Loading...
HomeMy WebLinkAbout10-21-80 CCMLAKE ELIMO CITY COUNCIL MEETING, OCTOBP,i?. 21, 1980 Mayor Armstrong called the meeting to order at 5:03 p.m. Councillors in attendance: Novak, Pott, Morgan, Mottaz (5:15) AGENDA.: ADDITIONS — Metropolitan Open Space Plan Armstrong moved, seconded by Morgan, to approve the agenda as amended.. Motion carried ).�-0. Mottaz absent. MINUTES: Correction - October 7, 1980 — Page 6, Odin Olson — the garage will be 2 ft. higher than the maximum 14 ft. to .....Motion corrected to read... the garage to be 2 ft, higher than the maximum 14 ft..#.#. Armstrong moved, seconded by Morgan, to approve the minutes of October 7, 1980, as amended. Motion carried 4-0. CLAIMS: Additions — George Seigfried, Park Shelter — $$129$80.80. (10% of the unpaid balance will be held for clean—up); and Christ Lutheran Church, Saurkraut Dinner for the Council — $$33.75 Pott moved, seconded by Armstrong, to approve Claims 80714 thru 80751, including the two additions. Motion carried 11 0. Administrator Whittaker will check the assessments for Irvin Court, Beutel Pond, and Legion Pond for the next meeting, BUILDING INSPECTOR'S REPORT: .A. City Office Roof — Bids on the office roof will be ready October. 28. The roof cannot be insulated because the roof supports will not bear the load. The entire roof will have to be done, temporary tarring cannot be done, The Council has scheduled a special meeting on October 28, to consider the bids, (Note date change later in meeting.) B, Park Shelter — Thkee minor items need to be completed: the heating system, privacy shield for the menb restroom and clean—up. NOVEMBXR 4, 1980 COUNCIL MEETING: Armstrong moved, seconded by Novak, to change the November 4, 1980, meeting to Wednesday, November 5, 1980 at 6:30'P.m. Motion carried 4-1. Pott opposed. He prefers a 7:30 meeting time. The meeting was changed because of the election. ADMINISTRATOR IS R11PORT: A. Bids -Y Civil Defense Sirens — The City received one bid for MgWO, for the Cimarron siren. The Administrator recommended rejecting the bid and rebidding for Cimarron and Tri—Lakes on October 31. He does not feel. the City should accept a bid that is more than 50% over the estimated cost. The Council discussed siren size and what was included in the original estimate; Pott recommended the siren bid be a smaller horsepower unit. The Council agreed., if this were possible. Armstrong moved, seconded by Morgan, to reject all bids and rebid the Civil Defense sirens for Cimarron and the Tri—Lakes. Motion carried 5-0. B. Status Civil Defense — 1. Cimarron Meeting — The Administrator reported that the meeting went well with Cimarron; but, only about 20 residents attended. 2. Civil Defense Director — Mayor Armstrong reviewed the Council's con— versation with Reneta Paulson, the new Civil Defense Director. The Council `agreed to pay expenses and mileage; but, indicated this is a volunteer /paxt—time job with no reimbursement other than expenses, The Council agreed that some short mileage trips be borne by the Director. LAKE ELMO CITY COUNCIL MEETING, OCTOBER 21, 1.980 -2- Civil Defense Director Cont'd — The Administrator will meet with Mrs, Paulson and outline the parameters of the job. 'The Council recommended that the Director attend the Damage Assessment Conference. C. Auditors Contract — The Administrator recommended the Council retain the firm o£ DeLaHunt, Veto. After reviewing the Administrator's memo L dated September 28, 1980, evaluating all the auditing firms and discussing the bids, the Council decided to award the contract to the low bidder, Armstrong move, seconded by Pott, to award. the Auditors Contract to the low bidder, Moen & Penttila, Ltd, at $5,700. Motion carried 5-0, The Council requested that ;:this ,years audit report be presented in a more simplified form, PARK COMMISSION. Tom Monette reported on how the money from Jaycee's Buff: and Puff Days is allocated. $1,000 has been expended in Tablyn Park on picnic tables and grills. This off —sets the 819000 City expenditure for play equipment at Lake Elmo school. These amounts cancel out each other in the 1980 Budget. A. Park Plans 1,1, Tablyn. Park — Leo Gehloff present the Master Plan for Tablyn Park. This plan was accepted in June of 1978. Development of the park is < following the projected schedule, Walking trails in the park are being bid now; and will be completed this year. Mottaz moved, seconded by Morgan, to accept the Master Plan for Tablyn Park, Motion carried 5-0. 2. DeMontreville Park — Jim Yarusso presented the Master Plan, completed in 1979. Iie outlined the proposed uses in the two park sections. The main park is designated to retain its natural characteristics. Walking trails will constitute the primary development. The small 6 acre park will provide more active park use, The Council discussed the limited parking area for the 24 acre park. This area can be expanded should the need arise. Armstrong moved, seconded by Mottaz, to accept the Master Plan for DeMontreville Park, with the recommendation that the Park Commission study future expansion of the parking area. Motion carried 5-0. 3. Lions Park — Sue Dunn presented the Master Plan. She reviewed the work that has been completed, the park shelter, ball diamond, fencing, etc. Resurfacing of the tennis courts will be bid in the spring. .. Pott asked if the Commission would be receptive to trading a portion of the park land, in back of the park shelter, to Lake Elmo hardwood in exchange for a second City well site. The Commission would like to avoid giving up any park property, if possible. Armstrong moved, seconded by Pott, to accept the Master Plan for Lions Park. r Motion carried 5-0. The Park Commission will be consulted about netotiations \_ between the City and Mr. Rogers. LAKE EIMO CITY COUNCIL MELTING, OCTOBER 21, 198o PARI{ COMMISSION: J�. Sunfish Park — Ed Nielsen present the Master Plan for Sunfish Park. Be reported that the Commission intends to keep this park primarily in a natural state with walking trails, ski trails, and l picnic areas. They do not intend to expand the parking area. The Council asked the status of the agreement between the Commission and Valley Branch Project 1005 relating to pumping across the ski -trails in the spring. The Commission ,passed a motion stating no pumping should be done between November 15 and March 1,5. This, and possible bridge trailq will be discussed with the Watershed. The Council discussed the offer from Everett Beaubien to purchase additional lakeshore around Sunfish Lake. This offer will be discussed at the November meeting. Mottaz moved, seconded by Pott, to accept the Master Plan for Sunfish. Park. Motion carried 5-0. 5. Reid Park — A concept plan has been discussed; but, no Master. Plan has been developed. The Council and the Park Commission agreed to delete the pool concept and the golf course from the 20 year plan. .The Commission will continue to work on developing a Master. Plan. B. 5—Year and 20—Year Capital Plan — Councilman Morgan gave a, brief Synopsis of future park use projections. He stated the Commission does not intend to acquire additional park land; and, that current park development has been designed and constructed for low maintenance at the lowest possible cost. Money is available in the Park Reserve to cover all -the items listed in the 5—Year Plan. The 20—Year Plan contains suggestions -that could be needed or considered within 20 ,years. C. _1g81 Capjta7..Budet — Many listed items were appropriated in 1980. Additional playground equipment has been included. Items in Lions Park, not completed in 19809 will be carried over to 1981. Armstrong moved., seconded by Mottaz, to approve the 1981 Paxk Budget. Motion carried 5-0. (A copy of the 1981 Budget attached hereto) DINNER,.: CHRIST LUTHERAN CHURCH ENGINEER a S REPORT: A. Derrick's Bond and Acceptance — 5th and 6th Addition — The developer has requested the City accept the street and storm sewer improvements prior to clean—up and total reduction of the bond, The Engineer reported some ditching and cleaning out of a pond remain incomplete. Brian Crombie, Derrick Land, does not think the pond work can be completed until spring. IIe stated the waterway ditiching is complete. Derrick would like the City to accept the completed improvements and retain the remaining bond ($5,000) until the pond work is completed. Engineer Bohrer said th.er was no problem in accepting the improvements. Administrator Whittaker recommended accepting -the improvements and retaining the bond. Armstrong moved, seconded by Morgan, -to adopt R-80-591 accepting the r improvements for DeMontreville Highlands 5th and 6th Addition. Motion carried 4-0. Mottaz absent. Crombie said he will try to get the pond dredging completed this fall. R-80-59 RESOLUTION CITY OF LAKE ELMO WASHINGTON COUNTY, MINNESOTA A RESOLUTION ACCEPTING THE STREET AND STORM SEWER IMPROVEMENTS FOR DEMON'REVILLE HIGHLANDS 5TH ADDIITION AND DEMONTREVILLE HIGHLANDS 6TH ADDITION AND REDUCING THE BOND TO $5,000.00 PRIOR TO FINAL CLEANUP. WHEREAS, the developers of Demontreville Highlands 5th Addition and Demontreville Highlands 6th Addition have completed the street improvements and storm sewer improvements required under the Development Agreements between the City and said developer; and WHEREAS, said street improvements and storm sewer improve- ments have been inspected by the City Engineer and said City Engineer has recommended acceptance of these improvements; and WHEREAS, the City Engineer has reported to the City ( Council that some ditching and cleanup work of a pond remain to be completed, but that the developer and the City Engineer feel this final work cannot be done until the Spring of 1981; and WHEREAS, the City Engineer has recommended the City retain a bond of $5,000.00 to assure completion of the ditching and pond cleanup; and WHEREAS, Section 401.510 D of the Subdivision Ordinance provides the subdivider shall warrant the said improvements for one (1) year after their. acceptance; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lake Elmo as follows: 1. The street improvements and storm sewer improvements constructed by the developer of the plat of Demontreville Highlands 5th Addition and Demontreville Highlands 6th Addition be, and the same hereby are, accepted by the City Council for maintenance subject to the right of the City to require the developer to perform any corrective work which may appear to be necessary to the City for a period of one (1) year following the adoption of this Resolution. 2. The City acknowledges that some final cleanup work remains to be done relating to a ditch and a pond and that this work will be completed as early as possible in the Spring of 1981. In order to complete this work, the developers bond shall be reduced to the sum of $5,000.00. 3. The City acknowledges the installation of certain utility improvements by the developer and various public utilities in the plat of Demontreville Highlands 5th Addition and Demontreville Highlands 6th Addition, however, the City accepts no responsibility whatsoever for maintenance of these utility improvements. Adopted this 21st day of October, 1980, by the City Council of the City of Lake Elmo, Washington County, Minnesota. Thomas G. Armstrong, Mayor ATTEST Laurence Whittaker City Administrator -2- . LAIQ LLMO CITY COUNCJIL M KINC, OCTOBER 219 1980 _4_ ENGIN:EER'S REPORT: B. Ilubo.ette- _Culvert: Donald. Hubenette, 8160 Hill Tr.. N., contacted the Administrator about spring flooding of his property, caused % by the culvert between his property and Olson Lake. The culvert freezes, 1 restricts the run—o£.f. and backs the water 'up on Hubenette's property. The solution would be a culvert that provides access from the top in order to thaw it out. Estimated cost would be $800 to $10000. This problem exists for about one week in 'the spring. The culvert is presently under— water, and once opened the lake is free to flow back onto the property. Mottaz recommended plugging the culvert and fill the yard and driveway area. The Engineer felt the culvert should remain open in case the lake recedes, but agreed with the filling proposal. The Council agreed; and instructed. the Admin:S.strator to notify Mr, Hubenette of this recommendation. C. Boutel. Pond — The valve needs to be installed. Engineer Bohrer is waiting for final approval from the County and verification that all their downstream improvements are complete. This project should be completed by November.l. D. Eagle Point Channel — Harem's Driveway — Engineer Bohrer distributed the survey that showed where the driveway, culvert, and channel are in relation -to the City's property and adjacent property. The culvert is on City property. Ile recommended a complete title search be made. The City withdrew its offer to Haxdys, on relocating their driveway, on September 2,5, 1980, after no response was received to the offer. The Council will reevaluate this after the title opinion is complete and it is determined how long the driveway has existed. The Council will then decide on renegotiating the offer or beginning the necessary channel work, E, Maintenence Building — Legion Pond — The Council ordered the Legion Pond project, per the submitted petition, on October 7. The petitioners decided to do the wotk themselves and withdrew their petition October 111. They will still use the fill from the Naintenance Building site., The Council discussed the expenses incurred from the time the petition was received until the petition was withdrawn and who is responsible for the exgineering and expenses. Armstrong moved,seconded by Novak, to allow the petitioners to withdraw their petition provided that an agreement is reached whereby all the expenses the City has incurred will be paid by those petitioning. Discussions the Engineer estimated between $500 and ,$1,000 has been expended, ( The petition was dated October 3, the project was ordered October 79 and the request to withdraw was received October 14.) Motion carried 5-0. The Council further discussed what benefit the petitioners received for this expenditure, Morgau asked for a breakdown of the costs. The Engineer will compile the figures. Ile also stated work has begun on the residents property by a, private contractor, 4.he Building Inspector will continue — to inspect the sewer systems. (_ Armstrong moved, seconded by Novak, to rAind the previous motion and con— sider the petitioners request to withdraw and their liability when exact costs are available. Motion carried 5--0, LAKE UMO CITY COUNCIL MEETING, OCTOBE$i 21, 1980 -5- ENGINEER'S REPORT: Maintenance Building Fill - Bob Mogren, contractor for the Legion Avenue residents, contacted the .Engineer about using the material at the landfill. The 11agineer said he should be able to remove almost all the excess material at no cost to the City. The Council agreed that removing the fill is of substantial benefit 04900045,000) to the City and that no costs should be assessed against the three Legion Pond petitioners. The Administrator recommended getting a price from Mogren to .finish the rough grading and gravel work on the driveway and in front of the building. The Council discussed location of the driveway. Armstrong moved' seconded by Mottaz, to reaffirm the original site plan location of the Maintenance Building driveway across from 42nd Street. Motion carried 5-0. The Administrator will get a qudse from Mogren to finish the ,grading work as shown on the plan, This will be ready ,for the Special Meeting October. 28, MEETING DATE CIIANGE: Armstrong moved' seconded by Mottaz, to change the scheduled Special Meeting from October 28, at .5:00 p.m. to Wednesday' October 29, at 5:00 P.M. in order that Councilman Morgan can attend. Motion carried 5-0 Bids on Park Trails, Office Roof, Jamaca Gate, and Finish Grading at the Landfill will be considered. 15TH STREET VACATION: Mayor Armstrong reopened the public hearing at 8:12 p.m. There was no one in the audience for the hearing. Mayor Armstrong closed the hearing at 8:13 p.m. Armstrong moved' seconded by Mottaz, to adopt R-80-609 vacating 15th Street as indicated on the map. (Map attached and a part of these minutes.) Motion carried 5-0, SUMMARY ACTION ON LEGION POND: The Administrator reviewed the Engineers report on pumping of the test wells. He reported that the water filled back in, within minutes of being pumped out, thus indicating it is a groundwater problem, as the Engineer had previously indicated. ADMINISTRATOR'S REPORT: B. Firemens Camp Plan - Councilman Pott reported that the proposed plan met with genera]. agreement of the Firemen. $5,300 was budgeted for the firemen. It was distributed as follows: Chief - $125 per year; Assistant Chief - $6100 per year; Ca tains - $675 per year; and Firemen $50 per ,year. The balance (about $4,000� will be prorated on man -calls, per man. This was developed by the Firemen. The Chief will present the final plan. Morgan moved, seconded by Armstrong, to accept the proposed plan and dis- tribution of the $659300 Firemen's Budget, subject to final presentation of the plan by the Fire Chief, Motion carried 5-0. E. Christman Lights - Armstrong moved, seconded by Morgan, to budget $6200 to cover expenses in putting up and taking down the Christmas lights; and the City will follow the same procedure used. .last year. Motion carried 5-0. RESOLUTION CITY OF LAKE ELMO WASHINGTON COUNTY, MINNESOTA A RESOLUTION VACATING A PORTION OF 15TH STREET NORTH. WHEREAS, the County of Washington has submitted to the City of Lake Elmo a Petition praying for the vacation of a portion of a public street in said City legally described as follows, to -wit: That part of 15th. Street North, commencing at the West Quarter Corner of said Section 27; thence North 89 degrees 11 minutes 48 seconds East (Bearing based on the Washington County Coordinate System South Zone) along the East - West quarter section line of said Section 27 for 1761.70 feet to the point of beginning of that part of 15th Street North to be vacated, said point of beginning also being a point in the center line of 15th Street North; thence continuing in an easterly direction along the traveled center line of said 15th Street North to a point where said traveled center line inter- sects the North line of said Government Lot 4 and said Vacation there terminating, The north- erly right-of-way line of said 15th Street North to be vacated is to terminate at the North line of Government Lot 4 and the southerly right-of- way line is to terminate at a point of inter- section with a line described as follows: Commencing at the Northeast Corner of said Government Lot 4, thence South 89 degrees 11 minutes 48 seconds West along the North line of Government Lot 4 for 788.5 feet; thence South 0 degrees 48 minutes12 seconds East to the intersection with the Southerly line of said 15th Street North and said line there terminating. WHEREAS, said Petition came on for hearing before said City Council at a regular meeting thereof held on Tuesday, October 21, 1980, pursuant to Notice thereof published and posted as required by law; and W WHEREAS, the City Council has reviewed this Petition with concern for the interest of the public; and WHEREAS, the street proposed for vacation is no longer, needed as a public street; moreover, by vacating the same, the property will be returned to the tax rolls and will enhance the taxable value of all the lands abutting thereon and affected thereby; and WHEREAS, for the foregoing reasons, it appears to be in the public .interest to vacate the street described above; NOW, THEREFORE, BE IT RESOLVED, the above -described street be, and the same hereby is, vacated. BE IT FURTHER RESOLVED, that the Clerk shall prepare a Notice of Completion of these proceedings which shall contain the name of the City, and the identification of the vacation, a statement of the time of completion thereof and a description of the real estate and land affected thereby. Such Notice shall be presented to the Washington County Auditor who shall enter the same in his transfer records and note upon the instrument over his official signature the words "Entered in the transfer records". This Notice shall then be filed with the County Recorder, all as required by Section 368.01, Sub- division 25 of the Minnesota Statutes. Adopted by the City Council of the City of Lake Elmo this 21st day of October, 1980. ATTEST: Laurence Whittaker City,Administrator Thomas G. Armstrong, Mayor -2- LAKE ELMO CITY COUNCIL MR17PING, OCTOBER 21, 1980 -6- ADMCNIST'RATOR'S REPORT- P. Lake Sevols Ponds in Region Park Reserve — The Administrator reported that the dike in down on Eagle Point, and the maintenance crew cleaned out the outlet to Lake Elmo and distributed a copy of the lake levels for Eagle Point and Lake Elmo, He will meet with the County and discuss ponding between the ]sakes soon, G. Licenses — Morgan moved, seconded by Armstrong, to approve the following licenses: Montgomery Ward & Co., 1)00 University, St, Paul — heating; and, Hinding Co., Inc., 915 W. 7th, St, Paul — heating and air conditioning. Motion carried 5-0, COUNCIL REPORTS: A. Clown—U DaYs — The,Administrator reported Clean —Up Days went as usual. Neither the hauler nor the paper truck came. Pdtt noted that these people should be contacted further ahead and the re -cycling aspect stressed. The Administrator will prepare a cost breakdown of Clean —Up Days to determine if two days a, year are economically feasible or necessary. B. e,n S acme flan. — Administrator Whittaker reviewed his comments on the Metropolitan Open Space Plan with the Council. The Council agreed with his comments and recommendations. The Administrator will write the Met Council and reitterate the City0s concerns about the plan. I11'ITTLE SUNI'ISII/CIMARRON HEARING- Mayor Armstrong reopened the hearing at 8-30 p.m. Engineer Bohrer reported that he has continued to study the alternatives available; and has contacted thr regulatory agencies to begin the nermi+ -process. Ile also reported he had appeared. before ValleyBranch and the PCA to present the feasibility study. Valley Branch, indicated that Alt. 2 and 3 were unacceptable unless all other alternatives were infeasible. They feel the flooding should be.solved on —site. The indicated they are firmly committed to provide an outlet to horseshoe Lake; in conjunction with I-94 construction, about 198L4. PCA indicated no concern with the dike. They expressed concern about water quality after the flooding. (Since the last meeting, Cimarron has begun plans to implement Alternate 1, the flood protection dike.) Engineer Bohrer stated that the dike will give reasonable assurance that the treatment plat will not be endangered; but did make them aware that the first effluent pond (lagoon) would, overflown into Little Sunfish if the water level around the pond was not reduced., along with the possibility of the treatment plant flooding. If the plant flooded, the PCA and the Health Department have the authority to close the park, if t1W determine a health hazard exists. DNR has been contacted. They indicate agreement with Valley Branch on transfering water downstream. The flood protection, dike does not require a permit from PAC or DNR. Valley Branch may require one, COMMENTS- Councilman Mottaz asked if the dike were constructed, would this assure that the park would not be cl.os.ed next spring? }engineer Bohrer indicated a 75% assurance. Unforseen conditions could cause flood waters to top the dike and there are constructural limitations on its height. Mayor Armstrongs.aid a solution. must be found that assures the park will not be closed. LAKE ELMO CITY COUNCIL MLETING, OCTOBER. 219 1980 -7- LITTLE SUNFISH HEARING: Engineer Bohrer estimates 125 acre feet need to be removed or stored, Jess Mottaz asked if ground water or run-off is responsible for flooding, Engineer Bohrer replied both affect the lake; but, he does not know which is the predominant factor. Records from Valley Branch, piezometer readings by Cimarron and TKDA all locate the ground water table within 1-2 feet of each others reading. This indicates that 6 feet or so can be removed from Little Sunfish before getting into the ground water table. If six feet are removed, the Engineer said the plant would be almost 100•1 safe. Steven Taylor, Cimarron, asked if there was an over -flow would 6 .feet still have to be removed from Little Sunfish to get the same results? Dagineer Bohrer said no, Steven Taylor asked how much would have to be removed with, over --flow? Ehgineer Bohrer said an over -flow would have to be installed a few feet lower than the present water surface of 879. If this type of over -flow is allowed, it would have to be a valved type similar to Beutel Pond, that could be opened and closed as necessary, Councilman Morgan noted that somewhere between 0 and 125 ft, would help. Engineer Bohrer said you would get some help by diking, somemore by transferring into other potholes. is estimate of 125 acre feet includes water that is in Little Sunfish and some estimate of bank storage that will, seep out as the water is being removed, but no recycling of any ground water. Councilman Mottaz asked .for a clarification of the Board of Managers decision that, even though we are'faced'with a good possibility (90&/) of having to close Cimarron Park, they would not give the City a permit to pump out 125-acre feet into an area that is not flowing out. It will not ad.d to the elevation of Horseshoe Lake nor the rate the water is flowing out. Would you (VBW.D) rather the City take the risk of losing sewer for 25% of the pipulation of Lake IRmo next spring than to authorize the City or give up permission to pump out 125 acre feet? George Hedges - Larry Bohrer said we have flooding problems downstream already and, VBWD would like to see everything else possible done before we start passing off water. Engineer Bohrer went on to say that the general lay of Cimarron's property is not conducive to pending. There are no natural depressions. In his opinion, one would have to make a depression by making a :dike or ex- cavating. Another possibility is to split Little Sunfish Lake in half at County Road. 70 by blocking the connecting culvert, which is submerged. He had approached the County with the possibility of plugging this large culvert, installing a small culvert at a higher elevation to protect their roadbed (they would not allow anything that would. saturate their subgrade) and then pump some of the water from the south side to the north side. This would increase the level of the north side about four feet. The water would encroach onto some property that it is not encroaching on now: Tartan Meadows Subdivision. And, it would, jeopardize the gravel driveway to the farmsted at Tartan Park. The gravel driveway would have to be relocated - probably across Paul Emerson's property, if he would agree. The County would not give the Ilhgineer a firm answer. They recom- mended sumitting a permit application for consideration. Administrator Whittaker asked the cost of this vs pumping. Bohrer does not have an accurate cost analysis; but estimated pumping 125 acre feet would be $109800 and pumping half the amount could be about half the cost regardless of where it is pumped. Additional costs would be in installing the culvert across County 70. This cost could be about $1,000 if the County allows the City to open -cut the County road. Generally, however, they require augering underneath the road. This operation would be at least as expensive as Alternate 2 ($109800), LAKE FLMO CITY COUNCIL MBlw.PIIqGo OCTOBL'R 21, 1980 -8- LITTLE SUNFISH: Administrator Whittaker noted, besides the culvert, we would have to replace the driveway and would probably have easement costs. Engineer Bohrer noted this would not endanger any residents:or buildings, but it would take more property. Al Lehman, 3M , still has problem with some of the L'hgineer's numbers. Ile feels the problem is primarily due to the surface run—off, not the ground water. From 'their .records surface water had the most extreme change in the five ,years that they have kept records. For instance, in five days in late August, we had a, five inch rain., Little Sunfish rose 4.1 ft., Lake limo rose less 'than a foot, Horseshoe rose 1 ft. Then, after a period of time of little rainfall, Sunfish receded to a point that is just a little above Horseshoe Lake (a foot or so above). In the five years of records Little Sunfish has never been lower than Horseshoe Lake. Lhgineer Bohrer said that theiopographic map the City has the water elevation on Little Sunfish Lake was 864.5. Now, it is about 15 .ft. above that. He said this must be due to the water table as well as surface water. Horseshoe has been down in that period to time, also. The water table in the entire area is up. Mayor Armstrong asked if Sunfish and Horseshoe rise and fall together? Mr. Lehman replied no, Sunfish is alway a little higher than Horseshoe. Little Sunfish is more affected by a heavy rainfall than Horseshoe or Lake Elmo. Armstrong asked if Horseshoe would rise if Sunfish was 6 feet higher than Horseshoe? Mr. Lehman said yes, I think it would, over a period of several months. Sunfish does recede to an elevation somewhat above horseshoe„ so it -gets into the ground water area. that goes directly to Horseshoe. The reverse is a,1so truo. If you pump Sunfish down, it will rise to the level of Horseshoe Lake. Even if there is some sealing of -the lake and, although there may by a seal., due to the compaction of County Road 70, water may pass from the south side to the north side if the culvert is plugged and ,you pump from the south side to the north side of Sunfish Lake itself, we don't know that pumping from one side of the road to the other is going to to prevent it from coming back. Engineer Bohrer said the roadbed itself would act like a dike. It is quite wide; but, some seepage may occur, as with any dike. It is not something that would solve the -total problem. We would have to incorporate more of these alternates to gain a higher level of confidence. Mr. Lehman said the basic problem is from storm water, getting a fair amount of rainand having it rise. If you pump out Sunfish, it is going to rise back up to a level that won't handle the storm. Horseshoe is just 2 feet higher in elevation than Sunfish. If you pump it down, it is going to come back up to about the same elevation. - Larry Bohrer replied, that is assuming that the ground water table is the same elevation as the surface on Horseshoe Lake. Mr.. Lehman said their water table tends to slope from west to east so it appears to in in the neighborhood of 78% of Sunfish Lake. The Watershed's obser— vation well, across from Cimarron, just west of Sunfish, has an elevation of 817 for the ground water. Mayor Armstrong asked is pumping from the south to the north, using County 70 as a dike will solve half the problem? Engineer Bohrer explained the relative size of Sunfish is 13A on the north and 8 to 8 1/2 acres on the south. The rise of the land is fairly steep so you don't gain a great amount of area to raise the level a couple of feet. Armstrong said this south to north pumping be considered Alternative LF. Engineer Bohrer said there are a lot of different alternatives, if we are not allowed r to transfer water to Horseshoe, then the other alternatives not considered \, either because of high costs or they did not solve the total problem, now have more importance LAKE ELMO CITY COUNCIL MEETING, OCTOI3rR 219 1980 ..9_ Mayor Armstrong noted that Alternative 1, construction of a flood protection dike, .is going to be done by Cimarron. Steven Taylor confirmed their construction of Alternative 1, then stated, I look upon -the raise of Sunfish Lake encroaching on our property and. any damage to our property as our problem. We are not expecting public money to pay for raising the dike or any damage to our property. It seems the other side of the coin is that if a public body of water rises predictably, and becomes at -health hazard, and there is nothing .further we can do about it, then, this becomes a public problem. Mayor Armstrong asked how .high the dike will be in alternative 1. Tom Noyes, Cimarron Ihgineer, stated basically, we are constructing alternative 1 as listed, but slightly lower. The would provide for a lake level increase of 5 feet with. I foot of free—boexd or less than a 25% chance of flooding due to snowmelt. Armstrong said, if we out tho chance of .flooding from 100% to 2594 what do we have to do to eliminate the 25%. Is it enough to pump 67 1/2 acre feet of water from one side of the road to the other? Councilman Mottaz asked about Tom Noyes? statment that the treatment plant could not stand the pressure if th.e dike is built to the height proposed.. Tom Noyes stated, if we have a lot of pressure greater than 3 ft. differential, we fear structural damage. We have placed piezometers on both sides of the treatment tank in order to monitor this. So, if we start to approach situation, we will have to take some other type of action. But, we see no other choice for Cimarron but to build the protection dike. This is 9,13. we can do. Armstrong asked if the dike is going to be as high as propoed in Alternate 1, Tom Noyes indicated they have not looked at any elevations. We have basically said that we are going to build a dike. We haven't drawn up plans as ,yet. It will probable be the same elevation. Armstrong said, if we assume that Alternate 1 is accomplished, and we reduce our chance of a flood —out to 25%; how much pumping do we have to do to reduce it , as close as possible, to a 0% chance. Larry Bohrer said, the lake level would have to be reduce two to three feet. Armstrong asked if pumping from the south to the north could accomplish this. The Engineer said. yes. Steven Taylor noted that if ,you effectively make a dike out of County 709 now ,you do not have a 22A lake in which to receive the run—off; now ,you have an B acre lake. Larry Bohrer said that if the run—off accumulates on the north side, we still have -to provide a culvert about 3 feet below the low point in the .road so that; I County Road 70 does not wash out. This is not a good alternative. It is just one of the alternatives. This is not the total answer. Armstrong read and reviewed Alternative 31 Gravity outlet -to horseshoe Lake, from the Engineer's Report. Ile asked, if this were put in place with a control valv4 at that point, would we have 100'/ assurance. This would allow us to pull the plug with everyones approval. and keep the water level down. Larry Bohrer said there may still be times when a fast run—off will make the lake rise. Tom. Noyes said, we do recognize, however, that the second effluent is almost 1.00'1 certain to be topped, and that will in itself lower the wetter quality of Sunfish. If we can prevent that; then; any -transfer of water from Sunfish to Horseshoe would be easier, because the water quality will not be as degraded. Armstrong said, with your, dike in place, with Alternate 3 in place and operating before any snowmelt, that would sufficiently reduce it so that there would. be no danger of pollution? Tom Noyes replied, No, it would be past the % .figure of protection, but we still have the absorption pond that; has nutrients from the treated effluent that has a, very good possibility of being mixed with Sunfish Lake. LAKE ELMO CITY COUNCIL MEETINC, OCTOBER 219 1980 _10_ Larry Bohrer noted, like a 100/ chance. That concrete pipe cannot be put in that fast. That is wly 1981 is listed in the report. The only way to get the water out of Sunfish Lake now is to pump it someplace. Mary Leslie « Before previous City Council I have stated that it is visably, apparent l when it rains that the majority of the water comes from Cimarron (that side of the road). You can see the different levels in Sunfish Lake. You can see it higher on Cimarron's side and lower on the side by the house, and see it as it transfers under the driveway to the north side. I would say that the run—off volume is greater from Cimarron than the rest of the watershed. It would appear, from the big storms, that there are different levels in the lake. Also, can the City Council guarantee that the main — stem plan will be adopted or they have some other plan to relieve the con— ditions for the people in West Lakeland and those that are concerned with Tartan Park? Armstrong said this is iap to the Watershed District. Now, we are trying •to explore possibilitj!es to solve the problem. Once we solve the problem, we have to follow that water downstream and see that there is a minimum problem there. kbone is going to come out 100%, A balancing of the interests is necessary, If it means 500 homes have to be closed, this is a very big interest that may outweigh potential flooding of a few ,yards downstream, where those people will not be forced out of their homes. The effect downstream will have to be determined. Mary Leslie asked is the Cimarron plant was a public or private concern. If private is it to be maintained by the private corporation? Armstrong replied that we are not dealing with Cimarron so much as we are dealing with 'the lake level. A lake level, the rise of which has to be taken eaxe of, is not Cimarron's problem alone. The point is not who is going to pay for this. One, there is a problem. We can go back ten years and say this should have been done differently. We have to live with what people have ( done in the past. We have to decide what is best for the future and where we are not. Cranted, maybe 10 ,years ago something could have been done to solve this. None of us expected the water level to rise; but, we have to ask what steps can. be taken to solve the problem. If this means the water has to rise up in Horseshoe for awhile or that more has to go down— stream, then we have to discuss that with the Watershed and see what can be done along those lines. If there is another viable alternative which is going to affect on one downstream, this is the best. Right now this does not appear feasible. Regardless, whether Cimarron is profit makeing or not, when it comes to assessing out the cost, the City is going to have to look at it and decide who bonefitted and who will pay. The time factor right now is important, too. Mary Leslie said, I am not concerned about the cost of pumping Cimarron into Horseshoe Lake. I am concerned about putting suspect water into a City lake. We have to consider all the agencies involved with such action. Jim Palmquist, 3M attorney, We have a water problem. Two weeks ago you realized the difficulty of putting this water. into Horseshoe and downstream. Valley Branch has confirmed the problems of going that route; so the other viable alternative is 'looking to see if there is someplace on the Cimarron property to store the water. Larry Boh.ere addressed this on the surface. I think that before Valley Branch or the City consider any other alternative that the real look ought to be what has to be constructed and what the cost would be to put it on Cimarron's property. This is the first thing. Until that is fully evaluated all the rest sould not be considered. It is only if it is impossible to pump it and store it on their land that we start : looking at other alternatives. LAKE ELMO CITY COUNCIL MEETING, OCT.'OBER 21, 1980 —11— Councilman Mottaz said we are losing sight of the foremost issue, 25% of the citizens of Lake Elmo stand a chance of ' waving to move out of their homes next spring while we figure out how to handle excess water that does not all come from Cimarron, And, maybe, should not be all stored at Cimarron, The only thing we have to address right now is making sure 25°yo of Lake Elmds, residents are not faced with this problem next spring and possibly be faced with finding alternate housing. This is what the Council has to consider, Jim Palmqui.st stated they are interested in the same thing. There is no question between people vs land downstream. People are of the utmost importance. The question is you have to pump it someplace and the first step is to look to Cimarron property, then downstream if that does not work. Mottaz replied, that is provided there is enough time before freeze—up. Jim Palmgiuist — we are not going to know the.viable solution unless we have a report or a study done. Councilperson Novak asked for a clarification on pumping and storage on —site. Larry Bohrer has not estimated what it would cost to build a storage site at Cimarron. Ile feels a storage site would have to be constructed if stored on —site, We are up against a time .frame. We have about 30 days left before it freezes up and pumping cannot be done. You can only transfer so much water in 30 days. Be has not estimated the cost of all the alternatives. They have been looked at in a, preliminary way. He still stands behind his original recommendations and .realizes the problems downstream, Steven Taylor — If the lake continues to come up and the facility overflows, we would have raw sewage running into a public lake. Then, we have water that is much more questionable as tow here you put it if ,you have to pump it. There has been no mixing of the water from the plant or either of the absorption ponds, to date. Al Lehman is still concerned about the protection of the treatment plant. The one proposal of blicking the culvert and pumping to the north side you have about 22 acre feet in Sunfish, 8 acre feet on the south side. In 1977, in a heavy rain, the lake rose !p feet. That's 88 acre feet of excess water, If ,you block the culvert ,you will get most of the water on the south side. That is a 10 foot rise on the south. You could have a rain. that is much less than in 1977; and still have problems. The gravity overflow between the difference on Sunfish now and Horseshoe with the friction loss in the pipe you are just barely getting flow with the present elevation of Horseshoe. If a storm comes ,you, still do not have good protection. The gravity pipe could only drop Sunfish 2 feet from its present elevation. Mottaz said the basic problem can only be resolved if we can pump some water from Sunfish to Horseshoe in the time we have. According to out Engineer this is the only alternative we have for the amount of time available. Larry Bohrer said water will have to be pumped at one time or another. This is the the time of the ,year to do this with a winter season to have it seep; than to try to pump it in the spring with run—off and everything else at maximum elevation. Steven Taylor said the longer ,you wait to pump the greater the risk of contamination. Armstrong asked the Valley Branch Board their reaction, if pumping is the only solution. Al Dornfield, Valley Branch Manager, said the feeling of the Managers is to retain as much water as possible. We have a very small flowage leaving Horseshoe and even that may cause problems like it did last winter when we had ice build up in the channel which created problems all the way up the line to the homes in West Lakeland between Horseshoe Lake and County Road 70. We still do not have the storage capacity downstream. We are very concerned about downstream.. We have pleanty of water coming down there already, Armstrong asked Mr, Dornfield if we take it as a given, that unless some water is removed there is going to be homes without sewage disposal in Cimarron, and we weigh those factors, do you foresee a great deal of damage or potential damage downstream if the water wereto be pumped today. LAKE ELMO CITY COUNCIL MEETING, OCTOBER 21.9 1980 _12_ Al Dornfield replied, I guess, you would have to show us that storing water on the north side of 70 is not practical. I also think ,you hve some storage on the golf course by plugging some so ..m sewers. The simplist way is pumping it downstream, no doubt; but I don't think it is the simplist way for those downstream. Councilman Morgan replied the Council is well aware of being downstream. Part of the reason there is a problem is because there is not more storage sites up —stream. 11hey have a problem up —stream from us but It is not stored. 1200 people live in Cimarron; and, they own their homes. If pumping 60A -feet would protect those homes, I thing, we ought to look for a place to put it. Mr., Taylor responded to the question of storing water on the,golf course. We have approximately 20A on the golf course. You would have to build a dike 3 ft. high all around the golf course and fill the entire course with 3 feet of a water. It is extremely .flat. George hedges asked about flooding existing bonds at the back of Cimarroris property. A resident: responded one small ponding area eould not take more than 2 ft. or the homes would flood. George hedges said these are the questions asked. Ilow much can be held on —site before we start .facing the already flooded situation downstream. No way will it be acceptable to have anyone put out of their homes. Armstrong noted the other problem is the 30 days, How much, time do we have to study all this. There is no time to got all feasibility reports. Mottaz said, exploring on —site and alternate storage should be done; but aver -the winter and. next spring when the danger is over with. He does not think, under the present circumstances and given the time frame and the length of time it takes to do studies, that we should. be developing ponding areas in Cimarron now. We risk winter freeze—up then no pumping / can be done anywhere. l John Leslie, 3M Club, wanted the record to show — He feels Cimarron has been very negligent because 10 years ago exactly the same situation was brough to their attention. It was suggested then they construct a dike and make provision for just this situation. I think, they have been very negligent in the last 10 years. This was brought up to them very emphatically in the Darr Lhgin.eering report, The report said that the dike should be put at an 884 level completely around the sewage plant, in anticipation of such a runs -off as this. Armstrong noted this work is being done now. Since that report there have been many changes,and circumstances the new owners may not have been aware of. Mary Leslie asked about a storage site on the property west of Cimarron. ['here is a natural depression there and Valley Branch has sited this as property that would have to outlet through Sunfish. Does a drain exist there? Dick Stockstead, property owner to the west — They have agreed to store for two 100 year floods. Mary .Leslie said another consideration is Downs Lake which previously flowed through Tartan Park. Downs is not suppose to flow 'through Tartan Park., It is suppose to flow east through Lake Elmo; but in 'that outlet there have been trees planted in the last -two years and a home constructed in close proximity, which may be endangered if the water flows out that way. The people on. the pond, in the middle, are already having problems with spring run—off into the pond, with it backing up onto the drainage easement. If it comes through Tartan Park what guarantee is there for relief to Tartan Park. This would take out their entire golf course. Mottaz said this is not part of this issue. LAKE ELMO CITY COUNCIL MEETING, OCTOBER 21, 1980 -13- Ed 'Bruno, Tartan Park, Reviewed past comments on Oakdale sending water to Lake Elmo. Now, Lake Elmo is considering sending water downstream. This sounds calloused and as though Lake Elmo is not concerned about West Lakeland, Is Lake Elmo giving thought to the people in West Lakeland? Mr. Bruno submitted a letter of concern. Armstrong replied the Council must consider ]3 00 people and their homes. There is concern about downstream effects. What damage will this 60A feet do? Steven Taylor said the question goes beyond 1300 people. The water to be pumped is not polluted now. The risk of pollution a public lake is a public concern, Should pollution occur, what do ,you do with this water? Cimarron cannot stop this from happening. Only the public bodies can prevent the pollution because the lake is rising, not the sewage lagoon. Councilman Pott noted you are talking about pumping 25 acre .fed if you pump from south to north across County 70. Larry Bohrer noted it would be oloser to 50 ft, considering bank sotrage. Councilman Pott said downstream is the only answer that will have significance in time, We axe talking about a situation that may occur next spring, The things mentioned, south to north pumping, on -site storage sites at Cimarron, storage west of Lake Elmo Avenue etc. all need more answers. If these possibilities dont1t work out and we have the anticipated problem next spring, what alternative is there except pumping downstream? Al Bornfield asked about the type of pump and its capacity. Engineer. Rohrer explained. He does not know if pumping could keep up with the run- off in the spring and feels the best solution is to provide the necessary storage this fall. Armstrong noted the most agreeable solution would be to pump across County 70. Engineer Bohror does not think this is a, good solution, The further away the water is from Cimarron the less chance of recycling or seepage, r- Maynard Eder, Valley Branch Manager, said the Board briefly discussed the possibility of pumping the water directly to the storage area south of 10th Street, The impact of this on West Lakeland is not known, but this is a suggestion. This would extend the project beyond the limits of Lake Elmo. George Hedges said the benefit is that before the next run-off you could work on the seepage capacity of that system. You are using it when on one else needs it during the winter. The City would need a cooperative agreement with West Lakeland for, this, Armstrong noted again the time element must be considered. If this is pumped into Horseshoe and .flows downstream how may homes could potentially be damaged? 1�hat elevations would cause damage? 60A.feet over 30 days is not a torrent. Larry Bohrer said in talking about a combination of diking and pumping, you axe proposing lowering Sunfish Lake 3 ;/2 feet, George Hedges noted that the suggestion of direct pumping to the West Lakeland storage site tends to fall on`the shoulders of the Watershed. The 60.A feet of water vs 120 A feet makes the project more palatable. Novak asked if the Board of Managers agree that Cimarron's diking action makes the project easier to sell, Mr. Hodges said ,yes, but noted it would help to have assurance this is a temporary pumping project and additional storage sites will be explored. This proposal is a one-time project. Ile said the City has "led us right up to the door. You do everything you can do here, the only thing left is to punp it downstream". MOTION: Armstrong mated, seconded by Pott, to adopt R-80-619 ordering a, pumping project to remove 60A feet of water from Little Sunfish Lake and pump it to Horseshoe Lake; and that the proper request for permits be made to Valley ;Branch., D.NR, and other required acencies; and easements be secured. 'Discussion:'The .Administrator will organize a committee to meet with West Lakeland and discuss the impact of this action on them and Lake Elmo, and assure them this is a one year temporary project after which Lake Elmo will work on a permanent solution. mW R-80-61 V RESOLUTION CITY OF LAKE ELMO WASHINGTON COUNTY, MINNESOTA A RESOLUTION ORDERING A PUMPING PROJECT TO REDUCE THE FLOOD WATERS ON SUNFISH LAKE IN SECTION 25 AND 36 IN SAID CITY. WHEREAS, the City Council on September 16, 1980, ordered the City Engineer to prepare a Feasibility Report on a possible pumping project to reduce the flood waters on Sunfish Lake in said City; and WHEREAS, said flood waters are presently and continue to endanger the sewage treatment plant that serves Cimarron, an area of 1300 homes in said City; and WHEREAS, said City Engineer has returned said Feasibility Report which finds that said proposed project is feasible; and WHEREAS, a public hearing on the feasibility of said project was held October 7, 1980, and again on October 21, 1980; NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Lake Elmo as follows: 1. The City shall, as soon as possible, commence a pumping project to remove approximately 60 acre feet of water from Little Sunfish Lake to Horseshoe Lake in said City. 2. The City shall make immediate and timely request for all necessary permits from the Valley Branch Watershed District, the Minnesota Department of Natural Resources and any other required permits. 3. The City shall also secure the necessary easements. 4. The City Administrator is directed to organize a committee to meet with the Town of West Lakeland to discuss the impact of this action on the residents of West Lakeland and Lake Elmo and to assure them this project is a one (.1) year temporary project after which Lake Elmo will work on a permanent W solution. 5. The City of Lake Elmo also intends to store a minimum of sixty (60) additional acre feet on Eagle Point Lake and to secure the necessary permission to do so. 6. The City Engineer is further instructed to determine any possible damage that may be caused downstream as a result of this pumping project through the Town of West Lakeland and in the event said pumping appears to be causing problems, a special meeting will be called between the City of Lake Elmo, the Valley Branch Watershed District and the Town of West Lakeland and concerned residents so that a decision can be made at that time as to whether the pumping should be continued. 7. The City also intends to continue to explore potential storage sights in the County Park. Adopted this 21st day of October., 1980, by the City Council., City of Lake Elmo, Washington County, Minnesota. ATTEST: Laurence Whittaker City Administrator Thomas G. Armstrong, Mayor -2- LAKE PJ MO CITY COUNCIL MEETING, OCTOB- 210 1980 -14- MOTION: Jim Palmquist, 3M Attorney, officially objects to pumping to Horseshoe Lake on the basis that Tartan Park may be damaged in some way. Morgan said pumping should be done at a rate agreeable to Valley Branch, and explore the possibility of storing an additional 60acre feet to 100acre feet of water on Eagle Point. George Hedges recommended the City h'onsider purchasing the type of pipe that could be incorporated for use in Project 1006. Pumping will be controlled so as to not endanger homes downstream. Armstrong moved, seconded by Pkt, to amend the motion and add: Th,e City will store a, minimum of 60 additional acre feet on Eagle Point Lake and secure the necessary permission to do so; and, the Engineer is instructed to determine any possible damage that may be caused downstream as a result of pumping 60 acre feet through West Lakeland; and, in the evert the pumping appears to be causing problems, a special. meeting will be called between Lake Elmo, Valley Branch, West Lakeland and. concerned residents; and, a decision will be made at that time to continue the project. Storage sites in the County Park will also be explored. Amendment earrai.ed 5-0. (Storage sites include West Lakeland, loth Street, Cimarron, on —site, property west of County 1.79 Eagle Point Lake, and the County PEwk. ) Motion, as amended, carried 5-0. Pumping will commence as soon as all necessary approvals are received. Engineer Bobrer outlined the sequence of events; 1. Obtain temporary easement from 3M Club to go across Tartan Park property — If this cannot be secured, a request to ET. Earthmovers will be made. 2. Obtain permits from Valley Branch Watershed District and DNR. 3. Obtain a larger pump, if needed. The Magi.neer suggested Cimarron partially block the outlets from their ponds in the southeast corner, if a, safe level of water can be stored without damage to homes. Cimarron indicated they would look into this. The Council will study alternate stibnage sites beginning this winter. Mayor Armstrong closed the hearing at 10 p.m. PROJI T 1006 — BOARD OF MANACFRS Valley Branch has requested a Shoreland. Permit to clean out the outlet around the pump box on Lake Jane for Project 1005. The DNR has been notified. Morgan moved, seconded by Armstrong, to approve the Shoreland Permit for Valley Branch Watershed District to allow them to clean out the outlet around the :pump box on Lake Jane (Project 1005) Motion carried 5-0, The Council had no further comments on the Public Water Map. project 1006 — The Managers reported their engineer is preparing a map with the three alternates and one variation, along with the cost estimate. if the Main Stem Study Committee agrees to one of the alternatives, that alternative will be the one the Managers will take to hearing. Their next meeting will be Tuesday October 28, at 7.30 P.m. LAKE ELMO CITY COUNCIL MEETING, OCTOBER 21, 1980 -15- ANNOUNCENWTS: A County meeting with residents of Big Carnelian will be held October 27, at 7:30 in Scandia. October 219 1980, is City Appreciation Day, November 2L[, 1980, Soo Line Trail Hearing at Lake Elmo Elementary School, ADJOURNMENT: Mottaz moved, seconded by Armstrong, to adjourn at 10:30 P.M. Motion carried 5-0. RESOLUTIONS: 80-59 - Accepting Improvements, DeMontreville Highlands 5th & 6th. Add. 80-60 - 15th Street Vacation 80-61 - Little Sunfish/TIorseshoe Lake Pumping Project 80752 80753 80754 80755 80756 80757 80758 80759 80760 80761 80762 80763 80764 80765 80766 80767 80768 80769 80770 80771 80772 8.0._7.73_ 80830- 80831 CLAIMS TO BE APPROVED AT NOVEMBER 5th COUNCIL MEETING Postmaster - postage. meter Laurence Whittaker - November Expense George Ringwelski - Park Gate October Lydia Richert - November garage rent Northwestern Bell Northern States Power Gerald Dahlberg - October animal control T. A. Schifsky - MC Mix First National Bank - Park Bond Service Charge Washington Cty.Tre.as. - 3rd & 4th 'Quarter Police Junker Sanitation - Fall clean up days (4 dumpsters) Washington Cty. Treas. - Copies of park plans Minn. Fire, Inc. - fire department equipment service Washington National Insurance Co. - Hosp. Allied Group Insurance Trust Minn. Benefit Ass°n General Electric Co. - Radios per bid"fire department Mollie Hedges - 10/28/80 newsletter T.K.D.A. General Legion Pond Beutel Pond. Little Sunfish Park M.S.A. Pass Thru Oakwood Animal Hospital Bruce Rosenau - October Mileage Stillwater Bakery - Election bakery International Harvester Co, - New Fire thru 80841 November 14th payroll $ 247.80 491.48 270.41 1,157.20 79.93 153.63 331.72 Truck chasis 80774 thru 80824 Ballot Counters $ 667.20 Election Judges 965.90 80825 Lowell Vanderhoff - Beutel Pond T 80826 Ken Friedrich - lay pipe (2 days) 80827 Scott Sellers - Lay Pipe (2 days) 80828 Labor Relations Seminar 80829 L. Wwhittaker_ - expense for election judge 200.00 50.00 60.00 50.00 85.03 755.92 333.00 34.65 73.13 27,832.00 632.00 8.00 99.70 372.82 105.62 26.40 2,310.00 140.00 2,732.17 232.50 135.75 23.90 27,628.00 3,800.00 1,633.10 3,500.00 49.60 49.60 20.00 9.51 $ 72,982.40 CLAIMS TO BE APPROVED AT OCTOBER 21, 1980 COUNCIL MEETING 80714 I.C..B.O. - Bldg, Inspector's Book $ 5.00 80715 Capitol Electronics, Inc. - Fire Dept -radio repair 50.05 80716 Minn. Fire, Inc. - Fire Dep't - 2 coats 270.45 80717 Lake Elmo Hardwood Lbr. - fire Dept 7.93 80718 Copy Duplicating Products - .Maint. Agreement 260.00 80719 C & H Oil Company - bulk oil 97.20 80720 James Steele Construction - Maint. Bldg, 2nd pmt. 38,329.20 80721 Soil Exploration Co. - Legion Pond Drilling 2,525.70 80722 Isberg, Riesenberg, Chelseth - Planning 510.00 80723 Tomahawk Live Trap Co. - 1 cat & 2 dog 255.02 80724 Mollie Hedges - 10/14/80 newsletter 140.00 80725 Kern's North Star 279.11 80726 Meyer Mercantile - Fire Department 102,08 Gen'l Maint, 41.50 143.58 80727 Bahls Motor & Implement - Maint. Parts 31.48 80728 Walter S. Booth & Sons - election supplies 5.98 80729 Stillwater Book & Stationery - office supplies 67.06 80730 Minn. Toro, Inc. - Mower Blades 50.06 80731 Ben's Elmo Inn. - Council & Park 91.81 80732 Zignego Agency, Inc. - Park Shelter insurance 20.00 80733 Oakwood Animal Hospital - animal control 94.50 80734 Moelter Construction Co. - Gravel 58,48 '10735 David A. Kirscht & .Assoc. - Park Plan Mylars 2.2.00 ,0736 T. A. Schifsky & Sons - Gravel 580,30 MC Mix 33«33 613.63 80737 R. H. Stafford, Wash. Cty Treas, - M( S Assessment 459.12 80738 Suburban Superintendents - Water School 5.00 807YI thru 807P October. 31st payroll 3,800.00 70 48,19`2.336 *07