Loading...
HomeMy WebLinkAbout09-09-75 CCMMINUTES OF THE SPECIAL MEETING OF THE 'LAKE ELMO CITY COUNCIL MEETING SEPTEMBER , 1975 Meeting called to order at 7:03 PM by Mayor Eder. Present:Mayor Eder, Councilmen Abercrombie, Shervheim & Pott & Councilwoman Lyons. Also Present:Counsel Raleigh & Engineer Noyes. Y Flood Control;Engineer Noyes advised that Lake Jane had receded from 921.94 to 921.67 from Sept.. 2 thru Sept. 9, roughly 3".. He reported that to construct a 30" gravity outlet from Lake Jane to Berschen's Pond would cost approximately $30,000., Based on cost of pumping it would take 3.42 occurances to break even with gravity outlet. Again based on history this type of high water conditions exists only once every 25 years. The break even point in terms of time is then.85.5 years. A similar realationship for a lift station from Berschen's Pond to the city park shows a break even time factor of 142 years. Equipment involved in lift station would probably have to be replaced every 25 years,. Mr. Noyes submitted a Flood Control Outline of Study, dated September 2, 1975, for consideration. Motion by Councilman Shervheim 2nd by Councilwoman Lyons to approve the preliminary concept for the interim plan. Carried 5-0. Adjournment: Motion by Councilman Abercrombie 2nd by Councilman Shervheim to adjourn at 7:40 PM. Carried 5-0. Donald Mehsikomer Lake Elmo City Clerk