HomeMy WebLinkAbout02.22.16 Planning Commission Packet
3800 Laverne Avenue North
Lake Elmo, MN 55042
(651) 747-3900
www.lakeelmo.org
NOTICE OF MEETING
The City of Lake Elmo
Planning Commission will conduct a meeting on
Monday, February 22, 2016 at 7:00 p.m.
AGENDA
1. Pledge of Allegiance
2. Approve Agenda
3. Approve Minutes
a. January 11, 2016
4. Public Hearings
a. OPEN SPACE DEVELOPMENT (OP) CONCEPT PLAN: A request from
Landucci Homes for concept plan review for a proposed OP development on three
unaddressed parcels totaling 110 acres to the north of 50th Street North and to the
south of Sanctuary development – PID’s: 01.029.21.42.0003; 01.029.21.43.0001;
01.029.21.41.0001.
b. FINAL PLAT: A request by US Home Corporation, DBA Lennar to Final Plat
Savona 4th addition into 78 single family lots – PID’s: 34.029.21.31.0004,
34.029.21.31.0008, 34.029.21.42.0071 and 34.029.21.42.0077.
c. INTERIM USE PERMIT: Carol Palmquist is requesting an Interim Use Permit to
operate a commercial wedding ceremony venue at 12202 55th Street N.
5. Business Items
a.
6. Updates
a. City Council Updates – February 16, 2016 Meeting
i. Commercial Wedding Ceremony Ordinance– Passed
ii. Commercial Wedding IUP – Passed
iii. ZTA Senior Living – Passed
iv. Arbor Glen – Rezoning & Condition Use Permit – Passed
v. Appointment of Kristina Lundquist as 2nd Alternate
b. Staff Updates
i. Upcoming Meetings:
March 14, 2016
March 28, 2016
c. Commission Concerns
7. Adjourn
Lake Elmo Planning Commission Minutes; 1-11-16
City of Lake Elmo
Planning Commission Meeting
Minutes of January 11, 2016
Chairman Dodson called to order the meeting of the Lake Elmo Planning Commission at
7:00 p.m.
COMMISSIONERS PRESENT: Dodson, Kreimer, Larson, Dunn, Griffin and Williams.
COMMISSIONERS ABSENT: Haggard, Fields
STAFF PRESENT: City Planner Stephen Wensman & Interim Administrator Schroeder
Election of Officers:
M/S/P: Larson/Kreimer move to postpone election of officers to the next meeting,
M/S/P: Williams/Kreimer move to amend the motion to delay the election of the chair
only to the next meeting, Vote: 6-0, motion carried unanimously.
M/S/P: Williams/Dodson, move to nominate Commissioner Kreimer as the Vice Chair,
Vote: 5-1, motion carried.
M/S/P: Williams/Dodson, move to nominate Commissioner Larson as Secretary, Vote:
6-0, motion carried unanimously.
Approve Agenda:
M/S/F: Dodson/Griffin, move to adjourn the meeting in protest of the dismissal of
Commissioner Dorschner from the Planning Commission, Vote 2-2-1, motion fails with
Commission Larson abstaining.
Williams, Dunn and Kriemer spoke against the motion because they feel City business
should continue and it would not be fair to the people who came to this meeting and
there were public hearings posted.
The agenda was accepted as presented.
Approve Minutes: November 23, 2015
M/S/P: Williams/Dodson move to approve minutes as presented, Vote: 3-0, motion
carried, with Griffin and Larson abstaining.
2
Lake Elmo Planning Commission Minutes; 1-11-16
Approve Minutes: December 14, 2015
M/S/P: Williams/Dodson move to approve minutes as amended, Vote: 5-0, motion
carried unanimously.
Interim Use Permit – Commercial Wedding Ceremony Venue.
Wensman stated that at the request of the applicant, they would like to continue the
public hearing to the February 8, 2016 Planning Commission meeting.
Public Hearing opened at 7:26 pm.
No one spoke and there was no written or electronic correspondence.
M/S/P: Williams/Dodson move to continue the public hearing to the February 8, 2016
Planning Commission meeting , Vote: 5-0, motion carried, unanimously.
Varinace Request from IRET properties for a sign Variance.
Wensman started his presentation for a sign variance at 8650 Hudson Blvd. The
variance is for 5’ in heigh and 4’ in width for a pylon sign. This property is located in the
Eagle Point office park. The purpose of the sign is to display the signs of the tenants
that are in the building. Right now there is not much visability for these businesses due
to topography. There is some ambiguity in the Eagle Point Development Standards.
When this application was first submitted, the former Planner thought it looked good,
but when the Community Development Director looked at it, he said it didn’t meet the
requirements. Based on research and what Wensman has read regarding pervious
conversations, he is recommending a variance.
The applicant first approached the City in January 2015. Staff feels that the variance
criteria has been met and is recommending approval.
Griffin asked if this met the sign ordinance. Wensman stated that this development is a
PUD and this application would be covered under their PUD Regulations.
Kreimer is wondering if the location where the sign is going is a buildable lot. Wensman
stated that it is part of the same lot. He did not evaluate if more could be built there.
Dodson is wondering if this is a lighted sign. Does this go over the height for lighting?
Wensman stated that we can follow up with the applicant to see if the whole sign is
lighted.
Dawn Grant, IRET Properties, distributed pictures to the Planning Commission. She
stated that this is one property. This property was designed to have an additional
3
Lake Elmo Planning Commission Minutes; 1-11-16
building, but this is a very small piece of property. She also stated that they have talked
about putting a road through where the sign is so people would know where to turn .
Steve Hertz, Nordquist Sign, stated that the height is dependent on where it is
measured. He addressed the lighting of the sign and stated that not all parts of the sign
are illuminated. He estimated that the distance from this sign to Park Dental is abo ut
150-200 feet.
Louis Suarez, Colliers, went through pictures of all angles of the property.
Griffin asked if Park Dental will have a problem if people use their driveway to get to this
building. Dawn Grant stated that Park Dental is a tenant of theirs and they received a
letter of support from them. If it becomes an issue, they are willing to put a road back
to the building.
Dunn stated that she is in support of sign for giving better clarity to where this building
is.
Larson asked if there was a way to put something on the sign as to where people are
supposed to turn. Dawn Grant stated that it would be a possibility.
Mal Sullivan, St. Croix Orthopedic, stated the visibility of the campus has always been a
challenge, but their business has changed and grown. People have trouble finding
them and they would really appreciate the help in getting this sign passed as it would
help their business.
Public Hearing opened at 8:04 pm.
No one spoke and there was no written or electronic correspondence.
Public Hearing Closed at 8:05 pm.
Williams is in support of the concept for a more visible sign, however, there are a
number of unanswered questions for if this is the solution. He feels that the location of
this sign might actually induce people to turn into Park Dental. He would like to learn
more about access spacing, the elevation differences and the feasibility of routing traffic
to the Park Dental lot and possibly increasing that parking lot. He wants to support this
business, but he is not sure enough global thinking has gone into this decision.
Steve Hertz, stated that the idea of this type of sign is to create an identity for the
businesses. There could be an addition to the sign about where to turn, but the intent
was really to identify what businesses are back there.
4
Lake Elmo Planning Commission Minutes; 1-11-16
Dunn supports the signage and feels it is important to identify what is back there. She
feels it meets the intent of the PUD ordinance and it is an exception for this one building
that is hard to see. She said it is the age of GPS to assist on where to turn.
Kriemer agrees with Commissioner Dunn. He feels that the visibility is key to the
success of these businesses. He does not feel it is for visibility, but more for advertising.
He wants to support the commercial businesses and would like to see more in this area.
Griffin feels it is a good place for the sign so that you can see it from the freeway. She
also feels it would be beneficial to get another sign out on the freeway.
Suarez stated that this PUD was planned 20 years ago. Healthcare has dramatically
changed since then and part of that change is to advertise and attract more people and
identify the businesses that are there. The point of this sign is to build the bran d of the
Highpoint medical campus.
Dodson is not in favor of the aesthetics of the sign. He would have liked to see more of
a monument type.
M//: Williams/ move to postpone consideration of this application until the Commission
recieves elevations, access spacing, opportunities to modify the Park Dental Parking lot
for access and MnDot contact for I94 signage supplied by the applicant , motion fails for
lack of 2nd.
M/S/P: Dodson/Griffin, move to recommend approval of the 5 foot height and 4 foot
width variance request at 8650 Hudson Blvd to allow for a 35 foot high, 16 foot wide
pylon sign at the High Pointe Medical Campus based on the findings identified in the
staff report, Vote: 4-1, motion carried.
Dunn stated that the elevation is important to think about. She goes along with this
motion.
M//: Dodson/, move to amend the motion to add a condition of approval that the
possibility of a road be looked at, Motion fails for lack of second.
ZTA and Ordinance Amendment – a request from the City of Lake Elmo to rezone an
RR Parcel to PF
Wensman started his presentation by stating that this a request by the City of Lake Elmo
to exempt essential services from the dimensional and buffer requirements in t he PF
Zoning District. Wensman is presenting the 2 itmes together, but will require 2 separate
motions. This particular essential service is for the City’s water booster station.
Essential services can be in any zoning district, but it is the City’s policy to rezone these
to public facility.
5
Lake Elmo Planning Commission Minutes; 1-11-16
Dimensional and buffer requirements are important for most land uses, however,
essential services are generally incidental and subordinate to the surrounding land uses.
The location of this booster station is on inwood. This is a small building on a small
piece of property. This change would not change the architectural standards and there
is landscaping on the outer edges of the development.
Dodson asked if this was just for this site, or if it was for all sites. Wensman stated that
it would pertain to all properties. Dodson is concerned about what this would mean in
other situations. Wensman stated the City would have the ability to purchase whatever
size property they wanted.
Public Hearing opened at 8:41 pm.
John Vettruba, 8451 26th Street N, lives right to the north of this site. He would like to
know what the setback will be. He is wondering if this building makes any noise.
Wensman stated that he doesn’t know about the noise, but there will be landscaping.
Wensman states that this is conceptual, but thinks it will be about 15 feet. Vettruba
would like there to be a pipe back to 26th street to improve the pressure of their water.
All of their homes have booster pumps and they need to replace them regularly.
Al Eberhard, 2298 Inwood Ave N, he is the property owner of this property and has
worked with the City Engineer extensively. He is wondering if the rezoning is turned
down by the commission, what would the options be. He would like th e intrusion to
the agricultural land as minimal as possible. He was told that there was a 10 foot
setback requirement. He also asked what type of lighting there is for this. He also
thinks that if the design of the building looks like a small house, the need for landscaping
would not be as great.
There was no written or electronic correspondence, there were a few calls asking what
it was about, but no concerns.
Public Hearing Closed at 8:57 pm.
Williams thinks it is ok to exempt this, but he would like to see conditions added that
when it is adjacent to a residential property and does not meet the basic setback,
screening should be added.
Williams thought we could add something regarding the noise. Kreimer thought
especially since it was next to a residential area. Schroeder stated that if you stand
outside of this building, you will know that something is running, but it is not
concerning.
6
Lake Elmo Planning Commission Minutes; 1-11-16
Williams suggested that as a footnote to the table in section E, 1, that footnote 1 should
be that essential services shall be exempt and footnote 2 that increased 4 seasoned
vegetative screening and fencing should be included when the PF zoning district is
adjacent to the residential zoning district. There was no objection to changing this.
Williams suggested that structures housing essential services, when the setbacks are not
met, should be designed to look like houses when they are adjacent to residential
properties.
Dodson feels that the architectural standards are enough and does not want to put an
unnecessary burden on the City. He doesn’t necessarily think that looking just like a
house would be the best. Kreimer also thinks that in this case it borders both AG and
residential and possibly a rural structure might work better.
Dunn feels that on larger structures, the City should work with the Engineer to design a
structure that blends in with the surroundings. The surroundings could be different
depending on the site.
Al Eberhard, 2298 Inwood Ave N, asked where the additional screening would be.
Williams stated that his thought was to have it on any border that did not meet the
setback. Mr. Eberhard feels that it should be on all sides, even if it is agricultural next to
it that could be residential in the future.
Dodson is wondering if there should be something specifically stating that they are not
exempt from the noise ordinance. Williams would like to add a number 8 stating that
the noise ordinance should be met. The Commission is in agreement with that.
The Commission is wondering if it might be a good idea to have a separate table of
setbacks for essential services, possibly 10 feet. Dunn & Dodson were uncomfortable
with no setback as well.
M/S/: Dodson/Kreimer, move to postpone voting on the proposals until they get
another draft of setbacks for essential services that have buildings in the PF zone ,
Motion and second withdrawn.
Kreimer asked about including the other suggestions.
Interim Administrator Schroeder said that there is some urgency on this issue. This
needs to be resolved for the $3.5 million grant. One of the verifications for the grant is
that it complies with all our local ordinances.
Wensman stated that he would suggest that the Planning Commission recommend what
setbacks they are comfortable with and move it forward to the City Council.
7
Lake Elmo Planning Commission Minutes; 1-11-16
M/S/P: Williams/Dodson, move to recommend approval of a zoning text amendment for
essential services to exempt them from the overall PF zoning requirements. There will
be improved buffering and screening and the setbacks will be 10 feet, in addition to
adding the noise restrictions, Vote: 5-0, motion carried Unamimously.
M/S/P: Williams/Kreimer, move to recommend rezoning of the Inwood booster station
property from RR to the PF zoning district, Vote: 5-0, motion carried Unanimously.
Ordinance Amendment – a request for an ordinance amendment to the animal
ordinance that pertains to the keeping of pigeons.
Wensman started his presentation stating that he had an inquiry regarding the keeping
of pigeons. Currently pigeons are not regulated. Wensman researched what other Cit ys
do. He used the Gem Lake ordinance as a guide and also used our accessory building
ordinance as a guide to know how many pigeons would fit in what size building. The
minimum lot size would be 2.5 acres and it would only apply to AG and RR zoning.
Maximum number allowed would be 20 and they would need to be banded. Aviaries
would need to be enclosed. The loft area would have an area of 4 cubic feet per bird
and the maximum loft height would be 20 feet with a maximum of 200 square feet.
They would need to be located in the rear property 50 feet away from any habitable
structures.
Dodson thinks the construction of the loft is very specific and is wondering why.
Wensman stated it was taken out of other code and is probably to keep the birds safe
from predators. Dodson was also wondering why it is limited to RR and AG. Wensman
stated it is because he is trying to restrict it to where there is the least potential for
complaints.
Williams asked how the number 20 was arrived at. Wensman stated th at he looked at
the size of the accessory building and worked backwards. Williams is not sure that 20 is
enough.
Public Hearing opened at 10:04 pm.
No one spoke and there was no written or electronic correspondence.
Public Hearing Closed at 10:05 pm.
Dodson would like to see the number increased to 60. Larson would like to see 100 as a
maximum.
Kreimer thinks that is a lot of birds on a 2.5 acre lot. No one spoke at the public hearing
and he thinks that we should be restrictive until someone comes in and asks for more.
Griffin stated that it can be a big nuisance if they are not taken care of and saw it first
8
Lake Elmo Planning Commission Minutes; 1-11-16
hand this summer. Dunn agrees that we should add to the code, but should be more
restrictive for now. Kreimer would like to see on page 3 letter K read “Pigeon lofts may
be located in the rear yard only and shall be at least 50 feet from property lines and
adjacent habitable structures.” Williams would like to include in 95.117 an item C that
would state “Any property where pigeons would be kept will have a principle use
conforming to the zoning ordinance.”
Williams would like to add under 95.117 letter D “The property will be the primary
residence of the pigeon keeper.”
M/S/P: Williams/Kreimer move to recommend approval of the ordinance pertaining to
the keeping of pigeons with the 3 suggested changes, Vote: 5-0, motion carried,
unanimously.
Ordinance Amendment – a request for an ordinance amendment to the weapons
ordinance as it pertains to hunting.
Wensman started his presentation and stated that this is being brought forward based
on the number of calls the City received this fall. Wensman stated that the City might
want to consider producing a map each year to designate where hunting is allowed.
Public Park, public trail, ROW and public school was specifically added. Wensman ran
these changes through Washington County sheriff and they were in support and liked
the idea of a map.
Griffin would like to see some distinction between shotguns and rifles. She would like to
see rifles prohibited in the City. The Commission was wondering how this applies to
conceal and carry and how 130.15 (B) (2) would apply. Wensman stated that he can
bring it back to the City Attorney. Dodson asked how much of this had to do with land
use and if it really needed to come to the Planning Commission.
Public Hearing opened at 10:30 pm.
No one spoke and there was no written or electronic correspondence.
Public Hearing Closed at 10:30 pm.
Kreimer was wondering where paint ball, air guns, etc. would fall in this scope.
Wensman stated that he looked at it only from the standpoint of hunting.
M/S/P: Williams/Kreimer move to postpone consideration of the weapons and hunting
ordinance until clarification on 4 issues is received, Vote: 5-0, motion carried,
unanimously.
Council Updates – December 15, 2015 Meeting
9
Lake Elmo Planning Commission Minutes; 1-11-16
1. CUP Amendment-Oakdale Gun Club – Approved.
2. Preliminary Plat Approval-Reider – approved.
3. ZTA-Uses in Rural Districts – Repeal uses that were added in 2013.
Council Updates – January 5, 2016 Meeting
1. Update on Status of BRT – Verbal.
2. Open Space Development to move to workshop.
Staff Updates
1. Upcoming Meetings
a. January 25, 2016
b. Frebruary 8, 2016
Commission Concerns
Meeting adjourned at 10:55 pm
Respectfully submitted,
Joan Ziertman
Planning Program Assistant
City of Lake Elmo Planning Department
OP Development / Concept Plan Review
To: Planning Commission
From: Ben Gozola, City Planner
Meeting Date: February 22, 2016
Applicants: Landucci Homes
Location: North of 50th Street North & South of the Sanctuary Development
Introductory Information
Request: The applicants are seeking approval of an OP development concept plan that would create
forty (40) lots on 90.15 gross buildable acres. The development is currently be called
“Legends of Lake Elmo.” This represents a reduction of four (4) lots from the previous
plan considered in October 2105.
Site Data: Existing Zoning – RR (Rural Residential)
Land Use Guidance – RAD (Rural Area Development)
Existing Parcel sizes – 50.03 acres, 20.0 acres, and 39.97 acres (110 gross acres)
Property Identification Numbers (PIDs): 01-029-21-42-0003, 01-029-21-43-0001,
and 01-029-21-41-0001
Various Calcs
(in acres):
TOTAL PROPERTY AREA ...........................................................110.01
BUILDABLE ACREAGE ..............................................................90.15
LAND USED FOR LOTS ..............................................................44.27
OPEN SPACE ...............................................................................50.05
– PARK AREA ......................................................................0.00
PERCENT OF OPEN SPACE ......................................................45.5%%
RIGHT OF WAY ...........................................................................10.39
WETLAND AREA ..........................................................................17.93
WOODED AREAS ........................................................................20.22
STEEP SLOPE AREAS .................................................................1.93
TOTAL PROPOSED LOTS ...........................................................40
OP Concept Plan Review: Legends of Lake Elmo (Jan 25, 2016 Submittal)
Planning Commission Report; 2-22-16
Page 2
GROSS DENSITY ..........................................................................0.36 UNITS/ACRE
NET DENSITY ..............................................................................0.44 UNITS/ACRE
Review
Site Character: Applicant Comments: Legends of Lake Elmo is proposed as an open space
development, located in the northeastern portion of the City, Section 1, Township 29N,
Range 21W. The project property consists of 110.1 acres, bordered on the south by 50th
Street, Tamarack Farm Estates and Carriage to the east, St. Croix Sanctuary to the
north and large agricultural properties to the west. The site is best characterized as
rolling open farm fields surrounded by existing mature oak stands, pines and wetlands
and by far one of the nicest natural parcels in Lake Elmo.
The availability of farm fields and natural terrain fortunately allows the proposed
design to preserve every wetland and nearly all of the mature trees.
Staff Comments: The rolling hills, open farm fields and scattered woodlands on these
three (3) parcels are a prime example of Lake Elmo’s rural landscape.
“OP” STANDARDS REVIEW:
Land Area:
According to code, applications for a residential OP development shall meet the following
criteria unless modified by a 4/5 vote of the City Council:
A. The minimum land area for the proposed OP development shall be 40 acres;
Staff comment: The development is proposed on 110 gross acres. Criteria met.
B. The ratio of parcel length to width shall not exceed 3:1
Staff comment: The width to depth of the three parcels which make up this
proposed development is roughly 1:1. Criteria met.
C. The total number of dwelling units permitted shall be according to the development
density criteria contained in the Comprehensive Plan (0.45 dwelling units per
buildable acre when planned as part of an Open Space Preservation development);
AND
D. The total number of dwelling units within an OP development shall not exceed the
density limitations contained in the Comprehensive Plan for OP Districts.
Criteria “C” and “D” are identical, so they were reviewed together.
Applicant comment: The density of the project, based on the underlying zoning
is 18/40 for an open space development. Subtracting out the steep slopes and
OP Concept Plan Review: Legends of Lake Elmo (Jan 25, 2016 Submittal)
Planning Commission Report; 2-22-16
Page 3
(cont.)
wetlands the net acreage for the development is 90.15 acres, which nets 40.57
units, 40 or 41 units if you were to round up.
The average lot size as proposed is 1.11 acres, 11% larger on average than the
required 1.00 acre minimum for individual septic lots. The typical lot width as
demonstrated on the concept plan is 140ft in width minimum. The smallest
proposed lot is 1.00 acres, with the largest at 1.53 acres.
We have shown five additional potential lots, labeled as Outlot D, E, F, G and H.
These are lots that represent the five additional lots if the City were to change the
ordinance to allow for 20 units per 40 acres. The open space calculation provided
does not include these lots. The amount of open space provided exceeds the
requirement without the lots included. These lots would be held by the developer
and not included in the associations common areas.
Staff comment: The provided documentation identifies 90.15 net buildable acres
after protected wetlands and sloped areas are taken out of consideration. As 40
units are proposed, the resulting density is 0.44 units per net acre which is
conforming to OP development standards. This is the first concept plan to come
before the City that is not seeking a 4/5 vote of Council to authorize additional lots
beyond the 40 units allowed by code.
At past meetings and in the current narrative, the applicant has made a point of
questioning staff’s insistence to round down rather than up when setting the
maximum number of lots allowed by code. Please note that the review criteria
states the total number of dwelling units “shall not exceed” density limitations.
The word “shall” is a legal term indicating staff has no flexibility on the
requirement. Rounding up results in a density which exceeds the maximum
allowed by the Comprehensive Plan, so rounding up is simply not an option under
current regulations.
E. Total preserved open space within the proposed development shall be at least 50% of
the total Buildable Land Area as defined by Chapter 150 of the City Code;
Staff comment: Based on 90.15 buildable acres, this development is required to
set aside a minimum of 45.08 acres of open space to meet the requirements of OP
development. The applicant is proposing 45.50 acres of open space (a 0.42%
increase over the minimum requirement). Criteria met.
F. Dwelling units are to be grouped so that at least 50% of the Buildable Land Area of
the proposed development remains in preserved open space.
Staff comment: The proposed open spaces are all interconnected and coordinated
throughout the proposed development. Suggestions for improvement are listed
under the review of open space below. Criteria met.
OP Concept Plan Review: Legends of Lake Elmo (Jan 25, 2016 Submittal)
Planning Commission Report; 2-22-16
Page 4
Open Space:
Applicant Comments on Open Space: The open space as proposed is predominately
preserving wetlands and subsequently the large areas of mature oak forest on the
property. The largest open space area is Outlot A, 25.69 acres of hardwood forest and
high valued wetlands.
The proposed trail provides a north south connection to the 50th Street Trail from
Sanctuary. Families from St. Croix Sanctuary, Carriage Station, Tamarack Estates,
Tana Ridge, Fields of St. Croix and others will be able to complete large bicycle,
running or walking loops with this design.
By code, open space created as part of an OP development must meet the following
criteria unless modified by a 4/5 vote of the City Council:
A. Open space created as part of an OP development must be protected by a conservation
easement;
Staff comment: The applicants have not indicated whether they have identified
an agency to oversee the required conservation easement for the proposed open
space. As part of the Concept plan review, they will be directed to have this
requirement addressed prior to proceeding to Preliminary Plat if allowed to do so.
B. Not less than 60% of the preserved open space shall be in contiguous parcels of not
less than ten (10) acres;
Staff comment: Outlots A (25.69 acres), B (11.04 acres) and C (13.33 acres) all
are contiguous and exceed ten (10) acres in size.
While this criteria is met, that’s not to say there are not areas worthy of debate
for potential change. Staff would encourage the applicant, Planning Commission
and Council to consider whether the following areas can/should be reconfigured:
i. There are now only three (3) lots with buildable areas in required buffer zones
from surrounding properties (buffers are specifically analyzed on page 10).
This is a significant reduction from the earliest plans. Of biggest concern
would be the lots (and potential future lots) nearest the Hecker property.
ii. The former “park” area in the NE corner with the potential winter skating rink
is no longer shown. As there seemed to be some support for that improvement,
its elimination may warrant discussion.
C. Preserved open space is to be maintained for the purposes for which it was set aside;
Staff comment: Per the applicant’s narrative, the proposed open space will be
passively managed as maintenance areas for wetlands and woods. Criteria met.
OP Concept Plan Review: Legends of Lake Elmo (Jan 25, 2016 Submittal)
Planning Commission Report; 2-22-16
Page 5
(cont.)
D. Where applicable, a homeowner’s association shall be established to permanently
maintain all residual open space and recreational facilities;
Staff comment: The applicant is anticipated to create an HOA to handle at least
trail maintenance (cleaning and plowing), maintenance of development
landscaping, and maintenance of the entrance monument(s). Criteria met.
E. Preserved open space shall be contiguous with preserved open space or public parks
on adjacent parcels.
Staff comment: The proposed open space is contiguous with open space or
parkland on adjacent property. Criteria met.
Lot Design: According to code, lots are to be designed to achieve the following objectives (listed in
the order of priority):
A. On the most suitable soils for sub-surface septic disposal.
Staff comment: The applicants have amended the plans to include one acre lots
and are proposing on-site septic facilities. Per the concept narrative:
“the site has been analyzed by a septic designer and has indicated that
soils for the proposed lots are adequate for on-site septic systems. The
designer will work with us to provide the City a final document with soil
information and testing for the preliminary plat submission. The open
space areas of the project will also be made available to lots if the final
design requires grading of the entire lot for construction.”
Please see engineering comments on wastewater on page 17 of this report for
further comments on septic facilities.
B. On the least fertile soils for agricultural uses and in a manner which maximizes the
usable area remaining for such agricultural use.
Staff comment: Please see the soils data and maps on the following pages.
OP Concept Plan Review: Legends of Lake Elmo (Jan 25, 2016 Submittal)
Planning Commission Report; 2-22-16
Page 6
Soil
Symbol Map Unit Name Acres
% of
total
acres Farmland Rating
HIGH QUALITY FARMLAND
153B Santiago silt loam, 2 to 6 percent slopes 19.1 17.4% All areas are prime farmland
49B Antigo silt loam, 2 to 6 percent slopes 10.7 9.7% All areas are prime farmland
264 Freeon silt loam, 1 to 4 percent slopes 7.6 6.9% All areas are prime farmland
49 Antigo silt loam, 0 to 2 percent slopes 1.4 1.3% All areas are prime farmland
120 Brill silt loam 1.4 1.3% All areas are prime farmland
266 Freer silt loam 5.1 4.7% Prime farmland if drained
468 Otter silt loam 3.0 2.8% Prime farmland if drained
48.3 acres 44%
MODERATE QUALITY FARMLAND
342C Kingsley sandy loam, 6 to 12 percent
slopes 8.6 7.9% Farmland of statewide importance
49C Antigo silt loam, 6 to 12 percent slopes 1.9 1.8% Farmland of statewide importance
155B Chetek sandy loam, 0 to 6 percent slopes 1.7 1.5% Farmland of statewide importance
153C Santiago silt loam, 6 to 15 percent slopes 0.6 0.5% Farmland of statewide importance
12.8 acres 12%
LOW QUALITY FARMLAND
155C Chetek sandy loam, 6 to 12 percent slopes 13.6 12.3% Not prime farmland
896C Mahtomedi-Kingsley complex, 3 to 12
percent slopes 9.8 8.9% Not prime farmland
W Water 4.9 4.5% Not prime farmland
456 Barronett silt loam 4.5 4.1% Not prime farmland
453C DeMontreville loamy fine sand, 6 to 12
percent slopes 4.3 3.9% Not prime farmland
541 Rifle muck 4.0 3.7% Not prime farmland
896D Mahtomedi-Kingsley complex, 12 to 25
percent slopes 4.0 3.7% Not prime farmland
155D Chetek sandy loam, 12 to 25 percent
slopes 3.6 3.2% Not prime farmland
454B Mahtomedi loamy sand, 0 to 6 percent
slopes 0.1 0.1% Not prime farmland
48.8 acres 44%
TOTALS: 110.0 100.0%
Washington County Soil Survey data from the USDA Soil Survey Website (http://websoilsurvey.nrcs.usda.gov/)
OP Concept Plan Review: Legends of Lake Elmo (Jan 25, 2016 Submittal)
Planning Commission Report; 2-22-16
Page 7
Soils Map
High Quality Farmlands = GREENS
Moderate Quality farmland = BLUES
Low Quality Farmlands = RED
OP Concept Plan Review: Legends of Lake Elmo (Jan 25, 2016 Submittal)
Planning Commission Report; 2-22-16
Page 8
Soils vs. Lot Layout Comparison
OP Concept Plan Review: Legends of Lake Elmo (Jan 25, 2016 Submittal)
Planning Commission Report; 2-22-16
Page 9
(cont.) C. Within any woodland contained in the parcel or along the far edges of open fields
adjacent to any woodland.
Staff comment: The proposed lots are largely outside of woodlands within the
open field areas.
D. In locations least likely to block scenic vistas as viewed from Hwy 36.
Staff comment: The property is not visible from Hwy 36.
E. Away from woodlands in open fields.
Staff comment: Lots are largely located per this standard.
Without adequate information on septic sites, staff cannot state one way or another
whether the proposed lot configuration follows this priority order (it’s arguably a
subjective decision). That said, what we can see is that most of the open space is not
centered on “the least fertile soils for agricultural uses,” (criteria #2 after best septic
locations), so staff would recommend that a 4/5 vote of Council be provided to authorize
the proposed layout.
Structures: The applicant is planning to construct homes at a slightly higher price point than the
ones found in the Sanctuary development to the north.
Buffer Zones: Applicant Comments on Home Setbacks and Buffering: We have listened to the
concerns of the neighboring properties and the feedback from the members of the
Planning Commission and have adapted the plan to conform more closely with the
feedback received. The layout is still very confined to the existing natural features.
Distances between the closest homes has been indicated on the plan set.
Per section 150.180(B)(2)(d), the following setbacks shall be provided between the
property line of the abutting parcel and any structure or driving surface within the OP
development:
o 200’ buffer from existing developments and from properties that are ineligible
for OP development;
o 100’ buffer from other OP developments or lands eligible for OP development.
Based on this revised plan, Lots 4, 32 and 37 have buildable area within the required
setback from adjacent lands (3 of the 40 proposed lots). This is a significant
improvement over previous plans, but will still require a 4/5 vote of Council to reduce
the surrounding buffers as proposed.
OP Concept Plan Review: Legends of Lake Elmo (Jan 25, 2016 Submittal)
Planning Commission Report; 2-22-16
Page 10
Boulevard
Landscaping:
Applicant Comments on Landscaping: With the homes being positioned in the
open farm fields, the addition of trees in the boulevards and around ponding areas
will be necessary to enhance the development. The concept plan demonstrates the
initial conceptual design for tree plantings, providing buffering and beautification of
the site.
Per code, boulevard landscaping is required along all streets. Such landscaping shall
consist of at least one tree per every 30 feet, or be placed in “clusters” at the same
ratio.
Landscaping over the entirety of the site must consist of at least ten (10) trees per
proposed building site, and such trees shall not be smaller than 1.5 caliper inches
when measured at 54 inches above grade level.
As part of a future preliminary plan submission, the applicant will be required to
provide a landscape plan for the entire site that meets the above requirements.
Lot
Configuration:
Section 150.180 (B)(2)(h) sets minimum lot sizes based on whether lots will be
serviced by individual septic systems or a communal facility. As the applicant
proposes to utilize individual septic systems for each home, the minimums lot size
would be 1.0 acre.
The following is a listing of all proposed lot sizes:
LOT Acres LOT Acres LOT Acres
1 1.02 15 1.11 29 1.00
2 1.01 16 1.06 30 1.21
3 1.02 17 1.05 31 1.10
4 1.00 18 1.07 32 1.03
5 1.02 19 1.00 33 1.02
6 1.01 20 1.05 34 1.26
7 1.02 21 1.01 35 1.21
8 1.30 22 1.10 36 1.02
9 1.07 23 1.02 37 1.03
10 1.01 24 1.08 38 1.53
11 1.32 25 1.12 39 1.33
12 1.07 26 1.10 40 1.03
13 1.06 27 1.28
14 1.07 28 1.45
Staff Comments: ALL lots are compliant to the minimum lot size requirement
(this is the first concept plan to not seek a deviation on the minimum lot size
standard).
OP Concept Plan Review: Legends of Lake Elmo (Jan 25, 2016 Submittal)
Planning Commission Report; 2-22-16
Page 11
Pathways: The proposed development includes one north/south trail to connect the Sanctuary
trail with 50th Street North.
The overall length of the proposed trail is approximately 4,741 linear feet (0.9 miles).
Trails are proposed to be eight (8) foot wide bituminous paths.
Staff Comments: As indicated in the staff reports on previous concept plans, a critical
pedestrian connection that will be required by the City is the construction of a
bituminous trail on the north side of 50th Street connecting the two sides of Outlot C
and extending to the westerly limits of the Plat. This connection must be shown on
any future preliminary application. Other than that, the requirements for pathways
appear to be met by the proposed plans. Criteria met.
Proposed
Density:
The maximum dwelling density within an OP development shall be 18 units per 40
gross acres of buildable land (or 0.45 units per acre). With 90.15 acres of buildable
land available, a maximum of 40 units is allowed by code.
o 90.15 * 0.45 = 40.57 = 40 units
As proposed, this development would result in 40 units on 90.15 acres of buildable
land which equates to a density of 0.44 units per acre. This is the first concept plan to
date that complies with the density maximum.
The applicant is proposing to plat five (5) Outlots on the southern portion of the
property that could potentially become buildable lots in the future should OP
regulations change to allow for increased density. Should this concept plan proceed
to the preliminary development stage, staff would suggest these five Outlots be
combined into a single Outlot for the following reasons:
1) There is no guarantee that any changes to the OP development standards will
occur, so creating five separate outlots suggests knowledge of a future standard
that has yet to be written;
2) Even if the OP regulations change to allow for greater development densities,
there is no way to know if the proposed boundaries are best to comply with the
updated regulations; and
3) To create buildable lots from an Outlot, the lot must be replatted. And if a
platting process will be required regardless, establishing how this area should
develop is best done at that time.
OP Concept Plan Review: Legends of Lake Elmo (Jan 25, 2016 Submittal)
Planning Commission Report; 2-22-16
Page 12
IN GENERAL
Adjacent parcel
dev.:
The surrounding parcels to the west can develop at some point in the future, so it is
important to consider how the current proposal will integrate with those future
developments.
As you can see in the graphic below, there are potentially three nearby future entry
points on to either Lake Elmo Avenue or 50th Street North. At least one right-of-
way in this development (as shown) should dead-end on the western property
line for eventually continuation to one or more of these points.
The circle road in Tamarack Farm Estates (to the southeast of the proposed
development) does include an undeveloped right-of-way which ends on this
property. Utilization of this undeveloped right-of-way is not recommended as it
would unnecessarily disturb wetlands for little improvement to the overall
transportation network.
Lot Access: All lots have direct access to a public road.
Driveways should be located so as to preserve existing trees in as much as possible.
Addresses for the individual homes should be posted at each driveway entrance.
OP Concept Plan Review: Legends of Lake Elmo (Jan 25, 2016 Submittal)
Planning Commission Report; 2-22-16
Page 13
Future parcel
development:
The proposed subdivision would fully divide the property as an OP development.
Easements: All standard drainage and utility easements will need to be shown on the future
preliminary plan document(s).
All easements intended for public utilities shall be a minimum of 15 feet on each side
of the utility and shall be shown on the future plans. All easements will be as wide as
necessary to address access and/or maintenance objectives.
OP Deviation
Summary:
The Legends of Lake Elmo is proposed to vary from the standard OP development
requirements in the following manner:
1) Lot Design/Configuration
The proposal includes lots within areas classified as prime farmland.
On the priority list of things to accomplish with lot design, placing homes “on the
least fertile soils for agricultural uses and in a manner which maximizes the
usable area remaining for such agricultural use” is the 2nd highest priority, and
many of these lots (especially in the NE corner) are located on prime farmland.
2) Buffers
Lots 4, 32 and 37 will all include buildable area within required buffers.
Council’s 4/5 vote on this item would authorize staff to work with the applicant
at preliminary plat to identify unique setbacks for each of the identified lots to
ensure buffers are maintained in as much as possible.
Resident
Concerns:
Staff has received a number of comments from residents leading up to past Planning
Commission meetings (minutes from such meetings are attached).
INFRASTRUCTURE:
In General: All public improvements constructed to support the development must be designed
and constructed in accordance with the City Engineering Design Standards Manual
available on the City website.
OP Concept Plan Review: Legends of Lake Elmo (Jan 25, 2016 Submittal)
Planning Commission Report; 2-22-16
Page 14
Streets and
Transportation:
Applicant Comments on Streets and Trails: The street design for the local roads are
proposed as 28-ft in width, with concrete curb and gutter. Right of way is proposed as
60-ft in width to allow for adequate room for small utilities, water main and sewer. The
road width and right of way width are slightly larger than what is required, due to the
feedback from City Staff. The trail is proposed to meet the current standard width and is
located along the proposed, which will make a nice walking loop for the residents and
provide connection, north to south, from St. Croix Sanctuary to 50th Street as previously
described.
Staff Comments: Staff will be very adamant about preserving the roadway connection
between this development and Sanctuary to the north for a number of reasons:
1. There are currently 59 (eventually 62) homes in Sanctuary that rely on a single
access point for ingress/egress to their home sites. The status quo should NOT
be supported by the City as a minimum of two ingress/egress points are necessary
(three are preferred) for the number of homes in Sanctuary. Ostensibly the reason
the City felt comfortable approving a single access point originally was the
knowledge that roads within the development would eventually provide two (2)
additional access points.
2. One access point is a major safety problem that must be rectified. Reconstruction
of Hwy 36 or Manning Avenue has the potential to severely limit (or eliminate at
times) access to this neighborhood. During those times, not only will residents
have problems accessing their properties, but so too will emergency vehicles. The
fire chief strongly supports multiple entry points for this reason.
3. Linden Avenue is not a “dead end.” It is clearly a right-of-way that temporarily
terminates at the development’s boundary, and there could be no mistaking the
intent that it would eventually be a through-road.
4. Enforcing the continuation of through-roads between developments that are
completed years apart is difficult for all communities, and all existing
neighborhoods request that such roads be terminated. Importantly, the City has a
responsibility to represent not only the current residents in this neighborhood, but
also the future residents as well. The access issue must be addressed.
5. Sanctuary was designed to have three access points: Manning Avenue North, 58th
Street North, and Linden Avenue North. Allowing Linden Avenue to be closed
at this time will essentially REQUIRE that 58th Street North continue to the west
in the future. Such a decision has the potential to instigate a resentment that would
fracture this neighborhood (residents near the 58th St. termination against those
near the Linden Avenue termination).
OP Concept Plan Review: Legends of Lake Elmo (Jan 25, 2016 Submittal)
Planning Commission Report; 2-22-16
Page 15
(cont.)
Engineering Comments:
The Plat must dedicate sufficient RƒW along 50th Street North to ensure 40 feet of
RƒW north of the existing centerline of the road (a total of 80 foot RƒW for collector
roadway). Additional RƒW may be required along Phase 1 Lots 1−2, and Outlots A,
B, and I.
Right and left turn lanes must be incorporated along 50th Street per the City design
standards to maintain safety along the roadway. Right and left turn lanes shall be
constructed at the developer’s expense.
The City’s Transportation Plan identifies 50th Street N. as a major east−west collector
roadway and Municipal State Aid route. Traffic concerns and complaints have
increased along 50th Street over the past few years and will continue to increase as
traffic volumes grow. There are two ways that the City can help manage and mitigate
these growing traffic issues:
Improve access management along the corridor when opportunities arise.
Improve pedestrian facilities along the corridor, at a minimum, completing the
bituminous trail along the north boulevard from Old TH 5 (CSAH 14) to Lake
Elmo Avenue.
Access Management: The development access point along 50th Street meets the City’s
Transportation Plan access spacing guidelines for Collector Roadways (every 660 ft.
to residential streets and commercial driveways) unless the adjacent westerly property
becomes commercial use.
The proposed access is 875 feet from Linden Trail to the east. Condition met.
The proposed access is 700 feet from Lily Avenue to the west. Condition met.
The proposed access is 420 feet from the adjacent farm driveway (Hecker
property) to the west. Condition not met if this becomes a commercial use
property.
From a brief field review the proposed access to 50th Street N. appears to
provide adequate sight distances for safe ingress and egress.
The development access road connection to 50th Street is properly located to balance
the various conflict points, however the following access management
recommendations should be required to improve safety and access management along
the road corridor:
The existing farm (Hecker parcel) should be required to connect to the new
roadway internal to the development to eliminate the driveway access to 50th
Street N, especially if this property becomes a commercial use.
OP Concept Plan Review: Legends of Lake Elmo (Jan 25, 2016 Submittal)
Planning Commission Report; 2-22-16
Page 16
(cont.) A new driveway for Lot 40 should be further reviewed as proper sight
distances may not be available. Consideration should be made to create shared
driveways when possible.
Pedestrian facilities: A bituminous trail must be incorporated along the north
boulevard of 50th Street N. to improve pedestrian safety and work toward
future trail connectivity. Segments of a bituminous trail currently exist along
50th Street N. alternating from the north to south side of the road. As traffic
continues to increase on 50th Street N. it is critical for the City to create a
continuous bituminous trail along the north side of 50th Street, from Old TH5
(CSAH 14) to Lake Elmo Avenue.
A residential street connection is required as shown to Linden Avenue in the
Sanctuary subdivision.
A residential street stub is required as shown between lots 28 and 29 to extend
to the westerly plat limits for future connection. A temporary cul‐de‐sac must
be provided. A trail should be extended along this road segment for future trail
connectivity.
The center roadway median at the cul‐de‐sac intersection for lots 2‐7 must be
revised to allow two way ingress/egress to the cul‐de‐sac.
All streets must be designed to meet the City’s Engineering Design Standards
including R/W width, street width and cul‐de‐sac radii. Street intersections
must approximate 90 degrees and maintain 50 feet of tangent with maximum
slopes of 2.5%. Residential maximum longitudinal grade is 8% with no
sidewalks, 6% where there are sidewalks.
Parkway or divided roadways must be a minimum of 18 feet wide from back
or curb to back of curb. The development street plan indicates five segments
with divided one‐way streets. The specific geometry of each divided street area
will require detailed review in the preliminary plat phase.
Ten (10) foot utility easements are required on either side of all right‐of‐ways.
Water
System(s):
Municipal water service is readily available in two locations. The applicant is
responsible to extend municipal water into the development to serve the proposed
properties.
Two connection points to the existing City system will be required:
1) A connection to the existing 16−inch watermain at Linden Avenue in the
Sanctuary subdivision.
2) A connection to the existing 12−inch watermain at 50th Street N.
OP Concept Plan Review: Legends of Lake Elmo (Jan 25, 2016 Submittal)
Planning Commission Report; 2-22-16
Page 17
(cont.)
A watermain lateral stub will be required to the westerly plat limits between Lots 28
and 29.
No trunk watermain oversizing is anticipated for this development.
Sanitary
System(s):
The proposed development is located outside of the City designated Municipal Urban
Service Area (MUSA) for sanitary sewer service. The developer is proposing private
individual on‐site septic systems for each Lot. Individual on‐site septic systems are
permitted by Washington County and must contain both a primary and secondary site
for each Lot. The Concept Narrative further proposes the use of open space for the
placement of private individual on‐site septic systems for some Lots.
The Open Space Ordinance does not allow private individual on‐site septic systems
to be placed within open space areas. Staff has concerns with this proposal because it
will be difficult, both technically and from a legal access right perspective, to ensure
that these areas are protected and reserved specifically for use by each specific
property. Any plan approved for development with the use of private individual on‐
site septic systems must demonstrate that both a primary and secondary private
individual on‐site septic system exits and is dedicated to each lot including septic
tanks, service lines and drainfields.
The Concept Plan does not detail the proposed wastewater management plan including
the location of each primary and secondary private individual on‐site septic system or
the supporting percolation testing to verify the existence of adequate supporting soils.
Therefore, the Concept Plan approval must be contingent upon a Preliminary Plat
submittal that addresses a comprehensive wastewater management plan and all Lot
locations and sizes must be subject to revision as needed to accommodate a properly
designed primary and secondary private individual on‐site septic system.
Septic system sites must be placed where soil investigations demonstrate
suitable soils and demonstrate that sufficient land is available to support both
a primary and secondary septic system site for each proposed Lot.
The plans must clearly show that no individual septic system area will be
located within the floodplain, wetland or wetland buffer.
City Comprehensive Wastewater Management Strategies: It is important to note that
the allowance of private individual on‐site septic systems for the Legends OP
development (no public sewer system) may economically prohibit the Sanctuary
subdivision to be able to connect to the municipal sewer system in the event of a
community system failure.
OP Concept Plan Review: Legends of Lake Elmo (Jan 25, 2016 Submittal)
Planning Commission Report; 2-22-16
Page 18
Storm water
/Grading:
(cont.)
Applicant Comments: The natural rolling nature of this site makes it easy to design storm
ponding and infiltration systems for the site. The final storm design will appear natural
in location and will provide a treatment train of ponding, swales and infiltration areas to
clean and lesson the impacts to the existing natural wetland features of the site.
The site plan is subject to a storm water management plan meeting State, VBWD
and City rules and regulations.
No proposed storm water management plan was provided as part of the Concept
Plans.
Storm water facilities proposed as part of the site plan to meet State and VBWD
permitting requirements must be constructed in accordance with the City
Engineering Design Standards Manual available on the City website.
The general drainage system should mimic the natural topography of the site in order
to ensure a drainage system that provides positive storm water drainage across the
development. Overland emergency overflows or outlets will be required as part of
the site plan.
Storm water pond facilities should be combined together to the greatest extent
possible to ensure adequate hydrology for efficient facility treatment operations.
The ultimate discharge rate and location will be an important consideration to avoid
negative impacts to downstream properties. The storm water management plan will
need to address changes to the downstream drainage system to the extent alterations
are proposed. To the extent adjacent properties are impacted, written permission
from those properties must be submitted as part of the development applications.
Per City requirements, all storm water facilities, infiltration basins, wetlands and
wetland buffers must be placed in Outlots deeded to the City for maintenance
purposes. The Stormwater Facility Outlots must fully incorporate the 100‐year
HWL, 10 foot maintenance bench and all maintenance access roads.
It is unclear from the concept plan if the proposed ponding and infiltration is on
Outlots that will be dedicated to the City. It is also unclear from the concept plan if
all weltands and required wetland buffers are located on Outlots. Future plan
submittals must address this information and requirements.
The plans must include the 100‐year HWL for all adjacent wetlands and water bodies
and must demonstrate that the 100‐year HWL does not encroach onto any proposed
Lot.
The plans must also demonstrate that the minimum floor elevations for each Lot are
in compliance with the VBWD rules providing a minimum 2‐foot separation from
any adjacent 100‐year HWL.
The storm sewer system shall be designed to maintain the City standard minimum
pipe cover of 3 feet. Drain tile is required as part of the City standard street section
at all localized low points in the street. Drain tile considerations may impact the
storm sewer design and depth requirements at low points.
Per City requirements all storm sewer pipe easements must be a minimum 30‐feet in
width.
OP Concept Plan Review: Legends of Lake Elmo (Jan 25, 2016 Submittal)
Planning Commission Report; 2-22-16
Page 19
Development
Phasing:
Applicant Comments: We are proposing to grade the entire project and install the
complete water main connection north to south. The roadway base and gravel is also
proposed to be completed with the first phase. The first phase of paving and home
construction is shown on the plans and the future residents of the Legends will access
from the north. The workers and deliveries for the construction of the proposed homes
will access only from 50th Street. The phasing of the project would then proceed from
north to south with home construction. A phasing map is shown on Page 2 of 4 of the
drawing set.
The Phasing plan indicates that the street pavement and home construction will
begin in the northeast adjacent to the Sanctuary subdivision and move south. The
developer proposes to control site access by requiring all construction traffic and
deliveries to access from 50th Street along gravel roads, with all home buyers and
new home owners accessing the site from Linden Avenue through the Sanctuary. It
is recommended that the Phasing plan be revised for all traffic to access from 50th
Street until all phases are completed. Managing traffic access for workers and
deliveries from 50th Street when a secondary paved access is available will be
difficult at best and will result in construction traffic accessing the site through the
Sanctuary.
Utilities:
Applicant Comments: The home sites are proposed to be served with City water and
private septic systems located on and off of the proposed lot areas. The majority of the
septic areas will be located on the lots due to the 1.0 acre size. The site has been
analyzed by a septic designer and has indicated that soils for the proposed lots are
adequate for on-site septic systems. The designer will work with us to provide the City a
final document with soil information and testing for the preliminary plat submission.
The open space areas of the project will also be made available to lots if the final design
requires grading of the entire lot for construction. These type of systems will only
require County approval and not State Approval.
The proposed water main system will help to create a looped water system, connecting
the 50th Street System to the St. Croix Sanctuary’s system, which will help to improve
water quality in the water main line and better flow for fire flow protection to this and
area developments. The connection points are shown on Page 1 of 4 of the drawing set.
All public utilities and facilities such as gas, electrical, sewer, and water supply
systems to be located in the flood plain district shall be flood-proofed in accordance
with the building code or elevated to above the regulatory flood protection elevation.
Telephone, electric, and/or gas service lines are to be placed underground in
accordance with the provisions of all applicable City ordinances.
OP Concept Plan Review: Legends of Lake Elmo (Jan 25, 2016 Submittal)
Planning Commission Report; 2-22-16
Page 20
Parking
Facilities:
Staff did not identify any parking issues for the proposed lots. On-site and on-street
parking opportunities should meet all needs within the development.
Required
Signage:
New street signs will be required at all intersections at the developer’s expense.
Entrance
Monument:
Designs and locations for entrance monuments off of 50th Street North and south of
Sanctuary should be identified as part of any future preliminary plan submittal.
Fire Hydrants: The applicant will be required to work with the City Engineer and Public Works to
identify the proper locations for future fire hydrants.
Streetlights: No streetlights are required as part of this development.
Monuments: In accordance with Section 400.14 Subd. 6; reference monuments shall be placed in
the subdivision as required by state law.
ENVIRONMENTAL & OTHER NEIGHBORHOOD IMPACTS:
Environmental
Impacts:
Staff does not foresee the need for an in-depth environmental analysis based on the
current proposal (i.e. EAW, EIS, AUAR, etc.)
Wetlands: The Valley Branch Watershed District (VBWD) is the Local Government Unit (LGU)
responsible for administering the Wetland Conservation Act (WCA). The developer
will need to follow all of the rules and regulations spelled out in the WCA, and acquire
the needed permit from the VBWD.
Review and comment by the Valley Branch Watershed District (VBWD) will be
needed with any future preliminary plat/plan application. The applicant is encouraged
to meet with the VBWD prior to any future submittal.
Shoreland
District:
While there are three public waters inventory wetlands in the area, there are no
waterbodies protected by the City’s shoreland overlay district within or near the
development site.
OP Concept Plan Review: Legends of Lake Elmo (Jan 25, 2016 Submittal)
Planning Commission Report; 2-22-16
Page 21
Erosion
Control:
The future grading plan should indicate proposed erosion control methodologies to be
utilized during the development process.
Silt fencing should be shown at the construction limits for the proposed houses or
driveways with the future building permit application.
Traffic: The proposed project will not significantly increase traffic volumes in the area to
justify a traffic study.
Flood Plain &
Steep Slopes:
According to the February 3, 2010 FEMA Flood Insurance Rate Map, the floodplain
around the wetland complexes near/within the development are undetermined (Zone
A).
The significant topography around the wetlands suggest that all proposed housing sites
will be outside of floodplains.
Docks: The project does not include any lakeshore or deeded access to lakes.
Other Permits: All necessary permits must be provided to the City. (VBWD, MPCA, NPDES, MDH)
CHARGES, FEES, & RESPONSIBILITIES:
In General: As always, the applicant is responsible for all fees related to the review of this
application (including but not limited to planning, legal, engineering, wetland,
environmental consultants, or other such experts as required by this application).
Park
Dedication:
Section 400.15 of City Code requires all subdivisions of land to dedicate a
reasonable portion of land to the City for public use as parks, trails, or open space.
The percentage for an OP development on RR zoned property is 7%.
110.01acres * 7% required dedication = 7.7 acres of land
The concept plan is currently not proposing dedication of any land for parks, but is
proposing 4,741 lineal feet (0.9 miles) of trail for public use. The applicants have
verbally indicated they would like to dedicate parkland, but would prefer direction on
the appropriate location for such.
Should this development move forward, the City will determine the fair market value
of the land by hiring a licensed appraiser (at the developer’s expense) prior to final
plat approval. The required cash-in-lieu of land payment shall be the fair market value
of the acreage not provided in land dedication less the cost of trail construction.
OP Concept Plan Review: Legends of Lake Elmo (Jan 25, 2016 Submittal)
Planning Commission Report; 2-22-16
Page 22
(cont.)
Staff is not recommending an expansion of the dedicated park land in Sanctuary for a
number or reasons:
– The existing parkland in Sanctuary is dismally located and acts far more as an
extended backyard for eight private residential lots than as a gathering/play place
for the public.
– Despite being public, the land and its equipment is largely hidden from the public:
it cannot be seen from any nearby road, and there is no sign on Lily Avenue North
to indicate a park is present.
– Access to the Park is difficult (especially for the handicapped) given the
topography leading to the park, and the fact that the asphalt path becomes a gravel
mess before turning into grass prior to actually reaching the groomed park land.
– Ignoring the Park’s major shortcomings in terms of location and accessibility, the
topography throughout the park parcel (from north to south) makes it largely
unusable for active uses except in the area where playground equipment has been
added. While topography, woods and wetlands are great feature within a private
park or in preserved open space, it is not ideal land for an active public park
(which this land is assigned to be).
In staff’s opinion, the only way overcome the existing poor design characteristics of
Sanctuary Park is to make the land both visible and easily accessible via adjacent
development. Unfortunately, topography between proposed Outlot B and the
existing Sanctuary Park is such that addressing either visibility or accessibility is
nearly impossible. The only apparent reason to expand the Sanctuary Park with land
in the Legends development would be to create a public sledding hill. If the City has
no interest in that type of facility, the City should be focusing on parkland elsewhere.
Sewer Charges: Not applicable.
Water Charges: Water service charges will consist of a $3,000 Water Availability Charge (WAC) per
REC unit plus $1,000 Water Connection Charge per REC unit. The number of REC
units will be as determined for SAC charges
Conclusion
The Planning Commission is asked to examine the proposed Concept Plan and provide
a recommendation of approval or denial for City Council consideration. Keep in mind
OP Concept Plan Review: Legends of Lake Elmo (Jan 25, 2016 Submittal)
Planning Commission Report; 2-22-16
Page 23
that an approval at this point simply allows the applicant to proceed to the preliminary
plan stage, and does NOT carry with it any assurances of future success or approvals.
Denial at this point will require the applicant to reassess the approach and return with a
revised concept plan.
Commission
Options:
The Planning Commission has the following options:
A) RECOMMEND APPROVAL of the requested Concept Plan and (some or all of
the) deviations from OP development standards based on the applicant's
submission, the contents of this report, public testimony and other evidence
available to the Council.
B) RECOMMEND DENIAL of the requested Concept Plan and deviations from
OP development standards based on the applicant's submission, the contents of
this report, public testimony and other evidence available to the Commission.
C) TABLE the request for further study.
Approval of
Deviations:
The following deviations from standard OP development must be approved by a 4/5
vote of City Council as a component of any motion for approval:
1) Lot Design/Configuration
The proposal includes lots within areas classified as prime farmland.
2) Buffers
Lots 4, 32 and 37 will all include buildable area within the required buffer.
The Commission is asked to provide separate recommendations on each of the proposed
deviations for Council consideration.
Review
Criteria:
Per code, the Planning Commission is to make a recommendation on this concept plan
which includes findings on the following:
A) The concept plan is consistent with the goals, objectives, and policies of the
Comprehensive Plan.
B) The concept plan is consistent with the purpose of open space preservation
development (i.e. to maintain the rural character of Lake Elmo by preserving
agricultural land, woodlands, corridors, and other significant natural features
OP Concept Plan Review: Legends of Lake Elmo (Jan 25, 2016 Submittal)
Planning Commission Report; 2-22-16
Page 24
while allowing residential development consistent with the goals and objectives of
the City’s Comprehensive Plan; and that protected open space will enhance and
preserve the natural character of the community and create distinct
neighborhoods).
C) The concept plan complies with the development standards required of OP
developments.
Staff
Guidance:
(cont.)
The review criteria for concept plans is very broad and subjective, so approval or denial
at this stage is less about compliance with code, and more about determining whether
the proposal is best for this property, best for the surrounding properties, and best for
the City as a whole. As such, staff is focusing our guidance on recommended
conditions should the Planning Commission and Council chose to approve the proposal.
Should the Planning Commission determine that a recommendation of
APPROVAL is appropriate, staff would recommend the following conditions
and/or guidance be directed at the applicant:
1) As part of any future preliminary plan application, the applicant shall:
(a) Articulate the details of the conservation easement that will be necessary to
protect the open space within the OP development;
(b) Work with staff to establish special setbacks for all lots that could
potentially allow construction within required buffer areas;
(c) Provide parkland as may have been directed by the City Council during
concept plan review;
(d) Provide for the needed east/west trail along 50th Street North;
(e) Provide detailed information on how the proposed public open space will be
managed and maintained into the future;
(f) Provide details of an HOA and outline its responsibilities for the
maintenance of open space and recreational facilities.
(g) Address all requirements of the City Engineer as listed in this report and the
Engineer’s memo on any future preliminary plan submittal.
(h) Address other issues as may have been identified either in the staff report or
at the public meetings to review the concept plan.
Should the Planning Commission determine that a recommendation of
DENIAL is appropriate, staff would recommend the following as potential
findings to support your conclusion:
OP Concept Plan Review: Legends of Lake Elmo (Jan 25, 2016 Submittal)
Planning Commission Report; 2-22-16
Page 25
1) The concept plan is not consistent with the purpose of open space preservation
development given the following:
(a) The plan does not strive to protect areas classified as prime farmland;
(b) The proposal does not include adequate buffers from surrounding OP or
future OP developments.
2) The concept plan was found to not enhance and preserve the natural character of
the community.
3) The concept plan was not approved given the requested deviations sought to OP
development standards.
PAGE 1 of 4
MEMORANDUM
Date: February 15, 2016
To: Stephen Wensman, Planning Director
Ben Gozola, Senior Planner, Sambatek
Re: Legends of Lake Elmo – OP Concept Plan Review
From: Jack Griffin, P.E., City Engineer
Engineering received a revised Concept Plan submittal on 01.25.2016 for the above referenced development proposal
consisting of the following exhibits/documentation prepared by Erickson Civil:
Concept Plans dated January 25, 2016, Sheets 1‐4.
Concept Narrative dated January 25, 2016.
The following engineering review comments are provided for your consideration.
All public improvements constructed to support the development must be designed and constructed in accordance with
the City Engineering Design Standards Manual available on the City website.
STREETS AND TRANSPORTATION
The Plat must dedicate sufficient R/W along 50th Street North to ensure 40 feet of R/W north of the existing
centerline of the road (a total of 80 foot R/W for collector roadway).
Right and left turn lanes must be incorporated along 50th Street per the City design standards to maintain safety
along the roadway. Right and left turn lanes shall be constructed at the developer’s expense.
The City’s Transportation Plan identifies 50th Street N. as a major east‐west collector roadway and Municipal State
Aid route. Traffic concerns and complaints have increased along 50th Street over the past few years and will
continue to increase as traffic volumes grow. There are two ways that the City can help manage and mitigate these
growing traffic issues:
Improve access management along the corridor when opportunities arise.
Improve pedestrian facilities along the corridor, at a minimum, completing the bituminous trail along the
north boulevard from Old TH 5 (CSAH 14) to Lake Elmo Avenue.
Access Management: The development access point along 50th Street meets the City’s Transportation Plan access
spacing guidelines for Collector Roadways (every 660 ft. to residential streets and commercial driveways) unless
the adjacent westerly property becomes commercial use.
The proposed access is 900 feet from Linden Trail to the east. Condition met.
The proposed access is 725 feet from Lily Avenue to the west. Condition met.
The proposed access is 450 feet from the adjacent farm driveway (Hecker property) to the west. Condition
not met if this becomes a commercial use property.
From a brief field review the proposed access to 50th Street N. appears to provide adequate sight distances
for safe ingress and egress.
FOCUS ENGINEERING, inc.
Cara Geheren, P.E. 651.300.4261
Jack Griffin, P.E. 651.300.4264
Ryan Stempski, P.E. 651.300.4267
Chad Isakson, P.E. 651.300.4283
PAGE 2 of 4
The development access road connection to 50th Street is properly located to balance the various conflict points,
however the following access management recommendations should be required to improve safety and access
management along the road corridor:
The existing farm (Hecker parcel) should be required to connect to the new roadway internal to the
development to eliminate the driveway access to 50th Street N, especially if this property becomes a
commercial use.
A new driveway for Lot 40 should be further reviewed as proper sight distances may not be available.
Consideration should be made to create shared driveways when possible.
Pedestrian facilities: A bituminous trail must be incorporated along the north boulevard of 50th Street N. to
improve pedestrian safety and work toward future trail connectivity. Segments of a bituminous trail currently
exist along 50th Street N. alternating from the north to south side of the road. As traffic continues to increase on
50th Street N. it is critical for the City to create a continuous bituminous trail along the north side of 50th Street,
from Old TH5 (CSAH 14) to Lake Elmo Avenue.
A residential street connection is required as shown to Linden Avenue in the Sanctuary subdivision.
A residential street stub is required as shown between lots 28 and 29 to extend to the westerly plat limits for
future connection. A temporary cul‐de‐sac must be provided. A trail should be extended along this road segment
for future trail connectivity.
The center roadway median at the cul‐de‐sac intersection for lots 2‐7 must be revised to allow two way
ingress/egress to the cul‐de‐sac.
All streets must be designed to meet the City’s Engineering Design Standards including R/W width, street width
and cul‐de‐sac radii. Street intersections must approximate 90 degrees and maintain 50 feet of tangent with
maximum slopes of 2.5%. Residential maximum longitudinal grade is 8% with no sidewalks, 6% where there are
sidewalks.
Parkway or divided roadways must be a minimum of 18 feet wide from back or curb to back of curb. The
development street plan indicates five segments with divided one‐way streets. The specific geometry of each
divided street area will require detailed review in the preliminary plat phase.
Ten (10) foot utility easements are required on either side of all right‐of‐ways.
MUNICIPAL WATER SUPPLY
Municipal water service is readily available in two locations. The applicant is responsible to extend municipal water
into the development to serve the proposed properties.
Two connection points to the existing City system will be required:
1) A connection to the existing 16‐inch watermain at Linden Avenue in the Sanctuary subdivision.
2) A connection to the existing 12‐inch watermain at 50th Street N.
A watermain lateral stub will be required to the westerly plat limits between lots 28 and 29.
No trunk watermain oversizing is anticipated for this development.
MUNICIPAL SANITARY SEWER / WATEWATER MANAGEMENT
The proposed development is located outside of the City designated Municipal Urban Service Area (MUSA) for
sanitary sewer service. The developer is proposing private individual on‐site septic systems for each Lot. Individual
on‐site septic systems are permitted by Washington County and must contain both a primary and secondary site
for each Lot. The Concept Narrative further proposes the use of open space for the placement of private individual
on‐site septic systems for some Lots.
The Open Space Ordinance does not allow private individual on‐site septic systems to be placed within open space
areas. Staff has concerns with this proposal because it will be difficult, both technically and from a legal access
right perspective, to ensure that these areas are protected and reserved specifically for use by each specific
property. Any plan approved for development with the use of private individual on‐site septic systems must
demonstrate that both a primary and secondary private individual on‐site septic system exits and is dedicated to
each Lot including septic tanks, service lines and drainfields.
PAGE 3 of 4
The Concept Plan does not detail the proposed wastewater management plan including the location of each
primary and secondary private individual on‐site septic system or the supporting percolation testing to verify the
existence of adequate supporting soils. Therefore, the Concept Plan approval must be contingent upon a
Preliminary Plat submittal that addresses a comprehensive wastewater management plan and all Lot locations
and sizes must be subject to revision as needed to accommodate a properly designed primary and secondary
private individual on‐site septic system.
Septic system sites must be placed where soil investigations demonstrate suitable soils and demonstrate
that sufficient land is available to support both a primary and secondary septic system site for each
proposed Lot.
The plans must clearly show that no individual septic system area will be located within the floodplain,
wetland or wetland buffer.
City Comprehensive Wastewater Management Strategies: It is important to note that the allowance of private
individual on‐site septic systems for the Legends OP development (no public sewer system) may economically
prohibit the Sanctuary subdivision to be able to connect to the municipal sewer system in the event of a
community system failure.
STORMWATER MANAGEMENT
The site plan is subject to a storm water management plan meeting State, VBWD and City rules and regulations.
No proposed storm water management plan was provided as part of the Concept Plans.
Storm water facilities proposed as part of the site plan to meet State and VBWD permitting requirements must be
constructed in accordance with the City Engineering Design Standards Manual available on the City website.
The general drainage system should mimic the natural topography of the site in order to ensure a drainage system
that provides positive storm water drainage across the development. Overland emergency overflows or outlets
will be required as part of the site plan.
Storm water pond facilities should be combined together to the greatest extent possible to ensure adequate
hydrology for efficient facility treatment operations.
The ultimate discharge rate and location will be an important consideration to avoid negative impacts to
downstream properties. The storm water management plan will need to address changes to the downstream
drainage system to the extent alterations are proposed. To the extent adjacent properties are impacted, written
permission from those properties must be submitted as part of the development applications.
Per City requirements, all storm water facilities, infiltration basins, wetlands and wetland buffers must be placed
in Outlots deeded to the City for maintenance purposes. The Stormwater Facility Outlots must fully incorporate
the 100‐year HWL, 10 foot maintenance bench and all maintenance access roads.
It is unclear from the concept plan if the proposed ponding and infiltration is on Outlots that will be dedicated to
the City. It is also unclear from the concept plan if all weltands and required wetland buffers are located on
Outlots. Future plan submittals must address this information and requirements.
The plans must include the 100‐year HWL for all adjacent wetlands and water bodies and must demonstrate that
the 100‐year HWL does not encroach onto any proposed Lot.
The plans must also demonstrate that the minimum floor elevations for each Lot are in compliance with the VBWD
rules providing a minimum 2‐foot separation from any adjacent 100‐year HWL.
The storm sewer system shall be designed to maintain the City standard minimum pipe cover of 3 feet. Drain tile
is required as part of the City standard street section at all localized low points in the street. Drain tile
considerations may impact the storm sewer design and depth requirements at low points.
Per City requirements all storm sewer pipe easements must be a minimum 30‐feet in width.
ADDITIONAL CONSIDERATIONS
The Phasing plan indicates that the street pavement and home construction will begin in the northeast adjacent
to the Sanctuary subdivision and move south. The developer proposes to control site access by requiring all
construction traffic and deliveries to access from 50th Street along gravel roads, with all home buyers and new
home owners accessing the site from Linden Avenue through the Sanctuary. It is recommended that the Phasing
PAGE 4 of 4
plan be revised for all traffic to access from 50th Street until all phases are completed. Managing traffic access for
workers and deliveries from 50th Street when a secondary paved access is available will be difficult at best and will
result in construction traffic accessing the site through the Sanctuary.