Loading...
HomeMy WebLinkAbout03-01-83 CCMLAKE ELMO CITY COUNCIL MEETING, MARCH 1, 1983 Acting Mayor Morgan convened the meeting at 7 p.m. Councillors present: Fraser, Dunn and Mazzara. Absent -Mayor Eder 1. AGENDA: M/S/P Fraser/Mazzara to approve the Agenda. Carried 4-0. 2. MINUTES - FEBRUARY 15, 1983: M/S/P Fraser/Mazzara to approve the minutes of February 15, 1983, as submitted. Carried 4-0. 3. CLAIMS: Name correction on Claim 83533 - Mike Pott M/S/P Mazzara/Fraser to approve Claims 835W thru 83550. Carried 4-0. 4. LICENSES: None 5. PUBLIC INQUIRIES: Councillor Mazzara asked about the drainage Problems that exist between Lake Elmo Hardwood and Pete Schiltgen. Whittaker briefly explained the background of the situation. This is not a City problem. Two means of resolution were suggested to Mr. Rogers, LEHL, One, the involvedpropertyowners resolve the problem between themselves. Two, Mr. Rogers petition the City for a proiect. 6. DAVE GARLOFF ^ CABLE COMMISSION REPORT: Mr. Garloff reported that the public hearing will be held on March 10, after which the franchise agreement'will:be submitted to. the Cable.Board for approval. '.Once approved, Croup W- can _start con-_.-.- struction of the system. This is a 20 month construction period. Work in Lake Elmo will be towards the end of this 20 month period. Mr. Garloff indicated that permits for work in the City will likely be requested next year about this time. He then gave a brief presentation of facts concerning the cable system and its time table. 10. ADMINISTRATOR'S REPORT: A. Assistant' Administrator - Whittaker summarized the position of fi— t e—Rersonnel Committee as outlined in the Administrator's Memo of February 25, 1983. M/S/P;Fraser/Dunn accepting the Personnel Committee recommendation, as outlined in the Administrator's Memo of February 25, 1983, and authorizing the Administrator to advertise for an Assistant Administrator, Carried 4-0, B. Dem'on'trevil'le'Access - Whittaker referred the Council to his February 25 memo w ich summarized the present status of the access. He urged Council attendance and support of the DNR position at the March 9 condemnation meeting, C. Board of Review - M/S%P flrTser/Mazzara scheduling the annual Board of Review for May 19, 1983, from 2:30 to 7:36 p.m. Carried 4-0. --Fraser - recommended following the procedure used last year whereby the Councillors and Assessors worked in pairs. Also, the Administrator will invite the Assessors in before the Board of Review to explain the valuation and assessing process to the new Council members. CITY COUNCIL MEETING, MARCH 1, 1983 -2- T. ENGINEER'S REPORT: A. Sinclair S'ho'r'e'land'Perm'it Engineer Bohrer referred the Council to kis letter oP February 17, 1983, which outlines the Shoreland Regulation variances 'requested by Mr. Sinclair in order to construct his home and -the Engineer's recommendations should these variance be granted. The following variances from the Shoreland Regulation are necessary to construct the proposed home: 1, lot size; 2, lot width; 3, setback from normal high water mark; 4, grading and filling to allow 2 to 1 slopes; 5. grading and filling to allow fill below the NOHWM; and, 6, variance from Septic System Regulation for setback of drainfield from structure. Bohrer reported that Mr. Sinclair received a permit from Valley Branch Watershed District to fill below the Normal Ordinary High Water Mark, The septic system will-:be'conventional, not piggy back or mound types.The Council reviewed the site plan and the variance recommendations. John Stine, DNR representative,, presented the concerns of the DNR concerning several of the variances. He referred the Council to his letter of March 1, 1983, He stated that the DNR would have submitted their concerns about the lot division and the lot development, but it was their understanding. that ;the lot division request was denied, The DNR was not notified that the council was reoonsidering the lot division variance as required by State regulation. Mr. Stine then summarized the areas of concern with the variances being requested, The DNR cited the following concerns: 1. The amount of fill (164 cu, yd.) that is proposed to be placed below the Ordinary High Water Level of Lake Olson. 2. The substantial alteration of the natural topography of the lot, 3. The creation of 2:1 slopes, to create upland development area�in the bed of Lake Olson. 4. The location /site of the home - could be redesigned and the driveway located so as to achieve the necessary setbacks for the drainfield and reduce the amount of fill below the OHW mark of Lake Olson.,, Mr. Stine reitterated the request for better cooperation between the City and the DNR concerning early notification of proposals requiring DNR review. --Fraser - asked the possible out come of Mr. Sinclair's pending application. --Stine - possiblity DNR could deny - regulations are very specific regarding placement of fill in lake beds for achieving greater setbacks and for the development of property. Could issue a permit with conditions - such as modification of the site plan or different lay out for the fill. Could approve the application as submitted. Regardless of Council decision, DNR regulations and requirements must be complied with. --Morgan - why are DNR regulations different from Valley Branch? --Stine - DNR looks at public waters from the environmental impact, whereas, VBWD may primarily consider the'i67ater'quantity management aspect. --Bohrer - In response to Councillor Morgan's question - yes, in his opinion, the requested amount of fill is necessary. --Stine - if the home site were redesigned, may need only 50 yards of fill - also, knocking a hole in the hill for the driveway will create a 'tunnel' effect, --Bohrer - explained how the. layout of the house was determined. Need the filled area in order to get the required setbacks for the two drainfield sites. CITY COUNCIL MEETING, MARCH 1, 1983 -3- 7. ENGINEER'S REPORT: A. Sinclair Shoreland Permit - 'nl— = �Tft' position is that the amount of fill proposed is more than the minimum necessary to achieve the purpose. --Pat Sinclair - first submitted a request in July of 1982; perc tests have been done; topos have been done; met 4-5 times with the City Council for the subdivision of the Orchard property and variance; have drawn seven site plans.and was never informed with any of the plans that a permit was needed from the DNR - the City Administrator informed him he needed a permit from Valley Branch - this was applied for and received; notified the City, when the lot division was approved, that variances -would be required - told -that only the Simple Lot.. Division could be discussed'a.t-that.-time. Has; over $2,000 invested in drawn plans. Response to Mr. Stines comments: Present slope on Lake Demontreville is 2:1 - would like to better this with the submitted proposal. Regarding fill in Lake Olson - plans were drawn to meet -the drainfield requirement - this approved by Valley Branch. If the road (Hill Trail) were at the minimum building requirement of 934 there would be no problem with water coming over the road and onto his property. --Whittaker - sent Mr. Sinclair a letter in October of 1982, advising him that he would need a permit from the DNR and Valley Branch. Valley Branch should have further notified him of the DNR requirement. --Fraser this situation is the result of trying to build a house on property where various rules and regulations do not permit it. Request was turned down twice by the Council. Variances are significant - would find it difficult or impossible to approve the variances. Opposed the lot division. MIS/Dunn/Morgan to approve the following variances for Patrick Sinclair, per the Engineer's recommendation'sand subject to an acceptable response from the DNR on the permit request: 1. Variance from Shoreland Regulations for lot size of 0.84 acres where 1.5 acres is required. 2. Variance from Shoreland Regulations for lot width 3. Variance from Shoreland Regulations for structure setback from Normal High Water Mark where 100' is required.- 74' from Lake Demontreville and 54' from the backwater of Lake Olson. 4. Variance from Shoreland Regulations for grading and filling to allow slopes as steep as 2:1 where 6:1 is required. Disturbed slopes be seeded and mulched as soon as possible to minimize erosion. 5. Variance from Shoreland Regulations for grading and filling to allow placement of fill below the Normal Ordinanry High Water Mark. VBWD permit allows 164 CY of fill below the NOBW mark. The location of the erosion control hay bale dike along Lake Demontreville shall be realigned to be parallel with the shoreline; and, the hay bale dikes shall remain in place until turf is established on all slopes. r 6. Variance from Septic System Regulations for setback of drainfield from structure of 10' where 20' is required. Trenches of the Primary Drainfield to be angled slightly as shown on the site plan to better fit the existing contours. Trench lengths of the Alternate Drainfield be modified as shown on the site plan. Drainfield trenches must have 24" of filter rock below the dis tribution Dii)es for hnth »rima rcr a,A CITY COUNCIL MEETING, MARCH 1, 1983 we T. ENGINEER'S REPORT: A. Sinclair ShorE t Con Discussion: �-Morgan - this is the best proposal of any of the questionable lots presented and approved by the Council during the past year. --Mazzara - would like to see a compromise between the DNR and Mr. Sinclair reached. --Fraser - approving these variances will make it more difficult to administer the zoning regulations in the future. Motion carried 3-1. Fraser opposed. B. 1983 StreetR'ehabil'itation Program - Engineer -Rohrer reported on%the public hearing. He noted that the Council has three options - proceed with the project as proposed, amend the method of constructing the improvements, per suggestions from residents at the public hearing, or abandon further consideration of the project. Bohrer concurred with the Administrator's statement that the design,sugg.ested in the Feasibility Report was the minimum design recommended. Not all.of-the cracked areas.were.proposed to be patched - "spot repair"was planned for the worst areas with the overlay bridging other dracked-up failed areas. By not constructing the overlay, many areas of cracked -up blacktop would be left and would not have any proposed repair. City has a rotating seal coating program - these streets would have been up for seal coating had they been suitable for seal coating in 1982, 1983 or 1984. A suggested means of minimizing the cost impact on adjacent property owners might be to apply the cost of an equivalent seal coat as a City participation in the project. This would result in about a 10% cost reduction.to the property owners. --Morgan - suggested delaying the question until the full Council was present. The Council acknowledged receipt of petitions from Tablyn Park, Bordner -Garner Farmettes, Kendridge Addition and Friedrich Heights opposing the project. --Mazzara - driven --through the areas in question - Tablyn Park has some bad areas, but thinks the majority of the roadway is in reasonably good condition. Biggest concern is the Jamaca Ct. (Friedrich Heights) area. This area looks in very bad shape - would suggest going along with the Engineers recommendation for this area and modifying the improvements in the other three areas to spot repair and seal coating. --Sharon Dornfeld, Jamaca Ct. - not dissatisified with the condition of the road. For the amount of traffic that uses this road, residents do not feel $1,000 per household warrants the extent of proposed improvement. --Fraser - Administrator's comments.in his February 25. 1983, Agenda memo were well considered and well taken Listened to the tape of the public hearing noted resident concern about lack of .past`maintenance that resulted in the present repair needs. Engineer's report clearly shows that the areas with the least amount of break-up and repair now are the least expensive to repair- as, those with the most disrepair have the most expense - this says if the project is delayed where it is already needed then the cost will be much greater later on. CIT" COUNCIL MEETING, MARCH 1, 1983 - 5- 7'. ENGINEER'S REPORT: B. 1'98 3� Street" Re'habtllt'a'ti'on� Program --Fraser- Contfnixe`ff _ PFETtions are good and,useful --in letting one know what people believe, but fee7s,thevpetition would be a stronger. -advisory if it said the petitioners had detailed information and understood what the Engineer has submitted and that if the improvement is not done now that the cost may double in 1,2, 3, etc. years. -Dunn asked the Engineer for -a cost comparison on the seal coating cost that the City might absorb - and asked that this be sent out to the residents. Presently, will not support any assessment for any project that the people don''.t want unanimously, such as this. This is his position on any assessments. --Bohrer - did some research on why the streets are in their present condition. Highway Department plan on 35 years as a useful life for their highways and anticipate first reconstruction or, overlay work at about 12 years with a major overlay at 20 yrs. These streets are at 10-13 years for the first reconstructive work - this is not that far out of line all public works have a useful:: life span they will not last forever. All these streets are local and have no through traffic - most of the households have garbage service, septic pumper service, etc. Mn/DOT research indicates that one trip of a_garbage truck has the same effect as 1500 cars - not just the local car traffic, but the services needed that create a lot of wear on the streets. M/S/P Morgan/Fraser to delay the Street Rehabilitation question until the full Council is present. Discussion - --Morgan people are not complaining because the roads are so bad that they are causing them problems - may have to delay rehabilitation until the residents acknowledge the problems and want to follow the Engineer's recommendation. Motion carried 4-0. C. Cottage Grove Ravine —Watershed Plan - Administrator Whittaker referred tie -Council to Engineer Bo rer's memo of February 18, summarizing the comments made at the last watershed meeting. He recommended that the Council authorize the Engineer to prepare a cost estimate for a plan for the City's part of this Watershed and also recommended that the Council support a Joint Powers Agreement as opposed to a Watershed District. The Council reviewed a sample resolution of such an agreement. --Bohrer - indicated that there is no charge to provide a cost estimate= - he will prepare a scope of the project and cost estimate for the next meeting. M/S/P Fraser/'Dunn instructing the Engineer to prepare a cost estimate for preparation of a subwatershed report of the Cottage Grove Ravine Watershed for Lake Elmo. Carried 4-0. D. Section 32 Land Plan Up -Date - Engineer Bohrer reported that Fee has receive all t e topo mapping requested for the Section 32 planning area. Copies will be available in the City Office. CIT" COUNCIL MEETING, MARCH 1, 1983 aM. 10,; ADMINISTRATOR'S REPORT: D. VBWD'A'dV'iso'ry-Comm'ittee- Whittaker reported that the City's two A'aysory representatives are up for reappointment, 1 M/S/P Morgan/Dunn endorsing the reappointment of Robert Logue and David Keane to the Valley Branch Watershed Citizens Advisory Committee. Carried 4-0. E. Stop Sign at Ironwood & 27th St.' Ta'b'lyn Park - Whittaker reported that he received a request from residents in Tablyn Park to replace the Yield Sign at the corner of 27th and Ironwood with a Stop Sign. The Maintenance Foreman agreed with the request stating this is a dangerous intersection. M/S/P Dunn/Morgan authorizing the City crew to erect a Stop Sign in place of the Yield Sign at 27th Street on Ironwood Tr. N. Carried 4-0. F. Administrator''s'Va'ca'tion - Whittaker notified the Council that he will --be on vacation March 3 thru March 13. BREAK 8. PLANNING COMMISSION RECOMMENDATIONS: A. Nelson/Hag R'e'z'on'ing - Planning Commission Chairman Prince addressed the Council and explained the Commission"s recnmmendation for denial. Engineer-Rohrer,'at-the-request of. -the Administrator, reviewed l the soils for this proposal, He putsthe soils overlay -map - for this',axea.over the_ -proposed development, He: -.noted d -large portionoftho'area had severe soil -limitations for septic systems.- these are slopes and clay soil conditions. These conditions do not prevent development, but should be taken into consideration. Bohrer stated that mound systems, which have been suggested, are not permitted as a first time septic system under City Ordinance. Tom Loucks, Nelson/Hageman Representative -developers are aware of the constraints - most of the septic concerns relate to slopes rather than bad soil - proposal before the Council is only a concept plan. Addressed the Planning Commission's reasons for denial: 1. Spot Rezoning - existing zoning to south is R-1; 1300 ft. east of the site is Cimarron Park and Tartan Meadows which is also R-1. Believe this proposal is consistent with surrounding zoning. Comp Plan suggests that the long term plan for this land is R-1. Maximum density under R-1 is not requested. Asking for 14 lots on a 32 acre site. 2. Met Council Recommendation to Review Future R-1 Zoning - Comp Plan recently reviewed and approved - believes a good deal of thought given by the PZC and the Council on the current plan therefore, it is reasonable to expect that this proposal would be reviewed and considered under the existing approved Comp Plan. Do not believe these 14 units would greatly impact the R-1 zoning consideration as suggested by the Met Council; also, this 14 unit development in R-1 zoning.fit$in with the existing zoning around the site. CITY COUNCIL MEETING, MARCH 1, 1983 -7- R. PLANNING COMMISSION REPORT: A. Ne'1's'on'gag'en'an'Re'zon'ing - Continued 3. Letter from County Planner Robert Lockyear noted that LockyearSs letter, while stating R-1 zoning would allow greater density than RR zoning, does not acknowledge that the proposal is consistent with the Comp Plan and all the present requirements of the City. In response to the comment on high ground water - agrees with the City Engineer that there will have to be more detailed plans developed at the time of the preliminary plat. Identified the high water table sites and the slope areas where onrsite disposal systems may be a problem. High ground water is located on less than 2 acres of a 32 acre parcel. 4. Soil conditions - no specific comments from the PZC - have addressed and will further develop plans for septic systems in the questionable areas. --Al Borsheim, Gun Club Respresentative - Certified Soil Inspector for PCA - addressed soil questions at the PZC meeting. All 120 soils on the map have high water tables - with water tables running 3/5 feet. All D marked soil types indicate a 12-18% slope. According to County Ordinance cannot put a septic system in any slope area that exceeds 12%. Cannot use drop box or mound systems and have to have less than 12% slope fora septic system. 49 type soils,where there is sand and gravel and the water table is greater than 6 ft. in depth/ creates a rapid perc rate and a possible contamination of Yround water. Another problem area is where the cul-de-sac 11T"'1'.s - area is low and has a 3 ft. water table. Club was ( aware of the development of this property - also aware and familar with the soils as'the same type of soil -runs through the Gun Club property, --Bohrer - 120 soils and steep slopes are areas where septics are either. difficult or cannot be put in. This does not mean a house cannot be placed in this area - only that it is not suitable for a septic system. Could possible place homes on the lots as shown on the concept plan. --Mazzara - asked if it would be reasonable to have the developer buffer his area from the Club. --Whittaker - believe R-1 development can be accomodated on this site if it were redesigned on the east of the property. Ordinance does not specifically provide for a developer to berm and/or buffer his property from commercial. --Fraser - would like to see the long term changes addressed and the effect of the Gun Club on surrounding property. --Loucks - willing to work with the Gun Club on buffering, but want assurance on the zoning of the property. --Rich Rudman,Director of the Gun Club- active in the noise abatement program - Council should be aware that it would be impossible to assure 'a noise reduction to the Nelson/Hageman property until it is physically achieved and can be measured or the Club can prove it has a technique available, at which point some assurance can be made to this effect. --Morgan - outlined the pro and cons for both parties - concerned about the safety factor and some need for a buffer zone and a provision where the Gun Club will not be forced to restrict their activities or leave the City. Also concerned about the soils - Recommended delaying action on the rezoning until the full Council is present - and, suggested the developers and Gun Club meet and try and develop a compromise for buffering and land use. CITY COUNCIL MEETING, MARCH 1, 1983 NO R'. PLANNING COMMISSION REPORT¢ A. Nelson/Hageman Rezoning: MIS/ Morgan/Fraser to defer action Rezoning request until the proposal considered by the full Council. Discussion - on the Nelson Hageman can be reviewed and --Fraser - would like to see a plan where the property owners can proceed with development of their property with cooperation reached between both property owners. --Hageman - despite zdningintends to build -home on this site. Stillwillbe,congerned about the shooting, no matter how many,. homes are built, -Dunn - , as population density increases so increases social and economic problems - when or if property is rezoned_-ptoblems will be created for future residents and/or the Gun Club. Motion carried 4-0. Item deferred until the March 15 meeting. B. Johnson/En�wer' Rezoning - Administrator Whittaker reviewed the Planning Commission recommendation to approve the rezoning, * approve the 'amended M/S/P Fraser/Morgan to rezoning of 3/15/83 a ten (10)acre-parcel to R-1 from Rural Residental owned by Alvin Schaerer, located in Section 4 at the intersection of 55th Street and Demontreville Trail, for Robert Engwer and Ronald Johnson, Grant Land ERA, rezoning applicants, per -the Planning j Commission recommendation. Carried 4-0. 9. OLD BUSINESS: A. ordinance 79,42 - D'og\Licens'es M/'S/P Fraser/Mazzara to adopt Ordinance 7942, an Ordinance amending the term of Dog Licenses and Redodi£ying Chapter 1400 of the 1979 Municipal Code of Lake Elmo. Carried 4-0. B. Ordinance 7943 Licenses - M/S/P Mazzara/Dunn to adopt Ordinance 7943, an Ordinance providing for the City Administrator to issue licenses for coin operated machines and certain occupations and recodifying chapter 1100 of the 1979 Municipal Code. Carried 4-0. ADJOURN: M/S/P Morgan/Dunn to adjourn at 9:30 p.m. Carried 4-0. ORDINANCES: 7942 - Dog Licenses - Recodifying Chapter 1400 7943 - Licensing -Coin Operated & Occupation- Reco3ifying Chapter 1100. CLAIMS TO BE APPROVED AT MARCH 1, 1983 LAKE ELMO COUNCIL MEETING 83506 State Treasurer - DNR well permit $ 5.00 83507 Council of Bldg. Officials -Jim's school 90.00 83508 Lampert Bldg. Center - Wet -Dry shop vac 39.97 83509 Postmaster - postage meter 200.00 83510 Void 83511 Commissioner of Revenue - February state withholding 885.00 83512 St.Treas. - Social Security withheld for Feb. 1,738.34 83513 State Bank of Lake Elmo - February federal wh. 1,893.50 83514 Washington National Insurance - March hose. 1,113.59 83515 Minn. Benefit Assn. - March premium 26.40 83516 Allied Croup Ins. Trust - March premium 88.32 83517 Laurence Whittaker - March expense 50.00 83518 Lake Elmo Associates Ltd - March rent 1,669.00 83519 James McNamara - February mileage 178.60 83520 Ilene Johnson - 2/15 council meeting minutes 98.65 83521 Mary Meyer - 2/22/83 newsletter 200.00 83522 Northwestern Bell 306.18 83523 Northern States Power 1,364.31 83524 Washington County Surveyors Office - map 2.50 83525 T S B Computer Center - water dept. billing 87.50 83526 St. Paul Dispatch - Pump ad $ 58.52 Ag preserve 1'10.20 168.72 83527 Road Rescue - Fire Dept. - EMS- 59.84 83528 Schwantes - Fire dept furnace repair 50.00 83529 M-R Sign Company - maintenance dept. flash tubes 46.38 83530 N,S.P. - maintenance dept. - slag 43.75 83531 I.C.M.A, - Maintenance dept. - book 28.00 83532 Walton Products - shop vac attachments 13.15 83533 Mike Pott - plow & sweep skating rink - parks 263.75 83534 City of North St. Paul - animal control vehicle 125.00 83535 Gerald Dahlberg - February animal control officer 274.00 83536 T K D A - General $ 469.35 Water Department 61.85 201,Step 2 & 3 application 424.55 Pass Thru 167.88 Sec. 32 plan 848.99 Waste to Energy 387.36 M.S.A. 301.63 1983 St. Rehabilitation 592.53 Reid Park Improvements 923.16 4,177.30 83537 thru 83550 March 4th payroll 5,500.00 20,806.75