
Road System: The road system in this area is fully built out, and no new roads are necessary to service
this parcel.
Water
System(s):
The site will be served by 6” service lines which tie into the public 12” water line in
Eagle Point Boulevard.
Engineering comments regarding the proposed water service may be found on the
Engineer’s memo attached to this report.
Sanitary
System(s):
Engineering comments regarding the proposed sanitary service may be found on the
Engineer’s memo attached to this report.
Storm water
/Grading:
Engineering comments regarding stormwater management and grading may be found
on the Engineer’s memo attached to this report.
Utilities: Telephone, electric, and/or gas service lines are to be placed underground in
accordance with the provisions of all applicable City ordinances.
Preliminary & Final PUD Plan/Plat Review
Northeast Metro ISD 916
Planning Commission Report; 8-24-15
Page 7
Parking
Facilities:
The required parking ratio is one (1) space per staff member plus one (1) space per
five (5) students of legal diving age based on design capacity
o The school will have a capacity of 75 staff members which would require 75
parking stalls
o The school will have a capacity of 0 students of legal driving age, requiring 0
parking stalls
As proposed, 154 stalls are being provided which meets the minimum
requirement.
All parking stalls (except for a few accessible stalls and compact car stalls) are
proposed to be 9 feet wide and 18 feet long. Minimum standards per Eagle Point
Business Park Development Standards are 9’x18’ north of Hudson Boulevard, and up
to 20% of stalls may be designed for compact cars which require an 8’x16’ space. All
stall dimensions are in accordance with these requirements.
The proposed parking lot conforms to minimum parking setbacks (front, 20’; sides
and rear, 10’; side street, 20’).
As encouraged by the City’s development standards, landscape islands are included
within the parking lot, and lot lighting can be well controlled on site with one minor
revision.
Sidewalks or
Trails:
As there are no sidewalks or trails leading to the site, none are proposed as part of
this development.
Signage:
No new street signs will be required as no new roads are being constructed.
The applicants are proposing two monument signs on the property; one located at
each driveway access point off of Eagle Point Boulevard. According to code, two
monument/ground signs are allowed for any lot with street frontage exceeding 1,000
feet. This property has 2,572 feet of street frontage along Eagle Point Boulevard, so
two monument signs are allowed by permit.
The allowed size of ground signs depends on the characteristics of the adjacent road.
Since Eagle Point Boulevard is a two-lane road, with a speed limit of 30 mph, a
ground sign may be up to ten (10) feet in height and thirty-two (32) square feet in
area.
o The proposed ground signs are nine (9) feet high;
o Liberally measuring the signs to only account for the main signage area
results in the signs being roughly 38 square feet in size.
Preliminary & Final PUD Plan/Plat Review
Northeast Metro ISD 916
Planning Commission Report; 8-24-15
Page 8
(cont.) o Conservatively measuring each sign to include ALL of the potential sign face
(including the base) results in a measurement of roughly 70 square feet.
o Regardless of how the calculation should be made, the signs as proposed
currently exceed allowed requirements and must be updated to be in
compliance prior to sign permits being issued.
Wall signs are currently limited to entrance markings, and all such letter appears to
be in conformance with required standards.
Fire Issues: Fire hydrant locations appear to be adequate according to the Fire Chief, although
the hydrant on the east side of the site currently labeled as “FUTURE ADDITION”
must be installed immediately and should not be delayed.
The FDC (Fire Department Connection) location needs to be approved by the Fire
Chief with the future building permit application.
Once the building is nearing completion, the school district shall contact the fire
chief for instruction on how to order the required lock box and to get approval of its
final location on-site.
Fire lanes must be identified, and be marked by painted curbing and signage.
The location of the Annunciator Panel must be approved by the Fire Chief.
Streetlights: No streetlights are required as part of this development.
Lighting Plan: The lighting plan for the site shows that illumination at the boundaries of the
property will be within required standards with the exception of the light proposed
for the northern entry point.
Per section 150.038 of City Code, the maximum illumination level at the property
boundary is 1.5 foot candles if the fixture has a total cut off angle of greater than 90
degrees, and 3.0 if the fixture has a total cut off angle of less than 90 degrees.
Regardless of the fixture type, the current lighting plan indicates that 3.5 foot
candles will exist on the property line. As a condition of approval, the lighting plan
must be updated to relocate the northern entrance light until illumination at the
property line is within acceptable levels.
The height of all lighting standards shall not exceed 30’.
Monuments: Because the plat will not be changing any lot lines, existing monumentation for Outlot
A will continue to be accurate following approval of the proposed plat.
Preliminary & Final PUD Plan/Plat Review
Northeast Metro ISD 916
Planning Commission Report; 8-24-15
Page 9
ENVIRONMENTAL & OTHER NEIGHBORHOOD IMPACTS:
Environmental
Impacts:
Staff has not identified any need for an in-depth environmental analysis based on the
current proposal (i.e. EAW, EIS, AUAR, etc.)
Wetlands &
Public Waters:
The applicant is in the process of seeking a no loss determination (application
included within this packet). As a condition of approval, staff would recommend
that approval of all wetlands (or lack thereof) shall be completed prior to filing of the
final plat.
It has already been determined that a DNR Public Waters Work Permit is not needed
for the proposed activity.
Shoreland
District:
This site is not within a designated shoreland district.
Erosion
Control:
Silt fencing has been proposed throughout the project site, specifically along the
western ridge in order to prevent erosion into the DNR protected watercourse at the
western edge of the property. Additional silt fences along drainage basins have also
been proposed. Any additional erosion control BMPs as directed by the City
Engineer should be shown at the construction limits with the future building permit
application.
Traffic: The proposed project will not significantly increase traffic volumes in a manner not
anticipated by the original PUD approval. No traffic study is warranted
Flood Plain &
Steep Slopes:
According to the February 3, 2010 FEMA Flood Insurance Rate Map (27163C0335E),
the site is outside of the floodplain (Zone X).
The City engineer was asked to examine this proposal to determine if there are any
steep slope concerns. Any such concerns will be noted in the Engineer’s memo
attached to this report.
Landscaping:
According to the Eagle Point Business Park development standards, the primary
landscaping materials required for this type of development shall be shade trees with
shrubs, hedges and other similar foliage used to complement trees. Berming and
landscaping must be approved within one (1) year of City Council approval.
Preliminary & Final PUD Plan/Plat Review
Northeast Metro ISD 916
Planning Commission Report; 8-24-15
Page 10
(cont.) Required Plantings:
o A minimum of 5 trees per disturbed acre and a minimum of two (2) trees per 100
linear feet of street frontage shall be provided.
o Based on 16.7 disturbed acres and 2,572 linear feet of street frontage, code requires
at a minimum 84 trees on the site and 52 trees along the road.
o The applicants have submitted a landscape plan that shows 84 trees being planted
on site with 52 trees along the road which does comply with minimum standards.
Parking Landscaping Requirements:
o 5% of interior area of parking lots shall be devoted to landscape planting areas in
islands or corner planting beds, and shade trees shall be provided on these islands
or corner planting beds at 1 tree per 15 spaces.
o Per the plans, there is 56,755 square feet of parking area which requires 2,838
square feet of internal landscaping areas. The plans indicate 5,600 square feet is
being provided which meets minimum requirements.
o Per plans, 154 parking spaces are being provided which requires 11 island or
corner planting trees—all of which are being shown.
Perimeter Parking Lot Landscaping:
o A landscaped frontage strip of a minimum of eight (8) feet shall be provided
between the parking lot and a public street given that over one hundred spaces are
proposed [Section 154.258(E)]. This is being met by the current plans.
o Within the frontage strip, a screen created by a wall, fence, berm, or hedge is
required at a minimum height of 3½ feet, and a maximum of 4 feet. This screening
must not be less than fifty percent (50%) opaque on a year-round basis. Additional
plantings may be necessary to meet this requirement. Staff is recommending that
the final landscape plan be reviewed and approved by the City’s consulting
landscape architect prior to a building permit being issued.
Docks: Not applicable as the project does not include any lakeshore or deeded access to lakes.
Other Permits: All necessary permits shall be provided to the City prior to issuance of a building
permit.
Preliminary & Final PUD Plan/Plat Review
Northeast Metro ISD 916
Planning Commission Report; 8-24-15
Page 11
CHARGES, FEES, & RESPONSIBILITIES:
In General: As always, the applicant is responsible for all fees related to the review of this
application (including but not limited to planning, legal, engineering, wetland,
environmental consultants, or other such experts as required by this application).
Park
Dedication:
Approval of the Eagle Point Business Park included provisions which allocated
individual park dedications to each development site on a square footage basis. The
overall fee for the business park to be collected totaled $252,437, which led to an
allocation of $0.06 per square foot for individual sites within the park. Accordingly,
the required dedication would be as follows:
848,981 square feet * $0.06/sq ft = $50,938.86
Because the proposed playground and sports fields will be semi -private facilities
meant for the school and not intended for daily public use, they will not receive credit
against the required park dedication.
Park dedication shall be paid prior to the issuance of a building permit for the proposed
office building.
Sewer Area
Charge:
As this subdivision will access municipal sewer services, there will be a sewer area
charge assessed.
Building
Permit Fees:
As this subdivision will access municipal services, hookup fees will be applicable.
After reviewing all criteria in code, staff believes the requested preliminary and final PUD plan/plat
should be approved with conditions.
Conclusion
The Planning Commission is asked to examine the proposed Preliminary & Final
PUD Plan/Plat materials and make a determination as to whether they meet all
conditions of approval outlined by city code. Keep in mind that an approval at this
point finalizes the subdivision—all desired/required changes must be addressed at
this time.
Preliminary & Final PUD Plan/Plat Review
Northeast Metro ISD 916
Planning Commission Report; 8-24-15
Page 12
Commission
Options:
The Planning Commission has the following options:
A) RECOMMEND APPROVAL of the requested Preliminary & Final PUD
Plan/Plat based on the applicant's submission, the contents of this report,
public testimony and other evidence available to the Council.
B) RECOMMEND DENIAL of the requested Preliminary & Final PUD
Plan/Plat based on the applicant's submission, the contents of this report,
public testimony and other evidence available to the Commission.
C) TABLE the request for further study.
Template
APPROVAL
Motion:
(Recommended)
“I move to recommend conditional approval of the requested Preliminary &
Final PUD Plan/Plat based on the following findings of fact:
a) The application is conforming to the standards and requirements for a PUD
within the Eagle Point Business Park;
b) The building design largely employs guidance from the City’s design
standards including building placement, open space, landscaping, controlled
parking lot lighting, high quality exterior materials and a cohesive
architectural style;
a. The applicant has agreed to improve the building design through the
addition of more parapet walls on all four sides of the building to bring
the roofline into compliance with required design standards;
b. The applicant has agreed to update the lighting plan to eliminate the
nonconforming illumination at the northern entry point;
c) Engineering design standards are being met or can be met via conditions; and
d) Review of the plan did not identify any environmental issues that cannot be
addressed through the proposed design.
Recommended
Conditions:
1. The City Engineer shall approval all final easements prior to consideration of the
Preliminary & Final PUD Plan/Plat by Council.
2. The City Engineer shall work with the applicant to finalize all stormwater
management plans to bring them into compliance with all applicable state and
local regulations.
3. In accordance with the conditional use permit condition, the applicant shall enter
into a service agreement with the City prior to issuance of a building permit for
the site.
Preliminary & Final PUD Plan/Plat Review
Northeast Metro ISD 916
Planning Commission Report; 8-24-15
Page 13
(cont.)
4. All necessary permits from other State, Regional, or local agencies shall be
provided to the City prior to issuance of a building permit.
5. Fire related conditions include:
a. FIRE HYDRANTS
i. Spacing – prior to filing of the final plat, the City Engineer must approve
proposed spacing of fire hydrants after confirming proposed placements
meet City requirements for commercial development.
ii. The hydrant on the East side of the property, currently identified as
“FUTURE ADDITION,” shall be installed at the same time as all other
fire hydrants.
b. The FDC (Fire Department Connection) location, Annunciator Panel location,
lock box location, and lock box type shall all be approved by the Fire Chief
prior to installation.
c. Fire lanes shall be identified with the Fire Chief, and all such lanes shall be
marked by painted curbing and signage when constructed.
6. Height of all lighting standards shall not exceed 30’.
7. The lighting plan shall be updated to relocate the proposed lighting standard near
the northern entry point to a location that brings anticipated foot candles at the
property line to a conforming level.
8. Silt fencing and/or other erosion control BMPs as directed by the City Engineer
shall be shown at the construction limits with the future building permit
application.
9. Telephone, electric, and/or gas service lines are to be placed underground in
accordance with the provisions of all applicable City ordinances.
10. Design of both monument signs shall be brought into compliance with City
standards for maximum sign size [thirty-two (32) square feet given the
characteristics of the adjacent roadway].
11. A park dedication payment in the amount of $50,938.86 shall be paid to the City
prior to the issuance of a building permit for the proposed school building.
12. Access charges for municipal services (as may be applicable) shall be paid prior
to the issuance of a building permit for the proposed school building.
Preliminary & Final PUD Plan/Plat Review
Northeast Metro ISD 916
Planning Commission Report; 8-24-15
Page 14
(cont.) 13. The final landscape plan be reviewed and approved by the City’s consulting
landscape architect prior to a building permit being issued.
14. Building plans shall be updated to include additional parapet walls on all four
sides of the building to address an existing lack of roof articulation.
15. All exterior metal shall be painted or colored with earth tones which complement
the other proposed siding materials for the building.
Template
DENIAL
Motion:
(Not Recommended)
“I move to recommend denial of the requested Preliminary & Final PUD
Plan/Plat based on the following findings of fact:
(Please list your findings of fact as to why the application is not in compliance
with zoning or subdivision regulations)
PAGE 1 of 3
MEMORANDUM
Date: August 21, 2015
To: Ben Gozola, Senior Planner, Sambatek Re: ISD 916 Intermediate School Building
Cc: Kyle Klatt, Planning Director Final Plat/Construction Plan Review
From: Jack Griffin, P.E., City Engineer
An engineering review has been completed for the Northeast Metro Intermediate School District Building. The
Final Plat and Construction Plan submittal consisted of the following documentation prepared by BRBW dated July
22, 2015:
Existing Conditions Survey, Preliminary and Final Plat.
Grading, Drainage and Erosion Control Plans.
Paving and Dimension Plan.
Utility Plan.
Landscape Plan.
Civil Details and Landscape Details.
Stormwater Management Plan including SWPPP.
STATUS/FINDINGS: An engineering review has been completed for the Eagle Point Business Park 8th Addition
Final Plat and Construction Plans. Please see the following comments relating to the Final Plat application.
FINAL PLAT – EAGLE POINT BUSINESS PARK 8TH ADDITION
1. Additional easements dedicated to the City must be provided as part of the Final Plat. A 30‐foot wide utility
easement must be placed over all 8‐inch watermain pipe, 6‐inch hydrant leads and the hydrants, centered
over the pipe such that 15‐foot easements exist in all directions of the pipe and hydrants. Easements must
be shown on the site plan, grading plan, utility plan and Plat.
2. No construction may occur until the applicant has received City Engineer approval for the Final
Construction Plans; the applicant has obtained and submitted to the City all applicable permits needed for
the project; and a preconstruction meeting has been held by the City’s engineering department.
3. The Final Plat shall not be recorded until final construction plan approval is granted.
STORM WATER MANAGEMENT PLAN
1. SWWD Permit. The Storm Water Management Plan was determined to be incomplete by the SWWD. The
applicant must obtain a SWWD Permit prior to final plan review by the City. Plan revisions made to acquire
this permit must be resubmitted for City review.
2. There are two Manage 2 type wetlands on the western edge of the parcel. These wetlands are subject to
the requirements SWWD and DNR review. The applicant must submit information to show compliance
with SWWD Rule 3 and the Wetland Conservation Act of 1991 as part of the WCA process.
3. The applicant must obtain an MPCA Stormwater Construction Permit prior to the start of construction.
Plan revisions made to acquire this permit must be resubmitted for City review.
FOCUS ENGINEERING, inc.
Cara Geheren, P.E. 651.300.4261
Jack Griffin, P.E. 651.300.4264
Ryan Stempski, P.E. 651.300.4267
Chad Isakson, P.E. 651.300.4285
PAGE 2 of 3
4. A HydroCAD model has been submitted showing a reduction in rate discharging for the 2, 10, and 100‐yr
24‐hr storm events, thereby meeting rate control requirements.
5. The applicant is proposing to use a combination of four (4) infiltration basins to meet volume control and
water quality requirements. The plan complies with SWWD and state rules subject to verification of plan
assumptions.
6. Each infiltration basin area must be investigated to verify infiltration assumptions shown in the storm
water model. A minimum of 2 borings are required to a depth of at least 5 feet below the proposed
infiltration basin bottom.
7. The storm water facilities are proposed to be constructed on private property and are not being
constructed to meet City engineering design standards. The storm water facilities therefore must be
privately owned and maintained. A maintenance agreement in a form acceptable to the City should be
executed and recorded with the County for all permanent storm water facilities to be located on private
property. The agreement shall provide a maintenance plan defining the maintenance responsibilities for
the private owner, the type of maintenance and the maintenance intervals.
FINAL CONSTRUCTION PLANS & SPECIFICATIONS: The following comments have been provided to direct plan
corrections necessary for final construction plan approval. When submitting revised plans, please provide a point
by point response letter that details the changes made to the plans.
1. Final Construction Plans and Specifications must be prepared in accordance with the City Engineering
Design Standards Manual using City standard plan notes, details and specifications for all public
infrastructure.
2. City of Lake Elmo standard specifications. City of Lake Elmo standard specifications must be placed in a
project manual to be available to the Contractor. The project manual must be submitted with the revised
final construction plans.
3. The Specifications must include the following statement as the first clause of the supplementary
provisions, “The City Standard Specifications for Public Infrastructure, dated February 2015, shall apply to
the work performed under this contract. Any supplemental specifications are intended to supplement the
City Standard Specifications, however they do NOT supersede the City Standard Specifications, Details,
Design Standards, or ordinances unless specific written approval has been provided by the City.”
4. Sheet 200CG:
City Standard Plan Notes for Grading and Erosion Control must be included on the Grading and
Erosion Control Plans. Any plan notes that contradict the City plan notes must be removed.
A plan note must be added to specify maximum slopes of 4:1 within public R/W.
Turf establishment details must be added to the plans. Seed, sod, mulch types and applications must
be specified including topsoil requirements and preparation.
Seeding mixes and turf establishment requirements for infiltration basins must be added to the plans.
Plan notes must be added to require the basin subgrade to be scarified to a minimum 12‐inch depth
prior to the placement of infiltration soil media.
Basin 4 outlet structure elevations and basin elevations must be corrected to be consistent with the
proposed design.
Storm sewer should be minimum 15‐inch diameter.
5. Sheet 200 CP:
The project proposes two driveway accesses located off Eagle Point Boulevard. It appears that the
driveway locations are consistent with staff direction, however the plans must be updated to show
the intersection of Island Drive with Eagle Point Boulevard so staff may review and verify access
spacing relative to Island Drive.
Drainage, geometric and profile details must be added to the plans to verify drainage is not directed
onto Eagle Point Boulevard at each access driveway. Valley gutters may be required to accommodate
drainage along Eagle Point Boulevard.
PAGE 3 of 3
Curb cuts and utility cuts to the existing pavement of Eagle Point Boulevard to be completed to the
limits and at the direction of the City Engineer. All cuts must be full width patches and must be
sufficiently large to utilize standard compaction equipment.
Add plan note at each access driveway as follows: “Sawcut and remove existing B618 concrete curb
and gutter at the nearest curb joint. Sawcut along existing bituminous street edge must be straight
and smooth”.
Fire Protection. Site Plans must be updated to include the placement of Fire Lanes, Yellow painted
curbing and No Parking areas for fire protection purposes at the direction of the Fire Chief.
6. Sheet 200 CU:
Connection to existing sanitary sewer stub. The project proposes to connect to the existing 8‐inch
sanitary sewer stub located in Eagle Point Boulevard. A 6‐inch private service line is proposed to
connect to the building. No public utilities are proposed.
Connection to existing watermain stub. The project proposes to connect to an existing 12‐inch
watermain at two locations within Eagle Point Boulevard to create a looped watermain network. In
addition, an 8‐inch watermain is also proposed interior to the site and looped around the building
with 5 hydrants for fire protection. A 4‐inch water service line and 8‐inch fire service line are proposed
to connect to the building (private service lines). The interior site watermain loop with hydrants must
be publically owned and maintained. Easements must be provided as part of the revised Plat.
The City minimum pipe size is 8inch. The 6‐inch watermain shown on the northwest side of the
building must be revised to 8‐inch pipe.
City Standard Plan Notes for Watermain must be included on the Utility Plans. Any plan notes that
contradict the City plan notes must be removed.
7. Sheet 200LP:
Plan notes must be added to require the Contractor to flag all tree locations for City review and
approval prior to installation. All trees must be located a minimum of 5 feet from public utilities.
Engineering has not reviewed the proposed landscape plan (privately owned) or building plans.
8. Detail Sheets:
City Standard Details Grading and Erosion Control must be used for the project and included on the
detail sheets.
City Standard Details for Watermain must be used for the project and included on the detail sheets.