HomeMy WebLinkAboutFINAL ORDINANCE NO. 08-024CITY OF LAKE ELMO
COUNTY OF WASHINGTON
STATE OF MINNESOTA
ORDINANCE NO.08-024
AN ORDINANCE AMENDING CHAPTERS 94,150, 151,152,153, AND 154 OF
CITY CODE TO BRING INTO CONFORMANCE WITH STORM WATER AND
EROSION AND SEDIMENT CONTROL REGULATIONS IN THE CITY OF
LAKE ELMO
Section 1. The City Council of the City of Lake Elmo hereby ordains that the Lake
Elmo City Code be amended to read as follows:
RIGHT-OF-WAY MANAGEMENT PERMITS CHAPTER (94)
§ 94.36 APPLICATION FOR A RIGHT-OF-WAY PERMIT.
(B) Right-of-way permit applications shall contain and will be considered complete
only upon compliance with the requirements of the following provisions:
(2) Submissions of a completed permit application form, including all required
_ attachments, and scaled drawings showing the location and area of the
proposed project and the location of all existing and proposed equipment;
(6) A Storm Water Management Plan and/or an Erosion and Sediment Control
Plan if al plicable as specified in Section 150.283.
GENERAL PROVISIONS CHAPTER (150)
OPEN SPACE PRESERVATION
§ 150.183 OP DEVELOPMENT PRELIMINARY PLAN, PRELIMINARY PLAT,
AND CONDITIONAL USE PERMIT.
(A) Submittals.
(2) Twenty sets of site plans, drawn to scale of not less than 1 inch equals 100
feet containing at least the following information:
(i) General grading and drainage plans for the developed OP development in
conjunction with a Storm Water Manat?ement Plan as identified in Section
150.287;
(7) A Soil Erosion Control Plan clearly illustrating erosion control measures to
be used during construction and as permanent measures. See also Section 150.287
retard iw Erosion and Sediment Control Plan requirements; and
RESTRICTIVE SOIL OVERLAY DISTRICT
§ 150.202 RESTRICTIVE SOILS AND DEVELOPMENT PERMIT PROVISIONS.
(C) Application for and processing ofpermit.
(2) The application shall include a map of the site and a delineation of the soils
found in the site along with a plan and cost estimate of the proposed development and the
other engineering data, surveys, and other information and material as may be required in
order to determine the effects of the development on the affected land and the suitability
of the soils for the development. See Section 150 283 to determine if a Storm Water
Management Plan or an Erosion and Sediment Control Plan is required.
(3) When proposed work includes construction or alterations of structures, the
work shall be submitted with the application, along with detailed drawings of any special
foundation structures and/or special provisions for on -site sewage disposal.
WETLAND PROTECTION AND PRESERVATION OVERLAY DISTRICT
§ 150.218 WETLAND PERMIT PROVISIONS.
(C) Application for and processing ofpermit.
(3) See Section 150.281 to determine if a Storm Water Management Plan or an
Erosion and Sediment Control Plan is required.
INTERSTATE CORRIDOR OVERLAY DISTRICT
§ 150.234 MINIMUM DISTRICT REQUIREMENTS; INTERIM USES.
(B) These uses shall be subject to the following minimum performance standards:
(11) The site plan shall provide for adequate drainage systems which do not
pose pollution problems see Section 150.283 to detennine if a Storm Water Management
Plan or an Erosion and Sediment Control Plan is required;
§ 150.235 MINIMUM DISTRICT REQUIREMENTS; LONG-TERM USES.
(B) These uses shall be subject to the following minimum performance standards:
(7) The site plan shall provide for adequate drainage systems which do not
pose pollution problems, see Section 150.283 to determine if a Storm Water Management
Plan or an Erosion and Sediment Control Plan is required;
§ 150.255 SHORELAND STANDARDS.
(G) Storm water management. The following general and specific standards
shall apply, in addition to all applicable requirements found in Section 150.283 (Store
Water Management) of the City Code.
BUILDING REGULATIONS CHAPTER (151)
§ 151.017 EXCAVATION AND GRADING PERMITS.
(C) Plan approval required. No grading or excavation permit shall be issued for
site grading or excavation without approved plans for site development and adequate
provision for site protection from wind or water erosion. See Section 150.283 for Stonn
Water and Erosion and Sediment Control requirements.
(G) Submission requirements. All grading and excavation permit applications
shall be accompanied by the following information:
(9) A drainage plan which includes any engineering work for stormwater
retention whi& nflay be f^^^^r must comply with Section 150.287:
(10) An erosion control plan indicating the type and location of erosion
measures to be used, must comply with section 150.287;
§ 151.027 CONSTRUCTION SITE RROSION CONTvnr GRADING
REQUIREMENTS.
(% (A) Site grading.
(1) Submission requirements. All applications for a building permit shall include
a plot or site plan detailing the proposed finished grades of the site at all building corners
and all lot comers. All grades proposed shall be consistent with the approved grading
plan for the subdivision in which the building site is located.
(2) As built grades certification. No certificate of occupancy shall be issued by
the city for any structure until the builder or the property owner have provided the city
with a certificate of a registered surveyor or civil engineer attesting to the "as built"
grades of all building corners and site corners; and, the certificate shows all the grades to
be consistent with the plot or site plan attached to the building permit application.
(B) See Section 150.289 and 150.290 for additional requirements.
§ 151.027 CONSTRUCTION SITE SURFACE WATER MANAGEMENT AND
EROSION AND SEDIMENT CONTROL
(A) The requirements for construction site stone water management and erosion and
sediment control are found in Section 150.283 (Storm Water and Erosion and Sediment
Control).
i
I
OWN
MOR
................
I�W
. .... . ....
...........
......... . ...............
..............
MIN lliglwll I
- --------- -- -
.................................................
........ . ............... . ..........
.........
........ . ..........
.........
� ....... . .
.. ........
........ . ..... .
�.M- �zm_
........
....
. ............ . ......
------------
�,= iii-10,16140
... . ......... .
PLAN REVIEW
§ 151.070 SITE AND BUILDING PLAN REVIEW.
(A) Information required. Except has hereinafter provided, every person, before
commending construction or alteration of a structure, shall submit to the Zoning
Administrator the following documents and information:
(3) Landscaping and screening plan.
(a) Complete landscaping, screening, and erosion control plans shall
be prepared and signed by a professional landscape architect or professional site planner
with educational training or work experience in land analysis and site plan preparation.
These plans shall include:
4. Details of proposed non -vegetative landscaping materials;
5. Planning and construction schedule for completion of
landscaping and screening plans.
(4) A Storm Water Manaeement Plan andior an Erosion and Sediment
Control Plan as required in Section 150.383.
FLOODPLAIN MANAGEMENT CHAPTER (152)
§ 152.07 FLOOD PLAIN DISTRICT.
(D) Standards for flood plain conditional uses.
(5) When at any 1 time more than 1,000 cubic yards of fill or other
similar material is located on a parcel for the activities as on -site storage, landscaping,
sand and gravel operations, roads, dredge spoil disposal, or construction of flood control
works, an erosion/sedimentation control plan must be submitted consistent with Section
150.281 and 150.287. The plan must be prepared and certified by a registered
professional engineer.
SUBDIVISION CHAPTER (153)
§ 153.06 PLATTING
(E) Proposed designfeatures.
(3) (a) Provision for surface water disposal, drainage, and flood control
within the boundaries of the proposed property division consistent with Section 150? 83
Storm Water Management and Erosion and Sediment Control.
MW
..
r
r
§ 153.07 PRELIMINARY PLAT.
(E) Proposed design features.
(11) (a) Surface water disposal, drainage, and flood control shall be
provided within the boundaries of the proposed property division consistent with Section
150.283 Storm Water Management and Erosion and Sediment Control.
-------------
...
§ 153.13 DESIGN STANDARDS; REQUIRED IMPROVEMENTS.
(C) Easements.
(1) Width and location. An easement for utilities at least 10 feet wide,
shall be provided along all lot lines. If necessary for the extension of main water or
sewer lines or similar utilities, easements of greater width may be required along lot lines
or across lots. See Section 150.287(A) (e) for other applicable easement reaulations.
(2) Continuous utility easement locations. Utility easements shall connect
with easements established in adjoining properties. These easements, when approved,
shall not subsequently be changed without the approval of the Council after a public
hearing.
(3) Provisions for drainage. Easements shall be provided along each
side of the center line of any water course or drainage channel whether or not shown in
the Comprehensive Plan, to a width sufficient in the judgment of the Council to provide
proper maintenance and protection and to provide for storm water runoff and installation
and maintenance of storm sewers. They shall be dedicated to the city by appropriate
language in the owner's certificate. See Section 150.287(A) (e) for other applicable
easement regulations.
(D) Erosion and sediment control. Erosion and sediment control plans shall be
provided in accordance with Section 150.287 (B) of the City Cade.
(E) Drainage. A complete and adequate drainage system design, in accordance
with the Watershed District, Section 150.287 (A) of the City Code, and Gity
Ge ns,prehe nsive Drainage Plan Local Storm Water Management Plan, approved by the
City Engineer, shall be required for the subdivision, and may ine •de a : teni se e-
nte m o a .nte ffi of ape n ditehes e. ,lyei4 - pipes, and e...te h hasi„s and pandifig" areas,
er both systems.
§ 153.13 DESIGN STANDARDS; REQUIRED IMPROVEMENTS.
(H) Streets, alleys, and curbs.
(17) Curb andgutter. nit miae , ,.A, shall ba ed where saekal-j
sewer will be insta4led at some latef date. Generete eurb afid gii#er shall be usedwhefe
sani4ary , f has been i stalled to eity ntanda fdn Curb and *utter shall be provided
when required in accordance with the Citv of Lake Ebno Engineering Design Standards.
§ 153.15 REQUIRED IMPROVEMENTS; FINANCIAL ARRANGEMENTS.
(G) Clean-up obligations; street signs.
i. The developer shall remove all soil and debris from and clean all
streets within the lands developed in accordance with Section 150.287
(B) (d) of the City Code.
xffemriixe date -c f any fe aeat by ffie city) dufing the f3i-nrry
eammeneing, Ma5 1 and ending Oc4o of 31 ef,.,.eh yeaf .,til the tiff.,,
as the streets and weepted faf ewiief ship and
ii. In the event there are or will be constructed on the property, 2 or more
streets, and if permanent street signs have not been installed,
developer shall install temporary street signs in accordance with
recommendations of the Maintenance Department, prior to the
issuance of any permit to build upon the property.
(H) Erosion control. Erosion control shall be provided with the installation of
utilities and street curbs in accordance with the Citv of Lake Elmo Enuineeriig Design
Standards. Withifl _
lieti of �he sedplaee a fiber blanketwith seed apprei,ed by the City Engineer (seeufed
with stakes „....wxi4..,........:.,:«giiffn Af6 Cot apai+1 Either sod „« fibef ff.u.+be..laee,7
teaeh.-
dist....ee of feet O ..,.h side of the ,.,,,..ter of the 9 .,.1,.
PLANNED UNIT DEVELOPMENT CHAPTER (154)
§ 154.074 PROCEDURE FOR PROCESSING.
(2) Development Stage Plan. Development stage submissions should depict
and outline the proposed implementation of the general concept stage for the PUD.
Information from the general concept stage for the PUD may be included for background
and to provide a basis for the submitted plan. The development stage submission shall
include but not be limited to:
(b) Ten sets of preliminary plans, drawn to a scale of not less than 1
inch equals 100 feet (or scale requested by the city staff) containing at least the following
information:
10. General grading and drainage plans for the developed PUD
in conjunction with a Storm Water Manaeernent Plan as identified in Section 150 287;
and
Tl,.,. a ftm eRt of N t, fal Des „ ,- othef a ,:th r aathe+4 , ells. o �" _ rc�c-�c.n-a ry
ffieestires. An Erosion and Sediment Control Plan in accordance with Section 150.287.
(E) Drainage. A complete and adequate drainage system design, in accordance
with the applicable Watershed District standards, Section 150.287 (A) of the City Code,
and City n,........,.1.,,, siye r,raiiiage the Lake Elmo Stonri Water Management Plan,
approved by the City Engineer, shall be required for the subdivision_ and may inelude
pending areas, r l...* 9 ,..tom,.... -
ADMINISTRATION
§ 154.018 CONDITIONAL USE PERMITS.
(C) Filing. Application for a conditional use permit shall be filed with the
Zoning Administrator. The application shall be accompanied by development plans for
the proposed use showing such information as may be reasonably required by the
Administrator, including but not limited to those things listed below. The plans shall
contain sufficient information for the community to determine whether the proposed
development will meet all applicable development standards.
(5) Finished grading and drainage plan sufficient to drain and dispose of
all surface water accumulated (See Section 150.281 to determine if a Storm Water
Management Plan andior an Erosion and Sediment Control Plan is required);
§ 154.019 INTERIM USE PERMITS.
(D) Application. Applications for an interim use permit shall be made by the fee
owner or authorized representative of the fee owner of the property upon which the
interim use is proposed. All applications shall include the following:
(4) Development plans for the proposed use showing all information
deemed necessary by the Administrator to ensure the community can determine whether
the proposed development will meet all applicable development standards. Such
information may include but shall not be limited to the following:
(e) Finished grading and drainage plan sufficient to drain and dispose
of all surface water accumulated (See Section 150.281 to deters ater
Management Plan and/or an Erosion and Sediment Control Plan is required);
§ 154.102 DRIVE-IN BUSINESS.
(A) Drainage. The entire area of any drive-in business shall have a drainage
system approved by the City Engineer. See Section 150.280' to determine if a Storm
Water Management Plan and/or an Erosion and Sediment Control Plan is required.
Section 2. Adoption Date
This ordinance shall become effective immediately upon adoption and publication in the
official newspaper of the City of Lake Elmo.
This Ordinance No. 08-024 was adopted on this 20t' ay of Apri O10 y a vote o
Ayes and D Nays.
Mayor Dean Johnston
ATTEST: ,
wlj[ W_
Bruce A. Messelt
City Administrator
FZeso��t, /.-08-024
This Ordinance N was published on the day of, 2010.