HomeMy WebLinkAboutPZ Minutes; 2-11-19Lake Elmo Planning Commission Minutes; 2-11-19
City of Lake Elmo
Planning Commission Meeting
Minutes of February 11, 2019
Chairman Weeks called to order the meeting of the Lake Elmo Planning Commission at
7:00 p.m.
COMMISSIONERS PRESENT: Cadenhead, Weeks, Hartley, Holtz, Steil and Risner
COMMISSIONERS ABSENT: Johnson
STAFF PRESENT: Planning Director Roberts and City Planner Prchal
Approve Agenda:
M/S/P: Holtz/Hartley, move to approve the agenda as presented, Vote: 6-0, motion
carried unanimously.
Approve Minutes: January 28, 2019
M/S/P: Hartley/Risner, move to approve the January 28, 2019 minutes as presented,
Vote: 6-0, motion carried unanimously.
Public Hearing – Planned Unit Development (PUD) Concept Plan
Roberts started his presentation regarding the Continental PUD Concept plan for a 300
unit multi-family development on 17 acres. The proposed site includes 15 buildings with
20 units each. There are 309 surface parking spaces and a clubhouse, pool and sun
deck, trash enclosure and two pet playgrounds. This development is in the MUSA and
would be served by City sewer and water. The City Engineer submitted a lengthy memo
which included comments on Hudson Boulevard improvements, th e North/South
Collector street, site access, including emergency access, private streets, traffic impact
study, Water, sewer and stormwater, etc.
The proposed land use map in the Comprehensive Plan update shows this site as MU -C.
This proposal would meet that designation as it is at least 50 percent residential and
requires a density range of 10-15 dwelling units per acre. With this pending land use
designation, this applicant will need to wait to submit preliminary and final PUD plans
until final Comprehensive Plan approval.
The proposed development does not propose a public park as it provides recreation for
its residents and Savona Park is to the North. Required parkland dedication fee is 10%
2
Lake Elmo Planning Commission Minutes; 2-11-19
of the purchase price which is yet to be determined. Staff is recommending approval of
the Concept plan based on 7 findings and 16 conditions of approval.
Gwyn Wheeler, Development Director, Continental Properties, they are excited to have
the opportunity to come back with a high quality Springs with the Comprehensive Plan
change. Wheeler stated that they have developed over 21,500 multi-family projects in
over 18 states across the country. Continental develops and manages all of their Springs
properties. Continental feels that the product they have to offer would be in high
demand in Lake Elmo. There are site amenities such as a fitness center, pool, etc. The
buildings have 4 sided architecture. The main access would be off of Hudson Blvd.
Continental is trying to work through an agreement with the property owner regarding
the North/South access road so that they do not bear the whole expense of that road.
Wheeler stated that they would commit to the trail along Hudson, but for the
North/South Road segment, they want to be allowed to work that ou t privately with the
seller so that Continental pays their fair share. Wheeler feels that that should be put in
with the commercial piece.
Risner is wondering if they have worked with the NTSB to figure out the number of trips
in and out each day. Wheeler stated that they are working on that now to create a
better picture. Holtz asked about price range of the product. Wheeler stated that
studios are usually around $1000/month, up to $1400/month for a 3 bedroom.
Wheeler stated that there is somewhat of an al-a-carte option to fit lifestyle and desires,
so there could be premiums added to that base.
Risner asked how long a project like this would take start to finish and if they use local
or regional contractors. Wheeler stated that they would like to get started this summer
if they can get through City and Met Council approvals. It is typically 10 months from
the time they start until the first building and clubhouse. The construction is sequential.
They finish one building and then move on to the next one with one going up about one
every two weeks. Wheeler stated that she thinks construction would be completed the
end of 2020 or early 2021. Wheeler stated that they work with a group of contractors,
but they would hire local subcontractors.
Cadenhead asked about how Continental plans to work with the wetland that is on the
site. Wheeler stated that it is on the list of priorities to resolve and they are doing
analysis on it. They are working with the watershed to try to resolve that. Cadenhead
asked about the traffic calming measures. Wheeler stated that they don’t do speed
bumps because of snow plow considerations, but they do more sound type of measures.
Holtz asked if Wheeler could address the sound proofing measures that they would use.
Wheeler stated at this point it is so early in the project that she can’t get into specifics.
Wheeler did say that Minnesota in general does have pretty high insulation
3
Lake Elmo Planning Commission Minutes; 2-11-19
requirements from an energy efficiency standpoint. Wheeler stated that as a se asoned
owner/operator, they should be trusted to produce a high quality product.
Steil asked about the Fire Chiefs comment regarding emergency access. Wheeler stated
that there is a program that can be plugged in to show how the trucks can meet t he turn
radius based on the specs. It is a common comment at concept plan and they are very
pro-active to make sure this is met.
Cadenhead asked if there is a transit along that road. There is no metro transit along
that area.
Public Hearing opened at 7:46 pm
Annie Daugherty, 553 6th Street LN, is confused why Continental is focusing on this area
and not Inwood and 5th that is already designated as high density residential and is
within walking distance of metro transit. Continental reviews on -line are not good and
she doesn’t know how they can be marketed as a high end product. Daugherty would
like to see split rail or aluminum. Daugherty is concerned about the lack of green space.
There were 3 written comments received. Two had concerns and one was in support.
Public Hearing closed at 7:52 pm
Hartley is wondering if since this property is 100% residential, if there will be a ghost
plat with the original owner that will accomplish the mixed use. Roberts stated that
there is not. The only time you need to do ghost platting is if there is less than 50%
residential.
Risner is wondering if there is something going in towards the North between this
development and 5th Street. Roberts stated that in two weeks, the Pulte townhome
project will be coming forward.
Holtz is wondering what staffs position is on the fencing. Roberts stated that is a detail
that is normally flushed out later in the process. Staff would look for consistency or
needs for the site. It might also depend on landscaping. Roberts stated at this point,
they should be looking at the big picture.
Weeks thinks this plan fits in with the upcoming Comprehensive Plan. Weeks stated the
noise is a preference. If you live by the freeway, it is a personal choice.
Hartley asked the Fire Chief if the plans having one entrance concerns him. Fire Chief
Malmquist stated that this is high level and at this point, they refer them to the
Minnesota State Fire Code.
4
Lake Elmo Planning Commission Minutes; 2-11-19
M/S/P:Cadenhead/Holtz, move to recommend approval of the PUD Concept Plan as
requested by Continental 483 Fund LLC for PID #34.029.21.43.0003 for the project to be
known as the Springs Apartments located on the north side of Hudson Blvd , east of the
future north-south street, subject to the recommended conditions of approval , Vote: 6-
0, motion carried unanimously.
M/S/P: Holtz/Hartley, move to reconsider the minutes of January 28, 2019, Vote: 6-0,
motion carried unanimously.
Holtz wanted clarification at the end of page three to add the words “per person”.
M/S/P: Hartley/Holtz, move to approve the minutes of January 28, 2019 as recently
amended, Vote: 6-0, motion carried unanimously.
Public Hearing – Zoning Text Amendment – Mixed Use Zoning Ordinance
Roberts started his presentation regarding the Mixed Use Business Park and Mixed Use
Commercial Ordinance and pointed out the incorporated changes from the last meeting.
Hartley stated that before Roberts came to the City, there was some discussion about
the use of the word plat. State law describes a plat as an engineering document. This
issue was discussed when major and minor subdivisions was the topic. People were
concerned about metes and bounds parcels and it was decided that a plat would be
required. Hartley is concerned about the use of the word plat in the submission
requirements. Robert is not concerned about that. Hartley thinks that there has been
history of confusing the engineering document of the plat and the approval process.
Weeks feels that the one instance this came up was when they were talking about the
major and minor subdivision and the code has been revised and it is taken care of.
Weeks feels if there is confusion in this ordinance, it should be clarified.
Public Hearing opened at 8:20 pm
No one spoke and no written comments were received.
Public Hearing closed at 8:21 pm
M/S/P: Hartley/Steil, move to recommend staff to forward the Mixed Use Ordinance as
discussed to the City Council for consideration, Vote: 6-0, motion carried unanimously.
City Council Updates – February 5, 2019
1. 2040 Comprehensive Plan Update - approved
Staff Updates
5
Lake Elmo Planning Commission Minutes; 2-11-19
1. Upcoming Meetings
a. February 25, 2019
b. March 11, 2019
Meeting adjourned at 8:35 pm
Respectfully submitted,
Joan Ziertman
Building Permit Technician