NOTICE OF MEETING
The City of Lake Elmo
Planning Commission will conduct a meeting on
Monday, October 26, 2015 at 7:00 p.m.
AGENDA
1. Pledge of Allegiance
2. Approve Agenda
3. Approve Minutes
a. October 12, 2015
4. Public Hearings
a. PRELIMINARY AND FINAL PLANNED UNIT DEVELOPMENT (PUD) –
HOME 2 SUITES. The Planning Commission is being asked to consider an
application for a preliminary and final Planned Unit Development (PUD)
development plan for a proposed 90-unit, four story hotel to be located within the
Eagle Point Business Park at 8585 Eagle Point Circle North (Lot 1, Block 1 of
HOA 2nd Addition). The PID of the subject property is 33.029.21.43.0007.
b. OPEN SPACE CONCEPT PLAN – LEGENDS OF LAKE ELMO. The Planning
commission is being asked to consider an application for an open space
development concept plan on three unaddressed parcels totaling 110 acres to the
north of 50th Street North and to the South of the Sanctuary development. This
concept plan has been revised from a previous submission and now includes 44
residential lots. The PID’s of the subject property are: 01.029.21.42.0003;
01.029.21.43.0001; 01.029.21.41.0001.
5. Business Items
a. None
6. Updates
a. City Council Updates – October 20, 2015 Meeting
i. Hammes Plat Extension – Tabled.
b. Staff Updates
i. Upcoming Meetings:
November 9, 2015
November 23, 2015
c. Commission Concerns
7. Adjourn
Lake Elmo Planning Commission Minutes; 10-12-15
City of Lake Elmo
Planning Commission Meeting
Minutes of October 12, 2015
Chairman Dodson called to order the meeting of the Lake Elmo Planning Commission at
7:00 p.m.
COMMISSIONERS PRESENT: Dodson, Dorschner, Fields, Haggard, Larson, Williams,
Griffin and Kreimer
COMMISSIONERS ABSENT: None
STAFF PRESENT: Community Development Director Klatt and Interim Administrator
Schroeder
Approve Agenda:
The agenda was accepted as presented.
Approve Minutes: September 28, 2015
M/S/P: Williams/Dorschner, move to approve minutes as presented, Vote: 7-0, motion
carried unanimously.
Zoning Ordinance Use Classification Review
Klatt started the discussion by stating that the City Council wanted to review the
Cemetery use, and it was a good time to take a comprehensive look at all uses.
Staff is recommending that the Planning Commission look at the Cemetery use and that
it not be an allowed or conditional use in AG or RR. Staff is recommending that the
Cemetery use only be allowed as a conditional use in the Public Facility zone.
Klatt stated that he hoped the Commission had time to review the chart and will bring
forward items for discussion. Klatt explained the differences between allowed,
conditional and interim uses.
Kreimer asked about the discretion of approving CUP’s. Klatt stated that it is somewhat
difficult to deny those uses. There was a general discussion of CUP’s.
Williams asked why Public Facility and mixed use along I94 were not in the chart. Klatt
responded that mixed use along I94 is handled via a PUD overlay and the Public Facility
has not been revised yet and is in a different table.
2
Lake Elmo Planning Commission Minutes; 10-12-15
Haggard would like to see the changes from 2013 taken back out until such time as the
public has a chance to weigh back in. Klatt stated that it would be difficult to notice
people as it potentially affects every property in the City.
Williams asked if it might be a good idea to deal with the cemetery issue and then
possibly schedule a workshop.
M/S/P: Dorschner/Griffin: move to recommend that a public hearing be scheduled to
eliminate the cemetery use in AG and RR zones. Vote: 7-0, motion carried unanimously.
Williams is against the motion as presented. He thinks that the definition can be
changed and cemeteries could be allowed in a limited way. Fields agreed and asked if it
could be changed to be conditional. Klatt stated that if it is made conditional, it is
subject to Council approval.
M/S/P: Williams/Dodson: move to make a friendly amendment to change the definition
of cemetery to read “ Land used or intended to be used for the burial of the dead and
dedicated for cemetery purposes, including columbariums, and mausoleums not over 8
feet in height”. He would also like the use category to be revised to conditional in AG
and RR. Vote: 7-0, motion carried unanimously, after amendment.
Yvette Oldendorff, 5418 Lake Elmo Ave, There is no public demand for a local cemetery.
They circulated a petition and 147 people signed who feel that a cemetery is a poor use
of property. Also, on another note, should there be any of these commercial uses such
as commercial Kennels and commercial stables in a residential district?
Saxe Roberts, there is no demand for cemeteries. Cremations are on the rise. There is
60% more land for cemeteries than is needed. They are already allowed in the public
facility zone.
Dodson withdrew his second to Williams friendly amendment. Haggard decided to
second the friendly amendment.
Williams stated that there is already a provision in the code to allow it in public facility,
so he doesn’t feel it needs to be in AG & RR.
M/S/P: Williams/Dodson: motion to amend his amendment to just change the definition
of cemetery and leave the original motion to remove the use from AG and RR would
stand. Vote: 7-0, motion carried unanimously.
M/S/P: Dorschner/Dodson: motion to amend the amendment to strike “not to exceed 8
feet in height”. Vote: 7-0, motion carried unanimously.
3
Lake Elmo Planning Commission Minutes; 10-12-15
The complete action taken, including amendments, was to recommend that a public
hearing be scheduled to remove cemetery as an allowed use from AG & RR and to
change the definition to: “Land used or intended to be used for the burial of the dead
and dedicated for cemetery purposes, including columbariums, and mausoleums”.
The Commission continued discussion regarding the use chart. Dodson asked about the
manufactured home park use in MDR. The Commission had some discussion regarding
this. There was some discussion regarding secondary dwellings and if those are located
in the most reasonable zones.
M/S/P: Dorschner/Williams: move to make secondary dwelling an allowed use in RT, AG,
RR, RS, RE, LDR, MDR, HDR & VMX, Vote: 6-1, motion carried with Haggard voting no.
Reason given was that she is not clear on the definition and the discussion of attached
vs detached was not fully finalized.
Schroeder stated that with this being the last meeting with Klatt and that the
Commission might want to consider a deeper discussion once the new staff is on board.
M/S/P: Dorschner/Fields: motion to table this discussion until such time as new staff is
available. Vote: 4-3, motion failed.
Fields asked if there were any other areas that might be of urgency. Larson feels that
the public assembly and religious institutions should be dealt with.
M/S/P: Dodson/Haggard: motion to remove public assembly as a use from the Business
Park Zoning. Vote: 7-0, motion carried unanimously
Williams and Haggard would like to go through and highlight areas that others are
concerned with so that they can all be thinking about them.
Williams would like to look at agricultural sales, garden center and Building supply sales.
He thinks commercial vehicle repair should be allowed somewhere. Wondering why
adult establishment is allowed in Business Park. Williams thinks the drive through item
should be looked at further. Motor Freight and Warehousing seems similar to
commercial vehicle repair. Research and testing is only allowed in Business Park and he
feels it should be allowed in other business. OP-alt was removed from the comp plan
and should also be removed from the zoning code.
Klatt stated that we currently don’t have an industrial zone for more intense uses, and
that might be something we might want to look at as we re-do the comp plan. Williams
thought we might want to consider an industrial park.
4
Lake Elmo Planning Commission Minutes; 10-12-15
Haggard would like to look at group home as a use. Klatt stated that this is something
regulated by state law and it has to be allowed anywhere we allow single family homes.
Klatt stated that we may also need to add that use to the other residential zones as well.
Haggard is concerned about any commercial type uses in the AG & RR zones. She is not
sure why a golf course would be allowed in LDR.
Kreimer would like to look at funeral homes in MDR. He is not sure they belong there.
Would like to discuss the greenhouses non-retail in RR and what it is we are allowing
with solar equipment which is permitted across the board.
Williams brought up changes for the definitions section. The Commission discussed
those possible changes.
Comprehensive Plan Update Discussion
Klatt started his discussion with a map south of 10th street showing the current land use
map of what went into the comprehensive plan. This map has changed a little bit as the
alignment of 5th street has changed. 5th street was going to be the dividing line between
low density and more intense densities. It has been discussed to possibly eliminate the
high density housing and possibly add a business park in that spot. It was also discussed
to possibly change some of the medium density to either low density or expanding the
commercial.
Klatt presented an analysis of what these changes would be in regards to numbers. This
would make the City very close to what the Met Council is looking for. Klatt is looking
for feedback from the Met Council and also from the general public as this will impact
property owners. Klatt stated that he is focusing on I94 because of the moratorium.
The Bus Rapid Transit line will also have an impact. There are certain standards for what
needs to develop around the transit stations.
Klatt discussed what the opportunities are for development in the rural areas. It is
limited by the amount of land that is available. The Commission should start thinking
about what they want that area to look like, what types of developments we want to
allow and what size of lots should be allowed to subdivide.
Kreimer pointed out that this does not take into consideration what might happen with
Tartan Park. If it was developed into residential units, that would be a significant
amount.
Council Updates – September 15, 2015 Meeting
1. Kleis Minor Subdivision – Passed with an additional condition that the
assessments will need to be paid in full.
5
Lake Elmo Planning Commission Minutes; 10-12-15
2. Halcyon Cemetery – Denied.
Staff Updates
Schroeder gave an update regarding staffing. There has been a new building inspector
hired and a new truck will be purchased or leased. The City Planner and Community
Development jobs will be filled and there will be one admin position upgraded and
another admin position will be hired.
Tartan Park has been sold, but the purchaser has not been made public knowledge yet.
They will bring that back once it is known.
1. Upcoming Meetings
a. October 26, 2015
b. November 9, 2015
Commission Concerns
Williams stated that the Planning Commission members received a letter from the
Bradley family asking to be removed from the moratorium restrictions. This property is
actually in phase III. Schroeder stated that they would actually have to come forward
and petition the City to be removed from the moratorium restrictions, so no action has
been taken.
Dorschner thanked Kyle for his service and is concerned that we will not have a City
Planner or Community Development Director. Klatt stated that as part of the transition
Ben Gozola will be working on projects and the City has asked him to be at the City as
much as he can.
Dodson also thanked Kyle for his service and professionalism with the Planning
Commission. Klatt stated that he has enjoyed working with the present and past
Planning Commissions and appreciates all the hard work that people put into the
volunteer position.
Meeting adjourned at 10:30 pm
Respectfully submitted,
Joan Ziertman
Planning Program Assistant
City of Lake Elmo Planning Commission Agenda Item
Executive Summary
Title of Item: Preliminary and Final Planed Unit Developmetn (PUD) – Home 2
Suites. A proposed hotel to be located in the Eagle Point Business Park.
Meeting Date: 10-26-15
Staff Reporting: Ben Gozola, City Planner
Summary: The City received an application for the development of a new hotel
within the Eagle Point Business Park, but the plan sets were incomplete
at the time of submittal. Staff deemed the application complete, but
noticed for a public hearing in the hopes that all missing information
would be received, could be reviewed, and the applicants could be kept
on an accelerated timeframe. As it is, the applicants are still working to
update plans, and staff has since determined they will also need a
conditional use permit for this project. Accordingly, no action is needed
at this time, and all items will be re-noticed for a public hearing in the
future.
Guidance: No action necessary at this time.
The public hearing can be opened and closed if members of the
public are in attendance to speak.
ATTACHMENTS:
1. None
ORDER OF BUSINESS:
- Report by Staff ........................................................................... Consulting Planner
- Open the Public Hearing (if public is present) ................................................. Chair
- Close the Public Hearing ................................................................................. Chair
City of Lake Elmo Planning Commission Agenda Item
Executive Summary
Title of Item: OP Development / Concept Plan Review: Application from Landucci
Homes requesting approval of an OP development concept plan that
would create forty-four (44) lots on 90.15 gross buildable acres. The
development is currently be called “Legends of Lake Elmo.”
Meeting Date: 10-26-15
Staff Reporting: Ben Gozola, City Planner
Summary: An OP Concept Plan allows a developer to gain initial feedback on a
development proposal prior to investing significant dollars towards the
idea. This revised proposal for the “Legends of Lake Elmo” is a
traditional OP development. Areas of concern that the Commission
should focus on include the number of proposed OP deviations (4),
buffering related to seven lots, septic design, the need for a road to the
west, and whether the layout is appropriate given the location of
farmlands, woods, and surrounding home sites.
Guidance: The review criteria for concept plans is very broad and subjective, so
approval or denial at this stage is less about compliance with specific
standards, and more about determining whether the proposal is best
for this property, best for the surrounding properties, and best for the
City as a whole.
The commission is asked to consider all facts outlined in the report,
and make a recommendation of approval or denial for Council
consideration.
Things to consider for an approval recommendation are listed on
page 24
Things to consider for a denial recommendation are listed on
pages 24 & 25.
ATTACHMENTS:
1. Area Map
2. Staff Report
3. Engineering Memo
4. Fire Chief Memo
5. Neighbor Feedback
6. Applicant’s Submittals
ORDER OF BUSINESS:
- Introduction ................................................................................ Consulting Planner
- Report by Staff ........................................................................... Consulting Planner
- Questions from the Commission .............................Chair & Commission Members
- Questions to the Applicant ......................................Chair & Commission Members
- Open the Public Hearing .................................................................................. Chair
- Close the Public Hearing ................................................................................. Chair
- Discussion by the Commission ...............................Chair & Commission Members
- Action by the Commission ...................................................... Chair & Commission
City of Lake Elmo Planning Department
OP Development / Concept Plan Review
To: Planning Commission
From: Ben Gozola, City Planner
Meeting Date: October 26, 2015
Applicants: Landucci Homes
Location: North of 50th Street North & South of the Sanctuary Development
Introductory Information
Request: The applicants are seeking approval of an OP development concept plan that would create
forty-four (44) lots on 90.15 gross buildable acres. The development is currently be called
“Legends of Lake Elmo.”
Site Data: Existing Zoning – RR (Rural Residential)
Land Use Guidance – RAD (Rural Area Development)
Existing Parcel sizes – 50.03 acres, 20.0 acres, and 39.97 acres (110 gross acres)
Property Identification Numbers (PIDs): 01-029-21-42-0003, 01-029-21-43-0001,
and 01-029-21-41-0001
Various Calcs
(in acres):
TOTAL PROPERTY AREA ...........................................................110.01
BUILDABLE ACREAGE ..............................................................90.15
LAND USED FOR LOTS ..............................................................34.37
OPEN SPACE ...............................................................................64.73
– PARK AREA ......................................................................0.00
PERCENT OF OPEN SPACE ......................................................58.8%%
RIGHT OF WAY ...........................................................................10.91
WETLAND AREA ..........................................................................17.93
WOODED AREAS ........................................................................20.22
STEEP SLOPE AREAS .................................................................1.93
TOTAL PROPOSED LOTS ...........................................................44
GROSS DENSITY ..........................................................................0.40 UNITS/ACRE
NET DENSITY ..............................................................................0.49 UNITS/ACRE
OP Concept Plan Review: Legends of Lake Elmo (October Submittal)
Planning Commission Report; 10-26-15
Page 2
Review
Site Character: Applicant Comments: Legends of Lake Elmo is proposed as an open space
development, located in the northeastern portion of the City, Section 1, Township 29N,
Range 21W. The project property consists of 110.1 acres, bordered on the south by 50th
Street, Tamarack Farm Estates and Carriage to the east, St. Croix Sanctuary to the
north and large agricultural properties to the west. The site is best characterized as
rolling open farm fields surrounded by existing mature oak stands, pines and wetlands,
by far one of the nicest natural beauty parcels in Lake Elmo.
Fortunately the availability of farm fields and natural terrain allow the proposed design
to preserve every wetland and nearly all of the mature trees. The Open Space
Ordinance appears to have been written with this parcel in mind.
Staff Comments: The rolling hills, open farm fields and scattered woodlands on these
three (3) parcels are a prime example of Lake Elmo’s rural landscape.
“OP” STANDARDS REVIEW:
Land Area:
According to code, applications for a residential OP development shall meet the following
criteria unless modified by a 4/5 vote of the City Council:
A. The minimum land area for the proposed OP development shall be 40 acres;
Staff comment: The development is proposed on 110 gross acres. Criteria met.
B. The ratio of parcel length to width shall not exceed 3:1
Staff comment: The width to depth of the three parcels which make up this
proposed development is roughly 1:1. Criteria met.
C. The total number of dwelling units permitted shall be according to the development
density criteria contained in the Comprehensive Plan (0.45 dwelling units per
buildable acre when planned as part of an Open Space Preservation development);
AND
D. The total number of dwelling units within an OP development shall not exceed the
density limitations contained in the Comprehensive Plan for OP Districts.
Criteria “C” and “D” are identical, so they were reviewed together.
Applicant comment: The density of the project, based on the underlying zoning
is 18/40 for an open space development. Subtracting out the steep slopes and
wetlands the net acreage for the development is 90.15 acres, which nets 41 units.
The City has requested a wider right of way and concrete curb and gutter. We in
turn are also want to offer a larger trail network and additional landscaping than
OP Concept Plan Review: Legends of Lake Elmo (October Submittal)
Planning Commission Report; 10-26-15
Page 3
(cont.) what ordinance requires. In order to accomplish these items we respectfully
request an additional 3 lots be included in our total lot count, with a requested
total of 44 units.
The average lot size as proposed is 0.78 acres, 56% larger than the required 0.50
acre minimum. The typical lot width as demonstrated on the concept plan is 140-
ft in width. The smallest proposed lot is 0.60 acres, with the largest at 1.10 acres.
As found [on the table on page one of the report], the overall gross density is
proposed at 0.40 units/acre, with net density at 0.49 units/acre.
Staff comment: The provided documentation identifies 90.15 net buildable acres
after protected wetlands and sloped areas are taken out of consideration. As 44
units are proposed, the resulting density is 0.49 units per net acre. The applicant
is requesting a modification to this requirement based on the arguments above.
This criteria will require a 4/5 vote of the City Council in order to be met.
E. Total preserved open space within the proposed development shall be at least 50% of
the total Buildable Land Area as defined by Chapter 150 of the City Code;
Staff comment: Based on 90.15 buildable acres, this development is required to
set aside a minimum of 45.08 acres of open space to meet the requirements of OP
development. The applicant is proposing 64.73 acres of open space (a 43.59%
increase over the minimum requirement). Criteria met.
F. Dwelling units are to be grouped so that at least 50% of the Buildable Land Area of
the proposed development remains in preserved open space.
Staff comment: The proposed open spaces are all interconnected and coordinated
throughout the proposed development. Suggestions for improvement are listed
under the review of open space below. Criteria met.
Open Space:
Applicant Comments on Open Space: The open space as proposed is predominately
preserving wetland and subsequently the large areas of mature oak forest on the
property. The largest open space area is Outlot A, 30.50 acres of hardwood forest and
high valued wetlands.
Trails are proposed to make the beautiful natural areas accessible to the subdivision
and with the connectivity of trails, the natural areas will be open to the surrounding
subdivisions to enjoy as well. A very logical and necessary connection of the trail
system is completed with this subdivision trail layout, which is a north south connection
to the 50th Street Trail. Families from St. Croix Sanctuary, Carriage Station, Tamarack
Estates, Tana Ridge, Fields of St. Croix and others will be able to complete large
bicycle, running or walking loops with this design and gain better access to the
proposed park area with vehicles.
OP Concept Plan Review: Legends of Lake Elmo (October Submittal)
Planning Commission Report; 10-26-15
Page 4
(cont.)
By code, open space created as part of an OP development must meet the following
criteria unless modified by a 4/5 vote of the City Council:
A. Open space created as part of an OP development must be protected by a conservation
easement;
Staff comment: The applicants have not indicated whether they have identified
an agency to oversee the required conservation easement for the proposed open
space. As part of the Concept plan review, they will be directed to have this
requirement addressed prior to proceeding to Preliminary Plat if allowed to do so.
B. Not less than 60% of the preserved open space shall be in contiguous parcels of not
less than ten (10) acres;
Staff comment: Outlots A (30.50 acres), B (17.93 acres) and C (16.30 acres) all
are contiguous and exceed ten (10) acres in size.
While this criteria is met, that’s not to say there are not areas worthy of debate
for potential change. Staff would encourage the applicant, Planning Commission
and Council to consider whether the following areas can/should be reconfigured:
i. There are still seven lots with buildable areas that will not meet the required
buffer zones from surrounding properties (buffers are specifically analyzed on
page 10). Reconfiguration of the lots and open space areas could minimize or
eliminate these encroachments and eliminate the need for a variation.
ii. The former “park” area with the potential winter skating rink has been
eliminated. As there seemed to be some support for that improvement, its
elimination may warrant discussion.
iii. Outlot C and its interplay with the dedicated park in Sanctuary can still be
given consideration as part of this development review. This is especially
important given the following problems with the existing City Park:
– The existing park is dismally located and acts far more as an extended
backyard for eight private residential lots than as a gathering/play place for
the public.
– Despite being public, the land and its equipment is largely hidden from the
public: it cannot be seen from any nearby road, and there is no sign on Lily
Avenue North to indicate a park is present.
– Access to the Park is difficult (especially for the handicapped) given the
topography leading to the park, and the fact that the asphalt path becomes
a gravel mess before turning into grass prior to actually reaching the
groomed park land.
OP Concept Plan Review: Legends of Lake Elmo (October Submittal)
Planning Commission Report; 10-26-15
Page 5
(cont.)
– Ignoring the Park’s major shortcomings in terms of location and
accessibility, the topography throughout the park parcel (from north to
south) makes it largely unusable for active uses except in the area where
playground equipment has been added. While topography, woods and
wetlands are great feature within a private park or in preserved open space,
it is not ideal land for an active public park (which this land is assigned to
be).
In staff’s opinion, the only way overcome the existing poor design
characteristics of Sanctuary Park is to make the land both visible and easily
accessible via adjacent development. Unfortunately, topography between
proposed Outlot C and the existing Sanctuary Park is such that addressing
either visibility or accessibility is nearly impossible. The only apparent
reason to expand the Sanctuary Park with land in the Legends development
would be to create a public sledding hill. If the City has no interest in that
type of facility, the City should be focusing on parkland elsewhere (and the
configuration of Outlot C—except potentially around Lot 18—becomes less
of a concern).
C. Preserved open space is to be maintained for the purposes for which it was set aside;
Staff comment: Per the applicant’s narrative, the proposed open space will be
passively managed as maintenance areas for wetlands and woods. Criteria met.
D. Where applicable, a homeowner’s association shall be established to permanently
maintain all residual open space and recreational facilities;
Staff comment: The applicant is anticipated to create an HOA to handle at least
trail maintenance (cleaning and plowing), maintenance of development
landscaping, and maintenance of the entrance monument(s). Criteria met.
E. Preserved open space shall be contiguous with preserved open space or public parks
on adjacent parcels.
Staff comment: The proposed open space is contiguous with open space or
parkland on adjacent property. Criteria met.
Lot Design:
According to code, lots are to be designed to achieve the following objectives (listed in
the order of priority):
A. On the most suitable soils for sub-surface septic disposal.
Staff comment: The applicants have not yet provided adequate information to
allow staff to determine whether this is the case. Please see engineering comments
on wastewater on page 17 of this report.
OP Concept Plan Review: Legends of Lake Elmo (October Submittal)
Planning Commission Report; 10-26-15
Page 6
(cont.) B. On the least fertile soils for agricultural uses and in a manner which maximizes the
usable area remaining for such agricultural use.
Staff comment: Please see the soils data and maps on the following pages.
Soil
Symbol Map Unit Name Acres
% of
total
acres Farmland Rating
HIGH QUALITY FARMLAND
153B Santiago silt loam, 2 to 6 percent slopes 19.1 17.4% All areas are prime farmland
49B Antigo silt loam, 2 to 6 percent slopes 10.7 9.7% All areas are prime farmland
264 Freeon silt loam, 1 to 4 percent slopes 7.6 6.9% All areas are prime farmland
49 Antigo silt loam, 0 to 2 percent slopes 1.4 1.3% All areas are prime farmland
120 Brill silt loam 1.4 1.3% All areas are prime farmland
266 Freer silt loam 5.1 4.7% Prime farmland if drained
468 Otter silt loam 3.0 2.8% Prime farmland if drained
48.3 acres 44%
MODERATE QUALITY FARMLAND
342C Kingsley sandy loam, 6 to 12 percent
slopes 8.6 7.9% Farmland of statewide importance
49C Antigo silt loam, 6 to 12 percent slopes 1.9 1.8% Farmland of statewide importance
155B Chetek sandy loam, 0 to 6 percent slopes 1.7 1.5% Farmland of statewide importance
153C Santiago silt loam, 6 to 15 percent slopes 0.6 0.5% Farmland of statewide importance
12.8 acres 12%
LOW QUALITY FARMLAND
155C Chetek sandy loam, 6 to 12 percent slopes 13.6 12.3% Not prime farmland
896C Mahtomedi-Kingsley complex, 3 to 12
percent slopes 9.8 8.9% Not prime farmland
W Water 4.9 4.5% Not prime farmland
456 Barronett silt loam 4.5 4.1% Not prime farmland
453C DeMontreville loamy fine sand, 6 to 12
percent slopes 4.3 3.9% Not prime farmland
541 Rifle muck 4.0 3.7% Not prime farmland
896D Mahtomedi-Kingsley complex, 12 to 25
percent slopes 4.0 3.7% Not prime farmland
155D Chetek sandy loam, 12 to 25 percent
slopes 3.6 3.2% Not prime farmland
454B Mahtomedi loamy sand, 0 to 6 percent
slopes 0.1 0.1% Not prime farmland
48.8 acres 44%
TOTALS: 110.0 100.0%
Washington County Soil Survey data from the USDA Soil Survey Website (http://websoilsurvey.nrcs.usda.gov/)
OP Concept Plan Review: Legends of Lake Elmo (October Submittal)
Planning Commission Report; 10-26-15
Page 7
Soils Map
High Quality Farmlands = GREENS
Moderate Quality farmland = BLUES
Low Quality Farmlands = RED
OP Concept Plan Review: Legends of Lake Elmo (October Submittal)
Planning Commission Report; 10-26-15
Page 8
Soils vs. Lot Layout Comparison
OP Concept Plan Review: Legends of Lake Elmo (October Submittal)
Planning Commission Report; 10-26-15
Page 9
(cont.) C. Within any woodland contained in the parcel or along the far edges of open fields
adjacent to any woodland.
Staff comment: The proposed lots are largely outside of woodlands within the
open field areas.
D. In locations least likely to block scenic vistas as viewed from Hwy 36.
Staff comment: The property is not visible from Hwy 36.
E. Away from woodlands in open fields.
Staff comment: Lots are largely located per this standard.
Without adequate information on where proposed septic sites are to be located or where
the best soils are, staff cannot state one way or another whether the proposed lot
configuration follows this priority order. What we can say is that many of the lots i n the
NE quadrant of the development are largely located on higher quality soils, and most are
compliant with the last priority of being within open fields. Ultimately staff would
recommend that a 4/5 vote of Council is needed to authorize the proposed layout.
Structures: The applicant is planning to construct homes at a slightly higher price point than the
ones found in the Sanctuary development to the north.
Buffer Zones: Applicant Comments on Home Setbacks and Buffering: We have listened to the
concerns of the neighboring properties and the feedback from the members of the
Planning Commission and have adapted the plan to conform more closely with the
feedback received. The layout is still very confined to the existing natural features,
which decreases the setbacks to below that of the ordinance, but also allows drives the
developments uniqueness.
The required buffer zones from the properties to the north, south, and west are
currently not met by the proposed development plan. Per code, one-hundred (100)
foot buffers are required from the adjacent OP developments (St. Croix Sanctuary,
Tamarack Farm Estates, The Fields of St. Croix, and Tana Ridge), and two-hundred
(200) foot buffers are required from Carriage Station to the east, and the Bergman,
Hecker, & Vanderhoff properties to the west. Buffers are defined as an area between
the property line of adjacent parcels, and any future building or driving surface in the
proposed development.
Based on this revised plan, Lots 4, 7, 13, 17, 18, 39, and 40 have buildable area within
the required setback from adjacent lands (7 of the 44 proposed lots).
As part of this concept plan proposal, the applicant is seeking a 4/5 vote of Council to
reduce the surrounding buffers in a manner that accommodates the lots as proposed.
OP Concept Plan Review: Legends of Lake Elmo (October Submittal)
Planning Commission Report; 10-26-15
Page 10
Boulevard
Landscaping:
Applicant Comments on Landscaping: With the homes being positioned in the
open farm fields, the addition of trees in the boulevards and around ponding areas
will be necessary to enhance the development. The concept plan demonstrates the
initial conceptual design for tree plantings, providing buffering and beautification of
the site. As stated, as part of the request for the additional lots, we propose at 25%
increase over the required landscaping requirement.
Per code, boulevard landscaping is required along all streets. Such landscaping shall
consist of at least one tree per every 30 feet, or be placed in “dusters” at the same
ratio.
Landscaping over the entirety of the site must consist of at least ten (10) trees per
proposed building site, and such trees shall not be smaller than 1.5 caliper inches
when measured at 54 inches above grade level.
As part of a future preliminary plan submission, the applicant will be required to
provide a landscape plan for the entire site that meets the above requirements.
Lot
Configuration:
Section 150.180 (B)(2)(h) sets minimum lot sizes based on whether lots will be
serviced by individual septic systems or a communal facility. As the applicant
proposes to utilize individual septic systems for each home, the minimums lot size
would be 1.0 acre which is ONLY met by one (1) of the forty-four (44) proposed
lots.
The following is a listing of all proposed lot sizes:
LOT Acres LOT Acres LOT Acres
1 0.85 16 0.67 31 0.77
2 0.60 17 0.73 32 0.73
3 0.78 18 0.81 33 0.85
4 0.70 19 0.84 34 0.85
5 0.84 20 0.81 35 0.79
6 0.92 21 0.75 36 0.87
7 0.70 22 0.71 37 0.62
8 0.87 23 0.67 38 0.64
9 0.73 24 0.83 39 1.10
10 0.72 25 0.89 40 0.70
11 0.87 26 0.87 41 0.78
12 0.87 27 0.67 42 0.71
13 0.80 28 0.71 43 0.78
14 0.85 29 0.86 44 0.68
15 0.76 30 0.82
Staff Comments: The average lot size proposed by the applicant is around 0.78
acres, with a high of 1.1 acres and a low of 0.6 acres. A 4/5 vote of Council is
required to approve the 43 deviations (can be done all at once if Council finds this
lot configuration to be the best layout for this land and the surrounding properties).
OP Concept Plan Review: Legends of Lake Elmo (October Submittal)
Planning Commission Report; 10-26-15
Page 11
(cont.) NOTE: On Thursday, October 22, 2015, the applicants contacted City Hall to clarify
that a form of communal septic systems are being proposed, and that such information
will be provided to the City. Such information was not able to be reviewed or
considered prior to completion of this report. Staff will update the Commission at the
meeting as to whether the new information eliminates the need for a lot size variation
vote.
Pathways: The proposed development includes a comprehensive trail system to serve this and
surrounding development.
The overall length of paths proposed by the concept plan is approximately 6,101 feet
(1.16 miles).
Trails are proposed to be eight (8) foot wide bituminous paths.
Staff Comments: A critical pedestrian connection needed by the City is the
construction of a bituminous trail on the north side of 50th Street connecting the
two sides of Outlot B and extending to the westerly limits of the Plat. This
connection must be shown on any future preliminary application. Other than that,
the requirements for pathways appear to be met by the proposed plans. Criteria
met.
Proposed
Density:
The maximum dwelling density within an OP development shall be 18 units per 40
gross acres of buildable land (or 0.45 units per acre). With 90.15 acres of buildable
land available, a maximum of 40 units is allowed by code.
o 90.15 * 0.45 = 40.57 = 40 units
As proposed, this development would result in 44 units on 90.15 acres of buildable
land which equates to a density of 0.49 units per acre (a 10% increase over allowed).
A 4/5 vote of Council will be needed to find compliance with the OP density standard.
To support their argument for a density increase, the applicants provided the following
narrative:
Applicant Comments: The City has requested a wider right of way and concrete curb
and gutter. We in turn are also want to offer a larger trail network and additional
landscaping than what ordinance requires. In order to accomplish these items we
respectfully request an additional 3 lots be included in our total lot count, with a
requested total of 44 units.
The decision to authorize the proposed density increase via a 4/5 vote should be made
solely on the City’s feeling as to whether the proposed development is best for this
lot, the surrounding parcels, and the City as a whole.
OP Concept Plan Review: Legends of Lake Elmo (October Submittal)
Planning Commission Report; 10-26-15
Page 12
IN GENERAL
Adjacent parcel
dev.:
The surrounding parcels to the west can develop at some point in the future, so it is
important to consider how the current proposal will integrate with those future
developments.
As you can see in the graphic below, there are potentially three nearby future entry
points on to either Lake Elmo Avenue or 50th Street North. At least one right-of-
way in this development should dead-end on the western property line for
eventually continuation to one or more of these points. Dedication of such a
right of way should be required with any preliminary submittal.
The circle road in Tamarack Farm Estates (to the southeast of the proposed
development) does include an undeveloped right-of-way which ends on this
property. Utilization of this undeveloped right-of-way is not recommended as it
would unnecessarily disturb wetlands, and would do nothing positive for area
transportation.
Lot Access: All lots have direct access to a public road.
Driveways should be located so as to preserve existing trees in as much as possible.
Addresses for the individual homes should be posted at each driveway entrance.
OP Concept Plan Review: Legends of Lake Elmo (October Submittal)
Planning Commission Report; 10-26-15
Page 13
Future parcel
development:
The proposed subdivision would fully divide the property as an OP development.
Easements: All standard drainage and utility easements will need to be shown on the future
preliminary plan document(s).
All easements intended for public utilities shall be a minimum of 15 feet on each side
of the utility and shall be shown on the future plans. All easements will be as wide as
necessary to address access and/or maintenance objectives.
OP Deviation
Summary:
The Legends of Lake Elmo is proposed to vary from the standard OP development
requirements in the following manner:
1) Density/Number of Homes
The proposal would result in a density of 0.49 units/buildable acre (an
increase from 40 to 44 homes).
The total number of dwelling units permitted shall be according to the
development density criteria contained in the Comprehensive Plan (0.45 dwelling
units per buildable acre when planned as part of an Open Space Preservation
development); AND, the total number of dwelling units within an OP development
shall not exceed the density limitations contained in the Comprehensive Plan for
OP Districts.
2) Lot Size
OP developments that propose to utilize individual septic systems for each
lot require a minimum lot size of 1.0 acres.
Forty-three (43) of the forty-four (44) proposed lots do not meet the minimum lot
size requirement. As proposed, the average lot size is approximately 0.78 acres,
with a high of 1.1 acres and a low of 0.6 acres. Should Council wish to approve
the proposed lot sizes, staff would recommend only one 4/5 vote to authorize all
proposed lots. NOTE: applicants have indicated they will be providing additional
information that may eliminate this variation.
3) Lot Design/Configuration
The proposal includes lots within areas classified as prime farmland.
On the priority list of things to accomplish with lot design, placing homes “on the
least fertile soils for agricultural uses and in a manner which maximizes the
usable area remaining for such agricultural use” is the 2nd highest priority, and
many of these lots (especially in the NE corner) are located on prime farmland.
OP Concept Plan Review: Legends of Lake Elmo (October Submittal)
Planning Commission Report; 10-26-15
Page 14
(cont). 4) Buffers
Lots 4, 7, 13, 17, 18, 39 and 40 will all include buildable area within the
required buffer.
Council’s 4/5 vote on this item would authorize staff to work with the applicant
at preliminary plat to identify unique setbacks for each of the identified lots to
ensure buffers are maintained in as much as possible.
Resident
Concerns:
Staff received a number of comments from residents leading up to the Planning
Commission meeting in September (minutes from that meeting are attached).
INFRASTRUCTURE:
In General: All public improvements constructed to support the development must be designed
and constructed in accordance with the City Engineering Design Standards Manual
available on the City website.
Streets and
Transportation:
Applicant Comments on Streets and Trails: The street design for the local roads are
proposed as 24-ft in width, with bituminous curb and gutter. Right of way is proposed as
60-ft in width to allow for adequate room for small utilities, water main and sewer. The
road width and right of way width are slightly larger than what is required, due to the
feedback from City Staff. The trail is proposed to meet the current standard width and is
located along the proposed roadway as well as through the natural area of Outlot A,
which will make a nice walking loop for the residents and provide connection, north to
south from St. Croix Sanctuary to 50th Street as previously described.
Staff Comments: Staff will be very adamant about preserving the roadway connection
between this development and Sanctuary to the north for a number of reasons:
1. There are currently 59 (eventually 62) homes in Sanctuary that rely on a single
access point for ingress/egress to their home sites. The status quo should NOT
be supported by the City as a minimum of two ingress/egress points are necessary
(three are preferred) for the number of homes in Sanctuary. Ostensibly the reason
the City felt comfortable approving a single access point was the knowledge that
roads within the development would eventually provide two (2) additional access
points.
OP Concept Plan Review: Legends of Lake Elmo (October Submittal)
Planning Commission Report; 10-26-15
Page 15
(cont.)
2. One access point is a major safety problem that must be rectified. Reconstruction
of Hwy 36 or Manning Avenue has the potential to severely limit (or eliminate at
times) access to this neighborhood. During those times, not only will res idents
have problems accessing their properties, but so too will emergency vehicles. The
fire chief strongly supports multiple entry points for this reason.
3. Linden Avenue is not a “dead end.” It is clearly a right-of-way that temporarily
terminates at the development’s boundary, and there could be no mistaking the
intent that it would eventually be a through-road.
4. Enforcing the continuation of through-roads between developments that are
completed years apart is difficult for all communities, and all existing
neighborhoods request that such roads be terminated. Importantly, the City has a
responsibility to represent not only the current residents in this neighborhood, but
also the future residents as well. The access issue must be addressed.
5. Sanctuary was designed to have three access points: Manning Avenue North, 58th
Street North, and Linden Avenue North. Allowing Linden Avenue to be closed
at this time will all but REQUIRE that 58th Street North continue to the west in the
future. Such a decision has the potential to instigate a resentment within this
neighborhood (those near the 58th termination against those near the Linden
Avenue termination).
Engineering Comments:
The Plat must dedicate sufficient RƒW along 50th Street North to ensure 40 feet of
RƒW north of the existing centerline of the road (a total of 80 foot RƒW for collector
roadway). Additional RƒW may be required along Phase 1 Lots 1−2, and Outlots A,
B, and I.
Right and left turn lanes must be incorporated along 50th Street per the City design
standards to maintain safety along the roadway. Right and left turn lanes shall be
constructed at the developer’s expense.
The City’s Transportation Plan identifies 50th Street N. as a major east−west collector
roadway and Municipal State Aid route. Traffic concerns and complaints have
increased along 50th Street over the past few years and will continue to increase as
traffic volumes grow. There are two ways that the City can help manage and mitigate
these growing traffic issues:
Improve access management along the corridor when opportunities arise.
Improve pedestrian facilities along the corridor, at a minimum, completing the
bituminous trail along the north boulevard from Old TH 5 (CSAH 14) to Lake
Elmo Avenue.
OP Concept Plan Review: Legends of Lake Elmo (October Submittal)
Planning Commission Report; 10-26-15
Page 16
(cont.)
Access Management: The development access point along 50th Street meets the City’s
Transportation Plan access spacing guidelines for Collector Roadways (every 660 ft.
to residential streets and commercial driveways) unless the adjacent westerly property
becomes commercial use.
The proposed access is 875 feet from Linden Trail to the east. Condition met.
The proposed access is 700 feet from Lily Avenue to the west. Condition met.
The proposed access is 420 feet from the adjacent farm driveway (Hecker
property) to the west. Condition not met if this becomes a commercial use
property.
From a brief field review the proposed access to 50th Street N. appears to
provide adequate sight distances for safe ingress and egress.
The development access road connection to 50th Street is properly located to balance
the various conflict points, however the following access management
recommendations should be required to improve safety and access management along
the road corridor:
A shared driveway should be constructed to serve the Phase 1 Lots 1 and 2
along 50th Street N.
The existing farm (Hecker parcel) should be required to connect to the new
roadway internal to the development to eliminate the driveway access to 50th
Street N, especially if this property becomes a commercial use.
Pedestrian facilities: A bituminous trail must be incorporated along the north
boulevard of 50th Street N. to improve pedestrian safety and work toward future trail
connectivity. Segments of a bituminous trail currently exist along 50th Street N.
alternating from the north to south side of the road. As traffic continues to increase on
50th Street N. it is critical for the City to create a continuous bituminous trail along
the north side of 50th Street, from Old TH5 to Lake Elmo Avenue.
A residential street connection is required as shown to Linden Avenue in the Sanctuary
subdivision.
A residential street stub with temporary cul−de−sac must be provided to the westerly
plat limits between Phase 1 Lots 17 and 18. The residential street stub was shown in
previous Concept Plans.
All streets must be designed to meet the City’s Engineering Design Standards
including RƒW width, street width and cul−de−sac radii. Surmountable concrete curb
and gutter shall be installed in single family residential areas with future driveways
and B618 curb installed along entrance roadways.
The application indicates 24 foot wide streets meeting the standards for parking along
one−side.
OP Concept Plan Review: Legends of Lake Elmo (October Submittal)
Planning Commission Report; 10-26-15
Page 17
(cont.) Street intersections must approximate 90 degrees and maintain 50 feet of tangent with
maximum slopes of 2.5%. Residential maximum longitudinal grade is 8% with no
sidewalks, 6% where there are sidewalks.
Parkway or divided roadways must be a minimum of 18 feet wide from back or curb
to back of curb. The development street plan indicates five segments with divided
one−way streets. The specific geometry of each divided street area will require
detailed review in the preliminary plat phase.
Ten (10) foot utility easements are required on either side of all right−of−ways.
Water
System(s):
Municipal water service is readily available in two locations. The applicant is
responsible to extend municipal water into the development to serve the proposed
properties.
Two connection points to the existing City system will be required:
1) A connection to the existing 16−inch watermain at Linden Avenue in the
Sanctuary subdivision.
2) A connection to the existing 12−inch watermain at 50th Street N.
A watermain lateral stub will be required to the westerly plat limits between Phase 1
Lots 17 and 18.
No trunk watermain oversizing is anticipated for this development.
Sanitary
System(s):
The proposed development is located outside of the City designated Municipal Urban
Service Area (MUSA) for sanitary sewer service. The developer is proposing private
individual on−site septic systems for each Lot. Individual on−site septic systems are
permitted by Washington County and must contain both a primary and secondary site
for each Lot.
The Concept Plan as submitted does not meet the City’s Open Space Ordinance as
follows:
The Open Space Ordinance requires a minimum of 1 acre lots when the Lots
are served by individual septic systems. Only 1 of the 44 Lots is 1 acre or
greater. Per the ordinance, single−family or multiple− family lots under 1 acre
must be constructed with an individual septic tank and a communal drainfield.
The Concept Narrative indicates that the individual septic systems will be
located primarily on Outlots. The Open Space Ordinance allows for
Communal drainfields to be partially or completely located in an area
designated as preserved open space provided certain conditions are met. The
ordinance does not provide for this allowance for individual septic systems.
OP Concept Plan Review: Legends of Lake Elmo (October Submittal)
Planning Commission Report; 10-26-15
Page 18
(cont.) The Open Space ordinance requires Lot design to be configured, as its highest
priority, to utilize the most suitable soils for sub−surface septic disposal. The
Concept Plans, as submitted to not provide soil survey and evaluation
information and do not show the proposed primary and secondary septic
system locations.
The Concept Plan must be revised to be consistent with the Open Space Ordinance.
Lot layouts must be revised to meet the 1 acre ordinance requirement and the primary
and secondary septic system sites must be shown for each lot. Septic system sites must
be placed where soil investigations demonstrate suitable soils and demonstrate that
sufficient land is available to support both a primary and secondary septic system site
for each proposed Lot.
Staff has concerns with the proposal to locate individual septic systems on Outlots. If
the City desires to consider this proposal than a detailed wastewater management plan
should be provided that describes, in detail, how the primary and secondary on−site
septic system areas located in the open space will be specifically designated to each
lot and how these areas will be protected from disturbance and compaction of soils
into perpetuity. Easements will be needed to facilitate this management system and
the easements should be shown.
The plans must clearly show that no individual septic system area will be located
within the floodplain.
Storm water
/Grading:
Applicant Comments: The natural rolling nature of this site makes it easy to design storm
ponding and infiltration systems or the site. The final storm design will appear natural
in location and will provide a treatment train of ponding, swales and infiltration areas to
clean and lesson the impacts to the existing natural wetland features of the site.
The site plan is subject to a storm water management plan meeting State, VBWD and
City rules and regulations. No proposed storm water management plan was provided
as part of the Concept Plans.
Storm water facilities proposed as part of the site plan to meet State and VBWD
permitting requirements must be constructed in accordance with the City Engineering
Design Standards Manual available on the City website.
The general drainage system should mimic the natural topography of the site in order
to ensure a drainage system that provides positive storm water drainage across the
development. Overland emergency overflows or outlets will be required as part of the
site plan.
Storm water pond facilities should be combined together to the greatest extent possible
to ensure adequate hydrology for efficient facility treatment operations.
OP Concept Plan Review: Legends of Lake Elmo (October Submittal)
Planning Commission Report; 10-26-15
Page 19
(cont.) The ultimate discharge rate and location will be an important consideration to avoid
negative impacts to downstream properties. The storm water management plan will
need to address changes to the downstream drainage system to the extent alterations
are proposed. To the extent adjacent properties are impacted, written permission from
those properties must be submitted as part of the development applications.
Per City requirements, all storm water facilities, infiltration basins, wetlands and
wetland buffers must be placed in Outlots deeded to the City for maintenance
purposes. The Stormwater Facility Outlots must fully incorporate the 100−year HWL,
10 foot maintenance bench and all maintenance access roads.
It is unclear from the concept plan if the proposed ponding and infiltration is on
Outlots that will be dedicated to the City. It is also unclear from the concept plan if all
weltands and required wetland buffers are located on Outlots. Future plan submittals
must address this information and requirements.
The plans must include the 100−year HWL for all adjacent wetlands and water bodies
and must demonstrate that the 100−year HWL does not encroach onto any proposed
Lot.
The plans must also demonstrate that the minimum floor elevations for each Lot are
in compliance with the VBWD rules providing a minimum 2−foot separation from
any adjacent 100−year HWL.
The storm sewer system shall be designed to maintain the City standard minimum
pipe cover of 3 feet. Drain tile is required as part of the City standard street section at
all localized low points in the street. Drain tile considerations may impact the storm
sewer design and depth requirements at low points.
Per City requirements all storm sewer pipe easements must be a minimum 30−feet in
width.
Development
Phasing:
Applicant Comments: The phasing of the project is anticipated to begin with the south
17 lots, and move logically to the north as market conditions allow. A phasing map is
shown on Page 2 of 4 of the drawing set.
South to north phasing as proposed will ensure that construction traffic does not
utilize the future Linden Avenue connection for ingress/egress. A prohibition
against construction traffic on Linden Avenue would need to be imposed during
Phase 3.
The Phasing plan indicates that the project will begin in the south with access from
50th Street N. with the final Phase making connection with the Sanctuary
development. Additional phasing plan information is needed to demonstrate that
stormwater management requirements remain in compliance with VBWD with each
phase of the project. 50th Street N. turn lanes must be constructed as part of phase 1.
OP Concept Plan Review: Legends of Lake Elmo (October Submittal)
Planning Commission Report; 10-26-15
Page 20
Utilities:
Applicant Comments: The home sites are proposed to be served with City water and
private septic systems located on and off of the proposed lot areas. The majority of the
septic areas will be located on the out lots, where the best soils from the site are found,
adequately sized to accommodate a primary and backup system. These type of systems
will only require County approval. The proposed water main system will help to create
a looped water system, connecting the 50th Street System to the St. Croix Sanctuary’s
system, which will help to improve water quality in the water main line and better flow
for fire flow protection to this and area developments. The connection points are shown
on Page 1 of 4 of the drawing set.
All public utilities and facilities such as gas, electrical, sewer, and water supply
systems to be located in the flood plain district shall be flood-proofed in accordance
with the building code or elevated to above the regulatory flood protection elevation.
Telephone, electric, and/or gas service lines are to be placed underground in
accordance with the provisions of all applicable City ordinances.
Parking
Facilities:
Staff did not identify any parking issues for the proposed lots. On-site and on-street
parking opportunities should meet all needs within the development.
Required
Signage:
New street signs will be required at all intersections at the developer’s expense.
Entrance
Monument:
Designs and locations for entrance monuments off of 50th Street North and south of
Sanctuary should be identified as part of any future preliminary plan submittal.
Fire Hydrants: The applicant will be required to work with the City Engineer and Public Works to
identify the proper locations for future fire hydrants.
Streetlights: No streetlights are required as part of this development.
Monuments: In accordance with Section 400.14 Subd. 6; reference monuments shall be placed in
the subdivision as required by state law.
ENVIRONMENTAL & OTHER NEIGHBORHOOD IMPACTS:
Environmental
Impacts:
Staff does not foresee the need for an in-depth environmental analysis based on the
current proposal (i.e. EAW, EIS, AUAR, etc.)
OP Concept Plan Review: Legends of Lake Elmo (October Submittal)
Planning Commission Report; 10-26-15
Page 21
Wetlands: The Valley Branch Watershed District (VBWD) is the Local Government Unit (LGU)
responsible for administering the Wetland Conservation Act (WCA). The developer
will need to follow all of the rules and regulations spelled out in the WCA, and acquire
the needed permit from the VBWD.
Review and comment by the Valley Branch Watershed District (VBWD) will be
needed with any future preliminary plat/plan application. The applicant is encouraged
to meet with the VBWD prior to any future submittal.
Shoreland
District:
While there are three public waters inventory wetlands in the area, there are no
waterbodies protected by the City’s shoreland overlay district within or near the
development site.
Erosion
Control:
The future grading plan should indicate proposed erosion control methodologies to be
utilized during the development process.
Silt fencing should be shown at the construction limits for the proposed houses or
driveways with the future building permit application.
Traffic: The proposed project will not significantly increase traffic volumes in the area to
justify a traffic study.
Flood Plain &
Steep Slopes:
According to the February 3, 2010 FEMA Flood Insurance Rate Map, the floodplain
around the wetland complexes near/within the development are undetermined (Zone
A).
The significant topography around the wetlands suggest that all proposed housing sites
will be outside of floodplains.
Docks: The project does not include any lakeshore or deeded access to lakes.
Other Permits: All necessary permits must be provided to the City. (VBWD, MPCA, NPDES, MDH)
CHARGES, FEES, & RESPONSIBILITIES:
In General: As always, the applicant is responsible for all fees related to the review of this
application (including but not limited to planning, legal, engineering, wetland,
environmental consultants, or other such experts as required by this application).
OP Concept Plan Review: Legends of Lake Elmo (October Submittal)
Planning Commission Report; 10-26-15
Page 22
Park
Dedication:
Section 400.15 of City Code requires all subdivisions of land to dedicate a
reasonable portion of land to the City for public use as parks, trails, or open space.
The percentage for an OP development on RR zoned property is 7%.
110.01acres * 7% required dedication = 7.7 acres of land
The concept plan is currently not proposing dedication of any land for parks, but is
proposing 6,101 feet (1.16 miles) of trails for public use. The applicants have verbally
indicated they would like to dedicate parkland, but would prefer direction on the
appropriate location for such.
Should this development move forward, the City will determine the fair market value
of the land by hiring a licensed appraiser (at the developer’s expense) prior to final
plat approval. The required cash-in-lieu of land payment shall be the fair market value
of the acreage not provided in land dedication less the cost of trail construction.
Sewer Charges: Not applicable.
Water Charges: Water service charges will consist of a $3,000 Water Availability Charge (WAC) per
REC unit plus $1,000 Water Connection Charge per REC unit. The number of REC
units will be as determined for SAC charges
Conclusion
The Planning Commission is asked to examine the proposed Concept Plan and provide
a recommendation of approval or denial for City Council consideration. Keep in mind
that an approval at this point simply allows the applicant to proceed to the preliminary
plan stage, and does NOT carry with it any assurances of future success or approvals.
Denial at this point will require the applicant to reassess the approach and return with a
revised concept plan.
Commission
Options:
The Planning Commission has the following options:
A) RECOMMEND APPROVAL of the requested Concept Plan and (some or all of
the) deviations from OP development standards based on the applicant's
submission, the contents of this report, public testimony and other evidence
available to the Council.
B) RECOMMEND DENIAL of the requested Concept Plan and deviations from
OP development standards based on the applicant's submission, the contents of
this report, public testimony and other evidence available to the Commission.
OP Concept Plan Review: Legends of Lake Elmo (October Submittal)
Planning Commission Report; 10-26-15
Page 23
(cont.) C) TABLE the request for further study.
Approval of
Deviations:
The following deviations from standard OP development must be approved by a 4/5
vote of City Council as a component of any motion for approval:
1) Density/Number of Homes
The proposal would result in a density of 0.49 units/buildable acre (an
increase from 40 to 44 homes).
2) Lot Size
OP developments that propose to utilize individual septic systems for each
lot require a minimum lot size of 1.0 acres. The applicants have indicated that
they will provide information on the night of the Planning Commission meeting
to show this deviation is unnecessary.
3) Lot Design/Configuration
The proposal includes lots within areas classified as prime farmland.
4) Buffers
Lots 4, 7, 13, 17, 18, 39 and 40 will all include buildable area within the
required buffer.
The Commission is asked to provide separate recommendations on each of the proposed
deviations for Council consideration.
Review
Criteria:
Per code, the Planning Commission is to make a recommendation on this concept plan
which includes findings on the following:
A) The concept plan is consistent with the goals, objectives, and policies of the
Comprehensive Plan.
B) The concept plan is consistent with the purpose of open space preservation
development (i.e. to maintain the rural character of Lake Elmo by preserving
agricultural land, woodlands, corridors, and other significant natural features
while allowing residential development consistent with the goals and objectives of
the City’s Comprehensive Plan; and that protected open space will enhance and
preserve the natural character of the community and create distinct
neighborhoods).
C) The concept plan complies with the development standards required of OP
developments.
OP Concept Plan Review: Legends of Lake Elmo (October Submittal)
Planning Commission Report; 10-26-15
Page 24
Staff
Guidance:
The review criteria for concept plans is very broad and subjective, so approval or denial
at this stage is less about compliance with code, and more about determining whether
the proposal is best for this property, best for the surrounding properties, and best for
the City as a whole. As such, staff is focusing our guidance on recommended
conditions should the Planning Commission and Council chose to approve the proposal.
Should the Planning Commission determine that a recommendation of
APPROVAL is appropriate, staff would recommend the following conditions
and/or guidance be directed at the applicant:
1) As part of any future preliminary plan application, the applicant shall:
(a) Articulate the details of the conservation easement that will be necessary to
protect the open space within the OP development;
(b) Work with staff to establish special setbacks for all lots that could
potentially allow construction within required buffer areas;
(c) Provide a dedicated right-of-way and construct a road dead-ending on the
western property line;
(d) Provide parkland as may have been directed by the City Council during
concept plan review;
(e) Provide for the needed east/west trail along 50th Street North;
(f) Provide detailed information on how the proposed public open space will be
managed and maintained into the future;
(g) Provide details of an HOA and outline its responsibilities for the
maintenance of open space and recreational facilities.
(h) Address all requirements of the City Engineer as listed in this report and the
Engineer’s memo on any future preliminary plan submittal.
(i) Address other issues as may have been identified either in the staff report or
at the public meetings to review the concept plan.
Should the Planning Commission determine that a recommendation of
DENIAL is appropriate, staff would recommend the following as potential
findings to support your conclusion:
1) The concept plan is not consistent with the purpose of open space preservation
development given the following:
(a) The requested density is too high and not in-line with code expectations for
this type of development;
OP Concept Plan Review: Legends of Lake Elmo (October Submittal)
Planning Commission Report; 10-26-15
Page 25
(cont.) (b) The plan does not strive to protect areas classified as prime farmland;
(c) The proposal does not include adequate buffers from surrounding OP or
future OP developments.
2) The concept plan was found to not enhance and preserve the natural character of
the community.
3) The concept plan was not approved given the level of deviations sought to OP
development standards.
Legends of Lake Elmo
SITE IDENTIFICATION MAP
Location within the City of Lake Elmo
TAMARACK
FARM
ESTATES
CARRIAGE
STATION
SANCTUARY
THE FIELDS
OF ST CROIX
TANA
RIDGE
PAGE 1 of 3
MEMORANDUM
Date: October 22, 2015
To: Kyle Klatt, Planning Director
Ben Gozola, Senior Planner, Sambatek
Re: Legends of Lake Elmo – OP Concept Plan Review
From: Jack Griffin, P.E., City Engineer
We received a revised Concept Plan submittal on 10.14.2015 for the above referenced development proposal consisting
of the following exhibits/documentation prepared by Erickson Civil:
Concept Plans dated October 12, 2015, Sheets 1‐4.
Concept Narrative dated October 12, 2015.
We have the following engineering review comments:
All public improvements constructed to support the development must be designed and constructed in accordance with
the City Engineering Design Standards Manual available on the City website.
STREETS AND TRANSPORTATION
The Plat must dedicate sufficient R/W along 50th Street North to ensure 40 feet of R/W north of the existing
centerline of the road (a total of 80 foot R/W for collector roadway). Additional R/W may be required along
Phase 1 Lots 1‐2, and Outlots A, B, and I.
Right and left turn lanes must be incorporated along 50th Street per the City design standards to maintain safety
along the roadway. Right and left turn lanes shall be constructed at the developer’s expense.
The City’s Transportation Plan identifies 50th Street N. as a major east‐west collector roadway and Municipal
State Aid route. Traffic concerns and complaints have increased along 50th Street over the past few years and
will continue to increase as traffic volumes grow. There are two ways that the City can help manage and mitigate
these growing traffic issues:
Improve access management along the corridor when opportunities arise.
Improve pedestrian facilities along the corridor, at a minimum, completing the bituminous trail along
the north boulevard from Old TH 5 (CSAH 14) to Lake Elmo Avenue.
Access Management: The development access point along 50th Street meets the City’s Transportation Plan
access spacing guidelines for Collector Roadways (every 660 ft. to residential streets and commercial driveways)
unless the adjacent westerly property becomes commercial use.
The proposed access is 875 feet from Linden Trail to the east. Condition met.
The proposed access is 700 feet from Lily Avenue to the west. Condition met.
The proposed access is 420 feet from the adjacent farm driveway (Hecker property) to the west.
Condition not met if this becomes a commercial use property.
From a brief field review the proposed access to 50th Street N. appears to provide adequate sight
distances for safe ingress and egress.
FOCUS ENGINEERING, inc.
Cara Geheren, P.E. 651.300.4261
Jack Griffin, P.E. 651.300.4264
Ryan Stempski, P.E. 651.300.4267
Chad Isakson, P.E. 651.300.4283
PAGE 2 of 3
The development access road connection to 50th Street is properly located to balance the various conflict points,
however the following access management recommendations should be required to improve safety and access
management along the road corridor:
A shared driveway should be constructed to serve the Phase 1 Lots 1 and 2 along 50th Street N.
The existing farm (Hecker parcel) should be required to connect to the new roadway internal to the
development to eliminate the driveway access to 50th Street N, especially if this property becomes a
commercial use.
Pedestrian facilities: A bituminous trail must be incorporated along the north boulevard of 50th Street N. to
improve pedestrian safety and work toward future trail connectivity. Segments of a bituminous trail currently
exist along 50th Street N. alternating from the north to south side of the road. As traffic continues to increase on
50th Street N. it is critical for the City to create a continuous bituminous trail along the north side of 50th Street,
from Old TH5 to Lake Elmo Avenue.
A residential street connection is required as shown to Linden Avenue in the Sanctuary subdivision.
A residential street stub with temporary cul‐de‐sac must be provided to the westerly plat limits between Phase 1
Lots 17 and 18. The residential street stub was shown in previous Concept Plans.
All streets must be designed to meet the City’s Engineering Design Standards including R/W width, street width
and cul‐de‐sac radii. Surmountable concrete curb and gutter shall be installed in single family residential areas
with future driveways and B618 curb installed along entrance roadways.
The application indicates 24 foot wide streets meeting the standards for parking along one‐side.
Street intersections must approximate 90 degrees and maintain 50 feet of tangent with maximum slopes of
2.5%. Residential maximum longitudinal grade is 8% with no sidewalks, 6% where there are sidewalks.
Parkway or divided roadways must be a minimum of 18 feet wide from back or curb to back of curb. The
development street plan indicates five segments with divided one‐way streets. The specific geometry of each
divided street area will require detailed review in the preliminary plat phase.
Ten (10) foot utility easements are required on either side of all right‐of‐ways.
MUNICIPAL WATER SUPPLY
Municipal water service is readily available in two locations. The applicant is responsible to extend municipal
water into the development to serve the proposed properties.
Two connection points to the existing City system will be required:
1) A connection to the existing 16‐inch watermain at Linden Avenue in the Sanctuary subdivision.
2) A connection to the existing 12‐inch watermain at 50th Street N.
A watermain lateral stub will be required to the westerly plat limits between Phase 1 Lots 17 and 18.
No trunk watermain oversizing is anticipated for this development.
MUNICIPAL SANITARY SEWER / WATEWATER MANAGEMENT
The proposed development is located outside of the City designated Municipal Urban Service Area (MUSA) for
sanitary sewer service. The developer is proposing private individual on‐site septic systems for each Lot.
Individual on‐site septic systems are permitted by Washington County and must contain both a primary and
secondary site for each Lot.
The Concept Plan as submitted does not meet the City’s Open Space Ordinance as follows:
The Open Space Ordinance requires a minimum of 1 acre lots when the Lots are served by individual
septic systems. Only 1 of the 44 Lots is 1 acre or greater. Per the ordinance, single‐family or multiple‐
family lots under 1 acre must be constructed with an individual septic tank and a communal drainfield.
The Concept Narrative indicates that the individual septic systems will be located primarily on Outlots.
The Open Space Ordinance allows for Communal drainfields to be partially or completely located in an
area designated as preserved open space provided certain conditions are met. The ordinance does not
provide for this allowance for individual septic systems.
The Open Space ordinance requires Lot design to be configured, as its highest priority, to utilize the
most suitable soils for sub‐surface septic disposal. The Concept Plans, as submitted to not provide soil
PAGE 3 of 3
survey and evaluation information and do not show the proposed primary and secondary septic system
locations.
The Concept Plan must be revised to be consistent with the Open Space Ordinance. Lot layouts must be revised
to meet the 1 acre ordinance requirement and the primary and secondary septic system sites must be shown for
each lot. Septic system sites must be placed where soil investigations demonstrate suitable soils and
demonstrate that sufficient land is available to support both a primary and secondary septic system site for each
proposed Lot.
Staff has concerns with the proposal to locate individual septic systems on Outlots. If the City desires to consider
this proposal than a detailed wastewater management plan should be provided that describes, in detail, how
the primary and secondary on‐site septic system areas located in the open space will be specifically designated
to each lot and how these areas will be protected from disturbance and compaction of soils into perpetuity.
Easements will be needed to facilitate this management system and the easements should be shown.
The plans must clearly show that no individual septic system area will be located within the floodplain.
STORMWATER MANAGEMENT
The site plan is subject to a storm water management plan meeting State, VBWD and City rules and regulations.
No proposed storm water management plan was provided as part of the Concept Plans.
Storm water facilities proposed as part of the site plan to meet State and VBWD permitting requirements must
be constructed in accordance with the City Engineering Design Standards Manual available on the City website.
The general drainage system should mimic the natural topography of the site in order to ensure a drainage
system that provides positive storm water drainage across the development. Overland emergency overflows or
outlets will be required as part of the site plan.
Storm water pond facilities should be combined together to the greatest extent possible to ensure adequate
hydrology for efficient facility treatment operations.
The ultimate discharge rate and location will be an important consideration to avoid negative impacts to
downstream properties. The storm water management plan will need to address changes to the downstream
drainage system to the extent alterations are proposed. To the extent adjacent properties are impacted, written
permission from those properties must be submitted as part of the development applications.
Per City requirements, all storm water facilities, infiltration basins, wetlands and wetland buffers must be placed
in Outlots deeded to the City for maintenance purposes. The Stormwater Facility Outlots must fully incorporate
the 100‐year HWL, 10 foot maintenance bench and all maintenance access roads.
It is unclear from the concept plan if the proposed ponding and infiltration is on Outlots that will be dedicated to
the City. It is also unclear from the concept plan if all weltands and required wetland buffers are located on
Outlots. Future plan submittals must address this information and requirements.
The plans must include the 100‐year HWL for all adjacent wetlands and water bodies and must demonstrate
that the 100‐year HWL does not encroach onto any proposed Lot.
The plans must also demonstrate that the minimum floor elevations for each Lot are in compliance with the
VBWD rules providing a minimum 2‐foot separation from any adjacent 100‐year HWL.
The storm sewer system shall be designed to maintain the City standard minimum pipe cover of 3 feet. Drain tile
is required as part of the City standard street section at all localized low points in the street. Drain tile
considerations may impact the storm sewer design and depth requirements at low points.
Per City requirements all storm sewer pipe easements must be a minimum 30‐feet in width.
ADDITIONAL CONSIDERATIONS
The Phasing plan indicates that the project will begin in the south with access from 50th Street N. with the final
Phase making connection with the Sanctuary development. Additional phasing plan information is needed to
demonstrate that stormwater management requirements remain in compliance with VBWD with each phase of
the project. 50th Street N. turn lanes must be constructed as part of phase 1.
Lake Elmo Planning Commission Minutes; 9-14-15
City of Lake Elmo
Planning Commission Meeting
Minutes of September 14, 2015
Chairman Dodson called to order the meeting of the Lake Elmo Planning Commission at
7:00 p.m.
COMMISSIONERS PRESENT: Dodson, Dorschner, Fields, Haggard, and Kreimer
COMMISSIONERS ABSENT: Larson, Williams and Griffin
STAFF PRESENT: Community Development Director Klatt, Contract Planner Gozola and
Interim Administrator Schroeder
Approve Agenda:
The agenda was accepted as amended.
Approve Minutes: August 24, 2015
M/S/P: Dorschner/Haggard, move to approve minutes as amended, Vote: 5-0, motion
carried unanimously.
Business Item: Minor Subdivision – Kleis Family Farm
Klatt began his presentation regarding the Kleis Family minor subdivision. This
application is to create two new ten acre parcels, leaving approximately 34 acres with
the original farmstead at 9130 55th Street Lane. Staff is recommending approval with 4
conditions. 1)Parkland dedication of $3600 per buildable lot ($7200) 2) future
driveways for the lots be approved by the City Engineer 3) if required, applicant must
obtain VBWD approval 4) minimum low floor elevation for lots must be depicted on
surveys for building permits.
Tim Freeman, surveyor for project discussed the septic and watershed district issues.
He stated that these would not pose a problem in the future.
M/S/P: Dorschner/Kreimer, Move to recommend approval of the Kleis Farmstead Minor
Subdivision with draft findings and 4 conditions of approval, Vote: 5-0 motion carried
unanimously.
Presentation: Gateway Corridor
2
Lake Elmo Planning Commission Minutes; 9-14-15
Lyssa Leitner, Washington County, presented information regarding the metro Gold Line
which is the eastern finger of the metro transit. The 1st question a company will ask is
regarding the availability of transit. They have chosen to go with rapid transit which will
have buses only lanes with 13 stations on the line. This is the safest, most efficient type
of transit. This will operate from 5 am until midnight. This will not replace the express
buses, but will operate in addition to them.
Dodson asked about the 8-15% return on investment. This return is made up of about 6
factors including, less wear and tear on roads, fuel, vehicles, etc. Dodson also asked
about the perception that a train is better than bus. It was stated that the cost of the
rapid transit is about half the cost. It will look similar to light rail with the lanes, but
without the rails.
Dodson asked if there was anything in the works for Highway 36. Lyssa stated that it is
in the works for the planning stages for 2016. They are waiting to see what happens
when the bridge opens. Dodson also asked about the risk factors. Llyssa stated that
there are risk analysis being undertaken by MnDOT & Met Council. There is a cost risk
analysis as well.
Will, East Metro Strong, which has been in existence for about a year and a half. East
Metro Strong is made up of a board of 3 counties, 4 Cities, 3 businesses and one non-
profit. The goal of the partnership is in support of catalytic transit investment. This will
make the eastern metro competitive and draws good economic development and
supports the quality of life. They work in support of the many stakeholders and provide
technical assistance.
Kreimer asked what the financial implications are to the City. Lyssa stated that there
would be zero cost to the Cities budget to build and operate. Dodson asked what the
deliverables from the study would be. Will stated that the report will state what types
of land uses the corridor can support which will translate to what Lake Elmo can support
as well, possibly using a balanced score card. The market study would take 3 months
from when they start.
The Commission was supportive of contributing to the study as long as we get
something back from it. Will stated that it is really targeted to Lake Elmo needs. Fields
is concerned that we are looking at the Lake Elmo long term goals. This market study is
looking out to 2040.
M/S/P: Dodson/Fields, move to recommend to the City Council that we move forward
with the market study for the BRT, Vote: 5-0, motion carried unanimously.
Public Hearing: Legends of Lake Elmo Concept Plan
3
Lake Elmo Planning Commission Minutes; 9-14-15
Gozola began his presentation regarding an application for an open space development
concept plan on three unaddressed parcels totaling 110 acres to the North of 50th Street
and to the South of the Sanctuary development. The concept plan includes 51
residential lots.
Gozola discussed some of the challenges with the site plan presented. These included
the lack of buffers, the access spacing for the 3 lots to the south that front 50th Street,
the difficulty with the park and the overall density. The Developer is asking for 3 main
deviations that would require a 4/5 Council approval. Those are 1) the density from 40
units to 51 units 2) the lack of buffer setbacks 3) lot design. As far as the development,
a very important part would be connections to the east and to Linden Avenue. This
would provide not only secondary access to Legends, but also to Sanctuary. The access
spacing on 50th street also needs to be looked at to limit access to 50th Street. There
were infrastructure issues talked about as well as phasing options.
Fields asked about the buffers. Gozola confirmed that they are not meeting the buffers.
Haggard asked about the 20% bonus. Gozola confirmed that the bonus only applies to
PUD’s, which this is not.
Todd Erickson, project engineer for Legends, answered some of the Commissioners
questions. He stated that they are requesting the additional lots in exchange for an
extensive trail system which connects the other developments and winds throughout
the development. There was a discussion about the different types of sewer systems.
Public Hearing opened at 9:40 pm
Amy Vanderhoff, 11384 50th Street, she supports a housing development, however,
would like to see them follow the codes. She is very concerned about the 3 lots to the
south that would have a shared driveway. Klatt stated that a shared driveway would
need to be evaluated and approved with this project.
Sue Hicks, concerned with the construction access, which seems to have been
addressed and also with the lack of buffering.
Austin Anderson, President of Sanctuary HOA, he is concerned with the lack of buffer
zones. He would like to see the park in the outlot F area which has been talked about in
the past.
Michelle Chickett, 5711 Linden, concerned with the lack of a buffer. Concerned that this
development will use Sanctuary as a cut through to 36. She would like to see only the
40 homes allowed by code and would not like to see any other deviations from code.
Concerned that the developer will not be held to development agreement as has
happened in the past.
4
Lake Elmo Planning Commission Minutes; 9-14-15
Klatt stated that we have much more stringent development contracts in place which
have more strict rules for the release of development securities. This will protect the
development.
Pam Chickett, 5711 Linden Ave, she is concerned with the streets in Sanctuary. The
quality is already poor and adding additional traffic will continue to degrade them. Their
neighborhood should not be a cut through to Hwy 36. She also is concerned with the
park. She feels that the park in Sanctuary was intended to be a neighborhood park and
not a park that people came from other neighborhoods to use.
Tricia Giese, 5805 Linden Ave N, there are numerous children on Linden Ave and is
concerned with people using Linden to access 36. She is wondering if the access to 36
could be changed to have a right and left hand turn lane as having Linden go through
will add a lot of traffic at rush hour time.
Ben Backberg, 5693 Linden Ave N, has an issue with where the park was moved. He has
a problem with the deviation on the number of lots. Would like to see the development
staged to start along 50th street.
Suzanne Meyers, 11711 56th Street, would like to see the road and cul-de-sac by her
home moved and would like to see buffers.
Joe Weber, 11649 56th Street, there is no buffer from the road to his lot. There is an
expectation that there would not be a road that close to their property. He was told by
developer when he purchased his home that Linden Trail was never intended to be a
through street. Klatt stated that the connection is shown in the 2005 Comprehensive
Plan.
Mayor Mike Pearson, 2805 Lisbon Ave, was wondering which council members the
developer had talked to about moving the park.
Carolyn Carey, 5701 Linden Ave, was told by developers that the road would not extend
outside development. Would not expect to access Legends by road, but by trail only.
She would like to see all of the infrastructure completed before homes are allowed to
be built.
Lisa Pilla, 11693 56th Street, asked Klatt about how the code applies to buffers. Klatt
stated that there is a 100 foot buffer for roads and structures from OP to OP. She
would request that the reduction be denied. She would request extensive landscaping.
Correspondence was received from the Hecker’s with updated statements regarding
additional homes and the buffering.
5
Lake Elmo Planning Commission Minutes; 9-14-15
Correspondence was also received from Greg & Amy Sainsbury that was similar to
comments already stated.
Public Hearing closed at 10:30 pm
Klatt stated that a number of years ago, the City went through and re-evaluated buffer
setbacks. Most of the projects ended up having exceptions to the buffers. Sanctuary is
one of the developments that had an exception to buffer setbacks.
Dorschner asked which council members the developer talked to about the park.
Landucci stated that he did not speak to all of the Council members, but did have
discussions. He does not like Community Septic Systems. He does not think it is good to
rely on the HOA to manage them. He feels setbacks are an issue & phasing should start
at 50th Street. He feels number of units should meet the code and the trails might not
be manageable.
Haggard is concerned that Sanctuary Park is a public Park and might not be accessible.
She likes where the Legends Park is on current plan as it will be accessible. Is concerned
about the upkeep of trails and would like Park Commission input on them. Not a fan of
the increased density and the buffering is a concern.
Fields is impressed with the overall quality of the development, but feels it was done in
a way to maximize the return to the developer. Is not in favor of the current design and
is not in favor of deviating from the City standards.
Kreimer likes a lot of things about the development, but sees no reason to go above the
City standard for density as this is not a PUD. Wants the buffers adhered to and would
like to ensure the construction traffic comes in off of 50 th Street.
Landucci stated that without the wetlands, 51 units would be allowed on 110 acres. 40
lots is not enough for this large of a piece of property and the wetlands are not
considered in the calculation for open space. Dodson stated that is not a good
argument as it is part of the code.
Dodson asked about the MPCA comments regarding the septic system. Gozola stated
that the MPCA would review and have to give approval if this moves forward. Klatt
discussed community vs. individual septic systems. Dodson feels that there are too
many homes to meet the spirit of the OP ordinance. He is concerned with the 3 lots to
the south with the proposed shared driveway. He wants the park Commission to check
in on this development. He wants to see the phasing changed to start with 50 th and
feels that eventually, Linden needs to go through.
6
Lake Elmo Planning Commission Minutes; 9-14-15
Haggard stated that this concept plan is close to being what they want and this
development will be a highly desirable neighborhood for Lake Elmo. She just has a
problem with the deviations.
M/S/P: Dorschner/Fields, move to recommend denial of the Concept plan based on the
discussions regarding density being too high, lack of buffer zones being met, and
phasing in reverse order, Vote: 5-0, motion carried unanimously.
Council Updates – September 1, 2015 Meeting
1. Village Park Preserve Final Plat Extension – Passed.
2. Zoning Text Amendment – Commercial Wedding Ceremony Venue
Ordinance – Passed.
3. Inwood 2nd Addition Final Plat – Passed.
4. Savona 3rd Addition Final Plat – Tabled.
5. NE Metro 916 Intermediate School District Final Plat and Preliminary and
Final PUD Plans – Passed.
Staff Updates
1. Upcoming Meetings
a. September 28, 2015
b. October 12, 2015
Commission Concerns
The Commission is concerned about a number of factors regarding the community
septic systems. They would like to discuss in the future if the City should move away
from allowing OP and possibly going to 2 ½ acre lots. Klatt stated that this discussion
should be had as a broader planning issue when looking at the comprehensive plan.
Haggard would like feedback from the Park Commission regarding trails, particularly
from a maintenance and standard standpoint. She would also like information
regarding when the Parks Commission looks at a development plan. They go to Planning
Commission first as they are the Land Use body.
Dodson asked when the Legends Concept plan would go to Council. It will go to Council
probably on October 6th or 7th. They discussed the differences between tabling and
denying an application.
Meeting adjourned at 11:15 pm
Respectfully submitted,
7
Lake Elmo Planning Commission Minutes; 9-14-15
Joan Ziertman
Planning Program Assistant