HomeMy WebLinkAboutPZ Packet 11-14-11OWN
LAKE City of Lake Elmo
ELMO OM 0 Laverne Avenue North
Lake
Lake Elmo, Minnesota 55042
(651) 777-5510 Fax: (651) 777-9615
Www.LakeElmo.Org
NOTICE OF MEETING
The City of Lake Elmo
Planning Commission will conduct a meeting on
Monday, November 1.4, 201. 1, at 7:00 p.m.
AGENDA
1. Pledge of Allegiance
2. Approve Agenda
3. Approve Minutes
a. None
4. Public Hearings
a. CHRIST LUTHERAN CHURCH EXPANSION — CUP AMENDMENT,
VARIANCE, SITE PLAN REVIEW: Christ Lutheran Church, 11194 36th Street
North, has submitted an application to expand its current facility and make other
improvements to increase accessibility, improve entrances into the building,
provide better interior circulation, and to provide additional space for learning and
hospitality. The request includes the reconfiguration of Laverne Avenue to utilize
a portion of the right-of-way for parking and a drop-off area in front of the
church. The variance would allow an expansion into existing setbacks on the east
and west sides of the building.
b, CAPITAL IMPROVEMENT PLAN: Review of a 5 -year capital improvement
plan for the city of Lake Elmo for the years 2012 to 2016.
5. Updates
a. City Council Updates:
i. November 9, 2011 Joint Meeting with Library Board
b. Staff Updates
i. Upcoming Meeting: November 16, 2011 —1-94 Planning Area Open
House
c. Commission Concerns
6. Adjourn
Planning Commission
Date: 11/14/11
Public Hearing
Item: 4b
ITEM: Hold a public hearing on the 2012-2016 Capital Improvement Plan
SUBMITTED BY: Kyle Klatt; Planning Director
REVIEWED BY: Joe Rigdon, Interim Finance Director
Jack Griffin, City Engineer
SUMMARY AND ACTION REQUESTED: As part of its responsibility to review and approve a
Comprehensive Plan for the City, the Planning Commission is also required to review a five-year
capital improvement plan (CIP), which is typically prepared in conjunction with the preparation of
a budget for the following year. Staff scheduled a public hearing to review the 2012-2016 Capital
Improvement Plan with the Planning Commission on October 4, 2011; however, the draft CIP was
not finished at this time and the Commission continued the public hearing until its November 14,
2011 meeting.
A draft CIP has now been completed by the City's Interim Finance Director, and is attached for
review by the Planning Commission. Staff is recommending that the Planning Commission
recommend approval of 2012-2016 Capital Improvement Plan for the City.
Recommended Motion #1: To open and conduct a public hearing on the proposed 2012-2016
Capital Improvement Plan
Recommended Motion #2: To close the public hearing on the proposed 2012-2016 CIP
Recommended Motion #3: To forward the proposed 2012-2016 CIP and the comments
received during this Public Hearing to the City Council for
subsequent review, assessment and adoption.
BACKGROUND: Attached, please find the 2012-2016 Capital Improvement Plan (CIP). MN
State Statutes views the Capital Improvement Plan as an element of the Comprehensive Plan,
which requires a Public Hearing by the Planning Commission and subsequent formal adoption by
the City Council. Consistent with State Statute a Notice of the Public Hearing was published in
the City's official newspaper.
The draft 2012-2016 CIP has been compiled by City staff, with input from the various agencies
and departments, prioritized by the City Administration, and initially reviewed and discussed by
the City Council at a recent public meeting.
ADDITIONAL INFORMATION: The purpose of a Capital Improvement Program is to provide a
multi-year plan of major projects and related expenditures. It is intended to be used as a tool for
identifying future infrastructure projects and to prevent duplication of projects (i.e. street
reconstruction project followed in a subsequent year by a water main project). The CIP is also
used as a long term financial guide to identify expenditures and related funding sources.
Major projects planned for 2012:
o Library building improvements
o Park improvements and maintenance
0 50th Street and Kimbro Avenue road improvements
o Keats Avenue road improvements
o Street seal -coating
o Street and water quality improvements
o Fire department site planning
0 1-94 to 30th Street sewer trunk force main
o Village Parkway trunk sewer (phase 1)
o Well and pump house #4 construction
o Keats trunk water main extension
o Rain garden improvements
o City facilities improvement
RECOMMENDATION: Staff is recommending that the Planning Commission continue the public
hearing concerning the Capital Improvement Plan and recommend approval of 2012-2016 Capital
Improvement Plan for the City.
ORDER OF BUSINESS:
- Introduction......................................................................................... Planning Director
- Report by staff..................................................................................... Planning Director
- Questions from the Commission....................................Chair & Commission Members
Applicant Comments.............................................................................. Chair facilitates
- Questions of the Applicant.............................................Chair & Commission Members
( - Open the Public Hearing........................................................................................ Chair
- Close the Public Hearing....................................................................................... Chair
- Call for a motion.................................................................................... Chair Facilitates
- Discussion of Commission on the motion ............................................. Chair Facilitates
Action by the Planning Commission..............................Chair & Commission Members
ATTACHMENTS (1):
1. Draft 2012-2016 Capital Improvement Program
n
55°°
EEEE
��.��nn
5
E
annnnnn
5555655
EE
an���n��nn
EEE
5555
n
n
55555`
nnnn�
EEEE
X5555
�4C�Ey����6Q66�546�Ey�66C4�LdGE
ppyy
yyggryryqp
ppcece
�
y�y��y�y��g�g�yy�y�g�yy
g�g
q�q
y�y
Q�d�
@�@
`�
g#Xa�X
m�mm
mXXXXxx##X
Ai
m_
mm
###XXXX
m�wv.mmnwmmmmmmmmmnmrim
UXxxx######X##XXXXxX
�}
pn�ggryry
555558555
�Fr������e"-��rrirrrr
5555
5
5
������5�r
LL
rr����a������r"-a
LL
a
$'°&$$8�&8888
o0
00o
a
ooa
�aeeg�6a
as
d
aaa
ggg�
aaaaaaa�egaggggeeeeeeeeeee
sa
aaaaaaaaaaaa
e'
e
8
......000
'8
0
n
`S
o
o'0
8
'oo'oo'oSo
aNO
o'S,
—
—
z
u
W1N¢
8
u�4
p
wju2zz
<
wa
3F
F
a�U
jzJw�
5
w
ao
p
uN
€
F
yQ�°xJ
o
°mm
ZNO
gg
�i
U
�
'o
F@'u5
E
�
WOK
J
�OJ
aa
Z
a
xW
ODOdOo2J8
2
QQJ
Qyy��
z2_po2
�5
�i
U'amgv
�OKW
ZR
°� Z¢
�m�a
¢=-F
c�Qva
�N
v$�g�
`oNw/ij
ci
a
�•5E`
E
zd �w��ww�w
K
ZZZ✓?�N2-'c>
N--aaoa3�fl
ma"
W15
-¢5
0'�
°xd
q
m.o�
iii-ss�"s'�r�-
Jou'
,po5
�r-��
ys9
o-`Oi
mmFSQso
ss
o'F
msm�p=@cYp'a5
p
5`Vgy
f Vp
SE
a
N
N
`o
O�ufu
f(�KFKf
F'Cc2�LFLc
fu
O(u
R000KO2m0��
NN
N�N�ON
LL
Z,N
F
N_U
EZmQQODOF�ONii~fa°�6
OF
F6QNmFnjn
ua226N¢e6V22�9�yZ
v�FF�vv
Gp
JJ
ZN'�
a.�,
%
N
N
OOp
N p___pi_
ms$�
x4n
Yn UU��N'
��N�wZgS§r/l
c5
L'i
.nnn
E
Lei
in �ii
cNN
40
Enrcno
w`a��3a
�
aaoocoxxxoxHsx3
6
mJzs
����-°.
5a
rcrc�
}�
a
c9
V6
aU
5
y
yy
b
ij
O
W11,�
>W
WIJIW
2222
K
2
W
2N
Z
m°°mm
S
2Zv
Z
e
__8
o
z
v
E
6x
FFa;99ga9S
!.°5
gsE
"2
r
mE�
yryryy.. K�z¢zz00000
a�
Fa¢zza¢aa¢zii�a�5'S'��
6¢¢
@
a�°s°a
e2E-
r8
=Z�NNZ6NNNNNZZ
Joo�oRF
TiL,
Z
ME.
.
75N~'EE
EE EE
Yn
5555
Ari N.y
.43RVc
s=
j
600NNNN�FNNNF
oz
A
:�6www4m�m
6Nn000
NSusn23332�
����u
gpn
mmm
ZN
�-W�W�t."G
Y
Y2
A
585
N��
NZ
y
L
EE
^'
o
K
n['uRRRRe�iN&NNN«
PvurNR
jE'ry
�
@
�
a
Ygi�icif
@@@
Ygi�fi
e;;;;e
�i-FiSEu�gim��fi���YgiLL6L2tl��i��iu�i
2
@@
B55
JVn
-
a
MIM
IM
MMI,
aa°
___S
c
N
Planning Commission
Date: 11/14/11
PUBLIC HEARING
Item: 4a
ITEM: Conditional Use Permit Amendment and Variances: Christ Lutheran
Church Expansion
SUBMITTED BY: Kyle Klatt, Planning Director
REVIEWED BY: Ryan Stempski, City Engineer
SUMMARY AND ACTION REQUESTED
The Planning Commission is being asked to consider a request from Christ Lutheran Church,
11194 3eh Street North, for a Conditional Use Permit amendment and variances related to an
expansion of its present facility. The specific action requested from the City is as follows:
• Conditional Use Permit Amendment to allow the expansion of a church within a PF —
Public Facility Zoning District.
• Variances from the required 50 -foot side yard setback to allow an addition to the building
that is set back 8 feet from the Laverne Avenue right-of-way and 38 feet from the western
property line.
• A Variance to allow the expansion of the existing facility, including new classroom and
general meeting space, without an increase in the number of off-street parking stalls
available to the Church.
ADDITIONAL INFORMATION:
The attached Staff report includes a detailed review of the application along with a Staff
recommendation.
RECOMMENDATION:
Staff is recommending that the Planning Commission table the Conditional Use Permit
amendment and variance requests by the applicant in order to ensure that all of the City's review
comments can be address by the Church.
Being cognizant of the applicant's desire to continue moving forward with the project in a timely
manner, Staff has prepared an alternate recommendation for consideration by the Planning
Commission based on the draft findings included in the detailed Staff report This
recommendation is for approval of the permits requested (Conditional Use Permit amendment
and variances) with specific conditions of approval as follows:
The applicant shall submit a septic system inspection report prepared and signed by a
licensed septic inspector verifying that the current septic system is compliant with
Washington County regulations, and that: a) address the available capacity of the system
and states its ability to accommodate the additional use created by the expansion project,
or provide a design for its expansion, and b) includes a description o the current system
type and components, dimensions, and capacity.
2. The proposed building addition must meet all requirements of Chapter 4 of the
Washington County Development Code.
3. The applicant shall provide a detailed narrative to describe the purpose and need for a
second water service connection, including projected water uses. The proposed
connections shall be subject to review and approval by the City Engineer.
4. The applicant shall pay a Water Availability Charge based on any increase in the
Residential Equivalent Connection calculation for the new addition.
5. The applicant shall provide detailed plans and specifications for all work proposed with
the City right-of-way in accordance with the City's Design Standards Manual. These
plans shall indicate existing conditions, including roadway widths and all public and
private utilities within the roadway, and incorporate information as requested by the City
Engineer.
6. Any work proposed within a City right-of-way shall only be allowed upon the approval of
an improvement/developer's agreement between the City of Lake Elmo and the
applicant.
7. The applicant shall provide a calculation for the existing and proposed impervious
coverage on the site.
8. The applicant shall submit a storm water management and a drainage and erosion
control plan for the site prior to the issuance of a building permit or before any work with
may commence within a public right-of-way.
9. The applicant shall submit a lighting plan that includes the light pole details and
standards (pole height and type, fixture type, and photometric plans). All new lighting
shall conform to Section 150.035 through 150.038 of the City Code.
10. The applicant shall submit a landscape plan for review and approval that provides for
replacement of any trees removed as part of the site work. The applicant shall work with
the City to identify suitable locations for replacement street trees on the site, giving
preference to any suitable locations within the Laverne Avenue boulevard. The applicant
shall also consider the conversion of existing or planned paved boulevard areas to
natural vegetation where possible as part of the planned street improvements.
11. The applicant shall maintain existing screening and buffering located between the Church
site and adjacent residential uses.
12. The applicant shall work with the City to identify appropriate modifications to the no
parking designations in the area as part of the proposed street improvements to Laverne
Avenue.
ORDER OF BUSINESS:
- Introduction ................................
- Report by staff ...........................
- Questions from the Commission
- Applicant Comments .................
- Questions of the Applicant ........
- Open the Public Hearing ...........
...........Planning Director
....................................................Planning Director
.............................. Chair & Commission Members
.......................................................Chair facilitates
.............. Chair & Commission Members
....................................................... Chair
Close the Public Hearing........................................................................................Chair
Call for a motion................................................................................... Chair Facilitates
Discussion of Commission on the motion ............................................ Chair Facilitates
Action by the Planning Commission .............................. Chair & Commission Members
ATTACHMENTS:
1.
Staff Report
2.
Application Form
3.
Application Narrative
4.
Location Map
5.
Location Map/Aerial Photograph
6.
Review Letter from TKDA
7.
Review Letter from Valley Branch Watershed District
8.
Site Plans
9.
Architectural Drawings
10.
Site Survey (Large Plan -Size Document)
City of Lake Elmo Planning Department
Conditional Use Permit Amendment and Variance
To: Planning Commission
From: Kyle IQatt, Planning Director
Meeting Date: 11/14/11
Applicant: Christ Lutheran Church
Owner: Christ Lutheran Church
Location: 11194 36`x' Street North
Zoning: PF — Public and Quasi -Public Open Space/Public Facilities
Application
Summary:
nest
The City of Lake Elmo has received an application from Christ Lutheran Church,
1119436 1h Street North, to expand its current facility and make other improvements
intended to increase accessibility, improve entrances into the building, provide better
interior circulation, and to provide additional space for learning and hospitality. In
order to move forward with its plans, the Church has requested the following specific
action from the City:
• A Conditional Use Permit amendment to allow for the expansion of an existing
structure that pre -dates the City's zoning regulations. Because a Church is
permitted by Conditional Use Permit in the PF — Public Facility Zoning
District, an expansion or major modification to the building requires a new
permit (or amendment) from the City.
• A variance from the side yard setback requirements within a PF —Public
Facility zoning district. The site plan submitted by the applicant indicates that
the proposed additions to the building will be set back 8 feet from the Laverne
Avenue right-of-way and 38 feet from the western property line, both of which
are side yard setbacks. The PF zoning district requires a minimum side yard
and corner side yard setback of 50 feet.
• A variance from the parking requirements for a PF — Public Facility Zoning
District to allow the expansion of a building without an increase in available
off-street parking.
The expansion into the existing side yard setbacks would allow the Church to create
upgraded entrances into the facility in the form of two new vestibules and covered
roof canopies over both of these entrances. Please note that the application narrative
provided by the applicant does not seem to accurately portray the setbacks shown on
the site plan for the eastern entrance. In addition, the applicant has provided setbacks
(and has shown the building setback lines on the site plans) from property lines and
(.7UPAm..entiment/Variance Request, Christ Lutheran Church
Planning Commission Report; 1.1/14/11
Property
Information:
not from the official right-of-way lines. Staff has taken scaled measurements from the
site plans and used the right-of-way lines to determine the official setback variance
being sought as noted above.
The proposed plans also call for a major reconfiguration of Laverne Avenue as part of
the eastern entrance improvements. The applicant is proposing to reconstruct the
boulevard along Lavern Avenue to create a drop-off area for visitors to the Church and
to install a new sidewalk within the street right-of-way along the length of its property.
These improvements would tie in with the overall plans to improve access into the
Church facility. Although the request to improve the right-of-way is technically a
separate action for consideration by the City, Staff is recommending that these
improvements be considered as part of the overall site plan review by the Planning
Commission and included in the Planning Commission's recommendation to the City
Council.
The attached site plans highlight the proposed changes to the building that are being
sought, and also show the reconfiguration proposed for Laverne Avenue. The
applicant has also provided a detailed narrative explaining the project and the need for
the improvements.
The Christ Lutheran Church building was initially constructed in the 1950's, and the
facility has been expanded and improved at various times over the past several years.
The most recent major renovation/expansion occurred in 1996, since that time there is
no record of any other significant improvements in the City records. The facility
includes several different components, including the sanctuary, offices, atrium,
classrooms, conference room, kitchen, and other ancillary functions. Because the
facility has been expanded various times in a piecemeal fashion, and given the age of
many of the improvements, the Church would like to improve overall access
throughout the facility and create additional space for church functions.
The applicant's site is located within the heart of the Village Planning Area, and is one
of a series of PF — Public Facility uses that is scattered amongst the residential and
commercial uses within the Village. The Church also owns the former Lake Elmo
Bank building at 3549 Lake Elmo Avenue North, and uses the parking lot accessory to
this building to help provide for the parking demand around the Church on Sundays
and during other peals usage times. The attached site survey includes all of the
property owned by the Church in this area, which is spread between four separate
parcels of land.
In addition to the parking provided on the old bank property, the church has a small
amount of parking along the west side of the facility (mostly handicapped stalls) and a
larger parking lot immediately north of the building. This parking lot has direct access
to Laverne Avenue and indirect access to 36t" Street along a driveway that runs the
length of the church property. In total, there are 33 parking stalls located on the main
church site, with an additional 37+ stalls on the old bank site. Just using the parking
calculations for the main sanctuary, which has a maximum seating capacity of 266, the
church would need to provide 67 parking stalls for the building (4 per seat in the main
S. -land Z u!CbTlChrut Lutheran Chur6ht Rerr PZ Christ Lutheran C'L%P.9ntend-F"arrnnce 11-14-11,doc
Pagw 2
CUP Amendmew/Vuriance Request: Christ Lutheran (7hurch
Planning Commission Report; 11/1,1111
Applicable
Codes:
assembly hall). The Zoning Ordinance notes that other uses within the facility should
be factored into the final evaluation of parking for the site. Since the church is already
short on parking for the main assembly hall by itself, any expansion of
classroom/meeting space will require a variance from the City's parking standards.
Within the Village area, it is not uncommon for buildings to be located at reduced
setbacks from the street and to not provide the required amount of off-street parking
otherwise required by the Zoning Ordinance. The City recently revised its
requirements for the GB — General Business District in the Village area to allow for
reduced setbacks and the waiver of parking requirements. The applicant's proposal is
therefore not out of character compared to the commercial uses that are located in
close proximity.
The Church is located in an area that has experienced storm water flooding issues in
the past, and although the proposed project will not require a Valley Branch
Watershed District, the applicant's plans should incorporate storm water mitigation
measures to manage the additional runoff from proposed increases in impervious
coverage for the site.
Section 154.063 PF — Public and Quasi -Public Open Space
(B) Uses allowed by conditional use permit
(2) Places of Worship
Sections A through F contain the district regulations for the PF Zoning District
Section 154.018 Conditional Use Permits.
(A) Granting/Denial. Outlines the general requirements for all conditionally
permitted uses in Lake Elmo.
(K) Amendment. In accordance with Section 154.018 K of the Zoning Ordinance,
an amended conditional use may be administered in a manner similar to that
required for a new permit.
Section 150.017 Variances.
(A -I) Variances. Identifies procedures and requirements for the processing and
review of a variance application. Please note that this section was recently
updated by the City to comply with revisions to Minnesota State Statutes.
& General Site Overview
Site Data:
Lot Size: 1.14 acres (3 parcels, including street right-ot-way)
Existing Use: Place of Worship (includes accessory uses)
Existing Zoning: PF— Public and Quasi -Public Facilities
Property Identification Numbers (PID): 13.029.21.21.0020; 13.029.21.23.0060; and
13.029.21.23.0061
S'G.mrd Z u �;UP;i`hrist Lutheran Cluu�t]t4Re� FZ Christ l.rerla<erarz Ctrl .4nterrd-F'tzrlcuare 1 /-Jd-! l.idcrc
Pc(ge
CLIP Amendnrenl/F ariran(e Request; Christ Lutheran Chureh
PlanningCommtssion Report; ./ 1/14,/11
Review:
General
The establishment of the Christ Lutheran Church on the applicant's property pre -dates
Review
the current zoning regulations, which now would require a "place of worship" to
Requirements
secure a Conditional Use Permit in order to be permitted on the site. In situations like
this, the proper procedure is to review any expansions or alterations on the site as
thought a Conditional Use Permit was previously granted. The applicant has therefore
submitted their request as a Conditional Use Permit amendment to expand the facility
in the manner depicted on the attached site plans.
In addition the Conditional Use Permit amendment request, the applicant is also
seeking approval of specific variances, due in part to the current location of the church
on a small parcel of land within the City's Village Planning area. The current
configuration of the church leaves no room for an expansion that meets the City's
underlying zoning requirements as most of the facility is already located within
required setback areas. The City's PF zoning district applies to only a few structures
within the Village, in which larger setbacks and significant parking requirements are
generally out of place.
The City's requirements for the two components of the applicant's request are noted
below.
A major component of the plans also includes a request to reconfigure the right-of-
way along Laverne Avenue, which Staff is suggesting that the Planning Commission
review as part of the overall project. Should this aspect of the planned improvements
move forward, the applicant will need to enter into a separate agreement with the City
concerning the proposed work. This agreement would ultimately serve as the City's
authorization to proceed with the improvements that are proposed.
The City Engineer has provided an initial review letter of the applicant's plans,
General Staff
requested additional information in order to complete the City's review. The
Review
comments focus on the following aspects of the project: 1) septic system compliance
and capacity, 2) Water service connections, 3) work within the City right-of-way, and
4) additional application requirements. While some of the information that has been
requested could be submitted at a later date, Staff is concerned that some of the
requested information is critical to evaluate all potential impacts from the proposed
project.
Although many of these details could be addressed through conditions of approval,
Staff is recommending at this time that the Planning Commission table this request in
order to assure that all questions and issues identified by Staff have been addressed.
Knowing that the applicant is on a schedule and would like to proceed sooner than
later with the improvements, Staff will be drafting suggested conditions of approval as
part of an alternative course of action that could be taken by the Planing
Commission.
While the Conditional Use Permit and Variance requests each have specific standards
that must met by an applicant, the request to make improvements within the Laverne
Avenue right-of-way are not subject to these same requirements. As such, the
.S - :Land Z ,e C UVChrxst Lutheran C1u r,,ViWop PZ Christ haheran CUI' Amend -d ammce 11-14-11 doc
Ffkge 4
CUP AmendmentlVarumce> Request; Christ Lutheran Cbxrch
Planning Commission Report; 1111"14/11
proposed work does represent a fairly major change to the street, and would have the
following impacts on the surrounding neighborhood:
• There are four larger trees (two ash and two maple trees according to the
applicant) along Laverne Avenue that would need to be taken down to make
room for the proposed driving/drop-off lane. Although these trees could be
replaced with new trees elsewhere on the site, there is very little room on the
site to do so, and almost no room within the boulevard to maintain trees within
the City right-of-way.
• Parking is not allowed along the eastern edge of Laverne Avenue, and is
instead allowed only along portion of the street. The proposed drop-off area
would eliminate approximately eight parking stalls within the street if parking
were not allowed within this new area. The fire chief has recommended that
this lane be marked as a fire lane, which would eliminate all parking along the
Church's portion of Laverne Avenue.
• Should the City agree to move forward with the plans for Laverne Avenue as
proposed, Staff would recommend that the parking/no parking situation along
this street be revisited by the City Council. It may make sense to move the
"no parking" signs to the opposite side of the entire street since there are seven
homes along the east side of the street and only three along the west side of the
street. The overall parking situation should be considered as part of any
request to modify the boulevard in front of the Church.
• The proposed boulevard work would remove nearly all of the pervious
landscaping presently along Lavern Avenue in front of the Church, and
adequate storm water plans will be needed to ensure that the additional storm
water runoff will not contribute to existing drainage deficiencies in the area.
• If the applicant is permitted to move forward with its project within the City's
right-of-way, Staff would like to propose that some additional green space be
reclaimed within the boulevard area along Lavern Avenue that is adjacent to
the northern parking lot exit. The entire boulevard adjacent to this parking
area is paved, but could provide some room for replacement trees and
landscaping next to the street.
Prior to reviewing the specific CUP and Variance criteria, Staff would like to add the
following additional comments concerning the proposed site development plans:
• The maximum impervious coverage requirement in the PF Zoning District for
a lot under five acres is 39.5%. The applicant most likely exceeds this amount,
and has been asked to document the actual percentage with the proposed
improvements. Should a variance be needed, it will need to be addressed as
part of the City's review.
• Although screening of PF structures next to residential districts is addressed by
the Zoning Ordinance, this screening is not required across a street. There is
also a row of hedges along the applicant's western property line that provides
screening between the Church and a residential use. Staff is not
S. land L soCUP;C'hov haheran Chu ch.Rep PZ C%d tr Lutheran C UP.41n end-Varimue i t-14-1 Ldoc
Page, j
CLIP nimendnren E'uriance 12egnrst; Christ Larthm-fin Church
Planning Comneission Report; 71/111/11
recommending that any additional screening be required as part of the current
request.
In general, the proposed improvements should not significantly alter the
impacts of the Church facility on the surrounding properties. The most
significant neighborhood impact will be from the work proposed with the
right-of-way and the loss of existing street trees that help maintain the
residential character of the area. Any increase in impacts associated with
traffic, noise, property values, and other factors will be minimal when
compared to the present situation.
The two sections of code that contain CUP requirements for this project include the PF
District regulations and Conditional Use Permit section. First, the PF District
requirements contain specific criteria for "Places of Worship". These requirements,
with Staff comments, are as follows:
• Direct access is provided to a public street classified by the Comprehensive
Plan as major collector or arterial. None of the routes immediately adjacent to
the Church is a collector or arterial road, however, the old bank building is
adjacent to Lake Elmo Avenue, which would meet this requirement. Since
the church's location predates the Zoning Ordinance, this condition will not
apply.
• No use may exceed 235 gallons wastewater generation per day per net acre of
land. The applicant did not provide a figure for the amount of'waste water
generated by the Church. The proposed improvements will not significantly
increase the demand; however, since the maximum seating capacity of the
church will not change with the proposed work. The City Engineer has
requested a system inspection report to complete the City's review.
• No on-site sewer system shall be designed to handle more than 5,000 gallons
per day. A review conducted by the City Engineer when the 1996 project was
submitted for review indicated that the drainage system consisted of a 1,000
tank with a 600 square foot drain field area. Although this is below the
threshold, for a PF zoning district, the City Engineer has requested
additional information and clarification concerning the location and
capacity of the current system on the site, and confirmation that the facility
is able to comply with current County septic requirements.
• Exterior athletic fields shall not include spectator seating, public address
facilities or lighting. There are no athletic, fields on this site.
No freestanding broadcast or telecast antennas are permitted. No broadcast
dish or antenna shall extend more than 6 feet above or beyond the principal
structure. There are no broadcast antennas on the site.
The City is also required to make findings specific to the Conditional Use Permit. For
these types of applications, the burden is on the City to show why the use should not
S:,Land I sc!Cf %P�C'In ist Lutheresn Church Rap PZ Christ hrrh<=rare CUP A illcluf F'rr, ww"e 11-I4-1I'doc
Mage 6
CLJI'.^ineerad rerr 6'ar ion e Request; Christ Lutherfin Church
Planning Commission Report 1.t/,14/11
be permitted due to impacts that cannot be controlled by reasonable
findings include the following:
1. Effects on the health, safety, morals, convenience, or general welfare of
surrounding lands
2. Existing and anticipated traffic conditions including parking facilities on
adjacent streets and land
3. The effect on utility and school capacities
4. The effect on property values of property in the surrounding area
5. The effect of the proposed use on the Comprehensive Plan
Provided that all additional submission requirements and application details are
provided to the City, Staff would offer the following proposed findings in response to
the standards listed above:
1. The proposed use is to expand and make renovations to an existing facility that
will increase accessibility, improve entrances into the building, provide better
interior circulation, and to provide additional space for learning and
hospitality. Since all of these activities are currently occurring on the
premises, the proposed improvements will not significantly alter the current
operation or impacts associated with the facility. The proposed improvements
will reduce neighborhood impacts by creating clearly designated entrance and
exit points while removing all short-term vehicle trips from the traveling lanes
of Laverne Avenue.
2. The propose improvements will allow.for a more efficient use ofparking areas
around the site and will create a designated drop-off area away from
residential uses.
3. The proposed use would have no effect on utility capacities. The City will
collect a Water Availability Charge for any additional water capacity that is
anticipated from the new addition.
4. The proposed amendment would have no effect on property values of
surrounding lands.
5. The proposed improvements are consistent with the City's Comprehensive
Plan considering that the Christ Lutheran Church property is guided for
public facility uses according to the future land use map.
An applicant must also establish and demonstrate compliance with the variance
criteria set forth in Lake Elmo City Code Section 154.017 before an exception or
modification to city code requirements can be granted. These criteria are listed below:
1. Practical Difficulties. A variance to the provision of this chapter may be granted
by the Board of Adjustment upon the application by the owner of the affected
property where the strict enforcement of this chapter would cause practical
difficulties because of circumstances unique to the individual property under
S. IL anel i u CUP'.0 Chid Lutheran t hmzrTt R.p PL Christ hallerarr CLiP Anteed-F"rrrim e 7 /--1�-7 Ldac g
C: L,N..�nsenrintent/G'tn•iaance Requesl, Christ Luthenvi Church
Planning Commission Ruport; 171114/11
consideration and then only when it is demonstrated that such actions will be in
keeping with the spirit and intent of this chapter. Definition of practical
difficulties - "Practical difficulties" as used in connection with the granting of a
variance, means that the property owner proposes to use the property in a
reasonable manner not permitted by an official control.
2. Unique Circumstances. The plight of the landowner is due to circumstances
unique to the property not created by the landowner.
3. Character of locality. The proposed variance will not alter the essential character
of the locality in which the property in question is located.
4. Adjacent properties and traffic. The proposed variance will not impair an
adequate supply of light and air to property adjacent to the property in question or
substantially increase the congestion of the public streets or substantially diminish
or impair property values within the neighborhood.
Given the information that has been submitted by the applicant and pending further
review by the Planning Commission, staff would offer the following suggested
findings specific to the variances that have been requested by the applicant:
1. The proposed building additions and the applicant's desire to improve the
entrances into an existing facility area reasonable use of the property. There
are no portions of the applicant's site that could accommodate any extension
of the existing building without a variance. The structure has been modified at
various times in its past, and any accessibility improvements would be difficult
to accomplish within the existing footprint of the building due to the current
mix of different building elevations, materials, and styles.
2. The applicant's site is unique because it is a small parcel located within the
Lake Elmo Village Area and is zoned PF — Public Facility. It is the only
church located within the City's central business district, and it is surrounded
by commercial and residential structures with a variety of setbacks and
building sizes.
3. The proposed building additions will not change the essential character of the
locality because the entrance improvements represent a small portion of the
overall building footprint. The City's central business district is comprised of
a wide mix of commercial and residential uses, many of which are located very
close or immediately adjacent to public right-of-way.
4. The proposed variance will not impair an adequate supply of' light and air to
property adjacent to the property in question or substantially increase the
congestion of the public streets or substantially diminish or impair property
values within the neighborhood. The proposed additions to the building will
not alter or increase any of the existing traffic patterns in the surrounding
S ,t urzd t. ,c�C'(./PiChrist Lutheran ChurchiRep AZ Christ Lutl:ermt (:'LrP flmraut-F'artm+ee 1144 1 Woc
Page 8
(.`GcP Amendnrent%6arianee Requesl; (,hnsr hitheran Church
Planning Commission Report; 11/14/11
Conclusions.
neighborhood.
Based partially on the review comments submitted by the City Engineer, Staff is
recommending that the Planning Commission table the Conditional Use Permit
amendment and variance requests by the applicant in order to ensure that all of the
City's review comments can be address by the Church. Should the Planning
Commission decide to make a recommendation at its meeting based on the
information and facts presented, Staff has prepared an alternate recommendation for
consideration by the Commission. This alternate recommendation is for approval, but
with a series of conditions that address the need for additional information concerning
the request. The alternate recommendation and recommended conditions are listed
below.
Resident I Staff has not received any feedback from neighboring property owners regarding the
Concerns. proposed Conditional Use Permit amendment. This action requires a public hearing to
be conducted by the Planning Commission at which time members of the public may
address the Commission regarding this application.
Additional I The Valley Branch Watershed District has reviewed the proposed site plans and found
Information: that the work would not require a permit from the Watershed District. The District's
comments regarding erosion control have been included as part of the conditions
drafted by staff.
Conclusion:
The Christ Lutheran Church, 11194 36`h Street North, has applied for a Conditional
Use Permit amendment and variances from the side yard setback and PF — Public
Facility parking standards to expand its current facility and make other improvements
intended to increase accessibility, improve entrances into the building, provide better
interior circulation, and to provide additional space for learning and hospitality.
The request also includes proposed improvements to the Lavern Avenue right-of-way
that are being submitted in conjunction with the zoning applications. These right-of-
way improvements are being reviewed as part of a larger project and are included in
the Staff recommendation that follows. These improvements could also be considered
as a separate issue should the Planning Commission find it appropriate to review the
application in such a manner.
Commission The Planning Commission has the following options:
Options: A) Table taking action on the request and consider the application again at its
December 12, 2011 meeting.
B) Recommend approval of the conditional use permit amendment request, with
S: eland C sc C i'PIChrisi bitheran ChuretrlRer P7 Chis Luthoem C%PAmeud-Varimace 11 74 H .,Io(
1))age 9
CUP Amendmc w/Variance Request; Christ Lutheron (:'hurch
Planning Commission Report; 11/14/11
Staff Ree:
the conditions as recommended by Staff,
C) Recommend denial of the conditional use permit amendment request.
The 60 -day review period for this application expires on December 7, 2011, but can be
extended an additional 60 days if more time is needed to complete the City's review.
Staff is recommending that the Planning Commission table the Conditional Use
Permit amendment and variance requests by the applicant in order to give the
applicant and City additional time to adequately respond to and address the review
comments from the City Engineer.
As an alternate recommendation, Staff has prepared findings of fact to support
approval of the applicant's request, and has drafted the following conditions of
approval for inclusion with a recommendation of approval by the Planning
Commission:
1. The applicant shall submit a septic system inspection report prepared and
signed by a licensed septic inspector verifying that the current septic system is
compliant with Washington County regulations, and that: a) address the
available capacity of the system and states its ability to accommodate the
additional use created by the expansion project, or provide a design for its
expansion, and b) includes a description o the current system type and
components, dimensions, and capacity.
2. The proposed building addition must meet all requirements of Chapter 4 of the
Washington County Development Code.
3. The applicant shall provide a detailed narrative to describe the purpose and
need for a second water service connection, including projected water uses.
The proposed connections shall be subject to review and approval by the City
Engineer.
4. The applicant shall pay a Water Availability Charge based on any increase in
the Residential Equivalent Connection calculation for the new addition.
5. The applicant shall provide detailed plans and specifications for all work
proposed with the City right-of-way in accordance with the City's Design
Standards Manual. These plans shall indicate existing conditions, including
roadway widths and all public and private utilities within the roadway, and
incorporate information as requested by the City Engineer.
6. Any work proposed within a City right-of-way shall only be allowed upon the
approval of an improvement/developer's agreement between the City of Lake
Elmo and the applicant.
S .Land I s -COP',Christ Lutheran Church`&;n PZ Christ bicho wn CLAP tlnaenit-G'itrinnete 7 i-74-1 Ldoc
Pa,; e 10
C'tlf rlracendnrerrr/t'uriance Requesi; Christ hahcrr n Church
Planning Commusion Report; 11J1,P11
7. The applicant shall provide a calculation for the existing and proposed
impervious coverage on the site.
8. The applicant shall submit a storm water management and a drainage and
erosion control plan for the site prior to the issuance of a building permit or
before any work with may commence within a public right-of-way.
9. The applicant shall submit a lighting plan that includes the light pole details
and standards (pole height and type, fixture type, and photometric plans). All
new lighting shall conform to Section 150.035 through 150.038 of the City
Code.
10. The applicant shall submit a landscape plan for review and approval that
provides for replacement of any trees removed as part of the site work. The
applicant shall work with the City to identify suitable locations for replacement
street trees on the site, giving preference to any suitable locations within the
Laverne Avenue boulevard. The applicant shall also consider the conversion
of existing or planned paved boulevard areas to natural vegetation where
possible as part of the planned street improvements.
11. The applicant shall maintain existing screening and buffering located between
the Church site and adjacent residential uses.
12. The applicant shall work with the City to identify appropriate modifications to
the no parking designations in the area as part of the proposed street
improvements to Laverne Avenue.
Denial I To deny the request, you may use the following motion as a guide:
Motion
Template. I move to recommend denial of the request by the Christ Lutheran Church to
amend a conditional use permit and further to recommend denial of the
applicant's request for variances... (please site reasons for the recommendation)
Approval
Motion
Template.
To approve the request, you may use the following motion as a guide:
I move to recommend approval of the request by the Christ Lutheran Church to
amend a conditional use permit and further to recommend approval of the
applicant's request for variances based on the findings provided in the staff
report ... (or cite your own)
...with the conditions outlined in the staff report.
S4Land C u ICIP'Chriv Lutheran ChureCRar PZChrisibah man C?P.Iuwli l-Varianee 1144- I!Joc
Page 11
CUP Amendmew./Vuriance Requast. Christ Lathercnr Church
Planning Commission'Report; 11/14i11
cc: Jim Lehmann, Christ Lutheran Church
Kevin Busch, Busch Architects
S Land Es CZiPIChrisi l uaheran Ontr6hA.p PZ Chri,,t Ladrerau CU'P Armand-Vanance 1114- l Lrioc
Page 12
e.,
City of Lake Elmo
DEVELOPMENT APPLICATION FORM
❑ Comprehensive Plan Amendment
❑ Zoning District Amendment
❑ Text Amendment
❑ Flood Plain C.U.P,
Conditional Use Permit
Conditional Use Permit (C.U.P.)
APPLICANT: Jluvi (_
(Name)
TELEPHONES; ,�_
(Home)
�• rUl't !'I' 6v �{'
FEE-eWIIER: V I
(Name)
XVariance * (See below)
❑ Minor Subdivision
❑ Lot Line Adjustinent
❑ Residential Subdivision
Sketch/Concept Plan
Site & Building Plan Review
(Work)
(Mailing
Address)
Fee $2J.aa
❑ Residential Subdivision
Preliminary/Final Plat
O 01-10 Lots
O 1 1 — 20 Lots
O 21 Lots or More
❑ Excavating & Grading Permit
❑ Appeal
a4' ,Afc'J
(Fax)
❑ PUD
A 2 -
(zip)
o �i4tS
(Zip)
TELEPHONES:_ (at2–W -22'75 &S7^AI Co --363¢ �,(2 33 r 2336
(Home) (Work) (Mobile)
(Fax)
PROPERTY LOCATION (Address and Complete (Long) Legal Description); See R iia .btej I
DETAILED REASON FOR REQUEST:
*VARIANCE REQUESTS: As outlined in Section 301.060 C. of the Lake Elmo Municipal ode, the Applicant must
demonstrate ahardship before a variance can be granted, The hardship related to this application is as follows
In signing this application, I hereby acknowledge that I have read and fully understand the applicable provisions of the
Zoning and Subdivision Ordinances and current administrative procedures. I further acknowledge the fee explanation as
outlined in the application procedures and hereby agree to pav all statements received from the Chy pertaining to
additional application expense
Signature of Applicantr—C, `F l0 !o Zt 1
Date Signature of Applicant Date
1122212004 City of Lake Elmo - 3800 Laverne Avenue North • Lake Elmo - 55042 • 651-777-55
10 •Fax 651-777-9615
Christ Lutheran Church
1119436 th Street North
Lake Elmo, MN
Request for Variance — Description and Hardship
a. List of Property Owners: Christ Lutheran Church
b. Legal Description: DESCRIPTION OF PROPERTY SURVEYED
(Per Deed Record No. 84, Page 607)
All that part of the Northwest quarter (NW1/4) of Section Number Thirteen (13), in Township
number Twenty-nine (29) North, of Range number Twenty-one West, described as follows, to -wit;
Beginning at a point in the center of the Elmo Road (so-called) at a point Six hundred and
seventy (670) feet Northerly of the Northwest corner of Lot Number One (1) of Block number One (1) of
Elmo Park, as surveyed and platted and now of record in the Office of the Register of Deeds in and for
said County; thence Easterly on a line parallel to the North line of said Section One hundred and eighty
(180) feet to a point, being the point of beginning; thence Northerly on a line parallel to the center line
of said road Two hundred and seventeen and eighty one -hundredths (217.80) feet; thence Easterly on a
line parallel to the North line of said Section Two Hundred (200) feet; thence Southerly on a line parallel
to the center line of said road Two hundred and seventeen and eighty
one -hundredths (217.80) feet; thence Westerly on a line parallel to the North line of said
Section two hundred (200) feet, to the point of beginning, except Twenty (20) feet on the
West Side of said lot which is to be used for private alley, and Thirty three (33) feet on the East side, anc
Thirty (30) feet on the South side, which is to be used for Public Road.
And
(Per Quit Claim Deed Document No. 192551)
The West Twenty (20) feet of Lot Thirty-nine (39) County Auditor's Plat No. 8, Washington County,
Minnesota.
And
(Per Warranty Deed Document No. 192552)
Lots Eight (8) and Nine (9), Block Two (2), Cloverdale, According to the plat thereof, on
file and of record in the Office of the Register of Deeds, Washington County, Minnesota.
And
(Per Special Warranty Deed Document Nos. 1123102 (Torrens) and 3155545 (Abstract))
Parcel 1 (Torrens):
The South Forty (40) feet of Lot Twenty-nine (29) and all of Lot Thirty (30), County
Auditor's Plat No. 8 as surveyed and platted and now on file in the Office of the Registrar
of Titles of Washington County, Minnesota being the Village of Lake Elmo, Minnesota.
Parcel 2 (Abstract):
Lot Twenty-nine except the South 40 feet thereof, County Auditor's Plat No. 8.
1. Parcel Identification Numbers: Cloverdale, Block 2, Lot 8 and Lot 9 (1302921230020); County
Auditor's Plat No. 8, Lots 39, 29, 30. (1302921230060); (1302921230053).
2. Parcel Size: 67,158 sf; 1.54 acres.
3. Existing Use of Land: Religious organization; Business; Parking.
4. Current Zoning: P/PF; R-1; GB —see drawings for locations of each.
c. State the Provisions of the Lake Elmo Code...
1. 154.063 PF Public and Quasi -Public Open Space
a. E. Minimum Requirements: Setback of Primary Structure, 50 feet all four
sides of structure.
d. Christ Lutheran Church (CLC) seeks a variance from the building setback requirements found in
the Lake Elmo Municipal Code. The current requirement is 50 feet from each property line.
Christ Lutheran Church has operated out of its present building for over 55 years. It is hoping
to make improvements to the building that include accessibility, entrances, interior circulation,
and additional space for learning and hospitality. After many rounds of space planning and
design, we determined that the best places to expand our entrances and interior circulation
structure were on the east and west sides of the building. Both sides involve extending the
building out into the present setback area. On the east side, the proposed building would
extend out into the setback 5 feet, with an additional 7 feet when the roof canopy is included.
On the west side, the building extension also includes an entrance vestibule extending about 7
feet into the setback area with another 7 feet for a roof canopy. The original building was built
prior to formal planning codes and the west end of it is about 11 feet into the setback. The roof
canopies do not include enclosed space.
CLC has been an important entity within the Lake Elmo Village area for many years. Our plan is
to continue to be a community oriented church, remaining in the Village area for years to come.
As we anticipate future growth of our community and as our building needs change over time
building updating (construction) is a must so that we can operate our programs successfully and
so we can invite and accommodate newer members of our village who may wish to join us.
e. Jim Lohmann, CLC church member and Building Committee chair, and Kevin Busch of Busch
Architects, Inc., architect for the project, met with Lake Elmo Planning Director Kyle Klatt on
September 15, 2011, to review the plans that the church has been working on and intending to
present to the planning Commission and City Council for approval. There had been other,
informal discussions between church leaders and city staff in the year prior to this meeting.
f. Many plan options were presented and discussed during our two-year planning period. The
present setback requirements don't allow us to improve and expand in a way that is efficient
spacewise or economically. Our hardship is that without the variance the church would be
forced to do nothing or forced to expand the building in such a way that was neither conducive
to good building planning nor provide the type of improvements that are greatly needed.
g. The church property was first built upon and added unto prior to the more formal and
restrictive ordinances were in place. Initial structures did not (could not) anticipate future
restrictions on property use.
Christ Lutheran Church has been a member and a fixture in this neighborhood for over 60 years.
We don't believe the variance will have any view, air, or noise impact on our neighbors. On the
west side, our proposed building extension, except for the roof canopy, does not extend further
out into the setback area than the existing building. On the east side the Laverne Avenue Right -
of -Way establishes extensive space between the church building and neighboring homes.
Thank you for your consideration.
d -y
N
NPo�NOL.VI $
Hg' I MR 11
ill 0
69 4
3
3
a
Fj6E �
V
Nda�
�I�I�II
r111L
oda° _
�N
I\s$ — N1WR-3nN3AY WIl — 1 '
33 ore 3 �\0�
Nil
14 HVBO g MON "30N3f"V 0413 3Ntl1 L{v4VS0 p
I s
I \ yb
I.�
d -y
N
NPo�NOL.VI $
Hg' I MR 11
ill 0
69 4
3
3
a
Fj6E �
V
Nda�
�I�I�II
r111L
oda° _
�N
I\s$ — N1WR-3nN3AY WIl — 1 '
33 ore 3 �\0�
Nil
14 HVBO g MON "30N3f"V 0413 3Ntl1 L{v4VS0 p
I s
I \ yb
MEMORANDUM
Date: October 31, 2011
To: Kyle Klatt, Lake Elmo Planning Director
Cc: Jack Griffin, P.E., City Engineer
From: Ryan Stempski, P.E.
FOCUSENGINEERING, inc.
Cara Geheren,P.E. 651.300.4261
Jack Griffin, P.E. 651.300.4264
Ryan Stempski, P.E. 651.300.4267
Re: City of Lake Elmo
Christ Lutheran Church
Building Expansion
Review of Variance Request
We have received the variance request and Building Expansion plans for the proposed Christ Lutheran
Church expansion located at 11194 36th Street. The following items were received:
• Request for Variance — Description and Hardship (3 Page List)
• Plan Set (7 pages) dated October 5, 2011, submitted by Busch Architects, Inc.
This application is incomplete. Additional items must be submitted before a review of this application
can be completed by engineering staff. Please request the applicant to provide and address the
following additional items.
Septic System Compliance and Capacity:
• A septic system inspection Report must be provided and signed by a Licensed Septic Inspector
verifying that the current system is compliant with Washington County regulations.
• The Report must address the available capacity of the system and state its ability to
accommodate the additional use created by the expansion project; or provide a design for its
expansion.
• The Report must include a description of the current system type and components, dimensions,
and capacity.
• The proposed building addition must meet all requirements of Chapter 4 of the Washington
County Development Code.
Water Service Connection:
• The applicant is requesting a second water service connection for the building. The applicant
must provide a detailed narrative to describe the purpose and need for the second service
connection, including projected water uses.
• Only one connection to the Watermain is recommended for the property pending the applicant's
explanation. With a new service connection, the existing service should be abandoned.
• Plumbing permit fees will apply to this proposed work.
• Additional Water Available Charge (WAC) units may apply for this expanded facility use.
Work in the Public Right-of-way:
• This Plan is proposing improvements within the public R/W. Additional information is needed to
evaluate the impact of these improvements to other existing or future facilities and uses of the
R/W to determine whether the R/W encroachment can be allowed.
• Detail plans must be provided to indicate the existing conditions including roadway widths and
all public and private utilities within the roadway. Utility locates will be required for this
information.
Additional Application Requirements:
• A calculation of the total added impervious surface must be provided on the application and
reported in square feet. The Plan must include necessary Stormwater mitigation measures for
applicable city and/or VBWD ordinance requirements.
• The application indicates new light poles. The plans must provide light pole details and standards
including pole height and type, fixture type and photometric plans.
Should the application move forward the applicant will be required to provide detailed plans and
specifications for all work located in the Public R/W prior to gaining final approval of the application.
Details must include but not be limited to the following (All construction details must be in accordance
with the City's Design Standards Manual):
• Typical Sections for the proposed bituminous street and concrete sidewalk.
• Plan details for all work in the R/W including water service connections, curb details, pavement
marking details, and sign details.
• A detailed drainage and grading plan to demonstrate positive drainage within the R/W.
• Concrete curb and gutter and valley gutter will be required along the proposed improvement. All
grades must meet or exceed 1% longitudinal grade.
• Signing and striping will be required for the Drop -Off area.
• Parking and no parking requirements along Laverne Avenue must be evaluated along both sides
of the street for this area.
• Landscape Plan must be included to address removal of existing trees.
• A development agreement will be required with security sufficient to address all proposed
improvements to be installed in city R/W.
• An Ownership and Maintenance Agreement will be required to address the proposed ownership
and maintenance of the proposed infrastructure within city R/W.
November 4, 2011
Mr. Kyle Klatt
City of Lake Elmo
3800 Laverne Avenue North
Lake Elmo, MN 55042
Re: Christ Lutheran Church Addition
Dear Kyle:
Thank you for submitting information regarding the proposal at the Christ Lutheran Church. On
behalf of the Valley Branch Watershed District (VBWD), I have reviewed the information and this
letter provides my comments.
The proposed project involves constructing new sidewalks, paving along Laverne Avenue North, and
expanding the church with a small building addition. The project does not require a VBWD permit
because it will create less than 6,000 square feet and does involve other activities regulated by the
VBWD.
Temporary erosion control measures should be installed prior to any earthwork. The erosion control
measures should be inspected during construction and maintained as needed. Disturbed areas should
be vegetated as soon as possible after disturbance, and no later than 14 days after final grading.
The site is near an area of Laverne Avenue North that floods frequently. While the proposed amount
of imperviousness is less than the amount that triggers the need for a VBWD permit, stormwater
volume control practices are encouraged wherever feasible.
If you have any questions, please contact me at 952-832-2622.
Sincerely,
Jh(S n P. Hanson, P.E.
BARR ENGINEERING COMPANY
Engineers for the District
DAVID BUCHECK • LINCOLN FETECHER • DALE BORASH • JILL LUCAS • EDWARD MARCHAN
VALLEY BRANCH WATERSHED DISTRICT • P.O:. BOX838 • LAKE ELMO, MINNESOTA 55042.0538
www.vbwd.org
S
{
�
±
�
zs
� ` � ! ° � ,!|;; ., || �,� | � �|| | ;|; , r[ |■|
I , ) )Nhj`
ze
se �oIgoEN
H.6N6N HHNHAd HNHRNV7 — — —
m
s
I
IN
a
a
I
sz
mV
gQ
Bo�
1
I
I
i
I
Z
-
0
m
I
1
Q
LU
Q
J
7
W
~ o
-=�
Q
W
�I
V
Cl
I
I
Ll
I
II
I I
li I
11 I
I
11
11 I
II
I I
I]I
�I
1 II
11
II I
I f I
II
I I
11
II I
II I
I II I
I
II
® II I
1 I
I
II
I I
II I
II
I III
1�
11 I
I
I
II 1
II
I II I
[��i�Tr-VIII I�
1 LLIJ �I
I 11
I
�Y-
I
1 I
1
I
I
1 I
1
'® I
I
I
I
I
I
I
1
1
I
I
1 I
1
1
I I
i
i
i
o
i
LS LS
a�
i
0
H
a
LU
W
J
W
I--
co
—c
LU u
CITY OF
LAKE
ELIN(9
City of Lake Elmo 651/777-5510
3800 Laverne Avenue North / Lake Elmo, MIN 55042
November 4, 2011
To I-94 Planning Area Property Owners and Stakeholders:
The City of Lake Elmo has been working over the past few months on a public
participation process for reviewing future sewered areas. As a part of this process, the
City is scheduling an open house for those interested in future growth in Lake Elmo.
This open house will focus specifically on the areas guided for sewered development
south of 10th Street (see map on back for locations).
What: Open House to Discuss Future Sewered Development South of 10th Street
Why: To present information and gather input/feedback from interested parties
When: Wednesday, November 16th from 6:00 p.m. to 8:00 p.m.
Where: Lake Elmo City Hall
3800 Laverne Avenue North
Lake Elmo, MN 55042
City staff will present information on some components of the Comprehensive Plan,
review the City's growth requirements for 2015 and beyond, and display a draft example
of a future land use plan. There will be time to ask questions of staff and opportunities to
provide written comments.
Please feel free to contact me if you have any questions in advance of the open house.
Sincerely,
Kyle Klatt
Planning Director
City of Lake Elmo
(651)233-5402
kklatt@lakeelmo.org
. printed an recycled paper