M/S/P: Lundquist/Williams, move to approve the agenda as presented, Vote: 7-0,
Approve Minutes: November 27, 2017
M/S/P: Williams/Lundquist, move to approve the November 27, 2017 minutes as
amended, Vote: 7-0, motion carried unanimously.
Public Hearing – Preliminary Plat and Development Stage Planned Unit Development
(PUD) Plans - GWSA
Becker started her presentation regarding Legacy at Northstar. The proposal is for 276
single family residential homes on 98.93 acres. It is located northwest of CSAH 14 and
CSAH 17 intersection. A portion of the development is in the Shoreland of Sunfish Lake
which triggers the need for a PUD because proposed lots do not meet the lot width and
impervious requirements for a Natural Environment Lake. The PUD is also necessary
because the density exceeds the allowable density with the Village Urban Low Density
Residential land use category, and because the applicant is proposing other deviations
from zoning standards. The proposed density is 2.78 units per acre gross, 2.82 units per
acre net, and 2.95 units per acre is park dedication is used as Public Park.
This development will require a subdivision and Zoning Map Amendment as it is guided
for Village Urban Low density, but is not zoned as such. Some of the f lexibility being
requested is in regards to lot size and lot width, setbacks, and impervious surface.
In order to meet the bonus density for the PUD, certain amenities need to be included
with bonus points associated with them. The development does provide those
2
Lake Elmo Planning Commission Minutes; 12-11-17
amenities. This development would be increasing the density by 13.25% or 18.47%
increase depending on if there is a public park or not.
The development is subject to the greenbelt corridor/Village Open Space Overlay on the
North and West side of the development. The width of the corridor is not specifically
called out in the Comprehensive Plan, but just scaling it out, it appears to be about 200
feet. There was discussion regarding if that buffer had to be physical feet or if that
buffer could include landscaping with an easement. The plan proposes about 15 feet of
buffer on the North side of the development and no buffer from the lots on the west
side of the development. There are 784 trees proposed.
The trail system is proposed to connect to the Hamlet on Sunfish neighborhood. The
City has been working with the Hamlet HOA to try to get the trails within that
development dedicated to the City. As of now, the City has been unsuccessful in doing
so. Because of that, staff recommends that we obtain the easement for the trails so
that if the Hamlet trails ever become public, we can build the trails.
Becker went through the access and streets. There will be stubs to the North and to the
South and also a stub to the Chavez parcel. The Fire chief, Building Official, City
Engineer and Washington County reviewed the plat and made comments. A few of
those comments include safe routes to school and where a pedestrian cross walk should
be located. There should be connection of stubs and parkways or divided roadways
need to be a minimum of 19 feet. The 276 lots will generate approximately 2760 trips
per day, so 30th Way should be designed as a collector street. The site will be subject to
a grading plan, stormwater management plan and storm sewer system.
The development will be done in 3 phases and the sewer for Hamlet on Sunfish is
proposed to be done with Phase 2. There will some conditions of the Concept PUD plan
approval that still need to be met. Staff is recommending 23 conditions of approval
which include following recommendations from City Engineer, DNR, Washington
County, Fire Chief and Building Official, etc.
Dodson asked why this did not come back as another Concept plan when it changed so
much and a number of items have not been addressed yet. Becker stated that staff
worked with the applicant to change the street layout and they went over the park and
trail with the Park Commission. Becker did not think it warranted going through
concept plan again. Dodson is concerned about the stubs on the South side of the
property as the City doesn’t know what is going to be happening to that property.
Becker stated that the Fire Chief and Building Official recommended putting those in at
least as a temporary cul-de-sac for safety.
Dodson asked what plans the County has for Lake Elmo Ave. Becker stated that the
current requirement is the County requires 150 feet of right -of-way when property is
3
Lake Elmo Planning Commission Minutes; 12-11-17
platted. Currently the County has no plan to put a sidewalk there, but the City is
suggesting that the developer at least put a trail to provide safe access to school.
Lundquist is concerned with the limited entrances and exits for such a large
development. Lundquist is wondering if the developer has made any attempt to
purchase an easement to 43rd Street to have an additional access. The City and County
does not see a problem. There are spacing limitation requirements for County roads
which could be part of the reason.
Dodson is wondering why the City would award 5 amenity points for the Pl aza if those
are private amenities. The amenities are not just for the City as a whole but can be
designed for the residents of the development.
Lundquist asked about the holding ponds and is concerned that they don’t look
anywhere near as large as Village Preserve which barely holds the water there. This is a
field that water pools in all the time and she is concerned that the water will not be
managed. Becker stated that the City Engineer reviewed the stormwater management
plan and did not mention anything in his memo regarding it. The entire site is at 35%
impervious, even though some of the lots have less.
Williams asked to have the 22% open space explained to them. Becker stated that it
includes all of the outlots and stormwater ponds, which can be included per the PUD
ordinance. Williams is wondering why there are not comments from the VBWD. Becker
stated that the Engineers memo states that a VBWD permit is required.
Dorschner is wondering how the City would grant the reuse amenity points when the
City and state doesn’t have any standards for it and the City has never done this before.
Becker stated that the City Engineer would have to review that plan to determine if it is
sufficient and if it works.
Hartley is wondering about the buffer setback and what is being proposed as
landscaping. Becker stated that there is landscaping proposed, no berming, but the City
is requiring a landscape easement.
Kreimer is wondering where the fencing is being proposed and what the other site
amenities are. Becker stated that the fencing is along Lake Elmo Ave similar to Village
Preserve.
Dodson asked about the Chavez property and how that relates to this proposal. Becker
stated that the City is requiring this development to provide the start of access, however
complete access would need to be completed through the Schiltgen property.
Dorschner is wondering why the bonus points are b eing given when the access for
sewer is not part of phase I. Becker stated that with this development, access to sewer
4
Lake Elmo Planning Commission Minutes; 12-11-17
is being provided and perhaps without the increased density, this development would
not go forward.
Craig Allen, GWSA, stated that all changes from the Concept Plan were based on
comments giving during the concept plan. The biggest change was the entrance and
when it was moved down to the south and the way it impacted the stormwater, they
had to move some things around. Dodson asked why the Village Parkway is not being
extended. Allen stated that it is not a collector road, so in discussions with staff, it didn’t
seem to make sense to have a 100 foot right-of-way for a neighborhood development
that dead ends. Parking was added for the pool based on comments and the theming
elements were added. Allen stated the concern regarding only 2 access points is not an
issue. There are many developments in the metro that are this dense with only 2 access
points including the Wildflower development. Allen stated that this will be a unique
development for Lake Elmo. He stated that with the standard 80 foot lots, they would
not be able to move forward as there is just too much supply of that product in Lake
Elmo right now. There is a 10 acre park that they would like to build and maintain. The
pool and clubhouse will be a great amenity.
Dodson asked about the water on the site and the concern that with this many lots, it
needs to be correct. Allen stated that the VBWD and the City will tell them what they
can and can’t do. GWSA is working with an Engineer that is a Storm Water expert and
they say it works. Allen stated that the impervious is 35% on the whole site. On the
Villa lots, the impervious is more like 50%. Lundquist stated that the difference
between the 2 access points from this development and Wildflower is the type of street
they exit from. Lundquist is concerned that there is no easement to 43 rd Street. Hartley
is wondering how the infiltration/irrigation system works. Allen stated that he is not
designing the system and is not sure how it is designed. They are required in Medina
and they work very well. If the pond gets too low, there is a well next to it that will refill
the pond.
Public Hearing opened at 8:20 pm
Joe Chavez, 3505 Kelvin Ave N, own 11.2 acres and they are currently pursuing access
through the Schiltgen farm. If that is unsuccessful, they would try to get a cartway
petition through the City Council and resolve any outstanding issues with the Planning
Director.
Scott Buss, 3948 Kindred Way, feels that this development is supposed to conform to
the Village Low Density standard and this is a major deviation from that. There is a
different standard for lot width, lot area, density and setbacks. He feels this is an entire
standard change and doesn’t understand why we would be that flexible. As far as the
open space, he doesn’t see where the 20% comes in. He is confused on why the open
space would not have to be in the area that they are developing. There is zero buffer on
5
Lake Elmo Planning Commission Minutes; 12-11-17
the West side and a small buffer on the North side when there should be a 200 foot
buffer. This is also a major deviation from what the buffer should be.
Josh Peltier, 4167 Kirkwood Lane, this seems like a very different plan and it does not
address some of the concerns talked about at concept, especially the buffering and
access. This will generate a lot of traffic right by the grade school. He feels that the
standards should be adhered to of at least 100 feet, if not, 200 feet with berms and
trees.
Joe Barweck, 3778 Kindred Ct, feels that adding another 276 homes to the homes
already added with Village Preserve and Wildflower sounds like a death trap. The traffic
on Lake Elmo Ave is already heavy without the addition of 2700 more trips a day. In
regards to connecting the pathway, they are waiting to see what happens with this
development. Their concern is that having the paths private, keeps their green space
private.
There were no electronic correspondence
Public Hearing closed at 8:32 pm
Williams does not agree with the staff analysis of amenity points. For example in
regards to open space, a minimum of 50% would have to be open. There is no way the
open space in this development is anywhere near that amount, so there should be no
amenity points for that. For the public right -of-way dedication, if they arrange to have
the trail along the West side of Lake Elmo Ave, that should qualify as amenity points
because it is not on the project site. The idea of the plaza was that it was going to be
public, but this an HOA clubhouse, so he doesn’t feel that should qualify. The
stormwater management, would qualify for amenity points.
Dodson is confused about the amenity points for the park for free. It is designated on
the plan as open space, not park. Those points are in question for him. Becker stated
that 14 amenity points would be needed to be justify the proposed density.
Dorschner doesn’t see that extending the sewer to Hamlet on Sunfish should qualify for
any points unless they are willing to get that hooked up right away. It isn’t unusual and
is often required of developers to extend sewer lines. Dorschner is not inclined to lo ok
for any density points. He isn’t sure the City should be adding any more density than
they have to, especially in this area.
Larson has a problem with how they are deciding how this is going to be. The neighbors
have a right to expect a buffer from their property. They are using the PUD process to
create a density that is unrealistic. Larson is concerned that this is out of character of
everything around it. The rules aren’t working in regards to what they were supposed
to protect.
6
Lake Elmo Planning Commission Minutes; 12-11-17
Hartley feels that the concerns regarding the overlay buffers were discussed at concept
plan and somehow they have gotten smaller. Hartley feels that somehow they are
being ignored when the Planning Commission talks about a 200 foot buffer and they
come back with 10 feet.
Williams feels that the amenity points relate to density and the buffer issue does not
necessarily affect the density. He would like to talk about density first and then move to
the buffers.
Johnson doesn’t have a problem with the density, but does have concern with the
access and the buffers. Dodson asked what the number of lots are with no amenity
points. Becker stated that it would be 243 lots. Williams stated that they are the
gatekeepers to evaluate a development against their existing zoning code. In this case
because it is a PUD, there can be an increase based on amenity points, but that is the
only mechanism to increase the density. Dorschner is not inclined to have the densities
go up. He is not inclined to change any lot sizes, setbacks or buffers. The
Comprehensive Plan wanted transitions and these lots do not have that. Dorschner
feels that most of the amenity points are a stretch. Larson feels that the buffering is a
problem because the aesthetics are a problem for the surro unding properties.
Emerson stated that the buffers are his biggest issue with the zoning to the North. He
doesn’t have as big a problem with the density. Kreimer stated that they have said all
along that they needed more buffering and it was actually reduced. He doesn’t agree
with some of the amenity points. Kreimer doesn’t think with this density with the
buffers and open space, you can get all the single family homes in. It might require
some townhomes or something. Johnson is wondering what would happen with the
development if they look at different priced homes or something with a smaller
footprint. Allen stated that they had a 20 or 30 foot buffer there and they were told by
staff that he would rather have that taken out and have landscaping u sed.
Williams feels that the current code allows for amenity points under certain
circumstances.
M/S/P: Williams/Dorschner, move to award ten amenity points in the public Right-of-
way category, provided the trail is installed on the West side of Lake Elmo Ave, award
three amenity points for Stormwater management, if a reuse plan is provided and
approved by the City Engineer, and one for theming if the white fencing is installed
along Lake Elmo Avenue, Vote: 7-0, motion carried unanimously.
Dorschner is still confused on why we are awarding amenity points when some of these
things could be required with a regular development. Williams stated that under
normal conditions the City would not require the developer to put in a trail that is not
on the subject property. The stormwater management is receiving points because of
the reuse component. The theming is encouraged, but not required. Dorschner is
7
Lake Elmo Planning Commission Minutes; 12-11-17
concerned about the reuse issue. The state is currently struggling with it and the City
does not currently have guidelines on it. He is concerned if that component is not
approved, what happens. There might also be concern with drilling the well next to it.
Williams is interested in talking about a 100 foot buffer for this development. Williams
feels that to reduce it further, the developer would need to submit a very detailed
berming and landscaping plan to convince them to reduce it.
M/S/W: Larson/Williams, move to support a 100 foot buffer or easement with elements
of visual separation which could include trees, trails, boulders and elements of
landscaping to create a softening effect between higher density and lower density
developments, Motion Withdrawn.
M/S/P: Dodson/Lundquist, move to amend condition #15 to remove the word adequate
and state that the outlots or landscape easement shall be at least 100 feet wide, Vote:
7-0, motion carried unanimously.
Dorschner stated that they should be consistent on the buffers for all the development.
For example with Savona and Stonegate, there was a 100 foot buffer, not contingent on
anything and they should be consistent with that here.
Williams asked if the City Engineer approved the 7’/8’ side yard setback. Becker stated
that the City Engineer did not see an issue with it.
M/S/P: Williams/Kreimer, move to make and additional condition that the 7’/8’ foot
setback requested by the applicant be approved by the City Engineer, Vote: 7-0, motion
carried unanimously.
Dorschner is not going to support shortening any of the setbacks. He feels there are
safety issues. Becker stated that the practice has been to average. The code is 5 feet on
garage side and 10 on living space side. The City has allowed averaging to 7.5 and 7.5 in
the past.
M/: Lundquist/, move to add to Condition #13 that the applicant attempt to obtain an
easement to the North to access 43rd Street, Fails for lack of second.
Dorschner asked if there was parking on both sides of the street. Becker stated that
there would be parking on both sides of the Street. Kreimer is wondering if homes can
have driveways on collector roads. Becker stated that there are no homes fronting the
Collector road.
M/S/P: Kreimer/Williams, move to add condition #25 that the Villa lots shall have a 15
foot minimum front yard setback for side load garages as long as the front of the
garages has architectural details, Vote: 7-0, motion carried unanimously.
8
Lake Elmo Planning Commission Minutes; 12-11-17
M/S/P: Williams/Kreimer, move to recommend approval of the requested Preliminary
Plat and PUD Plans for Legacy at Northstar with the attached findings and amended
conditions of approval, Vote: 7-0, motion carried unanimously.
Public Hearing – Zoning Text Amendment – Solar Farms
Becker started her presentation and outlined the changes based on the Planning
Commission’s recommendations. Changes include deleting the word “wholesale” from
the solar farm definition. Solar farms were added as a condition al principal use within
Ag and RR zoning districts. A ten acre minimum lot size, maximum coverage of 25% and
minimum setback of 50 feet were added as standards for solar farms.
Public Hearing opened at 10:20 pm
Hal Galvin, 1936 Kenwood Parkway, solar developer for solar gardens and he is
interested in tapping into the solar substation in Afton. The substation feeds 4
townships. Galvin is interested in exploring what areas might be compatible. Any new
solar gardens in the Xcel program can only be 1 megawatt or less. A megawatt takes
roughly 8 acres so if the minimum lot size is 10 acres it would take much more than 25%
of the 10 acres. The restriction on covering the ground is really cost prohibitive. The
statement of running lines buried underground is not reasonable because the power is
usually brought up to poles.
Lundquist is wondering if there are any safety concerns with the solar farms. Galvin
stated that they usually have a 6 foot high fence with razor wire and a locked fence.
Dodson is wondering what the solar farm looks like to the neighbors. Galvin stated that
it depends on the permitting authority and what is required. In some instances they are
required to put up trees. Larson asked how far off the ground the panels are. Galvin
stated that there are 2 types of panels. Tracking and fixed tilt. The majority in
Minnesota are fixed tilt. The tracking would sit on a 6 foot pole and then can tilt based
on where the sun is. At the highest, they might be 9 feet in the air. Williams asked
about stormwater management and with 90% coverage, how is that managed. Galvin
stated that there is always a hydrologist on the team and they plant shade grasses that
prevents runoff.
Dorschner is wondering what the benefit is to the City to occ upy 10 acres that would
generate little to no property tax. Galvin stated that the property that would be
classified as agricultural could be rezoned as commercial and the tax base would go up.
The developer pays the difference for the tax impact as part of the contract to
incentivize them to rent to them. Dodson asked what the decommission looks like.
Galvin stated that most developers have similar lease agreements that include
decommission and states that they will return the land to its original state. It is also
9
Lake Elmo Planning Commission Minutes; 12-11-17
usually reinforced by the municipality and they usually require funds in escrow to
guarantee it.
Public Hearing closed at 10:44 pm
M/S/P: Dodson/Williams, move to remove the words “providing daylight for interior
lighting” from the definition of Solar Energy System, Vote: 7-0, motion carried
unanimously.
M/S/F: Hartley/Dodson, move to remove “for the principal purpose of sales of
generated electricity to off-site customers” from the definition of solar farm, Vote: 1-6,
motion fails.
M/S/P: Dorschner/Hartley, move to delete under solar farms item 2, minimum lot size
“and may not cover more than 25% of the parcel”, Vote: 6-1, motion carried, with
Kreimer voting no.
M/S/P: Hartley/Dodson, move to delete item 5 under solar farms regarding power and
communication lines, Vote: 7-0, motion carried unanimously.
M/S/P: Williams/Lundquist, move to change item 6 a under Solar Energy Systems from 5
acres to 10 acres, Vote: 7-0, motion carried unanimously.
M/S/P: Kreimer/Dorschner, move to add to item #2 under solar farms the word fenced,
Vote: 7-0, motion carried unanimously.
M/S/P: Williams/Dodson, move to use the words “Solar Energy System” throughout the
ordinance, Vote: 7-0, motion carried unanimously.
M/S/P: Williams/Kreimer, move to change item 3 signage under Solar Energy Systems to
say “at least”, Vote: 7-0, motion carried unanimously.
M/S/P: Williams/Dodson, move to change the table on page 4 to allow a solar farm as
an interim use in RT, Vote: 7-0, motion carried unanimously.
M/S/F: Hartley/Williams, move to delete everything after the second sentence in item
#5 under Solar Energy Systems, Vote: 2-5, motion fails.
M/S/P: Williams/, move to recommend the solar ordinance be forwarded to the City
Council as amended, Vote: 7-0, motion carried unanimously.
Public Hearing – Zoning Test Amendment – Wind Generator
Public Hearing opened at 11:14 pm
10
Lake Elmo Planning Commission Minutes; 12-11-17
M/S/P: Dorschner/Lundquist, move to continue the public hearing until the next
meeting, Vote: 7-0, motion carried unanimously.
Public Hearing – Zoning Test Amendment – Sign Ordinance
Prchal started his presentation and stated that this has been discussed twice previously
and the suggestions of the Planning Commission at the November 27th meeting have
been incorporated.
Dodson asked how many variance requests there have been in regards to the sign
ordinance. Becker stated that there have been at least 3 in the past year and a half that
she knows of.
Public Hearing opened at 11:19 pm
Kathy Weeks, 3647 Lake Elmo Ave, sign maker by trade and would like the Planning
Commission to consider allowing signs along I94 to be a little bit larger than 150 square
feet, possibly 200 square feet. A typical billboard is 672 square feet, 150 square feet is
very small for along a freeway. She feels that the current sign ordinance is not helpful
to promote business and there have been 4 requests for variances.
Public Hearing closed at 11:28 pm
Larson is wondering what the sign guidelines are for Woodbury. Becker stated that the
guidelines are similar.
M/S/P: Dorschner/Lundquist, move to amend the notes in table 5-3 item b to be up to
250 square feet in size and change materials that match to materials that are similar to,
Vote: 7-0, motion carried unanimously.
M/S/P: Hartley/Williams, move to strike the word “frontage” from the description of
table 5-3, Vote: 7-0, motion carried unanimously.
M/S/P: Williams/Lundquist, move to recommend approval of the proposed
amendments to the City Sign regulations as amended, Vote: 7-0, motion carried
unanimously.
City Council Updates – December 5, 2017 Meeting
i) Continental Properties Comprehensive Plan Amendment and Concept Plan –
failed
ii) CPA and ZTA to amend language regarding allowable density for Open Space
Preservation development – failed
iii) Hidden Meadows 2nd Agreement - passed
11
Lake Elmo Planning Commission Minutes; 12-11-17
Staff Updates
1. Upcoming Meetings
a. January 8, 2018
b. January 22, 2018
2. MAC CEP Report
3. Comprehensive Plan Update
Commission Concerns
Williams stated that his term is up and he decided not to reapply for the Planning
Commission. He has enjoyed working with the Commissioners and staff. Williams
would encourage Commissioners to take classes and understand Roberts Rules of Order.
The Planning Commission members thanked Commissioner Williams and Commissioner
Larson for their service.
Meeting adjourned at 11:39 pm
Respectfully submitted,
Joan Ziertman
Planning Program Assistant