HomeMy WebLinkAbout04-01-75 CCMAGENDA-- CITY COUNCIL
CITY OF LAKE ELMO, MINN. 55042
MEETING TO BE HELD ON TUESDAY, APRIL 1, 1975.
7:30 P.M. -- Meeting convenes
Discussion period for Council Members
8:00 P.M. -- Mr. Benson and Mr. Auger from
Battan-Timbers--- Tree Chipper operation
8:30 P.M. -- ITEMS FOR DISCUSSION:
Olinger Plat
Brief discussion --Add to the City Code --
(this should be drafted by Counsel Raleigh).
1. Dealing with planning costs
passed through to developers.
2. Park dedication or in lieu of
funds on other than residential
development.
City position on landfill site proposed
in Lake Elmo by Metro Council Staff.
Waste Control Commission plans hearing
on sewer proposal May 14, 1975 at the
Oakland Jr. High.
MINUTES OF THE LAKE ELMO CITY COUNCIL MEETING APRIL 1, 1975 pg. 1
Meeting called to order at 7:32 PM by Mayor Eder.
Present: Mayor Eder, Councilmen Abercrombie & Pott & Councilwoman
Lyons.
Absent: Councilman Shervheim (excused).
Also Present:Bldg. Insp. Mueller (9:30 PM), Counsel Raleigh & Engineer
Bonestroo (9:15 PM).
Minutes: Motion by Councilman
approve the Minutes
submitted. Carried
Pott second by Councilwoman Lyons to
of the March 18, 1975 meeting as
4-0. Councilman Shervheim absent.
Legislation:Hubert Humphrey III has introduced legislation which places
excessive controls in the hands of the Metro Council. Lake
Elmo just became aware of it. Council to take copy of the
bill and review it. A voice opinion poll of all members will
be taken and a letter indicating consensus of opinion of the
Lake Elmo Council be sent on to the legislature until
formal action can be taken at a regular meeting of the council
Landfill site: Mayor Eder has been in contact with county relative to
the placement of a new landfill site in the Lake Elmo -Oakdale
Area (Sections 20,28 & 29-Parts of). The committee has not
finalized its decision. A second site of 280 acres is in
May Township and a third site of 400 acres is located in Hugo.
One advantage to the Lake Elmo -Oakdale site is the proximity
to the metro area. It was pointed out that part of the run-
off that ends up in Eagle Point Lake drains through this area.
File turned over to PZC Chairman Johnson for review.
Pebble Park:Park Advisory Board advised that David Kirst would like to
make a presentation regarding the development of Pebble Park
to the council and members of the PZC. One hour will be set
aside during the council meeting April 15, 1975 for present-
ation and a question and answer period. (7:45-8:45).
Arrangements should be made for larger facilities so adequate
space is available for interested citizens.
Barton Timber:Mr. Benson & Mr. Auger were on hand to answer questions
regarding subject operation. The large chipper was received
last December 7. It is not housed but reportedly does not
cause excessive noise levels. Equipment does not handle brush
but a new piece of equipment is due this week that will
handle the brush. Equipment produces 1050 yards per day of
chips. The average yds. per ton is 4. Presently 2 acres of
trees and brush are stockpiled. New chipper will definitely
be noisier than original equipment. Mr. Benson to advise the
Lake Elmo Office when equipment arrives on the site. Mr.
Benson agreed to have all material 2" and over chipped by
April 15, 1975. Mr.Beach will inspect and if material is a
biological hazard it will be ordered destroyed.Mr. Benson
requested permission to operate during the daylight hours
until the material is cleaned up.
Motion by Councilman Abercrombie 2nd by Councilwoman Lyons
to authorize operation during the daylight hours up through
May 1, 1975. Carried 4-0.
MINUTES OF THE LAKE ELMO CITY COUNCIL MEETING APRIL 1, 1975 pg. 2
Planning costs:Question has been raised relative to planning costs being
charged to developers. Counsel presented report indicating
( that this was adequately covered by the Municipal Code.
Park Dedication:Counsel presented memo on current policy. Copies of memo
to Park Board & to the PZC.
Road Plan: Engineer given approval to work with the chairman of the PZC
in updating our comprehensive road plan.
PZC Sub -committee: Question from PZC minutes relative to what differences
exist between Oakdale and Lake Elmo PUD Ordinances. Counsel
Raleigh instructed to contact Oakdale Counsel and determine
the extent of the differences and report back to council.
Water tank: Motion by Councilman Abercrombie 2nd by Councilwoman Lyons
that we should take bids and set opening for bids for
painting the interior and the exterior of the water tank for
May 6, 1975. Carried 4-0. Engineer advised that specs
would be available by April 21, 1975.
Sewer: Mr. Jensen of S.D.834 asked about the possibility of the
Oakland School hooking up to the Cimarron Sewer System.
Motion by Councilman Pott 2nd by Councilwoman Lyons author-
izing engineer to explore situation and report back to the
council at the April 15, 1975 meeting. Carried 4-0.
Roads: Motion by Councilman Pott 2nd by Councilman Abercrombie to
have engineer review the gravel roads and come up with a
proposal (possibly a five year plan) on retiring the gravel
roads. Carried 4-0.
Bike Trail: Clerk instructed to direct letter to DNR regarding dust
control in the bike trail in Lake Elmo.
Claims: Motion by Councilman Pott 2nd by Councilman Abercrombie to
approve payment of claims 75176 thru 75206. Carried 4-0.
RR Crossing:Motion by Councilman Abercrombie 2nd by Councilman Pout to
install stop signs at all RR crossings in Lake Elmo that are
not presently posted. Carried 4-0.
Richert Gravel Pit:Request from Shafer Contracting to use North exit
from Richert Gravel Pit until use of Southern route can be
obtained. Matter to be referred to PZC.
Board of Review:Clerk advised that county assessor has established May
22, 1975 from 9:30 AM to 3:30 PM for the Lake Elmo Board of
Review. The assessor, clerk and council quorum should be present.
Adjournment:Motion by Councilman Abercrombie 2nd by Councilman Pott that
council adjourn at 11:35 PM. Carried 4-0.
t Donald Mehsikomer
Clerk -treasurer
Lake Elmo, Minnesota
r�
MINUTES OF THE LAKE ELMO CITY COUNCIL MEETING
APRIL 1, 1975 pg. 1
Meeting called to order at 7:32 PM by Mayor Eder.
Present: Mayor Eder, Councilmen Abercrombie & Pout & Councilwoman
Lyons.
Absent: Councilman Shervheim (excused Also Present:B1dg. Insp. Mueller (9:30 PM;.
, Counsel Raleigh & Engineer
Bonestroo (9:15 PM).
Minutes: Motion by Councilman Pott second by Councilwoman Lyons to
approve the Minutes of the March 18, 1975 meeting as
submitted. Carried 4-0. Councilman Shervheim absent.
Legislation:Hubert Humphrey III has introduced legislation which places
excessive controls in the hands of the Metro Council. Lake
Elmo just became aware of it. Council to take copy of the
bill and review it. A voice opinion poll of all members will
be taken and a letter indicating consensus of opinion of the
Lake Elmo Council be sent on to the legislature until
formal action can be taken at a regular meeting of the council.
Landfill site: Mayor Eder has been in contact with county relative to
the placement of a new landfill site in the Lake Elmo -Oakdale
Area (Sections 20,28 & 29-Parts of). The committee has not
finalized its decision. A second site of 280 acres is in
May Township and a third site of 400 acres is located in Hugo.
One advantage to the Lake Elmo -Oakdale site is the proximity
to the metro area. It was pointed out that part of the run-
off that ends up in Eagle Point Lake drains through this area.
File turned over to PZC Chairman Johnson for review.
Pebble Park:Park Advisory Board advised that David Kirst would like to
make a presentation regarding the development of Pebble Park
to.the council and members of the PZC. One hour will be set
aside during the council meeting April 15, 1975 for present-
ation and a question.and answer period. (7:45-8:45).
Arrangements should be made for larger facilities so adequate
space is available for interested -citizens.
Barton Timber:Mr. Benson & Mr. Auger were on hand to answer questions
regarding subject operation. The large chipper was received
last December 7. It is not housed but reportedly does not
cause excessive noise levels. Equipment does not handle brush
but a new piece of equipment is due this week that will
handle the.brush. Equipment produces 1050 yards per day of
chips. The average yds. per ton is 4. Presently 2 acres of
trees and brush are stockpiled. New chipper will definitely
be noisier than original equipment. Mr. Benson to advise the
Lake Elmo Office when equipment arrives on the site. Mr.
Benson agreed to have all material 2" and over chipped by
April 15, 1975. Mr.Beach will inspect and if material is a
biological hazard it will be ordered destroyed.Mr. Benson
requested permission to operate during the daylight hours
until the material is cleaned up.
Motion by Councilman Abercrombie 2nd by Councilwoman Lyons
to authorize operation during the daylight hours up through
May 1, 1975. Carried 4-0.