HomeMy WebLinkAboutPZ Minutes; 10-26-15Lake Elmo Planning Commission Minutes; 10-26-15
City of Lake Elmo
Planning Commission Meeting
Minutes of October 26, 2015
Chairman Dodson called to order the meeting of the Lake Elmo Planning Commission at
7:00 p.m.
COMMISSIONERS PRESENT: Dodson, Dorschner, Fields, Haggard, Larson, Williams, and
Kreimer
COMMISSIONERS ABSENT: Griffin
STAFF PRESENT: Contract Planner Gozola and Interim Administrator Schroeder
Approve Agenda:
The agenda was accepted as presented.
Approve Minutes: October 12, 2015
M/S/P: Williams/Dorschner, move to approve minutes as presented, Vote: 7-0, motion
carried unanimously.
Public Hearing – Preliminary and final Planned Unit Development (PUD) Home 2 Suites
M/S/P: Dorschner/Dodson: move to table the Preliminary and Final Planned Unit
Development (PUD) Home 2 Suites, Vote: 7-0, motion carried unanimously.
Public Hearing – Open Space Concept Plan – Legends of Lake Elmo
Gozola began his presentation for an application for an open space development
concept plan on 110 acres to the North of 50th Street north and South of the Sanctuary
Development. This concept plan has been revised from a previous submission and now
includes 44 residential lots. Gozola stated that the phasing has been changed to go
from south to north, the number of lots has decreased from 51 to 44, which is st ill over
the 40 that is allowed by code. The buffers have been extended. Gozola talked about
the septic areas and some things related to that.
Gozola pointed out some lots that could potentially have issues with the buildable area,
especially if people want to put in pools or other structures. Staff feels that the
secondary access connecting to Linden Ave is critical, even though there is opposition
from Sanctuary residents. This connection is critical for both developments for safety
and access issues.
2
Lake Elmo Planning Commission Minutes; 10-26-15
There are 2-4 deviations requested which will require a 4/5 vote from the Council.
Those are higher density, not meeting the buffer setbacks on some lots, lot design with
the communal drainfield, and that some lots are on the prime farm land.
The entry point has been changed per the City Engineer suggestion to meet access
spacing.
Kreimer asked if there was a setback for the drainfield to the property line. Gozola
stated that there is not one.
Dorschner asked if there has been any preliminary soil testing on these sites, or if this is
just preliminary.
Todd Erickson, project engineer, talked about the drainfield sites. He stated that the
tanks and pipes are all privately owned.
There was a brief discussion regarding the park.
Council member Fliflet, 4577 Lily Ave, spoke regarding the termination of Linden Ave.
She feels public safety includes more than just emergency response time. S he is
concerned that it will become a cut through route to highway 36 which would create a
safety concern. She would like the Planning Commission to consider eliminating the
connection.
Public Hearing opened at 8:10 pm
Danny Hecker, 11658 50th Street, supports the overall concept of the development.
They are the most affected neighbor and they are asking that the required setbacks be
maintained.
Jeff Kloewer, 11928 56th Street, main concern is the road connection and how the access
to highway 36 will change.
Michelle Chickett, 5711 Linden Ave N, opposed to the road connection. Linden is
narrow and curvy and there are some blind spots. The idea of a cul-de-sac is a good one
as it would be available if needed for emergency purposes.
Pamela Chickett, 5711 Linden Ave N, agrees with previous speakers and would like them
to consider that there is over 100 kids in their neighborhood. Would be creating a very
unsafe situation for kids in Sanctuary and Legends.
Carolyn Carey, 5701 Linden Ave N, she lives close to where this road connects. She
would like to see the 2 neighborhoods connected by a trail and one that could be used
for emergency vehicles.
3
Lake Elmo Planning Commission Minutes; 10-26-15
Amy Vanderhoff, 11384 50th Street, is concerned about the 10 acre area next to
Hecker’s being used for septic. Feels that the code should be met with no deviations.
The 200 foot buffer setback is not being met in South corner and is also concerned with
driveways that would go out to 50th Street.
There were 2 emails received from Greg Sansbury and Suzanne Meyers asking that
Linden not be connected.
Public Hearing closed at 8:30 pm
M/S/P: Williams/Fields, move to find that the land use is consistent with the
comprehensive plan. Vote: 7-0, motion carried unanimously.
The Planning Commission decided to break up the details into discussions about the
park, sewer, Linden Ave and buffer setbacks.
Discussion was had regarding a possible park in this development. Williams suggested
possibly restricting discussion to if the Planning Commission would like to see a park in
this development or not.
M/S/P: Williams/Haggard, move to recommend a park be included in the development
and that the developer meet with the park commission to determine the best location.
M/S/P: Williams/Haggard, move to amend the above motion to read that the Planning
Commission requests the Park Commission to consider if a park should be included in
this plan and if so, where the best location would be. Vote: 7-0, the original motion as
amended carried unanimously.
Larson would like it noted that the discussion of the Park should also factor in that in
this area having a park could be a safety issue so that kids are not playing in the street.
M/S/P: Fields/Larson, move to recommend that the developer provide a Cul-de-Sac by
Linden Ave with a provision for an emergency access. Vote: 2-5, motion failed.
Dorschner, Larson and Williams are opposed to the motion. Larson feels the added cost
for plowing is a factor. Williams brought up the fact that the code does not allow a cul-
de-Sac longer than 600 feet which this is. The stub has always been there and should go
through.
M/S/P: Dorschner/Williams, move to recommend that Linden Ave be connected
through from Legends of Lake Elmo and Sanctuary as shown on the concept plan. Vote:
5-2, motion passed.
4
Lake Elmo Planning Commission Minutes; 10-26-15
M/S/P: Williams/Dorschner, move to recommend that a connection road be constructed
between Linden Ave and the west property line. Vote: 6-0, motion passed, (Larson did
not vote as left the room).
M/S/P: Fields/Dorschner, move to recommend that all setback requirements be met
with the exception of the Eastern Boundary. Vote: 7-0, motion passed, Unanimously.
Gozola clarified that the buffer setback is for any structure or driving surface.
M/S/P: Haggard/Dodson, move to recommend an amendment to the motion to add in
some sort of physical delineator between the property line of Carriage Station and the
East side of the development in places where there is a small amount of open space.
Vote: 5 -3, motion passed.
Williams suggested possibly a 2 foot tall marker or sign designating the open space.
M/S/P: Williams/Haggard, move to amend the original motion to insert the words
“adjacent to Carriage Station”. Motion Withdrawn.
Dodson started the discussion about the drainfield issue. He likes this proposal better
than the communal drainfield. The City Engineer comments are that the drainfield
should be on the individual lots and the lots should be bigger.
M/S/P: Williams/Dodson, move to postpone consideration of the drainfield portion only
until they receive the staff evaluation of these types of systems which are allegedly in
Sunfish Ponds and Whistling Valley. Vote: 7-0, motion passed, Unanimously.
Williams asked if there was any information regarding how the land trust feels about the
drainfields on the open space. He would like that as part of the research as well.
M/S/P: Williams/Dorschner, move to recommend that prior to preliminary plat, all
recommendations from the City Engineer in his letter dated October 22, 2015 be
addressed. Vote: 7-0, motion passed, unanimously.
Haggard thinks it is weird that the trail goes in front of the homes and they get credit as
parkland for what is virtually a sidewalk.
M/S/P: Williams/Dorschner, move to recommend that this proposal include a
constructed trail along the north side of 50th Street along the property. Vote: 7-0,
motion passed, Unanimously.
Gozola stated that the trail was already part of the Engineers recommendations and
would already be covered.
5
Lake Elmo Planning Commission Minutes; 10-26-15
The Planning Commission discussed the number of lots. 40 per code or the proposed
44. The developer stated that they came in with 44 as the en gineer is requiring
concrete curb which is very expensive. Dorschner asked if they will be able to meet the
buffer setback requirement. The developer stated that it would be very difficult to put
together a quality development and meet those setbacks. There was discussion about
postponing vs. denial.
M/S/P: Dorshner/Williams, move to postpone consideration until Developer comes back
with an alternate plan to address the setbacks and sewer concerns. Vote: 7-0, motion
passed, Unanimously.
Business item to discuss the public hearing notice regarding changes to RR & AG. What
direction would the Commission like to take? Should all of the 6 items be considered at
the same time? Council Member Fliflet suggested that maybe the scope of the public
hearing should be broader to be able to discuss all the uses that were added. The
consensus was to have a meeting to discuss the current uses in the rural districts.
Council Updates – October 20, 2015 Meeting
1. Hammes Plat Extension - Tabled
Staff Updates
Tartan Park has been sold, but the purchaser has not been made public knowledge yet.
They will bring that back once it is known.
Metro Transit is looking to put a park and ride in at 94 and Manning. This would
probably happen in 2017. This would be independent of the BRT. The question to ask is
if this is something the City wants.
1. Upcoming Meetings
a. November 9, 2015
b. November 23, 2015
Commission Concerns
Dorschner is concerned about adding agenda items the night of the meeting. He is
concerned about Council members coming and driving their meeting. Would like to
stick to the agenda items that are in the packet.
Meeting adjourned at 10:50 pm
Respectfully submitted,
6
Lake Elmo Planning Commission Minutes; 10-26-15
Joan Ziertman
Planning Program Assistant