HomeMy WebLinkAbout01-21-14 CCMPTHE. (:1T
IAK FLMO
Our Mission is to Provide Quality Public Services in a
Fiscally Responsible Manner While Preserving the City
Open Space Character
NOTICE OF MEETING
City Council Meeting
Tuesday, January 21, 2014 7:00 P.M.
City of Lake Elmo I 3800 Laverne Avenue North
AGENDA
A. Call to Order
7:00 B. Pledge of Allegiance
C. Roll Call
D. Order of Business
E. Approval of Agenda
F. Accept Minutes
1. Accept January 06, 2014 City Council Meeting Minutes
G. Council Reports
• Mayor
o Appointment of Cullen Case to Public Safety Committee
• Council
7:10 H. Public Comments/Inquiries
I. Board of Adjustment Hearing
2. Case 2014-01 Richie and Beth Springborn vs. City of Lake Elmo; Resolution 2014-06
7:30 1. Consent Agenda
3. Approve Payment of Disbursements and Payroll
4. Accept Financial Report dated December 31, 2013
5. Accept 2013 Year -End Building Report dated December 31, 2013
6. Section 34 Water and Sewer Utility Extension Improvements - Pay Request No. 3
7. Lake Elmo Sewer Infrastructure Improvements: 1-94 to 30th St. - Pay Request No. 4
8. Approve Predictive Index Hiring Tool
7:35 K. Regular Agenda
9. Council Meeting Date Change
10, Inwood Booster Station and Trunk Watermain Improvements - Public Hearing; Authorize
Plans and Specifications; Award Engineering Contract; Resolution 2014-07
7:55 11. Well No. 4 Connecting Watermain Improvements - Approve Plans and Specifications;
Resolution 2014-08
12. Lake Elmo Avenue Trunk Watermain Improvements - Approve Engineering Design and Construction
Support Services Contract
8:30 13. Comprehensive Plan Amendment - RAD-Alt to RAD - 9434 Stillwater Blvd.; Resolution 2014-09
14. Community Development Department 2014 Plan of Work
L. Staff Reports and Announcements
• City Administrator
• City Attorney
• Planning Director
• City Engineer
• Finance Director
• City Clerk
9:20 M. Adjourn
****Item times are estimates and subject to change***
LAKE ELMO CITY COUNCIL MINUTES
JANUARY 06, 2014
CITY OF LAKE ELMO
CITY COUNCIL MINUTES
JANUARY 06, 2014
Mayor Pearson called the meeting to order at 7:00 pin.
PRESENT: Mayor Mike Pearson, Council Members Wally Nelson, Justin Bloyer, and Mike
Reeves.
ABSENT: Council Member Anne Smith
Also Present: City Administrator Zuleger, City Engineer Griffin, Finance Director Bendel, and City Clerk
Bell.
PLEDGE OF ALLIGENCE
APPROVAL OF AGENDA
Council Member Nelson requested that ITEM 12 be pulled from the Consent Agenda for discussion and
placed at the beginning of Regular Agenda. City Engineer Griffin noted that ITEM 16's title was
corrected.
MOTION: Council Member Nelson moved TO APPROVE THE JANUARY 06, 2014 CITY COUNCIL
AGENDA AS AMENDED. Council Member Bloyer seconded the motion. MOTION PASSED 4-0.
ITEM I: ACCEPT MINUTES
THE DECEMBER 17, 2013 CITY COUNCIL MINUTES WERE APPROVED AS PRESENTED BY
CONSENSUS OF THE CITY COUNCIL.
COUNCIL REPORTS:
Mayor Pearson: Appointed Terry Forrest to Finance Committee; attended Library Board meeting;
attended full staff meeting.
Council Member Reeves: attended Lake Elmo Regional Trail Committee meeting where they discussed
regional trail concept plan: Washington County is very excited to work with the City. Commended
Planner Nick Johnson for his work done on the trail plans.
Council Member Bloyer: no report.
Council Member Nelson: no report.
PUBLIC INOUIRY/COMMENTS:
Beth & Richie Springborn — Driveway Ordinance
Beth Springborn 8970 55`b St. spoke about her driveway permit. Building Official Rick Chase informed
her that their driveway needed to be paved at the end. Explained her understanding of the definition of
"bitumen." They used crushed Hwy 36 millings. Over 6 inches thick on entire driveway. Mr. Chase said it
needed to be hot mix asphalt.
City Administrator Zuleger explained the rationale for requiring the hot mix. Ile showed the examples of
each type of material to Council. The city ordinance does not specifically further define the term
"bitumen" with enough specificity, The City has returned $4000 of $5000 escrow.
Mr. Zuleger explained the options for the council. It was stated that the Ordinance would be brought back
with a technical amendment. City Engineer Griffin explained the technical details of how the apron is
required and desired to be a hard surface: 1) hold edge of road together. 2) prevent tracking of mud on
road; and 3) loose gravel needs to be cleaned out of ditches and culverts, so increased maintenance would
be required. The specific driveway dimensions and requirements were discussed. It was determined that
Page 1 of 5
LAKE ELMO CITY COUNCIL MINUTES
JANUARY 06, 2014
the apron must cover the Right of Way. Council Member Nelson asked if instead of using a variable term
like ROW, use a specific distance,
Ms. Springborn stated her position is that they have already met the code requirements. Staffs preference
is to proceed through the appeal process if the Springborns choose, Mr. Bloyer asked if the appeal process
costs money. Mr. Zuleger stated that it does, but the City could waive it. The definition of "bitumen" was
discussed. Mr. Griffin stated his professional opinion was pretty clear that is included the binder aspect
and not simply loose millings.
Mayor Pearson stated his preference that Council and staff study the issue before taking action. He also
explained that the code language would not make any sense if interpreted as allowing loose material. The
consensus of the Council is that the text may be vague and should be examined. The Council was
supportive of staff s recommendation of abiding to the formal appeal process. It was noted that the City
has given the Springborns a one-year extension on the completion deadline.
No formal action taken.
SPEAK YOUR PEACE: REEVES
Reeves spoke on the Speak Your Peace tenet of repair damaged relationships. Eveiyone has been in
situation of saying or doing the wrong thing. In a perfect world that wouldn't happen, but it does. To
make it right one must apologize. Admit your mistake, move on. is the apology sincere? Does it keep
occurring? There must be a commitment to change behavior. Actions speak louder than words. Where
you develop trust, it is easier to accept apology.
CONSENT AGENDA
2. Approve Payment of Disbursements and Payroll in the amount of $269,770.91
3. Designate Official Publication Newspaper of Record
4. Designate Official Depositories of Funds; Res. No. 2014-01
5. Resolution Designating Data Practice Officials and Approving City's Data Practices Policy; Res. No.
2014-02
6. Appoint City Engineer and City Attorney
7. Approve 2014 Plan of Work
8. Storm water abatement; Res. No. 2014-03
9. Production Well No. 4 — Pay Request No. 5
10. Lake Elmo Avenue Sewer Improvements — Change Order No. 3
11. Section 34 Utility Extension Improvements — Change Order No. 2
12. 2012 Rain Gas:dent, Pay Request No, 2 (Final)
MOTION: Council Member Bloyer moved TO APPROVE THE CONSENT AGENDA AS AMENDED.
Council Member Reeves seconded the motion. MOTION PASSED 4-0.
ITEM 12: 2012 RAIN GARDENS — PAY REQUEST NO. 2 (FINAL)
City Engineer Griffin explained the item. Contractor is requesting payment in full. Staff does not agree
with full payment due to several issues, so is recommending a prorated payment. Contractor did not
perform completely and there have been several garden failures. Six of the 17 rain gardens were not
functioning for the year.
Council Member Bloyer asked if this was same contractor that built the garden at end of Jane Road. It is
not known at this time.
Griffin explained how at times the City is required to install rain gardens, but currently has discontinued
the voluntary installation for the time being. Rain gardens do work when installed correctly and
maintained properly.
Page 2 of 5
LAKE ELMO CITY COUNCIL MINUTES
JANUARY 06, 2014
MOTION: Mayor Pearson moved TO APPROVE PAY REQUEST NO. 2 (FINAL) TO ST. CROIX
VALLEY LANDSCAPING IN THE AMOUNT OF S3,560 FOR THE ONE YEAR MAINTENANCE
CONTRACT FOR THE 2012 RAIN GARDEN PROJECT, UPON CONTRACTOR'S RECOGNITION
THAT THIS IS PAYMENT IN FULL. Council Member Nelson seconded the motion.
Council Member Nelson wants city to look at the rain gardens on larger scale. He has heard nothing but
problems from residents. He applauded Mr. Griffin for getting away from the voluntary ones. It was
noted by Mr. Griffin that the first year is critical in maintaining. Professional maintenance is
recommended for the first year. After that the residents can do it themselves much more easily. Council
consensus is that further policy discussion is warranted.
MOTION PASSED 4-0.
REGULAR AGENDA
ITEM 13: APPOINT 2014 ACTING MAYOR
City Clerk Bell explained the statutory requirement to appoint an Acting Mayor. He noted that in 2013,
Councilman Bloyer was appointed. Mayor Pearson nominated Councilman Bloyer to serve as Acting
Mayor for 2014.
MOTION: Mayor Pearson moved TO APPOINT COUNCIL MEMBER JUSTIN BLOYER AS
ACTING MAYOR FOR 2014, TO COMPLY WITH AND FULFILL ALL DUTIES ENUMERATED
IN MINN STATUTE § 412.121 RELATING TO SELECTION OF AN ACTING MAYOR. Council
Member Nelson seconded the motion.
Council Member Reeves asked if Councilman Bloyer accepts the nomination. Mr. Bloyer stated he does.
MOTION PASSED 4-0.
ITEM 14: APPOINT REQUIRED OFFICIALS TO FIRE RELIEF ASSOCIATION BOARD OF
TRUSTEES
City Clerk Bell explained the statutory requirement to appoint officials to the Fire Relief Association
Board of Trustees. He noted that in 2013, Fire Chief Greg Malmquist, Councilman Wally Nelson and
Finance Director Cathy Bendel were appointed.
MOTION: Mayor Pearson moved TO APPOINT FIRE CHIEF MALMQUIST, FINANCE
DIRECTOR BENDEL, AND COUNCIL MEMBER WALLY NELSON TO THE FIRE RELIEF
ASSOCIATION BOARD OF TRUSTEES FOR 2014. Council Member Reeves seconded the motion.
MOTION PASSED 4-0.
ITEM 15: WATER SURFACE USE ORDINANCE REVIEW
City Administrator Zuleger explained the reason for the review. The ordinance was not effective until
9/25/13. Mr. Zuleger explained the limitations of the study data. One limitation was due to the high water
on 7/4/13. There were very few incidents. Lake is mostly used by bass fishermen. Staff spent 150-180
hours examining lakes.
Mayor Pearson explained that. the council said they would review the findings and so that is what they are
doing tonight. Council Member Bloyer recounted his experience. Council Member Nelson recounted his
as well. Both officials saw no issues and very little use in general. Mr. Zuleger affirmed their findings.
Mayor Pearson recounted his findings in line with the rest. Council nembers video recorded much of
their findings. Some video evidence was played. Mayor Pearson was glad that not much of an issue had
materialized. He noted that the past DNR grant request was denied due to low use. Mr. Bloyer noted that
40% of 2013 park survey responses supported an increased time; 28% were in favor of no change; more
than 30% didn't care.
ITEM 16: 2014 STREET IMPROVEMENTS — RECEIVING FEASIBILITY REPORT: CALLING
FOR HEARING: RES. NO. 2014-04
Page 3 of 5
LAKE ELMO CITY COUNCIL MINUTES
JANUARY 06, 2014
City Engineer Griffin explained the 2014 improvement projects. Two main locations and three main types
of improvements. Packard Park neighborhood/20th St/Manning Trail. Packard Park neighborhood will
consist of street reclaim, 20th Street consists of micro-surfaeing. Manning trail., Deer Pond Trail and Court
consist of reconstruction.
The differences between road types and how each project area would be done were explained. 40-50 year
roads are being constructed. Higher cost up front, but much longer lasting and saves costs later. Mr.
Griffin went through each project and explained the proposed assessments as well. Manning Trail is a
collector road, so there is a lower assessment. Tartan Park is 100% because it is non-residential.
Assessment is based on front footage.
There is a strategy with West Lakeland Township to extend the unimproved 370 ft on Manning Trail
located in their town and have them fully reimburse and also pay for properties accessing Manning Trail
situated in West Lakeland Township. Total cost is about $1.8 million. The summary of the assessments
for the various projects was further explained. Mr. Griffin gave overview of the project schedule.
Council Member Reeves asked about the front footage rationale. He asked about Tartan Park and if they
have access. Mr. Griffin explained that non-residential includes all abutting roads, They do not have
access.
Council Member Bloyer asked about cost if city forwent concrete curb and gutter. The figure is not
known offhand. Lower cost in maintenance. Concerned about residents being able to afford it.
Council Meinber Nelson asked about 70-30 assessment ratio, Mr. Griffin explained that many cities
started out at 20:80%. As legal challenges have increased, the percentage had been reduced. It was noted
that bonding requires that assessment cannot go below 20%. Mr, Nelson questioned the benefit of the
concrete gutter. Grading is much more difficult to perfect without concrete.
Mr. Reeves suggests taking a longer view of the benefits. Noted all council members are sensitive to
costs. Mayor Pearson asked Mr. Griffin to make a guess on the cost difference. Mr, Griffin estimated it
may be 10-20 percent.
Mr. Nelson asked why 10 years assessments. City Administrator Zuleger stated that 10 year term to retire
debt is standard. Longer roads may allow for longer terms, but it is unknown at this time. Modifying
policy for 50 year roads was discussed.
Mr. Bloyer asked about Deer Pond's initial construction. The specific date is unknown, Mr. Nelson noted
that residents may have different expectation now than 10-20 years ago. He wants City to reexamine
assessinent term policy. The financing options were discussed,
Mayor Pearson wants the three non-resident properties on Manning Trail to be assessed. He directed staff
to pursue assessing them regardless of what West Lakeland Township does in regards to the unimproved
370 foot portion.
MOTION: Council Member Nelson moved TO APPROVE RESOLUTION NO. 2014-04, RECEIVING
THE FEASIBILITY REPORT AND CALLING A HEARING FOR THE 2014 STREET
IMPROVEMENTS, Council Member Reeves seconded the motion. MOTION PASSES 4-0.
ITEM 17: PUMPHOUSE NO, 4 IMPROVEMENTS — APPROVE PLANS AND.
SPECIFICATIONS; RES. NO. 2014-05
City Engineer Griffin explained the project. Part of the 2013-14 Water System C1P. Consists of a
municipal building, housing the city well and related chemical feed equipment. Mr. Griffin explained the
specific details of the inwrovements. Paid through a combination of MN -DEED grant funds and water
enterprise funds. Total cost is $885,000. The construction schedule was explained.
Page 4 of 5
LAKE ELMO CITY COUNCIL MINUTES
JANUARY 06, 2014
MOTION: Council Member Reeves moved TO APPROVE RESOLUTION NO. 2014-05, APPROVING
THE PLANS AND SPECIFICATIONS AND ORDERING THE ADVERTISEMENT FOR BIDS FOR
THE PUMPHOUSE NO. 4 IMPROVEMENTS. Mayor Pearson seconded the It101/017, MOTION
PASSES 4-0.
SUMMARY REPORTS AND ANNOUNCEMENTS,
City Administrator Zuleger: explained the workshop schedule. There will be a few joint workshops
with the commissions; performance based budgeting; commended Alyssa MacLeod for her work on the
newsletter; east metro groundwater meeting; attended the Met Council meeting on MOU; working on
securing water security agreements; expecting Lennar final plat end of month. Preliminary: plat from
Amaris and Ryland is expected in February; noted the Gonyea water and sewer changes. New proposal
starting in the north should help the City with cost of sewer lines; gave summary of the departmental
progress. He commended the departments that were the highest developing in 2013.
Council Member Reeves noted the positive comments received on the accountability portion of the
newsletter. Mayor Pearson asked about Lake Elmo Days and a private entity taking it over. Mr. Zuleger
said that the Jaycees may be the entity, but it is unknown at this time.
City Engineer Griffin: No report.
Finance Director Bendel: final levy certification sent to county; 3,200 storm water bills were sent out.
City Clerk Bell: reported livestock ordinance is expected to be heard at the Planning Commission
meeting on 1 /27/14.
Mayor Pearson adjourned the meeting at 8:48pm.
ATTEST:
Adam R. Bell, City Clerk
LAKE ELMO CITY COUNCIL
Mike Pearson, Mayor
Page 5 of 5
AGENDA ITEM:
SUBMITTED BY:
THROUGH:
REVIEWED BY:
DATE: January 21, 2014
BOARD OF ADJUSTMENT HEARING
ITEM #2
Case 2014-01
Richie and Beth Springborn vs. City of Lake Elrno
Nick M. Johnson, City Planner
Dean Zuleger, City Administrator
Kyle Klatt, Community Development Director
Rick Chase, Building Official
Jack Griffin, City Engineer
SUGGESTED ORDER OF BUSINESS:
Introduction of Item .................................. .............„...„.. .
Report/Presentation
Questions from Council to Staff
Open the Public. Hearing
Close the Public Hearing
Call for Motion Mayor & City Council
Discussion Mayor & City Council
Action on Motion Mayor Facilitates
..... City Administrator
Community Dev elopment Director
Mayor Facilitates
Mayor Facilitates
•Mayor Facilitates
POLICY RECCOMENDER: The City's current and former driveway ordinance require that
the portion of a driveway located within the public right-of-way of an improved street be
constructed of bituminous or concrete material. This policy is established to protect City streets
and storm water infrastructure. It is recommended that the City Council uphold this policy in
order to maintain City infrastructure and ensure the maximum life of the assets.
FISCAL IMPACT; The $150.00 appeal fee was waived at the last City Council meeting on
1 /06/201 4.
SUMMARY AND ACTION REOUESTED: The Board of Appeals is respectfully requested
to determine whether staff is correctly interpreting the City Code in order to determine if a
-- page
City Council Meeting [Board in -Adjustment Hearing - Item 2
January 21, 2014
driveway constructed at 8970 55th Street North is in conformance with the City Driveway
Ordinance. The property owners, Richie and Beth Springbom, have built a compacted reclaimed
asphalt or millings driveway all the way to the City street (55th Street), whereas the City's
ordinance requires that the portion of the driveway located in the City's right-of-way be
constructed of bitumen or concrete. The applicants ask that the Board of Appeals consider Staff s
interpretation of §93.26 Driveway Standards. More specifically, the applicants are challenging
staff s interpretation of the definition of "bitumen".
Staff is recommending that the City Council co
thef011owing ;nation:
e
of
"Move to adopt Resolution 2014-06, con,flrrning and upholding staffs interpretation of the
Driveway Ordinance, therehy denying the appeal."
LEGISLATIVE HISTORY:
On September 3, 2013, the City of Lake Elmo issued a building permit for a new single family -
home at 8970 55'1' Street North to Richie and Beth Springborn, On November 21, 2013, the
City's Building Official conducted a final escrow inspection for the project, which is the last step
before issuing the Certificate of Occupancy (CO). During the inspection. the City Building
Official, Rick Chase, required a correction to make the portion of the residential driveway in the
public right-of-way bituminous or concrete. As opposed to using bituminous or concrete in the
right-of-way, the applicants constructed the entire driveway up to the improved street with
reclaimed millings or asphalt from the TH-36 project. The applicants are appealing the staffs
interpretation of the City's Driveway Ordinance based on the argument that the reclaimed
asphalt meets the definition of "bitumen". City staff does not agree with this argument, and
recommends that the Council confirm staff's interpretation of the City Code.
Prior to December of 2013, when the City adopted new driveway provisions, the City's previous
Driveway Ordinance (Attachment #3) included the following language regarding required
surface materials:
"§93.25 General Requirements
Driveway swiace, Whenever a driveway is constructed, all that portion of the boulevard
designated as driveway shall be surfaced with a plant -mixed machine laid bituminous
material conforming, to standards approved by the City Engineer and in accordance with
plans approved by the City Engineer."
It should he noted that this ordinance was in effect at the time the building permit for the single
family home at 8970 55th Street N. was issued. When the permit was issued, the ordinance called
for "plant -mixed machine laid bituminous material" in the portion of the boulevard (public right-
of-way). Given this language, there is no way to confuse reclaimed or crushed asphalt with
plant -mixed bituminous material. The main point is that under the previous driveway provisions.
— page 2 --
City Council Meeting [Board qf Aqiustnient Hearing - Item 2_1
January 21, 2014
which were active when the building permit was issued. the applicants would not have been able
to use reclaimed asphalt or millings as the approved driveway material in the public right-of-way
or boulevard.
In December of 2013, the City adopted a new Driveway Ordinance (Ordinance 08-096 —
Attachment #4) to prepare the community for additional residential development, particularly in
urban districts. As part of the new Driveway Ordinance, the following language was included in
relation to acceptable surface materials:
"§93.26 Driveway Standards
a Driveway Alatcrials.
I. Urban Districts. All driveways shall be constructed of bitumen, concrete or a durable
material approved by the City Engineer.
2. Rural Districts. Driveways may be constructed of crushed rock or equivalent crushed
material provided that the portion of the driveway within the road right-of-way shall be
constructed of bitumen or concrete when accessing an improved street. -
As part of the new ordinance. the required or acceptable driveway material within the road right-
of-way in rural zoning districts is bitumen or concrete. In seeking to appeal the City staffs
interpretation of the ordinance, the applicants are challenging the definition of bitumen, stating
that reclaimed asphalt or millings meets the definition of bitumen. However, staff disagrees with
this argument. When examining the context of the driveway materials portion of the ordinance,
it is clear that in the rural district, there is a clear delineation between what materials can be used
on the private lot and what materials must be used in the public right-of-way, The ordinance
states that "crushed rock or equivalent crushed material.' that can be used on the private lot,
whereas the right-of-way must he bitumen or concrete. In staffs professional judgment,
recycled or reclaimed asphalt or millings is an equivalent crushed material, not bitumen. On the
other hand, bituminous or bitumen is a petroleum based product that is bound and laid at high
temperatures. Crushed or recycled asphalt does not include the petroleum based hinder.
Regarding the expertise level of City staff. the City's Building Official, Rick Chase, has both
Bituminous I and Bituminous II MnDOT Certifications. In addition, the City Engineer, Jack
Griffin, is extremely experienced and knowledgeable about bituminous products. In the expertise
of both the Building Official and City Engineer. reclaimed asphalt does not qualify as bitumen.
Finally. with regards to the definition of bitumen not being clear enough in the City Code, it
should he noted that City staff drafted the current Driveway Ordinance based upon researching
several other local communities. Staff researched the driveway provisions of eight communities
(Woodbury, Apple Valley, Eagan, Inver Grove Heights, Shoreview, Eden Prairie. Minnetonka
and Cottage Grove). Of the communities that specified bituminous or bitumen as an acceptable
or required driveway material (3 cities — Inver Grove Heights, Apple Valley and Eden Prairie)
not one of them specifically defined what constitutes bituminous in their codes. Staff believes
that the reason for this is that what constitutes bitumen or bituminous is a well-known and
established standard. In other words, if the definition of bituminous was less clear cut, other
cities would define the term to establish what method and material is acceptable.
page 3 --
City Council Meeting [Board of Adjustment Hearing- Item
January 21, 2014
Finally. it should be noted that the City has established an engineering design standard for
residential driveways, The standard was adopted by the City Council along with the Engineering
Design Standards Manual on February 19, 2013 (Resolution 2013-09). The established driveway
standard calls for bituminous material at a specification consistent with MnDOT 2360. In other
words, contrary to the position that the City has not defined what constitutes bitumen, from
staff' s perspective. the City has defined what is acceptable by adopting this standard. It should
also be noted that reclaimed asphalt that is simply compacted does not meet this standard. The
City's driveway standard from the Engineering Design Standards Manual is found in attachment
#5.
BACKGROUND INFORMATION (SWOT):
Strengths: Confirming the staffs interpretation of the Driveway Ordinance demonstrates
a commitment to the protection and maintenance of City streets and other infrastructure.
In cases of installing new or improved residential driveways, requiring the public right-
of-way to be constructed of bitumen or concrete helps reduce cracking and degradation of
the City streets. In addition, it also helps reduce the trailing or tracking of loose rock or
other material or debris onto City Streets. Minimizing this debris helps .maximize safety
and protect storm sewer and other City infrastructure.
Weaknesses: N/A
Opportunities: N/A
Threats: If the appeal is granted. the action sets a negative precedent to allow crushed
rock or an equivalent crushed material as an acceptable material in the public right-of-
way for new residential driveways in rural zoning districts. This scenario presents a threat
to the ongoing maintenance and protection of City streets.
RECOMMENDATION:
Based on the rementioned Staff is recommending that the Ciiy Council cot
inietpreiation §93.26 Driveway Standards through the following motion:
"Move to adopt Resolution 2014-06, conf
e statts
'ng and upholding .s'tuff's interpretation of the
Driveway Ordinance, thereby denying the appeal."
ATTACHMENTS:
1. Resolution 2014-06
Zoning Appeal Application — Richie and Beth Springbom
3. City's Previous Driveway Ordinance
4. City's Current Driveway Ordinance
5. City's Residential Driveway Engineering Design Standard
-- page 4 --
CITY OF LAKE ELMO
WASHINGTON COUNTY, MINNESOTA
BOARD OF ADJUSTMENT AND APPEALS
RESOLUTION NO. 2014-06
RESOLUTION ST:4TING FINDINGS OF F.4CT REALTED TO AN APPEAL OF THE STAFF
INTERPRETATION OF THE CITY DRIVEWA Y ORDINANCE PERTAINING TO THE
CONSTRUCTION OF A RESIDENTIAL DRIVERAY AT 8970 55771 STREET NORTH
WHEREAS, the property owners at 8970 55th Street North, Richie and Beth Springborn,
have constructed a new residential driveway as part of a building permit for a single family home;
and
WHEREAS, the City staff determined that the constructed driveway was not compliant
with Section 93.26 of the City Code for the following reasons:
1) The Driveway Ordinance requires that any portion of a driveway in the public right-
of-way accessing an improved street must be constructed of bitumen or concrete.
55th Street is an improved street, requiring that any new or improved driveway
accessing the street be constructed of bitlimen or concrete in the area of the public
right-of-way.
The portion of the applicants' driveway in the public right-of-way is constructed of
reclaimed asphalt or millings, which does not meet the City's standard for bitumen
or concrete.
WHEREAS, the applicants submitted an appeal to the Board of Adjustments and Appeals
regarding the staff s interpretation of the Driveway Ordinance and the definition of bitumen, and
request that the Board find that the requirement to install bound bitumen or concrete in the public
right-of-way he waived; and
WHEREAS, on January 21, 2014, the Board heard the applicants and the City's staff and
counsel and considered the facts of this case; and
NOW. THEREFORE, the Board of Appeals and Adjustments of the City of Lake Elmo makes the
following 'findings related to the appeal by Richie and Beth Springborn of City staffs interpretation
of the Driveway Ordinance in connection to the construction of a new residential driveway at 8970
55th Street North:
Resolution 2014-06
FINDINGS
1) That the City requires the portion of the right-of-way for all residential driveways accessing
improved streets to be constructed of bitumen or concrete for the purpose of protecting the
integrity of the street and ensuring the maximum life of the asset.
) That the City strives to reduce the occurrence of trailing rock or other loose material onto
improved City streets for the purpose of keeping the street clear of debris to maximize safety
and minimize potential damage to storm sewer and other City infrastructure.
3) That the City Council has adopted and established an engineering design standard for
residential driveways that calls for a bituminous specification of MnDOT 2360 TYPE SP, a
hot, plant -mixed, machine laid and bounded bituminous product.
4) That the material used by the applicants to construct the portion of the residential driveway
in the public right-of-way, reclaimed compacted asphalt or millings, is not consistent with
the City's engineering standard or definition of bitumen.
CONCLUSIONS AND DECISION
Based on the foregoing, the City Council confirms and upholds City staff's interpretation of the
City Code, and thereby denies the application of appeal.
Passed and duly adopted this 21' day ofJanuary, 2014 by the City Council of the City of Lake
Elmo, Minnesota.
ATTEST:
Adam Bell, City Clerk
Resolution 2014-06
Mike Pearson, Mayor
_Date -Received.
Received 0y:
Perinit
SAKE ELMO
A
651-747-3900
338913,Weine Avenue North
lake -Elmo, 4{55042
LAND USE A PPLICA TION
D Cemprehensive.Plaii'D Zoning District Amend: 0 Zoning Text Amend 0 Variande(see-beloW) 0 Zoning Appeal
0 Conditional Use PerMit (C,U,P,) D Flood Plain CUP. D interirn Use Permit (LOP.) 0 ExcavatinglGrading
0 Lot Line AdjUstment- 0 Minor'Subdivision
Applicant' Richie and .Beth Fzr i
Address: 8970 55th St. N. Lake Elmo. MN 55(14?
phonol_ R. 651334-8428 / B-.651-592-9944
Email Address: r • S pr bcir nGims n com
Fee Owner: SC .00 - Fee s are waived Der Dean 710 p2,pr ilnd City Colmcil
Address:
Phone #
Ernail Address:
Property Location (Address and Complete (long) Legal Description.: 8970 55th St. N. Lake Elmr.), 4N 55042
Detailed ReasonforReguesti We are r eti no we be waived from havina to nut "Hot Mix or
concrete', a:tidentified by city- st::..vrf, at Lhw end of our driveway (richt-of-way)
We believe duc to the vagueness of the current City Code, and thc Code during our
final inspection on 11/21/15, we have complied with the code by using compacted
asphalt millings, from Highway 36, and the competed asphalt millings are 8-12"thick
Tiirougnoc.it our entire drivew4. The material we used falls under the City Colle word
'Bitumen_ S-ae attchments for u
a-PPortiu clOcvMeR14tion.
°VarianceRequeSts: As outlined in Section .301„060:L, Of the Lake Brno MunicipaL;ode, tne applicant must demonstrate'
practical,difficUltiestefora a variance can be granted. The practical Mot-ill-les related to this application are as follows:
in signing this application; i hereby,acknowledge that (have read and fully understand the -applicable provisions,of The Zoning
ordinance and current administrative' procedures, I further -acknowledge the -tee explanation as outlined:in the application,
procedures and here,by agree to pay aLstatements reclived, from the r City pertaining to additional application -expense,
Signature of applicant-
.-,J.vp-u\aicy% DateLi
5 .14-
City-Use.Only
Planning:Zoning District'
Reviewed by: Date:
Subject to the following conditions:
Engineering: Reviewed by:
Subject tothe following conditions;
are appealing the City Cocie, Section :)3.26, H, which rees as follows:
Driaveway Materials
Rural Oistricts, Driveways ray be constructad of crushed rock or equivalent crushed material
'pvided that the_,_por-Oon of the d7i'veway within the road ri(7ht-of-wav :ihL11 hp
nr t,h,n -
Beth & Rich Springborn
8970 55th St,
Lake Elmo, MN 55042
651-592-9944
January 6, 2014
Mayor and City Council Members:
We have finished building our home on 9.58 acres and during the final inspection on 11/21/2013, completed by
Rick Chase to obtain our occupancy permit, Rick noted that the end of our driveway needed to be asphalted. We
were confused by Rick's statement as the end of our driveway is asphalted. We looked up the City Code which
reads "(Rural Districts) Driveways may be constructed of crushed rock or equivalent crushed material provided
that the portion of the driveway within the road right-of-way shall be constructed of bitumen or Concrete when
accessing an improved street." Attached is a copy of the City Code that was given to us by Rick Chase.
We are questioning why we are required to have the end of our driveway asphalted since that is not what is
stated in the City code. To better understand the terminology in the city code we did some additional research:
So what does the word bitumen mean? The definition in the dictionary states: ("bitumen"- any of
various natural substances, as asphalt, maitha„ or gilsonite, consisting mainly of hydrocarbons. (See
attached)
We then received a letter from Joan Ziertman, dated 12/23/2013, (see attached) stating that we are to have an
asphalt access for the driveway. To better understand the word "asphalt" we looked up the definition and it
states:
"Asphalt" - Any of various dark -colored, solid, bituminous substances, native in various areas of the earth
and composed mainly of hydrocarbon mixtures.
1, A similar substance that is the by-product or petroleum -cracking operations.
2. A mixture of such substances with gravel, crushed rock, or the like, used for paving,
in regards to these definitions we feel that we comply with the City Code as we have crushed asphalt on our full
driveway, including the portion of the driveway within the road right-of-way.
We have had multiple conversations with staff related to this and during one conversation Rick stated that we are
required by City Code to have Hot mix asphalt 3" thick at the end of our driveway and based on his email he state
that we were not in compliance with the City ordinance. We disagree as that is not what is stated in the City Code.
We do not understand why we are being asked to do one thing and the City Code states another.
We are requesting the councirs clarification related to the materials needed for the end of driveways in 'rural
districts' and for the release of the remaining escrow funds. We believe we have met the requirements of the City
Code and especially as it relates to rural districts.
Thank you for your time arid we greatly appreciate an expedient response in order to complete this process,
Sincerely,
Beth Springborn
Rich Spr4horn
-
S89"14'48"W 418.42'
-\
-., 'VIONUMENTED-4•IORTH1I:7-NC,- (..;E-
2,
1-1-IE S-5 1DF THEIV;-tN3,-(7 SEC „ , 4---- ...-- ,----
- N. ....
- .._, --..
41
\ ''c -„, '----
.,$, , ''' $$,$),
$ )
.-.-
-"„
.• 7, , $ - .e, ' CONSTRUCTED
HOUSE
' ' LOCATIQN
1
, k IMPERVIOUS AREA
I 144c0 SQ. FT.
AS BUILT SPOT
ELEVATION. TYPICA
, \
9.58 ACRES' TOTAL ',
(417,410 SQ, FT„)
9.05 EX. RIGHT OF WAY
• ..„ (394,218 SQ. FT.)
-,
. \ ‘
\ , . . . .
\ ,
\ ..„ 'N ‘..• "--•
. \ • .•-.... -;-. n . N.
.. ,...... , , ...... ,...,
.--.. ..'-. g
‘..„
',..
. '..„
',.. \
N1$7 $`' ,...)„, , —.). , $-- - 71— "... '
,N$ ' 7 \
, 7. ..
`'. •„, •, ".
$,..
WEIL,A1'10i'SWAtell'l ....-4.) )
-,.,
..,<,)"--- „..... -
I( : "'? •.;
' , < t
....,;,, •Zfr .1" ', ;
'
.-, ,,'
,
l t' .•...
\•,..*.' \ I . ,
t;
l ''' f -• . \--,,
, •'..' -..-. i• .-.."-- 1I : ..r
". ,. ''''',. ''''' . •
i
i
........ "-- —
\ \ , \
/ \ N,
' ,.... , i / 4 /
16,5' HUFFER— 615.4
, / "' \
r ,
VVE I LAN DISWAMP \ :
----,,,,,
.0,„ •,,,..1 i
..--z---. --... \ . ,,. /, i r,e
..., ---.., ,..... , -. ,-'' I - Y' 1 'Id
.,'
,,, • -. \,..
,INV(SEV "T.4C.5
.2 :\ ,,,,,,) ,, / ...-- \ -....,
, .INV iNW ).C.77 4 .i:Y ''',,/ ../ 1, '
..." i
,........ , ., ... ,
— ,,.. •••••."4. 5,
- 7 NST -RUCT ED
LOCATION ! r--
i f -,
;POUND IRON R.
N55S12"E 0.8 4' t
3TNPIP0
2ASTIP,ON F-IARR[SON COUNT{
-4 CORNER MONUMENT
STONE MONUMENT
314° C UTSIDE DIAMETER
E-CAP NUMBER AS NOTED
IUTSIDE DIAMETER BY 18" LONG IRON
El GHING 1.13 LES. PER LINEAR FOOT
CAP DODGE RLS 45351
NAIL
SLY RE -:CORDED
)N IN DOC. '4 476217
" THAT THIS SURVEY, PLAN OR. REPORT WAS
OR UNDER MI DIRE-C.7 SUPERVISION AND THAT I AM A
../FiVEYOR UNDER THE LAV,/6 OF T/F STATP
ci)0
.••
f
WETLAN D/SWAMP
•
•
E. Distance from /ntersecUon. Nodriveway orcurb cut dlaUbeLess than ZOfeet from
any right-of-way line ofany street inter3ocdon, except that in high density readenha(,
commercial, and nlixed'uueZoning districts, the minimum distance shalt be 50haet.
F. DrivevvGyAng/e. ALL driveways shalt connect to the public street at 90 degree aDgies'
nrmust be approved bythe City Engineer. Exceptions must demonstrate aoinability
tOmeet the 9Odegree angle due toeatenuat|ngcircumstances.
G. D/ivewoyGrode. Driveways exceeding a grade of1O%must beapprovedhythe City
Engineer. Exceptions must demonstrate an inability to meet the 1O151"') rnaxirnurn grade
due toextenuating circumstances.
H� Driveway /Noter/o/s.
1. Urban Districts. ALL driveways shall be constructed nfbitunnen' concrete or 8
durable mate��dB d by the CityEngineer.
^ ^
_-
2. Rural Districts. Driveways may beconstructed Vfcrushed rock orcquivate t
crushed materia[provided that the portion ofthe driveway within the road right-
of-way shall be constructed of bitumen urconcrete when accessing animproved
i
Curb Box, R�� tio/Districts.Curb boxes located within driveway shalt be protected
with an Al Ford Lid or approved equaL
J. Control nfTraffic.
1. Where other alternatives exist, commercial sites nhouid not be accessed from
local residential streets,
2. Traffic shall, be controlled to ensure that the location of driveways shalt not
constitute hazard nor beinjuriousto adjacent residential uses.
K. Access toMajor Streets(7hon7ughfares). On properties having-frontageon both
thoroughfares and minor roads, access sha\ibe providedvia the minor road unless
otherwise approved bythe City Engineer. Access may be restricted on any non-
residential local road. The number and typeS of access drives onto major streets may
be controlled and Umited in the interests of public safety and efficient traffic flow.
L It���ond[nunty}f/�hwmy���uk'ernen��. Drivevv�ys��nstructedtoaccess any street
deviRnated as a state n|- county highway shall meet all additional specifications of the
appropriate jurisdiction, Access d/ive5onto state and county roads shall require o
vv reviebythe road authority and the City Engineer, The state, county and 'City
Engineer ShaUdeterrnine the upprnpriate iQCWjon, size and design Of such access
drives and may Limit the nunnberofaccessdrives in the interest nfpubUc safe�/ and
efficient traffic flow,
/$. Distance from Driveways to Side Lot _'Line, 4 driveway nnustbe at least 5 feet, from 3ny
side Lot line,
N, Emergency Vehicle Access, Driveways to phncipoL structupaS tha"travers;e woodec.
Steerpor openfie",d areas shall be construc-Led and maintained tnawidth and base
mate/ia(depth suff, cient tnsuppor1
access ' erneroencyvehicIles,
3
THE, CITY OF
LAKE ELM()
December 23, 2013
Hartman Homes
744 Ryan Drive, Suite 102
Hudson, WI 54016
Attn: Jeff Mears
Re: 8970 55th Street N
Dear Mr, Mears:
Lake Elmo City Hall
651-747-3900
3800 Laverne Avenue Node
Lake Elmo, MN 55042
Attached please find the rejection comments for the as -built survey that was submitted. in addition, ptease
not that per City Code, an asphalt access is required for the driveway. A copy of the City Code is provided.
Please make the corrections and resubmit the as -built. Please have the corrections to the driveway access
completed by June 1, 2014. If you have any questions, please feel free to contact myself or Rick Chase,
the Building Official at 651-747-3910. Thank you.
Sincerely,
Joan Ziertman
Planning Program Assistant
651-747-3918
Cc: Beth & Richie Springborn
TFILF CITY OF
Rich and Beth Springbom
O97OS5mStreet North
Lake Elmo, MN 55042
Dear Mr. and Mrs, SpAngbom:
|amwriting inresponse to your December 31,2O13letter inwhich you state your concern that the Lake
Elmo City Code concerning driveways isnot being properly applied tnyour recent building permit for a
new home atBg70 55wStreet North, The specific provisions that have been questioned are found in
Section g3.I6.H'which reads aofollows:
H. Drhvewoy80oteriab.
I. Urban Districts. All driveways shall be constructed of bitumen, concrete or a durable
material approved bythe City Engineer.
2. Rurm/Districts. Driveways may be constructed ofcrulshnd rock oi'equivalent crushed
material provided that the portion of the driveway within the road right-of-way shall be
constructed ofbitumen nrconcrete when accessing animproved street.
After reviewing this matter with our Staff -,/have found that the Code bbeing interpreted properly, and
specifically, that the millings you have used for your driveway donot meet the [ity'srequirements for
an allowed driveway material within a boulevard adjacent to an improved street. Please note that for all
utherportionxofthedrivewmynutzideofthcpubUcbou|evanduoea(vxithin1Sfeetfromtheedgeofthe
pavement) the millings are deemed acceptable as a crushed rock or equivalent material.
If you do not agree with this interpretation of the Code, you may file an appeal of the decision with the
Board of Adjustment consistent with the appeal procedures outlined in Section 154,108 (attached). Th\s
does require a formal request to the City Council as specified in. the ordinance.
if you decide not to file a formal appeal, you will need to modify that portion of the driveway th@t is
located within the public boulevard area (from the edge ofthe existing pavement toadepth ofatleast
15 back from the edg,-) consistent with the City's review comments concerning your as -built survey.
I understand that you have had recent conversations with the City Administrator regarding the escrow
deposkaubmhtedbyMartnanHonnesforthisbuUdingpenmitandatthispoint,theChyismiUiu8to
consider a partial release of the escrow payment based on substantial completion of Vour building
permit. I have also reviewed the three outstanding items for escrow release as indicated by the Building
Official in an email toyou dated December31, 3013 and we have agreed tmeliminate, all but
3800I-a,czne krcnue North ^I�kc-Riiiip~M6niacoo,z65042
requirement number 3 (pertaining to the driveway surface within the City boulevard). Furthermore, the
City bwilling to grant you additional time to install the driveway, and will extend the deadline for
compliance with the boulevard surfacing requirement out huJune 1,ZUIS. The City will therefore adjust
the escrow to cover only the estimated value of the outstanding driveway improvements and will
consider all other matters resolved.
NaaoecontactmeifyouhaveanyqueotimnsabouttheChy'sappea/submk-ta/andreviewPrncess or if
you would like to further discuss the City's driveway requirements.
Kyle Matt
Community Development Director
cc: Dean Zu|eger,City Administrator
Nick Johnson, City Planner
Rick Chase, Building Official
Mike Hartman, Hartman Homes
9800LmvcrfzoAvciao:I\Iordz°IakcI�Iroo~M.iu-icxot 55042
§154.1W8 Appeals and the Board of Adjustment
The Board of Adjustment is hereby estabhshed pursuant to this chapter and Minnesota law. The Board
of Adjustment (which isthe City Council inaccordance with §]1.i0ofthe City Code ) shall have those
powers and authority asprovided byMinnesota law and as hereinafter provided for. The Board of
Adjustment shall beformed and operate inconformance *AthChapter 31 ufthis Code and specifically
with S31,1`0.
A. Powers mfthe Board o/Adjustment,
1. Review ofAdministrative Decisions, The Board ofAdjustment shalt act upon all. questions
as they may arise inthe administration of this chapter, including the interpretation of
zoning maps, and itshall hear and deddeappea\s from and review any order, requirement,
decision or determination made by such an administrative official charg ed with enforcing
this chapter. Such appeal may bemade by any person, firm orcorporation aggrieved by an
officer, department, board -or bureau ufthe city.
I. Vbr/onoms' The Board nfAdjustment shaiialso have the power togrant variances tmthe
provisions ofthis chapter under certain conditions. The conditions for the issuance nfa
variance are as indicated in§154.10A o[this Article. No use variances (uses different than
those allowed inthe district) shalt be issued by the Board of Adjustment.
B. Procedures for Appeals.
Filing of Appeals, AU appeals tothe Board ofAdjustment shalt bein writing and filed with
the office of the Citv Clerk within 14 calendar days of the date of mailing of the noice of
the order, requirement, decision or determinat rori f6Fn vWich the appeal is made.
I Hearings, The Board ofAdjustment shall conduct aIneahng regarding aKappeals in
accordance with 5154.10Z.[.2of this Article.
]. Notice. Written notice nf the hearing shalt heprovided tothe parties tothe hearing and
mailed not less than i4days prior tothe hearing.
4. D/de/s, The Board shalt, within a reasonable time, make its order deciding the matter and
shall serve $ copy nfsuch order upon the app8kant0Fpetitioner bymail. The Board of
Adjustment may reverse oraffirm, whn8y or partly, nrmay modify the order, equirement,
decision or determination as in its opinion ought to be made. The reasons for the decision
of the Board of Adjustment shall be stated in the order. A majority vote of the Board of
Adjustment shall be necessary to reverse any decisions of an administrative office ofthe
city wrtudecide infavor cfthe apphcan|.
3800 'Lxvwu 'Avoime 11Jort6°L,le Ft6vto`kl�i^crot�l55W2
DEPA. TNTINTOF INSPECTIgn
CITY OF LAKE ELM61 -
(651) 747-3910
INSPECTION FOR ? /
DATE
ADDRESS
CONTRACTOR 't;
PRONE NUMIER
PASSI FLL MAKE CORRECTIONS & CONTINUE fl
TIME
I have this day made the inspection called for at the address listed above. You will Make
corrections as listed below before proceeding with any rvork that would cover up or effect the
listed correction. You will call for another inspection before corrections have been covered up.
If no violations of the ordinance are listed above,, approval is hereby given to proceed witb the
work completed as of the time and date listed below, 'Von will be in vioiation of the ordinance
if you dab not coil for the proper inspection and malteidorrection as called for.
Date s!' 'rime Inspector
•
CHAPTER 93: STREETS AND SIDEWALKS
Page 1 of 3
Print
Lake Elmo, MN Code of Ordinances
DRIVEWAYS
§ 93.20 PURPOSE.
The purpose of §§ 93,20 et seq. is to control the location of driveways and curb cuts in order
that traffic hazards be reduced, adequate street drainage be maintained, and that ingress and
egress from properties shall not constitute a hazard or impair the health, safety, or general
welfare of the residents of the city.
(1997 Code, § 1405,01)
§ 93.21 PERMIT REQUIREMENTS.
No driveway shall be constructed in any location where motor vehicles will be provided with
access to any public right-of-way without first obtaining a permit for the construction from the
properly designated city employee, who shall require a grade to establish the driveway. Prior to
the issuance of the permit, the provisions of §§ 93,20 et seq. shall be complied with.
(1997 Code, § 1405.02) Penalty, see § 10.99
§ 93.22 APPLICATION.
Any person desiring the permit shall present written application to the city describing the
project along with a site plan that indicates that the requirements of §§ 93.20 et seT is met. For
new residential developments, these site plans shall be reviewed by the City Building Inspector.
In commercial districts, driveways shall be reviewed as part of the site plan review by the City
Planner
(1997 Code, § 1405.03)
§ 93.23 PERMIT FEES.
The permit fees shall be set, from time to time, by ordinance by the Council.
(1997 Code, § 1405.04)
§ 93.24 PERMIT REVOCATION.
http://www.amlegal.com/alpscripts/get-content.aspx 11/6/2013
CHAPTER 93: STREETS AND SIDEWALKS Page 2 of 3
The permit issued may be revoked by the city at any time after its issuance for failure to
comply with the conditions of the permit or the directions of the city relative to the work covered
by the permit.
(1997 Code, § 1405.05)
§ 93.25 GENERAL REQUIREMENTS.
(A) Licensed contractor. All work done within the right-of-way of the street shall be done by
a regularly licensed contractor under the supervision of the proper city employee, who will see
that all regulations are rigidly followed.
(B) Driveway surface. Whenever a driveway is constructed., all that portion of the boulevard
designated as driveway shall be surfaced with a -plant -mixed machine laid bituminous material
-,conforming to -standards approved by the City Engineer and in-_aceordance with plans approved
-by the City .Engineer. Concrete specifications approved by the City Engineer may also be used
for driveway surfacing at the property owner's own risk.-: Should it subsequently become
necessary to repair or replace the concrete surfacing in whole or in part, the owner, or owners, of
property serviced by the concrete driveways shall pay all costs of the repairs or replacements.
(C) Scope. The requirements of §§ 93.20 et seq, apply to all new construction and to repairs
and changes to old driveways which do not conform to present requirements.
(D) Notification of construction, The city is to be notified at least 24 hours in advance of the
date the construction will start.
(E) Plot plan. Prior to the construction ef a driveway, a plan must be submitted which
indicates the location and specifications for driveways and curb cuts in accordance with §§ 93.20
et seq. The plat plan submitted shall be approved prior to the issuance of a permit for a
driveway.
(1997 Code, § 1405.06) Penalty, see § 10.99
§ 93.26 STANDARDS.
The following regulations shall apply to all driveways, curb cuts and aisles,
(A) Width. The width of driveways in any zoning district shall provide adequate egress and
ingress to the site for the safety of residents, and provide access for emergency vehicles. The
maximum width of driveways in residential districts is 22 feet, except that in the Residential
Estates (RE) Zoning District, the maximum width at a lot line shall be 12 feet and the maximum
width at the public street shall be 18 feet. The maximum width of driveways in commercial
districts is 34 feet. Driveways shall be included on all site plans for new residential permits for
review by the Building Official. In commercial districts, driveways shall be reviewed as part of
the site plan review by the City Planner.
(Am. Ord. 97-18, passed 9-16-1997)
http://www.arnlegal.com/alpscripts/get-eontent.aspx 11/6/2013
CHAPTER 93: STREETS AND SIDEWALKS Page 3 of 3
(B) Distance between driveways. The minimum distance between curbs of driveways at
right-of-way line shall be 10 feet in any residential district. In all other districts, the minimum
distance shall be 20 feet.
(C) Width of aisles. Any aisle in any parking lot in a zoning district other than a residential
district shall be a minimum of 24 feet. Any aisle in a parking lot in any residential district
serving a building containing 3 or more dwelling units shall also be a minimum of 24 feet.
(D) Distance fi'0171 inter.section. No driveway or curb cut shall be less than 20 feet from any
right-of-way line of any street intersection, except that in retail, business, and industrial zoning
districts, the minimum distance shall be 50 feet.
(E) Driveway angle. The minimum driveway ang]e from a 2-way access street shall be 90
degrees. The minimum driveway angle from a 1-way street shall be 30 degrees.
(F) Control of traffic.
(I) Where commercial land uses are adjacent to residential districts, ingress and egress from
the commercial uses on streets leading to or through the residential districts shall not be
permitted unless it can be demonstrated that adequate access to public right-of-way is thereby
denied.
(2) In this manner, traffic shall be controlled to ensure that the location of driveways shall
not constitute a hazard nor be injurious to adjacent residential uses.
(G) Access to thoroughfares. On properties having frontage on both thoroughfares and minor
roads, access shall be provided via the minor road wherever feasible in order to reduce the
number of curb cuts on thoroughfares.
(H) State and county highway requirements. The proposed driveway is to be constructed so
that if it opens into any street designated as a state or county highway, all additional
specifications of the appropriate highway departments will apply.
(I) Distance from driveways to side lot line. A driveway must be at least 5 feet from any side
lot line, except that in the Residential Estates (RE) Zoning District, a driveway must be at least
10 feet from any side lot line.
(1997 Code, § 1405.07) Penalty, see § 10.99
§ 93,27 PARKING AREAS,
The parking restrictions applicable to driveways are stated in the zoning code and §§ 150.001
et seq.
(1997 Code, § 1405.08)
httplAvww.amlegal.coin/alpscripts/get-content.aspx 11/6/2013
CITY OF LAKE ELMO
COUNTY OF WASHINGTON
STATE OF MINNESOTA
ORDINANCE NO, 08-096
AN ORDINANCE AMENDING THE LAKE ELMO CITY CODE OF ORDINANCES BY
AMENDING THE CITY'S DRIVEWAY REQUIREMENTS,
SECTION 1. The City Council of the City of Lake Elmo hereby amends Title IX:
General Regulations; Chapter 93: Streets and Sidewalks; Sections 20 through 27 to
read the following:
DRIVEWAYS
5 93.20 Purpose
The purpose of § 93.20 et seq. is to control the location of driveways and curb cuts in order
that traffic hazards be reduced, adequate street drainage be maintained, and that ingress
and egress from properties shalt not constitute a hazard or impair the health, safety, or
general welfare of the residents of the city.
$ 93.21 Permit Requirements
No driveway shall be constructed in any Location where motor vehicles will be provided with
access to any public right-of-way without first obtaining a permit for construction. Prior to
the issuance of the permit, the provisions of this Ordinance shall be complied with.
5 93.22 Application
Applications for permits shall be made in writing upon printed forms furnished by the City.
Each application for a permit shall have thereon the correct legal description of the property
and a drawing of the land showing the location of the proposed driveway with respect to the
boundary lines of the property. The written application shalt describe the project along with
a site plan that indicates that the requirements of this Ordinance are met.
§ 93.23 Permit Fees
The permit fees shall be set in the City's Fee Schedule by ordinance by the City Council.
9 93.24 Permit Revocation
The permit issued may be revoked by the City at any time after its issuance for failure to
comply with the conditions of the permit or the directions of the City relative to the work
covered by the permit.
S 93.25 General Requirements
A. Licensed Contractor. All work done within the Mght'of'vvoyVfthe street shalt bedone
by a City licensed contractor as specified in Chapter 115 of the City Code.
B. Site Plan. Prior tothe construction of driveway, a Sca\ed plan must be submitted
which indicates the Location and specifications for driveways and curb cuts, the widths
and dimensions at the street' property line and building structure, the slope of the
driveway, and the location o/the curb box anapplicable in accordance with 5593.2U
eCseq. The Site plan submitted shalt be approved prior tothe issuance ofapermit for
adriveway.
593.26 Driveway Standards
The following regulations shalt apply toall driveways and curb cuts. All driveway work shall
be constructed inaccordance with the approved site plan. Nudeviations orchanges shalt be
made inthe field without first obtaining permission from the City.
A. Driveway Width. All driveways shalt conform to the following requirements:
1. Residential Districts
n. /Mhn//nun7 Width, At( driveways shalt have arninimurnvvidth often (10)feet.
b. Maximum Width. All driveways shall have o nnax\nnunn width of twenty-two (22)
feet at the point it intersects the right-of-way line. In the absence of platted
right-of-way, the setback utwhich point the driveway width is measured »haK
be established by the prescriptive easement as determined by the City
Engineer.
c. [uch Cut A curb cut must not exceed the width of the driveway approach at
the property line bymore than ten (10) feet,
Z. Commercial and Mixed -Use Districts
a. /Nin/nnunn Width, All driveways shalt have a minimum width of twenty (20) feet.
b. /Nox/rDun7 NNoth. All driveways shalt have a nnaXin1unl width of thirty-four (34)
feet at the point it intersects the right-of-way line.
c. Curb Cut, 4curb cut must not exceed the width ofthe driveway approach at
the property Uneby more than ten (10) feet.
B. KerC/co/[/eoronce. There must be fourteen (14) feet ofvertical clearance above all
driveways'
C. Number ofCurb Cuts. |nResidential Districts, each property shall belimited toone
curb cut per dwelling unit. Exceptions may be atinvved when neither access is onto a
major street, and when the tot exceeds one hundred and fifty (150) feet in width or is
acorner tot. A(i requests for a second curb cut shall be reviewed by the City Engineer.
D. Distance between Driveways. The minimum distance between curbs of driveways at
right-of-way tine shalt be 10 feet in any residential district. Lots that have been
developed with zero tot line setbacks may bcexempt from this provision. {nat[ Other
districts' the minimum distance shalt be IOfceL.
2
E. Distance from Intersection, No driveway or curb cut shalt be less than 20feet from
any right'of-vvoyline ofany street intersection, except that in high density residential,
[Onnmerciu( and nnimed'usezoning districts, the minimum distanceshai\ be 50feet'
F. Driveway Angle. All driveways xha[iconnect tothe public street at9Odegree angles,
or must be approved by the City Engineer. Exceptions must demonstrate an inabiiity
tomeet the 90degree angle due tnextenuating circumstances.
G. Driveway Grade, Driveways exceeding agrade Vf10%must beapproved bythe City
Engineer. Exceptions must demonstrate oninability tV meet the 10% muXinnu[n8raUe
due toextenuating circumstances,
H. DrivewayDriyeway /MateTh7/3.
1. Urban Districts, All driveways shalt beconstructed ofbitumen, concrete ora
durable material approved bythe City Engineer,
Z. Ruro/D/str/cts. Driveways may he constructed ofcrushed rock orequivalent
crushed maLeriat provided that the portion ofthe driveway within the road right-
of-way shalt be constructed of bitumen or concrete when accessing an improved
street.
|. Curb Box, Residential Districts. Curb boxes located within driveway shalt be protected
with onA1 Ford Lid orapproved equa(.
J. Control nfTraffic.
1. Where other att9rnatiY8s exist, commercial sites should not boaccessed from
local residential streets,
2. Traffic shalt be controlled toensure that the location of driveways shalt not
cVnstitutca hazard nor be iniurinu� to adjacent res��Mh�( uses.
K. Access toMajor Stree[s /7hOD7ughhrred. On properties having frontage on both
thoroughfares and minor roads, access shalt b9provided via the minor road unless
otherwise approved by the City Engineer. Access may be restricted an any non-
residential iocairoad. The number and types 0faccess drives onto major streets may
be controlled and limited in the interests of public safety and efficient traffic flow,
L. State and County Highway Requirements. Driveways constructed to access any street
designated as a state or county highway sha(l meet all additional specifications of the
appropriate 'urisdictinn. Access drives onto state and county r0adushnii require a
review bythe road authority and the City Engineer, The state, county and City
Engineer ShaKdetermine the appropriate location, size and design of such access
drives and may limit the number ofaccess drives in the interest of public safety and
efficient traffic flow,
M. Distance from Driveways to Side Lot Line. Adrivaway must be at least 5 feet from any
side iotline.
N. Emergency Vehicle Access. Driveways toprincipal structures that traverse wooded,
steep oropen field areas shalt be constructed and maintained to a width and base
material depth sufficient [nsupport access by emergency vehicles,
993.27 Parking Areas
The parking restrictions applicable to driveways are stated in the zoning code and SS 150.001
et seq.
SECTION 2, Effective Date. This ordinance shall become effective immediately upon
adoption arid publication in the official newspaper of the City of Lake Elmo,
SECTION 3. Adoption Date. This Ordinance 08-096 was adopted on this third day of
December 2013, by a vote of 4,. Ayes and 0 Nays.
LAKE ELMO CtTV COUNCIL
Mike Pearson, Mayor
ATTEST:
Adam Bell, City C erk
This Ordinance 08-096 was published on the day of , 2013.
4
1 /2" EXP. JOINT
IF CONCRETE
TRANSITION-j
CURB
FLOW LINE
% MIN.)
WIDTH
(MAX. VARIES)
A
MATCH TO EXISTING SAW CUT EDGE
(1 /2" EXP. JOINT IF CONCRETE)
E3ITUMINOUS OR CONCRETE
(PAVEMENT TYPE TO
REPLACE EXISTING)
1/2" EXP. JOINT
(TYP.)
PLAN
VARIABLE
--1/2" EXP.
/ JOINT
APRON GRADE (2
CONTRACTION
JOINT IF
CONCRETE
(PANEL WIDTH
NOT TO
EXCEED 10')
CONC. CURB
& GUTTER
VARIABLE
DRIVEWAY GRADE MATCH
EXISTING (12% MAX.)
L.-- PAVEMENT MATERIAL
ASE MATERIAL
SECTION A -A
ERIVEWt..Y TYPE SURFACE TH:SKNESS BASE -THICKNESS-
5ITUMINOUS 3 NCHES 6 INCHES
CONCRETE 6 INCHES 4 INCHES
NOTES
I BITUMINOUS SHALL BE MnDOT 2360 TYPE SP, GRADATION MIXTURE NO. A WEARING COURSE,
2. AGGREGATE BASE SHALL BE MnDOT 3136 CL. 5, 100% CRUSHED STONE.
RESIDENTIAL DRIVEWAY
FEBRUARY 20
ELMO
CITY OF LAKE EL 0
STANDARD DRAWING NO,
504
LAKE ELMO
THE11
6",
L AVIU
AGENDA ITEM:
SUBMITTED BY:
THROUGH:
REVIEWED BY:
, • 6
b•
DATE:
CONSENT
ITEM
MOTION
January 2
#3
Approve Disbursements in the amount of $1,282,261.76
Cathy Bendel, Finance Director
Cathy Bendel, Finance Director
Dean Zuleger, City Administrator
014
SUGGESTED ORDER OF BUSINESS:
Introduction of Item City Administrator
Report/Presentation City Administrator
Questions from Council to Staff._ ....... ...... .......... Mayor Facilitates
Call for Motion Mayor & City Council
Discussion .......... ........ ............... ............ ......... ....... Mayor & City Council
Action on Motion Mayor Facilitates
POLICY RECOMMENDER: Finance
FISCAL IMPACT: S1,282,261.76
SUMMARY AND ACTION REQUESTED: As part of its Consent Agenda, the City Council
„..
is asked to approve disbursements in the amount of $l ,282,261.76. No specific motion is needed
as this is recommended to be part of the Consent Agencla.
LEGISLATIVE HISTORY: NA
-- page 1 --
City Council Meeting [Consent Agenda Item 37
January 2], 2014
BACKGROUND INFORMATION/STAFF REPORT,: The City of Lake Elmo has the
fiduciary responsibility to conduct normal business operations. Below is a summary of current
claims to be disbursed and paid in accordance with State law and City policies and procedures.
Claim # Amount Description
ACH 14,275,20 PayrollTaxes to IRS & MN Dept of Revenue 1/9/14
ACH $ 6,359.56 Payroll Retirement to PERA 1/9/14
DD5225-DD5274 $ 41,848.34 Payroll Dated (Direct Deposits) 1/9/14
40826 - 40827 $ 8,768.50 Accounts Payable Manual 1/3/14 & 1/10/14
40828 - 40900 $ 1,206,150.16 Accounts Payable 1/21/14
2146-2226 $ 4,860.00 Library Card Reimbursement 1/21/14
TOTAL $ 1,282,261.76
RECOMMENDATION: Based on the aforementioned, the staff recommends the City Council
approve as part of the Consent Agenda the aforementioned disbursements in the amount of
$1,282,261.76
ATTACHMENTS:
Accounts Payable — check registers
-- page 2 --
Accounts Payable
To Be_Paid Proof List
User; devise
Printed: 01/03/2014 - 10:29 AM
Batch: 011-12-2013
invoice tt Div Date
SPRINGI3R Spring,born R telt ie and Belli
1/3/2014 01/03/1014
803-000-0000-22900 Deposits Payable
I/3/2014 Total:
SPRINGBR 'Iota]:
Report Total:
Amount Quantity Pint Date Description Reference Task Type PO 0 (lose POLine fi
AP - To 13e Paid Proof List (01/03/14 - 10:29 A.N.1
4,000.00 0.00 01/03/1014 Partial Escrow Refund 8970 55tli St NI
4.000.00
4,000.00
4.000.00
No 0000
Page 1
Accounts Payable
To Be Paid Proof List
User: devise
Printed: 01/10/2014 - 12:39 PM
Batch: 002-01,-2014
Invoke # Inv Date
Amount Quantity Pint Date Description Reference Task Type 1'0 # Close POLine fi
WERNERAU Werner Auction Group
1/10/2014 01/10/2014 4,768.50 0.0(1 01/10/2014 5200 HD Thermal linage Camera & No 0000
101-420-2220-42400 Small Tools & Equipment Charger
1/10./2014 Total: 4,768.50
WERNERAU Total: 4,708.50
Report Total: 4,768.50
AP - To Be Paid Proof List (01/10/14 - 12:39 PM)
Page 1
Accounts Payable
To Be Paid Proof List
User: denise
Printed: 01;16/2014 - 2:17 PM
Batch: 003411-2014
Invoice t Inv 1)al.e
Amount Quantity Put Date Description Reference Task
AMERICAN American Eng and Testing, Inc.
60817 12/23/2013 4.595,95
601.-494-9400-43030 Engineering Services
60817 Total: 4,595.95
60863 01/15/2014 1.855.00
602-495-9450-43030 Engineering Services
60863 Total: 1,855.00
AMERICAN Total: 6,450,95
AKERP AT [3aker Patricia
INVOICE 2013-12 1)1/08/2014 550.00
101-410-1520-43150 Contract Services
INVOICE 2013-12 Total: 550.00
B AKER PAT Total: 550,00
BOETONME Bolton & Mcnk, Inc
0162699 12//0/2013 315.00
601-494-940(1-43030 Engineering Services
(1162699 Total: 315.00
0162-700 12;2012013 6,687.00
601-494-9400-43030 Engineering Services
(116270(1 I )P0/20)3 10,030.50
602-495-9450-43030 Engineering Services
0 162700 Total: 16,717.50
BOLTONME Total: 17,032,51)
C A C Companion Animal Control, EEC
12 12411/2013 500.00
I 01-420-2700-43 150 Contract Services
12 'rota': 500.0))
AP - To Be Paid Proof List (01/16/14 - 2:17 PM)
0,00 01/21/2014 Well No 4 Connecting Watermain
0.00 01/21/2014 Sewer Infrastructure Improv 194-30th
0.00 01/21/2014 Contract Services - Hours 22 2013-12
"1-ype P0 # Close POLine #
No 0000
No 0000
No 0000
(1.00 (11/2 112014 Well No 4 Connecting Watermain No 0000
WaterFund
0.00 01/21/2014 Section 34 Water & Sewer Utility Ext No 0000
Imp
0.00 01/21/2014 Section 34 Water & Sewer Utility Ext No 0000
lmp
0.00 01/21/2014 Animal Control Services - December
2013
No 0000
Page I
blV9ice Inv 0;3 te
AMOtlia Quantity Pnit Pate Description Reference Task Type PO # Close POLine
C A C 5(10.00
CA RQUEST Car Quest Auto Parts
2055-308065 12/31/201.3 50.65 0.00 01/21/2014 Lights- No 0000
101-430-3125-44040 Repairs/Main( Eqpt
2055-30005 Total: 5(1,65
CARQUEST Total: 50.65
CONICAST C'oineast
1207/2013 12/27/2013 7.92 0.00 (11/21/2014 Monthly Service - December 2013 No 0000
101-420-2220-44300 Miscellaneous
12127/2013 Total: 7.92
COMCAST Total: 7,92
CIVB LOOM City of -Bloomington
December 2013 12/3112013
601 -494-9400-42270 Utility System Maintenance
December 2013 Total
CTYF3LOOM Total:
31.50 0.00 I/2 1 720 141 Lab Bacteria Test No 0000
3 1 .50
3 1 .5(1
CTYNIAPLE City of Maplewood
007130 12/31/2013 5(1.32 (1.00 01/21/2014 Keats MSA Street
409-430-8000-43030 Engineering Services
007130 12/31/2013 37.96 0,00 01/21/2014 Keats Trunk Waterman)
601-494-9400-43030 Engineering Services
007130 Total: 88.28
CTY MAP LE Total: 88.28
CTY0A1(DA City of Oakdale
1000460-0 I I ,/3112013
601-494-9400-43820 Water Utility
1000460-01 Total:
O1Y0M(DA Total:
2.805.61 0.00 01/21/2014 Water Service 1-94 December 2013
2.805.61
2,805.61
ENI FROAUT Emergency Automotive Tech, Inc
AWI21713-4 I2/I7/20I3 353.38 0.00 01/21/2014 Light Bar -04-1
101-430-3125-44040 RepairsAlaint Eqpt
AW121713-4 Total: 353.38
Al' - To lie Paid Proof List (0 I /16/14 - 2:17 PM)
No 0000
No 0000
No 0000
No (1000
Page 2
R./vfliCe Inv Date Arnonnt Qnantity Putt Date Description Reference Task Type PO ti Close roLiiie #
EMERGAUT Total:
[AI MONS&O Emmons & Olivier Resources Inc
0156562 1)/1812013
"803-000-0000-12900 Deposits Payable
(1156562 Total:
EMMONS&O Total:
FXL FXL, Inc.
December 2013 17/21/2013
10 I -4 1 0-1320-43100 Assessing Services
December 2013 Total:
FXL Total:
GREATANIE Great American Marine Inc
36449 12/31/2013
I 01-470-22?0-42400 Small Tools & Equipment
36449 Total:
GR LATAME Total:
HACH 11A(.711 Company
860848 )' 12111/2013
601-494-9400-42160 Chemicals
8(1(18482 Total:
HACH Total:
IIOLIDAYC Holiday Credit Office
12715/2013 11/15/2013
101-420-2220-42120 Fuel, Oil and Fluids
12/15/2013 Total:
HOLIDAYC Total:
JOHNSON& Johnson & Turner Attorneys
31940 0 110S 2014
101-420-2 I 50-43045 Attorney Criminal
31940 Total:
31944 01/08/2014
601-494-9400-43040 Legal Services
31944 Total:
AP - To 13e Paid Proof' List 101/16/14 - 2:17 P1.11
353,38
76.00 0.00 01/21/2014 2012.130 Savona Lennar Dev SW
Grading
76.00
76.00
16.908,20 0.00 01/21/2014 Assessment Services - Final 2013
16,908,20
t 6,908,20
895,00 0.00 01 121/2014 Lightbar for Boat
895.00
895.00
544.89 0.00 01/21/2014 Lab Test Supplies
544.89
544.89
178.87 0.00 01/21/2014 Fuel - Fire Department
178.87
178.87
4,549.47 0.00 01/21/2014 Legal Services - Prosecution #31940
4,549.47
30.0(1 0,00 01/21/2014 Legal Services - 3M 431944
30.00
No 0000
No 0000
No 0000
No 0000
No 0000
No 0000
No 0000
Page 3
itry °ice 14 Inv Date
Amount Quantity Pint Date Description Reference Task Type PO # Close ['Mine #
31945 01/08/2014
206-450-5300-43040 Legal Services
31945 Total:
31957 01/08/2014
I 01-410-1320-43040 Legal Services
31952 Total:
31954 4)08/2014
409-480-8000-43040 Legal Services
31954 Total:
32359 01/08/2014
409-480-8000-43040 Legal Services
32359 Total:
JOHNSON& Total:
356,00 0.00 01/21/2014 Legal Services - Library #31 945 No 0(100
356,00
1,82 I .00 0.00 01/21/2014 Legal Services - Civil lnv #31952 No 0000
1,821.00
97.50 0,00 01/21/2014 Legal Services - Lennar Project Status No 0000
97.50
145.00 0.00 01/21/2014 Legal Services - Sewer Line Waivers No 0000
145.00
6,998.97
JOSTENS Jostens
LEFD13 09/20/2013 869,39 0,00 01/21/2014 20 Year Service Ring 0000
101-420-2220-44300 Miseellaneous
LEFD13 Total: 869.39
JOSTENS Total: 869.39
K AM CO Kameo, Corp
3962 12/28/2013 800.00 0.00 01/21/2014 Cut Down Storm Damaged No 0000
101-430-3120-43150 Contract Services Cottonwoods
3962 Total: 800.00
K AM CO Total: 800.00
KREMER Kreuter Services, ITC
29057 17/30/7013 418.02 0,00 01/21/2014 Spring Replace on 86- I Dump Truck No 0000
101-430-3125-42210 Equipment Parts
29057 Total: 418.02
KREMER Total: 418.02
LEOIL Lake Elmo Oil, Inc.
12/3112013 11/31.0013
101-420-2220-42120 Fuel, Oil and Fluids
12/31/2013 Total:
5076330 12/2612013
101-430-3120-42120 Fuel, Oil and Fluids
5076330 Total:
5676 CI8 12/19/2013
1.01-430-3120-42120 Fuel, Oil and Fluids
5676123 Total:
AP - To Ile Paid Proof List (0)(
4 - 2:17 PIvl
328.26 0.00 01/21/2014 Fuel -
323.16
4 I .83
41.83
30.00
30,00
0,00 01/21/2014 Fuel
0,00 01/21/2014 Fuel -
No 0000
No 0000
No 0000
Page 4
Invoke # Inv Date
Amount Quantity Pint Date Description Reference Task Type PO # Close POLine
5676139 I -I/ I S/2013
101-430-312(1-4212(1 Fuel, Oil and Fluids
5676139 otal:
LEOIL
37.00 0.00 01/21/20 4 Fuel -
37.00
437.09
No 0000
Lillie Newspapers Inc. Lillie Suburban
Aect No 007148 12/31/2013 55.90 0.00 01/21/2014 12/8 Notice - Inwood Booster Station No 0000
101-410-132043510 Legal Publishing
Acct No 007148 12j31/2013 13.20 0.00 01/21/2014 12/25 Ordinance #08-097 No 0000
101-410-1320-43510 Legal Publishing
Acct No 007148 12/31/2013 19.80 0.00 01;21/2014 1/1 Notice - Planning Commission No 0000
10 I-410-1320-43510 Legal Publishing
Aect No 007148 'rota!: 88.90
Lillie Total: 88.90
LOFT Loftler Companies, Inc.
1678116 0E02/2014 471.96 0.00 01/21/20i 4 Copy Machines Contract&Over 12/10- No 0000
101-410-1940-44040 Repairs/Main( Contractual Eqpt 1/9
1678216 Total: 471.96
LOFT Total: 471.96
LTLFALLS Little Falls Machine. Inc
.554 12:27/2013
101-430-3125-44040 Repairs/Maint Eqpt
52554 Total:
LILEALTS Total:
241.94 0.00 01/21/2014 Scraper Hangers & Hardware No 0000
241.94
241.94
NIARONEYS klaroney's Sanitation,. Inc
505823 01/02/2014 108.32 0.00 01/21/2014 Waste Removal - City Hall No 0000
101-41(1-1940-43840 Refuse
.505823 011.12/2014 47,68 0.00 (11/21/2014 Waste Removal - Fire No 0000
1(1E420-2210-43840 Refuse
505,823 01/0212014 207.S2 0.00 01/21/2014 Waste. Removal - Public Works No 0000
101-430-3100-413840 Refuse
505823 01412/2014 207.82 0.00 01/21/2014 Waste Removal - Parks No 0000
101-45(1-5200-43840 Refuse
505823 01/02/2014 48.12 0.00 01'2E2014 Waste Removal - Library No 0000
206-450-5300-43840 Refuse
505823 Total: 619.76
MARON EV S Total: 619.76
To Be pnid proof List (tt 116114 - 2:17 PN1)
Page 5
invoice 71 Inv Date
Amount Quantity hut Date Description Reference
'rash Type l'O # Close POLitte
MI LIFIZE.X Miller Excavating, Inc.
17844 17/31/2013
001-494-9400-44030 Repairs\ M aim( Imp Not B Idgs
17844 Total:
NIILLERE-IN Total:
MINGERCO Miner Construction Inc
Pay Request No4 12/01/2013
602-495-9450-43030 Engineering Services
Pay: Request No4 Total:
MINGERCO Total:
NASALTCO North American Salt Company
71083125 12r/5/2013
101-430-3125-42290 Sand/Salt
71083125 Total:
71088371 1)/310013
101-430-3125-42200 Sand/Salt
71088371 Total:.
NASA LTC° Total:
NELSONMA Nelson Marine
2)61) 12/2612013
10 I-4)0-2210-42400 Small "Fools& Equipinent
22612 Total:
NELSONMA Total:
ONECALL Gopher State One Call
86.765 2/31/2013
101-430-3100-43150 Contract Services
86265 Total:
ONECALL Total:
OURTEAM A Our Team Advantage Inc.
438 12/25/2(113
101-430-3125-43150 Contract Services
438 Total:
OURTEAMA Total:
AP - To Be Paid Proof List 101/16/14 - 2:17 PM)
2,190.55 0.00 0121/2014 Water Main Excavation & Materials
Layton
2,190.55
2,1.90.55
486,505.26 0.00 01/21/2014 Lake Elmo Ave Sewer Infras Imp 4th
Pay
486,505.26
486,505.26
No 0000
No 0000
3,696.63 0.00 01/21/2014 Road Salt No 0000
3,696.63
1,834.99 0.00 01121/2014 Road Salt No 0000
1,834.99
5.531.62
580.01 0.00 01/21/2014 Battery, Battery Box & Recharge kit
boat
580.01
580.01
39.25 0.00 01/2112014 FTP Tickets - December 2013
39.2s
39.25
805.00 0.00 01/21/2014 Contract Snow Plowing
8(15.00
805.00
No 0000
No 0000
No 0000
Page 6
1 vo ice if
Inv Date
Amount Quantity Putt Dale Description Reference
Task Type PO # Close POLine fi
REDSTONE Redstone Construction Co. Inc
Pay request No3 01/01/2014
601-494-9400-43030 Engineering Services
Pay request No3 01/01/2014
602-495-9450-43030 Engineering Services
Pay request No3 Total:
REDSTONE Total:
RENLUNDT Renlund Ten-y
14 01/02/2014
101 -420-24(10-43150 Inspector Contract Services
14 01/02/2014
101-420-2400-43310 Mileage
14 Total:
RENLUNDT Total:
RI VRCOOP River County Cooperative
12,',31/2013 12/31/2013
101-420-2220-42120 Fuel, Oil and Fluids
1213 U2(113 Total.:
Rf V RCOOP Total:
SAUTE:AST Safe -Fast, Inc,
INV 134330 12/26/2(113
101-450-5200-42150 Shop Materials
INV 134330 Total:
SAFEFAST Total:
SAMSCLUF3 Sums Club
12/17/2013 01/07/2014
101-420-2220-42400 Small Tools & Equipment
12/17/2013 Total:
11./30/2013 01/07/2014
101-420-2220-44300 Miscellaneous
12/30/2013 01/07/2014
( /1-420-2220-44010 Repairs/Maint Bldg
2/30/2013 01/07/2014
101-420-2220-42400 Small Tools & Equipment
12/30/2013 (11/(17/21114
101-43(1-3100-42000 Office Supplies
12/30/2013 Total:
I 26.211.40
189,317,09
315,528.49
315,528,49
364..50
116.96
481.46
481.46
295.79
295.79
295.79
161.61
161.6)
161.61
21.30
21.30
10,98
78.22
25.65
7.48
122.33
AP - To I3e Paid Proof- List {01/16/14 - 2:17 1k1)
0.00 01/21/2014
0.00 01121 /2014
0 MO
0.00
Section 34 Water & Sewer Utility Ext
Imp
Section 34 Water & Sewer Utility Ext
Lnip
01/21./2014 Building Inspector Services Dec
26;27;3(1
01/21/2014 Building Inspector Mileage Dee
26;2730
0.00 01/21/2014 Fuel -
OM 01/21/2014 lce Grippers & Safety Glasses
OW 01/21/2014 Phone Charger
0.00
U.00
0.00
01/21/2014
01/21/2014
01/21/2014
Restock Rehab Supplies
RestockStation Supplies
lce Melt air Trucks
0.00 01/21/2014 Supplies
No
No
No
No
No
No
No
No
No
No
No
0000
0000
0000
0000
0000
0000
0000
0000
000(.1
0000
00(10
Page 7
Invoice 4
Ins Pate
Amount Quantity Pint Pale DeSeription Reference Task Type PO # Close POLine #
SAMSCLUB Total: 143.63
S111 S111 International Corp
1301592525 12/19/2013
101-410-1320-43190 Software Programs
B015915 )5 Total:
SI-11 Total:
1EILANDN1 TE1 LaiRlinark Audio
1179731 12/70/2013
206-450-5300-42500 Library Collection Maintenance
(179731 Total:
-1EILANDNI
TKDA TK DA, Inc.
092013004149 10/09/2013
101-410-1930-43030 Engineering Services
002013004149 Total:
007013004150 10/02/2013
602-495-9450-43030 Engineering. Services
002013004 450 Total:
TKDA Total:
183.54 0.00 01/21/2014 1 - Acrobat XI Std software - Admin No 0000
188,54
188.54
164.02 0.00 01/21/2014 Audio Books (15)
164.02
164.02
130.93 0,00 01/21/2014 General Engineering Serv-Records
Data
130.93
3,580,92 0.00 01/21/2014 2013.123 Lake Elmo Ave Sewer Infra
Ilup
3,580.9)
3,711,85
-FRI- f' Tri State Pump & Control Inc.
34822 01/02/2014 8,564,50 0.00 01/21/2014 94 1411 Station Pump Repair
602-495-9450-441130 Repairs'Alaint Imp Not B1dgs
34822 Total: 8,564.50
TRI-P Total; 8,564.50
TwiNGAR Twin City Garage Door Corp.
106838 12123/2013 379.24 0.00 01/21/2014 Repair Garage Door Station #1
101-420-2270-44010 Repairs/Mann Bldg
406838 Total: 379.24
TwiNGAR Total: 379.24
VALLEYTR Valley Trophy Inc.
44919 12/05/2013 573.60 0.00 01/21/2014 Employee Recognition Awards - 2013
101-410-1320-44380 StarlDevelopment
44919 Total: 573.60
AP - To Be Paid Proof List (01/16/14 - 2:17 PM)
No 0000
No 0000
No 0000
No 0000
No 0000
No 0000
Page 8
to -voice t`, Inv Date
Antonin Quantity Pun Date Description Reference Task "Fype V() # Close POLitte #
'1,7ALLEYTR Total:
573.60
VOSSDAN-Voss Dan
855860 01/01/2014 400.00 0.00 01/21/2014 Snow Removal Dec 2013 No 0000
206-450-5300-43150 Contract Services
855860 Total: 400,00
VOSSDAN Total: 400,00
WAS-SHER Washington County
77742 12/30/2013 10.75 0,00 01/21/2014 Code Red - Notification- Training Bum No 0000
10 I -420-2220443 70 Conrcrences & Training,
77742 Total: 10.75
WAS-SHER Total: 1(1.75
WASH-REC Washington County:
)1245080 12/06/2013
101-410-1910-42030 Printed Forms
P245080 Total:
1'245874 12116/2013
1 tI1-410-1910-42030 Printed Forms
P245874 Total:
P240796 12/30/201 3
101-410-1910-42030 Printed Forms
P246790 Total:
P246995 12/31/2013
1111-410-1910-42030 Printed Forms
P246995 Total:
WASH-REC Total:
WASHCONS Washington Conservation Dist.
2813 12/31/2013
603496-9500-44370 Conferences (c.:. Training
2813 Total:
WASHCONS Total:
WATERCON Water Conservation Svs Inc.
'1541 01/05/2014
601-494-9400-44300 Miscellaneous
4541 Total:
AP - To Be Paid Proof List (0 I I (/14 - 2:17 PM)
40.00 0.00 01/21/2014 Easement on Lot 6 -Si Croix Sanctuary No 0000
46,00
46.00 0.00 01/21/2014 Easement - No 0000
46.00
52.65 0.00 01/21/2014 QCD 0000
52.65
52,65 0.00 01/21/2014 QCD - No 0000
52.65
197.30
556.25 0.00 01/21/201 4 4th of Four a er Billings Shared No 0000
Educ
556.75
556.25
272.40 0.00 01/21/2014 Leak Detection Service - VVIA1 Break
Layton
272.40
No 0000
Page 9
lovnice in 1.i;11.e.
Amount Quantity Putt Date Description Reference Task Type PO Close L'OLine #
WATERTON Total:
WE L.KSEND Weeks -End Signs & Graphics
1878 11/13/2013
601-494-9400-45200 Building and Structures
1878 Total'.
WEEKSEND Total:
NCEL Xcel Energy
17/2717013 12/27/2013
101-450-5200-43810 Electric Utility
12/27/2013 12/.27/20(3
607-495-9450-43810 Electric Utility
12/27/2013 12/27/2013
101-430-3160-43810 Street Lighting
12./27/2013 17/27/2013
101-430-3160-4381(1 Street Lighting
12/27/2(.113 12/27/2013
101-420-2220-43810 Electric Utility
12/27/2013 12/27/2013
101-410-1940-43810 Electric Utility
12/27/2013 12/27/2013
101-430-3160-43810 Street Lighting
12/27/2013 12/27/2013
101-410-1940-43810 Electric Utility
12/27/2013 12/27/2013
101-450-5200-43810 Electric Utility
17/77/2013 12/27/2013
101-450-5200-43810 Electric Utility
1127/2013 I 2/27/20 13
101-450-5200-43810 Electric Utility
12/27/2013 12/27/2013
601-494-9400-43810 Electric Utility
12/27/2013 17/7717013
101-420-2220-43810 Electric Utility
12/27/2013 17/77/1013
111-430-3160-43810 Street Lighting
12/27/2013 17;27/2013
101-450-5200-43810 Eteetric Utility
17/77/2013 170717013
002-195-9450-4.3810 Electric
12/27/2013 12./27/2013
6W-495-9450-43810 Electric Utility
272.40
154.96. 0.00
154.96
154.96
0 U21/2014 City Logo Graphics
68.19 0.00 01/21/2014 Xcel -Lights at Legion Park-3509
Laverne
17.32 (1.00 01121/2014 Xcel -Lift Station - 8860 Hudson
56.73 0.00 01721/20 I 4 Xcel -Traffic Lights - 100 Inwood
10,66 0,00 01/21/2014 Xcel -Street Lights - 3014 JainIcy
1,162.45 0.00 01/21/2014 Xcel - Fire Station 2 4259 Jainaca
296.33 0.00 01/21/2014
18.90 0.00 01/21/2014
695.24 0.00 01/21/2014
1.33 (1.00 01/21/2014
66.82 0.00 ()1/21/2014
-6.64 0.00 01/21/2014
Xcel - City Hall 3800 Laverne
Xccl - Traffic Lights 100 Keats
Xcel - City Hall 3800 Laverne
Xcel - Tennis Courts 3510 Laverne
Xcel - Parks Bldg - 11194 Upper 33rd
Xcel - Pebble Park - 8170 Lake Jane Tr
325.43 0.00 01/21/2014 Xccl - Wells 1&2 3303 Langly &
1197.5 55
31(1.78 0,00 01/21/2014 Xcel - Fire Station 1 3510 Laverne
28.55 0,00 01/21/2014
157.24 0.00 01/21/2014
9,76 (1.00 01/21/2(114
-9.88 0.00 01/21/2014 Xcel Lift Station - 2759 Legion Ave
AP - To Be Paid Proof List 101/16/14 - PN.1)
Xcel - Traffic Lights 998 Inwood
Xccl - Arts Center - 3585 Laverne
Xcel Lill Station - 11062 34th St
No
0000
No 0000
No 0000
No 0000
No 0000
No 0000
No 0000
No 0000
No 0000
No 0000
No 0000
No 0000
No 0000
No 0000
No 0000
No 0000
No 0000
No 0000
Page 10
invoice
NI' Dale
,,3u1011611: Quantity Pm( Date Description Reference Task Type PO it Close POLine
12'77/3013 1727/21113
1(11 -470-2220-43810 Electric
1E270(113 170712013
101-450-5200-43810 Electric Utility
17,27/2013 12/27/2013
101-430-3160-43810 Street Lighting
12/2772013 12/270013
101-430-3160-43810 Street Lighting
17/27/2013 12i:27/7013
I 01-450-5200-43810 Electric Utility
12/27/2013 13/27/7013
101-450-5200-43810 Electric Utility
17/27/2013 12137/2013
101-430-3100-43810 Electric Utility
17/27/2013 12/77/2013
601494-Q400-43810 Electric Utility
12/27/2013 12/77,2013
101-430-3160-43810 Street Lighting
17/27/7013 12/27/2013
101-430-3160-43810 Street Lighting
17/77/2013 17/37/2013
206-450-5300-43810 Electric Utility
12/27/2013 Total:
XCEL Total:
Report foal:
- To Be Paid Proof List (01/16/1-1 - 2:17 PM)
655,91
296,96
580.95
13.34
4,99
-64,10
1,593.69
118.94
3.72
19.58
615.2:6
7,048.45
7,048.45
891,904.31
0,00 01/21/2014 Xcel Lift Station - 3510 Laverne
0,00
0,00
0,00
0.00
0,00
0,00
01/21/2(114
01/21/2014
01/21/2014
(11/21/2(114
01/21/2014
01/21/2014
Xcel Legion Park - 3511 Laverne
Xcel Street Lights -
Xcel Traffic - Manning & Stillwater
Blv
Xcel Traffic -VFW Hal Meld-3675
Layton
Xcel Traffic -VFW Balltield-3675
Layton
Xcel Traffic -Public Wks 3400 Ideal
0.00 01/21/2014 Xcel Water Tower 2 3445 Ideal Ave
0.00 01/21/2(114 Xcel Speed Sign Hwy 5 10901
Stillwater
0.00 01/21/2.014 Xcel Welcome Sign - 425 Keats
0.00 01/21/2014 Xecl Library - 3537 Lake Elmo Ave
No 0000
No 0000
No 0000
No 0000
No 0000
No 0000
No 0000
No 0000
No 0000
No 0000
No 0000
Page I I
Accounts Payable
To Be Paid Proof List
(Jser: denise
Printed: 01/16/2014 - 2:39 P11,1
Batch: 004-01-/0 14
take # inv Datc
WAS-SHER Washingion County
77946 01/14/2014
101-420-2100-43150 Law Enforcement Contract
77946 Total:
WAS-SHER Total:
Report Total:
AP - To Be Paid ProofList (01116/14 - 2:39 PM)
Anton la Quail tity Pint te Description Reference Task Type PO # Close POLine #
2.51,242.31
251,242.32
251,242.32
251.242.3)
0.00 01121/2014 July - December 2013 Police Services
No 0000
Page 1
Accounts Payable
To Be Paid Proof List
User: denise
Printed: 01/16/2014 2:51 PM
Batch: 005-01-2014
Invoice tt
Inv Date
CARQUEST Car Quest Auto Parts
2(155-31,8499 01/(17/2(114
101-450-5200-42120 Fuel, Oil and Fluids
2055-308499 Total:
2055-308550 01/07/2014
101-450-5200-42120 Fuel, Oil and Fluids
2055-308550 Total:
2055-308554 01/07/2014
101-450-5200-42120 Fuel, Oil and Fluids
2055-308554 Total:
CARQUEST 'Iota]:
CONLEYM 0 Conley Morgan
Cable Op 1/6/14 01/06/2014
101-410-1450-43620 Cable Operations
Cahle Op 1/6/14 Total:
Cable Op1/1 3/14 01/13/2014
101-410-1450-43620 Cable Operations
Cable Op1/13/14 Total:
CONLEYMO Total:
CTYROSEV City of Roseville
0218204 01/06/2014
101-410-1450-43 180 Information Technology/Web
0218204 Total:
(1218244 0 E/06/2014
101-410-1450-43180 Information Technology/Web
0218244 Total:
0218282 01/08/2014
101-410-1320-43210 Telephone
0218782 0i/08/2014
101-420-2400-43210 Telephone
AP - `Fo Be Paid Proof List (01/16/14 - 2:5) PM)
Amount Quantity Pmt Date Description Reference
324.59 0.00 01/21/2014 Radiator & Cat converter repairs - 00-2
324.59
90,03 0.00 01.'21/2014 Battery
90.03
5.59 0.00 (11/21/2014 Fxhaut Gasket 00-2
5.59
420.21
55.00 0.00 01/21/2014 Cable Operations- 1/6/14 CC Meeting
(4hr)
55.00
55.00
55.00
1 1 0.00
0.00 (11/21/2014 Cable Operations-1/13/14 Plan Comm
(4hr)
113.97 0.00 01/21/2014 Domain Name Renewal 3 yrs
113.97
2,635.58
0.00
01/21/2014 Monthly IT Services - Jan 2014
2,635.58
87.10 0.00 01/21/2014 Monthly Tclephonc-Admin - Jan 2014
13.75 0.00 01/21/2014 Monthly Telephone -Building Insp Jan
2014
Task
'I ype PO # (lose. POI,ine #
No 0000
No 0000
No 0000
No 00(10
No 0000
No 0000
No
No 0000
No 0000
Page l
Invoke # nv Date
0218282 01/08/2014
101-410-1450-43210 Telephone
0218282 01/08/2014
101-410-1930-43210 Telephone
0218282 01/08/2014
101-410-1520-43210 Telephone
(1218282 01/08/2014
101-410-1910-43210 Telephone
(r)18282 01/08/2014
101-430-3100-43210 Telephone
0218282 Total:
CTYROS EV Total:
DERRICK Derrick Custom Homes
01;02/2014 01/02/2014
803-000-0000-22900 Deposits Payable
01102120 14 Total:
DERRICK Total;
DONA LUSA Donald Salverda & Associates
Jan 6 2014 01/06/2014
101-410-1320-44370 Conferences & Training
Jan 6 2014 Total:
DONALDSA
ENV ENT'S Envemis
Acct 738507 01/01/2(114
101-410-1940-43210 Telephone
Acct 738507 Total:
ENVENTIS Total:
EQUINOX Equinox Software
3416 01/13/2014
206-450-5300-43180 Information Technology
3416 Total:
EQUINOX Total:
FIORILLO Fiorillo Megan
Cable Op 1 /14/14 01/14/2014
1(11-410-1450-43620 Cable Operations
Cable 0111/14/14 Total:
Amount Quantity Pint Date Description Reference
AP - To Be Paid Proof List (01/16/14 - 2:51 pm)
13.75 0.00
13.75 0.00
97.50 0.0))
38.15 0.00
181.75 0.00
375,75
3,125.30
5,000.00
5,000.00
5,000.00
01/21/2014 Monthly Telephone -Communication
Jan 14
(11/21/2()14 Monthly Telephone -Engineering Jan
2014
01/21/2014 Monthly Telephone -Finance Jan 2014
01/21/2014 Monthly Telephone -Planning Jan 2014
01/21/2014 Monthly Telephone -Public Wks Jan
2014
0.00 01/21/2014 Refund Escrow#7829 8311 2Ist Street
600,00 0.00 01/21/2014 Ent:01111mM D Zuleger East Metro Mgr
600.00
600.00
53.46 0.00 01/21/2014 Telephone/Data Service -City Hall -Jan
53.46
53.46
3,100.00 0.00 01121/2(114 ILS Platform Support -I Yr Renewal-
Lihrar
3.100.00
3,100.00
34.38 0.00 01/21/2014 Cable Operations-1/14/14 CC
Workshop2.5
34.38
Task Type PO # Close POI,ine #
No
No
No
No
No
No
No
No
No
No
0010
(7000
0000
0000
000(1
0000
0000
01100
0000
ONO
Page 2
Invoice # Inv Date
Amounl Quantity Pint Date Description Reference Task
FIORILLO Total: 34.38
FRANCOTY Francotyp-Postalia, Inc
R1101811981 01/05/2014 247.30 0.00 01/21/2014 Postbase Inkjet Cartridge
101-410-1320-43220 Postage
R1101811981 Total: 247.30
FRANCOTY Total: 247.30
iTRROOFI .ITR Roofing Inc
01012014 01/01/2014 4,272.00 0.00 01/21/2014 Roof Repair & Gutter Replace
206-450-5300-42185 Software Dol,vopyint
01012014 Total: 4,272.00
,ITRROOF1 Total: 4,272.00
LMC IT League of MN Cities Ins. Trust
200012333 01/1612014 34,341.00 0.00 01/2172014 Worker's Compensation - 2014
101-000-0000-20600 Contracts Payable
200012333 'rota]: 34,341,00
V1_00012305 01716/2014 214.67 0.00 01/21/2014 Accident Plan for Volunteers
101-410-1320-43610 Insurance
VL00012305 01/1672014 214.67 0.00 01/21/2014 Accident Plan for Volunteers
204-450-5200-43610 Insurance
VL00012305 01/16/2014 214.66 0.00 01/2172014 Accident Plan for Volunteers
206-450-5300-43630 Insurance
VE00012305 Total: 644.00
LMC IT Total: 34,985,00
MARVS Marc's Professsional Tools
266477 1111472013 9.00 0,00 01/21/2014 Tools
101-430-3100-42400 Small Tools & klinor Equipment
266477 Total: 9,00
267922 01/07/2014 68.55 0.00 01/21/2014 Tools
I 01-430-3100-42400 Small Tools & Minor Equipment
267922 Total: 68.55
MARVS Total: 77.55
MBFTE IMBFTE
01/14/14 01714/2014 75.00 0.00 01/21/2014 License. Rencwal,Chief Malmquist
101-420-2220-44330 Dues & Subscriptions
0 I /14/14 Total: 75.00
AP - To Be Paid Proof List (01/16/14 - 2:51 PM)
Type PO ft' Close POLipe
, • •
No 0000
No 0000
No WOO
No 0000
No 0000
No 0000
No 0000
No 0000
No 0000
Page 3
Invoice # lnv Date
Amount ()flaunty hut Date Description Reference
MB FTE Total:
75.00
FNARDSO Menards - Oakdale
35360 0141272014 27.64 0.00 01721/2014 Shop Supplies
101-4511-5200-44010 Repairs/Maint Bldg
35360 Total: 27,64
35679 01/07/2014 59.94 0.00 0I/21/2014 Lights Council Chambers
101-410-194042230 Building Repair Supplies
35679 Total: 59.94
35696 01417/2014 1(14.03 0.00 01/2172014 Ballast Council Chambers
101-410-1940-42230 Building Repair Supplies
35696 Total: 104,03
MENARDSO Total: 191.61
METCOU Metropolitan Council
1029326 01/03/2014
602-495-9450-43820 Sewer Utility - Met Council
1029326 Total:
IM ETCOU Total:
Task ipe PO tl Close POLine #
1,550.84 0.00 01/2172014 Monthly Wastewater Service -Feb 2014 -
1,550.84
1,550.84
No (1000
No 0000
No 0000
No 0000
METRO MU Metro Cities
36 01/08/2014 3,397.00 0.00 01/21/2014 Mbrship Dues - Jan 2014- Dec 2014 No 0000
101-410-111(1-4,1330 Ducs & Subscriptions
36 Tota): 3,397.00
METRO MU Total: 3,397.00
MILLEREX Miller ENcavating, Inc.
17881 01/0972014
601-494-9400-44030 Repairs\ Maint Imp Not 131clgs
17881 Total'.
MILLEREX Total:
3,025.88 0.00 01/21/2014 Water Main ENcav&Materials 33rd-
Kraft Ci
3,025.88
3,025.88
ON ECALL Gopher State One Call
91440 01/1572014 100.00 0.00 01721/2014 Annual Fee - 2014
101-430-3100-44330 Dues & Subscriptions
91440 Total: 100.00
ON ECALL Total: 100,00
AP - To 13c.- Paid 0roo1 L.ist WI/16714 - 2:51 PM
No (1000
No 0000
Page 4
iniroiee 4 nv [)ate
Amount Quantity Pint Date Description Reference Task Type PO 4 Close POLiou
pe-
--------
OURTFAMA Our Team Advantage Inc.
545 01/08/2014 805.00 0.00 01/21/2014 Contract Snow Plowing - 1/3/14 No MOO
101-430-3125-43150 Contract Services
545 Total: 805.00
OURTEAMA Total: 805.00
S&T S&T Office Products. Inc.
01 QD8855-8854 01/0712014
101-410-1320-42000 Office Supplies
01QD8855-8854 Total:
S&T Total:
173.70 0.00 01/21/2014 Office Supplies - Administration
173.70
173.70
No 00110
TDS Tips Metrocom - LLC
: 1
651-779-S882 01113./2014 147A1 0.00 01/21/2014 Analog Lines - Fire No 11n
101-420-2220-43210 Telephone 239.20 651-779-8882 01/13/20140.00 01/21/2014 Analog Lines - Public Works No :( 101-430-3100-43210 Telephone
651-719-8882 01/13/2014 135.96 0.00 01/21/2014 Analog Lines - Lift Station Alarms No 0000
602-495-9450-43210 -Telephone
651-779-8882 01/13/2014 47.51 0.00 01/21/2014 Alarm -Well House #2 No 0000
601-494-9400-43210 Telephone
651-779-8882 Total: 570.08 570.08 TDS Total:
TOWNCTRY Town & Country Cleaning Co
114 466 01/01/2014
101-410-1940-44010 Repairs/Maint Contractual Bldg
114 466 Total:
114 5(19 01/01/2014
206-450-5.300-44010 Repairs/Maint Bldg
114 509 Total:
TOWNCTRY Total:
WAS-SHER Washington County
77841 01101/2014
101-420-2100-43150 Law Enforcement Contract
77841 Total:
WAS-SHER Total:
AP - To Be Paid Proof List ((11116/14 - 2:51 PM)
230.00 0.00 01/21/2014 Janitorial Service - City Hall .lart 2014 No 001,10
230,00
175.00 0.00 01/21/2014 Janitorial Service - Library Jan 2014 No 0010
175.00
405.00
634.72 0.00 01/2 I /2014 2014 Code Red Fee No 0000
634.22
634.22
Page 5
Invoice # Inv Date
Amount Quantity Pint Date Description Reference Task Type PO Close MUIR. /4
WASHFIRE Fire Chiefs Association Washington
01092014 01/09/20 14
101-420-2220-44330 Dues & Subscriptions
01092014 Total:
WASHFIRE Total:
Report Iota l:
AP - To Be Paid Proof List (01/10/14 - 2:51 PM)
50.00 0.00 01/21/2011 Annual Ducs Wash Cty Fire Chief
Assn
50.00
50.00
03,003.53
No 0000
Page 6
"THE ;IT
AGENDA ITEM: December 2013 Financial Reporting
SUBMITTED BY: Cathy Bendel, Finance Director
THROUGH: Cathy Bendel, Finance Director
REVIEWED BY: Dean Zuleger, City Administrator
DATE: January 21, 2014
CONSENT
ITEM #4
MOTION
SUGGESTED ORDER OF BUSINESS:
Introduction of Item ..................... .......... . ......... ...... ........ City Administrator
City Administrator
Questions from Council to Staff Mayor Facilitates
Call for Motion Mayor & City Council
Discussion.... ........ ....... ..... ................. ....... ............. ...... Mayor & City Council
Action on Motion Mayor Facilitates
Report/Presentation
POLICY RECOMMENDER: Finance
FISCAL IMPACT: NA
SUMMARY AND ACTION REQUESTED,: As part of its Consent Agenda, the City Council
is asked to accept the December 2013 Financial Reporting Packet. No specific motion is needed
as this is recommended to be part of the overall approval of the Consent Agenda.
BACKGROUND INFORMATION: The City of Lake Elmo has fiduciary authority and
responsibility to conduct non-nal business operations and report the financial (unaudited)
statement to the City Council. City guidelines suggest the Council be updated on a regular basis.
STAFF REPORT: Attached please find a summary of what is currently projected to be the
2013 year end surplus. In addition is the comparative report for December reflecting the
monthly and year to date detail, comparing the actual results to the 2013 Budget. Please note
that some minor adjustments will be necessary as part of the normal year end close process but
the numbers should be substantially complete.
-- page 1 --
City Council Meeting [Consent Agenda .Item 3]
January 21, 2014
The most significant variances are highlighted below:
Revenues:
• Building Permit revenue for the month was 4% above budget. On a year to date basis
actual activity continues to be above plan by 12%.
Utility Permit revenue for the month and year to date continues to be well above budget
due to the extensive development work along Hudson Boulevard and the need to relocate
numerous utilities. These amounts represent the ROW permit fees.
• As a reminder, although the state fire aid revenue is above budget, the net impact to the
General Fund is zero due 100% of those funds being forwarded on to the Fire Relief
Fund.
Plan review fees for the month were 50% above budget bringing the year to date revenue
to 40% above budget.
• Fines for the month were 46% above budget due to accruing the January funds received
for December fines into the year-end number. On a year to date basis the fine revenue
was under budget due to the decrease in number of fines issued which is a good trend.
• Interest earnings have not been calculated as all of the year end investment statements
have yet to be received.
Expenses:
Most departments continue to be below budget for the month and on a year to date basis as all
Departments continue to be very cost conscious. A few key items to note:
The membership with the Greater MSP was recently renewed for 2013 and is included in
the Mayor and Council department expenses. This expense was not included in the 2013
budget.
Assessor costs under the Administration department for the month were above plan as the
budget did not include the final true up for the year in it projections. Currently the
assessor is paid a flat $2k per month with the balance due in December based on the
parcels in the City.
Legal Publishing costs for the Administration department are higher than budget for the
month and on a year to date basis due to the increased codification activity related to the
initiative to update the City Code.
On a year to date basis the elections expenses are below plan due to the decision to not
add the new precincts which were budgeted for. It is anticipated that these precincts will
be added in the 2015-2016 election season.
-- page 2 --
City Council Meeting [Consent Agenda Item 3]
January 2], 2014
On a year to date basis, the newsletter expenses in the Communication department are
$7.5k below plan due to strategic issuance of the newsletter and some significant cost
savings with the vendor.
The Planning Department has incurred expenses above the amounts budgeted for many
expense items due to the City expansion initiative. The majority of the expenses were
related to additional staffing needs, external Engineering support and Contractor
expenses,
For the 2013 budget all of the telephone expense was budgeted under the City Hall
department. In 2013 it was decided to track actual expenses within each department. As
a result, the telephone expenses reported under City Hall look under budget while the
other departments look over budget. Overall, the total expense was very close to budget.
The law enforcement contracted costs were budget at $560k for the year for support from
Washington County. The actual costs incurred were $497k resulting in a savings of
$63k.
Conferences and training for the Fire Department for the year appear to be under budget
by $9.1k but this is a result of hooking the receipt of county reimbursements back to the
departmental expense rather than reporting it as income.
Engineering costs are above budget in the Building Inspection department on a year to
date basis by $8.1k due to all the additional work necessary due to the growth initiative.
Inspector contract services were not budgeted in 2013 resulting in a variance to budget of
$7.1k. These costs are to ensure there is no interruption of service when the City
Inspector is out of the office as well as to assist when volumes necessitate more help.
The Cost for the Permit Works software and licenses of $16.3k is reflected in the year to
date Info technology costs for the Building Inspection department, This expense was not
budgeted.
Personnel costs in the Public Works department were above budget for the year due to a
large number of unforeseen weather events.
On a year to date basis the street maintenance material costs were $11.8k above budget
due to the street repair initiative in 2013.
Sand and salt for the month came in over budget by $34.4k due to the constant snow and
ice in December. Also impacted were the fuel costs and the repairs and maintenance on
the equipment.
page
City Council Meeting [Consent Agenda Item 3J
January 21, 2014
Under repairs and maintenance under the Parks and Recreation department there is a $ lk
credit for the insurance funds received toward the repairs made related to the storm
damage last summer.
The $200k loan repayment is reflected under other financing for the month of December,
This represents the second of three installments toward paying back the internal loan.
Please note that the salary and benefit expenses are based on more accurate departmental
allocations than we had in August 2012 when the 2013 budget was initially compiled. As
a result, some departments are above budget, while others are under but overall,
personnel expenses are below budget.
RECOMMENDATION: Based on the aforementioned, the staff recommends the City Council
accept the attached December Financial Report.
ATTACHMENT:
1, December Financial Reports
-- page 4 --
City of Lake Ebno
2013 Preliminary Results
Projected Year End Surplus
As ofJanuary 21, 2014
Revenue
Levy/Property Tax
State Fire Aid
General Revenue
Total excess over budget
Expenses
General Government
Public Safety
Public Works
Parks & Rec
Contingency
Internal Loan Report
Total excess over budget
Net 2013 Surplus
370,870.04
16,778.39
69,795.01
457,443.44
(129,347.07)
35,748.10
(95,311.75)
21,149.82
120,679.41
(200,000.00)
(247,081.49)
210,361.95
$176.5 Fiscal Disparities not previously budgeted
One time state additional allocation in 2013
Primarily Building permits and Plan review fees
Primarily (Inc to expansion in Planning & Development
Due to savings of the Law Enforcement Contract
A result of multiple labor intensive weather events
Due to staffing changeover coverage by summer help
No contingency needs in 2013
Not budgeted in 2013; installment 2 of 3
City of Lake Elmo
2013 BY Month
Budget to Actual Comparative
As of December 31. 2013
_101-General Fund Detail
By Department
DEPT 410 - GEN'L GOV'T
1/21/2014
MONTH YTD
BUDGET ACTUAL Variance ($) Variance (%) BUDGET ACTUAL Variance ($) Variance (%)
Month Month Month Month YTD YTD YTD YTD
REVENUE
Current Ad Valorem Taxes 1,206,794.08 1,427,722.89 220,928.81 0.004•; 2,413,588.16 2,598,644.89 185,0.56.73 7.67%
Delinquent Ad Valorem Taxes 0.00 0.00 0.00 (1.00% 0.00 0.01) 0.00 0.00%
Mobile Horne Tax 4,000.00 12,255.22 8,255.22 0,00% 8,000.00 17,314.34 9,314.34 1 16.43%
Fiscal Disparities 0.00 61,889.01 61,889.01 0.00% 0.00 176,498.97 176,498.97 0.00%
Penalty & Interest on Taxes 0.00 1,330.31 1,330.31 0.00% 0.00 2,520.85 2,520.85 0.00%
Liquor License 0,00 1,700.0(1 1,700.00 0.00% 1,25,00 8,850,00 8,725,00 6980.00%
Wasteliauler License 0.00 600.00 600,00 0.00% 200.00 600.00 400.00 200.00%
General Contractor License 0.00 0,00 0.00 0.00'1i, 0.00 265.00 265.00 0.00%
Heating Contractor License 300.00 400.00 100.00 33.33% 4,475.00 5,250,00 775.00 17.37%
Blacktopping Contractor License 0.00 0.00 0.00 0.00% 0,00 0,00 0.00 0.00%
Building Permits 17.500,00 18.215.30 715.30 4.09% 172,000,00 192,543.54 20,543.54 11.94%
Heating Permits 1,000.00 3.120.00 2,1.20.00 212.00% 13,200.00 18,410.00 5,210,00 39,47%
Plumbing Permits 500.00 1,500.00 1,000.00 200.00% 7,500.00 14,245.00 6,745.00 89.934%0
Sewer Permits 0.00 0.11(1 0.00 0.00% 0,00 485.00 485.00 0.00`),.•
Animal License 100.00 160.00 60.00 60.00% 2,060.00 2,141.01) 81.00 3.93%
Utility Permits 600.00 785.00 185,00 31).83% 7,2011.00 21,500.00 14,300.00 198.61%
Burning Permit 50.00 420.00 370.00 740.00% 1,150.00 2,940.33 1,790.33 155.68%
Massage Therapy Permits 0.00 0.00 0.00 0.00% 0.00 858.00 858.00 0.00%
Homestead Credit Aid 0.00 0.00 0.00 0.00% 0.00 0,00 0.00 0.00%
MSA-Maintenanee 0.00 0.00 0,00 0.00% 98,022.00 98,022.00 0.00 0.00%
State Fire Aid 0.00 0.00 (1.00 0.00% 40,000.00 56,778.39 16,778.39 41.95%
PERA Aid 1,374.5(1 1,374.50 0.00 0.0094 2,749.00 2,749.00 0.00 0.00%
Gravel Tax 0.00 0.00 0.00 0,00% 688.63 (1.00 (688.63) -100.00%
Recycling Grant 0.00 0.00 (1.00 0.0094 15,500.00 15,588.00 88.00 0.57%
Misc State Grant/Surcharge Rev 0.00 1,537.34 1,537.34 0.00% 0.00 4,068.54 4,068.54 0.0094
Cable Franchise Revenue 0.00 0.00 0.00 0.0096 43,00(1.00 39,851.98 (3.148,02) -7.32%
Zoning & Subdivision Fees 0.00 0.00 0.00 0,0096 1,000.00 1,750.00 750.00 75.00%
Plan Check Fees 7,000.00 10,484,21 3,484,21 49.77% 71,01)0.00 100,057.42 29,057,42 40.93%
Sale of Copies, Books, Maps 10.00 2.00 (8.00) -80,00% 149.10 335.60 186.50 125.08%
Assessment Searches 50.00 90.00 40.00 80.0094 700.00 1,380.00 680.00 97.1494
Clean Up Days 0.00 0.00 0,00 0,00% 4,000.00 2,647,00 (1,353,00) -33.83%
Cable Operation Reimbursement 0.00 0.00 0.00 0,00% 1,485,00 0.00 (1,485.00) -100.00%
Fines 5,000.00 7,292.77 2,292.77 45.8694 60,000,00 47,887.56 (12,112,44) -20.1994
Miscellaneous Revenue 2,000.00 3,617.17 1,61'7,17 80.8694 19,000.00 23,134.92 4,134.92 21.76%
Internal Charges 50.00 26.00 (24.00) -48.0094 600.00 1,018.00 418.00 69.67%
Interest Earnings 20,000.00 0,00 (20,000.00) 0.0(1% 20,000,00 0.00 (20,000.00) 0.00%
Donations 0.00 0.00 0.00 0.00% 7,500.00 14,00(1.00 6,500.00 86.6794
Total Revenue 1,266,328.58 1,554,521.72 288,193.14 22.76% 3,014,891.89 3,472,335.33 457,443.44 I 5.17%,
EXPENSE
1110 - Mayor & Council
PT Salaries 12,845,00 I 2,845.00 0.00 0.00% 25,690.00 25,690.00 0.00 0.00%
FICA Contributions 796.39 796.39 0.00 0.00% 1,592.78 1,592.78 0.00 0.00%
Medicare Contributions 186.25 186.27 (0.02) 0.00% 372.51 372.54 (0.04) -0.01%
Workers Compensation 0.00 0.00 0.00 0.00% 36,00 215.81) (179.80) -499A4%
Mileage 0.00 0.00 0.00 0.00% 1,000.00 53.11 946.89 94.69%
M iscellaneous 0,00 85.59 (85.59) 0.00'.''O 565.27 6,661.41 (6,096.14) -1078.45%
Dues & Subscriptions 0.00 5,000.00 (5,000.00) 0.00% 8,391.00 17,711.32 (9,320.32) -1 1 1.08%
Conferences & Training 0.00 0.00 0.00 0.00% 2,155.00 1,586.00 569.00 26.40%
Total Mayor & Council 13,827.64 18,913.25 (5,085.61) -36.78% 39,802.56 53,882.96 (14,080.41) -35.38/0
1320 - Administration
FT Salaries 13,000.00 12,638.53 361.47 2.78% 180,444.93 163,565.87 16,879,06 9.35%
PERA Contributions 942,50 916.28 26.22 2.78% 12,756.57 11,751.83 1,004.74 7.88%
1CMA Contributions 0.00 0.00 0.00 0.00% 0.00 0.00 0.00 0.00%
FICA Contributions 806.00 740.37 65.63 8.14% 10,992.13 9,584,50 1,407.63 12.8 Pin
Medicare Contributions 188.50 173.13 15.37 8.15% 2,570.80 2,241.56 329.24 12.81
HealthiDental Insurance 3,127.60 2,611.00 516.60 16.52% 37,531.20 31,332.00 6,1 99.20 16.52%
Unemployment Benefits 0.00 0.00 0.00 0.00% 0.00 3,082.47 (3,082.47) ((.00%
Workers Compensation 0.00 0,00 0.00 0.00% 1,396.00 728.39 667.61 47.82%
Office Supplies 300.00 652.71 (352,71) - I 17.57°,1, 5,238.61 6,368.12 (1,129.51) -21.56%
Printed Forms (1.00 0.00 0.00 0.00N, 363,91 0.00 363.91 100.00%
Legal Services 4,000.00 5,641.61 (1,641.61) -41.04% 48,000,00 59,096.95 (11,096.95) -23.12%
NewsletteriWebsite 0.00 0.00 0.00 0.00% 0.00 355.66 (355.66) 0.00°/0
Assessing Services 2,000,00 18.908.20 (16,908.20) -845.41 % 25,500.00 49,142.34 (.23,642.34) -92.72%
Contract Services 0.00 1,000.00 (1,000.00) 0.00% 0.00 5,000.00 (5,000.00) 0.00%
Information Technology 0.00 I 88,54 (188.54) 0,00"/O 0.00 1,051.21 (1,051.21) 0.00%
Telephone 0.00 0.00 0.00 0.00% 0.00 2,696.52 (2,696.52) 0.00%
Postage 300.00 337.07 (37.07) -24.71% 3,600.00 3,560.46 39.54 I .10%
Mileage I 50.00 506.96 (356.96) 0.00% 1,800,00 1,050.55 749.45 41.64%
Legal Publishing 0.00 3,544.75 (3.544.75) 0.00% 157.74 6,20 1.53 (6,043.79 ) -3831A9?,O
Insurance 0.00 0.00 0.00 0.00% 38,8(1(1.00 35,339.30 3,460.70
Cahle Operation Expense 0.00 0,00 0.00 0.00% 0.00 0.00 0,00 0.00'1,1,
Miscellaneous 100.00 159.45 (59,45) -59.45% 1,200,00 2,782.94 (1,582.94) -131.91%
Dues & Subscriptions 100.00 0.00 100.00 0.00% 1,200.00 1,265.96 (65.96) -5.50°./o
Books 0.00 168.21 (168.21) 0.00% 0.00 632.51 (632.52) 0.00%
Conferences & Training 200.00 0.00 200.00 0.00°4) .), I 75.93 3,283.39 (1,107.46) -50.90°,.'n
Statf Development 0.00 573.66 (573.66) 0.00°.70 870.00 573.66 296.34 34.06%
Total Administration 25,214.60 48,760.47 (23,545.87) -93.38°/0 374,597.82 400,687.73 (26,089.91) -6.96"/0
1410 - Elections
PT Salaries 0.00 0.00 0.00 0,00% 0.00 100.00 (100.00) 0.00%
Office Supplies 0.00 0.00 0.00 0.00% 150,00 0.00 150.00 100.00%
Legal Publications/Notification 0.00 0.00 0,00 0.00% 2,150.00 0.00 2,150.00 100.00%
Election Equipment 0.00 0.00 0.00 0.00% 7,460.00 0.00 7,460.00 1.00.00%
Equipment Repair 0.00 0.00 0.00 0.00% 450.00 0.00 450.00 100.00%
County Election Fecs 0.00 0.00 0.00 0,00% 940.00 940.00 0.00 0,0(M
Printed Forms 0.00 0.00 0.00 0.00% 450.00 0.00 450.00 100.00%
Miscellaneous 0.00 339.39 (339.39) 0.00% 350.00 339.39 10.61 3.03%
Total Elections 0.00 339.39 (339.39) 0.00% 11,950.00 1,379-39 10,570,61 88.46%
1450 - Connunnications
FT Salaries 2,916.67 1,45/.92 1,463.75 50.19°•; 35,000.00 18,419.51 16,58(1,49 47.37%
PERA Contributions 211.46 105,35 106.11 50.I8% 2,537.50 1,335.46 1,202.04 47.37%
FICA Contributions 180.83 87.25 93.58 51.75% 2,170.00 1,106.07 1,063.93 49.03%
Medicare Contributions 42.29 20.41 21.88 51.74% 507,50 258.64 248.86 49.04%
Health/Dental Insurance 0,00 272.00 (272.00) 0.00°. (1.00 3,264.00 (3,264.00) 0.00%
Workers Compensation 0.00 0,00 0.00 0.00% 56.00 85.23 (29.23) -52.20%
!Newsletter 3,000.00 0.00 3,000.00 0.00% 12.061.00 7,785.63 4,275.37 35.45%
Office Supplies 50.00 0.00 50.00 0.00% 200.00 976.09 (776.09) 0.00%
En fo Technology/Web 2,000.00 2,714.17 (714.17) -35.71% 24,000.00 31,537.80 (7,537.80) -31.41%
Telephone 250.00 108.81 141.19 56.48% 3,000.00 1,138.64 1,861.36 62.05%
Public Notices 200.00 1,446.42 (1,246.42) -623.2]% 2,400.00 7,310,04 (4,910.04) -204.59%
Cable Operations 275.00 (1,200,63) 1.475.63 536.59u 3,300.00 554.2] 2,745.79 83.21%
Conferences 0.00 75.00 (75.00) 0.00% 0.00 573.00 (573.00) 0.00%
Repair/Maint Equipment 0,00 0.00 0.00 0.00% 0.00 155.50 (155.50) 0.00%
Total Communications 9,126.25 5,081.70 4,044.55 44.32% 85,232.00 74,499.82 10,732.18 12.59%
1520 - Finance
FT Salaries 4,576.40 6,905.98 (2,329.58) -50.90% 54,916.80 87,850.80 (32,934.00) -59.97%
PERA Contributions 331.79 500.67 (168.88) -50.90% 3,981.47 6,369.16 (2,387.69) -59.97%
FICA Contributions 283.74 402,57 (118.83) -41.88% 3,404.84 5,156.95 (1,752.11) -51.46%
Medicare Contributions 66.36 94.14 (27.78) -41.8716 796.29 1,205.93 (409.64) -51.445/0
Health/Dental Insurance 718,02 1,088.00 (369.98) -51,53% 8,616.23 13,056.(10 (4,439.77) -51.53%
Unemployment Benefits 0.00 0.00 0.00 0.00% 0.00 0.00 0.00 (1.00(1/
Workers Compensation 0.00 0.00 0.00 0.00% 0.00 405.18 (405.18) 0.00%
Office Supplies 100.00 150.85 (50.85) 0.00°41 400,00 582.91 (182.91) -45.73%
Printed Forms 0.00 0,00 (1.00 0.00% 500.00 0.00 500.00 100.00%
Audit Services 12,000.00 0.00 12,000.00 0.00% 20,500.00 20,500.00 0.00 0.00%
Contract Services 0,00 (3,835.97) 3,835.97 0.00°10 10,000.00 1(1,483.06 (483.06) -4.83%
Software Programs 0.00 0.00 0,00 0.00% 0.00 128.54 (128.54) 0.0096
Telephone 0.00 90.12 (9)1,12) 0.00% 0.00 720.96 (720.96) 0.00%
Mileage 0.00 (1.00 0.00 0.00% 0.00 44.40 (44.40) 0.00%
Miscellaneous 0,00 99,83 (99.83) 0.00% 1,500,00 1,481.76 18.24 1,22%
Dues & Subscriptions 0.00 0.00 0.00 0,00% 100.00 185.0(1 (85.00) 0.00%
Conferences & Training 0.00 200.00 (200.00) 0.00% 1,100.00 425.00 675.00 61.36%
Total Finance 18,076.30 5,696.19 12,380,11 68.49% 105,815.63 148,595.65 (42,780.02) -40.43"/0
1910 - Planning & Zoning
FT Salaries 8,278.95 12,675,90 (4,396.95) -53.1 l% 103,486.88 153,377.84 (49,890,97) -48.21%
PERA Contributions 600.22 919.01 (3(8.79) -53.11 % 7,502.80 11,298.24 (3,795.44) -50.59"/n
FICA Contributions 513,29 741.44 (228.15) -44,45% 6,416.19 9,155.08 (2,738.89) -42.69%
Medicare Contributions 81.83 173.40 (91.57) -111,90% 1,424.13 2,141.34 (717.21) -50.36%
Health/Dental insurance 886.48 1,656.00 (769,52) -86.81% 1,0,637,82 19,872.00 (9,234.18) -86.81%
Workers Compensation 0.00 0.00 0.00 0.00% 500,00 751.34 (251.34) -50.27%
Office Supplies 50.1)(1 52.96 (2.96) -5.92% 600.00 2.562.67 (1,962.67) -327,1 I %
Printed Forms 0.00 289.30 (289,30) 0.00"/O 0.00 2,577.15 (2,577.151 0.00%
Engineering Services 1,500,00 5,722.10 (4,222,10) -281,47% 18,000.00 25,514.94 (7,514.94) -41.75%
Contract Services 0.(I0 0.00 0.00 0.00% (1.00 14.869.24 (14,86),24) 0.00%
Information Technology 0,00 (1.00 0.00 0.00% 0,00 2,952.01 (2,952.01) 0.00%
Telephone (1.00 147.74 (147.74) 0.00% 0,00 1,182.56 (1,182.56) 0.00%
Postage 0.00 41.88 (41.88) 0.00% 0,00 95.50 (95.50) 0.00%
Mileage 30,00 0.00 30.00 150.00% 360.00 0.00 360,00 100.00?..;
Miscellaneous 20.00 0.00 20,00 I 0.00% 240.00 971,56 (731.56) -304.82'.!.;
Dues & Subscriptions 200.00 0.00 200.00 #DIV/0! 600.00 270.00 330,00 0.00%
Books 0.00 0.00 (1.00 0.00"6 200.00 211.37 (11.37) 0.00"41
Conferences & Training 0.00 0.00 C.00 0.00% 2,100.00 1,439.24 660.76 31.46%
Total Planning & Zoning 12,160.78 22,419.73 (10,258.95) -84.36% 152,067.81 249,242.08 (97,174.27) -63.90%
1930 - Engineering Services
Engineering Services
Total Engineering Services
5.000.00 7,695,94 (2,695.94) -53.92% 60,000.00 37,241.71 22,758.29 37.93"'n
5,000.00 7,695.94 (2,695.94) -53.92% 60,000.00 37,241.71 22,758.29 37.93"/n
1940 - City hall
Cleaning Supplies 50.00 0.00 50,00 100.00"/o 600.0U 7.48 592.52 98.75%
Building Repair Supplies 75.00 0.00 75.00 100.00% 900.00 36.53 863.47 95.94%
Telephone 700.00 127.34 572,66 81.81% 8,600.00 1,947.54 6,652.46 77.35%
Utilities 900.00 2,009.94 (1,109,94) -123.33% 10,800.00 11,028.98 (228.98) -2.12%
Refuse 108.32 216,64 (108.32) -100.0(ffn 1,299.84 1,408.16 (108.32) -8.33%
Rcpairs/Maint Contractual Bldg 700,00 245,81 454.19 64.88% 8,400.00 8,979.51 (579.51) -6.90%
Repairs/Maint Contractual Equip 400.00 1.131.14 (731.14) -182.79`Yo 4,800.00 6,134.71 (1,334.71) -27.81%
Miscellaneous 100.00 0.00 100.00 1011.009.1) 1,00(1.00 140.46 859.54 85.95"/0
Total City Hall 3,033.32 3,730.87 (697.55) -23.00% 36,399.84 29,683.37 6,716.47 I8.45%
Total General Government
86,438.90 112,637.54 (26,198.64) -30.31% 865,865.65 995,212.71 (129,347.06) -14.94"/0
DEPT 420 PUBLIC SAFETY
2100 - Police
Law Enforcement Contract 280,00(1.00 251,242.32 28,757.6S 0.00% 560,000,00 497,001.08 62,998,92 I 1,25%
Total Police 280,000.00 251,242.32 28,757.68 0.00% 560,000.00 497,001.08 62,998.92 11.25%
2150 - Prosecution
Attorney Criminal
Total Prosecution
4,250.00 8,848.67 (4,598.67) -1 08.20% 51,000.00 51,952.67 (952.67)
4,250.00 8,848.67 (4,598.67) -108.2041/0 51,000.00 51,952.67 (952.67) -1.87%
2220 - Fire
FT Salaries 6,000.00 5,701.48 298.52 4.98% 78,100.80 73,590.60 4.510.20 5.77%
PT Salaries 11,000.00 10,313.88 686.12 6.24% 131,000.0(1 113,995.5(1 17,004.50 12.98°.'i,
P ERA Contributions 1,232.50 965.86 266.64 21.63% 15,159,81 12,296.69 2,863.12 18.89%
FICA Contributions 1,054.00 585.41 468.59 44.46% 12,964.25 6,428.98 6,535.27 50,41°4.
Medicare Contributions 246.50 215.52 20.98 8.51% 3,031.96 2,638.50 393.46 12.98%
Health/Dental Insurance 1,276.70 1.686.00 (409.30) -32.06% 15,320.37 14,792.00 528.37 3.45%
Unemployment Benefits 0.00 0,00 0.00 0.00°'n 0.00 0.00 0.00 0.00%
Workers Compensation 0.00 0.00 0.00 0.00% 10,130.00 8,042.06 2,087.94 20.61%
Office Supplies 125.0(1 0.00 125.00 0.00% 5(10.00 3,038.10 (2,538.10) -507.62%
EMS Supplies 150.00 0.00 15(1.00 0.00% 2,358.00 905.41 1,452.59 61.60M
Fire Prevention 0.00 0.00 0.00 0.00°A, 3,000.00 3,242.62 (242.62) -8.09°.ii,
Fuel, Oil & Fluids 1,150.00 941.92 208.08 18.09°A, 13,632.00 12,978.66 653.34 4.79°.;
Small Tools & Equip I 00.00 2,444.76 (2,344.76) 0.00°4, 31,000,00 21,351.02 9,648.98 31.13%
Physicals 200.00 0.00 200.00 0.00% 7,416.60 2,061.95 5,354.65 72.20%
Information Technology 0.0(1 0,00 0.00 0.00% 0.00 656.61 (656.61) 0.00%
Telephone 250.00 369.71 (1(9.71) -3.11% 3,000.00 4,124.31 (1,124,31) -37.48%
Radio 3,846.08 3,800.76 45.32 ti-D1V/01 15,784.32 16,155.59 (371.27) -2.35%
Mileage 0.00 0.0(1 0.00 #DIV.101 200.00 99.44 100.56 50.28%
Vehicle Insurance 0.00 0.00 (1.00 0.00°,.. 12,000.00 5,237.00 6,763.00 56.36%
Electric Utility 1,000.00 3,185.86 (2,185.86) -4584.44% 11,500.00 13,549.72 (2,049.72) -17.82%
Refuse 47.68 95.36 (47.68) -12.67% 572,16 827.66 (255,50) -44.66%
Repair/Maint Bldg 376,30 4,402.09 (4,025.79) -223.66% 21,015.60 17,738.92 3,276.68 I5.59%
Repair/M ai nt Equip 1,800.00 14,632.51 (12,832,51) -381.81% 21,137.00 36.794.30 (15,657.30) -74.08%
Uniforms 3,361.00 0.00 3,361.00 4481.33% 9,902.50 3,727.12 6,175.38 62.36°A,
Miscellaneous 75.00 988.01 (913.01) 0,00% 900.00 2.089.52 (1,189.52) -132.17°!0
Dues & Subscriptions 0.00 0.00 0.00 0.00% 2,000.00 3,247.00 (1,247.00) -62.35°./0
Books 300.00 0,00 300.00 42.86% 600.00 480.94 119.06 19.84%
Conferences & Training 700.00 926.15 (226.15). -0.66% 22,550.00 13,481.26 9,068.74 40.22%
Total Fire 34,290.76 51,265.28 (16,974.52) -49.50% 444,775.37 393,571.48 51,203.89 11.51%
2250 - Fire Relief
Fire State Aid
Total Fire Relief
0.00 0.0(1 0.00 0.00°,•;-, 40,000.00 53,778.39 (13,778.39) -34.45%
0.00 0.00 0.00 0.00"/0 40,000.00 53,778.39 (13,778.39) -34.45%
2400 - Building Inspection
FT Salaries 5,747.36 6,689.08 (941,72) -16.39% 74,715.68 86,459.04 (11,743.36) -15.72%
PERA Contributions 416,68 484.97 (65.29.) -16.39% 4,859,60 6,268.40 (1,408.80) -28.99%
FICA Contributions 356.34 389,42 (33.08) -9.28% 4,112.23 5,033.86 (921.63) -22.41°4,
Medicare Contributions 83.34 91.06 (7.72) -9.27% 961.75 1,177.19 (215.44) -.27.40%
Health/Dental Insurance 767.49 1,414.00 (646,51) -84.24% 9,209,89 16,968.00 (7,758.1)) -84.24%
Unemployment Benefits 0.00 0.00 0.00 0.00% 0.00 0.00 0.00 0.00%
Workers Compensation 0.00 0.00 0.00 0.0014 2,000.00 397.88 1.602.12 80.1114
Office Supplies 0.00 200.2,8 (200.28) 0.0016 0.00 1,080.30 (1,080.30) 0.00%
Printed Forms 0.00 0.00 0.00 0.00% 0.00 146.61 (146.61) 0.00°A
Fuel, Oil & Fluids 0.00 0.00 0.00 0.00% (1.00 267,67 (267.67) 0.00°4,
Engineering 500.00 2,420.00 (1,920.00) -384.00(I'0 6,000.00 14,064.73 (8,064,73) -134.41%
Surcharge Pints 0.00 0.00 0.00 0,0016 0.00 (1.00 0.00 0.00%
Inspector Contract Services 0.00 1,500.00 (1,500.00) 0.0014 0.00 7,069.50 (7,069.50) 0.00%
Info Technology (Permit Works) 0.00 0.00 0.00 0.00% 0.00 17,146.69 (17,146,69) (1.0016
Software Programs 0.00 0.00 11.00 0.0014 0.00 0.00 0.00 0.00°/1,
Telephone 18.00 89.71 (71.71) -398,3914 216.00 922.05 (706.05) -326.88%
Mileage 0.00 370.65 (370.65) 0.0(1% 100.00 1.425.74 (1,325.74) 0.00%
Insurance 0.00 0.00 0.00 0.0014 255.00 340.00 (85.00) 0.00%
Repairs/Maint Equip 0.00 36.40 (36.40) 0.0014 500.00 499.68 0.32 0.0614
Uniforms 0.00 134.97 (134.97.) 0.0014 0.00 2.21.35 (221.35) 0.00%
Miscellaneous 0.00 6.95 (6.95) 0.00% 500.00 1,504.44 (1,004.44) -200.8916
Dues & Subscriptions 0.00 0.00 0,00 0,00% 190.00 90.00 100.00 52.63%
Books 0.00 0.00 0.00 0.0014 100.00 120.64 (20,64) -20.6414
Conferences & Training 250.00 857.00 (6(17.00) -242.80% 500.00 1,682.00 (1,182.00) -236A014
Total Building Inspections 8,139.21 14,684.49 (6,545.28) -80.4214 104,220.14 162,885.77 (58,665.63) -56.29%
2500 - Emergency Communications
Contract Services
Total Emergency Communications
0.00 0,00 0.00 0.00% 6,000.00 3,799.50 2,200,50 36.68%
0.00 0.00 0.00 0.00% 6,000.00 3,799.50 2,200.50 36.68%
2700 - Animal Control
Printed Forms 0.00 0.00 0.00 0.00% 0.00 0,00 0.00 0.00%
Contract Services 550.00 1,000.00 (450.00) -81.82% 7,000.00 11,609.93 (4,609.93) -65.86%
Miscellaneous 0.00 180.00 (180.00) 0.00% 0.00 2,648.59 (2,648.59)
Total Animal Control 550.00 1,180.00 (630.00) -114.55% 7,000.00 14,258.52 (7,258.52) -103.69%
Total Public Safety 327,229.96
327,220.76 9.20 0.00% 1,212,995.51 1,177,247.41 35,748.10 2.95"/0
DEPT 430 - PUBLIC WORKS
3100 - Public Works
FT Salaries 10.7(10.00 12,983.76 (2,283.76) -21.34% 128,7(10.00 156,071.65 (27,371.65) -21.27%
PT Salaries 0.00 1.056.70 (1,056.70) 0,00% 0.00 13,123.03 (13,123.03) 0.00%
PERA Contributions 775.75 1,011.51 (235.76) -30.39°4 9,330,75 12,227.47 (2.896.72) -31.04%
FICA Contributions 663.40 826.86 (163.46) -24.64% 7,979.40 9,883.94 (1,904.54) -23.87%
:Medicare Contributions 155.15 193.36 (38.21) -24.63% 1,866.15 2,311.60 (445.45) -23.87%
Health/Dental Insurance 2,893.14 2,899.00 (5.86) -0.20% 34,717.70 34,788.00 (70.3(1) -0.20%
Unemployment Benefits 0.00 0.00 0.00 0.00°4, 4,000.00 0.00 4,000.00 100.00%
Workers Compensation 0.00 0.00 0.00 0.00% 12,000.00 7,399.76 4,600.24 38.34%
Office Supplies 25.00 7.48 17.52 70.08% 500.00 1,055.11 (555.11) -111.02%
Shop Materials 150,00 47.05 102.95 68.63% 1,800.00 826.55 973.45 54.08%
Building Repair Supplies 0.00 0,00 0.00 0.00% 0.00 229,25 (229.25) 0.00%
Small Tools and Minor Equip 250.00 0.00 250.00 100.00% 3,000.00 1,768.66 1,231.34 41.04%
Engineering Services 150.00 1,568.25 (1,418.25) -945.50% 1,800.00 7,957.00 ((1,157.00) -342.06%
Contract Services 400.00 185.70 214.30 53.58% 4,800.00 5,181.10 (381.10) -7.940.4
Information Technology 0.00 0.00 0.00 gDIV/01 0.00 1,051.33 (1,051.33) 0.00°4
Telephone 650.00 822.50 (172.50) -26.54°4) 8,000.00 7,157,04 842.96 10.54°4
Radio 3011.00 300.06 (0.06) -0,02% 3,600.00 1,209.24 2,390.76 66.41°4,
Mileage 0.00 0.00 (1.00 0.00% 0.00 0.00 0.00 0.00%
Insurance 0.00 0.00 0.00 0.00% 22,000 .00 19,772.00 2,228.00 0.00°4
Electric Utility 2,000.00 2.441.75 (441.75) -72.0953 24,000.00 18,017.36 5,982.64 24.93%
Refuse 207.82 415.64 (207.82) -100.00% 2,493.84 2,493.84 0.00 0.00%
Fuel, Oil, Fluids (ALL depts) 3,000.00 1,875.22 1,124,78 37,49% 36,000.00 39,719.58 (3,71(.58) -10.33%
Repair/Maint Bldg 250.00 393.35 (143.35) -57.34% 3,000.00 6,330.93 (3,330.93) -111.03°4
Repair/Maint NOT Bldg 40.00 0.00 40.00 100.00% 500.00 153,38 346.62 69.32%
Repair/MainEquip (out) 500.00 0.00 500.00 100.00% 6,000.00 140.73 5,859.27 97.65%
Equipment Parts 500.00 0.00 500.00 100.00% 6,000.00 0.00 6,000.00 100.00%
Uniforms 175.00 2.00 173.00 98.86% 2,100.00 900,66 1,199.34 57.11°....
NI iscelloneous 100.00 0.00 100.00 100.00% 1,000.00 1,071.02 (71.02) -7.10%
Landscaping Material 80.00 0.00 80.00 100.00% 1,000.00 64.13 935.87 93,59°4
Dues & Subscriptions 0.00 0.00 0.00 0.00% 60.00 56.00 4.00 6.67%
Conferenek.'s & Training 0.00 0.00 0.00 0,00% 1,619.60 260.00 1,359.60 83.95%
Clean up Days 0.00 0.00 0.00 0.00% 6,000.00 4,481.33 1,518,67 75.3153
`fotal Public Works 23,965.26 27,030.19 (3,064.93) -12.79% 333,867.44 355,701.69 (21,834.25) -6.54%
3120 - Streets
Equipment Parts
Street Maintenance Materials
Sign Repair Materials
Contract Services
Repairs/Maim Equipment
Total Streets
0,00 494.00 (494.00) 0.00% 0.00 4,702.93 (4,702.93) 0.00%
1,000.00 1,574.75 (574.75) -57.4853 12,000.00 23,787.16 (11,787.16) -98.7353
250.0(1 0.00 250.00 100.00°4 3,000.00 1,479.16 1,520.84 50.6904
850.00 1,150.00 (300.00) -35.29% 10,200.00 1 I ,728.05 (1,528.05) -14.98%
0.00 1,309.65 (1,309.65) 0.00% 0.00 3,295.86 (3,295.86) 0.00%
2,100.00 4,528.40 (2,428.40) -115.64"/0 25,200.00 44,993.16 (19,793.16) -78.54%
3125 - Ice & Snow Removal
Landscaping Material 0.00 0.00 0.0(1 0.00% 0.00 103.38 (103.38) 0.00%
Sand/Salt 0.00 34,395.95 (34,395.95 ) 0.00% 69,500.00 105,48430 (35,984.30) -51.78%
Contract Services 1.250.00 5,692.50 (4,442.50) 0.00% 7,500.00 10,000.25 (2,500.25) -33.34%
Repairs/Maint Equipment 250.00 12,613.42 (.12,363.42) -4945.37% 3,000.00 17,966.35 (14,966.35) -498,88%
Total lee & Snow Removal 1,500.00 52,701.87 (51,201.87) -3413.46"/0 80,000.00 133,554.28 (53,554.28) -66.94%
3160 - Street Lighting
Street Lighting
"I'otal Street Lighting
2,100.00 3,525,62 (1,425.62)
2,100.00 3,525.62 (1,425.62) -67.89%
3200 - Recycling
Recycling Supplies 0.00 0.00 0.00 0.00%
Newsletter 1,000.00 0.00 1,000.00 0.00%
Miscellaneous 400.00 0.00 400.00 100.00%
Total Recycling 1,400.00 0.00 1,400.00 100.00°A,
3250 - Tree Program
Control Services
Total Tree Program
Total Public Works
400.00 0.00 400.011 100.00%
400.00 0.00 400.00 100.00"/o
31,465.26 87,786.08
(56,320.82) -178.99"/0
25,200.00 26,72(1.81 (1,520.81)
25,200.00 26,720.81 (1,520.81) -6.03%
3,500.00 3,584.25 (84.25) -2.41'!'O
3,000.00 0.00 3,000.00 100.00%
4,800.00 0.00 4,800.00 100,00%
11,300.00 3,584.25 7,715.75 68.28%
5,000.00 11,325_00 (6,325.00) -126.50%
5,000.00 11,325.00 (6,325.00) -126.50%
480,567.44
575,879.19 (95,311.75) -19.83%
DEPT 45(1- CULTURE, RECREATION
5200 - Parks & Recreation
FT Salaries 8,583.96 8,830.99 (247.03) -2,88% 111,591.08 91,491,40 2(1,099.68 18.01°..b
PT Salaries 700.00 502.93 197.07 28.159) 14,150.00 18.476.82 (4,326.82) -30.58%
PERA Contributions 622.34 640.24 (17,90) -2.88% 8,090.35 7,201.13 889.22 10.99°/t,
FICA Contributions 575.61 556.97 18.64 3.24% 7,795.95 6,573.91 1,222.04 I 5.68°,',
Medicare Contributions 134.62 (30,33 4,29 3.18% 1,823.25 1,537.46 285.79 15.67%
Health/Dental Insurance 1.084.57 290.16 794.41 73.25°, 13,014.88 4,727.12 8,287.76 63,68%
Unemployment Benefits 0,00 0.00 0.00 0.00% 0,00 0.00 0.00 0.00%
\Yorkers Compensation 0.00 0.00 0.00 0.00% 3,000.00 4,105.81 (1,105.81) -36.86%
Shop Materials 0.00 161.61 (161..61) 0,00°,4) 0.00 835,41 (835.41) 0.00%
Chemicals 50.00 0.00 50.00 100.00% 600.00 740.98 (140.98) -23.50%
Equipment Parts 150.00 0.00 15C,00 100.00% 1,800.00 2,223.42 (423.42) -23.52%
Building Repair Supplies OM° 0.00 0.00 0.00% (1.00 10.63 ((0.63) 0.00%
Landscaping Materials 2110.00 0,00 200.00 100.00% 2,400.00 2,780,50 (38(1.50) -15.85%
Small Tools and Minor Equip 75.00 0.00 75.00 100.00% 900.00 2.276.93 (1,376.93) -152.99%
Telephone 100.00 91.01 8.99 8,99% 1,200.01) 1,061.47 138.53 I I .54°,i)
Mileage 0.00 0.00 0.00 0.00% 0.00 0.00 0.00 0.00%
insurance 0.00 0.00 0.00 0.00% 5,000.00 3,683.00 1,317.00 26.34%
Electric Utility 750.00 1,067.80 (317,80) -42.37% 9,000.00 8,356.46 643.54 7.15%
Refuse 207.82 415.64 (207,82) - I 00.00% 2,493.84 2,701.66 (207.82) -8.33%
Repair/Maim Bldg 75.00 12.66 12.34 49.36% 300.00 395.86 (95.86) -3!.95%
RcpairiMaint NOT Bldg 50.00 (1,035.91) 1.085.91 21 71.82%') 600.00 2,943.79 (2,343.79) -390.63%
Repair/Maint Equip 100.00 0,00 100.00 100,00% 1,20(1.00 0.00 1,200.00 100.00°1)
Rental Buildings 400.00 0.00 400.00 100.00% 4,800.00 5,292.62 (492.62) -I0.26°A)
Miscellaneous 0.00 196.21 (196.21) 0,00% (1.00 1,193.15 (1,193.15) 0.00%
Total Parks & Recreation 13,808.91 11,860.64 1,948.27 14.11% 189,759,35 168,609.53 21,149.82 11.15%
DEPT 460 - COMP ADJ 0.00 0.00 0.00 0.00% 0.00 0.00 (1.00 0.00°,/n
DEFT 490 - CONTINGENCY FUND 60,339.70 0.00 60,339.70 0,00"/o 120,679.41 0.00 120.679A1 100.00%
DEPT 493 - OTI1 FINANCING 0.00 200,000.00 (200,000.00) 0.00% 0.00 200,000.00 (200,000.00) 0.00%
GRAND TOTAL ALL DEPTS 458,943.04 739,505.02 (28(1,56(.98) -61.13"/o 2,869,867.36 3,116,948.84 (247,981.48) -8.61%
Net Income over Expenses
807,385.54 815,016,70 7,631.16 0.95% 145,024.54 355,386.49 210,361.95 145.95%
THE •; Tr.,' OF
I Its,
AGENDA ITEM:
SUBMITTED BY:
THROUGH:
REVIEWED BY:
DATE: January 21, 2014
CONSENT
ITEM #: 5
New Single Family Horne Permit Report
Rick Chase, Building Official
Rick Chase, Building Official
Kyle Klatt, Planning Director
SUGGESTED ORDER OF BUSINESS:
Introduction of Item City Administrator
Report/Presentation City Administrator
Questions from Council to Staff ........ ............... ...... ........ Mayor Facilitates
Call for Motion Mayor & City Council
Discussion ....... ...... . ......... „... ........ ..............„... ......... __Mayor & City Council
Action on Motion Mayor Facilitates
SUMMARY AND ACTION REQUESTED: As part of its Consent Agenda, the City Council
is asked to accept the monthly new single family home permit report through December of 2013.
No specific motion is needed as this is recommended as part of the C0115C111 Agenda.
LEGISLATIVE HISTORY/BACKGROUND INFORMATION:
Included in the monthly report is an annual summary for new homes as well as the total
valuation for all construction activity in 2013. The figures below compare the current year
activity to the two previous year's activity.
New homes
Total valuation
Average home value
Total Valuation
(New homes included)
2013
36
$16,966,169
$471,282
$20,944,966
2012
34
$15,156,112
$445,768
$22,671,178
2011
23
$10,214,000
$439,752
$18,723,663
-- page
City Council Meeting [Consent Agenda Item 5]
January 21, 2014
Please note that in 2013, the roof and siding permits were converted to a flat rate fee structure
and as such are no longer included in the valuation numbers. Also note that these numbers
represent the incremental valuation which will increase the Cities Taxable property tax base
beginning with the 2015 tax roll.
RECOMMENDATION: Based on the aforementioned, the staff recommends the City Council
accept the monthly new single family home permit report.
"T'1-117. GI TY OE
KE FLMC
1.4„ 41-44. 444
,"
.. 4-4 • , .'4
DATE: January 21, 2014
CONSENT
ITEM #: 6
AGENDA ITEM: Section 34 Water and Sewer Utility Extension improvements — Pay
Request No. 3
SUBMITTED BY: Ryan Stempski, Project Engineer
THROUGH: Dean A. Zuleger, City Administrator
REVIEWED BY: Jack Griffin, City Engineer
Cathy Bendel, Finance Director
Mike Bouthilet, Public Works
SUGGESTED ORDER OF BUSINESS (iftentoved from the Consent A genda):
Questions from Council to Staff Mayor Facilitates
Public Input, if Appropriate Mayor Facilitates
Call for Motion Mayor & City Council
Discussion - Mayor & City Council
Action on Motion Mayor Facilitates
POLICY RECOMMENDER: Engineering
FISCAI,. IMPACT:
None. Partial payment is proposed in accordance with the Contract for the project. Payment
remains within the authorized scope and budget.
SUMMARY 40ND ACTION REOUESTED:
The City Council is respectfully requested to consider approving Pay Request No. 3 for the
Section 34 Water and Sewer Utility Extension Improvements. If removed from the consent
agenda, the recommended motion for this action is as follows:
"Move to approve Pay Request No. 3 to Redstone Construction Company, Inc. in the amount
of $315,528.49, for the Section 34 Water and Sewer Utility Extension Improvements;"
-- page 1 --
City Council Meeting [Consent' Agenda Item 6]
January 21. 2014
LEGISLATIVE HISTORY/BACKGROUND INFORMATION:
Redstone Construction Company, Inc. (the Contractor for the project) has submitted Partial Pay
Estimate No. 3 in the amount of $315,528.49. The request has been reviewed and payment is
recommended in the amount requested. In accordance with the contract documents, the City has
retained 5% of the total work completed. The amount retained is $71,443.89.
RECOMMENDATION:
Staff is recomtnending that the City Council consider approving, as part of the Consent Agenda,
Pay Request No. 3 for the Section 34 Water and Sewer Utility Extension Improvements. If
removed from the consent agenda, the recommended motion for this action is as follows:
"Move to approve Pay Request No. 3 to Redstone Construction Contpany, Inc. in the amount
of $315,528.49, for the Section 34 Water and Sewer Utility Extension Improvements."
ATTACHMENT(S):
1. Partial Pay Estimate No. 3
page 2
PROJECT PAY FORM
PARTIAL PAY ESTIMATE NO.
3
SECTION 34 WATER & SEWER UTILITY EXTENSION IMPROVEMENTS
PROJECT NO, 2013.126
PROJECT OWNER;
CITY OF LAKE ELMO
3800 LAVERNE AVENUE NORTH
LAKE ELMO, MN 55042
ATTN: JACK GRIFFIN, CITY ENGINEER
N o.
Approval Amount
Date
1 11/6/2013
2 1/6/2014
Additions
$11,162.82
$0.00
TOTALS $11,162.82
NET CHANGE $11,162.82
START DATE:
SUBSTANTIAL COMPLETION:
FINAL COMPLETION:
FOCUS ENGINEERING, inc.
PERIOD OF ESTIMATE
FROM 12/2/2013 TO 1/1/2014
CONTRACTOR:
REDSTONE CONSTRUCTION COMPANY INC.
PO BOX 218
MORA, MN 55051
ATTN: DALE MANS, PROJECT MANAGER
PASE.STIMATI-tLIMMAR*
1. Original Contract Amount
Deductions .2. Net Change Order Sum
$0.00 3, Revised Contract (1+2)
$0.00 4, '''Work Completed
5. *.Stored Materials
6. Subtotal (4+5)
7. Retainage* 5.0%
.8. Previous Payments
9..Amount Due (6-7-Z)
*Detailed Breakdown Attached
10/7/2013
5/19/2014
5/30/2014
$0,00
CGNTR
I ORIGINALDAYS -235
--REVISED.DAYS
REMAINING 149
ENGINEER'S CERTIFICATION:
The undersigned certifies that the work has been reviewed and to the
best of their knowledgeand belief, the quantities shown in this
estimate are correct and the work has been performed in accordance ENGINEER
with the contract documents.
DATE
CONTRACTOR'S CERTIFICATION:
The undersigned Contractor certifies that to the best of their
knowledge, information and belief the work covered by this payment
estimate has been completed in accordance with the contract BY
documents, that all amounts have been paid by the contractor for
work for which previous payment estimates was issued and payments
DATE
received from the owner., and that current payment shown herein is
now due.
APPROVED BY OWNER: CITY OF LAKE ELMO, MINNESOTA
BY BY
DATE DATE
FOCUS Engineering, inc.
$1,701,88430
$11,162.82
$1,713,047,32
$1,428,877.81
S0.00
$1,428,877.81
$71,443.89
$1,041,905.43
S31E,528.49
ON SCHEDULE
YES
NO
PROJECT PAYMENT FORM
PARTIAL PAY ESTIMATE NO. 3
SECTION 34 WATER & SEWER UTILITY EXTENSION IMPROVEMENTS
CITY OF LAKE ELMO, MINNESOTA
PROJECT NO. 2013.126
If EM DESCRIPTION OF PAY ITEM
90115930911- GENERAL
1 MOBILIZATION LS 1 IX) $48,000.00 648,000.00 0.00 $0.90 0.90 $43,200.09
2 TRAFFIC CONTROI 15 1 $0,300.90 $6,300.00 1.44 $6.300.00 L. $6,100.00
3 CLEAR AND GRUB 'TREES LS 1 .$19,000.00 910,000.00 0.00 SO EID 1 513,090.00
4 TEMPORARY ROCK CONSTRIOCTION ENTRANCE EA 2 44,10020 5.4. 200.00 CLEO $0,09 0 $0.09
5 STREET SWEEPING LiR 40 3175.00 67.000.00 0.00 $0.00 0 4000
SUBTOTAL- DIVISION I 338,500200 $0,300.00 362..380.00
FOCUS ENGINEERING, inc.
CONTRACT THEE PERIOD TOTAL TO DATE
UNIT
QUANTITY UNIT EMU AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT
OILASION 2 - SANITARY SEWER (GRAVITY SEWER - HUDSON BLV(1.)
6 CON CRE;' 6 JERSEY BARRIERS LT 900 0.00 000
$91.09 318,900.00
7 REMOVE AND DISPOSL OP EXISTING BITUMINOUS DRIVEWAY 90 590 0.00 0 $18,90009
$0,00
$1,1LX3.00
6 REMOVE P;PE CULVERT LP 245 73430 54 3S.°Qt.Z°5°Opr) 79 $434.50
52,347.5.0
5 REMOVE SANITARY SEWER PIPE LE 13 $2.20
43.04 13
S5.50
$85.15
10 SAWANL AND REINSTALL 12" PCP, INCL APRONS LP E0 $8.55
S0.00 51,518055'.0195 5.N $85.15
II PATCH BITUMINOUS DRIVEWAY SY S00 $22.10 $1.105.00
0.00 $0.00 0
S37500.00
12 PATCH GRAVEL DRIVEWAY TN 105 SISAX)
0.00 40.00 309 01.10509
51.500.00
15 IN" X 42" ARCH CRAP CULVERT LE 69 65115:009,,
04,00 64 50.00
$53,':3251.:0°
$3.581.10
14 30" CMP CULVERT LF 71 15.00 $3.321,60
15
1S 36" 014 P cu,vEki La 35$3,139.20
0.00 S69$03:00.
0 S6s063.:
050905'2°$1,810.50
13 42" CM P CULVERT LE 64 0.00 0 $0.00
S76.29 $4,676.80
17 23" X 42' ARCH CM99144VEVE FA 2 2...94) $09so$0'',0:0° 2
10 30' CLIP APRON EA a Lon 1 $396.90
:4389:0000
SI!1g967'700
19 36" CM P APRON EA 7 0,L/9 5 38g.D0
0 6389.00
91.14600
20 424 CLAP APRON EA 2 $57?...00
$1,110.00 oak 0
32;92290;0000
21 CONNECT TO EXi STING SANFEAR4 SEWER MH EA 1 0.330 1
7.2 8" PVC SANITARY SEWER, S00 55, 0' . 194 DEEP LE 25 S933.00
0.00 28, ;59o:u:
5 :81 4:3 06: I.' 3 3:9: $972.59 $,;1..0,00,
23 10" PVC SANITARY SEWER. SDR 26, 25' - 30' DEEP- LE 20 0.00 :40
$3,080.00 $931798083.:07)
24 12$ PVC SANITARY SEWER, SDR 35. C' • 10' DEEP I F 885 0.00 400
075 $32,037.00 sS:.A.400
$31,132.00
$ 5 12" PVC SANITARY SEWER, SOP 35, 10' -15' DEEP LF 527,009.00 0.00 $0.00 700
$6,640.20
26 12' PVC:SANITARY SEWER, SDA 35, 15' . 2V DEEP LE 230 93.00 287 $28,000.00
929 406 00
S.4')O,'EtaL°, 57. 0,431,80
27 12$ PVC SANITARY SEWER. SDR 15, 15' - 29' DEEP LE 65 0.00 43 95,434.00
28 /2" PVC SANFLAPV SEWER.. SDR 25. 20' . 2.9' DEEP IS 109 571.40
0.90 LOB 9%2E9.89
$83 5()
9 S1 09 3I' I :
29 12" PVC sAMTARY SEWER, SDP 26, 25' - 30' DEEP LE 560 918.240.00
0.00 515 STS,240.09
SS7,6130.00
30 JACK 12" EVE SANITARY SEWER LE 49 S46,400.99 0.00
8S°.70 445 $53,148.00
:..,500.0000
$164400.09
31 ROCK FOUNDATION BORROW LF 1.30s4 $410.0,
0
32 !NSW ATION, 2" THICK SY ISO
33 PLACE FILL OV5R SANITARY SEWER PIPE IL19 CY ISO 50.01
$ 519;9705 013.00
$9.985.00
100 .00 S0.00
188.3
100 9 3 77 4:45 :1 7:
$1.162.50
34 CROSS NIGH PRESSUP.E GA5 PIPE LINE 4.5 1 69,760.00 1.00 1
s$ 23 s,. 677 E 09, : :, c40$ 004
35 SANITARY SEWER MN, 4' 0944,49I ER LA 8 92.760.00
0.09 E S2,790.00
$20,740.LX1 S20,240.00
36 ExcESS MANHOLE. DEPTH, 4' DIAMETER IF 56 $2,530.00
2.09
.95.443.20 5205375 54.469.20
37 7ELE045E SANITARY SE4YER LE $37.20
000 45.08
0
2,I471. 94.675,00
38 OFF ROAD 5TRUCTURF MAPLE R EA 7 S. SS . Si . . 27 05 6366,40 7.09 60409
7 53:(6740°
4.9 SEED MIX 250 & BLANKET sY 5.000 0.00 0 $0 3x3
$.333$013.0040
S5,500.00
$7,14%D.'0°0°
40 SEED MIX 210 & SE ANKET SY 54:10) $1.10
51.14 SS.9.98.00 0,09 0
41 5EED MIN 250 & HY DROMULCH SY 5,000 $2,100.00 17,0mA, 17 CILX) $0.00
42 SEED MN 270 & ILYDPONILNCH SY 5,200 0.00 0 $7,3 40.0D
$6:.4426
43 EROSION STAINLIZAT30Li mAT SY 150 $9.90 2.,392.00
0.00 5'.1.0°10u0° 0
44 TEMPORARY SEED MIX 100 AND MULCii AC '0 $686.00 $1,485.00
0,00 00.00 0 090.0000
0000
45 DITCH CHECK Eh II 92.744.00
S769.00 0,00 $0,00 0 30.00
45 CIAVERT INLET PROTECTION EA a $87.50
$200.00 0.00 5000 0
42 SILT FENCE IF TRW
930::',7::::1°52FL° 679.00 7,352
SUBTOTAL. DIViSION 2 ST:3:GL: 91:21 $1.255.5E
527752.43 9248,999.SO
ITEM DESCRIPTION OF PAr ITEM UNIT
CONTRACT
QUANTITY UNIT PRICE AMOUNT
(HIS PERIOD
aoANTrty AMOUNT
TOTALTO DATE
QUANTNY AMOUNT
DIVISION a , SANiTARY SEWER (LIFT STATIONISYSTEM)
48 ROADVE AND 0,593551371I 3.13151ING BITUNIINDUS DRIVEWAY 55 520 $2.75 51,567.50 0 3X+ 50.033 345 9948.75
49 REMOVE AND DISPOSE OF EXIST1Nu cONOIETE DRIVEWAY SY 40 58.75 $350130 0.00 50.00 0 50.310
50 REMOVE AND DISPOSE OF CONCRETE CURB AND GUTTER LF ao 94.35 110000 30.00 $110.93 30 5130.50
51 ROLIDVE PIPE «JIVER' LF le% $5.50 5907.511 178 (X" 5979,00 175 $979.00
52 SALVAGE AND REiNsTALL 18" PCP. [NC/ APRONS LF 60 $24.30 91,458.00 24.00 5583.20 24 0003.20
53 PATCP 01111341NO3.15 DR IVEWAy SY 200 935.00 27,000.00 0.00 50.00 A 52100
54 PATCH GRAVEL DRIVEWAY TN 2E9 815110 63.750120 000 50.00 94 31.41000
55 8618 CONCRETE CURS AND GUTTER IF 30 53000 $900.00 0.00 50.00 0 $0.00
56 12" CPO CULVERT LF 30 320.50 8615.00 40.639 282.0.00 40 8E2000
57 18" C149 CULVERT LF 52 528.80 01,393.60 9200.52,465.60 92 92,465.60
5.5 21" GAP ttiLVERT IF 40 131.93 $1.240.00 41.00 $1,271,00 41 $1,271031
59 12" CAW APRON EA 1 3131.00 5131.00 1.00 51 31.00 3 1131.00
ED le CNTP APRON EA 2 $157.00 1314.00 3 DO $471.00 3 8471.00
61 217 CRIP APRON EA 2 $187.00 5374.00 2.00 $174.50 2 5174 (30
62 8" DIP sANITARY SEWER, CLASS 52. 10' • /5' DEEP LF 40 $44.30 51.772.00 0.00 5006 40 $1,772.00
63 III PVC SANITARY SEWER, 5.011 35. 9' - 10' DEEP LE 700 525,70 3317.990.00 640,00 516,448.00 639 S17,93:4.30
64 8" Pvc 5ANITARY 0EWE0, 5011 35,10' y 15' DEEP IF 1,275 92600 355.700.00 357 00 S9,996.00 957 520.79600
65 8" PVC $4341FA0y SEWER, 51)R 35.15' '24' DEEP IF 425 $59.00 $25,075.00 000 50.00 744 $43,65600
66 8" PVC SANITARY SEWER. SDP 3e, 30 - 25' DEEP IF 10 674.30 5743.00 0,00 50,00 0 4C.00
67 8" PVC bANITARySEWER. SDR 26, 0' - 10' DEER LF $0 $23.10 SI 405.00 0.00 $37.031 0 30.00
68 8" PVC SANITARY SEWER SDR 26,10' - 15' DEEP LF 806 534.50 $27,807.00 0.00 50.00 747 $25.771.50
0 E. 37316 54104413Y SEINER. SDR 26.15' - 20' DEFF IR 435 569.90 530,406.50 0.00 5000 381 526 611.90
70 a" PVC SAND AR? sr.wER.5911 26, 20 - 25' DEEP IF 115 002,90 553,271.86 0.3X? Soo° 896 874,278,40
71 8" PVC SANITARY SEWER, 3013 26, 25' - 30 DEEP LF 35 594,20 $3.007.00 0.370 50,00 70 36,594,00
72 10" PVC SANITARY SEWER, SOR 26, 15' - 20' DEEP LF /0 100,I0 55,607.09 0.00 30.00 0 50,00
73 10" PVC SANITARY SEWER, SRC 2E, 20' - 25' DEEP IF 32 $51.50 01,648.00 0.00 90.00 102 95.2.53.00
74 10" PVC sANITARY SEWER. SDR 26, 25' - 30' DEPP IF 0 $109.00 3000 0.00 $000 0 $33.00
75 ICY PVC sANITARY Stwoo. SDR 26. 30' - 35' DEEP LF 0 5637 DO 50.00 0.00 $0.00 0 $0.00
76 ROCK FOU 0 DATION 1309P.OW LT 5,003 50.01 $50.00 000 53100 0 $0.00
77 a" DIP SANITARY sEwER OUTSIDE DROP IF 27 S162.00 54,374 00 0.10 $16.20 12.3. $1,960.26
78 V' DM SANITARY SEWER bLIND DUTSJDE DROP LE 29 3315 LW 94,379.00 0.00 SOO" 79.3 $4,424,30
79 SANITARY SEWER WI 4' MAMETER EA 27 52,46000 566,420.00 7,00 517.220.00 27 566,420.0a
80 EXCESS MANHOLE DE970, 4' DIAMETER IS 168 597.29 $16.358.48 42.30 $4,131.00 347.52 5.1.8.220.94
81 TELEVISE SANITARY SEWER IF 4,733 31 'LS $8.282.75 0,49 50.00 0 10.00
82 OFF ROAD STRUCTURE MARKER EA 29 5E5.20 51,60060 27.00 $1,490.40 27 $1 490.40
83 8" PVC POKE (344113 LF S 960 524.90 8148.404.00 0.00 50.00 6,940 $147,90E1.00
84 MR REGFASF M1.414 EA 49,410.00 $20,820.00 0.07 50.00 2 510,820.072,
55 DER FM INC'S III 100 $3.95 (1 106.70 186,00 $1,10e.70 186 51.103,70
86 3,90STAT3ON TS 1 (220,00000 62.530,000,011 0.17 .537,400.00 0.57 5125,400.00
E.7 BEM 61(NODS DP WEVIAY (LIFT STA71014) SY 337 $33.00 930,461.00 0.333 $0.3F0 0 $0.00
SS SEED MIX 250 8, BLANKET SY 24,600 S1.10 927,060.3)u 42.,300,00 82.7$0.3143 2500 .92,750.00
89 SEED ATIX 250S, 90091994ULC8 SY 24,000 00 4:3 5890I040-00 23,794.00 39,993-43 23,764 $9.993.48
90 roosioN STABILIZATION MAT SY 50 39.90 $495.00 OFF) 30.00 0 50.00
91 SEED mic 250. MULCH, Ey DISC ANCHOR AC 5 5929.40 $4,645.00 4,50 $4.180.50 4.5 $4,180.50
92 TEMPORAR, SEEE.IMIX 100 AND MOLD< AC 15 5686.00 $10,290.00 0,00 630.00 0 80.c0
93 WETLAND RESTORATION WITS OWSR 6113 143181 Sy 80 99.91 $792.80 ODD $0.00 0 90.00
94 DiTai CHECK 14 17 $97.50 $1,657.50 0.321.1 $0.00 0 $0,00
95 ,,,I.A.VRT INLET PROTECTEON EA 9 3294.40 $.5.800.00 4.00 5800.00 4 $800.00
96 SILT TENC IF 5.110 $1.71 99.080 10 1,316.00 $2,248,55 2,630 54,(197.31)
SUBTOTAL - DIVISION 3 S793,732,23 $115,000.23 $63651007
DIVISION 4 - SANITARY SEWER (SERVICE TO CNI PROPERTIES)
97 8' PvCSAN/TARy SEWER. SLYR 3.3, 0' - 10' 06 FP Li 45 933.20 87,494.00 45011 e1.494.00 45 73,494,00
98 I ACK 87 PyC SANITARY sEWER LF 60 340900 $24,10000 60.(4) $24.300.00 60 524,10900
99 SPED NM 250 5: 6143331357 SY 100 5110 5330 00 0.00 $0,00 0 5050
100 SILT FENCE LF 50 91.71 585.E0 25.00 $42 75 50 985.50
SUBTOTAL - DIVISION 4 276209.50 S25,836.75 57.5..179.50
DIVISION 5 - SANITARY SEWER (LENNAR AREA SERVICES)
101 8' X 4" PVC ',WE, SEM 2.6 EA 11 $127.0,3 51.397.00 0.00 S. CLOD 11
102 .4" PVC SAN1TARy SEWER SERViCE RGER LF 110 3725 91007.99 OM 50.06 143
SUBTOTAL - DIVISION 5 92,404.50 $0.00
61,391,00
81.337.00
52,544.00
DWISION 6- WATERMAiN
103 CONNECT TO EXISTiNG 12" WATER MAIN EA 1 6404.00 5404,00 1.00 9404.00 1 $4314.00
104 VI DIP, a.. 52 WATER 3,14IN LF 215 928.50 5.6.127.50 g3,(y) F,.2,650.50 155 54,417.00
105 8. DtP, G. 52 WATER MAIN LE 40 535.90 91,4 36.00 1.5.00 $538.50 44 91,579,60
106 12" 031'. (0.52 WATFR MAIN t F ,,305 546.90 .1357,214.50 1,64 5,00 895,120.50 6,541 1119,354,90
107 633055 HIGH PRESSURE GAS PIPE UNE J5 5 Saano S112.00 1.109 Saaloo 1 $882.00
108 6" GATE vALVE AND ilos EA 14 91,220.00 $17,080.00 3.00 531160.00 10 51.2,700.00
109 V GATE, VALVE AND ROX EA 4 51,830.380 97,370,00 1,00 01,830.00 4 57,320.031
110 12" GATT VALVE AND OD% 'LT.A. 12 $3,3370.00 536,840.90 0.00 $18,420.00 12 536,84000
111 vAlvE 13(7X EXTENSION IF 15 355.40 5531,00 2.00 Silos° 2 $110.80
112 vALVE NUT 837E0510N 10 15 437.70 0565.00 0.00 50.943 0 9100
003 HYDRANT EA 11 54.09000 5471.990 00 2.01 912,27000 10 540,900.00
CONTRACT NIS PERIOD TOTAL 70 ETAT 3
ITEM DESCRIPTION or PAY ITEM UNIT
QUANTITY UNIT Y RIC E AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT
114 1701.198551 ETTENSION IT 6 $666.00 13,99600 2,00 01,337,00 $1,332, 00
115 OFF ROAD STRUCTURF MARKER CA 37 155.2.0 WRAC/ 22.00 1602.40 12 1662.40
116 DUCTILE IRON FITTINGS LB 1,0130 34.95 314,850.00 2336,06 $11,565.7.0 2,500 $12,375.00
SUBTOTAL- DIVISION 6 3491.474.90 12 49A31.9-0 1 1438,87827C
T
TOTALS - BASE CONTRACT $1,704,102.98 $324,329.31 91,423,018.47
CHANGE ORDER NO, 1
501.5 CI.FAR & GROB TREfR ii,iFT STATION SITE ON 007 PROPERTY) 23 1.0 33,300.00 11,50070 0.00 10.00 0 71 52,435.60
C01-2 DETRA 11- OF DEPTH 47 VALVE MIL TS 1.0 11.63794 $1.631.94 LOG 31.631.94 3.0 51,63794
C01-3 MBA DEPTH OF TORITMON IT 3060 570.53 56,174.30 30E1.00 116,274.00 300.0 56,174.06
C01-4 LIFT STATION GRAVEL DRIVEWAY EN 138.0 sis.m 47070.00 ow soon 0,0 30.09
5305-5 DEDUCT FOR GRAVCY $ANTTARY SEWER 'TRACER WIRE LI 7136.0 -30.60 -13,43160 27.00 93.00 7.336.0 -34.41730
TOTALS - CHANGE ORDER NO. 1 $8,944.34 $7,809,94 $5,859.34
TOTALS - REVISED CONTRACT S1.713,04732 9332,135.25 $1,428,877.81
THE. (In' OF
AGENDA ITEM:
SUBMITTED BY:
THROUGH:
REVIEWED BY:
DATE: January 21, 2014
CONSENT
ITEM # 7
Lake Elmo Avenue Sewer lnfrastructure Improvements: 1-94 to 301h Street
— Pay Request No. 4
Ryan Stempski, Project Engineer
Dean A. Zuleger, City Administrator
Jack Griffin, City Engineer
Cathy Bendel, Finance Director
Mike Bouthilet, Public Works
SUGGESTED ORDER OF BUSINESS (if removed from the Consent Av,enda):
Questions from Council to Staff Mayor Facilitates
Public Input, if Appropriate Mayor Facilitates
Call for Motion Mayor & City Council
- Discussion.. ................ .„ ....... ............... ..... ......... ......... Mayor & City Council
Action on Motion Mayor Facilitates
POLICY RECOMMENDER: Engineering
FISCAL IMPACT:
None. Partial payment is proposed in accordance with the Contract for the project. Payment
remains within the authorized scope and budget.
SUMMARY AND ACTION REQUESTED:
The City Council is respectfully requested to consider approving Pay Request No. 4 for the Lake
Elmo Avenue Sewer Infrastructure Improvements: I-94 to 30'h Street. If removed from the
consent agenda, the recommended motion for this action is as follows:
"Move to approve Pay Request No. 4 to Minger Construction, Inc. in the amount of
$486,505.26 for the Lake Elmo Avenue Sewer Infrastructure Improvements;
1-94 to 30th Street."
City Council Meeting [Consent Agenda Item 71
January 21, 2014
LEGISLATIVE HISTORY/BACKGROUND INFORMATION:
Minger Construction Inc., the Contractor for the project, has submitted Partial Pay Estimate No.
4 in the amount of $486,505.26. The request has been reviewed and payment is recommended in
the amount requested. In accordance with the contract docuinents, the City has retained 5% of
the total work completed. The amount retained is S113,843.23.
RECOMMENDATION:
Staff is recommending that the City Council consider approving, as part of the Consent Agenda,
Pay Request No. 4 for the Lake Elmo Avenue Sewer Infrastructure Improvements: I-94 to 30th
Street. If removed from the consent agenda, the recommended motion for this action is as
follows:
"Move to approve Pay Request No. 4 to Minger Construction, Inc. in the amount of
S486,505.2601. the Lake Elmo Avenue Sorer Infrastructure Improvements:
1-94 to 30m Street."
ATTACHMENT(S1:
. Partial Pay Estimate No. 4
-- page 2 --
PROJECT PAY FORM
PARTIAL PAY ESTIMATE NO,
LAKE ELMO AVENUE SEWER INFRASTRVCiT3JFIE iMPROVEMaNTS
PROIECT NO, 201.3...;
PROJEC.7 OWNER:,
Cr( OF LAKE ELMO
1180D LAVERNE AVENUE N RT
LAKE ELMO, MN 17:::(iti1
ATTN: JACK GR°PrtN CITY 7:NGINE'ER
CONTRACT CHANGE ORDER SUMARY
No. Approval j .Arnount
Date 1 Additions I Dadui...tions
1 1/5/2OI3 $0.00
2 11/6/2313 59,07C.00 I
3 1/6/2014 $0.00
TOTALS
NET CHANGE
START DATE:
.59,07Ci.OD
(S10,533,70
S/9/201..3
UTANTIAL 2/!:.V201.4
FINAL COMPLETN:
F 1 C 5 ENGINEER113, inc.
PERIOD OF ESTIMATE
FROM 12/ VI/n1.4
CONTRACTOR:
MINIZER CON!;;TilLICTION,
Jfl GALPiN COURT, SUITE 110, PC Es0X. ',/135
CI-IANHASSEr-11, M 55317-023.6
ArtN.: AARorit EF3, PROZCT MANACBP
PAY ESTIMATE S MM
1. Orinai Contrai.t: Amount
2. Nat Change irJrdsir Sum
3. Revised Contrt (1+2)
4. *Work Completed
S. "'Stored M.azeriais
Subtot Vi+5)
7. Retainage*
Previoul: -Payments,
9, Amount Di.1°?, (6-7-8)
'Detailed&realseio Ain A tt:7.ched
ACT fiME
ORi INA L DAYS
PJ:ft.'ISED DAYS
REivNfNG
ENUNEERS CERTIFICATION:
The undersigned tiertifies that the work nas beer reviewed and iu the
tt of their knov.,feegis b214!f, the quantties shown in this
esi:irriate are rEct and the work has been performed, in accoriinri=a 'ENGEigER
with the contracA documents.
CONITRA(.77S)RiS CE- ISATION:
The uncier:.;iFncd Coritracgor certifies that to to host of their
know/edgeinorrr,tiori Frid elief the covered by this paymeht
tirrwze has been corn,:iieted in accaruor,ce with ti cdritract
do cumem:s, that aI ar-;cunis have been by the e-cintractor
whi I: for vvh orr.,Nious isaytdent estimatc-s was issued -and t...rav;-iiient,
received frz.-,rn the r,,vrier, arid ttiat curte.ri: par -tent st,own herein
reOW 641E,
AFI'ROVED BY VER. r,.TY OF LAKE ELmc, VNEEOTL
BY
LIATE
rocus Emprcering, inc.
265
0
15,1
FOCUS Engineering, inc..
DATE_
CONTRACTOR
DATE
BY
DATE
$63,201.60
$3,452,567.90
$2,2,76,864S2
$0.00
52,276,FE45'6
$1.13,843.23
S1,676,S16.04:
ON SCHEDULE
YES
PRCJI:CT PAYMENri FOR
A
PAMAL PAY Er,
8
.-.
":2 88'. ;88.' •,-.4
•-• '8' 2 :";
8 8 8. '8" -.'? :8 8 ,8 ":: 2 8 ...'..a. '8 5. =8 8.' .8' 2 8, a ,-- ..8 ,,--. ..- ." -:, ., , ...; ; -..., .`.-;. -.; '' " - - '-:-• . ;.-- l-7" '"":'
• 8 -- 8. 3." 8 8 8 1 -2 3, .8 8
,... 3,
1.1. 3,-
8
.8 3,
.8. '',..---3, 8-. ".8. i.'-!• 38,-3 Ti. ';',-..1 ;,.=, "33.3
8 -8
...
43
,8 'r-'
00
8. 3
1
1-1;;;;.., 1.55155111115111555, 5,5 5,5 11155,5
DIVISION 14 wiS'ITERMAIN
5.551" 5,555/11.1 155
; n. 51555575 5.4.511.1
E RE!, 4 55; 411411 14 ?1(.0,
40084555;5' 5, • [5;;;551 155
SNDTOTAL
DIVISION 1- 510114ET4 AND FLESIOPATION
41,14111
..1.1.55;;;;;-15,51.; 1,155 1 5,4551 55
4-/ 1440;15.1.51. 1o; ; ;'4-5170 155;15541
ry1 4;1 551'11555 511,1 5 55155 4-45/115/55155„ I,
1 5. ;t5 .55,555 15 ;11515355: 5;5. 1.11157 ..5.1..1:15„ 555; 11.545,5141 1.1'555 r. 55;
5155,51.5., 11 5;15!!: 5, 1'5551. (55;515;1E ;15111; 4.15.1"515 111
5 1.155 5151515555 5,15 c...1.55;;+1.4,51 L:
k -515 .55.554515,51-5
5; 555.55; ;551;11;155;EA;14t 55 5
5115. 1,555.1-155.5.5. 5'55, :(5i5Y, 5515.5
5.,51; 51555 C; 15;55 L LI
24 51.5 55,141555,5755 111/55r. 1115555;: 153-1i 11.;
...55 5 51; ;;5.;; 551./ -; 55551, . 555
C.15; 1155,511 5151' f 5.554-;555. 55
SODTOTAI.... DIVISION ..I
1
51;11
,.;:plfarry 511;41551551-; 5.51.555.15151115 .555/C5t 11515
1.15
55 111.5 )55.i555 55E5 5
r;:;0
5115;5
55..1;5 1 15.5.: .51111 555, 5,5,551 51 -55 5 +X; 1
55 55.5.1,011; C. 05
6_66
•.;:'61'-..,''''',.'. ,1:66.6.
........„.......
..., - ___ ___ . ... • _.....
. -6._ .. ''.:.'.-2 ,
.., 66 1 .1:' ,'?.,,-.
si.....'.., 7.:'____..._ ...... . _
6 '1'6 ';.1511
,...,..., :
1
1-,E0
,5 .L 1
, , ,:,.;,:
.
55 :511 1
C.1
-5511
15:
5 Ft :15, 51:2111;r.5. ;!
6 v0
5'1'15,
°l';;G-:1.'';'11 555;5.
551.115-1 5.
1505. t 1. 5 31
551!;5(115;7.:1
1-
5.0.1 51.555L;
15155565.54*
TOTALS - EASE CONTRACT $2,41T000.4.0 2547,344,90
CHANGE ORE NO. 3
, 575.111-t,
11
55.5„5.5555,1151, 11;;51.1-+ no,
TOTALS - cHANGI: ORDER No,
CHANGE CRDER NO. 2
L. LN5-5;,NN.HN.,fr.c,t'LL
TOTALS - CHANGE ORDER HO, 2
517:15551 .51 1.5,15555535
-".•,,,,v-3.,..6, .6'.,,sqr,..6.,:.
TOTALS - R141S5D CONIKA.C.T S2,432.607.90
I>1,47.50
155' 551
5515;5
50.01)
1 55
$9,487.50
,$4.004.00
55,200.00
S21,225.00
222;22S.00
SLII.I7E.D64.53
HE ill TY OF
AGENDA ITEM:
SUBMITTED BY:
THROUGH:
REVIEWED BY:
";.
P
DATE: January 21, 2014
CONSENT S$
ITEM #: 8
Approve Predictive Index Hiring Tool
Dean Zuleger, City Administrator
Mayor Mike Pearson
Adam Bell, Asst. Administrator / HR,
Cathy Bendel, Finance Director,
Mike Reeves, HR Committee
SUGGESTED ORDER OF BUSINESS:
Introduction of Item
Report/Presentation
City Administrator
City Administrator
Questions from Council to Staff Facilitates
Public Input; if Appropriate ,,,,,,,, ........... Mayor Facilitates
Call for Motion ,.... .. ..... ..... MayOr & City CoLiliCil
..... .. - - - Mayor & City Council
Action on ....... „.. Mayor -Facilitates -
POLICY RECCOMENDER: City Administrator
FISCAL IMPACT: $3100 (Small Organization Discount)
SUMMARY AND ACTION REOUESTED: Use the Predictive Index Diagnostic Tool to
place current employees in the most productive working environments, improve HR
management efficiency, and improve hiring by evaluating compatibility in the screening process.
As part of its consent agenda, no specific motion is required. Should Council remove this item
from Consent, the recommended motion would be as fbllows:
"Move to approve the expenditure of $3100 for the subscription to the Predictive Employee
Evaluation Program with the .fluids coming from the 2014 Contingency Fund.
LEGISLATIVE HISTORY: None — the City has used traditional hiring practices in the past.
-- page
City Council Meeting [Consent Agenda Dein 8]
January 21, 2014
BACKGROUND INFORMATION,: With growth imminent, it is important for the City to
employ the best hiring practices to ensure that the right employees are brought into the
organization. In addition, recent staff interviews have revealed that as many as 25% of our
employees are not in a "good fit" for their own edification and organizational efficiency.
Predictive Index is an EEOC approved tool that measures employment characteristics that:
I. Tells the organization how an individual likes to work;
2. Evaluates how the individual feels the organization wants them to work:
3. Measures how the individual synthesizes the two points above to create a work style.
The attached nriaterial provided goes into greater detail on methodology and applicability.
BACKGROUND iNfolVATIQN(SWQT):
Strengths: Provides objective, empirical methodology for the selection and
assignment of City employees. Methodology sanctioned by the EEOC.
City Administrator is certified in the system.
Weakness: Removes "intangibles" and nuance of personality in the selection process.
Opportunities: Allows City to increase workplace productivity and efficiency by
placing employees in roles that maximize their effectiveness.
Threats: rvIay cause organizational disruption with the replacement, release or
reassignment of tasks with the current employee pool.
RECOMMENDATION: To stabilize the hiring and assignment process in the staffing of the
City of Lake Elmo, the City Administrator recommends the following:
"Move to approve the expenditure of S3100 for the subscription to the Predictive Employee
Evaluation Program with the funds coming from the 2014 Contingency Fund."
ATTAckpiENT,s:
1. What is the Predictive Index?
-- page 2 --
What is The Predictive Index® (PI®)?
Predictive Index(R) (PI®) is a scientifically validated assessment that accurately predicts workplace behaviors and
tendencies.
Who is PI Worldwide? www.PIWorldwide.com
PI Worldwide and its global consulting network combine the power of predictive data with business expertise to
help organizations worldwide achieve a competitive advantage. Trusted advisors since 1955, we help organizations
align their people with their strategy,' to create long-term sustainable results.
Our Methodology
Data Driven
Science -based assessments are the foundation of our methodology everything starts with the data. Our assessments
it -leas -me critical dimensions ofbehaviors and skills in the workplace. The Predictive lndcN assessment, developed in
1955, was among the first to quantify the importance of behavioral drives and needs in the workplace. Since then,
we've added additional assessments that continue the tradition of providing you with unprecedented insight into
your leaders, employees. and candidates.
Knowledge Transfer
Education and knowledge transfer are essential elements of our partnering strategy with our clients. For more than
50 years. we have helped our clients develop subject matter experts to interpret and apply their own data within the
context of their own organizations. Our powerful programs, combined with ongoing complimentary support. ensure
competence is developed inside your organization. Our clients cite our education programs as transformational in
their ability to manage and lead others and to better understand themselves.
Technology
Jo today's fast -paced organizations. our clients require on -demand access to our tools and data. To support this need,
we offer a variety of web -based solutions that allow you to collect, analyze, and apply assessment data to your most
critical business challenges. We also offer robust integrations to industry -leading HRIS and ATS platforms to
automate the process of applying workforce analytics more easily.
Expertise
Our global consulting network consists of 45 rinilc representing 400 professional consultants. These
experts provide the highest levels of applied experience. industry knowledge, and service. As part of the PI
Worldwide community, each consultant brings a unique combination of global experience and local presence. They
serve as trusted business advisors and have earned a client retention rate of more than 90%. Our consultants can
engage with your organization for strategy planning sessions, group analytics work, teatn optimization, leadership
development. succession planning, and strategic workforce planning.
DATE: January 21, 2014
REGULAR
ITEM # 9
No SWOT Analysis
AGENDA ITEM: Council Meeting Date Change
SUBMITTED BY: Beckie Gumatz, Deputy Clerk
THROUGH: Dean Zuleger, City Administrator
REVIEWED BY: Adam Bell, Assistant City Administrator/City Clerk
SUGGESTED ORDER OF BUSINESS:
Introduction of Item .................... ....... . ..... .......... ..... ........ City Administrator
Report/Presentation ......... ........ ...... , ....... ..........City Administrator
Questions from Council to Staff Mayor Facilitates
Call for Motion ........... ...... ........... ....... . ........ .. Mayor & City Council
Discussion......... .....„............ ................... ,........... ...... ..... Mayor & City Council
Action on Motion Mayor Facilitates
POLICY RECOMMENDER: State Law
FISCAL IMPACT: NA
SUMMARY AND ACTION REOUESTED: City Council is respectfully requested to move
the City Council meeting from Tuesday, February 4, 2014 to Wednesday, February 5, 2014 due
to Precinct Caucuses. The recommended motion for this action is as follows:
"Move to approve moving the Tuesday, February 4, 2014 Council Meeting to Wednesday,
February 5, 2014, due to Precinct caucuses,"
LEGISLATIVE HISTORY: When the 2014 Meeting calendar was presented and approved at
the December 17, 2013 meeting, the date of Precinct Caucuses was overlooked. State law
prohibits cities from holding meetings after 6:00pm on the date of Precinct Caucuses. By moving
the meeting to Wednesday, the City will be better able to conduct its business.
-- page 1 --
City Council Meeting
January 21, 2014
[Regular Agenda lion 921
RECOMVIENDATION: City Council is respectfully requested to move the City Council
meeting from Tuesday, February 4, 2014 to Wednesday, February 5, 2014 due to Precinct
Caucuses. The recommended motion for this action is as follows:
"Move to approve moving the Tuesday, Februarl, 4, 2014 Council Meeting to Wednesday,
February 5, 2014, due to Precinct Caucuses."
— page 2 --
1 1'
11 IF:CJF
K E ELM(
AGENDA ITEM:
SUBMITTED BY:
THROUGH:
REVIEWED BY:
r'
DATE: January 21, 2014
REGULAR
ITEM 10
Inwood Booster Station and Trunk Waten-nain Improvements — Public
Improvement Hearing; Resolution Ordering the Improvement and the
Preparation of Plans and Specifications; Motion to Approve Engineering
Design and Construction Support Services Contract
Jack Griffin, City Engineer
Dean A. Zuleger, City Adtninistrator
Adam Bell, City Clerk
Cathy Bendel, Finance Director
Chad Isakson, Project Engineer
9.119.11
SUGGESTED ORDER OF BUSINESS:
Introduction of Item City Engineer
Report/Presentation City Engineer
Questions from Council to Staff Mayor Facilitates
Open Public Improvement Hearing; Public Input Mayor Facilitates
Call for Motion Mayor & City Council
Discussion Mayor & City Council
Action on Motion Mayor Facilitates
POLICY RECOMMENDER: Engineering
FISCAL IMPACT: S166,000 for preparation of plans and specifications which includes geotechnical
investigations for design.
The Inwood Booster Station and Trunk Waten-nain improvement project is a $3.84 million water
system infrastructure project that is programmed for construction in the 2014 Capital
Improvement Plan, The Capital Improvement Plan is funded as detailed in the city financial pro
forma previously presented and accepted by the city council. More specifically this project will
be funded through the water enterprise fund and special assessments as identified in the
feasibility report.
-- page
City Council Meeting [Regular Agenda Item 10]
January 21, 2014
Approving the Plans and Specifications and entering into a professional services contract
commits the city to incur the engineering and geotechnical costs necessary to complete detailed
design and receive contractor bids to ready the project for construction in April 2014. The
council will be asked to award a contract for watermain construction in May 2014 and the
booster station construction in June 2014, at which time the city would commit to the remaining
project costs,
SUMMARY AND ACT1ON REQUESTED:
The City Council is respectfully requested to open the Public Improvement Hearing for the
Inwood Booster Station and Trunk Watermain hnprovements; and following the Hearing,
consider adopting Resolution No. 2014-06 Ordering the Improvement and the Preparation of
Plans and Specifications; and awarding a Professional Engineering Design and Construction
Support Services Contract. The recommended motions for these actions are as follows:
"Move to adopt Resolution No. 2014-07 Ordering the Inwood Booster Station and Trunk
Watermain Improvements and the Preparation of Plans and Specifications."
and
"Move to approve the updated Professional Engineering Support Services Consulting Pool,
thereby adding MSA Professional Services, Inc. in the area of General Municipal Services."
and
"Move to approve a Professional Engineering Design and Construction Support Services
Contract to MSA Professional Services, Inc. in the not to exceed amount of $200,772."
LEGISLATIVE HISTORY/BACKGROUND INFORMATION,:
Pursuant to Minnesota Statutes, Section 429.011 to 429.111, a Public Improvement Hearing was
noticed for January 21, 2014, to consider making the following improvements:
Extension of trunk watennain facilities along Inwood Avenue from 26th Street North to
Eagle Point Boulevard, passing through the Parkview Estates neighborhood.
• Construction of a water booster station to increase water pressures in the southern part of
the city.
The attached notice was published in the official newspaper and individual notifications were
sent to each address that potentially will be assessed a portion of the project costs. In addition a
resident meeting was held on January 15, 2014 to present the information to the benefitting
property owners identified in the report.
This project is programmed_ for construction in the 2014 Capital Improvement Plan. The
feasibility report was authorized by the city council on August 6, 2013 in order to ready this
project for 2014 construction. The report identified the necessary improvements, estimated
project costs, assessment methodology and preliminary assessment amounts to be levied against
properties adjacent to and benefiting from the improvements.
page 2 --
City Council Meeting [Regular Agenda Item 10J
January 21, 2014
The proposed improvements include the extension of trunk watermain facilities along Inwood
Avenue from 26th Street North to Eagle Point Boulevard, connecting to the existing water system
in the Eagle Point Business Park. The feasibility report recommended that water service he
extended into the Parkview Estates neighborhood to provide a more efficient water distribution
network that includes additional properties along the selected route.
A water booster station has been identified as part of this improvement to increase water
pressures in the southern part of the city due to higher topography. These improvements are
consistent with the 2030 Water System Comprehensive Plan which identifies the southwestern
part of the city as the high water pressure zone. Property acquisition is necessary in the vicinity
of 26th Street North and Inwood Avenue to accommodate the water booster station facility.
Individual home service stubs and fire hydrants will be installed as waten-nain is extended past
existing residential properties. There are properties adjacent to this improvement project that will
gain direct access to connect to the water system, without being assessed for a lateral watermain
in the future. Two properties have been identified along Inwood Avenue to he assessed a $5,800
lateral benefit assessment since the trunk watermain will be placed adjacent to their residence. In
addition, there are twenty-five (25) properties located in the Parkview Estates neighborhood that
will be served by the project. The city has the option to install the trunk watennain on Inwood
Avenue and bypass this neighborhood altogether. Therefore, the added costs to include the
Parkview Estates neighborhood were determined. Applying the Special Assessment Policy,
100% of the added costs should be assessed to the 25 properties, resulting in a preliminary unit
assessment amount of $16,500.
To complete the engineering design, the city engineer prepared and sent out a Request for
Proposal (RFP) for Engineering Support Services that includes a full topographic survey, the
preparation of plans and specifications; plan printing, distribution and bidding services;
construction administration support to the city engineer, and construction staking. FOCUS
Engineering will provide resident and council communication, conduct public meetings, project
management, coordinate the project permitting, and will provide construction administration
services for the project. FOCUS will also oversee the project design and quality control review,
lead site acquisition for the booster station, and provide city design standards and documents to
be incorporated with the project plans. Construction observation services will be retained at a
later date once the project has been bid and awarded for construction.
The RFP was sent to five fines from the city' s Engineering Consultant Pool, including AE2S,
Bolton and Menk, TKDA, MSA and SEH. The proposals were received on January 10, 2014
and were reviewed and ranked on the following basis:
Project Team Qualifications with a focus on a Project Manager capable of leading and
delivering a utility extension project using directional drilling installation techniques;
Demonstrated understanding and experience with the project and understanding of the
critical success factors;
Understanding the scope of work and roles and responsibilities of the Consultant;
-- page 3 --
City Council Meeting [Regular Agenda Item 10]
January 21, 2014
Collaboration skills and responsiveness demonstrated during the RFP submittal process:
and
Engineering Fees, indicating a detailed breakdown that is consistent with the Consultant's
written proposal.
The attached exhibit provides the Proposal Fee Summary as received by the responding
consultants, together with staff adjustments needed to reconcile the requested work scope for the
project. The Proposal Fees ranged from $128,935 to $353,030, Engineering Fees are subtotaled
for each project phase including project management, plans and specifications, bidding, and
construction support services including construction staking. Full construction phase services
including construction observation is included in the consultant's fee for the booster station.
The city engineer is recommending a contract be awarded to MSA Professional Services, Inc.
MSA has assigned a qualified project manager and a highly qualified team to handle both the
watermain utility work and the complex design work needed for the booster station. While the
MSA fee is higher than several other proposals, we believe that they have submitted the best
work plan that proposes the appropriate level of hours necessary by the various level of technical
expertise to successfully implement this improvement project. Their proposal identifies a
thorough understanding of the work to be performed and they are aware of key issues related to
the corridor.
RECOMMENDATION:
Staff is recommending that the City Council adopt Resolution No. 2014-06 Ordering the
Improvements and the Preparation of Plans and Specifications for the Inwood Booster Station
and Trunk Watermain Improvements. Ordering a 429 Public Improvement nroiect without a,
resident netition reauires a suner maioritv 4/5 vote. The recommended motion for this action is
as follows:
"Move to adopt Resolution No. 20l4-07 Ordering the Inwood Booster Station and Trunk
Watermain Improvements and the Preparation of Plans and Specifications."
Staff is also recommending that the City Council consider approving the updated Professional
Engineering Support Services Consulting Pool, thereby adding MSA Professional Services, Inc,
(MSA) in the area of General Municipal Services. The recommended motion for this action is as
follows:
"Move to approve the updated Professional Engineering Support Services Consulting Pool,
thereby adding MSA Professional Services, Inc. in the area of General Municipal Services"
Staff is also recommending that the City Council award a Professional Engineering Design and
Construction Support Services Contract for the Inwood Booster Station and Trunk Watermain
Improvements. The recommended motion for this action is as follows:
-- page 4 --
City Council Meeting [Regular Agenda Item 10J
January 21. 2014
"Move to approve a Professional Engineering Design and Construction Support Services
Contract to MSA Professional Services, Inc. in the not to exceed amount of $200,772."
ATTACHMENT(S):
1, Resolution 2014-07 Ordering the Improvements and Preparation of Plans and Specifications.
2. Notice of Hearing on Improvement.
3. Preliminary Assessment Roll.
4. Project Schedule.
5. Location Map.
6. Professional Engineering Support Services Consulting Pool; updated January 21, 2014.
7. Proposal Fee Summary Worksheet.
8. Feasibility Report (available for review at City Hall)
-- page 5
CITY OF LAKE ELMO
WASHINGTON COUNTY
STATE OF MINNESOTA
RESOLUTION NO. 2014-07
A RESOLUTION ORDERING THE IMPROVEMENT AND PREPARATION OF PLANS AND
SPECIFICATION
FOR THE INWOOD BOOSTER STATION AND
TRUNK WATER1VIAIN IMPROVEMENTS
WHEREAS, pursuant a resolution of the city council adopted the 3rd day of December, 2013. the council
ordered a hearing on Improvement for the Inwood Booster Station and Trunk Watei main Improvements; and
WHEREAS, ten daysmailed notice and two weeks published notice of the hearing was given, and the
hearing was held thereon on the 21st day of January, 2014, at which all persons desiring to be heard were given the
opportunity to be heard thereon; and
WHEREAS, the feasibility report prepared by FOCUS Engineering, Inc.. and dated November 2013 states
that the project is necessary, cost-effective, and feasible; and
WHEREAS, in order to provide municipal water to developing properties located south of 10'1' Street N the
city needs to design and construct a booster station and a trunk watermain along Inwood Avenue North from 26th
Street North to Eagle Point Boulevard,
NOW, THEREFORE, BE IT RESOLVED,
1. Such improvement is deemed necessary, cost-effective, and feasible as detailed in the Feasibility Report
dated November 2013.
Such improvement is hereby ordered as proposed in the council resolution adopted this 21st day of January,
2014.
3. The city council declares its official intent to reimburse itself for the costs of the improvement from the
proceeds of tax exempt bonds.
4. The city engineer is hereby designated as the engineer for making this improvement. The engineer, and his
consultants, shall oversee the preparation of the Plans and Specifications for the making of such
improvement,
5. The city engineer shall retain the services of a consulting engineering firm to assist, where needed, to
prepare Plans and Specifications for the making of such improvement and to assist the city engineer during
the construction phase of the improvement as requested.
ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE TWENTY FIRST DAY OF JANUARY,
2014.
CITY OF LAKE ELMO
By:
Mike Pearson
Mayor
(Seal)
ATTEST:
Adam Bell
City Clerk
Resolution No. 2014-07
CITY OF LAKE ELMO
NOTICE OF HEARING ON IMPROVEMENT
INWOOD BOOSTER STATION AND TRUNK WATERMAIN IMPROVEMENTS
Notice is hereby given that the City Council of Lake Elmo will meet in the council
chambers of the city hall at or approximately after 7:00 P.M. on Tuesday. January 21,
2014, to consider the making of the following improvements, pursuant to Minnesota
Statutes, Sections 429.011 to 429.11 I:
The improvement will consist of extending the water system approximately 2.8
miles south along Inwood Avenue beginning at 26th Street North, deviating into
Parkview Estates along Ivory Avenue North, and back along Inwood Avenue
south to and along future Sth Street. to provide municipal water service to
developing properties in the southwest part of the City. Individual service stubs
will be installed to properties with existing homes that are. located adjacent to the
watermain improvements. Fire hydrants will be installed along the corridor,
providing increased fire suppression capabilities in the extended service area.
The area proposed to he assessed for these improvements include the properties with
existing residences and located along Inwood Avenue and Ivory Avenue North. directly
abutting the location of the proposed watermain improvements. The estimated total cost
of the improvements is $3,840,000. A reasonable estimate of the impact of the
assessment will be available at the hearing. Such persons as desire to be heard with
reference to the proposed improvements will he heard at this meeting.
DATED: December 3, 2013
BY ORDER OF THE LAKE ELMO CITY COUNCIL
Mike Pearson, Mayor
(Published in the Oakdale-Lalw Dino Review an December 11, 2013 and December 18, 2013)
CITY OF LAKE ELMO, MN.
NOVEMBER 2013 PRELIMINARY ASSESSMENT ROLL
INWOOD BOOSTER STATION AND TRUNK WATERMAIN IMPROVEMENTS PAGE 1 of 1
NO. NAME ADDRESS RID UNITS
- -7.„ —"EEERi-lAkbeAROI_INi MiRS &A-T.i,i At Ei4Ekb- - . '23 " 'Iii. ' AVE N. .1:A6E' ELMO ' 55042 2102921310001 $ 5,800
2 MEEHAN FAMILY LLC 2038 INWOOD AVE N LAKE ELMO 55042 2102921340013 $ 5,800
1 HANSON KENNETH L & ANN I E M C 1873 IVORY AVE N LAKE ELMO 55042 2802921120023 $ 16,500
2 SAULSBURY KIM B & THERESA D 1849 IVORY AVE N LAKE ELMO 55042 2802921120022 $ 16,500
3 KLOSNER MARKS & BARBARA F 1827 IVORY AVE N LAKE ELMO 55042 2802921120021 $ 16,500
4 WILLIAMS JAMES M & SUSAN T 1805 IVORY AVE N LAKE ELMO 55042 2802921120020 $ 16,500
5 HANGGE JOSEPH P & MICHELE L 1779 IVORY AVE N LAKE ELMO 55042 2802921120019 5 16,500
6 NELSC)N DAVID F & LESLIE R 1757 IVORY AVE N LAKE ELM() 55042 2802921120018 $ 16,500
7 FORLITI EDWARD 1 & CYNTHIA ] 1743 IVORY AVE N LAKE ELMO 55042 2802921120017 $ 16,500
8 KNUTSON BRANDON 1 & JODI F FISH 1727 IVORY AVE N LAKE ELMO 55042 2802921120016 $ 16,500
9 AKBERG GARY T & JEANETTE 1709 IVORY AVE N LAKE ELMO 55042 2802921120015 $ 16,500
10 BARTCSH PETER T & SANDRA K 1697 IVORY AVE N LAKE ELMO 55042 2802921120014 $ 16,500
11 YOCUM TIMOTHY C & SHANNON C 5 1694 IVORY AVE N LAKE ELMO 55042 2802921120009 $ 16,500
12 BEARTH GREGORY A & MELISSA A 1681 IVORY AVE N LAKE ELMO 55042 2802921120013 $ 16,500
1.3 DEEBTIFFNI & DANIEL L 1680 IVORY AVE N LAKE ELMO 55042 2802921120008 $ 16,500
14 WORTMAN STEPHEN D & CHERYL L 1668 IVORY AVE N LAKE ELMO 55042 2802921120007 $ 16,500
15 IVERSON JEFFREY 5 & JULI A 1663 IVORY AVE N LAKE ELMO 55042 2802921120012 $ 16,500
16 BATTAH ABDALLA M & DEBRA I 1654 IVORY AVE N LAKE ELMO 55042 2802921120006 $ 16,500
17 ANDERSON DAVID M & MARIA V 1645 IVORY AVE N LAKE ELMO 55042 2802921120011 $ 16,500
18 SNIDER BERT W & TERRI L 1636 IVORY AVE N LAKE ELMO 55042 2802921120005 $ 16,500
19 ANDERSON DAMES L & KARIN L 1627 IVORY AVE N LAKE ELMO 55042 2802921120010 $ 16,500
20 HAUGE ROBERT IR & LAIS MONICA 1615 IVORY AVE N LAKE ELMO 55042 2802921130018 5 16,50,0
21 JACOBS PHILLIP 1584 IVORY AVE N LAKE ELMO 55042 2802921130017 $ 16,500
22 ROLANDO RICHARD 1 & JEAN M 1583 IVORY AVE N LAKE ELMO 55042 2802921130014 $ 16,500
23 HENEHAN THOMAS A & MARY L 1570 IVORY AVE N LAKE ELMO 55042 2802921130016 $ 16,500
24 RICKERT BRENDA 1567 IVORY AVE N LAKE ELMO 55042 2802921130015 $ 16,500
25 KUMP SUZANNE &JOHN 1539 IVORY CT N LAKE ELMO .55042 2802921130008 $ 16,500
TOTAL $ 424,100
PROJECT SCHEDULE
CITY [lFLAKE AMF)
|NVVOODBOOSTER STATION AND
TRUNK VVATERMAINIMPROVEMENTS
PROJECT NO, 2O1Z.1ZG
TRUNK WATERMAIN PROJECT SCHEDULE
ENGINEERING, inc.
Cara 6eheen,F.E.
Jack Griffin, P.E.
nyanStempoki' P.E.
Chad iekson,p.E.
January 21, 2014 Public Improvement Hearing. Council Orders Improvement and Preparation of plans
and specifications,
April 15,2014 Council approves Plans and Specifications; Orders Advertisement for Bids,
May 23,ZO14 Receive Contractor Bids.
May 20,2O14 Council accepts bids and awards Contract.
June 9'2OI4 Conduct Pre -construction Meeting and Issue Notice tVProceed.
Septennber,2014 Substantial completion.
October,ZD14 Final completion.
BOOSTER STATION PROJECT SCHEDULE
January31, 2014 Public Improvement Hearing. Council Orders Improvement and Preparation of plans
and specifications,
May ZO,2Ul4 Council approves Plans and Specifications; Orders Advertisement for Bids,
June l2,ZO14 Receive Contractor Bids.
June 17,2O14 Council accepts bids and awards Contract.
]une3O, 2014 Conduct Pre -construction Meeting and Issue Notice to Proceed.
Engineer Recommendation ' Substantial and Final completion.
ENG NEER NG
PROJ. NO. 2012.126
LAKE ELMO, MINNESOTA
NOVEMBER, 2013
2000
LTRE NO.
LOCATION MAP
INWOOD BOOSTER STATION AND TRUNK
WATERMAIN IMPROVEMENTS
4000
Feet
TABLE 1
CITY OF LAKE ELMO - PROFESSIONAL ENGINEERING SUPPORT SERVICES CONSULTING POOL
Traffic Engineering &
General Municipal Services
Transportation Planning
Water System
Bolton & Menk Inc. SRF Consulting Barr Engineering Inc
FOTH Infrastructure Spack Consulting, Inc. SEH
MSA Professional Services AE2S
STANTEC KLM Engineering Inc.
Stevens
TKDA
General Services - Specialties
Surveying / Easements
Cornerstone Land Survey
E,G.Rud and Sons, Inc.
Folz, Freeman and Erickson
Wastewater Surface Water
Barr Engineering Inc
AE2S
Water Tower Maintenance / Antermas
KLM Engineering Inc.
Emmons ()Wier Resources
Hydromethods
Solution Blue
Barr Engineering Inc
GIS / Mapping
Flat Rock Geographics
Municipal Buildings & Parks, Landscaping, Urban
Facilities Design
No Award No Award
Consulting Firm Total Engineering
CITY OF LAKE ELMO, MINNESOTA
INWOOD BOOSTER STATION AND TRUNK WATERMAIN IMPROVEMENTS
PROJECT NO. 2012.126
DATE RECEIVED: JANUARY 10, 2014
PROPOSAL FEE SUMMARY - AS RECEIVED
Project
Management
P&S Bidding Construction
AE2S $353,030 $15,991 $236,539 $17,456 $83,044
Bolton & Menk, Inc. $155,851 $9,360 $98,312 $2,958 $45,222
MSA Professional Services, Inc. $200,772 $4,090 $113,180 $3,379 $80,123
SEH, Inc. $125,695 $6,048 $75,537 $3,162 $40,948
TKDA, Inc. $178,540 $111,330 $7,130 $60,080
Consulting Firm
PROPOSAL FEE SUMMARY - STAFF ADJUSTED
Project
Total Engineering P&5 Bidding Construction Topo Survey
Management
AE2S $353,030 $15,991 $236,539 $17,456 $83,044 ??
Bolton & Menk, Inc. $155,851 $9,360 $88,781 $2,958 $45,222 $9,531
MSA Professional Services, Inc. $200,772 $4,090 $95,560 $3,379 $80,123 $17,620
SEH, Inc. $128,935 56,048 $63,357 $3,162 $44,188 $12,180
TKDA, Inc. $181,500 $5,052 $95,221 $7,130 $63,040 $11,057
TI (Try or
FLi 1(
AGENDA ITEM:
SUBMITTED BY:
THROUGH:
REVIEWED BY:
DATE: January 21, 2014
REGULAR
ITEM # 11
Well No, 4 Connecting, Watermain Improvements — Approve Plans and
Specifications and Order Advertisement for Bids
Jack Griffin, City Engineer
Dean A. Zuleger, City Administrator
Chad Isakson, Project Engineer
Cathy Bendel, Finance Director
Mike Bouthilet, Public Works
SUGGESTED ORDER OF BUSINESS:
Introduction of Item
Report/Presentation
Questions from Council to Staff
City Engineer
City Engineer
Mayor Facilitates
Public Input, if Appropriate ....... , .................... .................,.Mayor Facilitates
Call for Motion ................ ...................... ........... ...............Mayor & City Council
Discussion__ ........ ............ ........... .......... ........... . ....... . ..... Mayor & City Council
Action on Motion. ........... . ...... ........ . ..... ........................., ..... Mayor Facilitates
POLICY RECOMMENDER: Engineering.
FISCAL IMPACT:
The total estimated project cost for Well No, 4 Connecting Watermain improvements is S617,000. The
project is scheduled to be paid through a combination of DEED grant money ($260,000) and water
enterprise funds ($357,000). 'The city cost share, or water enterprise funds, will be financed through the
issuance of bonds with the bond payments paid with the collection of water availability and water
connection charges.
Approval of this resolution does not commit the council to the project costs. Once contractor bids are
received, the actual construction costs will be known and the council will be asked to consider entering
into a contact to complete the work.
City Council Meeting [Regular Agenda Item I I]
January 21, 2014
SUMMARY AND ACTION REQUESTED:
The city council is respectfully requested to consider approving the plans and specifications and ordering
the advertisement for bids for the Well No. 4 Connecting Watermain improvements. The recommended
motion for this action is as follows:
"Move to approve Resolution No. 2014-08, approving le plans and specifications and ordering the
advertisement for bids for the Well No. 4 Connecting Watermain Improvements."
LEGISLATIVE HISTORY:
In accordance with the 2013-2014 Capital Improvement Plan, the city is pursuing the addition of a new
water supply well, Well No, 4, to support the current and future growth and development water supply
needs for the city. The project is being completed under three separate contracts to align with the various
required contractor specialties including a weli driller; a building contractor with electrical, controls, and
HVAC specialties; and a directional drilling utility contractor. All three contracts, along with the Keats
Trunk Watennain Improvements, are part of the city's water system DEED grant, whereby the city must
expend $1.0 million in local matching funds to receive the $1.0 million state bond grant. Per the Grant
Agreement, all grant funds must be fully expended by December 31, 2014. The well drilling for Well No.
4 is near completion.
On August 6, 2013, the council authorized the preparation of plans and specifications for the Well No. 4
Connecting Watennain Improvements. In accordance with the project schedule, the plans and
specifications for the Pumphouse have been completed and are ready to be advertised for contractor bids.
BACKGROUND INFORMATION:
Plans and Specifications have been completed for the Well No. 4 Connecting Watermain Improvements.
The Engineer's opinion of probable construction cost is $447,860. The improvements include:
Construction of a approximately 4,400 LF of 12-inch wateimain to connect Well No. 4 to the
existing distribution system.
Installation of 10 service stubs to existing properties to provide property owners the opportunity
to hook up to municipal water.
• Erosion control, cleanup and site restoration.
RECOMMENDATION:
Staff is recommending that the City Council approve the plans and specifications and order the
advertisement for bids for the Well No, 4 Connecting Waterman' Improvements. The recommended
motion for this action is as follows:
"Move to approve Resolution No. 2014-08, approving t se plans and specifications and ordering the
advertisement for bids for the Well No. 4 Connecting Waterman; improvements."
ATTACHMENT:
I. Resolution 2014-08 Approving Plans and Specifications and Ordering Advertisement for Bids.
2. Location Map.
3. Project Schedule.
4. Well No. 4 Connecting Waterman" Plans and Specifications (available,* review at Ci
page
1 -1
CITY OF LAKE ELMO
WASHINGTON COUNTY
STATE OF MINNESOTA
RESOLUTION NO. 2014-08
A RESOLUTION APPROVING PLANS AND SPECIFICATIONS
AND ORDERING ADVERTISEMENT FOR BIDS FOR THE
WELL NO, 4 CONNECTING WATERMAIN IMPROVEMENTS
WHEREAS, pursuant to a resolution passed by the city council on the 6th day of August, 2013,
the city engineer, together with Bolton and Menk, Inc. has prepared plans and specifications for
the Well No. 4 Connecting Watermain Improvements and has presented such plans and
specifications to the council for approval.
NOW, THEREFORE, IT IS HEREBY RESOLVED,
Such plans and specifications, a copy of which is on file at Lake Elmo City Hall and
made a part hereof, are hereby approved.
2. The City Clerk shall prepare and cause to be inserted in the official paper and posted
online with Quest Construction Data Network (QuestCDN.com) an advertisement for
bids upon the making of such improvements under such approved plans and
specifications. The advertisement shall be published for at least 21 days, shall specify the
work to be done, and shall state that sealed bids provided to the City Clerk prior to the
specified bid date and time and accompanied by a bid bond or cashier's check made
payable to the City of Lake Elmo in an amount not less than 5% of the amount of such
hid will be considered.
ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE TWENTY-FIRST DAY
OF JANUARY 2014.
CITY OF LAKE ELMO
By:
Mike Pearson
Mayor
(Seal)
ATTEST:
Adam Bell
City Clerk
Resolution No. 2014-08
LEGEND
PROPOSED WATERMAIN
PROPOSED WATERMAIN SERVICE STUB
"83 PROPOSED HYDRANT
XXXX ASSESSABLE PROPERTY
FOC
ENGINEER
NG
PROJ. NO. 2013.131
LAKE ELMO, MINNESOTA
SEPTEMBER, 2013
9
I I
590
1000
Feet
FIGURE NO, 2
PROPOSED WATERMAIN IMPROVEMENTS
WELL NO. 4 CONNECTING
WATERMAIN IMPROVEMENTS
PROJECT SCHEDULE
CITY OF LAKE AMO
WELL NO. 4CONNECTING VVATERK0A\NIMPROVEMENTS
PROJECT NO. 2O13.13l
ENGINEERING) inc.
Cara Gehe��P.E.
Jack Griffin, P.E.
Ryan Stem pxki,P.E.
Chad |sakson,P.[.
651-300.4261
651.300.4264
651.300.4267
651.300.4283
14N44Ry2D24
August 6,2Ol3 Presenttion of Preliminary Study Findings, Council authorizes Feasibility Report,
September 3,IO1] Presentation of Feasibility Report. Council accepts Report and Calls Hearing,
September l9,2O13 Property owner meeting, Presentation of Report findings and recommendations,
October l, 2013 Public Improvement Hearing. Council orders Preparation ofplans and specifications.
January 21,2Ol4 Council approves Plans and Specifications; Orders Advertisement for Bids.
February Z[\I0l4 Receive Contractor Bids,
March 4,lO14
April l,1014
June Z0,ZOI4
]u|y 18, 2014
Council accepts bids and awards Contract.
Conduct Pre -construction Meeting and Issue Notice to Proceed.
Substantial completion (estimated 12weeks).
Final Completion,
1E,CITY OF
[AKED
, '.;;;44.2•
AGENDA ITEM:
SUBMITTED BY:
THROUGH:
REVIEWED BY:
r
' •,z
DATE: January 21, 2014
REGULAR
ITEM # 12
Lake Elmo Avenue Trunk Watermain Improvements Approve Engineering
Design and Construction Support Services Contract
Jack Griffin, City Engineer
Dean A. Zuleger, City Administrator
Chad Isakson, Project Engineer
SUGGESTED ORDER OF BUSINESS if removed from the Consent Auenda1:
- Introduction of Item City Engineer
Report/Presentation ...... City Engineer
Questions from Council to Staff ............ ................ ..........Mayor Facilitates
Public Input, if Appropriate Mayor Facilitates
- Call for Motion Mayor & City Council
Discussion Mayor & City Council
Action on Motion Mayor Facilitates
POLICY RECOMMENDER: Engineering.
FISCAL IMPACT: $80,000 for preparation of plans and specifications which includes geotechnical
investigations for design.
The Lake Elmo Avenue Trunk Watermain Improvement project is a S3.0 million water system
infrastructure project that is programmed for construction in the 2014 Capital Improvement Plan. The
Capital Improvement Plan is funded as detailed in the city financial pro forma previously presented and
accepted by the city council. More specifically this project will be funded through the water enterprise
fund and special assessments as identified in the feasibility report.
Entering o a professional services contract commits the city to incur the engineering and geotechnical
costs necessary to complete detailed design and receive contractor bids to ready the project for
construction in 2014. The council will be asked to award a contract for construction in April 2014, at
which time the city would commit to the remaining project costs.
SUMMARY AND ACTION REOUESTED:
The City Council is respectfully requested to consider awarding a Professional Engineering Design and
Construction Support Services Contract for the Lake Elmo Avenue Trunk Watermain Improvements to
-- page 1 --
City Council Meeting !Regular Agenda hem I 2]
January 21, 2014
TKDA, Inc. in the estimated not to exceed amount of 566,500. The recommended motion for this action
is as follows:
"Move to approve a Professional Engineering Design and Construction Support Services Contract
for the Lake Elmo Avenue Trunk Watermain Improvements to
TKDA, Inc. in the estimated not to exceed amount of S66,500."
LEGISLATIVE HISTORY/BACKGROUND INFORMATION:
On December 3, 2013, following a public improvement hearing, the City Council authorized the
preparation of plans and specifications for the Lake Elmo Avenue Trunk Watermain Improvements. The
proposed improvements include the extension of trunk waterrnain along Lake Elmo Avenue, from the
existing Village water system, south approximately 2.5 miles to the future intersection location of Lake
Elmo Avenue and 511' Street. The improvements are identified for construction in 2014 and are consistent
with the capital improvement plan.
To complete the engineering design, the city engineer prepared and sent out a Request for Proposal (RFP)
for Engineering Support Services that includes a design survey, the preparation of plans and
specifications; plan printing, distribution and bidding services; construction administration support to the
city engineer, and construction staking. FOCUS Engineering will provide resident and council
communication, conduct public meetings, project management, coordinate the project permitting, and will
provide construction administration services for the project. FOCUS will also oversee the project design
and quality control review, and provide city design standards and documents to be incorporated with the
project plans. Construction observation services will be retained at a later date once the project has been
bid and awarded for construction.
The RFP was sent to four firms from the city's Engineering Consultant Pool, including AE2S, Bolton &
Menk, TKDA, and SEH. Three proposals were received on December 6, 2013 and were reviewed and
ranked on the following basis:
• Project Team Qualifications with a focus on a Project Manager capable of leading and delivering
a utility extension project using directional drilling installation techniques;
• Demonstrated understanding and experience with the project and understanding of the critical
success factors;
6 Understanding the scope of work and roles and responsibilities of the Consultant:
6 Collaboration skills and responsiveness demonstrated during the RFP submittal process; and
o Engineering Fees, indicating a detailed breakdown that is consistent with the Consultant's written
proposal.
The attached exhibit provides the Proposal Fee Summary as received by the responding consultants,
together with staff adjustments needed to reconcile the requested work scope for the project. The Proposal
Fees ranged from $66,500 to 571,560. Engineering Fees are subtotaled for each project phase including
project management, plans and specifications, topographic survey, bidding, and construction support
services including construction staking.
The city engineer is recommending a contract- be awarded to TKDA, Inc. TKDA has assigned a qualified
team appropriate for the level of work required for this project. In particular, TKDA has dedicated
significantly more hours to the project for a senior level engineer experienced in directional drilling
technology. TKDA also identified a thorough understanding of the work to be performed and they are
aware of key issues related to the corridor. The engineering fees from all firms were relatively close and
all proposed fees are below the project budget. Staff is recommending TKDA's team for their senior level
project experience with directional drilling combined with their existing knowledge of the corridor.
page 2 --
City Council Meeting [Regular Agenda Item 12]
January 2 , 2014
RECOMMENDATION:
Staff is recommending that the City Council award a Professional Engineering Design and Construction
Support Services Contract for the Lake Elmo Avenue Trunk Watennain Improvements to TKDA. Inc. in
the estimated not to exceed amount of $66,500. The recommended motion for this action is as follows:
"Move to approve a Professional Engineering Design and Construction Support Services Contract
for the Lake Elmo A venue Trunk Waterman? Improvements to
TKDA, Inc. in the estimated not to exceed amount of S66,500."
ATTAcHMENT(51:
1. Proposal Fee Summary Worksheet
-- page 3 --
Consulting Firm Total Engineering
Consulting Firm Total Engineering
Bolton & Menk, Inc. $71,560
SEH, Inc. $78,469
TKDA $65,000
CITY OF LAKE ELMO, MINNESOTA
LAKE ELMO AVE TRUNK WATERMAIN IMPROVEMENTS
PROJECT NO, 2013.133
DATE: DECEMBER 27, 2013
PROPOSAL FEE SUMMARY - AS RECEIVED
Project
Management
P&S
Bidding Construction
$5,400 $50,090 $1,050 $15,020
$7,400 $45,833 $3,043 $22,193
$40,500 $3,200 $21,300
PROPOSAL FEE SUMMARY - STAFF ADJUSTED
Project
Management
P&S Bidding
Construction Topo Survey
Bolton & Menk, Inc. $71,560 $5,400 $33,890 $1,050 $15,020 $16,200
SEH, Inc. $82,519 57,400 $31,440 $3,043 $26,243 $14,393
TKDA $66,500 $2,724 $35,612 $3,200 $22,780 $2,164
Ti 1E CITY
KE ELMO
t‘,
AGENDA ITEM:
SUBMITTED BY:
THROUGH:
REVIEWED BY:
t , 4
r •'•
• 4 ) 2 4
4 J p
DATE: January 21, 2014
REGULAR
ITEM # 13
Friedrich Property Comprehensive Plan Amendment (RAD-ALT to RAD)
Kyle Klatt, Community Development Director
Dean Zuleger, City Administrator
Planning Commission
Nick Johnson, City Planner
SUGGESTED ORDER OF BUSINESS:
Introduction of Item Community Development Director
Report/Presentation .Community Development Director
Questions from Council to Staff Mayor Facilitates
0111 for Motion . . .... .. . „ ....... ..... Mayor & City Council
Discussion Mayor & City Council
Action on Motion Mayor Facilitates
POLICY RECCOMENDER: The City Council has previously asked the Planning
Commission for its recommendation concerning an amendment to the Lake Elmo
Comprehensive Plan that would change the future land use designation of property located at
9434 Stillwater Boulevard North (the "Friedrich Property") from RAD-ALT to RAD. In
accordance with City Code and State Law, the City Council may only amend the Comprehensive
Plan only after the Planning Commission has conducted a review of the proposed changes and
after the Commission's has conducted a public hearing concerning the amendment.
The Planning Commission considered the proposed amendment at its January 13, 2014 meeting
and a summary of the Commission's report and recommendation are included below.
FISCAL IMPACT: There are no direct fiscal impacts to the City associated with the proposed
Comprehensive Plan Amendment. Staff has spent time preparing for the meeting and following
proper hearing notification procedures. As a Council -initiated agenda item, the City will not
receive any application fees to offset the hearing publication and mailing costs.
-- page 1 --
City Council Meeting [Regular Agenda Item 13J
January 21, 2014
SUMMARY AND ACTION REOUESTED: At its December 3, 2013 meeting, the City
Council directed the Planning Commission to conduct a public hearing to consider a
Comprehensive Plan amendment that would revise the future land use map for property at 9434
Stillwater Boulevard North. Specifically the Council asked that the Planning Commission
consider changing the future land use designation of this property from RAD-ALT (Rural Area
Development Alternate Density) to RAD (Rural Area Development). The difference between
these land use categories is that the RAD-ALT designation would allow residential densities on
the site up to 2 units per acre while the RAD designation would limit this number to 0.45 units
per acre.
The Planning Commission considered this matter at its January 13, 2014 meeting and
recommended approval of the amendment to change the future land use designation for the
subject property from RAD-ALT to RAD.
The suggested motion to adopt the Planning Commission recommendation is as follows:
"Move to adopt Resolution No. 2014-09 amending the Comprehensive Plan to change the
future land use designation of 9434 Stillwater Boulevard North .from RAD-ALT to RAD."
LEGISLATIVE HISTORY/PLANNING COMMISSION REPORT: The attached Staff
report to the Planning Commission includes general information regarding the subject property
in addition to a summary of the planning and zoning issues pertaining to the site. Also attached
for consideration by the Council is the Staff report concerning a request to change the future land
use designation of this site that was prepared in early 2010. These two documents provide good
synopsis of recent action taken by the City for this property, with relevant dates noted as follows:
Date Action
3/22/] 0 Application for Comprehensive Plan, Zoning Text Amendment and
PUD/OP Concept Plan accepted as complete by the City
6/1/10 City Council approval of Comprehensive Plan amendment for subject
property (RAD to RAD-2)
7/20/10 City Council approval of OP/PUD Concept Plan for senior living/farm-
based preschool development
7/19/11 Granting of one-year extension for preliminary plan submission
8/21/12 Granting of additional one-year extension for preliminary plan
submission
3/14/13 Expiration of OP/PUD Concept Plan
1/21/14 City Council consideration of Comprehensive Plan amendment (RAD-
ALT to RAD)
The Planning Commission considered the proposed Comprehensive Plan Amendment at its
January 13, 2014 meeting and conducted a public hearing concerning the amendment at this
time. The following individuals addressed the Commission during the course of the public
hearing:
-- page 2 —
City Council Meeting [Regular Agenda Item 13]
January 21, 2014
Janice Green spoke to the Commission as the owner of the property. She explained that
her father was strongly supportive of the farm school concept and that this project was
intended to help preserve the agricultural buildings and activity on the site. She stated
that the land owners are requesting that the land use designation remain RAD-ALT.
Larry Weiss, 9302 Stillwater Boulevard North, explained that he was originally in
support of the proposed development on this site, but that he changed his mind when the
density increased. He asked that that land use designation be changed back to RAD.
Ed Nielson, 9498 Stillwater Boulevard North, expressed concern over the information
that was presented about the senior living and faun school project when it was initially
proposed. He explained that senior living projects are typically located along larger
roads. He commented that 98% of the surrounding neighbors are opposed to the previous
development proposal.
Stewart Helgeson, 11150 121h Street North, stated that it would not make sense to change
the land use plan back to RAD because the City may need to make yet another change if
an acceptable project were to come forward.
The Planning Commission generally discussed the City's long range plans for rural areas and the
OP zoning regulations that would apply to this site. Commissioners supported the findings for
approval of the amendment as drafted by Staff, and recommended five additional findings to
support its recommendation to the City Council. The Commission further noted that the City is
still operating under older population and household foreeast numbers that -will be valid until the
updated regional forecast is finalized by the Met Council.
The Planning Commission adopted a motion to recommend approval of the Comprehensive Plan
Amendment to change the future land use designation of 9434 Stillwater Boulevard North from
RAD-ALT to RAD consistent with the findings as noted in the attached Resolution No. 2014-
109. The vote on the motion unanimous at 7-0.
BACKGROUND INFORMATION (SWOTII
Strengths
Weaknesses
The proposed amendment provides clarity for the City and
neighbors regarding the maximum amount of development for
the site.
The Commission noted that the amendment would alleviate a
potential "spot zoning" situation in this area.
An amendment would prohibit a unique development from
moving forward that would combine senior living, a preschool,
and agricultural activities on the site.
Any new application for multi -family living and/or a farm -based
preschool on the site could only move forward with another
Comprehensive Plan amendment.
-- page
City Council Meeting [Regzdar Agenda Item 131
January 21, 2014
Opportunities Future development proposals could be approved by the City
that are consistent with the OP zoning regulations.
• The property owner/developer may still pursue a Comprehensive
Plan amendment as part of a future development proposal.
The City will be able to further evaluate the used and densities
allowed in rural development areas once the regional forecast
has been finalized,
Threats
The City is still operating under the forecasts approved under the
MOU and 2013 Land Use Plan (additional density in rural
development would be needed to reach these forecast numbers).
RECOMMENDATION: The Planning Commission is recommending that the City Council
approve the amendment to change the future land use designation for the subject property from
RAD-ALT to RAD. The suggested motion to adopt the Planning Commission recommendation
is as follows:
"Move to adopt Resolution No. 2014-09 amending the Comprehensive Plan to change the
future land use designation of 9434 Stillwater Boulevard North from RAD-ALT to RAD."
Please note that this action requires a 4/5ths majority vote of the City Council. If there are fewer
than four votes to approve the resolution amending the Comprehensive Plan, the future land use
designation for the subject will not be changed.
ATTACHMENTS:
1. Resolution No. 2014-09
2. Planning Commission Staff Report 1/13/14
3. Location Map
4. Proposed Map Amendment
5. Staff Report to City Council Dated 5/4/10
6. Planning Commission Meeting Minutes — 1/13/14
CITY OF LAKE ELMO
WASHINGTON COUNTY, MINNESOTA
RESOLUTION NO, 2014-09
RESOLUTION APPROVING AN AMENDMENT TO THE CITY OF LAKE ELMO
COMPREHENSIVE PLAN
WHEREAS, the City of Lake Elmo has established a Comprehensive Plan that provides a
compilation of background data, policy statements, standards, and maps, which help to guide the
future physical, social, and economic development of the City; and
WHEREAS, The City Council of the City of Lake Elmo ("City") has directed the Lake
Elmo Planning Commission to consider an amendment the Lake Elmo Comprehensive Plan that
would change the future land use designation of property located at 9434 Stillwater Boulevard
North from RAD-ALT to RAD, a description of which is on file in the Community Development
Department; and
WHEREAS, the City previously amended the Comprehensive Plan for the subject property
on June 1, 2010 to allow for an increase in density on the site in conjunction with a proposed
development that is no longer valid; and
WHEREAS, the Lake Elmo Planning Commission held a public hearing on January 13,
2014 to consider said Comprehensive Plan amendment; and
WHEREAS, on January 13, 2014 the Lake Elmo Planning Commission adopted a motion to
recommend that the City Council, approve said Comprehensive Plan amendment; and
WHEREAS, the City Council reviewed the recommendation of the Planning Commission
and the proposed amendment to the Comprehensive Plan at a meeting on January 21, 2014; and.
NOW, THEREFORE, based upon the testimony elicited and information received, the City
Council makes the following:
FINDINGS
1) That the Planning Commission has reviewed said Comprehensive Plan Amendment in
accordance with the procedures as established by the Lake Elmo Planning Department and
Lake Elmo Planning COMMiSSiOn.
Resolution No. 2014-09
2) That the Planning Commission conducted a public hearing on January 13, 2014 consistent
with these procedures.
3) That the proposed amendment is to is to revise the Future Land Use Map (Map 3-3 in
Chapter III — Land Use Plan) in the Lake Elmo Comprehensive Plan, and to specifically
change the future land use designation a parcel of land commonly known as 9434 Stillwater
Boulevard North (PID 15.029.21.31.0001) from RAD-ALT Rural Area Development
Alternate Density to RAD Rural Area Development.
4) That the Comprehensive Plan Amendment will apply to property leally described in the
attached Exhibit "A".
5) That there have been no changes in circumstances since the Land Use Section of the
Comprehensive Plan was updated in 2006 that warrant revisions to increase or transfer
density to the subject site.
6) That higher density residential development is encouraged in areas that will be served by
public sanitary sewer where the provision of these services is more cost-effective and where
the City will receive credit towards the REC unit counts mandated under its Memorandum
of Understanding with the Metropolitan Council.
7) That the Housing Chapter of the Comprehensive Plan specifically states that any future
senior -specific housing in Lake Elmo will be best accommodated within the Old Village
Area due to proximity to goods, services, and public facilities.
8) That the subject site does not demonstrate any characteristics that are substantially different
from other areas guided for RAD development in the City of Lake Elmo or that would
indicate that higher density development is more appropriate in this area than any other site
within the City.
9) That the City is has recently adopted major Comprehensive Plan amendment related to
development in the Old Village Area and the 1-94 corridor. Given the current market
conditions, the City encourages higher density development in areas that would help off -set
the significant infrastructure costs required to serve these areas.
10) That higher density housing is not consistent with the City's stated goals to preserve and
enhance its rural character, especially when planned in areas that are guided for Rural
Agricultural Density.
11) That build -out of existing empty lots in platted and developed OP developments is
encouraged over the creation of new development and service areas in the community
12) That new access that would be needed to support development on the subject site does not
conform to the City's Transportation Plan that encourages limited access to major collector
roads and is inconsistent with the City's access spacing guidelines.
Resolution No. 2014-09
13) That the 2010 Comprehensive Plan Amendment was designed to accommodate a specific
development proposal which no longer exists.
14) That recent Met Council projections of population and household growth indicate less
overall population growth than was expected in 2010.
15) That the support of local neighbors for the 2010 development proposal was based on a
misunderstanding of the details of the proposal. The 2010 Planning Commission
recommendation was significantly driven by the support of neighbors, which support no
longer exists.
16) That the Planning Commission and City Council have become more educated and
experienced in considering higher density development. Such development should not be
considered for land not guided for sewer before 2030.
17) That the 2010 action could be considered spot zoning based on later information and
training received by the Planning Coinmission.
NOW, THEREFORE, BE IT RESOLVED, that based on the foregoing, the Lake Elmo
City Council hereby approves the Comprehensive Plan amendment, subject to and contingent upon
the following:
1) Submission of the Comprehensive Plan Amendment to the Metropolitan Council and the
receipt of formal notification from the Metropolitan Council that its review has been
completed and approved.
Passed and duly adopted this 215t day of January 2104 by the City Council of the City of Lake
Elmo, Minnesota.
Mike Pearson, Mayor
ATTEST:
Adam Bell, City Clerk
Resolution No, 2014-09
Exhibit "A"
PT OF SW1/4 OF SD SEC 15 LYING NLY OF NLY R/W OF RR DESC AS FOLL: COM AT
NELY COR SD SW1/4 THN SOODEG51'44"E BRG ORIENTED TO WACO SYS ALG ELY LN
SD SW1/4 DIST 1067.20FT THN S89DEG13'16"W DIST 289.50FT THN S48DEG14'16"W ALG
A LN HEREINAFTER REFERRED AS LN "A" DIST 36.58FT TO PT HEREINAFTER
REFERRED AS PT "C" THN SO5DEG16'16"W ALG A LN HEREINAFTER REFERRED AS LN
"B" DIST 194.90FT M/L TO PT OF INTER WITH NLY R/W LN OF HWY 5 AKA
STILLWATER BLVD N SD PT OF INTER BEING THE POB THN NO5DEG16`16"E ALG SD
LN "B" DIST 194.90FT M/L TO BEFORE DESC PT "C" THN N48DEG14'16"E ALG SD LN
"A" DIST 35.69FT M/L TO INTER WITH SLY LN OF N 1067.20FT OF SD SWI/4 THN
S89DEGO6'21"W ALG SD SLY LN DIST 24.33FT M/L TO WLY LN OF E 314.50FT OF SD
SW1/4 THN NOODEG51'44"W ALG SD WLY LN DIST 1067.20FT M/L TO NLY LN OF SD
SW1/4 THN S89DEGO6'21"W ALG SD NLY LN DIST 995.27FT M/L TO ELY LN OF W
1312.FT OF SD SW1/4 THN SOODEG41'24"E ALG SD ELY LN DIST 460.FT M/L TO SLY LN
OF N 460.FT OF SD SW1/4 THN S89DEGO6'21"W ALG SD SLY LN DIST 404.OIFT M/L TO
DESC ELY LN OF FRIEDRICH HGTS PLAT THN SOODEG41'24"E ALG SD ELY LN DIST
141.48FT THN S8ODEG54'36"W ALG SLY LN SD PLAT DIST 59.61FT THN SOODEG41'24"E
ALG SD ELY LN SD PLAT DIST 66.FT THN N8ODEG54"36"E ALG SD NLY LN SD PLAT
DIST 164.77FT THN SOODEG41'24"E ALG SD ELY LN SD PLAT DIST 5.O7FT M/L TO
INTER WITH LN DRAWN PARL WITH SD NLY LN OF SW1/4 & EXT WLY FROM IPM ON
WLY LN OF E1/2 SD SW1/4 SD WLY LN HAVING BRG OF SOODEG46'34"E SD IPM DIST
657.56FT SLY FROM NWLY COR OF SD E1/2-SW1/4 THN N89DEGO6'21"E ALG SD PARL
LN DIST 299.85FT M/L TO SD IPM THN N89DEG24'43"E ALG NLY LN TRACT DESC IN
DOC #714370 & ALG NLY LN OF PARCEL DESC IN DOC #3408380 DIST 309.19FT M/L TO
IPM AT THE NELY COR THEREOF THN SOIDEGO0'08"E ALG ELY LN SD PARCEL DESC
IN DOC #3408380 DIST 386.67FT M/L TO INTER WITH A LN HERINAFTER REFERRED AS
LN "C" DRAWN AT RT ANG & ELY FROM A PT IN SD WLY LN OF E1/2-SW1/4 SD PT
BEING HERINAFTER REFERRED AS PT "A" SD PT ALSO DIST 118.20FT NLY AS MEAS
ALG SD WLY LN OF El
4
Resolution No. 2014-09
I AKF 1\40
--•
PLANNING COMMISSION
DATE: 1/13/14
AGENDA ITEM: 5A — PUBLIC HEARING
CASE # 2014-01
ITEM: Friedrich Property Comprehensive Plan Amendment
SUBMITTED BY: Kyle Klatt, Community Development Director
REVIEWED BY: Nick Johnson, City Planner
SUMMARY AND ACTION REQUESTED:
The Planning Commission has been directed by the City Council to conduct a public hearing to
consider a Comprehensive Plan Amendment that would revise the future land use map for property at
9434 Stillwater Boulevard North. The Council has specifically asked that the Planning Commission
consider changing the future land use designation of this property from RAD-ALT (Rural Area
Development Alternate Density) to RAD (Rural Area Development). The primary difference
between these two land use categories is that the RAD-ALT designation would allow residential
densities on the site of up to 2.0 units per acre while the RAD designation would limit this number to
0.45 units per acre.
Because the Planning Commission has spent a significant amount of time over the last two months
reviewing and discussing the City's rural development areas in a fair amount of dm,A1, Staff will be
providing a more basic summary of the City's past action on this property within the present report
and will ask that the Commission refer to the previous meeting packets for additional information
concerning the history and current issues associated with the rural development areas in the
community.
GENERAL INFORMATION
Applicant: City Council initiated action
Property Owners: Irvin Friedrich, 9434 Stillwater Boulevard North
Location: 9434 Stillwater Boulevard North (part of Section 15 Township 029 Range 021).
PID Number 15.029.21.31.0001
Request: Comprehensive Plan Amendment to change the future land use designation of the
subject property from RAD-ALT to RAD
Existing Land Use: Single Family Residential/Agricultural/Agricultural Outbuildings
Existing Zoning: RR — Rural Residential
Surrounding Land Use: Single Family Residential, Agricultural, Park
Surrounding Zoning; RS — Rural Single Family; RR — Rural Residential; A — Agriculture
Comprehensive Plan: RAD-ALT (Rural Agricultural Density Alternate Density); 2.0 units per
acre
PUBLIC HEARING ITEM 5a — PUBLIC HEARING
2
Proposed Comp Plan: RAD (Rural Agricultural Density); 0.45 units per acre
Histoly: The subject property has been used as an agricultural farmstead for decades. The
future land use designation for the property was changed in 2010 in response to a
request for a senior living/farm school development proposal that has since been
rendered void due to the passing of City submittal deadlines for further review.
There are no active development proposals pending on the property. Upon receipt of
a Planning Commission recommendation to establish a moratorium on all RAD-ALT
properties, the City Council did not adopt such a moratorium and instead directed the
Commission to consider a land use change to the subject property.
Deadline fOr Action: None
Applicable Regulations:
Comprehensive Plan — Chapter III: Land Use Plan
Zoning Ordinance — Article 9: Rural District Standards
Section 154.067 — OP2 Zoning Regulations
REQUEST DETAILS
The Planning Commission has devoted time at two of its recent meetings to discuss the City's rural
development areas, and has asked that these conversations continue as part of the Commission's
work plan for 2014. The Commission will specifically be looking at potential changes to the
Comprehensive Plan that will study the following issues:
Potential population and household forecast reductions associated with the Met Council's
revised 2040 regional forecasts.
6 Elimination of the RAD-ALT future land use category.
Amendments to the rural development areas that will allow for additional development
opportunities on parcels less than 40 acres in size.
Consideration of the benefits and drawbacks of allowing additional development in rural
areas in terms of public service costs, impacts on rural character, and other factors.
In anticipation of potential changes to the City's Comprehensive Plan related to the above
discussions, the Planning Commission recommended that the City Council adopt a rnoratoriurn on all
RAD-ALT development for a period of nine months. This time period was chosen to allow time for
the 2040 Regional Forecast (and related projections for cities within the metro area) to be finalized
before the City made any long-term decisions concerning the population and household numbers
used in the land use plan. The City Council ultimately did not support the recommended moratorium
concerning RAD-ALT development, but did ask the Planning Commission to consider a more
immediate change on one of the City's properties that is guided in this manner.
The specific request from the City Council was that the Commission consider a Comprehensive Plan
Amendment to change the future land use designation of the property at 9434 Stillwater Boulevard
North from RAD-ALT to RAD. The Council's rationale for choosing only this parcel for a change
includes the following:
The City created the RAD-ALT (which was initially called RAD-2) land use category as
part of the 2005 Comprehensive Plan amendment after an extensive study and review of
the City's obligations under the Memorandum of Understanding between the City and
Met Council,
PUBLIC HEARING ITEM 5a — PUBLIC HEARING
Based on an analysis of these obligations, it was decided that the City would need to
increase densities in the rural development areas in order to achieve the household and
population requirements by 2030.
The sites chosen for the increased density (RAD-2 land use classification) were selected
for specific reasons, including proximately to sewered development, isolation from other
rural parcels, and locations along municipal boundaries or adjacent sewered communities.
• The land use designation for the subject parcel at 9434 Stillwater Boulevard was changed
based on a specific development proposal that has not materialized and is no longer valid.
Under state statutes, the City Council cannot take action to amend the Comprehensive Plan without a
recommendation from the Planning Commission and until after a public hearing has been conducted
as part of the Commission's review. The Commission is therefore being asked to conduct this public
hearing at its next meeting to gather additional feedback on this matter and to make a formal
recommendation to the City Council concerning the appropriate land use designation for the subject
property.
BACKGROUND/PLANNING AND ZONING ISSUES
The City received a land use application from Tammy Malmquist, 8549 Ironwood Trail in the spring
of 2010 to change the future land use designation of the Friedrich property at 9434 Stillwater
Boulevard North from RAD to RAD-2 (which is the same as the current RAD-ALT land use
category). This application was made in order to allow a concurrent request for a senior living,
townhouse, and farm -based preschool Planned Unit Development project to move forward. The
applicant further requested an amendment to the City's zoning regulation in order to create new OP-2
Open Space Preservation Zoning regulations that was also drafted in order support the proposed
development.
In the period of time since the Comprehensive Plan amendment for the subject property was
approved, the project applicant has not submitted a preliminary development plan and the timeframe
for submitting such a plan has expired. There is therefore no pending application moving forward on
this property, and any previous or new request for development would need to go back through a
concept plan review (with a new application, hearing, etc.).
In order to aid the Planning Commission's deliberation on the current Comprehensive Plan
Amendment under review, Staff has attached the previous Staff Report that was prepared for the City
Council when the 2010 request was initially reviewed by the City. Although over three years has
passed since this review was conducted by the City, the information specific to the Comprehensive
Plan and the applicant's site is still relevant and should be useful for the Planning Commission to
consider with the present request. Please note the following important points from this report:
• The City split up its review of the Comprehensive Plan Amendment and project development
(PUD) applications and dealt with these matters at separate meetings.
• Planning Staffrecommended denial of the Comprehensive Plan Amendment for reasons that
are spelled out in greater detail in the report.
• The Planning Commission unanimously (all nine members at the time) recommended
approval of the request to the City Council.
o The City Council, after several meetings and a workshop session, voted 4-1 to approve the
Comprehensive Plan amendment.
PUBLIC HEARING ITEM 5a — PUBLIC HEARING
4
Since 2010, the City has adopted two major amendments to the Comprehensive Plan and adopted a
new future land use map for the entire community. There were no changes made, however, to any of
the land uses outside of the Village Planning Area and 1-94 Corridor Planning Area with the
exception of minor corrections and adjustments to fir the new map.
REVIEW AND ANALYSIS
Because this matter is being directed to the Planning Commission from the City Council, Staff will
not be presenting a formal recommendation to the Commission other than to review the findings that
have been previously proposed or adopted. The Commission should consider its recent discussions
concerning rural area development as part of its review, and Staff would be happy to make any of
these past reports available to individual Commissioners (these reports are also available on the
City's website),
Staff would like to suggest the following parameters as the Commission deliberates on the present
request;
1, The Planning Commission has been asked to consider a specific Comprehensive Plan
Amendment for a specific property in the community.
A public hearing notice has been mailed to all properties within 350 feet of the subject parcel
and this hearing has been scheduled for January 13, 2014.
3 Comments and discussion concerning a specific development are not appropriate and are
irrelevant to the Council's specific request,
4. Discussion and comments concerning general land uses are appropriate, especially those that
relate to uses and densities allowed under the RAD-ALT land use designation.
5. The zoning that eon -elates to the RAD-ALT category (OP-2 zoning regulations) allows senior
living multi -family buildings, townhouses, and single family residential structures at a
density of up to 2 dwelling units per acre. The RAD category and corresponding OP zoning
allow single family homes and a very limited number of townhouses at a density of 0.45 units
per acre (18 houses per 40 acres).
6. The Council is seeking public feedback on the proposed change and will be considering this
feedback along with the Planning Commission's recommendation prior to taking action on
the proposed amendment.
Using the previous staff recommendation and City Council action as a guide, the Planning
Commission should consider the following potential findings as the basis for a recommendation to
the City Council. All of these findings are based on the information that was presented or drafted
during the 2010 City reviews:
Findings that Support No Change to the Comprehensive Plan (Leave Subject Property as RAD):
1) The current use of this site as a working farm is unique compared to other properties
designated for RAD development in the Comprehensive Plan.
2) The proposed amendment will help provide opportunities for senior housing within the
community.
3) Recent subdivisions in areas guided for RAD development have been approved at a density
below the unit levels anticipated in the Comprehensive Plan. The proposed density increase
will be offset by reductions that have previously been approved or acknowledged by the City.
PUBLIC HEARING ITEM 5a PUBLIC HEARING
5
4) The subject site is located in close proximity to public transportation along State Highway 5,
and specifically, a bus route that could provide alternate transportation options for a
residential development.
5) The applicant's site is located immediately adjacent to existing R-1 Single Family Residential
zoning districts along its southern, eastern, and western boundaries. Other areas guided for
RAD development are primarily surrounded by rural residential, agricultural, or public open
space uses.
Findings that Support a Comprehensive Plcm Amendment (Change Subject Property.from RAD-ALT
to RAD):
1) There have been no changes in circumstances since the Land Use Section of the
Comprehensive Plan was updated in 2006 that warrant revisions to increase or transfer
density to the subject site.
2) Higher density residential development is encouraged in areas that will be served by public
sanitary sewer where the provision of these services is more cost-effective and where the City
will receive credit towards the REC unit counts mandated under its Memorandum of
Understanding with the Metropolitan Council.
3) The Housing Chapter of the Comprehensive Plan specifically states that any future senior -
specific housing in Lake Elmo will be best accommodated within the Old Village Area due to
proximity to goods, services, and public facilities.
4) The subject site does not demonstrate any characteristics that are substantially different from
other areas guided for RAD development in the City of Lake Elmo or that would indicate that
higher density development is more appropriate in this area than any other site within the
City.
5) The City is has recently adopted major Comprehensive Plan amendment related to
development in the Old Village Area and the 1-94 corridor. Given the current market
conditions, the City encourages higher density development in areas that would help off -set
the significant infrastructure costs required to serve these areas.
6) Higher density housing is not consistent with the City's stated goals to preserve and enhance
its rural character, especially when planned in areas that are guided for Rural Agricultural
Density.
7) Build -out of existing empty lots in platted and developed OP developments is encouraged
over the creation of new development and service areas in the community
8) New access that would be needed to support development on the subject site does not
conform to the City's Transportation Plan that encourages limited access to major collector
roads and is inconsistent with the City's access spacing guidelines.
DRAFT FINDINGS
Please refer to the comments in the previous section.
PUBLIC HEARING ITEM 5a — PUBLIC HEARING
6
RECCOMENDATION:
Staff is recommending that the Planning Commission review the materials present above, attached to
this report, and previously considered by the Commission during its deliberations regarding the
City's rural development areas and make a recommendation to the City Council to either:
a) approve an amendment to the Lake Elmo Comprehensive Plan to change the future land
use designation of property at 9434 Stillwater Boulevard North from RAD-ALT to RAD
based on the "Findings that Support a Comprehensive Plan Amendment" as presented
above or as otherwise modified by the Planning Commission; or
b) make no changes to the Lake. Elmo Comprehensive Plan based on the "Findings that
Support No Change to the Comprehensive Plan" as presented above or as otherwise
modified by the Planning Commission,
ATTACHMENTS:
1. Staff Report — 5/4/10 City Council Meeting
2. Location Map
3. Proposed Map Amendment
ORDER OF BUSINESS:
Introduction Community Development Director
Report by Staff ....... Community Development Director
- Questions from the Commission Chair & Commission Members
- Public Hearing Corrunents Chair
- Discussion by the Commission Chair & Commission Members
- Action by the Commission Chair & Commission Members
PUBLIC HEARING ITEM 5a — PUBLIC HEARING
Location Map: 9434 Stillwater B
'I'I lE CITY OF
SAKE ELMO
9434 Stillwater Blvd. N.
Data Scource: Washington County, MN
1-10-2014
Map 3-3
•\
itt)
T)
1
Tablyn
Park'
_
1 1_
Planned Land Uses
Business Park
Commercial
LJ Limited Business
F70 Village Mixed Use
kYi Village Urban Low Density
72 Village Urban Medium Density
El Urban Low Density
r
1U11111111111111
9434
Btillwater
:1" Blvd
• w w-s 1-
. .
t.
•
TakeElino-'"
Regional,
Park Reserve
Proposed Amendment: RAD-Alt to RAD
Urban Medium Density
Urban High Density
1 Rural Single Family
Li Residential Estate
Rural Area Development
uJ Rural Area Development Alt
Public/Park
Planned Land Use
Proposed CPA: 9434 Stillwater Blvd. N.
Lake Elmo Comprehensive Plan 2030
Sources: Washington County & Metro GIS
1-10-2014
TI iE CITY OF
AKE ELMO
iszorsaaaVB
City of Lake Elmo Planning Department
Comprehensive Plan and Zoning Text Amendment
To: City Council
FrOM Kyle Klatt, Planning Director
Meeting Date: 5/4/10
Applicant: Tammy Malmquist
Owner: Tammy Malmquist; Marlene Friedrich
Location: 9434 Stillwater Blvd N
Zoning: RR — Rural Residential
Introductory Information
Application The City of Lake Elmo has received an application from Tammy Malmquist, 8549
Summary: Ironwood Trail North, for a Comprehensive Plan Amendment, Zoning Text
Amendment, Open Space Preservation (OP) Development Concept Plan, and Planned
Unit Development (PUD) Concept Plan. The individual elements of this request have
been made to allow the establishment of a 40-unit senior living multi -family building,
10 townhouse units, and a farm-themed preschool on a 30.9 acres parcel at 9434
Stillwater Boulevard North. The request would incorporate the existing family care
facility that is located adjacent to this property at 9442 Stillwater Boulevard North. As
the current owner of the 30.9-acre parcel, Marlene Friedrich has signed as a co -
applicant to this request.
Given the complex nature of this application, Staff has recommended that the City
review focus first on the Comprehensive Plan and Zoning amendments before
proceeding with a discussion of the OP Development and PUD Concept Plans. To
facilitate this two -tiered review, separate public hearings and agenda items have been
scheduled at different times with the Planning Commission as follows:
April 26: Comprehensive Plan and Zoning Text Amendments
May 10: OP Development and PUD Concept Plans
The primary reason for the staged review is to take the bigger picture items first, and
then advance with the detailed plan reviews if warranted. This process will save time
and effort if there is no support by the City Council to move forward with the
Comprehensive Plan and Rezoning. If these elements of the application are approved,
it would allow the required Met Council review to proceed while the City is
considering the development Concept Plans.
Ce,,,,;•q>rci5cii.virc• Phi n . 1 Sciden- arta 1:012?;
inci7 poii 1
The Planning Commission reviewed and conducted a public hearing on both the
Comprehensive Plan and Zoning Text Amendments, and made a recommendation to
the City Council on the first issue at its meeting on April 2611), The Commission tabled
its discussion on the latter issue and directed staff to prepare an alternate ordinance to
consider in addition to the amendments requested by the applicant. The ordinance will
he brought back before the Planning Commission at its next meeting, prior to
discussion on the OP Development and PUD Concept Plans,
Application As noted above, there are four distinct components of the applicants request, which
Details: include the following:
Comprehensive Plan Amendment. The proposed amendment would change the
future land use designation of the parcel located at 9434 Stillwater Boulevard
North from RAD (Rural Agricultural Density — 0.45 dwelling units per acre) to
RAD2 (Rural Agricultural Density — 2 dwelling units per acre). This change is
necessary to move forward with the proposed development because the current
designation as RAD would limit the overall number of units on the site to 14 units
and the project that has been requested is for 51 units (1.7 units per acre), in
addition to the existing single family residential site and proposed farm school.
The applicant has proposed shifting density from an area guided for RAD2 west of
the applicant's property to this site in order to avoid any impacts to the overall
population projections in the Comprehensive Plan.
Zoning Text Amendments. The applicant has requested an amendment to the OP
Open Space Preservation Ordinance to add requirements for development in areas
that are guided RAD2, and more specifically, to amend the OP District to allow for
the proposed multi -family senior living facility and farrn-based preschool. The
current OP Ordinance does not contain any provisions that would allow residential
development to exceed a density of 0.45 units per acre (or 18 units per 40 acres),
and although one section ties the maximum allowed density to the Comprehensive
Plan, another section very specifically limits densities in OP developments to 18
units per 40 gross acres of buildable land. The other proposed amendments to this
section include the following:
Adding Multi -Family Senior Housing buildings (only in areas guided for
RAD2) and Farm Schools for preschool and school -aged children to the list
of allowable uses in an OP development.
Reducing the minimum land area for an OP development from 40 to 20
acres in areas guided RAD2.
Reducing the amount of contiguous land required in open areas from 10 to
5 acres for land guided RAD2.
Reducing the required buffer setback in areas guided RAD2 to 50 feet from
200 feet,
Adding standards for Senior Housing Buildings in the OP minimum district
(-01 'iprch,-77, 'hit; Si'71;0!thi( t 1t11.9i
0.•if7tril /1,10
requirements table.
OP — Open Space Preservation (OP) Development Concept Plan. The ultimate
objective of the Comprehensive Plan and Zoning Text Amendments described
above is to allow the development of a 40-unit senior housing building, 10-unit
townhouse development, and farm -based preschool on a 30.9-acre property located
at 9434 Stillwater Boulevard North. Should the City adopt the requested OP
District changes, the applicant would be able to submit a request for the proposed
development in accordance with the requirements for new OP Open Space
Preservation projects. The first step in this process is the submission of a concept
plan for review, and all plans and information required as part of this submission
have been included as part of the overall application. A few of the details of this
proposal include the following:
The Wunder Years day care would remain in its current location, and
would be updated along with the existing house at 9434 Stillwater
Boulevard North to match the proposed townhouses.
• A community septic system is planned to serve the development.
One access is planned off Stillwater Boulevard to serve the project area in
the general location now used for access to the existing home and daycare.
50% of the project site area would be set aside as permanent open space in
accordance with the OP district requirements.
An open green area is planned within the center of the development area
and a common architectural theme is planned throughout the development
area consistent with the past agricultural use of the property.
A more detailed description and complete staff review of the proposed OP
Development Concept Plan will be provided at the next Planning Commission
meeting when this aspect of the request is considered. This request may only
proceed if the Comprehensive Plan and Zoning amendments are approved by the
City Council.
Planned Unit Development (PUD) — Concept Plan, In addition to the OP
Development concept plan submission, the application also includes a request for a
Planned Unit Development concept plan. A PUD is necessary to move forward
with the applicant's request since the project includes a mix of uses and activities
that would otherwise not be possible under current zoning regulations. The PUD
portion of the request will be considered by the City in conjunction with the
review schedule for the OP Development concept plan. The pending staff review
will group the concept plans together for the purpose of providing an analysis of
the request in a future report.
Property The applicant's property is located near the intersection of Jamaca Avenue North and
Information: Stillwater Boulevard North (Highway 5). The current uses consist of the original
Friederich family farmstead and related outbuildings and the Wunder Years day care
/ Ttit)/' ;;'111,;z: Wit/
7/70
facility. Other than the agricultural fields, each of these uses would be considered a
permitted residential and/or agricultural use of the property. The 30.9 acre farmstead
is zoned RR — Rural Residential while the day care site is zoned R-1 Single Family
Residential and is 29,670 square feet (0.68 acres) in size. Each property currently has
its own access to Stillwater Boulevard via two driveways that are approximately 25
feet apart.
Other notable features of the farm property include a larger wooded area in the
northeast portion of the site (referred to as the "Oak Savanna" on the concept plans)
and gently rolling topography throughout the proposed project area. The 30.9-acre
parcel extends westward to Jamaca Court North, and connects to this street via a
narrow connection point between two existing homes. The surrounding property uses
include single family homes zoned R-1 to the south and east along Stillwater
Boulevard, and agricultural uses located to the north and east that are zoned A —
Agriculture and RR — Rural Residential. The Washington County Landfill and
Sunfish Lake Park is located further to the north and northwest for the latter.
Applicable Section 150.175 through 150.189 OP Open Space Preservation
Codes:
Describes the process and requirements associated with an OP Open Space
Preservation development. The applicant has requested an amendment to this
section of the City Code in order to allow a multi -family senior living building and
farm -based preschool as part of an OP development.
Section 154.020 Amendments
Outlines the process and requirements for requesting an amendment to the
Zoning Ordinance. Of particular interest, please note Subsection (J) which
reads: "Conformance with Comprehensive Plan. In granting or recommending
any rezoning or other permit provided for in this chapter, the Zoning
Administrator, the Planning Commission, or Council shall find that the
proposed development conforms substantially to the policies, goals, and
standards of the Comprehensive Plan."
Section 154.036 RR — Rural Residential
Outlines the general requirements for the RR Rural Residential Zoning District
in Lake Elmo.
Section 154.070 through 154.075. Planned Unit Development
Describes the process and requirements for submitting an application for a
Planned Unit Development.
Findings & General Site Overview
Site Data: Lot Sizes: 30.9 acres and 0.68 acres
Existing Uses: Single Family Residences/Agricultural/Agricultural Outbuildings
h;');.v.iVu um/
Fy CoisHc;I t;
Existing Zoning: RR — Rural Residential and R-1 Single Family Residential
Future Land Use: RAD — Rural Agricultural Density and Neighborhood Conservation
Property Iden/iflcation Numbers (PID): 15-029-21-31-0001 and 15-029-21-31-0003
Comprehensive Plan and Zoning Text Antendment Review:
Comp Plan
Analysis
Staff
Comments:
Of all the land use requests that are considered by a Planning Commission, a City has
the most discretion to approve or deny proposals to amend the Comprehensive Plan.
For communities within the Twin Cities metropolitan area, this discretion is limited
somewhat by the Metropolitan Council, which requires cities to update their plans
every ten years and has the authority to review all requests to amend an approved
Comprehensive Plan. In this case, if the City decides to move forward with the
proposed amendment, the proposed change will need to be reviewed by the
Metropolitan Council before it can be officially adopted by the City. The update must
also be submitted to adjacent communities for review and comment before the Met
Council will take action on the proposal, and once accepted, there is a 60 day review
period that can be extended an additional 60 days if needed.
In general, Cities may consider an amendment to a Comprehensive Plan for several
reasons. Below are some specific examples as listed in the Met Council's Local
Planning Handbook:
• Changes resulting from interim planning activities such as master plans,
redevelopment plans or annexation
A need to change a land use designation to allow a proposed development.
• Routine update of a public facilities element, such as a parks plan
• A text amendment to revise a land use category, policy or other description
• A routine update to incorporate new information such as census figures
The applicant's request clearly falls under the category of a land use designation
change to allow a proposed development; however, there is much more to the
Comprehensive Plan than just the simple designation of future land uses on a map. In
Lake Elmo's situation, the City's Comprehensive Plan includes many other sections
devoted to housing, provision of water service, transportation, and other elements that
form a unified set of goals and objectives for the City. Any proposed land use changes
should remain consistent with the other policies within the Comprehensive Plan or
may otherwise need to be considered in the context of a larger update to the plan.
In order to support an amendment to a Comprehensive Plan, planners will typically try
to identify circumstances that may have changed since the plan was last updated to
support a change in the future land use designation or other components of a plan. For
instance, market conditions may have led to assumptions concerning the rate of
growth that are incorrect or a transportation improvement may have opened up new
areas for development that were otherwise inaccessible. In Lake Elmo's case, certain
sections of the plan will be updated this year, while the land use section was last
rani/
COHOCII pf,i7; .t'.1/10
updated in 2006. It is staffs opinion that, if anything, conditions have changed during
this period of time in a manner that is not conducive to the request being considered
by the Planning Commission. Specifically:
The economic downturn has led to a very slow rate of build out in the more
recent OP developments. It is in the best interest of the City and each affected
neighborhood to encourage new building to take place on lots that are currently
vacant and served with water, roads, sewer, and other services and not in new
areas with no or limited existing services.
• The City is lagging well behind the development phasing planned for urban
service areas (with no growth in these areas to date) while OP development
have only in the past few years begun experiencing the severe downtown in
building activity. A multi -family project is more typical of the type of
development planned for the urban service areas.
• The City's Comprehensive Plan and the Memorandum of Understanding
between Lake Elmo and the Met Council includes provisions that will allow
the Council to assess penalties against the City for failure to reach target
population figures in sewered residential areas. Given the potential for
penalties associated with a slow rate of build -out, larger projects should be
directed to the urban service areas where they would help meet the
development milestones in the Plan.
• Although it appears that the overall pattern of development in areas guided for
RAD density in the Comprehensive Plan will result in a lower overall
population living in these areas than previously estimated, the overall impacts
to the City's infrastructure and planning policies will be much lower if the
current trend is followed than by increasing the allowed densities by over four
times the amounts projected in some of these areas. On the applicant's site, the
current zoning would permit a density of three dwelling units (or up to 14 units
if combined with adjacent parcels) verses the 51 units that have been
requested.
• The re -allocation of densities throughout areas guided for RAD and RAD2
should be considered within the larger context of where these densities may
best be integrated with surrounding land uses and where they can best be
provided with public services (even if these services are somewhat limited in
OP developments). There has been no substantial change since the land use
plan was updated to indicate why the applicant's site would be better -suited for
additional density verses the areas currently guided RAD2.
Other general comments from Staff:
• The applicant has proposed to re -allocate densities from an existing RAD2
property in order to permit the proposed 50-unit project without increasing the
overall population projections for the City. In order to keep the overall
population projections level for the City, this would reduce the density of an
existing RAD2 areas to accommodate this change. There are currently around
if 1 .7/10
Zoning
Amendment
Staff
Analysis:
140 total acres guided RAD2 which could theoretically accommodate up to
280 new housing units. If the proposed Comprehensive Plan amendment is
approved, a net transfer of 37 units in excess of the current OP standards would
be required (14 allow at .45 units per acre compared to 51 requested units).
This transfer would reduce the overall density on the 140 acre sites to
approximately 1.75 units per acre (or less if borrowed from just one property).
There has been no discussions with the current property owner of the 103 acre
parcels that are guided RAD2 to the west of the applicant's site that the overall
density on this site may change (or any of the RAD2 guided property owners).
Although the land use description for RAD2 notes that "limited life cycle
housing" would be appropriate in these areas, there are no other references to
such housing in RAD or RAD2 guided land. In fact, the housing section of the
current plan states very specifically that "Any future senior -specific housing in
Lake Elmo will be best accommodated within the Old Village Area due to
proximity to goods, services, and public facilities. The combination of senior
housing needs and village scale housing density may result in attached housing
of some description".
• The Comprehensive Plan calls for the City to make some fairly substantial
investments in public sanitary sewer services, and Staff recommends that any
developments that exceed the base densities allowed in rural areas be directed
to the urban service areas where such developments can help support the
provision of these services.
• The applicant's plan would place additional traffic directly on to Stillwater
Boulevard at a new intersection that is not consistent with the recently -
prepared Transportation Plan. The Plan specifically encourages the use of
collector streets and limiting access to major roads The proposed project also
does not comply with MnDOT's or the City's access spacing guidelines.
Based on the reasons provided above, Staff recommended that the Planning
Commission recommend denial of the request to amend the Comprehensive Plan to
change the future land use designation of the applicant's site from RAD to RAD2.
Draft findings were also presented to the Planning Commission consistent with the
review comments noted above. The Commission ultimately did not support the
position taken by Staff and developed a revised list of findings that are included in the
Planning Commission report that follows.
The second part of the request that was considered by the Planning Commission
concerns the proposed amendments to the OP Open Space Preservation District as
detailed in the applicant's submission materials and summarized by Staff in this
report. Many of the changes proposed would apply on to areas designated as RAD2,
and in particular, senior -living dwellings would not be peiiuitted outside of land so
designated. If approved, the proposed changes would apply to all portions of the City
guided for RAD2 development, which includes 103 acres at the western edge of the
City along Stillwater Boulevard and a smaller 36-acre area immediately north of 10th
Street at its intersection with Manning Avenue. This would open up these parcels for
a similar senior -living or school project.
Looking at the proposed zoning amendments in a general sense, Staff offered the
following comments for consideration by the Planning Commission:
• The current OP Ordinance does not contain provisions that would allow
densities to exceed the 0.45 units per acre maximum in the code even in areas
guided RAD2. At some point, this discrepancy should be addressed so that the
densities allowed in the Zoning Ordinance are consistent with the
Comprehensive Plan.
• If approved, the proposed amendments would not alter the maximum permitted
density in areas guided RAD2, and would primarily amend the types of uses
that would be permitted in such areas.
• Rather than amending the current OP Ordinance provisions, Staff would
recommend that an overlay zoning district be created for RAD2 that would
require compliance with all OP development standards with specific
exceptions that would allow higher densities in RAD areas. This approach
would leave the current OP Ordinance as -is while focusing a new overlay
district only in specific areas to accommodate higher densities.
• The proposed language in 150.180 (B, 2, g) should read "per gross acres of
buildable land" to he consistent with the current OP requirements.
Given the allowance for larger buildings up to three stories in height, Staff
recommends that the buffer setbacks (Section 150.180 11, 2, d) be left as
currently written since a larger buffer should be provided in cases where there
is greater potential fbr dissimilar uses to be located next to each other.
The Planning Commission may want to consider whether or not Farm Schools
should be permitted in all OP developments as the proposed draft would allow.
• The Zoning Ordinance only permits buildings over 35 feet in the BP Business
Park and PF Public Facility zoning districts. The maximum height for Senior
Housing Buildings as proposed would be 48 feet.
• The OP district standards table should include setbacks from side and rear
property lines for Senior Housing Buildings.
The Planning Commission chose to table taking action on the Zoning Amendment,
and requested that Staff prepare an alternate to the applicant's proposal that would
create an overlay zoning district instead of amending the existing OP Ordinance. The
Commission requested that the same standards proposed by the applicant be used to
draft overlay regulations.
With the separation of the concept plan review from the Comprehensive Plan and
Zoning Amendments, Staff will not be providing a detailed analysis of the submitted
concept plans at this time. These plans were been provided, however, as part of the
Commission's review materials since the application was submitted at one time. The
project narratives and required submissions are also intertwined and are being
prc.c /.; SCii7(//' 1
Co,rni.i! 16. 11;
Concept Plan
Issues:
presented in one package of infon-nation rather than splitting up certain pieces of
information between the two scheduled meeting and hearing dates. Also, the Planning
Department has asked for all comments from other agencies and internal staff on the
entire application, and all comments that have been submitted to date are included as
part of the Council meeting material.
In order to give the City Council, and the applicant, a quick overview of the major
issues associated with the concept plans that have been identified to date, please
consider the following:
The Minnesota Department of Transportation has indicated that it will require
certain improvements to Highway 5 if access is provided as shown on the
concept plan. Specifically, a right turn lane and escape lane for eastbound
traffic will be required at the new entrance road.
• The City Engineer has recommended that the concept plan be revised to
provide road connectivity to the east and north with the development proposal.
• The water plan does not appear to meet fire flow requirements for the proposed
improvements since the new eight -inch pipe as shown on the utility plan
connects to an existing four -inch water pipe at the edges of the development.
• The stonn water management and drainage and erosion control plan will need
to address the City's recently adopted storm water quantity and quality
standards.
A small portion of the site is located within a shoreland district and will need
to comply with any applicable shoreland ordinance requirements.
The City of Oakdale's Fire Chief has been asked to review the plans from a
public safety perspective since the applicant is married to Lake Elmo's Fire
Chief.
• The proposed landscape plan does not accommodate the minimum number of
trees required under the OP Ordinance.
• The community septic system and a portion of the trail system are shown
within and power line easement. The City should receive an acknowledgement
and consent from the easement holder in order to perrnit these encroachments.
• Staff would suggest a greater amount of spacing between the proposed tree
preservation area and the buildings and roads on the site. The City should
evaluate whether or not it is appropriate to use the required open space areas
for storm water retention ponds.
A more thorough review and analysis of the proposed concept plans will be
forthcoming from Staff should the Comprehensive Plan and Zoning Amendments be
approved by the City Council. Should approvals be granted, the City will need to
discuss the review schedule with the applicant since no action may be finalized with
regards to the Comprehensive Plan until the Met Council has completed its review.
l'1717H
1();mcit
Staff Based on the report and analysis provided above, Staff recommended that the Planning
Recommoulation: Commission recommend denial of the request to amend the Comprehensive Plan to
change the future land use designation of 9434 Stillwater Boulevard North from RAD
to RAD2. Consistent with this recommendation, Staff further recommended that the
Planning Commission recommend denial of the proposed text amendments to the OP
Open Space Preservation Ordinance,
Pending Council action on these items, a separate recommendation from Staff
concerning the OP Development and PUD concept plans will presented at the next
Planning Commission meeting.
Additional Comments have been received for all four aspects of the applicant's request from
Information: MnDOT, Valley Branch Watershed District, the City of Oakdale Fire Department, and
the City Engineer are attached for consideration by the City Council.
In addition to the applicant's submission materials, staff has also attached an aerial
image of the site and Future Land Use Map from the Comprehensive Plan identifying
the applicant's site and the two areas currently guided as RAD2.
Planning Commission Report:
Planning
The Planning Commission reviewed the request for a Comprehensive Plan
C0111MiSSiOn
Amendment and Zoning Text Amendment and conducted a public hearing on each of
Review and
these items at its April 26, 2010 meeting. At the meeting, the following feedback was
Public
provided to the Commission:
Hearing:
Tammy Malmquist explained her overall goals and objectives behind the
proposed senior living and farm school project. She also introduced Jan
Friedrich, who talked about her father's discussions with Mrs. Malmquist
concerning the future of this property.
Tim Freeman with Folz, Freeman, Erickson, Inc. suggested alternative
findings in support of the proposed Comprehensive Plan Amendment.
Seven people spoke in favor of the amendments needed to support the project.
Council -member Ann Smith addressed the Commission and reviewed some of
the history behind the preparation of the Comprehensive Plan, and in
particular, the creation of a separate RAD2 land use designation.
Eight letters of support were submitted and distributed at the meeting. These
letters are included as part of the Council agenda packet.
One additional letter of support was submitted by a resident who also spoke
during the public hearing.
Staff noted that Ed Nielsen, 9498 Stillwater Boulevard North, had contacted
the City via telephone earlier in the week to express his support for the
project.
Planning
Commission
Reconuna
• The project consultant submitted a list of neighbors that had attended a March
31, 2010 meeting conducted by the applicant to discuss the project (seven
neighbors were in attendance of this meeting).
The Commission reviewed the Staff recommendation and considered the comments
submitted in writing and verbally at the meeting. The Planning Commission
developed findings of fact to support the proposed Comprehensive Plan Amendment,
and by a unanimous vote of 9-0, recommended that the City Council approve the
request to change the future land use designation of the applicant's property from
RAD to RAD2. The 'Planning Commission tabled taking any action regarding the
proposed amendments to the OP Open Space Preservation Ordinance; however, and
instead directed Staff to prepare an alternate to the applicant's request that would
create a separate overlay district with the same standards.
The overlay district to be considered by the Planning Commission would include the
following as specific exceptions to the existing OP Ordinance:
• Allowing a density of 2 units per acre.
• Adding Multi -Family Senior Housing buildings and Farm Schools for
preschool and school -aged children as allowable uses.
Reducing the minimum land area required from 40 to 20 acres.
• Reducing the amount of contiguous land required in open areas from 10 to 5
acres.
• Reducing the required buffer setback to 50 feet.
Adding standards for Senior Housing Buildings.
In developing its findings of fact, the Planning Commission was concerned about
setting precedent with the approval of the Comprehensive Plan amendment. The
Commission's findings describe some aspects of this site that that the Commission has
indicated set it apart from other properties that are guided for RAD development.
A complete record of the Planning Coinmission's findings is listed as part of the
formal recommendation below.
The Planning Commission Recommends that the City Council approve the
Comprehensive Plan Amendment to change the future land use designation of the
parcel located at 9434 Stillwater Boulevard North from RAD (Rural Agricultural
Density — 0.45 dwelling units per acre) to R.AD2 (Rural Agricultural Density — 2
dwelling units per acre). The Planning Commission further offers the following
findings to support this recommendation:
1) The current use of this site as a working farm is unique compared to other
properties designated for RAD development in the Comprehensive Plan.
2) The proposed request will help fulfill a need for senior housing within the
comm unity.
'(21M
3) Recent subdivisions in areas guided for RAD development have been approved
at a density below the unit levels anticipated in the Comprehensive Plan. The
proposed density increase will be offset by reductions that have previously
been approved or acknowledged by the City.
4) The applicant's site is located in close proximity to public transportation along
State Highway 5, and specifically, a bus route that could provide alternate
transportation options for seniors.
5) The applicant's site is located immediately adjacent to existing R-1 Single
Family Residential zoning districts along its southern, eastern, and western
boundaries. Other areas guided for RAD development are primarily
surrounded by rural residential, agricultural, or public open space uses.
6) There has been broad public support for the proposed project and no objections
from neighboring property owners have been filed with the City.
cc: Tammy Malmquist, 8549 Ironwood Trail
Folz, Freeman, Erickson, Inc.: 12445 55'1' Street N
nx-/nrop
TI,i���l�U�LM[\
City wYLake Elmo
Planning Commission Meeting
Minutes ofJanuary 13,2014
Chairman Williams called to order the meeting of the Lake Elmo Planning Commission at
COMMISSIONERS PRESENT: Williams, Lundgren, Dodson, Haggard, Dorschner, Kreimer
and Larson;
COMMISSIONERS ABSENT: Yocum and K4nrreale;and
STAFF PRESENT: Community Development Director K|attand City Planner Johnson.
Elections:
M/S/P:Dodson/Lundgren:move to nominate Williams Chairperson, vote 7:O
K4/S/P: Oorschne//Haggard: move to nominate Dodson as Vice Chairperson, vote: 7-0.
K4/S/P: Haggard/Dodson, move to nominate DVrSchn8r as Secretary, vote 7-0.
Approve Agenda:
Agenda accepted aspublished,
Approve Minutes: December 9, 2013
M/S/P:Dodoon/Kreirner,move to accept the minutes a5presented, vote: 7{Lwith
Haggard and Dorschnernot voting.
Public Hearing: Comprehensive Plan Amendment —9434Stillwater Blvd,
Klatt began his presentation by explaining important terminology in the Comprehensive
Plan related to rural areas. More specifically, he explained the significance of Rural Area
Development (RAD), Rural Area Development —Alternate Density (RAD'Alt), Open Space
Preservation District (OP) and (}pen Space Preservation Overlay District /OP-2\. RAO-Alt
a|1Ovvs for open space project with an increased density than what is 3l|Ovxed in the rural
areas under the standard OPOrdinance.
Providing purpose of tonight's hearing, Klatt noted that the City Council has directed the
Planning Commission tnhold apublic hearing tUreconsider the appropriate future land
Lake Eli -no Planning Commission Minutes; 1-13-14
2
use designation for the property at 9434 Stillwater Blvd. (TlH-5). He noted that the City
Council asked the Planning Commission to consider the specific property at 9434
Stillwater Blvd. because the subject property was not included in the Cit«'5o[igina|
comprehensive planning process. While other properties were designated with the
RAD'A|t classification to meet the Cit«'s required growth forecasts, the subject property
was changed from RADtoRAD-A|tthrough a separate comprehensive plan amendment
related too senior|iving/farnn school development.
To put it simply, the Planning Commission is asked to make a recommendation to the
City Council on what is the best future land use category for the subject property.
K|att moved On to explain further history about the site, including the various iterations
of proposed development on the site, Currently, there is no active development
application that isvalid for the site,
Nattalso provided 8description ofgeneral site characteristics. The site is immediately
north VfTH'5. The site isbounded byactive farms to the north, with Sunfish Lake Park
tnthe northeast, Tothe west, the site |s adjacent tomultiple single family lots that are
guided rural single family. In addition to showing an aerial map, K/att presented the
future land use map ofthe Comprehensive Plan, specifically zooming |nonthe area
surrounding 9434Stillwater Blvd. N.
To aid the discussion, Klatt added that the Planning Commission has reviewed the rural
development areas ofthe City atprevious meetings. More specifically, the Planning
Commission has discussed l) a desire to look atdevelopment options for smaller rural
parcels. 3>the growth forecast will likely be lowered and less growth is anticipated in
these rural development areas. 3)the RAID o|tcategory could be eliminated as it was
initially created toaccommodate the Cities ZO3Oforecast numbers. 4)part Ofthe
Planning Commission Z014work plan istVlook atrural development areas onoCity
wide basis.
Klatt retraced the history of the original comprehensive plan amendment action. The
staff recommended denial nfthe comp plan amendment and provided findings related
to denial. The Planning Commission unanimously recommended the comp plan
amendment for approval. The City Council affirmed the Planning Commission's
recommendation with a4'1vote.
K|atthighlighted the role nfthe planning commission in holding public hearing on land
use items. |naddition, Klattprovided 8list ofwhat isappropriate for the public hearing
before the Planning Commission. For example, the action before the Planning
Commission is focused on the appropriate land use Category (RAD or RAD-A|t) for the
subject property, and not focused on specific development proposals.
Lake Elmo Planning Commission Minutes; 1-13-14
Finally, K|att presented two sets of draft findings for consideration by the Planning
Commission, K/ott presented the draft findings from the original staff report that
recommended denial, Healso presented the draft findings that the City Council made
when approving the comp plan amendment |n2Ol0. Henoted that staff isnot making a
specific recommendation atthis time. Hepresented the Planning Commission with two
options. 1) Amend the Comprehensive plan to change the subject property from RAD-
a|tto RAID 2) Make no change tothe Comprehensive Plan and leave the subject property
as RAD'a|t.
Dorschnerasked ifthe site isplanned for future sewer service. Nattnoted that the site
is not currently guided for sewer per the comprehensive plan but there is City water,
Haggard asked about the land uses that are allowed inRAD. K1attnoted that )t/s
primarily single family homes, with a small allowance for townhomes,
Williams invited the landowner to speak.
Janice Green provided background regarding the history ofthe site. She noted that the
original landowner was presented with the idea ofmaking the original farm into 8farm
school. The idea ofofarm was strongly supported bythe land owners and their father.
She wanted itnnthe record that the landowners are requesting the land use guidance
rennainRAO'Alt.
Public Hearing opened at7/47pnn.
Larry Weiss, 9]02Stillwater Blvd. N,stated that hemoved toLake Elmo to enjoy open
space and rural lifestyle. He noted that he originally supported the farm school, but
soon changed his mind when the density of the senior living component increased. He
also noted that the original development proposal has fallen through, Due to this status,
the land use guidance should be changed back toRAID, Hestated that heiswilling to
work with the property owner onother development projects, bV1Dothigherd2nshx.
Healso highlighted some polls orsurveys that indicated that the surrounding neighbors
were strongly opposed tnRAD'A|tand the senior living component.
EdNielson, 9498Stillwater Blvd. N,stated that hemoved to aproperty adjacent tothe
Friedrich farm in 1997. Nielson provided background information ofhow the farm
school and senior living proposal developed. Healso presented a comparison chart of
some analysis he completed ofsurrounding senior living developments, He commented
that 98Y6Ofthe surrounding neighbors are against the previous development proposal.
Stewart He|Qeson, 11150 12 1h Street N, stated he has lived in Lake Elmo for 15 years. He
commented that it makes no sense to change the land use guidance back to RAID until a
project is on the table. If development proposal comes forward, then the comp plan
would have to b2amended once again. Procedurally, this does not make alot ofsense.
Lake Elmo Planning Commission Minutes; 1-13-14
4
Public hearing closed at7:50pno.
Haggard stated that it was previously explained that the RAD-Alt designation was
necessary onthis site due tothe numbers for the Met Council. The projectionshave
decreased sothere isnoneed for the RAD-A|tdesignation onthis property.
Williams stated he supports the motion but would like tVadd the following findings of
fact. 1\the 20I0Connp Plan amendment was in part based on a specific development
that no longer exists 2\the action in 20I0 is very similar to a spot zoning, 3)the RAD-Alt
designation is no longer needed to meet the Met Council projections 4\ the neighbors
supported the change at the time based on a misunderstanding of the information and
their support no longer exists 5) higher density development should be provided with
public utilities,
M/S/P: Haggard/Dorschner, move to recommend an amendment to the Comp Plan to
change the land use designation from RAD'A|tto RAD at9434Stillwater Blvd. N. based
Vnthe findings inthe Staff Report, Vote: 7-O, motion carries unanimously.
Larson asked if farm school can be an allowed use 'in RAID. Klatt stated that there would
have tobeanamendment tOthe zoning code tospecifically make itanallowed use.
Haggard asked if the farm school could bedone byCUP, K1attstated that |twould need
tobgspecified auaconditionally allowed use.
Lundgren asked ifthere was currently afarm school inLake Elmo, K1@ttstated that
there isone inWest Lakeland,
K4/5/P�VVU|iarno/DomChner,move to amend the motion toinclude Sadditional findings
offact as provided by Chairman Williams to staff, Vote: 7-0, motion carries
unoninnoua|y,
Kreimer noted that he supports both motions, but wanted to add that the City still has
to meet certain amount of development as guided by the MOU.
D0dg)O stated that having a similar plan locate here does not make sense so it is
important tOchange itback.
DDr5hcnerstated that without changing thezonjngbackthe[itv/s basically saying that
the higher density |s appropriate here.
Business Item: 2014 Planning Commission Work Plan
Lake Elmo Planning Commission Minutes; 1-13-14
Klatt talked about the work plan and stated that they come up with an aggressive plan
and then prioritize the items on the plan with the knowledge that not everything will
probably get done.
Business Item: 2013 and 2014 Work Plan
Klatt presented the 2014 Work Plan and stated that there a number of large scale items,
Those include general comprehensive Plan initiatives, reducing oreliminating the K4OU,
updating the Village AUARwhich isdue every 5years, updating the airport zone,
becoming more active with the Parks Commission and it will be a busy year for platting
and development reviews.
Haggard asked if the Planning Commission could be provided with the City Council Work
Plan tobetter understand the big picture. He stated
Larson noted that he is the liaison with the Parks Commission. He is available as a
resource, and iswilling to help with the communication between the Commissions.
The Planning commission reviewed the Work Plan
Williams asked that specific development ordinances and general performance
standards should be a higher priority.
Do[lChner noted that outdoor wood burning furnaces can present real prVb|grn if
unaddressed hythe Chv'sordinances. He suggested raising the priority.
Dodson asked about the permit works planning softvva[e. He asked if there is a public
cVnnponent. K|at1noted that the City atthis time is only using the Building Permit
Module, However, there may beopportunities inthe future toallow for more external
user interaction with the vvebJiteand software,
Dodson asked what kind nfimpact the volume of development applications that are Vn
the horizon can have onthe staff. Klgttstated that itishard toprioritize because there
are time constraints, nnapplications. The staff has put policies inplace so the
applications are processed more timely.
Dodson asked about 8 market study for downtown. Klatt explained that the market
study will be used to determine what types of uses and businesses we want to see in
downtown. Dodson vvnV/d like to see this sooner than later and would like the priority
tobeaI.
Williams asked about the Lake Elmo Ave Village surface waterstudy with Washington
County. Johnson stated that this has started smshould belisted 8siDprocess, The crux
Lake Elmo Planning Commission Minutes; 1-13-14
b
of this is a drainage study and to plan for the reconstruction of the road from 301h to
TH5and includes some therninge(ennents.
Dodson asked about the newspaper article indicating that the trend istomove back to
the City. Could some ofthat data help with getting rid of the K4OU? Klatt stated that it
could and that is probably why the forecast numbers went down.
Williams wants tosee the village parkway ofthe railroad crossing solved. K|atthas been
working with the Engineers on this issue. The next step will be the application to create
anew opening and have public meetings.
Dodson would like tosee the review ofpublic community septic systems policy bea
higher priority. He would suggest a ZorI %|attstated that this refers tothe 2D1
systems which we haven't put good policies in place for. Dodson would like bJadd an
item for private community septic systems tothe list. K|attstated that part ofthe
oversight has turned the compliance ofthese systems over tothe County.
Dodson asked about the disasterp|an. Johnson stated that iti3something the Planning
Staff is working on in conjunction with the Building Official.
Business Item: Zoning District Cleanup Amendment
Iohnson talked about the cleanup to remove all outdated and unnecessary zoning
districts. This cleanup will improve the organization ofthe document. The cleanup will
remove ZO zoning districts, 19 of which are holding districts. ]ohD3VD went through
which ones are being removed and which ones are being kept and why.
Updates and Concerns
Council Updates
1. The City Council confirmed the findings for the District 916 CUP at the December
l7,ZOI]meeting.
2. The City Council adopted the Village Land Use Plan atthe December l7,2Ol3
3. The City Council approved the Boulder Ponds PUD Concept Plan at the December
l7,ZO13meeting.
Staff Updates
1. Planning Commissioner Terms
2. Planning Commissioner Journal Articles
3. Upcoming Meetings
Lake Elmo Planning Commission Minutes; 1'13-14
7
a. January 27,2Ol4—Ipublic hearings and one sketch plan
b. February 1[i2Ol4
o. February 24,ZO14
Commission Concerns -None
Meeting adjourned at9:4Oprn
Respectfully submitted,
Nick Johnson
City Planner
Lake Elmo Planning Commission Minutes; 1-13-14.
'F1 IF CITY
iL\1,/,',EFLMO
AGENDA ITEM:
SUBMITTED BY:
THROUGH:
REVIEWED BY:
4. ay' - • v.', T.', , • t .^•
DATE: January 21, 2014
REGULAR
ITEM # 14
Community Development Department 2014 Work Plan
Kyle Klatt, Community Development Director
Dean Zuleger, City Administrator
Planning Commission
Nick Johnson, City Planner
SUGGESTED ORDER OF BUSINESS:
Introduction of Item Community Development Director
Report/Presentation Community Development Director
Questions from Council to Staff Mayor Facilitates
Call for Motion Mayor & City Council
Discussion Mayor & City Council
Action on Motion Mayor Facilitates
POLICY RECCOMENDER: Staff and Planning Commission
FISCAL IMPACT: Not yet specified. Certain items on the work plan may require outside
assistance. Staff will seek Council direction as appropriate prior to utilizing such assistance.
SUMMARY AND ACTION REQUESTED: The City Council is being asked to review and
accept the Community Development Department's annual work plan for 2014 that has been
prepared with input from the Planning Commission. Th.e Council is asked to review the plan and
comment on it so that the Planning Commission and Council are communicating about priorities
at the start of the year. The primary intent of the work plan is to help prioritize the projects the
Planning Commission will be reviewing over the course of 2014, and to also help keep the
Commission informed about the internal planning related activities and projects that will he
undertaken by the Staff over the coming year. This is a working document that provides
guidance to the Commission and Council yet has the flexibility to respond to priorities as they
emerge. It will also help the Commission gauge its progress at achieving some of its goals for
the year.
-- page 1 --
City Council Meeting [Regular Agenda Item 147
January 21. 2014
The plan has been drafted in a format similar to the one used for previous years, using the format
and codes that were include in last year's work plan. Please note that this document is intended
to augment the City-wide work plan recently adopted by the Council, and all land use items on
the Council's work plan have been assigned a high -priority designation in the attached
document.
The recommended motion to act on this is as follows:
"Move to accept the 2014 Community Development Department Work Plan"
LEGISLATIVE, HISTORY/PLANNING COMMISSION REPORT: The work plan as
recommended by the Planning Commission was prepared using the previous year's plan as a
template and tracking any changes (deletions and additions) that were used to create the new
document. The version that is attached for consideration by the Council has had all revisions
made in order to present a final, clean document for review.
The Planning Commission reviewed the work plan at its January 13, 2014 meeting and
recommended approval with a minor modifications that have since been made to the document.
BACKGROUND INFORMATION (SWOT): Adoption of a work plan helps provide for an
increased level of accountability within the department and also helps to ensure that the Planning
Commission and City Council are in agreement concerning the overall priorities for the
Community Development Department for the year. The one drawback to the plan that has been
recommended is that it is fairly extensive, and not all items are likely to be completed by the end
of the year. In addition, there is potential for the Planning Commission to receive a much higher
number of land use applications this year than has been submitted in previous years, which
would make achieving some of the broader goals somewhat difficult.
RECOMMENDATION: Based upon the above background information, Staff report, and
Planning Commission recommendation, it is recommended that the City Council accept the 2014
Community Development Department Work Plan by undertaking the following action
"Move to accept the 2014 Planning Commission Work Plan"
Alternatively, the City Council may make modifications to the Plan as it deems necessary and
adopt the work plan with modifications.
ATTACHMENTS:.
1. 2014 Community Development Departrnent WorkDepartment Plan
— page 2 —
2014 Community Development Work Plan
Prepared by the Lake Elmo Planning Commission: 1/13/14
Accepted by the City Council: 1/21/14
T1 IF, (:FFY (
LAKE -71_,M0
Key:
Status: C — Complete
IP — In Progress
Date: A — 0 to 3 months
(Completion B — 3 to 6 months
Goal) C — 6 to 9 months
D — 9 to 12 months
Admin: Staff Projects/Initiatives
PL: Priority Level (1-5 with 1 being the highest priority)
Project and Description
ZONING INITIATIVES
Zoning Map Updates
• Adopt map changes necessary to implement Comprehensive
Plan amendments for Village
General map updates and corrections
Implement zoning map changes for specific developments in
the Village and 1-94 Corridor.
Zoning Permit Tracking
• Develop system for tracking of planning and zoning permits,
including Conditional Use Permits, Interim Use Permits,
Variances, Planned Developments, and other applications
Date PL Status
(Months)
A 1 IP
Zoning Text Amendments (Zoning Code Update)
• Accessory buildings A 1 IP
Exterior storage B 2
General performance standards C 1
Specific development standards C 1
O Open Space Ordinance update (OP and OP-2) D 3
O Public Facilities ordinance amendments D 4
Zoning Text Amendments (General)
* Outdoor Lighting Ordinance Revisions A 1
• Animal ordinance A 1 IP
Outdoor Wood Burning Furnaces D 5
Form -based Code
• Prepare a scope of work to be accomplished including the A
need for outside assistance
Draft a form -based code to supplement the Village Mixed -Use C 2
zoning district based on the scope of work
Incorporate design standards from the Design Standards C 2
Manual as part of a form -based code
Airport Zoning
• Resolve zoning conflicts with the Metropolitan Airports
Commission, Met Council, MnDOT, and Washington County
Implement City airport zoning regulations for the airport safety D 2
zones within the Village Planning Area
Permit Software Implementation
Complete PermitWorks database for City parcels 6 4
Add Planning Module from PermitWorks to track planning and B 1
zoning applications
Sign Code Update
• Review sign code for consistency with new zoning districts
and economic development goals and objectives
Subdivision Ordinance
• Review ordinance for consistency with ongoing zoning
amendments
D
Development Reviews
• Savona Final Plat and Developer's Agreement A 2 IP
Boulder Ponds Preliminary and Final Development plans B 2 IP
Landucci Goetschel Property development B 2 IP
Ryland/Pratt Homes Landucci Property development B 2 IP
Hammes Property development C 2
Chase Easton Village (Village) sketch plan review C 2 IP
Engstrom Village development C 2
• Gonyea Homes Village development C 2
1-94 Commercial development C 2
PLANNING...w,TIATlygs
Village Area Planning
• Prepare Village Area AUAR five-year update A 1
Participate in Lake Elmo Avenue/Village Storm Water study 0 2 IP
with Washington County
2
Conduct Village Area market area study through U of MN 6 2
Extension Service
• Submit application for new Village Parkway railroad crossing D 1 IP
• Develop street design and cross section for Village Parkway A 1 IP
I-94/10th Street Corridor Planning
• Develop street design and cross section for 51h Street minor A 1 IP
collector road
General Comprehensive Planning
Reduce the population expectations to 18,000 by 2040 A 1 IP
Eliminate the Memorandum of Understanding with the Met 6 1 IP
Council
• Review Comp Plan for consistency with 1-94 Corridor and D 4
Village land use plan amendments
• Prepare rural development area study to consider future 0 2
development options for rural areas
• Review Waste Water chapter of Comprehensive Plan in
conjunction with rural areas review
Consider Comprehensive Plan Amendment for "Friedrich A 1IP
Property" on Stillwater Boulevard
• Consider Comprehensive Plan amendments to eliminate 0 2
remaining RAD-ALT land use parcels
• Review individual projects for compliance with the
Comprehensive Plan
Park Planning
• Create a master plan for selected City parks, provide
assistance to Parks Commission as needed
Review park plans for individual developments with the Park 0 2 IP
Commission
Conduct comprehensive mapping of existing private and D 4
public trail systems (using GPS where appropriate)
• Work with the Trail Sub -Committee to identify alignments and C 2 IP
funding for future priority trail segments, including the Lake
Elmo Regional Trail
o Update Park Plan in City's Comprehensive Plan D 2
• Update Trail Plan in City's Comprehensive Plan D 2
Capital Improvement Plan
• Planning Commission review of 2014-2018 Capital D 2
Improvement Plan for consistency with the Comprehensive
Plan
General Planning Studies
• Conduct review of 201 (community) septic system policies
and management practices. Develop system for proper
oversight, billing, and maintenance of community systems.
• Develop list of contacts and resources for private community
septic systems
Economic Development Support
• Provide support and assistance to City Administrator and
Economic Development Authority (EDA) as needed for
economic development activities
Maintain list of business in Lake Elmo on City web site D 5
ADMINISTRATIVE INITIATIVES
Developer's Agreements and Escrows
• Fully implement developer's agreement and escrow process A
Building Division
• Monitor status of staffing within building inspection
department; consider staffing needs in 2014 and beyond
Develop disaster preparedness manual for Lake Elmo
Gateway Corridor Commission
• Act as City representative for Technical Advisory Commission A
• Provide support for environmental study and alternatives
analysis review for Lake Elmo/Woodbury alignment
Permit Tracking Software
• Complete move of planning file system to PermitWorks
software
Code Enforcement
* Follow updated code enforcement program with the Building
Inspector as the City's code enforcement officer
File Archiving and Management
* Scan Planning and Building Department files into the City
laserfische system
A
D
IP
IP
Engineering Projects
• Provide planning assistance as needed for regional trunk A 2 IP
sewer project
4
Policy and Procedures Review
Streamline and improve policies and procedures for the C 1IP
handling of routine matters (variances, site plan review,
setbacks, etc...)
TRANSPORTATION PLANNING PROJECTS
Participate in Lake Elmo Avenue (CSAH 17) study with 0 2 IP
Washington County.
Participate in Manning Avenue (CSAH 15) study with B 2 IP
Washington County.
Study Village/TH-5 pedestrian facilities and connections,
including potential Stillwater High School trail
5