Loading...
HomeMy WebLinkAbout09-21-82 CCMCITY COUNCIL MEETING, SEPTEMBER 21, 1982 Mayor Eder convened the meeting at 7:02 p.m. with the following Councillors present: Nottaz, Morgan, Novak and Fraser. Also present Administrator Whittaker. 1. AGENDA Additions - 8. D. Lemire 11. L. Office Sewer Assessment Hearing Date Cleaning M/S/P Morgan/Mottaz to approve the Agenda as amended. Carried 5-0. 2. MINUTES: September 7 and September 13. M/S/P Mottaz/Fraser to approve the minutes of September 7. Carried 5-0. M/S/P Morgan/Eder to approve the minutes of September 13, Special Budget meeting. Carried 4-0-l'. Fraser abstained. 3. CLAIMS: M/S/P Morgan/Mottaz to approve Claims 82916 thru 8300. Carried 5-0. 4. LICENSES: M/S/P Morgan/Mottaz to approve a Masonry Contractor's license for Rivard Masonry, Rt 11 Box 414, St. Joseph, Wi. Carried 5-0. 5. PUBLIC HEARING ON PROPOSED BUDGET -AND FEDERAL REVENUE SHARING Mayor Eder opened the public hearing at 7:10 p.m. - A.. Pay Plan The io cT reviewed the Personnel Committee's recommendations as presented in the Administrator's memo of September 17, 1982, Re. 1983 Pay Plan. Whittaker advised the Council that Ken Carroll is dissatisified with his proposed 1983 salary., Mr.`Carroll believes that with I yr, and XO months experience as a Light Equipment Operator his salary should be closer to'khb"mid-point range; and asked that the Council consider granting him the difference between mid -point and the insurance benefit(.19/hr), which would bring him up to $9.47/hr. Total cost of this change would be $395.20. Whittaker noted that with the changes before the Council the pay plan is at the ceiling for the 8% pay increase set by the Council. --Fraser - acknowledges Mr. Carroll's position; but, since the pay increases are at the 8% maximum and the pay plan was reviewed and developed to provide equity among all the employees it is not feasible to increase Mr. Carroll's salary. --Eder - agreed with Fraser. Questioned the job title for the Senior Secretary. Title should reflect more her background and responsibilities. M/S/P Morgan/Fraser to accept the 1983 Pay Plan as outlined in the Administrator's memo of September_ 17, 1982 - 1983 Pay Plan. B. CTP (lf Pa��rks - Whittaker reported ;the -following recommendations �. and- "-changes £roni the Part. Commission 1. The bleachers in Pebble Park and picnic shelter in Lions Park be delayed past the 5 year CIP. CITY COUNCIL MEETING, SEPTEMBER 21, 1982 -2- B. CIP ( FParks - Continued - 2. The tennis courts in Demontreville 6th will be necessary by 1985 and should remain in the CIP. If the neighborhood does not fully develop by 1985 and no demand is indicated, this can be reevaluated. 3. The ballfields planned for Demontreville 6th Add. and Reid Park should not exceed $2500 per field. The City should not budget the engipeer's-estimate of,$13,41.0"for Demontreville or $5,000 for Reid. If necessary, assistance will be secured from the Army Reserve and/or the Jaycees to do the work. -in order to stay within the $2500 per field cost. 4. The cost of the Vita Course to be reduced from $5,000 to $3,000. The course should be in Sunfish Park, rather than the landfill, as it is a passive use,rt.fits into the natural setting of Sunfish, and would improve the use use of the park in the summer. Additional improvement to the Vita Course can be made in the future, if desired. CA - Whittaker outlined a program to ensure,adequate funds will be available to subsidize the improved CIP while minimizing interest costs and borrowing needs. 1. Combine Fire, Maintenance and Park. Departments Capital Improvement Reserves into one reserve. Revenue surplus left in the.General Fund each year, after operating expenses, would go into the Capital Improvement Reserve. 2. The reserve would be used only to purchase approved Capital Improvements in the 5 yr plans for the three departments. 3. Balance of costs, not adequately covered, would be paid by Equipment Certificates. 4. Donations for specific purposes (is Parks, Fire equipment) would be used only in those departments to pay for items in approved CIP, unless otherwise stipulated by donor. 5. Present Park Reserve and Capital Projects Fund will continue to be used exclusively for Parks. 6. CIP's will be updated and reviewed annually before budget is approved each year. This is a way to balance the reserves and fund the CIP in all three departments- would have to make sure that every year ,subsequent to 1987®there is enough money to finance the parks. The advantage of this program is simplifying the bookkeeping and having a total picture of CIP expenditures.and needs. --Morgan - likes the present breakdown by individual departments - know what departments are in need and which are not, --Fraser - not sure there is any great advantage in changing the reserve program. As they are set up now/could transfer:from.one reserve to cover an expenditure in another. --Novak - making a process out of transferring funds from one reserve to another makes one take a second look at the necessity of the action. --Whittaker - final question is how the the reserves will be divided. Only thing in'thOBudget for,reserves,-now, is $8,000 for Parks. With Increased permit fees and other items discussed, could have about $25,000 total going into some reserve. --Morgan - concern of the Park Commission is that if the reserve is run down to zero then there will be no funds to match the opportunities to get grants; also Equipment Certificates cannot be used to purchase capital improvements for the parks. They felt there should be some minimum put into this reserve to support the program. CITY COUNCIL MEETING, SEPTEMBER 21, 1982 -3- B. CIP (1T Parks - Continued --WIi ttaker - if Park.Reserve is budgeted just to handle the 5 yr program there will be zero in this reserve in 1987. Presently averaging $25,000/yr in expenses - State law prohibits levying this amount in 1987 to support the continuing development program. Should plan on having $25,000 in 1987, unless it is demonstrated that remaining improvements will not be built in 1987 or the next 5 yr planning period. This can be reviewed in 1984. May have to take any surplus from the General Fund and put it into the Park Reserve as this is the only way to finance improvements. Fire and Maintenance equipment can be financed with Equipment Certificates, if need be. The Council agreed that, Whittaker should use the present approach for reserves,- determine the unfunded part of the park program, including their recommendations, and assign this amount to the Parks Reserve with the remaining balance of the levy going into the Maintenance Equipment Reserve. --Eder -- has no problems with the dollar changes recommended by the Park Commission. M/S/'P Fraser./Morgan to accept the recommendations of the Park Commission, as outlined above, and include these recommendations in the over-all Budget. Carried 5-0. (2) Fire Department - No changes were made in their CIP, M/S/P Morgan/Fraser to approve the Capital Improvement Plan for the Fire Department. (3) Maintenance Department - M/S/P Morgan/Fraser to approve the CIP for the Maintenance Department as outlined in the Minutes of September 13, Special City Council Budget meeting. Carried 5-0. D. Waste to Energy/Intern - No action E. Watershed Plans - No action F. Building Permit Fees - Eder reviewed the permit fees and other Budget changes that were approved at the September 13, Special Budget Meeting. (Sept. 13, minutes attached.) M/S/P Morgan/Mottaz to assigns14,582.to the Maintenance Equipment Reserve. Carried 5-0. M/S/ Morgan/Fraser to adopt-R-82-50, a Resolution approving the, 1983 .budget and levy. --Whittaker - $6,000 is still included under Waste/Energy Plant for an Intern or related use. No answer on reimbursed costs has, been received from the County to date. The Council agreed to leave this amount in the Budget. *amended Motion carried*-5--0. 4-1. Novak opposed because Intern budgeted 10/5/82 without County commitment for reimbursement. There was no audience comments on the 1983 Budget Mayor Eder closed the public hearing at 8:50 p.m. CITY COUNCIL MEETING, SEPTEMBER 21, 1982 -4- 6. JOHN MADOLE, WASHINGTON COUNTY - LEAF COMPOSTING PROGRAM; Lisa Musiker, representing John Madole, outline the proposed leaf composting project; after which, Brian Gulla, St. Paul Department of Public Works, presented a slide review of a pilot program initiated in St. Paul. Ms. Musiker said this is an opportunity for Lake Elmo to participate with Washington County and the City of St. Paul in this composting program; and requested the City Council's endorsement of the project and assist in developing a flyer that will notify residents of the program and how they can participate. A_list of participating Lake Elmo haulers will be made available. Mg. Musiker also requested City assistance in mailing out the flyers to Lake Elmo residents. --Morgan - much in favor M/S/P Morgan/Novak to support and participate in the Leaf Composting Program; and,-`ass`,-s--t in the prepatation df-a flyer,and notification Qf residents. Details to be worked out with the City Administrator and staff. Carried 5-0. 7. ALLEN DORNFELD--.VBWD - I-94 OUTLET: Mr. Dornfeld appeared to answer questions the Council raised at the last meeting and outlined in the Administrators letter of September 11, 1982. Dick Murray and Ray Brenner were also present. 1. Assessment- Area := Mr. Dornfeld referred to Section 112.501, Waters ed Act that..prohibits assessing areas that are not directly tributary to o.r,.bernefitted:by a.,drainage project. Therefore, the Watershed.does"not ... feel Afton can be assessed, as there is no land in Afton that will be going into this particular drainage system. This is also true of the Woodbury area to the west of Afton. There is no assessment shown for any area south of I-94. --Eder - can the word 'controlled' not be construed to prevent something. Fast Watershed_ phi:lo:sophy proUlded.that'AftQn benefitted by the prevention_of water getting to Afton. This is an abandonment of previous philosophy; not so much based on use of the Afton storage site, but, the potential of upstream water getting to Afton. --Dornfeld - Watershed position is just a reaction to the Water- shed law. 7Eder would the Watershed consider changing its mind and attempt to include Afton, as this has been the philosophy up until recently. --Dornfeld - the Watershed up -held this philosophy when talking about Project 1006 with water going into the Afton Storage Site, but in this case (I-94 Project) there is no plantouse the Afton Storage Site. Believes this project is quite different from what was proposed in the past. --Mottaz - asked Mr. Dornfeld where the water would go if the City does not join with the Highway Department and run the down the freeway and face the potential of another project to go down to County 21 - where would the water go. --Dornfeld - As things stand now, it would eventually end up ( in Afton. The primary reason for the flow design is that it is a cost saving measure - the primary purpose„ - most of r-o-w is purchased and no need to enlarge existing pipes. --Mottaz - what happens if you just let the water go. --Dornfeld - you'll have flooding problems. If it gets high enough at the Afton Storage Site it will back up over the highway. CITY COUNCIL MEETING, SEPTEMBER 21, 1982 -5- 7. ALLEN DORNFELD - VBWD - I-94 PROJECT - Continued --Eder - a point of clarification, the cost benefit is the benefit of putting the pipes down through Afton to protect the Belwin Foundation and others - this was always the cost benefit. If just assume the Main Stem goes down through Afton, then the protection must be in Afton - is this not still the cost benefit rational of the District. --Dornfeld - Yes; but are talking a different system entirely. Would not oppose assessing Afton if it could be shown that it could be legally done. --Novak - theoretically, Lake Elmo could not be assessed if a pipe eras - constructed from Oakdale or North St. Paul but not through Lake Elmo, G 2. Proje'ct/Pipe' Size - =-Dornfel - until recently did not know the actual size of the pipes. Latest information - the pipe from the West Lakeland Storage Site to the proposed rest area along I-94 is 123 cfs capacity. Highway Department is not talking about any outlet from the rest area - feel there is enough seepage capacity to handle the water. Next pipe starts at Co. 21, east of the rest area storage site, and goes to the St. Croix. This pipe is 16 cfs capacity. There is a possibility that things could be regulated and use the existing 123 cfs pipe after their flows have gone through it. This is feasible, not impossible. The Highway Department have never given anyone the right to use their storm drainage conveyance system without a charge. The charge is based on peak flow. The current proposed charge is $235,000 for the use of the pipe. Not sure how much the State will be using the West Lakeland Storage Site. Will be using some of the Lee Richert property for ponding (State purchased all of the Richert property). --Mottaz - how can the State justify charging - not like the pipe belongs to another Country - we're all in the same camp. When they're not using the pipe, and the pipe is sitting.An Lake Elmo property and the City has water to discharge, why should their be a $235,000 charge to use their empty pipe. The Council further discussed pipe size vs pipe size costs. --Morgan - Concerns: 1. The assessment area - Afton - Tri-Lakes 2. Size of the system = 35 cfs is a tremendous amount of water, about 70 a-ft/day - still a very large system 3. 35 cfs is to resolve the existing systems- the new policy for provides storage in only 1%':excess - if provided additional storage areas upstream with ponds, streams, etc. possibly the proposed system could be sized smaller. --Eder - what ponding is this based on? Dornfeld - still using the lakes and their bounce. This system is designed for a 100 yr, event - the 35 cfs will not be going down the pipe continually, -initially it will in order to get the system equalized, to get the lakes down and get some storage.. --Mottaz - not just talking about the lakes, but marsh areas that dry up after the spring run-off - use these areas 365 days out of the year. CITY COUNCIL MEETING, SEPTEMBER 21, 1982 Q. T. ALLEN DORNFELD - VBWD - Continued --Eder - are certain costs reduced proportionately by going to a 30 cfs pipe. --Dornfeld - no great difference. Because of past problems on several of the lakes in the City it was felt the pipe should be sized for the 35 cfs. --Eder - would the Highway Department accept the'City's willingness to take a risk that we have the West Lakeland Storage Site and the capacity to flow to the rest area and no outlet, and pass on the County 21 to the river. --Dornfeld - Can look into cfs capacity for 25 yr and 50 yr events. --Mottaz - still concerned with the assessment question. --Eder - could strongly support if the residents in Afton wore assessed and could make the minimum possible sizing of the pipe, skip the pipe to the river and get the minimum West Lakeland Storage Site possible within tolerances that are consistent with the pipe sizing and assurances that the program for the northwest part of the district will be adequate. --Mottaz - if live by the 1% rule, and if the pumping of Lake Jane is hendUng that problem, there is a strong argument against assessing residents north of Lake Jane for this project. Could not vote on the project without additional answers. Not convinced that.the people-south_'of'the_ freeway are not benefitted. They do not want the water. They have instructed their attorney to fight against running the water down there. If this is the case, they are benefitting, The Council asked Mr;.; Dornfeld to ask the District's Counsel to sustain the argument that Afton be assessed. --Eder - request would be considered provided the cfs could be changed, costs modified, and Aftonwereassessed.. --Dornfeld - will work on these concerns and get back to the Mayor with a response. 8. ENGINEER'S REPORT: - A. Final Payment and Acceptance of Tabl n Park Improvements - Tlie'�Enginee r made a final inspection an recommended that final payment be made. M/S/P Morgan/Mottaz to accept the improvements of the Tablyn Park Roadway and Parking Lot and authorize final payment for the improvements, per the Engineer's recommendation. Carried 5-0. B. Dean_ Johnston Shoreland Permit and Variance - The Engineer recapped the proposa and -he---- riances needed, and referred the Council to his letter of September 15 which addressed 4uestions raised by the Council on September 7. --Eder questioned the driveway location in relation to adjacent property lines. --Whittaker - noted that there is a five foot setback requirement for driveways --Mottaz - this setback severly affects the drainfield area, as the driveway is closer than the required five feet. --Bohrer - apprised the Council of correspondence from Darrel Paulsrud, who owns the second lot to the west, stating that the previous owner, Mona Cohn Bloom, that a portion of their drainfield may be on the Johnston lot. CITY COUNCIL MEETING, SEPTEMBER 21, 1982 -7- 8. ENGINEER'S REPORT B. Dean Johnston Continued - -=Bo rear --If the Paulsrud information is correct, the drainfield would have to pass under the driveway of the adjacent lot to the west (Bonestroo's) and a portion of the blacktop on the cul,de-sac. Bohrer referred to his September 15, letter, paragraph three, regarding his conversation with Mrs. Bloom. He also distributed a copy of in response to Mr. Johnston's the proposed septic system on systems. a letter from Roger Machmier question on the effect of the environment and nearby --Eder - questions to the Engineer - 1, in terms of the variance for the drainfield, septic tank area and driveway, is any more critical than the other? --Bohrer - do riot consider any of the variances being health related. --Novak - when a system is close to the street, does packed snow or snow removal affect the use or efficiency of the system? --Bohrer - variance is to place one leg of the drainfield closer to the righ?hof,-way.line, not up to the blacktop, Would not anticipate that area of the ground wo rld- be frozen. If the snow were completely removed and the area allowed to freeze, this would interfere with the operation of the system. Not in an area close to the blacktop or a-mormally exposed area. -Eder - 2. In your opinion, does the individual sewer treatment system proposed meet the minimum standards of the City's Code with respect to the installation of such system. --Bohrer - yes. The design and installation does meet the standards. 3. In your opinion, will the waste treatment function of this system be adequate to protect the health of adjacent property owners and the body of water, also adjacent to this property, which has the larger public interest. --Bohrer - Yes it does, in so:far that it meets the Code.; and the Code has safety.standards built into it to protect these items. 4, in your opinion, is the location of this system detrimental to the safety of adjacent property owners and the public in a way as to affect the footings of buildings, surface of driveways (ie the cul-de-sac), etc. --Bohrer - No, do not believe it would be detrimental. --Eder - clarified the purpose of his questions. -_ -Whittaker - read the Code requirement concerning off-street parking -location, --Bohrer - this requirement would not al-low-this:system,'as designed, to fit into the area proposed. Do not know if it could be redesigned to allow it. Would be very difficult to take away five feet and still have it fit. --Morgan - if the system were designed five feet smaller would it still meet the code. --Bohrer - do not think so. Driveway is only 10 ft. wide. --Eder - five feet is quite a bit of compromise from what is considered allot in the Tri-Lakes area - use to be 101. CITY COUNCIL MEETING, SEPTEMBER 21, 1982 8, ENGINEER'S REPORT; B. Dean Johnston - Continued -- Mottaz - this would require a.fifth variance. These are not ( small variances - one is 50%, one 60%, another is 50%. -- Morgan - in response to the lot 'size variance - this lot appears to be one of the larger lots in the subdivision being .57 acres - there is only one "larger lot. -- Eder - one distinguishing feature, this lot has the pennisula on it - this adds to the area, but what value does it have to a composite lot - big projection. -- Novak - variances are a big problem - the amount and percentage. Have to consider Pauisrud's letter, -- Darrel Paulsrud, 8195 Hill Trail - was told by the original owner (Mona Cohn Bloom) that there was a septic tank and drainfield that ran under Bonestroo's driveway and in the direction of the old stable (no longer there), that being in the southeast portion of the lot in question. No written documentation as to when the system was installed or to what is there. Only have the verbal acknowledgement of this. Purchased the house from Mrs, Cohn Bloom. -- Bohrer - reconfirmed this converstation with Mrs. Bloom. She stated that she has no knowledge of any septic system on that lot and doesn't believe there ever was one. Confused by the conflicting positions. One of the important things is that if you,amin-fact, dochave a septic system that crosses two other lots what rights do you have or do not have by having that system,located on property that is not your own, -- Paulsrud - other than the fact that it was the original system - the original system out there, does this not hold anything. -- Novak--,- are we talking about rights or would this prevent anything from happening as far as another septic system. -- Bohrer - when this question was brought up last time, did not quite understand the question that there was an existing funcitioning system on the lot. Understood it to mean that there may have been a previous system on the lot. Commented that the only interference that would cause is if that is encountered while excavating for a new system - would have to either remove it(old system, as in the case of a septic tank or some structure) or if a drainfield trench is encountered this would have to be plugged off so the water from the new trench will not short circuit and run someplace else that you don't want it to. -- Paulsrud - looking to be assured that, if his drainfield is on the Johnston property, it won'L be shut off. Has a working system. Has replaced one system and running out of room to replace another one. -- Bohrer - just about impossible to determine if all of that system is functioning or not. Cound not see how the system could continue to function in the winter if it ran under Bonestroo's driveway. No way to verify unless it was --dug for, -- Morgan - there have been variances granted in this area before. Lot is larger than most in the area. If Mr. Johnston uses his land with the variances and the technologies available, will this in any way damage the environment of this subdivision. �, -- Bohrer - in my opinion, no. In the fact that it can meet all of the codes that are presently applicable, those codes have safety features already built-in. As -:an example, when say the septic system is just 50 ft. from the Bonestroo well, that 50 ft. already has a safet' factor built in and, in my opinion, it is not necessary to add on additional safety factors. CITY COUNCIL MEETING, SEPTEMB ER 21, 11982 -9- 8. ENGINEER'S REPORT: B. .Dean Johnston -'Continued /- =-Bo rear — This holds true with the distance that a system 1 has to be above a groundwater table or bedrock condition. The aft. requirement to permit placement a septic system above the water table is considered safe, based on the bes-c available technology. --Novak - if all the safety features are built in, then how far do you go with a variance. --Bohrer -- can only address the engineering features of the septic system. Some of the other variances, set backs for driveways, etc. do not deal with the function or design of the septic system, and, cannot or should not advise the Council on since it is not an engineering dec:ialon. --Eder - what are the specifics on Lila setback of the driveway - adjacent to or not. --Bohrer - it appears from the site plan the edge of the driveway is 1-2 ft away from the property line. --Mottaz - before the Council can give a variance from the driveway setback would have to have a statement from the adjacent property cwner,whose property would be infringed upon, stating he has. no objection. Audience Comments - --Dean Johnston, 8200 Hill Tr. - Basically what .iG being ;XMpesed isa--house that i.s sa.fe for the neighborhood, is consistent with the other homes in the area in terms of the setbacks, the driveway is already existing and was not challenged at the time. This is a new issue. Think all of r the issues raised at the public hearing have been addressed satisfactorily. --Eder - questioned the driveway. --Johnston driveway exists right now _ it is there. It was put in as a part of the access to install the retaining wall. --Eder - do not recall any showing or agreement on a driveway. --Bill Schumacher, 8186 Hill Tr. N. asked for clarification on the closest well,; and asked if there would be any effect on the Klass well that is 60 ft. away. --Bohrer - The Klass well to the east has a lower ground surface eteVbtion, by the well, than. '-some of the upper drainfield runs. However, 3 ft of earth vertically is considered adequate to remove all of the harmful substances that are in the effluent and 3 ft. horizonitally would do the same. --Robert Peterson, 8278 Hidden Bay Ct. N. - lives about 500 ft. from the proposed site. In the 26 yrs has lived in this area has only asked for one variance. See four or five variance here. One so critical to getting closer to the lake, where we know there has been contamination. Do not understand how more than one variance could be considered. --Ben Klass, 8190 Hill Tr. N. - property owner to the east - driveway in question adjoins his property. At the time the driveway was installed had no objection, but, was not asked if he had any objection. Have benefitted too in some respects. Greatest concern is contamination of his well, with drainage that may end up on his property and into his septic system. This is everyone's main concern. Other than that has no objection. At the present time, would have to think over the suggestion of signing an agreementregarding the driveway variance. Would have to discuss it with the neighbors. CITY COUNCIL MEETING, SEPTEMBER 21, 1982 -10- 8, ENGINEER'S REPORT: B. Dean Johnston - Continued W itta er - the principle reason for the driveway setback is for snow piling to avoid piling snow on/in-a neighbors' yard, --Ben Klass - snow piling would be a concern as it would have no place to go but into his yard. --Jan Sovereign, 4415 Olson Lake Tr., 1. Can this home be serviced for fire? Does not believe a fire truck can get into this area and turn around. 2. If this were being done today, it would need over 3x's its present acreage. 3. Should be some research into the septic tanks in that particular area. Many homes, close together, and could be a danger of contaminating the water. 4. The soil the system goes in is important to the drainage. -- Lois DeLong, 8374 Hidden Bay - asked when the lot size was determined - was it during the flood stage early in the year or when the area is drier. Asked when the driveway setback was changed.(Eder responded) --Bohrer - the area was measured from the NOHM which is elevation 930 and was not taken in any relation to where the water was or is. --Whittaker - rei fire protection- no worse than it would be for the other five homes on the pennisula, --Eder - the percent of variances and the number of variances a large concern. If there are unknown safety factors, appears we are giving up clot of safety factors. --Mottaz - too much variance, not satisified with the safety factors to health that are suppose to be built into this system due to the variance that would be required. M/S/ Mottaz/Eder to deny the Shoreland permit with variances for Dean Johnston, based on the number of variances and the percent of variances required to meet the permit and ensure the health, safety and welfare of surrounding homes. Discussion: --Fraser - very tight difficult decision - many pros and cons. Based on the discussion, would have to agree with the motion. --Morgan - denying Mr. Johnston the use of his land. This is nor, different than the way the land presently there is being used. His is coming and they are there. With the modern technology, this house in no way will damage the enviroment any more than the existing homes. Will probably be superior because of the modern technology. He has done everything properly to come before the Council, got the proper technical experts and engineers. If this is denied, the City should go into this area and enforce the literial interruptation of all the ordinances by the existing properties, including surrounding areas on the lake. Have set some precedences in the past and appear to be making an exception to those precedences. --Novak - would like to know about the other septic system. Wouldlike to have the driveway question cleared up. I£ not going to give a variance for the driveway the whole picture changes, and effects the type and location of the septic system. Personally believes that driveways can become a problem. Will not I vote until these two items are addressed. CITY COUNCIL MEETING, SEPTEMBER 21, 1982 -11- 3S ENGINEER'S REPORT: B. Dean Johnston (Continued) --Morgan recommended that in light of the new information on the driveway ordinance, Mr. Johnson be given time to revise his plan so that a variance would not be required;. and consider another type system, mound, in order to meet the requirements. --Bohrer - under the new Washington County Ordinance a mound system is not permitted as a first installation. It is only allowed as an installation after the initial system has failed and there is no opportunity to put a covential system in. Motion carried 3-171. Morgan opposed. Novak abstained. C. Cost estimate for Demontreville Access Plan - The Engineer resented t'e p propose concept p an for Council review. The County Traffic Engineer believes 35 mph would be appropriate zoning in this area and would possibly be accepted by state aid people. They asked TKDA to provide the design for a 35 mph design. Bohrer reported this design can be prepared for submittal to the County for a cost not to exceed $300. --Mottaz - questioned the 35 mph design. Demontreville is presently 30 mph from 50th to Highway 36, with 25 mph curves. Why is the County requesting the 35 mph design? --Bohrer - a 35 mph curve would encroach more on Lot, some on Lot 7, and part of Lot 6, Uncertain why they are making the 35 mph request. --Mottaz - original motion requested 30 mph which would require only some property be taken from lot 8 with a possible trade- off between the owner of lot 8 and DNR property. This would .be impossible with the 35 mph design. M/S/P Mottaz/Fraser instructing the -Administrator to senda letter to the County,,- Highway nepartment'requesting that they;: seek a variance from State Aid.Standards to'permit the design of�l.a;30mph- cuufre:'.otODemontreville for the proposed public access. A copy of this letter to be sent to Commissioner Schaefer. Motion carried 5-0. The Administrator will also set up a joint meeting between the County Highway Department, the DNR and the City. E. Patrick Curran - Shoreland Permit and Variance - The Caunci1_reviewed t e Engineers comments and recommendations as outlined in his letter of September 10. this is an aesthetic variance - from 200 ft. setback to 120 ft. from Sunfish.Lake. -- Revisions will have to be.made to up -date the present septic system. Structure will be no closer to the water than it is now. M/S/P Morgan/Novak,.to approve the Shoreland Permit and variance for Patrick Curran, 3607 Kelvin, per the engineers recommendations. Carried 5-0. CITY COUNCIL MEETING, SEPTEMBER 21, 1982 -12- 8. ENGINEER'S REPORT: D. Assessments for Keats Avenue - M/S/P Morgan/Mottaz to adopt R-82�-51, calling+_a public. -hearing on assessments for the Keats Avenue Project, on,_Dctober_20, 1982 at 7:45 p.m. Carridd'5-0. M/S/P Morgan/Jlottaz to call a public hearing on the Lemcire Sewer Assessment on October 20, 1982, at 815 p.m: ,,Carried 5-0 9. WASTE/ENERGY UP -DATE: No report 10. COUNCIL REPORTS: --Mayor Eder - League Meeting - Eder requested Whittaker to make the Council copies of Mr. Ruedels letter, setting criteria for spending in this area. There were no other Council reports. 11. ADMINISTRATOR'S REPORT: A. Computer Quotes - Deferred until October 6. B. Resolution on Highway Bonds - No action C. Park Donations - The Council reviewed the Administrator's recommendation, as presented in his memo of September 20. The Park Commission concurred with this recommendation. M/S/P Morttaz/Morgan to adopt the following Park Donation Policy: Value of land submitted by the developer will be compared to the assessed market value assigned by the County Assessor. If the numbers are comparable, 100% of the County Assessor's value will be used to compute cash park donations. Carried 5-0. (This assumes County value is 90 of Market Value. Will use 100% of market value) D. EMS Meeting (Ambulance Subsidy) - Whittaker notified the Council of t e-change in the meeting date. E. Ordinance 7939 Parking Code - Final Adoption M/S/P Mottaz/Fraser to adopt Ordinance 7939, Parking Code. Carried 5-0. Typographical errors will be corrected before the final document is copied and published. F. Parking on CSAH 17 - Whittaker referred the Council to his Sept em er 17 Agenda memo, explaining the No Parking zone on CSAH 17. G. New Street Name - Guardian Angels Avenue. The City received a request from James Fitzpatrick, Administrator at Guardian Angels Church, requesting that the road in front of the Church be identified as Guardian Angels Avenue. M/S/P Mottaz/Morgan to approve the name of the street in front of Guardian Angels Church as Guardian Angels Avenue. Carried 5-0 H. Ramsey/Metro Watershed Planning Committee - M/S/P Eder/Morgan to approve the appointment of'Laurence E. Whittaker as the City's representative on the Ramsey/Metro Watershed Planning Committee. Carried 5-0. CITY COUIQCIL MEETING, SEPTEMBER 21, 1982 -13 - 11. ADMINISTRATOR'S REPORT: I. Kaiser Minor Subdivision rescind t at the City as ad no response al - Whittaker reported .'Kaiser. M/S/P Morgan/Mottaz to rescind Council approval for a Minor Subdivision and Private Road granted to Joe Kaiser. Carried 5-0. J. County Sand and Gravel Tax - Whittaker reported that other com�mun ties have requested a portion of this tax. He .will secure further information and report back to the Council. If the City qualifies for a share of this tax, it would like to receive it. K. Concrete Piles - Hammes - The County is holding a bond for Tom Au�h, Leon Joyce Construction, pending removal and disposal of the concrete presently stored on the Hammes property. The Council took issue with Mr. Auth's proposal as presented in his letter of September 13. M/S/P Mottaz/Eder to encourage the County to exercise its authority under the Leon Joyce Bond and initiate removal of the concrete piles being stored on the William Hammes property. Carried 5-0. L. Office Cleaning - Whittaker reported that the office cleaning iserferring_with the. --work of the maintenance crew. Dave Dder has indicated that he would like to do the cleaning as a part-time job. His salary would be $3.10/hr. The Council question the amount of time spent cleaning the Fire Hall; and requested that Dave keep track of the time cleaning the Fire Hall, City Office and Council Chambers. The Council would like to keep his salary at about $65 per month. M/S/P Mottaz/Morgan to hire Dave Eder to clean the City Office facility and Fire Hall at $3.10/hr. carried 5-0. ADJOURNMENT: Mottaz/Morgan to adjourn at 10:20 p.m. RESOLUTt(5NS: 82-50 - 1983 Budget 82-51 - Keats Avenue Assessemnt Hearing ORDINANCE 7939 - Parking 82916 82917 82918 82919 82920 82921 82922 82923 82924 82925 82926 82927 82928 82929 82930 82931 82932 82933 82934 82935 82936 82937 82938 82939 82940 82941 82942 82943 82944 82945 82946 82947 82948 82949 82950 82951 82952 82953 82954 82955 82956 82957 82958 82959 82960 82961 82962 82963 82964 82965 82966 82967 CLALTIS TO BE APPROVED AT SEPTEMBER 21, 1982 LAIC ELND CITY COUNCIL MEETING Cub Foods - Bakery & Coffee for election Postmaster - Postage meter Menards - Frames for maps $ 29.08 Posts-Tablyn Park 87,30 League of Minn. Cities - 2 boo s ocal James McNamara - Bldg. Insp. mtg. 25.13 200.00 116.38 & Regional Planning 26,00 10.00 Donald Moe - Election Judge $ 30.15 Katherine Kamb 30.15 Ann Bucheck 26.80 Shirley Renfroa 30.15 Madeline Tegtmeier 30.15 Audrey Olsen 30.15 Marilyn Schaefer 30.15 Lucille Wohlberg 30.15 Carole Chandler 30.15 Jane Opland 26.80 Bud Schneider 26.80 Lucille Sheridan 30.15 Mary Ann Klaas 30.15 Patricia O'Donnell 26.80 Wanda Springborn 30.15 Verle Thompson 26.80 Vicki Nielsen 30.15 Emily Brenengen 26.80 Phyllis Cram 26.80 Geri Eder 26.80 Rita Schoenecker 26,80 Doris Shogren 30.15 Virginia Schneider 26.80 Florence Swanson 30.15 Suzanne Friesen 18.43 Joyce Mehsikoner 18.43 Nancy Friedrich 18,43 Grace Henning 18.43 Phyllis Nereson 18.43 Delores Radman 18.43 Angelika Menard 18.43 Anita Miller 15.08 Bill Lundquist 15.08 Doris Tauer 15.08 Edwina Lohmann 15.08 Deana Nowezki 15.08 Margie Horning 15.08 Iris Cline 15,08 Marian Konobeck 15.08 Bruce Dunn 71.23 Betty Michels 73.15 - Total Washington County - plat map up -date ICMA - Fire Management Package The Croixside Press - Building Permit supplies Junker Sanitation W h' as ington County Sheriff - 4th Quarter sheriff contract Washington County - Assessors Office -2,031 parcels @ $3.60 1,084.13 746.50 17.25 322,95 42.00 15,621,50 7,311,60 CLAIMS TO BE APPROVED SEPTEMBER 21, 1982 (continued) 82968 Mary Meyer - 9/14/82 newsletter $ 175.00 82969 Chapin Publishing - Water Tower repainting - legal notice 80.94 82970 Metro Waste Control Commission - monthly service chg. 118,03 82971 First National Bank of St. Paul - Equip.Cert. interest 4,950.00 82972 Woodcrafter Signs - Tablyn Park sign 462,00 82973 Ace Blacktop - Tablyn Park Parking Lot - final pmt. 703.65 82974 Husting & Engstrom, Inc, - Keats Ave. - lst pmt. 41,446.41 82975 Duane Grace - Corm -Co inspections 136.50 82976 Mid -Central Fire, Inc. - fire dept.-helmets & air pak 1,336.00 82977 Brookman Motor Sales - - .fire dept. truck repairs 664.45 82978 Kunz Oil Co. - fire dept. 22.20 82979 Charles Schwartz - Bayport Fire Dept. - face shields 40.00 82980 Lake Elmo Oil - Fire Dept. $,108.87 Maint. Dept. 56.17 165.04 82981 Motorola, Inc. - Police Radios — 1,078.00 82982 U. of M. - Dave Wisdorf communications/management skills course 75.00 82983 Vern's GTC - Maint. Dept, truck repair 16.07 82984 Lake Elmo Repair - 79 Ford Dunp repairs 258,88 82985 Bahls Motor & Implement - mint dept. parts 11,08 82986 Del's Sharpening Service - maint dept - parts 20.75 82987 T. A. Schifsky & Sons - MC mix 32,78 82988 G, A. Meyer Mercantile - mint dept - misc.supplies 56.98 82989 thru 83000 October 1st payroll 4,800.00 $ 82,173.20