HomeMy WebLinkAboutPZ Packet; 02-27-17
3800 Laverne Avenue North
Lake Elmo, MN 55042
(651) 747-3900
www.lakeelmo.org
NOTICE OF MEETING
The City of Lake Elmo
Planning Commission will conduct a meeting on
Monday February 27, 2017 at 7:00 p.m.
AGENDA
1. Pledge of Allegiance
2. Approve Agenda
3. Approve Minutes
a. January 9, 2017
b. February 13, 2017
4. Public Hearings
a.
5. Business Items
a. Zoning Text Amendment -Village Low Density Residential Zoning: The
Planning Commission will discuss a draft for the V-LDR Zoning.
b. Zoning Text Amendment – Planned Unit Development Zoning: The Planning
Commission will discuss a draft for Planned Unit Development Zoning.
c. Solar Ordinance Discussion: The Planning Commission will discuss a draft
ordinance for Solar.
6. Updates
a. City Council Updates – February 21, 2017
i. OP-ALT Zoning District Repeal - passed
ii. Shoreland Management Overlay Ordinance Amendment – failed and
tabled to next meeting
iii. ZMA and CUP for 3549 Lake Elmo Ave - passed
b. Staff Updates
i. Upcoming Meetings:
March 13, 2017
March 27, 2017
ii. MAC CEP Report
c. Commission Concerns
7. Adjourn
***Note: Every effort will be made to accommodate person or persons that need special considerations to attend this
meeting due to a health condition or disability. Please contact the Lake Elmo City Clerk if you are in need of special
accommodations.
Lake Elmo Planning Commission Minutes; 1-9-17
City of Lake Elmo
Planning Commission Meeting
Minutes of January 9, 2017
Chairman Kreimer called to order the meeting of the Lake Elmo Planning Commission at
7:00 p.m.
COMMISSIONERS PRESENT: Kreimer, Griffin, Dodson, Williams, Larson, and Lundquist
COMMISSIONERS ABSENT: Haggard, Fields and Dorschner
STAFF PRESENT: Planning Director Wensman, City Planner Becker & City Administrator
Handt
Approve Agenda:
M/S/P: Dodson/Lundquist, move to approve the agenda as amended, Vote: 6-0, motion
carried.
Election of Officers:
M/S/P: Williams/Dodson, move to elect Tom Kreimer for Chair, Vote: 6-0, motion
carried unanimously.
M/S/P: Lundquist/Griffin, move to elect Todd Williams for Vice Chair, Vote: 6-0, motion
carried unanimously.
M/S/P: Dodson/Griffin, move to elect Rolf Larson for Secretary, Vote: 6-0, motion
carried unanimously.
Approve Minutes: December 12, 2016
M/S/P: Williams/Griffin, move to approve the December 12, 2016 minutes as presented,
Vote: 6-0, motion carried unanimously.
Public Hearing – Zoning Map Amendment and Minor Subdivision– rezone the property
at 3880 Laverne Ave
Becker started her presentation regarding the Zoning Map Amendment and Minor
Subdivision. The Zoning Map amendment is requested to rezone from GB to VMX. This
land is guided for VMX in the Comprehensive Plan, which has not minimum lot size for
non-residential. The subdivision will create three separate parcels.
2
Lake Elmo Planning Commission Minutes; 1-9-17
This property does qualify for an exception to platting as it is not creating more than
four parcels. There is a cash contribution for park land dedication of $5,220 required.
GB requires 1.5 acres per parcel, so if this is not rezoned, those 2 lots cannot be created.
Some engineering comments are that they are recommending a combined driveway
access for Parcel A & B. There is also a need for a number of easements. There were
more engineering comments regarding sewer & water and stormwater.
The zoning map amendment is consistent with the Comprehensive plan. Staff is
recommending 13 conditions of approval.
Dodson asked if the City Engineer considered access of parcel B to Laverne Ave. Becker
stated that the City Engineer did not look at that. The condition could be changed to
state reviewed by the City Engineer.
Williams is wondering why the condition doesn’t require shared parking vs. just
encouraging it. Becker stated that there might be circumstances where that might not
work.
Tim Freeman, represents Zignego, the idea of sharing parking is something that they are
interested in. He talked about suburban type zero setbacks for the VMX district. He
thinks making a condition of approval for the building setback and combined parking,
limits things for this approval and could be dealt with when a project comes forward.
Freeman feels that the parkland dedication has already been paid for this area by the
acre. He feels replatting this property does not add any acreage, it just further
subdivides it. Instead of having that be a condition of approval, he would like to see
something like this will be reviewed a little further with the City Attorney.
Dodson asked the developer what the motivation of subdividing the lots is vs. just
adding buildings to the existing lot. Freeman stated that the new lots would most likely
have different ownership. Dodson stated that when property subdivides, Parkland
dedication is paid. Freeman stated that the fee was already paid on all of the acreage.
Wensman stated that the City Attorney has already reviewed this. There was debate
about collecting it on 2 lots or 3. The discovery of the previously paid fee, limited it just
to the 2 newly created lots. The City Attorney is the one that recommended it as a
condition of approval.
Public Hearing opened at 7:30 pm
No one spoke and there were no written comments
Public Hearing closed at 7:31 pm
3
Lake Elmo Planning Commission Minutes; 1-9-17
Williams agrees that there is a conflict of the VMX zoning and the required utility
easement. This area needs to be looked at for if it should be a parkway or something
else. He is interested in removing number 7 as a condition of this project approval.
Wensman would recommend changing the wording of condition #8 to read if there is an
access to 39th street, that it be a shared driveway. Williams is wondering if it would be
better to say that there will be only one access permitted to 39th Street for those 2 lots.
Williams would like condition 9 to state that the City will work with the owners of
Brookfield II building to analyze parking needs with the possibility of shared parking with
Brookfield II building and submit their findings to the City within 60 days of approval.
Wensman stated that there are no building plans yet and they should be required to
submit that with the site plan review. Dodson’s concern is that the building plans will
not come at the same time.
Williams is wondering if something should be included in the findings that it would be
desirable for the existing Brookfield parking to be shared with the new development.
That way it is not a condition of approval, but makes it should desirable.
M/S/P: Dodson/Williams, move to recommend approval of the zoning Map amendment
to rezone the property located at 3880 Laverne Ave to Village Mixed Use, Vote: 6-0,
motion carried unanimously.
M/S/P: Dodson/Lundquist, move to recommend approval of the Minor Subdivision
request for the property located at 3880 Laverne Ave, subject to the 11 outlined
conditions of approval as amended and based on the amended findings, Vote:6-0,
motion carried unanimously.
Public Hearing – Comprehensive Plan Amendment – to create a new land use
designation called “Golf Course Community” with updated maps and figures
Wensman started his presentation regarding the Comprehensive plan amendment for
the former Tartan Park property. There would be 5 changes to the comprehensive land
use plan. 1) A new land use category called “Golf Course Community” 2) updated
density of 1.5-2.49 3) updated planned land use map 4) “Preservation of Community
Amenities” will be added which describes the need for “Golf Course Community” land
use 5) updated map to reflect the changes to the MUSA.
The City has broad discretion when reguiding property. The Golf Course Community
specifically ties the residential development to the golf course and cannot be
redeveloped if the golf course is eliminated. The Royal Golf development will be a PUD
and if an amendment was requested to eliminate the golf course, it would be
inconsistent with the Comprehensive Plan and would be denied.
4
Lake Elmo Planning Commission Minutes; 1-9-17
There are 4 changes to the Comprehensive wastewater management plan 1) reference
made to the Golf Course Community on former Tartan Park property 2) Community
Forecast for areas served by regional sewer service (REC Units) was updated to reflect
the addition of Royal Golf development 3) Table 6B updated to reflect the increased
sewer flows by the addition of Royal Golf Course Development 4) Maps were updated to
reflect changes in the MUSA to accommodate the Royal Golf development.
Staff is recommending not guiding the Emerson property to Golf Course Community at
this time because 1) net density is .46 if platted alone, less than 1.5 min 2) if platted
with Royal Golf, net density would be 1.43, brings the average d.u.a. to lower than 1.5
3) not ready to plat at this time 4) Brings MUSA average from 3.7 with RG to 3.3 d.u.a.
A letter was received from the Homestead Homeowners Assoc which asked for less
density and greater buffers.
An email was received from Mike Tate giving support for the Golf Course Community.
Dodson stated that he is still concerned about the road access to 10 th Street. Wensman
stated that he is under the impression that there is an agreement with Mr. Emerson for
the road access.
Williams stated that on page III-13, the changes in blue do not incorporate the changes
that the Planning Commission recommended at their meeting on December 12, 2016.
He is wondering if this property was developed as an OP development, could the Golf
Course be included as the open space. Wensman stated that would be a possibility, but
there would be no urban services. The Shoreland ordinance requires urban services, so
there is a conflict in the codes.
Clark Schroeder, Royal Golf, stated that the road going through the Emerson property is
an absolute according to the City Engineer for Cul-de-Sac length and for the gravity
system going through there. The city will own a lift station on the Emerson property
with an easement through that property.
Public Hearing opened at 8:06 pm
Terry Emerson, 2204 Legion Lane Circle N, he is not interested in being with the Golf
Course Community, but he would like to see the MUSA line include his property because
he believes the sewer should be along the lake and that is what the Shoreland
Ordinance calls for. He doesn’t see any ordinance that his property would fit under.
Emerson stated that this is a 28 acre piece of property and he is looking to put in about
13 lots with sewer and water.
5
Lake Elmo Planning Commission Minutes; 1-9-17
Philip Simonet, 11125 14th Street, he feels the density is way too high and is inconsistent
with the mission statement of Lake Elmo. He would like to see some restrictive
covenants for the golf course not being redeveloped. He feels that the setbacks should
be much more substantial.
Shelli Wilk, 11253 14th Street, she is pleased that the City is looking at Golf Course
Community instead of the Village Transition. However, she has a petition signed by over
160 residents asking for Rural Area Development on this property. This is more in line
with what is in the current Comprehensive Plan. She would like to see lower densities
to protect the natural resources in this area which is more in line with the DNR
recommendations.
Ann Bucheck, 2301 Legion Ave, she feels that this comprehensive plan is tailored to one
property and might even be considered spot zoning. She doesn’t believe that Tartan
Park is a City Amenity, but was a private amenity. She also feels that there should be a
conservation easement on the open space. The city decided that the sewer would be
kept south of 10th Street and in the Village Area. What has changed? Why are we giving
up the low density that was supposed to be north of 10th Street? She feels that this
property could easily be developed in an OP development. The Shoreland Ordinance
does not require that a development be sewered.
Michael Zwiefel, 2055 Manning, the developer purchased this property as a golf course.
There was no guarantee that anything else would be allowed there when the property
was purchased. If the City is going to accommodate residential, he is still confused on
why anything other than what is around the rest of the area would be allowed.
Stacey Stoffregen, 2390 Legion Lane, she is concerned about the safety of 20th Street for
biking and pedestrians. It is already congested and will get increasingly so with
additional housing.
Tim Mandel, 2479 Lisbon Ave, he feels that when comprehensive Plan changes are
made, it affects a lot of people. He feels that it is an important document that should
not change frequently. This Golf Course will be doing a lot of things such as the fitness
center to make money. These are all things that people have to get to, which will
create a lot of traffic.
Public Hearing closed at 8:30 pm
Williams is concerned that there is no significant guarantee that the golf course will
remain. He is concerned that double the houses could be put in. The DNR and PCA
consider community septic as legitimate public sewer. He is interested in having this OP
density served with a community septic with the golf course being in a conservation
easement.
6
Lake Elmo Planning Commission Minutes; 1-9-17
Wensman stated that the DNR states that municipal sewer is required if available. Our
ordinance currently requires it. That ordinance is under discussion later on this agenda.
Lundquist stated that she feels it should be sewered because of the Shoreland. Her
concern is to ensure the open space. She is also concerned about the setback. She feels
it should be much greater. She is concerned about 20th Street. It is already unsafe and
with more traffic, it will be even worse.
Dodson is concerned about preserving the golf course for open space. His concern with
using the open space ordinance is that it cannot have municipal sewer. He is not a fan
of community septic. He is also concerned that if the Emerson property is not included
in the MUSA tonight, he will have a difficult time getting it put in at a future date.
Wensman stated that if we went down to a minimum density of .46, this would bring us
below the 3.00 required by the Met Council and this Comprehensive Plan would not be
approved.
Williams stated that we do not need more sewered development to meet Met Council
guidelines. Until 2011, it was not public and was not an asset of the City and we need to
stop referring to it as something that needs to be preserved.
M/S/W: Williams/Dodson, move to postpone consideration of the Comprehensive Plan
Amendment until we receive an analysis of the West metro golf course case from the
City Attorney, Motion was withdrawn.
Larson wants people to recognize that this is a good development. There are some
negatives, that have room for discussion, but this is a very unique and historic golf
course.
Administrator Handt stated that she did receive a memo from the City Attorney today.
The court concluded that the deciding factor was whether th e denial of the
Comprehensive Plan Amendment leaves the property owner with any reasonable use.
If there is a less dense development that is economically viable, the court could make a
different decision. Williams is still concerned that once this property develops with the
golf course, at some future date when the golf course is no longer viable, a developer
will come forward to redevelop the golf course and the City will have no alternative but
to allow housing there as a park or open space at that tim e is not a reasonable use. The
only way to protect against that is to put it in a conservation easement.
Lundquist asked how much of the land is required to remain open with the Shoreland
Ordinance. Wensman stated that a minimum of 50% of the Shorela nd area needs to
remain open. Most of the golf course is not in Shoreland.
Kreimer asked about developments on golf courses in other communities. He is
wondering if when people buy these homes if they are just risking that it will always
7
Lake Elmo Planning Commission Minutes; 1-9-17
remain a golf course. Williams stated that the significant thing here is that the City is
extending sewer and having more density.
Sheila Smith, 2121 Legion Lane, residents that surround the golf course are already in
this situation. They bought their homes believing that Tartan Park would always be
there and they are finding out that is not the case. She is concerned about the density
with or without the future of the golf course. If the golf course fails, it will be even more
dense.
Clark Schroeder, Royal Golf Course, if you have a private golf course, everyone in the
development would own part of the golf course and it would be run by the HOA and
there are requirements for all of the homeowners. They do not feel that is a viable
business model. They feel that for the golf course to be successful, it would need to be
debt free and they need the density they are proposing for that to happen.
Williams would like something put in where it talks about the preservation of the golf
course that it state some kind of a period of time. They had previously talked about a 25
year guarantee. Wensman stated that it seems unenforceable. Williams stated that
they could put it in and the City Council could take it out after talking to the city
attorney. Dodson stated that he would strike that whole sentence.
M/S/P: Williams /Dodson, move to recommend adding to page III-3 one expansive open
space that does not share the same certainty of continuance , Vote: 6-0, motion carried
unanimously.
M/S/P: Williams /Lundquist, move to make the following changes: change the words
“destination within the community” to an “expansive open space” that is worth saving if
at all possible. At the end of the paragraph, delete “amenity rather than develop the
land as a standard OP rural development”, Vote: 6-0, motion carried unanimously.
Kreimer asked if these additional 292 units can be used to reduce the number of
required units south of 10th or in the Village Area. Wensman stated that anything that is
already in the MUSA has to remain at a minimum of 3. We need to stay pretty much at
what we already have to meet the 3 tiers of the Comprehensive plan such as
affordability in the Comprehensive Plan.
Williams stated that there is a practical limit to what we can lower the density to. He
doesn’t think that they can go any lower if they want to have sewer there. Dodson
stated that alternate uses for that property could be an open space development or
rural residential or residential estates. Dodson is leaning towards residential estates vs.
golf course community because there is too much uncertainty around the golf course.
Williams asked Dodson for clarification if he would rather have this property rezoned
residential estates rather than having a golf course. Dodson stated that he would.
Williams stated that we don’t need a golf course in Lake Elmo as there are many golf
8
Lake Elmo Planning Commission Minutes; 1-9-17
courses within driving distance. Williams likes the idea of residential estates. Lundquist
stated that this property was sold by one private property to another. Her concern is
that the City needs to be accountable for protecting the Community and upholding our
standards, but also recognizing the rights of the property owner. She is uncomfortable
with the conversation of rezoning it to residential estates. Williams stated that at the
Comprehensive Plan level, they would be talking about zoning it as rural development
which would include AG, RR and RE. The City has the most discretion at the
Comprehensive Plan level as long as it is a reasonable use of the land.
Handt stated that she would encourage them to either approve this or deny this tonight.
The whole reason that this is back is that what is talked about needs to be advertised.
They do not have to go into the details of if they do not do the golf course community,
what would they like it to be at this time. They can either approve this Comprehensive
Plan Amendment, or start developing findings for denial.
Kreimer asked if the City Council asked them to start developing standards for the Golf
Course Community. Handt stated that they did. There was interest from the Council in
the Golf Course Community and the Council asked that the Public Hearing be held to
talk about it. Williams stated that he was told by at least one member of the City
Council to be sure and tell the City Council what the Planning Commission wants, not
what they think the City Council wants.
Wensman stated that if the Planning Commission wants to go with a different land use
designation, they would have to deny this application. The City would then have to
advertise and hold a public hearing for a different land use designation.
Dodson stated that he takes into consideration private property rights of one property
and weighs it against the property rights of the surrounding neighbors. Those 2 are
sometimes in conflict with one another.
M/S/: Williams/Dodson, move to recommend denial of the comprehensive plan
amendment proposal to create a new land use designation called “Golf Course
Community” with the following findings 1) we do not need any more sewered units 2)
the current Comprehensive Plan reflects the overwhelming desire of Lake Elmo
residents to limit residential growth and sewered growth 3) one of Lake Elmo’s core
values is to preserve rural character 4) sewered development north of 10 th street does
not preserve the rural character 5) there is a significant but unknown level of risk that
the golf course would be redeveloped into more housing in the future 6) there are a
significant amount of Lake Elmo residents that live in the area that object to the project
based on density that would come with the sewer, Vote: 3-3, motion did not pass, with
Lundquist, Larson and Kreimer voting against.
Kreimer is not in favor of denying the proposal. He feels this development has a lot to
offer and that the developer has done a lot to make this a very nice development. He is
9
Lake Elmo Planning Commission Minutes; 1-9-17
concerned about what else this could be if this is denied. Larson agrees that it would be
unfortunate if they let this development go. He doesn’t think anything this good will
come forward in the future.
Williams asked Kreimer for clarification of what he thinks the good aspects of the
development are. Kreimer stated that he thinks the types of houses vs the types of
houses in some of the other developments we have are much more quality. He feels
they are high value homes that will make a beautiful neighborhood which would be a
great asset to the City. Larson thinks the connectivity and the ablility to have access to
all the landscapes of the golf course and environmental features that will be connected
by trail system.
M/S/: Kreimer/Lundquist, move to recommend approval of the comprehensive plan
amendment proposal to create a new land use designation called “Golf Course
Community”, with the amendments as discussed in the 2 previous motions, with the
following findings 1) golf course community would protect a regional amenity that the
City wishes to maintain 2) the sewered development would protect the Shoreland from
pollution 3) the densities would support an efficient level for municipal sewer 4) the
golf course is another form of open space 5) there are a significant of residents around
the property that object to the density and subsequent traffic increase, Vote: 3-3,
motion did not pass, with Griffin, Williams and Dodson voting against.
Dodson is concerned with the thought process of relying on the fact that this developer
is a quality developer. Things can change and that doesn’t always maintain throughout
the development.
M/S/F: Williams/Dodson, move to recommend to the City Council that this land be
guided for rural development with a preference for residential estates zoning, Vote: 2-4,
motion failed.
Rick Packer, Royal Golf, stated that they have initiated the process to reguide this
property. The Planning Commission has chosen not to give a recommendation to the
City Council. He doesn’t understand why the City has a burning desire to guide this
property rural development. He is not sure why the City would want to guide this
property for something that they are not asking for.
Williams is not in favor of extending sewer north of 10th Street. He is in favor of a
property owner having a reasonable use of his land. In Lake Elmo, north of 10 th Street,
excluding the Village Area, a reasonable use of property is rural residential
development. Packer stated that if the motion fails, to do anything with this property,
they would need to come back in and ask to have the land reguided to something else.
Williams stated that the motion on the floor asks the City Council to guide the property
as rural development without any further initiation from the property owner.
10
Lake Elmo Planning Commission Minutes; 1-9-17
Kreimer is not in favor of the motion. He thinks they should just wait for the
Comprehensive Plan Amendment process and see what the Council comes back with.
Larson is in agreement with that. Williams stated that in defense of the motion, it is
reasonable to give the City Council an alternative since there was not a specific
recommendation one way or another on the request that was b efore them.
Public Hearing – Zoning Text Amendment to create “Golf Course Community” Zoning.
Becker started her presentation of the ZTA for the Golf Course Community Zoning
District. This is a rough draft of what a golf course community would look like as a land
use plan. Becker went through the uses that would be allowed in GCC either as
permitted or conditional uses. The density for residential would be 1.5 -2.49 units per
acre. Becker went through the minimum lot size and setbacks and compari sons to LDR
zoning and why staff is recommending these. The recommended open space is
something that they need to discuss. Staff is recommending 50% of the gross acreage
be dedicated to either a golf course, its accessory uses or as open space. There would
be a 100 foot buffer required from external residential lots within the City. The buffer
area shall be part of the required 50% open space. This buffer may be reduced by the
council if there is a visual buffer provided. There must be connectivity and adequate
street design to support the proposed uses. There are a number of site development
standards set forth for allowed and conditional uses, in addition to the ones already
established in the City Code. Staff also is proposing to add semi-transient
accommodations at the request of Royal Golf. If this use is added, there would be
standards specific to Golf Course Community. The only comment that the City has
received from the public hearing notice is to include more standards for indoor
recreational facility.
Dodson asked if the semi-transient accommodations would be considered commercial.
Wensman stated that would probably be used for the owners or relatives of residents
who live in the community.
Williams thinks that on page 14 of proposed zoning code (O) (4), regarding street
designs can be struck as they are required to meet current street standards anyway.
Clark Schroeder, Royal Golf Course, stated that the concept of the cottages is something
they have not fully vetted out, but is still in the idea stage. Schroeder stated that the
buffers are currently very similar to the OP buffer setbacks. Dodson is wondering why
the City would deal with the cottage issue now if it is just a concept and not at a future
date so they can really think about what conditions might be necessary. Wensman
stated that they would not have to approve this tonight. They noticed th e public
hearing for tonight, but it could come back at a future date.
Public Hearing opened at 10:35 pm
11
Lake Elmo Planning Commission Minutes; 1-9-17
Ann Bucheck, 2301 Legion Ave, she hopes that the public hearing is extended as this is
the first time that they are hearing about some of these thi ngs. She feels that adding 4
more cottages increases the density again. She doesn’t think the cottages are necessary
on site which is more like a B & B. There a lot of places to stay in the area and she does
not feel these are necessary at the golf course. She does not feel the minimum lot size
should be reduced from the 20,000 square feet. She feels this area does not need the
substantial traffic indicated with the recreational use. She does not want to see any
exterior secondary dwellings as they are not appropriate for this development. There is
a standard of a 100 foot buffer. She would argue to make it bigger vs. smaller. She
would like the public hearing extended as new things have been brought up and the
public has not had a chance to look at them completely.
Tim Mandel, 2479 Lisbon Ave, he is wondering if they can issue a conditional use permit
for anything they want on this property. This is not a commercially zoned property, and
these cottages would be “commercial”. He does not want to see a lot of these more
“commercial” things put in as if the golf course fails, those buildings will be used for
other things.
Public Hearing closed at 10:42 pm
Dodson would like to change the lower end of the density from 1.5 to .9 to allow for the
lowest density possible. Kreimer is concerned about that because of what it will do to
the other areas to keep minimums for the Met Council.
Williams is concerned about the secondary dwelling. He is fine if it is inside the
dwelling, but he is not in favor of having additional structures on the properties. If this
is specific to Golf Course Community, he would like the definitions and standards for
secondary dwelling to read a residential unit located within the principle structure or
above an attached garage. Becker stated that this is a definition for this use for
anywhere that this is allowed, not just for Golf Course Community.
M/S/P: Williams/Dodson, motion to have a definition for secondary dwelling specific to
Golf Course Community that reads a residential secondary dwelling unit is located
within the principle structure or above an attached garage, Vote: 5-0, motion carried
unanimously.
M/S/P: Williams/Kriemer, motion to add letter Q on page 15 to add indoor recreation
Golf Course Community district this a conditional use only if it is owned and operated by
the same entity that owns and operates the golf course or CIC. This is not allowed as a
free standing commercial operation open to the public, Vote: 5-0, motion carried
unanimously.
12
Lake Elmo Planning Commission Minutes; 1-9-17
M/S/P: Williams/Dodson, motion to change Item (O) (3) connectivity on page 14 to read
“Trails, walkways and paths must make planned connections to planned external trails
and walkways and paths within the community, Vote: 5-0, motion carried unanimously.
M/S/P: Dodson/, motion to delete Item (O) (4) on page 14 regarding street design,
Vote: 5-0, motion carried unanimously.
M/S/P: Dodson/, motion to delete Item (O) (4) on page 14 regarding street design,
Vote: 5-0, motion carried unanimously.
M/S/P: Williams/Dodson, move to require that the restaurant and drinking
establishments must be in the same structure as the clubhouse and golf shop, Vote: 5-0,
motion carried unanimously.
M/S/P: Dodson/Williams, move to require the clubhouse follow the city’s commercial
design guidelines and standards manual for Lake Elmo, Vote: 5-0, motion carried
unanimously.
Williams is not in favor of including the semi-transient accommodations without further
definition. Kreimer stated that he doesn’t feel that they need to do that now.
Wensman stated that this would be the time to include it and get the definition set,
otherwise they will need to do a zoning text amendment in the future. Handt suggested
that they could table this to the next meeting which would give staff time to draft the
standards.
There was discussion regarding the 9000 square feet minimum lot size and how that
number was arrived at.
M/S/P: Williams/Kreimer, move to table the addition of a Golf Course Community
Zoning District to the Zoning Code until standards are received for the semi -transient
accommodations, Vote: 5-0, motion carried unanimously.
Public Hearing – Zoning Text Amendment amending the City’s Shoreland Management
Overlay District
Becker started the presentation with some history regarding the Shoreland Ordinance.
In 2014, a Shoreland ordinance was drafted that was modeled after Woodbury’s. It was
submitted to the DNR, but the DNR did not approve it. In 2016, staff started workin g to
make amendments to submit to the DNR. Definitions were removed, 4 water bodies
were removed, Berschen’s Pond was added, and the language for water oriented
accessory structures was kept. The DNR suggested that the City include a Forest Land
Conversion as a conditional use with standards. They also suggested deleting the
riparian dedication, changed the setbacks and impervious standards. Standards are
13
Lake Elmo Planning Commission Minutes; 1-9-17
addressed for lots intended as controlled access to public waters, restrictions on roads,
driveways and parking areas and subdivision standards. There is a nonconformities
section and a more detailed list for the planned unit development section. The
proposed ordinance for a PUD maps out what the open space can and cannot be.
There were 2 public comments received. One comment was asking for an increase to
setbacks for sewered development on Natural Environment Lakes from 100 ft. to 150 ft.
The second comment is requesting that Goetschel pond not be removed.
Dodson asked if community septic is considered sewered or unsewered. Becker stated
that by City standards it would be considered unsewered. The DNR might have a
different standard.
Dodson stated that the proposal states that when municipal sewer is not available, a
community septic is required. Is there a minimum number of lots for that? Becker
stated that by City PUD standards, a minimum of 5 acres is required and they would
have to adhere to the minimum base standards of the district.
Williams would like the wording regarding the requirement for 50% open space more
clear to say only in the shoreland area vs. the total project area.
Public Hearing opened at 11:39 pm
Ann Bucheck, 2301 Legion Ave, she is wondering how much of the shoreland area has to
be open space. Becker stated that they spoke to the DNR and they stated that it does
not mean the open space needs to be in the shoreland area and that it can transfer to
anywhere in the project area. She is wondering if it is requiring city sewer. Becker
stated that with a PUD, when city sewer is not available, a community septic is allowed.
Terry Emerson, 2204 Legion Lane Circle N, went through a few of the water bodies on
the list and a number of them would not meet the ordinance. He thinks there will be a
lot of issues with the current homes on the lakes that do not meet the code and are
going to be coming in for variances. He feels that changing the building setback from
100 to 150 feet is a little excessive as compared to the lakes that are already developed.
Public Hearing closed at 11:56 pm
M/S/P: Williams/Kreimer, move to recommend keeping Goetschel Pond in the
Shoreland classification table, Vote: 5-0, motion carried unanimously.
M/S/P: Williams/Kreimer, move to recommend clarifying the open space requirements
for PUD: open space must constitute at least 50% of the total project area within the
Shoreland, Vote: 5-0, motion carried unanimously.
14
Lake Elmo Planning Commission Minutes; 1-9-17
M/S/P: Williams/Kreimer, move to recommend approval of Ord. 08- . amending section
154.800: Shoreland Management Overlay District of the Zoning Code, Vote: 5-0, motion
carried unanimously.
City Council Updates – December 20, 2016 Meeting
i) Boulder Ponds 2nd addition Final Plat and PUD extension – passed.
ii) Village Area AUAR – passed.
iii) Diedrich Property zoning map amendment – passed.
iv) Comprehensive Plan to meet population targets and growth plans –
forwarded to Planning Commission.
v) Moratorium ordinance – repealed.
vi) Low impact development standards – referred to Planning Commission.
vii) Noise Ordinance – failed.
City Council Updates – January 3, 2017 Meeting
i) Hammes Estates 2nd Addition Final Plat – passed.
ii) Planning Commission appointments of Gary Fields and Dale Dorschner.
1. Upcoming Meetings
a. January 23, 2017
b. February 13, 2017
Commission Concerns
Meeting adjourned at 12:30 pm
Respectfully submitted,
Joan Ziertman
Planning Program Assistant
Lake Elmo Planning Commission Minutes; 2-13-17
City of Lake Elmo
Planning Commission Meeting
Minutes of February 13, 2017
Chairman Kreimer called to order the meeting of the Lake Elmo Planning Commission at
7:00 p.m.
COMMISSIONERS PRESENT: Kreimer, Dodson, Dorschner, Williams, Lundquist and
Hartley
COMMISSIONERS ABSENT: Fields, and Larson
STAFF PRESENT: Planning Director Wensman
Approve Agenda:
M/S/P: Williams/Dodson, move to approve the agenda as amended, adding picking a
member of the Planning Commission to be on the Comprehensive Plan Advisory Board
as item 5b, Vote: 6-0, motion carried, unanimously.
Approve Minutes: January 9, 2017
M/S/P: Williams/Lundquist, move to approve the January 9, 2017 minutes as amended,
Vote: 6-0, motion carried unanimously.
Approve Minutes: January 23, 2017
M/S/P: Dodson/Dorschner, move to postpone consideration of the January 23, 2017
minutes until the next meeting, Vote: 6-0, motion carried unanimously.
Public Hearing – Zoning Text Amendment and Conditional Use Permit – 3549 Lake
Elmo Ave
Wensman started his presentation for the Zoning Map Amendment and CUP for 3549
Lake Elmo Ave. Christ Lutheran Church owns this property and now has a buyer for the
property. The Church would like to separate part of the parking lot and keep that
portion of the property. In 2013 the Church had approval for a variance and lot split.
They did not proceed with the lot split as they did not have a buyer for the bank
building. The variance is now expired, as they are only good for 1 year. This property is
currently guided Village Mixed Use. Wensman stated that a variance is not the way to
go forward at this point. It would be more appropriate to rezone the property to Village
Mixed Use. There is no minimum lot size in this district which would allow the property
owner to subdivide. A parking lot is a conditional use in this zoning district.
2
Lake Elmo Planning Commission Minutes; 2-13-17
The City is suggesting 3 conditions of approval. 1) that there be a shared parking
agreement between the church and new property owner 2) a drainage easement be
provided along the storm water infiltration area that collects storm water runoff from
both parcels 3) a formalized document for a drainage and utility easement for the storm
sewer pipe reinstalled as part of downtown project executed and recorded.
Williams asked if the minor lot split was administrative. Wensman stated that it is
administrative, but cannot be done until the property is rezoned to Village Mixed Use.
(statement corrected on page 4)
Dorschner asked why the City would ask for the shared parking agreement i f VMX does
not have required parking. Wensman stated that it is to ensure that both users will
have access to that parking lot. Dorschner stated that he thinks that should just be a
private agreement between property owners and not a condition of approval.
Wensman stated that was a condition for the variance and they just brought it forward,
but the Planning Commission can remove if they desire. Dorschner is wondering if the
drainage and utility easement is the same thing. Wensman stated that it is 2 d ifferent
things. One is for the pipe and one is for the shared drainage area in the parking lot.
Hartley asked if either property is sold, will they have to come back to the City to change
the use on the property. Wensman stated that if it is a conditional use, it would have to
come back through the process. If it is a permitted use, it would be a certificate of
zoning compliance and the staff would review it for compliance administratively.
Jim Kelly, for Christ Lutheran Church, stated the Church pu rchased this property
primarily for use of the parking lot, but they have also maintained the building and have
rented it in the past. They are ready to sell the building and get it back on the tax rolls.
M/S/P: Williams/Dodson, move to hold the 2 public hearings simultaneous for the
Zoning Map Amendment and CUP, Vote: 6-0, motion carried unanimously.
Public Hearing opened at 7:21 pm
No one spoke and there were no written comments
Public Hearing closed at 7:22 pm
M/S/P: Lundquist/Williams, move to recommend approval of the zoning map
amendment to rezone the property located at 3549 Lake Elmo Avenue from GB –
General Business to VMX – Village Mixed Use, Vote: 6-0, motion carried unanimously.
M/S/P: Williams/Lundquist, move to recommend approval of a Conditional Use Permit
for a parking facility on the property legally describes as “Lot 29 except the south 40 feet
thereof, County Auditor’s Plat No. 8, Washington County, MN” with the findings and
recommended conditions of approval, Vote: 6-0, motion carried unanimously.
3
Lake Elmo Planning Commission Minutes; 2-13-17
M//P: Dorschner/, move to make an amendment to remove condition #2, requiring an
easement for shared parking, Vote: 3-3, motion fails. (Note: there was no formal
second)
Dorschner feels the shared parking agreement should be between the 2 business
owners as it is not a requirement of the VMX zoning district. Wensman stated that it
might be worth touching base with applicant to see what their preference would be.
Mr. Kelly, representing Christ Lutheran Church stated that it was a requirement of the
variance at the request of City Staff. The Church feels that that fewer agreements that
go into the future would be preferable from a property standpoint. They would be in
support of the amendment as described.
Wensman asked the Commission to reaffirm their recommendation of approval for the
lot split and corrected a previous statement that the lot split did require Commission
and Council approval which was granted by Resolution 2013-46.
John Whitcomb, representing the buyer of the property, stated that the easement will
be in place regardless of the action tonight. There is an agreement in place between the
buyer and the seller that this easement will be put in place.
Dorschner stated that his reason for recommending removing this condition is because
VMX does not require parking and he does not want to see the City setting a precedent
to require commercial to find parking.
Williams would like to speak against the motion because even though it isn’t required in
the VMX, it is very valuable downtown and at a premium. He thinks the shared
easement will benefit both properties as well as the City. Kreimer agrees with Williams
and would like to see the easement put in place. Dorschner agrees that parking is at a
premium, but he feels it is something the Planning Commission needs to think about,
not putting that burden on the business owners that currently have that asset. If
parking is required, it should be required and not d one piece meal.
Hartley agrees with Dorschner from the standpoint that if parking is important to
businesses in the VMX district, than it should be required of all businesses. He feels that
the City needs to look down the road and consider what could h appen in the future on
those two properties. This creates an oddity in the VMX zone. He feels this is
somewhat of a backdoor requirement for parking. Dodson asked what would happen if
they want to change the number of parking spaces. Would that violat e the easement?
John Whitcomb stated that the easement is a benefit to both property owners and the
only way that the easement can be changed is if both parties agree to the change.
4
Lake Elmo Planning Commission Minutes; 2-13-17
Hartley stated that both of the parties have agreed to an easement agreement that they
are comfortable with. He does not feel that the City needs to be involved with the
private agreement. He feels that since VMX does not have a parking requirement, if the
City requires the agreement, it is creating an awkward situation for the future. If
something changes with the properties, with the City requiring an agreement, it would
have to come back to the City vs. the property owners working out a different
agreement.
Williams stated that the conditions are for the Conditional Use for parking. Parking is a
Conditional Use in the VMX zoning and therefore he feels that it is very appropriate for
the City to put conditions on the parking that are useful for the City and the property
owners. Nothing that he has heard so far has in dicated to him that anybody is losing
anything by having this condition retained. He feels it does not set a precedent as it is
specifically related to this CUP, not the general zoning district.
Dorschner feels that by putting this condition in place for the parking lot, it is not
treating the old bank building property like a VMX property. It is placing a condition on
it that they have to have an easement with the church for the parking.
M/S/P: Williams/Kreimer, move to recommend re-affirming approval of Minor
Subdivision granted by Resolution 2013-46, Vote: 6-0, motion carried unanimously.
Public Hearing – Zoning Text Amendment to repeal OP-ALT District
Wensman started his presentation giving background about OP-Alt District that was
created in 2010. This was repealed from the Comprehensive Plan, but it still exists in
the zoning code. There is nothing guided for this zoning, so staff has prepared a Zoning
Text Amendment to repeal it from the zoning code.
Public Hearing opened at 7:43 pm
No one spoke and there were no written comments
Public Hearing closed at 7:43 pm
M/S/P: Williams/Dodson, move to recommend approval of repealing Article XV – OP-Alt
District from the Zoning Code, Vote: 6-0, motion carried unanimously.
Business Item – Village District Zoning Discussion
Wensman started his presentation by stating that there are some projects coming
forward that are guided for Village LDR, but there are no standards set forth for this
district. There are a couple of the Village developments that were approved using the
5
Lake Elmo Planning Commission Minutes; 2-13-17
LDR guidelines, but he thinks that was more of a convenience utilizing a loophole in the
zoning language. Staff has created draft Village LDR and Village MDR regulations. At the
end of the last meeting, it was discussed about having staff prepare a basic, streamlined
ordinance that could be worked on over time. It is important to get his in place now as
there are a couple of developments likely to come forward that this would apply to.
There were some things looked at and taken out, such as the requirement for sidewalks
on both sides of the street. There has to be some kind of balance between density and
requirements for infrastructure.
Lundquist asked which properties this would apply to. Wensman put up a map showing
which areas of land this pertained to. Williams asked what the densities are for the LDR
that was approved. Wensman stated that it has a density of 2.5 and the V-LDR is guided
for 2.49 du/ac in the Comprehensive Plan. Part of the discussion at the last Planning
Commission centered on the densities for the Village area being lower than South of
10th Street.
Hartley asked what the density is for a sewered area. Wensman stated that Met Council
wants the average MUSA area to be a minimum of 3.0 throughout the City sewered
area. Hartley asked if they redo this density, would the City still meet the required
MUSA densities for sewered properties. Wensman stated that as the Village develops,
the City will need to watch and manage the development below 3.0. Royal Golf will
bring our average down, but not below 3.0. Hartley is wondering if the City is backing
itself into a corner. Wensman stated that most developers are going to want to get the
most density that they can get on a piece of property, based on what the market
demand is. Wensman stated that the Comprehensive Plan currently guides the Gonyea
West property as V-LDR & V-MDR. With the Comprehensive Plan update on the
horizon, that may be something that the City might want to consider. Dodson asked
how the density is calculated in the MUSA and if open spaces are included. Wensman
stated that some of the developments seem denser as we allow smaller lot sizes. It is
almost like a transfer of density which leaves some areas more open, and the lot area
more dense.
Williams asked if any of the developers that are guided for low density have requested
to be guided for higher density. Wensman stated that the only one that he is aware of is
Easton Village. They would like to do the rest of the development as Villas and smaller
lots, but cannot.
Dodson is wondering how the MUSA is calculated as far as the density goes. Staff
explained that it is determined by how the land is guided in the Comprehensive Plan.
Hartley stated that his point is that the City not set ourselves up by specifying low
densities that get used and then we find out down the road that we have to put in a
high density high rise to get out of issues with the Met Council. Wensman stated that
the Met Council also has requirements for affordable housing and as a result of that,
6
Lake Elmo Planning Commission Minutes; 2-13-17
there needs to be a certain amount of land guided for medium and/or high density to
meet those requirements. The amount of medium and high density guided currently
meets those requirements through 2040.
Williams stated that the residential developments that have been approved so far are at
the low to middle density ranges, and he is concerned about the trend toward getting
closer to going under the 3.0 units per acre. Williams stated that in other cities there
are lots that are smaller and narrower, but you see a more modest home on the lot. He
is not sure how the City can have proper urban development with these huge homes on
the lots. Williams cannot recall why the density is lower in the V -LDR than it is for LDR.
He is wondering if anyone else knows what the reasoning was as it seems
counterproductive. Williams is wondering if they can postpone taking action on this
until they can consider the density issue. Wensman stated that it would be something
he would need to talk to the City Attorney about.
There is a precedent that the LDR zoning was used in the Village in the past. He is not
sure how appropriate that was. Wensman stated that they can certainly postpone, but
if a development comes forward, the developer will need to know how to proceed.
Dorschner asked if all of the medium and high density is south of 10th Street. Wensman
stated that there are places in the Village area that allows VMX which is up to 10 units
per acre. The VMDR is essentially the same density as the LDR found south of 10th
Street.
Lundquist stated that she feels in the past, the City has not paid close enough attention
to the terrain. The 2 developments north of Old Hwy 5, Village Preserve and Wildflower
at Lake Elmo, has had flooding. The Gonyea West property is a field now that has
regular ponds there regardless of if there are crops there. If houses go there, she is
concerned that they will have water problems. Wensman stated that any new
development is required to capture their runoff on -site so there will be extensive
ponding to address the runoff.
Dodson asked about page 9 of the proposed ordinance talking about new housing types
and why there can be no more than ¼ of lineal frontage of a developed block converted
to townhouse units. Wensman stated that it was taken from the MDR language for
townhouse as it is a conditional use. Wensman believes the language was intended
more for redevelopment so that they do not tear down a whole block of existing homes
for townhouses. Wensman suggested this should be rewritten to only address
redevelopment.
Williams is interested in getting the City Attorney’s opinion on whether what was done
in the past was appropriate and how they should proceed to effectively increase the
density in the V-LDR. Wensman stated that to increase the V-LDR density, a
Comprehensive Plan Amendment is required. Williams would like to see a
7
Lake Elmo Planning Commission Minutes; 2-13-17
Comprehensive Plan Amendment to see the Gonyea West property changed to V-MDR
which would match LDR. Wensman stated the alternative is to see what Gonyea West
proposes. If they propose something less than 2.5, the ordinance could be quickly
adopted or if they are interested in higher density we can let them know that there is
some support for it. Hartley doesn’t feel it is appropriate to have the developer put
money and effort into plans based on a certain density and then the City changes what
it is looking for. Dorschner is wondering what the real concern is as we haven’t even
looked at south of 10th Street yet. He is wondering if the Comprehensive Plan is
followed the way it is, would there be a problem? Wensman stated that the plan as it is
now, is still above 3.0 units. Wensman stated that it isn’t the issue of the numbers, but
of the desire for connectivity and for the Village to be a viable commercial district. The
more homes, the easier it is to achieve this. Dorschner feels that looking at changing
densities needs to be looked at as a complete package including the south of 10th Street
area. He doesn’t think that residents want overall greater numbers throughout the City
and does not want to see higher density somewhere it is not needed.
Wensman stated that it is part of the larger Comprehensive Plan discussion that will
take place over the next 6-8 months. The problem is that Gonyea West and Village Park
Preserve will probably come in sooner than that. There is no action item before the
Commission, but the City needs to get ready with a zoning district for when the projects
come in. Hartley is wondering if he can tell them what the overall sewered density is
compared to the Met Council requirements and if density changes somewhere, do we
know where we will be at. Wensman stated that there is a worksheet from the Met
Council that calculates that. Williams stated that he is not in favor of more
development, however, he is trying to be realistic about the development patterns in
the Village and what would be a good scheme to make it viable. He feels that if some of
the Village properties are adjusted, there are ample opportunities s outh of 10th street to
make adjustments. Dorschner feels that to the North of the Gonyea West property is
open space and to make it higher density does not give that buffer zone. He thinks the
higher densities should be closer to the central Village and they should be lower as it
moves out as there are larger properties and open space developments as you move
out. Williams agrees with that statement.
Dodson wanted to talk about the maximum setback requirements. At the last meeting
there was a build to line and he would like to see what the rest of the Commission
thinks. Wensman stated that a build to line makes more sense in an urban district like
VMX, but not so much in the V-LDR/M-LDR district. If a build to line is put into VMX,
they will need to decide what areas to put it in as it does not make sense in all places.
Kreimer feels that they should move forward with the zoning district so that the City has
something in place if development comes forward. If the Council is interested in higher
density on the Gonyea West property, the City could move forward with a
Comprehensive Plan amendment.
8
Lake Elmo Planning Commission Minutes; 2-13-17
Lundquist does not want to see this land developed higher than it is currently
designated. She does not feel the terrain and the wetlands would support it without
problems.
Wensman stated that he could put together the ordinance for V -LDR that would mimic
LDR with a few differences and bring back a draft before holding the public hearing. The
V-MDR can be addressed after the Comprehensive Plan update. The Planning
Commission was agreeable to that. Williams asked that when the V-LDR ordinance is
brought back could there be findings included. He would like the imminence of the
Gonyea West development noted as well as the fact that the Planning Commission is
interested in increasing the density of the VLDR, but it requires a Comprehensive Plan
Amendment.
Comprehensive Plan Advisory Board
Wensman stated that they are kicking off the Comprehensive Plan process. They have
met with the consultant SHC. They proposed the Comprehensive Plan Advisory Board
which would include a representative from the Parks Commission, Planning
Commission, possibly Environmental Committee and possibly at large community
members. Tonight he is asking that the Planning Commission Member be appointed to
the Board which is not a steering committee, but an advisory board. Wensman thinks
this board would meet about 6 times between now and November. Jesse Hartley
volunteered to be the Planning Commission representative, wit h Dale Dorschner willing
to be an alternate if the dates and times do not work for Hartley.
City Council Updates – January 17, 2017 Meeting
i) Zignego Minor Subdivision and Zoning Map – passed
ii) Golf Course Community Zoning District – passed with amendments
iii) Shoreland Management Overlay District Ordinance Amendment – tabled
iv) Inwood 4th Addition Developers Agreement – passed
v) Hammes Estates 2nd Addition Developers Agreement – passed
vi) Work Plan – Approved with addition of adding secondary dwelling as allowed
conditional uses in rural districts
Staff Updates
1. Upcoming Meetings
a. February 27, 2017
b. March 13, 2017
2. Appointment of Keith Bergmann as citizen representative to the MAC Citizen
Engagement Process Committee.
Commission Concerns
Dodson stated that in regards to the upcoming solar ordinance discussion, that was a
topic that was brought up at the class that he went to. They mentioned the need for
9
Lake Elmo Planning Commission Minutes; 2-13-17
the ordinance to control where solar gardens can be as they can b e quite large. He is
also concerned about lighting standards for streets. He is not necessarily in favor of all
new developments having street lights, but now the City requires them. He would like
more information regarding the standards. He would like there to be a proven need for
street lights, such as high speed. He does not feel that they are always necessary in
residential developments. Wensman will do some research regarding where those
standards came from and what those standards are and then the Commission can talk
about it. Dorschner thinks that in conjunction with the solar, they should also think
about wind turbines.
Meeting adjourned at 9:02 pm
Respectfully submitted,
Joan Ziertman
Planning Program Assistant
BUSINESS ITEM 5a
PLANNING COMMISSION
DATE: FEBRUARY 27, 2017
AGENDA ITEM: 5A - BUSINESS ITEM
CASE #2016-59
TO: Planning Commission
FROM: Emily Becker, Planner
SUBMITTED BY: Zoning Text Amendment – Village Urban Districts
REVIEWED BY: Stephen Wensman, Planning Director
BACKGROUND:
Planning Staff has amended the draft ordinance creating standards for the Village Urban Low Density (V-
LDR) zoning district as well as clarified some setback standards for the Village Mixed Use (VMX)
District based on feedback provided by the Planning Commission at its January 23, 2017 and February
13, 2017 meetings.
ISSUE BEFORE THE COMMISSION:
Staff respectfully requests that the Commission review the revised draft ordinance of the Village Urban
Residential Districts and provide additional feedback before a public hearing and formal recommendation
is made.
PLANNING/ZONING ANALYSIS:
Summary of Discussed Changes to Proposed Ordinance.
Previously proposed V-MDR District is removed. The proposed standards for the V-MDR District were
generally the same as those of the existing Urban Low Density Residential (LDR) zoning district
standards, and so it was not necessary to create this separate zoning district.
All Specific Site Development Standards for sidewalks and trails were removed. The Commission felt the
proposed additional standards were cost prohibitive in a less dense development.
Theming Elements. The Commission recommended that elements of the 2013 Lake Elmo Theming
Project be encouraged within this district, and so language involving theming was added to the ordinance.
Theming would pertain to lighting, benches, sidewalks, etc.
Lot Dimensions and Bulk Requirements.
Setbacks.
o Maximum setbacks. While the normal minimum setback standard of the LDR district is
proposed in the proposed V-LDR ordinance, maximum setbacks are also proposed in
order to maintain a consistent environment where homes and family life are not too far
away from the street, sidewalks, or their neighbors.
o Side and rear yard setbacks are large enough to maintain privacy and comfortable
distances between buildings and are consistent with urban residential district standards.
Minimum Lot Size.
o Slightly larger than that of the LDR zoning district (9,000 vs. 8,000).
2
BUSINESS ITEM 5a – ACTION ITEM
Maximum Impervious Surface.
o Slightly less than that of the LDR zoning district (30% vs. 40%)
Preserved Open Space and Buffers.
Buffers Part of Open Space, Not Residential Lots. Clarification that open space as designated in
the Village Open Space Overlay District must be included in the buffer area and not as part of
residential lots.
Minimum size standards for single family detached dwellings were added. These same size standards (960
square feet and 24 foot width minimum for single family detached houses) are in the rural residential and
urban residential sections of the Zoning Code.
Secondary Dwelling Standards. The standard that Secondary Dwellings be located within the principal
structure is added, as this was a recommendation by the Planning Commission during the Golf Course
Community public hearing. The Commission should keep in mind this provision was struck by the City
Council in the adopted ordinance.
Setbacks within the VMX District. Clarification on the 0-20 setback standards is provided in 154.505 (B)
(1). The language indicates that the front yard setback of a new non-residential building within the VMX
district shall maintain the front yard setback of the adjacent property fronting the same public street, or a
maximum setback of 20 feet, whichever is less. This will assist with the challenge posed by the Village
Parkway street design, which is not conducive to a zero lot line setback, as is encouraged in the VMX
district.
Findings.
The Planning Commission drafted the following findings at its last meeting:
1. That certain areas of the Old Village are guided for Urban Limited Density Residential in the
Land Use Plan of the Comprehensive Plan, which designates a density of 1.5-2.49 units per acre.
2. That there currently does not exist a Village Limited Density Residential zoning district which
has a density of 1.5-2.49 units per acre within the Zoning Code.
3. That the Village Limited Density Residential zoning district is being proposed due to the
imminence of the Gonyea West Development, which is expected to be proposed to be located
within the Old Village in an area guided for Village Limited Density Residential.
4. That the Planning Commission would be interested in exploring increased densities within the
Old Village as an amendment to the Comprehensive Plan.
RECOMMENDATION:
Staff recommends that the Planning Commission review and provide feedback on the addition of the
proposed V-LDR Zoning Districts to Article XIII of the Zoning Code:
ATTACHMENTS:
1. Draft Ordinance
Planning Commission Draft 2/27/2017
1
CITY OF LAKE ELMO
COUNTY OF WASHINGTON
STATE OF MINNESOTA
ORDINANCE NO. 08-__
AN ORDINANCE AMENDING THE LAKE ELMO CITY CODE OF ORDINANCES PERTAINING TO
STREET NAMING
SECTION 1. The City Council of the City of Lake Elmo hereby amends Title XV: Land Usage;
Chapter154: Zoning Code; Article XIII: Village Mixed Use District; to read the following:
ARTICLE XIII: VILLAGE MIXED USE DISTRICTS
§ 154.500 PURPOSE AND DISTRICT DESCRIPTION
(A) V-LDR Village Limited Density Residential. The purpose of the V-LDR zoning district is to
provide opportunity for lower density residential development within the Old Village and create a
transition and connectivity between the heart of the Old Village and surrounding rural areas. Residential
development within areas zoned V-LDR will occur at a density of 1.5-2.49 units per acre.
(B) VMX – Village Mixed Use District. The purpose of the VMX district is to provide an area
for compact, mixed use development made mutually compatible through a combination of careful
planning and urban design and coordinated public and private investment. This district is intended to
continue the traditional mixed use development that has occurred in the Village area by allowing retail,
service, office, civic and public uses as well as residential units. The mixture of land uses within the
district is essential to establishing the level of the level of vitality and intensity needed to support retail
and service uses. The placement of building edges and treatment of building, parking, landscaping, and
pedestrian spaces is essential to creating the pedestrian friendly environment envisioned for the VMX
district. The standards in this chapter are intended to implement and effectuate the principles and
relationships established in the Village Master Plan, which will be carried out through specific standards
related to site planning, signage, architecture, building materials, and landscaping. Renovation and infill
of traditional storefront-type buildings is encouraged, and parking standards may be waived to
recognize the availability of on-street and shared parking facilities.
§ 154.501 PERMITTED AND CONDITIONAL USES
Table 11-1 lists all permitted and conditional uses allowed in the urban residential districts. “P”
indicates a permitted use, “C” a conditional use. Uses not so indicated shall be considered prohibited.
Cross-references listed in the table under “Standards” indicate the location within this Ordinance of
specific development standards that apply to the listed use.
Planning Commission Draft 2/27/2017
2
A. Combinations of uses. The following use types may be combined on a single parcel:
1. Principal and accessory uses may be combined on a single parcel.
2. A principal and secondary dwelling unit may be combined according to the standards of Section
155.137 154.454 (C).
B. Combinations of uses in the VMX District
1. Single-family attached or multi-family complexes designed for rental or condominium occupancy,
since these typically include multiple units and buildings on a single parcel.
2. Other permitted or conditional uses allowed within the district may be combined on a single parcel,
provided that a unified and integrated site plan is approved. The entire development must be approved
as a conditional use.
3. A mixed-use building that combines permitted or conditionally permitted residential, service, retail and
civic uses may be developed meeting the form standards of this Article. Office or studio uses on upper
stories are encouraged.
Planning Commission Draft 2/27/2017
3
Table 11-1: Permitted and Conditional Uses, VMX Village Districts
V-LDR VMX Standard
Residential Uses Residential Uses
Household Living
Single-family detached dwelling P P* 155.504.A 154.505 (A) (1),
(2), *(3)
Two-family dwelling - P* 155.504.A 154.505 (A) (1),
*(3), (4)
Single-family attached dwelling - C 154.505 (A) (1), (4)
Multifamily dwelling - C* 154.505 (A) (1), (4), *(5)
Secondary dwelling C C* 154.505.D 154.454 (C) &
*154.505 (A) (1), (6)_
Live-work unit - P 155.505.J 154.505 (B) (6)
Group Living
Group Home P P 155.102.C 154.301 (A)
Group Residential Facility - C 155.102.D 154.301 (B)
Congregate Housing - C 155.102.E 154.301 (C)
Semi-Transient Accommodations - C 155.102.F 154.301 (C)
Public and Civic Uses
Community Services - P 155.103.C
Day Care Center - P 155.103.D
Public Assembly - C 155.505.M
Religious Institutions - C 155.505.N 154.303 (N)
Schools, Public and Private - C 155.505.O 154.303 (A)
Services
Business Services - P
Business Center - P
Offices - P
Communications Services - P
Education Services - P 154.303 (A)
Financial Institution - P 155.505.P
Funeral Home - C
Lodging - C 155.505.Q 154.302 (D)
Medical Facility - C 155.505.R 154.303 (B)
Membership Organization - C 155.505.N
Nursing and Personal Care - C 155.104.C 154.303 (C)
Personal Services - P
Repair and Maintenance Shop - C 155.505.E 154.505 (B) (1)
Trade Shop - C 155.505.F 154.505 (B) (2)
Veterinary Services - C 154.505.G 154.505 (B) (3)
Planning Commission Draft 2/27/2017
4
Food Services
Standard Restaurant - P
Restaurant with Drive-through - C 154.304 (A)
Drinking and Entertainment - P 155.505.S 154.304 (B)
Sales of Merchandise
Retail Trade 1 - P 155.505.T
Farmer’s Market - C 155.505.AA
Garden Center - C 155.505.U 154.505 (B) (4)
Neighborhood Convenience Store - P 155.505.V
Shopping Center - C 155.505.W
Wayside Stand P P 154.454 (D)
Automotive/Vehicular Uses
Automobile Maintenance Service - C 155.505.X 154.505 (B) (5)
Automobile Parts/Supply - P 155.505.X154.505 (B) (5)
Gasoline Station - C 155.505.X 154.305 (B)
Parking Facility - C 155.505.X 154.505 (B) (7)
Sales and Storage Lots - C 155.505.X 154.305 (C)
Outdoor Recreation
Outdoor Recreation Facility - C 155.505.Y 154.306 (C)
Parks and Open Areas P P
Indoor Recreation/Entertainment
Indoor Athletic Facility - C 155.505.Z 154.307
Indoor Recreation - C 155.505.Z 154.307
Transportation and Communications
Broadcasting or Communications
Facility
- C 155.110.B
Accessory Uses
Home Occupation P P 155.111.A,B
154.012 (12) (e)
Bed and Breakfast - C 155.111.C
154.310 (A)
Family Day Care P P 155.111.G
154.012 (12) (d)
Group Family Day Care - C 155.111.G
Temporary Sales P P 155.107.B
154.509 (G)
Parking Facility - P 154.505 (H) (7)
Solar Equipment P P 155.111.I
154.310 (C)
Swimming Pools, Hot Tubs, Etc. P P 155.111.J
Other Structures Typically Incidental
and Clearly Subordinate to Permitted
Uses
P P
Planning Commission Draft 2/27/2017
5
Note: Standards listed in Table 11-1 are listed by Article, Section and Subsection.
1Retail Trade in the VMX District includes all uses and activities defined as Retail Trade in §155.507.B.5
154.012 (5) (c) with the exception of building supplies sales and warehouse club sales.
§ 154.502 LOT DIMENSIONS AND BUILDING BULK REQUIREMENTS
Lot area and setback requirements shall be as specified in Table 11-2, Lot Dimension and Setback Requirements.
Table 11-2: Lot Dimension and Setback Requirements, VMX Villages Districts
V-LDR VMX
Minimum Lot Area (sq. ft.) a
Non-Residential Use - None
Single Family Detached Dwelling 9,000 5,000
Two-Family Dwelling (per unit) b - 3,000
Single-Family Attached (per unit) c - 2,500
Multi-Family Dwelling (per unit) - 1,800
Secondary Dwelling - See 154.454 (C)
Live-Work Unit - 3,000
Congregate Housing - 155.102.E
154.301 (C)
Other Structures - 3,500
Maximum Lot Area (acres)
Residential Structures N/A N/A
Other Structures N/A 5
Minimum Lot Width (feet)
Single Family Detached Dwelling 70 50
Two-Family Dwelling (per unit) b - 30
Single-Family Attached (per unit)c - 25
Multi-Family Dwelling (per building) - 75
Live-Work Unit - 25
Maximum Height (feet/stories) 35 35/3 d
Maximum Impervious Coverage
Residential Structures 30% 75%
Other Structures - No Limit
Minimum Building Setbacks (feet)
Planning Commission Draft 2/27/2017
6
Front Yard 25 See 1554.506,
154.505 (A) (3) (b)
&
154.505 (B) (1)
Interior Side Yard 10 10 f
Corner Side Yard 15 0 g
Rear Yard 20 10
Maximum Building Setbacks 40 See 154.506
Notes to VMX Village District Table
a. No development may exceed the residential density range as specified in the Comprehensive Plan for the
Village Mixed Use corresponding land use category.
b. Two-family units may be side-by-side with a party wall between them (“twin”) or located on separate
floors in a building on a single lot (“duplex”). The per-unit measurements in this table apply to “twin”
units, whether on a single lot or separate lots. The standards for single-family detached dwelling shall
apply to a “duplex” containing two vertically-separated units on a single lot.
c. In the case of single-family attached dwellings that are not situated on individual lots, minimum lot size
shall be applied to each unit as a measure of density; i.e. 1 unit per 2,500 square feet. This standard is
also used for multifamily dwellings.
d. Buildings up to 45 feet in height may be permitted as part of a PUD in the VMX District.
e. The front yard setback for single family homes shall be 25 feet in the VMX District.
f. Side yard setbacks in the VMX District apply only along lot lines abutting residentially zoned parcels
or those parcels with residential uses as the sole use.
g. Corner properties: the side yard façade of a corner building adjoining a public street shall maintain
the front setback of the adjacent property fronting upon the same public street, or the required front
yard setback, whichever is less. If no structure exists on the adjacent property, the setback shall be
shown in the table.
§ 154.503 DIMENSIONAL REQUIREMENTS AND PRESERVATION OF OPEN SPACE
A. Averaging of Lot Area. When lots are clustered within a development to provide common open space,
the open space may be used to calculate an average density per lot to determine compliance with the
individual lot area requirements.
B. Lot Dimension Reductions. Other reductions in dimensional standards may be considered as part of a
Planned Unit Development if these reductions provide for common open space within a
development.
Commented [EB1]: This is already stated in 154.505 (A)
(3) (b)
Planning Commission Draft 2/27/2017
7
C. Village Open Space Overlay District. Development of areas within the Village Open Space Overlay
District, as designated by the Comprehensive Plan, is not allowed. Residential lots shall not encroach
on the areas designated as open space per this overlay district, unless approved by Council.
§ 154.504 GENERAL SITE DESIGN CONSIDERATIONS – LMX VILLAGE DISTRICTS
Development of land within the VMX Village Districts shall follow established standards for traffic circulation,
landscape design, and other considerations as specified in Article 5, 6 and 7 as well as .
A. Circulation. New access points to State Highway 5 County State Aid Highway 14 may be refused or
restricted to right-in right-out movement if alternatives exist. Internal connections shall be provided
between parking areas on adjacent properties wherever feasible.
1. The number and width of curb-cuts shall be minimized. To promote pedestrian circulation,
existing continuous curb-cuts shall be reduced to widths necessary for vehicular traffic, and
unnecessary or abandoned curb cuts shall be removed as parcels are developed.
B. Fencing and Screening. Fencing and screening walls visible from the public right-of-way shall be
constructed of materials compatible with the principle structure.
C. Lighting design. Lighting shall be integrated into the exterior design of new or renovated structures to
create a greater sense of activity, security, and interest to the pedestrian, and shall comply with
§150.035-150.038 Lighting, Glare Control, and Exterior Lighting Standards.
D. Exterior Storage. Exterior materials storage must be screened from view from adjacent public streets
and adjacent residential properties, by a wing of the principal structure or a screen wall constructed
of the same materials as the principal structure. Height of the structure or screen wall must be
sufficient to completely conceal the stored materials from view at eye level (measured at six feet
above ground level) on the adjacent street or property.
E. Screening of Existing Residential Structures. When a new development is proposed adjacent to an existing
single family residential structure, screening shall be provided in accordance with §154.258.F. The City
may require buffering or screening above and beyond this section in cases where the required screening
will not provide an adequate separation between incompatible uses.
F. Sidewalks and/or Trails. Where cul-de-sacs are permitted by the City, sidewalks or trails are required to
connect the bulb of the cul-de-sac with the nearest through-road.
G. Lake Elmo Theming Study. Elements of the Lake Elmo Theming Study not herein described
must be incorporated in to development within Village Districts where applicable.
§ 154.505 DEVELOPMENT STANDARDS FOR SPECIFIC USES
Planning Commission Draft 2/27/2017
8
Development of land within the VMX Village d Districts shall follow established standards for traffic circulation,
landscape design, parking, signs and other considerations as specified in Articles 5, 6 and 7. The following standards
apply to specific uses; other standards related to design and building type may be found at §154.506.
A. Residential Units, Village Districts
1. All Residential Units, Village Districts
a. Residential housing units shall be designed to reflect the general scale and character of
the Village, including front yard depth, height and roof pitch, primary materials, facade
detailing and size and placement of window and door openings.
2. Single-Family Detached Dwellings, Village Districts
a. No parking shall be located in the front yard or between the front façade and the
street except on a permitted driveway.
b. Primary entrances are required to be along the front façade.
c. Dwelling units shall be at least twenty-four (24) feet in width, at least nine hundred sixty
(960) square feet in area, and be placed on a permanent foundation.
3. Single-Family Detached and Two-Family Dwellings, VMX District.
a. Single-Family Detached Dwellings are limited to those existing at the time of adoption of this
Ordinance. Existing single-family dwellings shall be considered permitted uses, rather than
nonconforming uses.
b. Unless otherwise specified in this Article, Single and Two Family Dwellings in the VMX
district shall adhere to the MDR district setbacks as specified in §154.452.
4. Single-Family Attached, Two-Family Dwellings, and Multi-Family Buildings V-MDR and
VMX Districts.
a. A maximum of eight (8) units shall be permitted within a single building.
a. The primary entrance to each unit shall be located on the façade fronting a public street; an
additional entrance may be provided on the rear or side façade.
b. For redevelopment projects, new housing types should be introduced in limited quantities to
increase diversity and housing choice, not to replace whole blocks of existing housing.
Therefore, no more than 1/4 of the lineal frontage of a developed block (measured around the
entire block perimeter) may be converted to townhouse units, and no further townhouse, two-
family or higher-density development is permitted once this threshold is reached.
Planning Commission Draft 2/27/2017
9
c. Common open space for use by all residents or private open space adjacent to each unit shall be
provided. Such open space shall compromise a minimum of three hundred (300) square feet per
unit.
d. No parking shall be located in the front yard or between the front façade and the street.
5. Multi-Family Dwelling Units, VMX Districts.
a. Dwelling units (both condominium and rental) are restricted to the upper floors or rear or side
ground floors of a mixed use building.
6. Secondary Dwellings, Village District. Restricted to lots occupied by single-family
dwellings, and must meet the standards for secondary dwellings in residential districts,
§154.13454 (C) and be located within the primary structure.
B. Non-Residential Uses, VMX District.
1. Setbacks, Generally. The front yard setback of a new non-residential building within the
VMX district shall maintain the front yard setback of the adjacent property fronting the
same public street, or a maximum setback of 20 feet, whichever is less.
2. Repair and Maintenance Shop. No outdoor storage is permitted unless fully screened from public
view.
3. Trade Shop. Exterior materials storage must be totally screened from view from adjacent
public streets and adjacent residential properties by a wall of the principal structure or a screen
wall constructed of the same materials as the principal structure.
4. Veterinary Services. All activities must be conducted within an enclosed building.
5. Garden Center.
a. The storage or display of any materials or products shall meet all setback requirements of a
structure, and shall be maintained in an orderly manner. Screening along the boundaries of
adjacent residential properties may be required, meeting the standards of Article 6, Section
155.89.F.
b. All loading and parking shall be provided off-street.
c. The storage of any soil, fertilizer or other loose, unpackaged materials shall be contained so as to
prevent any effects on adjacent uses.
6. Automobile Maintenance Service and Automobile Parts/Supply, VMX District.
a. All vehicle repairs shall be conducted in a completely enclosed building
Planning Commission Draft 2/27/2017
10
b. The storage or display of inoperable or unlicensed vehicles or other equipment shall meet all
setback requirements of a structure, and shall be totally screened from view from adjacent public
streets and adjacent residential properties.
7. Live-Work Unit. The purpose of a live-work unit is to provide a transitional use type between a home
occupation and a larger commercial enterprise, and to provide neighborhood-oriented commercial
services, while maintaining a generally residential character in which the work space is subordinate
to the residential use.
a. The work space component shall be located on the first floor or basement of the building.
b. The dwelling unit component shall maintain a separate entrance located on the front or side
façade and accessible from the primary abutting public street.
c. The work space component of the unit shall not exceed thirty (30) percent of the total gross floor
area of the unit.
d. A total of two (2) off-street parking spaces shall be provided for a live-work unit, located to the
rear of the unit, or underground/enclosed.
e. The size and nature of the work space shall be limited so that the building type may be
governed by residential building codes. An increase in size or intensity beyond the specified
limit on floor area would require the building to be classified as a mixed-use building.
f. The business component of the building may include offices, small service establishments, home
crafts which are typically considered accessory to a dwelling unit, or limited retailing (by
appointment only) associated with fine arts, crafts, or personal services. It may not include a
wholesale business, a commercial food service requiring a license, a limousine business or auto
service or repair for any vehicles other than those registered to residents of the property.
g. The business of the live-work unit must be conducted by a person who resides on the same lot.
The business shall not employ more than two (2) workers on-site at any one time who live
outside of the live-work unit.
8. Parking Facility. Structured parking is permitted as a ground floor use within a mixed-use building,
provided that it is located on side or rear facades, not facing the primary abutting street. The
primary street-facing façade shall be designed for retail, office or residential use. The primary
street façade may include an entrance into the parking facility.
9. Outdoor Dining Accessory to Food Services. Outdoor dining is allowed as an accessory use in the
commercial districts, provided that tables do not block the sidewalk. A minimum of five (5) feet
of sidewalk must remain open.
§ 154.506 VMX DISTRICT DESIGN AND DEMOLITION REVIEW
Planning Commission Draft 2/27/2017
11
A. Review of Design. For certain development activity as specified in the Lake Elmo Design Standards
Manual, design review is required as part of the approval process for a building permit, conditional
use permit, or certificate of zoning compliance under this Ordinance. All projects subject to design
review shall be reviewed for conformance with the Lake Elmo Design Standards Manual. A separate
process for design review is not established.
1. Review Authority and Process. Design review shall be the responsibility of the individual or body
authorizing the permit or certificate and shall be incorporated in the established review of the
applicable building permit, conditional use permit, or certificate of zoning compliance. For those
applications under this Ordinance that require review by the Planning Commission (i.e.
conditional use permits), the Planning Commission shall consider the standards in the Lake Elmo
Design Standards Manual as part of its recommendation to the City Council.
2. Review by Professional. The authorizing body may request review by a design professional of the
proposed design or demolition. The cost of review by such design professional shall be charged by
the applicant, and shall not exceed $1,000 unless otherwise agreed to by the applicant.
3. Development Activity Defined. Development Activity consists of new construction and
redevelopment activities, including remodeling that expands the footprint of a structure, altering, or
repairing a structure in a manner that will change the exterior appearance of said structure.
Development activity also includes the construction of a new parking lots and installation of
signage.
a. Exempt Activities. The following activities shall be exempt from under review of this Section:
i. Ordinary repairs and maintenance that will not change the exterior appearance of a structure;
ii. Removal of existing signage without replacement unless said signs are an integral part of the
building;
iii. Emergency repairs ordered by the Director of Planning in order to protect public health and
safety;
iv. Exterior alteration, addition, or repair of a structure used as a single-family residence,
duplex, or two-family residence.
v. Temporary signage, installed in accordance with §154.212 of this Ordnance, or during
which time an application for permanent signage is pending under this Ordinance;
vi. Maintenance of existing signage advertising an on-site business;
vii. Alterations only to the interior of a structure.
§ 154.507 ACCESSORY USES AND STRUCTURES
Accessory uses are listed in the VMX District Use Table 11-1 as permitted or conditional accessory uses.
Accessory uses and structures in the VMX Village Districts shall comply with the following standards and all
other applicable regulations of this ordinance:
Planning Commission Draft 2/27/2017
12
A. Phasing. No accessory use or structure shall be constructed or established on any lot prior to the
time of construction of the principal use to which it is accessory.
B. Incidental to Principal Use. The accessory use or structure shall be incidental to and customarily
associated with the principal use or structure served.
C. Subordinate to Principal Use. The accessory use or structure shall be subordinate in the area, extent, and
purpose to the principal use or structure served.
D. Function. The accessory use or structure shall contribute to the comfort, convenience, or necessity
of the occupants of the principal use or structure served.
E. Location. The accessory use or structure shall be located on the same zoning lot as the principal use or
structure.
F. Residential Accessory Structures
§ 154.5087 RESIDENTIAL ACCESSORY STRUCTURES
A. 1. Design Compatibility. On parcels used for residential structures within the VMX Village
Districts, the design and construction of any garage, carport, or storage building shall be similar
to or compatible with the design and construction of the main building. The exterior building
materials, roof style, and colors shall be similar to or compatible with the main building or shall
be commonly associated with residential construction.
B. 2. Attached structures. An accessory structure shall be considered attached, and an integral part of, the
principal structure when it is connected by an enclosed passageway. All attached accessory
structures shall be subject to the following requirements:
a. The structure shall meet the required yard setbacks for a principal structure, as
established for the zoning district in which it is located.
b. The structure shall not exceed the height of the principal building to which it is attached.
B. 3. Attached Garages.
3. a. Attached garages are encouraged to be side or rear loaded. If facing the primary street, garages
shall be designed using one of the following techniques, unless specific physical conditions on
the lot in question require a different approach:
i. The front of the garage is recessed at least four (4) feet behind the plane of the primary
façade; or
ii. The front of the garage is recessed at least four (4) feet behind a porch if the garage
is even with the primary façade; or
Planning Commission Draft 2/27/2017
13
iii. The width of the attached garage shall not exceed 40% (in VMX Districts) and
60% in (V-LDR and V-MDR Districts) of the width of the entire principal building
façade (including garage) fronting the primary street.
4. b. Attached garages shall not exceed one thousand (1,000) square feet in area at the ground floor
level except by conditional use permit.
5. c. Garage doors or openings shall not exceed fourteen (14) feet in height.
C. 4. Detached structures. Detached accessory structures for permitted residential structures in the
VMX Village Districts must be in accordance with the following requirements:
a. Detached accessory structures shall be located to the side or rear of the principal
building, and are not permitted within the required front yard or within a side yard
abutting a street.
b. Detached garages shall not exceed one thousand (1,000) square feet at ground floor level and
shall not exceed a height of twenty-two (22) feet or the height of the principal structure,
whichever is higher. The maximum size and height may be increased upon approval of a
conditional use permit, provided that lot coverage requirements are satisfied.
c. Pole barns, as defined herein, shall be prohibited.
d. No more than thirty (30) percent of the rear yard area may be covered by accessory structures.
e. Garagedoors or openings shall not exceed fourteen (14) feet in height.
§ 154.509 ACCESSORY USES
A. G. Exterior Storage on Residential Parcels. All materials and equipment shall be stored within a building
or be fully screened so as not to be visible from adjoining properties, except for the following:
a. Laundry drying,
b. Construction and landscaping materials and equipment currently being used on the premises.
Materials kept on the premises for a period exceeding six (6) months shall be screened or stored
out of view of the primary street on which the house fronts.
c. Agricultural equipment and materials, if these are used or intended for use on the premises.
d. Off-street parking and storage of vehicles and accessory equipment, as regulated in Article
5, Section 155.67 154.210.
e. Storage of firewood shall be kept at least ten (10) feet from any habitable structure and screened
from view of adjacent properties.
f. Outdoor parking.
B. H. Temporary Sales. Temporary sales, also known as yard or garage sales, are permitted in all
residential districts, limited to two (2) per calendar year per residence, not to exceed four (4) days in
length for each event.
C. I. Accessory Uses and Structures Not Listed
Planning Commission Draft 2/27/2017
14
§ 154.51009 ACCESSORY USES AND STRUCTURES NOT LISTED
Standards for accessory uses and structures that are permitted in all districts, or in all residential buildings
in any district, are listed in Article 7, Specific Development Standards. These include uses such as family
and group family day care, bed and breakfast facilities, and home occupations, and structures such as
swimming pools and solar equipment.
SECTION 2. The City Council of the City of Lake Elmo hereby amends Title XV: Land
Usage; Chapter154: Zoning Code; Article X: Division Into Districts; Section 154.350
to read the following:
Zoning District R
Reference
R-2 One and Two Family Residential 154.033
GB General Business
154.034
A Agriculture Article XI
RR Rural Residential Article XI
RT Rural Development Transitional Article XI
RS Rural Single Family
Article XI
RE Residential Estate
Article XI
LDR Urban Low Density Residential Article XII
MDR Urban Medium Density Residential Article XII
HDR Urban High Density Residential Article XII
V-LDR Village Limited Density Residential Article XIII
VMX Village Center - Mixed Use
Article XIII
C Commercial Article XIV
CC Convenience Commercial Article XIV
LC Neighborhood Office/Limited Commercial Article XIV
BP Business Park/Light Manufacturing Article XIV
PF Public Facilities Article XV
SECTION 3. Effective Date. This ordinance shall become effective immediately upon
adoption and publication in the official newspaper of the City of Lake Elmo.
SECTION 4. Adoption Date. This Ordinance 08-___ was adopted on this _____ day of
________, 2017, by a vote of ___ Ayes and ___ Nays.
Planning Commission Draft 2/27/2017
15
LAKE ELMO CITY COUNCIL
______________________________
Mike Pearson, Mayor
ATTEST:
_______________________
Julie Johnson, City Clerk
This Ordinance 08-__ was published on the ____ day of ___________________, 2017.
STAFF REPORT
DATE: 2/27/2017
B U S I N E S S
I T E M # : 4 B
TO: Planning Commission
FROM: Stephen Wensman, Planning Director
AGENDA ITEM: Planned Unit Development Ordinance Update
REVIEWED BY: Emily Becker, Planner
Ben Gozola, Consulting Senior Planner
BACKGROUND:
In October of 2016, the City approved a revision to the Open Space Development regulations changing
the process for such developments from a conditional use permit process to a more appropriate planned
unit development (PUD) process. The changes were a specific to open space development regulations,
however, Staff believes the new PUD approval process is superior to that within the City’s current PUD
regulations. When the open space PUD regulations were approved, Staff was given direction by the
Commission to proceed with updating our existing PUD regulations so that the processes would be
consistent between both PUD ordinances.
ISSUE BEFORE THE COMMISSION:
To review the draft update to the City’s PUD Ordinance, Article XVIII – Sections 154.750-154.760
PROPOSAL DETAILS/ANALYSIS:
The proposed update to the City’s PUD Ordinance is intended to improve the application process and to
make it consistent with the City’s recently approved Open Space Development PUD Ordinance.
The draft changes include:
Making text changes to better describe the ordnance as regulating developments with overlay
district, meaning that the regulations are over the underlying base zoning district regulations.
154.752; changes strikes reference to uses approved, rather refers to the PUD plans which codify
uses, design and other regulatory requirements as needed.
154.752 (C); removes references to floor area ratios (FARs). These are defined in Chapter 11,
however, the Zoning Code sets forth standards for impervious surface, not maximum gross floor
area/floor area ratio. Therefore, it’s difficult to deduce what would be the maximum allowed floor
area ratio for a zoning district and therefore hard to allow an increase. Alternative language was
Planning Commission Meeting Business Item #4b
February 27, 2017
2
drafted to allow an increase in impervious surface in order to allow for more intense
development.
154.752 (D); fixes reference by referencing Table 16-2
154.752 (G); fixes reference.
154.753 (A); changes text to say “development area”, rather than “lot area”. Removed the
minimum acreage requirement for PUDs. For PUD requests on tracts greater than 5 acres in size a
sketch plan is required for review by the Planning Commission to determine if a PUD meets
criteria to move forward. For lots less than five acres, the sketch plan is optional, and the
Planning Director makes the determination if the project meets the criteria to move forward.
Table 16-2; the criteria for natural resources was amended because preservation of natural features
and/or restoration of ecological functions is already a requirement of development. The criteria
would require measures beyond that required.
154.756 Phasing and Guarantee of Performance; this section is stricken. The phasing is typically
addressed in the developer agreement.
154.757 Control of PUD Following completion; this section is stricken as new section 154.757
PUD AMENDMENTS addresses any changes after construction.
154.661 PUD Review Procedure; this section is renumbered and amended to follow the procedures
outlined in the City’s new Open Space Development PUD review procedure with a few exceptions
to fit the PUD Ordinance. Please note these changes:
o Sketch plans have a 6 month limitation of approval before they expire.
o The City Council will vote on modifications proposed to the underlying zoning standards
to instruct the applicant as to whether the modification can be pursued as a component of
the PUD Preliminary Plan review.
o Effect of a PUD Sketch Plan Review; this language clarifies that the sketch plan process
is primarily for information purposes
o Preliminary PUD Plans must be distinctly similar to PUD Sketch Plans reviewed by the
City Council
o Limitation of Approval for Preliminary PUD Plans will be valid for 180 days, consistent
with the City’s preliminary plat requirements, Section 153.07 (L)
o Approved PUD Plans need to be constructed one year after final approval or they may be
deemed void.
154.757 PUD AMENDMENTS; this section sets forth provisions for administrative amendments,
PUD Ordinance amendments and PUD Plan amendments.
FISCAL IMPACT:
Planning Commission Meeting Business Item #4b
February 27, 2017
3
None
OPTIONS:
Staff is requesting that the Planning Commission review the proposed changes to the Planned Unit
Development ordinance and direct staff to make changes as needed prior to scheduling a public hearing for
the ordinance amendment.
ATTACHMENTS:
Draft PUD Ordinance Amendment
ARTICLE I. PLANNED UNIT DEVELOPMENT (PUD) REGULATIONS
§ 154.750 INTENT.
This article establishes the procedures and standards for the development of areas as unified,
planned developments in accordance with the intent and purpose of this zoning ordinanceSection
and the applicable policies of the Comprehensive Plan. Because of the larger size of PUDs and to
help achieve the identified objectives for planned unit development sites, this article provides for
flexibility in the use of land and the placement and size of buildings in order to better utilize site
features and obtain a higher quality of development. Approval of a planned unit development
shall result in a zoning change to a specific PUD overlay district, with specific requirements and
standards that are unique to that development.
(Ord. 08-070, passed 2-19-2013)
§ 154.751 IDENTIFIED OBJECTIVES.
When reviewing requests for approval of a planned unit development, the city shall consider
whether one or more of the objectives listed below will be served or achieved. It is the
responsibility of the applicant to provide a narrative of how the proposed planned development
meets one or more of the city’s identified objectives ((A) through (J)). Planned unit
developments should not be allowed simply for the purpose of increasing overall density or
allowing development that otherwise could not be approved.
A. Innovation in land development techniques that may be more suitable for a given parcel
than conventional approaches.
B. Promotion of integrated land uses, allowing for a mixture of residential, commercial, and
public facilities.
C. Provision of more adequate, usable, and suitably located open space, recreational
amenities and other public facilities than would otherwise be provided under
conventional land development techniques.
D. Accommodation of housing of all types with convenient access to employment
opportunities and/or commercial facilities; and especially to create additional
opportunities for senior and affordable housing.
E. Preservation and enhancement of important environmental features through careful and
sensitive placement of buildings and facilities.
F. Preservation of historic buildings, structures or landscape features.
G. Coordination of architectural styles and building forms to achieve greater compatibility
within the development and surrounding land uses.
H. Creation of more efficient provision of public utilities and services, lessened demand on
transportation, and the promotion of energy resource conservation.
I. Allowing the development to operate in concert with a redevelopment plan in certain
areas of the City and to ensure the redevelopment goals and objectives will be achieved.
J. Higher standards of site and building design than would otherwise be provided under
conventional land development technique.
(Ord. 08-070, passed 2-19-2013)
§ 154.752 ALLOWED DEVELOPMENT.
Uses within the PUD may include only those uses generally considered associated with the
general land use category shown for the area on the official Comprehensive Land Use Plan.
Specific allowed uses and performance standards for each PUD shall be delineated in an
ordinance and development plan. The PUD development plan shall identify all the proposed land
uses and those uses shall become permitted uses with the acceptance of the development plan.
Any change in the list of uses approved in to [EB1]the development plan will be considered an
amendment to the PUD, and will follow the procedures specified in Article 3, Administration,
for zoning amendments. PUDs may allow for flexibility in the following:
A. Permitted Uses. The PUD application shall identify all proposed land uses and those uses
shall become permitted uses upon the approval of the planned unit development.
B. Placement of Structures. More than one principal building may be placed on a platted lot
within a planned unit development. The appearance and compatibility of buildings in
relation to one another, other site elements, and surrounding development shall be
considered in the review process.
C. Development Intensity. The PUD may provide for an increase in the maximum gross
floor area or floor area ratio maximum impervious surface by up to 20% [EB2]of that
allowed in the base zoning district, for the purpose of promoting project integration and
additional site amenities.
D. Density. The PUD may provide for an increase in density of residential development by
up to 20% of that allowed in the base zoning district, for the purpose of promoting
diversity of housing types and additional site amenities. Increased residential densities of
varying levels will be awarded based upon the provision of a combination of various site
amenities outlined in § 154.209Table 16-2. In addition, the city retains the right to
evaluate all proposals for bonus density in accordance with the overall goals of the city’s
Land Use Element of the Comprehensive Plan.
E. Building Setbacks. The PUD may provide for a reduction in or elimination of required
setbacks in the base zoning district, provided that a landscaped setback area of the
minimum width established for the base zoning district is maintained along the periphery
of the adjacent zoning district(s).
F. Lot Requirements. The Council may authorize reductions in the area and width of
individual lots within a PUD from that required for the base zoning district, provided that
such reductions are compensated for by an equivalent amount of open space or other
public amenities elsewhere in the planned unit development. Any open space shall not
include areas designated as public or private streets. The plan may increase the maximum
density beyond that permitted in the base zoning district for the purpose of promoting an
integrated project with a variety of housing types and additional site amenities.
G. Other Exceptions. As part of PUD approval, the Council is authorized to approve other
exceptions to the zoning controls applicable to the base zoning district, such as the
maximum height of structures or the minimum off-street parking requirements. Such
exceptions shall only be granted when they are clearly warranted to achieve the
objectives identified in § 154.801751.
(Ord. 08-070, passed 2-19-2013)
§ 154.753 MINIMUM REQUIREMENTS.
A. Lot Development Area. A PUD must include a minimum of 5 acres or more for
undeveloped land or 2 acres for developed land within the approved development. Tracts
of less than 2 acres may be developed as a PUD only after a sketch plan review and the
Planning Commission determines that approved only if the applicant can demonstrate
that athe project is of project of superior design can be achieved to meet one or more of
the identified objectives listed in § 154.801751, or that compliance with the
Comprehensive Plan goals and policies can be attained through the use of the PUD
process.. The Planning Commission shall authorize submittal of a PUD for a tract of less
than 2 acres prior to submittal of a general concept plan application. For requests to
establish Planned Unit Developments on tracks of land less than five (5) acres, the Sketch Plan is
optional if the Planning Director determines that the project is of superior design can be
achieved to meet one or more of the identified objectives listed in § 154.751, or that
compliance with the Comprehensive Plan goals and policies can be attained through the
use of the PUD process.
B. Open Space. For all PUDs, at least 20% of the project area not within street rights-of-way
shall be preserved as protected open space. Other public or site amenities may be
approved as an alternative to this requirement. Any required open space must be available
to the residents, tenants, or customers of the PUD for recreational purposes or similar
benefit. Land reserved for storm water detention facilities and other required site
improvements may be applied to this requirement. Open space shall be designed to meet
the needs of residents of the PUD and the surrounding neighborhoods, to the extent
practicable, for parks, playgrounds, playing fields and other recreational facilities.
C. Street Layout. In existing developed areas, the PUD should maintain the existing street
grid, where present, and restore the street grid where it has been disrupted. In newly
developing areas, streets shall be designed to maximize connectivity in each cardinal
direction, except where environmental or physical constraints make this infeasible. All
streets shall terminate at other streets, at public land, or at a park or other community
facility, except that local streets may terminate in stub streets when those will be
connected to other streets in future phases of the development or adjacent developments.
(Ord. 08-070, passed 2-19-2013)
§ 154.754 DENSITY.
The PUD may provide for an increase in density of residential development by up to 20% of that
allowed in the base zoning district. Applicants seeking increased residential density through a
Planned Unit Development are required to provide at least 1 or a combination of site amenities
that equal the required amount of amenity points to achieve the desired density bonus.
A. Amenity Points and Equivalent Density Increases. Increases in density will be awarded
through a 1:1 ratio with amenity points. For every increase in amenity points for a
Planned Unit Development, the applicant will be allowed an equivalent amount of
density increase, up to a maximum increase of 20%. Table 16-1 outlines the required
amount of amenity points to achieve various density increases.
Table 16‐1: Amenity Points and Equivalent Density Increases
Amenity Points Density Increase
5 5%
10 10%
15 15%
20 20%
B. Site Amenities. Site amenities that are eligible for amenity points are listed in Table 16-2,
including the associated standards of implementation. Some of the amenities may be
awarded a range of amenity point based upon the quality and magnitude of the amenity.
Where the amenity does not meet all of the standards required in Table 16-2, no points
shall be awarded. Partial points for site amenities shall not be awarded, except as
otherwise allowed in Table 16-2.
C. Site Amenities Not Listed. The city may also consider the allotment of amenity points for
site amenities that are not otherwise specified within this ordinance as part of the
preliminary plan phase of the planned development.
Table 16‐2: Site Amenities
Points Amenity Standards
5‐10 Underground or
Structure Parking
Proposed underground or structured parking must be integrated into the
primary structure. The purpose of this amenity is to better integrate parking
into the site, reduce the amount of surface parking stalls, and reduce the
amount of impervious surface. Proposed underground or structured parking
must reduce the amount of surface parking stalls located outside of the
footprint of the principal structure by a minimum of 25%. Amenity points will
be awarded based upon the amount of surface parking stalls reduced
(between 25‐50%). For every additional 5% of surface parking stalls reduced
above 25%, the applicant will be awarded 1 additional amenity point, up to a
maximum of 10 amenity points. The facade of any underground or structure
parking areas must match the architectural design of the principal structure.
10 Historic Preservation
Preservation, rehabilitation or restoration of designated historic landmarks in
a manner that is consistent with the standards for rehabilitation of the
Secretary of the Interior as part of the development.
Points Amenity Standards
10 Additional Open
Space
A minimum of 50% of the site not occupied by buildings shall be landscaped
outdoor open space. A minimum of 50% of the provided open space shall be
contiguous. Open space classifications that qualify may include natural
habitat, neighborhood recreation, trail corridors or open space buffers.
10 Public Right‐of‐Way
Dedication
Dedication of land and construction of a public road, trail, pathway, or
greenway that is part of an approved city plan, but outside the scope of the
immediate project area. Right‐of‐way improvements should be designed per
the specification of the City Engineer.
5 Fire Sprinkler
Systems
The installation of fire sprinkler systems, per NFPA 13, 13D or 13R, in
structures that are not currently required to install these systems under state
code. Amenity points will only be awarded in situations where there are a
significant proportion of structures in the development that are not required
to be sprinkled under State Building Code. In addition, the density bonus
calculation shall only be applied to the number of structures that do not
require fire sprinkler systems.
5 Contained Parking
The purpose of this amenity is to better integrate surface parking into the site
and reduce the amount of visible surface parking from the public right‐of‐way.
Parking should be rear‐loaded and hidden by the building facade, or
integrated into the site in some other fashion that is acceptable to the city.
This amenity is separate from underground or structure parking.
5
Leadership in Energy
and Environmental
Design
The proposed development shall meet the minimum standards for LEED Silver
certification. The project does not have to achieve actual LEED certification;
however, the developer must submit the LEED checklist and documentation
to the city, approved by a LEED Accredited Professional (LEED‐AP), which
shows that the project will comply with LEED Silver requirements.
5 Pedestrian
Improvements
A site and building design that allows for exceptional and accessible
pedestrian and/or bicycle access through and/or around a site. The
improvements shall use a combination of trails, landscaping, decorative
materials, access control and lighting to create safe, clear and aesthetically
pleasing pedestrian facilities through and /or around the site that comply with
the Americans with Disabilities Act accessibility requirements.
5 Adaptive Reuse Significant renovation, rehabilitation and adaptive reuse of an existing
building(s), rather than demolition.
5 Plaza
The development shall include some form of plaza or public square that is
wholly or partly enclosed by a building or buildings. Plazas are landscaped or
paved open areas that shall have a minimum area not less than 1,000 square
feet. Plazas for commercial or mixed‐use development shall be open to the
public during daylight hours.
Points Amenity Standards
1‐5 Enhanced
Landscaping
A Landscaping Plan of exceptional design that has a variety of native tree,
shrub and plan types that provide seasonal interest and that exceeds the
requirements of the Lake Elmo Design Standards Manual. The landscaped
areas should have a resource efficient irrigation system. The Landscaping Plan
shall be prepared by a licensed landscape architect. Amenity points shall be
awarded based upon the quality and magnitude of the Landscaping Plan.
3 Enhanced Storm
Water Management
Provide capacity for infiltrating stormwater generated onsite with artful rain
garden design that serves as a visible amenity. Rain garden designs shall be
visually compatible with the form and function of the space and shall include
long‐term maintenance of the design. The design shall conform to the
requirements per the Minnesota Stormwater Manual and shall meet the
approval of the City Engineer.
1‐3 Theming
Significant utilization of various elements of Theming consistent with the 2013
Lake Elmo Theming Project, including but not limited to signage, fencing,
landscaping, lighting and site furnishings. Amenity points will be awarded
based upon the quality and magnitude of Theming elements integrated into
the project.
3 Natural Features
Site planning that preserves significant natural features or restores ecological
functions of a previously damaged natural environment greater than required
by City ordinance or Engineering requirements.
(Ord. 08-070, passed 2-19-2013)
§ 154.755 COORDINATION WITH OTHER REGULATIONS.
A. Coordination with Subdivision Review. Subdivision review under the subdivision
regulations shall be carried out simultaneously with the review of the PUD. The plans
required under this subchapter shall be submitted in a form that will satisfy the
requirements of the Subdivision Ordinance for the preliminary and final plat.
B. Coordination with Other Zoning Requirements. All of the provisions of this chapter
applicable to the original district within which the Planned Unit Development District is
established shall apply to the PUD District except as otherwise provided in approval of
the Final Plan.
(Ord. 08-070, passed 2-19-2013)
§ 154.756 PHASING AND GUARANTEE OF PERFORMANCE.
A. Development Schedule. The City shall compare the actual development accomplished in
the various PUD zones with the approved development schedule.
B. Schedule Extension. For good cause shown by the property owner, the City Council may
extend the limits of the development schedule.
C. Phasing of Amenities. The construction and provision of all of the common open space,
site amenities and public and recreational facilities which are shown on the final development
plan must proceed at the same rate as the construction of dwelling units, if any. The
Development Review Committee [SW3]shall review all of the building permits issued for the PUD
and examine the construction which has taken place on the site. If they find that the rate of
construction of dwelling units is greater than the rate at which common open spaces, site
amenities and public and recreational facilities have been constructed and provided, they shall
forward this information to the City Council for action.
D. Guarantees. A financial guarantee or letter of credit shall be required to guarantee
performance by the developer. The amount of this guarantee or letter of credit, and the specific
elements of the development program that it is intended to guarantee, will be stipulated in the
development agreement.[SW4]
E. Changes During Development Period
1. Minor changes in the location, placement and height of structures may be authorized by
the Development Review Committee if required by engineering or other circumstances not
foreseen at the time the final plan was approved and filed with the Planning Director.
2. Changes in uses, any rearrangement of lots, blocks and building tracts, changes in the
provision of common open spaces, and all other changes to the approved final development plan
may be made only under the procedures for zoning amendments, §§ 154.015 through 154.021.
Any changes shall be recorded as amendments to the recorded copy of the final development
plan.[EB5]
F. Rezoning to Original District. If substantial development has not occurred within a
reasonable time after approval of the PUD Zoning District, the City Council may instruct the
Planning Commission to initiate rezoning to the original zoning district. It shall not be necessary
for the City Council to find that the rezoning was in error.[SW6]
(Ord. 08-070, passed 2-19-2013)
§ 154.757 CONTROL OF PLANNED UNIT DEVELOPMENT FOLLOWING
COMPLETION.
A. Final Development Plan Controls Subsequent Use. After the certificate of occupancy has
been issued, the use of the land and the construction, modification or alteration of any
buildings or structures within the planned development shall be governed by the final
development plan.
B. Allowed Changes. After the certificate of occupancy has been issued, no changes shall be
made in the approved final development plan except upon application as provided below:
1. Any minor extensions, alterations or modifications of existing buildings or
structures may be authorized by the Development Review Committee if they are
consistent with the purposes and intent of the final plan. No change authorized by
this section may increase the cubic volume of any building or structure by more
than 10%; and
2. Any building or structure that is totally or substantially destroyed may be
reconstructed only in compliance with the final development plan unless an
amendment to the final development plan is approved under this chapter.
C. Amendment Required for Major Changes. Any other changes in the final development
plan, including any changes in the use of common open space, must be authorized by an
amendment of the final development plan under the procedures for Zoning Amendments,
Article 3.
(Ord. 08-070, passed 2-19-2013)
§ 154.661 756 PLANNED UNIT DEVELOPMENT REVIEW PROCEDURE
All requests to establish a Planned Unit Development on tracts of land greater than five (5) acres in size
shall be initiated by following the steps below. For requests to establish Planned Unit Developments on
tracks of land less than five (5) acres, the Sketch Plan is optional..
A. Pre-Application Conference. Upon filing of an application for PUD, the applicant of the
proposed PUD shall arrange for and attend a conference with the Planning Director. The
primary purpose of the conference shall be to provide the applicant with an opportunity to
gather information and obtain guidance as to the general suitability of his or her proposal
for the area for which it is proposed and its conformity to the provisions of this
subchapter before incurring substantial expense in the preparation of plans, surveys and
other data.
(1)B. PUD Sketch Plan
(a) Purpose
The PUD Sketch Plan is the first second step in the development process which gives the
applicant an opportunity to present their ideas to the Planning Commission, the City
Council and public so as to gain general feedback on areas that will require additional
analysis, study, design, changes, etc. Feedback gained during the PUD Sketch Plan phase
should be addressed within the subsequent PUD Preliminary Plan.
(b) PUD Sketch Plan Submittal Requirements
Except as may be waived by the Director of Planning, the following information shall
constitute a complete application for a PUD Sketch Plan.
1. General Information
a. The landowner’s name and address and his/her interest in the subject
property.
b. The applicant’s name and address if different from the landowner.
c. The names and addresses of all professional consultants who have
contributed to the development of the PUD plan being submitted,
including but not limited to attorney, land planner, engineer and surveyor.
2. Present Status
a. The address and legal description of the property.
a.b. Gross site acreage.
b.c. The existing zoning classification and present use of the subject property
and all lands within 350 feet of the subject property.
c.d. A map depicting the existing development of the subject property and all
land within 350 feet of the subject property and showing the location of
existing streets, property lines, easements, water mains, and storm and
sanitary sewers, with invert elevations on and within 100 feet of the
subject property.
d.e. Site conditions. Where deemed necessary by the city, graphic
reproductions of the existing site conditions at a scale of 1 inch equals 100
feet shall be submitted and contain the following:
i. Contours; minimum 5 foot intervals;
ii. Location, type and extent of tree cover;
iii. Slope analysis; and
iv. Location and extent of water bodies, wetlands, streams, and flood
plains within 300 feet of the subject property.
e.f. A written narrative describing the proposed PUD, explaining the applicant’s
proposed objectives for the PUD, a listing of the proposed modifications from
current zoning as may be applicable, an explanation of how the proposal achieves
the objectives identified in §154.751 and the proposals statement generally
describing the proposed PUD and showing its relationship to the City
Comprehensive Plan.
g. Statement of the estimated total number of dwelling units proposed for the
PUD and a tabulation of the proposed approximate allocations of land use
expressed in acres and as a percent of the total project area, which shall
include at least the following:
i. Calculation of the proposed density;
ii. Area devoted to residential use by building type;
iii. Area devoted to common open space;
iv. Area devoted to public open space and public amenities;
v. Approximate area devoted to, and number of, off-street parking and
loading spaces and related access;
vi. Approximate area, and floor area, devoted to commercial uses; and
vii. Approximate area, and floor area, devoted to industrial or office use.
f.h. Schematic drawing of the proposed development concept, including but
not limited to the general location of major circulation elements, public
and common open space, residential and other land uses.
i. Proposed design features related to proposed streets, showing right-of-way
widths, typical cross-sections, and areas other than streets including but
not limited to pedestrian ways, utility easements and storm water facilities.
j. A statement of intent to establish a Common Interest Community
association with bylaws and deed restrictions to include, but not be
limited to, the following:
i. Ownership, management and maintenance of defined public or
common elements;
ii. Maintenance of public and private utilities; and
g.iii. General architectural guidelines for principal and accessory
structures.
h.k.Proposed PUD phasing if it is to be constructed in stages during a period
of time extending beyond a single construction season, a preliminary
schedule for the development of such stages or units shall be submitted
stating the approximate beginning and completion date for each such stage
and overall chronology of development to be followed from stage to stage
i.l. The City may excuse an applicant from submitting any specific item of
information or document required in this stage which it finds to be
unnecessary to the consideration of the specific proposal.
j.m. The City may require the submission of any additional information
or documentation which it may find necessary or appropriate to full
consideration of the proposed PUD.
(c) PUD Sketch Plan Proposal Review
(i) Planning Commission
1. Upon receiving a PUD Sketch Plan proposal, the City shall schedule a date upon
which the Planning Commission will review the proposal[BGA7].
n. The Planning Director shall review the PUD Sketch Plan proposal and prepare a
report including, but not limited to, identifying proposed modifications from
current zoning as may be applicable, how the proposal achieves the objectives
identified in §154.751 and the proposals relationship to the City
Comprehensive Plan.
1.2. The Planning Commission shall review the application and upon completing their
review, the Planning Commission shall adopt findings and recommendations on
the proposed PUD as soon as practical.
2.3. The Director of Planning may forward an application to the City Council without
a recommendation from the Planning Commission only if it is deemed necessary
to ensure compliance with state mandated deadlines for application review.
(ii) City Council
1. The City Council may listen to comments from the public on the proposed
development if they deem such necessary prior to discussing the proposed PUD
Sketch plan.
2. After consideration of the Director of Planning’s recommendation, the Planning
Commission recommendation, and any public comments received, the City
Council may comment on the merit of the request, needed changes, and
suggested conditions that the proposer should adhere to with any future
application.
3. For each of the identified modifications to the underlying zoning standards, the
City Council shall take a vote to instruct the applicant as to whether the
modification can be pursued as a component of the PUD Preliminary Plan
review.
(d) Effect of a PUD Sketch Plan Review
(i) The City Council and Planning Commission’s comments during the PUD Sketch
Plan review are explicitly not an approval or denial of the project, and are intended
only to provide information for the applicant to consider prior to application for a
PUD Preliminary Plan.
(ii) Proposed modifications that receive a majority vote of support from Council may be
requested as part of the future PUD Preliminary Plan application, but support to
pursue the modification as part of the PUD Sketch Plan in no way guarantees that the
modification will be approved as part of the PUD Preliminary Plan.
(e) Limitation of Approval
The City Council’s review of a PUD Sketch Plan shall remain valid for a period of six (6)
months. The City Council, in its sole discretion, may extend the validity of their findings
for an additional year.
B.C. PUD Preliminary Plan
(a) Prerequisite
No application for a PUD Preliminary Plan will be accepted unless an applicant’s
proposal is distinctly similar to one reviewed in the completed the PUD Sketch Plan
review process which is valid upon the date of application.
(b) PUD Preliminary Plan Submittal Requirements
Except as may be waived by the Director of Planning, the following information shall
constitute a complete application for a PUD Preliminary Plan. Applicable plans must
meet requirements of the City’s Engineering Design and Construction Manual. [EB8]
1. Preliminary plat and information required by § 153.07.
2. General Information
a. The landowner’s name and address and his interest in the subject property.
b. The applicant’s name and address if different from the landowner.
c. The names and addresses of all professional consultants who have
contributed to the development of the PUD plan being submitted,
including but not limited to attorney, land planner, engineer and surveyor.
d. Evidence that the applicant has sufficient control over the subject property
to effectuate the proposed PUD, including a statement of all legal,
beneficial, tenancy and contractual interests held in or affecting the subject
property and including an up-to-date certified abstract of title or registered
property report, and such other evidence as the City Attorney may require
to show the status of title or control of the subject property.
3. Present Status
a. The address and legal description of the property.
b. The existing zoning classification and present use of the subject property
and all lands within 350 feet of the property.
c. A map depicting the existing development of the property and all land
within 350 feet thereof and indicating the location of existing streets,
property lines, easements, water mains and storm and sanitary sewers,
with invert elevations on and within one hundred feet of the property.
d. A written statement generally describing the proposed PUD and the
market which it is intended to serve and its demand showing its
relationship to the city’s Comprehensive Plan and how the proposed PUD
is to be designed, arranged and operated in order to permit the
development and use of neighboring property in accordance with the
applicable regulations of the city.
e. A statement of the proposed financing of the PUD.
f. Site conditions. Graphic reproductions of the existing site conditions at a
scale of one 1 inch equals 100 feet. All of the graphics should be at the
same scale as the final plan to allow easy cross-reference. The use of
overlays is recommended for ease of analysis
i. Contours; minimum two 2 foot intervals.
ii. Location, type and extent of tree cover.
iii. Slope analysis.
iv. Location and extent of water bodies, wetlands and streams and
flood plains within 300 feet of the property.
v. Significant rock outcroppings.
vi. Existing drainage patterns
vii. Vistas and significant views.
viii. Soil conditions as they affect development.
g. Schematic drawing of the proposed development concept, including but
not limited to the general location of major circulation elements, public
and common open space, residential and other land uses.
h. A statement of the estimated total number of dwelling units proposed for
the PUD and a tabulation of the proposed approximate allocations of land
use expressed in acres and as a percent of the total project area, which
shall include at least the following:
i. Area devoted to residential use by building type;
ii. Area devoted to common open space;
iii. Area devoted to public open space and public amenities;
iv. Approximate area devoted to streets;
v. Approximate area devoted to, and number of, off-street parking
and loading spaces and related access;
vi. Approximate area, and floor area, devoted to commercial uses;
and
vii. Approximate area, and floor area, devoted to industrial or office
use.
i. When the proposed PUD includes increases in density of residential
development above the base zoning district, a statement describing the
site amenities to be included within the PUD, and demonstrating that the
proposed site amenities sufficiently achieve the desired density bonus.
Applicant is required to demonstrate that all site amenity standards have
been met in order to be awarded increased density for residential
development.
j. When the PUD is to be constructed in stages during a period of time
extending beyond a single construction season, a schedule for the
development of such stages or units shall be submitted stating the
approximate beginning and completion date for each such stage or unit
and the proportion of the total PUD public or common open space and
dwelling units to be provided or constructed during each such state and
overall chronology of development to be followed from stage to stage.
k. When the proposed PUD includes provisions for public or common open
space or service facilities, a statement describing the provision that is to
be made for the care and maintenance of such open space or service
facilities.
l. Any restrictive covenants that are to be recorded with respect to property
included in the proposed PUD.
m. Schematic utilities plans indicating placement of water, sanitary and
storm sewers.
n. The City may excuse an applicant from submitting any specific item of
information or document required in this stage which it finds to be
unnecessary to the consideration of the specific proposal.
n.o.Applicable plans must meet requirements of the City’s Engineering Design and
Construction Manual. [EB9]
o.p.The City may require the submission of any additional information or
documentation which it may find necessary or appropriate to full
consideration of the proposed PUD.
(c) PUD Preliminary Plan Review
1. As part of the review process for an PUD Preliminary Plan, the Director of Planning
shall review the PUDs, and shall prepare a report and make a recommendation
regarding the proposed Preliminary PUD Plan for Planning Commission and City
Council consideration.
2. The Director of Planning shall prepare a draft ordinance to establish the potential
PUD overlay zoning district to be established as a component of the PUD Final
Plan.
3. The Planning Commission shall hold a public hearing and report its findings and
make recommendations to the City Council on the merit, needed changes, and
suggested conditions to impose on the PUD.
4. As a condition of PUD Preliminary Plan approval; finalization, adoption, and
publication of an overlay district ordinance shall need to occur prior to the filing of
any future final plat.
K. Effect of a PUD Preliminary Plan Review
Preliminary Plan approval governs the preparation of the PUD Final Plan which must be
submitted for final approval in accordance with the requirements of this Article.
L. Limitation of Approval
The City Council’s approval of a PUD Preliminary Plan shall remain valid for a period of
180 days[SW10], unless a request for time extension is submitted in writing and approved
by the City Council.
C.D. PUD Final Plan
(a) Application Deadline
Application for a PUD Final Plan shall be submitted for approval within 180[SW11] days of
City Council approval of the PUD Preliminary Plan unless a written request for a time
extension is submitted by the applicant and approved by the City Council.
(b) PUD Final Plan Submittal Requirements
Except as may be waived by the Director of Planning, the following information shall
constitute a complete application for a PUD Final Plan:
1. A final plat and information required by § 153.08;
2. Final plans drawn to a scale of not less than 1 inch equals 100 feet (or a scale
requested by the Zoning Administrator) containing at least the following
information:
a. Proposed name of the development (which shall not duplicate nor be
similar in pronunciation to the name of any plat heretofore recorded in the
county where the subject property is situated);
b. Property boundary lines and dimensions of the property and any
significant topographical or physical features of the property;
c. The location, size, use and arrangement including height in stories and feet
and total square feet of ground area coverage and floor area of proposed
buildings, including manufactured homes, and existing buildings which
will remain, if any;
d. Location, dimensions of all driveways, entrances, curb cuts, parking stalls,
loading spaces and access aisles, and all other circulation elements
including bike and pedestrian; and the total site coverage of all circulation
elements;
e. Location, designation and total area of all common open space;
f. Location, designation and total area proposed to be conveyed or dedicated
for public open space, including parks, playgrounds, school sites and
recreational facilities;
g. The location of applicable site amenities, if any;
h. Proposed lots and blocks, if any and numbering system;
i. The location, use and size of structures and other land uses on adjacent
properties;
j. Detailed sketches and provisions of proposed landscaping;
k. General grading and drainage plans for the developed PUD; and
l. Any other information that may have been required by the Planning
Commission or Council in conjunction with the approval of the
Preliminary Plan;
3. An accurate legal description of the entire area within the PUD for which final
development plan approval is sought;
4. A tabulation indicating the number of residential dwelling units and expected
population;
5. Density calculations, including proposed density bonuses above the base
zoning district. To be granted increased density of residential development,
the applicant must submit a schedule of site amenities with proposed designs
and standards. The applicant must demonstrate that site amenity standards in
Table 15-2 have been met to be rewarded additional density;
6. A tabulation indicating the gross square footage, if any, of commercial and
industrial floor space by type of activity (e.g. retail or office);
7. Preliminary architectural “typical” plans indicating use, floor plan, elevations
and exterior wall finishes of proposed building, including manufactured
homes;
8. A detailed site plan, suitable for recording, showing the physical layout,
design and purpose of all streets, easements, rights of way, utility lines and
facilities, lots, block, public and common open space, general landscaping
plan, structure, including mobile homes, and uses;
9. Preliminary grading and site alteration plan illustrating changes to existing
topography and natural site vegetation. The plan should clearly reflect the site
treatment and its conformance with the approved concept plan; and
10. A soil erosion control plan acceptable to watershed districts, Department of
Natural Resources, Natural Resources Conservation Service, or any other
agency with review authority, clearly illustrating erosion control measures to
be used during construction and as permanent measures.
10.11. Applicable plans must meet requirements of the City’s Engineering Design and
Construction Manual. [EB12]
(c) PUD Final Plan Review
1. The Director of Planning shall generate an analysis of the final documents against the
conditions of the PUD Preliminary Plan approval, and make a recommendation as to
whether all conditions have been met or if additional changes are needed.
2. The Director of Planning shall identify any information submittals that were waived
so Council may determine if such is needed prior to making a final decision.
3. The Director of Planning shall finalize the ordinance to establish the proposed
overlay district for consideration by the Planning Commission and City Council.
4. The Planning Commission shall hold a public hearing [BGA13]on the proposed PUD
overlay District zoning district ordinance and Final PUD Plans, and shall submit a
recommendation to the City Council for consideration. Because a PUD Preliminary
Plan was previously approved, the Planning Commission’s recommendation shall
only focus on whether the Ordinance and PUD Final Plan are in substantial
compliance with the PUD Preliminary Plan and the required conditions of approval.
5. The City Council shall then consider the recommendations of the Director of
Planning, the public, and the Planning Commission; and make a decision of approval
or denial, in whole or in part, on the PUD Final Plan. A denial shall only be based on
findings that a PUD Final Plan is not in substantial compliance with the approved
PUD Preliminary Plan and/or the required conditions of approval.
6. As a condition of PUD Final Plan approval, publication of the PUD ordinance shall
be required prior to filing of the approved final plat.
7. Planned Unit Development Agreement.
a. At its sole discretion, the City may as a condition of approval, require the owner
and developer of the proposed PUD to execute a development agreement which
may include but not be limited to all requirements of the PUD Final Plan.
b. The development agreement may require the developers to provide an
irrevocable letter of credit in favor of the City. The letter of credit shall be
provided by a financial institution licensed in the state and acceptable to the City.
The City may require that certain provisions and conditions of the development
agreement be stated in the letter of credit. The letter of credit shall be in an
amount sufficient to ensure the provision or development of improvement called
for by the development agreement.
8. As directed by the City, documents related to the PUD shall be recorded against the
property.
(d) Time Limit
1. A Planned Unit Development shall be validated by the applicant through the
commencement of construction or establishment of the authorized use(s), subject to
the permit requirements of this Code, in support of the Planned Unit Development
within one (1) year of the date of PUD Final Plan approval. Failure to meet this
deadline shall render the open space PUD Final Plan approval void. Notwithstanding
this time limitation, the City Council may approve extensions for validation of up to
one (1) year if requested in writing by the applicant; extension requests shall be
submitted to the Director of Planning and shall identify the reason(s) why the
extension is necessary along with an anticipated timeline for validation of the
Planned Unit Development.
2. An application to reinstate an open space PUD that was voided for not meeting the
required time limit shall be administered in the same manner as a new PUD
beginning at PUD Preliminary Plan.
§ 154.662 7567 PUD AMENDMENTS
Approved PUDs may be amended from time to time as a result of unforeseen circumstances, overlooked
opportunities, or requests from a developer or neighborhood. At such a time, the applicant shall make an
application to the city for a PUD amendment.
(A) Amendments to Existing Planned Unit Development
Amendments to an approved PUD shall be processed as one of the following:
(1) Administrative Amendment
The Director of Planning may approve minor changes if such changes are required by
engineering or other circumstances, provided the changes conform to the approved overlay
PUD zoning district intent and are consistent with all requirements of the PUD district
[EB14]ordinance. Under no circumstances shall an administrative amendment allow additional
lots, or changes to designated uses established as part of the PUD. An Administrative
Amendment shall be memorialized via letter signed by the Planning Director and recorded
against the PUD property.
(2) Ordinance Amendment
A PUD change requiring a text update to the adopted o PUD overlay zoning [EB15]district
language shall be administered in accordance with adopted regulations for zoning code
changes in § 154.105[EB16]. Ordinance amendments shall be limited to changes that are
deemed by the Director of Planning to be consistent with the intent of the original PUD
approval, but are technically necessary due to construction of the adopted PUD district
language.
(3) PUD Amendment
Any change not qualifying for an administrative amendment or an Ordinance ordinance
amendment shall require a PUD amendment. An application to amend ana PUD shall be
administered in the same manner as that required for a new PUD beginning at PUD
Preliminary Plan.[EB17]
§ 154.7587 CONTROL OF PLANNED UNIT DEVELOPMENT FOLLOWING
COMPLETION.
A. Final Development Plan Controls Subsequent Use. After the certificate of occupancy has
been issued, the use of the land and the construction, modification or alteration of any
buildings or structures within the planned development shall be governed by the final
development plan.
B. Allowed Changes. After the certificate of occupancy has been issued, no changes shall be
made in the approved final development plan except upon application as provided below:
1. Any minor extensions, alterations or modifications of existing buildings or
structures may be authorized by the Development Review Committee if they are
consistent with the purposes and intent of the final plan. No change authorized by
this section may increase the cubic volume of any building or structure by more
than 10%; and
2. Any building or structure that is totally or substantially destroyed may be
reconstructed only in compliance with the final development plan unless an
amendment to the final development plan is approved under this chapter.[EB18]
C. Amendment Required for Major Changes. Any other changes in the final development
plan, including any changes in the use of common open space, must be authorized by an
amendment of the final development plan under the procedures for Zoning Amendments,
Article 3.[EB19]
(Ord. 08-070, passed 2-19-2013)
§ 154.663 7598 PUD CANCELLATION
A PUD shall only be cancelled and revoked upon the City Council adopting an ordinance rescinding the
PUD district. Cancellation of a PUD shall include findings that demonstrate that the PUD is no longer
necessary due to changes in local regulations over time; is inconsistent with the Comprehensive Plan or
other application land use regulations; threatens public safety, health, or welfare; has become void[EB20]; or
other applicable findings in accordance with law.
§ 154.664 759 ADMINISTRATION
In general, the following rules shall apply to all PUDs:
(A) Rules and regulations
No requirement outlined in the PUD review process shall restrict the City Council from taking
action on an application if necessary to meet state mandated time deadlines;
(B) Preconstruction
No building permit shall be granted for any building on land for which a PUD plan is in the process
of review, unless the proposed building is allowed under the existing zoning and will not impact,
influence, or interfere with the proposed PUD plan.
(C) Effect on Conveyed Property
In the event that any real property in an approved PUD is conveyed in total, or in part, the new
owners thereof shall be bound by the provisions of the PUD zoning district.
§ 154.758 PROCEDURES FOR PROCESSING A PLANNED UNIT DEVELOPMENT.
There are four stages to the PUD process: application conference, general concept plan,
preliminary plan and final plan, as described below.
D. Application Conference. Upon filing of an application for PUD, the applicant of the
proposed PUD shall arrange for and attend a conference with the Planning Director. The
primary purpose of the conference shall be to provide the applicant with an opportunity to
gather information and obtain guidance as to the general suitability of his or her proposal
for the area for which it is proposed and its conformity to the provisions of this
subchapter before incurring substantial expense in the preparation of plans, surveys and
other data.
E. General Concept Plan. The general concept plan provides an opportunity for the
applicant to submit a plan to the city showing his or her basic intent and the general
nature of the entire development without incurring substantial cost. The plan should
include the following: overall density ranges, general location of residential and
nonresidential land uses, their types and intensities, general location of streets, paths and
open space, and approximate phasing of the development.
F. Preliminary Plan. Following approval of the general concept plan, the applicant shall
submit a preliminary plan application and preliminary plat, in accordance with the
requirements described in § 153.07. The application shall proceed and be acted upon in
accordance with the procedures in this subchapter for zoning changes.
G. Final Plan. Following approval of the preliminary plan, the applicant shall submit a final
plan application and final plat, in accordance with the requirements described in §
153.08. The application shall proceed and be acted upon in accordance with the
procedures in this ordinance for zoning changes. If appropriate because of the limited
scale of the proposal, the preliminary plan and final plan may proceed simultaneously.
H. Schedule for Plan Approval
1. Developer presents the general concept plan to the Planning Commission for their
review and comment.
2. After verification by the Planning Director that the required plan and supporting
data are adequate, the Planning Commission shall hold a public hearing, with
public notice.
3. The Planning Commission shall conduct the hearing and report its findings and
make recommendations to the City Council.
4. The City may request additional information from the applicant concerning
operational factors or retain expert testimony at the expense of the applicant
concerning operational factors.
5. The Council may hold a public hearing after the receipt of the report and
recommendations from the Planning Commission. If the Planning Commission
fails to make a report within 60 days after receipt of the application, then the City
Council may proceed without the report. The Council may approve the general
concept plan and attach such conditions as it deems reasonable.
6. Following approval of the General Concept Plan, the application may proceed to
the preliminary plan phase.
7. Developer presents the preliminary plan to the Planning Commission for their
review and comment.
8. After verification by the Planning Director that the required plan and supporting
data are adequate, the Planning Commission shall hold a public hearing, with
public notice.
9. The Planning Commission shall conduct the hearing and report its findings and
make recommendations to the City Council.
10. The City may request additional information from the applicant concerning
operational factors or retain expert testimony at the expense of the applicant
concerning operational factors.
11. The Council may hold a public hearing after the receipt of the report and
recommendations from the Planning Commission. If the Planning Commission
fails to make a report within 60 days after receipt of the application, then the City
Council may proceed without the report. The Council may approve the
preliminary plan and attach such conditions as it deems reasonable.
12. Following approval of the Preliminary Plan, the application may proceed to the
final plan phase.
13. Developer presents the Final Plan to the Planning Commission for their review
and comment.
14. After verification by the Planning Director that the required plan and supporting
data are adequate, the Planning Commission shall hold a public hearing, with
public notice.
15. The Planning Commission shall conduct the hearing and report its findings and
make recommendations to the City Council.
16. The City may request additional information from the applicant concerning
operational factors or retain expert testimony at the expense of the applicant
concerning operational factors.
17. After the receipt of the report and recommendations from the Planning
Commission, the City Council may approve the Final Plan and attach such
conditions as it deems reasonable.
(Ord. 08-070, passed 2-19-2013)
§ 154.759 APPLICATION REQUIREMENTS FOR GENERAL CONCEPT PLAN,
PRELIMINARY PLAN AND FINAL PLAN.
Ten copies of the following plans, exhibits and documents shall be submitted at the general
concept plan stage, preliminary plan stage and the final plan stage.
STAFF REPORT
DATE: 2/27/2017
REGULAR
ITEM #:5c
MOTION
TO: Planning Commission
FROM: Emily Becker, City Planner
AGENDA ITEM: Solar Energy Ordinance
REVIEWED BY: Stephen Wensman, Planning Director
BACKGROUND:
The creation of a solar garden/solar power ordinance is an item on the 2017 Planning Commission Work
Plan.
ISSUE BEFORE COMMISSION:
The Planning Commission is being asked to clarify what should be included in the requested solar
garden/solar power ordinance.
PROPOSAL DETAILS/ANALYSIS:
What’s currently in the Zoning Code Regarding Solar Energy?
Definition of Solar Equipment 154.012.B.12
Solar Equipment. Any solar collector, skylight, or other solar energy device whose
primary purpose is to provide for the collection, storage, and distribution of solar energy
for space heating, cooling, water heating, or for power generation.
Standards for Accessory Use 154.310 (C)
A. Solar Energy Systems. Solar energy systems and solar structures are permitted accessory
uses in all districts, provided the system is in compliance with minimum lot requirements
and setbacks.
1. A solar structure must comply with all setback, height and lot coverage restrictions
unless a variance is granted.
Permitted Accessory Use .
Where permitted. All zoning districts (except PF – Public and Quasi Public Open Space) list
solar equipment as a permitted accessory use.
o Note: 154.310 (C) indicates that solar energy systems and solar structures are permitted
accessory uses in all districts, even though it is not an explicitly-stated accessory use in the
PF district.
Planning Commission Meeting 2/27/2017 Business Item #4c
Page 2
Cannot be located on vacant lot. Because the Zoning Code states in Section 154.213: Accessory
Buildings and Structures, Generally., that no accessory buildings or structures shall be constructed
nor accessory uses located on a lot until a building permit has been issued for the principal structure
to which it is accessory, this means that solar equipment cannot be located on a property unless
there is already a principal structure or building on the property.
Why Add Additional Solar Energy Standards to the Zoning Code?
Comprehensive Plan. The Resource Protection section of the Comprehensive Plan, calls for the need to
account for solar access through forward-thinking local planning and ordinances.
Protecting Solar Access. Adjacent structures or vegetation are prevented from shading solar collectors.
Solar Energy Systems should be situated in areas where there are larger lots and/or adequate open space
and height of surrounding buildings are limited.
Improve Competitive Markets. Solar energy systems offer additional energy choice to consumers and will
improve competition in the electricity and natural gas supply market. Xcel has a Solar Rewards Community
program, which allows subscribers to a solar garden to receive payment for a portion of the garden’s solar
energy produced as a credit on their energy bills.
Washington County Landfill. The Minnesota Pollution Control Agency (MPCA) has created a Land Use
Plan for the Washington County Landfill management area that designates an area of the site as restricted
from the use of park and open space available to the public. The plan does allow a solar energy farm. Minn.
Stat. 115B.412, Subd. 9 requires all local land-use plans be consistent with the MPCA’s land-use plans for
landfill management areas. The creation of an ordinance more closely regulating solar energy systems
would better help to prepare the use of solar energy on this site as a primary use.
Solar Equipment Not Allowed as Primary Use. Solar equipment is not currently allowed as a primary use
on any lot. Therefore, no vacant lot could have solar equipment. If or when a new land use plan is adopted
for the Washington County Landfill site, that land use plan could include a solar energy farm as an either
conditional or permitted primary use. The Commission may wish, however, to recommend allowing solar
equipment as a primary use on vacant lots within other zoning districts.
Standards to Regulate Design, Required Permits, Etc. The Commission may wish to recommend adding
design standards, required certifications, regulations protecting solar access, or minimu m lot size required
for solar energy systems.
Other Cities’ Examples. Staff has provided examples of other cities’ solar energy ordinances. These are
cities within Washington County that participate in Xcel Energy’s Solar Rewards Community program,
which enables community solar gardens to interconnect to Xcel Energy’s systems and allows for a bill
credit on subscribers’ Xcel Energy electric bills which may, or may not, offset the cost of subscription . A
summary table is attached for reference.
FISCAL IMPACT:
None.
OPTIONS:
Planning Commission Meeting 2/27/2017 Business Item #4c
Page 3
The Commission may wish to:
Specify desired amendments or additions to the Zoning Code regarding solar garden/solar power
ordinance.
Not recommend amending current standards or adding new ones.
ATTACHMENTS:
Other cities’ solar energy system ordinances and summary table
1
CITY OF LAKE ELMO
COUNTY OF WASHINGTON
STATE OF MINNESOTA
ORDINANCE NO. 08-___
AN ORDINANCE AMENDING THE LAKE ELMO CITY CODE OF ORDINANCES BY
ADDING ADDITIONAL STANDARDS FOR SOLAR ENERGY SYSTEMS.
SECTION 1. The City Council of the City of Lake Elmo hereby amends Title XV: Land
Usage; Chapter 154: Zoning Code; Article II; Section 154.012; Subd. (B) (12) by amending
the definition of Solar Equipment and adding definitions to Solar Equipment:
Solar Garden. A solar garden is a facility that generates electricity by means of a ground-
mounted or roof-mounted solar photovoltaic device whereby subscribers receive a bill credit for
the electricity generated in proportion to the size of their subscription. The solar garden must
have a nameplate capacity of no more than one megawatt. Each subscription shall be sized to
represent at least 200 watts of the community solar garden's generating capacity and to supply,
when combined with other distributed generation resources serving the premises, no more than
120 percent of the average annual consumption of electricity by each subscriber at the premises
to which the subscription is attributed.
Solar Equipment Energy System. Any solar collector, skylight, or other solar energy device
whose A device or structural design feature, a primary purpose of which is to provide for the
collection, storage, and distribution of solar energy for space heating, cooling, water heating,
providing daylight for interior lighting, or for power generation.
Building-Integrated Solar Energy Systems. An active solar energy system that is an integral part
of a principal or accessory building, rather than a separate mechanical device, replacing or
substituting for an architectural or structural component of the building. Building-integrated
systems include but are not limited to photovoltaic or hot water solar energy systems that are
contained within roofing materials, windows, skylights, and awnings.
SECTION 2. The City Council of the City of Lake Elmo hereby amends Title XV: Land
Usage; Chapter 154: Zoning Code; Article II; Section 154.310 (C) to read as follows.
Solar Energy Systems. Solar energy systems and solar structures are permitted accessory uses in
all districts, provided the system or equipment is in compliance with minimum lot requirements
and setback requirements for accessory uses and structures of the zoning district including .
1. A solar structure must comply with all setback, height and lot coverage restrictions unless
a variance is granted.
SECTION 2. Effective Date. This ordinance shall become effective immediately upon
adoption and publication in the official newspaper of the City of Lake Elmo.
Commented [EB1]: This is confusing, as it leaves the questions
if the lot must meet minimum lot size requirements.
2
SECTION 43 Adoption Date. This Ordinance 08-___ was adopted on this ______ day of ___
2017, by a vote of ___ Ayes and ___ Nays.
LAKE ELMO CITY COUNCIL
_________________________________
Mike Pearson, Mayor
ATTEST:
_________________________________
Julie Johnson, City Clerk
This Ordinance 08-____ was published on the ____ day of ___________________, 2017.
&
"
" "
"7 7 ""7 "7
+* ++)#* 0+* *1B* *10B*00-)8
0 0 )-)* -)0)) ?-)-)++);*1J
> @B* *1)02*)*
>
@B* *1+ )) ?J0B*00 *0)-)* -)0)) ?+
B* *1)* #*)0
)? ++2)* 0 ))* +#+B*1*2++*0*
*2+ +)*)) *+);*?* +)
2+*+) !? )A*0-*+** ++
)0+;**)++*+))+*2+
<+#**)0** *)!? ++)0+;*< 0*
5* )7*+*1)!? ++)0+;**)+7*+*1)
)2)-5* )
-!+* ++0**0*:)0**1*-;*+)01*
)00**) *)+)0*);# )+#* *) *1+ 2
?+* ++)*-++)00**));)) ;**;)0*+ )-
)) ?+)*))+**))*-)0* )? ++2)
) )*-;**))5* )&0)- )*)0*);#
0* *)
&E&95
) )-*0)))*) ++) *+!+)0= +* )
);;*)0=*1+**)-)*#*1)#)**)+ )0** *#
0*2*+*10*;+*2+++ #*;2*)--)$)*1
0** )7*+*1%--**+A*) 0** *#90*
)**)+ 90* +*-)#*;) 2+* ** %*
75E5
0 )-)8+*
0)-)8);
,+1+ **) )-)8
. **))-)8*+*1J020+1*1* );*1
))*0)+*1)-++;*2* 0 )-*)*1;*+*+
1**-+*2+
"*+)*+*1+)*))-)+* ;*2* +*+;* *)*)
)* ;*+*+1*+++ ) *+) ++*+
* 2;) +
1*K 5* )*-**))8 *1 *-**)
/&)0*))-+); *)+1+))+)-)
<&%
?;*++)2++);*'C&* *?;*++20** *#+0**++)
:)*1* *
!" ,-
233*6"
6* *++* )++ )+1* ++*) **)--)
7
) * ;**)0 *#9+*)-* *)* )++); )2+
2) )+ 2 * )); )-* )+1 )
"%,!
"3F 3F
"
<%%&
"
)1#+)0)-;2+12 * ) * ;*)00*#+)0
*)--) )* )*-)-)++);*1) J
)0 *#9+)+ )01)+ )-)0 *#9+ #+
-;+-)-*R **: 2)0)*1 ---*#--** )-*#
)+1 0 * ++))! *) 0*))--) *+-+ )*+*! +*
+*1-)++);*1 )+1 *-*++*0+0-)++);*11)+ J
+4)1 )-+)+;2+1 ) *+*1)*+**)
-);* )+2*)0 1
2+49)0) *2+2*+*1 *1010* * **+)00*+
* *+2*+*1 ) # )--1*)
C) *)>C@)+1* 2;2+))++*11
)* )# *))+**);*++)));2+1
) C) >C@0* *) )*;)++*)
+ -)0 )-)#*)+1 )
,)+ ))+1* ! +)+1 ))1*1 )- )+
1;*++*# *-)00*R 1 +)-)+*)+*0*B) )-* +* =
)*;*-) *+-+
.0)#)0**#5= )+1 0 )--**)+1)*)) 0
;*++*0)#)0**)*+**+1 +0=
$-)++);*1;) 0 ; ** *) ++#0*1
*2)0** *)B;B +-**) *)*+))B
++** *--0*1
%
6&6!*# )+1 0* *1+)-
**+) )2*+*1 0*+#*+*1) 2 **1-)
*+) +)0))-2*+*17*+*1!*1 0 *+2)
+*0*)))#)+*)); )+1 0 )*;**))-*10*+
;*); =+*1 ;*1
6! )+!+*>))#)+*@)#* *++*);>)-**+
)B-)*+);@)0+*+)00*002 )2 * **1)+))--! *-)0
+)*))- )+1 0) * ;*5*
7 . ) )
)00* )+ 002* ))**+
+
%6&6!))#)+* )+1 0* ))+*
** #2+**+*)0
5%
6&6!))#)+* )+1 0*;*** 1*:2
)+1 0)+*++)*;)+*** #2
+**+*)0
6&6! )+1 0 )++*1);*) -)0*1
*))-)0)-1) -*11#*B1
6! )+1 0)# )+1*+*)+**
7 &&6&&! 0+*0* *1)+)*))
2))-0* *2+#+)0)2+);* 0* +*0 )-
)#1*))2)-)) )-)#**1 -)2-*+);*) +*1 *1
)#+);* 0* + -**5",2,)0)
# *)
7 &6! )+1);*1 0;2+1 0 ))
*+ *# 0 #+-*) 1) );*);
7 !-*+B*) +))-2*+*1))-++2* )#*++2)
B+ *#+B *;+- ,F
F
F
&
"
6!)2 )- )+ )> -***)2+);@)+))2*+*1
*+*1 ) 8+**1 -)) )-*1* +*1))
)+1 0
6!#* ))-#*) -);**0) * )
-)0 )+*1*)0+0*+0*+)+*+1
66
!)- )+)++)2 )2 )+1-) *)++)R
1 -)0*)) )++) -) )*+-0 ) 0)*1
;
6$!#* *-*++ *1)*#* *2+)*))- )+
0;*+))++*1*-)*)-) **++0**1**)2*+*1 *+*)-
*-**++*1*1
6&!*1*#-)0 2)++*-)0)-)+*12
)+)++)
6&$! 0) * )-0* 0 *1*0*+))#**1))+*1
+*+);0*+); )++*1*1)))#*)02**))--)1)*12
0 )-)++*1 -*1 )+11*) *2*#) *#
0 0 0+ )#2*+*)- )*1 1-)-*+*:*)9 *#
)+1 0 *1 )+1#* )02;++)0+)-
)0+ ;*);
6&6!#*) + *1- 2 *+) )-;** ))#*-)
)++*) )1* *2*))- +*1-) *1)))+*11*))-+**
;*1))#**1+*1-)**)+*1*1
6(!)00*+-*+*)# +*1*)+**;2))#)+* >9'@
)*1 )+0+#* >@)))# *))+)1-)*0) )-
;)+ + + )-1+** )+-0* **++ -)+);***
+)
6,&'!)0))- )+1#** ) --)0)
2 ))*+*A*)1
6,6!*# )+1 0*+ )+)++)))#**
+0+ *12*1!*+*1)**)2*+*1*0) --**
-)0*++ #*++0))++)) )!-*1;++
6,!6
69! 0*+ )+)++)
B1 ) ;-)2*+*1*1 0 ))); *+*1
**+)0 *););-))00*+)
63
$!=*1-0 ))#* ++);0)*1)- )+)++)
))))- -)1)
67
!#*;)- -)0 *-*)*)+))2*+*1* ))2 2
#1*)2*+*1))28-)0**00)--)) 2;) )-J5,J95
*0))-
66#!)0))- )+1#** ) ) )+1+**
)-)+
&+8
++ )+1 0 ++)0+;*+++*2++)+ -+
1+)) *+*1+++*+2*+*1+02*1)A*0
<%%&
"
*# )+1 0 ++2++); ))*0+
*++:)*1* * *;* )- )++); *1) +1
-)*0
6*)1 )+ )2)*++; 2*#* *) ++); -)
B* *1 )+)2)) * ;*5* )
) ++2;*++2+)= )+ -)B* *1**+ )*-*1
) )+ )-2*+2+)-#+))+
2*1))+ ))0); R10)#)00)* )00*))
)2;0+*+)); ++-)2** ++*))- )+1 0 )
*1 --*#++ )+1* ++*)
0 ++);* +)++); )+ 0 )2-*+) * ;*
5* )"*),2*+*1); 0)
*12)*1)* )) ) +*1 0* -)0)12
); )-*12)*1)* +)2*+*1 )) ;)+
*0** )+
2*#* *))+ 0 *0A*; 2*#* *) )**- )+
0 ; )+1 0 *0+0 )**))-9& 2*#* *)
)**)+ ))0* *-***)3)-* )*
,6
+++*2++ - ++20
.78
7*+*190* +*+90* F)9+02*190* A*)
) * ++ )+1 0 **)--); **+))00*+
;1)!)+!2*+*1!)))-!0)+*+90* )2*)1
)-5* )7*+*19+02*190*+**) )2*)1* ++
*+J
N)! +O)*:)+#*+>+#*)@;*1 )- )+1 0*+*1J
*<)9*))-5) 0!*1 -** +))- )+)++)
+))--** ))- -);*** 0)
**<)<+))-5) 0!* )))-1) )2*+*1
**-*1*1)-2*+*1) -)1 * ) * )-
0-)0 -)11)-2*+*1*1 -** *1)-
)+)++)2)#-** -)-))-F)
2*;*1 );*1+)*) )- 0 *+0))
*+*1A* 2= )+*
")+++* )+1 0 ))+*
* *2*)) 0* *) 0)1B* *1 #*)-*0 ) * ++
)2**)*)10;*+**+**;) #**) 0*
+))+1 0 )*+)* *2*)) 0* *) 00
)2**)*)10;**)*1+**+*%--!1* 0
B0-)0* A*0
6
++ )+1 0 28) ) -)* **;***
+)*+*12)+*0*) 2=*1)#1+*0*
)+1 0 28)-)++);*1 * J
++*)) **+ 0 2 *1)2+*)*)-
2*+*1
2 ++*)))00*+ ++2+)))-)+*0*#* *2*+*-)02+*
*1!)-!;))2+*)))- *1)#*0**0*:*1#* *2*+* *++++);
));) )2+ )+1
)+))- )+)++)* )A*)2) * ;*)))-*10*+
*# )+1 0 ))0 * ;*++A*)**)+
90*
6<) **++**) )*0 ++ )+B.=?
&
"
,,
7*+*1!)))-!0) 0 ++)B0B*00*1++);*:)*1
* *
*++2)*1;!-)>
.@* 2)#))-
**<)) )-*10 0 )+ 0 )2*+*1!*1 0
++2) *)20*+#* *) * ;*)2*+*1!
0)0*+#* -):)*1* **;* 0* 2*1* ++
B )+1 0 ++)2A*)2
2)!)9)+!0) 0 ++)B
-**1;)*0B*00
*+
.6% *# )+1 0 0 0 ) 2=-):)*1
* **0+ )*;*+));* 0* +)
7*+*1!)))-!0) 0 **))2*+*1 2=)++) -
0)*1#* -)))-!0) )+1 0 ++)B2)B*)
*0)-2*+*1);* 0* 0))2*++ )++)
0)*1 0 2B+**+1*) -+B2)1 2=
)#*)+B*)**1-) )+); 0 ++2++);)B
2)*0)-2*+*1) *B)
2)!)9)+!0) 0 5 2 2=-)0)+* 0*
A*-)) ) 0)B*) *!)! 2=;
)*0**00 *1*+
")
-)-)+!)1)!0) 0 0 )0+;*
*R )#++*0#*) )#1A*0
0#*) )#1;*++2++2 )-))*)- 00**00*+
27*+*1!)))-!0) 0 ++++);-)A))- ) )!-*1)
-+))-);*+ 0)
)!)9)+!0) 0)++) -)--)*))0 )*+)
))0))- )+* ++*)* ) **0#*) -
'11))++) - ++2 )0**1 )0;)--
+++ )+1 0 ++0**0*:1+ ) ))--8)2)*
5 )0**0*:1+*+ +*#+0)- 0 *1))
F) * )- )+0)*-*1)**))- 0*1 )-
-+) 0))0* +*0*1+
/,
)+1 0 )2*+*1 ;** *1* )** * ))+)++
*1* )*2*+*1 >B+ *#)-)<+* )* *1*)@;*++A*
0** *#0* *1#*;2C*19 #*))00* *)>C9@
<=$
/68
;,6
@
<))!5) 0 0B*00 )++ A-))1++);* " A-
) Q)-)+ A-))1)-+);*#* +
2))-!5) 0 )++ A-))1* ) *);#*02+*0*2
*:)-))-)))-
5 0*)--)* )*+ #*)
A* 0** *#0* *1#*;2C*19 #*))00* *)
>C9@
7
7
77
@
5
"DJ
*-)-++ J
> @0B*00*1)- "-0B*00#*+*+)++ A-))1)-
, A-A* 2=
<%%&
"
**--++ J
> @0B*00*1)-
-)++ A-))1)- A-
28)2*1-++ -)02+*) *12)*1)* 28
) )F)2+**+*);1*) **)
25"D*D@
*-)-++ J
> @0B*00*1)- "-0B*00#*+*+)++ A-))1)-
, A-A* 2=
>
@0B*00*1)- "-)++ A-))1)-" A-*-
2=
--)0++)+* 28) )F)2+**+*);
1*) **)
**--++ J
> @0B*00*1)-
-)++ A-))1)- A-
28) )F)2+**+*);1*) **) A*
2=
5*D@
*-)-++ J
> @0B*00*1)-
-0B*00#*+*+)++ A-))1)-
, A-A* 2=
>
@0B*00*1)-
-)++ A-))1)-" A-*-
2=
--)0++)+* 28) )F)2+**+*);
1*) **)
>,@0B*00*1)-
-)++ A-))1/" A-*- 2=
"--)0++)+* 28) )F)2+**+*);1*)
**)
**--++ J
> @0B*00*1)-
-)++ A-))1)-
A-*-
-++ 28) )F)2+**+*);1*) **)
A* 2=
,)
@
))-))00* 0 0*)+* *+* *
2)!0))00* )+1 0 ++);)+* *+* *
++); )**)+
)+-0 )+++);* *+* *
6
))-)1)!0) )+1 0 02*
))*0 *1) +1-))--! * )* *2*)1*
) * ;*5*
7 . ) )
))-))00* 0 0*)+* *+* *
2)!0))00* )+1 0 ++);)+* *+* *
++); )**)+
*)*)100 2)0+;*+**+**;) #*
*) 0* +)
++ 0 )0+;* 2=*1)#1+*0**) -)* **;*
0* +)
)!0) 0 0 )0+;*++A* -) ** **
;* 0* +)
6
)+-0 )+++);* *+* *
)+-0 A*)**)+ 90*
2)+-0 28)*R )0;010) *) *0))+
)#* *) *)+9)++&* 1+*0**) 0>9&@0*A*0
<)*) A+*-*1* ++*--)*) *1)- )++
=*1 )* ;**)- *)+ 1*#+)+ )*++*0
)**)
&
"
9);)00**)+* 9);)00**)+* *12;2= )- )+
+ )2+* 2 *) )*)*) ;*2*+*1 ++22*
1)B0*) 0212*** ; ++);2)=;
) ))+0 )-++ *-;*2*+*)2+* )
* 0= 1)*1*- *2+* *))-$)*10** )
*9+A**+ *+-)2)B* *1)) )**) 0 2
20* );*1+)*))-++ )+ ) )+* *1 !)-!;
#*) -+))+* ;+ ))+ ) ))1+*
A*0++)* * A 2* *+ )++ ) );++
:)*1* * )#+* *
-#**)9)*)<) )+-0 +);**"-)-*));**)7
-:) )-*)+*0 )0+)#* + )-)++
C:+ * ))+>C@-)*)--*))+);2-*+)
) * ;**09)+*<#*;)-)+19)8 )<++
%2+*1*) )0) # *))2<
11*++9)*))+-0 0 )0+;* * 0) )*+**-**)
*))1*++ )*+
9)5*++ )+* ++*) ++20**)*1)*
++2*;)=*1)-)*))-* -++*-
C$
$
)00* *)*1+ ++2A*) -*+** )+0)#*-
=);)2 -*)+)* )*-* -++*-
&)00* *)*1)- )++ 0 )*#)* -) *B>@) *#
0)
,+ ++*+)#* *) -)0)#+)-++ -)*) )*))- )*+
#1*)+ *1-**+ ) ;*++2#*+2+)-++)00* *) *
.&* ) +)- F)-)*) ++0)#* *) )-*R )+*?
%*
"*0A*) *1)-2)+)-*) 2+* 0)- );)
) ))00* *)*1
! A-
6
8-
@*
6
-0 0=A* *+#0*
'C!-0 0=2+)+*2+*=
,-0 0= ++2)2+)+)!)-*)1*:*) ++)2)2
)00*+*
. +)--))) * 28))2**1A*0* )+* -)092+*
C+&0
"9=*1* + )*;*-0 0= ++)* )*-;*
B* *12 * )*) --**+*) )=*1
* ++2=*)+0* +)-*0 ++2 )0 ) *2+
) ))*-;*B* *12 * =*1)*#;)*)
/+ 0* *+ 0) ++2+)) +)) -
+ )#**=)1 *+#0*
3-0 0=;*#+* *+#0*0#)0) *1))B
.
A-*)0) *B-**1
)) ++#;*0* *))-));)+)) *-*
*
*++!)10 ++2 )-0*+**)
*11+*1*1+ ++2)#2:)*10** )*)) +
& *0 +)*))- + ++2)# )- *+#0*
" % !
"6"F F
"
11-4-10: SOLAR COLLECTOR SYSTEMS:
A. Purpose: Cottage Grove supports the use of solar collection systems as an accessory
use in all zoning districts and as a conditional use in special zoning districts whereby it is
determined that rural and urban agricultural land is unproductive farmland. The
development of solar energy farms should be balanced with the protection of the public
safety and the existing natural resources in Cottage Grove. This section is to provide for
the regulation of the construction and operation of solar collector systems in Cottage
Grove, subject to reasonable conditions that will protect the environment, public health,
safety, and welfare. The provisions of this section shall apply within all zoning districts;
allowing solar panels as an appurtenance to rooftops and exterior walls, and allow
modest adjustments to regulations to allow applicants access to solar resources on their
property. In no case shall the provisions of this section guarantee rights to solar access.
B. Definitions: The following words, terms and phrases, when used in this section, shall have
the meanings ascribed to them in this section:
ALTERNATIVE ENERGY SYSTEM: A ground source heat pump, wind or solar energy
system.
COMMUNITY SOLAR GARDEN: A solar electric (photovoltaic) array that provides retail
electric power (or a financial proxy for retail power) to multiple community members or
businesses residing or located off site from the location of the solar energy system, under
the provisions of Minnesota statutes 216B.1641 or successor statute.
PHOTOVOLTAIC SYSTEM: An active solar energy system that converts solar energy
directly into electricity.
SOLAR COLLECTOR: A device, structure or a part of a device or structure for which the
primary purpose is to capture sunlight and transform it into thermal, mechanical,
chemical, or electrical energy.
SOLAR COLLECTOR SURFACE: Any part of a solar collector that absorbs solar energy
for use in the collector's energy transformation process. Collector surface does not
include frames, supports and mounting hardware.
SOLAR DAYLIGHTING: A device specifically designed to capture and redirect the visible
portion of the solar spectrum, while controlling the infrared portion, for use in illuminating
interior building spaces in lieu of artificial lighting.
SOLAR ENERGY: Radiant energy received from the sun that can be collected in the
form of heat or light by a solar collector.
SOLAR ENERGY DEVICE: A system or series of mechanisms designed primarily to
provide heating, cooling, electrical power, mechanical power, solar daylighting or to
Page 1 of 6Sterling Codifiers, Inc.
2/2/2017http://sterlingcodifiers.com/codebook/printnow.php
provide any combination of the foregoing by means of collecting and transferring solar
generated energy into such uses either by active or passive means. Such systems may
also have the capability of storing such energy for future utilization. Passive solar energy
systems shall clearly be designed as a solar energy device such as a trombe wall and
not merely a part of a normal structure such as a window.
SOLAR ENERGY SYSTEM: A device or structural design feature, a substantial purpose
of which is to provide daylight for interior lighting or provide for the collection, storage and
distribution of solar energy for space heating or cooling, electricity generation or water
heating.
SOLAR ENERGY SYSTEM, BUILDING INTEGRATED: A solar energy system that is an
integral part of a principal or accessory building, replacing or substituting for an
architectural or structural component of the building. Building integrated systems include,
but are not limited to, photovoltaic or hot water solar energy systems that are contained
within or substitute for roofing materials, windows, skylights, awnings and shade devices.
SOLAR ENERGY SYSTEM, GRID INTERTIE: A photovoltaic solar energy system that is
connected to an electric circuit served by an electric utility company.
SOLAR ENERGY SYSTEM, GROUND MOUNT: A freestanding solar system mounted
directly to the ground using a rack or pole rather than being mounted on a building.
SOLAR ENERGY SYSTEM, OFF GRID: A photovoltaic solar energy system in which the
circuits energized by the solar energy system are not electrically connected in any way to
electric circuits that are served by an electric utility company.
SOLAR ENERGY SYSTEM, ROOF MOUNTED: A solar energy system mounted directly
or abutting the roof of a principal or accessory building.
SOLAR FARM: A commercial facility that converts sunlight into electricity, whether by
photovoltaic (PV), concentrating solar thermal devices (CST), or other conversion
technology, for the principal purpose of wholesale sales of generated electricity.
SOLAR HEAT EXCHANGER: A component of a solar energy device that is used to
transfer heat from one substance to another, either liquid or gas.
SOLAR HOT AIR SYSTEM (Also Referred To As SOLAR AIR HEAT OR SOLAR
FURNACE): An active solar energy system that includes a solar collector to provide
direct supplemental space heating by heating and recirculating conditioned building air.
The most efficient performance typically uses a vertically mounted collector on a south
facing wall.
SOLAR HOT WATER SYSTEM (Also THERMAL SYSTEM): A system that includes a
solar collector and a heat exchanger that heats or preheats water for building heating
systems or other hot water needs, including residential domestic hot water and hot water
for commercial processes.
SOLAR MOUNTING DEVICES: Racking, frames, or other devices that allow the
Page 2 of 6Sterling Codifiers, Inc.
2/2/2017http://sterlingcodifiers.com/codebook/printnow.php
mounting of a solar collector onto a roof surface or the ground.
SOLAR RESOURCE: A view of the sun from a specific point on a lot or building that is
not obscured by any vegetation, building, or object for a minimum of four (4) hours
between the hours of nine o'clock (9:00) A.M. and three o'clock (3:00) P.M. standard time
on any day of the year.
SOLAR STORAGE UNIT: A component of a solar energy device that is used to store
solar generated electricity or heat for later use.
C. Standards:
1. Building Integrated Solar Energy System: A building integrated solar energy system
shall be allowed only on principal structures in all zoning districts and regulated as any
other building element. Wall mounted solar collection systems are prohibited on the
side of a principal structure facing a public street.
2. Minimum Lot Size: A minimum lot area of five (5) acres is required for ground mounted
solar energy systems for all residential properties in any zoning district.
3. Height: Roof mounted solar energy systems shall comply with the maximum height
requirements in the zoning district that the property is zoned. In nonresidential zoning
districts, ground mounted solar energy systems may be permitted in the front, side or
rear yards, but must set back a minimum of twenty feet (20') from the property line.
4. Roof Mounting Devices And Roof Mounted Solar Energy Systems: Roof mounting
devices and roof mounted solar energy systems shall be flush mounted on pitched
roofs. Solar energy systems located in nonresidential districts or on nonresidential
uses may be mounted at an angle to the roof to improve their efficiency; however, the
highest point of a solar panel shall not be more than five feet (5'), measured in a
straight line above the roof upon which the panel is mounted. Roof mounted devices
and roof mounted solar energy systems shall not extend beyond the exterior perimeter
of the building on which the system is mounted or built, unless the collector and
mounting system has been explicitly engineered to safely extend beyond the edge,
and setback standards are not violated. Exterior piping for solar hot water systems is
prohibited to extend beyond the perimeter of the building.
5. Mirror Reflecting Designed Solar Energy Systems: Mirror reflecting designed solar
energy systems are permitted only on properties with five (5) acres or larger and
located outside the metropolitan urban service area (MUSA). A conditional use permit
is required.
6. Easements: Solar energy systems shall not encroach on public drainage or utility
easements.
7. Aesthetics: Reflection angles from solar energy systems shall be oriented away from
neighboring windows. Where necessary, screening may be required to address glare.
Page 3 of 6Sterling Codifiers, Inc.
2/2/2017http://sterlingcodifiers.com/codebook/printnow.php
8. Ground Mounted Solar Energy Systems: Ground or pole mounted solar energy
systems shall not exceed fifteen feet (15') in height when oriented at maximum tilt.
Ground mounted solar energy systems shall comply with the accessory structure
setback standards for the applicable zoning district in which they are located.
Community solar gardens or solar farms shall comply with the principal structure
setback standards for the applicable zoning district in which they are located. Solar
energy systems may not extend into the minimum side or rear yard setbacks when
oriented at minimum or maximum design tilt.
9. Standards: Solar energy systems shall meet the minimum standards outlined by the
International Electrotechnical Commission (IEC), the American Society Of Heating,
Refrigerating, And Air-Conditioning Engineers (ASHRAE), ASTM International,
International Organization For Standardization (ISO), Underwriter's Laboratory (UL),
the Solar Rating And Certification Corporation (SRCC) or other standards as
determined by the community development director.
10. Certification: Solar energy systems and components shall be certified by
Underwriters Laboratories, Inc. (UL), the National Renewable Energy Laboratory, and
Solar Rating And Certification Corporation (SRCC), or other appropriate certification(s)
as determined by the city. The city reserves the right to deny a building permit for
proposed solar energy systems deemed to have inadequate certification.
11. Building Permit Required: All solar energy systems require a building permit. A
building permit application and plan submittal must comply with the following
requirements:
a. Applications For Solar Energy Systems: An application to the city for a building
permit under this section shall contain the following information, including, but not
limited to, the following:
(1) A building permit application.
(2) A site plan of existing and proposed site conditions.
(3) Number of solar collectors to be installed.
(4) Location and spacing of solar panels.
(5) Ground mounted system applications shall identify existing vegetation on
installation site (list vegetation type and percent of coverage; i.e., grassland,
plowed field, wooded areas, etc.), and provide a maintenance plan for controlling
vegetative growth on site upon installation of the solar energy system.
(6) A description of the method of connecting the array to a building or substation
and a signed copy of the interconnection agreement a copy of the application to
with the local electric utility be included with the conditional use permit application
or a written explanation outlining why an interconnection agreement is not
necessary.
(7) Planned location of underground or overhead electric lines connecting the solar
electric system to the building, substation or other electric load.
Page 4 of 6Sterling Codifiers, Inc.
2/2/2017http://sterlingcodifiers.com/codebook/printnow.php
(8) New electrical equipment other than at the existing building or substation that is
the connection point for the solar electric system.
(9) Manufacturer's specifications and recommended installation methods for all
major equipment, including solar panels, mounting systems and foundations for
poles or racks.
(10) Existing and proposed (if existing grade will be altered) topography at two foot
(2') contours.
12. Feeder Lines And Grid Interties: All power lines shall be placed underground within
the interior of each parcel. The collection system may be placed overhead near
substations or points of interconnection to the electric grid. All grid intertie systems
shall have an agreement with the local utility prior to the issuance of a building permit.
A visible external disconnect must be provided if required by the utility. Off grid
systems are exempt from this requirement.
13. Special Exceptions: A solar collection system with a cumulative area of six (6) square
feet or less is permitted in all zoning districts and does not require a building permit. No
more than three (3) solar collection panels are permitted. Examples of these systems
are outdoor accent lighting systems, power supply for traffic control systems, powering
a water pump for water gardens, telecommunication systems, backup power systems
during power outages, and etc.
D. Community Solar Garden Or Solar Farm: A conditional use permit is required for
community solar garden or solar farm systems and must be located within the designated
areas shown in exhibit A attached to the ordinance codified herein. Utility scale solar
energy systems are allowed in all zoning districts. A minimum of five (5) acres of land is
required.
E. Decommissioning: A decommissioning plan shall be submitted with all applications for
community solar garden or solar farm systems.
1. Decommissioning plans shall outline the anticipated means and cost of removing the
system at the end of its serviceable life or upon its becoming a discontinued use. The
cost estimates shall be made by a competent party, such as professional engineer, a
contractor capable of decommissioning or a person with suitable expertise or
experience with decommissioning. The plan shall also identify the financial resources
that will be available to pay for the decommissioning and removal of the system.
Owners of residential solar energy systems may rely on manufacturer's data to submit
estimates.
2. Decommissioning of the system must occur within ninety (90) days from either of the
following:
a. The end of the system's service life; or
Page 5 of 6Sterling Codifiers, Inc.
2/2/2017http://sterlingcodifiers.com/codebook/printnow.php
b. The system becomes a discontinued use.
c. A system shall be considered a discontinued use after one year without energy
production, unless a plan is developed and submitted to the zoning administrator
outlining the steps and schedule for returning the system to service.
d. The city may at its discretion require the owner and/or operator of the commercial or
utility scale system to provide financial security in the form of a cash escrow, bond,
or irrevocable letter of credit in an amount equal to one hundred twenty five percent
(125%) of a cost estimate for decommissioning the system.
3. The owner of a utility scale system must notify the city in writing when feeder lines
and/or grid interties are disconnected from the local utility transmission line.
F. Abandonment: If the solar energy system remains nonfunctional or inoperative for a
continuous period of one year, the system shall be deemed to be abandoned and shall
constitute a public nuisance. The owner shall remove the abandoned system at their
expense after a demolition permit has been obtained. Removal includes the entire
structure and components. (Ord. 948, 10-7-2015)
Page 6 of 6Sterling Codifiers, Inc.
2/2/2017http://sterlingcodifiers.com/codebook/printnow.php
Print
Forest Lake, MN Code of Ordinances
§ 153.307 SOLAR ENERGY SYSTEM REQUIREMENTS.
(A) Zoning districts. Solar energy systems in accordance with the standards in this section are
allowed as a permitted accessory use in all zoning districts.
(B) Standards.
(1) Exemption. Passive or building-integrated solar systems are exempt from the
requirements of this section and shall be regulated as any other building element.
(2) Height. Roof mounted solar energy systems shall comply with the maximum height
requirements in the applicable zoning district. Ground mounted solar energy systems shall not
exceed 15 feet in height.
(3) Location. In residential zoning districts, ground mounted solar energy systems are
limited to the rear yard. In non-residential zoning districts, ground-mounted solar energy systems
may be permitted in the side yard meeting accessory structure requirements in § 153.110.
(4) Setbacks. Ground mounted solar energy systems shall comply with all accessory
structure setbacks in the applicable zoning district. Roof mounted systems shall comply with all
building setbacks in the applicable zoning district and shall not extend beyond the exterior
perimeter of the building on which the system is mounted.
(5) Roof mounting. Roof mounted solar collectors shall be flush mounted on pitched roofs
unless the roof pitch is determined to be inadequate for optimum performance of the solar energy
system in which case the pitch of the solar collector may exceed the pitch of the roof up to 5%
but in no case shall be higher than 10 inches above the roof. Solar collectors may be bracket-
mounted on flat roofs.
(6) Easements. Solar energy systems shall not encroach on public drainage, utility roadway,
or trail easements.
(7) Screening. Solar energy systems shall be screened from view to the extent possible
without impacting their function.
(8) Maximum area. In the SF, MXR-1, MXR-2, MXR-3, and MF residential districts,
ground mounted solar energy systems shall be limited to a maximum area of 200 square feet. In
C, A and RR residential zoning districts, ground mounted solar energy systems shall be limited
to a maximum area consistent with the accessory structure requirements in § 153.110 or no more
than 25% of the rear yard whichever is less.
(9) Aesthetics. All solar energy systems shall be designed to blend into the architecture of
the building to the extent possible without negatively impacting the performance of the system
and to minimize glare towards vehicular traffic and adjacent properties.
(10) Feeder lines. The electrical collection system shall be placed underground within the
interior of each parcel. The collection system may be placed overhead near substations or points
on interconnection to the electric grid.
Page 1 of 2CHAPTER 153: ZONING CODE
2/2/2017http://library.amlegal.com/alpscripts/get-content.aspx
(11) Structures shall not be located such that solar power access blocks a neighboring
property.
(C) Safety.
(1) Standards and certifications.
(a) Standards. Solar energy systems shall meet current industry standards.
(b) Certification. Solar energy systems shall be certified by an appropriate industry
certifying entity.
(2) Utility connection. All grid connected systems shall have a completed contractual
agreement with the local utility prior to the issuance of a building permit. A visible external
disconnect must be provided.
(a) Abandonment. If the solar energy system remains nonfunctional or inoperative for a
continuous period of 6 months, the system shall be deemed to be abandoned and shall constitute
a public nuisance. The owner shall remove the abandoned system at the owner’s expense after a
demolition permit has been obtained. Removal includes the entire structure including
transmission equipment.
(b) Permits. A building permit shall be obtained for any solar energy system prior to
installation.
(Ord. 596, passed 2-8-2010)
Page 2 of 2CHAPTER 153: ZONING CODE
2/2/2017http://library.amlegal.com/alpscripts/get-content.aspx
City
Zoning District in
Which Solar
Energy Systems
are Allowed /
Permitted or
Conditional /
Principal or
Accessory Uses
Aesthetic
Standards
Size and Height Standards, Setbacks
and Impervious Coverage
Permits, Agreements,
Industry Standards, and
Discontinuation and
Decommissioning
Required
Protection of
Solar Access
Standards for
Specific Uses
Afton Solar energy
systems are
permitted
accessory use in
all districts
(unless aesthetic
standards are not
met)
Rooftop
community
systems and solar
farms are
permitted uses
and ground-
mount
community solar
energy systems
as conditional
uses in the
Industrial
District
Must be designed
to blend in to the
architecture of
the building
Must be
contained on roof
of commercial
buildings
Those not
meeting design
standards require
a CUP
Same as zoning district unless
Pole mounted systems to be setback
same distance from property line as
height of pole
Size Regulated by district:
VHS District:
-Max panel sf: 150 sf or 1% of total sf
of lot
RR and Ag Districts:
-Lots up to 10 acres:
-If not fully screened:
Max height: 15 ft
Max panel sf: 150 sf
-If fully screened:
Max height: 20 ft
Max sf: 1000 sf
-Max size restrictions increase as lot
size increase
Height not to exceed maximum
height allowed in any zoning
district
Clarifies that appropriate
City permits are required
for installation
Requires interconnection
agreement for systems
connecting to electric
distribution or
transmission system
through the existing
service
Requires a
decommissioning plan
Panels must be
decommissioned if not in
use for six months
May require escrow to
ensure proper
decommissioning
Prevents
blockage of
solar access
Prevents
homeowners’
agreements,
etc. from
forbidding
solar energy
installations
Allows
easements
across
neighboring
properties and
can prevent
erection of
structures that
would
diminish solar
access
Sets forth
standards for
specific solar
uses including
community solar
energy systems
and solar farms
Solar array shall
not exceed 40
kW
Scandia Solar farms and
community solar
gardens are
allowed within
Solar farms and
community solar
garden must be
Regulates passive solar energy
systems as any other building element
Exempts accessory solar farm and
community solar farm garden uses
Solar farm or community
solar garden requires
Conditional Use Permit
application
Solar farms with
a generating
capacity of 50
megawatts to fall
certain Ag and
Rural zoning
districts as a
conditional
principal use
Prohibits solar
farms and
community solar
gardens in the
shoreland
district, within
600 feet of
formally
protected
wildlife areas,
wetlands,
floodplain
district
screened from
public ROW
To be designed
and located to
prevent reflective
glare toward
inhabited
buildings on
adjacent
properties, ROW
Warning sign
concerning
voltage required
Mechanical
equipment to be
enclosed by fence
and screened
from maximum square footage and
number of structures standards of
accessory structures
Solar farms are to be located on lots of
at least 5 acres
Solar farms subject to principal
structure setbacks and lot coverage
standards and must be setback a
minimum of 200 ft from centerline or
150 ft from ROW of minor arterial
roads
Ground-mounted solar energy systems
not to exceed 15 ft in height
Building-integrated not to exceed
height of building
Requires interconnection
agreement
Requires liability
insurance
Requires
decommissioning plan
Must be decommissioned
if not operable or operated
for one year
May require posting of
bond, letter of credit, etc.
to ensure proper
decommissioning
Requires payment in lieu
of taxes for prospective
tax revenue lost due to
reclassification of
property to solar energy
generating system
Qualified engineer to
certify foundation and
design is within accepted
professional standards
Specifies that solar energy
systems must meet all
applicable standards and
regulations
under
jurisdicition of
MN Public
utilities
Forest
Lake
Solar energy
systems are
allowed as
permitted
accessory uses in
all district
To be screened
from view to
extent possible
Shall be designed
to blend in to
architecture of
buiding to extent
possible
Roof-mounted solar energy systems:
-Max height requirements of zoning
district
-Setbacks to comply with building
setbacks and not extend beyond
exterior perimeter of building
-Shall be flush mounted on pitched
roofs
Ground-mounted solar energy system:
-Max height: 15 ft
Specifies that solar energy
systems must meet
industry standards and
certified by appropriate
industry certifying entity
System must be
abandoned if system is
nonfunctional or
inoperative for continuous
period of six months
Structures
shall not be
located such
that solar
power access
blocks a
neighboring
property
Passive or
building-
integrated solar
systems are
exempt from the
requirements
Feeder line to be
placed
underground
-Setbacks to comply with accessory
structure setback requirements
-Limited to 200 sf in size in more
urban residential districts
-Restricted to rear yard in residential
districts and side or rear yard in non-
residential districts
Building permit required
Cottage
Grove
Solar collection
systems are an
accessory use in
all zoning
districts
Community solar
garden or solar
farm is a
conditional,
principal use in
designated areas
Reflection angles
oriented away
from neighboring
windows
Screening may be
required
Power lines to be
placed
underground with
exceptions
Wall mounted solar collection systems
prohibited on side of building facing a
street
Ground-mounted systems:
-Minimum lot size of 5 acres for all
residential properties
-Non-residential properties: may be in
front, side, or rear yard if set back 20 ft
-Max height: 15 ft
-General systems must comply with
accessory structure setbacks
-Community solar gardens or solar
farms are to comply with principal
structure setback requirements
Roof-mounted systems:
-Max height requirements of zoning
district
-Must be flush with roof with
exceptions to nonresidential uses
Building integrated solar energy
system allowed on principal structures
in all zoning districts and regulated as
building element
Mirror-reflecting systems allowed only
on properties 5 acres or larger
Must meet minimum
standards as outlined and
receive outlined
certification
Building permit required
with exceptions
Requires
decommissioning plan
Decommissioning
required after 1 year and
90 days of discontinued
use or abandonment or 90
days after end of service
life